US20130125376A1 - Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby - Google Patents
Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby Download PDFInfo
- Publication number
- US20130125376A1 US20130125376A1 US13/299,228 US201113299228A US2013125376A1 US 20130125376 A1 US20130125376 A1 US 20130125376A1 US 201113299228 A US201113299228 A US 201113299228A US 2013125376 A1 US2013125376 A1 US 2013125376A1
- Authority
- US
- United States
- Prior art keywords
- fastener
- cold
- worked
- shank
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 97
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 title claims description 15
- 229910001069 Ti alloy Inorganic materials 0.000 title claims description 14
- 229910052719 titanium Inorganic materials 0.000 title claims description 14
- 239000010936 titanium Substances 0.000 title claims description 14
- 239000002243 precursor Substances 0.000 claims description 116
- 239000000463 material Substances 0.000 claims description 74
- 230000009467 reduction Effects 0.000 claims description 48
- 230000008569 process Effects 0.000 claims description 39
- 238000000576 coating method Methods 0.000 claims description 34
- 239000011248 coating agent Substances 0.000 claims description 33
- 238000005482 strain hardening Methods 0.000 claims description 31
- 230000006835 compression Effects 0.000 claims description 29
- 238000007906 compression Methods 0.000 claims description 29
- 239000000203 mixture Substances 0.000 claims description 16
- 230000007797 corrosion Effects 0.000 claims description 11
- 238000005260 corrosion Methods 0.000 claims description 11
- 238000000137 annealing Methods 0.000 claims description 9
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 5
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 229910000851 Alloy steel Inorganic materials 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 229910052782 aluminium Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 16
- ZWEHNKRNPOVVGH-UHFFFAOYSA-N 2-Butanone Chemical compound CCC(C)=O ZWEHNKRNPOVVGH-UHFFFAOYSA-N 0.000 description 12
- 238000003756 stirring Methods 0.000 description 9
- 238000009646 cryomilling Methods 0.000 description 8
- 239000000843 powder Substances 0.000 description 8
- 239000000956 alloy Substances 0.000 description 7
- 230000002829 reductive effect Effects 0.000 description 7
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 6
- YXFVVABEGXRONW-UHFFFAOYSA-N Toluene Chemical compound CC1=CC=CC=C1 YXFVVABEGXRONW-UHFFFAOYSA-N 0.000 description 6
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 description 5
- 239000002904 solvent Substances 0.000 description 5
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 4
- 238000001125 extrusion Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000013011 mating Effects 0.000 description 4
- 238000007669 thermal treatment Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000000295 complement effect Effects 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 230000000670 limiting effect Effects 0.000 description 3
- 239000007769 metal material Substances 0.000 description 3
- 229910052757 nitrogen Inorganic materials 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- 230000035882 stress Effects 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- KXGFMDJXCMQABM-UHFFFAOYSA-N 2-methoxy-6-methylphenol Chemical compound [CH]OC1=CC=CC([CH])=C1O KXGFMDJXCMQABM-UHFFFAOYSA-N 0.000 description 2
- 239000000654 additive Substances 0.000 description 2
- 229910052786 argon Inorganic materials 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 2
- 238000001513 hot isostatic pressing Methods 0.000 description 2
- 239000001257 hydrogen Substances 0.000 description 2
- 229910052739 hydrogen Inorganic materials 0.000 description 2
- 238000005304 joining Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 229910001092 metal group alloy Inorganic materials 0.000 description 2
- 150000004767 nitrides Chemical class 0.000 description 2
- 239000005011 phenolic resin Substances 0.000 description 2
- 229920001568 phenolic resin Polymers 0.000 description 2
- 239000004014 plasticizer Substances 0.000 description 2
- -1 polytetrafluoroethylene Polymers 0.000 description 2
- 229920001343 polytetrafluoroethylene Polymers 0.000 description 2
- 239000004810 polytetrafluoroethylene Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000000087 stabilizing effect Effects 0.000 description 2
- NVKTUNLPFJHLCG-UHFFFAOYSA-N strontium chromate Chemical compound [Sr+2].[O-][Cr]([O-])(=O)=O NVKTUNLPFJHLCG-UHFFFAOYSA-N 0.000 description 2
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 238000000498 ball milling Methods 0.000 description 1
- 239000008199 coating composition Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000005242 forging Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 150000002431 hydrogen Chemical class 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000005549 size reduction Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/58—Making machine elements rivets
- B21K1/60—Making machine elements rivets hollow or semi-hollow rivets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J15/00—Riveting
- B21J15/02—Riveting procedures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K1/00—Making machine elements
- B21K1/58—Making machine elements rivets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B19/00—Bolts without screw-thread; Pins, including deformable elements; Rivets
- F16B19/04—Rivets; Spigots or the like fastened by riveting
- F16B19/06—Solid rivets made in one piece
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B5/00—Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them
- F16B5/04—Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them by means of riveting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
- Y10T29/49947—Assembling or joining by applying separate fastener
- Y10T29/49954—Fastener deformed after application
- Y10T29/49956—Riveting
Definitions
- the present disclosure relates generally to fasteners and, more particularly, to a system and method for preparing a one-piece fastener having a locally cold-worked section.
- Mechanical fasteners are widely used for joining two or more components of a structural assembly.
- mechanical fasteners are used extensively for joining the structural components of an airframe.
- Two-piece fasteners are used in a variety of applications including applications where tension loads in the fastener are relatively high.
- Such two-piece fasteners may include a bolt or a pin that is inserted into a hole and a threaded nut or swage collar that may be mechanically secured to threads or other features formed on the free end of the bolt or pin. By tightening the nut or collar against the structure, the components of the structural assembly may be clamped together.
- two-piece fasteners generally provide relatively high clamp-up and tension load-carrying capability
- two-piece fasteners suffer from several drawbacks that detract from their overall utility. For example, due to the need to fabricate, process, and store a large quantity of each component of the system that comprise two-piece fastener systems, procurement costs are relatively high. In addition, the time required for installation and assembly of two-piece fasteners in a structure is relatively high and may require separate, unique tools for the various components of the two-piece fastener configurations, which may add to production costs.
- two-piece fasteners may be relatively heavy due to the required size or length of the mating nut or collar to sufficiently engage the threads formed on the end of the pin or bolt to provide adequate clamp-up and tension load-carrying capabilities. Due to the high volume of fasteners utilized in a single airframe, even minor savings in weight, cost, and time associated with the fasteners can results in significant savings over the number of aircraft produced during the life of a program.
- a one-piece fastener system having a head and a shaft or shank extending from the head and terminating at a tail end portion.
- the shaft or shank may include a cold-worked shank section located adjacent to the head and a ductile shank section extending between the cold-worked shank section and the tail end portion.
- the method may include the step of providing a blank precursor having opposing ends.
- the blank precursor may be inserted into a bore of a forming die.
- the forming die may have an enlarged bore portion.
- the method may preferably include applying an additional axial compression force to the blank precursor and cold-working a head onto the blank precursor and forming an enlarged shaft or shank portion on the blank precursor corresponding to the enlarged bore portion of the forming die.
- a nominal shank portion may extend from the enlarged shank portion.
- the nominal shank portion may have a diameter that may be approximately equal to a final diameter of the fastener.
- the method may further include inserting the nominal shank portion into a bore of a final reduction die and applying an axial compression force to the enlarged shank portion.
- the method may additionally include urging the enlarged shank portion into the bore of the final reduction die and forming a cold-worked shank section by reducing the cross-sectional area of the enlarged shank portion such that the blank precursor is formed into a final fastener configuration.
- the present disclosure also includes a method of assembling a structure.
- the method may include the step of providing a one-piece fastener (e.g., a rivet) having a head and a shank terminating at a tail end portion.
- the head may comprise a cold-worked head section.
- the shank may include a cold-worked shank section and a ductile shank section extending from the cold-worked shank section to the tail end portion.
- the cold-worked head section and cold-worked shank section may have a higher strength than the ductile shank section.
- the method may additionally include installing the fastener in a hole of the structure and upsetting the tail end portion of the ductile shank section.
- FIG. 1 is a schematic side view of an embodiment of a one-piece fastener having a cold-worked head section, a cold-worked shank section, and a ductile shank section extending from the cold-worked shank section to a tail end portion of the fastener;
- FIG. 2 is a schematic side view of a flush shear head, one-piece fastener installed in a structure
- FIG. 3 is a schematic side view of a flush tension head, one-piece fastener installed in a structure
- FIG. 4 is a schematic side view of a protruding shear head, one-piece fastener installed in a structure
- FIG. 5 is a schematic side view of a protruding tension head, one-piece fastener installed in a structure
- FIG. 6 is a schematic side view of a semi-tubular, one-piece fastener in a structure prior to upsetting the tail end portion of the fastener;
- FIG. 7 is a schematic side view of the semi-tubular, one-piece fastener after upsetting the tail end portion of the fastener;
- FIG. 8 is a flow chart illustrating one or more operations that may be included in a method of installing a one-piece fastener into a structure wherein the one-piece fastener has a cold-worked head section, a cold-worked shank section, and a ductile shank section;
- FIG. 9 is a schematic side view of a one-piece fastener having cold-worked head and shank sections prior to installation of the fastener in a hole extending through components of a structure;
- FIG. 10 is a schematic side view of the one-piece fastener installed in the hole and illustrating the cold-worked head and shank sections having a length that is substantially equivalent to a length of the hole and further illustrating the ductile shank section at a tail end portion of the fastener extending out of the hole in a pre-installed or pre-upset condition;
- FIG. 11 is a schematic side view of the one-piece fastener having a tool and a bucking bar disposed on opposite ends of the fastener in a pre-installed or intermediate-upset condition;
- FIG. 12 is a schematic side view of the one-piece fastener installed in the structure and illustrating the tail end portion of the fastener in a post-upset condition;
- FIG. 13 is a schematic side view of the one-piece fastener installed in the structure with the tool and bucking bar removed and illustrating the upset end of the fastener comprising the ductile shank section of the fastener;
- FIG. 14 is a flow chart illustrating one or more operations that may be included in a method of forming a one-piece fastener having a cold-worked head section and a cold-worked shank section;
- FIG. 15 is a perspective view of a blank precursor that may be formed into a flush head, one-piece fastener having the cold-worked head and shank sections as shown in the sequence of operations illustrated in FIGS. 16-23 ;
- FIG. 16 is a schematic side view of a forming die having a countersink and a forming ram for use in cold-working a flush head and forming an enlarged shank portion on the blank precursor;
- FIG. 17 is a schematic side view of the blank precursor installed within the forming die prior to the application of an axial compression force to the blank precursor by the forming ram;
- FIG. 18 is a schematic side view of the forming ram in contact with the forming die after application of the axial compression force and illustrating a portion of the blank precursor assuming a shape substantially corresponding to a shape of the forming die and forming ram to form the cold-worked head section and the enlarged shank portion of the blank precursor;
- FIG. 19 is a schematic side view of an intermediarily-formed blank precursor having an enlarged shank portion formed thereon as a result of the application of the axial compression force;
- FIG. 20 is a schematic side view of a final reduction die having a countersink and a reduction ram for use in cold-working the enlarged shank portion on the blank precursor;
- FIG. 21 is a schematic side view of the intermediarily-formed blank precursor installed within the final reduction die prior to the application of an axial compression force to the flush head by the reduction ram;
- FIG. 22 is a schematic side view of the reduction ram in contact with the final reduction die after application of the axial compression force and the reduction in the size of the enlarged shank portion to form a cold-worked head section and cold-worked shank section of a flush head one-piece fastener;
- FIG. 23 is a schematic side view of the final configuration of the flush head, one-piece fastener having the cold-worked head and shank sections formed thereon as a result of the application of the axial compression force;
- FIG. 24 is a perspective view of a blank precursor that may be formed into a protruding head, one-piece fastener having the cold-worked head and shank sections as shown in the sequence of operations illustrated in FIGS. 25-32 ;
- FIG. 25 is a schematic side view of a forming die and a forming ram for use in cold-working the protruding head and forming the enlarged shank portion on the blank precursor;
- FIG. 26 is a schematic side view of the blank precursor installed in the forming die prior to the application of an axial compression force to the blank precursor by the forming ram;
- FIG. 27 is a schematic side view of the forming ram in contact with the forming die after application of the axial compression force and illustrating a portion of the blank precursor assuming a shape substantially corresponding to a shape of the forming die and forming ram to form the cold-worked head section and the enlarged shank portion of the blank precursor;
- FIG. 28 is a schematic side view of an intermediarily-formed blank precursor having an enlarged shank portion formed thereon as a result of the application of the axial compression force;
- FIG. 29 is a schematic side view of a final reduction die and reduction ram for use in cold-working the enlarged shank portion on the intermediarily-formed blank precursor;
- FIG. 30 is a schematic side view of the intermediarily-formed blank precursor installed within the final reduction die prior to the application of an axial compression force to the protruding head by the reduction ram;
- FIG. 31 is a schematic side view of the reduction ram in contact with the final reduction die after application of the axial compression force and the reduction in the size of the enlarged shank portion to form the cold-worked shank section of a protruding head, one-piece fastener;
- FIG. 32 is a schematic side view of the final configuration of the protruding head, one-piece fastener having the cold-worked head and shank sections formed thereon as a result of the application of the axial compression force;
- FIG. 33 is a perspective illustration of a semi-tubular blank precursor and an insert tool as may be implemented for stabilizing a tubular cavity of the blank precursor during the forming of the blank precursor into a final configuration of a one-piece fastener in a sequence of operations similar to the sequence illustrated in FIGS. 2-9 ;
- FIG. 34 is a schematic side view of the semi-tubular blank precursor installed in the forming die and the insert positioned below the tubular cavity of the blank precursor;
- FIG. 35 is a schematic side view of the semi-tubular blank precursor installed in the forming die and the insert installed in the tubular cavity prior to the application of the axial compression force to the semi-tubular blank precursor;
- FIG. 36 is a flow chart illustrating one or more operations that may be included in a method of forming a one-piece fastener having the cold-worked head and shank sections and including one or more optional heat treatment steps and the application of an organic coating to the one-piece fastener.
- FIG. 1 is schematic view of an embodiment of a fastener 200 formed in a one-piece fastener configuration.
- the one-piece fastener 200 e.g., rivet
- the shank 206 extends from the head 203 and terminates at a tail end portion 210 .
- the head 203 is cold-worked and comprises a cold-worked head section 204 of the one-piece fastener 200 .
- the shank 206 has a ductile shank section 214 and a cold-worked shank section 212 .
- the cold-worked shank section 212 is also cold-worked and may be located adjacent to the cold-worked head section 204 of the one-piece fastener 200 .
- the ductile shank section 214 may extend from the cold-worked shank section 212 to the tail end portion 210 of the shank 206 .
- the shank 206 may be formed with a substantially constant shank diameter 208 along the length of the shank 206 , the shank 206 may be intermediarily formed in two or more different diameters (not shown) at different locations along the shank 206 .
- the one-piece fastener 200 may be provided in any one of a variety of configurations, without limitation, and is not limited to a rivet configuration. Even further, the fastener 200 is not limited for use as a one-piece fastener 200 .
- the fastener 200 and its associated forming steps may be applied to and implemented in a multi-piece fastener system, such as in a two-piece fastener system to achieve similar advantageous benefits.
- the cold-worked head section 204 and the cold-worked shank section 212 of the fastener 200 have a higher strength than the ductile shank section 214 due to the resulting effects of a cold-working process that may be applied to the head 203 and to a portion of the shank 206 as described in greater detail below.
- the cold-worked head section 204 and the cold-worked shank section 212 may have a shear strength that is higher than the shear strength of the ductile shank section 214 .
- the cold-worked head section 204 and the cold-worked shank section 212 may have an ultimate shear strength of at least 95 ksi and, more preferably, an ultimate shear strength of at least 100 ksi.
- the fastener 200 may also have a relatively high tension-carrying capability relative to conventional fasteners due to the process of cold-working the head section 204 and the shank section 212 as described in greater detail below.
- the locally increased strength levels in the cold-worked head section 204 and the cold-worked shank section 212 may be achieved without thermal treatment of the fastener 200 .
- the relatively high strength levels in the cold-worked head section 204 and the cold-worked shank section 212 may also be due in part to the use of fastener material having a relatively small average grain size as described below.
- the relatively small average grain size may be achieved through the use of cryo-milling, equal-angle-extrusion, or other grain size reduction processes.
- the use of reduced grain size in the fastener 200 such as cryo-milled titanium or titanium-alloy materials results in improved strength, improved formability, and increased elevated temperature stability relative to conventional, titanium or titanium-alloy materials.
- the improved mechanical properties provided by material having relatively small grain size such as reduced, ultra-fine grain material may be achieved without the need for subsequent thermal treatments.
- the addition of cold-working the fastener 200 as disclosed herein results in the cold-worked head section 204 and cold-worked shank section 212 .
- the combination of the cold-worked head section 204 and cold-worked shank section 212 with the relatively high mechanical properties provided by relatively small grain size material, such as that of cryo-milled ultra-fine grain material results in a one-piece fastener 200 having tension and clamp-up capabilities similar to the tension and clamp-up capabilities provided by conventional two-piece fasteners.
- the ability to use a simple one-piece fastener 200 in place of conventional two-piece fasteners simplifies the fastener installation process, which results in lower fastener installation costs.
- the one-piece fastener 200 disclosed herein may have a lower weight (e.g., 30 percent lower) than that of a two-piece fastener having comparable mechanical properties.
- the ductile shank section 214 may advantageously have a level of ductility that is higher than the level of ductility of the cold-worked head section 204 and the cold-worked shank section 212 .
- the high level of ductility of the ductile shank section 214 may facilitate the adequate deformation or upsetting of the tail end portion 210 of the fastener 200 during fastener installation (e.g., a riveting or upsetting operation) as described below.
- the high level of ductility of the ductile shank section 214 may be substantially similar to the high level of ductility of the blank precursor 12 from which the fastener 200 may be formed.
- the high level of ductility of the ductile shank section 214 relative to the ductility of the cold-worked head section 204 and cold-worked shank section 212 may be a result of locally limiting the cold-working of the fastener 200 to the cold-worked head section 204 and cold-worked shank section 212 and avoiding any cold-working of the remainder (i.e., the ductile shank section 214 ) of the shank 206 .
- the ductile shank section 214 may have ductility values that facilitate adequately deforming the tail end portion 210 of the fastener 200 without failure or other unacceptable conditions.
- the ductile shank section 214 may have ductility values of at least approximately 10 percent elongation along a longitudinal axis of the fastener 200 prior to fracturing or failure of the shank 206 .
- the ductile shank section 214 may also have a ductility level represented by a reduction in cross-sectional area of at least approximately 30 percent prior to fracturing or failure of the shank 206 .
- the relatively high level of ductility of the ductile shank section 214 may be the result of the relatively small grain size of the material from which the fastener 200 (i.e., the blank precursor 12 ) may be formed.
- the fastener 200 may be formed from an ultra-fine grain material having a relatively small average grain size.
- the fastener 200 may be formed from material having an average grain size of less than approximately 10,000 nanometers (nm) (i.e., less than approximately 10 microns).
- nm nanometers
- Such ultra-fine grain material may be produced by a friction stir process and/or by equal-angle-extrusion (EAE), or other process.
- the fastener 200 may be formed from material having an average grain size of less than approximately 500 nanometers (nm) and, more preferably, an average grain size of less than approximately 300 nanometers.
- the material may have an average grain size of from approximately 100 nanometers to 300 nanometers.
- the material for forming the fastener 200 is not limited to material having an average grain size of less than approximately 10,000 nanometers, but may be formed from any material having any grain size.
- the fastener 200 may be formed of material having course grain material described as having an average grain size of greater than approximately 100,000 nanometers.
- the fastener 200 material may also be formed of material that may described as fine grain material having an average grain size of less than approximately 100,000 nanometers such as between approximately 50,000 to 75,000 nanometers.
- the material for the blank precursor 12 may be formed using a friction stir process (not shown).
- the friction stir process may use coarse-grained (e.g., average grain size of greater than approximately 100,000 nm) metallic material, such as titanium or titanium-alloy material.
- the coarse-grained metallic material may be processed using a stirring chamber (not shown) and a stirring tool (not shown).
- the temperature of the coarse-grained material may be increased as the coarse-grained material is passed through the stirring chamber where the stirring tool stirs the material and using severe mechanical deformation to reduce grain size and improve the homogeneity or uniformity of the microstructure of the material.
- the material may consolidate upon exiting the stirring chamber resulting in a relatively highly homogeneous material having an ultra-fine grain microstructure.
- the grain size of the material from which the blank precursor 12 is formed may be reduced with an equal-angle-extrusion (EAE) process (not shown) wherein the material may be forced through a die having approximately a ninety-degree bend.
- EAE equal-angle-extrusion
- the forcing of the material through the ninety-degree bend results in the mechanical, cold-working of the material.
- the mechanical, cold-working of the material may reduce the average grain size of the material.
- the grain size of the material may also be produced using a cryo-milling process wherein a ball-type, attritor device (not shown) may be used to reduce the size of the microstructure of the material.
- Material may be attrited into a relatively fine grain powder slurry through severe mechanical deformation using the ball-type attritor device.
- the material may be attrited in liquid hydrogen or nitrogen or other cooling medium.
- the ultra-fine grain powder material may be consolidated using a hot isostatic pressing (HIP) process or other consolidating processes. The process may result in a material having an ultra-fine, submicron grain microstructure.
- HIP hot isostatic pressing
- titanium and/or titanium-alloy powder may be produced in a cryo-milling process wherein titanium and/or titanium-alloy powder may be blended with other alloy elements in pre-determined amounts or percentages and subjected to the cryo-milling process.
- the metallic-alloy powder mixture may be milled with attritor-type ball-milling equipment using stainless steel balls in a slurry of liquid nitrogen, argon, hydrogen, or other environment.
- the chemical composition of the metallic-alloy powder mixture may be altered.
- very fine oxides or nitride phases may be produced as a result of the nitrogen, argon, oxygen, or other gas atmosphere of the cryo-milling process.
- the fine oxides and nitride phases may improve the temperature stability of the resulting submicron, ultra-fine grain size material.
- an improved high-strength, stable, ultra-fine grain size powder may be produced.
- the titanium powder may be degassed and consolidated such as by using a hot isostatic process (HIP), a Ceracon-type forging process, or other consolidation process to provide titanium or titanium-alloy material having an ultra-fine grain microstructure with a high level of homogeneity.
- HIP hot isostatic process
- Ceracon-type forging process or other consolidation process to provide titanium or titanium-alloy material having an ultra-fine grain microstructure with a high level of homogeneity.
- the fastener 200 i.e., blank precursor 12
- the fastener 200 may be provided in any material composition including, but not limited to, aluminum, aluminum-alloy, steel, steel-alloy such as stainless steel, and any one of a variety of other material compositions, without limitation.
- Such material compositions may preferably have a relatively small average grain size as described above.
- the cold-worked head section 204 and the cold-worked shank section 212 of the fastener 200 may be formed by a cold-working process wherein a blank precursor 12 ( FIG. 15 ) of the fastener 200 may be cold-worked.
- the cold-working process may comprise cold-working the blank precursor 12 to form the cold-worked head section 204 and simultaneously form an enlarged shank portion 32 ( FIG. 19 ) of an intermediarily-formed blank precursor 13 ( FIG. 19 ).
- the cold-working process may further comprise locally reducing a cross-sectional area of the enlarged shank portion 32 to form the cold-worked shank section 212 of the fastener 200 as described in greater detail below.
- the cross-sectional area of the enlarged shank portion 32 may be reduced by approximately 2 to 5 percent as described in greater detail below.
- the cold-working process may comprise reducing the cross-sectional area of the enlarged shank portion 32 by less than approximately 2 percent or by more than approximately 5 percent.
- the cold-working process may comprise reducing the cross-sectional area of the enlarged shank portion 32 by approximately 3.5 percent.
- the enlarged shank diameter 34 of the intermediarily-formed blank precursor 13 ( FIG. 19 ) may be cold-work-reduced to the approximate diameter of the final shank diameter 208 of the fastener 200 .
- the fastener 200 shear strength and tension strength in or adjacent to the cold-worked head section 204 and the cold-worked shank section 212 may be locally increased relative to the strength in the ductile shank section 214 ( FIG. 1 ).
- the ductile shank section 214 of the shank 206 i.e., the remainder of the shank 206 ) retains the relatively high level of ductility, formability, and durability that is a result of the relatively small grain size (e.g., ultra-fine grain size) of the material.
- the high level of ductility in the ductile shank section 214 improves fastener 200 installation by providing improved drivability or upsetting of the tail end portion 210 of the rivet through improved elongation, which improves clamp-up subsequently achieved between two or more components 252 , 254 ( FIG. 2 ) that may be fastened together by the fastener 200 .
- the relatively high strength levels of the cold-worked head section 204 and the cold-worked shank section 212 may advantageously be achieved without a thermal treatment process (e.g., annealing, artificial aging, etc.) which may significantly reduce fastener 200 fabrication cost and fastener 200 fabrication time.
- one or more thermal treatments may be included in the process of forming the fastener 200 to enhance or stabilize the cold-worked head section 204 and the cold-worked shank section 212 of the fastener 200 and/or to further improve the mechanical properties of the fastener 200 such as increasing the shear strength of the cold-worked head section 204 and the cold-worked shank section 212 .
- Additional improvements in the performance of the fastener 200 may be achieved by applying a corrosion-inhibiting organic coating 202 ( FIG. 1 ) to the fastener 200 .
- the coating 202 may improve the lubricity of the fastener 200 which may aid in the installation of the fastener 200 .
- the improved lubricity provided by the coating 202 may also avoid the complexity, time, and expense associated with wet-installation of fasteners.
- the coating 202 may also provide enhanced corrosion protection for the fastener 200 against environmental (e.g., moisture) corrosion, galvanic corrosion, and/or stress corrosion.
- the coating 202 may comprise a curable corrosion-resistant, organic coating material that may be applied in solution to the fastener 200 at any time before, during, and/or after the forming of the fastener 200 described below.
- the coating 202 may comprise a phenolic resin that may be mixed with one or more plasticizers.
- the coating 202 may also include organic components such as polytetrafluoroethylene.
- Inorganic additives may also be included such as aluminum powder and/or strontium chromate. Such coating components and additives may be dissolved in a solvent to facilitate application of the coating 202 .
- the solvent may comprise ethanol, toluene, methyl ethyl ketone (MEK), and/or other solvents.
- the coating 202 may be provided in a solution having approximately 30 percent by weight ethanol, approximately 7 percent by weight toluene, and approximately 45 percent by weight methyl ethyl ketone (MEK) as the solvent, and approximately 2 percent by weight strontium chromate, approximately 2 percent by weight aluminum powder.
- the remainder of the coating composition may comprise phenolic resin and plasticizer as the coating material and a relatively small amount of polytetrafluoroethylene may be included.
- the coating 202 may be commercially available as Hi-KoteTM 1 from The Hi-Shear Corporation, Torrance, Calif., a division of Lisi Aerospace.
- the coating 202 may be applied to the fastener 200 ( FIG. 1 ) by any one of a variety of different methods such as by spraying, dipping, brushing, or by other methods and cured at various elevated temperatures depending upon time. As indicated above, the coating 202 ( FIG. 1 ) may reduce or eliminate the need for lubrication or wet sealants when installing the fastener 200 . The coating 202 may also provide sealing of the fastener 200 to the structure 250 ( FIG. 2 ). In addition, the coating 202 may provide increased adherence of paint or other coatings that may be subsequently applied to the fastener 200 as installed or to the fastener 200 heads 204 prior to installation in a structure 250 .
- FIGS. 2-7 shown are several of a wide variety of various embodiments of the fastener 200 that may be formed by the cold-working process disclosed herein and which may be installed in a structure 250 .
- FIG. 2 illustrates a flush shear head fastener 220 installed in a structure 250 for fastening a first component 252 of the structure 250 to a second component 254 .
- the flush shear head fastener 220 has a cold-worked head section 220 d and a cold-worked shank section 220 a that extends to the ductile shank section 220 b of the fastener 220 .
- the cold-worked head section 220 d and the cold-worked shank section 220 a provide enhanced shear strength to the flush shear head fastener 220 .
- the tail end portion 220 c of the flush shear head fastener 220 is included in the ductile shank section 220 b of the flush shear head fastener 220 .
- the tail end portion 220 c of the flush shear head fastener 220 is adequately deformed or upset against the surface 256 of one of the components 252 , 254 .
- FIG. 3 illustrates a flush tension head fastener 222 installed in a structure 250 .
- the cold-worked head section 222 d of the flush tension head fastener 222 has a larger size than the cold-worked head section 220 d of the flush shear head fastener 220 .
- the larger size of the cold-worked head section 222 d in the flush tension head fastener 222 reduces the length of the cold-worked shank section 222 a of the flush tension head fastener 222 relative to the length of the cold-worked shank section 220 a of the flush shear head fastener 220 shown in FIG. 2 .
- the larger size of the cold-worked head section 222 d provides increased tension load-carrying capability to the fastener 222 relative to the tension load-carrying capacity of conventional fasteners and is due to the cold-working that is imparted to the cold-worked head section 222 d during the process of forming the cold-worked head section 222 d as described below.
- the tail end portion 222 c of the fastener 222 comprises the ductile shank section 222 b , and is upset against the structure 250 during installation.
- FIG. 4-5 illustrate protruding head fasteners 224 .
- FIG. 4 illustrates a protruding shear head fastener 226 installed in a structure 250 .
- the protruding shear head fastener 226 is shown having a cold-worked head section 226 d and a cold-worked shank section 226 a having a length that is substantially similar to the length 260 ( FIG. 9 ) of the hole 258 or the thickness of the first and second components 252 , 254 and which may maximize the shear load-carrying capability of the fastener 224 .
- the ductile shank section 226 b of the fastener 226 comprises the tail end portion 226 c shown upset against the surface 256 of one of the components 252 , 254 .
- FIG. 5 illustrates a protruding tension head fastener 228 installed in a structure 250 , which also has a cold-worked head section 228 d and a cold-worked shank section 228 a having a length that is substantially similar to the thickness of the structure 250 .
- the cold-worked head section 228 d of the protruding tension head fastener 228 in FIG. 5 is larger than the cold-worked head section 226 d of the protruding shear head fastener 226 in FIG. 4 which results in an increased tension load-carrying capability.
- the ductile shank section 228 b of the fastener 228 comprises the tail end portion 228 c, which is shown upset against the surface 256 of one of the components 252 , 254 .
- FIGS. 6-7 illustrates a semi-tubular fastener 230 installed in a structure 250 .
- FIG. 6 illustrates the semi-tubular fastener 230 prior to upsetting the tail end portion 230 c of the semi-tubular fastener 230 .
- the semi-tubular fastener 230 is shown having a cold-worked head section 230 d and a cold-worked shank section 230 a having a length that is substantially similar to the thickness of the first and second components 252 , 254 .
- FIG. 7 illustrates the semi-tubular fastener 230 after upsetting the tail end portion 230 c .
- the semi-tubular fastener 230 has a generally hollow tubular cavity 230 d to reduce the amount of force required to upset the tail end portion 230 c of the fastener 230 .
- the ductile shank section 230 b of the semi-tubular fastener 230 comprises the tail end portion 230 c , which is shown upset against the surface 256 of one of the components 252 , 254 .
- the relatively small grain size of the material of the fastener 230 further reduces the amount of force required to upset the tail end portion 230 c relative to conventional, one-piece fasteners having a relatively large grain size.
- FIGS. 2-7 illustrate several of a wide variety of various embodiments of the fastener 200 that may be formed by the cold-working process disclosed herein.
- FIG. 8 shown in FIG. 8 is a flow chart illustrating an embodiment of a method 300 of installing a fastener 200 ( FIG. 9 ) in a structure 250 ( FIG. 9 ) wherein the fastener 200 has a cold-worked head section 204 ( FIG. 9 ) and a cold-worked shank section 212 ( FIG. 9 ) and a ductile shank section 214 ( FIG. 9 ).
- Step 302 of the method 300 of FIG. 8 includes providing the fastener 200 .
- the fastener 200 comprises a flush head fastener 220 as described above.
- the structure 250 comprises a first component 252 and a second component 254 .
- the first component 252 has a countersink 262 that may be formed complementary to the flush head fastener 220 .
- the shank 206 includes the cold-worked shank section 212 located adjacent to the cold-worked head section 204 and further includes the ductile shank section 214 extending from the cold-worked head section 204 and the cold-worked shank section 212 to the tail end portion 210 .
- the cold-worked head section 204 and cold-worked shank section 212 may have a higher strength than the ductile shank section 214 .
- the cold-worked head section 204 and cold-worked shank section 212 may have a shear strength that is higher than the shear strength of the ductile shank section 214 .
- the ductile shank section 214 may have a higher level of ductility than the cold-worked head section 204 and cold-worked shank section 212 .
- Step 304 of the method 300 of FIG. 8 may include installing the fastener 200 in the hole 258 formed in the structure 250 as shown in FIG. 10 .
- the cold-worked head section 204 and cold-worked shank section 212 may have a length that is substantially equivalent to the length 260 ( FIG. 9 ) of the hole 258 when the head is seated against the structure 250 . In this manner, the shear load-carrying capability of the fastener 200 is maximized.
- FIG. 10 further illustrates a tool 272 such as a rivet gun disposed against the head of the fastener 200 and a bucking bar 270 disposed against the tail end portion 210 of the fastener 200 .
- the tail end portion 210 is shown in a pre-upset condition 264 prior to application of an upsetting force 274 on the fastener 200 by the tool 272 and the bucking bar 270 .
- Step 306 of the method 300 of FIG. 8 may include upsetting the tail end portion 210 of the fastener 200 by applying the upsetting force 274 to the fastener 200 .
- the upsetting force 274 may be applied by a series of impacts provided by the rivet gun. The impacts are preferably of a magnitude causing successively increasing plastic deformation of the tail end portion 210 against the surface 256 of the structure 250 , which is illustrated in the intermediate upset condition 266 in FIG. 11 .
- 10-12 illustrates the upsetting of the tail end portion 210 being performed by a tool 272 , such as a rivet gun and a bucking bar 270 , any device, mechanism, or process may be used to upset the tail end portion 210 including, but not limited to, a rivet compression tool, a rivet crimping tool, or other manual or automated tools or devices.
- a tool 272 such as a rivet gun and a bucking bar 270
- any device, mechanism, or process may be used to upset the tail end portion 210 including, but not limited to, a rivet compression tool, a rivet crimping tool, or other manual or automated tools or devices.
- FIG. 12 shown is the tail end portion 210 of the fastener 200 deformed into the final post-upset condition 268 .
- the relatively high level of ductility in the ductile shank section 214 reduces the amount of force required to upset the tail end portion 210 , which may correspond to a reduction in the amount of rework needed or time required to install the fastener 200 .
- FIG. 13 illustrates the final installation of the fastener 200 with the tool (e.g., rivet gun) and the bucking bar 270 removed.
- the tool e.g., rivet gun
- FIG. 14 shown in FIG. 14 is a flow chart illustrating an embodiment of a method 400 of forming a fastener 200 having a cold-worked head section 204 and cold-worked shank section 212 and a ductile shank section 214 .
- the cold-worked head section 204 and cold-worked shank section 212 may be formed using a system 10 which may include dies 50 , 50 a , 100 , 100 a and rams 80 , 130 as shown in FIGS. 16 , 20 , 25 and 29 and described below.
- the method 400 of forming the fastener 200 is described in the context of a forming a flush head fastener 218 as illustrated in FIGS. 15-23 and in the context of forming a protruding head fastener 224 as illustrated in FIGS. 24-32 .
- Step 402 of the method 400 of FIG. 14 may include providing a blank precursor 12 having opposing first and second ends 14 , 16 as shown in FIGS. 15 and 24 .
- the blank precursor 12 may be provided as a rod or generally elongated cylindrical member. Although shown as having a generally solid 18 configuration, the blank precursor 12 may optionally be provided as a semi-tubular blank precursor 20 having a tubular cavity 22 extending at least partially into the blank precursor 12 as shown in FIG. 33 and described in greater detail below.
- the blank precursor 12 may have a generally constant nominal shank diameter 30 ( FIG. 15 ) extending along the length of the blank precursor 12 . However, the blank precursor 12 may be provided with a shank diameter 208 that may vary along the length of the blank precursor 12 .
- the blank precursor 12 in FIGS. 15 and 24 may advantageously be formed of a material having a relatively small average grain size as described above.
- the blank precursor 12 may be formed of titanium material or titanium-alloy material having an ultra-fine grain such as an average grain size of less than approximately 10,000 nanometers or, more preferably, an average grain size of less than approximately 300 nanometers such as between approximately 100 to 300 nanometers.
- the blank precursor 12 may be formed of material having relatively course grain size (e.g., greater than approximately 100,000 nanometers) or a material have a fine grain size (e.g., less than approximately 100,000 nanometers).
- the material may also optionally comprise any metallic material including, but not limited to, aluminum, aluminum-alloy, steel, steel-alloy, stainless steel, and titanium or titanium-alloy materials.
- a forming die 50 and a forming ram 80 of the system 10 may be provided for providing the blank precursor 12 with a countersunk head 36 for forming a flush head fastener 218 ( FIGS. 1-3 ).
- the forming die 50 may have opposing first and second ends 52 , 54 .
- the forming die 50 may include a forming die cavity 58 having a forming die countersink 60 for forming a corresponding countersink head 36 ( FIG. 19 ) on the blank precursor 12 .
- FIG. 25 illustrates a forming die 50 a and a forming ram 80 for forming a protruding head 38 ( FIG. 28 ) on the blank precursor 12 .
- the forming die 50 a may have opposing first and second ends 52 a, 54 a. As shown in FIG. 25 , the forming die 50 a may include a forming die cavity 58 a, which may be devoid of a countersink 60 such that the forming die 50 a may be used for forming a protruding head fastener 224 ( FIGS. 4-7 ).
- the forming die 50 , 50 a and forming ram 80 may be formed of a relatively high-strength material that may be compatible with the material composition of the blank precursor 12 .
- the forming die 50 , 50 a may have a forming die cavity 58 , 58 a.
- the forming die cavity 58 , 58 a may comprise a bore 62 , 62 a that may be formed in the forming die 50 , 50 a .
- the bore 62 , 62 a may include a nominal bore portion 64 , 64 a ( FIGS.
- the nominal bore portion 64 , 64 a may transition to the enlarged bore portion 68 , 68 a via an enlarged bore countersink 72 , 72 a.
- the enlarged bore portion 68 , 68 a may be concentric with the nominal bore portion 64 , 64 a and may be open on one end of the forming die 50 , 50 a .
- the nominal bore portion 64 , 64 a may open to an end of the forming die 50 , 50 a opposite the end of the enlarged bore portion 68 , 68 a.
- the nominal bore portion 64 , 64 a may terminate inside the forming die 50 , 50 a and does not necessarily extend to an end of the forming die 50 , 50 a .
- the nominal bore portion 64 , 64 a of the forming die 50 , 50 a may have a nominal bore diameter 66 , 66 a that may substantially correspond to or is approximately equivalent to the nominal shank diameter 30 ( FIG. 15 ) of the blank precursor 12 ( FIG. 15 ).
- the nominal shank diameter 30 of the blank precursor 12 may be approximately equivalent to the final shank diameter 208 ( FIGS. 23 and 32 ) of the fastener 200 ( FIGS. 23 and 32 ) in the cold-worked shank section 212 ( FIGS. 23 and 32 ) and in the ductile shank section 214 ( FIGS. 23 and 32 ).
- the forming ram 80 shown in FIGS. 16 and 25 may have a ram cavity 82 configured to receive the end of the blank precursor 12 ( FIGS. 17 and 26 ).
- the ram cavity 82 may be concave as shown or the ram cavity 82 may be provided with an alternative shape.
- the forming ram 80 may have a surface 84 configured to contact a mating surface 56 , 56 a of the forming die 50 , 50 a .
- the forming die 50 , 50 a and forming ram 80 may be provided with alternative mating geometery and are not limited to surfaces configured to contact one another.
- the forming die 50 , 50 a and forming ram 80 may be configured to form the blank precursor 12 without contacting one another.
- Step 404 of the method 400 of FIG. 14 may include inserting the blank precursor 12 ( FIGS. 17 and 26 ) into the nominal bore portion 64 , 64 a ( FIGS. 17 and 26 ) of the forming die 50 , 50 a as shown in FIGS. 17 and 26 .
- the forming die 50 , 50 a may be supported on a backing device 88 .
- the blank precursor 12 may have a length such that when the blank precursor 12 is inserted into the nominal bore portion 64 , 64 a and the blank precursor 12 contacts the backing device 88 ( FIGS. 17 and 26 ), the blank precursor 12 protrudes from the enlarged bore portion 68 , 68 a ( FIGS. 17 and 26 ) of the forming die 50 , 50 a.
- Step 406 of the method 400 of FIG. 14 may include applying an axial compression force 86 to the blank precursor 12 as shown in FIGS. 17 and 26 .
- the forming ram 80 may apply the axial compression force 86 to the portion of the blank precursor 12 protruding from the forming.
- the blank precursor 12 may be supported by the backing device 88 during the application of the axial compression force 86 .
- Step 408 of the method 400 of FIG. 14 may include contacting the forming ram 80 with the forming die 50 , 50 a and causing a portion of the blank precursor 12 to substantially fill the ram cavity 82 and the enlarged bore portion 68 , 68 a as shown in FIGS. 18 and 27 .
- the application of the axial compression force 86 FIGS. 17
- the portion of the blank precursor 12 may assume a shape substantially corresponding to the combined shape of the ram cavity 82 and the enlarged bore portion 68 , 68 a ( FIG. 18 ).
- Step 410 of the method 400 of FIG. 14 may include forming a head 40 and an enlarged shank portion 32 on the intermediarily-formed blank precursor 13 as shown in FIGS. 19 and 28 in response to applying the axial compression force 86 ( FIGS. 18 and 27 ) to the intermediarily-formed blank precursor 13 .
- the intermediarily-formed blank precursor 13 may include the enlarged shank portion 32 located adjacent to the cold-worked head section 204 with the nominal shank portion 28 extending from the enlarged shank portion 32 .
- the nominal shank portion 28 may be approximately equivalent to the original diameter of the cylindrical blank precursor 12 illustrated in FIG. 15 .
- FIGS. 20 and 29 shown is a final reduction die 100 , 100 a and a reduction ram 130 for forming the intermediarily-formed blank precursor 13 ( FIGS. 19 and 28 ) into a fastener 200 ( FIG. 23 ) having a cold-worked head section 204 and cold-worked shank section 212 ( FIGS. 23 and 32 ).
- the reduction ram 130 ( FIG. 20 ) may have opposing first and second ends 102 , 102 a, 104 , 104 a and may include a final reduction die cavity 108 , 108 a having a bore 112 , 112 a extending completely or partially through the final reduction die 100 , 100 a .
- the reduction ram 130 may have a surface 134 configured to contact a mating surface 106 , 106 a of the final reduction die 100 , 100 a .
- the reduction ram 130 may have a ram cavity 132 which may be formed complementary to the shape of the ram cavity 82 ( FIGS. 16 and 25 ) of the forming ram 80 ( FIGS. 16 and 25 ).
- the reduction ram 130 may be configured to receive the end of the intermediarily-formed blank precursor 13 .
- the final reduction die 100 ( FIG. 20 ) may include a final reduction die countersink 110 ( FIG. 20 ) corresponding to the forming die countersink 60 ( FIG. 16 ) formed in the forming die 50 ( FIG. 16 ).
- the bore 112 , 112 a in each one of the final reduction dies 100 , 100 a shown in FIGS. 20 and 29 may have a bore diameter 114 , 114 a that may be substantially equivalent to the nominal shank diameter 30 of the nominal shank portion 28 of the blank precursor 12 illustrated in FIGS. 15 and 24 .
- the reduction ram 130 in FIGS. 20 and 29 may be configured substantially similar to the forming ram 80 illustrated in FIGS. 17 and 26 and described above.
- Step 412 of the method 400 of FIG. 14 may include inserting the nominal shank portion 28 of the intermediarily-formed blank precursor 13 into the bore 112 , 112 a of the final reduction die 100 , 100 a as shown in FIGS. 21 and 30 .
- the final reduction die 100 , 100 a may be supported on a backing device 138 ( FIGS. 22 and 31 ).
- the enlarged shank portion 32 may have an enlarged shank diameter 34 ( FIGS. 19 and 28 ) that may be larger than the diameter 114 , 114 a of the final reduction die bore 112 , 112 a.
- the enlarged shank portion 32 may be disposed above the bore 112 , 112 a of the final reduction die 100 , 100 a .
- the intermediarily-formed blank precursor 13 may include a tapered transition between the nominal shank portion 28 and the enlarged shank portion 32 to facilitate entry of the enlarged shank portion 32 into the bore 112 , 112 a of the final reduction die 100 , 100 a as described below.
- Step 414 of the method 400 of FIG. 14 may include applying an axial compression force 136 to the intermediarily-formed blank precursor 13 as shown in FIGS. 22 and 31 .
- the final reduction die 100 , 100 a shown in each of FIGS. 22 and 31 may optionally be supported on the backing device 88 ( FIGS. 22 and 31 ) during the application of the axial compression force 136 .
- the reduction ram 130 may apply the axial compression force 136 to the head 40 of the intermediarily-formed blank precursor 13 .
- Step 416 of the method 400 of FIG. 14 may include urging or forcing the enlarged shank portion 32 into the bore 112 , 112 a of the final reduction die 100 , 100 a as shown in FIGS. 22 and 31 .
- the axial compression force 136 may be applied to the intermediarily-formed blank precursor 13 until the reduction ram 130 contacts the final reduction die 100 , 100 a.
- Step 418 of the method 400 of FIG. 14 may include forming the cold-worked shank section 212 by reducing the cross-sectional area of the enlarged shank portion 32 to the cross-sectional area of the final reduction die bore 112 , 112 a as shown in FIGS. 22 and 31 .
- the method may include reducing the diameter of the enlarged shank portion 32 of the intermediarily-formed blank precursor 13 to the diameter 114 , 114 a of the final reduction die bore 112 , 112 a in response to forcing the enlarged shank portion 32 into the final reduction die bore 112 , 112 a.
- Step 418 may comprise forming the intermediarily-formed blank precursor 13 of FIGS. 22 and 31 into a fastener 200 ( FIGS.
- the intermediarily-formed blank precursor 13 may be formed into a flush head fastener 218 in FIG. 23 . Alternatively, the intermediarily-formed blank precursor 13 may be formed into a protruding head fastener 200 in FIG. 32 .
- FIGS. 33-35 shown are the preliminary steps for forming a semi-tubular blank precursor 20 into a semi-tubular fastener 200 ( FIG. 6 ).
- FIG. 33 illustrates a semi-tubular blank precursor 20 having a generally hollow tubular cavity 22 extending at least partially into an end of the blank precursor 12 .
- An insert tool 24 having a shaft formed complementary to the hollow tubular cavity 22 may be provided for stabilizing the semi-tubular blank precursor 20 .
- the insert tool 24 may stabilize the hollow tubular cavity 22 of the semi-tubular blank precursor 20 against collapse or deformation during the process of forming the semi-tubular blank precursor 20 into a semi-tubular fastener 200 having a cold-worked head section 204 and a cold-worked shank section 212 ( FIG. 6 ).
- FIG. 34 shows the semi-tubular blank precursor 20 installed in the forming die 50 and the insert tool 24 positioned below the tubular cavity 22 of the semi-tubular blank precursor 20 .
- the insert tool 24 may optionally include a boss 26 from which the insert tool 24 may extend.
- the boss 26 may be provided for handling the insert tool 24 .
- FIG. 35 shows the blank precursor 12 installed in the forming die 50 and the insert tool 24 installed in the tubular cavity 22 prior to the application of the axial compression force 86 to the blank precursor 12 .
- the insert tool 24 may be mechanically retained in position during the application of the axial compression force 86 to the blank precursor 12 to stabilize the hollow tubular cavity 22 when forming the semi-tubular blank precursor 20 ( FIG. 33 ) into a semi-tubular fastener 200 ( FIG. 6 ) having a cold-worked head section 204 and cold-worked shank section 212 ( FIG. 6 ).
- the method 500 may include one or more of the steps described above with regard to forming a blank precursor 12 ( FIG. 15 ) into a fastener 200 and may include additional steps for improving the performance and strength properties of the fastener 200 .
- Step 502 of the method 500 of FIG. 36 may include providing a blank precursor 12 ( FIG. 15 ) having a desired grain size.
- Step 502 may comprise providing the blank precursor 12 having an ultra-fine grain material composition having a grain size of less than approximately 10,000 nanometers although larger grain size material may be used as described above.
- Step 504 of the method 500 of FIG. 36 may include forming a cold-worked head section 204 and an enlarged shank portion 32 of an intermediarily-formed blank precursor 13 ( FIG. 19 ) and which may comprise cold-working the intermediarily-formed blank precursor 13 during the forming step.
- Step 504 may comprise imparting improved strength to the cold-worked head section 204 , such as improved tension strength, due to the cold-work produced during the forming process shown in FIGS. 18 and 27 .
- Step 506 of the method 500 of FIG. 36 may comprise the optional step of annealing the intermediarily-formed blank precursor 13 ( FIG. 21 ) prior to forming the cold-worked shank section 212 ( FIG. 22 ).
- the annealing step may include heating the intermediarily-formed blank precursor 13 to a pre-determined temperature and holding the temperature for a pre-determined period of time.
- the annealing may optionally be performed to reduce or eliminate residual stress in the intermediarily-formed blank precursor 13 and/or improve one or more properties of the intermediarily-formed blank precursor 13 , such as the strength properties of the intermediarily-formed blank precursor 13 .
- Step 508 of the method 500 of FIG. 36 may include cold-working a localized area (e.g., the enlarged shank portion 32 — FIG. 19 ) of the intermediarily-formed blank precursor 13 to form a fastener 200 ( FIG. 23 ) having a cold-worked shank section 212 as described above and illustrated in FIGS. 23 and 32 .
- the cold-working process may comprise reducing the cross-sectional area of the enlarged shank portion 32 to form the cold-worked shank section 212 .
- the cold-worked head section 204 and cold-worked shank section 212 may have a higher strength than the ductile shank section 214 .
- the ductile shank section 214 may have a higher level of ductility than the cold-worked head section 204 and cold-worked shank section 212 .
- Step 510 of the method 500 of FIG. 36 may comprise the optional step of annealing the fastener 200 after forming the cold-worked head section 204 ( FIG. 23 ) and cold-worked shank section 212 ( FIG. 23 ) in the fastener 200 ( FIG. 23 ).
- the annealing step may comprise further heat-treating the fastener 200 by heating the fastener 200 to a pre-determined elevated temperature and holding at the temperature for a pre-determined period of time as a means to reduce or eliminate residual stress that may develop in the fastener 200 during the cold-working process.
- the annealing step may also improve the mechanical properties of the fastener 200 .
- Step 512 of the method 500 of FIG. 36 may include applying a corrosion-resistant coating 202 ( FIG. 23 ) to the fastener 200 ( FIG. 23 ).
- the coating 202 may comprise a curable, corrosion-resistant organic coating material.
- the coating 202 may be applied to the fastener 200 such as by spraying, brushing, or using an alternative method.
- the coating 202 material may preferably have a thickness of approximately 0.0003 to 0.0005 inch in thickness after curing although other thicknesses of the coating 202 are possible.
- Step 514 of the method 500 of FIG. 36 may include curing the applied coating material such as by increasing the temperature of the environment of the coated-fastener 200 to a pre-determined curing temperature and holding for a pre-determined period of time.
- the increase in temperature of the coating 202 may result in evaporation of the solvent from the applied coating material.
- Step 516 of the method 500 of FIG. 36 may comprise the optional step of final heat-treating the fastener 200 ( FIG. 23 ) for a pre-determined period of time at a pre-determined temperature regime to increase the fastener 200 strength properties.
- the heat-treating of the fastener 200 may be performed concurrently with the curing of the coating material to reduce total time and cost for fabricating the fastener 200 .
- Step 516 may optionally be combined with Step 514 to cure the applied material coating and thermally treat the fastener 200 .
- Step 518 of the method 500 of FIG. 36 may include installing the fastener 200 ( FIG. 23 ) in a structure 250 as described above and illustrated in FIGS. 9-13 .
- the fastener 200 may be formed as a flush head fastener 218 ( FIG. 9 ) having a cold-worked head section 204 ( FIG. 9 ) and cold-worked shank section 212 ( FIG. 9 ) having a length that is substantially equivalent to the total thickness of the structure 250 ( FIG. 9 ).
- the fastener 200 may be formed as a protruding head fastener 224 ( FIG. 4 ) having a cold-worked shank section 226 a ( FIG. 4 ) having a length that is substantially equivalent to the total thickness of the structure 250 ( FIG. 9 ).
- a protruding head fastener 224 may provide maximum shear capability to the structural joint formed by the fastener 224 installation.
- Step 520 of the method 500 of FIG. 36 may include upsetting the tail end portion 210 of the ductile shank section 214 against the structure 250 as illustrated in the sequence of steps shown in FIGS. 10-12 .
- the tail end portion 210 may be adequately deformed against a component of the structure 250 during upsetting of the tail end portion 210 .
- the high level of ductility in the ductile shank section 214 provides improved drivability or upsetting of the tail end portion 210 of the fastener 200 , which results in improved quality of fastener installations, and clamp-up of components being fastened by the fastener 200 .
- the improved clamp-up may improve the joint fatigue and tensile strength levels of a structural joint formed by the fastener 200 installation.
- the process for forming a fastener 200 with cold-worked head and shank sections 204 , 212 is described above in the context of using a set of dies (i.e., a forming die 50 and a final reduction die 100 ) to form the cold-worked head section 204 and cold-worked shank section 212 , other methods may be implemented.
- the cold-worked head and shank sections 204 , 212 may be formed by extruding, rolling, swaging, or any other operation that may impart the desired level of local cold-working (e.g., 2 to 5 percent reduction in cross-sectional area).
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Forging (AREA)
- Insertion Pins And Rivets (AREA)
- Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)
Abstract
A fastener has a cold-worked head section, a cold-worked shank section, and a ductile shank section extending from the cold-worked shank section to a tail end portion of the fastener.
Description
- The present disclosure relates generally to fasteners and, more particularly, to a system and method for preparing a one-piece fastener having a locally cold-worked section.
- Mechanical fasteners are widely used for joining two or more components of a structural assembly. For example, mechanical fasteners are used extensively for joining the structural components of an airframe. Two-piece fasteners are used in a variety of applications including applications where tension loads in the fastener are relatively high. Such two-piece fasteners may include a bolt or a pin that is inserted into a hole and a threaded nut or swage collar that may be mechanically secured to threads or other features formed on the free end of the bolt or pin. By tightening the nut or collar against the structure, the components of the structural assembly may be clamped together.
- Although two-piece fasteners generally provide relatively high clamp-up and tension load-carrying capability, two-piece fasteners suffer from several drawbacks that detract from their overall utility. For example, due to the need to fabricate, process, and store a large quantity of each component of the system that comprise two-piece fastener systems, procurement costs are relatively high. In addition, the time required for installation and assembly of two-piece fasteners in a structure is relatively high and may require separate, unique tools for the various components of the two-piece fastener configurations, which may add to production costs.
- Furthermore, the need to handle two separate pieces for each two-piece fastening system adds to the complexity of installation, which may undesirably add to the overall production time considering the relatively large quantity of fasteners (e.g., tens of thousands) that may be installed in a single airframe. Even further, two-piece fasteners may be relatively heavy due to the required size or length of the mating nut or collar to sufficiently engage the threads formed on the end of the pin or bolt to provide adequate clamp-up and tension load-carrying capabilities. Due to the high volume of fasteners utilized in a single airframe, even minor savings in weight, cost, and time associated with the fasteners can results in significant savings over the number of aircraft produced during the life of a program.
- As can be seen, there exists a need in the art for a fastener system having reduced complexity of installation and which may be installed in a reduced amount of time while providing strength characteristics that are at least equivalent to conventional two-piece fasteners.
- The above-noted needs associated with two-piece fastener systems are addressed and alleviated by the present disclosure, which, in an embodiment, provides a one-piece fastener system having a head and a shaft or shank extending from the head and terminating at a tail end portion. The shaft or shank may include a cold-worked shank section located adjacent to the head and a ductile shank section extending between the cold-worked shank section and the tail end portion.
- Also disclosed is a method of forming a one-piece fastener system. The method may include the step of providing a blank precursor having opposing ends. The blank precursor may be inserted into a bore of a forming die. The forming die may have an enlarged bore portion. The method may preferably include applying an additional axial compression force to the blank precursor and cold-working a head onto the blank precursor and forming an enlarged shaft or shank portion on the blank precursor corresponding to the enlarged bore portion of the forming die. A nominal shank portion may extend from the enlarged shank portion. The nominal shank portion may have a diameter that may be approximately equal to a final diameter of the fastener. The method may further include inserting the nominal shank portion into a bore of a final reduction die and applying an axial compression force to the enlarged shank portion. The method may additionally include urging the enlarged shank portion into the bore of the final reduction die and forming a cold-worked shank section by reducing the cross-sectional area of the enlarged shank portion such that the blank precursor is formed into a final fastener configuration.
- The present disclosure also includes a method of assembling a structure. The method may include the step of providing a one-piece fastener (e.g., a rivet) having a head and a shank terminating at a tail end portion. The head may comprise a cold-worked head section. The shank may include a cold-worked shank section and a ductile shank section extending from the cold-worked shank section to the tail end portion. The cold-worked head section and cold-worked shank section may have a higher strength than the ductile shank section. The method may additionally include installing the fastener in a hole of the structure and upsetting the tail end portion of the ductile shank section.
- The features, functions, and advantages that have been discussed can be achieved independently in various embodiments of the present disclosure or may be combined in yet other embodiments, further details of which can be seen with reference to the following description and drawings below.
- These and other features of the present disclosure will become more apparent upon reference to the drawings wherein like numerals refer to like parts throughout and wherein:
-
FIG. 1 is a schematic side view of an embodiment of a one-piece fastener having a cold-worked head section, a cold-worked shank section, and a ductile shank section extending from the cold-worked shank section to a tail end portion of the fastener; -
FIG. 2 is a schematic side view of a flush shear head, one-piece fastener installed in a structure; -
FIG. 3 is a schematic side view of a flush tension head, one-piece fastener installed in a structure; -
FIG. 4 is a schematic side view of a protruding shear head, one-piece fastener installed in a structure; -
FIG. 5 is a schematic side view of a protruding tension head, one-piece fastener installed in a structure; -
FIG. 6 is a schematic side view of a semi-tubular, one-piece fastener in a structure prior to upsetting the tail end portion of the fastener; -
FIG. 7 is a schematic side view of the semi-tubular, one-piece fastener after upsetting the tail end portion of the fastener; -
FIG. 8 is a flow chart illustrating one or more operations that may be included in a method of installing a one-piece fastener into a structure wherein the one-piece fastener has a cold-worked head section, a cold-worked shank section, and a ductile shank section; -
FIG. 9 is a schematic side view of a one-piece fastener having cold-worked head and shank sections prior to installation of the fastener in a hole extending through components of a structure; -
FIG. 10 is a schematic side view of the one-piece fastener installed in the hole and illustrating the cold-worked head and shank sections having a length that is substantially equivalent to a length of the hole and further illustrating the ductile shank section at a tail end portion of the fastener extending out of the hole in a pre-installed or pre-upset condition; -
FIG. 11 is a schematic side view of the one-piece fastener having a tool and a bucking bar disposed on opposite ends of the fastener in a pre-installed or intermediate-upset condition; -
FIG. 12 is a schematic side view of the one-piece fastener installed in the structure and illustrating the tail end portion of the fastener in a post-upset condition; -
FIG. 13 is a schematic side view of the one-piece fastener installed in the structure with the tool and bucking bar removed and illustrating the upset end of the fastener comprising the ductile shank section of the fastener; -
FIG. 14 is a flow chart illustrating one or more operations that may be included in a method of forming a one-piece fastener having a cold-worked head section and a cold-worked shank section; -
FIG. 15 is a perspective view of a blank precursor that may be formed into a flush head, one-piece fastener having the cold-worked head and shank sections as shown in the sequence of operations illustrated inFIGS. 16-23 ; -
FIG. 16 is a schematic side view of a forming die having a countersink and a forming ram for use in cold-working a flush head and forming an enlarged shank portion on the blank precursor; -
FIG. 17 is a schematic side view of the blank precursor installed within the forming die prior to the application of an axial compression force to the blank precursor by the forming ram; -
FIG. 18 is a schematic side view of the forming ram in contact with the forming die after application of the axial compression force and illustrating a portion of the blank precursor assuming a shape substantially corresponding to a shape of the forming die and forming ram to form the cold-worked head section and the enlarged shank portion of the blank precursor; -
FIG. 19 is a schematic side view of an intermediarily-formed blank precursor having an enlarged shank portion formed thereon as a result of the application of the axial compression force; -
FIG. 20 is a schematic side view of a final reduction die having a countersink and a reduction ram for use in cold-working the enlarged shank portion on the blank precursor; -
FIG. 21 is a schematic side view of the intermediarily-formed blank precursor installed within the final reduction die prior to the application of an axial compression force to the flush head by the reduction ram; -
FIG. 22 is a schematic side view of the reduction ram in contact with the final reduction die after application of the axial compression force and the reduction in the size of the enlarged shank portion to form a cold-worked head section and cold-worked shank section of a flush head one-piece fastener; -
FIG. 23 is a schematic side view of the final configuration of the flush head, one-piece fastener having the cold-worked head and shank sections formed thereon as a result of the application of the axial compression force; -
FIG. 24 is a perspective view of a blank precursor that may be formed into a protruding head, one-piece fastener having the cold-worked head and shank sections as shown in the sequence of operations illustrated inFIGS. 25-32 ; -
FIG. 25 is a schematic side view of a forming die and a forming ram for use in cold-working the protruding head and forming the enlarged shank portion on the blank precursor; -
FIG. 26 is a schematic side view of the blank precursor installed in the forming die prior to the application of an axial compression force to the blank precursor by the forming ram; -
FIG. 27 is a schematic side view of the forming ram in contact with the forming die after application of the axial compression force and illustrating a portion of the blank precursor assuming a shape substantially corresponding to a shape of the forming die and forming ram to form the cold-worked head section and the enlarged shank portion of the blank precursor; -
FIG. 28 is a schematic side view of an intermediarily-formed blank precursor having an enlarged shank portion formed thereon as a result of the application of the axial compression force; -
FIG. 29 is a schematic side view of a final reduction die and reduction ram for use in cold-working the enlarged shank portion on the intermediarily-formed blank precursor; -
FIG. 30 is a schematic side view of the intermediarily-formed blank precursor installed within the final reduction die prior to the application of an axial compression force to the protruding head by the reduction ram; -
FIG. 31 is a schematic side view of the reduction ram in contact with the final reduction die after application of the axial compression force and the reduction in the size of the enlarged shank portion to form the cold-worked shank section of a protruding head, one-piece fastener; -
FIG. 32 is a schematic side view of the final configuration of the protruding head, one-piece fastener having the cold-worked head and shank sections formed thereon as a result of the application of the axial compression force; -
FIG. 33 is a perspective illustration of a semi-tubular blank precursor and an insert tool as may be implemented for stabilizing a tubular cavity of the blank precursor during the forming of the blank precursor into a final configuration of a one-piece fastener in a sequence of operations similar to the sequence illustrated inFIGS. 2-9 ; -
FIG. 34 is a schematic side view of the semi-tubular blank precursor installed in the forming die and the insert positioned below the tubular cavity of the blank precursor; -
FIG. 35 is a schematic side view of the semi-tubular blank precursor installed in the forming die and the insert installed in the tubular cavity prior to the application of the axial compression force to the semi-tubular blank precursor; and -
FIG. 36 is a flow chart illustrating one or more operations that may be included in a method of forming a one-piece fastener having the cold-worked head and shank sections and including one or more optional heat treatment steps and the application of an organic coating to the one-piece fastener. - Referring now to the drawings wherein the showings are for purposes of illustrating preferred and various embodiments of the disclosure, shown in
FIG. 1 is schematic view of an embodiment of afastener 200 formed in a one-piece fastener configuration. The one-piece fastener 200 (e.g., rivet) has ahead 203 and a shaft orshank 206. Theshank 206 extends from thehead 203 and terminates at atail end portion 210. Thehead 203 is cold-worked and comprises a cold-workedhead section 204 of the one-piece fastener 200. Theshank 206 has aductile shank section 214 and a cold-workedshank section 212. The cold-workedshank section 212 is also cold-worked and may be located adjacent to the cold-workedhead section 204 of the one-piece fastener 200. Theductile shank section 214 may extend from the cold-workedshank section 212 to thetail end portion 210 of theshank 206. Although theshank 206 may be formed with a substantiallyconstant shank diameter 208 along the length of theshank 206, theshank 206 may be intermediarily formed in two or more different diameters (not shown) at different locations along theshank 206. - It should be noted that although the present disclosure describes the one-
piece fastener 200 in the context of a rivet, the one-piece fastener 200 may be provided in any one of a variety of configurations, without limitation, and is not limited to a rivet configuration. Even further, thefastener 200 is not limited for use as a one-piece fastener 200. For example, thefastener 200 and its associated forming steps may be applied to and implemented in a multi-piece fastener system, such as in a two-piece fastener system to achieve similar advantageous benefits. - Advantageously, the cold-worked
head section 204 and the cold-workedshank section 212 of thefastener 200 have a higher strength than theductile shank section 214 due to the resulting effects of a cold-working process that may be applied to thehead 203 and to a portion of theshank 206 as described in greater detail below. For example, the cold-workedhead section 204 and the cold-workedshank section 212 may have a shear strength that is higher than the shear strength of theductile shank section 214. For afastener 200 having a titanium or titanium-alloy composition with ultra-fine grain, the cold-workedhead section 204 and the cold-workedshank section 212 may have an ultimate shear strength of at least 95 ksi and, more preferably, an ultimate shear strength of at least 100 ksi. Thefastener 200 may also have a relatively high tension-carrying capability relative to conventional fasteners due to the process of cold-working thehead section 204 and theshank section 212 as described in greater detail below. - Advantageously, the locally increased strength levels in the cold-worked
head section 204 and the cold-workedshank section 212 may be achieved without thermal treatment of thefastener 200. The relatively high strength levels in the cold-workedhead section 204 and the cold-workedshank section 212 may also be due in part to the use of fastener material having a relatively small average grain size as described below. The relatively small average grain size may be achieved through the use of cryo-milling, equal-angle-extrusion, or other grain size reduction processes. Advantageously, the use of reduced grain size in thefastener 200 such as cryo-milled titanium or titanium-alloy materials results in improved strength, improved formability, and increased elevated temperature stability relative to conventional, titanium or titanium-alloy materials. Additionally, the improved mechanical properties provided by material having relatively small grain size such as reduced, ultra-fine grain material may be achieved without the need for subsequent thermal treatments. - The addition of cold-working the
fastener 200 as disclosed herein results in the cold-workedhead section 204 and cold-workedshank section 212. The combination of the cold-workedhead section 204 and cold-workedshank section 212 with the relatively high mechanical properties provided by relatively small grain size material, such as that of cryo-milled ultra-fine grain material, results in a one-piece fastener 200 having tension and clamp-up capabilities similar to the tension and clamp-up capabilities provided by conventional two-piece fasteners. Advantageously, the ability to use a simple one-piece fastener 200 in place of conventional two-piece fasteners simplifies the fastener installation process, which results in lower fastener installation costs. In addition, the one-piece fastener 200 disclosed herein may have a lower weight (e.g., 30 percent lower) than that of a two-piece fastener having comparable mechanical properties. - The
ductile shank section 214 may advantageously have a level of ductility that is higher than the level of ductility of the cold-workedhead section 204 and the cold-workedshank section 212. The high level of ductility of theductile shank section 214 may facilitate the adequate deformation or upsetting of thetail end portion 210 of thefastener 200 during fastener installation (e.g., a riveting or upsetting operation) as described below. The high level of ductility of theductile shank section 214 may be substantially similar to the high level of ductility of theblank precursor 12 from which thefastener 200 may be formed. More specifically, the high level of ductility of theductile shank section 214 relative to the ductility of the cold-workedhead section 204 and cold-workedshank section 212 may be a result of locally limiting the cold-working of thefastener 200 to the cold-workedhead section 204 and cold-workedshank section 212 and avoiding any cold-working of the remainder (i.e., the ductile shank section 214) of theshank 206. In an embodiment, theductile shank section 214 may have ductility values that facilitate adequately deforming thetail end portion 210 of thefastener 200 without failure or other unacceptable conditions. For example, theductile shank section 214 may have ductility values of at least approximately 10 percent elongation along a longitudinal axis of thefastener 200 prior to fracturing or failure of theshank 206. Theductile shank section 214 may also have a ductility level represented by a reduction in cross-sectional area of at least approximately 30 percent prior to fracturing or failure of theshank 206. - The relatively high level of ductility of the
ductile shank section 214 may be the result of the relatively small grain size of the material from which the fastener 200 (i.e., the blank precursor 12) may be formed. Advantageously, in an embodiment, thefastener 200 may be formed from an ultra-fine grain material having a relatively small average grain size. For example, thefastener 200 may be formed from material having an average grain size of less than approximately 10,000 nanometers (nm) (i.e., less than approximately 10 microns). Such ultra-fine grain material may be produced by a friction stir process and/or by equal-angle-extrusion (EAE), or other process. In a further embodiment, thefastener 200 may be formed from material having an average grain size of less than approximately 500 nanometers (nm) and, more preferably, an average grain size of less than approximately 300 nanometers. For example, the material may have an average grain size of from approximately 100 nanometers to 300 nanometers. - However, the material for forming the
fastener 200 is not limited to material having an average grain size of less than approximately 10,000 nanometers, but may be formed from any material having any grain size. For example, thefastener 200 may be formed of material having course grain material described as having an average grain size of greater than approximately 100,000 nanometers. Thefastener 200 material may also be formed of material that may described as fine grain material having an average grain size of less than approximately 100,000 nanometers such as between approximately 50,000 to 75,000 nanometers. - In an embodiment, the material for the
blank precursor 12 may be formed using a friction stir process (not shown). The friction stir process may use coarse-grained (e.g., average grain size of greater than approximately 100,000 nm) metallic material, such as titanium or titanium-alloy material. The coarse-grained metallic material may be processed using a stirring chamber (not shown) and a stirring tool (not shown). The temperature of the coarse-grained material may be increased as the coarse-grained material is passed through the stirring chamber where the stirring tool stirs the material and using severe mechanical deformation to reduce grain size and improve the homogeneity or uniformity of the microstructure of the material. The material may consolidate upon exiting the stirring chamber resulting in a relatively highly homogeneous material having an ultra-fine grain microstructure. - Alternatively, the grain size of the material from which the
blank precursor 12 is formed may be reduced with an equal-angle-extrusion (EAE) process (not shown) wherein the material may be forced through a die having approximately a ninety-degree bend. In an equal-angle-extrusion process, the forcing of the material through the ninety-degree bend results in the mechanical, cold-working of the material. The mechanical, cold-working of the material may reduce the average grain size of the material. - The grain size of the material may also be produced using a cryo-milling process wherein a ball-type, attritor device (not shown) may be used to reduce the size of the microstructure of the material. Material may be attrited into a relatively fine grain powder slurry through severe mechanical deformation using the ball-type attritor device. The material may be attrited in liquid hydrogen or nitrogen or other cooling medium. The ultra-fine grain powder material may be consolidated using a hot isostatic pressing (HIP) process or other consolidating processes. The process may result in a material having an ultra-fine, submicron grain microstructure.
- For example, titanium and/or titanium-alloy powder may be produced in a cryo-milling process wherein titanium and/or titanium-alloy powder may be blended with other alloy elements in pre-determined amounts or percentages and subjected to the cryo-milling process. As mentioned above, in the cryo-milling process, the metallic-alloy powder mixture may be milled with attritor-type ball-milling equipment using stainless steel balls in a slurry of liquid nitrogen, argon, hydrogen, or other environment. In response to the extreme mechanical deformation of the metallurgical structure of the powder during the cryo-milling process, the chemical composition of the metallic-alloy powder mixture may be altered. For example, during the Gyro-milling process, very fine oxides or nitride phases may be produced as a result of the nitrogen, argon, oxygen, or other gas atmosphere of the cryo-milling process. The fine oxides and nitride phases may improve the temperature stability of the resulting submicron, ultra-fine grain size material. In this regard, by using a cryo-milling process, an improved high-strength, stable, ultra-fine grain size powder may be produced. The titanium powder may be degassed and consolidated such as by using a hot isostatic process (HIP), a Ceracon-type forging process, or other consolidation process to provide titanium or titanium-alloy material having an ultra-fine grain microstructure with a high level of homogeneity.
- Although the material for forming the
fastener 200 is described herein in the context of titanium and titanium-alloy, the fastener 200 (i.e., blank precursor 12) material may be provided in any material composition including, but not limited to, aluminum, aluminum-alloy, steel, steel-alloy such as stainless steel, and any one of a variety of other material compositions, without limitation. Such material compositions may preferably have a relatively small average grain size as described above. - Referring still to
FIG. 1 , the cold-workedhead section 204 and the cold-workedshank section 212 of thefastener 200 may be formed by a cold-working process wherein a blank precursor 12 (FIG. 15 ) of thefastener 200 may be cold-worked. In an embodiment, the cold-working process may comprise cold-working theblank precursor 12 to form the cold-workedhead section 204 and simultaneously form an enlarged shank portion 32 (FIG. 19 ) of an intermediarily-formed blank precursor 13 (FIG. 19 ). The cold-working process may further comprise locally reducing a cross-sectional area of theenlarged shank portion 32 to form the cold-workedshank section 212 of thefastener 200 as described in greater detail below. In an embodiment, the cross-sectional area of theenlarged shank portion 32 may be reduced by approximately 2 to 5 percent as described in greater detail below. However, the cold-working process may comprise reducing the cross-sectional area of theenlarged shank portion 32 by less than approximately 2 percent or by more than approximately 5 percent. In an embodiment, the cold-working process may comprise reducing the cross-sectional area of theenlarged shank portion 32 by approximately 3.5 percent. In this regard, theenlarged shank diameter 34 of the intermediarily-formed blank precursor 13 (FIG. 19 ) may be cold-work-reduced to the approximate diameter of thefinal shank diameter 208 of thefastener 200. - By locally cold-working the
head 203 and the shank 206 (FIG. 1 ), locally increased levels of strength can be achieved in the resulting cold-workedhead section 204 and the cold-worked shank section 212 (FIG. 1 ) while the remaining portion of the shank 206 (i.e., the ductile shank section 214) retains the relatively high levels of ductility (i.e., formability) and durability which facilitate improved performance in fastener 200 (FIG. 1 ) installations. For example, by locally cold-working theshank 206, thefastener 200 shear strength and tension strength in or adjacent to the cold-workedhead section 204 and the cold-workedshank section 212 may be locally increased relative to the strength in the ductile shank section 214 (FIG. 1 ). Conversely, by limiting the cold-working to the localized cold-workedhead section 204 and the cold-workedshank section 212, theductile shank section 214 of the shank 206 (i.e., the remainder of the shank 206) retains the relatively high level of ductility, formability, and durability that is a result of the relatively small grain size (e.g., ultra-fine grain size) of the material. - Advantageously, for a one-
piece fastener 200 configuration such as the rivet shown inFIG. 1 , the high level of ductility in theductile shank section 214 improvesfastener 200 installation by providing improved drivability or upsetting of thetail end portion 210 of the rivet through improved elongation, which improves clamp-up subsequently achieved between two ormore components 252, 254 (FIG. 2 ) that may be fastened together by thefastener 200. The relatively high strength levels of the cold-workedhead section 204 and the cold-workedshank section 212 may advantageously be achieved without a thermal treatment process (e.g., annealing, artificial aging, etc.) which may significantly reducefastener 200 fabrication cost andfastener 200 fabrication time. However, as described below, one or more thermal treatments may be included in the process of forming thefastener 200 to enhance or stabilize the cold-workedhead section 204 and the cold-workedshank section 212 of thefastener 200 and/or to further improve the mechanical properties of thefastener 200 such as increasing the shear strength of the cold-workedhead section 204 and the cold-workedshank section 212. - Additional improvements in the performance of the fastener 200 (
FIG. 1 ) may be achieved by applying a corrosion-inhibiting organic coating 202 (FIG. 1 ) to thefastener 200. Thecoating 202 may improve the lubricity of thefastener 200 which may aid in the installation of thefastener 200. The improved lubricity provided by thecoating 202 may also avoid the complexity, time, and expense associated with wet-installation of fasteners. Thecoating 202 may also provide enhanced corrosion protection for thefastener 200 against environmental (e.g., moisture) corrosion, galvanic corrosion, and/or stress corrosion. In an embodiment, thecoating 202 may comprise a curable corrosion-resistant, organic coating material that may be applied in solution to thefastener 200 at any time before, during, and/or after the forming of thefastener 200 described below. - In an embodiment, the coating 202 (
FIG. 1 ) may comprise a phenolic resin that may be mixed with one or more plasticizers. Thecoating 202 may also include organic components such as polytetrafluoroethylene. Inorganic additives may also be included such as aluminum powder and/or strontium chromate. Such coating components and additives may be dissolved in a solvent to facilitate application of thecoating 202. The solvent may comprise ethanol, toluene, methyl ethyl ketone (MEK), and/or other solvents. In an embodiment, thecoating 202 may be provided in a solution having approximately 30 percent by weight ethanol, approximately 7 percent by weight toluene, and approximately 45 percent by weight methyl ethyl ketone (MEK) as the solvent, and approximately 2 percent by weight strontium chromate, approximately 2 percent by weight aluminum powder. The remainder of the coating composition may comprise phenolic resin and plasticizer as the coating material and a relatively small amount of polytetrafluoroethylene may be included. Thecoating 202 may be commercially available as Hi-Kote™ 1 from The Hi-Shear Corporation, Torrance, Calif., a division of Lisi Aerospace. - As described below, the coating 202 (
FIG. 1 ) may be applied to the fastener 200 (FIG. 1 ) by any one of a variety of different methods such as by spraying, dipping, brushing, or by other methods and cured at various elevated temperatures depending upon time. As indicated above, the coating 202 (FIG. 1 ) may reduce or eliminate the need for lubrication or wet sealants when installing thefastener 200. Thecoating 202 may also provide sealing of thefastener 200 to the structure 250 (FIG. 2 ). In addition, thecoating 202 may provide increased adherence of paint or other coatings that may be subsequently applied to thefastener 200 as installed or to thefastener 200heads 204 prior to installation in astructure 250. - Referring now to
FIGS. 2-7 , shown are several of a wide variety of various embodiments of thefastener 200 that may be formed by the cold-working process disclosed herein and which may be installed in astructure 250.FIG. 2 illustrates a flushshear head fastener 220 installed in astructure 250 for fastening afirst component 252 of thestructure 250 to asecond component 254. The flushshear head fastener 220 has a cold-workedhead section 220 d and a cold-workedshank section 220 a that extends to theductile shank section 220 b of thefastener 220. The cold-workedhead section 220 d and the cold-workedshank section 220 a provide enhanced shear strength to the flushshear head fastener 220. Thetail end portion 220 c of the flushshear head fastener 220 is included in theductile shank section 220 b of the flushshear head fastener 220. Thetail end portion 220 c of the flushshear head fastener 220 is adequately deformed or upset against thesurface 256 of one of thecomponents -
FIG. 3 illustrates a flushtension head fastener 222 installed in astructure 250. The cold-workedhead section 222 d of the flushtension head fastener 222 has a larger size than the cold-workedhead section 220 d of the flushshear head fastener 220. The larger size of the cold-workedhead section 222 d in the flushtension head fastener 222 reduces the length of the cold-workedshank section 222 a of the flushtension head fastener 222 relative to the length of the cold-workedshank section 220 a of the flushshear head fastener 220 shown inFIG. 2 . However, the larger size of the cold-workedhead section 222 d provides increased tension load-carrying capability to thefastener 222 relative to the tension load-carrying capacity of conventional fasteners and is due to the cold-working that is imparted to the cold-workedhead section 222 d during the process of forming the cold-workedhead section 222 d as described below. Thetail end portion 222 c of thefastener 222 comprises theductile shank section 222 b, and is upset against thestructure 250 during installation. -
FIG. 4-5 illustrate protrudinghead fasteners 224.FIG. 4 illustrates a protrudingshear head fastener 226 installed in astructure 250. The protrudingshear head fastener 226 is shown having a cold-workedhead section 226 d and a cold-workedshank section 226 a having a length that is substantially similar to the length 260 (FIG. 9 ) of thehole 258 or the thickness of the first andsecond components fastener 224. Theductile shank section 226 b of thefastener 226 comprises thetail end portion 226 c shown upset against thesurface 256 of one of thecomponents -
FIG. 5 illustrates a protrudingtension head fastener 228 installed in astructure 250, which also has a cold-workedhead section 228 d and a cold-workedshank section 228 a having a length that is substantially similar to the thickness of thestructure 250. The cold-workedhead section 228 d of the protrudingtension head fastener 228 inFIG. 5 is larger than the cold-workedhead section 226 d of the protrudingshear head fastener 226 inFIG. 4 which results in an increased tension load-carrying capability. Theductile shank section 228 b of thefastener 228 comprises thetail end portion 228 c, which is shown upset against thesurface 256 of one of thecomponents -
FIGS. 6-7 illustrates asemi-tubular fastener 230 installed in astructure 250.FIG. 6 illustrates thesemi-tubular fastener 230 prior to upsetting thetail end portion 230 c of thesemi-tubular fastener 230. Thesemi-tubular fastener 230 is shown having a cold-workedhead section 230 d and a cold-workedshank section 230 a having a length that is substantially similar to the thickness of the first andsecond components FIG. 7 illustrates thesemi-tubular fastener 230 after upsetting thetail end portion 230 c. Thesemi-tubular fastener 230 has a generally hollowtubular cavity 230 d to reduce the amount of force required to upset thetail end portion 230 c of thefastener 230. Theductile shank section 230 b of thesemi-tubular fastener 230 comprises thetail end portion 230 c, which is shown upset against thesurface 256 of one of thecomponents fastener 230 further reduces the amount of force required to upset thetail end portion 230 c relative to conventional, one-piece fasteners having a relatively large grain size. As indicated above,FIGS. 2-7 illustrate several of a wide variety of various embodiments of thefastener 200 that may be formed by the cold-working process disclosed herein. - Referring to
FIG. 8 with additional reference toFIGS. 9-13 , shown inFIG. 8 is a flow chart illustrating an embodiment of amethod 300 of installing a fastener 200 (FIG. 9 ) in a structure 250 (FIG. 9 ) wherein thefastener 200 has a cold-worked head section 204 (FIG. 9 ) and a cold-worked shank section 212 (FIG. 9 ) and a ductile shank section 214 (FIG. 9 ). - Step 302 of the
method 300 ofFIG. 8 includes providing thefastener 200. In the embodiment shown inFIG. 9 , thefastener 200 comprises aflush head fastener 220 as described above. Thestructure 250 comprises afirst component 252 and asecond component 254. Thefirst component 252 has acountersink 262 that may be formed complementary to theflush head fastener 220. Theshank 206 includes the cold-workedshank section 212 located adjacent to the cold-workedhead section 204 and further includes theductile shank section 214 extending from the cold-workedhead section 204 and the cold-workedshank section 212 to thetail end portion 210. As indicated above, the cold-workedhead section 204 and cold-workedshank section 212 may have a higher strength than theductile shank section 214. For example, the cold-workedhead section 204 and cold-workedshank section 212 may have a shear strength that is higher than the shear strength of theductile shank section 214. Theductile shank section 214 may have a higher level of ductility than the cold-workedhead section 204 and cold-workedshank section 212. - Step 304 of the
method 300 ofFIG. 8 may include installing thefastener 200 in thehole 258 formed in thestructure 250 as shown inFIG. 10 . The cold-workedhead section 204 and cold-workedshank section 212 may have a length that is substantially equivalent to the length 260 (FIG. 9 ) of thehole 258 when the head is seated against thestructure 250. In this manner, the shear load-carrying capability of thefastener 200 is maximized.FIG. 10 further illustrates atool 272 such as a rivet gun disposed against the head of thefastener 200 and a buckingbar 270 disposed against thetail end portion 210 of thefastener 200. Thetail end portion 210 is shown in a pre-upset condition 264 prior to application of an upsettingforce 274 on thefastener 200 by thetool 272 and the buckingbar 270. - Step 306 of the
method 300 ofFIG. 8 may include upsetting thetail end portion 210 of thefastener 200 by applying the upsettingforce 274 to thefastener 200. Referring toFIG. 11 , the upsettingforce 274 may be applied by a series of impacts provided by the rivet gun. The impacts are preferably of a magnitude causing successively increasing plastic deformation of thetail end portion 210 against thesurface 256 of thestructure 250, which is illustrated in the intermediate upset condition 266 inFIG. 11 . AlthoughFIGS. 10-12 illustrates the upsetting of thetail end portion 210 being performed by atool 272, such as a rivet gun and a buckingbar 270, any device, mechanism, or process may be used to upset thetail end portion 210 including, but not limited to, a rivet compression tool, a rivet crimping tool, or other manual or automated tools or devices. - Referring to
FIG. 12 , shown is thetail end portion 210 of thefastener 200 deformed into the final post-upset condition 268. Advantageously, the relatively high level of ductility in theductile shank section 214 reduces the amount of force required to upset thetail end portion 210, which may correspond to a reduction in the amount of rework needed or time required to install thefastener 200.FIG. 13 illustrates the final installation of thefastener 200 with the tool (e.g., rivet gun) and the buckingbar 270 removed. - Referring to
FIG. 14 with additional reference toFIGS. 15-32 , shown inFIG. 14 is a flow chart illustrating an embodiment of amethod 400 of forming afastener 200 having a cold-workedhead section 204 and cold-workedshank section 212 and aductile shank section 214. The cold-workedhead section 204 and cold-workedshank section 212 may be formed using asystem 10 which may include dies 50, 50 a, 100, 100 a and rams 80, 130 as shown inFIGS. 16 , 20, 25 and 29 and described below. Themethod 400 of forming thefastener 200 is described in the context of a forming aflush head fastener 218 as illustrated inFIGS. 15-23 and in the context of forming a protrudinghead fastener 224 as illustrated inFIGS. 24-32 . - Step 402 of the
method 400 ofFIG. 14 may include providing ablank precursor 12 having opposing first and second ends 14, 16 as shown inFIGS. 15 and 24 . Theblank precursor 12 may be provided as a rod or generally elongated cylindrical member. Although shown as having a generally solid 18 configuration, theblank precursor 12 may optionally be provided as a semi-tubularblank precursor 20 having atubular cavity 22 extending at least partially into theblank precursor 12 as shown inFIG. 33 and described in greater detail below. Theblank precursor 12 may have a generally constant nominal shank diameter 30 (FIG. 15 ) extending along the length of theblank precursor 12. However, theblank precursor 12 may be provided with ashank diameter 208 that may vary along the length of theblank precursor 12. - The
blank precursor 12 inFIGS. 15 and 24 may advantageously be formed of a material having a relatively small average grain size as described above. For example, theblank precursor 12 may be formed of titanium material or titanium-alloy material having an ultra-fine grain such as an average grain size of less than approximately 10,000 nanometers or, more preferably, an average grain size of less than approximately 300 nanometers such as between approximately 100 to 300 nanometers. However, theblank precursor 12 may be formed of material having relatively course grain size (e.g., greater than approximately 100,000 nanometers) or a material have a fine grain size (e.g., less than approximately 100,000 nanometers). As described above, the material may also optionally comprise any metallic material including, but not limited to, aluminum, aluminum-alloy, steel, steel-alloy, stainless steel, and titanium or titanium-alloy materials. - Referring to
FIG. 16 , a formingdie 50 and a formingram 80 of thesystem 10 may be provided for providing theblank precursor 12 with a countersunkhead 36 for forming a flush head fastener 218 (FIGS. 1-3 ). The formingdie 50 may have opposing first and second ends 52, 54. InFIG. 16 , the formingdie 50 may include a formingdie cavity 58 having a formingdie countersink 60 for forming a corresponding countersink head 36 (FIG. 19 ) on theblank precursor 12.FIG. 25 illustrates a formingdie 50 a and a formingram 80 for forming a protruding head 38 (FIG. 28 ) on theblank precursor 12. The forming die 50 a may have opposing first and second ends 52 a, 54 a. As shown inFIG. 25 , the forming die 50 a may include a formingdie cavity 58 a, which may be devoid of acountersink 60 such that the forming die 50 a may be used for forming a protruding head fastener 224 (FIGS. 4-7 ). - In
FIGS. 16 and 25 , the formingdie ram 80 may be formed of a relatively high-strength material that may be compatible with the material composition of theblank precursor 12. The formingdie die cavity die cavity bore die bore nominal bore portion FIGS. 16 and 25 ) having anominal bore diameter enlarged bore portion enlarged bore diameter nominal bore portion enlarged bore portion - The
enlarged bore portion nominal bore portion die nominal bore portion die enlarged bore portion nominal bore portion die die nominal bore portion die nominal bore diameter FIG. 15 ) of the blank precursor 12 (FIG. 15 ). Thenominal shank diameter 30 of theblank precursor 12 may be approximately equivalent to the final shank diameter 208 (FIGS. 23 and 32 ) of the fastener 200 (FIGS. 23 and 32 ) in the cold-worked shank section 212 (FIGS. 23 and 32 ) and in the ductile shank section 214 (FIGS. 23 and 32 ). - The forming
ram 80 shown inFIGS. 16 and 25 may have aram cavity 82 configured to receive the end of the blank precursor 12 (FIGS. 17 and 26 ). Theram cavity 82 may be concave as shown or theram cavity 82 may be provided with an alternative shape. The formingram 80 may have asurface 84 configured to contact amating surface die die ram 80 may be provided with alternative mating geometery and are not limited to surfaces configured to contact one another. In an embodiment, the formingdie ram 80 may be configured to form theblank precursor 12 without contacting one another. - Step 404 of the
method 400 ofFIG. 14 may include inserting the blank precursor 12 (FIGS. 17 and 26 ) into thenominal bore portion FIGS. 17 and 26 ) of the formingdie FIGS. 17 and 26 . In the embodiments shown, the formingdie backing device 88. Theblank precursor 12 may have a length such that when theblank precursor 12 is inserted into thenominal bore portion blank precursor 12 contacts the backing device 88 (FIGS. 17 and 26 ), theblank precursor 12 protrudes from theenlarged bore portion FIGS. 17 and 26 ) of the formingdie - Step 406 of the
method 400 ofFIG. 14 may include applying anaxial compression force 86 to theblank precursor 12 as shown inFIGS. 17 and 26 . The formingram 80 may apply theaxial compression force 86 to the portion of theblank precursor 12 protruding from the forming. Theblank precursor 12 may be supported by thebacking device 88 during the application of theaxial compression force 86. - Step 408 of the
method 400 ofFIG. 14 may include contacting the formingram 80 with the formingdie blank precursor 12 to substantially fill theram cavity 82 and theenlarged bore portion FIGS. 18 and 27 . In this regard, the application of the axial compression force 86 (FIGS. 17 ) may cause the portion of theblank precursor 12 to assume a shape substantially corresponding to the combined shape of theram cavity 82 and theenlarged bore portion FIG. 18 ). - Step 410 of the
method 400 ofFIG. 14 may include forming ahead 40 and anenlarged shank portion 32 on the intermediarily-formedblank precursor 13 as shown inFIGS. 19 and 28 in response to applying the axial compression force 86 (FIGS. 18 and 27 ) to the intermediarily-formedblank precursor 13. In this regard, the intermediarily-formedblank precursor 13 may include theenlarged shank portion 32 located adjacent to the cold-workedhead section 204 with thenominal shank portion 28 extending from theenlarged shank portion 32. As indicated earlier, thenominal shank portion 28 may be approximately equivalent to the original diameter of the cylindricalblank precursor 12 illustrated inFIG. 15 . - Referring to
FIGS. 20 and 29 , shown is a final reduction die 100, 100 a and areduction ram 130 for forming the intermediarily-formed blank precursor 13 (FIGS. 19 and 28 ) into a fastener 200 (FIG. 23 ) having a cold-workedhead section 204 and cold-worked shank section 212 (FIGS. 23 and 32 ). The reduction ram 130 (FIG. 20 ) may have opposing first and second ends 102, 102 a, 104, 104 a and may include a final reduction diecavity bore reduction ram 130 may have asurface 134 configured to contact amating surface reduction ram 130 may have aram cavity 132 which may be formed complementary to the shape of the ram cavity 82 (FIGS. 16 and 25 ) of the forming ram 80 (FIGS. 16 and 25 ). Thereduction ram 130 may be configured to receive the end of the intermediarily-formedblank precursor 13. The final reduction die 100 (FIG. 20 ) may include a final reduction die countersink 110 (FIG. 20 ) corresponding to the forming die countersink 60 (FIG. 16 ) formed in the forming die 50 (FIG. 16 ). Thebore FIGS. 20 and 29 may have abore diameter nominal shank diameter 30 of thenominal shank portion 28 of theblank precursor 12 illustrated inFIGS. 15 and 24 . Thereduction ram 130 inFIGS. 20 and 29 may be configured substantially similar to the formingram 80 illustrated inFIGS. 17 and 26 and described above. - Step 412 of the
method 400 ofFIG. 14 may include inserting thenominal shank portion 28 of the intermediarily-formedblank precursor 13 into thebore FIGS. 21 and 30 . The final reduction die 100, 100 a may be supported on a backing device 138 (FIGS. 22 and 31 ). Theenlarged shank portion 32 may have an enlarged shank diameter 34 (FIGS. 19 and 28 ) that may be larger than thediameter enlarged shank portion 32 may be disposed above thebore blank precursor 13 may include a tapered transition between thenominal shank portion 28 and theenlarged shank portion 32 to facilitate entry of theenlarged shank portion 32 into thebore - Step 414 of the
method 400 ofFIG. 14 may include applying anaxial compression force 136 to the intermediarily-formedblank precursor 13 as shown inFIGS. 22 and 31 . The final reduction die 100, 100 a shown in each ofFIGS. 22 and 31 may optionally be supported on the backing device 88 (FIGS. 22 and 31 ) during the application of theaxial compression force 136. Thereduction ram 130 may apply theaxial compression force 136 to thehead 40 of the intermediarily-formedblank precursor 13. - Step 416 of the
method 400 ofFIG. 14 may include urging or forcing theenlarged shank portion 32 into thebore FIGS. 22 and 31 . Theaxial compression force 136 may be applied to the intermediarily-formedblank precursor 13 until thereduction ram 130 contacts the final reduction die 100, 100 a. - Step 418 of the
method 400 ofFIG. 14 may include forming the cold-workedshank section 212 by reducing the cross-sectional area of theenlarged shank portion 32 to the cross-sectional area of the final reduction die bore 112, 112 a as shown inFIGS. 22 and 31 . In this regard, the method may include reducing the diameter of theenlarged shank portion 32 of the intermediarily-formedblank precursor 13 to thediameter enlarged shank portion 32 into the final reduction die bore 112, 112 a. In this manner,Step 418 may comprise forming the intermediarily-formedblank precursor 13 ofFIGS. 22 and 31 into a fastener 200 (FIGS. 23 and 32 ) having a cold-workedhead section 204 and cold-worked shank section 212 (FIGS. 23 and 32 ) and a ductile shank section 214 (FIGS. 23 and 32 ). Theductile shank section 214 may extend from the cold-workedshank section 212 to the tail end portion 210 (FIGS. 23 and 32 ) of thefastener 200. The intermediarily-formedblank precursor 13 may be formed into aflush head fastener 218 inFIG. 23 . Alternatively, the intermediarily-formedblank precursor 13 may be formed into a protrudinghead fastener 200 inFIG. 32 . - Referring to
FIGS. 33-35 , shown are the preliminary steps for forming a semi-tubularblank precursor 20 into a semi-tubular fastener 200 (FIG. 6 ).FIG. 33 illustrates a semi-tubularblank precursor 20 having a generally hollowtubular cavity 22 extending at least partially into an end of theblank precursor 12. Aninsert tool 24 having a shaft formed complementary to the hollowtubular cavity 22 may be provided for stabilizing the semi-tubularblank precursor 20. Theinsert tool 24 may stabilize the hollowtubular cavity 22 of the semi-tubularblank precursor 20 against collapse or deformation during the process of forming the semi-tubularblank precursor 20 into asemi-tubular fastener 200 having a cold-workedhead section 204 and a cold-worked shank section 212 (FIG. 6 ). -
FIG. 34 shows the semi-tubularblank precursor 20 installed in the formingdie 50 and theinsert tool 24 positioned below thetubular cavity 22 of the semi-tubularblank precursor 20. Theinsert tool 24 may optionally include aboss 26 from which theinsert tool 24 may extend. Theboss 26 may be provided for handling theinsert tool 24. -
FIG. 35 shows theblank precursor 12 installed in the formingdie 50 and theinsert tool 24 installed in thetubular cavity 22 prior to the application of theaxial compression force 86 to theblank precursor 12. Theinsert tool 24 may be mechanically retained in position during the application of theaxial compression force 86 to theblank precursor 12 to stabilize the hollowtubular cavity 22 when forming the semi-tubular blank precursor 20 (FIG. 33 ) into a semi-tubular fastener 200 (FIG. 6 ) having a cold-workedhead section 204 and cold-worked shank section 212 (FIG. 6 ). - Referring now to
FIG. 36 , shown is a further embodiment of amethod 500 for forming a fastener 200 (FIG. 23 ) with a cold-workedhead section 204 and cold-worked shank section 212 (FIG. 23 ). Themethod 500 may include one or more of the steps described above with regard to forming a blank precursor 12 (FIG. 15 ) into afastener 200 and may include additional steps for improving the performance and strength properties of thefastener 200. - Step 502 of the
method 500 ofFIG. 36 may include providing a blank precursor 12 (FIG. 15 ) having a desired grain size. For example,Step 502 may comprise providing theblank precursor 12 having an ultra-fine grain material composition having a grain size of less than approximately 10,000 nanometers although larger grain size material may be used as described above. - Step 504 of the
method 500 ofFIG. 36 may include forming a cold-workedhead section 204 and anenlarged shank portion 32 of an intermediarily-formed blank precursor 13 (FIG. 19 ) and which may comprise cold-working the intermediarily-formedblank precursor 13 during the forming step. In addition to forming the cold-workedhead section 204 and theenlarged shank portion 32,Step 504 may comprise imparting improved strength to the cold-workedhead section 204, such as improved tension strength, due to the cold-work produced during the forming process shown inFIGS. 18 and 27 . - Step 506 of the
method 500 ofFIG. 36 may comprise the optional step of annealing the intermediarily-formed blank precursor 13 (FIG. 21 ) prior to forming the cold-worked shank section 212 (FIG. 22 ). The annealing step may include heating the intermediarily-formedblank precursor 13 to a pre-determined temperature and holding the temperature for a pre-determined period of time. The annealing may optionally be performed to reduce or eliminate residual stress in the intermediarily-formedblank precursor 13 and/or improve one or more properties of the intermediarily-formedblank precursor 13, such as the strength properties of the intermediarily-formedblank precursor 13. - Step 508 of the
method 500 ofFIG. 36 may include cold-working a localized area (e.g., theenlarged shank portion 32—FIG. 19 ) of the intermediarily-formedblank precursor 13 to form a fastener 200 (FIG. 23 ) having a cold-workedshank section 212 as described above and illustrated inFIGS. 23 and 32 . In an embodiment, the cold-working process may comprise reducing the cross-sectional area of theenlarged shank portion 32 to form the cold-workedshank section 212. Advantageously, the cold-workedhead section 204 and cold-workedshank section 212 may have a higher strength than theductile shank section 214. Theductile shank section 214 may have a higher level of ductility than the cold-workedhead section 204 and cold-workedshank section 212. - Step 510 of the
method 500 ofFIG. 36 may comprise the optional step of annealing thefastener 200 after forming the cold-worked head section 204 (FIG. 23 ) and cold-worked shank section 212 (FIG. 23 ) in the fastener 200 (FIG. 23 ). The annealing step may comprise further heat-treating thefastener 200 by heating thefastener 200 to a pre-determined elevated temperature and holding at the temperature for a pre-determined period of time as a means to reduce or eliminate residual stress that may develop in thefastener 200 during the cold-working process. The annealing step may also improve the mechanical properties of thefastener 200. - Step 512 of the
method 500 ofFIG. 36 may include applying a corrosion-resistant coating 202 (FIG. 23 ) to the fastener 200 (FIG. 23 ). In an embodiment described above, thecoating 202 may comprise a curable, corrosion-resistant organic coating material. Thecoating 202 may be applied to thefastener 200 such as by spraying, brushing, or using an alternative method. Thecoating 202 material may preferably have a thickness of approximately 0.0003 to 0.0005 inch in thickness after curing although other thicknesses of thecoating 202 are possible. - Step 514 of the
method 500 ofFIG. 36 may include curing the applied coating material such as by increasing the temperature of the environment of the coated-fastener 200 to a pre-determined curing temperature and holding for a pre-determined period of time. The increase in temperature of thecoating 202 may result in evaporation of the solvent from the applied coating material. - Step 516 of the
method 500 ofFIG. 36 may comprise the optional step of final heat-treating the fastener 200 (FIG. 23 ) for a pre-determined period of time at a pre-determined temperature regime to increase thefastener 200 strength properties. In an embodiment, the heat-treating of thefastener 200 may be performed concurrently with the curing of the coating material to reduce total time and cost for fabricating thefastener 200. Step 516 may optionally be combined withStep 514 to cure the applied material coating and thermally treat thefastener 200. - Step 518 of the
method 500 ofFIG. 36 may include installing the fastener 200 (FIG. 23 ) in astructure 250 as described above and illustrated inFIGS. 9-13 . Thefastener 200 may be formed as a flush head fastener 218 (FIG. 9 ) having a cold-worked head section 204 (FIG. 9 ) and cold-worked shank section 212 (FIG. 9 ) having a length that is substantially equivalent to the total thickness of the structure 250 (FIG. 9 ). Alternatively, thefastener 200 may be formed as a protruding head fastener 224 (FIG. 4 ) having a cold-workedshank section 226a (FIG. 4 ) having a length that is substantially equivalent to the total thickness of the structure 250 (FIG. 9 ). A protrudinghead fastener 224 may provide maximum shear capability to the structural joint formed by thefastener 224 installation. - Step 520 of the
method 500 ofFIG. 36 may include upsetting thetail end portion 210 of theductile shank section 214 against thestructure 250 as illustrated in the sequence of steps shown inFIGS. 10-12 . Thetail end portion 210 may be adequately deformed against a component of thestructure 250 during upsetting of thetail end portion 210. Advantageously, the high level of ductility in theductile shank section 214 provides improved drivability or upsetting of thetail end portion 210 of thefastener 200, which results in improved quality of fastener installations, and clamp-up of components being fastened by thefastener 200. The improved clamp-up may improve the joint fatigue and tensile strength levels of a structural joint formed by thefastener 200 installation. - It should be noted that although the process for forming a
fastener 200 with cold-worked head andshank sections die 50 and a final reduction die 100) to form the cold-workedhead section 204 and cold-workedshank section 212, other methods may be implemented. For example, the cold-worked head andshank sections - Many modifications and other embodiments of the disclosure will come to mind to one skilled in the art to which this disclosure pertains having the benefit of the teachings presented in the foregoing descriptions and the associated drawings. The embodiments described herein are meant to be illustrative and are not intended to be limiting or exhaustive. Although specific terms are employed herein, they are used in a generic and descriptive sense only and not for purposes of limitation.
Claims (23)
1. A fastener, comprising:
a cold-worked head section;
a cold-worked shank section; and
a ductile shank section extending from the cold-worked shank section to a tail end portion of the fastener, the ductile shank section being non-cold-worked.
2. The fastener of claim 1 wherein:
the cold-worked head section and the cold-worked shank section have a higher strength than the ductile shank section.
3. The fastener of claim 1 wherein:
the ductile shank section has a higher level of ductility than the cold-worked head section and the cold-worked shank section.
4. The fastener of claim 1 wherein:
the fastener has at least one of the following material compositions: aluminum, aluminum-alloy.
5. The fastener of claim 1 wherein:
the fastener has at least one of the following material compositions: steel, steel-alloy.
6. The fastener of claim 1 wherein:
the fastener has at least one of the following material compositions: titanium, and titanium-alloy.
7. The fastener of claim 1 wherein:
the fastener has an ultra-fine grain material composition.
8. The fastener of claim 1 wherein:
the cold-worked head section and the cold-worked shank section are formed by a cold-working process.
9. The fastener of claim 1 wherein:
the fastener is coated with a corrosion-resistant, curable organic coating material.
10. The fastener of claim 1 having at least one of the following configurations:
a flush head configuration; and
a protruding head configuration.
11. A method of forming a fastener, comprising the steps of:
inserting a blank precursor into a bore of a forming die having an enlarged bore portion;
applying an axial compression force to the blank precursor;
forming a cold-worked head section and an enlarged shank portion on the blank precursor corresponding to the enlarged bore portion, the enlarged shank portion having a nominal shank portion extending therefrom;
inserting the nominal shank portion into a bore of a final reduction die;
applying an axial compression force to the enlarged shank portion;
urging the enlarged shank portion into the bore of the final reduction die; and
forming a cold-worked shank section by reducing a cross-sectional area of the enlarged shank portion.
12. The method of claim 11 wherein the step of reducing the cross-sectional area of the enlarged shank portion comprises:
reducing the cross-sectional area of the enlarged shank portion by approximately 2 to 5 percent.
13. The method of claim 11 wherein the step of providing the blank precursor comprises:
providing a blank precursor in at least one of the following material compositions:
titanium, titanium-alloy.
14. The method of claim 11 wherein:
providing a blank precursor having an ultra-fine grain material composition.
15. The method of claim 11 further comprising at least one of the following steps:
annealing the blank precursor prior to forming the cold-worked shank section and cold-worked head section; and
annealing the fastener after forming the cold-worked head section and the cold-worked shank section.
16. The method of claim 11 further comprising the step of:
coating the fastener with a corrosion-resistant, curable organic coating material.
17. A method of assembling a structure, comprising the steps of:
providing a fastener having a head and a shank terminating at a tail end portion, the head comprising a cold-worked head section, the shank including a cold-worked shank section and a ductile shank section extending from the cold-worked shank section to the tail end portion, the cold-worked head section and the cold-worked shank section having a higher strength than the ductile shank section;
installing the fastener in a hole of the structure; and
upsetting the tail end portion of the ductile shank section.
18. The method of claim 17 wherein the step of providing the fastener comprises:
providing the fastener in at least one of the following material compositions: titanium, and titanium-alloy.
19. The method of claim 17 wherein the step of providing the fastener comprises:
providing the fastener in an ultra-fine grain material.
20. The method of claim 17 wherein:
the ductile shank section has a level of ductility that is higher than the level of ductility of the cold-worked head section and the cold-worked shank section.
21. The method of claim 17 wherein:
the cold-worked head section and the cold-worked shank section are formed by a cold-working process.
22. The method of claim 17 further comprising the step of:
providing the fastener coated with a corrosion-resistant, curable organic coating material.
23. The method of claim 17 wherein the step of installing the fastener comprises:
installing the fastener in an aircraft structure.
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/299,228 US20130125376A1 (en) | 2011-11-17 | 2011-11-17 | Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby |
CA2792752A CA2792752C (en) | 2011-11-17 | 2012-10-17 | Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby |
EP12192230.6A EP2594349B1 (en) | 2011-11-17 | 2012-11-12 | Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners |
BR102012029191-6A BR102012029191B1 (en) | 2011-11-17 | 2012-11-14 | ASSEMBLY PROCESS OF A STRUCTURE |
JP2012252251A JP6258580B2 (en) | 2011-11-17 | 2012-11-16 | Method of adjusting integrated fastener using high deformability titanium and titanium alloy and fastener adjusted by the method |
CN201210467855.6A CN103122900B (en) | 2011-11-17 | 2012-11-19 | Prepare can high deformation titanium and the method and fastener prepared by this method of titanium alloy single-piece fastener |
US14/569,031 US9649682B2 (en) | 2011-11-17 | 2014-12-12 | Method of assembling a structure using highly-deformable titanium and titanium-alloy one-piece fasteners |
US15/479,848 US10589342B2 (en) | 2011-11-17 | 2017-04-05 | Method of forming a highly-deformable titanium or titanium-alloy one-piece fastener |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/299,228 US20130125376A1 (en) | 2011-11-17 | 2011-11-17 | Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/569,031 Division US9649682B2 (en) | 2011-11-17 | 2014-12-12 | Method of assembling a structure using highly-deformable titanium and titanium-alloy one-piece fasteners |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130125376A1 true US20130125376A1 (en) | 2013-05-23 |
Family
ID=47227548
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/299,228 Abandoned US20130125376A1 (en) | 2011-11-17 | 2011-11-17 | Method for preparing highly-deformable titanium and titanium-alloy one-piece fasteners and fasteners prepared thereby |
US14/569,031 Active 2032-03-29 US9649682B2 (en) | 2011-11-17 | 2014-12-12 | Method of assembling a structure using highly-deformable titanium and titanium-alloy one-piece fasteners |
US15/479,848 Active 2033-03-06 US10589342B2 (en) | 2011-11-17 | 2017-04-05 | Method of forming a highly-deformable titanium or titanium-alloy one-piece fastener |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/569,031 Active 2032-03-29 US9649682B2 (en) | 2011-11-17 | 2014-12-12 | Method of assembling a structure using highly-deformable titanium and titanium-alloy one-piece fasteners |
US15/479,848 Active 2033-03-06 US10589342B2 (en) | 2011-11-17 | 2017-04-05 | Method of forming a highly-deformable titanium or titanium-alloy one-piece fastener |
Country Status (6)
Country | Link |
---|---|
US (3) | US20130125376A1 (en) |
EP (1) | EP2594349B1 (en) |
JP (1) | JP6258580B2 (en) |
CN (1) | CN103122900B (en) |
BR (1) | BR102012029191B1 (en) |
CA (1) | CA2792752C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074852A (en) * | 2014-06-27 | 2014-10-01 | 哈尔滨工业大学 | Rivet sleeve for titanium self-plugging rivet and preparation method of rivet sleeve |
US20180141107A1 (en) * | 2016-11-18 | 2018-05-24 | Wabash National, L.P. | Hollow shank rivet and rivet coupling method |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3013781A1 (en) * | 2013-11-25 | 2015-05-29 | Airbus Operations Sas | FIXING ELEMENT FOR PARTS OF AN ASSEMBLY |
CN104454870A (en) * | 2014-12-22 | 2015-03-25 | 贵州精立航太科技有限公司 | High-strength rivet and manufacturing method thereof |
CN105650081A (en) * | 2016-04-08 | 2016-06-08 | 航天精工股份有限公司 | Double-metal rivet with lining structure |
US10689955B1 (en) | 2019-03-05 | 2020-06-23 | SWM International Inc. | Intelligent downhole perforating gun tube and components |
US11078762B2 (en) | 2019-03-05 | 2021-08-03 | Swm International, Llc | Downhole perforating gun tube and components |
US11268376B1 (en) | 2019-03-27 | 2022-03-08 | Acuity Technical Designs, LLC | Downhole safety switch and communication protocol |
US11619119B1 (en) | 2020-04-10 | 2023-04-04 | Integrated Solutions, Inc. | Downhole gun tube extension |
CN113000767A (en) * | 2021-03-01 | 2021-06-22 | 中冶重工(唐山)有限公司 | Forging seat for forming low-L-shaped wear-resistant lining plate and lining plate forming method |
CN113941706B (en) * | 2021-10-19 | 2022-07-19 | 阳江职业技术学院 | Preparation method of titanium alloy wing root three-fork joint of airplane |
CN118204452A (en) * | 2023-10-19 | 2024-06-18 | 贵州安大航空锻造有限责任公司 | Intelligent manufacturing method, device and equipment for titanium alloy ring forging and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040247835A1 (en) * | 2003-06-03 | 2004-12-09 | Keener Steven G. | Method for preparing pre-coated, metallic components and components prepared thereby |
US20060177284A1 (en) * | 2005-02-07 | 2006-08-10 | The Boeing Company | Method for preparing pre-coated aluminum and aluminum-alloy fasteners and components having high-shear strength and readily deformable regions |
US20080089802A1 (en) * | 2003-11-25 | 2008-04-17 | Keener Steven G | Method for preparing ultra-fine, submicron grain titanium and titanium-alloy articles and articles prepared thereby |
Family Cites Families (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3126561A (en) * | 1964-03-31 | Apparatus and method for selectively work hardening a workpiece | ||
US1329144A (en) * | 1919-08-26 | 1920-01-27 | Thomas E Murray | Method of connecting plates by electrical riveting |
US1554336A (en) * | 1920-04-17 | 1925-09-22 | Roy H Smith | Metal article |
US2395721A (en) * | 1944-09-20 | 1946-02-26 | Milton H Lees Jr | Apparatus for making rivets |
US3072933A (en) * | 1959-01-26 | 1963-01-15 | Textron Ind Inc | Method of extruding shank portions with 50% or less cross-sectional area than that of the original blanks |
US3426641A (en) * | 1966-04-07 | 1969-02-11 | Irwin E Rosman | Fastener unit with forming die |
US3526032A (en) * | 1969-02-19 | 1970-09-01 | Lockheed Aircraft Corp | Riveting method employing metal flow in both the manufactured head and the upset head |
US3626531A (en) * | 1969-05-29 | 1971-12-14 | Standard Pressed Steel Co | Method for forming ultra high-strength buckable rivets |
US3848389A (en) * | 1969-12-29 | 1974-11-19 | Textron Inc | Bimetal rivets |
US3828422A (en) * | 1970-08-05 | 1974-08-13 | Boeing Co | Method of making fatigue resistant fastener joint |
JPS4859242A (en) * | 1971-11-29 | 1973-08-20 | ||
US3911783A (en) * | 1973-02-05 | 1975-10-14 | Townsend Company A Division Of | Rivet of titanium-columbium alloy and method of making the same |
US3975786A (en) * | 1973-02-05 | 1976-08-24 | Textron, Inc. | Method of forming a rivet of titanium-columbium alloy |
US4223433A (en) | 1974-06-19 | 1980-09-23 | Rosman Irwin E | Method of joining workpieces with a rivet fastener system |
US4126076A (en) | 1974-06-19 | 1978-11-21 | Rosman Irwin E | Rivet fastener system |
US3995406A (en) | 1974-06-19 | 1976-12-07 | Rosman Irwin E | Rivet fastener system |
SU543454A1 (en) * | 1974-11-01 | 1977-01-25 | Горьковское Производственно-Конструкторское Объединение "Нормаль" | Method of making rod parts with heads |
JPS529613A (en) * | 1975-07-11 | 1977-01-25 | Textron Inc | Rivet made from tiinb alloy and method of making therof |
FR2634526B1 (en) * | 1988-07-22 | 1990-09-28 | Garonne Ets Auriol & Cie | FIXING MEMBER SUCH AS RIVET, ASSEMBLY METHOD AND ASSEMBLY OBTAINED |
US4861211A (en) | 1988-10-17 | 1989-08-29 | Lockheed Corporation | Composite rivet |
US5333980A (en) | 1993-07-15 | 1994-08-02 | Textron, Inc. | Buckling semi-solid rivet |
CA2219916C (en) * | 1995-05-01 | 2008-01-08 | Steven G. Keener | Preparation of pre-coated aluminum alloy articles |
US6267684B1 (en) * | 1997-04-30 | 2001-07-31 | Allfast Fastening Systems, Inc. | Rivets and rivet manufacturing methods |
US6274200B1 (en) | 1998-09-11 | 2001-08-14 | Boeing North American, Inc. | Method for preparing pre-coated ferrous-alloy components and components prepared thereby |
JP2001173624A (en) * | 1999-12-21 | 2001-06-26 | Nitto Seiko Co Ltd | Fastener part for ornament |
US6526658B1 (en) * | 2000-05-23 | 2003-03-04 | Silverbrook Research Pty Ltd | Method of manufacture of an ink jet printhead having a moving nozzle with an externally arranged actuator |
KR100908859B1 (en) | 2000-12-29 | 2009-07-21 | 프로필 페르빈둥스테크닉 게엠베하 운트 컴파니 카게 | Bolt element comprising a shaft part and a spherical head, assembly component and a method for producing a bolt element |
US6499926B2 (en) | 2001-05-18 | 2002-12-31 | The Boeing Company | Fastener apparatus and method of fastening non-metallic structures |
US6638381B2 (en) | 2001-12-18 | 2003-10-28 | The Boeing Company | Method for preparing ultra-fine grain titanium and titanium-alloy articles and articles prepared thereby |
US6726085B2 (en) | 2002-05-14 | 2004-04-27 | The Boeing Company | Method and apparatus for producing a refined grain structure |
US7097403B1 (en) * | 2002-12-18 | 2006-08-29 | The Everhold Group, Corporation | Reduced material fastener |
US6912885B2 (en) | 2002-12-30 | 2005-07-05 | The Boeing Company | Method of preparing ultra-fine grain metallic articles and metallic articles prepared thereby |
JP4340754B2 (en) * | 2003-12-26 | 2009-10-07 | 独立行政法人物質・材料研究機構 | Steel having high strength and excellent cold forgeability, and excellent molded parts such as screws and bolts or shafts having excellent strength, and methods for producing the same. |
US7465234B2 (en) | 2004-09-13 | 2008-12-16 | The Boeing Company | Hybrid fastening system and associated method of fastening |
US7829014B2 (en) * | 2004-11-05 | 2010-11-09 | The Boeing Company | Method for preparing pre-coated, ultra-fine, submicron grain titanium and titanium-alloy components and components prepared thereby |
US7922841B2 (en) | 2005-03-03 | 2011-04-12 | The Boeing Company | Method for preparing high-temperature nanophase aluminum-alloy sheets and aluminum-alloy sheets prepared thereby |
DE102006012043A1 (en) * | 2006-03-16 | 2007-09-20 | Braun Gmbh | Rivet connection on plastic basis |
CN201568418U (en) * | 2009-12-22 | 2010-09-01 | 北京有色金属研究总院 | Self-tightening I shape memory alloy bar for connection |
CN201836171U (en) * | 2010-10-11 | 2011-05-18 | 温州东南碳制品有限公司 | Novel rivet for connecting carbon brush holder of automobile starting motor |
-
2011
- 2011-11-17 US US13/299,228 patent/US20130125376A1/en not_active Abandoned
-
2012
- 2012-10-17 CA CA2792752A patent/CA2792752C/en active Active
- 2012-11-12 EP EP12192230.6A patent/EP2594349B1/en active Active
- 2012-11-14 BR BR102012029191-6A patent/BR102012029191B1/en active IP Right Grant
- 2012-11-16 JP JP2012252251A patent/JP6258580B2/en active Active
- 2012-11-19 CN CN201210467855.6A patent/CN103122900B/en active Active
-
2014
- 2014-12-12 US US14/569,031 patent/US9649682B2/en active Active
-
2017
- 2017-04-05 US US15/479,848 patent/US10589342B2/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040247835A1 (en) * | 2003-06-03 | 2004-12-09 | Keener Steven G. | Method for preparing pre-coated, metallic components and components prepared thereby |
US20080089802A1 (en) * | 2003-11-25 | 2008-04-17 | Keener Steven G | Method for preparing ultra-fine, submicron grain titanium and titanium-alloy articles and articles prepared thereby |
US20060177284A1 (en) * | 2005-02-07 | 2006-08-10 | The Boeing Company | Method for preparing pre-coated aluminum and aluminum-alloy fasteners and components having high-shear strength and readily deformable regions |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074852A (en) * | 2014-06-27 | 2014-10-01 | 哈尔滨工业大学 | Rivet sleeve for titanium self-plugging rivet and preparation method of rivet sleeve |
US20180141107A1 (en) * | 2016-11-18 | 2018-05-24 | Wabash National, L.P. | Hollow shank rivet and rivet coupling method |
US10376949B2 (en) * | 2016-11-18 | 2019-08-13 | Wabash National, L.P. | Hollow shank rivet and rivet coupling method |
Also Published As
Publication number | Publication date |
---|---|
CN103122900A (en) | 2013-05-29 |
US9649682B2 (en) | 2017-05-16 |
US20170203356A1 (en) | 2017-07-20 |
EP2594349A3 (en) | 2015-07-15 |
JP2013108624A (en) | 2013-06-06 |
US10589342B2 (en) | 2020-03-17 |
BR102012029191A2 (en) | 2014-12-30 |
CA2792752C (en) | 2016-11-15 |
EP2594349B1 (en) | 2020-04-29 |
CN103122900B (en) | 2017-10-13 |
BR102012029191B1 (en) | 2021-06-29 |
EP2594349A2 (en) | 2013-05-22 |
US20150096166A1 (en) | 2015-04-09 |
JP6258580B2 (en) | 2018-01-10 |
CA2792752A1 (en) | 2013-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10589342B2 (en) | Method of forming a highly-deformable titanium or titanium-alloy one-piece fastener | |
US7654909B2 (en) | Hybrid fastening system | |
US10294976B2 (en) | Method of installing a structural blind fastener | |
EP3584289B1 (en) | Blind fastener system with electromagnetic effects-protective coating | |
US10005120B2 (en) | Method for forming a joint using a self-piercing rivet | |
US9068250B2 (en) | Pre-coated, ultra-fine, submicron grain titanium and titanium-alloy components | |
US8529177B2 (en) | Integrated pin/sleeve blind fastener | |
US10871181B2 (en) | Process for producing a connecting element as well as connecting element | |
WO1999018359A2 (en) | Interference blind type bolt | |
US20180238374A1 (en) | Clinch nut and method for manufacturing one such nut | |
US20060177284A1 (en) | Method for preparing pre-coated aluminum and aluminum-alloy fasteners and components having high-shear strength and readily deformable regions | |
US20050193793A1 (en) | Method of preparing ultra-fine grain metallic articles and metallic articles prepared thereby | |
US8137755B2 (en) | Method for preparing pre-coated, ultra-fine, submicron grain high-temperature aluminum and aluminum-alloy components and components prepared thereby | |
Sankaran et al. | High speed ridged fasteners for multi-material joining | |
Padfield | Mechanical Joining of Aluminum | |
Heger et al. | Mechanical joining of magnesium alloys |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: THE BOEING COMPANY, ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KEENER, STEVEN G.;REEL/FRAME:027247/0796 Effective date: 20111117 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |