US20170030180A1 - Drain Hole Drilling in a Fractured Reservoir - Google Patents
Drain Hole Drilling in a Fractured Reservoir Download PDFInfo
- Publication number
- US20170030180A1 US20170030180A1 US14/810,478 US201514810478A US2017030180A1 US 20170030180 A1 US20170030180 A1 US 20170030180A1 US 201514810478 A US201514810478 A US 201514810478A US 2017030180 A1 US2017030180 A1 US 2017030180A1
- Authority
- US
- United States
- Prior art keywords
- well
- horizontal
- drain hole
- drilled
- horizontal segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 claims abstract description 32
- 238000004519 manufacturing process Methods 0.000 claims abstract description 26
- 239000012530 fluid Substances 0.000 claims description 33
- 230000007423 decrease Effects 0.000 claims description 14
- 239000004576 sand Substances 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 3
- 239000011347 resin Substances 0.000 claims description 2
- 229920005989 resin Polymers 0.000 claims description 2
- 206010017076 Fracture Diseases 0.000 description 71
- 208000010392 Bone Fractures Diseases 0.000 description 25
- 239000011435 rock Substances 0.000 description 12
- 230000035699 permeability Effects 0.000 description 11
- 239000007787 solid Substances 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000005755 formation reaction Methods 0.000 description 5
- 239000002245 particle Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 229930195733 hydrocarbon Natural products 0.000 description 4
- 150000002430 hydrocarbons Chemical class 0.000 description 4
- 238000011282 treatment Methods 0.000 description 4
- 208000006670 Multiple fractures Diseases 0.000 description 3
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000013508 migration Methods 0.000 description 3
- 230000005012 migration Effects 0.000 description 3
- 239000004215 Carbon black (E152) Substances 0.000 description 2
- 230000008021 deposition Effects 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Definitions
- Disclosed herein are improved methods for recovering fluids from horizontal wells that have been hydraulically fractured. More particularly, methods are disclosed for drilling drain holes that intersect hydraulic fractures that have been formed from wells in a hydrocarbon reservoir.
- Hydraulic fracturing of vertical wells is a very mature art in the oil and gas industry.
- the method is well-known: inject a fluid at high rate and a pressure sufficient to overcome earth stresses at the bottom of the well, then inject a proppant material in fluid after a fracture has been opened in the rock surrounding the well.
- hydraulic fracturing has received a great amount of attention because it, combined with directional drilling, has made possible large increases in production of oil and gas from “unconventional” reservoirs in the United States.
- the reservoirs that have been exploited in recent years have been primarily in shale, which was previously thought to be too low in permeability to produce at commercial rates.
- the shale has natural fractures, and can be fractured with hydraulic fracturing techniques such that in a horizontal well, where tens of spaced-apart hydraulic fractures can be formed along a horizontal segment of a wellbore, very economic production rates can be obtained.
- Hydraulic will be used herein to designate segments of wells or wells that have segments in a hydrocarbon reservoir that are more than sixty degrees from vertical.
- Hydraulic fracturing in shale introduces new aspects to the hydraulic fracturing process that were not known in the classical hydraulic fracturing treatments in vertical wells, first performed in 1947 and first commercially used in 1949 in the United States.
- a single vertical fracture extends in a productive zone from a vertical wellbore.
- the fracture is thought to be formed in two “wings” extending from the wellbore into the reservoir, normally of about equal length, extending in the direction perpendicular to the direction of the least horizontal stress in the earth. Amounts of fracturing fluid and proppant are injected to make possible fractures that are propped to a thickness estimated to be about 1/32 inch up to about 1/16 inch.
- the width of fractures formed while pumping fluid into the earth are often calculated to be up to about 1 ⁇ 2 inch in some cases.
- the presence of natural fractures in the rock creates further uncertainty in the rate of fluid leak off from the hydraulic fracture while pumping, and the lack of well-defined strata of rock and other factors make prediction of fracture geometry and properties in shale a more difficult proposition.
- Many technical papers have been published in recent years on the process and results of fracturing of shale reservoirs, but there is still much to be learned.
- the decline in production rate of a well can be caused by a decline in fluid conductivity of the propped hydraulic fractures in the reservoir around the well.
- the conductivity of hydraulic fractures can be decreased by several phenomena that have been recognized in the past.
- One effect is the presence of residue from polymers used in fracturing fluid; another is the crushing of proppant particles in response to the stresses in the earth; and a third, not widely studied, phenomena is the migration of fine solid particles in the hydraulic fracture.
- Plugging of fractures because of solid particle migration would be exacerbated near a horizontal wellbore, because the fluid velocity flowing into the wellbore becomes extremely high as radial flow from the fracture nears the wellbore.
- the high velocity increases the tendency for solid particles to migrate in the fracture and plug the conductivity or flow capacity in a fracture. High fluid velocity may also cause erosion or mechanical failure of rock abound the fracture or of the proppant.
- U.S. Pat. No. 8,646,526 discloses methods of improving production in a wellbore that includes determining the textural complexity of a formation and the induced fractured complexity in creating a plurality of fractures, then drilling a lateral well originating from a wellbore to maintain conductivity of the formation. More than one lateral well may be drilled. The disclosure also includes drilling a second wellbore in the formation. Method for injecting a material that sets to a solid in hydraulic fractures is also disclosed.
- U.S. Pat. No. 8,333,245 discloses increasing production rate from a reservoir by drilling a plurality of branching wellbores through the reservoir.
- International Patent WO/2014/107475 discloses developing high pressure shale in tight rock formations using a profusion of sinusoidal open-hole laterals. The object is to drill enough laterals to achieve contact surface areas comparable with that of hydraulically fractured wells.
- Drilling of drain holes in the earth around wells is well-known.
- U.S. Pat. No. 6,668,948 describes jet drilling of small holes from a cased wellbore. Drain holes are not cased. This technique may be used to extend the drainage radius of a well, somewhat similarly to the hydraulic fracturing technique.
- the main body” of a drain hole is defined as that part of the drain hole that is outside the influence of the window in the casing, or generally more than one to two feet from the casing wall.
- What is needed is a method to utilize hydraulic fracturing in shale reservoirs but to decrease, minimize or eliminate the decrease in production rate after the well has been fractured and placed on production.
- Drain holes are drilled from selected locations in a main wellbore to extend selected distances alongside the main wellbore.
- the drain holes are drilled, preferably using commercial directional drilling technology, after a window is made in the casing of the main wellbore at a selected location.
- the drain holes may be drilled after the reservoir rock around the main wellbore has been hydraulically fractured and the well has been produced. Alternatively, the drain holes may be drilled before the well has been fractured or after the well has been fractured and before the well is produced.
- the drain holes may extend across only one hydraulic fracture formed from the main wellbore or they may extend across multiple hydraulic fractures. Drain holes will normally not contain casing and cement. Mechanical or diverter means may be used to plug the drain holes, preferably at the casing in the main wellbore. Offset horizontal wells may also be drilled with open hole segments at selected distances from the horizontal segment of an original horizontal well.
- FIG. 1 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled parallel to the horizontal segment of the horizontal well from the vertical segment of the horizontal well and a naturally fractured zone.
- FIG. 2 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled from the horizontal segment of the horizontal well to intersect multiple fractures.
- FIG. 3 is a side view of hydraulic fractures at intervals along a horizontal well and multiple straight drain holes drilled from the horizontal segment of the horizontal well to intersect the multiple fractures.
- FIG. 4 is a side view of hydraulic fractures at intervals along a horizontal well and multiple curved drain holes drilled from the horizontal segment of the horizontal well to intersect the multiple fractures.
- FIG. 5 is a plan view of hydraulic fractures at intervals along a first horizontal well and a drain hole drilled from the horizontal segment of the horizontal well to intersect the multiple hydraulic fractures.
- FIG. 6 is a side view of hydraulic fractures at intervals along a first horizontal well and a second offset horizontal well drilled near the heel of the first well so as to intersect the hydraulic fractures in the first well.
- FIG. 7 is a side view of hydraulic fractures at intervals along a first horizontal well and a second offset horizontal well drilled near the toe of the first well so as to intersect the hydraulic fractures in the first well.
- FIG. 8 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled parallel to the horizontal segment of the horizontal well from the vertical segment of the horizontal well and straddle packers placed across a hydraulic fracture from the first well and between hydraulic fractures coming from the first well.
- FIG. 9 is a side view of equipment that may be used to drill horizontal wells and drain holes.
- well 10 is a horizontal well drilled into productive reservoir 19 .
- Reservoir 19 is in rock that has very low permeability—usually shale—or it may be very low permeability sandstone or carbonate.
- Multiple hydraulic fractures 14 have been formed at spaced-apart locations along horizontal segment 12 of the well. Usually, only by forming multiple hydraulic fractures 14 can an economic production rate be obtained from the well.
- the number of hydraulic fractures, each one resulting from a “stage” of the hydraulic fracturing treatment of the well commonly is in the range from 3 to 40 or more.
- the location of the hydraulic fractures may be determined by perforations in the cemented casing of the well or by packers in open hole outside un-cemented casing that contains openings that can be selectively opened between swellable or inflatable packers.
- These “well completion” technologies are very well known in the oil and gas industry.
- the horizontal segment of a horizontal well may also be open hole, with no casing. In this case, the location of a hydraulic fracture may be determined by placement of straddle packers on a work string.
- Damage zones 16 around horizontal segment 12 of well 10 where fluid enters the casing, is a lower permeability zone that may be formed in or around each fractured interval. This lowered permeability or “damage” zone is attributed to near wellbore effects such as migration of fine particles to this zone or deposition of solids from the flowing fluids entering the well. It is believed that damage zone 16 is normally caused by plugging of the flow channels of fracture 14 . The high velocity of the fluid entering the horizontal well accounts for the increased mobility in solids or deposition of solids in damaged zone 16 . It is believed that damaged zone 16 accounts for the rapid decrease in production rate that is often observed in fractured horizontal wells in low permeability reservoirs.
- Horizontal drain hole 18 may be drilled at any time, but usually it will be drilled after production rate from horizontal well 10 has significantly decreased. Horizontal drain hole 18 is drilled such that it generally follows a path at distance “d” offset from original horizontal segment 12 . The drain hole is drilled through a window formed in the casing in the vertical segment of well 10 . This distance d is preferably greater than the diameter of damage zone 16 , which is often estimated to be in the range of 10 to 20 feet. Drain holes are not cased and cemented. Drain hole 18 may be drilled such that the distance d is relatively constant, or it may be drilled with varying d along the path of the well.
- the angular location in a vertical plane of horizontal drain hole 18 with respect to the center of horizontal segment 12 may vary along the trajectory of the drain hole.
- the effect of horizontal drain hole 18 is that a fraction of the fluid that would otherwise enter horizontal segment 12 is diverted to drain hole 18 .
- This has two positive effects: the fluid velocity into horizontal segment 12 is decreased, because fluid is diverted into drain hole 18 ; and, flow can enter drain hole 18 and well 10 without passing through damage zone 16 .
- drain hole 18 is beyond the radius of damaged zone 16 . Since drain holes are not cased and cemented, fluid can enter where the drain hole intersects a fracture.
- drain hole is an “open hole.”
- a preferred diameter of drain holes is in the range of 3 to 5 inches, with 43 ⁇ 4 inches being a common value because of this diameter being a common bit size, but drain holes may be larger or smaller. The total effect is an increase in production rate from well 10 .
- horizontal well 20 has been drilled into low permeability reservoir 29 .
- Hydraulic fractures 24 have been formed at selected intervals along horizontal segment 22 of well 20 .
- Damage zones 26 have formed around horizontal segment 22 near the intersection of fractures 24 with segment 22 .
- Drain hole 28 has been drilled from a window formed in the casing of horizontal segment 22 at a selected location. Drain hole 28 preferably takes a path alongside original well 20 , but far enough away to be outside the radius of damage zone 26 , preferably more than about 10 to 20 feet. Drain hole 28 may be straight or may undulate or go in selected directions dependent on the geometry of the rock strata in reservoir 29 .
- horizontal well 30 is drilled through low permeability reservoir 39 .
- Hydraulic fractures 34 have been formed from horizontal segment 32 of well 30 .
- Damaged zone 36 may exist around horizontal segment 32 at the intersection of hydraulic fractures with the well.
- drain holes 38 A, 38 B and 38 C are formed at different locations along horizontal segment 32 by cutting holes in the casing to form windows and drilling drain holes from the windows so as to intersect the hydraulic fractures formed outside damaged zone 36 .
- Drain holes 38 A, B and C may be as short as about 10′ or as long as hundreds of feet, depending upon the geometry of the reservoir and well 30 .
- horizontal well 40 is drilled through low permeability reservoir 40 .
- Hydraulic fractures 44 have been formed from horizontal segment 42 of well 40 .
- Damaged zone 46 may exist around horizontal segment 42 at the intersection of hydraulic fractures with the well.
- drain holes 48 A, 48 B and 48 C are formed at different locations along horizontal segment 42 by cutting holes in the casing to form windows and drilling drain holes from the windows so as to intersect the hydraulic fractures formed outside damaged zone 46 .
- Drain holes 48 A, B and C may be as short as about 10′ or as long as hundreds of feet, depending upon the geometry of the reservoir and well 40 and the drain holes are drilled with a bent sub, which results in curved drain holes.
- original horizontal well 50 has been drilled into reservoir 59 .
- Hydraulic fractures 44 have been formed at intervals along original well 50 . Damaged zones 56 may be present near the intersection of hydraulic fractures 54 and original well 50 .
- Drain hole 51 has been drilled also into reservoir 59 . Drain hole 51 has a horizontal segment alongside and displaced from original well 50 and also intersecting hydraulic fractures 54 formed from original well 50 . Drain hole 51 allows production of fluid from fractures 54 without flow through damaged zones 56 .
- horizontal well 60 has been drilled into reservoir 69 .
- the vertical segment of offset well 61 may be in the vicinity of the vertical section of original well 60 and near the heel of the horizontal section of the well. Fractures 64 and damaged zones 66 exist around each fracture.
- offset well 71 is drilled vertically into reservoir 79 near the toe of the horizontal section of well 70 . Fractures 74 and damaged zones 76 , have formed along horizontal segment 70 .
- well 80 is a horizontal well drilled into productive reservoir 89 .
- Reservoir 89 is in rock that has very low permeability.
- Multiple hydraulic fractures 84 have been formed at spaced-apart locations along horizontal segment 82 of the well, using the same techniques as described above. Damaged zones 86 exist near the intersection of the hydraulic fractures and the horizontal well.
- Drain hole 88 has been drilled at a distance d from the horizontal well.
- a work string (not shown) with straddle packers may be placed in drain hole 88 and the work string lowered to place the straddle packers at locations 87 A and 87 B. In this location, hydraulic fracture 84 between the straddle packers may be re-fractured. Additional proppant may be injected into the fracture.
- the straddle packers may also be placed so as to place straddle packers at locations 85 A and 85 B in the drain hole.
- a new hydraulic fracture 83 may be formed from the drain hole between straddle packers 85 A and 85 B.
- the straddle packers may be released after each fracturing treatment and moved to a new location in the drain hole. Using this procedure, multiple hydraulic fractures may be formed from a drain hole. After fracturing in a drain hole is complete, resin coated sand may be circulated into the drain hole or a slotted liner, pierced plastic pipe, sand screen or uncemented casing may be placed in the drain hole.
- Bent motor drilling assembly 90 is illustrated in use in reservoir 99 .
- Assembly 90 includes instruments for measurements-while-drilling 92 , which are placed in non-magnetic collar 93 .
- Drilling motor segment 94 is attached to bent sub 95 .
- Bent subs and drilling motors are well known in the drilling industry.
- the bent sub may be at selected angles or may be adjustable at angles ⁇ , as shown in FIG. 9 .
- Bit 96 usually a drag bit but possibly a rotary bit, as shown, is attached to the bent sub and is powered by drilling motor 94 .
- the majority of horizontal wells in shale or low permeability formations are drilled with this assembly.
- the bent assemblies drill along straight trajectories when the drill pipe is rotating and along curved trajectories when the drill pipe is not rotating (i.e., is in the “slide” mode).
- the trajectory of wells can be controlled by utilizing the rotating and slide modes as needed.
- the curved sections in horizontal wells are drilled in slide mode.
- the measurement-while-drilling tool measures the azimuth and orientation of the borehole. These measurements are needed to steer the drill bit.
- Non-magnetic collar 63 allows the MWD tools to make magnetic measurements needed to steer the bit.
- the bits are normally PDC rotary bits using man-made diamonds in the cutters. These bits allow drilling at high rates and have good side-cutting capabilities, which are important when drilling curved sections in directional wells.
- drain holes are drilled “underbalanced.”
- the pressure in the drain hole is preferably maintained below the pressure in the reservoir being drilled. This will minimize or eliminate damage to the fractures and reservoir rock during the drilling operation.
- Wall friction between the drill pipe and the wall of the bore hole increases as the length of the horizontal section increases.
- wall friction is not a problem.
- the wall friction can be high and can limit the length of a horizontal section to one or two miles.
- RST rotary steerable tools
- the drain holes can be drilled horizontal, slanted, curved or undulating using these tools or any combination of the tools described above. Jet drilling can also be used, such as disclosed in U.S. Pat. No. 6,668,948.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Earth Drilling (AREA)
Abstract
Method for increasing production rate of horizontal wells having hydraulic fractures formed along a horizontal segment of the well by drilling drain holes to intersect the hydraulic fractures is provided.
Description
- 1. Field of the Invention
- Disclosed herein are improved methods for recovering fluids from horizontal wells that have been hydraulically fractured. More particularly, methods are disclosed for drilling drain holes that intersect hydraulic fractures that have been formed from wells in a hydrocarbon reservoir.
- 2. Description of Related Art
- Hydraulic fracturing of vertical wells is a very mature art in the oil and gas industry. The method is well-known: inject a fluid at high rate and a pressure sufficient to overcome earth stresses at the bottom of the well, then inject a proppant material in fluid after a fracture has been opened in the rock surrounding the well. In recent years hydraulic fracturing has received a great amount of attention because it, combined with directional drilling, has made possible large increases in production of oil and gas from “unconventional” reservoirs in the United States. The reservoirs that have been exploited in recent years have been primarily in shale, which was previously thought to be too low in permeability to produce at commercial rates. The shale has natural fractures, and can be fractured with hydraulic fracturing techniques such that in a horizontal well, where tens of spaced-apart hydraulic fractures can be formed along a horizontal segment of a wellbore, very economic production rates can be obtained. (“Horizontal” will be used herein to designate segments of wells or wells that have segments in a hydrocarbon reservoir that are more than sixty degrees from vertical.) This revolution in technology has in recent years made the United States again a world-class producer of hydrocarbons.
- Hydraulic fracturing in shale introduces new aspects to the hydraulic fracturing process that were not known in the classical hydraulic fracturing treatments in vertical wells, first performed in 1947 and first commercially used in 1949 in the United States. In the classical hydraulic fracturing process, a single vertical fracture extends in a productive zone from a vertical wellbore. The fracture is thought to be formed in two “wings” extending from the wellbore into the reservoir, normally of about equal length, extending in the direction perpendicular to the direction of the least horizontal stress in the earth. Amounts of fracturing fluid and proppant are injected to make possible fractures that are propped to a thickness estimated to be about 1/32 inch up to about 1/16 inch. The width of fractures formed while pumping fluid into the earth are often calculated to be up to about ½ inch in some cases. In the matter of hydraulic fracturing of shale reservoirs, the presence of natural fractures in the rock creates further uncertainty in the rate of fluid leak off from the hydraulic fracture while pumping, and the lack of well-defined strata of rock and other factors make prediction of fracture geometry and properties in shale a more difficult proposition. Many technical papers have been published in recent years on the process and results of fracturing of shale reservoirs, but there is still much to be learned.
- One general characteristic that is consistently observed in wells that are hydraulically fractured in shale reservoirs, however, is that the rate of decline of production in the wells is generally greater than the rate of decline of production from wells fractured in conventional reservoirs. The reasons for this and for other observations in fracturing shale wells are complex to explain. A review paper entitled “Examining Our Assumptions—Have Over-Simplifications Jeopardized Our Ability to Design Optimal Fractured Treatments?” (SPE—119143-MS, Society of Petroleum Engineers, January, 2009) discusses many of the factors that can explain results of hydraulic fracturing in shale wells. A recent review paper that discusses results of re-fracturing to address the decline in productivity of fractured wells in shale reservoirs is “Beating the decline through refracturing,” (World Oil, June 2015, pages 39-43).
- The decline in production rate of a well can be caused by a decline in fluid conductivity of the propped hydraulic fractures in the reservoir around the well. The conductivity of hydraulic fractures can be decreased by several phenomena that have been recognized in the past. One effect is the presence of residue from polymers used in fracturing fluid; another is the crushing of proppant particles in response to the stresses in the earth; and a third, not widely studied, phenomena is the migration of fine solid particles in the hydraulic fracture. Plugging of fractures because of solid particle migration would be exacerbated near a horizontal wellbore, because the fluid velocity flowing into the wellbore becomes extremely high as radial flow from the fracture nears the wellbore. The high velocity increases the tendency for solid particles to migrate in the fracture and plug the conductivity or flow capacity in a fracture. High fluid velocity may also cause erosion or mechanical failure of rock abound the fracture or of the proppant.
- For example, if a horizontal well is producing 100 barrels of liquid per day or 0.385 cu ft per minute from a set of perforations in the horizontal segment of the well, the wellbore has a diameter of 8 inches and a single fracture 1/16 inch wide intersects the wellbore, the total cross-sectional area of the fracture at the wellbore is only 8π× 1/16=1.57 sq inch or 0.011 sq ft. 100 barrels=560 cu ft, so the linear velocity (“Darcy velocity”) of the liquid at the wellbore is 0.385 cu ft/min/0.011 sq ft=35 ft/min or 7 inch/sec. Eight inches away from the wellbore, fluid velocity would be half as large—still a high value. Over time, this high velocity fluid (in turbulent flow) will cause erosion and failure of rock or proppant. Particles produced from the failure could cause a decrease in conductivity of the fracture at or near the wellbore. Well production rate will decrease as fracture conductivity decreases. It is believed that these conditions cause the rapid decline of production rate of fractured horizontal wells.
- U.S. Pat. No. 8,646,526 discloses methods of improving production in a wellbore that includes determining the textural complexity of a formation and the induced fractured complexity in creating a plurality of fractures, then drilling a lateral well originating from a wellbore to maintain conductivity of the formation. More than one lateral well may be drilled. The disclosure also includes drilling a second wellbore in the formation. Method for injecting a material that sets to a solid in hydraulic fractures is also disclosed.
- U.S. Pat. No. 8,333,245 discloses increasing production rate from a reservoir by drilling a plurality of branching wellbores through the reservoir. International Patent WO/2014/107475 discloses developing high pressure shale in tight rock formations using a profusion of sinusoidal open-hole laterals. The object is to drill enough laterals to achieve contact surface areas comparable with that of hydraulically fractured wells.
- Drilling of drain holes in the earth around wells is well-known. For example, U.S. Pat. No. 6,668,948 describes jet drilling of small holes from a cased wellbore. Drain holes are not cased. This technique may be used to extend the drainage radius of a well, somewhat similarly to the hydraulic fracturing technique. “The main body” of a drain hole is defined as that part of the drain hole that is outside the influence of the window in the casing, or generally more than one to two feet from the casing wall.
- What is needed is a method to utilize hydraulic fracturing in shale reservoirs but to decrease, minimize or eliminate the decrease in production rate after the well has been fractured and placed on production.
- Drain holes are drilled from selected locations in a main wellbore to extend selected distances alongside the main wellbore. The drain holes are drilled, preferably using commercial directional drilling technology, after a window is made in the casing of the main wellbore at a selected location. The drain holes may be drilled after the reservoir rock around the main wellbore has been hydraulically fractured and the well has been produced. Alternatively, the drain holes may be drilled before the well has been fractured or after the well has been fractured and before the well is produced. The drain holes may extend across only one hydraulic fracture formed from the main wellbore or they may extend across multiple hydraulic fractures. Drain holes will normally not contain casing and cement. Mechanical or diverter means may be used to plug the drain holes, preferably at the casing in the main wellbore. Offset horizontal wells may also be drilled with open hole segments at selected distances from the horizontal segment of an original horizontal well.
-
FIG. 1 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled parallel to the horizontal segment of the horizontal well from the vertical segment of the horizontal well and a naturally fractured zone. -
FIG. 2 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled from the horizontal segment of the horizontal well to intersect multiple fractures. -
FIG. 3 is a side view of hydraulic fractures at intervals along a horizontal well and multiple straight drain holes drilled from the horizontal segment of the horizontal well to intersect the multiple fractures. -
FIG. 4 is a side view of hydraulic fractures at intervals along a horizontal well and multiple curved drain holes drilled from the horizontal segment of the horizontal well to intersect the multiple fractures. -
FIG. 5 is a plan view of hydraulic fractures at intervals along a first horizontal well and a drain hole drilled from the horizontal segment of the horizontal well to intersect the multiple hydraulic fractures. -
FIG. 6 is a side view of hydraulic fractures at intervals along a first horizontal well and a second offset horizontal well drilled near the heel of the first well so as to intersect the hydraulic fractures in the first well. -
FIG. 7 is a side view of hydraulic fractures at intervals along a first horizontal well and a second offset horizontal well drilled near the toe of the first well so as to intersect the hydraulic fractures in the first well. -
FIG. 8 is a side view of hydraulic fractures at intervals along a horizontal well and a drain hole drilled parallel to the horizontal segment of the horizontal well from the vertical segment of the horizontal well and straddle packers placed across a hydraulic fracture from the first well and between hydraulic fractures coming from the first well. -
FIG. 9 is a side view of equipment that may be used to drill horizontal wells and drain holes. - Referring to
FIG. 1 , well 10 is a horizontal well drilled intoproductive reservoir 19.Reservoir 19 is in rock that has very low permeability—usually shale—or it may be very low permeability sandstone or carbonate. Multiplehydraulic fractures 14 have been formed at spaced-apart locations along horizontal segment 12 of the well. Usually, only by forming multiplehydraulic fractures 14 can an economic production rate be obtained from the well. The number of hydraulic fractures, each one resulting from a “stage” of the hydraulic fracturing treatment of the well, commonly is in the range from 3 to 40 or more. The location of the hydraulic fractures may be determined by perforations in the cemented casing of the well or by packers in open hole outside un-cemented casing that contains openings that can be selectively opened between swellable or inflatable packers. These “well completion” technologies are very well known in the oil and gas industry. The horizontal segment of a horizontal well may also be open hole, with no casing. In this case, the location of a hydraulic fracture may be determined by placement of straddle packers on a work string. -
Damage zones 16 around horizontal segment 12 of well 10, where fluid enters the casing, is a lower permeability zone that may be formed in or around each fractured interval. This lowered permeability or “damage” zone is attributed to near wellbore effects such as migration of fine particles to this zone or deposition of solids from the flowing fluids entering the well. It is believed thatdamage zone 16 is normally caused by plugging of the flow channels offracture 14. The high velocity of the fluid entering the horizontal well accounts for the increased mobility in solids or deposition of solids in damagedzone 16. It is believed that damagedzone 16 accounts for the rapid decrease in production rate that is often observed in fractured horizontal wells in low permeability reservoirs. - Horizontal drain hole 18 may be drilled at any time, but usually it will be drilled after production rate from
horizontal well 10 has significantly decreased. Horizontal drain hole 18 is drilled such that it generally follows a path at distance “d” offset from original horizontal segment 12. The drain hole is drilled through a window formed in the casing in the vertical segment ofwell 10. This distance d is preferably greater than the diameter ofdamage zone 16, which is often estimated to be in the range of 10 to 20 feet. Drain holes are not cased and cemented. Drain hole 18 may be drilled such that the distance d is relatively constant, or it may be drilled with varying d along the path of the well. The angular location in a vertical plane of horizontal drain hole 18 with respect to the center of horizontal segment 12 may vary along the trajectory of the drain hole. The effect of horizontal drain hole 18 is that a fraction of the fluid that would otherwise enter horizontal segment 12 is diverted to drain hole 18. This has two positive effects: the fluid velocity into horizontal segment 12 is decreased, because fluid is diverted into drain hole 18; and, flow can enter drain hole 18 and well 10 without passing throughdamage zone 16. Preferably, drain hole 18 is beyond the radius of damagedzone 16. Since drain holes are not cased and cemented, fluid can enter where the drain hole intersects a fracture. (In other words, the drain hole is an “open hole.”) A preferred diameter of drain holes is in the range of 3 to 5 inches, with 4¾ inches being a common value because of this diameter being a common bit size, but drain holes may be larger or smaller. The total effect is an increase in production rate from well 10. - It is known that natural fracture zones exist in shale and other very low permeability rocks containing hydrocarbons. When such zones are indicated in a reservoir, from additional geophysics, microseismic measurements, or production data, for example, drain holes may be drilled to intersect indicated natural fracture zones, such as
zone 19 f inFIG. 1 . - Referring to
FIG. 2 ,horizontal well 20 has been drilled intolow permeability reservoir 29.Hydraulic fractures 24 have been formed at selected intervals alonghorizontal segment 22 ofwell 20.Damage zones 26 have formed aroundhorizontal segment 22 near the intersection offractures 24 withsegment 22.Drain hole 28 has been drilled from a window formed in the casing ofhorizontal segment 22 at a selected location.Drain hole 28 preferably takes a path alongsideoriginal well 20, but far enough away to be outside the radius ofdamage zone 26, preferably more than about 10 to 20 feet.Drain hole 28 may be straight or may undulate or go in selected directions dependent on the geometry of the rock strata inreservoir 29. - In another embodiment, illustrated in
FIG. 3 ,horizontal well 30 is drilled throughlow permeability reservoir 39.Hydraulic fractures 34 have been formed from horizontal segment 32 ofwell 30. Damagedzone 36 may exist around horizontal segment 32 at the intersection of hydraulic fractures with the well. In this embodiment, drain holes 38A, 38B and 38C are formed at different locations along horizontal segment 32 by cutting holes in the casing to form windows and drilling drain holes from the windows so as to intersect the hydraulic fractures formed outside damagedzone 36. Drain holes 38A, B and C may be as short as about 10′ or as long as hundreds of feet, depending upon the geometry of the reservoir and well 30. - In another embodiment, illustrated in
FIG. 4 ,horizontal well 40 is drilled throughlow permeability reservoir 40.Hydraulic fractures 44 have been formed fromhorizontal segment 42 ofwell 40. Damagedzone 46 may exist aroundhorizontal segment 42 at the intersection of hydraulic fractures with the well. In this embodiment, drain holes 48A, 48B and 48C are formed at different locations alonghorizontal segment 42 by cutting holes in the casing to form windows and drilling drain holes from the windows so as to intersect the hydraulic fractures formed outside damagedzone 46. Drain holes 48A, B and C may be as short as about 10′ or as long as hundreds of feet, depending upon the geometry of the reservoir and well 40 and the drain holes are drilled with a bent sub, which results in curved drain holes. - In another embodiment, illustrated in
FIG. 5 , a top or plan view, originalhorizontal well 50 has been drilled intoreservoir 59.Hydraulic fractures 44 have been formed at intervals alongoriginal well 50.Damaged zones 56 may be present near the intersection ofhydraulic fractures 54 andoriginal well 50.Drain hole 51 has been drilled also intoreservoir 59.Drain hole 51 has a horizontal segment alongside and displaced fromoriginal well 50 and also intersectinghydraulic fractures 54 formed fromoriginal well 50.Drain hole 51 allows production of fluid fromfractures 54 without flow through damagedzones 56. - Referring to
FIG. 6 ,horizontal well 60 has been drilled intoreservoir 69. The vertical segment of offset well 61 may be in the vicinity of the vertical section oforiginal well 60 and near the heel of the horizontal section of the well.Fractures 64 and damagedzones 66 exist around each fracture. Alternatively, rather than near the heel of the horizontal well, such as illustrated inFIG. 6 , in an alternate embodiment, illustrated inFIG. 7 , offset well 71 is drilled vertically intoreservoir 79 near the toe of the horizontal section ofwell 70.Fractures 74 and damagedzones 76, have formed alonghorizontal segment 70. - Referring to
FIG. 8 , well 80 is a horizontal well drilled intoproductive reservoir 89.Reservoir 89 is in rock that has very low permeability. Multiplehydraulic fractures 84 have been formed at spaced-apart locations alonghorizontal segment 82 of the well, using the same techniques as described above.Damaged zones 86 exist near the intersection of the hydraulic fractures and the horizontal well.Drain hole 88 has been drilled at a distance d from the horizontal well. A work string (not shown) with straddle packers may be placed indrain hole 88 and the work string lowered to place the straddle packers atlocations 87A and 87B. In this location,hydraulic fracture 84 between the straddle packers may be re-fractured. Additional proppant may be injected into the fracture. The straddle packers may also be placed so as to place straddle packers atlocations hydraulic fracture 83 may be formed from the drain hole betweenstraddle packers - Apparatus generally available in industry for drilling horizontal wells and drain holes, such as described above, is illustrated in
FIG. 9 . Bentmotor drilling assembly 90 is illustrated in use inreservoir 99.Assembly 90 includes instruments for measurements-while-drilling 92, which are placed innon-magnetic collar 93.Drilling motor segment 94 is attached tobent sub 95. Bent subs and drilling motors are well known in the drilling industry. The bent sub may be at selected angles or may be adjustable at angles α, as shown inFIG. 9 .Bit 96, usually a drag bit but possibly a rotary bit, as shown, is attached to the bent sub and is powered by drillingmotor 94. The majority of horizontal wells in shale or low permeability formations are drilled with this assembly. The bent assemblies drill along straight trajectories when the drill pipe is rotating and along curved trajectories when the drill pipe is not rotating (i.e., is in the “slide” mode). Thus the trajectory of wells can be controlled by utilizing the rotating and slide modes as needed. The curved sections in horizontal wells are drilled in slide mode. - The measurement-while-drilling tool measures the azimuth and orientation of the borehole. These measurements are needed to steer the drill bit. Non-magnetic collar 63 allows the MWD tools to make magnetic measurements needed to steer the bit. The bits are normally PDC rotary bits using man-made diamonds in the cutters. These bits allow drilling at high rates and have good side-cutting capabilities, which are important when drilling curved sections in directional wells.
- To drill drain holes out of the cased segment of a well, it is necessary to mill a “window” in the casing and drill through this opening. This is a routine operation performed in the drilling industry. Preferably, drain holes are drilled “underbalanced.” The pressure in the drain hole is preferably maintained below the pressure in the reservoir being drilled. This will minimize or eliminate damage to the fractures and reservoir rock during the drilling operation.
- Wall friction between the drill pipe and the wall of the bore hole increases as the length of the horizontal section increases. When the drill pipe is rotating, wall friction is not a problem. When the drill pipe is not rotating, or is in the slide mode, the wall friction can be high and can limit the length of a horizontal section to one or two miles.
- Service companies have also developed rotary steerable tools (RST) that allow the drill pipe to be rotated in both straight and curved sections in a horizontal well. This overcomes the wall friction problems and allows the drilling of high angle and horizontal sections in excess of eight miles in some wells. Most shale wells are shorter, with horizontal sections not more than 6,000 feet, so they are mostly drilled with bent assemblies because of the high reliability of the bent assemblies and the high cost of the rotary steerable tools.
- The drain holes can be drilled horizontal, slanted, curved or undulating using these tools or any combination of the tools described above. Jet drilling can also be used, such as disclosed in U.S. Pat. No. 6,668,948.
- Although the present invention has been described with respect to specific details, it is not intended that such details should be regarded as limitations on the scope of the invention, except to the extent that they are included in the accompanying claims.
Claims (21)
1. A method for producing fluid from a subsurface reservoir, comprising:
drilling and completing a horizontal well having a horizontal segment in the subsurface reservoir and a casing;
creating a plurality of hydraulic fractures spaced apart along the horizontal segment of the well;
cutting a window at a selected location in the casing of the well and drilling a drain hole having a main body from the window, the main body of the drain hole being spaced apart from the horizontal segment of the well and drilled so as to intersect a hydraulic fracture extending from the horizontal segment; and
producing fluid from the well.
2. The method of claim 1 wherein fluid is produced from the well at a production rate for a selected time before cutting a window in the casing of the well and drilling a drain hole.
3. The method of claim 1 wherein a plurality of drain holes having main bodies spaced apart from the horizontal segment of the well are drilled at spaced apart angles with respect to the horizontal well in a plane perpendicular to the axis of the horizontal well.
4. The method of claim 2 wherein the selected time is after the time required for the production rate of the well to decrease from an initial production rate of the well to less than one-half (½) the initial production rate.
5. The method of claim 1 wherein the drain hole is further drilled so as to intersect a zone of natural fractures in the subsurface reservoir or selected zones in the reservoir.
6. The method of claim 1 wherein the selected location to drill a drain hole is in a vertical segment of the horizontal well.
7. The method of claim 1 wherein the drain hole is drilled with a drilling motor and bent sub assembly.
8. The method of claim 1 wherein the drain hole is drilled with a jet drilling assembly.
9. The method of claim 1 wherein the main body of the drain hole is drilled at a selected distance from the horizontal segment of the well, the selected distance being greater than the estimated radius of a damage zone around the horizontal segment.
10. The method of claim 1 wherein the drain hole is drilled to be undulating or sinusoidal.
11. The method of claim 1 wherein the drain hole is branched before intersecting a hydraulic fracture such that two or more branches of the drain hole intersect a hydraulic fracture.
12. The method of claim 1 wherein at least a segment of the main body of the drain hole is drilled with fluid pressure in the drain hole less than fluid pressure in the subsurface reservoir.
13. The method of claim 1 further comprising placing a slotted liner, a pierced plastic pipe, a sand screen, resin-coated sand or a casing in the drain hole.
14. The method of claim 1 further comprising injecting fluid at hydraulic fracturing conditions from a drain hole by placing straddle packers on a work string and pumping fluid from the work string between the straddle packers.
15. The method of claim 14 wherein the straddle packers are placed across an existing hydraulic fracture.
16. The method of claim 14 wherein the straddle packers are placed between existing hydraulic fractures.
17. A method for producing fluid from a subsurface reservoir, comprising:
drilling and completing a first horizontal well having a horizontal segment in the subsurface reservoir;
creating a plurality of hydraulic fractures spaced apart along the horizontal segment of the first horizontal well;
drilling a second horizontal well having a horizontal segment drilled so as to intersect a hydraulic fracture extending from the horizontal segment of the first horizontal well; and
producing fluid from the at least one of the wells.
18. The method of claim 17 wherein the second horizontal well is drilled so as to intersect a hydraulic fracture nearer to the heel of the horizontal segment of the first well.
19. The method of claim 17 wherein the second horizontal well is drilled so as to intersect a hydraulic fracture nearer to the toe of the horizontal segment of the first well.
20. A method for producing fluid from a subsurface reservoir, comprising:
drilling and completing a horizontal well having a horizontal segment in the subsurface reservoir and a casing;
cutting a window in the casing of the well and drilling a drain hole having a main body from a selected location in the well, the main body of the drain hole being directed so as to intersect a natural fracture zone in the reservoir; and
producing fluid in the well.
21. A method for producing fluid from a subsurface reservoir, comprising:
drilling a horizontal well having a horizontal segment in the subsurface reservoir, the horizontal segment being an open hole;
creating a plurality of hydraulic fractures spaced apart along the horizontal segment of the well;
drilling a drain hole having a main body at a selected location along the horizontal segment, the main body of the drain hole being spaced apart from the horizontal segment of the well and drilled so as to intersect a hydraulic fracture extending from the horizontal segment; and
producing fluid from the well.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/810,478 US20170030180A1 (en) | 2015-07-27 | 2015-07-27 | Drain Hole Drilling in a Fractured Reservoir |
CA2926067A CA2926067A1 (en) | 2015-07-27 | 2016-04-04 | Drain hole drilling in a fractured reservoir |
PCT/US2016/031491 WO2017019147A1 (en) | 2015-07-27 | 2016-05-09 | Drain hole drilling in a fractured reservoir |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/810,478 US20170030180A1 (en) | 2015-07-27 | 2015-07-27 | Drain Hole Drilling in a Fractured Reservoir |
Publications (1)
Publication Number | Publication Date |
---|---|
US20170030180A1 true US20170030180A1 (en) | 2017-02-02 |
Family
ID=57881865
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/810,478 Abandoned US20170030180A1 (en) | 2015-07-27 | 2015-07-27 | Drain Hole Drilling in a Fractured Reservoir |
Country Status (3)
Country | Link |
---|---|
US (1) | US20170030180A1 (en) |
CA (1) | CA2926067A1 (en) |
WO (1) | WO2017019147A1 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236257A (en) * | 2018-10-11 | 2019-01-18 | 青岛大地新能源技术研究院 | A kind of radial bore volume fracturing method |
US10626712B2 (en) * | 2010-03-15 | 2020-04-21 | Landmark Graphics Corporation | Systems and methods for positioning horizontal wells within boundaries |
EP3510245A4 (en) * | 2016-09-12 | 2020-05-13 | Services Pétroliers Schlumberger | Attaining access to compromised fractured production regions at an oilfield |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
CN112253070A (en) * | 2020-10-10 | 2021-01-22 | 中煤科工集团西安研究院有限公司 | Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam |
US11143008B1 (en) * | 2020-04-24 | 2021-10-12 | Saudi Arabian Oil Company | Methods of hydraulic fracturing |
CN113586020A (en) * | 2020-04-30 | 2021-11-02 | 中国石油化工股份有限公司 | Vertical well volume fracturing method and system combining radial well with carbon dioxide fracturing |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11466549B2 (en) | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US20240093578A1 (en) * | 2022-09-20 | 2024-03-21 | Ergo Exergy Technologies Inc. | Quenching and/or sequestering process fluids within underground carbonaceous formations, and associated systems and methods |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4629012A (en) * | 1985-07-08 | 1986-12-16 | Atlantic Richfield Company | Drainhole drilling assembly |
US5301760C1 (en) * | 1992-09-10 | 2002-06-11 | Natural Reserve Group Inc | Completing horizontal drain holes from a vertical well |
US6095244A (en) * | 1998-02-12 | 2000-08-01 | Halliburton Energy Services, Inc. | Methods of stimulating and producing multiple stratified reservoirs |
AUPP209498A0 (en) * | 1998-03-02 | 1998-03-26 | Commonwealth Scientific And Industrial Research Organisation | Hydraulic fracturing of ore bodies |
WO2005005763A2 (en) * | 2003-06-09 | 2005-01-20 | Precision Drilling Technology Services Group, Inc. | Method for drilling with improved fluid collection pattern |
US20050247447A1 (en) * | 2004-05-10 | 2005-11-10 | Spring Roger L | Angled perforating device for well completions |
US20050051326A1 (en) * | 2004-09-29 | 2005-03-10 | Toothman Richard L. | Method for making wells for removing fluid from a desired subterranean |
US20090159286A1 (en) * | 2007-12-21 | 2009-06-25 | Schlumberger Technology Corporation | Method of treating subterranean reservoirs |
US9062545B2 (en) * | 2012-06-26 | 2015-06-23 | Lawrence Livermore National Security, Llc | High strain rate method of producing optimized fracture networks in reservoirs |
-
2015
- 2015-07-27 US US14/810,478 patent/US20170030180A1/en not_active Abandoned
-
2016
- 2016-04-04 CA CA2926067A patent/CA2926067A1/en not_active Abandoned
- 2016-05-09 WO PCT/US2016/031491 patent/WO2017019147A1/en active Application Filing
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10626712B2 (en) * | 2010-03-15 | 2020-04-21 | Landmark Graphics Corporation | Systems and methods for positioning horizontal wells within boundaries |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
EP3510245A4 (en) * | 2016-09-12 | 2020-05-13 | Services Pétroliers Schlumberger | Attaining access to compromised fractured production regions at an oilfield |
US11840909B2 (en) * | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US20210102452A1 (en) * | 2016-09-12 | 2021-04-08 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11466549B2 (en) | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
CN109236257A (en) * | 2018-10-11 | 2019-01-18 | 青岛大地新能源技术研究院 | A kind of radial bore volume fracturing method |
US11143008B1 (en) * | 2020-04-24 | 2021-10-12 | Saudi Arabian Oil Company | Methods of hydraulic fracturing |
CN113586020A (en) * | 2020-04-30 | 2021-11-02 | 中国石油化工股份有限公司 | Vertical well volume fracturing method and system combining radial well with carbon dioxide fracturing |
CN112253070A (en) * | 2020-10-10 | 2021-01-22 | 中煤科工集团西安研究院有限公司 | Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam |
US20240093578A1 (en) * | 2022-09-20 | 2024-03-21 | Ergo Exergy Technologies Inc. | Quenching and/or sequestering process fluids within underground carbonaceous formations, and associated systems and methods |
US12098621B2 (en) * | 2022-09-20 | 2024-09-24 | Ergo Exergy Technologies Inc. | Quenching and/or sequestering process fluids within underground carbonaceous formations, and associated systems and methods |
Also Published As
Publication number | Publication date |
---|---|
CA2926067A1 (en) | 2017-01-27 |
WO2017019147A1 (en) | 2017-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20170030180A1 (en) | Drain Hole Drilling in a Fractured Reservoir | |
US7451814B2 (en) | System and method for producing fluids from a subterranean formation | |
US10683740B2 (en) | Method of avoiding frac hits during formation stimulation | |
US5482116A (en) | Wellbore guided hydraulic fracturing | |
US20110005762A1 (en) | Forming Multiple Deviated Wellbores | |
US8967297B2 (en) | Well construction using small laterals | |
US20180119533A1 (en) | Wellbore System With Lateral Wells | |
US11840909B2 (en) | Attaining access to compromised fractured production regions at an oilfield | |
US4945994A (en) | Inverted wellbore completion | |
WO2019191349A1 (en) | An integrated data driven platform for completion optimization and reservoir characterization | |
Maut et al. | Production enhancement in mature fields of Assam Arakan basin by radial jet drilling-a case study | |
Elliott | Coiled-tubing method drills radial laterals to improve oil production from a depleted reservoir | |
Holditch et al. | The GRI staged field experiment | |
US5029641A (en) | Inverted wellbore completion | |
Abdel-Basset et al. | Chemical and mechanical water shut-off in horizontal passive icd wells; experience and lessons learnt in giant darcy reservoir | |
Surjaatmadja et al. | Consideration for Future Stimulation Options is Vital in Deciding Horizontal Well Drilling and Completion Schemes for Production Optimization | |
Liagova et al. | The technology of completion reservoir by drilling a network of branched channels under controlled trajectory | |
Potapenko et al. | The First Application of a Novel Reservoir Simulation Technology Comprising Radial Drilling and Hydraulic Fracturing in the Niobrara Shale | |
Barge et al. | Successful use of horizontal well technology in mitigating water production and increasing oil recovery in the South Umm Gudair Field, PNZ, Kuwait | |
Horn et al. | Multilateral horizontal well increases liquids recovery in the Gulf of Thailand | |
Abdel-Basset et al. | Water Shutoff Challenges Experience and Lessons Learned in Horizontal Passive Inflow Control Devices Completions of Giant North Kuwait Darcy Reservoir | |
Hatzignatiou et al. | Innovative Production Enhancement Interventions Through Existing Wellbores | |
Batruna et al. | Drilling and Completion of horizontal wells | |
Moiseenkov et al. | Openhole Completions as Recovery Case for Drilling Across Salt and High Pressure Floaters | |
Atsalos | Fishbone wells. Drilling, stimulation and productivity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |