US8328902B2 - Method of estimating the dust load of an ESP, and a method and a device of controlling the rapping of an ESP - Google Patents
Method of estimating the dust load of an ESP, and a method and a device of controlling the rapping of an ESP Download PDFInfo
- Publication number
- US8328902B2 US8328902B2 US12/530,096 US53009608A US8328902B2 US 8328902 B2 US8328902 B2 US 8328902B2 US 53009608 A US53009608 A US 53009608A US 8328902 B2 US8328902 B2 US 8328902B2
- Authority
- US
- United States
- Prior art keywords
- bus
- rapping
- section
- collecting electrode
- electrode plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active, expires
Links
- 238000000034 method Methods 0.000 title claims abstract description 111
- 239000000428 dust Substances 0.000 title claims description 190
- 239000012717 electrostatic precipitator Substances 0.000 claims abstract description 89
- 239000002245 particle Substances 0.000 claims description 164
- 238000005259 measurement Methods 0.000 claims description 18
- 230000000977 initiatory effect Effects 0.000 claims description 12
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 59
- 230000008569 process Effects 0.000 description 40
- 239000003546 flue gas Substances 0.000 description 33
- 230000001276 controlling effect Effects 0.000 description 26
- 238000011144 upstream manufacturing Methods 0.000 description 21
- 230000008901 benefit Effects 0.000 description 9
- 230000003247 decreasing effect Effects 0.000 description 9
- 230000007423 decrease Effects 0.000 description 8
- 102100030346 Antigen peptide transporter 1 Human genes 0.000 description 7
- 101000652570 Homo sapiens Antigen peptide transporter 1 Proteins 0.000 description 7
- 101001080484 Homo sapiens DNA replication complex GINS protein PSF1 Proteins 0.000 description 7
- 102100030343 Antigen peptide transporter 2 Human genes 0.000 description 6
- 101000652582 Homo sapiens Antigen peptide transporter 2 Proteins 0.000 description 6
- 101000736065 Homo sapiens DNA replication complex GINS protein PSF2 Proteins 0.000 description 6
- 230000000875 corresponding effect Effects 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 239000000446 fuel Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000012716 precipitator Substances 0.000 description 4
- 230000003213 activating effect Effects 0.000 description 3
- 239000012080 ambient air Substances 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 239000002028 Biomass Substances 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000010420 art technique Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 239000010791 domestic waste Substances 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000002440 industrial waste Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 239000003415 peat Substances 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C—MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C3/00—Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
- B03C3/34—Constructional details or accessories or operation thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C—MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C3/00—Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
- B03C3/34—Constructional details or accessories or operation thereof
- B03C3/74—Cleaning the electrodes
- B03C3/76—Cleaning the electrodes by using a mechanical vibrator, e.g. rapping gear ; by using impact
- B03C3/763—Electricity supply or control systems therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C—MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C3/00—Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
- B03C3/34—Constructional details or accessories or operation thereof
- B03C3/86—Electrode-carrying means
Definitions
- the present invention also concerns a device for estimating the load of dust particles on at least one collecting electrode plate of an electrostatic precipitator.
- An ESP has a casing which encloses the discharge electrodes and the collecting electrodes and functions as a flue gas duct through which the flue gas flows from a flue gas inlet, past the discharge and collecting electrodes, and to a flue gas outlet.
- the ESP may contain, inside the casing, several independent units, also called fields, coupled in series. An example of this can be found in WO 91/08837 describing three individual fields coupled in series. Further each of such fields may be divided into several parallel units, which are often referred to as cells or bus-sections. Each such bus-section may be controlled, as regards rapping, power, etc, independently of the other bus-sections.
- said step of controlling, using the measured sparking rate, the rapping of said at least one collecting electrode plate further comprises adjusting the point in time of initiating a rapping event with respect to a selected control sparking rate.
- the rapping of said at least one collecting electrode plate is controlled to occur when the measured sparking rate reaches a selected control sparking rate.
- a rapping rate is adjusted for the purpose of minimizing the difference between the selected control sparking rate and the measured sparking rate at which rapping of said collecting electrode plate is initiated.
- Many known rapping methods utilize a certain rapping rate, i.e., a certain number of rapping events are initiated per hour.
- a known method can be upgraded, such that the rapping rate is adjusted, preferably continuously, or on a periodic basis, so as to initiate a rapping event each time the sparking rate is substantially equal to a selected control sparking rate.
- a rapping control method is provided, which can be combined with known methods, or can be used as a stand-alone method, in which rapping is initiated when needed with respect to the load of dust particles on said at least one collecting electrode plate.
- a further object of the present invention is to provide a method of estimating the present load of dust particles on at least one collecting electrode plate of an electrostatic precipitator (ESP).
- ESP electrostatic precipitator
- This object is achieved by means of a method of estimating the present load of dust particles existing on at least one collecting electrode plate of an electrostatic precipitator, the method being characterized in
- An advantage of this method is that it provides for a simple, yet efficient method of estimating whether or not said at least one collecting electrode plate is “full”. Unlike other measurement methods, such as measuring the dust load with the aid of load cells, the present method does not require much extra equipment, but utilizes, as sensors, the collecting electrode plate and the discharge electrode already existing in the ESP.
- the present method may, furthermore, not necessarily give the load of dust particles on said at least one collecting electrode plate in kilograms, but may give the load of dust particles in relation to the load that said collecting electrode plate can carry at the present operating conditions of the ESP, with respect to the electrical properties of the dust, the flue gas properties, etc. This provides for a more sensitive estimation of the dust load on said at least one collecting electrode plate, an estimation which is sensitive to the actual operating conditions in the ESP.
- Another object of the present invention is to provide a device for controlling the rapping of at least one collecting electrode plate of an electrostatic precipitator (ESP), which device provides for increasing the removal capability of the collecting electrode plates.
- ESP electrostatic precipitator
- a device for controlling the rapping of at least one collecting electrode plate of an electrostatic precipitator said device being characterised in comprising
- a measurement device adapted for measuring the sparking rate between said at least one collecting electrode plate, and said at least one discharge electrode
- control device which is adapted for controlling, using the measured sparking rate, the rapping of said at least one collecting electrode plate.
- An advantage of this device is that it comprises said at least one collecting electrode plate and said at least one discharge electrode that both function as load sensors and also as means of the ESP for collecting dust particles.
- the device requires little extra equipment, since equipment already in place in the ESP is utilized for sensing the sparking rate, which is then used for controlling the rapping in such a manner that a rapping event is initiated when needed with respect to the load of dust particles on said at least one collecting electrode plate.
- a further object of the present invention is to provide a device for estimating the present load of dust particles on at least one collecting electrode plate of an electrostatic precipitator (ESP).
- ESP electrostatic precipitator
- a measurement device adapted for measuring the sparking rate between said at least one collecting electrode plate, and said at least one discharge electrode
- an estimating device which is adapted for estimating the load of dust particles on said at least one collecting electrode plate using the measured sparking rate.
- An advantage of this device is that it provides for simple, yet efficient estimation of whether or not said at least one collecting electrode plate is “full”.
- the present device utilizes the collecting electrode plate and the discharge electrode already existing in the ESP as sensors, thereby reducing the investment cost.
- FIG. 1 is a cross-sectional view and shows an electrostatic precipitator as seen from the side.
- FIG. 2 is a top-view and shows the electrostatic precipitator as seen from above.
- FIG. 3 is a top-view and illustrates the control system of the electrostatic precipitator.
- FIG. 4 is a diagrammatical illustration of the sparking rate and the emission of dust particles.
- FIG. 5 is a diagrammatical illustration of the rapping controlled by sparking rate according to a first embodiment.
- FIG. 6 is a diagrammatical illustration of the rapping controlled by sparking rate according to a second embodiment.
- FIG. 7 is a flow diagram and illustrates the control of rapping of two subsequent bus-sections.
- FIG. 8 a is a diagrammatical illustration of the emission of dust particles according to prior art rapping control.
- FIG. 8 b is a diagrammatical illustration of the emission of dust particles when controlling the rapping according to the flow diagram of FIG. 7 .
- FIG. 9 is a flow diagram and illustrates the control of rapping in a further subsequent bus-section.
- FIG. 10 is a flow diagram and illustrates the control of rapping of two subsequent bus-sections in accordance with an alternative embodiment.
- FIG. 11 is a side view and shows an electrostatic precipitator as seen from the side.
- FIG. 1 shows schematically an electrostatic precipitator (ESP) 1 as seen from the side and in cross-section.
- FIG. 2 shows the same precipitator 1 as seen from above.
- the precipitator 1 has an inlet 2 for flue gas 4 that contains dust particles and an outlet 6 for flue gas 8 from which most of the dust particles have been removed.
- the flue gas 4 may, for instance, come from a boiler in which coal is combusted.
- the precipitator 1 has a casing 9 in which a first field 10 , a second field 12 and a third, and last, field 14 , are provided.
- Each field 10 , 12 , 14 is provided with discharge electrodes and collecting electrode plates as is known in the art, for instance from U.S. Pat. No. 4,502,872, which is hereby incorporated by this reference.
- each field 10 , 12 , 14 is divided into two parallel independent units, called bus-sections.
- a bus-section is defined as a unit having at least one collecting electrode plate, at least one discharge electrode, and at least one power source for applying a voltage between the collecting electrode plate/-s and the discharge electrode/-s.
- the field 10 has a bus-section 16 and a parallel bus-section 18
- field 12 has a bus-section 20 and a parallel bus-section 22
- field 14 has a bus-section 24 and a parallel bus-section 26 .
- Each bus-section 16 , 18 , 20 , 22 , 24 , 26 is provided with discharge electrodes 28 , shown in FIG. 1 , and collecting electrode plates 30 , shown in FIG. 1 and indicated in phantom in FIG. 2 .
- Each of the bus-sections 16 - 26 is provided with an independent power source in the form of a rectifier 32 , 34 , 36 , 38 , 40 , 42 , respectively, which applies a current and a voltage between the discharge electrodes 28 and the collecting electrode plates 30 of that specific bus-section 16 - 26 .
- the flue gas 4 passes the discharge electrodes 28 , the dust particles will become charged and travel towards the collecting electrode plates 30 where the dust particles will be collected.
- Each bus-section 16 - 26 is provided with an individual rapping device 44 , 46 , 48 , 50 , 52 , 54 , respectively, each of which being operative to remove the collected dust from the collecting electrode plates 30 of the respective bus-section 16 - 26 .
- a non limiting example of such a rapping device with so called tumbling hammers can be found in U.S. Pat. No. 4,526,591.
- Each of the rapping devices 44 - 54 comprises a first set of hammers, of which only one hammer 56 is shown in FIG. 1 for each rapping device, adapted for rapping the upstream end of the respective one of the collecting electrode plates 30 associated therewith.
- Each of the rapping devices 44 - 54 also comprises a second set of hammers, of which only one hammer 58 is shown in FIG. 1 for each rapping device, adapted for rapping the downstream end of the respective one of the collecting electrode plates 30 associated therewith.
- Each of the rapping devices 44 - 54 comprises a first motor 60 , shown in FIG. 2 , adapted for operating the first set of hammers, i.e. the hammers 56 , and a second motor 62 , shown in FIG. 2 , adapted for operating the second set of hammers, i.e. the hammers 58 .
- the collecting electrode plates 30 are accelerated, by getting hit by the hammers 56 , 58 , in such a way that the dust falls off the collecting electrode plates 30 in cakes.
- the rapping of the collecting electrode plates 30 thus results in that the dust particles collected on the collecting electrode plates 30 are released and are collected in hoppers 64 , shown in FIG. 1 , from which the collected dust particles are transported away.
- some of the dust previously collected on the collecting electrode plates 30 of the bus-section being rapped is re-entrained with the flue gas 4 and leaves the bus-section in question with the flue gas 8 .
- Every rapping results in a dust emission peak, which may have a size anywhere from large to almost undetectable depending on which one of the bus-sections 16 - 26 is rapped, how and when that one of the bus-sections 16 - 26 is rapped, and what the conditions are of the other bus-sections of the ESP.
- the cleaning of the collecting electrode plates 30 of a bus-section 16 - 26 could be done in different ways.
- Each rapping of the collecting electrode plates 30 of a bus-section 16 - 26 can be referred to as a “rapping event”, which typically lasts for about 10 seconds to 4 minutes, usually 10-60 seconds.
- the rapping events can be performed in different ways and at different time intervals.
- one parameter that can be varied is the current situation, i.e., whether the rectifier 32 - 42 of that specific bus-section 16 - 26 does or does not apply a current to the electrodes 28 , 30 during the rapping event.
- the ability of the particles to stick to the collecting electrode plates 30 during rapping will be higher if the current is applied during the rapping of the collecting electrode plates 30 , than if the current is not applied during the rapping.
- the collecting electrode plate 30 is also not as “clean” at the end of the rapping event, compared to rapping the collecting electrode plate 30 with no current applied, or with a low current applied, such as, e.g., 5% of the normal current.
- a low current applied such as, e.g., 5% of the normal current.
- the hammers 58 on the same occasion or with only one of the sets of hammers 56 , 58 .
- the number of times the hammers 56 , 58 are made to rap the collecting electrode plates 30 will also influence how much of the dust particles on the collecting electrode plates 30 that is removed during the rapping event.
- rapping the collecting electrode plates 30 there are many ways of rapping the collecting electrode plates 30 and each way of rapping will have a slightly different behaviour as regards the amount of dust particles that are removed from the collecting electrode plate 30 and also as regards, which will be shown below, the amount of dust particles that are dispersed in the flue gas and leave the bus-section, or even the precipitator 1 , with the cleaned flue gas 8 .
- FIG. 3 shows a control system 66 controlling the operation of the electrostatic precipitator 1 .
- the control system 66 comprises six control units 68 , 70 , 72 , 74 , 76 , 78 and a control device in the form of a central process computer 80 .
- Each bus-section 16 - 26 is provided with an individual control unit 68 , 70 , 72 , 74 , 76 , 78 , respectively.
- the control unit 68 - 78 controls the operation of the corresponding rectifier 32 - 42 of the bus-section 16 - 26 in question.
- Such control includes control of the voltage/current supplied and counting the number of spark-overs.
- a “spark-over” is defined as a situation when a spark arises between a discharge electrode and a collecting electrode plate due to the fact that the voltage between the discharge electrode and the collecting electrode plate exceeds the dielectric strength of the gap between such electrodes.
- the electrodes are grounded, such that all electrical power available in the system is consumed. As a consequence the voltage between the electrodes drops temporarily to zero volts, which is detrimental to the collecting capability of the collecting electrode plate.
- the control unit 68 - 78 reduces the voltage, and then starts to increase it again.
- the control unit 68 - 78 of the respective bus-section 16 - 26 also controls the operation of the corresponding rapping device 44 - 54 of that respective bus-section 16 - 26 . As indicated above, this control includes when and how the collecting electrode plates 30 are rapped.
- the central process computer 80 controls the control units 68 - 78 and thereby controls the operation of the entire electrostatic precipitator 1 .
- the rapping of the collecting electrode plates 30 is controlled to occur at preset time intervals.
- the preset time intervals are different for the different bus-sections 16 - 26 , due to the fact that a larger amount of dust particles will be collected in bus-sections 16 and 18 of the first field 10 than in the bus-sections 24 and 26 of the third and last field 14 .
- rapping could, according to prior art technology, as an example be performed every 5 minutes for the first field 10 , every 30 minutes for the second field 12 and every 12 hours for the last field 14 . It has been found that this type of control is not optimal and provides an increased dust particle emission and increased power consumption.
- the present invention provides for novel and inventive methods of controlling the rapping of an electrostatic precipitator.
- a first aspect of the present invention it has been found that it is possible to detect when the collecting electrode plates 30 of a bus-section 16 - 26 have collected such an amount of dust particles that a rapping event is required in order not to deteriorate the dust particle removal capability of the bus-section 16 - 26 in question.
- the collecting electrode plates 30 of a bus-section 16 - 26 are full and require rapping.
- FIG. 4 is a diagrammatic illustration of the emission of dust particles EM, the dust particle emission being illustrated by the curve EC, from bus-section 16 as correlated to the time TR elapsed since the collecting electrode plates 30 of that bus-section 16 were rapped.
- the curve EC represents an indirect measure of the amount of dust particles that have been collected on the collecting electrode plates 30 of the bus-section 16 , i.e., the curve EC represents, indirectly, the present load of dust particles on the collecting electrode plates 30 of the bus-section 16 , versus the time since the rapping of those collecting electrode plates 30 .
- present load of dust particles which corresponds to a certain present emission of dust particles EC is given on the lower x-axis, which is denoted “LoAD”, in three discrete levels; “Almost empty”, “Half-full”, and “Almost full”.
- LoAD present load of dust particles which corresponds to a certain present emission of dust particles EC
- the sparking rate i.e., the number of spark-overs per unit of time
- one bus-section e.g., the bus-section 16
- the sparking rate of said one bus-section e.g., bus-section 16
- the curve EC i.e., to the dust particle emission from that one bus-section.
- the measured present sparking rate can be utilized as an indirect measure of the present dust particle emission EC from the bus-section 16 .
- the measured sparking rate can also, due to the fact that the dust particle emission EC indirectly represents the load of dust particles on the collecting electrode plates 30 , be utilized as an indirect measure of the load of dust particles on the collecting electrodes 30 .
- the number of spark-overs per time unit, i.e., the sparking rate, is measured by the control unit 68 controlling the bus-section 16 .
- the control unit 68 will function as a measurement device that measures the sparking rate of the bus-section 16 .
- the bus-section 16 will itself function as a sensor that senses the spark-overs.
- a spark-over means that the electrodes are grounded.
- the measured number of spark-overs is used for controlling the voltage or current supplied to the bus-section 16 by the rectifier 32 . It has now been found that the sparking rate NR, given on the left y-axis of FIG. 4 , as a function of the time TR has a characteristic appearance, as shown in curve SC in FIG. 4 .
- the NR 1 of a bus-section 16 of a first field 10 may be about 10-40 spark-overs per minute.
- the sparking rate NR increases slowly.
- the time TR 1 could, for example, be 4 to 30 minutes. It has now been found that the rapid increase in sparking rate NR coincides with the rapid increase in the emission of dust particles EM.
- both the curve SC, indicating the sparking rate, and the curve EC, indicating the emission of dust particles show a steep increase after the time TR 1 . It is, therefore, possible to use the sparking rate NR as a measure of when the collecting electrode plates 30 are “full” and need to be rapped in order to decrease the emission of dust particles. Furthermore, the load of dust particles on the collecting electrode plates 30 can be estimated from the measured sparking rate.
- the process computer 80 having in this respect the function of a correlation device, can be provided with the curve EC illustrated in FIG. 4 . As alternative the control unit 68 could function as the correlation device. Based on the correlation between the measured present sparking rate and the curve EC of FIG.
- the process computer 80 can estimate the present load of dust particles on the collecting electrode plates 30 . Since the sparking rate curve SC and the dust particle emission curve EC often has a similar principal appearance, as illustrated in FIG. 4 , the sparking rate can in many cases be correlated directly to the load of dust particles, without necessitating the use of the curve EC. While such estimation may give a rather rough output regarding such load, such as “Almost empty”, “Half-full”, and “Almost full”, as is illustrated in FIG. 4 , such information on the load of dust particles on the collecting electrode plates 30 of an individual bus-section, e.g., the bus-section 16 , is still very useful information in the control of the electrostatic precipitator 1 .
- such information can also be utilized for, e.g., detecting mechanical and electrical problems in the rapping devices, the collecting electrode plates, etc.
- FIG. 5 illustrates a first embodiment of the manner in which the findings of FIG. 4 are implemented in a control method for controlling when it is time for the control unit 68 to cause the rapping device 44 to rap the collecting electrode plates 30 of the bus-section 16 .
- the bus-section 16 itself is used as an on-line measurement device, operating to measure when the collecting electrode plates 30 have reached their maximum collecting capability, i.e., when the load of dust particles on the collecting electrode plates 30 has substantially reached its maximum, and the collecting electrode plates 30 thus need to be rapped.
- a particular advantage of using the bus-section 16 itself as part of an on-line measurement device is that all parameters that affect the collecting capability of the collecting electrode plates 30 , such parameters including, e.g., the amount of flue gas 4 , the fuel quality, the humidity and temperature of the flue gas 4 , the physical and chemical condition of the collecting electrode plates 30 , the physical and chemical properties of the dust particles, etc., are automatically and implicitly accounted for, because such control method reacts when the collecting electrode plates 30 cannot collect more dust particles without sparking, such sparking resulting in a decreased collecting efficiency, as will be described hereinafter.
- the bus-section 16 will form part of a measuring device measuring the load of collected dust particles on the collecting electrode plates 30 .
- a control sparking rate NR 2 is chosen, as illustrated in FIG. 5 .
- the value NR 2 could, for example, be 15 spark-overs per minute.
- the control unit 68 continuously monitors the sparking rate. After a rapping has been performed, the sparking rate will follow along the curve SC, as indicated by the arrow SR 1 .
- the control unit 68 detects that the sparking rate NR has reached the preset value NR 2 , the control unit 68 causes the rapping device 44 to rap the collecting electrode plates 30 of the bus-section 16 .
- the sparking rate NR then decreases, as indicated by a broken arrow SR 2 , as a result of such rapping.
- the rapping is controlled and made to occur as soon as the sparking rate has reached the preset value NR 2 .
- the control method in accordance with the first embodiment of the present invention does not depend on time, but initiates a rapping when it is necessary, i.e., when the sparking rate has reached the value NR 2 , a value which corresponds to a rapidly increasing emission of dust particles, as shown in FIG. 4 .
- a rapping is performed as soon as the collecting electrode plates 30 are “full” of collected dust particles, regardless of whether it takes 1 minute or 2 hours to get to that state.
- the sparking rate which is measured on-line by means of the bus-section 16 and the control unit 68 , is utilized as a measure of when it is time to rap the collecting electrode plates 30 , said sparking rate taking all relevant parameters into account.
- NR 2 can be determined in different ways.
- One way is to perform a calibration measurement. In that measurement the emission of dust particles, EM, immediately after the bus-section 16 is measured continuously starting from a rapping and continuing thereafter. All operating data, such as the flue gas properties, the fuel quality and the fuel load, the settings of the rectifier 32 , etc., should be kept as constant as possible.
- the emission of dust particles, immediately after the bus-section 16 can be measured in different manners.
- One manner is to perform an indirect measurement by analysing the voltage and/or current of the rectifier 36 of the bus-section 20 which is located immediately downstream of the bus-section 16 .
- the emission of dust particles from the bus-section 16 will produce a “fingerprint” in the behaviour of the voltage and/or current of the rectifier 36 of the bus-section 20 .
- an increased emission of dust particles from the bus-section 16 can be observed as an increase in the voltage of the rectifier 36 of the bus-section 20 .
- a further manner of measuring the emission of dust particles immediately after the first bus-section 16 is to employ a dust particle analyser, such as an opacity analyser, which is introduced between the bus-section 16 and the bus-section 20 in order to measure the emission of dust particles immediately after the bus-section 16 .
- a dust particle analyser such as an opacity analyser
- the emission EM reaches the maximum allowable value, which has been preset for the bus-section 16
- the corresponding control sparking rate NR 2 is read from the control unit 68 .
- the value of NR 2 is then used to control the rapping and no further measurements of emission of dust particles is needed. It will be appreciated that tests could be performed in alternative ways for finding a suitable value for NR 2 for a bus-section. It is also possible to use other criteria when finding the suitable value for NR 2 .
- One such alternative criteria for selecting the NR 2 could be to strive towards a minimum number of rapping events in the bus-section 16 , simultaneously with a minimum number of spark-overs in a downstream bus-section 20 .
- the optimum value for NR 2 will be specific for each bus-section of the electrostatic precipitator 1 , since there is always some variation in the conditions, also between the parallel bus-sections 16 , 18 of one field 10 . Furthermore, there will also be differences between electrostatic precipitators having the same design, but installed in different power stations.
- Suitable values of NR 2 could be collected in a database.
- preferred values of NR 2 for different fuels, different mechanical designs of collecting electrode plates, discharge electrodes and rapping devices, etc., could be collected.
- a suitable value for NR 2 based on the data of that new electrostatic precipitator 1 , can be found in the aforementioned database. In that way, no calibration measurements would need to be done for each specific installation of an electrostatic precipitator 1 .
- a further alternative of determining a suitable value of NR 2 includes utilizing the control unit 68 .
- the control unit 68 can be made to search for that time TR 1 when the sparking rate starts to increase steeply.
- the control unit 68 may calculate the derivative of the curve SC.
- the time TR 1 can be found at that point in time when the derivate of the curve SC suddenly increases.
- the value of NR 2 could be chosen as that value of sparking rate NR that corresponds to the time TR 1 .
- Such a conservative approach is not always preferable, because it may result in an unduly high frequency of initiating rapping events.
- the background is that the collected dust particles form so called dust “cakes” on the collecting electrode plates 30 .
- NR 2 can be chosen to be a higher value than that occurring at the time TR 1 .
- the dust cake formed on the collecting electrode plates 30 may have a very low mechanical strength and integrity resulting in more of the collected dust particles being mixed with the flue gas at the rapping, compared to that, which is obtained with the present invention.
- FIG. 6 illustrates a second embodiment of the manner in which the findings of FIG. 4 can be implemented in a control method for controlling when it is time for the control unit 68 to cause the rapping device 44 to rap the collecting electrode plates 30 of the bus-section 16 .
- the curve SC illustrating the relation between the time TR and the sparking rate NR, as shown in FIG. 6 , is identical to the curve SC shown in FIGS. 4 and 5 .
- the rapping device 44 performs rapping at a certain rapping rate, i.e., a certain number of rapping events per unit of time.
- the rapping rate is controlled by the sparking rate and is changed on a continuous basis with the aim of finding a rapping rate that starts a rapping event just as the sparking rate reaches a desired value.
- the rapping rate may initially be set to 15 rapping events per hour. This means that the time to elapse between the start of each rapping event is 4 minutes.
- a rapping event is started after a time T 1 of 4 minutes has elapsed since the start of the immediately preceding rapping event.
- the sparking rate N 1 at the time rapping is initiated, is, e.g., 10 spark-overs/minute. Since N 1 is lower than a desired control sparking rate NR 2 of 15 spark-overs/minute, the control unit 68 sets the rapping device 44 to decrease the rapping rate.
- control unit 68 may decrease the rapping rate by setting the rapping device 44 to a rapping rate of 10 rapping events/hour, i.e., a time T 2 of 6 minutes will elapse between the start of each rapping event.
- the sparking rate N 2 may correspond to 17 spark-overs/minute. Since this is higher than the desired value NR 2 of 15 spark-overs/minute the control unit 68 may then increase the rapping rate by setting the rapping device 44 to a rapping rate of 12.5 rapping events/hour.
- the control unit 68 gradually tunes the rapping rate of the rapping device 44 to obtain a rapping rate wherein rapping is always performed when the sparking rate is close to the desired control sparking rate NR 2 .
- the rapping rate will be adjusted, that is, the rapping rate will be increased or decreased, by the control unit 68 to obtain such a rapping rate that the sparking rate, at the time the rapping is performed, is close to the desired control sparking rate NR 2 .
- FIG. 6 illustrates a simple way of finding a rapping rate that makes rapping occur when the sparking rate is as close to NR 2 as possible
- an alternative solution is to use e.g. a PID-controller which controls the rapping rate in such manner that rapping occurs when the sparking rate is as close to NR 2 as possible, i.e. the PID-controller strives to find the rapping rate that, at the present conditions, initiates rapping when the sparking rate is close to NR 2 .
- the PID-controller strives to minimize the difference between the selected control sparking rate NR 2 and that present sparking rate at which rapping occurs.
- an upper safety limit on sparking rate to ensure that the number of spark-overs do not exceed a predetermined value.
- a rapping event is immediately initiated.
- an upper safety limit on sparking rate could, in the embodiment described hereinbefore with reference to FIG. 6 , be 18 spark-overs/minute.
- a rapping is immediately ordered by the control unit 68 .
- a lower safety limit on sparking rate to ensure that rapping does not occur to early.
- Such a lower safety limit on sparking rate could be 8 spark-overs/minute.
- the upper and lower safety limits are set to such values that the control of the rapping rate is normally controlled by the PID-controller as described hereinbefore.
- the PID-controller can also be restricted in such a way that the rapping rate can only be controlled within a certain range, for instance within the range of 5 to 20 rapping events/hour for bus-section 16 .
- the PID-controller which controls the rapping rate based on the measured present sparking rate, is allowed to control the rapping rate only within a certain safe “window”, in which there is no risk of mechanical or electrical damage to the ESP. It will be appreciated that it is also possible to utilize other types of controllers and/or control technology, as alternative to the PID-controller type, for controlling the rapping rate.
- control unit 68 could implement the decision as to when to change the setting of the rapping rate of the rapping device 44 , based on several preceding rapping events. For instance, the control unit 68 could calculate an average sparking rate from 10 preceding rapping events. Based on the average of the sparking rate at the start of rapping obtained therefrom the control unit 68 could then effect a change of the rapping rate of the sparking device 44 with the aim of ultimately arriving at an average of the sparking rate at the start of rapping, which is very close to NR 2 .
- electrostatic precipitator 1 is shown in FIG. 3 as having two parallel rows of bus-sections, where bus-sections 16 , 20 and 24 form a first row 82 and bus-sections 18 , 22 and 26 form a second row 84 , the inventive method of FIGS. 4-6 may be employed with an electrostatic precipitator 1 having any number of parallel rows, for instance 1-4 parallel rows of bus-sections.
- the method described hereinbefore with reference to FIG. 4-6 provides a number of advantages when compared to the prior art.
- a method is described which makes it possible to measure, on-line, the present load of dust particles on the collecting electrode plates 30 . That load which is measured is not the exact load in kilograms, but an indirect load which is related to the load capacity of the collecting electrode plates 30 at the present conditions.
- This method of measuring the load on the collecting electrode plates 30 takes into account all relevant parameters, such as the properties of the flue gas 4 , the properties of the dust particles, the properties of the collecting electrode plates 30 , etc., and is therefore more meaningful than a mass-based load measurement.
- the load measurement is used for controlling when the collecting electrode plates are to be rapped.
- such controlling provides control over when rapping is performed such that rapping is only performed when it is needed, i.e., when the emission of dust particles has begun to rise faster.
- the sparking rate of an individual bus-section 16 - 26 at a certain moment in time is used as an indirect measure of the load of dust particles, at that certain moment in time, on the collecting electrode plates 30 of that bus-section 16 - 26 .
- the rapping can be controlled so as to occur before the dust particle emission EC has increased to high levels.
- rapping is controlled so as to not occur so often that the dust particle emission occurring due to re-entrainment of dust in connection with rapping becomes significant. Further, by not rapping too often, the wear on the hammers 56 , 58 of the rapping devices 44 - 54 as well as the power consumption related thereto is kept at a low level.
- a control method is employed in which the rapping of the individual bus-sections 16 - 26 is coordinated in order to thereby minimize the emission of dust particles from the overall electrostatic precipitator 1 .
- rapping is performed some of the dust particles previously collected on the collecting electrode plates 30 is again mixed with the flue gas 8 and leaves the electrostatic precipitator 1 as a dust particle emission peak in the flue gas 8 , as described above.
- the rapping is coordinated in such a way that a rapping event cannot be started simultaneously in two of the bus-sections 16 - 26 .
- bus-section 16 is not allowed to be rapped simultaneously with bus-section 18 , since that could cause a double-sized peak, when dust particles simultaneously released from the bus-section 16 and from the bus-section 18 during rapping leave the electrostatic precipitator 1 with the flue gas 8 .
- FIG. 7 illustrates a sequence of steps of a method in accordance with a first embodiment of the second aspect of the present invention.
- the method can be applied to any two, or more, bus-sections of an ESP, as long as one of the bus-sections is located downstream of the other.
- a bus-section located downstream of the bus-section that is to be rapped is capable of removing the dust particles that are re-entrained during the rapping of the upstream bus-section.
- FIG. 7 illustrates a first embodiment that accomplishes this effect.
- the process computer 80 is provided with an input from a control unit, e.g., the control unit 68 , of a first bus-section, e.g., bus-section 16 , to the effect that the control unit 68 intends to initiate a rapping event in the near future, for example, within 3 minutes.
- a control unit e.g., the control unit 68
- a first bus-section e.g., bus-section 16
- a second step 92 the process computer 80 inquires of the control unit, e.g., the control unit 72 , of a second bus-section, e.g., bus-section 20 , which is located immediately downstream of the first bus-section 16 , regarding the rapping status of the collecting electrode plates 30 of this second bus-section 20 , i.e., the process computer 80 wants to know when and how the collecting electrode plates 30 of the bus-section 20 were last rapped.
- the process computer 80 determines whether the second bus-section 20 is or is not capable of receiving the increased emission of dust particles that will occur during rapping of the first bus-section 16 .
- a criterion for this may be the time that has elapsed since the latest rapping of the second bus-section 20 . If the collecting electrode plates 30 of the second bus-section 20 have not been rapped for some time, for example, if they have not been rapped within the preceding 10 minutes, then the process computer 80 may determine that the second bus-section 20 is not ready to receive the increased emission of dust particles arising from the rapping of the first bus-section 16 , i.e., the answer to the question in the third step 94 , which is shown in FIG. 7 , is “NO”, and thereby the process computer 80 proceeds to fourth step 96 .
- a relaxation time of about 0.5-3 minutes, is allowed after the rapping device 48 has stopped its operation, until the rapping is regarded as being “completed”.
- any dust released from the collecting electrode plates 30 of the second bus-section 20 have time to either fall down into the hopper 64 or to leave the second bus-section 20 and enter a downstream bus-section.
- the process computer 80 allows the control unit 68 of the first bus-section 16 to start a rapping event by activating the rapping device 44 .
- FIG. 8 a is an example of the operation in accordance with a prior art method and illustrates by means of curve AFF therein, the emission of dust particles EM as measured after bus-section 16 of the first field 10 , and by means of curve ASF therein, the emission of dust particles EM as measured after bus-section 20 of the second field 12 .
- rapping is performed in the bus-section 16 .
- the rapping in the bus-section 16 results in a dust particle emission peak PFF measured after the bus-section 16 .
- the collecting electrode plates 30 of the bus-section 20 have not been rapped for quite some time.
- the collecting electrode plates 30 of the bus-section 20 are quite “full” with dust particles.
- the dust particle emission peak PFF after the bus-section 16 results in a large dust particle emission peak, which is indicated in FIG. 8 a by PSF 1 , after the bus-section 20 , since the collecting electrode plates 30 of the bus-section 20 already carry a large amount of dust particles and cannot remove, due to increased sparking and a resulting decrease in the voltage of the bus-section 20 , a sufficient amount of the increased amount of dust particles, which are released by the rapping of the bus-section 16 that occurs at time TR 16 .
- FIG. 8 b illustrates the emission of dust particles when operating according to the second aspect of the present invention, which has been described above with reference to FIG. 7 .
- the emission of dust particles EM as measured after bus-section 16 of the first field 10 is depicted by the curve AFF in FIG. 8 b
- the emission of dust particles EM as measured after bus-section 20 of the second field 12 is depicted by the curve ASF in FIG. 8 b .
- the control unit 68 of the bus-section 16 informs, in the first step 90 , the process computer 80 that the control unit 68 intends to start a rapping event soon, e.g., within the next 3 minutes.
- the control unit 72 of the bus-section 20 to start a rapping event, by activating the rapping device 48 , substantially immediately.
- the bus-section 16 has not been allowed to start a rapping event until the rapping event of bus-section 20 has been completed.
- the rapping of the bus-section 20 is performed at the time TR 20 shown in FIG. 8 b .
- the rapping of the second bus-section 20 at the time TR 20 results in the dust particle emission peak PSF 1 shown in FIG. 8 b . Since the rapping event of the bus-section 20 is started before the collecting electrode plates 30 are full, the peak PSF 1 resulting from the rapping event in the bus-section 20 is quite small, as seen in FIG. 8 b .
- the process computer 80 determines that the rapping event of the bus-section 20 has been completed, i.e., that the rapping device 48 has stopped its operation and after which a period of, e.g., 2 minutes of relaxation has elapsed
- the process computer 80 allows, in accordance with the fifth step 98 depicted in FIG. 7 , the control unit 68 of the bus-section 16 to start a rapping event.
- the rapping event of the bus-section 16 is executed by means of the rapping device 44 at the time TR 16 that is shown in FIG. 8 b .
- the curve AFF depicted in FIG. 8 b which curve AFF illustrates the emission of dust particles after the bus-section 16 , can be seen to be similar to that of FIG.
- the rapping of the bus-section 16 results, also in this case, in the dust particle emission peak PFF, which is shown in FIG. 8 b .
- the second bus-section 20 has, at the time TR 16 , clean collecting electrode plates 30 . Due to this fact, the bus-section 20 is well prepared to absorb the dust particle emission peak PFF resulting from the rapping event of the bus-section 16 .
- the rapping of the bus-section 16 at time TR 16 results in a small dust particle emission peak PSF 2 after the bus-section 20 .
- FIG. 9 illustrates a second embodiment of the second aspect of the present invention.
- the process computer 80 makes use of a further step before the process computer 80 allows a rapping event to start in the first bus-section 16 .
- the steps that are illustrated in FIG. 9 are inserted between the steps 94 and 96 that are illustrated in FIG. 7 , and are normally employed only if the answer to the question in step 94 is “NO”.
- the process computer 80 checks the rapping status in a third bus-section, e.g., in the bus-section 24 , which is located immediately downstream of the second bus-section, e.g., bus-section 20 .
- the process computer 80 instructs the control unit 68 of the first bus-section 16 and the control unit 72 of the second bus-section 20 to wait before starting a rapping event.
- the process computer 80 also instructs the control unit 76 of the third bus-section 24 to start substantially immediately a rapping event by activating the rapping device of the third bus-section 24 , e.g., the rapping device 52 .
- the collecting electrode plates 30 of the third bus-section 24 will have full dust collecting capability.
- the process computer 80 allows the control unit 72 of the second bus-section 20 to start a rapping event as a result of the activation of the rapping device 48 .
- the rapping of the second bus-section 20 is then performed according to step 96 , shown in FIG. 7 . If the answer is “YES” in the step 102 , i.e., that the third bus-section 24 has recently been rapped, then the process computer 80 , with reference to FIG. 9 , proceeds immediately from step 102 to step 106 and thus the second bus-section 20 is immediately allowed to start a rapping event, according to step 96 that is shown in FIG. 7 .
- the control unit 68 can decide, based on the measured present sparking rate in the downstream bus-section, if the downstream bus-section needs to be rapped prior to rapping the upstream bus-section.
- FIG. 10 illustrates a third embodiment of the second aspect of the present invention.
- the control of the rapping of the upstream first bus-section is performed in such a way, that the rapping of the upstream first bus-section must be preceded by a rapping of the downstream second bus-section.
- the process computer 80 is provided with an input from a control unit, e.g., the control unit 68 , of a first bus-section, e.g., bus-section 16 , to the effect that the control unit 68 intends to initiate a rapping event in the near future, for example, within 3 minutes.
- a second step 192 the process computer 80 instructs the control unit, i.e., the control unit 72 , of a second bus-section, i.e. the bus-section 20 , which is located downstream of the first bus-section 16 , to immediately start a rapping event.
- the control unit 72 of the second bus-section 20 then instructs its rapping device, i.e., the rapping device 48 , to perform a rapping of the collecting electrode plates 30 of the second bus-section 20 .
- the process computer 80 checks if the rapping of the second bus-section 20 has been completed such that the collecting electrode plates 30 of the second bus-section 20 have been cleaned and have full dust collecting capability.
- the check in the third step 194 gives the output “NO”, then the check of the third step 194 is repeated after some time, e.g., after 30 seconds, until the output is “YES”, by which is meant that the collecting electrode plates 30 of the second bus-section 20 have been cleaned and are ready to collect the dust particle emission that will be caused by the rapping of the collecting electrode plates 30 of the first bus-section 16 .
- the process computer 80 allows the control unit 68 of the first bus-section 16 to start a rapping event, as illustrated in FIG. 10 . It will be appreciated that the third embodiment of the second aspect of the present invention, as described with reference to FIG.
- the downstream second bus-section is automatically rapped before the upstream first bus-section is rapped. In this manner it will always be ensured that the downstream second bus-section will be ready to collect the dust particle emission resulting from the rapping of the upstream first bus-section.
- the upstream first bus-section will act as the main dust particle collector, while the downstream second bus-section acts as a guard bus-section, which removes any remaining dust particles not collected in the upstream first bus-section.
- downstream second bus-section 20 is rapped prior to each rapping of the upstream first bus-section 16
- a rapping event of the downstream second bus-section 20 is initiated only prior to every second occasion of initiating a rapping event in the upstream first bus-section 16 , such that two consecutive rapping events of the upstream first bus-section 16 will correspond to one rapping event of the downstream second bus-section 20 .
- the process computer 80 checks if a rapping event of a downstream bus-section has been finalized, until it allows an upstream bus-section to initiate a rapping event.
- a further possibility is to design the control method in such a manner that the finalization of a rapping event in a downstream bus-section automatically triggers the initiation of the rapping event of the upstream bus-section. Such a control may in some cases result in a faster control of the rapping.
- FIG. 11 illustrates a fourth embodiment of the second aspect of the present invention.
- FIG. 11 illustrates, schematically, an electrostatic precipitator, ESP, 101 having four bus-sections 116 , 118 , 120 and 122 placed in series.
- the flue gas 104 enters the first bus-section 116 , then continues further to the second bus-section 118 , to the third bus-section 120 , and, finally, to the fourth bus-section 122 .
- the cleaned flue gas 108 leaves the fourth bus-section 122 .
- the first bus-section 116 and the second bus-section 118 form a first pair 124 of bus-sections in which the first bus-section 116 will operate as the main collecting unit, and the second bus-section 118 will operate as a guard bus-section collecting dust particles that have not been removed by the first bus-section 116 .
- the first bus-section 116 and the second bus-section 118 of the first pair 124 of bus-sections may thus be operating in the manner that has been described hereinbefore with reference to FIG. 10 , i.e., a process computer, not shown, will order a rapping event in the second bus-section 118 , prior to allowing the first bus-section 116 to perform a rapping event.
- the third bus-section 120 and the fourth bus-section 122 form a second pair 126 of bus-sections in which the third bus-section 120 will operate as the main collecting unit, and the fourth bus-section 122 will operate as a guard bus-section collecting dust particles that have not been removed by the third bus-section 120 .
- the third bus-section 120 and the second bus-section 122 forming the second pair 126 of bus-sections 120 , 122 may operate in the manner that has been described hereinbefore with reference to FIG. 10 , i.e., a process computer, not shown, will order a rapping event in the fourth bus-section 122 , prior to allowing the third bus-section 120 to perform a rapping event.
- FIG. 10 The embodiment of FIG.
- each bus-section 116 , 118 , 120 , 122 is controlled in an optimized manner for one specific task.
- the first and third bus-sections 116 , 120 are controlled for maximum removal efficiency. It is preferred that the need for performing a rapping event in any of these two bus-sections 116 , 120 is analyzed in the manner described hereinbefore with reference to FIG. 4-6 , i.e., that the sparking rate is utilized as a measure of the present load of dust particles on the collecting electrode plates 30 of those bus-sections 116 , 120 .
- the measured load of dust particles on the collecting electrode plates 30 of the bus-sections 116 , 120 is utilized for controlling when the control unit, not shown in FIG. 11 , of the respective bus-section 116 , 120 should send a request to the process computer that a rapping event needs to be performed for that particular bus-section 116 , 120 . In that way the first and third bus-sections 116 , 120 are only rapped when their respective collecting electrode plates 30 are full of dust particles.
- the second and fourth bus-sections 118 , 122 are controlled to have maximum capability for removing the dust particles that have not been collected in the upstream bus-section 116 , 120 , respectively, and in particular to have maximum capability for removing the dust particle emission peaks generated during the rapping of the respective upstream bus-section 116 , 120 .
- the bus-sections 118 and 120 may never become “full” on their own, the bus-sections 116 and 120 will remove the majority of the dust, and the bus-sections 118 and 122 will function as guard bus-sections to prevent the majority of re-entrained dust from the bus-section 116 , 120 , respectively, to exit the pair 124 , 126 of bus-sections.
- the manner of dividing the ESP into pars of bus-sections as described with reference to FIG. 11 can be utilized for any ESP having an even number of bus-sections.
- the last bus-section can be utilized as an extra guard bus-section, which is controlled for maximum removal of the dust particle emission peaks that occur during rapping of the guard bus-section of the last pair of bus-sections.
- the bus-sections 24 and 26 could have the function of being the extra guard bus-section.
- each pair 124 , 126 of bus-sections will have different main objectives, they could also be designed in different ways as regards the mechanical design, e.g., as regards the size and the number of collecting electrode plates 30 , so as to further optimize the respective bus-section 116 , 118 , 120 , 122 for its main objective.
- rapping is coordinated in such a way that the emission of dust particles from the electrostatic precipitator 1 is decreased compared to that of prior art methods.
- the various embodiments of the second aspect of the present invention makes it possible to decrease the emission of dust particles from an electrostatic precipitator 1 without having to change the mechanical design of the casing 9 and the contents thereof.
- the process computer 80 may be designed to function such that the first row 82 of bus-sections and the second row 84 of bus-sections are operated in such a manner that rapping is not performed in both of the rows 82 and 84 at the same time.
- the process computer 80 can be designed to handle this by effecting control of the rapping in such a way that rapping of the bus-sections 16 and 18 is performed in a staggered manner.
- staggered manner is meant that the rapping of the bus-section 16 is followed by a waiting time of e.g., 3 minutes before bus-section 18 is rapped, then there is another waiting time of, e.g., 3 min after which the bus-section 16 is rapped again.
- the basic method of control would, however, be that which is illustrated in FIGS. 7 , 8 b and 9 ; namely, that rapping of a given bus-section is only allowed if it has been assured that a bus-section downstream of the given bus-section is capable of handling the increased emission of dust particles resulting from the rapping of the given bus-section.
- the second embodiment of the second aspect of the present invention shows the following chain of procedural checks: in order to allow rapping in a first bus-section a check is first made in accordance with step 92 of FIG. 7 , to determine if rapping is needed in the second bus-section. If rapping is required in the second bus-section then a check is made in accordance with step 100 of FIG. 9 , to determine whether rapping is required in the third bus-section.
- all three bus-sections are linked together in such a way that a first check is made from the standpoint of the first bus-section with regard to the second bus-section, and a second check is then made from the standpoint of the second bus-section with regard to the third bus-section.
- An alternative to this way of linking the three consecutive bus-sections together is to make one combined check made from the standpoint of the first bus-section with regard to both the second and the third bus-sections, at the same time, to see if either the second bus-section or the third bus-section is in need of being rapped before a rapping can be performed in the first bus-section.
- a rapping of the second bus-section may be initiated for another reason other than the fact that the bus-section 16 is to be subjected to the start of a rapping event.
- the sparking rate of the second bus-section 20 has reached the value NR 2 as determined by the first aspect of the present invention, which has been described herein previously in connection with a reference to FIGS. 4-6 .
- the start of a rapping event in the second bus-section 20 is triggered by the second bus-section 20 itself and not by the fact that some specified conditions exists in an upstream bus-section.
- bus-section 20 it is preferable, also in such a case, to check, before a rapping event is allowed to be started in the bus-section 20 , the rapping status of a downstream bus-section, e.g., bus-section 24 , to determine whether the latter is required to be rapped.
- the operation would be similar to that described hereinbefore with reference to FIG. 7 , with the bus-section 20 performing the function of the first bus-section and the bus-section 24 performing the function of the second bus-section insofar as the steps indicated in FIG. 7 are concerned.
- first, second and third embodiments of the second aspect of the present invention which has been described hereinbefore with reference to FIGS. 7 , 8 b , 9 , and 10 , have been illustrated for three consecutive bus-sections 16 , 20 , 24 .
- fourth embodiment of the second aspect of the present invention which has been described hereinbefore with reference to FIG. 11 , has been illustrated for four consecutive bus-sections 116 , 118 , 120 , 122 .
- the second aspect of the present invention without departing from the essence thereof, is useful with any number of consecutive bus-sections from 2 or more.
- the second aspect of the present invention would be employed with 2-5 consecutive bus-sections, i.e., electrostatic precipitators 1 having 2-5 fields. It has been described hereinbefore that the first two, three or four bus-sections of the electrostatic precipitator are controlled. It will be appreciated that it is also possible, without departing from the essence of the second aspect of the present invention, to avoid controlling that bus-section/-s located closest to the inlet of the electrostatic precipitator.
- bus-section number 3 In an electrostatic precipitator having 6 consecutive bus-sections numbered 1 - 6 it would thus be possible to control only bus-section number 3 - 5 in accordance with the second aspect of the present invention, in which case bus-section number 3 would be regarded as the “first bus-section”, bus-section number 4 would be regarded as the “second bus-section” etc.
- the second aspect of the present invention could be applied to any two or more consecutive bus-sections located anywhere in an electrostatic precipitator, and that the “first bus-section” need not necessarily be that bus-section being located closest to the inlet of the electrostatic precipitator.
- the “second bus-section” need not be located immediately downstream of the “first bus-section”, it may also be located further downstream of the “first bus-section”. However, it is often preferred that the “second bus-section” is located immediately downstream of the “first bus-section”.
- the first aspect of the present invention which has been described hereinbefore with reference to FIGS. 4-6 , can be utilized for each bus-section of an electrostatic precipitator having one or more bus-sections.
- the process computer 80 functions to control all of the control units 68 - 78 . It is also possible, however, without departing from the essence of the present invention, to arrange one of the control units, preferably control unit 76 or control unit 78 located in the last field 14 , such that said one of the control units functions as a master controller having control over the other control units and operative to send instructions to the other control units.
- each rapping device 44 , 48 , 52 is provided with a first set of hammers 56 adapted for rapping the upstream end of the respective collecting electrode plate 30 , and a second set of hammers 58 adapted for rapping the downstream end of the respective collecting electrode plate 30 .
- each rapping device could be provided with only one of the first set of hammers 56 and the second set of hammers 58 , such that each collecting electrode plate 30 is rapped on either its upstream end, or on its downstream end.
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Mechanical Engineering (AREA)
- Electrostatic Separation (AREA)
Abstract
Description
Claims (12)
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP07103495 | 2007-03-05 | ||
EP07103495.3 | 2007-03-05 | ||
EP07103495.3A EP1967276B1 (en) | 2007-03-05 | 2007-03-05 | A method of estimating the dust load of an esp, and a method and a device of controlling the rapping of an esp |
PCT/US2008/055781 WO2008109595A1 (en) | 2007-03-05 | 2008-03-04 | A method of estimating the dust load of an esp, and a method and a device of controlling the rapping of an esp |
Publications (2)
Publication Number | Publication Date |
---|---|
US20100037767A1 US20100037767A1 (en) | 2010-02-18 |
US8328902B2 true US8328902B2 (en) | 2012-12-11 |
Family
ID=38325550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/530,096 Active 2029-08-07 US8328902B2 (en) | 2007-03-05 | 2008-03-04 | Method of estimating the dust load of an ESP, and a method and a device of controlling the rapping of an ESP |
Country Status (13)
Country | Link |
---|---|
US (1) | US8328902B2 (en) |
EP (1) | EP1967276B1 (en) |
JP (1) | JP5553616B2 (en) |
KR (1) | KR101203933B1 (en) |
CN (1) | CN101626837B (en) |
BR (1) | BRPI0808490A2 (en) |
CA (1) | CA2679288C (en) |
DK (1) | DK1967276T3 (en) |
PL (1) | PL1967276T3 (en) |
RU (1) | RU2481896C2 (en) |
TW (1) | TWI387486B (en) |
WO (1) | WO2008109595A1 (en) |
ZA (1) | ZA200906909B (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120111188A1 (en) * | 2009-07-17 | 2012-05-10 | Her Majesty The Queen In Right Of Canada As Represented By The Minister Of Natural Resources | Hot sieving electrostatic precipitator |
US20120255438A1 (en) * | 2011-04-05 | 2012-10-11 | Alstom Technology Ltd | Method and system for discharging an electrostatic precipitator |
US20140053727A1 (en) * | 2012-08-27 | 2014-02-27 | Stanley J. Miller | Staged electrostatic precipitator |
US20140251371A1 (en) * | 2011-11-29 | 2014-09-11 | Alstom Technology Ltd | Method and a device for cleaning an electrostatic precipitator |
US9339822B2 (en) | 2013-03-15 | 2016-05-17 | Bruce Edward Scherer | Electrostatic precipitator with adaptive discharge electrode |
US20180178222A1 (en) * | 2016-12-22 | 2018-06-28 | Valmet Technologies Oy | Method and arrangement |
WO2019020613A1 (en) | 2017-07-24 | 2019-01-31 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
WO2019020609A1 (en) | 2017-07-24 | 2019-01-31 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
US20200009580A1 (en) * | 2016-12-21 | 2020-01-09 | Koninklijke Philips N.V. | Systems and methods for detecting the status of an electrostatic filter |
WO2020011953A1 (en) | 2018-07-11 | 2020-01-16 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
US11229916B2 (en) * | 2015-12-10 | 2022-01-25 | General Electric Technology Gmbh | Method and system for data capture for electrostatic precipitator control |
US11283245B2 (en) | 2016-08-08 | 2022-03-22 | Global Plasma Solutions, Inc. | Modular ion generator device |
US11344922B2 (en) | 2018-02-12 | 2022-05-31 | Global Plasma Solutions, Inc. | Self cleaning ion generator device |
US11581709B2 (en) | 2019-06-07 | 2023-02-14 | Global Plasma Solutions, Inc. | Self-cleaning ion generator device |
US11695259B2 (en) | 2016-08-08 | 2023-07-04 | Global Plasma Solutions, Inc. | Modular ion generator device |
US11980704B2 (en) | 2016-01-21 | 2024-05-14 | Global Plasma Solutions, Inc. | Flexible ion generator device |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20096157A (en) * | 2009-11-06 | 2011-05-07 | Lo Group Oy | Procedure for cleaning an electric filter cell in an air purifier |
CN102847609B (en) * | 2011-06-29 | 2015-04-22 | 宝山钢铁股份有限公司 | Method for detection of discharge electrode wire rapping effect of dust collection electrode plate in operation of electric dust collector |
US9039815B2 (en) | 2011-08-10 | 2015-05-26 | John P. Dunn | Vane electrostatic precipitator |
US9073062B2 (en) | 2011-08-10 | 2015-07-07 | John P. Dunn | Vane electrostatic precipitator |
US9238230B2 (en) * | 2011-08-10 | 2016-01-19 | John P. Dunn | Vane electrostatic precipitator |
EP2620221A1 (en) * | 2012-01-26 | 2013-07-31 | Alstom Technology Ltd | Rapping an electrostatic precipitator |
KR101688276B1 (en) * | 2014-11-26 | 2017-01-02 | 주식회사 포스코아이씨티 | Micro Pulse System, Electrostatic Precipitator Having The Same, and Method for Controlling Micro Pulse System |
CN108105738B (en) * | 2017-12-12 | 2019-11-15 | 中国恩菲工程技术有限公司 | Waste heat boiler dust control system |
KR102316126B1 (en) * | 2020-06-01 | 2021-10-25 | 황종덕 | Electric Precipitator for ship |
KR102215260B1 (en) * | 2020-08-28 | 2021-02-15 | 한국지질자원연구원 | Control method of electric precipitator used in diesel generator for drilling rig and diesel engine for ship, computer-readable medium having a program recorded therein for executing the same and electric precipitator for diesel engine controlled thereby |
CN112682859A (en) * | 2020-12-08 | 2021-04-20 | 珠海格力电器股份有限公司 | Air conditioner electrostatic dust collector, self-cleaning air conditioner and self-cleaning air conditioner using method |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1091398A (en) | 1965-04-20 | 1967-11-15 | Koppers Co Inc | Improvements in or relating to method and apparatus for an electrostatic precipitator |
US3504480A (en) | 1966-10-21 | 1970-04-07 | Cottrell Res Inc | Electrostatic precipitator rapper control system |
US4285024A (en) * | 1979-05-29 | 1981-08-18 | Research-Cottrell, Inc. | Electrostatic precipitator rapper control system rapper plunger lift indicator |
US4290003A (en) * | 1979-04-26 | 1981-09-15 | Belco Pollution Control Corporation | High voltage control of an electrostatic precipitator system |
JPS57113852A (en) | 1981-01-07 | 1982-07-15 | Hitachi Plant Eng & Constr Co Ltd | Cottrel precipitator |
US4432062A (en) * | 1980-01-17 | 1984-02-14 | Siemens Aktiengesellschaft | Method for optimizing the knock frequency of an electrofilter system |
US4502872A (en) | 1983-03-31 | 1985-03-05 | Combustion Engineering, Inc. | Discharge electrode wire assembly for electrostatic precipitator |
US4521223A (en) * | 1983-07-20 | 1985-06-04 | Siemens Aktiengesellschaft | Method for determining the existence of an optimal interval for rapping the electrodes of an electrostatic precipitator |
SU1588440A1 (en) | 1987-04-06 | 1990-08-30 | Предприятие П/Я В-8796 | Method of automatic controlling of operation of electric precipitator |
JPH02253868A (en) | 1989-03-27 | 1990-10-12 | Mitsubishi Heavy Ind Ltd | Automatic hammering control method for electrostatic precipitator |
WO1991008837A1 (en) | 1989-12-11 | 1991-06-27 | ABB Fläkt AB | Method for reducing the risk of back-corona in an electrostatic precipitator |
WO1997041959A1 (en) | 1996-05-09 | 1997-11-13 | ABB Fläkt Aktiebolag | Method for controlling an electrostatic precipitator |
TW442334B (en) | 1997-11-20 | 2001-06-23 | Midori Anzen Co Ltd | Air cleaning device and electrical dust collecting device |
US6336961B1 (en) * | 1997-06-23 | 2002-01-08 | Sumitomo Heavy Industries, Ltd. | Electric precipitator and electric precipitation electrode used for the same |
US6540812B2 (en) * | 2001-07-06 | 2003-04-01 | Bha Group Holdings, Inc. | Method and system for improved rapper control |
US20050178265A1 (en) * | 2004-02-18 | 2005-08-18 | Altman Ralph F. | ESP performance optimization control |
US7001447B1 (en) * | 2003-04-22 | 2006-02-21 | Electric Power Research Institute | Polarity reversing circuit for electrostatic precipitator system |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB903163A (en) * | 1960-03-15 | 1962-08-15 | Cottrell Res Inc | Improvements in or relating to electrostatic precipitators |
SU618730A1 (en) * | 1972-06-20 | 1978-08-05 | Научно-исследовательский и проектный институт по газоочистным сооружениям, технике безопасности и охране труда в промышленности строительных материалов | Device for control of gas electrostatic purification installation |
GB1479033A (en) * | 1973-08-14 | 1977-07-06 | Masuda S | Electrostatic precipitating apparatus |
US4111669A (en) * | 1975-01-28 | 1978-09-05 | Koppers Company, Inc. | Magnetic impulse rapper control system |
JPS54105376A (en) * | 1978-02-06 | 1979-08-18 | Hajime Suzuki | Automatic cleaning control method of electric precipitator and its device |
SU1080871A1 (en) * | 1983-01-10 | 1984-03-23 | Казахский политехнический институт им.В.И.Ленина | Apparatus for controlling electric wave filter |
SU1286290A1 (en) * | 1985-07-19 | 1987-01-30 | Предприятие П/Я А-7113 | Method of controlling regeneration of electrostatic precipitator |
RU2045091C1 (en) * | 1992-02-27 | 1995-09-27 | Общество с ограниченной ответственностью - фирма "ПИК" | Device controlling gas cleaning process in electric filter |
CN2265248Y (en) * | 1996-06-05 | 1997-10-22 | 甘肃省电力工业局兰州电力修造厂 | Program controller for electromagnetic vibrator |
RU2200343C2 (en) * | 2000-10-05 | 2003-03-10 | Общество с ограниченной ответственностью "ПИК" | Device for controlling gas cleaning process in electrostatic precipitator |
-
2007
- 2007-03-05 EP EP07103495.3A patent/EP1967276B1/en active Active
- 2007-03-05 DK DK07103495.3T patent/DK1967276T3/en active
- 2007-03-05 PL PL07103495T patent/PL1967276T3/en unknown
-
2008
- 2008-03-04 JP JP2009552835A patent/JP5553616B2/en active Active
- 2008-03-04 TW TW097107532A patent/TWI387486B/en not_active IP Right Cessation
- 2008-03-04 RU RU2009136558/03A patent/RU2481896C2/en not_active IP Right Cessation
- 2008-03-04 CN CN2008800071758A patent/CN101626837B/en active Active
- 2008-03-04 WO PCT/US2008/055781 patent/WO2008109595A1/en active Application Filing
- 2008-03-04 BR BRPI0808490-4A patent/BRPI0808490A2/en not_active IP Right Cessation
- 2008-03-04 CA CA2679288A patent/CA2679288C/en not_active Expired - Fee Related
- 2008-03-04 KR KR1020097020610A patent/KR101203933B1/en not_active IP Right Cessation
- 2008-03-04 US US12/530,096 patent/US8328902B2/en active Active
-
2009
- 2009-10-05 ZA ZA2009/06909A patent/ZA200906909B/en unknown
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1091398A (en) | 1965-04-20 | 1967-11-15 | Koppers Co Inc | Improvements in or relating to method and apparatus for an electrostatic precipitator |
US3360902A (en) | 1965-04-20 | 1968-01-02 | Koppers Co Inc | Electrode rapping control for an electrostatic precipitator |
US3504480A (en) | 1966-10-21 | 1970-04-07 | Cottrell Res Inc | Electrostatic precipitator rapper control system |
US4290003A (en) * | 1979-04-26 | 1981-09-15 | Belco Pollution Control Corporation | High voltage control of an electrostatic precipitator system |
US4285024A (en) * | 1979-05-29 | 1981-08-18 | Research-Cottrell, Inc. | Electrostatic precipitator rapper control system rapper plunger lift indicator |
US4432062A (en) * | 1980-01-17 | 1984-02-14 | Siemens Aktiengesellschaft | Method for optimizing the knock frequency of an electrofilter system |
JPS57113852A (en) | 1981-01-07 | 1982-07-15 | Hitachi Plant Eng & Constr Co Ltd | Cottrel precipitator |
US4502872A (en) | 1983-03-31 | 1985-03-05 | Combustion Engineering, Inc. | Discharge electrode wire assembly for electrostatic precipitator |
US4521223A (en) * | 1983-07-20 | 1985-06-04 | Siemens Aktiengesellschaft | Method for determining the existence of an optimal interval for rapping the electrodes of an electrostatic precipitator |
SU1588440A1 (en) | 1987-04-06 | 1990-08-30 | Предприятие П/Я В-8796 | Method of automatic controlling of operation of electric precipitator |
JPH02253868A (en) | 1989-03-27 | 1990-10-12 | Mitsubishi Heavy Ind Ltd | Automatic hammering control method for electrostatic precipitator |
WO1991008837A1 (en) | 1989-12-11 | 1991-06-27 | ABB Fläkt AB | Method for reducing the risk of back-corona in an electrostatic precipitator |
WO1997041959A1 (en) | 1996-05-09 | 1997-11-13 | ABB Fläkt Aktiebolag | Method for controlling an electrostatic precipitator |
US6336961B1 (en) * | 1997-06-23 | 2002-01-08 | Sumitomo Heavy Industries, Ltd. | Electric precipitator and electric precipitation electrode used for the same |
TW442334B (en) | 1997-11-20 | 2001-06-23 | Midori Anzen Co Ltd | Air cleaning device and electrical dust collecting device |
US6540812B2 (en) * | 2001-07-06 | 2003-04-01 | Bha Group Holdings, Inc. | Method and system for improved rapper control |
US7001447B1 (en) * | 2003-04-22 | 2006-02-21 | Electric Power Research Institute | Polarity reversing circuit for electrostatic precipitator system |
US20050178265A1 (en) * | 2004-02-18 | 2005-08-18 | Altman Ralph F. | ESP performance optimization control |
US7081152B2 (en) | 2004-02-18 | 2006-07-25 | Electric Power Research Institute Incorporated | ESP performance optimization control |
Non-Patent Citations (6)
Title |
---|
Article-Automatic Control and Management of Electrostatic Precipitator, Prasad et al. May/Jun. 1999 (Jun. 7, 1999), IEEE Transactions on Industry Applications, vol. 35, No. 3, pp. 561 to 567. |
Article—Automatic Control and Management of Electrostatic Precipitator, Prasad et al. May/Jun. 1999 (Jun. 7, 1999), IEEE Transactions on Industry Applications, vol. 35, No. 3, pp. 561 to 567. |
European Search Report dated Aug. 8, 2007 (EP 07 10 3495). |
Official Notification of the Examination Results from the Russian Patent Office for Application 2009136558 dated Sep. 11, 2012. |
PCT International Search Report and the Written Opinion of the International Searching Authority dated Jun. 23, 2008-(PCT/US08/55781). |
PCT International Search Report and the Written Opinion of the International Searching Authority dated Jun. 23, 2008—(PCT/US08/55781). |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120111188A1 (en) * | 2009-07-17 | 2012-05-10 | Her Majesty The Queen In Right Of Canada As Represented By The Minister Of Natural Resources | Hot sieving electrostatic precipitator |
US8679225B2 (en) * | 2009-07-17 | 2014-03-25 | Her Majesty The Queen In Right Of Canada As Represented By The Minister Of Natural Resources | Hot sieving electrostatic precipitator |
US20120255438A1 (en) * | 2011-04-05 | 2012-10-11 | Alstom Technology Ltd | Method and system for discharging an electrostatic precipitator |
US8999040B2 (en) * | 2011-04-05 | 2015-04-07 | Alstom Technology Ltd | Method and system for discharging an electrostatic precipitator |
US20140251371A1 (en) * | 2011-11-29 | 2014-09-11 | Alstom Technology Ltd | Method and a device for cleaning an electrostatic precipitator |
US9630186B2 (en) * | 2011-11-29 | 2017-04-25 | General Electric Technology Gmbh | Method and a device for cleaning an electrostatic precipitator |
US20140053727A1 (en) * | 2012-08-27 | 2014-02-27 | Stanley J. Miller | Staged electrostatic precipitator |
US9272291B2 (en) * | 2012-08-27 | 2016-03-01 | Energy & Environmental Research Center Foundation | Staged electrostatic precipitator |
US9339822B2 (en) | 2013-03-15 | 2016-05-17 | Bruce Edward Scherer | Electrostatic precipitator with adaptive discharge electrode |
US11229916B2 (en) * | 2015-12-10 | 2022-01-25 | General Electric Technology Gmbh | Method and system for data capture for electrostatic precipitator control |
US11980704B2 (en) | 2016-01-21 | 2024-05-14 | Global Plasma Solutions, Inc. | Flexible ion generator device |
US11695259B2 (en) | 2016-08-08 | 2023-07-04 | Global Plasma Solutions, Inc. | Modular ion generator device |
US11283245B2 (en) | 2016-08-08 | 2022-03-22 | Global Plasma Solutions, Inc. | Modular ion generator device |
US12100938B2 (en) | 2016-08-08 | 2024-09-24 | Global Plasma Solutions, Inc. | Modular ion generator device |
US20200009580A1 (en) * | 2016-12-21 | 2020-01-09 | Koninklijke Philips N.V. | Systems and methods for detecting the status of an electrostatic filter |
US10751729B2 (en) * | 2016-12-22 | 2020-08-25 | Valmet Technologies Oy | Electrostatic precipitor |
US20180178222A1 (en) * | 2016-12-22 | 2018-06-28 | Valmet Technologies Oy | Method and arrangement |
WO2019020613A1 (en) | 2017-07-24 | 2019-01-31 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
WO2019020609A1 (en) | 2017-07-24 | 2019-01-31 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
US11344922B2 (en) | 2018-02-12 | 2022-05-31 | Global Plasma Solutions, Inc. | Self cleaning ion generator device |
WO2020011953A1 (en) | 2018-07-11 | 2020-01-16 | S.A. Lhoist Recherche Et Developpement | Sorbent composition for an electrostatic precipitator |
US11581709B2 (en) | 2019-06-07 | 2023-02-14 | Global Plasma Solutions, Inc. | Self-cleaning ion generator device |
US12015250B2 (en) | 2019-06-07 | 2024-06-18 | Global Plasma Solutions, Inc. | Self-cleaning ion generator device |
Also Published As
Publication number | Publication date |
---|---|
EP1967276A1 (en) | 2008-09-10 |
DK1967276T3 (en) | 2019-08-12 |
JP2010520056A (en) | 2010-06-10 |
WO2008109595A1 (en) | 2008-09-12 |
US20100037767A1 (en) | 2010-02-18 |
RU2009136558A (en) | 2011-04-10 |
CA2679288C (en) | 2012-09-04 |
CA2679288A1 (en) | 2008-09-12 |
TWI387486B (en) | 2013-03-01 |
TW200918168A (en) | 2009-05-01 |
ZA200906909B (en) | 2010-12-29 |
JP5553616B2 (en) | 2014-07-16 |
KR101203933B1 (en) | 2012-11-23 |
CN101626837B (en) | 2013-03-20 |
BRPI0808490A2 (en) | 2014-07-22 |
PL1967276T3 (en) | 2019-11-29 |
CN101626837A (en) | 2010-01-13 |
EP1967276B1 (en) | 2019-05-08 |
RU2481896C2 (en) | 2013-05-20 |
KR20090127328A (en) | 2009-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8328902B2 (en) | Method of estimating the dust load of an ESP, and a method and a device of controlling the rapping of an ESP | |
US8268040B2 (en) | Method of controlling the order of rapping the collecting electrode plates of an ESP | |
CN109290057B (en) | Method and device for cleaning an electrostatic precipitator | |
KR101347568B1 (en) | A method and a device for controlling the power supplied to an electrostatic precipitator | |
US8465568B2 (en) | Method and a device for controlling the rapping of an ESP | |
CN103372499A (en) | Electric dust collector power control means | |
WO2008109594A1 (en) | A method and a control system for controlling the operation of a last field of an electrostatic precipitator | |
JPH0724358A (en) | Operation control of electric dust collector for main exhaust gas from sintering machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: ALSTOM TECHNOLOGY LTD,SWITZERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOYDEN, SCOTT A.;KARLSSON, ANDERS;SIGNING DATES FROM 20090810 TO 20090921;REEL/FRAME:023404/0563 Owner name: ALSTOM TECHNOLOGY LTD, SWITZERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOYDEN, SCOTT A.;KARLSSON, ANDERS;SIGNING DATES FROM 20090810 TO 20090921;REEL/FRAME:023404/0563 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
CC | Certificate of correction | ||
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
AS | Assignment |
Owner name: GENERAL ELECTRIC TECHNOLOGY GMBH, SWITZERLAND Free format text: CHANGE OF NAME;ASSIGNOR:ALSTOM TECHNOLOGY LTD;REEL/FRAME:039714/0578 Effective date: 20151102 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
AS | Assignment |
Owner name: ANDRITZ AKTIEBOLAG, SWEDEN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GENERAL ELECTRIC TECHNOLOGY GMBH;REEL/FRAME:060358/0218 Effective date: 20220307 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 12 |