US20120082536A1 - Hybrid excavator and method of controlling hybrid excavator - Google Patents
Hybrid excavator and method of controlling hybrid excavator Download PDFInfo
- Publication number
- US20120082536A1 US20120082536A1 US13/376,932 US201013376932A US2012082536A1 US 20120082536 A1 US20120082536 A1 US 20120082536A1 US 201013376932 A US201013376932 A US 201013376932A US 2012082536 A1 US2012082536 A1 US 2012082536A1
- Authority
- US
- United States
- Prior art keywords
- capacitor
- motor
- regeneration
- boom
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W20/00—Control systems specially adapted for hybrid vehicles
- B60W20/10—Controlling the power contribution of each of the prime movers to meet required power demand
- B60W20/13—Controlling the power contribution of each of the prime movers to meet required power demand in order to stay within battery power input or output limits; in order to prevent overcharging or battery depletion
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W10/00—Conjoint control of vehicle sub-units of different type or different function
- B60W10/04—Conjoint control of vehicle sub-units of different type or different function including control of propulsion units
- B60W10/08—Conjoint control of vehicle sub-units of different type or different function including control of propulsion units including control of electric propulsion units, e.g. motors or generators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W10/00—Conjoint control of vehicle sub-units of different type or different function
- B60W10/24—Conjoint control of vehicle sub-units of different type or different function including control of energy storage means
- B60W10/26—Conjoint control of vehicle sub-units of different type or different function including control of energy storage means for electrical energy, e.g. batteries or capacitors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W10/00—Conjoint control of vehicle sub-units of different type or different function
- B60W10/30—Conjoint control of vehicle sub-units of different type or different function including control of auxiliary equipment, e.g. air-conditioning compressors or oil pumps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/22—Control systems or devices for electric drives
- B66C13/23—Circuits for controlling the lowering of the load
- B66C13/26—Circuits for controlling the lowering of the load by ac motors
- B66C13/28—Circuits for controlling the lowering of the load by ac motors utilising regenerative braking for controlling descent of heavy loads and having means for preventing rotation of motor in the hoisting direction when load is released
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/08—Superstructures; Supports for superstructures
- E02F9/10—Supports for movable superstructures mounted on travelling or walking gears or on other superstructures
- E02F9/12—Slewing or traversing gears
- E02F9/121—Turntables, i.e. structure rotatable about 360°
- E02F9/123—Drives or control devices specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/08—Superstructures; Supports for superstructures
- E02F9/10—Supports for movable superstructures mounted on travelling or walking gears or on other superstructures
- E02F9/12—Slewing or traversing gears
- E02F9/121—Turntables, i.e. structure rotatable about 360°
- E02F9/128—Braking systems
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2058—Electric or electro-mechanical or mechanical control devices of vehicle sub-units
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2058—Electric or electro-mechanical or mechanical control devices of vehicle sub-units
- E02F9/2062—Control of propulsion units
- E02F9/2075—Control of propulsion units of the hybrid type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2058—Electric or electro-mechanical or mechanical control devices of vehicle sub-units
- E02F9/2091—Control of energy storage means for electrical energy, e.g. battery or capacitors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2058—Electric or electro-mechanical or mechanical control devices of vehicle sub-units
- E02F9/2095—Control of electric, electro-mechanical or mechanical equipment not otherwise provided for, e.g. ventilators, electro-driven fans
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2217—Hydraulic or pneumatic drives with energy recovery arrangements, e.g. using accumulators, flywheels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2246—Control of prime movers, e.g. depending on the hydraulic load of work tools
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0029—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with safety or protection devices or circuits
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/14—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
- H02J7/1423—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle with multiple batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/14—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
- H02J7/1469—Regulation of the charging current or voltage otherwise than by variation of field
- H02J7/1492—Regulation of the charging current or voltage otherwise than by variation of field by means of controlling devices between the generator output and the battery
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W20/00—Control systems specially adapted for hybrid vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W2300/00—Indexing codes relating to the type of vehicle
- B60W2300/17—Construction vehicles, e.g. graders, excavators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W2710/00—Output or target parameters relating to a particular sub-units
- B60W2710/24—Energy storage means
- B60W2710/242—Energy storage means for electrical energy
- B60W2710/244—Charge state
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60W—CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- B60W2710/00—Output or target parameters relating to a particular sub-units
- B60W2710/24—Energy storage means
- B60W2710/242—Energy storage means for electrical energy
- B60W2710/248—Current for loading or unloading
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2200/00—Type of vehicle
- B60Y2200/40—Special vehicles
- B60Y2200/41—Construction vehicles, e.g. graders, excavators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2200/00—Type of vehicle
- B60Y2200/40—Special vehicles
- B60Y2200/41—Construction vehicles, e.g. graders, excavators
- B60Y2200/412—Excavators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2200/00—Type of vehicle
- B60Y2200/90—Vehicles comprising electric prime movers
- B60Y2200/92—Hybrid vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60Y—INDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
- B60Y2400/00—Special features of vehicle units
- B60Y2400/11—Electric energy storages
- B60Y2400/114—Super-capacities
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0029—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with safety or protection devices or circuits
- H02J7/00302—Overcharge protection
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/342—The other DC source being a battery actively interacting with the first one, i.e. battery to battery charging
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/345—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- the present disclosure generally relates to a hybrid excavator, and more particularly to a hybrid excavator in which a capacitor is charged by regeneration power from an electric load.
- a hybrid excavator includes an upper turning body which carries work elements, such as a boom, an arm, and a bucket.
- the hybrid excavator drives the boom and the arm while turning the upper turning body so that the bucket is moved to a desired work position.
- a hybrid excavator which uses an electric motor as a source of power of a turning mechanism to turn the upper turning body is proposed (for example, refer to Patent Document 1 listed below).
- the electric motor When decelerating the upper turning body, the electric motor is operated as a dynamo to generate electric power and the regeneration power is stored in a capacitor.
- the present disclosure provides a hybrid excavator which is capable of adjusting at least one of a target charging value of a capacitor and a target charging value of a DC bus variably and capable of preventing overcharging of the capacitor even if large regeneration power occurs.
- the present disclosure provides a hybrid excavator including a lower running body, an upper turning body which is turned on the lower running body, a boom having an end rotatably attached to the upper turning body, an arm having an end rotatably attached to the other end of the boom, and a work element rotatably attached to the other end of the aim, the hybrid excavator including: an engine disposed in the upper turning body to generate a driving force; a motor generator disposed in the upper turning body to perform a power generating operation by the driving force transmitted from the engine; a motor generator control unit disposed in the upper turning body to control operation of the motor generator in response to an externally supplied control signal; a first capacitor disposed in the upper turning body and being capable of storing electricity; a second capacitor disposed in the upper turning body, electrically connected to the motor generator control unit and being capable of storing electricity; a charge/discharge control unit disposed in the upper turning body to electrically
- the present disclosure provides a method of controlling a hybrid excavator including: an engine to generate a driving force; a motor generator to perform an electric power generating operation by the driving force transmitted from the engine; a motor generator control unit to control operation of the motor generator in response to an externally supplied control signal; a first capacitor capable of storing electricity; a second capacitor electrically connected to the motor generator control unit and being capable of storing electricity; a charge/discharge control unit electrically connecting the first capacitor and the second capacitor together and controlling a charge/discharge operation between the first capacitor and the second capacitor in response to an externally supplied control signal; a motor electrically connected to the second capacitor, the motor being capable of performing a regeneration operation to generate electric energy from mechanical energy and capable of storing the electric energy generated by the regeneration operation in the second capacitor; and a control device to supply a control signal to at least one of the motor generator control unit and the charge/discharge control unit, the method of controlling the hybrid
- the target charging value of the capacitor when occurrence of regeneration power is expected, the target charging value of the capacitor is lowered and it is possible to prevent the overcharging of the capacitor.
- the target charging value of the capacitor By adjusting the target charging value of the capacitor according to the operating state of the hybrid excavator, it is possible to prevent the overcharging of the capacitor.
- FIG. 1 is a side view of a hybrid excavator.
- FIG. 2 is a block diagram showing the composition of a drive system of a hybrid excavator of a first embodiment of the present disclosure.
- FIG. 3 is a block diagram showing the composition of a capacitor system.
- FIG. 4 is a circuit diagram of a capacitor system.
- FIG. 5 is a flowchart for explaining the process which sets up a target value of SOC.
- FIG. 6 is a flowchart for explaining the process which computes an estimated regeneration power.
- FIG. 7 is a diagram for explaining an estimated boom regeneration power.
- FIG. 8 is a flowchart for explaining the process which computes an estimated regeneration target value.
- FIG. 9 is a diagram for explaining the process which sets up an SOC target value in excavation and dumping work.
- FIG. 10 is a block diagram showing the composition of a drive system of a series type hybrid excavator.
- FIG. 11 is a block diagram showing the composition of a drive system of a hybrid excavator of a second embodiment of the present disclosure.
- FIG. 12 is a diagram showing an equivalent circuit of a capacitor system of the second embodiment.
- FIG. 13A and FIG. 13B are timing charts for explaining a controlling method of the hybrid excavator of a first comparative example of the second embodiment and a controlling method of the hybrid excavator of a first example of the second embodiment respectively.
- FIG. 14A and FIG. 14B are timing charts for explaining a controlling method of the hybrid excavator of a second comparative example of the second embodiment and a controlling method of the hybrid excavator of a second example of the second embodiment respectively.
- FIG. 15 is a block diagram showing the composition of a drive system of a hybrid excavator in which all the drive parts are hydraulically actuated.
- FIG. 1 is a side view of a hybrid excavator to which an embodiment of the present disclosure is applied.
- a lower running body 1 of the hybrid excavator carries an upper turning body 3 through a turning mechanism 2 .
- a boom 4 is attached to the upper turning body 3 .
- An arm 5 is attached at the end of the boom 4 .
- a bucket 6 is attached at the end of the arm 5 .
- the boom 4 , the arm 5 , and the bucket 6 are hydraulically driven by a boom cylinder 7 , an arm cylinder 8 , and a bucket cylinder 9 , respectively.
- a cabin 10 is arranged in the upper turning body 3 , and the source of power, such as an engine, is carried in the upper turning body 3 .
- FIG. 2 is a block diagram showing the composition of a drive system of a hybrid excavator of a first embodiment of the present disclosure.
- the double line denotes a mechanical drive line
- the thick solid line denotes a high voltage hydraulic line
- the dotted line denotes a pilot line
- the thin solid line denotes an electric drive/control line, respectively.
- An engine 11 as a mechanical drive part and a motor generator 12 as an assist drive part are connected to two input axes of a gearbox 13 , respectively.
- a main pump 14 as a hydraulic pump and a pilot pump 15 are connected to the output axis of the gearbox 13 .
- a control valve 17 is connected to the main pump 14 via a high voltage hydraulic line 16 .
- the control valve 17 is a control unit which controls a hydraulic system of the hybrid excavator.
- a hydraulic motor 1 A (for the right side use) and a hydraulic motor 1 B (for the left side use) are provided for driving the lower running body 1 .
- the hydraulic motors 1 A and 1 B, the boom cylinder 7 , the aim cylinder 8 , and the bucket cylinder 9 are connected to the control valve 17 via the high voltage hydraulic line.
- a capacitor system 120 contains a capacitor as a capacitor part of the hybrid excavator and is connected to the motor generator 12 via an inverter 18 A.
- a turning motor 21 as an electric work element is connected to the capacitor system 120 via an inverter 20 .
- a resolver 22 , a mechanical brake 23 , and a turning gearbox 24 are connected to the axis of rotation 21 A of the turning motor 21 .
- An operation device 26 is connected to the pilot pump 15 via the pilot line 25 .
- the turning motor 21 , the inverter 20 , the resolver 22 , the mechanical brake 23 , and the turning gearbox 24 constitute a load drive system.
- the operation device 26 includes a lever 26 A, a lever 26 B, and a pedal 26 C.
- the lever 26 A, the lever 26 B, and the pedal 26 C are connected to each of the control valve 17 and a voltage sensor 29 via a hydraulic line 27 and a hydraulic line 28 , respectively.
- the voltage sensor 29 is connected to a controller 30 , and the controller 30 performs drive control of the electric system.
- a boom regeneration motor 300 (also called a dynamo 300 ) is provided for obtaining boom regeneration power and is connected to the capacitor system 120 via an inverter 18 C.
- the dynamo 300 is driven by a hydraulic motor 310 which is driven by the hydraulic fluid discharged from the boom cylinder 7 .
- the dynamo 300 converts the potential energy of the boom 4 into electrical energy by using the voltage of the hydraulic fluid discharged from the boom cylinder 7 when the boom 4 is lowered by gravity.
- the hydraulic motor 310 and the dynamo 300 are illustrated as being located in the positions that are separate from each other. In practical applications, however, the axis of rotation of the dynamo 300 is mechanically connected to the axis of rotation of the hydraulic motor 310 .
- the hydraulic motor 310 is arranged so that the hydraulic motor 310 is rotated by the hydraulic fluid which is discharged from the boom cylinder 7 when the boom 4 is lowered.
- the hydraulic motor 310 is provided to convert the energy generated when the boom 4 is lowered by gravity into a rotational force.
- the hydraulic motor 310 is arranged in a hydraulic piping 7 A between the control valve 17 and the boom cylinder 7 .
- the hydraulic motor 310 may be attached to a suitable location within the upper turning body 3 .
- the power generated by the dynamo 300 is supplied to the capacitor system 120 through the inverter 18 C as regeneration power.
- the dynamo 300 and the inverter 18 C constitute a load drive system.
- a boom angle sensor 7 B is provided for detecting the angle of the boom 4 and attached to the supporting shaft of the boom 4 .
- the boom angle sensor 7 B supplies the detected boom angle ⁇ B to the controller 30 .
- FIG. 3 is a block diagram showing the composition of the capacitor system 120 .
- the capacitor system 120 includes a capacitor 19 as a capacitor part of the hybrid excavator, and an up-down voltage converter 100 and a DC bus 110 .
- the DC bus 110 is a second capacitor part of the hybrid excavator and controls transfer of the electric power between capacitor 19 as the first capacitor part of the hybrid excavator, the motor generator 12 , and the turning motor 21 .
- a capacitor voltage detecting part 112 for detecting a voltage value of the capacitor and a capacitor current detecting part 113 for detecting a current value of the capacitor are arranged.
- the capacitor voltage value and the capacitor current value which are detected by the capacitor voltage detecting part 112 and the capacitor current detecting part 113 are supplied to the controller 30 .
- the up-down voltage converter 100 controls switching of voltage raising operation and voltage lowering operation according to the operating state of the motor generator 12 , the dynamo 300 , and the turning motor 21 so that the DC bus voltage value falls within a fixed range.
- the DC bus 110 is arranged between the inverters 18 A, 18 C, and 20 and the up-down voltage converter 100 , and delivers or receives the electric power between the capacitor 19 , the motor generator 12 , the dynamo 300 , and the turning motor 21 .
- the controller 30 is a control unit as a main control part which performs drive control of the hybrid excavator.
- the controller 30 is constituted by a processor unit including a CPU (central processing unit) and an internal memory, and the functions of the controller 30 are performed by the CPU which executes a drive control program read from the internal memory.
- the controller 30 converts the signal received from the voltage sensor 29 into a speed command, and performs drive control of the turning motor 21 by using the speed command.
- the signal received from the voltage sensor 29 is equivalent to the signal indicating the operational amount when the operation device 26 is operated in order to turn the turning mechanism 2 .
- the controller 30 controls operation of the motor generator 12 (switching of a motor-assisted operation and a power generating operation), and controls operation of the up-down voltage converter 100 as the voltage raising/lowering control unit in order to control charging/discharging of the capacitor 19 .
- the controller 30 controls switching of the voltage raising operation and the voltage lowering operation of the up-down voltage converter 100 based on the charging state of the capacitor 19 , the operating state of the motor generator 12 (motor-assisted operation or power generating operation) and the operating state (power operation or regeneration operation) of the turning motor 21 , so that the charging/discharging of the capacitor 19 is controlled.
- the switching control of the voltage raising operation and the voltage lowering operation of the up-down voltage converter 100 is carried out based on the DC bus voltage value detected by the DC bus voltage detecting part 111 , the capacitor voltage value detected by the capacitor voltage detecting part 112 , and the capacitor current value detected by the capacitor current detecting part 113 .
- the power generated by the motor generator 12 as an assist motor is supplied to the DC bus 110 of the capacitor system 120 via the inverter 18 A, and supplied to the capacitor 19 via the up-down voltage converter 100 .
- the regeneration power obtained by the regeneration operation of the turning motor 21 is supplied to the DC bus 110 of the capacitor system 120 via the inverter 20 , and supplied to the capacitor 19 via the up-down voltage converter 100 .
- the power generated by the boom regeneration motor 300 is supplied to the DC bus 110 of the capacitor system 120 via the inverter 18 C, and supplied to the capacitor 19 via the up-down voltage converter 100 .
- the rotational speed (the angular velocity ⁇ ) of the turning motor 21 is detected by the resolver 22 .
- the angle (the boom angle ⁇ B) of the boom 4 is detected by the boom angle sensor 7 B, such as a rotary encoder, provided on the supporting shaft of the boom 4 .
- the controller 30 computes an estimated turning regeneration power (energy) based on the angular velocity ⁇ of the turning motor 21 , and computes an estimated boom regeneration power (energy) based on the boom angle ⁇ B. Based on the estimated turning regeneration power and the estimated boom regeneration power which are thus computed, the controller 30 computes an estimated regeneration target value of SOC.
- the controller 30 controls the respective parts of the hybrid excavator to bring the SOC of the capacitor 19 close to the thus computed estimated regeneration target value.
- FIG. 4 is a circuit diagram of the capacitor system 120 .
- the capacitor system 120 includes an up-down voltage converter 100 , a reactor 101 , a voltage raising IGBT (insulated gate bipolar transistor) 102 A, a voltage lowering IGBT 102 B, a pair of power supply connection terminals 104 for connecting the capacitor 19 , a pair of output terminals 106 for connecting the DC bus 110 , and a smoothing capacitor 107 connected in parallel to the output terminals 106 .
- the DC bus 110 is connected between the output terminals 106 of the up-down voltage converter 100 and the inverters 18 A, 18 C, and 20 .
- One end of the reactor 101 is connected to the midpoint of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B, and the other end of the reactor 101 is connected to one of the power supply connection terminals 104 .
- the reactor 101 is provided to supply the induced electromotive force produced by the switching ON/OFF of the voltage raising IGBT 102 A to the DC bus 110 .
- Each of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B is famed by a bipolar transistor in which a MOSFET (metal oxide semiconductor field effect transistor) is incorporated in the gate portion.
- Each of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B is a semiconductor element which is capable of switching large electric power at high speed.
- Each of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B is driven by the controller 30 which supplies a PWM voltage to the gate terminal.
- a diode 102 a and a diode 102 b, which are rectifier elements, are connected in parallel to the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B respectively.
- the capacitor 19 may be a chargeable and dischargeable capacitor which enables the electric power to be delivered and received between the capacitor 19 and the DC bus 110 via the up-down voltage converter 100 .
- the capacitor 19 which is a capacitor part of the hybrid excavator is illustrated.
- a chargeable and dischargeable secondary battery such as a lithium ion battery, a lithium ion capacitor, or another power supply which can deliver and receive electric power may be used instead of the capacitor 19 .
- the power supply connection terminals 104 and the output terminals 106 may be terminals which can connect the capacitor 19 and the DC bus 110 .
- the capacitor voltage detecting part 112 which detects the capacitor voltage value is connected between the power supply connection terminals 104 .
- the DC bus voltage detecting part 111 which detects the DC bus voltage value is connected is connected between the output terminals 106 .
- the capacitor voltage detecting part 112 detects the voltage value (vbat_det) of the capacitor 19 .
- the DC bus voltage detecting part 111 detects the voltage value (the DC bus voltage: vdc_det) of the DC bus 110 .
- the smoothing capacitor 107 is a capacitor element which is inserted between the positive-electrode terminal and the negative-electrode terminal of the output terminals 106 and provided to smooth the DC bus voltage.
- the voltage of the DC bus 110 is maintained at a predetermined voltage by the smoothing capacitor 107 .
- the capacitor current detecting part 113 is a detecting part to detect the value of the current which flows through the capacitor 19 .
- the capacitor current detecting part 113 includes a resistor for current detection.
- the capacitor current detecting part 113 detects the current value (ibat_det) of the current flowing through the capacitor 19 .
- the PWM voltage is supplied to the gate terminal of the voltage raising IGBT 102 A, and the induced electromotive force generated in the reactor 101 by the switching ON/OFF of the voltage raising IGBT 102 A is supplied to the DC bus 110 through the diode 102 b connected in parallel to the voltage lowering IGBT 102 B. Thereby, the voltage of the DC bus 110 is increased.
- the PWM voltage is supplied to the gate terminal of the voltage lowering IGBT 102 B, and the regeneration power supplied via the voltage lowering IGBT 102 B and the DC bus 110 is supplied from the DC bus 110 to the capacitor 19 .
- the capacitor 19 is charged by the power stored in the DC bus 110 and the voltage of the DC bus 110 is lowered.
- a drive part which generates the PWM signal for driving the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B is provided between the controller 30 and each of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B.
- the illustration of the drive part is omitted in FIG. 4 .
- Such a drive part may be constructed by either an electronic circuit or a processor unit.
- the charging ratio SOC of the capacitor 19 is always maintained in a high state, and the electric load can be driven by using the power from the capacitor with good energy efficiency.
- the target SOC of the capacitor is set to a small value, for example, 80%, so that overcharging of the capacitor may not take place even if large regeneration power is supplied from the electric load to the capacitor.
- the target SOC has been set up to 70% with a margin being left, so that even when large power is supplied to the capacitor due to sudden power generation and regeneration, the SOC of the capacitor in the charged state of the capacitor will not reach 100%.
- the SOC of the capacitor is controlled to be always 70% or less, so that the output voltage of the capacitor will be a low voltage corresponding to the SOC of 70% or less.
- the output voltage of the capacitor becomes high and the electric load can be driven efficiently.
- the electric load can be driven more efficiently than the related art if the output voltage of the capacitor is set to a higher voltage value and the electric load is driven by the higher voltage value.
- a large amount of electric power can be stored in the capacitor if the target SOC of the capacitor is set to a high value. For example, if the target SOC of the capacitor can be set to a higher value, a small-size capacitor can be used without reducing the storage amount of the capacitor according to the related art.
- the charging ratio (SOC) of the capacitor is controlled variably. Namely, when it is predicted that large regeneration power arises, the SOC of the capacitor is lowered in advance, so that the SOC after the large regeneration power is stored in the capacitor does not exceed the upper limit of the system.
- the turning motor 21 functions as a dynamo which generates regeneration power (turning regeneration power) and supplies the regeneration power to the capacitor system 120 .
- the hydraulic fluid returned from the boom cylinder 7 is used to drive the dynamo 300 so that regeneration power (boom regeneration power) is generated, and supplied to the capacitor system 120 .
- the capacitor 19 is operated at an increased charging ratio SOC which is high enough to increase the amount of electric power stored therein.
- the discharge voltage of the capacitor 19 is maintained at a high level to allow discharging of the capacitor 19 at a high voltage and prevent shortage of power, so that the energy efficiency is increased.
- the capacitor 19 is charged with the large amount of electric power in the high SOC state so that the capacitor 19 is in an overcharge state.
- the SOC of the capacitor 19 is lowered to prevent the capacitor 19 from being in an overcharge state.
- an estimated value of turning regeneration power and an estimated value of boom regeneration power are computed, and a target value of SOC is determined and changed based on the estimated turning regeneration power value (estimated turning regeneration energy) and the estimated boom regeneration power value (boom regeneration energy).
- the target value of SOC is set to a fixed value based on the control condition of the system. In this embodiment, however, the target value of SOC is changed variably at any time based on the estimated regeneration power (the estimated regeneration energy).
- FIG. 5 is a flowchart for explaining the process which sets up the target value of SOC.
- an estimated regeneration power QA is computed in step S 1 .
- the estimated regeneration power QA is computed as the sum of an estimated turning regeneration power (estimated turning rotational energy) QS and an estimated boom regeneration power (estimated boom potential energy) QB.
- step S 2 it is determined whether the estimated regeneration power QA is larger than zero. In other words, it is determined whether the estimated regeneration power QA takes place.
- the process progresses to step S 3 . For example, when the bucket drive operation and the arm drive operation other than the turning or the boom drive operation is performed, it is estimated that regeneration power does not take place.
- step S 3 the SOC target value SOCtg which is the target charging value is set to a system control upper limit SOCcul.
- the system control upper-limit SOCcul is a upper limit of SOC which is determined depending on the control of the hybrid excavator. When a detection value of SOC exceeds the system control upper limit SOCcul, it is determined that the capacitor 19 is in an overflowing state.
- step S 4 an estimated regeneration target value SOCetg is computed based on the computed estimated regeneration power QA.
- the estimated regeneration target value SOCetg is a value of SOC which does not cause the SOC value of the capacitor 19 to exceed the system control upper limit SOCcul even if the estimated regeneration power QA is supplied to the capacitor 19 .
- the estimated regeneration target value SOCetg is smaller than the system control upper limit SOCcul.
- step S 4 After the estimated regeneration target value SOCetg is computed in step S 4 , the process progresses to step S 5 .
- step S 5 the SOC target value SOCtg which is the target charging value is set to the estimated regeneration target value SOCetg. In this case, the process is terminated.
- the estimated regeneration target value SOCetg varies according to the value of the estimated regeneration power QA, and the SOC target value SOCtg also varies according to the value of the estimated regeneration power QA.
- step S 3 and the processing of step S 5 are performed by the capacitor target value control unit in the controller 30 .
- the computation of the estimated regeneration power QA is performed by the estimated regeneration energy computing unit in the controller 30 .
- FIG. 6 is a flowchart for explaining the process which computes the estimated regeneration power QA.
- an estimated boom regeneration power QB is computed.
- the estimated boom regeneration power QB is determined by the potential energy of the boom 4 .
- the estimated boom regeneration power QB is equivalent to the potential energy in the position in which the boom 4 is lifted.
- FIG. 7 is a diagram for explaining the estimated boom regeneration power QB.
- the potential energy needed to lift the weight of the boom 4 , the arm 5 , and the bucket 6 is stored. Subsequently, if the boom 4 is lowered, the stored potential energy is released (the return hydraulic fluid of the boom cylinder 7 ) and the boom regeneration hydraulic motor 310 is driven. In this case, the boom regeneration motor 300 is driven and electric power is regenerated. The power obtained by this power generation is equivalent to the boom regeneration power.
- an estimated boom regeneration power for lowering the boom 4 from the position (height) where the boom 4 is lifted to the horizontal position is computed as the estimated boom regeneration power QB.
- the distance RB from the supporting point of the boom 4 to the end of the boom 4 is multiplied by sin ⁇ B.
- the distance (height) RS of the supporting point of the boom 4 from the ground is added to the product RB ⁇ sin ⁇ B.
- the boom angle ⁇ B is a detection value which is detected by the boom angle sensor 7 B.
- the position where the boom 4 is lowered from the position where the boom 4 is lifted is not necessarily the horizontal position. However, if the boom regeneration power is computed under the assumption that the boom 4 is lowered to the horizontal position, the computed value is approximate to the maximum regeneration power obtained from the position where the boom 4 is lifted.
- the estimated boom regeneration power QB may be computed by multiplying the weight m, which is the sum of the maximum weight of the sand contained in the bucket 6 and the weight of the boom 4 , the arm 5 and the bucket 6 , by the gravity g, and further multiplying the resultant value by the height H of the end of the boom 4 from the ground, as follow.
- step S 11 the process progresses to step S 12 .
- step S 12 the computation of the estimated turning regeneration power QS is performed.
- the computation of the estimated turning regeneration power QS may be computed in accordance with the formula:
- Mi is the moment of inertia of the upper turning body 3
- ⁇ is the angular velocity of the turning movement of the upper turning body 3
- the value of Mi is taken as the maximum moment of inertia in the state where the boom 4 and the arm 5 are extended.
- the angular velocity ⁇ may be determined based on the rotational speed of the turning motor 21 detected by the resolver 22 .
- step S 12 After the estimated turning regeneration power QS is computed in step S 12 , the process progresses to step S 13 .
- step S 4 is the process which computes the estimated regeneration target value SOCetg.
- the process of computing the estimated regeneration target value SOCetg is performed by the capacitor target value determining unit in the controller 30 .
- FIG. 8 is a flowchart for explaining the process which computes an estimated regeneration target value SOCetg.
- step S 41 the capacitor work amount Qmax which is the power stored in the capacitor 19 when the charging ratio (SOC) of the capacitor 19 reaches the system control upper limit SOCcul is computed.
- the capacitor work amount Qmax is equivalent to the maximum power that can be stored in the capacitor 19 according to the system control.
- the capacitor work amount Qmax may be computed in accordance with the formula:
- C is the electrostatic capacity of the capacitor 19 .
- an estimated regeneration target value SOCetg is computed based on the target value Q of power.
- step 55 of the process of FIG. 5 the SOC target value SOCtg is set to the estimated regeneration target value SOCetg.
- FIG. 9 is a diagram for explaining the process which sets up the SOC target value SOCtg in the excavation and dumping work. Because it is expected that the estimated regeneration power QA is present during the work period from time 0 to time t 4 in FIG. 9 , the SOC target value SOCtg as the target charging value is set to the estimated regeneration target value SOCetg.
- the height H of the boom 4 changes as shown in FIG. 9( a ).
- the boom 4 is lowered after the time the height H of the boom 4 reaches the peak, and the boom regeneration power takes place.
- the turning speed of the upper turning body 3 is proportional to the angular velocity ⁇ of the turning motor 21 , and the turning speed of the upper turning body 3 changes during the excavation and dumping work as shown in FIG. 9( c ).
- the turning speed decreases after the time the angular velocity ⁇ reaches the peak, and the turning regeneration power takes place.
- the minus direction (negative value) of the turning speed means the reverse rotation, and the estimated turning regeneration power is computed using the absolute value of the turning speed.
- the estimated regeneration power QA is the sum of the estimated boom regeneration power QB and the estimated turning regeneration power QS, and changes of the estimated regeneration power QA are in the pattern as shown in FIG. 9( e ), which is a resultant pattern of the pattern of FIG. 9( b ) and the pattern of FIG. 9( d ).
- the estimated regeneration target value SOCetg is set up to the value that does not exceed the permissible maximum charging ratio (the system control upper limit SOCcul) of the capacitor 19 according to the system control when the estimated regeneration power QA is supplied to the capacitor 19 and the capacitor 19 is charged with the estimated regeneration power QA.
- the estimated regeneration target value SOCetg is obtained by subtracting the estimated regeneration power QA from the system control upper limit SOCcul, and changes of the estimated regeneration target value SOCetg are in the pattern as shown in FIG. 9( f ).
- the boom 4 is lifted while the turning operation is performed.
- the SOC target value SOCtg (which is, in this case, the estimated regeneration target value SOCetg) is lowered. Because the estimated regeneration target value SOCetg is lowered from the system control upper limit SOCcul, the percentage of the stored power corresponding to the decrease of the estimated regeneration target value SOCetg is discharged. In this case, the power discharged can be used for the lifting of the boom 4 or the power operation of the turning.
- the boom 4 is lowered and the turning speed is decreased, and the computed estimated regeneration power is also decreased.
- the SOC target value SOCtg (which is, in this case, the estimated regeneration target value SOCetg) is increased.
- the boom regeneration power takes place because of the lowering of the boom 4
- the turning regeneration power also takes place because of the braking operation (decelerating operation) of the turning motor.
- the percentage of such regeneration power corresponding to the increase of the estimated regeneration target value SOCetg can be stored in the capacitor 19 by charging of the capacitor 19 .
- the estimated regeneration target value SOCetg is decreased and discharging of the capacitor 19 corresponding to the decrease of the estimated regeneration target value SOCetg is performed.
- the estimated regeneration target value SOCetg is increased and charging of the capacitor 19 corresponding to the increase of the estimated regeneration target value SOCetg is performed.
- C denotes the electrostatic capacity of the capacitor 19
- V denotes the capacitor voltage (the voltage between the terminals) of the capacitor 19 .
- the SOC by which the charging voltage is 67% of the rated voltage has been used.
- the SOC of 95% which is obtained by multiplying the conventional SOC value by ⁇ square root over ( ) ⁇ 2 may be used.
- the capacitor with 1/2 of the electrostatic capacity may be used while maintaining the same capacitor energy as the case where the SOC of 67% is used.
- the SOC when no regeneration power is present, the SOC is controllable to be above about 90% (the charging ratio is 95%). In other word, the electrostatic capacity of the capacitor capacity can be reduced to 1 ⁇ 2 of the conventional value. Hence, using the hybrid excavator of this embodiment provides increased flexibility of selection of the capacitor 19 .
- the target value of SOC is variably controllable and when it is expected that regeneration power is present, the target ratio of SOC can be reduced in advance. Thus, it is possible to present overcharge of the capacitor 19 .
- the estimated regeneration target value SOCetg computed in this embodiment when it is estimated that regeneration power is not present is equal to the system control upper limit SOCcul which is larger than the conventional SOC target upper limit.
- the estimated regeneration target value SOCetg computed in this embodiment when it is estimated that regeneration power is present is equal to the value which is obtained by subtracting the charging ratio (which increases from the system control upper limit SOCcul when the capacitor 19 is charged by the estimated regeneration power QA) from the system control upper limit SOCcul.
- the estimated regeneration power QA is computed by adding together the estimated boom regeneration power QB and the estimated turning regeneration power QS.
- the estimated turning regeneration power QS may be used as the estimated regeneration power QA.
- the estimated regeneration power QA may be computed by adding together the estimated lifting magnet regeneration power QL.
- the regeneration power from the lifting magnet is generated by the reverse current flowing when the lifting magnet is turned OFF, and this reverse current has an almost constant current value.
- the estimated lifting magnet regeneration power QL may be set to a fixed value.
- the target charging value is set to the value which is equal to the system control upper limit.
- the target charging value may be set to a value which is slightly smaller than the system control upper limit.
- the target charging value may be set to a value which falls within a predetermined range.
- the present embodiment is also applicable to a series type hybrid excavator in which the motor generator 12 is driven by the engine 11 , the power generated by the motor generator 12 is stored in the capacitor system 120 , and the main pump 14 is driven by the stored power only as shown in FIG. 10 .
- the motor generator 12 in this embodiment has a dynamo function only to generate electric power when the motor generator 12 is driven by the engine 11 .
- FIG. 11 is a block diagram showing the composition of a drive system of a hybrid excavator of the second embodiment.
- the elements which are the same as corresponding elements shown in FIG. 2 are designated by the same reference numerals, and a description thereof will be omitted.
- the controller 30 includes a central processing unit (CPU) and an internal memory.
- the CPU executes the drive control program stored in the internal memory.
- the controller 30 calls the operator's attention by displaying a degraded state of the relevant parts or the like on a display device (not shown).
- the input/output terminals of the electric system of the motor generator 12 are connected to the DC bus 110 via the inverter 18 A.
- the DC bus 110 is connected to the capacitor 19 via a converter (battery charge/discharge circuit) 100 .
- the capacitor 19 may include a plurality of electric double layer capacitors which are connected in series.
- the voltage of the DC bus 110 is controllable by using the converter 100 . For example, if a charging current is caused to flow through the converter 100 , the electric energy of the DC bus 110 moves to the capacitor 19 and the voltage of the DC bus 110 is lowered. On the contrary, if a discharging current is caused to flow through the converter 100 , the electric energy of the capacitor 19 moves to the DC bus 110 and the voltage of the DC bus 110 is increased. In this manner, the converter 100 controls charge/discharge operation between the capacitor 19 and the DC bus 110 .
- the capacitor 19 is equivalent to a first capacitor that is capable of storing electricity and the DC bus 110 is equivalent to a second capacitor that is capable of storing electricity.
- the converter 100 is equivalent to a charge/discharge control unit which electrically connects the capacitor 19 and the DC bus 110 and controls charge/discharge operation between the capacitor 19 and the DC bus in response to an externally supplied control signal.
- the capacitor system 120 including the capacitor 19 , the converter 100 , and the DC bus 110 is disposed in the upper turning body 3 .
- the DC bus 110 is connected to the boom regeneration motor 300 via the inverter 18 C.
- the boom regeneration motor 300 is connected to the boom regeneration hydraulic motor 310 and can generate electric energy by the driving force of the hydraulic motor 310 .
- the electric energy generated by the boom regeneration motor 300 is supplied to the DC bus 110 via the inverter 18 C and this inverter converts the three-phase alternating current into the direct current.
- the DC bus 110 is connected to the turning motor 21 via another inverter 20 .
- the electric energy is exchanged between the DC bus 110 and the turning motor 21 through the inverter 20 .
- Each of the inverters 20 and 18 C and the converter 100 is controlled by a control signal output from the controller 30 .
- FIG. 12 is a diagram showing an equivalent circuit of the capacitor system 120 of this embodiment.
- the up-down voltage converter 100 controls the charge/discharge current of the capacitor 19 which is the first capacitor.
- the DC bus 110 which is the second capacitor includes a smoothing capacitor 107 .
- the capacitor 19 is connected to a pair of power supply connection terminals 103 A and 103 B of the converter 100 , and the smoothing capacitor 107 of the DC bus 110 is connected to a pair of output terminals 106 A and 106 B.
- the power supply connection terminal 103 B (one of the pair of power supply connection terminals) and the output terminal 106 B (one of the pair of output terminals) are grounded.
- the DC bus 110 is connected to the motor generator 12 , turning motor 21 , and the boom regeneration hydraulic motor 310 via the inverters 18 A, 18 C, and 20 , respectively.
- the power generated by the motor generator 12 can be supplied to the capacitor 19 or the DC bus 110 via the inverter 18 A.
- the required electric power can be supplied from the capacitor 19 or the DC bus 110 to the motor generator 12 via the inverter 18 A.
- the electric energy is supplied from the capacitor 19 or the DC bus 110 to the turning motor 21 .
- the regeneration energy generated by the turning motor 21 is stored in the capacitor 19 or the DC bus 110 .
- the voltage between the terminals of the smoothing capacitor 107 is detected by a voltage detecting part 111 , and the detected voltage is input to the controller 30 .
- the converter 100 is controlled based on the detected voltage from the voltage detecting part 111 and the target value of the DC bus 110 , so that the voltage of the DC bus is maintained at the fixed value.
- the controller 30 is capable of detecting the state (non-operating state) of the hybrid excavator in which none of the lower running body 1 , the turning mechanism 2 , the boom 4 , the arm 5 , and the bucket 6 operates and neither charging operation nor discharging operation of the capacitor 19 and the DC bus 110 is performed.
- the series circuit in which the collector of the voltage raising IGBT (insulated gate bipolar transistor) 102 A and the emitter of the voltage lowering IGBT 102 B are connected to each other is connected between the output terminals 106 A and 106 B.
- the emitter of the voltage raising IGBT 102 A is grounded and the collector of the voltage lowering IGBT 102 B is connected to the high voltage output terminal 106 A.
- the connection point of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B is connected to the high voltage power supply connection terminal 103 A via the reactor 101 .
- a diode 102 a is connected in parallel to the voltage raising IGBT 102 A and a diode 102 b is connected in parallel to the voltage lowering IGBT 102 B respectively, such that the direction from the emitter to the collector is consistent with the forward direction.
- a voltage detecting part 112 is connected between the power supply connection terminals 103 A and 103 B and detects the voltage between the terminals of the capacitor 19 .
- a current detecting part 113 is connected in series to the reactor 101 and detects the charge/discharge current of the capacitor 19 . The detected voltage and the detected current are input to the controller 30 .
- the controller 30 supplies a pulse-width-modulation (PWM) voltage (control signal) to the gate of each of the voltage raising IGBT 102 A and the voltage lowering IGBT 102 B.
- PWM pulse-width-modulation
- the voltage raising operation (discharging operation) will be described. If the PWM voltage is supplied to the gate of the voltage raising IGBT 102 A, the induced electromotive force occurs in the reactor 101 at the time of the OFF state of the voltage raising IGBT 102 A in the direction to forward the current from the high voltage power supply connection terminal 103 A to the collector of the voltage raising IGBT 102 A. This electromotive force is supplied to the DC bus 110 via the diode 102 b. In this manner, the voltage raising of the DC bus 110 is performed.
- the voltage lowering (charging operation) will be described. If the PWM voltage is supplied to the gate electrode of the voltage lowering IGBT 102 B, the induced electromotive force occurs in the reactor 101 at the time of the OFF state of the voltage lowering IGBT 102 B in the direction to forward the current from the emitter of the voltage lowering IGBT 102 B to the high voltage power supply connection terminal 103 A. The capacitor 19 is charged by this electromotive force. In this manner, the DC bus 110 can be controlled at a fixed voltage at any time.
- FIG. 13A is a timing chart for explaining the controlling method of the first comparative example.
- the operator of the hybrid excavator maintains the boom lever of the operation device 26 in the “lift” state during the period of time t 1 to time t 2 , and the boom 4 is gradually lifted upward from the upper turning body 3 .
- the boom 4 is lifted to the stroke upper limit (power generating operation).
- the operator returns the boom lever to its neutral position and maintains that state until time t 3 .
- the boom 4 is maintained in the position of the stroke upper limit.
- the boom 4 is lifted only by the driving force of the engine 11 and the motor generator 12 does not perform the motor-driven (motor-assisted) operation.
- the DC bus 110 is maintained at the fixed voltage (high voltage state VM).
- the “target voltage of DC bus 110 ” denotes the target value to which the voltage of the DC bus 110 is changed.
- the boom 4 is lowered, and the driving force (torque) occurs in the boom regeneration motor 310 .
- the driving force is transmitted to the boom regeneration motor 300 , and power generation is performed by the boom regeneration motor 300 (regeneration operation).
- the generated electric energy is supplied to the inverter 18 C, the DC bus 110 , and the converter 100 and stored in the capacitor 19 .
- the DC bus 110 is kept in the high voltage state VM but the converter 100 performs charging operation.
- the energy generated by the dynamo 300 is stored in the capacitor 19 by the charging operation of the converter 100 as indicated by the arrow in FIG.
- the SOC changes in the case in which the SOC is set to 90% when it is expected that no regeneration power is present.
- the power by which the capacitor 19 is charged is increased and the SOC is increased.
- the SOC is initially set to 90% which is a relatively high target value, the SOC will exceed the system control upper limit (at which the SOC is 100%) during the period of time t 3 to time t 4 and overcharging of the capacitor 19 will take place.
- FIG. 13B is a timing chart for explaining the controlling method of the first example of the second embodiment.
- the graphs of “boom lever” and “angle of boom 4 ” in FIG. 13B are the same as those of the first comparative example in FIG. 13A .
- the boom 4 is lifted using the driving force of the engine 11 and the assist drive power of the motor generator 12 .
- the electric energy stored in the DC bus 110 is used instead of the capacitor 19 .
- the “output state of motor generator 12 ” is in the assist state and the “target voltage of DC bus 110 ” which is the target charging value is set in the low voltage state VL.
- the converter 100 does not perform the charge/discharge operation. Because the motor generator 12 performs the motor-assisted operation, the main pump 14 is shifted to the high-output state PH in which the high output can be generated.
- the voltage value of the DC bus 110 actually detected by the voltage detecting part 111 is indicated by the dotted line. Because the engine 11 is assisted by the motor generator 12 during the period of time t 1 to time t 2 , the voltage of the DC bus 110 is gradually decreased from the high voltage state VM to the low voltage state VL in time t 2 . As indicated by the arrow in FIG. 13B which is drawn from the graph of “target voltage of DC bus 110 ” to the graph of “output state of motor generator 12 ”, the motor-assisted operation of the motor generator 12 is performed by the decrement of the voltage of the DC bus 110 .
- the motor generator 12 does not perform the motor-assisted operation or the power generating operation.
- the electric energy stored in the capacitor 19 and the DC bus 110 does not change.
- the converter 100 does not perform the charge/discharge operation, and the target voltage and the actual voltage of the DC bus 110 are maintained in the low voltage state VL.
- the main pump 14 is maintained in the low power output state PN. In this manner, the DC bus 110 is maintained in the low voltage state VL and charge/discharge control between the DC bus 110 and the capacitor 19 is not performed. Therefore, it is possible to prevent occurrence of power loss.
- the boom 4 is lowered and the potential energy of the boom 4 is converted into electrical energy through the boom regeneration hydraulic motor 310 and the boom regeneration motor 300 (dynamo) (regeneration operation).
- the resulting electric power is stored in the DC bus 110 instead of the capacitor 19 .
- the converter 100 does not perform the charge/discharge operation with the capacitor 19 .
- the target voltage of the DC bus 110 is set in the high voltage state VM.
- the actual voltage of the DC bus 110 is gradually increased from the low voltage state VL during the period of time t 3 to time t 4 .
- the electric energy discharged from the DC bus 110 is not completely collected by the lowering of the boom 4 , and the actual voltage of the DC bus 110 in time t 4 is lower than the high voltage state VM.
- the electric energy generated by the boom regeneration motor 300 is stored in the DC bus 110 and the voltage of the DC bus 110 is increased as indicated by the arrow in FIG. 13B .
- the main pump 14 is kept in the low power output state PN.
- the insufficiency of the voltage of the DC bus 110 is recovered to the high voltage state VM.
- the target voltage of DC bus 110 is maintained in the high voltage state VM and the converter 100 performs the discharge operation until the target voltage value VM is reached.
- the electric energy of the capacitor 19 is stored in the DC bus 110 by the discharge operation of the converter 100 as indicated by the arrow in FIG. 13B which is drawn from the graph of “current state of converter 100 ” to the graph of “target voltage of DC bus 110 ”.
- the SOC changes according to the change of the voltage of the DC bus 110 in the first embodiment.
- the boom regeneration power is stored in the DC bus 110 and the voltage of the DC bus 110 is increased.
- the regeneration power is not supplied to the capacitor 19 and the SOC of the capacitor 19 can be maintained in the high state.
- storing the regeneration power in the DC bus 110 prevents the capacitor 19 from being further charged by the regeneration power. Because the charging of the capacitor 19 the SOC of which SOC is high by the regeneration power is avoided, and it is possible to prevent the overcharging of the capacitor 19 .
- the capacitor 19 is slightly discharged and the resulting power is supplied to the DC bus 110 .
- the power generating operation of the motor generator 12 is performed and the capacitor 19 is charged, so that the charging ratio SOC of the capacitor 19 is set to the target charging ratio (90%).
- the target charging ratio in this case is equivalent to the voltage ratio of about 95%.
- the motor-assisted operation of the motor generator 12 is performed using the electric energy stored in the DC bus 110 during the period of time t 1 to time t 2 , and the motor-assisted driving force is added to the driving force of the engine 11 , so that the boom 4 is lifted. Because a part of the energy released from the main pump 14 is supplied from the motor generator 12 when the boom 4 is lifted, the load of the engine 11 can be decreased. Hence, the setup pump power for the lifting of the boom 4 (setting of main pump 14 ) can be increased. Thus, the power for lifting the boom 4 can be increased.
- the energy generated by the lowering of the boom 4 is stored in the DC bus 110 during the period of time t 3 to time t 4 , instead of the capacitor 19 . Hence, it is possible to prevent the power consumption in the converter 100 during this period.
- the electric energy of the capacitor 19 is moved to the DC bus 110 and the voltage state of the DC bus 110 is maintained in the constant state (the high voltage state VM).
- the constant voltage (the high voltage state VM) in which the voltage of the DC bus 110 is maintained after time t 5 is higher than the constant voltage in which the voltage of the capacitor 19 is maintained.
- FIG. 14A is a timing chart for explaining the controlling method of the second comparative example.
- the operator of the hybrid excavator maintains the turning lever of the operation device 26 in the “forward rotation” state during the period of time t 1 to time t 3 , and the upper turning body 3 is turned from the initial value to the target value.
- the upper turning body 3 starts turning in the direction of forward rotation from the stop state at the initial velocity of zero in time t 1 , arrives at the target position in time t 4 , and the terminal velocity is equal to zero so that the turning is stopped.
- the angular velocity of the upper turning body 3 is gradually increased.
- the upper turning body 3 is turned at the equal angular velocity.
- the angular velocity of the upper turning body 3 is gradually decreased.
- the turning motor 21 generates a rotational force from the electric energy and performs the power generating operation for turning the upper turning body 3 during the period of time t 1 to time t 2 and performs the regeneration operation and generates electric energy from the turning rotation of the upper turning body 3 during the period of time t 3 to time t 4 .
- the turning motor 21 does not perform the power generating operation or the regeneration operation.
- the voltage of the DC bus 110 is maintained and the power generating operation of the turning motor 21 is performed using the electric energy stored in the capacitor 19 .
- the regeneration energy generated by the turning motor 21 is stored in the capacitor 19 .
- the converter 100 performs the discharging operation and releases the electric energy stored in the capacitor 19 .
- the converter 100 performs the charging operation and stores the resulting regeneration energy in the capacitor 19 .
- the regeneration energy which is stored in the capacitor 19 during the period of time t 3 to time t 4 is smaller than the energy released from the capacitor 19 during the period of time t 1 to time t 2 .
- the motor generator 12 performs the power generating operation to compensate the insufficiency of the electric power, in order to maintain the voltage of the capacitor 19 at a constant level.
- the electric energy generated by the motor generator 12 is stored in the capacitor 19 by the charging operation of the converter 100 .
- the power operation is performed by using the energy of the capacitor 19 and the resulting regeneration energy is stored in the capacitor 19 .
- the target voltage of the DC bus 110 does not change and is maintained in the high voltage state VM.
- the charge/discharge control operation is performed between the converter 100 and the capacitors 19 in order to maintain the voltage of the DC bus 110 in the high voltage state VM.
- the power consumption is caused by the charge/discharge control operation.
- FIG. 14B is a timing chart for explaining the controlling method of the second example of the second embodiment.
- the graphs of “turning lever”, “turning angle of upper turning body 3 ”, and “output state of turning motor 21 ” in FIG. 14B are the same as those of the second comparative example in FIG. 14A .
- the power generating operation of the turning motor 21 is performed using the electric energy stored in the capacitor 19 and the DC bus 110 .
- the energy generated by the regeneration operation of the turning motor 21 is stored in the DC bus 110 instead of the capacitor 19 .
- the electric energy of the DC bus 110 is used to perform the power operation during the period of time t 1 to time t 2 , and the target voltage of the DC bus 110 is shifted from the high voltage state VM to the low voltage state VL.
- the converter 100 performs the discharging operation and the electric energy of the capacitor 19 is also used to perform the power operation.
- the motor generator 12 does not perform the motor-assisted operation or the power generating operation.
- the actual voltage of the DC bus 110 is gradually decreased from the high voltage state VM in time t 1 to the low voltage state VL in time t 2 .
- the turning motor 21 does not receive the supply of electric energy and does not generate regeneration energy.
- the target voltage and the actual voltage of the DC bus 110 are maintained in the low voltage state VL.
- the converter 100 does not perform the charge/discharge operation and the motor generator 12 does not perform the motor-assisted operation or the power generating operation.
- the DC bus 110 is maintained in the low voltage state VL and the charge/discharge control between the DC bus 110 and the capacitor 19 is not performed. Hence, it is possible to prevent the power loss.
- the turning motor 21 generates regeneration energy from the turning rotation of the upper turning body 3 (regeneration operation).
- the target voltage of the DC bus 110 is changed from the low voltage state VL to the high voltage state VM, and the regeneration energy is stored in the DC bus 110 .
- the charge/discharge operation of the converter 100 and the motor-assisted operation or the power generating operation of the motor generator 12 are not performed.
- the actual voltage of the DC bus 110 is gradually increased from the low voltage state VL during the period of time t 3 to time t 4 , but does not reach the high voltage state VM.
- the voltage of the DC bus 110 is recovered to the high voltage state VM.
- the target voltage of the DC bus 110 is maintained in the high voltage state VM, and the converter 100 performs the discharging operation until the target voltage value VM is reached.
- the voltage of the DC bus 110 is variably controlled and the SOC of the capacitor 19 can be maintained in the high state.
- the power generating operation of the motor generator 12 is performed and the charging of the capacitor 19 is performed in order to recover the lowered voltage of the capacitor 19 .
- the energy of the power operation is partially supplied from the DC bus 110 .
- the current which flows through the converter 100 can be reduced. Therefore, it is possible to prevent the power consumption.
- the energy generated by the regeneration operation of the turning motor 21 during the period of time t 3 to time t 4 is stored in the DC bus 110 , not in the capacitor 19 . Therefore, it is possible to prevent the power consumption in the converter 100 during this period.
- the electric energy of the capacitor 19 is moved to the DC bus 110 and the voltage of the DC bus 110 is maintained in the high voltage state VM.
- the constant voltage (the high voltage state VM) in which the voltage of the DC bus 110 is maintained after time t 5 is higher than the constant voltage in which the voltage of the capacitor 19 is maintained. In other words, after time t 5 , the power generating operation of the motor generator 12 is performed and the charging operation of the capacitor 19 is performed in order to recover the lowered voltage of the capacitor 19 .
- the collectable energy is predicted with the lowering of the boom 4 and the regeneration operation of the turning motor 21 , at least the collectable energy is released and the lifting of the boom 4 and the power generating operation of the turning motor 21 are performed. Because the boom cylinder has the predetermined stroke, after the boom 4 is lifted, the lowering operation of the boom 4 must be performed in the amount equivalent to the lifting amount. Hence, the energy corresponding to the energy generated by the lowering operation of the boom 4 may be released. Similarly, after the upper turning body 3 is accelerated by the turning motor 21 , the speed of the upper turning body 3 must be reduced to a stop.
- the energy corresponding to the energy generated by the decelerating operation of the upper turning body 3 may be released.
- the charging ratio of the capacitor 19 during the period of time t 1 to time t 2 is smaller than the target charging ratio, the charging of the capacitor 19 is performed.
- the charging ratio of the capacitor 19 during the period of time t 4 to time t 5 is smaller than the target charging ratio, the charging of the capacitor 19 is performed.
- the lifting or lowering of the boom 4 and the turning of the upper turning body 3 are performed at different times.
- the regeneration energy generated by the boom 4 may be stored in the DC bus 110
- the regeneration energy generated by the upper turning body 3 may be stored in the capacitor 19 , for example. If both the two types of regeneration energy are stored in the capacitor 19 , the current flowing through the converter 100 will be increased and the energy loss will be increased. If the control is performed so that the regeneration energy from the boom 4 is stored in the DC bus 110 , the energy loss in the converter 100 can be prevented.
- the hybrid excavator has been used.
- a crane may be used instead.
- lifting and lowering of the crane may be considered to be equivalent the lifting and lowering of the boom.
- the crane corresponds to the boom and the motor for lifting the crane is equivalent to the boom regeneration motor.
- the present disclosure is applicable to a hybrid excavator in which all the drive parts are hydraulically actuated as shown in FIG. 15 .
- electric power generated by the motor generator 12 using excessive power of the engine 11 and electric power generated by the boom regeneration motor 300 are stored in the capacitor system 120 .
- the electric power stored in the capacitor system 120 is used to assist the output of the engine 11 .
- the present disclosure is applicable to a hybrid excavator in which an engine is assisted by an electric motor.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Combustion & Propulsion (AREA)
- Transportation (AREA)
- General Chemical & Material Sciences (AREA)
- Electrochemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Manufacturing & Machinery (AREA)
- Automation & Control Theory (AREA)
- Operation Control Of Excavators (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Hybrid Electric Vehicles (AREA)
Abstract
Description
- The present disclosure generally relates to a hybrid excavator, and more particularly to a hybrid excavator in which a capacitor is charged by regeneration power from an electric load.
- Generally, a hybrid excavator includes an upper turning body which carries work elements, such as a boom, an arm, and a bucket. The hybrid excavator drives the boom and the arm while turning the upper turning body so that the bucket is moved to a desired work position.
- A hybrid excavator which uses an electric motor as a source of power of a turning mechanism to turn the upper turning body is proposed (for example, refer to
Patent Document 1 listed below). When decelerating the upper turning body, the electric motor is operated as a dynamo to generate electric power and the regeneration power is stored in a capacitor. -
- Patent Document 1: Japanese Laid-Open Patent Publication No. 2007-218003
- If large regeneration power occurs in a hybrid excavator and the regeneration power is supplied to the capacitor, there is a possibility that an overvoltage exceeding an upper limit of the capacitor takes place and the capacitor is in an overcharge state. If the capacitor is in an overcharge state, the capacitor is continuously subjected to the overvoltage, which will promote degradation of the capacitor. Therefore, the life of the capacitor becomes short.
- Accordingly, in one aspect, the present disclosure provides a hybrid excavator which is capable of adjusting at least one of a target charging value of a capacitor and a target charging value of a DC bus variably and capable of preventing overcharging of the capacitor even if large regeneration power occurs.
- In an embodiment which solves or reduces one or more of the above-mentioned problems, the present disclosure provides a hybrid excavator including a lower running body, an upper turning body which is turned on the lower running body, a boom having an end rotatably attached to the upper turning body, an arm having an end rotatably attached to the other end of the boom, and a work element rotatably attached to the other end of the aim, the hybrid excavator including: an engine disposed in the upper turning body to generate a driving force; a motor generator disposed in the upper turning body to perform a power generating operation by the driving force transmitted from the engine; a motor generator control unit disposed in the upper turning body to control operation of the motor generator in response to an externally supplied control signal; a first capacitor disposed in the upper turning body and being capable of storing electricity; a second capacitor disposed in the upper turning body, electrically connected to the motor generator control unit and being capable of storing electricity; a charge/discharge control unit disposed in the upper turning body to electrically connect the first capacitor and the second capacitor together and controlling a charge/discharge operation between the first capacitor and the second capacitor in response to an externally supplied control signal; a motor disposed in the upper turning body and electrically connected to the second capacitor, the motor being capable of performing a regeneration operation to generate electric energy from mechanical energy and capable of storing the electric energy generated by the regeneration operation in the second capacitor; and a control device disposed in the upper turning body to supply a control signal to at least one of the motor generator control unit and the charge/discharge control unit, wherein the control device is arranged to reduce a target charging value of at least one of the first capacitor and the second capacitor before the regeneration operation is performed by the motor.
- In an embodiment which solves or reduces one or more of the above-mentioned problems, the present disclosure provides a method of controlling a hybrid excavator including: an engine to generate a driving force; a motor generator to perform an electric power generating operation by the driving force transmitted from the engine; a motor generator control unit to control operation of the motor generator in response to an externally supplied control signal; a first capacitor capable of storing electricity; a second capacitor electrically connected to the motor generator control unit and being capable of storing electricity; a charge/discharge control unit electrically connecting the first capacitor and the second capacitor together and controlling a charge/discharge operation between the first capacitor and the second capacitor in response to an externally supplied control signal; a motor electrically connected to the second capacitor, the motor being capable of performing a regeneration operation to generate electric energy from mechanical energy and capable of storing the electric energy generated by the regeneration operation in the second capacitor; and a control device to supply a control signal to at least one of the motor generator control unit and the charge/discharge control unit, the method of controlling the hybrid excavator including: reducing a target charging value of at least one of the first capacitor and the second capacitor before the regeneration operation is performed by the motor.
- According to the present disclosure, when occurrence of regeneration power is expected, the target charging value of the capacitor is lowered and it is possible to prevent the overcharging of the capacitor. By adjusting the target charging value of the capacitor according to the operating state of the hybrid excavator, it is possible to prevent the overcharging of the capacitor.
-
FIG. 1 is a side view of a hybrid excavator. -
FIG. 2 is a block diagram showing the composition of a drive system of a hybrid excavator of a first embodiment of the present disclosure. -
FIG. 3 is a block diagram showing the composition of a capacitor system. -
FIG. 4 is a circuit diagram of a capacitor system. -
FIG. 5 is a flowchart for explaining the process which sets up a target value of SOC. -
FIG. 6 is a flowchart for explaining the process which computes an estimated regeneration power. -
FIG. 7 is a diagram for explaining an estimated boom regeneration power. -
FIG. 8 is a flowchart for explaining the process which computes an estimated regeneration target value. -
FIG. 9 is a diagram for explaining the process which sets up an SOC target value in excavation and dumping work. -
FIG. 10 is a block diagram showing the composition of a drive system of a series type hybrid excavator. -
FIG. 11 is a block diagram showing the composition of a drive system of a hybrid excavator of a second embodiment of the present disclosure. -
FIG. 12 is a diagram showing an equivalent circuit of a capacitor system of the second embodiment. -
FIG. 13A andFIG. 13B are timing charts for explaining a controlling method of the hybrid excavator of a first comparative example of the second embodiment and a controlling method of the hybrid excavator of a first example of the second embodiment respectively. -
FIG. 14A andFIG. 14B are timing charts for explaining a controlling method of the hybrid excavator of a second comparative example of the second embodiment and a controlling method of the hybrid excavator of a second example of the second embodiment respectively. -
FIG. 15 is a block diagram showing the composition of a drive system of a hybrid excavator in which all the drive parts are hydraulically actuated. - A description will now be given of embodiments of the present disclosure with reference to the accompanying drawings.
-
FIG. 1 is a side view of a hybrid excavator to which an embodiment of the present disclosure is applied. - A lower running
body 1 of the hybrid excavator carries an upper turningbody 3 through aturning mechanism 2. Aboom 4 is attached to the upper turningbody 3. An arm 5 is attached at the end of theboom 4. A bucket 6 is attached at the end of the arm 5. Theboom 4, the arm 5, and the bucket 6 are hydraulically driven by aboom cylinder 7, anarm cylinder 8, and abucket cylinder 9, respectively. Acabin 10 is arranged in the upper turningbody 3, and the source of power, such as an engine, is carried in the upper turningbody 3. -
FIG. 2 is a block diagram showing the composition of a drive system of a hybrid excavator of a first embodiment of the present disclosure. InFIG. 2 , the double line denotes a mechanical drive line, the thick solid line denotes a high voltage hydraulic line, the dotted line denotes a pilot line, and the thin solid line denotes an electric drive/control line, respectively. - An
engine 11 as a mechanical drive part and amotor generator 12 as an assist drive part are connected to two input axes of agearbox 13, respectively. Amain pump 14 as a hydraulic pump and apilot pump 15 are connected to the output axis of thegearbox 13. Acontrol valve 17 is connected to themain pump 14 via a high voltagehydraulic line 16. - The
control valve 17 is a control unit which controls a hydraulic system of the hybrid excavator. Ahydraulic motor 1A (for the right side use) and ahydraulic motor 1B (for the left side use) are provided for driving the lower runningbody 1. Thehydraulic motors boom cylinder 7, theaim cylinder 8, and thebucket cylinder 9 are connected to thecontrol valve 17 via the high voltage hydraulic line. - A
capacitor system 120 contains a capacitor as a capacitor part of the hybrid excavator and is connected to themotor generator 12 via aninverter 18A. A turningmotor 21 as an electric work element is connected to thecapacitor system 120 via aninverter 20. Aresolver 22, amechanical brake 23, and aturning gearbox 24 are connected to the axis ofrotation 21A of the turningmotor 21. Anoperation device 26 is connected to thepilot pump 15 via thepilot line 25. The turningmotor 21, theinverter 20, theresolver 22, themechanical brake 23, and the turning gearbox 24 constitute a load drive system. - The
operation device 26 includes alever 26A, a lever 26B, and apedal 26C. Thelever 26A, the lever 26B, and thepedal 26C are connected to each of thecontrol valve 17 and avoltage sensor 29 via ahydraulic line 27 and ahydraulic line 28, respectively. Thevoltage sensor 29 is connected to acontroller 30, and thecontroller 30 performs drive control of the electric system. - In this embodiment, a boom regeneration motor 300 (also called a dynamo 300) is provided for obtaining boom regeneration power and is connected to the
capacitor system 120 via aninverter 18C. Thedynamo 300 is driven by ahydraulic motor 310 which is driven by the hydraulic fluid discharged from theboom cylinder 7. Thedynamo 300 converts the potential energy of theboom 4 into electrical energy by using the voltage of the hydraulic fluid discharged from theboom cylinder 7 when theboom 4 is lowered by gravity. - For the sake of convenience of description, in
FIG. 2 , thehydraulic motor 310 and thedynamo 300 are illustrated as being located in the positions that are separate from each other. In practical applications, however, the axis of rotation of thedynamo 300 is mechanically connected to the axis of rotation of thehydraulic motor 310. - Namely, the
hydraulic motor 310 is arranged so that thehydraulic motor 310 is rotated by the hydraulic fluid which is discharged from theboom cylinder 7 when theboom 4 is lowered. Thehydraulic motor 310 is provided to convert the energy generated when theboom 4 is lowered by gravity into a rotational force. Thehydraulic motor 310 is arranged in ahydraulic piping 7A between thecontrol valve 17 and theboom cylinder 7. Thehydraulic motor 310 may be attached to a suitable location within theupper turning body 3. - The power generated by the
dynamo 300 is supplied to thecapacitor system 120 through theinverter 18C as regeneration power. Thedynamo 300 and theinverter 18C constitute a load drive system. - In this embodiment, a
boom angle sensor 7B is provided for detecting the angle of theboom 4 and attached to the supporting shaft of theboom 4. Theboom angle sensor 7B supplies the detected boom angle θB to thecontroller 30. -
FIG. 3 is a block diagram showing the composition of thecapacitor system 120. Thecapacitor system 120 includes acapacitor 19 as a capacitor part of the hybrid excavator, and an up-downvoltage converter 100 and aDC bus 110. TheDC bus 110 is a second capacitor part of the hybrid excavator and controls transfer of the electric power betweencapacitor 19 as the first capacitor part of the hybrid excavator, themotor generator 12, and the turningmotor 21. - In the
capacitor 19, a capacitorvoltage detecting part 112 for detecting a voltage value of the capacitor and a capacitorcurrent detecting part 113 for detecting a current value of the capacitor are arranged. The capacitor voltage value and the capacitor current value which are detected by the capacitorvoltage detecting part 112 and the capacitorcurrent detecting part 113 are supplied to thecontroller 30. - The up-down
voltage converter 100 controls switching of voltage raising operation and voltage lowering operation according to the operating state of themotor generator 12, thedynamo 300, and the turningmotor 21 so that the DC bus voltage value falls within a fixed range. TheDC bus 110 is arranged between theinverters voltage converter 100, and delivers or receives the electric power between thecapacitor 19, themotor generator 12, thedynamo 300, and the turningmotor 21. - Referring back to
FIG. 2 , thecontroller 30 is a control unit as a main control part which performs drive control of the hybrid excavator. Thecontroller 30 is constituted by a processor unit including a CPU (central processing unit) and an internal memory, and the functions of thecontroller 30 are performed by the CPU which executes a drive control program read from the internal memory. - The
controller 30 converts the signal received from thevoltage sensor 29 into a speed command, and performs drive control of the turningmotor 21 by using the speed command. The signal received from thevoltage sensor 29 is equivalent to the signal indicating the operational amount when theoperation device 26 is operated in order to turn theturning mechanism 2. - The
controller 30 controls operation of the motor generator 12 (switching of a motor-assisted operation and a power generating operation), and controls operation of the up-downvoltage converter 100 as the voltage raising/lowering control unit in order to control charging/discharging of thecapacitor 19. Thecontroller 30 controls switching of the voltage raising operation and the voltage lowering operation of the up-downvoltage converter 100 based on the charging state of thecapacitor 19, the operating state of the motor generator 12 (motor-assisted operation or power generating operation) and the operating state (power operation or regeneration operation) of the turningmotor 21, so that the charging/discharging of thecapacitor 19 is controlled. - The switching control of the voltage raising operation and the voltage lowering operation of the up-down
voltage converter 100 is carried out based on the DC bus voltage value detected by the DC busvoltage detecting part 111, the capacitor voltage value detected by the capacitorvoltage detecting part 112, and the capacitor current value detected by the capacitorcurrent detecting part 113. - In the above-described composition, the power generated by the
motor generator 12 as an assist motor is supplied to theDC bus 110 of thecapacitor system 120 via theinverter 18A, and supplied to thecapacitor 19 via the up-downvoltage converter 100. The regeneration power obtained by the regeneration operation of the turningmotor 21 is supplied to theDC bus 110 of thecapacitor system 120 via theinverter 20, and supplied to thecapacitor 19 via the up-downvoltage converter 100. The power generated by theboom regeneration motor 300 is supplied to theDC bus 110 of thecapacitor system 120 via theinverter 18C, and supplied to thecapacitor 19 via the up-downvoltage converter 100. - The rotational speed (the angular velocity ω) of the turning
motor 21 is detected by theresolver 22. The angle (the boom angle θB) of theboom 4 is detected by theboom angle sensor 7B, such as a rotary encoder, provided on the supporting shaft of theboom 4. Thecontroller 30 computes an estimated turning regeneration power (energy) based on the angular velocity ω of the turningmotor 21, and computes an estimated boom regeneration power (energy) based on the boom angle θB. Based on the estimated turning regeneration power and the estimated boom regeneration power which are thus computed, thecontroller 30 computes an estimated regeneration target value of SOC. Thecontroller 30 controls the respective parts of the hybrid excavator to bring the SOC of thecapacitor 19 close to the thus computed estimated regeneration target value. -
FIG. 4 is a circuit diagram of thecapacitor system 120. Thecapacitor system 120 includes an up-downvoltage converter 100, areactor 101, a voltage raising IGBT (insulated gate bipolar transistor) 102A, avoltage lowering IGBT 102B, a pair of powersupply connection terminals 104 for connecting thecapacitor 19, a pair ofoutput terminals 106 for connecting theDC bus 110, and a smoothingcapacitor 107 connected in parallel to theoutput terminals 106. TheDC bus 110 is connected between theoutput terminals 106 of the up-downvoltage converter 100 and theinverters - One end of the
reactor 101 is connected to the midpoint of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B, and the other end of thereactor 101 is connected to one of the powersupply connection terminals 104. Thereactor 101 is provided to supply the induced electromotive force produced by the switching ON/OFF of thevoltage raising IGBT 102A to theDC bus 110. - Each of the
voltage raising IGBT 102A and thevoltage lowering IGBT 102B is famed by a bipolar transistor in which a MOSFET (metal oxide semiconductor field effect transistor) is incorporated in the gate portion. Each of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B is a semiconductor element which is capable of switching large electric power at high speed. Each of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B is driven by thecontroller 30 which supplies a PWM voltage to the gate terminal. Adiode 102 a and adiode 102 b, which are rectifier elements, are connected in parallel to thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B respectively. - The
capacitor 19 may be a chargeable and dischargeable capacitor which enables the electric power to be delivered and received between thecapacitor 19 and theDC bus 110 via the up-downvoltage converter 100. InFIG. 4 , thecapacitor 19 which is a capacitor part of the hybrid excavator is illustrated. Alternatively, a chargeable and dischargeable secondary battery, such as a lithium ion battery, a lithium ion capacitor, or another power supply which can deliver and receive electric power may be used instead of thecapacitor 19. - The power
supply connection terminals 104 and theoutput terminals 106 may be terminals which can connect thecapacitor 19 and theDC bus 110. The capacitorvoltage detecting part 112 which detects the capacitor voltage value is connected between the powersupply connection terminals 104. The DC busvoltage detecting part 111 which detects the DC bus voltage value is connected is connected between theoutput terminals 106. - The capacitor
voltage detecting part 112 detects the voltage value (vbat_det) of thecapacitor 19. The DC busvoltage detecting part 111 detects the voltage value (the DC bus voltage: vdc_det) of theDC bus 110. The smoothingcapacitor 107 is a capacitor element which is inserted between the positive-electrode terminal and the negative-electrode terminal of theoutput terminals 106 and provided to smooth the DC bus voltage. The voltage of theDC bus 110 is maintained at a predetermined voltage by the smoothingcapacitor 107. The capacitorcurrent detecting part 113 is a detecting part to detect the value of the current which flows through thecapacitor 19. The capacitorcurrent detecting part 113 includes a resistor for current detection. The capacitorcurrent detecting part 113 detects the current value (ibat_det) of the current flowing through thecapacitor 19. - When raising the voltage of the
DC bus 110 by the up-downvoltage converter 100, the PWM voltage is supplied to the gate terminal of thevoltage raising IGBT 102A, and the induced electromotive force generated in thereactor 101 by the switching ON/OFF of thevoltage raising IGBT 102A is supplied to theDC bus 110 through thediode 102 b connected in parallel to thevoltage lowering IGBT 102B. Thereby, the voltage of theDC bus 110 is increased. - When lowering the voltage of the
DC bus 110 by the up-downvoltage converter 100, the PWM voltage is supplied to the gate terminal of thevoltage lowering IGBT 102B, and the regeneration power supplied via thevoltage lowering IGBT 102B and theDC bus 110 is supplied from theDC bus 110 to thecapacitor 19. Thereby, thecapacitor 19 is charged by the power stored in theDC bus 110 and the voltage of theDC bus 110 is lowered. - In practical applications, a drive part which generates the PWM signal for driving the
voltage raising IGBT 102A and thevoltage lowering IGBT 102B is provided between thecontroller 30 and each of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B. However, the illustration of the drive part is omitted inFIG. 4 . Such a drive part may be constructed by either an electronic circuit or a processor unit. - In the hybrid excavator described above, the charging ratio SOC of the
capacitor 19 is always maintained in a high state, and the electric load can be driven by using the power from the capacitor with good energy efficiency. - In the hybrid excavator according to the related art, the target SOC of the capacitor is set to a small value, for example, 80%, so that overcharging of the capacitor may not take place even if large regeneration power is supplied from the electric load to the capacitor. Or, in the hybrid excavator according to the related art, the target SOC has been set up to 70% with a margin being left, so that even when large power is supplied to the capacitor due to sudden power generation and regeneration, the SOC of the capacitor in the charged state of the capacitor will not reach 100%. Hence, the SOC of the capacitor is controlled to be always 70% or less, so that the output voltage of the capacitor will be a low voltage corresponding to the SOC of 70% or less.
- If the target SOC of the capacitor is set to a value higher than that according to the related art, the output voltage of the capacitor becomes high and the electric load can be driven efficiently. In other words, the electric load can be driven more efficiently than the related art if the output voltage of the capacitor is set to a higher voltage value and the electric load is driven by the higher voltage value.
- When a small-size capacitor with a small capacitance is used in order to reduce the cost of the capacitor system, a large amount of electric power can be stored in the capacitor if the target SOC of the capacitor is set to a high value. For example, if the target SOC of the capacitor can be set to a higher value, a small-size capacitor can be used without reducing the storage amount of the capacitor according to the related art.
- After a normal operating state of the drive part in the driving system of the hybrid excavator and the charged amount and the charging ratio of the capacitor are taken into consideration, it has been found out that setting the target SOC of the capacitor to be below 90% is satisfactory for the normal use. Hence, if the target SOC of the capacitor is set to be below 90%, the electric load can be efficiently driven by a high voltage, and miniaturization of the capacitor and the cost reduction are possible.
- However, for example, in a case where the target SOC of the capacitor is set to 90%, there is a possibility that overcharging of the capacitor takes place when large regeneration power occurs in the state where the SOC of the capacitor is relatively high. To eliminate the problem, in a first embodiment of the present disclosure which will be described below, the charging ratio (SOC) of the capacitor is controlled variably. Namely, when it is predicted that large regeneration power arises, the SOC of the capacitor is lowered in advance, so that the SOC after the large regeneration power is stored in the capacitor does not exceed the upper limit of the system.
- Next, the method of controlling the charging ratio (SOC) of the
capacitor 19 in the hybrid excavator of the first embodiment will be described. - In the first embodiment, at the time of decelerating the
upper turning body 3, the turningmotor 21 functions as a dynamo which generates regeneration power (turning regeneration power) and supplies the regeneration power to thecapacitor system 120. In addition, when lowering theboom 4, the hydraulic fluid returned from theboom cylinder 7 is used to drive thedynamo 300 so that regeneration power (boom regeneration power) is generated, and supplied to thecapacitor system 120. - In this embodiment, the
capacitor 19 is operated at an increased charging ratio SOC which is high enough to increase the amount of electric power stored therein. Hence, the discharge voltage of thecapacitor 19 is maintained at a high level to allow discharging of thecapacitor 19 at a high voltage and prevent shortage of power, so that the energy efficiency is increased. In such a case, if large turning regeneration power or large boom regeneration power is generated and supplied to thecapacitor 19, thecapacitor 19 is charged with the large amount of electric power in the high SOC state so that thecapacitor 19 is in an overcharge state. - To eliminate the problem, in this embodiment, it is detected in advance whether turning regeneration power or boom regeneration power is generated. When it is detected that such power is generated, the SOC of the
capacitor 19 is lowered to prevent thecapacitor 19 from being in an overcharge state. Specifically, an estimated value of turning regeneration power and an estimated value of boom regeneration power are computed, and a target value of SOC is determined and changed based on the estimated turning regeneration power value (estimated turning regeneration energy) and the estimated boom regeneration power value (boom regeneration energy). Normally, the target value of SOC is set to a fixed value based on the control condition of the system. In this embodiment, however, the target value of SOC is changed variably at any time based on the estimated regeneration power (the estimated regeneration energy). -
FIG. 5 is a flowchart for explaining the process which sets up the target value of SOC. - First, an estimated regeneration power QA is computed in step S1. In this embodiment, the estimated regeneration power QA is computed as the sum of an estimated turning regeneration power (estimated turning rotational energy) QS and an estimated boom regeneration power (estimated boom potential energy) QB.
- Subsequently, in step S2, it is determined whether the estimated regeneration power QA is larger than zero. In other words, it is determined whether the estimated regeneration power QA takes place. When the estimated regeneration power QA is zero, the process progresses to step S3. For example, when the bucket drive operation and the arm drive operation other than the turning or the boom drive operation is performed, it is estimated that regeneration power does not take place.
- In step S3, the SOC target value SOCtg which is the target charging value is set to a system control upper limit SOCcul. In this case, the process is terminated. The system control upper-limit SOCcul is a upper limit of SOC which is determined depending on the control of the hybrid excavator. When a detection value of SOC exceeds the system control upper limit SOCcul, it is determined that the
capacitor 19 is in an overflowing state. - On the other hand, when the estimated regeneration power QA is larger than zero, the process progresses to step S4. In this case, it is estimated that regeneration power takes place. In step S4, an estimated regeneration target value SOCetg is computed based on the computed estimated regeneration power QA. The estimated regeneration target value SOCetg is a value of SOC which does not cause the SOC value of the
capacitor 19 to exceed the system control upper limit SOCcul even if the estimated regeneration power QA is supplied to thecapacitor 19. The estimated regeneration target value SOCetg is smaller than the system control upper limit SOCcul. - After the estimated regeneration target value SOCetg is computed in step S4, the process progresses to step S5. In step S5, the SOC target value SOCtg which is the target charging value is set to the estimated regeneration target value SOCetg. In this case, the process is terminated. The estimated regeneration target value SOCetg varies according to the value of the estimated regeneration power QA, and the SOC target value SOCtg also varies according to the value of the estimated regeneration power QA.
- The processing of step S3 and the processing of step S5 are performed by the capacitor target value control unit in the
controller 30. - Next, the process which computes the estimated regeneration power QA in the step S1 will be described. The computation of the estimated regeneration power QA is performed by the estimated regeneration energy computing unit in the
controller 30. -
FIG. 6 is a flowchart for explaining the process which computes the estimated regeneration power QA. First, in step 511, an estimated boom regeneration power QB is computed. The estimated boom regeneration power QB is determined by the potential energy of theboom 4. Namely, the estimated boom regeneration power QB is equivalent to the potential energy in the position in which theboom 4 is lifted. -
FIG. 7 is a diagram for explaining the estimated boom regeneration power QB. When theboom 4 of the hybrid excavator is lifted, the potential energy needed to lift the weight of theboom 4, the arm 5, and the bucket 6 is stored. Subsequently, if theboom 4 is lowered, the stored potential energy is released (the return hydraulic fluid of the boom cylinder 7) and the boom regenerationhydraulic motor 310 is driven. In this case, theboom regeneration motor 300 is driven and electric power is regenerated. The power obtained by this power generation is equivalent to the boom regeneration power. In this embodiment, before the boom regeneration power is generated, an estimated boom regeneration power for lowering theboom 4 from the position (height) where theboom 4 is lifted to the horizontal position is computed as the estimated boom regeneration power QB. - The height H of the
boom 4 from the ground is computed by the formula H=RB×sin θB+RS as follows. The distance RB from the supporting point of theboom 4 to the end of theboom 4 is multiplied by sin θB. And the distance (height) RS of the supporting point of theboom 4 from the ground is added to the product RB×sin θB. The boom angle θB is a detection value which is detected by theboom angle sensor 7B. The position where theboom 4 is lowered from the position where theboom 4 is lifted is not necessarily the horizontal position. However, if the boom regeneration power is computed under the assumption that theboom 4 is lowered to the horizontal position, the computed value is approximate to the maximum regeneration power obtained from the position where theboom 4 is lifted. - As described above, the estimated boom regeneration power QB may be computed by multiplying the weight m, which is the sum of the maximum weight of the sand contained in the bucket 6 and the weight of the
boom 4, the arm 5 and the bucket 6, by the gravity g, and further multiplying the resultant value by the height H of the end of theboom 4 from the ground, as follow. -
- As described above, after the estimated boom regeneration power QB is computed in step S11, the process progresses to step S12. In step S12, the computation of the estimated turning regeneration power QS is performed. The computation of the estimated turning regeneration power QS may be computed in accordance with the formula:
-
QS−½×Mi×ω 2 - where Mi is the moment of inertia of the
upper turning body 3, and ω is the angular velocity of the turning movement of theupper turning body 3. The value of Mi is taken as the maximum moment of inertia in the state where theboom 4 and the arm 5 are extended. The angular velocity ω may be determined based on the rotational speed of the turningmotor 21 detected by theresolver 22. - After the estimated turning regeneration power QS is computed in step S12, the process progresses to step S13. In step S13, the estimated boom regeneration power QB and the estimated turning regeneration power QS are added together, and the estimated regeneration power is computed by the formula QA=QB+QS.
- Next, the processing of step S4 in
FIG. 5 will be described. The processing of step S4 is the process which computes the estimated regeneration target value SOCetg. The process of computing the estimated regeneration target value SOCetg is performed by the capacitor target value determining unit in thecontroller 30. -
FIG. 8 is a flowchart for explaining the process which computes an estimated regeneration target value SOCetg. First, in step S41, the capacitor work amount Qmax which is the power stored in thecapacitor 19 when the charging ratio (SOC) of thecapacitor 19 reaches the system control upper limit SOCcul is computed. - The capacitor work amount Qmax is equivalent to the maximum power that can be stored in the
capacitor 19 according to the system control. When the electrostatic capacity of the capacitor is used, the capacitor work amount Qmax may be computed in accordance with the formula: -
- where C is the electrostatic capacity of the
capacitor 19. - Next, in step S42, the target value Q of the power which can be stored in the
capacitor 19 is computed by subtracting the estimated regeneration power QA from the capacitor work amount Qmax (Q=Qmax−QA). - In step S43, an estimated regeneration target value SOCetg is computed based on the target value Q of power. The estimated regeneration target value SOCetg may be computed in accordance with the formula: SOCetg=2×Q/(C×3602).
- After the estimated regeneration target value SOCetg is computed as described above, in step 55 of the process of
FIG. 5 , the SOC target value SOCtg is set to the estimated regeneration target value SOCetg. - Next, the setting of the SOC target value in the excavation and dumping work performed by the hybrid excavator will be described.
FIG. 9 is a diagram for explaining the process which sets up the SOC target value SOCtg in the excavation and dumping work. Because it is expected that the estimated regeneration power QA is present during the work period fromtime 0 to time t4 inFIG. 9 , the SOC target value SOCtg as the target charging value is set to the estimated regeneration target value SOCetg. - In the excavation and dumping work, the height H of the
boom 4 changes as shown inFIG. 9( a). The estimated boom regeneration power QB is proportional to the height H of theboom 4 as described above (QB=m×g×H), and the changes of the estimated boom regeneration power QB are in the same pattern as the changes of the height H of theboom 4, as shown inFIG. 9( b). - The
boom 4 is lowered after the time the height H of theboom 4 reaches the peak, and the boom regeneration power takes place. - On the other hand, in the excavation and dumping work, the turning speed of the
upper turning body 3 is proportional to the angular velocity ω of the turningmotor 21, and the turning speed of theupper turning body 3 changes during the excavation and dumping work as shown inFIG. 9( c). The estimated turning regeneration power QS is proportional to the square of the angular velocity ω of the turningmotor 21 as described above (QS=½×Mi×ω)2), and the estimated turning regeneration power QS changes as shown inFIG. 9( d). - The turning speed decreases after the time the angular velocity ω reaches the peak, and the turning regeneration power takes place. The minus direction (negative value) of the turning speed means the reverse rotation, and the estimated turning regeneration power is computed using the absolute value of the turning speed.
- The estimated regeneration power QA is the sum of the estimated boom regeneration power QB and the estimated turning regeneration power QS, and changes of the estimated regeneration power QA are in the pattern as shown in
FIG. 9( e), which is a resultant pattern of the pattern ofFIG. 9( b) and the pattern ofFIG. 9( d). - The estimated regeneration target value SOCetg is set up to the value that does not exceed the permissible maximum charging ratio (the system control upper limit SOCcul) of the
capacitor 19 according to the system control when the estimated regeneration power QA is supplied to thecapacitor 19 and thecapacitor 19 is charged with the estimated regeneration power QA. Hence, the estimated regeneration target value SOCetg is obtained by subtracting the estimated regeneration power QA from the system control upper limit SOCcul, and changes of the estimated regeneration target value SOCetg are in the pattern as shown inFIG. 9( f). - With reference to
FIG. 9( f), the case in which the capacitor voltage value of thecapacitor 19 in the time t=0 is considered as 100% of the rated voltage will be described. In the period oftime 0 to time t10, theboom 4 is lifted while the turning operation is performed. In this case, according to the increase in the computed estimated regeneration power, the SOC target value SOCtg (which is, in this case, the estimated regeneration target value SOCetg) is lowered. Because the estimated regeneration target value SOCetg is lowered from the system control upper limit SOCcul, the percentage of the stored power corresponding to the decrease of the estimated regeneration target value SOCetg is discharged. In this case, the power discharged can be used for the lifting of theboom 4 or the power operation of the turning. - In the period of time t1 to time t3 in
FIG. 9( f), theboom 4 is lowered and the turning speed is decreased, and the computed estimated regeneration power is also decreased. In this case, the SOC target value SOCtg (which is, in this case, the estimated regeneration target value SOCetg) is increased. Simultaneously, the boom regeneration power takes place because of the lowering of theboom 4, and the turning regeneration power also takes place because of the braking operation (decelerating operation) of the turning motor. The percentage of such regeneration power corresponding to the increase of the estimated regeneration target value SOCetg can be stored in thecapacitor 19 by charging of thecapacitor 19. - Similarly, in the period of time t3 to time t11, the estimated regeneration target value SOCetg is decreased and discharging of the
capacitor 19 corresponding to the decrease of the estimated regeneration target value SOCetg is performed. In the period of time t11 to time t4, the estimated regeneration target value SOCetg is increased and charging of thecapacitor 19 corresponding to the increase of the estimated regeneration target value SOCetg is performed. - The capacitor energy E which is stored in the
capacitor 19 is represented by the formula E=(½)CV2 where C denotes the electrostatic capacity of thecapacitor 19 and V denotes the capacitor voltage (the voltage between the terminals) of thecapacitor 19. Hence, if the capacitor voltage V is increased, the capacity of thecapacitor 19 for storing the same electric energy can be reduced. In the conventional system according to the related art, in order for the SOC not to exceed the system control upper limit, the SOC target value is determined by taking into consideration the regeneration power. For example, the conventional SOC target value is set to 67% (=V/Vmax: the charging ratio) of the rated voltage (Vmax). When the system control upper limit is reached, the SOC is set up so that the charging voltage is equal to 100% (=V/Vmax: the charging ratio) of the rated voltage. - As is apparent from the formula E=(½)CV2, if the charging voltage value V of the
capacitor 19 is multiplied by √{square root over ( )}2, thecapacitor 19 is able to store the capacitor energy E which is the same as that when ½ of the electrostatic capacity is used. In other words, if the charging voltage value V is multiplied by √{square root over ( )}2, the electrostatic capacity of the capacitor can be reduced to ½. - Conventionally, the SOC by which the charging voltage is 67% of the rated voltage has been used. In this embodiment, the SOC of 95% which is obtained by multiplying the conventional SOC value by √{square root over ( )}2 may be used. In other words, by changing the charging ratio to 95%, the capacitor with 1/2 of the electrostatic capacity may be used while maintaining the same capacitor energy as the case where the SOC of 67% is used. When the charging ratio is 95%, the SOC is about 90% because the SOC is expressed by the ratio of the square of the voltage V (SOC=(½)CV2/(½)CVmax2).
- In the example of
FIG. 9( f), the case in which the SOC is 90% (the charging ratio is 95%) has been described. However, it is desirable that, when no regeneration power is present, the SOC (charging ratio) is set to a higher value, which enables the electrostatic capacity of the capacitor to be reduced. - In this embodiment, when no regeneration power is present, the SOC is controllable to be above about 90% (the charging ratio is 95%). In other word, the electrostatic capacity of the capacitor capacity can be reduced to ½ of the conventional value. Hence, using the hybrid excavator of this embodiment provides increased flexibility of selection of the
capacitor 19. The target value of SOC is variably controllable and when it is expected that regeneration power is present, the target ratio of SOC can be reduced in advance. Thus, it is possible to present overcharge of thecapacitor 19. - As is apparent from
FIG. 9( f), the estimated regeneration target value SOCetg computed in this embodiment when it is estimated that regeneration power is not present (QA=0) is equal to the system control upper limit SOCcul which is larger than the conventional SOC target upper limit. The estimated regeneration target value SOCetg computed in this embodiment when it is estimated that regeneration power is present (QA>0) is equal to the value which is obtained by subtracting the charging ratio (which increases from the system control upper limit SOCcul when thecapacitor 19 is charged by the estimated regeneration power QA) from the system control upper limit SOCcul. Accordingly, it is possible to control thecapacitor 19 so that the charging ratio of thecapacitor 19 does not exceed the system control upper limit SOCcul even when regeneration power is supplied to thecapacitor 19, while maintaining the charging ratio of thecapacitor 19 to the value near the system control upper limit SOCcul. - In the above-described embodiment, the estimated regeneration power QA is computed by adding together the estimated boom regeneration power QB and the estimated turning regeneration power QS. However, it is not necessary to add together the estimated boom regeneration power QB and the estimated turning regeneration power QS. For example, when the excavator has no boom regeneration function, only the estimated turning regeneration power QS may be used as the estimated regeneration power QA. Or, in a case of a lifting magnet type excavator including a lifting magnet attached to the end of the arm instead of the bucket (which has a lifting magnet regeneration function instead of turning regeneration and boom regeneration functions), the estimated regeneration power QA may be computed by adding together the estimated lifting magnet regeneration power QL. The regeneration power from the lifting magnet is generated by the reverse current flowing when the lifting magnet is turned OFF, and this reverse current has an almost constant current value. Hence, the estimated lifting magnet regeneration power QL may be set to a fixed value. When the voltage value of the
capacitor 19 during the period oftime 0 to time t10 is smaller than the target charging value, charging of thecapacitor 19 is performed. Similarly, when the voltage value of thecapacitor 19 during the period of time t3 to time t11 is smaller than the target charging value, charging of thecapacitor 19 is performed. - When it is expected that no regeneration power is present, the target charging value is set to the value which is equal to the system control upper limit. Alternatively, when it is expected that no regeneration power is present, the target charging value may be set to a value which is slightly smaller than the system control upper limit. Alternatively, the target charging value may be set to a value which falls within a predetermined range.
- In the above-mentioned embodiment, the example of a parallel type hybrid excavator (in which the
engine 11 and themotor generator 12 are connected in parallel to themain pump 14 as the hydraulic pump for driving the main pump) to which the present disclosure is applied has been described. Alternatively, the present embodiment is also applicable to a series type hybrid excavator in which themotor generator 12 is driven by theengine 11, the power generated by themotor generator 12 is stored in thecapacitor system 120, and themain pump 14 is driven by the stored power only as shown inFIG. 10 . In this case, it is assumed that themotor generator 12 in this embodiment has a dynamo function only to generate electric power when themotor generator 12 is driven by theengine 11. - Next, a second embodiment of the present disclosure will be described.
-
FIG. 11 is a block diagram showing the composition of a drive system of a hybrid excavator of the second embodiment. InFIG. 11 , the elements which are the same as corresponding elements shown inFIG. 2 are designated by the same reference numerals, and a description thereof will be omitted. - In the hybrid excavator of
FIG. 11 , when a large load is put on theengine 11, a motor-assisted operation in which themotor generator 12 converts electrical energy into mechanical energy and assists theengine 11 by the mechanical energy is performed. The mechanical energy of themotor generator 12 is transmitted to themain pump 14 via thegearbox 13 and the load on theengine 11 is reduced. On the other hand, when a small load is put on theengine 11, the driving force of theengine 11 is transmitted to themotor generator 12 via thegearbox 13 and a power generating operation of themotor generator 12 is performed. Control of the switching of themotor generator 12 between the motor-assisted operation and the power generating operation is performed by using theinverter 18A connected (electrically connected) to themotor generator 12. Theinverter 18A is controlled by a control signal output from thecontroller 30. - The
controller 30 includes a central processing unit (CPU) and an internal memory. The CPU executes the drive control program stored in the internal memory. Thecontroller 30 calls the operator's attention by displaying a degraded state of the relevant parts or the like on a display device (not shown). - The input/output terminals of the electric system of the
motor generator 12 are connected to theDC bus 110 via theinverter 18A. TheDC bus 110 is connected to thecapacitor 19 via a converter (battery charge/discharge circuit) 100. Thecapacitor 19 may include a plurality of electric double layer capacitors which are connected in series. The voltage of theDC bus 110 is controllable by using theconverter 100. For example, if a charging current is caused to flow through theconverter 100, the electric energy of theDC bus 110 moves to thecapacitor 19 and the voltage of theDC bus 110 is lowered. On the contrary, if a discharging current is caused to flow through theconverter 100, the electric energy of thecapacitor 19 moves to theDC bus 110 and the voltage of theDC bus 110 is increased. In this manner, theconverter 100 controls charge/discharge operation between thecapacitor 19 and theDC bus 110. - As described above, the
capacitor 19 is equivalent to a first capacitor that is capable of storing electricity and theDC bus 110 is equivalent to a second capacitor that is capable of storing electricity. Theconverter 100 is equivalent to a charge/discharge control unit which electrically connects thecapacitor 19 and theDC bus 110 and controls charge/discharge operation between thecapacitor 19 and the DC bus in response to an externally supplied control signal. Thecapacitor system 120 including thecapacitor 19, theconverter 100, and theDC bus 110 is disposed in theupper turning body 3. - The
DC bus 110 is connected to theboom regeneration motor 300 via theinverter 18C. Theboom regeneration motor 300 is connected to the boom regenerationhydraulic motor 310 and can generate electric energy by the driving force of thehydraulic motor 310. The electric energy generated by theboom regeneration motor 300 is supplied to theDC bus 110 via theinverter 18C and this inverter converts the three-phase alternating current into the direct current. Further, theDC bus 110 is connected to the turningmotor 21 via anotherinverter 20. The electric energy is exchanged between theDC bus 110 and the turningmotor 21 through theinverter 20. Each of theinverters converter 100 is controlled by a control signal output from thecontroller 30. -
FIG. 12 is a diagram showing an equivalent circuit of thecapacitor system 120 of this embodiment. The up-downvoltage converter 100 controls the charge/discharge current of thecapacitor 19 which is the first capacitor. TheDC bus 110 which is the second capacitor includes a smoothingcapacitor 107. Thecapacitor 19 is connected to a pair of powersupply connection terminals converter 100, and the smoothingcapacitor 107 of theDC bus 110 is connected to a pair ofoutput terminals 106A and 106B. The powersupply connection terminal 103B (one of the pair of power supply connection terminals) and the output terminal 106B (one of the pair of output terminals) are grounded. - The
DC bus 110 is connected to themotor generator 12, turningmotor 21, and the boom regenerationhydraulic motor 310 via theinverters - When the power generating operation of the
motor generator 12 is performed, the power generated by themotor generator 12 can be supplied to thecapacitor 19 or theDC bus 110 via theinverter 18A. When the motor-assisted operation of themotor generator 12 is performed, the required electric power can be supplied from thecapacitor 19 or theDC bus 110 to themotor generator 12 via theinverter 18A. - The electric energy is supplied from the
capacitor 19 or theDC bus 110 to the turningmotor 21. The regeneration energy generated by the turningmotor 21 is stored in thecapacitor 19 or theDC bus 110. - The voltage between the terminals of the smoothing
capacitor 107 is detected by avoltage detecting part 111, and the detected voltage is input to thecontroller 30. Theconverter 100 is controlled based on the detected voltage from thevoltage detecting part 111 and the target value of theDC bus 110, so that the voltage of the DC bus is maintained at the fixed value. - The
controller 30 is capable of detecting the state (non-operating state) of the hybrid excavator in which none of thelower running body 1, theturning mechanism 2, theboom 4, the arm 5, and the bucket 6 operates and neither charging operation nor discharging operation of thecapacitor 19 and theDC bus 110 is performed. - The series circuit in which the collector of the voltage raising IGBT (insulated gate bipolar transistor) 102A and the emitter of the
voltage lowering IGBT 102B are connected to each other is connected between theoutput terminals 106A and 106B. The emitter of thevoltage raising IGBT 102A is grounded and the collector of thevoltage lowering IGBT 102B is connected to the highvoltage output terminal 106A. The connection point of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B is connected to the high voltage powersupply connection terminal 103A via thereactor 101. - A
diode 102 a is connected in parallel to thevoltage raising IGBT 102A and adiode 102 b is connected in parallel to thevoltage lowering IGBT 102B respectively, such that the direction from the emitter to the collector is consistent with the forward direction. - A
voltage detecting part 112 is connected between the powersupply connection terminals capacitor 19. A current detectingpart 113 is connected in series to thereactor 101 and detects the charge/discharge current of thecapacitor 19. The detected voltage and the detected current are input to thecontroller 30. - The
controller 30 supplies a pulse-width-modulation (PWM) voltage (control signal) to the gate of each of thevoltage raising IGBT 102A and thevoltage lowering IGBT 102B. - In the following, the voltage raising operation (discharging operation) will be described. If the PWM voltage is supplied to the gate of the
voltage raising IGBT 102A, the induced electromotive force occurs in thereactor 101 at the time of the OFF state of thevoltage raising IGBT 102A in the direction to forward the current from the high voltage powersupply connection terminal 103A to the collector of thevoltage raising IGBT 102A. This electromotive force is supplied to theDC bus 110 via thediode 102 b. In this manner, the voltage raising of theDC bus 110 is performed. - Next, the voltage lowering (charging operation) will be described. If the PWM voltage is supplied to the gate electrode of the
voltage lowering IGBT 102B, the induced electromotive force occurs in thereactor 101 at the time of the OFF state of thevoltage lowering IGBT 102B in the direction to forward the current from the emitter of thevoltage lowering IGBT 102B to the high voltage powersupply connection terminal 103A. Thecapacitor 19 is charged by this electromotive force. In this manner, theDC bus 110 can be controlled at a fixed voltage at any time. - Next, a controlling method of the hybrid excavator of a first comparative example of the second embodiment and a controlling method of the hybrid excavator of a first example of the second embodiment will be described with reference to
FIG. 13A andFIG. 13B . These controlling methods are performed by thecontroller 30. -
FIG. 13A is a timing chart for explaining the controlling method of the first comparative example. As shown in the graphs of “boom lever” and “angle ofboom 4”, the operator of the hybrid excavator maintains the boom lever of theoperation device 26 in the “lift” state during the period of time t1 to time t2, and theboom 4 is gradually lifted upward from theupper turning body 3. For example, in time t2, theboom 4 is lifted to the stroke upper limit (power generating operation). In time t2, the operator returns the boom lever to its neutral position and maintains that state until time t3. During this period, theboom 4 is maintained in the position of the stroke upper limit. Subsequently, during the period of time t3 to time t4, the operator maintains the boom lever in the “lower” state, and theboom 4 is gradually lowered. For example, theboom 4 is returned to the original position (the lowermost position in time t1) in time t4 (regeneration operation). - As shown in the graphs of “target voltage of
DC bus 110”, “setting ofmain pump 14”, “output state ofmotor generator 12”, and “current state ofconverter 100”, in the controlling method of the first comparative example, theboom 4 is lifted only by the driving force of theengine 11 and themotor generator 12 does not perform the motor-driven (motor-assisted) operation. Hence, theDC bus 110 is maintained at the fixed voltage (high voltage state VM). In the following, the “target voltage ofDC bus 110” denotes the target value to which the voltage of theDC bus 110 is changed. - Accordingly, all the graphs of “target voltage of
DC bus 110”, “setting ofmain pump 14”, “output state ofmotor generator 12”, and “current state ofconverter 100” are maintained at the constant level during the period of time t1 to time t2. In other words, the “target voltage ofDC bus 110” is kept in the high voltage state VM and the “setting ofmain pump 14” is kept in the low-power output state PN. Themotor generator 12 does not perform the motor-assisted operation or the power generating operation, and theconverter 100 does not perform charge/discharge operation. Because the charge/discharge operation of theconverter 100 is not performed, the voltage of thecapacitor 19 does not change. - Also during the period of time t2 to time t3, the
boom 4 is not moved, and all the graphs of “target voltage ofDC bus 110”, “setting ofmain pump 14”, “output state ofmotor generator 12”, and “current state ofconverter 100” are kept constant. - During the period of time t3 to time t4, the
boom 4 is lowered, and the driving force (torque) occurs in theboom regeneration motor 310. The driving force is transmitted to theboom regeneration motor 300, and power generation is performed by the boom regeneration motor 300 (regeneration operation). The generated electric energy is supplied to theinverter 18C, theDC bus 110, and theconverter 100 and stored in thecapacitor 19. Hence, during this period, theDC bus 110 is kept in the high voltage state VM but theconverter 100 performs charging operation. During the period of time t3 to time t4, the energy generated by thedynamo 300 is stored in thecapacitor 19 by the charging operation of theconverter 100 as indicated by the arrow inFIG. 13A drawn from the graph of “output state of boom regeneration motor 130” to the graph of “current state ofconverter 100”. The setting of themain pump 14 is maintained in the low-power output state PN and themotor generator 12 does not perform the motor-assisted operation or the power generating operation. In this manner, the charge/discharge control between theconverter 100 and thecapacitor 19 is performed to maintain theDC bus 110 in the high voltage state VM. Accordingly, the charge/discharge control operation causes the power consumption (energy loss). - As shown in the graph of “charging ratio SOC” of
FIG. 13A , in the first comparative example, the SOC changes in the case in which the SOC is set to 90% when it is expected that no regeneration power is present. In this case, if boom regeneration power is present when the boom is lowered during the period of time t3 to time t4, the power by which thecapacitor 19 is charged is increased and the SOC is increased. Because the SOC is initially set to 90% which is a relatively high target value, the SOC will exceed the system control upper limit (at which the SOC is 100%) during the period of time t3 to time t4 and overcharging of thecapacitor 19 will take place. -
FIG. 13B is a timing chart for explaining the controlling method of the first example of the second embodiment. The graphs of “boom lever” and “angle ofboom 4” inFIG. 13B are the same as those of the first comparative example inFIG. 13A . - In the controlling method of the first example, the
boom 4 is lifted using the driving force of theengine 11 and the assist drive power of themotor generator 12. To perform the motor-assisted operation of themotor generator 12, the electric energy stored in theDC bus 110 is used instead of thecapacitor 19. - Hence, during the period of time t1 to time t2 in which the
boom 4 is lifted, the “output state ofmotor generator 12” is in the assist state and the “target voltage ofDC bus 110” which is the target charging value is set in the low voltage state VL. Theconverter 100 does not perform the charge/discharge operation. Because themotor generator 12 performs the motor-assisted operation, themain pump 14 is shifted to the high-output state PH in which the high output can be generated. - In the graph of “target voltage of
DC bus 110”, the voltage value of theDC bus 110 actually detected by thevoltage detecting part 111 is indicated by the dotted line. Because theengine 11 is assisted by themotor generator 12 during the period of time t1 to time t2, the voltage of theDC bus 110 is gradually decreased from the high voltage state VM to the low voltage state VL in time t2. As indicated by the arrow inFIG. 13B which is drawn from the graph of “target voltage ofDC bus 110” to the graph of “output state ofmotor generator 12”, the motor-assisted operation of themotor generator 12 is performed by the decrement of the voltage of theDC bus 110. - During the period of time t2 to time t3 in which the
boom 4 is kept in the stroke upper limit position, themotor generator 12 does not perform the motor-assisted operation or the power generating operation. In this case, the electric energy stored in thecapacitor 19 and theDC bus 110 does not change. Hence, theconverter 100 does not perform the charge/discharge operation, and the target voltage and the actual voltage of theDC bus 110 are maintained in the low voltage state VL. Themain pump 14 is maintained in the low power output state PN. In this manner, theDC bus 110 is maintained in the low voltage state VL and charge/discharge control between theDC bus 110 and thecapacitor 19 is not performed. Therefore, it is possible to prevent occurrence of power loss. - During the period of time t3 to time t4, the
boom 4 is lowered and the potential energy of theboom 4 is converted into electrical energy through the boom regenerationhydraulic motor 310 and the boom regeneration motor 300 (dynamo) (regeneration operation). The resulting electric power is stored in theDC bus 110 instead of thecapacitor 19. - In this state, the
converter 100 does not perform the charge/discharge operation with thecapacitor 19. On the other hand, the target voltage of theDC bus 110 is set in the high voltage state VM. Hence, the actual voltage of theDC bus 110 is gradually increased from the low voltage state VL during the period of time t3 to time t4. - However, because the
boom 4 is lifted during the period of time t1 to time t2, the electric energy discharged from theDC bus 110 is not completely collected by the lowering of theboom 4, and the actual voltage of theDC bus 110 in time t4 is lower than the high voltage state VM. The electric energy generated by theboom regeneration motor 300 is stored in theDC bus 110 and the voltage of theDC bus 110 is increased as indicated by the arrow inFIG. 13B . Themain pump 14 is kept in the low power output state PN. - During the period of time t4 to time t5, the insufficiency of the voltage of the
DC bus 110 is recovered to the high voltage state VM. Hence, the target voltage ofDC bus 110 is maintained in the high voltage state VM and theconverter 100 performs the discharge operation until the target voltage value VM is reached. The electric energy of thecapacitor 19 is stored in theDC bus 110 by the discharge operation of theconverter 100 as indicated by the arrow inFIG. 13B which is drawn from the graph of “current state ofconverter 100” to the graph of “target voltage ofDC bus 110”. - As shown in the graph of “charging ratio SOC” of
FIG. 13B , the SOC changes according to the change of the voltage of theDC bus 110 in the first embodiment. In the first embodiment, when regeneration power is present during the period of time t3 to time t4, the boom regeneration power is stored in theDC bus 110 and the voltage of theDC bus 110 is increased. Hence, the regeneration power is not supplied to thecapacitor 19 and the SOC of thecapacitor 19 can be maintained in the high state. In other words, storing the regeneration power in theDC bus 110 prevents thecapacitor 19 from being further charged by the regeneration power. Because the charging of thecapacitor 19 the SOC of which SOC is high by the regeneration power is avoided, and it is possible to prevent the overcharging of thecapacitor 19. - Because the voltage of the
DC bus 110 is recovered during the period of time t4 to time t5 only, thecapacitor 19 is slightly discharged and the resulting power is supplied to theDC bus 110. After time t5, the power generating operation of themotor generator 12 is performed and thecapacitor 19 is charged, so that the charging ratio SOC of thecapacitor 19 is set to the target charging ratio (90%). The target charging ratio in this case is equivalent to the voltage ratio of about 95%. When the charging ratio of thecapacitor 19 is smaller than the target charging ratio during the period of time t4 to time t5, charging of thecapacitor 19 is performed. - In the controlling method of the first example of the second embodiment, the motor-assisted operation of the
motor generator 12 is performed using the electric energy stored in theDC bus 110 during the period of time t1 to time t2, and the motor-assisted driving force is added to the driving force of theengine 11, so that theboom 4 is lifted. Because a part of the energy released from themain pump 14 is supplied from themotor generator 12 when theboom 4 is lifted, the load of theengine 11 can be decreased. Hence, the setup pump power for the lifting of the boom 4 (setting of main pump 14) can be increased. Thus, the power for lifting theboom 4 can be increased. - Because the electric energy for performing the motor-assisted operation of the
motor generator 12 is supplied from theDC bus 101 instead of thecapacitor 19, it is possible to prevent the power consumption in the converter 100 (possible to reduce the energy loss). - The energy generated by the lowering of the
boom 4 is stored in theDC bus 110 during the period of time t3 to time t4, instead of thecapacitor 19. Hence, it is possible to prevent the power consumption in theconverter 100 during this period. - By the discharge operation of the
converter 100 during the period of time t4 to time t5, the electric energy of thecapacitor 19 is moved to theDC bus 110 and the voltage state of theDC bus 110 is maintained in the constant state (the high voltage state VM). For example, when it is needed to lift theboom 4 again, the energy of theDC bus 110 can be used promptly according to the situation. The constant voltage (the high voltage state VM) in which the voltage of theDC bus 110 is maintained after time t5 is higher than the constant voltage in which the voltage of thecapacitor 19 is maintained. - Next, a controlling method of the hybrid excavator of a second comparative example of the second embodiment and a controlling method of the hybrid excavator of a second example of the second embodiment will be described with reference to
FIG. 14A andFIG. 14B . These controlling methods are performed by thecontroller 30. -
FIG. 14A is a timing chart for explaining the controlling method of the second comparative example. As shown in the graphs of “turning lever”, “turning angle ofupper turning body 3”, and “output state of turningmotor 21”, the operator of the hybrid excavator maintains the turning lever of theoperation device 26 in the “forward rotation” state during the period of time t1 to time t3, and theupper turning body 3 is turned from the initial value to the target value. Theupper turning body 3 starts turning in the direction of forward rotation from the stop state at the initial velocity of zero in time t1, arrives at the target position in time t4, and the terminal velocity is equal to zero so that the turning is stopped. During the period of time t1 to time t2, the angular velocity of theupper turning body 3 is gradually increased. During the period of time t2 to time t3, theupper turning body 3 is turned at the equal angular velocity. During the period of time t3 to time t4, the angular velocity of theupper turning body 3 is gradually decreased. The turningmotor 21 generates a rotational force from the electric energy and performs the power generating operation for turning theupper turning body 3 during the period of time t1 to time t2 and performs the regeneration operation and generates electric energy from the turning rotation of theupper turning body 3 during the period of time t3 to time t4. During the period of time t2 to time t3, the turningmotor 21 does not perform the power generating operation or the regeneration operation. - As shown in the graph of “current state of
converter 100”, in the controlling method of the second comparative example, the voltage of theDC bus 110 is maintained and the power generating operation of the turningmotor 21 is performed using the electric energy stored in thecapacitor 19. The regeneration energy generated by the turningmotor 21 is stored in thecapacitor 19. Hence, in the power operation during the period of time t1 to time t2, theconverter 100 performs the discharging operation and releases the electric energy stored in thecapacitor 19. During the period of time t3 to time t4, theconverter 100 performs the charging operation and stores the resulting regeneration energy in thecapacitor 19. - As shown in the graph of “output state of
motor generator 12”, the regeneration energy which is stored in thecapacitor 19 during the period of time t3 to time t4 is smaller than the energy released from thecapacitor 19 during the period of time t1 to time t2. Hence, during the period of time t3 to time t4, themotor generator 12 performs the power generating operation to compensate the insufficiency of the electric power, in order to maintain the voltage of thecapacitor 19 at a constant level. The electric energy generated by themotor generator 12 is stored in thecapacitor 19 by the charging operation of theconverter 100. - As shown in the graph of “target voltage of
DC bus 110”, in the second comparative example, the power operation is performed by using the energy of thecapacitor 19 and the resulting regeneration energy is stored in thecapacitor 19. Hence, the target voltage of theDC bus 110 does not change and is maintained in the high voltage state VM. In this manner, the charge/discharge control operation is performed between theconverter 100 and thecapacitors 19 in order to maintain the voltage of theDC bus 110 in the high voltage state VM. Hence, the power consumption (energy loss) is caused by the charge/discharge control operation. -
FIG. 14B is a timing chart for explaining the controlling method of the second example of the second embodiment. The graphs of “turning lever”, “turning angle ofupper turning body 3”, and “output state of turningmotor 21” inFIG. 14B are the same as those of the second comparative example inFIG. 14A . - In the controlling method of the second example of the second embodiment, the power generating operation of the turning
motor 21 is performed using the electric energy stored in thecapacitor 19 and theDC bus 110. The energy generated by the regeneration operation of the turningmotor 21 is stored in theDC bus 110 instead of thecapacitor 19. - As shown in the graphs of “target voltage of
DC bus 110” which is the target charging value, “output state ofmotor generator 12”, and “current state ofconverter 100”, the electric energy of theDC bus 110 is used to perform the power operation during the period of time t1 to time t2, and the target voltage of theDC bus 110 is shifted from the high voltage state VM to the low voltage state VL. Theconverter 100 performs the discharging operation and the electric energy of thecapacitor 19 is also used to perform the power operation. Themotor generator 12 does not perform the motor-assisted operation or the power generating operation. The actual voltage of theDC bus 110 is gradually decreased from the high voltage state VM in time t1 to the low voltage state VL in time t2. - During the period of time t2 to time t3 in which the
upper turning body 3 is turned at the equal angular velocity, the turningmotor 21 does not receive the supply of electric energy and does not generate regeneration energy. The target voltage and the actual voltage of theDC bus 110 are maintained in the low voltage state VL. Theconverter 100 does not perform the charge/discharge operation and themotor generator 12 does not perform the motor-assisted operation or the power generating operation. TheDC bus 110 is maintained in the low voltage state VL and the charge/discharge control between theDC bus 110 and thecapacitor 19 is not performed. Hence, it is possible to prevent the power loss. - During the period of time t3 to time t4, the turning
motor 21 generates regeneration energy from the turning rotation of the upper turning body 3 (regeneration operation). The target voltage of theDC bus 110 is changed from the low voltage state VL to the high voltage state VM, and the regeneration energy is stored in theDC bus 110. The charge/discharge operation of theconverter 100 and the motor-assisted operation or the power generating operation of themotor generator 12 are not performed. The actual voltage of theDC bus 110 is gradually increased from the low voltage state VL during the period of time t3 to time t4, but does not reach the high voltage state VM. - During the period of time t4 to time t5, the voltage of the
DC bus 110 is recovered to the high voltage state VM. The target voltage of theDC bus 110 is maintained in the high voltage state VM, and theconverter 100 performs the discharging operation until the target voltage value VM is reached. - As shown in the graph of “charging ratio (SOC)” of
FIG. 14B , in the second embodiment, the voltage of theDC bus 110 is variably controlled and the SOC of thecapacitor 19 can be maintained in the high state. During the period of time t2 to time t3, the power generating operation of themotor generator 12 is performed and the charging of thecapacitor 19 is performed in order to recover the lowered voltage of thecapacitor 19. - In the controlling method of the second embodiment, the energy of the power operation is partially supplied from the
DC bus 110. Compared with the second comparative example in which all the energy of the power operation is fully supplied from thecapacitor 19, the current which flows through theconverter 100 can be reduced. Therefore, it is possible to prevent the power consumption. - The energy generated by the regeneration operation of the turning
motor 21 during the period of time t3 to time t4 is stored in theDC bus 110, not in thecapacitor 19. Therefore, it is possible to prevent the power consumption in theconverter 100 during this period. - By the discharging operation of the
converter 100 during the period of time t4 to time t5, the electric energy of thecapacitor 19 is moved to theDC bus 110 and the voltage of theDC bus 110 is maintained in the high voltage state VM. For example, when it is needed to perform the turning operation again, the energy of theDC bus 110 can be used promptly according to the situation. The constant voltage (the high voltage state VM) in which the voltage of theDC bus 110 is maintained after time t5 is higher than the constant voltage in which the voltage of thecapacitor 19 is maintained. In other words, after time t5, the power generating operation of themotor generator 12 is performed and the charging operation of thecapacitor 19 is performed in order to recover the lowered voltage of thecapacitor 19. - In the controlling methods of the first and second examples of the second embodiment, the collectable energy is predicted with the lowering of the
boom 4 and the regeneration operation of the turningmotor 21, at least the collectable energy is released and the lifting of theboom 4 and the power generating operation of the turningmotor 21 are performed. Because the boom cylinder has the predetermined stroke, after theboom 4 is lifted, the lowering operation of theboom 4 must be performed in the amount equivalent to the lifting amount. Hence, the energy corresponding to the energy generated by the lowering operation of theboom 4 may be released. Similarly, after theupper turning body 3 is accelerated by the turningmotor 21, the speed of theupper turning body 3 must be reduced to a stop. Hence, the energy corresponding to the energy generated by the decelerating operation of theupper turning body 3 may be released. When the charging ratio of thecapacitor 19 during the period of time t1 to time t2 is smaller than the target charging ratio, the charging of thecapacitor 19 is performed. Similarly, when the charging ratio of thecapacitor 19 during the period of time t4 to time t5 is smaller than the target charging ratio, the charging of thecapacitor 19 is performed. - As described in the foregoing, the first and second examples of the second embodiment of the present disclosure have been described. However, the present disclosure is not limited to these examples.
- For example, in the above examples, the lifting or lowering of the
boom 4 and the turning of theupper turning body 3 are performed at different times. Alternatively, when these operations are performed simultaneously, the regeneration energy generated by theboom 4 may be stored in theDC bus 110, and the regeneration energy generated by theupper turning body 3 may be stored in thecapacitor 19, for example. If both the two types of regeneration energy are stored in thecapacitor 19, the current flowing through theconverter 100 will be increased and the energy loss will be increased. If the control is performed so that the regeneration energy from theboom 4 is stored in theDC bus 110, the energy loss in theconverter 100 can be prevented. - In the foregoing embodiments, the hybrid excavator has been used. Alternatively, a crane may be used instead. In this case, lifting and lowering of the crane may be considered to be equivalent the lifting and lowering of the boom. The crane corresponds to the boom and the motor for lifting the crane is equivalent to the boom regeneration motor.
- In addition, the present disclosure is applicable to a hybrid excavator in which all the drive parts are hydraulically actuated as shown in
FIG. 15 . In the hybrid excavator shown inFIG. 15 , electric power generated by themotor generator 12 using excessive power of theengine 11, and electric power generated by theboom regeneration motor 300 are stored in thecapacitor system 120. The electric power stored in thecapacitor system 120 is used to assist the output of theengine 11. - The present disclosure is not limited to the above-described embodiments, and variations and modifications may be made without departing from the scope of the present disclosure.
- The present international application is based on and claims the benefit of priority of Japanese patent application No. 2009-137970, filed on Jun. 9, 2009, the contents of which are incorporated herein by reference in their entirety.
- The present disclosure is applicable to a hybrid excavator in which an engine is assisted by an electric motor.
-
- 1 lower running body
- 1A, 1B hydraulic motors
- 2 turning mechanism
- 3 upper turning body
- 4 boom
- 5 arm
- 6 bucket
- 7 boom cylinder
- 7A hydraulic piping
- 7B boom angle sensor
- 8 arm cylinder
- 9 bucket cylinder
- 10 cabin
- 11 engine
- 12 motor generator
- 13 gearbox
- 14 main pump
- 15 pilot pump
- 16 high voltage hydraulic line
- 17 control valve
- 18, 18A, 18B, 20 inverters
- 19 capacitor
- 21 turning motor
- 22 resolver
- 23 mechanical brake
- 24 turning gearbox
- 25 pilot line
- 26 operation device
- 26A, 26B levers
- 26C pedal
- 26D button switch
- 27 hydraulic line
- 28 hydraulic line
- 29 voltage sensor
- 30 controller
- 35 display device
- 100 up-down voltage converter
- 101 reactor
- 102A voltage raising IGBT
- 102B voltage lowering IGBT
- 104 power supply connection terminal
- 105 inverter
- 106 output terminal
- 107 capacitor
- 110 DC bus
- 111 DC bus voltage detecting part
- 112 capacitor voltage detecting part
- 113 capacitor current detecting part
- 120 capacitor system
- 300 boom regeneration motor (dynamo)
- 310 boom regeneration hydraulic motor
Claims (12)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009-137970 | 2009-06-09 | ||
JP2009137970 | 2009-06-09 | ||
PCT/JP2010/059696 WO2010143628A1 (en) | 2009-06-09 | 2010-06-08 | Hybrid excavator and manufacturing method therefor |
Publications (2)
Publication Number | Publication Date |
---|---|
US20120082536A1 true US20120082536A1 (en) | 2012-04-05 |
US8768578B2 US8768578B2 (en) | 2014-07-01 |
Family
ID=43308883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/376,932 Expired - Fee Related US8768578B2 (en) | 2009-06-09 | 2010-06-08 | Hybrid excavator and method of controlling hybrid excavator |
Country Status (6)
Country | Link |
---|---|
US (1) | US8768578B2 (en) |
EP (1) | EP2441894B1 (en) |
JP (1) | JP5198660B2 (en) |
KR (1) | KR101360698B1 (en) |
CN (1) | CN102459769B (en) |
WO (1) | WO2010143628A1 (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120112672A1 (en) * | 2010-11-08 | 2012-05-10 | Toyota Jidosha Kabushiki Kaisha | Rotation angle calculation apparatus and rotation angle calculation method |
US20120160796A1 (en) * | 2010-12-22 | 2012-06-28 | Terex Demag Gmbh | Crane and method for operating a crane using recovery of energy from crane operations as a secondary energy source |
US20130006457A1 (en) * | 2011-06-29 | 2013-01-03 | Caterpillar Inc. | System and method for managing power in machine having electric and/or hydraulic devices |
US20130116897A1 (en) * | 2010-07-13 | 2013-05-09 | Volvo Construction Equipment Ab | Swing control apparatus and method of construction machinery |
US20130325235A1 (en) * | 2011-04-19 | 2013-12-05 | Hitachi Construction Machinery Co., Ltd. | Electromotive drive device for construction machine |
US20130333958A1 (en) * | 2010-12-22 | 2013-12-19 | Klaus Kalmbach | Crawler vehicle and relative control method |
US8775033B2 (en) | 2011-06-07 | 2014-07-08 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method of controlling shovel |
US20140222274A1 (en) * | 2011-10-26 | 2014-08-07 | Sumitomo Heavy Industries, Ltd. | Hybrid excavator and method of controlling hybrid excavator |
US8972122B2 (en) | 2011-03-08 | 2015-03-03 | Sumitomo (S.H.I.) Construction Machinery Co., Ltd. | Shovel and method for controlling shovel |
EP2857601A1 (en) * | 2013-09-24 | 2015-04-08 | Kobelco Construction Machinery Co., Ltd. | Hybrid construction machine |
US20150284931A1 (en) * | 2012-12-21 | 2015-10-08 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method of controlling shovel |
US20160221569A1 (en) * | 2013-09-09 | 2016-08-04 | Byd Company Limited | Hybrid electrical vehicle and method for controlling the same |
US20170350094A1 (en) * | 2015-01-06 | 2017-12-07 | Kawasaki Jukogyo Kabushiki Kaisha | Drive control system of operating machine, operating machine including drive control system, and drive control method of operating machine |
US9902291B2 (en) | 2013-09-09 | 2018-02-27 | Byd Company Limited | Vehicle and sliding feedback control system of vehicle and method for the same |
US10011264B2 (en) | 2013-09-09 | 2018-07-03 | Byd Company Limited | Control system of hybrid electrical vehicle and control method for the same |
US10017174B2 (en) | 2013-09-09 | 2018-07-10 | Byd Company Limited | Control system and control method of hybrid electric vehicle |
US10077040B2 (en) | 2013-09-09 | 2018-09-18 | Byd Company Limited | Hybrid electrical vehicle and method for controlling same |
US10077039B2 (en) | 2013-09-09 | 2018-09-18 | Byd Company Limited | Hybrid electrical vehicle and method for controlling the same |
US10099690B2 (en) | 2013-09-09 | 2018-10-16 | Byd Company Limited | Hybrid electrical vehicle and method for cruising control of the same |
US10132335B2 (en) | 2012-09-21 | 2018-11-20 | Joy Global Surface Mining Inc | Energy management system for machinery performing a predictable work cycle |
US20220281724A1 (en) * | 2019-08-27 | 2022-09-08 | J. D. Neuhaus Holding Gmbh & Co. Kg | Fluid-operated lifting gear |
US11468838B2 (en) | 2017-03-30 | 2022-10-11 | Samsung Display Co., Ltd. | Pixel and organic light emitting display device having the same |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5736768B2 (en) * | 2010-12-24 | 2015-06-17 | 株式会社豊田中央研究所 | Battery charger |
JP5747533B2 (en) * | 2011-02-02 | 2015-07-15 | コベルコ建機株式会社 | Swivel work machine |
CN104246081B (en) * | 2012-06-08 | 2018-05-22 | 住友重机械工业株式会社 | The control method and control device of excavator |
JP6071327B2 (en) * | 2012-08-22 | 2017-02-01 | ナブテスコ株式会社 | Hybrid type construction machine control method and hybrid type construction machine |
JP2014087115A (en) * | 2012-10-22 | 2014-05-12 | Kobe Steel Ltd | Secondary battery protection circuit for construction machine |
JP6014463B2 (en) | 2012-11-07 | 2016-10-25 | 日立建機株式会社 | Work vehicle |
KR101958027B1 (en) * | 2012-12-26 | 2019-07-04 | 두산인프라코어 주식회사 | Apparatus for controlling engine of hybrid construction equipment |
KR101988053B1 (en) * | 2012-12-26 | 2019-06-11 | 두산인프라코어 주식회사 | Energy storage device charging system for hybrid construction equipment and charging method |
KR102046178B1 (en) * | 2013-01-24 | 2019-11-18 | 두산인프라코어 주식회사 | Apparatus and method for controlling dc terminal voltage of construction equipment with elctric motor |
JP6087190B2 (en) * | 2013-03-29 | 2017-03-01 | 住友重機械工業株式会社 | Excavator |
JP6324661B2 (en) * | 2013-03-29 | 2018-05-16 | 住友重機械工業株式会社 | Excavator |
US9222493B2 (en) * | 2013-10-14 | 2015-12-29 | Brian Riskas | Statically stable walking machine and power system therefor |
CN103790205B (en) * | 2014-02-14 | 2016-11-02 | 上海华兴数字科技有限公司 | Hybrid construction machine and energy-saving control method thereof |
WO2015196193A1 (en) | 2014-06-20 | 2015-12-23 | General Electric Company | System and method of power control for an energy storage charging station |
JP6191575B2 (en) * | 2014-08-06 | 2017-09-06 | トヨタ自動車株式会社 | Power supply |
JP6367080B2 (en) * | 2014-10-24 | 2018-08-01 | 株式会社神戸製鋼所 | Electric winch drive |
KR102368304B1 (en) * | 2015-01-27 | 2022-02-28 | 삼성에스디아이 주식회사 | Battery pack, method for controlling and driving system of electro-mechanical apparatus having the same |
BR112017025487B1 (en) | 2015-05-28 | 2023-10-17 | Joy Global Longview Operations Llc | TRANSPORT VEHICLE AND METHOD OF OPERATION OF A TRANSPORT VEHICLE |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5941328A (en) * | 1997-11-21 | 1999-08-24 | Lockheed Martin Corporation | Electric vehicle with variable efficiency regenerative braking depending upon battery charge state |
US6635973B1 (en) * | 1999-03-31 | 2003-10-21 | Kobelco Construction Machinery Co., Ltd. | Capacitor-equipped working machine |
US6701229B2 (en) * | 2001-01-19 | 2004-03-02 | Nissan Motor Co., Ltd. | Vehicle drive system |
US6727670B1 (en) * | 2002-12-12 | 2004-04-27 | Ford Global Technologies, Llc | Battery current limiter for a high voltage battery pack in a hybrid electric vehicle powertrain |
US20040210356A1 (en) * | 2000-12-27 | 2004-10-21 | Transportation Techniques, Llc | Method and apparatus for selective operation of a hybrid electric vehicle in various driving modes |
US6966803B2 (en) * | 2003-07-18 | 2005-11-22 | Honda Motor Co., Ltd. | Control apparatus for hybrid vehicle |
US7388301B2 (en) * | 2005-10-12 | 2008-06-17 | Kobelco Construction Machinery Co., Ltd. | Construction machine |
US20090024265A1 (en) * | 2007-07-19 | 2009-01-22 | Bernhard Kortschak | Micro-Hybrid Motor Vehicle |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IL121076A (en) | 1996-06-19 | 2000-10-31 | Akzo Nobel Nv | Pharmaceutical combinations comprising mirtazapine and one or more selective serotonin reuptake inhibitors |
JP2002359935A (en) * | 2001-05-31 | 2002-12-13 | Komatsu Ltd | Charging/discharging control device for power storing part of hybrid work machine |
JP3880924B2 (en) * | 2002-12-18 | 2007-02-14 | 松下電器産業株式会社 | Power supply control device and control method thereof |
JP2007059810A (en) * | 2005-08-26 | 2007-03-08 | Toyota Motor Corp | Power supply |
JP2007155586A (en) | 2005-12-07 | 2007-06-21 | Sumitomo Heavy Ind Ltd | Working machine and method for starting operation of working machine |
JP5318329B2 (en) | 2006-02-17 | 2013-10-16 | 東芝機械株式会社 | Drive device for hybrid construction machine |
JP2008038503A (en) * | 2006-08-08 | 2008-02-21 | Shin Caterpillar Mitsubishi Ltd | Hybrid type working machine |
CN102301561B (en) * | 2009-01-28 | 2015-03-11 | 住友重机械工业株式会社 | Hybrid working machine and electricity storage control apparatus |
-
2010
- 2010-06-08 EP EP10786159.3A patent/EP2441894B1/en not_active Not-in-force
- 2010-06-08 CN CN201080024889.7A patent/CN102459769B/en not_active Expired - Fee Related
- 2010-06-08 US US13/376,932 patent/US8768578B2/en not_active Expired - Fee Related
- 2010-06-08 KR KR1020117029363A patent/KR101360698B1/en not_active IP Right Cessation
- 2010-06-08 JP JP2011518541A patent/JP5198660B2/en not_active Expired - Fee Related
- 2010-06-08 WO PCT/JP2010/059696 patent/WO2010143628A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5941328A (en) * | 1997-11-21 | 1999-08-24 | Lockheed Martin Corporation | Electric vehicle with variable efficiency regenerative braking depending upon battery charge state |
US6635973B1 (en) * | 1999-03-31 | 2003-10-21 | Kobelco Construction Machinery Co., Ltd. | Capacitor-equipped working machine |
US20040210356A1 (en) * | 2000-12-27 | 2004-10-21 | Transportation Techniques, Llc | Method and apparatus for selective operation of a hybrid electric vehicle in various driving modes |
US6701229B2 (en) * | 2001-01-19 | 2004-03-02 | Nissan Motor Co., Ltd. | Vehicle drive system |
US6727670B1 (en) * | 2002-12-12 | 2004-04-27 | Ford Global Technologies, Llc | Battery current limiter for a high voltage battery pack in a hybrid electric vehicle powertrain |
US6966803B2 (en) * | 2003-07-18 | 2005-11-22 | Honda Motor Co., Ltd. | Control apparatus for hybrid vehicle |
US7388301B2 (en) * | 2005-10-12 | 2008-06-17 | Kobelco Construction Machinery Co., Ltd. | Construction machine |
US20090024265A1 (en) * | 2007-07-19 | 2009-01-22 | Bernhard Kortschak | Micro-Hybrid Motor Vehicle |
Cited By (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130116897A1 (en) * | 2010-07-13 | 2013-05-09 | Volvo Construction Equipment Ab | Swing control apparatus and method of construction machinery |
US9008919B2 (en) * | 2010-07-13 | 2015-04-14 | Volvo Construction Equipment Ab | Swing control apparatus and method of construction machinery |
US8288977B2 (en) * | 2010-11-08 | 2012-10-16 | Toyota Jidosha Kabushiki Kaisha | Rotation angle calculation apparatus and rotation angle calculation method |
US20120112672A1 (en) * | 2010-11-08 | 2012-05-10 | Toyota Jidosha Kabushiki Kaisha | Rotation angle calculation apparatus and rotation angle calculation method |
US20120160796A1 (en) * | 2010-12-22 | 2012-06-28 | Terex Demag Gmbh | Crane and method for operating a crane using recovery of energy from crane operations as a secondary energy source |
US9975417B2 (en) * | 2010-12-22 | 2018-05-22 | Prinoth S.P.A. | Crawler vehicle and relative control method |
US20130333958A1 (en) * | 2010-12-22 | 2013-12-19 | Klaus Kalmbach | Crawler vehicle and relative control method |
US8857635B2 (en) * | 2010-12-22 | 2014-10-14 | Terex Cranes Germany Gmbh | Crane and method for operating a crane using recovery of energy from crane operations as a secondary energy source |
US8972122B2 (en) | 2011-03-08 | 2015-03-03 | Sumitomo (S.H.I.) Construction Machinery Co., Ltd. | Shovel and method for controlling shovel |
US9249556B2 (en) | 2011-03-08 | 2016-02-02 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method for controlling shovel |
US20130325235A1 (en) * | 2011-04-19 | 2013-12-05 | Hitachi Construction Machinery Co., Ltd. | Electromotive drive device for construction machine |
US8972121B2 (en) * | 2011-04-19 | 2015-03-03 | Hitachi Construction Machinery Co., Ltd. | Electromotive drive device for construction machine |
US8775033B2 (en) | 2011-06-07 | 2014-07-08 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method of controlling shovel |
US20130006457A1 (en) * | 2011-06-29 | 2013-01-03 | Caterpillar Inc. | System and method for managing power in machine having electric and/or hydraulic devices |
US8606448B2 (en) * | 2011-06-29 | 2013-12-10 | Caterpillar Inc. | System and method for managing power in machine having electric and/or hydraulic devices |
WO2013003015A1 (en) * | 2011-06-29 | 2013-01-03 | Caterpillar Inc. | System for managing power in machine having electric and/or hydraulic devices |
US20140222274A1 (en) * | 2011-10-26 | 2014-08-07 | Sumitomo Heavy Industries, Ltd. | Hybrid excavator and method of controlling hybrid excavator |
US9441345B2 (en) * | 2011-10-26 | 2016-09-13 | Sumitomo Heavy Industries, Ltd. | Hybrid excavator and method of controlling hybrid excavator |
US10132335B2 (en) | 2012-09-21 | 2018-11-20 | Joy Global Surface Mining Inc | Energy management system for machinery performing a predictable work cycle |
US10132056B2 (en) | 2012-12-21 | 2018-11-20 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel |
US20150284931A1 (en) * | 2012-12-21 | 2015-10-08 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method of controlling shovel |
US9382687B2 (en) * | 2012-12-21 | 2016-07-05 | Sumitomo(S.H.I.) Construction Machinery Co., Ltd. | Shovel and method of controlling shovel |
US10077040B2 (en) | 2013-09-09 | 2018-09-18 | Byd Company Limited | Hybrid electrical vehicle and method for controlling same |
US10077039B2 (en) | 2013-09-09 | 2018-09-18 | Byd Company Limited | Hybrid electrical vehicle and method for controlling the same |
US9902291B2 (en) | 2013-09-09 | 2018-02-27 | Byd Company Limited | Vehicle and sliding feedback control system of vehicle and method for the same |
US9718457B2 (en) * | 2013-09-09 | 2017-08-01 | Byd Company Limited | Hybrid electrical vehicle and method for controlling the same |
US10011264B2 (en) | 2013-09-09 | 2018-07-03 | Byd Company Limited | Control system of hybrid electrical vehicle and control method for the same |
US10017174B2 (en) | 2013-09-09 | 2018-07-10 | Byd Company Limited | Control system and control method of hybrid electric vehicle |
US20160221569A1 (en) * | 2013-09-09 | 2016-08-04 | Byd Company Limited | Hybrid electrical vehicle and method for controlling the same |
US10099690B2 (en) | 2013-09-09 | 2018-10-16 | Byd Company Limited | Hybrid electrical vehicle and method for cruising control of the same |
US9217239B2 (en) | 2013-09-24 | 2015-12-22 | Kobelco Construction Machinery Co., Ltd. | Hybrid construction machine |
EP2857601A1 (en) * | 2013-09-24 | 2015-04-08 | Kobelco Construction Machinery Co., Ltd. | Hybrid construction machine |
US20170350094A1 (en) * | 2015-01-06 | 2017-12-07 | Kawasaki Jukogyo Kabushiki Kaisha | Drive control system of operating machine, operating machine including drive control system, and drive control method of operating machine |
US10435866B2 (en) * | 2015-01-06 | 2019-10-08 | Kawasaki Jukogyo Kabushiki Kaisha | Drive control system of operating machine, operating machine including drive control system, and drive control method of operating machine |
US11468838B2 (en) | 2017-03-30 | 2022-10-11 | Samsung Display Co., Ltd. | Pixel and organic light emitting display device having the same |
US20220281724A1 (en) * | 2019-08-27 | 2022-09-08 | J. D. Neuhaus Holding Gmbh & Co. Kg | Fluid-operated lifting gear |
Also Published As
Publication number | Publication date |
---|---|
US8768578B2 (en) | 2014-07-01 |
WO2010143628A1 (en) | 2010-12-16 |
EP2441894B1 (en) | 2015-11-04 |
JPWO2010143628A1 (en) | 2012-11-22 |
KR20120024736A (en) | 2012-03-14 |
CN102459769B (en) | 2014-03-26 |
EP2441894A1 (en) | 2012-04-18 |
KR101360698B1 (en) | 2014-02-07 |
JP5198660B2 (en) | 2013-05-15 |
CN102459769A (en) | 2012-05-16 |
EP2441894A4 (en) | 2012-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8768578B2 (en) | Hybrid excavator and method of controlling hybrid excavator | |
US8286741B2 (en) | Hybrid operating machine | |
US8831805B2 (en) | Construction machine and industrial vehicle having power supply system | |
US8285434B2 (en) | Hybrid-type construction machine having an output condition calculating unit to calculate output conditions of an engine and an electric storage device | |
US9203261B2 (en) | Excavator | |
US9206584B2 (en) | Hybrid working machine and method of controlling hybrid working machine | |
US9863124B2 (en) | Construction machinery | |
EP2479058B1 (en) | Hybrid-type construction machine | |
US9441345B2 (en) | Hybrid excavator and method of controlling hybrid excavator | |
JP5101400B2 (en) | Hybrid construction machine | |
US9702116B2 (en) | Shovel with enhanced engine speed management using power storage device | |
JP5550954B2 (en) | Hybrid work machine | |
JP5037558B2 (en) | Hybrid construction machine | |
JP6324661B2 (en) | Excavator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SUMITOMO HEAVY INDUSTRIES, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KAWASHIMA, KOJI;SUGIYAMA, YUTA;REEL/FRAME:027353/0208 Effective date: 20111206 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551) Year of fee payment: 4 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20220701 |