US20160084034A1 - One-trip packer and perforating gun system - Google Patents
One-trip packer and perforating gun system Download PDFInfo
- Publication number
- US20160084034A1 US20160084034A1 US14/786,869 US201414786869A US2016084034A1 US 20160084034 A1 US20160084034 A1 US 20160084034A1 US 201414786869 A US201414786869 A US 201414786869A US 2016084034 A1 US2016084034 A1 US 2016084034A1
- Authority
- US
- United States
- Prior art keywords
- packer
- perforating gun
- completion tool
- coupling
- wellbore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000008878 coupling Effects 0.000 claims abstract description 24
- 238000010168 coupling process Methods 0.000 claims abstract description 24
- 238000005859 coupling reaction Methods 0.000 claims abstract description 24
- 238000005553 drilling Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims description 11
- 238000010008 shearing Methods 0.000 claims description 9
- 230000002706 hydrostatic effect Effects 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 38
- 230000015572 biosynthetic process Effects 0.000 description 34
- 238000005755 formation reaction Methods 0.000 description 34
- 239000004576 sand Substances 0.000 description 17
- 239000012530 fluid Substances 0.000 description 15
- 239000007787 solid Substances 0.000 description 8
- 238000012856 packing Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 229930195733 hydrocarbon Natural products 0.000 description 3
- 150000002430 hydrocarbons Chemical class 0.000 description 3
- 239000004215 Carbon black (E152) Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 238000010304 firing Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/126—Packers; Plugs with fluid-pressure-operated elastic cup or skirt
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/116—Gun or shaped-charge perforators
Definitions
- a string of protective casing may be run into the wellbore followed by production tubing inside the casing.
- the casing is perforated across one or more production intervals to allow formation fluids to enter the casing.
- formation sand may become entrained in the fluid and swept into the production stream.
- Producing sand is undesirable for multiple reasons. For example, formation sand can lead to significant wear and damage to downstream production equipment, necessitating additional filtration and separating equipment.
- Sand production can also compromise the integrity of the well because as sand is removed from the formation, the formation becomes increasingly unstable and prone to collapse or subsidence. Removal of sand can also lead to voids along the outside of the casing, reducing the support provided to the casing and increasing the risk of casing collapse.
- a gavel pack To control formation sand, operators may perform a gavel pack. This process involves locating a screened section of production tubing at the production interval and packing the annulus between the production tubing and the casing with gravel.
- the gravel is generally sized to prevent migration of formation sand while still permitting formation fluid to flow into the production tubing.
- a similar process combines a gravel pack with a fracturing operation.
- a frac pack involves injection of high pressure fluid into the wellbore following perforation. As the fluid enters the formation via the casing perforations, the high pressure of the fluid creates fractures in the formation and causes the fractures to propagate through the formation. The fractures improve production by increasing the available flow paths between the wellbore and the formation. Fluids used in frac pack operations further contain gravel or other granular solids. These solids fill the annulus and the fractures and provide similar filtration effects as the gravel used in gravel pack operations.
- Preparing a wellbore interval for a frac or gravel pack operation involves isolating the section by installing a sump packer.
- the sump packer is installed below the target production interval before perforating the casing and provides a lower boundary for the section being frac or gravel packed.
- Wireline or e-line is generally made of flexible cord or cable, and depends in part on the force of gravity to insert tools into the wellbore.
- wireline is suitable for use only in substantially vertical wells (i.e., wells having less than 45 degrees of deviation) or operations in which the tool can be pumped through the wellbore.
- a work string may be required.
- a work string is generally made of rigid or semi-rigid tubing and can be used to push the packer across deviated or horizontal portions of the wellbore.
- the sump packer is correlated on depth using logging-while-drilling or similar equipment and then set, causing the sump packer to engage the wellbore.
- the e-line or work string is then detached from the packer and withdrawn from the wellbore.
- Perforating guns are then run into the wellbore to perforate the casing. Similar to the sump packer, the perforating guns may be correlated on depth using logging-while-drilling or similar equipment. Alternatively, the perforating gun may be inserted into the wellbore until it contacts the sump packer, then backed up to the proper position.
- FIG. 1 is a schematic view of a wellbore having a completed gravel pack operation.
- FIG. 2 is a schematic view of a completion tool in accordance with one embodiment inserted into a wellbore
- FIG. 3 is a schematic view of the completion tool of FIG. 2 in position to install a sump packer.
- FIG. 4 is a schematic view of the completion tool of FIGS. 2 and 3 following firing of a perforation gun.
- FIGS. 5A-5B show a cross-sectional view of a portion of the completion tool depicting a first coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool.
- FIGS. 6A-6B show a cross-sectional view of a portion of the completion tool depicting a second coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool.
- the present disclosure relates generally to completion of hydrocarbon wells and specifically to preparations of a well bore for gravel pack or frac packing operations.
- a casing 106 is cemented into place and lines a wellbore 108 .
- the wellbore extends through three distinct layers of a formation 102 A, 102 B, and 104 .
- the casing 106 includes a series of perforations 110 previously made using a perforating gun.
- the perforations 110 permit communication of fluids between the surrounding formation 104 and the inside of the casing 106 .
- the perforations 110 correspond to a production interval 111 of the casing 106 .
- the production interval 111 is delineated from the rest of the wellbore by a sump packer 112 , a gravel packer 114 , and production tubing 116 .
- the production tubing 116 is hollow and runs from the gravel packer 114 through the production interval 111 , and through the sump packer 112 .
- a screen section 118 of the production tubing 116 permits fluid to communicate into the production tubing 116 .
- FIG. 1 depicts a cross-section of an example formation in which gravel packing is commonly used.
- the first formation layer 102 A and third formation layer 102 B are intended to be made of stable rock having low permeability.
- the middle layer 104 is a looser formation, consisting of high permeability rock having a high sand content. As a result, middle layer 104 is suitable as a production zone but may be unstable and, absent operator intervention, is prone to sand production.
- gravel 120 is inserted inside the casing 106 between the production tubing 116 and the casing 106 .
- the gravel 120 acts as a filter, retaining sand that would otherwise enter the production stream.
- the gravel used in a given gravel pack operation is determined by the properties of the formation sand.
- the specific details of gravel selection are known in the art, but generally, gravel is selected based on the size and composition of the formation sand such that the formation sand is prevented from entering the production stream with minimal restriction to formation fluid flow between the formation and the production tubing.
- FIG. 1 The formation depicted in FIG. 1 is intended to illustrate a common gravel pack application.
- the characteristics of the formation depicted in FIG. 1 should not be regarded as limiting the scope or applications of this disclosure.
- Gravel pack operations are suitable for a wide range of formations having varying compositions. Further, gravel pack operations are suitable not only for substantially vertical wells, such as that depicted in FIG. 1 , but may also be applied in deviated wells.
- frac pack operations Preparation of a wellbore for gravel pack and frac pack operations is substantially similar. Both operations involve the general steps of isolating a production zone, perforating the production zone, and filling the space between the wellbore and production tubing with gravel or similar solids that act to retain formation sand.
- the step of filling the wellbore with gravel or solids is combined with a fracturing operation.
- fluid containing gravel or other solids is pumped into the wellbore and into the formation under high pressure.
- the pressure causes fractures in the formation and propagation of those fractures.
- the gravel or solids in a fracturing operation penetrate into the newly created fractures.
- the gravel or solids perform a similar function as in a gravel pack operation, retaining formation sand while permitting flow of hydrocarbons into a production tubing.
- the gravel or solids also act as a proppant, maintaining the fractures open during the course of production.
- FIGS. 2-4 depict the sequence of operation of one embodiment of a completion tool in accordance with this disclosure.
- FIG. 2 is a schematic view of a completion tool according to one embodiment.
- the completion tool 200 is depicted inside a casing 206 cemented in a wellbore 208 .
- the completion tool 200 is further depicted disposed on the end of a work string 222 .
- the work string 222 may be any tubular suitable for inserting the completion tool 200 into the wellbore 208 .
- the work string 222 may be a series of work string segments, a length of coiled tubing, or any combination of similar work string elements.
- the completion tool 200 includes a hydrostatic-set sump packer 212 connected beyond the distal end of a perforating gun 230 .
- Hydrostatic-set sump packers like sump packer 212 , are generally configured to activate when exposed to a predetermined hydrostatic pressure. Activation expands one or more flexible, elastomeric packer elements, causing the elements to engage the inner surface of the casing or wellbore and fixing the packer in place.
- the sump packer 212 is connected to the completion tool 200 by a coupling 232 .
- the coupling 232 is configured so that the sump packer 212 is detachable from the rest of the completion tool 200 once the sump packer 212 is anchored or set in the casing 206 .
- the completion tool 200 is inserted into the casing 206 by the work string 222 .
- Positioning of the completion tool within the wellbore 208 may be assisted by a navigation sub 226 containing logging-while-drilling (LWD) or measurement-while-drilling (MWD) equipment.
- LWD logging-while-drilling
- MWD measurement-while-drilling
- the position of the completion tool 200 may be determined based on various measurements, including but not limited to position and orientation of the navigation sub 226 and properties of the surrounding formation.
- the sump packer 212 is then positioned and set within the wellbore, as shown in FIG. 3 .
- the sump packer 212 is positioned below the intended production interval to form a lower boundary of the gravel or frac pack operation.
- fluid is pumped into the work string 222 and into the casing 206 through a ported sub 228 , increasing the hydrostatic pressure within the casing 206 until the setting pressure of the sump packer 212 is reached.
- the sump packer 212 sets, expanding to engage the inner surface of the casing 206 and becoming fixed within the casing 206 .
- the coupling 232 is disengaged, detaching the sump packer 212 from the rest of the completion tool 200 .
- the completion tool 200 can be repositioned within the casing 206 to align the perforating gun 230 with a target production zone. Repositioning the completion tool 200 may be accomplished using the navigation sub 226 or by simply retracting the completion tool 200 a known distance from the set sump packer 212 .
- FIGS. 2-4 include a second packer 234 disposed on the completion tool 200 and located above the perforating gun 230 .
- the second packer may be mechanically set. Such packers depend on twisting or thrusting of the work string to set the packer. Once operations are complete, a substantially opposite movement of the work string may be used to disengage the packer.
- the second packer 234 is optional but may be used to isolate the production zone. Isolating the production zone is useful during the steps of setting the packer and firing the perforating gun, which may be hydrostatically activated in certain embodiments. The hydrostatic pressure necessary to set the packer and/or fire the perforating gun is achieved by pumping fluid into the wellbore. Isolating the production zone using the second packer minimizes the volume necessary to be filled in order to build pressure within the production zone and as a consequence, minimizes the time required to set the packer or fire the perforating gun.
- FIGS. 5A and 5B are cross-sectional views of a portion of one embodiment of a completion tool in which a sump packer 512 is connected to the completion tool using shearing members.
- the shearing members are depicted as shear pins 534 A, B.
- Other types of shearing members include shear screws and shear sleeves, and any type of shearing member may be used alone or in combination with any other type of shearing member.
- the shear pins 534 A, B extend from the sump packer 512 into a coupling 532 disposed on the end of a perforating gun 530 .
- FIGS. 6A and 6B are cross-sectional views of a portion of a second embodiment of a completion tool in which a sump packer 612 is connected to a coupling 632 of the completion tool using a threaded connection 634 .
- the coupling 632 may be detached from the packer 612 by disengaging the threaded connection 634 by rotating and withdrawing the work string on which the completion tool is disposed.
- the sump packer may also be implemented.
- magnets located on the coupler and on the inside of the packer may couple the sump packer to the completion tool.
- the shear pins depicted in FIG. 5A may be replaced with pins that retract into either the sump packer or coupling. The pins may retract based on hydrostatic pressure, spring force, or electromagnetic force, such as with a solenoid.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
- In the course of completing a hydrocarbon well, a string of protective casing may be run into the wellbore followed by production tubing inside the casing. The casing is perforated across one or more production intervals to allow formation fluids to enter the casing.
- During production of the formation fluid, formation sand may become entrained in the fluid and swept into the production stream. Producing sand is undesirable for multiple reasons. For example, formation sand can lead to significant wear and damage to downstream production equipment, necessitating additional filtration and separating equipment. Sand production can also compromise the integrity of the well because as sand is removed from the formation, the formation becomes increasingly unstable and prone to collapse or subsidence. Removal of sand can also lead to voids along the outside of the casing, reducing the support provided to the casing and increasing the risk of casing collapse.
- To control formation sand, operators may perform a gavel pack. This process involves locating a screened section of production tubing at the production interval and packing the annulus between the production tubing and the casing with gravel. The gravel is generally sized to prevent migration of formation sand while still permitting formation fluid to flow into the production tubing.
- A similar process, called a frac pack, combines a gravel pack with a fracturing operation. As with standard fracturing operations, a frac pack involves injection of high pressure fluid into the wellbore following perforation. As the fluid enters the formation via the casing perforations, the high pressure of the fluid creates fractures in the formation and causes the fractures to propagate through the formation. The fractures improve production by increasing the available flow paths between the wellbore and the formation. Fluids used in frac pack operations further contain gravel or other granular solids. These solids fill the annulus and the fractures and provide similar filtration effects as the gravel used in gravel pack operations.
- Preparing a wellbore interval for a frac or gravel pack operation involves isolating the section by installing a sump packer. The sump packer is installed below the target production interval before perforating the casing and provides a lower boundary for the section being frac or gravel packed.
- Typically, the sump packer is inserted into the wellbore using a wireline or work string. Wireline or e-line is generally made of flexible cord or cable, and depends in part on the force of gravity to insert tools into the wellbore. As a result, wireline is suitable for use only in substantially vertical wells (i.e., wells having less than 45 degrees of deviation) or operations in which the tool can be pumped through the wellbore.
- For deviated or horizontal wells, a work string may be required. A work string is generally made of rigid or semi-rigid tubing and can be used to push the packer across deviated or horizontal portions of the wellbore.
- Once inserted into the wellbore, the sump packer is correlated on depth using logging-while-drilling or similar equipment and then set, causing the sump packer to engage the wellbore. The e-line or work string is then detached from the packer and withdrawn from the wellbore. Perforating guns are then run into the wellbore to perforate the casing. Similar to the sump packer, the perforating guns may be correlated on depth using logging-while-drilling or similar equipment. Alternatively, the perforating gun may be inserted into the wellbore until it contacts the sump packer, then backed up to the proper position.
- Separately running the sump packer and perforating gun can significantly increase rig time. As depths of modern drilling and completion operations increase, rig time stands to increase. Further, in highly deviated wells, the generally faster approach of using wireline to insert the packer and perforating gun is not available.
- As a result, there is a need for a completion tool that reduces the number of wireline or work string runs necessary for preparing a wellbore for gravel or frac packing operations.
- A more complete understanding of the present embodiments and advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying drawings, in which like reference numbers indicate like features.
-
FIG. 1 is a schematic view of a wellbore having a completed gravel pack operation. -
FIG. 2 is a schematic view of a completion tool in accordance with one embodiment inserted into a wellbore -
FIG. 3 is a schematic view of the completion tool ofFIG. 2 in position to install a sump packer. -
FIG. 4 is a schematic view of the completion tool ofFIGS. 2 and 3 following firing of a perforation gun. -
FIGS. 5A-5B show a cross-sectional view of a portion of the completion tool depicting a first coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool. -
FIGS. 6A-6B show a cross-sectional view of a portion of the completion tool depicting a second coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool. - While embodiments of this disclosure have been depicted and described and are defined by reference to exemplary embodiments of the disclosure, such references do not imply a limitation on the disclosure, and no such limitation is to be inferred. The subject matter disclosed is capable of considerable modification, alteration, and equivalents in form and function, as will occur to those skilled in the pertinent art and having the benefit of this disclosure. The depicted and described embodiments of this disclosure are examples only, and not exhaustive of the scope of the disclosure.
- The present disclosure relates generally to completion of hydrocarbon wells and specifically to preparations of a well bore for gravel pack or frac packing operations.
- Illustrative embodiments of the present invention are described in detail herein. In the interest of clarity, not all features of an actual implementation may be described in this specification. It will of course be appreciated that in the development of any such actual embodiment, numerous implementation specific decisions must be made to achieve the specific implementation goals, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of the present disclosure.
- To facilitate a better understanding of this disclosure, the following examples of certain embodiments are given. In no way should the following examples be read to limit, or define, the scope of the claims.
- In
FIG. 1 , acasing 106 is cemented into place and lines awellbore 108. As depicted, the wellbore extends through three distinct layers of aformation casing 106 includes a series ofperforations 110 previously made using a perforating gun. Theperforations 110 permit communication of fluids between the surroundingformation 104 and the inside of thecasing 106. Theperforations 110 correspond to aproduction interval 111 of thecasing 106. - The
production interval 111 is delineated from the rest of the wellbore by asump packer 112, agravel packer 114, andproduction tubing 116. Theproduction tubing 116 is hollow and runs from thegravel packer 114 through theproduction interval 111, and through thesump packer 112. Ascreen section 118 of theproduction tubing 116 permits fluid to communicate into theproduction tubing 116. -
FIG. 1 depicts a cross-section of an example formation in which gravel packing is commonly used. Thefirst formation layer 102A andthird formation layer 102B are intended to be made of stable rock having low permeability. Themiddle layer 104, on the other hand, is a looser formation, consisting of high permeability rock having a high sand content. As a result,middle layer 104 is suitable as a production zone but may be unstable and, absent operator intervention, is prone to sand production. - To prevent production of sand,
gravel 120 is inserted inside thecasing 106 between theproduction tubing 116 and thecasing 106. As formation fluid flows from theformation 104, through thescreen 118, and into theproduction tubing 116, thegravel 120 acts as a filter, retaining sand that would otherwise enter the production stream. - The gravel used in a given gravel pack operation is determined by the properties of the formation sand. The specific details of gravel selection are known in the art, but generally, gravel is selected based on the size and composition of the formation sand such that the formation sand is prevented from entering the production stream with minimal restriction to formation fluid flow between the formation and the production tubing.
- The formation depicted in
FIG. 1 is intended to illustrate a common gravel pack application. The characteristics of the formation depicted inFIG. 1 should not be regarded as limiting the scope or applications of this disclosure. Gravel pack operations are suitable for a wide range of formations having varying compositions. Further, gravel pack operations are suitable not only for substantially vertical wells, such as that depicted inFIG. 1 , but may also be applied in deviated wells. - The system and methods described in this disclosure may also be applied to combination fracturing and gravel packing operations, commonly referred to as frac pack operations. Preparation of a wellbore for gravel pack and frac pack operations is substantially similar. Both operations involve the general steps of isolating a production zone, perforating the production zone, and filling the space between the wellbore and production tubing with gravel or similar solids that act to retain formation sand.
- In frac pack operations, however, the step of filling the wellbore with gravel or solids is combined with a fracturing operation. Specifically, fluid containing gravel or other solids is pumped into the wellbore and into the formation under high pressure. The pressure causes fractures in the formation and propagation of those fractures. In addition to filling the wellbore, as in a standard gravel pack operation, the gravel or solids in a fracturing operation penetrate into the newly created fractures. Once completed, the gravel or solids perform a similar function as in a gravel pack operation, retaining formation sand while permitting flow of hydrocarbons into a production tubing. By filling the newly created fractures, the gravel or solids also act as a proppant, maintaining the fractures open during the course of production.
-
FIGS. 2-4 depict the sequence of operation of one embodiment of a completion tool in accordance with this disclosure. -
FIG. 2 is a schematic view of a completion tool according to one embodiment. Thecompletion tool 200 is depicted inside acasing 206 cemented in awellbore 208. Thecompletion tool 200 is further depicted disposed on the end of awork string 222. Thework string 222 may be any tubular suitable for inserting thecompletion tool 200 into thewellbore 208. For example, thework string 222 may be a series of work string segments, a length of coiled tubing, or any combination of similar work string elements. - To facilitate one-trip sump packer installation and perforation, the
completion tool 200 includes a hydrostatic-setsump packer 212 connected beyond the distal end of a perforatinggun 230. Hydrostatic-set sump packers, likesump packer 212, are generally configured to activate when exposed to a predetermined hydrostatic pressure. Activation expands one or more flexible, elastomeric packer elements, causing the elements to engage the inner surface of the casing or wellbore and fixing the packer in place. - The
sump packer 212 is connected to thecompletion tool 200 by acoupling 232. As will be discussed later in this disclosure, thecoupling 232 is configured so that thesump packer 212 is detachable from the rest of thecompletion tool 200 once thesump packer 212 is anchored or set in thecasing 206. - As depicted in
FIG. 2 , thecompletion tool 200 is inserted into thecasing 206 by thework string 222. Positioning of the completion tool within thewellbore 208 may be assisted by anavigation sub 226 containing logging-while-drilling (LWD) or measurement-while-drilling (MWD) equipment. Depending on the specific equipment within thenavigation sub 226, the position of thecompletion tool 200 may be determined based on various measurements, including but not limited to position and orientation of thenavigation sub 226 and properties of the surrounding formation. - The
sump packer 212 is then positioned and set within the wellbore, as shown inFIG. 3 . Thesump packer 212 is positioned below the intended production interval to form a lower boundary of the gravel or frac pack operation. Once in position, fluid is pumped into thework string 222 and into thecasing 206 through a portedsub 228, increasing the hydrostatic pressure within thecasing 206 until the setting pressure of thesump packer 212 is reached. When the setting pressure is reached, thesump packer 212 sets, expanding to engage the inner surface of thecasing 206 and becoming fixed within thecasing 206. - As depicted in
FIG. 4 , after thesump packer 212 is set, thecoupling 232 is disengaged, detaching thesump packer 212 from the rest of thecompletion tool 200. Once detached from thesump packer 212, thecompletion tool 200 can be repositioned within thecasing 206 to align the perforatinggun 230 with a target production zone. Repositioning thecompletion tool 200 may be accomplished using thenavigation sub 226 or by simply retracting the completion tool 200 a known distance from the setsump packer 212. -
FIGS. 2-4 include asecond packer 234 disposed on thecompletion tool 200 and located above the perforatinggun 230. In embodiments having a second packer, the second packer may be mechanically set. Such packers depend on twisting or thrusting of the work string to set the packer. Once operations are complete, a substantially opposite movement of the work string may be used to disengage the packer. - The
second packer 234 is optional but may be used to isolate the production zone. Isolating the production zone is useful during the steps of setting the packer and firing the perforating gun, which may be hydrostatically activated in certain embodiments. The hydrostatic pressure necessary to set the packer and/or fire the perforating gun is achieved by pumping fluid into the wellbore. Isolating the production zone using the second packer minimizes the volume necessary to be filled in order to build pressure within the production zone and as a consequence, minimizes the time required to set the packer or fire the perforating gun. - Coupling of the
sump packer 212 to thecompletion tool 200 can be accomplished using various approaches. For example,FIGS. 5A and 5B are cross-sectional views of a portion of one embodiment of a completion tool in which asump packer 512 is connected to the completion tool using shearing members. InFIGS. 5A and 5B , the shearing members are depicted as shear pins 534A, B. Other types of shearing members include shear screws and shear sleeves, and any type of shearing member may be used alone or in combination with any other type of shearing member. - The shear pins 534A, B extend from the
sump packer 512 into acoupling 532 disposed on the end of a perforatinggun 530. Once thesump packer 512 is set and engages the inner surface of the casing, the completion tool is retracted, as depicted inFIG. 5B , causing the shear pins to shear and detaching thesump packer 512 from the completion tool. -
FIGS. 6A and 6B are cross-sectional views of a portion of a second embodiment of a completion tool in which asump packer 612 is connected to acoupling 632 of the completion tool using a threaded connection 634. In this embodiment, once thesump packer 612 is set and engages the inner surface of the casing, thecoupling 632 may be detached from thepacker 612 by disengaging the threaded connection 634 by rotating and withdrawing the work string on which the completion tool is disposed. - Other methods for coupling the sump packer to the completion tool may also be implemented. For example, in one embodiment, magnets located on the coupler and on the inside of the packer may couple the sump packer to the completion tool. In another embodiment, the shear pins depicted in
FIG. 5A may be replaced with pins that retract into either the sump packer or coupling. The pins may retract based on hydrostatic pressure, spring force, or electromagnetic force, such as with a solenoid. - Although numerous characteristics and advantages of embodiments of the present invention have been set forth in the foregoing description and accompanying figures, this description is illustrative only. Changes to details regarding structure and arrangement that are not specifically included in this description may nevertheless be within the full extent indicated by the claims.
Claims (20)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/786,869 US20160084034A1 (en) | 2013-04-18 | 2014-07-02 | One-trip packer and perforating gun system |
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361813470P | 2013-04-18 | 2013-04-18 | |
US201361854493P | 2013-04-25 | 2013-04-25 | |
US201361817149P | 2013-04-29 | 2013-04-29 | |
US201361819992P | 2013-05-06 | 2013-05-06 | |
US201361898093P | 2013-10-31 | 2013-10-31 | |
US14/786,869 US20160084034A1 (en) | 2013-04-18 | 2014-07-02 | One-trip packer and perforating gun system |
PCT/US2014/045269 WO2016003463A1 (en) | 2014-07-02 | 2014-07-02 | One-trip packer and perforating gun system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160084034A1 true US20160084034A1 (en) | 2016-03-24 |
Family
ID=55525288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/786,869 Abandoned US20160084034A1 (en) | 2013-04-18 | 2014-07-02 | One-trip packer and perforating gun system |
Country Status (1)
Country | Link |
---|---|
US (1) | US20160084034A1 (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20200056446A1 (en) * | 2018-08-14 | 2020-02-20 | Saudi Arabian Oil Company | Tandem Cement Retainer and Bridge Plug |
US11448026B1 (en) | 2021-05-03 | 2022-09-20 | Saudi Arabian Oil Company | Cable head for a wireline tool |
US11466564B2 (en) | 2018-06-13 | 2022-10-11 | Halliburton Energy Services, Inc. | Systems and methods for downhole memory tool activation and control |
US11549329B2 (en) | 2020-12-22 | 2023-01-10 | Saudi Arabian Oil Company | Downhole casing-casing annulus sealant injection |
US11598178B2 (en) | 2021-01-08 | 2023-03-07 | Saudi Arabian Oil Company | Wellbore mud pit safety system |
US11655685B2 (en) | 2020-08-10 | 2023-05-23 | Saudi Arabian Oil Company | Downhole welding tools and related methods |
US11680459B1 (en) | 2022-02-24 | 2023-06-20 | Saudi Arabian Oil Company | Liner system with integrated cement retainer |
US11828128B2 (en) | 2021-01-04 | 2023-11-28 | Saudi Arabian Oil Company | Convertible bell nipple for wellbore operations |
US11859815B2 (en) | 2021-05-18 | 2024-01-02 | Saudi Arabian Oil Company | Flare control at well sites |
US11905791B2 (en) | 2021-08-18 | 2024-02-20 | Saudi Arabian Oil Company | Float valve for drilling and workover operations |
US11913298B2 (en) | 2021-10-25 | 2024-02-27 | Saudi Arabian Oil Company | Downhole milling system |
US11946336B1 (en) * | 2022-09-15 | 2024-04-02 | Saudi Arabian Oil Company | Isolating a section of a wellbore |
US11993992B2 (en) | 2022-08-29 | 2024-05-28 | Saudi Arabian Oil Company | Modified cement retainer with milling assembly |
US12018565B2 (en) | 2022-05-24 | 2024-06-25 | Saudi Arabian Oil Company | Whipstock to plug and abandon wellbore below setting depth |
US12054999B2 (en) | 2021-03-01 | 2024-08-06 | Saudi Arabian Oil Company | Maintaining and inspecting a wellbore |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5579840A (en) * | 1994-10-05 | 1996-12-03 | Dresser Industries, Inc. | Packer running and setting tool |
US5704426A (en) * | 1996-03-20 | 1998-01-06 | Schlumberger Technology Corporation | Zonal isolation method and apparatus |
US5850875A (en) * | 1996-12-30 | 1998-12-22 | Halliburton Energy Services, Inc. | Method of deploying a well screen and associated apparatus therefor |
US5947204A (en) * | 1997-09-23 | 1999-09-07 | Dresser Industries, Inc. | Production fluid control device and method for oil and/or gas wells |
US6394184B2 (en) * | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US20050133217A1 (en) * | 2003-12-23 | 2005-06-23 | Zafer Erkol | Hyraulically releasable inflation tool for permanent bridge plug |
US20070181303A1 (en) * | 2006-02-03 | 2007-08-09 | Matthew Billingham | Method and apparatus for assembling stackable gun system inside a well bore |
US20080314591A1 (en) * | 2007-06-21 | 2008-12-25 | Hales John H | Single trip well abandonment with dual permanent packers and perforating gun |
US20100230105A1 (en) * | 2009-03-13 | 2010-09-16 | Vladimir Vaynshteyn | Perforating with wired drill pipe |
-
2014
- 2014-07-02 US US14/786,869 patent/US20160084034A1/en not_active Abandoned
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5579840A (en) * | 1994-10-05 | 1996-12-03 | Dresser Industries, Inc. | Packer running and setting tool |
US5704426A (en) * | 1996-03-20 | 1998-01-06 | Schlumberger Technology Corporation | Zonal isolation method and apparatus |
US5850875A (en) * | 1996-12-30 | 1998-12-22 | Halliburton Energy Services, Inc. | Method of deploying a well screen and associated apparatus therefor |
US5947204A (en) * | 1997-09-23 | 1999-09-07 | Dresser Industries, Inc. | Production fluid control device and method for oil and/or gas wells |
US6394184B2 (en) * | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US20050133217A1 (en) * | 2003-12-23 | 2005-06-23 | Zafer Erkol | Hyraulically releasable inflation tool for permanent bridge plug |
US20070181303A1 (en) * | 2006-02-03 | 2007-08-09 | Matthew Billingham | Method and apparatus for assembling stackable gun system inside a well bore |
US20080314591A1 (en) * | 2007-06-21 | 2008-12-25 | Hales John H | Single trip well abandonment with dual permanent packers and perforating gun |
US20100230105A1 (en) * | 2009-03-13 | 2010-09-16 | Vladimir Vaynshteyn | Perforating with wired drill pipe |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11466564B2 (en) | 2018-06-13 | 2022-10-11 | Halliburton Energy Services, Inc. | Systems and methods for downhole memory tool activation and control |
US20200056446A1 (en) * | 2018-08-14 | 2020-02-20 | Saudi Arabian Oil Company | Tandem Cement Retainer and Bridge Plug |
US10837254B2 (en) * | 2018-08-14 | 2020-11-17 | Saudi Arabian Oil Company | Tandem cement retainer and bridge plug |
US11391113B2 (en) | 2018-08-14 | 2022-07-19 | Saudi Arabian Oil Company | Tandem cement retainer and bridge plug |
US11655685B2 (en) | 2020-08-10 | 2023-05-23 | Saudi Arabian Oil Company | Downhole welding tools and related methods |
US11549329B2 (en) | 2020-12-22 | 2023-01-10 | Saudi Arabian Oil Company | Downhole casing-casing annulus sealant injection |
US11828128B2 (en) | 2021-01-04 | 2023-11-28 | Saudi Arabian Oil Company | Convertible bell nipple for wellbore operations |
US11598178B2 (en) | 2021-01-08 | 2023-03-07 | Saudi Arabian Oil Company | Wellbore mud pit safety system |
US12054999B2 (en) | 2021-03-01 | 2024-08-06 | Saudi Arabian Oil Company | Maintaining and inspecting a wellbore |
US11448026B1 (en) | 2021-05-03 | 2022-09-20 | Saudi Arabian Oil Company | Cable head for a wireline tool |
US11859815B2 (en) | 2021-05-18 | 2024-01-02 | Saudi Arabian Oil Company | Flare control at well sites |
US11905791B2 (en) | 2021-08-18 | 2024-02-20 | Saudi Arabian Oil Company | Float valve for drilling and workover operations |
US11913298B2 (en) | 2021-10-25 | 2024-02-27 | Saudi Arabian Oil Company | Downhole milling system |
US11680459B1 (en) | 2022-02-24 | 2023-06-20 | Saudi Arabian Oil Company | Liner system with integrated cement retainer |
US12018565B2 (en) | 2022-05-24 | 2024-06-25 | Saudi Arabian Oil Company | Whipstock to plug and abandon wellbore below setting depth |
US11993992B2 (en) | 2022-08-29 | 2024-05-28 | Saudi Arabian Oil Company | Modified cement retainer with milling assembly |
US11946336B1 (en) * | 2022-09-15 | 2024-04-02 | Saudi Arabian Oil Company | Isolating a section of a wellbore |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160084034A1 (en) | One-trip packer and perforating gun system | |
CN102007264B (en) | Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion | |
US7836950B2 (en) | Methods and apparatus to convey electrical pumping systems into wellbores to complete oil and gas wells | |
US7325606B1 (en) | Methods and apparatus to convey electrical pumping systems into wellbores to complete oil and gas wells | |
US7040420B2 (en) | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells | |
US7100710B2 (en) | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells | |
US7036610B1 (en) | Apparatus and method for completing oil and gas wells | |
US9103207B2 (en) | Multi-zone completion systems and methods | |
US20070284106A1 (en) | Method and apparatus for well drilling and completion | |
EP2762672A2 (en) | Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well | |
EP2764200A2 (en) | System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well | |
EP3441559A1 (en) | Single trip multi-zone completion systems and methods | |
Acock et al. | Practical approaches to sand management | |
GB2503559B (en) | Hybrid-tieback seal assembly | |
WO2015134565A1 (en) | Method and apparatus for reservoir testing and monitoring | |
EP2929135B1 (en) | Systems and methods for optimized well creation in a shale formation | |
US8944170B2 (en) | Real time downhole intervention during wellbore stimulation operations | |
AU2013378834A1 (en) | Systems and methods for optimized well creation in a shale formation | |
WO2019140287A2 (en) | Method of avoiding frac hits during formation stimulation | |
CN112313392B (en) | Well construction and completion method | |
US20060124306A1 (en) | Installation of one-way valve after removal of retrievable drill bit to complete oil and gas wells | |
AU2014399903B2 (en) | One-trip packer and perforating gun system | |
US20090101343A1 (en) | High rate gravel packing | |
US11708745B2 (en) | Method for incorporating scrapers in multi zone packer assembly | |
US20240068301A1 (en) | Interventionless methods and systems for testing a liner top |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ROANE, THOMAS;PATTERSON, DANIEL;FREEMAN, GARY;SIGNING DATES FROM 20120824 TO 20140930;REEL/FRAME:036871/0069 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
STCV | Information on status: appeal procedure |
Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS |
|
STCV | Information on status: appeal procedure |
Free format text: BOARD OF APPEALS DECISION RENDERED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION |