[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

US3866677A - Underwater connection apparatus - Google Patents

Underwater connection apparatus Download PDF

Info

Publication number
US3866677A
US3866677A US386431A US38643173A US3866677A US 3866677 A US3866677 A US 3866677A US 386431 A US386431 A US 386431A US 38643173 A US38643173 A US 38643173A US 3866677 A US3866677 A US 3866677A
Authority
US
United States
Prior art keywords
flowline
flange
assembly
set forth
alignment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US386431A
Inventor
Benton F Baugh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vetco Gray LLC
Original Assignee
Vetco Offshore Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vetco Offshore Industries Inc filed Critical Vetco Offshore Industries Inc
Priority to US386431A priority Critical patent/US3866677A/en
Priority to US526100A priority patent/US3924446A/en
Priority to US05/526,309 priority patent/US3973625A/en
Priority to US05/526,465 priority patent/US3968838A/en
Publication of US3866677A publication Critical patent/US3866677A/en
Application granted granted Critical
Assigned to VETCO OFFSHORE, INC. A CORP OF DE reassignment VETCO OFFSHORE, INC. A CORP OF DE ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: VETCO INC.
Assigned to VETCO OFFSHORE INDUSTRIES, INC., A DE. CORP. reassignment VETCO OFFSHORE INDUSTRIES, INC., A DE. CORP. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: VETCO OFFSHORE, INC., A CORP. OF DE.
Assigned to CITIBANK, N.A., reassignment CITIBANK, N.A., SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: VETCO GRAY INC., A DE. CORP.
Assigned to VETCO GRAY INC., reassignment VETCO GRAY INC., MERGER (SEE DOCUMENT FOR DETAILS). TEXAS, EFFECTIVE NOVEMBER 14, 1986 & DECEMBER 17, 1986. Assignors: GRAY TOOL COMPANY, A TX. CORP. (INTO), VETCO OFFSHORE INDUSTRIES, INC., A CORP. (CHANGED TO)
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/013Connecting a production flow line to an underwater well head
    • E21B43/0135Connecting a production flow line to an underwater well head using a pulling cable
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations

Definitions

  • US. Pat. No. 3,721,294, issued to Nelson discloses an underwater pipe connection apparatus for connecting a Christmas tree flowline on a subsea well to a flowline which has been laid from a storage facility downwardly to the oil well.
  • One of the purposes of the connection apparatus of the Nelson patent is to permit the use of a standard, less expensive guide structure which has guidelines extending upwardly from the well to the operating vessel at the surface.
  • the apparatus of the Nelson patent includes a pulling device having two funnels with wirelines passing therethrough into connection with the surface vessel and the storage flowline so that the flowline can be pulled into alignment for connection with the Christmas tree flowline.
  • the apparatus of the preferred embodiment of this invention includes a well guide structure for mounting on a well such that the well guide structure includes guidelines which extend upwardly to the surface.
  • a well fluid flow control network or Christmas tree is positioned onto the well guide structure for controlling the flow of well fluid outwardly of the well.
  • a storage flowline is laid from a lay barge to a position adjacent to the well and wireline positioning means attached to the storage flowline is lowered downwardly along the guidelines to the well.
  • the wireline positioning means is provided with means for moving the storage flowline to a position of partial alignment with respect to the Christmas tree flowline.
  • Hydraulic power means remotely operable from the surface is provided for engaging and moving the storage flowline from the position of partial alignment to a position of substantially complete alignment with the Christmas tree flowline, so that a sealed, fluid connection can be made between the two flowlines.
  • the underwater connection apparatus of this invention further includes a flowline pulling tool which includes means for running to the well from the surface a flowline alignment assembly adapted to receive the Christmas tree flowline and storage flowline in axial alignment for connection.
  • the flowline pulling tool further includes a funnel assembly having a wireline passing therethrough into attachment with the storage flowline whereby the position of the flowline is controlled by movement of the wireline, which is controlled at the surface.
  • the funnel assembly cooperates with the wireline to move the storage flowline into a position of partial alignment with the Christmas tree.
  • the remotely operable power means attaches to the storage flowline and moves the storage flowline into a locked position in the funnel assembly so that the flowline is pivotal with the funnel assembly.
  • the funnel assembly is pivoted downwardly with the storage flowline attached thereto to a position where the storage flowline is in complete, axial alignment with the Christmas tree flowline.
  • Connection means are provided for making a sealed fluid connection between the completely aligned Christmas tree flowline and storage flowline.
  • independent test means Prior to connection of the two flowlines, independent test means are provided for testing the storage flowline, the inde pendent testing means being thereafter removable from the storage flowline so that the storage flowline can be connected with the Christmas tree flowline.
  • the independent testing means and the flowline pulling tool are removed from the well site after a sealed. fluid connection has been made between the Christmas tree flow line and the storage flowline.
  • Hydraulic terminal connections are provided in the flowline positioning assembly for hydraulically controlling the means for making connection between the aligned flowlines, thereby allowing the Christmas tree to be run and capped from the surface vessel and eliminating the need for re-entry of the Christmas tree manifold to control the means for connecting the flowlines.
  • the Christmas tree flowline includes a flowline flange into which the Christmas tree flowlines terminate.
  • the flowline flange has mounted thereon a seal assembly for making the sealed, fluid connection between the Christmas tree flowline flange and a flowline flange on the storage flowline.
  • the seal assembly is removable by means of a running tool whereby the seal assembly can bereplaced if desired.
  • FIG. 1 is an isometric view of the completed underwater connection made between the Christmas tree and the storage flowline according to the preferred embodiment of this invention
  • FIG. 3 is a side view illustrating the running of the flowline alignment assembly downwardly into position on the well guide structure by means of the flowline positioning or pulling tool;
  • FIG. 4 is a sectional view taken along line 4-4 of FIG. 3 illustrating the latching of the flowline alignment assembly to the well guide structure;
  • FIG. 5 is an isometric view of the release of the flowline positioning tool from the flowline alignment assemy
  • FIG. 6 is a side view of the well fluid flow control network or Christmas tree having been landed onto the well guide structure and the flowline alignment assemy;
  • FIG. 7 is a top view of the Christmas tree illustrating the landed position of the Christmas tree flowline flange and the hydraulic means for positioning same;
  • FIG. 8 is a side view partially in section taken along line 8--8 of FIG. 7 of the hydraulically operated connection means for making connection between the fully aligned Christmas tree flange and storage flowline flange;
  • FIG. 9 is a front view of the tree flowline flange landed in the alignment channel of the flowline alignment assembly
  • FIG. is a partially schematic side view of the landed flowline positioning assembly prior to the pulling of the storage flowline probe into the funnel assemy;
  • FIG. 11 is a schmatic view of the relative positions of the surface vessel and the flowline lay barge with respect to the subsea oil well;
  • FIG. 12 is a side view of the funnel assembly of the flowline positioning assembly having moved the storage flowline and the carrier attached therewith to a position of partial alignment with respect to the Christmas tree flowline flange;
  • FIG. 13 is a side view of the funnel assembly of the flowline positioning assembly with the carrier assembly for the storage flowline having been moved into a lockedposition with the funnel assembly;
  • FIG. 14 is a side view in section of the funnel assembly as described in FIG. 13;
  • FIG. 15 is a side view of the flowline alignment assembly with the funnel assembly having been tilted or I pivoted downwardly by hydraulic power to a position wherein the storage flowline flange is substantially in complete alignment with the Christmas tree flange;
  • FIG. 16 is a front view of the funnel assembly having landed the carrier assembly and storage flowline flange in substantially complete alignment as illustrated in FIG. 15;
  • FIG. 17 is sectional view taken along line 17l7 in FIG. 16 illustrating the secondary hydraulic terminal for the hydraulically operated connection apparatus mounted with the Christmas tree flowline flange;
  • FIG. 18 is a sectional view of the release mechanism for releasing the carrier assembly from the storage flowline flange
  • FIG. 19 is a sectional view taken along line l9-19 of FIG. 18 illustrating the structure and connection of the storage flowline test flange or blank with the carrier assembly and storage flowline flange;
  • FIG. 19a is a sectional view taken along line 19a of FIG. 19 illustrating the retention of the horizontal latch dog by the storage flowline testing flange prior to a removal thereof;
  • FIG. 20 is a sectional view similar to FIG. 18 of the release mechanism having released the carrier from connection with the storage flowline flange;
  • FIG. 21 is a side view of the flowline positioning assembly in a slightly raised position for removing the storage flowline testing flange
  • FIG. 22 is a side view similar to FIG. 21 of the flowline positioning assembly with the funnel assembly tilted upwardly;
  • FIG. 23 is a side view of the connection means with the side connection plates in a raised position with the Christmas tree flowline flange and the storage flowline flange in position for connection;
  • FIG.-24 is a side view similar to FIG. 23 with the connection means having made a sealed, fluid connection between the flowline flanges;
  • FIG. 25 is a side view of the removal tool in position for removing the seal assembly attached to the Christmas tree flowline flange.
  • FIG. 26 is a side view of the flowline flanges having been moved apart to allow the removal tool to remove the seal assembly.
  • the letter A generally designates the apparatus of the preferred embodiment of this invention for making a fluid connection at the site F and a subsea well between a Christmas tree flowline network Fand a storage flowline S which extends from the side of the well upwardly to some type of storage facility on the surface of a body of water.
  • the apparatus A basically comprises a guide structure G which is particularly illustrated in FIG. 2, a flowline alignment assembly B illustrated in various Figures, including FIGS. 5 and 10, a fluid flow control network or Christmas tree T illustrated in FIG. 1 in particular and a flowline positioning assembly P illustrated in various figures, including FIGS. 5 and 10.
  • the apparatus A of this invention is for mounting on an oil well housing schematically designated by the letter H in FIG. 1, which has been drilled into formations underlying the floor of the ocean or other body of water.
  • the apparatus A of this invention is generally used in cooperation with a surface vessel V and a flowline lay barge L (FIG. 11).
  • the first step in making the under water connection between a storage flowline S and a Christmas tree flowline F is to lower downwardly from the surface vessel V the guide structure G.
  • the guide structure G includes a main cylindrical housing portion 10 which is connected with four upwardly extending guide posts 11 through radially extending frame members 11a which are welded onto the main housing 10 and extend radially outwardly therefrom into welded connection with the guide posts 11.
  • Side frame members 11b extend between adjacent pairs of the radially extending frame members 11a in order to cooperate with the radially extending frame members to provide a suitably strong frame to support the guide posts 11.
  • the frame members 11a and 11b are I-beams.
  • Each of the guide posts 11 are connected with a flexible guideline 12 which extends upwardly from the well to the operating vessel V on the surface of the body of water with the guide structure positioned on the well housing H.
  • the guidelines 12 can be used as a guide system for lowering tools and other equipment such as the inventive components described herein downwardly from the operating vessel V onto the guide posts 11.
  • the flowline alignment assembly B is lowered on the guidelines 12 onto the guide posts 11.
  • the flowline alignment assembly or tool B includes a main plate member 14 which is welded to guide sleeves 15a and 15b which are adapted to fit over the guide posts 11 of the guide structure G.
  • the guide sleeves 15a and 15b are known in the art and include enlarged conical lower sections such as 15awhich cooperate with upper tapered portions such as 12a of the guide posts 11 to center the guide sleeves such as over the guide posts as the flowline alignment assembly is lowered along the guidelines 12.
  • the main plate member 14 which is welded or otherwise connected to the two side guide sleeves 15a and 15b includes a horizontal platform portion 14a welded or otherwise connected to the main plate member, which is positioned in a substantially vertical plane when mounted with the guide posts 11. I
  • the flowline alignment assembly B further includes a latch channel 14b which provides a U-shaped recess for receiving a latch from a suitable running tool which is utilized to actually lower the flowline alignment assembly B downwardly from the operating vessel V onto two of the guide posts 11.
  • the flowline alignment assembly B is actually landed onto the guide structure G by the landing of the guide sleeves 15a and 15b onto the radial guide structure frame members 11a.
  • the flowline alignment assembly B is latched to the radially extending guide structure frame members lla by latch mechanisms 16 illustrated in FIGS. 3, 4 and 10.
  • the latch mechanisms 16 include a latch portion 16a pivotally mounted to support studs 16b which are welded or otherwise attached to the main plate member 14.
  • the latch portions 16a are adapted to pivot to a position under top portions 110 of the radial guide structure frame members 11a thereby securing the flowline alignment assembly B onto the guide structure G.
  • the flowline alignment assembly B further includes an alignment channel 17 which is adapted to provide the channel or track for receiving the Christmas tree flowline F and the storage flowline S in a position of substantially complete alignment and for making a sealed, fluid connection therebetween.
  • the alignment channel 17 includes side channel members 17a and 17b which are welded in a U-shaped recess 170 in the main frame member 14.
  • the side channel member 17a has a substantially T-shaped slot 17d therein which is positioned opposite of another substantially T-shaped slot 172 in the side channel member 1711. Further, the side channel member 17a includes a substantially V-shaped slot 18a which is machined into a top landing surface 18b thereof.
  • the side channel member 17b has a substantially V-shaped slot 19a positioned across from the V-shaped slot 18a, the slot 19a being machined in the top landing surface 19b thereof.
  • the side alignment channel member 17a is supported by pipe member 20a extending from the platform member 14a.
  • the flowline alignment assembly B is actually run or lowered along the guidelines 12 by means of the flowline positioning assembly. The mechanism for attaching the flowline alignment assembly B to the flowline positioning assembly or running tool will be described hereinafter.
  • a fluid flow network or Christmas tree T is lowered along the guidelines 12 and landed onto the guide structure G and the flowline alignment assembly B.
  • the fluid flow network hereinafter referred to as a Christmas tree is basically well known in the art as being a fluid flow control device for controlling fluid flow outwardly of an oil well.
  • the Christmas tree T utilized in this invention includes a main connected thereto in a manner to [be described hereinafter a removable seal plate assembly 23 which is provided for making the fluid, sealed connection between the tree flowline flange 22 and the storage flowline S.
  • the tree flowlines F-l, F 2 and F-3 are also joined in a hub portion 24 which is slidably mounted within a flowline guide sleeve 25 attached to the tree housing 21.
  • the portions of the flowlines F-l, F-2 and F-3 between the hub portion 24 and the tree flowline flange 22 as well as the flange itself are mounted for moving in a substantially horizontal direction, a direction substantially perpendicular to the main, vertical axis for the main tree housing portion 21.
  • the curved flowlines F-l, F-2 and F-3 flex in order to allow movement of the substantially horizontally positioned end portions thereof supported by the tree sub portion 24 and the tree flowline flange 22.
  • the Christmas tree T is lowered along the guidelines 12 by any suitable running tool which is connected into a sub located at the upper portion 21a of the Christmas tree T.
  • the tree flowline flange 22 is positioned in and supported by the alignment channel 17 between the side channel members 17a and 17b.
  • the side channel members 17a and 17b are each provided with beveled top edges 17f and 17g, respectively, in order to cooperate with the tree flowline flange 22 to properly align the flange 22 between the side channel members 17a and 17b.
  • the Christmas tree T includes suitable frame members such as illustrated at 27a, 27b, 27c and 27d which extend outwardly from the main tree housing portion 21 and terminate in guide sleeves 28.
  • the guide sleeves 28 allow the Christmas tree T to be lowered on the guide lines 12 and serve to mount the tree T over the: guide posts 12 in a known manner.
  • the Christmas tree T is further provided with a secondary hydraulic terminal which is designated by the numbers 29 and illustrated in FIGS. 7 and l7,for providing fluid connection between the tree and the surface after the conventional hydraulic manifold mounted with the main housing 211 has been capped.
  • a hydraulic power assembly 30 extends between the hub guide sleeve 25 and the flowline flange 22 in order to provide hydraulic force to move the tree flowline flange 22 in a substantially horizontal direction into and out of the channel 17.
  • the hydraulic power assembly 30 is pivotally mounted onto a mounting plate 21a attached to the main tree housing 21 and further onto a tree flange connector plate 220 which is welded or otherwise attached onto the top of the tree flowline flange 22.
  • the hydraulic cylinder assembly 30 is pivotally connected by any suitable means such as the lug and pin connections illustrated at 30a to the mounting plate 21a and at 30b to the tree flange connector plate 22c.
  • the pivotal connection at 30a to the tree mount ing plate 21a allows the tree flowline flange 22 to be pivoted with respect to the hydraulic assembly 30 in a horizontal plane as illustrated in the drawings.
  • the pivotal connection 30b between the hydraulic power assembly 30 and the tree flange connector plate 22c allows the tree flowline flange 22 to be pivoted in a vertical plane. in this manner, the hydraulic power assembly 30 is operable to move the tree flowline flange 22 inwardly and outwardly of the channel in spite of horizontal or vertical variations in the position of the tree flowline.
  • the flowline positioning assembly P is lowered along the guidelines 12 and landed on the flowline alignment assembly B in a manner to be described hereinafter in detail.
  • the wireline W extends from the vessel V to the tool P and from the tool P to the lay barge L.
  • the lay barge L is then used to lay the flowline S downwardly to a position adjacent the pulling tool P at the well.
  • the storage flowline S actually includes three flowlines 8-1, 8-2 and 8-3 which terminate in a storage flowline flange 40.
  • the storage flowline flange 40 is actually an assembly which includes a flange member 40a which receives and supports the end portions of the three storage flowlines S-l, S-2 and 8-3.
  • a carrier assembly generally designated by the number 41 is releasably mounted onto the flange member 40a for cooperating with the flowline pulling tool P to first partially position and then completely position the flange member 40a in the alignment channel 17 of the flowline alignment assembly B.
  • the carrier assembly 41 includes a landing flange assembly 42 pivotally mounted onto the storage flowline flange member 40a and a probe unit 43 pivotally mounted onto the landing flange assembly 42.
  • the landing flange assembly 42 includes side mounting plates 42a and 42b which are pivotally mounted by pins le and 51f (to be described hereinafter) onto upwardly extending lugs 40b and 40c which extend upwardly from the top of the storage flowline flange member 40a.
  • the actual pivotal connection between the landing flange assembly 42 and the storage flowline flange 40 is releasable by a releasable, pivotal connection means generally designated in FIG. 18 by the number 44.
  • the side mounting plates 42a and 42b are welded or otherwise connected to a circular flange member 42c having extending therefrom laterally alignment pins 42d and 42e.
  • a cylindrical landing member 42f is welded or otherwise attached at the center of the circular flange 420 (also referred to as a landing flange).
  • a connecting pin 42g extends outwardly from the tapered end portion 42h of the cylindrical landing member and terminates in an integrally formed nut 42i.
  • the entire landing flange assembly 42 is mounted for pivotal movement with respect to the storage flowline flange 40.
  • the nut portion 421' has a slot 42j therein, the slot being a straight U-shaped groove.
  • the probe unit 43 includes a nose portion 42a comprised of a hollow, cylindrical portion 43b which tapers downwardly to a nose point 430.
  • the hollow cylindrical nose portion 43b includes a spherically-shaped recessed portion 43d adapted to be mounted over the nut 421'.
  • a pin 43e is mounted in the spherically-shaped recess and extends inwardly into the slot 42j in the nut 42i.
  • the nose portion is attached to the wireline W by a leaded spelter socket 43e. In this manner the nose 43a is mounted for pivotal movement in at least two planes with respect to the connector pin 42g.
  • the pin 43e in the nose portion 43a prevents rotation of the nose portion 4311 with respect to the nut 421'.
  • the nose portion 43a will be pivotal in a horizontal plane and a vertical plane but will be prevented by the pin 43e from twisting or rotational movement in a clockwise or counterclockwise direction.
  • the storage flowline flange member 40 further includes a substantially T-shaped detent means 45 for locking the storage flowline flange in the substantially T-shaped slots 17d and l7e in the alignment side channel members 17a and 17b, respectively.
  • the substantially T-shaped detent means 45 includes a vertical detent portion 45a and a horizontal detent portion 45b which are resiliently mounted in the sides of the flowline flange member 40a and are urged outwardly thereof by any suitable resilient means such as springs 45c positioned between the flowline flange member 40a and the detent members such as 45b.
  • the carrier assembly 41 is released from connection with the tree flowline flange member 40a.
  • the flowlines S-l, S-2 and S-3 are independently tested by testing flange assembly 50, which is subsequently removed with the carrier assembly 41
  • the testing flange assembly 50 is releasably mounted onto the front storage flowline face 40d and is also attached to the carrier assembly 41.
  • the testing flange assembly 50 is provided for independent testing ofthe flowlines S-l, S-2 and 3-3 after the flowline flange 40 has been landed in the alignment channel 17 on the flowline alignment assembly B. This independent testing of the flowlines S-l, S-2 and 8-3 is accomplished prior to the making of a sealed, fluid connection between the tree flowline flange 22 and the storage flowline flange 40.
  • the testing flange assembly 50 includes a blank or plate 50a which is adapted to be placed adjacent to the front storage flowline face 40d.
  • a top plate 50b and two side plates 50c are mounted onto the top and sides 402, respectively, of the flowline flange such that the flowline flange can be placed over the top and sides of the storage flowline flange member.
  • the side plates 506 for the testing flange assembly include a longitudinal groove 5011 which is adapted to receive a corresponding longitudinal ridge 46 on each side of the storage flowline flange.
  • the side plates 50c terminate in retainer ridges or ears 502 which extend inwardly against the horizontal dogs 45b of the substantially T-shaped detent members 45 mounted on the flowline flange member 40a.
  • the ears 50c on the testing flange assembly side plates 50c serve to hold the horizontal detent members 45b inwardly out of the corresponding horizontal groove portions on the T-shaped grooves such as 17d in the alignment side channel member 17a. This allows the flowline flange 40 to be removed by a vertical lifting force prior to removal of the testing flange assembly 50.
  • a center mounting plate 50f is welded or otherwise attached onto the testing flange. assembly top plate 50b for releasably attaching the testing flange assembly 50 with the storage flowline flange member 40a and for attaching the testing flange assembly 50 to the carrier assembly 41.
  • the releasable pivotal connection means 44 provides a releasable, pivotal connection between the landing flange assembly 42 and the flowline flange member 40a.
  • the releasable pivotal connection means 44 further releases the testing flange assembly 50 from the testing position as illustrated in FIG. 19.
  • a movable releasable pin assembly generally designated by the number 51 is mounted in the landing flange assembly side plates 42a and 42b extends through the upwardly extending storage flowline flange lugs 40b and 400 in order to provide a releasable connection between the landing flange assembly 42 and the flowline flange member 40a.
  • the releasable connection means includes the following elements which are mounted for movement as a releasable pin unit.
  • An actuator pin 51a is slidably mounted in the carrier plate 42b.
  • the actuator 51a is operated by actuation of the hydraulic power assembly 52 which includes a rod portion 52a in position to extend into engagement and actually move or displace the actuator pin 51a.
  • the actuator pin 51a is attached to a first connector plate 51 b which is positioned between the testing flange assembly central mounting plate 50f and the landing flange assembly side mounting plate 42b.
  • the connector plate 51b is attached to a retaining pin 510 which extends through the arcuate slot 50g in the testing flange assembly central mounting plate 50f and further extends through landing flange assembly side mounting plate 42a.
  • a second connector plate 51d is attached to the retainer pin 51c outside the landing flange assembly side mounting plate 42a.
  • the connector plate is also attached to a releasing pin Sle which in FIG. 18 extends into an opening in the upstanding flange lug portion 40b.
  • the first connector plate 51b of the releasable pin unit 51 is attached to a release pin 51f which extends through an opening in the upstanding lug portion 400 on the storage flowline flange member 40a.
  • a retainer pin and sleeve combination 51g is attached to the first connector plate 51b and extends through an opening 51h in the testing flange assembly center mounting plate 51f.
  • the releasable pin or connection unit 51 releasably attaches the landing flange assembly 42 and the testing flange assembly 50 with the flowline storage flange 40.
  • the connected position is illustrated in FIG. 18.
  • the hydraulic cylinder assembly 42a is actuated from a remote point to drive the rod 52a into engagement the actuator pin 51a thereby moving the entire releasable pin unit to a release position wherein the release pins Sle and 51f have been moved out of the upstanding flowline flange lugs 40b and 40c, respectively.
  • Movement of the release pins She and 51f out of the upstanding lug portions 40b and 40c free the entire carrier assembly 41, including the landing flange assembly and the testing flange assembly, for movement off of the landed flowline flange 40a, which will be landed in a manner to be described hereinafter.
  • the flowline flanges 8-1, 8-2 and S-3 Prior to removal of the testing flange assembly 50, the flowline flanges 8-1, 8-2 and S-3 are tested individually to determine if there are any leaks or other problems in the flowlines which have been laid from the lay barge L downwardly to the well. It is understood that some of the prior testing procedures utilized did not provide for testing of the laid flowlines 8-1, 8-2 and 3-3 until after connection with the Christmas tree T. However, utilizing the testing flange assembly of this invention, the flowlines 8-1, 8-2 and S-3 can be tested prior to connection, thereby isolating any problem with the flowlines before connection with the remainder of the system.
  • the testing flange assembly 50 includes a central passageway 53 which extends longitudinally of the flowline blank member 50a in order to provide fluid communication between each of the flowlines S-l, S-2 and S3. Suitable O-rings such as 50h prevent the entry of sea water between the blank member 50a and the flange member 40a.
  • An impression making pin 54 having a cone-shaped point 54a is mounted into the back face 53a of the passageway or bore 53 in alignment with the storage flowline 8-1.
  • the impression making point 54a is adapted to receive a block of soft material such as lead mounted onto a suitable pig or other pressure differential tool which is pumped through the flowline 8-1 from the surface downwardly to the testing flange assembly 50.
  • the soft material block If the soft material block is pumped all the way through the flowline 8-1 from the surface downwardly to the How line flange, it will engage the impression making point 54a thereby causing a cone-shaped depression in the block. Reverse circulation through either or both of the other flowlines S-2 and S-3 will move the soft material block with the cone-shaped depression therein outwardly of the flowline S-l so that the operators can determine that the block actually progressed all the way through the entire flowline Sl, thereby ensuring that the flowline 8-1 is not obstructed. at any point.
  • Another impression making point 55 having a chiselshaped point 55a is mounted on the back face 53a of the passageway 53 in order to receive and provide a chisel-shaped impression in a block of soft material pumped through the flowline S2.
  • Impression making pin 56 is mounted on the back plate 53a of the the testing flange assembly passageway 53 in alignment with the flowline S-3 in order to receive and make a ringshaped depression in a block of soft material by means of the ring-shaped point 56a.
  • the details of the structure of the storage flowline S have now been described.
  • the storage flowline flange 40 has been described as being releasably connected to a carrier means which is adapted to cooperate with the flowline pulling tool P to actually land the storage flowline flange 40 in a position of substantially complete alignment in the alignment channel 17 with the tree flowline flange 22.
  • a flowline pulling too] P of particular construction and utilization has been invented.
  • the flowline positioning or pulling tool P includes a main frame section 60 which terminates in guide sleeves 61 and 62 which are adapted to be mounted over the guide structure guide posts 11.
  • the main frame section 60 includes a central plate member 60a which is connected to a horizontally extending pipe member 60b which is welded onto the guide sleeves 61 and 62.
  • a connector sub 60c is welded or otherwise attached at the top of the frame plate 60a for connection with a suitable running tool such as a drillpipe running tool represented by the number 64.
  • the frame plate member 60a has a recess 60d therein for mounting a funnel assembly generally designated by the number 65 for manipulating the carrier assembly 41 attached with the flowline storage flange 40.
  • Horizontally positioned support plates 66a and'66b are welded or otherwise mounted onto the bottom of the frame plate 60a on ei ther side of the recessed area 60d in order to provide support for the pivotal mounting of the funnel assembly 65.
  • the frame plate 60a has mounted therewith on either side the recess 60d landing corner plates 67a and 67b which are positioned for insertion into the landing slots 18a and 19a on the alignment channel members 17a and 17b. In this manner, the entire flowline pulling tool P is positioned and aligned with respect to the flowline alignment assembly B as it is lowered onto the flowline alignment assembly B.
  • a hydraulic assembly 68 is mounted by any suitable means onto the frame plate 60a adjacent to a running latch member 69, which is also pivotally mounted onto the frame member 60a.
  • the flowline pulling tool P may be used as a running too] for running downwardly the flowline alignment assembly B.
  • the latch member 69 is latched into the U-shaped recess in the channel 14b of the flowline alignment assembly B.
  • Drillpipe represented as 64 is then utilized to run downwardly on the guidelines 12 the flowline pulling tool having attached therewith the flowline alignment assembly B.
  • the hydraulic cylinder assembly 68 is actuated to pivot the running latch 69 out of the groove in channel 14b so that the pulling tool P can be returned to the surface for installation of the Christmas tree T.
  • the funnel assembly 65 is provided for pulling inwardly the carrier assembly 41 and storage flowline flange 40 to a position of partial alignment with respect to the tree flowline flange 20a and then finally to a position of complete alignment therewith.
  • the funnel assembly 65 cooperates with a remotely operable hydraulic power means 70 to move the storage flowline flange 40 to the position of final alignment with tree flange 20.
  • the funnel assembly 65 includes the following elements.
  • the funnel assembly 65 includes a funnel sleeve 65a which is connected by suitable means with an enlarged funnel flange portion 65b.
  • the enlarged, funnel flange portion 65b includes a tapered or frustro-conical receiving surface 650 adapted to receive the landing flange 42c.
  • Alignment holes 65d and 65e are provided in the tapered, annular surface 65c for receiving alignment pins 42d and 42e laterally extending from the landing flange 420.
  • the funnel portion 65a is mounted onto the frame member 60a for pivotal movement between an upwardly tilted position such as illustrated in FIG. and a downwardly tilted position such as illustrated in FIGS. 15, 16 and 21.
  • the pivotal mounting of the funnel assembly including the funnel assembly 65 is accomplished by the attachment of vertical plates such as 71a onto the frame plate 60a on either side of the recess 60d.
  • the vertical plates have openings therein adapted to receive pins which extend into pivotal contact with the funnel sleeve 65a.
  • the pins positioned on either side of the funnel sleeve 65a are designated by the number 72.
  • the vertical support plates 71 extend downwardly into contact and are supported by the horizontal support plates 66a and 66b which have been previously described as being attached at the bottom of the frame member 60a on either side of the re cess 60d.
  • a funnel assembly support plate 73 is welded or otherwise mounted onto the top of the funnel sleeve 65a and includes side plates 73a which pivot with the pivotally mounted funnel sleeve 65a
  • Hydraulic power cylinders 74 are mounted on either side of the recess 60d in the frame member 60a and extend into pivotal connection with the support plate 73 in order to provide remotely operable hydraulic power to move'the entire funnel assembly 65 between the upwardly tilted position and the downwardly tilted position.
  • the hydraulic power assemblies 74 are pivotally mounted by pin and lug connections such as 74a onto the support plates 66b and 66a. Suitable pin and lug connections 74b are also made between the hydraulic power assemblies 74 and the side support plates 73a mounted with the funnel sleeve 65a.
  • the locking means 75 includes a locking tool 75a which is mounted within the hollow funnel section 65a for slidable movement with respect to the funnel section 65a.
  • the sleeve 75a includes a tapered end portion 75b adapted to seat a correspondingly tapered portion 43a of the probe unit 43.
  • Latch means 750 are mounted within the hollow bore 75d of the locking sleeve or tool 75a for latching the tapered nose 430 into the bore 75a such that the entire probe unit 43 and landing flange assembly connected therewith are movable with movement of the locking tool 75a.
  • the locking tool 75a is hydraulically powered by means of hydraulic cylinder assemblies 76 mounted on either side of the funnel section 65a.
  • the hydraulic cylinder assemblies 76 are suitably mounted to the funnel section 65a onto suitable connecting studs which are connected to the funnel section 65a.
  • the hydraulic power assemblies are also attached to a rear tool plate 75e which is mounted at the rear of the locking tool or sleeve 75a. The providing of hydraulic fluid under pressure to the power assemblies 76 provide for slidable movement of the locking tool 75a out of the funnel section 65a thereby pulling the landing flange assembly 42 into the funnel portion 65a and 65b.
  • the wireline W is passed through the funnel assembly including the funnel section 65a and through the locking tube 75a and extends upwardly to the operating vessel at the surface.
  • a sheave network 77 is provided for redirecting the path of the wireline from its direction of extension through the funnel assembly 65 into a direction extending upwardly to the surface of the water.
  • the sheave network 77 includes a first sheave 77a mounted onto the rear tube plate 75e. This first sheave 77a is thus mounted for movement with the locking tool 75a.
  • a second sheave 77b is mounted onto a support plate 77c attached with the funnel section 65a.
  • a third sheave 77d is actually mounted onto the pulling tool frame plate 60a in order to finally direct the wireline W upwardly toward the surface vessel V.
  • each of the sheaves are mounted for rotation in a well known manner such that the wireline can be manipulated from the surface in order to pull the carrier assembly 41 and storage flowline flange inwardly into a position of partial alignment with respect to the tree flowline flange 22.
  • the funnel section 65a includes therein two circular or helical surfaces 49, one of which is illustrated in FIG.
  • the double helical surfaces 49 are adapted to receive a vertical aligning pin 43f which extends outwardly from the main nose section 43b.
  • the nose 43a for the probe unit 43 is cammed or gradually forced to a vertical position as the locking tool 75a pulls the nose 43a of the probe unit 43 further inwardly such that the entire carrier assembly is locked for movement with the funnel assembly 65 and the flowline flange 40 is in a vertical position for seating between the alignment channel members 170 and 1717.
  • the flowline pulling tool P operates to move the carrier assembly 41 and storage flowline flange 40 into a position of final alignment between the alignment channel members 17a and 17b in the following manner.
  • the wireline W is connected between the surface vessel V, the funnel assembly 65 and the tapered nose portion 430 prior to the storage flowline S being laid or lowered into the water from the lay barge L.
  • the storage flowline S is laid or extended outwardly from the lay barge L in a known manner and the flowline S is finally positioned such that the end thereof which includes the car rier assembly 41 and the storage flowline flange 40 are positioned substantially adjacent to the flowline alignment assembly B.
  • the wireline W extends from the sheave 77d into connection with any suitable wireline control means which is capable of exerting great pulling strength on the wireline after the flowline pulling tool P is lowered and landed.
  • the flowline pulling tool P is lowered along the guidelines 12 by a drillpipe running tool 64 or other suitable means. If a drillpipe running tool is utilized, the wireline W can be positioned within the drillpipe.
  • the flowline pulling tool is aligned with and landed onto the flowline alignment assembly in the following manner.
  • the side, guide sleeves 61 and 62 are mounted over the guide posts 11 which have received the guide sleeves of both the flowline alignment assembly and the Christmas tree.
  • the landing corners 67a and 67b are landed in the slots 18a and 19a in the alignment channel members 17a and 17b, respectively, thereby centering properly the pulling tool P onto the flowline alignment assembly B.
  • the wireline pulling means at the surface is operated to pull on the wireline until a dart or other connection point on the wireline is attached at the surface pulling apparatus such that the initial positioning process can begin.
  • the wireline pulling apparatus at the surface is actuated to exert upward pulling force on the wireline through the drillpipe running tool 64 thereby causing the probe unit 43, the landing flange assembly 42 and the storage flowline flange 40a to be moved inwardly toward the upwardly tilted funnel sections 65a and 65b.
  • the wireline is pulled from the surface until the nose 43a of the probe unit 43 is pulled into the funnel section 65a and further into the locking sleeve 75a and is latched by the latching element 75c.
  • the entire carrier assembly 41 with the storage flowline flange 411 has been moved to a position of partial alignment with respect to the tree flowline flange 22.
  • a secondary hydraulic terminal 78 mounted on the pulling tool frame member a was inserted into the secondary hydraulic terminal 29 on the Christmas tree T. Hydraulic connection was made between the secondary hydraulic terminal connection 78 on the pulling tool P by the use of alignment pins such as 78a, illustrated in FIG. 17, which are inserted into alignment bores 29a on the tree terminal connection. The insertion of the alignment pins 78a into the alignment bores 29a serve to make hydraulic connection between the male hydraulic terminal member 78b and female hydraulic terminal member 2812 on the Christmas tree T.
  • the secondary hydraulic terminal 78a on the pulling tool is connected by suitable fluid lines with the surface.
  • hydraulic fluid under pressure can be applied through the secondary, male hydraulic terminal on the pulling tool into the female, hydraulic terminal on the Christmas tree and to the hydraulic mechanisms mounted with the Christmas tree such as the hydraulic power assembly 30 for manipulating the tree flange 22.
  • Mounted with the secondary hydraulic terminal 78 are a series of hydraulic fluid connections extending from the surface downwardly into hydraulic fluid con nection with the various hydraulic power assemblies mounted on the pulling tool P itself, such as the funnel hydraulic pivoting assembly 74 and the locking tool hydraulic assemblies 76.
  • the carrier assembly 41 and the storage flowline flange 40 are partially aligned with respect to the Christmas tree flange 22.
  • the hydraulic power assemblies 76 are now actuated by the application of hydraulic fluid from the surface vessel V to move the locking tool 75a outwardly of the funnel section a thereby pulling the cylindrical landing portion 42finto the funnel section 65a.
  • the hydraulic cylinder assemblies 76 move the locking tool a until the landing flange 42c is locked against the annularly tapered funnel end portion 65b.
  • the stud or alignment pin 43f on the nose 43a engages one of the two helical surfaces 49 thereby gradually rotating the nose and the remainder of the carrier assembly 41 to a vertical position.
  • the engagement of the alignment pin 43finto one of the helical surfaces 49 causes the probe unit 43 and the landing flange assembly and the storage flowline flange to be moved to a vertical position if not already in a vertical position, due to the restricted pivotal connection between the nose 42a and the connector nut 421' of the landing flange assembly 42.
  • the landing flange 42c is in a position such that the alignment pins 42d and 42e are inserted into the alignment openings 65d and 65e in the funnel flange portion 65b.
  • the nose 43 and the landing flange 420 are moved entirely into a locked position with respect to the funnel sections 65a and 65b so that the landing flange assembly is locked for movement with the funnel sections 65a and 65b.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

An improved underwater connection apparatus is provided for selectively making fluid connection between a Christmas tree flowline and a flowline extending underwater from surface storage facilities, the storage flowline being pulled into a position of partial alignment with the Christmas tree flowline by a wireline device and completely axially aligned by a remotely operable hydraulic mechanism, the two flowlines being thereafter secured together for fluid transfer.

Description

United States Patent [191 Baugh [451 Feb. 18, 1975 UNDERWATER CONNECTION APPARATUS [75] Inventor: Benton F. Baugh, Houston, Tex.
[73] Assignee: Vetco-Offshore, Inc., Houston, Tex. 22 Filed: Aug. 7, 1973 [21] Appl. No.: 386,431
[52] US. Cl. 166/.6 [51] Int. Cl E2lb 33/035, E21b 43/01 [58] Field of Search 166/5, .6
[56] References Cited UNITED STATES PATENTS 3,716,100 2/1973 Nelson 166/.6 3,721,294 3/1973 Nelson Nelson 166/.6 Williamset a1, 166/.6
Primary Examiner-James A. Leppink [57] ABSTRACT 39 Claims, 27 Drawing Figures .AIEHI FEB 1 81 975 SHEET UlUF 12 PAIENTEU H81 1% sum [130F112 PATENTEUFEBWIQYS SHEET sum 1 P'ATENTED 58 1 8 1915 SHEET UBUF 12 Zia PMENTED FEB 1 81975 SHEET 07' 0F 12 PATENTEU FEB I 8 I975 SHEET 0 8 0F 12 SHEET lUUF 12 PATENTED 1 5 SHEET llUF 12 PATENTED FEB 1 8 I975 SHEET 12UF 12 1 UNDERWATER CONNECTION APPARATUS BACKGROUND OF THE INVENTION This invention relates to the completion of subsea wells for the transfer of well fluid from the well to the surface.
US. Pat. No. 3,721,294, issued to Nelson, discloses an underwater pipe connection apparatus for connecting a Christmas tree flowline on a subsea well to a flowline which has been laid from a storage facility downwardly to the oil well. One of the purposes of the connection apparatus of the Nelson patent is to permit the use of a standard, less expensive guide structure which has guidelines extending upwardly from the well to the operating vessel at the surface. The apparatus of the Nelson patent includes a pulling device having two funnels with wirelines passing therethrough into connection with the surface vessel and the storage flowline so that the flowline can be pulled into alignment for connection with the Christmas tree flowline.
SUMMARY OF THE INVENTION It is an object of this invention to provide a new and improved apparatus for selectively making fluid connection to a well drilled into a formation underlying a body of water wherein a storage flowline is accurately positioned for alignment with a Christmas tree flowline by a combination of wireline apparatus and hydraulic apparatus controlled on the surface. The apparatus of the preferred embodiment of this invention includes a well guide structure for mounting on a well such that the well guide structure includes guidelines which extend upwardly to the surface. A well fluid flow control network or Christmas tree is positioned onto the well guide structure for controlling the flow of well fluid outwardly of the well. A storage flowline is laid from a lay barge to a position adjacent to the well and wireline positioning means attached to the storage flowline is lowered downwardly along the guidelines to the well. The wireline positioning means is provided with means for moving the storage flowline to a position of partial alignment with respect to the Christmas tree flowline. Hydraulic power means remotely operable from the surface is provided for engaging and moving the storage flowline from the position of partial alignment to a position of substantially complete alignment with the Christmas tree flowline, so that a sealed, fluid connection can be made between the two flowlines.
The underwater connection apparatus of this invention further includes a flowline pulling tool which includes means for running to the well from the surface a flowline alignment assembly adapted to receive the Christmas tree flowline and storage flowline in axial alignment for connection. The flowline pulling tool further includes a funnel assembly having a wireline passing therethrough into attachment with the storage flowline whereby the position of the flowline is controlled by movement of the wireline, which is controlled at the surface. The funnel assembly cooperates with the wireline to move the storage flowline into a position of partial alignment with the Christmas tree. Thereafter, the remotely operable power means attaches to the storage flowline and moves the storage flowline into a locked position in the funnel assembly so that the flowline is pivotal with the funnel assembly. The funnel assembly is pivoted downwardly with the storage flowline attached thereto to a position where the storage flowline is in complete, axial alignment with the Christmas tree flowline.
Connection means are provided for making a sealed fluid connection between the completely aligned Christmas tree flowline and storage flowline. Prior to connection of the two flowlines, independent test means are provided for testing the storage flowline, the inde pendent testing means being thereafter removable from the storage flowline so that the storage flowline can be connected with the Christmas tree flowline. The independent testing means and the flowline pulling tool are removed from the well site after a sealed. fluid connection has been made between the Christmas tree flow line and the storage flowline.
Hydraulic terminal connections are provided in the flowline positioning assembly for hydraulically controlling the means for making connection between the aligned flowlines, thereby allowing the Christmas tree to be run and capped from the surface vessel and eliminating the need for re-entry of the Christmas tree manifold to control the means for connecting the flowlines. The Christmas tree flowline includes a flowline flange into which the Christmas tree flowlines terminate. The flowline flange has mounted thereon a seal assembly for making the sealed, fluid connection between the Christmas tree flowline flange and a flowline flange on the storage flowline. The seal assembly is removable by means of a running tool whereby the seal assembly can bereplaced if desired.
These features and objects of this invention, as well as additional meritorious features, will be pointed out in the detailed description to follow.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an isometric view of the completed underwater connection made between the Christmas tree and the storage flowline according to the preferred embodiment of this invention;
FIG. 2 is an isometric view of the well guide structure adapted for mounting on the subsea oil well which has been drilled into a formation underlying a body of water;
FIG. 3 is a side view illustrating the running of the flowline alignment assembly downwardly into position on the well guide structure by means of the flowline positioning or pulling tool;
FIG. 4 is a sectional view taken along line 4-4 of FIG. 3 illustrating the latching of the flowline alignment assembly to the well guide structure;
FIG. 5 is an isometric view of the release of the flowline positioning tool from the flowline alignment assemy;
FIG. 6 is a side view of the well fluid flow control network or Christmas tree having been landed onto the well guide structure and the flowline alignment assemy;
FIG. 7 is a top view of the Christmas tree illustrating the landed position of the Christmas tree flowline flange and the hydraulic means for positioning same;
FIG. 8 is a side view partially in section taken along line 8--8 of FIG. 7 of the hydraulically operated connection means for making connection between the fully aligned Christmas tree flange and storage flowline flange;
FIG. 9 is a front view of the tree flowline flange landed in the alignment channel of the flowline alignment assembly;
FIG. is a partially schematic side view of the landed flowline positioning assembly prior to the pulling of the storage flowline probe into the funnel assemy;
FIG. 11 is a schmatic view of the relative positions of the surface vessel and the flowline lay barge with respect to the subsea oil well;
FIG. 12 is a side view of the funnel assembly of the flowline positioning assembly having moved the storage flowline and the carrier attached therewith to a position of partial alignment with respect to the Christmas tree flowline flange;
FIG. 13 is a side view of the funnel assembly of the flowline positioning assembly with the carrier assembly for the storage flowline having been moved into a lockedposition with the funnel assembly;
FIG. 14 is a side view in section of the funnel assembly as described in FIG. 13;
FIG. 15 is a side view of the flowline alignment assembly with the funnel assembly having been tilted or I pivoted downwardly by hydraulic power to a position wherein the storage flowline flange is substantially in complete alignment with the Christmas tree flange;
FIG. 16 is a front view of the funnel assembly having landed the carrier assembly and storage flowline flange in substantially complete alignment as illustrated in FIG. 15;
FIG. 17 is sectional view taken along line 17l7 in FIG. 16 illustrating the secondary hydraulic terminal for the hydraulically operated connection apparatus mounted with the Christmas tree flowline flange;
FIG. 18 is a sectional view of the release mechanism for releasing the carrier assembly from the storage flowline flange;
FIG. 19 is a sectional view taken along line l9-19 of FIG. 18 illustrating the structure and connection of the storage flowline test flange or blank with the carrier assembly and storage flowline flange;
FIG. 19a is a sectional view taken along line 19a of FIG. 19 illustrating the retention of the horizontal latch dog by the storage flowline testing flange prior to a removal thereof;
FIG. 20 is a sectional view similar to FIG. 18 of the release mechanism having released the carrier from connection with the storage flowline flange;
FIG. 21 is a side view of the flowline positioning assembly in a slightly raised position for removing the storage flowline testing flange;
FIG. 22 is a side view similar to FIG. 21 of the flowline positioning assembly with the funnel assembly tilted upwardly;
FIG. 23 is a side view of the connection means with the side connection plates in a raised position with the Christmas tree flowline flange and the storage flowline flange in position for connection;
FIG.-24 is a side view similar to FIG. 23 with the connection means having made a sealed, fluid connection between the flowline flanges;
FIG. 25 is a side view of the removal tool in position for removing the seal assembly attached to the Christmas tree flowline flange; and
FIG. 26 is a side view of the flowline flanges having been moved apart to allow the removal tool to remove the seal assembly.
DESCRIPTION OF THE PREFERRED EMBODIMENT Referring to the drawings, the letter A generally designates the apparatus of the preferred embodiment of this invention for making a fluid connection at the site F and a subsea well between a Christmas tree flowline network Fand a storage flowline S which extends from the side of the well upwardly to some type of storage facility on the surface of a body of water. The apparatus A basically comprises a guide structure G which is particularly illustrated in FIG. 2, a flowline alignment assembly B illustrated in various Figures, including FIGS. 5 and 10, a fluid flow control network or Christmas tree T illustrated in FIG. 1 in particular and a flowline positioning assembly P illustrated in various figures, including FIGS. 5 and 10. The apparatus A of this invention is for mounting on an oil well housing schematically designated by the letter H in FIG. 1, which has been drilled into formations underlying the floor of the ocean or other body of water. The apparatus A of this invention is generally used in cooperation with a surface vessel V and a flowline lay barge L (FIG. 11).
The first step in making the under water connection between a storage flowline S and a Christmas tree flowline F is to lower downwardly from the surface vessel V the guide structure G. The guide structure G includes a main cylindrical housing portion 10 which is connected with four upwardly extending guide posts 11 through radially extending frame members 11a which are welded onto the main housing 10 and extend radially outwardly therefrom into welded connection with the guide posts 11. Side frame members 11b extend between adjacent pairs of the radially extending frame members 11a in order to cooperate with the radially extending frame members to provide a suitably strong frame to support the guide posts 11. In the embodiment of the invention illustrated in the drawings, the frame members 11a and 11b are I-beams. Each of the guide posts 11 are connected with a flexible guideline 12 which extends upwardly from the well to the operating vessel V on the surface of the body of water with the guide structure positioned on the well housing H. In this manner, the guidelines 12 can be used as a guide system for lowering tools and other equipment such as the inventive components described herein downwardly from the operating vessel V onto the guide posts 11.
After the direction of approachment of the storage flowline S has been decided, the flowline alignment assembly B is lowered on the guidelines 12 onto the guide posts 11. The flowline alignment assembly or tool B includes a main plate member 14 which is welded to guide sleeves 15a and 15b which are adapted to fit over the guide posts 11 of the guide structure G. The guide sleeves 15a and 15b are known in the art and include enlarged conical lower sections such as 15awhich cooperate with upper tapered portions such as 12a of the guide posts 11 to center the guide sleeves such as over the guide posts as the flowline alignment assembly is lowered along the guidelines 12. The main plate member 14 which is welded or otherwise connected to the two side guide sleeves 15a and 15b includes a horizontal platform portion 14a welded or otherwise connected to the main plate member, which is positioned in a substantially vertical plane when mounted with the guide posts 11. I
The flowline alignment assembly B further includes a latch channel 14b which provides a U-shaped recess for receiving a latch from a suitable running tool which is utilized to actually lower the flowline alignment assembly B downwardly from the operating vessel V onto two of the guide posts 11. The flowline alignment assembly B is actually landed onto the guide structure G by the landing of the guide sleeves 15a and 15b onto the radial guide structure frame members 11a. The flowline alignment assembly B is latched to the radially extending guide structure frame members lla by latch mechanisms 16 illustrated in FIGS. 3, 4 and 10. The latch mechanisms 16 include a latch portion 16a pivotally mounted to support studs 16b which are welded or otherwise attached to the main plate member 14. The latch portions 16a are adapted to pivot to a position under top portions 110 of the radial guide structure frame members 11a thereby securing the flowline alignment assembly B onto the guide structure G.
The flowline alignment assembly B further includes an alignment channel 17 which is adapted to provide the channel or track for receiving the Christmas tree flowline F and the storage flowline S in a position of substantially complete alignment and for making a sealed, fluid connection therebetween. The alignment channel 17 includes side channel members 17a and 17b which are welded in a U-shaped recess 170 in the main frame member 14. The side channel member 17a has a substantially T-shaped slot 17d therein which is positioned opposite of another substantially T-shaped slot 172 in the side channel member 1711. Further, the side channel member 17a includes a substantially V-shaped slot 18a which is machined into a top landing surface 18b thereof. Similarly, the side channel member 17b has a substantially V-shaped slot 19a positioned across from the V-shaped slot 18a, the slot 19a being machined in the top landing surface 19b thereof. The side alignment channel member 17a is supported by pipe member 20a extending from the platform member 14a. In the embodiment of this invention illustrated and discussed herein, the flowline alignment assembly B is actually run or lowered along the guidelines 12 by means of the flowline positioning assembly. The mechanism for attaching the flowline alignment assembly B to the flowline positioning assembly or running tool will be described hereinafter.
After the flowline alignment assembly B has been lowered along the guidelines 12 and landed onto the guide structure G, a fluid flow network or Christmas tree T is lowered along the guidelines 12 and landed onto the guide structure G and the flowline alignment assembly B. The fluid flow network, hereinafter referred to as a Christmas tree is basically well known in the art as being a fluid flow control device for controlling fluid flow outwardly of an oil well. The Christmas tree T utilized in this invention includes a main connected thereto in a manner to [be described hereinafter a removable seal plate assembly 23 which is provided for making the fluid, sealed connection between the tree flowline flange 22 and the storage flowline S. The tree flowlines F-l, F 2 and F-3 are also joined in a hub portion 24 which is slidably mounted within a flowline guide sleeve 25 attached to the tree housing 21. In this manner, the portions of the flowlines F-l, F-2 and F-3 between the hub portion 24 and the tree flowline flange 22 as well as the flange itself, are mounted for moving in a substantially horizontal direction, a direction substantially perpendicular to the main, vertical axis for the main tree housing portion 21. As previously known, the curved flowlines F-l, F-2 and F-3 flex in order to allow movement of the substantially horizontally positioned end portions thereof supported by the tree sub portion 24 and the tree flowline flange 22.
The Christmas tree T is lowered along the guidelines 12 by any suitable running tool which is connected into a sub located at the upper portion 21a of the Christmas tree T. When the Christmas tree T has been landed onto the guide structure G and the flowline alignment assembly B, the tree flowline flange 22 is positioned in and supported by the alignment channel 17 between the side channel members 17a and 17b. In order to center the tree flowline flange 22 between the side channel members 17a and 17b, the side channel members 17a and 17b are each provided with beveled top edges 17f and 17g, respectively, in order to cooperate with the tree flowline flange 22 to properly align the flange 22 between the side channel members 17a and 17b. In order to further accomplish this alignment or centering of the tree flowline flange 22 in the alignment channel 17, beveled portions 22a and 22b are provided on a flowline connection means 26 which will be described in greater detail hereinafter. Of course, the Christmas tree T includes suitable frame members such as illustrated at 27a, 27b, 27c and 27d which extend outwardly from the main tree housing portion 21 and terminate in guide sleeves 28. The guide sleeves 28 allow the Christmas tree T to be lowered on the guide lines 12 and serve to mount the tree T over the: guide posts 12 in a known manner.
The Christmas tree T is further provided with a secondary hydraulic terminal which is designated by the numbers 29 and illustrated in FIGS. 7 and l7,for providing fluid connection between the tree and the surface after the conventional hydraulic manifold mounted with the main housing 211 has been capped.
A hydraulic power assembly 30 extends between the hub guide sleeve 25 and the flowline flange 22 in order to provide hydraulic force to move the tree flowline flange 22 in a substantially horizontal direction into and out of the channel 17. The hydraulic power assembly 30 is pivotally mounted onto a mounting plate 21a attached to the main tree housing 21 and further onto a tree flange connector plate 220 which is welded or otherwise attached onto the top of the tree flowline flange 22. The hydraulic cylinder assembly 30 is pivotally connected by any suitable means such as the lug and pin connections illustrated at 30a to the mounting plate 21a and at 30b to the tree flange connector plate 22c. The pivotal connection at 30a to the tree mount ing plate 21a allows the tree flowline flange 22 to be pivoted with respect to the hydraulic assembly 30 in a horizontal plane as illustrated in the drawings. The pivotal connection 30b between the hydraulic power assembly 30 and the tree flange connector plate 22c allows the tree flowline flange 22 to be pivoted in a vertical plane. in this manner, the hydraulic power assembly 30 is operable to move the tree flowline flange 22 inwardly and outwardly of the channel in spite of horizontal or vertical variations in the position of the tree flowline.
Referring to FIG. 11, the flowline positioning assembly P is lowered along the guidelines 12 and landed on the flowline alignment assembly B in a manner to be described hereinafter in detail. When the tool P is landed at the well, the wireline W extends from the vessel V to the tool P and from the tool P to the lay barge L. The lay barge L is then used to lay the flowline S downwardly to a position adjacent the pulling tool P at the well.
The storage flowline S actually includes three flowlines 8-1, 8-2 and 8-3 which terminate in a storage flowline flange 40. The storage flowline flange 40 is actually an assembly which includes a flange member 40a which receives and supports the end portions of the three storage flowlines S-l, S-2 and 8-3. A carrier assembly generally designated by the number 41 is releasably mounted onto the flange member 40a for cooperating with the flowline pulling tool P to first partially position and then completely position the flange member 40a in the alignment channel 17 of the flowline alignment assembly B. The carrier assembly 41 includes a landing flange assembly 42 pivotally mounted onto the storage flowline flange member 40a and a probe unit 43 pivotally mounted onto the landing flange assembly 42. The landing flange assembly 42 includes side mounting plates 42a and 42b which are pivotally mounted by pins le and 51f (to be described hereinafter) onto upwardly extending lugs 40b and 40c which extend upwardly from the top of the storage flowline flange member 40a. The actual pivotal connection between the landing flange assembly 42 and the storage flowline flange 40 is releasable by a releasable, pivotal connection means generally designated in FIG. 18 by the number 44. The side mounting plates 42a and 42b are welded or otherwise connected to a circular flange member 42c having extending therefrom laterally alignment pins 42d and 42e. A cylindrical landing member 42fis welded or otherwise attached at the center of the circular flange 420 (also referred to as a landing flange). A connecting pin 42g extends outwardly from the tapered end portion 42h of the cylindrical landing member and terminates in an integrally formed nut 42i. Thus the entire landing flange assembly 42 is mounted for pivotal movement with respect to the storage flowline flange 40.
The nut portion 421' has a slot 42j therein, the slot being a straight U-shaped groove. The probe unit 43 includes a nose portion 42a comprised of a hollow, cylindrical portion 43b which tapers downwardly to a nose point 430. The hollow cylindrical nose portion 43b includes a spherically-shaped recessed portion 43d adapted to be mounted over the nut 421'. A pin 43e is mounted in the spherically-shaped recess and extends inwardly into the slot 42j in the nut 42i. The nose portion is attached to the wireline W by a leaded spelter socket 43e. In this manner the nose 43a is mounted for pivotal movement in at least two planes with respect to the connector pin 42g. However, the pin 43e in the nose portion 43a prevents rotation of the nose portion 4311 with respect to the nut 421'. For example, ifthe connector pin 42g and the remainder of the landing flange assembly 42 is positioned in a horizontal plane, the nose portion 43a will be pivotal in a horizontal plane and a vertical plane but will be prevented by the pin 43e from twisting or rotational movement in a clockwise or counterclockwise direction.
The storage flowline flange member 40 further includes a substantially T-shaped detent means 45 for locking the storage flowline flange in the substantially T-shaped slots 17d and l7e in the alignment side channel members 17a and 17b, respectively. Referring to FIG. 19, the substantially T-shaped detent means 45 includes a vertical detent portion 45a and a horizontal detent portion 45b which are resiliently mounted in the sides of the flowline flange member 40a and are urged outwardly thereof by any suitable resilient means such as springs 45c positioned between the flowline flange member 40a and the detent members such as 45b.
After the flowline flange member 40a is landed in the alignment channel 17 in a position of substantially complete alignment with the tree flange 22, the carrier assembly 41 is released from connection with the tree flowline flange member 40a. Prior to such release, the flowlines S-l, S-2 and S-3 are independently tested by testing flange assembly 50, which is subsequently removed with the carrier assembly 41 The testing flange assembly 50 is releasably mounted onto the front storage flowline face 40d and is also attached to the carrier assembly 41. The testing flange assembly 50 is provided for independent testing ofthe flowlines S-l, S-2 and 3-3 after the flowline flange 40 has been landed in the alignment channel 17 on the flowline alignment assembly B. This independent testing of the flowlines S-l, S-2 and 8-3 is accomplished prior to the making of a sealed, fluid connection between the tree flowline flange 22 and the storage flowline flange 40.
The testing flange assembly 50 includes a blank or plate 50a which is adapted to be placed adjacent to the front storage flowline face 40d. A top plate 50b and two side plates 50c are mounted onto the top and sides 402, respectively, of the flowline flange such that the flowline flange can be placed over the top and sides of the storage flowline flange member. The side plates 506 for the testing flange assembly include a longitudinal groove 5011 which is adapted to receive a corresponding longitudinal ridge 46 on each side of the storage flowline flange. Further, the side plates 50c terminate in retainer ridges or ears 502 which extend inwardly against the horizontal dogs 45b of the substantially T-shaped detent members 45 mounted on the flowline flange member 40a. The ears 50c on the testing flange assembly side plates 50c serve to hold the horizontal detent members 45b inwardly out of the corresponding horizontal groove portions on the T-shaped grooves such as 17d in the alignment side channel member 17a. This allows the flowline flange 40 to be removed by a vertical lifting force prior to removal of the testing flange assembly 50. A center mounting plate 50f is welded or otherwise attached onto the testing flange. assembly top plate 50b for releasably attaching the testing flange assembly 50 with the storage flowline flange member 40a and for attaching the testing flange assembly 50 to the carrier assembly 41.
The releasable pivotal connection means 44 provides a releasable, pivotal connection between the landing flange assembly 42 and the flowline flange member 40a. The releasable pivotal connection means 44 further releases the testing flange assembly 50 from the testing position as illustrated in FIG. 19. A movable releasable pin assembly generally designated by the number 51 is mounted in the landing flange assembly side plates 42a and 42b extends through the upwardly extending storage flowline flange lugs 40b and 400 in order to provide a releasable connection between the landing flange assembly 42 and the flowline flange member 40a. The releasable connection means includes the following elements which are mounted for movement as a releasable pin unit. An actuator pin 51a is slidably mounted in the carrier plate 42b. The actuator 51a is operated by actuation of the hydraulic power assembly 52 which includes a rod portion 52a in position to extend into engagement and actually move or displace the actuator pin 51a. The actuator pin 51a is attached to a first connector plate 51 b which is positioned between the testing flange assembly central mounting plate 50f and the landing flange assembly side mounting plate 42b. The connector plate 51b is attached to a retaining pin 510 which extends through the arcuate slot 50g in the testing flange assembly central mounting plate 50f and further extends through landing flange assembly side mounting plate 42a. A second connector plate 51d is attached to the retainer pin 51c outside the landing flange assembly side mounting plate 42a. The connector plate is also attached to a releasing pin Sle which in FIG. 18 extends into an opening in the upstanding flange lug portion 40b. The first connector plate 51b of the releasable pin unit 51 is attached to a release pin 51f which extends through an opening in the upstanding lug portion 400 on the storage flowline flange member 40a. Further, a retainer pin and sleeve combination 51g is attached to the first connector plate 51b and extends through an opening 51h in the testing flange assembly center mounting plate 51f.
The releasable pin or connection unit 51 releasably attaches the landing flange assembly 42 and the testing flange assembly 50 with the flowline storage flange 40. The connected position is illustrated in FIG. 18. After the flowline flange 40a has been landed in a position of substantially complete alignment in the alignment channel 17a with the tree flowline flange 22, the hydraulic cylinder assembly 42a is actuated from a remote point to drive the rod 52a into engagement the actuator pin 51a thereby moving the entire releasable pin unit to a release position wherein the release pins Sle and 51f have been moved out of the upstanding flowline flange lugs 40b and 40c, respectively. Movement of the release pins She and 51f out of the upstanding lug portions 40b and 40c free the entire carrier assembly 41, including the landing flange assembly and the testing flange assembly, for movement off of the landed flowline flange 40a, which will be landed in a manner to be described hereinafter.
Prior to removal of the testing flange assembly 50, the flowline flanges 8-1, 8-2 and S-3 are tested individually to determine if there are any leaks or other problems in the flowlines which have been laid from the lay barge L downwardly to the well. It is understood that some of the prior testing procedures utilized did not provide for testing of the laid flowlines 8-1, 8-2 and 3-3 until after connection with the Christmas tree T. However, utilizing the testing flange assembly of this invention, the flowlines 8-1, 8-2 and S-3 can be tested prior to connection, thereby isolating any problem with the flowlines before connection with the remainder of the system.
Referring again to FIG. 19, the testing flange assembly 50 includes a central passageway 53 which extends longitudinally of the flowline blank member 50a in order to provide fluid communication between each of the flowlines S-l, S-2 and S3. Suitable O-rings such as 50h prevent the entry of sea water between the blank member 50a and the flange member 40a. An impression making pin 54 having a cone-shaped point 54a is mounted into the back face 53a of the passageway or bore 53 in alignment with the storage flowline 8-1. The impression making point 54a is adapted to receive a block of soft material such as lead mounted onto a suitable pig or other pressure differential tool which is pumped through the flowline 8-1 from the surface downwardly to the testing flange assembly 50. If the soft material block is pumped all the way through the flowline 8-1 from the surface downwardly to the How line flange, it will engage the impression making point 54a thereby causing a cone-shaped depression in the block. Reverse circulation through either or both of the other flowlines S-2 and S-3 will move the soft material block with the cone-shaped depression therein outwardly of the flowline S-l so that the operators can determine that the block actually progressed all the way through the entire flowline Sl, thereby ensuring that the flowline 8-1 is not obstructed. at any point.
Another impression making point 55 having a chiselshaped point 55a is mounted on the back face 53a of the passageway 53 in order to receive and provide a chisel-shaped impression in a block of soft material pumped through the flowline S2.. Impression making pin 56 is mounted on the back plate 53a of the the testing flange assembly passageway 53 in alignment with the flowline S-3 in order to receive and make a ringshaped depression in a block of soft material by means of the ring-shaped point 56a. Thus each of the flowlines S-l, S-2 and S-3 can be independently tested from the surface in order to ensure that the flowlines do not have any obstructions therein. After the testing operation, the testing flange assembly 50 is removed along with the entire carrier assembly 41 from attachment with the flowline flange 40 in order to free the flowline flange 40 for connection to the tree flowline flange 22.
The details of the structure of the storage flowline S have now been described. The storage flowline flange 40 has been described as being releasably connected to a carrier means which is adapted to cooperate with the flowline pulling tool P to actually land the storage flowline flange 40 in a position of substantially complete alignment in the alignment channel 17 with the tree flowline flange 22. In order to accomplish this manipulation of the storage flowline S into a position of final alignment for connection with the tree flowline flange 22, a flowline pulling too] P of particular construction and utilization has been invented.
The flowline positioning or pulling tool P includes a main frame section 60 which terminates in guide sleeves 61 and 62 which are adapted to be mounted over the guide structure guide posts 11. The main frame section 60 includes a central plate member 60a which is connected to a horizontally extending pipe member 60b which is welded onto the guide sleeves 61 and 62. A connector sub 60c is welded or otherwise attached at the top of the frame plate 60a for connection with a suitable running tool such as a drillpipe running tool represented by the number 64. The frame plate member 60a has a recess 60d therein for mounting a funnel assembly generally designated by the number 65 for manipulating the carrier assembly 41 attached with the flowline storage flange 40. Horizontally positioned support plates 66a and'66b are welded or otherwise mounted onto the bottom of the frame plate 60a on ei ther side of the recessed area 60d in order to provide support for the pivotal mounting of the funnel assembly 65. The frame plate 60a has mounted therewith on either side the recess 60d landing corner plates 67a and 67b which are positioned for insertion into the landing slots 18a and 19a on the alignment channel members 17a and 17b. In this manner, the entire flowline pulling tool P is positioned and aligned with respect to the flowline alignment assembly B as it is lowered onto the flowline alignment assembly B.
A hydraulic assembly 68 is mounted by any suitable means onto the frame plate 60a adjacent to a running latch member 69, which is also pivotally mounted onto the frame member 60a. The flowline pulling tool P may be used as a running too] for running downwardly the flowline alignment assembly B. When used as a running tool, the latch member 69 is latched into the U-shaped recess in the channel 14b of the flowline alignment assembly B. Drillpipe represented as 64 is then utilized to run downwardly on the guidelines 12 the flowline pulling tool having attached therewith the flowline alignment assembly B. When the flowline alignment assembly B is positioned onto the flowline guide structure G as previously described, the hydraulic cylinder assembly 68 is actuated to pivot the running latch 69 out of the groove in channel 14b so that the pulling tool P can be returned to the surface for installation of the Christmas tree T.
The funnel assembly 65 is provided for pulling inwardly the carrier assembly 41 and storage flowline flange 40 to a position of partial alignment with respect to the tree flowline flange 20a and then finally to a position of complete alignment therewith. The funnel assembly 65 cooperates with a remotely operable hydraulic power means 70 to move the storage flowline flange 40 to the position of final alignment with tree flange 20.
Referring to FIGS. 3, 5, 10, 12-16 and 21-22, the funnel assembly 65 includes the following elements. The funnel assembly 65 includes a funnel sleeve 65a which is connected by suitable means with an enlarged funnel flange portion 65b. The enlarged, funnel flange portion 65b includes a tapered or frustro-conical receiving surface 650 adapted to receive the landing flange 42c. Alignment holes 65d and 65e are provided in the tapered, annular surface 65c for receiving alignment pins 42d and 42e laterally extending from the landing flange 420. The funnel portion 65a is mounted onto the frame member 60a for pivotal movement between an upwardly tilted position such as illustrated in FIG. and a downwardly tilted position such as illustrated in FIGS. 15, 16 and 21. The pivotal mounting of the funnel assembly including the funnel assembly 65 is accomplished by the attachment of vertical plates such as 71a onto the frame plate 60a on either side of the recess 60d. The vertical plates have openings therein adapted to receive pins which extend into pivotal contact with the funnel sleeve 65a. The pins positioned on either side of the funnel sleeve 65a are designated by the number 72. The vertical support plates 71 extend downwardly into contact and are supported by the horizontal support plates 66a and 66b which have been previously described as being attached at the bottom of the frame member 60a on either side of the re cess 60d. A funnel assembly support plate 73 is welded or otherwise mounted onto the top of the funnel sleeve 65a and includes side plates 73a which pivot with the pivotally mounted funnel sleeve 65a Hydraulic power cylinders 74 are mounted on either side of the recess 60d in the frame member 60a and extend into pivotal connection with the support plate 73 in order to provide remotely operable hydraulic power to move'the entire funnel assembly 65 between the upwardly tilted position and the downwardly tilted position. The hydraulic power assemblies 74 are pivotally mounted by pin and lug connections such as 74a onto the support plates 66b and 66a. Suitable pin and lug connections 74b are also made between the hydraulic power assemblies 74 and the side support plates 73a mounted with the funnel sleeve 65a.
The locking means 75 includes a locking tool 75a which is mounted within the hollow funnel section 65a for slidable movement with respect to the funnel section 65a. The sleeve 75a includes a tapered end portion 75b adapted to seat a correspondingly tapered portion 43a of the probe unit 43. Latch means 750 are mounted within the hollow bore 75d of the locking sleeve or tool 75a for latching the tapered nose 430 into the bore 75a such that the entire probe unit 43 and landing flange assembly connected therewith are movable with movement of the locking tool 75a. The locking tool 75a is hydraulically powered by means of hydraulic cylinder assemblies 76 mounted on either side of the funnel section 65a. The hydraulic cylinder assemblies 76 are suitably mounted to the funnel section 65a onto suitable connecting studs which are connected to the funnel section 65a. The hydraulic power assemblies are also attached to a rear tool plate 75e which is mounted at the rear of the locking tool or sleeve 75a. The providing of hydraulic fluid under pressure to the power assemblies 76 provide for slidable movement of the locking tool 75a out of the funnel section 65a thereby pulling the landing flange assembly 42 into the funnel portion 65a and 65b.
The wireline W is passed through the funnel assembly including the funnel section 65a and through the locking tube 75a and extends upwardly to the operating vessel at the surface. A sheave network 77 is provided for redirecting the path of the wireline from its direction of extension through the funnel assembly 65 into a direction extending upwardly to the surface of the water. The sheave network 77 includes a first sheave 77a mounted onto the rear tube plate 75e. This first sheave 77a is thus mounted for movement with the locking tool 75a. A second sheave 77b is mounted onto a support plate 77c attached with the funnel section 65a. A third sheave 77d is actually mounted onto the pulling tool frame plate 60a in order to finally direct the wireline W upwardly toward the surface vessel V. Of course, each of the sheaves are mounted for rotation in a well known manner such that the wireline can be manipulated from the surface in order to pull the carrier assembly 41 and storage flowline flange inwardly into a position of partial alignment with respect to the tree flowline flange 22.
The funnel section 65a includes therein two circular or helical surfaces 49, one of which is illustrated in FIG.
14, which begin at the front end 65a at the bottom of the funnel section and curve in a helical path and terminate at the rear end 65c of the funnel section 65a'at the top thereof. The double helical surfaces 49 are adapted to receive a vertical aligning pin 43f which extends outwardly from the main nose section 43b. In this manner, the nose 43a for the probe unit 43 is cammed or gradually forced to a vertical position as the locking tool 75a pulls the nose 43a of the probe unit 43 further inwardly such that the entire carrier assembly is locked for movement with the funnel assembly 65 and the flowline flange 40 is in a vertical position for seating between the alignment channel members 170 and 1717.
Referring in particular to FIGS. 10, 12-16 and 21 and 22, the flowline pulling tool P operates to move the carrier assembly 41 and storage flowline flange 40 into a position of final alignment between the alignment channel members 17a and 17b in the following manner. The wireline W is connected between the surface vessel V, the funnel assembly 65 and the tapered nose portion 430 prior to the storage flowline S being laid or lowered into the water from the lay barge L. The storage flowline S is laid or extended outwardly from the lay barge L in a known manner and the flowline S is finally positioned such that the end thereof which includes the car rier assembly 41 and the storage flowline flange 40 are positioned substantially adjacent to the flowline alignment assembly B. At this point, the Christmas tree T and the flowline alignment assembly P have already been lowered along the guidelines 12 and landed onto the guide structure and the flowline alignment assembly B. The wireline W extends from the sheave 77d into connection with any suitable wireline control means which is capable of exerting great pulling strength on the wireline after the flowline pulling tool P is lowered and landed.
The flowline pulling tool P is lowered along the guidelines 12 by a drillpipe running tool 64 or other suitable means. If a drillpipe running tool is utilized, the wireline W can be positioned within the drillpipe. The flowline pulling tool is aligned with and landed onto the flowline alignment assembly in the following manner. The side, guide sleeves 61 and 62 are mounted over the guide posts 11 which have received the guide sleeves of both the flowline alignment assembly and the Christmas tree. The landing corners 67a and 67b are landed in the slots 18a and 19a in the alignment channel members 17a and 17b, respectively, thereby centering properly the pulling tool P onto the flowline alignment assembly B. After the pulling tool P is landed, the wireline pulling means at the surface is operated to pull on the wireline until a dart or other connection point on the wireline is attached at the surface pulling apparatus such that the initial positioning process can begin.
The wireline pulling apparatus at the surface is actuated to exert upward pulling force on the wireline through the drillpipe running tool 64 thereby causing the probe unit 43, the landing flange assembly 42 and the storage flowline flange 40a to be moved inwardly toward the upwardly tilted funnel sections 65a and 65b. The wireline is pulled from the surface until the nose 43a of the probe unit 43 is pulled into the funnel section 65a and further into the locking sleeve 75a and is latched by the latching element 75c. At this point, the entire carrier assembly 41 with the storage flowline flange 411 has been moved to a position of partial alignment with respect to the tree flowline flange 22.
When the pulling tool P was landed on the flowline alignment B, a secondary hydraulic terminal 78 mounted on the pulling tool frame member a was inserted into the secondary hydraulic terminal 29 on the Christmas tree T. Hydraulic connection was made between the secondary hydraulic terminal connection 78 on the pulling tool P by the use of alignment pins such as 78a, illustrated in FIG. 17, which are inserted into alignment bores 29a on the tree terminal connection. The insertion of the alignment pins 78a into the alignment bores 29a serve to make hydraulic connection between the male hydraulic terminal member 78b and female hydraulic terminal member 2812 on the Christmas tree T. The secondary hydraulic terminal 78a on the pulling tool is connected by suitable fluid lines with the surface. Therefore, hydraulic fluid under pressure can be applied through the secondary, male hydraulic terminal on the pulling tool into the female, hydraulic terminal on the Christmas tree and to the hydraulic mechanisms mounted with the Christmas tree such as the hydraulic power assembly 30 for manipulating the tree flange 22. This eliminates the necessity of having to re enter the conventional hydraulic terminal mounted at the upper portion 21a of the Christmas tree main housing 21. Mounted with the secondary hydraulic terminal 78 are a series of hydraulic fluid connections extending from the surface downwardly into hydraulic fluid con nection with the various hydraulic power assemblies mounted on the pulling tool P itself, such as the funnel hydraulic pivoting assembly 74 and the locking tool hydraulic assemblies 76.
At this point, the carrier assembly 41 and the storage flowline flange 40 are partially aligned with respect to the Christmas tree flange 22. The hydraulic power assemblies 76 are now actuated by the application of hydraulic fluid from the surface vessel V to move the locking tool 75a outwardly of the funnel section a thereby pulling the cylindrical landing portion 42finto the funnel section 65a. The hydraulic cylinder assemblies 76 move the locking tool a until the landing flange 42c is locked against the annularly tapered funnel end portion 65b. As the landing flange assembly is moved inwardly, the stud or alignment pin 43f on the nose 43a engages one of the two helical surfaces 49 thereby gradually rotating the nose and the remainder of the carrier assembly 41 to a vertical position.
The engagement of the alignment pin 43finto one of the helical surfaces 49 causes the probe unit 43 and the landing flange assembly and the storage flowline flange to be moved to a vertical position if not already in a vertical position, due to the restricted pivotal connection between the nose 42a and the connector nut 421' of the landing flange assembly 42. When the alignment pin 43 has reached the top end portion 650 of the helical surface 49, the landing flange 42c is in a position such that the alignment pins 42d and 42e are inserted into the alignment openings 65d and 65e in the funnel flange portion 65b. Thus the nose 43 and the landing flange 420 are moved entirely into a locked position with respect to the funnel sections 65a and 65b so that the landing flange assembly is locked for movement with the funnel sections 65a and 65b.
With the landing flange 42c locked against the funnel end section 65b, the hydraulic cylinders 74 are remotely actuated to tilt the funnel sections 65a and 65b downwardly to the downwardly tilted positions illustrated in FIGS. 15 and 16. Referring to FIG. 16, the

Claims (39)

1. Apparatus for selectively making fluid connection to a well drilled into a formation underlying a body of water, comprising: a well fluid flow control network for being positioned at a well drilled in a body of water, said well fluid flow control network including first flowline means for transferring well fluid outwardly of said well; second flowline means for extending from a remote point to said well, said second flowline means being lowered into the body of water for connection with said first flowline means such that said well fluid is transferable through said well fluid flow control network and said first and second flowline means to a remote point; wireline positioning means for mounting at said well and utilizing wireline apparatus to move said second flowline means into a position of initial attachment with said wireline positioning means, in which position said second flowline means is partially aligned with said first flowline means; remotely operable power means for mounting at said well for engaging and moving said second flowline means from said position of initial attachment to a locked position in said wireline positioning means and for moving said wireline positioning means and said second flowline means to a position in which said second flowline means is substantially completely aligned with said first flowline means for connection therewith; and flowline connection means for operatively connecting said first and second flowline means whereby well fluid is transferable from said well and through said first and second flowline means.
2. The structure set forth in claim 1, including: said first flowline means terminating in a first flowline flange supporting one or more first flowlines; said second flowline means terminating in a second flowline flange supporting one or more second flowlines; said flowline connection means connecting said first and second flowline flanges together for fluid communication therebetween; said second flowline flange having a side lug thereon; and said flowline connection means includes a connector plate having a plate lug thereon, said connector plate being mounted on said first flowline flange for movement between a release position in which said first and second flowline flanges are separable and an interlocked position in which said connector plate lug engages said side lug of said second flowline flange, whereby said one or more first flowlines are joined in fluid communication with said one or more second flowlines with said side plate in said interlocked position.
3. The structure set Forth in claim 1, including: a well support means mounted at said well; a flowline alignment assembly for lowering onto said well support means; and said flowline alignment assembly including means cooperating with said remotely operable power means to substantially align said first and second flowline means for connection.
4. The structure set forth in claim 3, including: said first flowline means terminating in a first connection flange; said second flowline means terminating in a second connection flange; and said flowline alignment assembly including an alignment channel for receiving said first and second connection flanges.
5. The structure set forth in claim 1, wherein said wireline positioning means and remotely operable power means includes: a flowline positioning assembly which is lowerable to a position in proximity to said well fluid control network; said flowline positioning assembly including a funnel assembly having a wireline extending therethrough into attachment with said second flowline means, said wireline being extendable to a wireline control means located at the surface of the body of water for controlling movement of said wireline; and said funnel assembly and wireline control means including means pulling said second flowline means inwardly into position for attachment to said funnel assembly, in which position said second flowline means is partially aligned with respect to said first flow line means.
6. The structure set forth in claim 5, including: attachment means for attaching said second flowline means to said funnel assembly; and locking means for moving said second flowline means further inwardly of said funnel assembly to a locked position in which said second flowline means remains partially aligned with respect to said first flowline means.
7. The structure set forth in claim 6, wherein said locking means includes: an attachment yoke mounted for movement in said funnel assembly and means mounted therewith for attaching said second flowline means for movement with said attachment yoke; and a remotely operable hydraulic cylinder assembly connected with said attachment yoke for moving said yoke and said second flowline means to said locked position in which said second flowline means is movable with said funnel assembly.
8. The structure set forth in claim 6, wherein: said funnel assembly having a substantially helical surface therein for directing said second flowline means to a vertical position.
9. The structure set forth in claim 6, wherein: means for pivoting said funnel assembly downwardly with said second flowline means in said locked position for landing said second flowline means in complete alignment with said first flowline means.
10. Thet structure set forth in claim 5, including: a secondary hydraulic terminal mounted with said fluid flow control network; and a movable hydraulic supply terminal mounted with said flowline positioning assembly for operable connection with said secondary hydraulic terminal, said movable hydraulic supply terminal having fluid lines extending to the surface of said body of water.
11. The structure set forth in claim 5, wherein said second flowline means includes: one or more second flowlines for extension underwater between said well and the surface; said one or more second fluid flowlines terminating in a second flowline flange for fluid connection to said first flowline means; and a carrier assembly attached to said second flowline flange, said wireline being attached to said carrier assembly whereby movement of said wireline controls movement of said one or more second flowlines and second flowline flange.
12. The structure set forth in claim 11, wherein said carrier assembly includes: a landing flange assembly pivotally attached to said second flowline flange; and a probe unit mounted onto said landing flange assembly for pivotal movement with respEct to said landing flange assembly, said wireline being attached to said probe unit whereby movement of said wireline controls movement of said landing flange assembly and said probe unit.
13. The structure set forth in claim 12, including: said wireline attached to said probe unit being adapted to pull said probe unit inwardly into said funnel assembly to such that said second flowline flange connected with said landing flange assembly and probe unit is in a position of partial alignment with said first flowline means; attachment means for attaching said probe unit to said funnel assembly; and locking means for moving said probe unit further inwardly of said funnel assembly such that said landing flange assembly is landed in a locked position for movement with said funnel assembly.
14. The structure set forth in claim 13, including: carrier release means for releasing said landing flange assembly from attachment to said second flowline flange whereby said carrier assembly is freed for subsequent removal with said funnel assembly.
15. The structure set forth in claim 14, including: said landing flange assembly being pivotally movable with respect to said second flowline flange with said landing flange assembly in said locked position with said funnel assembly; and funnel assembly pivoting means for pivoting said funnel assembly downwardly to substantially align said second flowline flange with said first flowline means.
16. The structure set forth in claim 15, including: a test flange attached to said second flowline flange for testing of said one or more flowlines, said test flange further being attached to said landing flange assembly; and release means for releasing said test flange from attachment to said second flowline flange whereby said test flange is removable with said landing flange assembly.
17. The structure set forth in claim 15, including: a well support means for mounting on said well; a flowline alignment assembly being mounted on said well support means and including an alignment channel for receiving said first flowline means; said funnel assembly pivoting means pivoting said funnel assembly downwardly such that said second flowline flange is seated in said alignment channel in substantially complete alignment with said first flowline means.
18. The structure set forth in claim 17, including: said second flowline flange including latch means for seating said second flowline flange in said alignment channel in said position of substantial alignment.
19. The structure set forth in claim 17, wherein: said first flowline means includes one or more first flowlines terminating in a first flowline flange, said flowline flange being mounted for slidable movement in said alignment channel; hydraulic power means for moving said first flowline flange toward and away from said second flowline flange; and said flowline connection means includes means for joining said first and second flowline flanges for fluid communication therebetween.
20. The structure set forth in claim 19, wherein said means for joining said flowline flanges includes: a lug extending from said second flowline flange; a connector plate mounted on said first flowline flange for movement between release and interlocked positions, said connector plate having a lug thereon; and means for moving said connector plate to an interlocked position in which said lugs are in locked engagement to prevent separation of said flowline flanges.
21. The structure set forth in claim 19, including: said first flowline flange having removably mounted thereon a seal plate which provides a sealed fluid connection between said one or more first flowlines and said one or more second flowlines with said first and second flowline flanges joined.
22. The structure set forth in claim 21, including: said hydraulic power means moving said first flowline flange out oF said joined connection with said second flowline flange; and removal tool means for running from said water surface to a point substantially between said first and second flowline flanges, said removal tool means including means for engaging said seal plate for removal.
23. The structure set forth in claim 22, including: said hydraulic power means moving said first flowline flange away from said removal tool to release said first flowline flange from attachment with said seal plate.
24. The structure set forth in claim 11, including: a testing flange assembly mounted with said second flowline flange for testing said one or more second flowlines prior to connection with said first flowline means.
25. The structure set forth in claim 24, including: said second flowline means including two second flowlines; and said testing flange assembly including means providing fluid communication between said two second flowlines for testing said flowlines.
26. The structure set forth in claim 25, including: impression means mounted in said testing flange assembly for making an impression on a soft material pumped from the surface through one of said two flowlines to test said flange assembly.
27. The structure set forth in claim 25, wherein said testing flange assembly includes: a test flange attached with said second flowline flange; and means for releasing said test flange from attachment with said second flowline flange.
28. A method for making an underwater connection between a well drilled into a formation underlying a body of water, comprising the steps of: lowering from the water surface a flowline alignment assembly and landing said flowline alignment assembly with a well support means mounted at said well; lowering a fluid flow network and landing said fluid flow network with said flowline alignment assembly, said fluid flow network including a first flowline means for transferring well fluid; lowering a flowline positioning assembly with a wireline connected to a second flowline means and landing said flowline positioning assembly in proximity to said flowline alignment assembly; operating said wireline from the surface in order to pull said wireline and said second flowline means attached therewith inwardly toward said flowline positioning assembly until said second flowline means is in a position of partial alignment with said first flowline means; using hydraulic force to move said second flowline means to a locked position with said flowline positioning assembly and thereafter manipulating said flowline positioning assembly to land said second flowline means in a position of substantially complete alignment with said first flowline means; and joining said first and second aligned flowline means in a fluid connection.
29. The method set forth in claim 28, including the step of: lowering said flowline alignment assembly downwardly on said flowline positioning assembly and thereafter removing said flowline positioning assembly prior to lowering said fluid flow network.
30. The method set forth in claim 28, including the step of: providing an alignment channel to receive said first and second flowline means in complete alignment for connection.
31. The method set forth in claim 30, including the step of: seating said first flowline means in said alignment channel when said fluid flow network is landed with said well guide structure and said flowline alignment assembly.
32. The method set forth in claim 31, including the step of: landing said second flowline means in said channel to place said second flowline means in complete alignment for connection with said first flowline means.
33. The method set forth in claim 28, including the step of: utilizing a funnel assembly with said wireline extended therethrough to pull said second flowline means partially within said funnel assembly such that said second flowline means is partially aligned with said first flowline means.
34. The method set forth in claim 33, including the step of: utilizing said funnel assembly to grip said partially aligned second flowline means and move said second flowline means into said position of substantially complete alignment.
35. The method set forth in claim 28, including the step of: testing said second flowline means prior to connection of said first flowline means.
36. The method set forth in claim 28, including the step of: providing hydraulic power directly to said flowline positioning tool and to said fluid flow network.
37. The method set forth in claim 28, including: moving said second flowline means to a vertical position as said second flowline means is moved to said position of substantially complete alignment.
38. The method set forth in claim 28, including the step of: removing said flowline positioning assembly after said second flowline means is joined with said first flowline means.
39. Apparatus for selectively making fluid connection to a well drilled into a formation underlying a body of water, comprising: a well fluid flow control network for being positioned at a well drilled in a body of water, said well fluid flow control network including first flowline means for transferring well fluid outwardly of said well; second flowline means for extending from a remote point to said well, said second flowline means being lowered into the body of water for connection with said first flowline means such that said well fluid is transferable through said well fluid flow control network and said first and second flowline means to a remote point; wireline positioning means for mounting at said well and utilizing wireline apparatus to move said second flowline means to a position of partial alignment with respect to said first flowline means; remotely operable power means for mounting at said well for engagging and moving said second flowline means to a position of substantially complete alignment for connection with said first flowline means; and test means mounted with said second flowline means for testing said second flowline means prior to connection with said first flowline means.
US386431A 1973-08-07 1973-08-07 Underwater connection apparatus Expired - Lifetime US3866677A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US386431A US3866677A (en) 1973-08-07 1973-08-07 Underwater connection apparatus
US526100A US3924446A (en) 1973-08-07 1974-11-22 Underwater connection apparatus
US05/526,309 US3973625A (en) 1973-08-07 1974-11-22 Underwater connection apparatus
US05/526,465 US3968838A (en) 1973-08-07 1974-11-25 Underwater connection apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US386431A US3866677A (en) 1973-08-07 1973-08-07 Underwater connection apparatus

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US05/526,309 Division US3973625A (en) 1973-08-07 1974-11-22 Underwater connection apparatus
US05/526,465 Division US3968838A (en) 1973-08-07 1974-11-25 Underwater connection apparatus

Publications (1)

Publication Number Publication Date
US3866677A true US3866677A (en) 1975-02-18

Family

ID=23525541

Family Applications (1)

Application Number Title Priority Date Filing Date
US386431A Expired - Lifetime US3866677A (en) 1973-08-07 1973-08-07 Underwater connection apparatus

Country Status (1)

Country Link
US (1) US3866677A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS523501A (en) * 1975-06-23 1977-01-12 Vetco Offshore Ind Inc Method of and apparatus for connecting fluid pipe in water
US4004635A (en) * 1974-04-05 1977-01-25 Subsea Equipment Associates Limited Method for connecting a submerged well head to a pipe consisting of steel tubes
US4023619A (en) * 1974-04-05 1977-05-17 Subsea Equipment Associates Limited Method of connecting of an undersea central station to a group of undersea wells and outflow pipes
FR2461182A1 (en) * 1978-12-27 1981-01-30 Mac Evoy Oilfield Equipment Flow line coupling to offshore well head - by rope between flowline gland and coupling piece on hauling tool
US4329085A (en) * 1978-12-27 1982-05-11 Smith International, Inc. Connection of underwater lines
US4476897A (en) * 1979-10-24 1984-10-16 Smith International, Inc. Flowline connector seal
US4579372A (en) * 1979-10-24 1986-04-01 Smith International, Inc. Flowline connector seal
US4620818A (en) * 1984-05-25 1986-11-04 Shell Oil Company Flowline connection means
US4629003A (en) * 1985-08-01 1986-12-16 Baugh Benton F Guilelineless subsea completion system with horizontal flowline connection
US4643614A (en) * 1984-08-20 1987-02-17 Shell Oil Company Method and apparatus for the installation of a hose between a platform and a submerged buoy
US5323797A (en) * 1992-08-07 1994-06-28 Rankin George J Rotating hose apparatus
US20130098626A1 (en) * 2011-10-20 2013-04-25 Vetco Gray Inc. Soft Landing System and Method of Achieving Same
CN112800626A (en) * 2021-02-17 2021-05-14 大连理工大学 Early warning method for simulating circulation submarine pipeline hydrate blockage
CN112800698A (en) * 2021-02-17 2021-05-14 大连理工大学 Flow safety early warning method for seabed gas pipeline with hydrate film falling off along with fluid physical properties

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3716100A (en) * 1971-01-12 1973-02-13 Vetco Offshore Ind Inc Apparatus for aligning and connecting flowlines
US3721294A (en) * 1971-01-12 1973-03-20 Vetco Offshore Ind Inc Underwater pipe connection apparatus
US3722585A (en) * 1971-01-12 1973-03-27 Vetco Offshore Ind Inc Apparatus for aligning and connecting underwater flowlines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3716100A (en) * 1971-01-12 1973-02-13 Vetco Offshore Ind Inc Apparatus for aligning and connecting flowlines
US3721294A (en) * 1971-01-12 1973-03-20 Vetco Offshore Ind Inc Underwater pipe connection apparatus
US3722585A (en) * 1971-01-12 1973-03-27 Vetco Offshore Ind Inc Apparatus for aligning and connecting underwater flowlines

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4004635A (en) * 1974-04-05 1977-01-25 Subsea Equipment Associates Limited Method for connecting a submerged well head to a pipe consisting of steel tubes
US4023619A (en) * 1974-04-05 1977-05-17 Subsea Equipment Associates Limited Method of connecting of an undersea central station to a group of undersea wells and outflow pipes
JPS523501A (en) * 1975-06-23 1977-01-12 Vetco Offshore Ind Inc Method of and apparatus for connecting fluid pipe in water
FR2461182A1 (en) * 1978-12-27 1981-01-30 Mac Evoy Oilfield Equipment Flow line coupling to offshore well head - by rope between flowline gland and coupling piece on hauling tool
US4329085A (en) * 1978-12-27 1982-05-11 Smith International, Inc. Connection of underwater lines
US4476897A (en) * 1979-10-24 1984-10-16 Smith International, Inc. Flowline connector seal
US4579372A (en) * 1979-10-24 1986-04-01 Smith International, Inc. Flowline connector seal
US4620818A (en) * 1984-05-25 1986-11-04 Shell Oil Company Flowline connection means
US4643614A (en) * 1984-08-20 1987-02-17 Shell Oil Company Method and apparatus for the installation of a hose between a platform and a submerged buoy
US4629003A (en) * 1985-08-01 1986-12-16 Baugh Benton F Guilelineless subsea completion system with horizontal flowline connection
US5323797A (en) * 1992-08-07 1994-06-28 Rankin George J Rotating hose apparatus
US20130098626A1 (en) * 2011-10-20 2013-04-25 Vetco Gray Inc. Soft Landing System and Method of Achieving Same
US8931561B2 (en) * 2011-10-20 2015-01-13 Vetco Gray Inc. Soft landing system and method of achieving same
US9347292B2 (en) 2011-10-20 2016-05-24 Vetco Gray Inc. Soft landing system and method of achieving same
CN112800626A (en) * 2021-02-17 2021-05-14 大连理工大学 Early warning method for simulating circulation submarine pipeline hydrate blockage
CN112800698A (en) * 2021-02-17 2021-05-14 大连理工大学 Flow safety early warning method for seabed gas pipeline with hydrate film falling off along with fluid physical properties

Similar Documents

Publication Publication Date Title
US3866677A (en) Underwater connection apparatus
US3973625A (en) Underwater connection apparatus
US4191256A (en) Subsea flowline connector
US3308881A (en) Method and apparatus for offshore well completion
US5730551A (en) Subsea connector system and method for coupling subsea conduits
US4216835A (en) System for connecting an underwater platform to an underwater floor
US3592263A (en) Low profile protective enclosure for wellhead apparatus
US3633667A (en) Subsea wellhead system
US3166123A (en) Method and apparatus for underwater wells
US3302709A (en) Method for attaching and detaching a working base to an underwater well base
US3504740A (en) Subsea satellite foundation unit and method for installing a satellite body within said foundation unit
US4046192A (en) Method and apparatus for installing a control valve assembly on an underwater well head
US4625806A (en) Subsea drilling and production system for use at a multiwell site
US3968838A (en) Underwater connection apparatus
US4161367A (en) Method and apparatus for completing diverless subsea flowline connections
US4437521A (en) Subsea wellhead connection assembly and methods of installation
US3332484A (en) Subsea well control tube methods and apparatus
GB1576065A (en) Method and apparatus for making subsea pipe connections
US4004635A (en) Method for connecting a submerged well head to a pipe consisting of steel tubes
US3672447A (en) Marine well drilling method and apparatus
JPS6114396B2 (en)
US3179176A (en) Method and apparatus for carrying out operations at underwater installations
US3236302A (en) Apparatus for attaching and detaching a working base to an underwater well base
US4023619A (en) Method of connecting of an undersea central station to a group of undersea wells and outflow pipes
NO332032B1 (en) Underwater wellhead assembly and method of completing an underwater well

Legal Events

Date Code Title Description
AS Assignment

Owner name: VETCO OFFSHORE, INC. 5740 RALSTON ST.VENTURA,CA.93

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:VETCO INC.;REEL/FRAME:004056/0858

Effective date: 19820922

AS Assignment

Owner name: VETCO OFFSHORE INDUSTRIES, INC., 7135 ARDMORE ROAD

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:VETCO OFFSHORE, INC., A CORP. OF DE.;REEL/FRAME:004572/0533

Effective date: 19860421

AS Assignment

Owner name: CITIBANK, N.A.,

Free format text: SECURITY INTEREST;ASSIGNOR:VETCO GRAY INC., A DE. CORP.;REEL/FRAME:004739/0780

Effective date: 19861124

AS Assignment

Owner name: VETCO GRAY INC.,

Free format text: MERGER;ASSIGNORS:GRAY TOOL COMPANY, A TX. CORP. (INTO);VETCO OFFSHORE INDUSTRIES, INC., A CORP. (CHANGED TO);REEL/FRAME:004748/0332

Effective date: 19861217