US3777812A - Subsea production system - Google Patents
Subsea production system Download PDFInfo
- Publication number
- US3777812A US3777812A US00202230A US3777812DA US3777812A US 3777812 A US3777812 A US 3777812A US 00202230 A US00202230 A US 00202230A US 3777812D A US3777812D A US 3777812DA US 3777812 A US3777812 A US 3777812A
- Authority
- US
- United States
- Prior art keywords
- support structure
- well
- valves
- manifold
- manipulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 86
- 241000191291 Abies alba Species 0.000 claims abstract description 20
- 238000012423 maintenance Methods 0.000 claims abstract description 15
- 239000012530 fluid Substances 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 11
- 238000005553 drilling Methods 0.000 claims description 2
- 235000004507 Abies alba Nutrition 0.000 abstract description 14
- 238000002347 injection Methods 0.000 abstract description 6
- 239000007924 injection Substances 0.000 abstract description 6
- 230000008439 repair process Effects 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000012636 effector Substances 0.000 description 5
- 238000009825 accumulation Methods 0.000 description 4
- 238000002955 isolation Methods 0.000 description 3
- 101150047356 dec-1 gene Proteins 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000009977 dual effect Effects 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 239000003129 oil well Substances 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 241000282887 Suidae Species 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000005574 cross-species transmission Effects 0.000 description 1
- 210000002969 egg yolk Anatomy 0.000 description 1
- 238000005188 flotation Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000002706 hydrostatic effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
- E21B43/0175—Hydraulic schemes for production manifolds
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/04—Manipulators for underwater operations, e.g. temporarily connected to well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/08—Underwater guide bases, e.g. drilling templates; Levelling thereof
Definitions
- ABSTRACT A submergible template structure is completely equipped with manifolding for handling well production fluids, gas injection and well maintenance with through-the-flowline (TFL) pumpdown tools.
- the template is designed to contain a number of clustered wells and is provided with a pollution control system, electro-hydraulic power source and an unmanned manipulator unit capable of traveling on a track arranged on the template for specific maintenance work on valves, control pods, pipe sections, etci
- the template is furnished power and control through an electrical cable laid to a remote surface power source.
- Pipelines connect the template manifolding to remote gathering terminals.
- the template structure and the manifolding are disconnectable and reconnectable in sections for removal, repair and replacement'of damaged sections.
- the template structure is completely equipped at the surface and then lowered to the sea floor using lines and controlled buoyancy. Once on bottom, the template is leveled and piles driven to anchor it. Wells are drilled from floating rigs and the wellheads are grouped together on the template. Christmas trees are lowered andconnected to the wellheads and to the manifolding. Basic well maintenance is performed with TFL equipment although the wells may be reentered vertically from a floating rig when necessary. All valves are hydraulic fail-safe and manual valves in the manifold are operable by the manipulator unit. The manipulator is lowered to the track and positioned where desired when performing operation of the valves or basic maintenance on the valves and manifold.
- the present invention concerns a subsea production system for remotely completing wells and handling production well fluids in offshore operations.
- the present invention also concerns the assembly, installation on the sea floor and operation of the subsea production system.
- the system is economically attractive, reliable, fail-safe, nonpo'lluting, remotely maintainable and particularly adaptable for use in deep water.
- the subsea production system of the invention comprises, briefly, a template containing a plurality of well bays and manifolding which includes production, maintenance and control piping looping the well bays.
- a track is arranged on the template about the well bays.
- the template structure, the manifold piping and the track have disconnect-reconnect points for separating selected sections of the template manifold piping and track for removal and replacement thereof.
- Also supported on the template are disconnectable and reconnectable hydraulic power, pipeline block valve, and electric power-transformer units.
- a remotely controlled manipulator is arranged on the track for movement to selected positions for operating valves and for maintenance operations.
- FIG. 1 is a plan view of the subsea production system of the invention
- FIG. 2 is a view taken along lines 2-2 of FIG. 1;
- FIG. 3 is a fragmentary view illustrating means for guiding a removable section of the upper support structure of the template into position on the base structure of the template;
- FIG. 4 is an isometric view of a portion of the upper support structure of the template and the surrounding track;
- FIG. 5 is an isometric view of the manifold piping assembly
- FIG. 6 is a front view of the submersible manipulator work unit mounted on the track.
- FIG. 7 is a fragmentary side view of the manipulator work unit.
- a template or platform 10 includes a truss framework base structure 11 and an upper framework support structure 12.
- Base structure 11 includes a base member 13 at mud line elevation and vertical and horizontal supports 14.
- a well, indicated at 15, has been drilled through each well bay, well pipe set and cemented in, and a Christmas tree 16 landed and connected to a wellhead 17 in accordance with the procedure shown and described in application Ser. No. 64,519 entitled Multi-String Tubingless COmpletion Technique filed Aug. 14, 1970, by Carl E. Reistle, III et al.
- Christmas tree 16 is connected to a wellhead assembly 17 by a connector 18. Master valves 19 and 20, positioned on the Christmas tree, control flowlines 21 and 22 connected to the dual pipe strings in the well. Flowlines 21 and 22 connect to conduits 23 and 24, respectively, by connectors 25 and 26. Conduits 23 and 24 connect into the production headers of the manifold system which is shown and described in detail with reference to FIG. 5.
- a hydraulic conduit containing hydraulic control lines is also connected to Christmas tree 16 by a connector 32 to operate the various valves associated with the Christmas tree piping. These hydraulic lines connect to the hydraulic unit 33 through a closed hydraulic distribution system.
- Manifold piping 30 extends into base support structure 11 under track 40 at 38, connects into block valve assembly 46, and then extends to outside template 10 and terminates in a piping connection 39.
- the lines from each header are provided with a master shut-in valve in block valve assembly 46.
- Pressure sensors are installed on production header lines upstream and downstream of the block valve skid. If the allowable operating pressure range is exceeded, the entire subsea production system will shut in.
- An electrically driven pump on the hydraulic power unit 45 charges an accumulator to provide hydraulic power to the hydraulic distribution system indicated by line 57. A suitable reserve of hydraulic pressure ample for valve operation is available from the accumulator. If standby hydraulic pressure is ever exhausted, all subsea production system valves will close automatically.
- the electro-hydraulic system controls the subsea production system operation.
- a digital coded electronic signal sent to the subsea production system over cable 55 identifies (1) template location (2) the specific well or manifold to be actuated and (3) the function desired.
- the signal will actuate an appropriate solenoid on the subsea production system allowing hy draulic pressure to act on the valve operator.
- the electrical system also allows monitoring of pressure and temperature at selected points on the subsea production system and wellheads.
- Subsea electrical equipment is encased in an oil bed and functions at sea pressure to minimize the possibility of water leakage into the system.
- the upper support structure 12 includes tubular support members 34 and bulk head supports 35 on which the manifold system is supported.
- the manifold pipes 30 extend through the openings 36 in bulk heads 35 and are also supported by clamps 37 attached to vertical support pipes 34.
- the upper support structure and the well bays are looped and surrounded by a track 40 which is formed by interlocking sections joined, as indicated at 41, for disconnection and reconnection along with separable sections of upper support structure 12 connected thereto and indicated at 42.
- Upper support structure 12 also supports, along the outside of track 40, a hydraulic power skid, indicated at 45, a block valve assembly skid indicated at 46 and an electric power skid indicated at 47.
- a multiple conductor cable 55 supplies power to unit 47 from a control station at the surface.
- a conduit 48 containing electrical power lines for supplying electrical power to the well control pods 49 is supported on the upper support structure, as shown.
- COnduit 48 is separable in removable sections as indicated at points 50. Sections of upper support structure 12 following removal for repair may be properly repositioned on base support structure 11 by, for example, guiding vertical pipes 34 to fit over prong members 33 secured to base support structure 11 as shown in FIG. 3.
- Openings 67 in the base structure may be employed to accommodate piles used to secure the template.
- the manifold system 30 is shown in greater detail in FIG. 5.
- Two large production headers 60 and 61 completely loop production trees 1 2 and 3 which are connected to production manifold sections 1, 2 and 3.
- a smaller gas lift supply header 62 and two smaller multipurpose headers 63 and 64 also loop the production trees.
- Disconnects 65 are positioned on the manifold pipes adjacent bulk heads 35 (see FIG. 4).
- Each production manifold section is provided with a gas-lift wing valve 70, a gas isolation valve 71, a production wing valve 72, a production isolation valve 73, a TFL wing valve 74, a TFL diverter 75, a TFL wing valve 76, a production isolation valve 77 and a TF L diverter 78.
- Front bulk head end bulk head sections 79 are each provided with a TFL block valve 80, a water flood and production block valve 81, a gas injection block valve 82, a production block valve 83 and a TF L block valve 84. Front bulk head section 79 is also provided with pan drain valves 85 and 86. Pig injection manifolding 90 includes pig launch valves 91, pig block valves 92 and bypass valves 93. A TFL cross-over valve is shown at 95. Pan drain lines are indicated at 96 and hydraulic control lines are indicated at 31.
- tree No. l is on a water input well; tree No. 2 is on a gas-lifted oil well; and tree No. 3 is on an oil well being serviced by TF L tools.
- the various lines are identified as follows: production lines are designated A, gas injection lines are designated B, water flood and production lines are designated C, TFL lines are designated D and E, pan drain lines are designated F and the pig launch magazine is designated, G. Arrows on the E TFL line indicate the path of fluid pumped to move TFL tools down the production casing after the tools pass TF L wind valve 76 in production manifold section No. 3.
- TFL cross-over valve 95 is opened, the TFL wing valve 76 is closed and the flow path is reversed when TFL service tools are initially pumped from the remote service station to the subsea production system.
- the scraper pigging system built into the manifold assembly is for the purpose of cleaning the production pipelines. Scraper pigs can be stored in the system and released into the lines one at a time on command.
- scraper pigging system suitable for use in.the manifolding of the subsea production system described herein is described in US. Pat. No. 3,562,014 issued Feb. 9, I971 entitled Pipeline Scraper Launching System.
- the disconnect flanges 65 located in every header at selected damage control points around the manifold loop allow removal and replacement of complete header sections.
- the inverted drip pans are mounted over the entire subsea production system manifold as well as the pipeline block valve skid and electric power and hydraulic power skids.
- the pans are connected by piping to an oil sump.
- This pollution control system for the manifold system is described in US Pat. application Ser. No. 174 entitled Underwater Pollution Control filed Jan. 2, 1970, by T. W. Childers.
- the equipment catches, collects and disposes of any small amounts of oil that might escape during change out of a valve. Since the pans cover the entire manifold, they also entrap oil from any leak that might develop. Oil which accumulates under a drip pan will migrate up through the piping system and collect in the sump section.
- An inductive device mounted in the sump senses the hydrocarbon accumulation and shut-in sections of the subsea production system operation while simultaneously transmitting an alarm to the remote control station. Any additional accumulation of oil will-eventually fill a part of the sump section and spill over into another section. The additional oil buildup will be sensed by the inductive device and shut in the entire subsea production system. Accumulation in the sump can be drained into the production header in the manifold upon command. An operator at the control station then can override the safety shut-in to determine cause of the oil accumulation. When located, the leaky section can be isolated and the remainder of the subsea production system returned to service. As an additional safety measure production lines operate at pressures less than hydrostatic head of the surrounding sea.
- a manipulator work unit 100 illustrated in FIGS. 6 and 7 performs basic maintenance on the subsea production system valves and manifold.
- the unit runs on track 40 and has access to all well and subsea production system disconnect flanges, valves, etc.
- An electrical umbilical cable to the surface provides power to move the unit along the track and to operate the manipulator arm.
- Television cameras monitor the operation.
- the components of the unit are illustrated in FIGS. 6 and 7 and include a replacement buoy 101 containing a haul down line, a bell 102 containing a complete control system, a drum for winding the haul down cable, a bumper to protect the end effector on the surface, a hydraulic supply with compensator and motors, an orientation bushing, an anchor, receivers for valves, end effector (working tool) 103, a motor starter pod, a transformer pod with volumetric compensator, an electric pod containing a command system, foam 104 for flotation, replacement valves 105, a lifting beam, TV cameras 106, a lifting cable 107, an electrical umbilical cable 108 and wheels 109.
- the template support structure and manifolding are assembled at the surface and lowered through the water and set on the ocean bottom.
- the template is leveled and piles may be set through the template to anchor it or the template may be preleveled by shaping the bottom of the template to conform to the shape of the sea floor.
- a well is drilled, well pipe set and cemented in and a Christmas tree landed and connected to the wellhead as described in the aforementioned application Ser. No. 64,519.
- the flowline and hydraulic connections between the tree and the manifold are made up and the electric and hydraulic equipment are tested. Then additional wells may be drilled and such equipment tested in a similar manner or the first drilled well may be completed and produced before any additional wells are drilled.
- a buoy 101 is remotely released from the template to lift a line to the surface.
- the manipulator work unit 100 is moved to location by a ship and attached to the line.
- the work unit is positively buoyant and pulls itself down to the subsea production system following the line attached to the buoy.
- the unit aligns itself and lands properly on the template track 40 as indicated at point 32.
- yolks engage an anchor to hold the unit on the track.
- An electrical umbilical cable 108 to the surface provides power to move the unit along the track and to operate the manipulator arm or effector 103.
- Television cameras monitor the operation.
- the effector 103 closes manual valves to isolate the valve to be replaced.
- the effector is then positioned over the valve body and removes it from the manifold, rotates and places the body in a rack on the work unit.
- a new valve section is picked up from another rack on the work unit and reinstalled on the manifold. Seals on the replaceable valve element are tested by the work unit.
- the unit retraces its path to its landing point 32, releases the anchor and returns up the line to the surface. All mechanical, electrical and hydraulic subsea production system components are maintained in this manner.
- the manipulator will attach a line from the surface to the component, release it from the subsea production system and a boat or floating rig will then retrieve the unit.
- a man can be lowered in a bell attached to the work unit.
- the unit is provided with a self-contained power system which permits it to move along the track if the umbilical power cable to the surface should fail. Also the man can release the work unit from the anchor or release the bell from the work unit and allow it to float to the surface.
- a subsea oil and/or gas production system comprising:
- a template including a base support structure and an upper support structure
- first disconnect-reconnect means located at selected points on said manifold system to permit selective removal and replacement of sections of said manifold system
- said upper support structure being formed in disconnectable-reconnectable sections to permit selective removal and replacement of sections of said upper support structure;
- said track being formed in disconnectablereconnectable sections to permit selective removal and replacement of sections of said track;
- each production manifold section including a plurality of removable and replaceable valves for use in controlling flow of fluids through said production manifold section;
- a manipulator unit capable of traversing said track and accessible to said reconnect-disconnect means for operation of said reconnect-disconnect means, said manipulator unit also being accessible to said valves for removal and replacement of said valves.
- a subsea production system as recited in claim 1 in which said base support structure is located on the sea bottom and extends to an elevation at least sufficient to permit piping connected to said manifold system to extend under said track.
- a subsea production system as recited in claim 2 in which said manifold system includes two large production headers and three smaller service headers, two of said service headers being capable of servicing wells by TFL techniques and the other service header being capable of servicing wells for gas-lift operations.
- a subsea production system as recited in claim 4 including removable and replaceable electric power, hydraulic power, and block valve units arranged on said upper support structure along the outer perimeter of said track.
- a subsea production system as recited in claim 5 including electro-hydraulic pods associated with each christmas tree and mounted on said upper support structure for controlling operation of the well to which said christmas tree is connected.
- a subsea production system as recited in claim 6 including a scraper pigging system arranged in said manifold system.
- a method of assembly of a subsea well fluid production system comprising the steps of:
- a template including a base support structure containing a plurality of well bays and an upper support structure mounted thereon, said upper support structure supporting a track arranged about said well bays and a manifold system looping said well bays, said manifold system and said upper support structure and said track being formed so as to permit selective removal and replacement of sections thereof, said manifold system including removable and replaceable valves for controlling production of the well and servicing of the well and maintenance of the well, said upper support structure supporting outside said track electric, hydraulic, and block valve units removable from and replaceable on said upper support structure, said manifold system containing removable and replaceable pods for controlling operation of the valves;
- a manipulator capable of dis connecting and reconnecting components of said subsea production system including sections of said manifold system and said removable and replaceable units and of removing and replacing said valves;
- a method as recited in claim 9 including removing said disconnected component by said manipulator and replacing said component by said manipulator and then operating said manipulator to reconnect said replaced component into said subsea production system.
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Jet Pumps And Other Pumps (AREA)
- Agricultural Chemicals And Associated Chemicals (AREA)
- Polyesters Or Polycarbonates (AREA)
Abstract
A submergible template structure is completely equipped with manifolding for handling well production fluids, gas injection and well maintenance with through-the-flowline (TFL) pumpdown tools. The template is designed to contain a number of clustered wells and is provided with a pollution control system, electrohydraulic power source and an unmanned manipulator unit capable of traveling on a track arranged on the template for specific maintenance work on valves, control pods, pipe sections, etc. The template is furnished power and control through an electrical cable laid to a remote surface power source. Pipelines connect the template manifolding to remote gathering terminals. The template structure and the manifolding are disconnectable and reconnectable in sections for removal, repair and replacement of damaged sections. The template structure is completely equipped at the surface and then lowered to the sea floor using lines and controlled buoyancy. Once on bottom, the template is leveled and piles driven to anchor it. Wells are drilled from floating rigs and the wellheads are grouped together on the template. Christmas trees are lowered and connected to the wellheads and to the manifolding. Basic well maintenance is performed with TFL equipment although the wells may be re-entered vertically from a floating rig when necessary. All valves are hydraulic fail-safe and manual valves in the manifold are operable by the manipulator unit. The manipulator is lowered to the track and positioned where desired when performing operation of the valves or basic maintenance on the valves and manifold.
Description
United States Patent 1 Burkhardt et al.
[ Dec. 11, 1973 SUBSEA PRODUCTION SYSTEM [73] Assignee: Esso Production Research Company,
Houston, Tex.
221 Filed: Nov. 26, 1971 21 Appl.No.:202,230
[52] US. Cl. 166/.6 [51] Int. Cl E2lb 43/01 [58] Field of Search l66/0.5, 0.6
[56] References Cited UNITED STATES PATENTS 3,633,667 1/1972 Falkner, Jr 166/05 3,292,695 12/1966 Haeber 166/05 3,643,736 2/1972 Talley, Jr 166/0.5 3,099,316 7/1963 Johnson 166/0.6 3,545,539 12/1970 Manning 166/05 3,552,903 l/l97l Townsend, Jr l66/0.5 3,621,91 1 1 1/197] Baker 166/05 3,638,720 2/1972 Thomas 166/05 3,307,627 3/1967 Shatto, Jr 166/05 Primary ExaminerJames A. Leppink AttorneyThomas B. McCulloch et al.
[57] ABSTRACT A submergible template structure is completely equipped with manifolding for handling well production fluids, gas injection and well maintenance with through-the-flowline (TFL) pumpdown tools. The template is designed to contain a number of clustered wells and is provided with a pollution control system, electro-hydraulic power source and an unmanned manipulator unit capable of traveling on a track arranged on the template for specific maintenance work on valves, control pods, pipe sections, etci The template is furnished power and control through an electrical cable laid to a remote surface power source. Pipelines connect the template manifolding to remote gathering terminals. The template structure and the manifolding are disconnectable and reconnectable in sections for removal, repair and replacement'of damaged sections. The template structure is completely equipped at the surface and then lowered to the sea floor using lines and controlled buoyancy. Once on bottom, the template is leveled and piles driven to anchor it. Wells are drilled from floating rigs and the wellheads are grouped together on the template. Christmas trees are lowered andconnected to the wellheads and to the manifolding. Basic well maintenance is performed with TFL equipment although the wells may be reentered vertically from a floating rig when necessary. All valves are hydraulic fail-safe and manual valves in the manifold are operable by the manipulator unit. The manipulator is lowered to the track and positioned where desired when performing operation of the valves or basic maintenance on the valves and manifold.
11 Claims, 7 Drawing Figures MANIPULATOR H WELL SAYS END BULKHE MANIFOLD 2 FRONT BULKHEAD MAN NANIPULA POINT LANDING PATENTED DEC 1 1 I973 SHIET 1 BF 5 SHEET 5 UP 5 FIG. 6.
PATENTED DEC 1 1 I875 IOO SUBSEA PRODUCTION SYSTEM BACKGROUND OF THE INVENTION The present invention concerns a subsea production system for remotely completing wells and handling production well fluids in offshore operations. The present invention also concerns the assembly, installation on the sea floor and operation of the subsea production system. The system is economically attractive, reliable, fail-safe, nonpo'lluting, remotely maintainable and particularly adaptable for use in deep water.
BRIEF DESCRIPTION OF THE INVENTION The subsea production system of the invention comprises, briefly, a template containing a plurality of well bays and manifolding which includes production, maintenance and control piping looping the well bays. A track is arranged on the template about the well bays. The template structure, the manifold piping and the track have disconnect-reconnect points for separating selected sections of the template manifold piping and track for removal and replacement thereof. Also supported on the template are disconnectable and reconnectable hydraulic power, pipeline block valve, and electric power-transformer units. A remotely controlled manipulator is arranged on the track for movement to selected positions for operating valves and for maintenance operations.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a plan view of the subsea production system of the invention;
FIG. 2 is a view taken along lines 2-2 of FIG. 1;
FIG. 3 is a fragmentary view illustrating means for guiding a removable section of the upper support structure of the template into position on the base structure of the template;
FIG. 4 is an isometric view of a portion of the upper support structure of the template and the surrounding track;
FIG. 5 is an isometric view of the manifold piping assembly;
FIG. 6 is a front view of the submersible manipulator work unit mounted on the track; and
FIG. 7 is a fragmentary side view of the manipulator work unit.
The components of the subsea production system for a three well arrangement are shown in FIGS. 1 to 4. As shown in these figures, a template or platform 10 includes a truss framework base structure 11 and an upper framework support structure 12. Base structure 11 includes a base member 13 at mud line elevation and vertical and horizontal supports 14. A well, indicated at 15, has been drilled through each well bay, well pipe set and cemented in, and a Christmas tree 16 landed and connected to a wellhead 17 in accordance with the procedure shown and described in application Ser. No. 64,519 entitled Multi-String Tubingless COmpletion Technique filed Aug. 14, 1970, by Carl E. Reistle, III et al. Although a tubingless completion is described in that application, for purposes of the present invention the completion may be of the conventional type in which the dual production strings are not cemented in the well. Christmas tree 16 is connected to a wellhead assembly 17 by a connector 18. Master valves 19 and 20, positioned on the Christmas tree, control flowlines 21 and 22 connected to the dual pipe strings in the well. Flowlines 21 and 22 connect to conduits 23 and 24, respectively, by connectors 25 and 26. Conduits 23 and 24 connect into the production headers of the manifold system which is shown and described in detail with reference to FIG. 5. A hydraulic conduit containing hydraulic control lines is also connected to Christmas tree 16 by a connector 32 to operate the various valves associated with the Christmas tree piping. These hydraulic lines connect to the hydraulic unit 33 through a closed hydraulic distribution system.
Manifold piping 30 extends into base support structure 11 under track 40 at 38, connects into block valve assembly 46, and then extends to outside template 10 and terminates in a piping connection 39. The lines from each header are provided with a master shut-in valve in block valve assembly 46.
Pressure sensors, not shown, are installed on production header lines upstream and downstream of the block valve skid. If the allowable operating pressure range is exceeded, the entire subsea production system will shut in. An electrically driven pump on the hydraulic power unit 45 charges an accumulator to provide hydraulic power to the hydraulic distribution system indicated by line 57. A suitable reserve of hydraulic pressure ample for valve operation is available from the accumulator. If standby hydraulic pressure is ever exhausted, all subsea production system valves will close automatically.
The electro-hydraulic system controls the subsea production system operation. A digital coded electronic signal sent to the subsea production system over cable 55 identifies (1) template location (2) the specific well or manifold to be actuated and (3) the function desired. The signal will actuate an appropriate solenoid on the subsea production system allowing hy draulic pressure to act on the valve operator. The electrical system also allows monitoring of pressure and temperature at selected points on the subsea production system and wellheads. Subsea electrical equipment is encased in an oil bed and functions at sea pressure to minimize the possibility of water leakage into the system.
The upper support structure 12 includes tubular support members 34 and bulk head supports 35 on which the manifold system is supported. The manifold pipes 30 extend through the openings 36 in bulk heads 35 and are also supported by clamps 37 attached to vertical support pipes 34. The upper support structure and the well bays are looped and surrounded by a track 40 which is formed by interlocking sections joined, as indicated at 41, for disconnection and reconnection along with separable sections of upper support structure 12 connected thereto and indicated at 42. Upper support structure 12 also supports, along the outside of track 40, a hydraulic power skid, indicated at 45, a block valve assembly skid indicated at 46 and an electric power skid indicated at 47. A multiple conductor cable 55 supplies power to unit 47 from a control station at the surface. Each of these skids are disconnectable and reconnectable for removal and replacement. A conduit 48 containing electrical power lines for supplying electrical power to the well control pods 49 is supported on the upper support structure, as shown. COnduit 48 is separable in removable sections as indicated at points 50. Sections of upper support structure 12 following removal for repair may be properly repositioned on base support structure 11 by, for example, guiding vertical pipes 34 to fit over prong members 33 secured to base support structure 11 as shown in FIG. 3.
The manifold system 30 is shown in greater detail in FIG. 5. Two large production headers 60 and 61 completely loop production trees 1 2 and 3 which are connected to production manifold sections 1, 2 and 3. A smaller gas lift supply header 62 and two smaller multipurpose headers 63 and 64 also loop the production trees. Disconnects 65 are positioned on the manifold pipes adjacent bulk heads 35 (see FIG. 4). Each production manifold section is provided with a gas-lift wing valve 70, a gas isolation valve 71, a production wing valve 72, a production isolation valve 73, a TFL wing valve 74, a TFL diverter 75, a TFL wing valve 76, a production isolation valve 77 and a TF L diverter 78. Front bulk head end bulk head sections 79 are each provided with a TFL block valve 80, a water flood and production block valve 81, a gas injection block valve 82, a production block valve 83 and a TF L block valve 84. Front bulk head section 79 is also provided with pan drain valves 85 and 86. Pig injection manifolding 90 includes pig launch valves 91, pig block valves 92 and bypass valves 93. A TFL cross-over valve is shown at 95. Pan drain lines are indicated at 96 and hydraulic control lines are indicated at 31.
As an illustration of the operation of the manifold system, tree No. l is on a water input well; tree No. 2 is on a gas-lifted oil well; and tree No. 3 is on an oil well being serviced by TF L tools. The various lines are identified as follows: production lines are designated A, gas injection lines are designated B, water flood and production lines are designated C, TFL lines are designated D and E, pan drain lines are designated F and the pig launch magazine is designated, G. Arrows on the E TFL line indicate the path of fluid pumped to move TFL tools down the production casing after the tools pass TF L wind valve 76 in production manifold section No. 3. Return fluid simultaneously displaced up the parallel casing string (designated gas injection) by the TFL tools returns by way of the D TFL lines. The TFL cross-over valve 95 is opened, the TFL wing valve 76 is closed and the flow path is reversed when TFL service tools are initially pumped from the remote service station to the subsea production system.
The scraper pigging system built into the manifold assembly is for the purpose of cleaning the production pipelines. Scraper pigs can be stored in the system and released into the lines one at a time on command. A
scraper pigging system suitable for use in.the manifolding of the subsea production system described herein is described in US. Pat. No. 3,562,014 issued Feb. 9, I971 entitled Pipeline Scraper Launching System. The disconnect flanges 65 located in every header at selected damage control points around the manifold loop allow removal and replacement of complete header sections.
The inverted drip pans are mounted over the entire subsea production system manifold as well as the pipeline block valve skid and electric power and hydraulic power skids. The pans are connected by piping to an oil sump. This pollution control system for the manifold system is described in US Pat. application Ser. No. 174 entitled Underwater Pollution Control filed Jan. 2, 1970, by T. W. Childers. The equipment catches, collects and disposes of any small amounts of oil that might escape during change out of a valve. Since the pans cover the entire manifold, they also entrap oil from any leak that might develop. Oil which accumulates under a drip pan will migrate up through the piping system and collect in the sump section. An inductive device mounted in the sump senses the hydrocarbon accumulation and shut-in sections of the subsea production system operation while simultaneously transmitting an alarm to the remote control station. Any additional accumulation of oil will-eventually fill a part of the sump section and spill over into another section. The additional oil buildup will be sensed by the inductive device and shut in the entire subsea production system. Accumulation in the sump can be drained into the production header in the manifold upon command. An operator at the control station then can override the safety shut-in to determine cause of the oil accumulation. When located, the leaky section can be isolated and the remainder of the subsea production system returned to service. As an additional safety measure production lines operate at pressures less than hydrostatic head of the surrounding sea.
A manipulator work unit 100 illustrated in FIGS. 6 and 7 performs basic maintenance on the subsea production system valves and manifold. The unit runs on track 40 and has access to all well and subsea production system disconnect flanges, valves, etc.
An electrical umbilical cable to the surface provides power to move the unit along the track and to operate the manipulator arm. Television cameras monitor the operation. The components of the unit are illustrated in FIGS. 6 and 7 and include a replacement buoy 101 containing a haul down line, a bell 102 containing a complete control system, a drum for winding the haul down cable, a bumper to protect the end effector on the surface, a hydraulic supply with compensator and motors, an orientation bushing, an anchor, receivers for valves, end effector (working tool) 103, a motor starter pod, a transformer pod with volumetric compensator, an electric pod containing a command system, foam 104 for flotation, replacement valves 105, a lifting beam, TV cameras 106, a lifting cable 107, an electrical umbilical cable 108 and wheels 109.
In operation, the template support structure and manifolding are assembled at the surface and lowered through the water and set on the ocean bottom. The template is leveled and piles may be set through the template to anchor it or the template may be preleveled by shaping the bottom of the template to conform to the shape of the sea floor. A well is drilled, well pipe set and cemented in and a Christmas tree landed and connected to the wellhead as described in the aforementioned application Ser. No. 64,519. The flowline and hydraulic connections between the tree and the manifold are made up and the electric and hydraulic equipment are tested. Then additional wells may be drilled and such equipment tested in a similar manner or the first drilled well may be completed and produced before any additional wells are drilled.
If maintenance work is to be done on a subsea production system manifold valve, for example, a buoy 101 is remotely released from the template to lift a line to the surface. The manipulator work unit 100 is moved to location by a ship and attached to the line. The work unit is positively buoyant and pulls itself down to the subsea production system following the line attached to the buoy. The unit aligns itself and lands properly on the template track 40 as indicated at point 32. Upon landing, yolks engage an anchor to hold the unit on the track. An electrical umbilical cable 108 to the surface provides power to move the unit along the track and to operate the manipulator arm or effector 103. Television cameras monitor the operation. The effector 103 closes manual valves to isolate the valve to be replaced. The effector is then positioned over the valve body and removes it from the manifold, rotates and places the body in a rack on the work unit. A new valve section is picked up from another rack on the work unit and reinstalled on the manifold. Seals on the replaceable valve element are tested by the work unit. The unit retraces its path to its landing point 32, releases the anchor and returns up the line to the surface. All mechanical, electrical and hydraulic subsea production system components are maintained in this manner. When it is necessary to handle large equipment items such as the hydraulic unit or manifold section, the manipulator will attach a line from the surface to the component, release it from the subsea production system and a boat or floating rig will then retrieve the unit.
If a maintenance job cannot be performed remotely, a man can be lowered in a bell attached to the work unit. The unit is provided with a self-contained power system which permits it to move along the track if the umbilical power cable to the surface should fail. Also the man can release the work unit from the anchor or release the bell from the work unit and allow it to float to the surface.
Changes and modifications may be made in the specific, illustrative embodiments of the invention shown and/or described herein without departing from the scope of the invention as defined in the appended claims.
Having fully described the method, apparatus, ob jects and advantages of our invention, we claim:
1. A subsea oil and/or gas production system comprising:
a template including a base support structure and an upper support structure;
a plurality of spaced apart well bays arranged on said upper support structure;
a track arranged on said upper support structure about said well bays;
a manifold system arranged on said upper support structure looping said well bays;
first disconnect-reconnect means located at selected points on said manifold system to permit selective removal and replacement of sections of said manifold system;
said upper support structure being formed in disconnectable-reconnectable sections to permit selective removal and replacement of sections of said upper support structure;
said track being formed in disconnectablereconnectable sections to permit selective removal and replacement of sections of said track;
a wellhead in each of said well bays;
a christmas tree mounted on each of said wellheads;
a production manifold section connecting each christmas tree to said manifold system;
each production manifold section including a plurality of removable and replaceable valves for use in controlling flow of fluids through said production manifold section; and
a manipulator unit capable of traversing said track and accessible to said reconnect-disconnect means for operation of said reconnect-disconnect means, said manipulator unit also being accessible to said valves for removal and replacement of said valves.
2. A subsea production system as recited in claim 1 in which said base support structure is located on the sea bottom and extends to an elevation at least sufficient to permit piping connected to said manifold system to extend under said track.
3. A subsea production system as recited in claim 2 in which said manifold system includes two large production headers and three smaller service headers, two of said service headers being capable of servicing wells by TFL techniques and the other service header being capable of servicing wells for gas-lift operations.
4. A subsea production system as recited in claim 3 in which said removable and replaceable valves include two TFL wing valves and a production wing valve.
5. A subsea production system as recited in claim 4 including removable and replaceable electric power, hydraulic power, and block valve units arranged on said upper support structure along the outer perimeter of said track.
6. A subsea production system as recited in claim 5 including electro-hydraulic pods associated with each christmas tree and mounted on said upper support structure for controlling operation of the well to which said christmas tree is connected.
7. A subsea production system as recited in claim 6 including a scraper pigging system arranged in said manifold system.
8. A method of assembly of a subsea well fluid production system comprising the steps of:
assembling at the surface of the sea a template including a base support structure containing a plurality of well bays and an upper support structure mounted thereon, said upper support structure supporting a track arranged about said well bays and a manifold system looping said well bays, said manifold system and said upper support structure and said track being formed so as to permit selective removal and replacement of sections thereof, said manifold system including removable and replaceable valves for controlling production of the well and servicing of the well and maintenance of the well, said upper support structure supporting outside said track electric, hydraulic, and block valve units removable from and replaceable on said upper support structure, said manifold system containing removable and replaceable pods for controlling operation of the valves;
lowering said template and said equipment supported thereon to the sea bottom;
drilling a hole and setting well pipes;
running and setting a christmas tree on said well;
connecting said christmas tree to said manifold system;
connecting said manifold system to a pipeline;
perforating said well;
lowering to said track a manipulator capable of dis connecting and reconnecting components of said subsea production system including sections of said manifold system and said removable and replaceable units and of removing and replacing said valves;
or replacing said component, returning said component to its initial position, and then operating said manipulator to reconnect said component into said subsea production system.
11. A method as recited in claim 9 including removing said disconnected component by said manipulator and replacing said component by said manipulator and then operating said manipulator to reconnect said replaced component into said subsea production system. I i *0
Claims (11)
1. A subsea oil and/or gas production system comprising: a template including a base support structure and an upper support structure; a plurality of spaced apart well bays arranged on said upper support structure; a track arranged on said upper support structure about said well bays; a manifold system arranged on said upper support structure looping said well bays; first disconnect-reconnect means located at selected points on said manifold system to permit selective removal and replacement of sections of said manifold system; said upper support structure being formed in disconnectablereconnectable sections to permit selective removal and replacement of sections of said upper support structure; said track being formed in disconnectable-reconnectable sections to permit selective removal and replacement of sections of said track; a wellhead in each of said well bays; a christmas tree mounted on each of said wellheads; a production manifold section connecting each christmas tree to said manifold system; each production manifold section including a plurality of removable and replaceable valves for use in controlling flow of fluids through said production manifold section; and a manipulator unit capable of traversing said track and accessible to said reconnect-disconnect means for operation of said reconnect-disconnect means, said manipulator unit also being accessible to said valves for removal and replacement of said valves.
2. A subsea production system as recited in claim 1 in which said base support structure is located on the sea bottom and extends to an elevation at least sufficient to permit piping connected to said manifold system to extEnd under said track.
3. A subsea production system as recited in claim 2 in which said manifold system includes two large production headers and three smaller service headers, two of said service headers being capable of servicing wells by TFL techniques and the other service header being capable of servicing wells for gas-lift operations.
4. A subsea production system as recited in claim 3 in which said removable and replaceable valves include two TFL wing valves and a production wing valve.
5. A subsea production system as recited in claim 4 including removable and replaceable electric power, hydraulic power, and block valve units arranged on said upper support structure along the outer perimeter of said track.
6. A subsea production system as recited in claim 5 including electro-hydraulic pods associated with each christmas tree and mounted on said upper support structure for controlling operation of the well to which said christmas tree is connected.
7. A subsea production system as recited in claim 6 including a scraper pigging system arranged in said manifold system.
8. A method of assembly of a subsea well fluid production system comprising the steps of: assembling at the surface of the sea a template including a base support structure containing a plurality of well bays and an upper support structure mounted thereon, said upper support structure supporting a track arranged about said well bays and a manifold system looping said well bays, said manifold system and said upper support structure and said track being formed so as to permit selective removal and replacement of sections thereof, said manifold system including removable and replaceable valves for controlling production of the well and servicing of the well and maintenance of the well, said upper support structure supporting outside said track electric, hydraulic, and block valve units removable from and replaceable on said upper support structure, said manifold system containing removable and replaceable pods for controlling operation of the valves; lowering said template and said equipment supported thereon to the sea bottom; drilling a hole and setting well pipes; running and setting a christmas tree on said well; connecting said christmas tree to said manifold system; connecting said manifold system to a pipeline; perforating said well; lowering to said track a manipulator capable of disconnecting and reconnecting components of said subsea production system including sections of said manifold system and said removable and replaceable units and of removing and replacing said valves; positioning said manipulator adjacent one of said valves to be removed; removing said one valve by said manipulator; and replacing said valve by said manipulator with another valve.
9. A method as recited in claim 8 including positioning said manipulator adjacent a component to be removed, and operating said manipulator to disconnect said component from said subsea production system.
10. A method as recited in claim 9 including lifting said diconnected component to the surface, repairing or replacing said component, returning said component to its initial position, and then operating said manipulator to reconnect said component into said subsea production system.
11. A method as recited in claim 9 including removing said disconnected component by said manipulator and replacing said component by said manipulator and then operating said manipulator to reconnect said replaced component into said subsea production system.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US20223071A | 1971-11-26 | 1971-11-26 |
Publications (1)
Publication Number | Publication Date |
---|---|
US3777812A true US3777812A (en) | 1973-12-11 |
Family
ID=22748995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00202230A Expired - Lifetime US3777812A (en) | 1971-11-26 | 1971-11-26 | Subsea production system |
Country Status (7)
Country | Link |
---|---|
US (1) | US3777812A (en) |
JP (1) | JPS5526275B2 (en) |
AU (1) | AU473685B2 (en) |
CA (1) | CA962586A (en) |
GB (1) | GB1410523A (en) |
IE (1) | IE36977B1 (en) |
NO (1) | NO139323C (en) |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2322256A1 (en) * | 1975-08-27 | 1977-03-25 | Akers Mek Verksted As | JUNCTION BOX FOR SUBMARINE OIL WELLS |
US4120362A (en) * | 1976-11-22 | 1978-10-17 | Societe Nationale Elf Aquitaine (Production) | Subsea station |
FR2402762A1 (en) * | 1977-09-12 | 1979-04-06 | Standard Oil Co | UNDERWATER DRILLING TEMPLATE EQUIPPED WITH A CARROUSEL GUIDING SYSTEM |
US4192383A (en) * | 1978-05-02 | 1980-03-11 | Armco Inc. | Offshore multiple well drilling and production apparatus |
US4224986A (en) * | 1978-12-11 | 1980-09-30 | Exxon Production Research Company | Diverter tool |
US4438817A (en) * | 1982-09-29 | 1984-03-27 | Armco Inc. | Subsea well with retrievable piping deck |
US4625806A (en) * | 1979-09-26 | 1986-12-02 | Chevron Research Company | Subsea drilling and production system for use at a multiwell site |
FR2600712A1 (en) * | 1986-06-30 | 1987-12-31 | Inst Francais Du Petrole | Carriage for securing and connecting flexible lines on a base |
EP0185727B1 (en) * | 1984-06-22 | 1988-06-22 | Total Transportation Systems (International) A/S | Underwater operating system |
FR2621071A1 (en) * | 1987-09-29 | 1989-03-31 | Inst Francais Du Petrole | METHOD AND SYSTEM FOR PRODUCING AN EFFLUENT CONTENT IN AN UNDERWATER GEOLOGICAL FORMATION |
GB2272927A (en) * | 1992-11-25 | 1994-06-01 | Jp Kenny Caledonia Limited | A subsea manifold |
WO1997039273A1 (en) * | 1996-04-16 | 1997-10-23 | Petroleo Brasileiro S.A. - Petrobras | Method and equipment for launching pigs into undersea pipes |
US6420976B1 (en) * | 1997-12-10 | 2002-07-16 | Abb Seatec Limited | Underwater hydrocarbon production systems |
US20030221835A1 (en) * | 2002-06-04 | 2003-12-04 | Yarom Polsky | Modular coiled tubing system for drilling and production platforms |
US6808021B2 (en) * | 2000-08-14 | 2004-10-26 | Schlumberger Technology Corporation | Subsea intervention system |
US20050178556A1 (en) * | 2002-06-28 | 2005-08-18 | Appleford David E. | Subsea hydrocarbon production system |
US20060108120A1 (en) * | 2004-11-22 | 2006-05-25 | Energy Equipment Corporation | Well production and multi-purpose intervention access hub |
US20090038804A1 (en) * | 2007-08-09 | 2009-02-12 | Going Iii Walter S | Subsurface Safety Valve for Electric Subsea Tree |
GB2454807A (en) * | 2007-11-19 | 2009-05-20 | Vetco Gray Inc | A subsea tree including a utility skid and a wing block |
US20090294132A1 (en) * | 2003-05-31 | 2009-12-03 | Cameron International Corporation | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US20100025034A1 (en) * | 2006-12-18 | 2010-02-04 | Cameron International Corporation | Apparatus and method for processing fluids from a well |
US20110061871A1 (en) * | 2008-05-15 | 2011-03-17 | Sigvard Omvik | Manifold structure having adjustable brackets |
US8776891B2 (en) | 2004-02-26 | 2014-07-15 | Cameron Systems (Ireland) Limited | Connection system for subsea flow interface equipment |
WO2017000051A1 (en) * | 2015-07-01 | 2017-01-05 | Fmc Technologies Do Brasil Ltda | Manifold and shared actuator |
US20170146189A1 (en) * | 2014-05-30 | 2017-05-25 | Ge Oil & Gas Pressure Control Lp | Remote well servicing systems and methods |
WO2018115347A1 (en) * | 2016-12-22 | 2018-06-28 | Vetco Gray Scandinavia As | A flow base system for subsea wells |
US20180266214A1 (en) * | 2017-03-16 | 2018-09-20 | Cameron International Corporation | System and method for actuating multiple valves |
US10619471B2 (en) | 2014-05-30 | 2020-04-14 | Ge Oil & Gas Pressure Control Lp | Remote mobile operation and diagnostic center for frac services |
CN113062708A (en) * | 2021-03-05 | 2021-07-02 | 海洋石油工程股份有限公司 | Underwater central manifold with control system |
WO2021190787A1 (en) * | 2020-03-27 | 2021-09-30 | Vetco Gray Scandinavia As | Self-propelled valve actuator on a rail transport system for manifolds and subsea trees |
US20210372272A1 (en) * | 2018-11-13 | 2021-12-02 | Vault Pressure Control Llc | Surface completion system for operations and monitoring |
US11466536B2 (en) | 2019-10-04 | 2022-10-11 | Vault Pressure Control, Llc | Hydraulic override for confined space |
EP4182225A4 (en) * | 2020-09-24 | 2024-10-23 | Kinetic Pressure Control Ltd | Remote underwater robotic actuator |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3099316A (en) * | 1960-04-25 | 1963-07-30 | Shell Oil Co | Underwater wellhead apparatus and method |
US3292695A (en) * | 1963-09-12 | 1966-12-20 | Shell Oil Co | Method and apparatus for producing underwater oil fields |
US3307627A (en) * | 1963-06-20 | 1967-03-07 | Shell Oil Co | Method and apparatus for connecting a pipe line to an underwater well |
US3545539A (en) * | 1967-08-28 | 1970-12-08 | Mobil Oil Corp | Subsea satellite foundation unit and method for installing satellite body therewithin |
US3552903A (en) * | 1968-06-28 | 1971-01-05 | Mobil Oil Corp | Subsea production satellite |
US3621911A (en) * | 1969-04-01 | 1971-11-23 | Mobil Oil Corp | Subsea production system |
US3633667A (en) * | 1969-12-08 | 1972-01-11 | Deep Oil Technology Inc | Subsea wellhead system |
US3638720A (en) * | 1968-09-24 | 1972-02-01 | Ocean Systems | Method and apparatus for producing oil from underwater wells |
US3643736A (en) * | 1968-06-27 | 1972-02-22 | Mobil Oil Corp | Subsea production station |
-
1971
- 1971-11-26 US US00202230A patent/US3777812A/en not_active Expired - Lifetime
-
1972
- 1972-11-14 CA CA156,388A patent/CA962586A/en not_active Expired
- 1972-11-15 GB GB5267072A patent/GB1410523A/en not_active Expired
- 1972-11-16 IE IE1585/72A patent/IE36977B1/en unknown
- 1972-11-16 AU AU48934/72A patent/AU473685B2/en not_active Expired
- 1972-11-16 NO NO4185/72A patent/NO139323C/en unknown
- 1972-11-27 JP JP11879572A patent/JPS5526275B2/ja not_active Expired
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3099316A (en) * | 1960-04-25 | 1963-07-30 | Shell Oil Co | Underwater wellhead apparatus and method |
US3307627A (en) * | 1963-06-20 | 1967-03-07 | Shell Oil Co | Method and apparatus for connecting a pipe line to an underwater well |
US3292695A (en) * | 1963-09-12 | 1966-12-20 | Shell Oil Co | Method and apparatus for producing underwater oil fields |
US3545539A (en) * | 1967-08-28 | 1970-12-08 | Mobil Oil Corp | Subsea satellite foundation unit and method for installing satellite body therewithin |
US3643736A (en) * | 1968-06-27 | 1972-02-22 | Mobil Oil Corp | Subsea production station |
US3552903A (en) * | 1968-06-28 | 1971-01-05 | Mobil Oil Corp | Subsea production satellite |
US3638720A (en) * | 1968-09-24 | 1972-02-01 | Ocean Systems | Method and apparatus for producing oil from underwater wells |
US3621911A (en) * | 1969-04-01 | 1971-11-23 | Mobil Oil Corp | Subsea production system |
US3633667A (en) * | 1969-12-08 | 1972-01-11 | Deep Oil Technology Inc | Subsea wellhead system |
Cited By (74)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2322256A1 (en) * | 1975-08-27 | 1977-03-25 | Akers Mek Verksted As | JUNCTION BOX FOR SUBMARINE OIL WELLS |
US4090560A (en) * | 1975-08-27 | 1978-05-23 | A/S Akers Mek. Verksted | Junction housing for use in undersea oil wells |
US4120362A (en) * | 1976-11-22 | 1978-10-17 | Societe Nationale Elf Aquitaine (Production) | Subsea station |
FR2402762A1 (en) * | 1977-09-12 | 1979-04-06 | Standard Oil Co | UNDERWATER DRILLING TEMPLATE EQUIPPED WITH A CARROUSEL GUIDING SYSTEM |
US4174011A (en) * | 1977-09-12 | 1979-11-13 | Standard Oil Company (Indiana) | Subsea drilling template with carousel guidance system |
US4192383A (en) * | 1978-05-02 | 1980-03-11 | Armco Inc. | Offshore multiple well drilling and production apparatus |
US4224986A (en) * | 1978-12-11 | 1980-09-30 | Exxon Production Research Company | Diverter tool |
US4625806A (en) * | 1979-09-26 | 1986-12-02 | Chevron Research Company | Subsea drilling and production system for use at a multiwell site |
US4438817A (en) * | 1982-09-29 | 1984-03-27 | Armco Inc. | Subsea well with retrievable piping deck |
EP0185727B1 (en) * | 1984-06-22 | 1988-06-22 | Total Transportation Systems (International) A/S | Underwater operating system |
FR2600712A1 (en) * | 1986-06-30 | 1987-12-31 | Inst Francais Du Petrole | Carriage for securing and connecting flexible lines on a base |
EP0310506A1 (en) * | 1987-09-29 | 1989-04-05 | Institut Français du Pétrole | Apparatus and method for underwater production of a fluid contained in a geological formation |
FR2621071A1 (en) * | 1987-09-29 | 1989-03-31 | Inst Francais Du Petrole | METHOD AND SYSTEM FOR PRODUCING AN EFFLUENT CONTENT IN AN UNDERWATER GEOLOGICAL FORMATION |
US4967843A (en) * | 1987-09-29 | 1990-11-06 | Institut Francais Du Petrole | Device for producing an effluent contained in a submarine geological formation and production method employed using such a device |
GB2272927A (en) * | 1992-11-25 | 1994-06-01 | Jp Kenny Caledonia Limited | A subsea manifold |
GB2272927B (en) * | 1992-11-25 | 1996-09-18 | Jp Kenny Caledonia Limited | A subsea manifold |
WO1997039273A1 (en) * | 1996-04-16 | 1997-10-23 | Petroleo Brasileiro S.A. - Petrobras | Method and equipment for launching pigs into undersea pipes |
GB2326689A (en) * | 1996-04-16 | 1998-12-30 | Petroleo Brasileiro Sa | Method and equipment for launching pigs into undersea pipes |
GB2326689B (en) * | 1996-04-16 | 2000-01-19 | Petroleo Brasileiro Sa | Method and equipment for launching pigs into undersea pipes |
US6139644A (en) * | 1996-04-16 | 2000-10-31 | Petroleo Brasileiro S.A.-Petrobras | Method and equipment for launching pigs into undersea pipes |
US6420976B1 (en) * | 1997-12-10 | 2002-07-16 | Abb Seatec Limited | Underwater hydrocarbon production systems |
US6808021B2 (en) * | 2000-08-14 | 2004-10-26 | Schlumberger Technology Corporation | Subsea intervention system |
US20030221835A1 (en) * | 2002-06-04 | 2003-12-04 | Yarom Polsky | Modular coiled tubing system for drilling and production platforms |
US6763890B2 (en) * | 2002-06-04 | 2004-07-20 | Schlumberger Technology Corporation | Modular coiled tubing system for drilling and production platforms |
US20050178556A1 (en) * | 2002-06-28 | 2005-08-18 | Appleford David E. | Subsea hydrocarbon production system |
US8733436B2 (en) | 2002-07-16 | 2014-05-27 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8469086B2 (en) | 2002-07-16 | 2013-06-25 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8746332B2 (en) | 2002-07-16 | 2014-06-10 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US10107069B2 (en) | 2002-07-16 | 2018-10-23 | Onesubsea Ip Uk Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US9556710B2 (en) | 2002-07-16 | 2017-01-31 | Onesubsea Ip Uk Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US20100206546A1 (en) * | 2003-05-31 | 2010-08-19 | Cameron International Corporation | Apparatus and Method for Recovering Fluids From a Well and/or Injecting Fluids Into a Well |
US20090301727A1 (en) * | 2003-05-31 | 2009-12-10 | Cameron International Corporation | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US20090294132A1 (en) * | 2003-05-31 | 2009-12-03 | Cameron International Corporation | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8573306B2 (en) | 2003-05-31 | 2013-11-05 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8220535B2 (en) | 2003-05-31 | 2012-07-17 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8272435B2 (en) | 2003-05-31 | 2012-09-25 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8281864B2 (en) | 2003-05-31 | 2012-10-09 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8622138B2 (en) | 2003-05-31 | 2014-01-07 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8540018B2 (en) | 2003-05-31 | 2013-09-24 | Cameron Systems (Ireland) Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
US8776891B2 (en) | 2004-02-26 | 2014-07-15 | Cameron Systems (Ireland) Limited | Connection system for subsea flow interface equipment |
US9260944B2 (en) | 2004-02-26 | 2016-02-16 | Onesubsea Ip Uk Limited | Connection system for subsea flow interface equipment |
US20060108120A1 (en) * | 2004-11-22 | 2006-05-25 | Energy Equipment Corporation | Well production and multi-purpose intervention access hub |
US7219740B2 (en) * | 2004-11-22 | 2007-05-22 | Energy Equipment Corporation | Well production and multi-purpose intervention access hub |
US8776893B2 (en) | 2006-12-18 | 2014-07-15 | Cameron International Corporation | Apparatus and method for processing fluids from a well |
US8297360B2 (en) | 2006-12-18 | 2012-10-30 | Cameron International Corporation | Apparatus and method for processing fluids from a well |
US9291021B2 (en) | 2006-12-18 | 2016-03-22 | Onesubsea Ip Uk Limited | Apparatus and method for processing fluids from a well |
US20100025034A1 (en) * | 2006-12-18 | 2010-02-04 | Cameron International Corporation | Apparatus and method for processing fluids from a well |
US20090038804A1 (en) * | 2007-08-09 | 2009-02-12 | Going Iii Walter S | Subsurface Safety Valve for Electric Subsea Tree |
GB2454807B (en) * | 2007-11-19 | 2012-04-18 | Vetco Gray Inc | Utility skid tree support system for subsea wellhead |
US8245787B2 (en) | 2007-11-19 | 2012-08-21 | Vetco Gray Inc. | Utility skid tree support system for subsea wellhead |
US20090126938A1 (en) * | 2007-11-19 | 2009-05-21 | Vetco Gray Inc. | Utility skid tree support system for subsea wellhead |
GB2454807A (en) * | 2007-11-19 | 2009-05-20 | Vetco Gray Inc | A subsea tree including a utility skid and a wing block |
US20110061871A1 (en) * | 2008-05-15 | 2011-03-17 | Sigvard Omvik | Manifold structure having adjustable brackets |
US8627891B2 (en) * | 2008-05-15 | 2014-01-14 | Aker Subsea As | Manifold structure having adjustable brackets |
US20170146189A1 (en) * | 2014-05-30 | 2017-05-25 | Ge Oil & Gas Pressure Control Lp | Remote well servicing systems and methods |
US10816137B2 (en) * | 2014-05-30 | 2020-10-27 | Ge Oil & Gas Pressure Control Lp | Remote well servicing systems and methods |
US10619471B2 (en) | 2014-05-30 | 2020-04-14 | Ge Oil & Gas Pressure Control Lp | Remote mobile operation and diagnostic center for frac services |
US10533399B2 (en) | 2015-07-01 | 2020-01-14 | Fmc Technologies Do Brasil Ltda | Manifold and shared actuator |
WO2017000051A1 (en) * | 2015-07-01 | 2017-01-05 | Fmc Technologies Do Brasil Ltda | Manifold and shared actuator |
WO2018115347A1 (en) * | 2016-12-22 | 2018-06-28 | Vetco Gray Scandinavia As | A flow base system for subsea wells |
US20190323325A1 (en) * | 2016-12-22 | 2019-10-24 | Vetco Gray Scandinavia As | A flow base system for subsea wells |
US20180266214A1 (en) * | 2017-03-16 | 2018-09-20 | Cameron International Corporation | System and method for actuating multiple valves |
US10570701B2 (en) * | 2017-03-16 | 2020-02-25 | Cameron International Corporation | System and method for actuating multiple valves |
US11255161B2 (en) | 2017-03-16 | 2022-02-22 | Cameron International Corporation | System and method for actuating multiple valves |
US11708756B2 (en) * | 2018-11-13 | 2023-07-25 | Vault Pressure Control Llc | Surface completion system for operations and monitoring |
US20210372272A1 (en) * | 2018-11-13 | 2021-12-02 | Vault Pressure Control Llc | Surface completion system for operations and monitoring |
US11230917B2 (en) | 2018-11-13 | 2022-01-25 | Vault Pressure Control Llc | Surface completion system for operations and monitoring |
US11466536B2 (en) | 2019-10-04 | 2022-10-11 | Vault Pressure Control, Llc | Hydraulic override for confined space |
GB2609334A (en) * | 2020-03-27 | 2023-02-01 | Vetco Gray Scandinavia As | Self-propelled valve actuator on a rail transport system for manifolds and subsea trees |
WO2021190787A1 (en) * | 2020-03-27 | 2021-09-30 | Vetco Gray Scandinavia As | Self-propelled valve actuator on a rail transport system for manifolds and subsea trees |
US12006785B2 (en) | 2020-03-27 | 2024-06-11 | Vetco Gray Scandinavia As | Self-propelled valve actuator on a rail transport system for manifolds and subsea trees |
GB2609334B (en) * | 2020-03-27 | 2024-09-04 | Vetco Gray Scandinavia As | Self-propelled valve actuator on a rail transport system for manifolds and subsea trees |
EP4182225A4 (en) * | 2020-09-24 | 2024-10-23 | Kinetic Pressure Control Ltd | Remote underwater robotic actuator |
CN113062708A (en) * | 2021-03-05 | 2021-07-02 | 海洋石油工程股份有限公司 | Underwater central manifold with control system |
Also Published As
Publication number | Publication date |
---|---|
GB1410523A (en) | 1975-10-15 |
NO139323B (en) | 1978-11-06 |
CA962586A (en) | 1975-02-11 |
IE36977B1 (en) | 1977-04-13 |
NO139323C (en) | 1979-02-14 |
AU473685B2 (en) | 1976-07-01 |
JPS5526275B2 (en) | 1980-07-11 |
AU4893472A (en) | 1974-05-16 |
IE36977L (en) | 1973-05-26 |
JPS4860003A (en) | 1973-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3777812A (en) | Subsea production system | |
CA2418804C (en) | Subsea intervention system | |
US6763889B2 (en) | Subsea intervention | |
US7036598B2 (en) | Intervention module for a well | |
US4174000A (en) | Method and apparatus for interfacing a plurality of control systems for a subsea well | |
EP0480772B1 (en) | Subsea production system | |
US4625806A (en) | Subsea drilling and production system for use at a multiwell site | |
AU2001282979A1 (en) | Subsea intervention system | |
US3482410A (en) | Underwater flowline installation | |
US3621911A (en) | Subsea production system | |
US4437521A (en) | Subsea wellhead connection assembly and methods of installation | |
GB2367079A (en) | Subsea intervention | |
US9038728B1 (en) | System and method for diverting fluids from a wellhead by using a modified horizontal christmas tree | |
JP2004516396A (en) | Well management system | |
US3913669A (en) | Method of installation and control of underwater equipment | |
US3517735A (en) | Underwater production facility | |
US4090560A (en) | Junction housing for use in undersea oil wells | |
USRE27745E (en) | Subsea production system | |
US3536135A (en) | Underwater production facility including base unit and production fluid handling unit | |
US4616706A (en) | Apparatus for performing subsea through-the-flowline operations | |
US3186487A (en) | Underwater well guide system | |
Goodfellow | An overview of subsea construction | |
US20190071947A1 (en) | A riserless intervention system and method | |
Cochrane | One-Atmosphere Production Systems for Use in Deep Water | |