US20170130551A9 - Integrated wellhead assembly - Google Patents
Integrated wellhead assembly Download PDFInfo
- Publication number
- US20170130551A9 US20170130551A9 US14/318,629 US201414318629A US2017130551A9 US 20170130551 A9 US20170130551 A9 US 20170130551A9 US 201414318629 A US201414318629 A US 201414318629A US 2017130551 A9 US2017130551 A9 US 2017130551A9
- Authority
- US
- United States
- Prior art keywords
- wellhead assembly
- head
- rams
- bore
- artificial lift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 claims abstract description 99
- 238000007789 sealing Methods 0.000 claims description 30
- 238000000034 method Methods 0.000 claims description 8
- 229910052500 inorganic mineral Inorganic materials 0.000 description 28
- 239000011707 mineral Substances 0.000 description 28
- 238000009434 installation Methods 0.000 description 21
- 239000012530 fluid Substances 0.000 description 14
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 14
- 230000008878 coupling Effects 0.000 description 13
- 238000010168 coupling process Methods 0.000 description 13
- 238000005859 coupling reaction Methods 0.000 description 13
- 238000006243 chemical reaction Methods 0.000 description 12
- 238000000605 extraction Methods 0.000 description 9
- 239000003345 natural gas Substances 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 238000003780 insertion Methods 0.000 description 6
- 230000037431 insertion Effects 0.000 description 6
- 230000007246 mechanism Effects 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000005086 pumping Methods 0.000 description 4
- 230000004888 barrier function Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 238000002955 isolation Methods 0.000 description 3
- 230000000717 retained effect Effects 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 239000004020 conductor Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000009977 dual effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229920001971 elastomer Polymers 0.000 description 2
- 239000000806 elastomer Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000002250 progressing effect Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 241000191291 Abies alba Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 210000004907 gland Anatomy 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/068—Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/126—Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive
Definitions
- oil and natural gas have a profound effect on modern economies and societies. Indeed, devices and systems that depend on oil and natural gas are ubiquitous. For instance, oil and natural gas are used for fuel in a wide variety of vehicles, such as cars, airplanes, boats, and the like. Further, oil and natural gas are frequently used to heat homes during winter, to generate electricity, and to manufacture an astonishing array of everyday products.
- drilling and production systems are often employed to access and extract the resource.
- These systems may be located onshore or offshore depending on the location of a desired resource.
- wellhead assemblies may include a wide variety of components, such as various casings, valves, fluid conduits, and the like, that control drilling and/or extraction operations.
- the well may undergo various operational stages. For example, many wells begin as naturally flowing wells such that, during production, the mineral may be under sufficient pressure to flow out of the well (referred to as “free flow”).
- various components may be included to protect the production system from the pressures in the well. As the pressure in the well declines, additional pressure may be added to the well to maintain production.
- Such systems and corresponding components may be referred to as “artificial lift” systems and components.
- converting from a free flowing well to an artificial lift system requires a change in the wellhead and/or wellhead configuration to accommodate the artificial lift system and components, resulting in increased cost and delayed production.
- many artificial lift systems have numerous separate components that require installation and configuration to ensure adequate operation of the artificial lift system.
- FIG. 1 is a schematic illustration of an embodiment of a mineral extraction system having an integrated wellhead assembly
- FIGS. 2A-2D are schematic illustrations of various operations using an integrated wellhead assembly in accordance with an embodiment of the present invention.
- FIG. 3 depicts a perspective view of an embodiment of an integrated wellhead assembly
- FIG. 4 depicts a side view of an embodiment of an integrated wellhead assembly of FIG. 3 ;
- FIG. 5 is a cross-section of an embodiment of the integrated wellhead assembly taken along line 5 - 5 of FIG. 3 ;
- FIG. 6 depicts a perspective view of an embodiment of an integrated wellhead assembly having a side tube
- FIG. 7 depicts a side view of an embodiment of the integrated wellhead assembly of FIG. 6 ;
- FIG. 8 depicts a cross-section of an embodiment of an integrated wellhead assembly with the side tube taken along line 8 - 8 of FIG. 6 ;
- FIG. 9 is a block diagram of an embodiment of an integrated wellhead assembly with the side tube used during artificial lift;
- FIG. 10 depicts a cross-section of an embodiment of an integrated wellhead assembly having a backpressure valve prep head
- FIG. 11 depicts a cross-section of an embodiment of an integrated wellhead assembly having a side accessible stuffing box
- FIG. 12 depicts a cross-section of an embodiment of an integrated wellhead assembly with a tubing rotator
- FIG. 13 depicts a cross-section of an embodiment of an integrated wellhead assembly having an annular BOP
- FIGS. 14-16 are flowcharts depicting processes of operations using an integrated wellhead assembly in accordance with embodiments of the present invention.
- Embodiments of the present invention include an integrated wellhead assembly that enables change from free flow production to an artificial lift production without reconfiguration of the wellhead assembly. Further, the integrated wellhead assembly may provide full bore access to the well without reconfiguration or removal of the wellhead.
- the wellhead assembly may include internal sealing components, such as rams, that may be retracted to provide the full bore access.
- the integrated wellhead assembly may include an integrated sealing component for sealing to artificial lift components.
- the wellhead assembly may include a side tube extending into and providing additional fluid access to the bore.
- FIG. 1 is a block diagram that illustrates an embodiment of a mineral extraction system 10 having an integrated wellhead assembly 12 .
- the illustrated mineral extraction system 10 can be configured to extract various minerals and natural resources, including hydrocarbons (e.g., oil and/or natural gas), or configured to inject substances into the earth.
- the mineral extraction system 10 is land-based (e.g., a surface system) or subsea (e.g., a subsea system).
- the system 10 includes an integrated wellhead assembly 12 coupled to a mineral deposit 14 via a well 16 .
- the well 15 is generally comprised of a series of concentric tubes or casing strings.
- the outermost casing is the conductor 17 , inboard, of which are the outer casing 19 , the production casing 21 , and production tubing 23 , respectively.
- the conductor 17 and the outer casing 19 may be cemented to one another, and the production casing 21 may be cemented to the outer casing 19 .
- the space between the production casing 21 and the production tubing 19 define an annulus 25 that provides access to the mineral deposit 14 .
- fluid in the mineral deposit is produced to the surface through the production tubing 23 .
- an artificial lift device such as a pump 27 , may be located in the production tubing to bias the fluid toward the surface.
- An articulated rod often a polished rod, may be linearly or rotational actuated to motivate a pumping mechanism.
- the well 16 also includes a wellhead hub 18 , such as a casing head, and a well-bore 20 .
- the wellhead hub 18 generally includes a large diameter hub that is disposed at the termination of the well-bore 20 .
- the wellhead hub 18 provides for the sealable connection of the wellhead assembly 12 to the well 16 , and provides support for a casing hanger 29 that carries the production casing 23 .
- the wellhead assembly 12 may be coupled to multiple components that control and regulate activities and conditions associated with the well 16 .
- the wellhead assembly 12 may generally be coupled to (or may include) bodies, spools, valves and seals that route produced minerals from the mineral deposit 14 , provide for regulating pressure in the well 16 , and provide for the injection of chemicals into the well-bore 20 .
- the integrated wellhead assembly 12 includes an upper portion 24 and a lower portion 26 , each having a bore 32 .
- the upper portion 24 and lower portion 26 may be integrally coupled to form a single unit, e.g., an integrated assembly.
- the upper portion 24 and lower portion 26 may be cast as a single unit, welded together to form a single unit, etc.
- the lower portion 26 may include one or more side ports (e.g., inlets or outlets) 28 to provide fluid connections to the bore 32 of the lower portion 26 .
- the ports 28 may be in fluid communication with the annulus 25 and, as such, provide access to the mineral deposit 14 .
- the lower portion 26 may support a tubing hanger 31 that supports the production tubing 23 . If desired, the tubing hanger 31 can include sealing components that isolate the annulus 25 from the bore 32 of the upper portion 24
- the wellhead assembly 12 facilities the insertion of various tools into the well-bore as well as access to the mineral deposit 14 .
- components such as back-pressure valves and plugs, can be run down to the wellhead assembly 12 and disposed in the bore 32 to seal-off the well bore 20 , to inject chemicals down-hole, to suspend tools down-hole, to retrieve tools down-hole, and the like.
- the upper portion 24 may include blowout-prevention components 33 that provide sealing of the bore 32 , such as a set of blind rams 34 that seal against one another and a set of rod rams 36 that seal against the outer surface of a polished rod.
- the blowout-prevention components 33 may include only one set of rams, an annular BOP, variable-size ram, sheer rams, etc.
- the upper portion 24 may include a Flex-Packer® BOP.
- the upper portion 24 may include a side port (e.g., inlet or outlet) 38 , e.g., a flow tee, having any size and type of connection and providing access to the bore 32 .
- the rams 34 and 36 may be closed or opened to provide access to the bore 32 , seal the bore 32 , or seal around components disposed in the bore 32 .
- the upper portion 24 may provide access to the bore 32 and enable hanging of tubing 30 in the lower portion 26 , yet also provide compatibility with an artificial lift system 27 , such as a progressing cavity pump system and sucker rod/beam pump system.
- an artificial lift system 27 such as a progressing cavity pump system and sucker rod/beam pump system.
- the upper portion 24 may provide the functionality of, and may be referred to, as a composite pumping tee (CPT) head.
- CPT composite pumping tee
- the wellhead assembly 12 may include a sealing component 40 integrally or separately coupled to the upper portion 24 .
- the sealing component 40 may be a sealing component configured for sealing additional components 42 to the assembly 12 .
- the sealing component 40 may be a stuffing box (or other type of gland seal) and the additional component 42 may be a drivehead for an artificial lift system, such as a progressing cavity pump system.
- the sealing portion 40 may be removed and the other component 42 may include a blowout preventor (BOP), a tree, or any other component of the mineral extraction system 10 .
- BOP blowout preventor
- the upper portion 24 may also receive any other sealing component 40 or coupling, such as flanges, timesaver couplings, etc.
- the integrated wellhead assembly 12 may enable conversion between free flow production operation, artificial lift production operation, and various workovers without removal and/or reconfiguration of the wellhead assembly 12 . That is, the wellhead assembly 12 may accommodate a variety of operations, thus reducing the time and cost associated with converting between operations of the mineral extraction system 10 . During such conversions and operations, the wellhead assembly 12 may remain coupled to the hub 18 , and various components may be installed in or coupled to the wellhead assembly 12 .
- FIGS. 2A-2D depict various operations using the wellhead assembly 12 in accordance with an embodiment of the present invention.
- FIG. 2A depicts a workover operation in a free flow well
- FIG. 2B depicts free flow production operation of wellhead assembly 12
- FIG. 2C depicts workover operation in an artificial lift well
- FIG. 2D depicts artificial lift production operation of the wellhead assembly 12 .
- the operations depicted of FIGS. 2A-2D are examples and are not limiting on the operations supported by the wellhead assembly 12 .
- the wellhead assembly 12 may provide for other stages of operation not depicted in FIGS. 2A-2D .
- the wellhead assembly 12 remains coupled to the well 16 and is not removed and/or reconfigured during the operations or conversions between operations.
- FIG. 2A the wellhead assembly 12 is depicted during workover of a free flow well 16 in accordance with an embodiment of the present invention.
- FIG. 2A may depict workover to convert the well 16 from drilling to production through the installation of a tubing hanger 31 and production tubing 23 , etc.
- the wellhead assembly 12 may be coupled to a BOP 50 .
- the BOP 50 may be coupled to the upper portion 24 of the wellhead assembly 12 through a flange, union nut, or any other suitable connection.
- the exemplary BOP 50 includes blind rams and rams configured to seal against the production tubing.
- the tubing head and production tubing can be installed while maintaining isolation between the annulus 25 and bore 20 and the external environment on the surface.
- the blowout prevention components 33 of the wellhead assembly can be articulated to future assist in the isolation of the bore and the external environment. It is envisaged that the certain embodiments of the present invention may facilitate the installation and removal of production tubing without the need for an external pressure control device like the BOP 50 .
- the wellhead assembly 12 may provide for additional sealing of the bore 32 and the well 16 .
- a check valve 52 or isolation plug may be installed in the hanger 31 to provide a sealing mechanism between the bore 32 of the upper portion 24 and the bore 20 defined by the production tubing 23 .
- the blind rams 34 of the upper portion 24 may be closed to seal off the bore 32 (as illustrated by encircled region 54 ).
- the blind rams 34 , or other blowout prevention components 33 may be manually or automatically (e.g., hydraulically, pneumatically, electrically etc.) actuated.
- the blind rams 34 may provide sealing of the well 16 during installation and/or removal of the tubing BOP 50 .
- the blind rams 34 may be opened (e.g., manually or automatically retracted) to expose the bore 32 and enable insertion or removal of the check valve 52 , the hanger 31 , and/or the tubing 30 .
- FIG. 2B depicts such a stage of operation of the wellhead 12 in accordance with an embodiment of the present invention.
- the wellhead 12 may be provide for conversion between free flow workover (as shown in FIG. 2A ) and free flow production without reconfiguration and/or removal of the wellhead 12 or any components below the wellhead 12 .
- conversion to free flow production may include removal of the tubing BOP 50 and installation of a “christmas tree” 58 on the upper portion 24 of the wellhead 12 .
- the tree 58 may be directly coupled to the upper portion 24 or may be coupled by a separate flange or other coupling between the wellhead 12 and the tree 58 .
- the tree 58 generally includes a variety of flow paths (e.g., bores), valves, fittings, and controls for operating the well 16 .
- the tree 58 may include a frame that is disposed about a tree body, a flow-loop, actuators, and valves.
- the tree 58 may provide fluid communication with the well 16 .
- Minerals extracted from the well 16 e.g., oil and natural gas
- produced minerals flow from the well 16 via the wellhead assembly 12 and/or the tree 58 before being routed to shipping or storage facilities.
- the tree 58 may enable further routing of produced minerals flowing through the tubing 30 (installed during the free flow workover depicted in FIG. 2A ).
- the blind rams 34 and the rod rams 36 may be retracted to expose the full bore 32 of the wellhead assembly 12 .
- the full bore 32 enables routing of minerals to the tree 58 .
- the bore 32 may be sized to allow the insertion of tools into the production casing 25 in the case when the production tubing 23 has been removed.
- the blind rams 34 may still provide for sealing of the well 16 , such as in the event of an overpressure situation, by manual or automatic closing of the blind rams 34 . With the blind rams 34 in a closed position, the bore 20 and annulus 25 are isolated from the external environment, and the sealing component 40 , whether that is a tree 58 or a BOP 50 or other component may be removed without exposure of the external environment.
- FIG. 2C depicts conversion of the system 10 to artificial lift production in accordance with embodiment of the present invention.
- the tree 58 may be removed and a rod BOP 60 may be installed on the upper portion 24 of the wellhead assembly 12 , without removal and/or reconfiguration of the wellhead assembly 12 .
- the rod BOP 60 may provide well protection during running and landing of a pump 62 and rods 64 in the well 16 .
- the blind rams 34 and rod rams 36 may be fully opened (either manually or automatically retracted) to expose the full bore 32 of the wellhead assembly 12 and enable installation and/or removal of the hanger 31 and tubing 30 , and installation of the pump 62 , rods 64 , and any insertion and/or removal of any associated tools and/or components.
- the rod rams 36 of the wellhead assembly 12 may be closed to seal around the rods 64 and seal the well 16 .
- the wellhead assembly 12 may enable hang off of the system 10 to the capacity of the rod rams 36 , such a closing the rod rams 36 around a rod coupling 65 .
- the wellhead assembly 12 may provide for workover to convert the well 16 to artificial lift without reconfiguration and/or removal of the wellhead assembly 12 .
- the wellhead assembly 12 may provide for workover to convert the well to free flow production or other operations.
- FIG. 2D depicts operation of the wellhead assembly 12 in artificial lift production in accordance with an embodiment of the present invention.
- the wellhead assembly 12 may be converted to artificial lift production through installation of the pump 62 and rods 64 , such as during the workover depicted in FIG. 2C .
- conversion to artificial lift production may include removal of the rod BOP 60 and installation of a stuffing box 70 on the upper portion 24 of the wellhead assembly 12 .
- the stuffing box 70 may be coupled to the wellhead assembly 12 through a flange or any other suitable type of coupling.
- the stuffing box 70 may be integral to the upper portion 24 of the wellhead assembly 12 , such that installation of the stuffing box 70 is not necessary when converting to artificial lift production.
- the stuffing box 70 may provide for coupling and sealing of artificial lift equipment, e.g., a drivehead 72 , to the rods 64 and the wellhead assembly 12 .
- the side port 38 of the upper portion 24 of the wellhead assembly 12 may operate as a flow tee for the artificial lift system to direct extracted minerals.
- the rod rams 36 and the blind rams 34 may be opened (e.g., manually or automatically retracted) to expose the full bore 32 of the wellhead assembly 12 and enable routing of the produced mineral from the well 16 .
- the wellhead assembly 12 may be converted from artificial lift production, as shown in FIG. 2D , to workover, as shown in FIG. 2C , and back to free flow production, as shown in FIG. 2B , without reconfiguration and/or removal of the wellhead assembly 12 .
- conversion of the wellhead assembly 12 from artificial lift production to free flow production may include removal of the stuffing box 70 and installation and removal of the check valve 52 , the tubing BOP 50 , and/or the hanger 31 and tubing 30 .
- the rod rams 36 and blind rams 34 may be opened or closed as desired to provide sealing of the well 16 and access to the bore 32 (such as for removal and/or installation of another hanger and tubing).
- the wellhead assembly 12 may be converted from artificial lift production to free flow production by closing the rod rams 36 , removing all artificial lift equipment above the upper portion 24 , and hanging off the rods 62 below the rod rams 36 .
- FIGS. 3 and 4 depict a perspective view and a side view respectively of the integrated wellhead assembly 12 in accordance with an embodiment of the present invention.
- the wellhead assembly 12 includes an upper portion 24 and lower portion 26 forming an integral assembly (i.e., single unit) as described above.
- the lower portion 26 may include side ports 28 and a flange 100 .
- the flange 100 may be any suitable size and provide for any suitable connection.
- the flange 100 may be an 11′′ American Petroleum Institute (API) 3K flange, or a 7 1/16′′ API 3K flange.
- the side ports 28 may be any suitable size and provide for any suitable connection.
- the side ports 28 may be 2 1/16′′ APU 5K studded outlets.
- the intersection of the lower portion 26 and upper portion 24 may include fasteners 104 that disposed around the circumference of the assembly 12 .
- the fasteners 104 may include lock screws or other suitable fasteners and may insert into the bore 32 of the assembly 12 to engage a hanger or other component disposed in the bore 32 .
- the upper portion 24 may include the blind rams 34 , the rod rams 36 , and the side port 38 , e.g., a flow tee.
- the sealing component 40 e.g., a stuffing box 106
- the stuffing box 106 may include an orifice 107 to receive rods or other artificial lift components.
- the stuffing box 106 may be coupled to the upper portion 24 by a flanged connection or other suitable coupling.
- the stuffing box 106 may be integrally coupled to the upper portion 24 .
- FIG. 5 is a cross-section of the wellhead assembly 12 taken along line 5 - 5 of FIG. 3 in accordance with an embodiment of the present invention.
- FIG. 5 illustrates disposal of the tubing hanger 31 and production tubing 30 in the bore 32 of the wellhead assembly 12 .
- the hanger 31 may be landed on a shoulder 108 of the lower portion 26 .
- the hanger 31 may be secured by the fasteners 104 (e.g., lockscrews) inserted into the bore 32 of the wellhead assembly 32 to engage the hanger 31 .
- the fasteners 104 e.g., lockscrews
- the hanger 31 sealably connects the upper portion 24 with the well 16 , and carries the production tubing 30 used to route minerals from the well 16 .
- the blind rams 34 may include two components, e.g., blocks 110 and 112 , that move in the radial directions indicated by arrows 114 and 116 .
- the blind rams 34 may be manually (or automatically) retracted, such that blocks 110 and 112 move in the outwardly radial direction as indicated by arrows 114 .
- the blind rams 34 may be manually (or automatically) closed (the position depicted in FIG.
- blocks 110 and 112 move in the inward radial direction as indicated by arrows 116 .
- the blocks 110 and 112 meet in the center of the bore 32 to seal the portion of the well 16 below the blind rams 34 .
- the rod rams 36 may work in a similar manner to the blind rams 34 but, as described above, the rod rams 36 seal around a rod or other component inserted into the bore 32 of the wellhead assembly 12 .
- the rod rams 36 may include two components, e.g., blocks 118 and 120 , which move in the radial directions indicated by arrows 114 and 116 .
- the rod rams 36 may be manually (or automatically) retracted by moving blocks 118 and 120 in the outward radial direction as indicated by arrows 114 .
- the rod rams 34 may be manually (or automatically) closed (the position shown in FIG.
- One of, or both of, the blind rams 34 and the rod rams 36 may be opened or closed to facilitate the operations or conversion between operations described above in FIGS. 2A-2D , or any other operation or conversion.
- both the blind rams 34 and the rod rams 36 may be retracted to provide full bore access to the bore 32 of the wellhead assembly 12 , such as during workover or free flow production.
- the blind rams 34 may be closed to seal the well 16 and the rod rams 36 may be opened to facilitate workover of the well 16 , such as when converting to/from free flow production and artificial production.
- the rod rams 36 may be closed to seal around a rod or other component and the blind rams 34 may be opened to enable artificial lift production, hang off, or other operations.
- the stuffing box 106 may include the orifice 107 to allow insertion of rods 64 for an artificial lift system.
- the stuffing box 106 may also include sealing components 126 , such as annular elastomer seals, to seal against the rods 64 and the well 16 .
- the stuffing box 106 may provide access to internal components to allow repair and/or replacement without removal of the stuffing box 106 , thus providing longer life without removal of a drivehead and replacement of the stuffing box 106 .
- the stuffing box 106 may include a side access panel that may be opened and/or removed to allow access to the sealing components 126 .
- the wellhead assembly 12 also maintains a fixed configuration and position that can accommodate different equipment.
- the wellhead assembly 12 includes the shoulder 108 for landing a hanger or other equipment.
- operation of the wellhead assembly 12 does not require the addition of tubing heads to provide additional shoulders for landing additional hangers and tubing.
- a distance 128 between the upper portion 24 and the lower portion 26 , (and the side ports 28 and 28 ) remains fixed regardless of the operation.
- the fixed distance 128 provides for easier use of the wellhead assembly 12 during workover and other operations, without necessitating removal of the assembly 12 .
- an integrated wellhead assembly 12 may include a side tube that provides for additional operations.
- FIGS. 6-8 depict the wellhead assembly 12 having a side tube 140 in accordance with another embodiment of the present invention.
- the side tube 140 may be used for clean out (e.g., injecting fluids and removing fluids and debris), artificial lift, or production during operation of the system 10 .
- the wellhead assembly 12 having the side tube 140 may be used in any of the stages of operation discussed above in FIGS. 2A-2D .
- FIG. 6 depicts a perspective view
- FIG. 7 depicts a side view of the wellhead assembly 12 with the side tube 140 in accordance with an embodiment of the present invention.
- the wellhead assembly 12 includes the upper portion 24 having rod rams 36 , blind rams 34 , and side port 38 , and the lower portion 26 having side ports 28 and flange 100 .
- a stuffing box 106 is shown coupled to the upper portion 24 , although, as mentioned above, any suitable sealing component may be coupled to the upper portion 24 .
- the side tube 140 extends from the lower portion 26 , such as from a flanged portion 142 of the lower portion 26 .
- the side tube 140 may be integrally coupled to the wellhead assembly 12 to form an integrated assembly 12 , e.g., a single unit.
- the side tube 140 may be welded to the assembly 12 or the assembly 12 may be cast or otherwise formed as a single unit.
- the side tube 140 may extend at any suitable angle 141 to clear the wellhead assembly 12 .
- the angle 141 may be 0 to 90 degrees, 5 to 60 degrees, 5 to 45 degrees, 5 to 15 degrees, e.g., less than approximately 5, 10, 15, 20, 30, 35, 40, or 45 degrees but greater than 0 degrees.
- the upper portion 24 may include a recessed portion 144 to receive a portion of the side tube 140 .
- the side tube 140 may include a flange 146 to enable coupling of different components to the side tube 140 .
- the bore of the side tube 140 may be in fluid communication with the bore 32 of the lower portion 26 of the wellhead assembly 12 , and, if production tubing is suspended from the tubing hanger 31 , may be in fluid communication with the annulus 25 between the production tubing 23 and the production casing 21 .
- FIG. 8 depicts a cross-section of the wellhead assembly 12 with the side tube 140 taken along line 8 - 8 of FIG. 6 in accordance with an embodiment of the present invention.
- the side tube 140 includes a bore 148 in fluid communication with the bore 132 of the wellhead assembly 12 .
- the upper portion 24 and rod rams 36 and blind rams 34 may function to seal the well 16 or provide full bore access as described above. That is, incorporation of the side tube 140 does not alter or change the functionality of the upper portion 24 of the wellhead assembly 12 .
- An opening 150 of the side tube 140 may allow for injection and/or removal of fluids to and from the bore 132 of the lower portion 26 .
- the flange 146 may provide for coupling of different devices to the side tube 140 .
- the side tube 140 may be used for a clean-out operation to remove fill material, e.g., debris, from the wellbore.
- the side tube 140 may be used to add a column to the top of the fluid in the well and aid artificial lift production.
- the side tube 140 may be used for production, either during free flow production or artificial lift production.
- FIG. 9 depicts a block diagram of the assembly 12 with side tube 140 used during artificial lift production in accordance with an embodiment of the present invention.
- the artificial lift system may include the components described above, such as a pump 62 , rod 62 , and drivehead 72 .
- the drivehead 72 may be coupled to the wellhead 12 by the stuffing box 106 , and the stuffing box 106 may also provide sealing of the rod 62 and the drivehead 72 .
- coil tubing 152 may be installed in the side tube 140 to the opening of the side tube 140 .
- a sealing element and/or lubricator such as a stuffing box 154 , may be coupled to the top of the side tube 140 by the flange 146 .
- a mineral may be produced through the annulus of the assembly 12 and through the coil tubing 152 installed in the side tube 140 .
- Such a system may also include valves, fittings, or other components coupled to the top of the side tube 140 to provide for routing of the produced mineral for further processing.
- FIGS. 10-13 depict additional embodiments of the wellhead assembly 12 having, for example, a backpressure valve (BPV) prep head, a side panel stuffing box, a tubing rotator, and/or an annular BOP.
- BPV backpressure valve
- Any of the features illustrated in the embodiments below may be used in the operations illustrated above in FIGS. 2A-2D . Further, it should be appreciated that the features described below in FIGS. 10-13 may be implemented in different embodiments of the wellhead assembly 12 having various combinations of the features discussed herein.
- FIG. 10 depicts the integrated wellhead assembly 12 having a backpressure valve prep head 156 in accordance with an embodiment of the present invention.
- the backpressure valve prep head 156 may be included in the upper portion 24 of the wellhead assembly 12 and may be configured to receive a backpressure valve 158 .
- the upper portion 24 of the wellhead assembly 12 may only include one set of rams, e.g., rod rams 36 .
- the backpressure valve 158 may provide sealing of the well 16 instead of an additional blind rams included in the upper portion 24 .
- the backpressure valve 158 may be retained by lock screws inserted through the upper portion 24 and into the bore 32 .
- the backpressure valve 158 may be retained in the bore 32 by one or more lock rings disposed around one or more portions of the backpressure valve 158 . Further still, the backpressure valve may be retained by an appropriate mechanism located on an inner surface of the tubing hanger 31 .
- FIG. 11 depicts the integrated wellhead assembly 12 having a side accessible stuffing box 160 in accordance with an embodiment of the present invention.
- the stuffing box 160 may include a plurality of seals 164 (e.g., annular elastomer seals) configured to seal a rod inserted into an orifice 167 of the stuffing box 160 .
- seals 164 and/or other components of the stuffing box 160 may be replaced to ensure seal integrity and extend service life of the stuffing box.
- the stuffing box 160 may include a side panel 166 to provide for access to the seals 164 and/or other components of the stuffing box 160 .
- the side panel 166 provides for repair and/or replacement of the seals 164 and/or other components of the stuffing box 160 without removal of the stuffing box 160 , the drivehead, and/or any other components coupled to the upper portion 24 of the wellhead assembly 12 .
- the side panel 166 may be fully removable, and/or may be hinged, bolted, latched, or otherwise secured to the stuffing box 160 .
- the wellhead assembly 12 may include a tubing rotator that rotates tubing installed in the assembly to prevent uneven wear caused by a rod and pumping action of an artificial lift system.
- FIG. 12 depicts the integrated wellhead assembly 12 with a tubing rotator 170 in accordance with an embodiment of the present invention.
- the tubing rotator 170 may be disposed at or near the intersection of the upper portion 24 and the lower portion 26 and may include a mechanism that rotates the tubing 30 (and, in some embodiments, the hanger 31 ).
- the tubing rotator 170 may be driven by a pump or other suitable drive mechanism.
- the tubing rotator 170 may rotate the tubing to encourage even wear of the tubing 30 as the rod moves in the assembly 12 and contacts the tubing 30 .
- the tubing rotator 170 may be deactivated so that the tubing 30 is not rotated.
- FIG. 13 depicts the wellhead assembly 12 having an annular BOP 174 in accordance with an embodiment of the present invention.
- the annular BOP 174 may be disposed in the upper portion 24 of the wellhead assembly 12 .
- the annular BOP 174 may be closed to seal the bore 32 of the wellhead assembly 12 , and/or, in some embodiments, to provide sealing around tubing, or a rod of an artificial lift system.
- the annular BOP 174 may include a toroid or torus component disposed circumferentially around the bore 32 that may be contracted radially inward to seal the bore 32 (or around components inserted into the bore). Additionally, the annular BOP 174 may be opened (manually or automatically) to provide access to the full bore 32 of the wellhead assembly 12 , such as during workover or for production from the well 16 .
- FIGS. 14-16 are flowcharts depicting various operations using the integrated wellhead assembly 12 . As illustrated above in FIGS. 2A-2D , such operations may be performed without removal and/or reconfiguration of the wellhead 12 .
- FIG. 14 depicts a process 200 for workover operation for a free flow production well using the integrated wellhead assembly 12 in accordance with an embodiment of the present invention.
- the wellhead assembly 12 may be used in free flow production (block 202 ) and producing mineral through a tree coupled to the wellhead assembly 12 (as depicted in FIG. 2B ).
- a valve e.g., a check valve
- the blind rams 34 may be closed to seal the well 16 (block 206 ). It should be appreciated that the valve and blind rams 34 may provide a dual barrier compliant seal during the workover.
- the tree may be removed from the wellhead assembly (block 208 ), and a BOP (e.g., a tubing BOP) may be installed on the wellhead assembly 12 and tested (block 210 ).
- the blind rams 34 may then be opened to provide full bore access to the well 16 (block 212 ).
- a workover task may be performed in the well 16 (block 214 ), such as insertion and use of a tool, removal and/or installation of a hanger and/or tubing, etc.
- the blind rams 34 may be closed to seal the well (block 216 ) and provide another barrier during removal of the BOP (block 218 ).
- a tree may be installed (block 220 ) and the blind rams 34 may be opened (block 222 ).
- the valve may be removed and the well 16 may then be returned to production (block 224 ). It should be appreciated that the process 200 may be implemented in an artificial lift system 12 using the wellhead 12 , but the rod rams 36 may provide sealing of the well 16 during installation of a rod BOP and/or removal of the rods.
- FIG. 15 depicts a process 300 for conversion from free flow production to artificial production using the integrated wellhead assembly 12 in accordance with an embodiment of the present invention.
- the process 300 may include workover of the free flow well to perform a workover task (block 302 ), such as depicted in blocks 202 - 214 of FIG. 14 .
- the workover task may include removal of a hanger and/or tubing adapted for free flow production and installation of a hanger and/or tubing adapted for artificial lift production.
- the blind rams 36 may be closed (block 304 ) and the tubing BOP may be removed (block 306 ).
- a rod BOP (block 308 ) may be installed on the wellhead assembly 12 and the blind rams 36 may be opened (block 310 ). Any valve disposed in the bore of the wellhead assembly 12 may be removed (block 312 ).
- the artificial lift pump and rods e.g., sucker rods, may be installed in the wellhead assembly (block 314 ).
- the rod rams 34 may be closed to enable hang off up to the rod capacity (block 316 ).
- the rod BOP may then be removed (block 318 ).
- a stuffing box may be installed on the wellhead assembly 12 (block 320 ) or, in other embodiments, the stuffing box may already be integrated with the upper portion of the wellhead assembly 12 .
- the rod rams 34 may be opened (block 322 ) and production may be resumed through completion of the artificial lift system (block 324 ).
- FIG. 16 depicts a process 400 for conversion from free flow production to artificial lift production using the wellhead assembly 12 in accordance with an embodiment of the present invention.
- the process 400 may include workover of the artificial lift well to perform a workover task (block 402 ).
- the workover task may include removal of a hanger and/or tubing adapted for artificial lift production and installation of a hanger and/or tubing adapted for free flow production.
- the rod rams may be closed and, in some embodiments, the well may be killed (block 404 ).
- the stuffing box may be removed from the wellhead assembly 12 and a rod BOP installed (block 406 ). In other embodiments having an integrated stuffing box, as discussed above, the stuffing box may not be removed.
- the rod rams may be opened (block 408 ).
- the well 16 may be converted to free flow production, such as depicted above in FIG. 2B .
- the rods and pump may be removed from the well (block 410 ).
- a valve e.g., a check valve
- the blind rams 34 may be closed to seal the well 16 (block 414 ) and provide dual barrier sealing capability with the valve.
- the rod BOP may be removed (block 416 ).
- the well 16 may then be converted to free flow production by installing a tubing BOP, removing and/or installing a hanger and/or tubing, and installing a tree, as described in blocks 210 - 224 of FIG. 14 .
- the wellhead assembly 12 may enable hang off of a pump and rod assembly to convert from artificial lift production to free flow production.
- the pump after opening the rod rams (block 408 ) the pump may be unseated and the rods may be pulled to locate a rod coupling in the upper portion 24 of the wellhead assembly 12 (block 418 ).
- the rod rams 36 After locating the coupling, the rod rams 36 may be closed around the coupling (block 420 ) to seal the well 16 and the rods above the coupling may be disconnected and removed (block 422 ).
- the rod BOP may then be removed ( 424 ).
- a tree may be installed on the integrated wellhead assembly 12 and the free flow production may begin (block 426 ).
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Abstract
Description
- This application claims priority to and benefit of U.S. Non-Provisional patent application Ser. No. 13/975,275, entitled “Integrated Wellhead Assembly”, filed on Aug. 23, 2013, which is herein incorporated by reference in its entirety, which claims priority to and benefit of U.S. Non-Provisional patent application Ser. No. 12/705,484, entitled “Integrated Wellhead Assembly”, filed on Feb. 12, 2010, which is herein incorporated by reference in its entirety.
- This section is intended to introduce the reader to various aspects of art that may be related to various aspects of the present invention, which are described and/or claimed below. This discussion is believed to be helpful in providing the reader with background information to facilitate a better understanding of the various aspects of the present invention. Accordingly, it should be understood that these statements are to be read in this light, and not as admissions of prior art.
- As will be appreciated, oil and natural gas have a profound effect on modern economies and societies. Indeed, devices and systems that depend on oil and natural gas are ubiquitous. For instance, oil and natural gas are used for fuel in a wide variety of vehicles, such as cars, airplanes, boats, and the like. Further, oil and natural gas are frequently used to heat homes during winter, to generate electricity, and to manufacture an astonishing array of everyday products.
- In order to meet the demand for such natural resources, companies often invest significant amounts of time and money in searching for and extracting oil, natural gas, and other subterranean resources from the earth. Particularly, once a desired resource is discovered below the surface of the earth, drilling and production systems are often employed to access and extract the resource. These systems may be located onshore or offshore depending on the location of a desired resource. Further, such systems generally include a wellhead assembly through which the resource is extracted. These wellhead assemblies may include a wide variety of components, such as various casings, valves, fluid conduits, and the like, that control drilling and/or extraction operations.
- During operation of such systems, the well may undergo various operational stages. For example, many wells begin as naturally flowing wells such that, during production, the mineral may be under sufficient pressure to flow out of the well (referred to as “free flow”). In such systems, various components may be included to protect the production system from the pressures in the well. As the pressure in the well declines, additional pressure may be added to the well to maintain production. Such systems and corresponding components may be referred to as “artificial lift” systems and components. However, converting from a free flowing well to an artificial lift system (or vice-versa) requires a change in the wellhead and/or wellhead configuration to accommodate the artificial lift system and components, resulting in increased cost and delayed production. Further, many artificial lift systems have numerous separate components that require installation and configuration to ensure adequate operation of the artificial lift system.
- Various features, aspects, and advantages of the present invention will become better understood when the following detailed description is read with reference to the accompanying figures in which like characters represent like parts throughout the figures, wherein:
-
FIG. 1 is a schematic illustration of an embodiment of a mineral extraction system having an integrated wellhead assembly; -
FIGS. 2A-2D are schematic illustrations of various operations using an integrated wellhead assembly in accordance with an embodiment of the present invention; -
FIG. 3 depicts a perspective view of an embodiment of an integrated wellhead assembly; -
FIG. 4 depicts a side view of an embodiment of an integrated wellhead assembly ofFIG. 3 ; -
FIG. 5 is a cross-section of an embodiment of the integrated wellhead assembly taken along line 5-5 ofFIG. 3 ; -
FIG. 6 depicts a perspective view of an embodiment of an integrated wellhead assembly having a side tube; -
FIG. 7 depicts a side view of an embodiment of the integrated wellhead assembly ofFIG. 6 ; -
FIG. 8 depicts a cross-section of an embodiment of an integrated wellhead assembly with the side tube taken along line 8-8 ofFIG. 6 ; -
FIG. 9 is a block diagram of an embodiment of an integrated wellhead assembly with the side tube used during artificial lift; -
FIG. 10 depicts a cross-section of an embodiment of an integrated wellhead assembly having a backpressure valve prep head; -
FIG. 11 depicts a cross-section of an embodiment of an integrated wellhead assembly having a side accessible stuffing box; -
FIG. 12 depicts a cross-section of an embodiment of an integrated wellhead assembly with a tubing rotator; -
FIG. 13 depicts a cross-section of an embodiment of an integrated wellhead assembly having an annular BOP; and -
FIGS. 14-16 are flowcharts depicting processes of operations using an integrated wellhead assembly in accordance with embodiments of the present invention. - One or more specific embodiments of the present invention will be described below. These described embodiments are only exemplary of the present invention. Additionally, in an effort to provide a concise description of these exemplary embodiments, all features of an actual implementation may not be described in the specification. It should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking of design, fabrication, and manufacture for those of ordinary skill having the benefit of this disclosure.
- Embodiments of the present invention include an integrated wellhead assembly that enables change from free flow production to an artificial lift production without reconfiguration of the wellhead assembly. Further, the integrated wellhead assembly may provide full bore access to the well without reconfiguration or removal of the wellhead. The wellhead assembly may include internal sealing components, such as rams, that may be retracted to provide the full bore access. In some embodiments, the integrated wellhead assembly may include an integrated sealing component for sealing to artificial lift components. In another embodiment, the wellhead assembly may include a side tube extending into and providing additional fluid access to the bore.
-
FIG. 1 is a block diagram that illustrates an embodiment of amineral extraction system 10 having an integratedwellhead assembly 12. The illustratedmineral extraction system 10 can be configured to extract various minerals and natural resources, including hydrocarbons (e.g., oil and/or natural gas), or configured to inject substances into the earth. In some embodiments, themineral extraction system 10 is land-based (e.g., a surface system) or subsea (e.g., a subsea system). As illustrated, thesystem 10 includes an integratedwellhead assembly 12 coupled to amineral deposit 14 via awell 16. The well 15 is generally comprised of a series of concentric tubes or casing strings. The outermost casing is the conductor 17, inboard, of which are theouter casing 19, theproduction casing 21, andproduction tubing 23, respectively. The conductor 17 and theouter casing 19 may be cemented to one another, and theproduction casing 21 may be cemented to theouter casing 19. The space between theproduction casing 21 and theproduction tubing 19 define anannulus 25 that provides access to themineral deposit 14. Ultimately, fluid in the mineral deposit is produced to the surface through theproduction tubing 23. As such, an artificial lift device, such as apump 27, may be located in the production tubing to bias the fluid toward the surface. An articulated rod, often a polished rod, may be linearly or rotational actuated to motivate a pumping mechanism. Thewell 16 also includes awellhead hub 18, such as a casing head, and a well-bore 20. Thewellhead hub 18 generally includes a large diameter hub that is disposed at the termination of the well-bore 20. Thewellhead hub 18 provides for the sealable connection of thewellhead assembly 12 to the well 16, and provides support for acasing hanger 29 that carries theproduction casing 23. - The
wellhead assembly 12 may be coupled to multiple components that control and regulate activities and conditions associated with the well 16. For example, thewellhead assembly 12 may generally be coupled to (or may include) bodies, spools, valves and seals that route produced minerals from themineral deposit 14, provide for regulating pressure in the well 16, and provide for the injection of chemicals into the well-bore 20. - The
integrated wellhead assembly 12 includes anupper portion 24 and alower portion 26, each having abore 32. As explained further below, theupper portion 24 andlower portion 26 may be integrally coupled to form a single unit, e.g., an integrated assembly. For example, theupper portion 24 andlower portion 26 may be cast as a single unit, welded together to form a single unit, etc. - The
lower portion 26 may include one or more side ports (e.g., inlets or outlets) 28 to provide fluid connections to thebore 32 of thelower portion 26. Theports 28 may be in fluid communication with theannulus 25 and, as such, provide access to themineral deposit 14. Thelower portion 26 may support atubing hanger 31 that supports theproduction tubing 23. If desired, thetubing hanger 31 can include sealing components that isolate theannulus 25 from thebore 32 of theupper portion 24 - Advantageously, the
wellhead assembly 12 facilities the insertion of various tools into the well-bore as well as access to themineral deposit 14. For example, components, such as back-pressure valves and plugs, can be run down to thewellhead assembly 12 and disposed in thebore 32 to seal-off the well bore 20, to inject chemicals down-hole, to suspend tools down-hole, to retrieve tools down-hole, and the like. - The
upper portion 24 may include blowout-prevention components 33 that provide sealing of thebore 32, such as a set ofblind rams 34 that seal against one another and a set of rod rams 36 that seal against the outer surface of a polished rod. In other embodiments, the blowout-prevention components 33 may include only one set of rams, an annular BOP, variable-size ram, sheer rams, etc. In yet other embodiments, theupper portion 24 may include a Flex-Packer® BOP. Theupper portion 24 may include a side port (e.g., inlet or outlet) 38, e.g., a flow tee, having any size and type of connection and providing access to thebore 32. As explained further below, during various operational stages of thesystem 10, therams bore 32, seal thebore 32, or seal around components disposed in thebore 32. Theupper portion 24 may provide access to thebore 32 and enable hanging oftubing 30 in thelower portion 26, yet also provide compatibility with anartificial lift system 27, such as a progressing cavity pump system and sucker rod/beam pump system. Thus, theupper portion 24 may provide the functionality of, and may be referred to, as a composite pumping tee (CPT) head. - The
wellhead assembly 12 may include asealing component 40 integrally or separately coupled to theupper portion 24. The sealingcomponent 40 may be a sealing component configured for sealingadditional components 42 to theassembly 12. For example, in one embodiment, the sealingcomponent 40 may be a stuffing box (or other type of gland seal) and theadditional component 42 may be a drivehead for an artificial lift system, such as a progressing cavity pump system. In other embodiments, the sealingportion 40 may be removed and theother component 42 may include a blowout preventor (BOP), a tree, or any other component of themineral extraction system 10. In some embodiments, theupper portion 24 may also receive anyother sealing component 40 or coupling, such as flanges, timesaver couplings, etc. - As mentioned above, the
integrated wellhead assembly 12 may enable conversion between free flow production operation, artificial lift production operation, and various workovers without removal and/or reconfiguration of thewellhead assembly 12. That is, thewellhead assembly 12 may accommodate a variety of operations, thus reducing the time and cost associated with converting between operations of themineral extraction system 10. During such conversions and operations, thewellhead assembly 12 may remain coupled to thehub 18, and various components may be installed in or coupled to thewellhead assembly 12. -
FIGS. 2A-2D depict various operations using thewellhead assembly 12 in accordance with an embodiment of the present invention.FIG. 2A depicts a workover operation in a free flow well,FIG. 2B depicts free flow production operation ofwellhead assembly 12,FIG. 2C depicts workover operation in an artificial lift well, andFIG. 2D depicts artificial lift production operation of thewellhead assembly 12. The operations depicted ofFIGS. 2A-2D are examples and are not limiting on the operations supported by thewellhead assembly 12. In other embodiments, thewellhead assembly 12 may provide for other stages of operation not depicted inFIGS. 2A-2D . However, regardless of the type of operation, thewellhead assembly 12 remains coupled to the well 16 and is not removed and/or reconfigured during the operations or conversions between operations. - Turning now to
FIG. 2A , thewellhead assembly 12 is depicted during workover of a free flow well 16 in accordance with an embodiment of the present invention. For example,FIG. 2A may depict workover to convert the well 16 from drilling to production through the installation of atubing hanger 31 andproduction tubing 23, etc. During the operation depicted inFIG. 2A , thewellhead assembly 12 may be coupled to aBOP 50. TheBOP 50 may be coupled to theupper portion 24 of thewellhead assembly 12 through a flange, union nut, or any other suitable connection. Theexemplary BOP 50 includes blind rams and rams configured to seal against the production tubing. Thus, by articulating the rams, the tubing head and production tubing can be installed while maintaining isolation between theannulus 25 and bore 20 and the external environment on the surface. In addition, theblowout prevention components 33 of the wellhead assembly can be articulated to future assist in the isolation of the bore and the external environment. It is envisaged that the certain embodiments of the present invention may facilitate the installation and removal of production tubing without the need for an external pressure control device like theBOP 50. - During the workover, the
wellhead assembly 12 may provide for additional sealing of thebore 32 and the well 16. For example, acheck valve 52 or isolation plug, may be installed in thehanger 31 to provide a sealing mechanism between thebore 32 of theupper portion 24 and thebore 20 defined by theproduction tubing 23. Additionally, theblind rams 34 of theupper portion 24 may be closed to seal off the bore 32 (as illustrated by encircled region 54). The blind rams 34, or otherblowout prevention components 33, may be manually or automatically (e.g., hydraulically, pneumatically, electrically etc.) actuated. The blind rams 34 may provide sealing of the well 16 during installation and/or removal of thetubing BOP 50. In the workover operation, after installation of thetubing BOP 50, theblind rams 34 may be opened (e.g., manually or automatically retracted) to expose thebore 32 and enable insertion or removal of thecheck valve 52, thehanger 31, and/or thetubing 30. - After workover of the well 16, the well 16 may operate in free flow production so that the
mineral deposit 14 may produce through thewellhead 12, such as through theproduction tubing 30 and out of thesystem 10 to shipping or storage facilities.FIG. 2B depicts such a stage of operation of thewellhead 12 in accordance with an embodiment of the present invention. Thewellhead 12 may be provide for conversion between free flow workover (as shown inFIG. 2A ) and free flow production without reconfiguration and/or removal of thewellhead 12 or any components below thewellhead 12. As shown inFIG. 2B , conversion to free flow production may include removal of thetubing BOP 50 and installation of a “christmas tree” 58 on theupper portion 24 of thewellhead 12. Thetree 58 may be directly coupled to theupper portion 24 or may be coupled by a separate flange or other coupling between thewellhead 12 and thetree 58. - The
tree 58 generally includes a variety of flow paths (e.g., bores), valves, fittings, and controls for operating thewell 16. For instance, thetree 58 may include a frame that is disposed about a tree body, a flow-loop, actuators, and valves. Further, thetree 58 may provide fluid communication with the well 16. Minerals extracted from the well 16 (e.g., oil and natural gas) may be regulated and routed via thetree 58. Accordingly, produced minerals flow from the well 16 via thewellhead assembly 12 and/or thetree 58 before being routed to shipping or storage facilities. Thus, thetree 58 may enable further routing of produced minerals flowing through the tubing 30 (installed during the free flow workover depicted inFIG. 2A ). - As shown in
FIG. 2B , theblind rams 34 and the rod rams 36 may be retracted to expose thefull bore 32 of thewellhead assembly 12. Thefull bore 32 enables routing of minerals to thetree 58. In fact, thebore 32 may be sized to allow the insertion of tools into theproduction casing 25 in the case when theproduction tubing 23 has been removed. The blind rams 34 may still provide for sealing of the well 16, such as in the event of an overpressure situation, by manual or automatic closing of the blind rams 34. With theblind rams 34 in a closed position, thebore 20 andannulus 25 are isolated from the external environment, and thesealing component 40, whether that is atree 58 or aBOP 50 or other component may be removed without exposure of the external environment. - As mentioned above, in some embodiments it may be desirable to convert the well 16 to artificial lift production, which may use a pumping mechanism to increase pressure in the well 16 to enable further extraction and production of the
mineral deposit 14.FIG. 2C depicts conversion of thesystem 10 to artificial lift production in accordance with embodiment of the present invention. As shown inFIG. 2C , thetree 58 may be removed and arod BOP 60 may be installed on theupper portion 24 of thewellhead assembly 12, without removal and/or reconfiguration of thewellhead assembly 12. Therod BOP 60 may provide well protection during running and landing of apump 62 androds 64 in thewell 16. During installation of thepump 62 androds 64, theblind rams 34 and rod rams 36 may be fully opened (either manually or automatically retracted) to expose thefull bore 32 of thewellhead assembly 12 and enable installation and/or removal of thehanger 31 andtubing 30, and installation of thepump 62,rods 64, and any insertion and/or removal of any associated tools and/or components. - After installation of the artificial lift components, e.g., the
pump 62 and therods 64, the rod rams 36 of thewellhead assembly 12 may be closed to seal around therods 64 and seal thewell 16. In this configuration, thewellhead assembly 12 may enable hang off of thesystem 10 to the capacity of the rod rams 36, such a closing the rod rams 36 around arod coupling 65. Thewellhead assembly 12 may provide for workover to convert the well 16 to artificial lift without reconfiguration and/or removal of thewellhead assembly 12. Similarly, thewellhead assembly 12 may provide for workover to convert the well to free flow production or other operations. -
FIG. 2D depicts operation of thewellhead assembly 12 in artificial lift production in accordance with an embodiment of the present invention. As described above, thewellhead assembly 12 may be converted to artificial lift production through installation of thepump 62 androds 64, such as during the workover depicted inFIG. 2C . As shown inFIG. 2D , conversion to artificial lift production may include removal of therod BOP 60 and installation of astuffing box 70 on theupper portion 24 of thewellhead assembly 12. Thestuffing box 70 may be coupled to thewellhead assembly 12 through a flange or any other suitable type of coupling. In other embodiments, thestuffing box 70 may be integral to theupper portion 24 of thewellhead assembly 12, such that installation of thestuffing box 70 is not necessary when converting to artificial lift production. - The
stuffing box 70 may provide for coupling and sealing of artificial lift equipment, e.g., adrivehead 72, to therods 64 and thewellhead assembly 12. Additionally, theside port 38 of theupper portion 24 of thewellhead assembly 12 may operate as a flow tee for the artificial lift system to direct extracted minerals. As also shown inFIG. 2D , during artificial lift production the rod rams 36 and theblind rams 34 may be opened (e.g., manually or automatically retracted) to expose thefull bore 32 of thewellhead assembly 12 and enable routing of the produced mineral from thewell 16. - The
wellhead assembly 12 may be converted from artificial lift production, as shown inFIG. 2D , to workover, as shown inFIG. 2C , and back to free flow production, as shown inFIG. 2B , without reconfiguration and/or removal of thewellhead assembly 12. For example, conversion of thewellhead assembly 12 from artificial lift production to free flow production may include removal of thestuffing box 70 and installation and removal of thecheck valve 52, thetubing BOP 50, and/or thehanger 31 andtubing 30. Again, the rod rams 36 andblind rams 34 may be opened or closed as desired to provide sealing of the well 16 and access to the bore 32 (such as for removal and/or installation of another hanger and tubing). In other embodiments, thewellhead assembly 12 may be converted from artificial lift production to free flow production by closing the rod rams 36, removing all artificial lift equipment above theupper portion 24, and hanging off therods 62 below the rod rams 36. -
FIGS. 3 and 4 depict a perspective view and a side view respectively of theintegrated wellhead assembly 12 in accordance with an embodiment of the present invention. Referring generally toFIGS. 3 and 4 , thewellhead assembly 12 includes anupper portion 24 andlower portion 26 forming an integral assembly (i.e., single unit) as described above. As shown inFIGS. 3 and 4 , thelower portion 26 may includeside ports 28 and aflange 100. Theflange 100 may be any suitable size and provide for any suitable connection. In some embodiments, theflange 100 may be an 11″ American Petroleum Institute (API) 3K flange, or a 7 1/16″ API 3K flange. Theside ports 28 may be any suitable size and provide for any suitable connection. In one embodiment, theside ports 28 may be 2 1/16″ APU 5K studded outlets. - The intersection of the
lower portion 26 andupper portion 24 may includefasteners 104 that disposed around the circumference of theassembly 12. Thefasteners 104 may include lock screws or other suitable fasteners and may insert into thebore 32 of theassembly 12 to engage a hanger or other component disposed in thebore 32. - As illustrated in
FIGS. 3 and 4 , theupper portion 24 may include theblind rams 34, the rod rams 36, and theside port 38, e.g., a flow tee. Also illustrated inFIG. 3 is the sealingcomponent 40, e.g., astuffing box 106, coupled to theupper portion 24. Thestuffing box 106 may include anorifice 107 to receive rods or other artificial lift components. In some embodiments, as shown inFIG. 3 , thestuffing box 106 may be coupled to theupper portion 24 by a flanged connection or other suitable coupling. In other embodiments, thestuffing box 106 may be integrally coupled to theupper portion 24. -
FIG. 5 is a cross-section of thewellhead assembly 12 taken along line 5-5 ofFIG. 3 in accordance with an embodiment of the present invention.FIG. 5 illustrates disposal of thetubing hanger 31 andproduction tubing 30 in thebore 32 of thewellhead assembly 12. Thehanger 31 may be landed on ashoulder 108 of thelower portion 26. Thehanger 31 may be secured by the fasteners 104 (e.g., lockscrews) inserted into thebore 32 of thewellhead assembly 32 to engage thehanger 31. As mentioned above, when inserted into thewellhead assembly 32 thehanger 31 sealably connects theupper portion 24 with the well 16, and carries theproduction tubing 30 used to route minerals from thewell 16. - As also seen in
FIG. 5 , the rod rams 36 and theblind rams 34 are shown in a closed position. The blind rams 34 may include two components, e.g., blocks 110 and 112, that move in the radial directions indicated byarrows bore 32 of thewellhead assembly 12, theblind rams 34 may be manually (or automatically) retracted, such that blocks 110 and 112 move in the outwardly radial direction as indicated byarrows 114. To seal the well 16, theblind rams 34 may be manually (or automatically) closed (the position depicted inFIG. 5 ), such that blocks 110 and 112 move in the inward radial direction as indicated byarrows 116. In the closed position, theblocks bore 32 to seal the portion of the well 16 below the blind rams 34. - The rod rams 36 may work in a similar manner to the
blind rams 34 but, as described above, the rod rams 36 seal around a rod or other component inserted into thebore 32 of thewellhead assembly 12. The rod rams 36 may include two components, e.g., blocks 118 and 120, which move in the radial directions indicated byarrows bore 32 of thewellhead assembly 12, the rod rams 36 may be manually (or automatically) retracted by movingblocks arrows 114. The rod rams 34 may be manually (or automatically) closed (the position shown inFIG. 5 ), such that blocks 118 and 120 move in the radially inward direction as indicated byarrows 116. In the closed position, theblocks orifice 122 in the center of thebore 32 to seal around a component disposed in thebore 32. - One of, or both of, the
blind rams 34 and the rod rams 36 may be opened or closed to facilitate the operations or conversion between operations described above inFIGS. 2A-2D , or any other operation or conversion. Thus, both theblind rams 34 and the rod rams 36 may be retracted to provide full bore access to thebore 32 of thewellhead assembly 12, such as during workover or free flow production. In another example, theblind rams 34 may be closed to seal the well 16 and the rod rams 36 may be opened to facilitate workover of the well 16, such as when converting to/from free flow production and artificial production. Additionally, the rod rams 36 may be closed to seal around a rod or other component and theblind rams 34 may be opened to enable artificial lift production, hang off, or other operations. - The
stuffing box 106 may include theorifice 107 to allow insertion ofrods 64 for an artificial lift system. Thestuffing box 106 may also include sealingcomponents 126, such as annular elastomer seals, to seal against therods 64 and the well 16. In some embodiments, thestuffing box 106 may provide access to internal components to allow repair and/or replacement without removal of thestuffing box 106, thus providing longer life without removal of a drivehead and replacement of thestuffing box 106. For example, in one embodiment thestuffing box 106 may include a side access panel that may be opened and/or removed to allow access to the sealingcomponents 126. - To further provide for various operations of the
mineral extraction system 10, thewellhead assembly 12 also maintains a fixed configuration and position that can accommodate different equipment. As illustrated above, thewellhead assembly 12 includes theshoulder 108 for landing a hanger or other equipment. Thus, operation of thewellhead assembly 12 does not require the addition of tubing heads to provide additional shoulders for landing additional hangers and tubing. Additionally, as shown inFIG. 5 , adistance 128 between theupper portion 24 and thelower portion 26, (and theside ports 28 and 28) remains fixed regardless of the operation. The fixeddistance 128 provides for easier use of thewellhead assembly 12 during workover and other operations, without necessitating removal of theassembly 12. - In other embodiments, an
integrated wellhead assembly 12 may include a side tube that provides for additional operations.FIGS. 6-8 depict thewellhead assembly 12 having aside tube 140 in accordance with another embodiment of the present invention. As described below, theside tube 140 may be used for clean out (e.g., injecting fluids and removing fluids and debris), artificial lift, or production during operation of thesystem 10. Thewellhead assembly 12 having theside tube 140 may be used in any of the stages of operation discussed above inFIGS. 2A-2D . - Turning now to
FIGS. 6 and 7 ,FIG. 6 depicts a perspective view andFIG. 7 depicts a side view of thewellhead assembly 12 with theside tube 140 in accordance with an embodiment of the present invention. Thewellhead assembly 12 includes theupper portion 24 having rod rams 36,blind rams 34, andside port 38, and thelower portion 26 havingside ports 28 andflange 100. Additionally, astuffing box 106 is shown coupled to theupper portion 24, although, as mentioned above, any suitable sealing component may be coupled to theupper portion 24. - As seen in
FIGS. 6 and 7 , theside tube 140 extends from thelower portion 26, such as from aflanged portion 142 of thelower portion 26. Theside tube 140 may be integrally coupled to thewellhead assembly 12 to form anintegrated assembly 12, e.g., a single unit. For example, theside tube 140 may be welded to theassembly 12 or theassembly 12 may be cast or otherwise formed as a single unit. Theside tube 140 may extend at anysuitable angle 141 to clear thewellhead assembly 12. In some embodiments, theangle 141 may be 0 to 90 degrees, 5 to 60 degrees, 5 to 45 degrees, 5 to 15 degrees, e.g., less than approximately 5, 10, 15, 20, 30, 35, 40, or 45 degrees but greater than 0 degrees. Additionally, in some embodiments, theupper portion 24 may include a recessedportion 144 to receive a portion of theside tube 140. Theside tube 140 may include aflange 146 to enable coupling of different components to theside tube 140. As explained below, the bore of theside tube 140 may be in fluid communication with thebore 32 of thelower portion 26 of thewellhead assembly 12, and, if production tubing is suspended from thetubing hanger 31, may be in fluid communication with theannulus 25 between theproduction tubing 23 and theproduction casing 21. -
FIG. 8 depicts a cross-section of thewellhead assembly 12 with theside tube 140 taken along line 8-8 ofFIG. 6 in accordance with an embodiment of the present invention. As seen inFIG. 8 , theside tube 140 includes abore 148 in fluid communication with thebore 132 of thewellhead assembly 12. As described above, theupper portion 24 and rod rams 36 andblind rams 34 may function to seal the well 16 or provide full bore access as described above. That is, incorporation of theside tube 140 does not alter or change the functionality of theupper portion 24 of thewellhead assembly 12. - An
opening 150 of theside tube 140 may allow for injection and/or removal of fluids to and from thebore 132 of thelower portion 26. Theflange 146 may provide for coupling of different devices to theside tube 140. In one embodiment, theside tube 140 may be used for a clean-out operation to remove fill material, e.g., debris, from the wellbore. In other embodiments, theside tube 140 may be used to add a column to the top of the fluid in the well and aid artificial lift production. - In another embodiment, the
side tube 140 may be used for production, either during free flow production or artificial lift production.FIG. 9 depicts a block diagram of theassembly 12 withside tube 140 used during artificial lift production in accordance with an embodiment of the present invention. The artificial lift system may include the components described above, such as apump 62,rod 62, anddrivehead 72. As mentioned above, thedrivehead 72 may be coupled to thewellhead 12 by thestuffing box 106, and thestuffing box 106 may also provide sealing of therod 62 and thedrivehead 72. - To enable production through the
side tube 140,coil tubing 152 may be installed in theside tube 140 to the opening of theside tube 140. Further, in some embodiments, a sealing element and/or lubricator, such as astuffing box 154, may be coupled to the top of theside tube 140 by theflange 146. As the artificial life system operates, a mineral may be produced through the annulus of theassembly 12 and through thecoil tubing 152 installed in theside tube 140. Such a system may also include valves, fittings, or other components coupled to the top of theside tube 140 to provide for routing of the produced mineral for further processing. -
FIGS. 10-13 depict additional embodiments of thewellhead assembly 12 having, for example, a backpressure valve (BPV) prep head, a side panel stuffing box, a tubing rotator, and/or an annular BOP. Any of the features illustrated in the embodiments below may be used in the operations illustrated above inFIGS. 2A-2D . Further, it should be appreciated that the features described below inFIGS. 10-13 may be implemented in different embodiments of thewellhead assembly 12 having various combinations of the features discussed herein. -
FIG. 10 depicts theintegrated wellhead assembly 12 having a backpressurevalve prep head 156 in accordance with an embodiment of the present invention. The backpressurevalve prep head 156 may be included in theupper portion 24 of thewellhead assembly 12 and may be configured to receive abackpressure valve 158. In such an embodiment, theupper portion 24 of thewellhead assembly 12 may only include one set of rams, e.g., rod rams 36. Thebackpressure valve 158 may provide sealing of the well 16 instead of an additional blind rams included in theupper portion 24. In some embodiments, thebackpressure valve 158 may be retained by lock screws inserted through theupper portion 24 and into thebore 32. In other embodiments, thebackpressure valve 158 may be retained in thebore 32 by one or more lock rings disposed around one or more portions of thebackpressure valve 158. Further still, the backpressure valve may be retained by an appropriate mechanism located on an inner surface of thetubing hanger 31. -
FIG. 11 depicts theintegrated wellhead assembly 12 having a sideaccessible stuffing box 160 in accordance with an embodiment of the present invention. As described above, thestuffing box 160 may include a plurality of seals 164 (e.g., annular elastomer seals) configured to seal a rod inserted into anorifice 167 of thestuffing box 160. During artificial lift production of the well 16, theseals 164 and/or other components of thestuffing box 160 may be replaced to ensure seal integrity and extend service life of the stuffing box. Thestuffing box 160 may include aside panel 166 to provide for access to theseals 164 and/or other components of thestuffing box 160. Theside panel 166 provides for repair and/or replacement of theseals 164 and/or other components of thestuffing box 160 without removal of thestuffing box 160, the drivehead, and/or any other components coupled to theupper portion 24 of thewellhead assembly 12. Theside panel 166 may be fully removable, and/or may be hinged, bolted, latched, or otherwise secured to thestuffing box 160. - In other embodiments, the
wellhead assembly 12 may include a tubing rotator that rotates tubing installed in the assembly to prevent uneven wear caused by a rod and pumping action of an artificial lift system.FIG. 12 depicts theintegrated wellhead assembly 12 with atubing rotator 170 in accordance with an embodiment of the present invention. Thetubing rotator 170 may be disposed at or near the intersection of theupper portion 24 and thelower portion 26 and may include a mechanism that rotates the tubing 30 (and, in some embodiments, the hanger 31). Thetubing rotator 170 may be driven by a pump or other suitable drive mechanism. As mentioned above, when a rod is inserted in thewellhead assembly 12 for artificial lift production, thetubing rotator 170 may rotate the tubing to encourage even wear of thetubing 30 as the rod moves in theassembly 12 and contacts thetubing 30. During free flow production, thetubing rotator 170 may be deactivated so that thetubing 30 is not rotated. - As also mentioned above, in other embodiments the
upper portion 24 of thewellhead assembly 12 may include other BOP types.FIG. 13 depicts thewellhead assembly 12 having an annular BOP 174 in accordance with an embodiment of the present invention. The annular BOP 174 may be disposed in theupper portion 24 of thewellhead assembly 12. The annular BOP 174 may be closed to seal thebore 32 of thewellhead assembly 12, and/or, in some embodiments, to provide sealing around tubing, or a rod of an artificial lift system. The annular BOP 174 may include a toroid or torus component disposed circumferentially around thebore 32 that may be contracted radially inward to seal the bore 32 (or around components inserted into the bore). Additionally, the annular BOP 174 may be opened (manually or automatically) to provide access to thefull bore 32 of thewellhead assembly 12, such as during workover or for production from thewell 16. -
FIGS. 14-16 are flowcharts depicting various operations using theintegrated wellhead assembly 12. As illustrated above inFIGS. 2A-2D , such operations may be performed without removal and/or reconfiguration of thewellhead 12.FIG. 14 depicts aprocess 200 for workover operation for a free flow production well using theintegrated wellhead assembly 12 in accordance with an embodiment of the present invention. Initially, thewellhead assembly 12 may be used in free flow production (block 202) and producing mineral through a tree coupled to the wellhead assembly 12 (as depicted inFIG. 2B ). To workover thewell 16, a valve (e.g., a check valve) may be installed in the wellhead assembly 12 (block 204). The blind rams 34 may be closed to seal the well 16 (block 206). It should be appreciated that the valve andblind rams 34 may provide a dual barrier compliant seal during the workover. - The tree may be removed from the wellhead assembly (block 208), and a BOP (e.g., a tubing BOP) may be installed on the
wellhead assembly 12 and tested (block 210). The blind rams 34 may then be opened to provide full bore access to the well 16 (block 212). A workover task may be performed in the well 16 (block 214), such as insertion and use of a tool, removal and/or installation of a hanger and/or tubing, etc. The blind rams 34 may be closed to seal the well (block 216) and provide another barrier during removal of the BOP (block 218). A tree may be installed (block 220) and theblind rams 34 may be opened (block 222). The valve may be removed and the well 16 may then be returned to production (block 224). It should be appreciated that theprocess 200 may be implemented in anartificial lift system 12 using thewellhead 12, but the rod rams 36 may provide sealing of the well 16 during installation of a rod BOP and/or removal of the rods. -
FIG. 15 depicts aprocess 300 for conversion from free flow production to artificial production using theintegrated wellhead assembly 12 in accordance with an embodiment of the present invention. Theprocess 300 may include workover of the free flow well to perform a workover task (block 302), such as depicted in blocks 202-214 ofFIG. 14 . The workover task may include removal of a hanger and/or tubing adapted for free flow production and installation of a hanger and/or tubing adapted for artificial lift production. Next, theblind rams 36 may be closed (block 304) and the tubing BOP may be removed (block 306). A rod BOP (block 308) may be installed on thewellhead assembly 12 and theblind rams 36 may be opened (block 310). Any valve disposed in the bore of thewellhead assembly 12 may be removed (block 312). The artificial lift pump and rods, e.g., sucker rods, may be installed in the wellhead assembly (block 314). - After installation of the pump and rods, the rod rams 34 may be closed to enable hang off up to the rod capacity (block 316). The rod BOP may then be removed (block 318). A stuffing box may be installed on the wellhead assembly 12 (block 320) or, in other embodiments, the stuffing box may already be integrated with the upper portion of the
wellhead assembly 12. The rod rams 34 may be opened (block 322) and production may be resumed through completion of the artificial lift system (block 324). -
FIG. 16 depicts aprocess 400 for conversion from free flow production to artificial lift production using thewellhead assembly 12 in accordance with an embodiment of the present invention. Theprocess 400 may include workover of the artificial lift well to perform a workover task (block 402). The workover task may include removal of a hanger and/or tubing adapted for artificial lift production and installation of a hanger and/or tubing adapted for free flow production. Next, the rod rams may be closed and, in some embodiments, the well may be killed (block 404). In one embodiment, the stuffing box may be removed from thewellhead assembly 12 and a rod BOP installed (block 406). In other embodiments having an integrated stuffing box, as discussed above, the stuffing box may not be removed. After installation of the rod BOP the rod rams may be opened (block 408). - In some embodiments, the well 16 may be converted to free flow production, such as depicted above in
FIG. 2B . In such an embodiment, the rods and pump may be removed from the well (block 410). A valve (e.g., a check valve) may be installed in the wellhead assembly 12 (block 412). Additionally, theblind rams 34 may be closed to seal the well 16 (block 414) and provide dual barrier sealing capability with the valve. After closing theblind rams 34, the rod BOP may be removed (block 416). The well 16 may then be converted to free flow production by installing a tubing BOP, removing and/or installing a hanger and/or tubing, and installing a tree, as described in blocks 210-224 ofFIG. 14 . - In another embodiment, the
wellhead assembly 12 may enable hang off of a pump and rod assembly to convert from artificial lift production to free flow production. In such an embodiment, after opening the rod rams (block 408) the pump may be unseated and the rods may be pulled to locate a rod coupling in theupper portion 24 of the wellhead assembly 12 (block 418). After locating the coupling, the rod rams 36 may be closed around the coupling (block 420) to seal the well 16 and the rods above the coupling may be disconnected and removed (block 422). The rod BOP may then be removed (424). A tree may be installed on theintegrated wellhead assembly 12 and the free flow production may begin (block 426). - While the invention may be susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and have been described in detail herein. However, it should be understood that the invention is not intended to be limited to the particular forms disclosed. Rather, the invention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the following appended claims.
Claims (20)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/318,629 US9869150B2 (en) | 2010-02-12 | 2014-06-28 | Integrated wellhead assembly |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/705,484 US8544535B2 (en) | 2010-02-12 | 2010-02-12 | Integrated wellhead assembly |
US13/975,275 US8794306B2 (en) | 2010-02-12 | 2013-08-23 | Integrated wellhead assembly |
US14/318,629 US9869150B2 (en) | 2010-02-12 | 2014-06-28 | Integrated wellhead assembly |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/975,275 Continuation US8794306B2 (en) | 2010-02-12 | 2013-08-23 | Integrated wellhead assembly |
Publications (3)
Publication Number | Publication Date |
---|---|
US20150053418A1 US20150053418A1 (en) | 2015-02-26 |
US20170130551A9 true US20170130551A9 (en) | 2017-05-11 |
US9869150B2 US9869150B2 (en) | 2018-01-16 |
Family
ID=44368359
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/705,484 Expired - Fee Related US8544535B2 (en) | 2010-02-12 | 2010-02-12 | Integrated wellhead assembly |
US13/975,275 Expired - Fee Related US8794306B2 (en) | 2010-02-12 | 2013-08-23 | Integrated wellhead assembly |
US14/318,629 Expired - Fee Related US9869150B2 (en) | 2010-02-12 | 2014-06-28 | Integrated wellhead assembly |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/705,484 Expired - Fee Related US8544535B2 (en) | 2010-02-12 | 2010-02-12 | Integrated wellhead assembly |
US13/975,275 Expired - Fee Related US8794306B2 (en) | 2010-02-12 | 2013-08-23 | Integrated wellhead assembly |
Country Status (6)
Country | Link |
---|---|
US (3) | US8544535B2 (en) |
CA (1) | CA2789250C (en) |
GB (1) | GB2489898B (en) |
MX (1) | MX2012009384A (en) |
SG (1) | SG182726A1 (en) |
WO (1) | WO2011100036A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170074060A1 (en) * | 2015-09-14 | 2017-03-16 | Control Technology Inc. | Pipe centering and washing apparatus |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8544535B2 (en) * | 2010-02-12 | 2013-10-01 | Cameron International Corporation | Integrated wellhead assembly |
UA109683C2 (en) | 2010-12-09 | 2015-09-25 | PUMP PUMP PLACED PIPE | |
EP2665887A2 (en) * | 2011-01-18 | 2013-11-27 | Noble Drilling Services, Inc. | Method for capping a well in the event of subsea blowout preventer failure |
US9670755B1 (en) * | 2011-06-14 | 2017-06-06 | Trendsetter Engineering, Inc. | Pump module systems for preventing or reducing release of hydrocarbons from a subsea formation |
USD687125S1 (en) | 2011-08-19 | 2013-07-30 | S.P.M. Flow Control, Inc. | Fluid end |
WO2013116535A1 (en) | 2012-02-01 | 2013-08-08 | S.P.M. Flow Control, Inc. | Pump fluid end with integrated web portion |
USD679292S1 (en) | 2012-04-27 | 2013-04-02 | S.P.M. Flow Control, Inc. | Center portion of fluid cylinder for pump |
USD706832S1 (en) | 2012-06-15 | 2014-06-10 | S.P.M. Flow Control, Inc. | Fluid cylinder for a pump |
USD705817S1 (en) | 2012-06-21 | 2014-05-27 | S.P.M. Flow Control, Inc. | Center portion of a fluid cylinder for a pump |
US9702214B2 (en) * | 2013-10-31 | 2017-07-11 | Bulldog Services, LLP | Abandonment cap and method of sealing production wells |
US9828823B2 (en) * | 2014-04-01 | 2017-11-28 | Cameron International Corporation | Rod hang-off system |
BR112017001282B1 (en) | 2014-08-21 | 2022-03-03 | Halliburton Energy Services, Inc | Drilling system, rotary control device and method for accessing a wellbore |
WO2016165020A1 (en) | 2015-04-15 | 2016-10-20 | 1904296 Alberta Ltd. | Tool and method for use in supporting a sucker rod string in an oil or gas well |
US9759032B2 (en) * | 2015-04-17 | 2017-09-12 | Cameron International Corporation | Blowout preventer end connection |
CA2991538C (en) | 2015-07-09 | 2022-12-13 | Western Oiltools Ltd. | Modified stuffing box |
CA3013084C (en) | 2016-02-10 | 2024-01-16 | Dreco Energy Services Ulc | Anti-extrusion seal arrangement and ram-style blowout preventer |
US10900313B2 (en) | 2016-07-26 | 2021-01-26 | Dreco Energy Services Ulc | Method and apparatus for production well pressure containment for blowout |
US10619441B2 (en) | 2017-01-06 | 2020-04-14 | Oil Lift Technology Inc. | Wellhead assembly with integrated tubing rotator |
WO2018129620A1 (en) * | 2017-01-16 | 2018-07-19 | Dreco Energy Services Ulc | Multifunction blowout preventer |
CA2967606C (en) | 2017-05-18 | 2023-05-09 | Peter Neufeld | Seal housing and related apparatuses and methods of use |
US10941628B2 (en) | 2017-09-25 | 2021-03-09 | Dreco Energy Services Ulc | Adjustable blowout preventer and methods of use |
US10718177B2 (en) * | 2017-11-17 | 2020-07-21 | Fmc Technologies, Inc. | Composite block frac tree |
CN107725039A (en) * | 2017-11-25 | 2018-02-23 | 西安安森智能仪器股份有限公司 | A kind of natural gas wellhead integrated apparatus |
US11459844B2 (en) * | 2019-08-27 | 2022-10-04 | Hydril USA Distribution LLC | Blowout preventer system and method |
CN110685616B (en) * | 2019-10-21 | 2020-11-27 | 江苏油田矿业开发有限公司 | Well repairing operation method for low-permeability water-sensitive oil well |
CN111706287B (en) * | 2020-07-23 | 2024-10-11 | 西安宇星石油机械新技术开发有限公司 | Quick rush-mounting device for hydraulic annular wellhead sleeve flange |
RU203209U1 (en) * | 2020-08-20 | 2021-03-25 | Денис Борисович Белоконов | PRODUCTION WELL RETURN VALVE |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2162179A (en) * | 1937-09-29 | 1939-06-13 | Gray Tool Co | Oil well completion equipment |
US2148327A (en) * | 1937-12-14 | 1939-02-21 | Gray Tool Co | Oil well completion apparatus |
US3163430A (en) * | 1962-08-01 | 1964-12-29 | Gulf Coast Machine & Supply Co | Stuffing box assembly for sucker rod strings |
US4804045A (en) * | 1986-11-06 | 1989-02-14 | Reed Lehman T | Oil and gas well diversionary spool assembly |
CA2098324C (en) | 1993-06-14 | 2001-02-20 | Edward Grenke | Method and apparatus for securing a well head drive against unintentional rotation |
US5577556A (en) * | 1995-01-17 | 1996-11-26 | Reed; Lehman T. | Unitary diversionary-tubing hanger and energizable rod seal |
US5743332A (en) * | 1996-02-16 | 1998-04-28 | Stream-Flo Industries Ltd. | Integral wellhead assembly for pumping wells |
CA2240058C (en) * | 1998-06-09 | 2008-03-25 | Linden H. Bland | Coupling device for a drive assembly |
CA2349988E (en) | 2000-06-09 | 2008-01-22 | Oil Lift Technology Inc. | Polish rod locking clamp |
CA2311036A1 (en) | 2000-06-09 | 2001-12-09 | Oil Lift Technology Inc. | Pump drive head with leak-free stuffing box, centrifugal brake and polish rod locking clamp |
US6557643B1 (en) * | 2000-11-10 | 2003-05-06 | Weatherford/Lamb, Inc. | Rod hanger and clamp assembly |
US6457530B1 (en) * | 2001-03-23 | 2002-10-01 | Stream-Flo Industries, Ltd. | Wellhead production pumping tree |
CA2368877C (en) * | 2002-01-17 | 2005-03-22 | Tony M. Lam | Assembly for locking a polished rod in a pumping wellhead |
US7395867B2 (en) * | 2004-03-17 | 2008-07-08 | Stinger Wellhead Protection, Inc. | Hybrid wellhead system and method of use |
US7717181B2 (en) * | 2007-01-09 | 2010-05-18 | Terry Bullen | Artificial lift system |
US7806175B2 (en) * | 2007-05-11 | 2010-10-05 | Stinger Wellhead Protection, Inc. | Retrivevable frac mandrel and well control stack to facilitate well completion, re-completion or workover and method of use |
US8201624B2 (en) * | 2007-10-23 | 2012-06-19 | Saudi Arabian Oil Company | Clustered wellhead trunkline protection and testing system with ESP speed controller and emergency isolation valve |
US8544535B2 (en) * | 2010-02-12 | 2013-10-01 | Cameron International Corporation | Integrated wellhead assembly |
AU2011237441A1 (en) * | 2010-04-07 | 2012-11-01 | David Randolph Smith | Submersible hydraulic artificial lift systems and methods of operating same |
MX2012012516A (en) * | 2010-04-30 | 2012-12-17 | Oil Lift Technology Inc | A continuous rod pump drive system. |
US8479828B2 (en) * | 2010-05-13 | 2013-07-09 | Weatherford/Lamb, Inc. | Wellhead control line deployment |
US20110308812A1 (en) * | 2010-06-22 | 2011-12-22 | Terry Bullen | Artificial lift system |
US8794334B2 (en) * | 2010-08-25 | 2014-08-05 | Cameron International Corporation | Modular subsea completion |
-
2010
- 2010-02-12 US US12/705,484 patent/US8544535B2/en not_active Expired - Fee Related
- 2010-12-21 SG SG2012055133A patent/SG182726A1/en unknown
- 2010-12-21 CA CA2789250A patent/CA2789250C/en not_active Expired - Fee Related
- 2010-12-21 GB GB1214087.7A patent/GB2489898B/en not_active Expired - Fee Related
- 2010-12-21 MX MX2012009384A patent/MX2012009384A/en active IP Right Grant
- 2010-12-21 WO PCT/US2010/061632 patent/WO2011100036A2/en active Application Filing
-
2013
- 2013-08-23 US US13/975,275 patent/US8794306B2/en not_active Expired - Fee Related
-
2014
- 2014-06-28 US US14/318,629 patent/US9869150B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170074060A1 (en) * | 2015-09-14 | 2017-03-16 | Control Technology Inc. | Pipe centering and washing apparatus |
Also Published As
Publication number | Publication date |
---|---|
MX2012009384A (en) | 2012-11-23 |
US20150053418A1 (en) | 2015-02-26 |
SG182726A1 (en) | 2012-08-30 |
CA2789250C (en) | 2016-03-29 |
US9869150B2 (en) | 2018-01-16 |
GB2489898B (en) | 2013-10-02 |
GB201214087D0 (en) | 2012-09-19 |
US8544535B2 (en) | 2013-10-01 |
US20140069630A1 (en) | 2014-03-13 |
WO2011100036A3 (en) | 2011-11-24 |
GB2489898A (en) | 2012-10-10 |
CA2789250A1 (en) | 2011-08-18 |
US20110198072A1 (en) | 2011-08-18 |
US8794306B2 (en) | 2014-08-05 |
WO2011100036A2 (en) | 2011-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9869150B2 (en) | Integrated wellhead assembly | |
US6612368B2 (en) | Flow completion apparatus | |
US7025132B2 (en) | Flow completion apparatus | |
US8613323B2 (en) | Wellhead assembly | |
EP3172396B1 (en) | A system and method for accessing a well | |
US8371385B2 (en) | Christmas tree and wellhead design | |
EP3262275B1 (en) | System and method for accessing a well | |
US9027656B2 (en) | Positive locked slim hole suspension and sealing system with single trip deployment and retrievable tool | |
US10550657B2 (en) | Hydraulic tool and seal assembly | |
US9790759B2 (en) | Multi-component tubular coupling for wellhead systems | |
US11274517B2 (en) | Rotating control device system with rams | |
US9512692B2 (en) | Retrievable horizontal spool tree sealing method and seal assembly | |
Paulo et al. | Programme for standardization of subsea equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: CAMERON INTERNATIONAL CORPORATION, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:COTE, SHELDON;GUIDRY, KIRK P.;SIGNING DATES FROM 20100804 TO 20100830;REEL/FRAME:033220/0226 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20220116 |