Business flow analysis method and apparatus Download PDFInfo
- Publication number
- US20110106577A1 US20110106577A1 US12/987,570 US98757011A US2011106577A1 US 20110106577 A1 US20110106577 A1 US 20110106577A1 US 98757011 A US98757011 A US 98757011A US 2011106577 A1 US2011106577 A1 US 2011106577A1
- Authority
- US
- United States
- Prior art keywords
- job
- process instances
- transition
- process instance
- standard deviation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 355
- 238000005206 flow analysis Methods 0.000 title claims description 12
- 230000008569 process Effects 0.000 claims abstract description 343
- 230000007704 transition Effects 0.000 claims abstract description 190
- 238000013500 data storage Methods 0.000 claims description 30
- 230000006872 improvement Effects 0.000 abstract description 46
- 230000009467 reduction Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 35
- 238000010422 painting Methods 0.000 description 21
- 238000009434 installation Methods 0.000 description 11
- 239000000284 extract Substances 0.000 description 7
- 230000008439 repair process Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 4
- 238000000605 extraction Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
- G06F16/285—Clustering or classification
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Definitions
- This technique relates to an analysis technique of a business flow.
- a technique to automatically generate a business flow by collecting and analyzing data generated in a business application system used in a company or the like in order to carryout a Business Process Re-engineering (BPR) has already been known.
- BPR Business Process Re-engineering
- a business flow analysis method includes: extracting a series of transaction records for each case from a database storing transaction records for processing results of respective performed jobs, generating, for each of the cases, a process instance including job names and time data of the performed jobs, which are arranged in a time series, and storing data of the process instance into a process instance storage device; classifying process instances satisfying a designated condition among process instances stored in the process instance storage device; calculating, for each classification of the process instances, an average value and a standard deviation of transition periods that are differences between a start time and an end time of a job section to be processed, in the process instances satisfying the designated condition, and storing the calculated average value and the calculated standard deviation into a storage device; identifying a classification of the process instances satisfying a predetermined condition representing that it is possible to reduce a transition period of the job section, based on the average value and said standard deviation, which are stored in the storage device; comparing either of jobs and inter-job transitions, which are included in the process instance belonging to the identified classification of the process instances satisfying the
- FIG. 1 is a diagram to explain an average value and standard deviation of transition periods
- FIG. 2 is a diagram to explain the average value and standard deviation of the transition periods
- FIG. 3 is a diagram to explain the average value and standard deviation of the transition periods
- FIG. 4 is a functional diagram of a business flow analysis apparatus relating to an embodiment
- FIG. 5 is a diagram depicting a processing flow in the embodiment
- FIG. 6 is a diagram depicting an example of data stored in a table A
- FIG. 7 is a diagram depicting an example of data stored in a table B
- FIG. 8A is a diagram depicting an example of data stored in a table C
- FIG. 8B is a diagram to explain a process instance
- FIG. 9 is a diagram to explain the transition period
- FIG. 10 is a diagram depicting process instance types to be processed in a first example
- FIG. 11 is a diagram to explain a processing for the first example
- FIG. 12 is a diagram to explain the processing for the first example
- FIG. 13 is a diagram to explain a processing in the embodiment.
- FIG. 14 is a diagram to explain the processing for the first example
- FIG. 15 is a diagram to explain the processing for the first example
- FIG. 16 is a diagram depicting process instance types extracted as improvement candidates in the first example
- FIG. 17 is a diagram depicting the processing in the embodiment.
- FIG. 18 is a diagram depicting events and inter-event transitions to be shown, which are extracted in the first example
- FIG. 19 is a diagram depicting one example of data to be shown to the user in the first example
- FIG. 20 is a diagram depicting processing instance types to be processed in the second example
- FIG. 21 is a diagram depicting schematically superimposed process instance types to be processed in the second example.
- FIG. 22 is a diagram depicting the process instance types extracted as the improvement candidate in the second example.
- FIG. 23 is a diagram depicting events common to the process instance types extracted as the improvement candidates in the second example.
- FIG. 24 is a diagram depicting inter-event transitions common to the process instance types extracted as the improvement candidates in the second example
- FIG. 25 is a diagram depicting the process instance types other than the improvement candidates in the second example.
- FIG. 26 is a diagram depicting the events and inter-event transitions to be shown, which are extracted in the second example;
- FIG. 27 is a diagram depicting data to be shown to the user in the second example.
- FIG. 28 is a diagram depicting the average value and standard deviation of the transition periods in a third example.
- FIG. 29 is a diagram depicting events in the process instances extracted as the improvement candidate in the third example.
- FIG. 30 is a diagram depicting inter-event transitions in the process instances extracted as the improvement candidates in the third example.
- FIG. 31 is a diagram depicting the inter-event transitions extracted in the third example.
- FIG. 32 is a diagram depicting the inter-event transitions extracted in the third example.
- FIG. 33 is a functional block diagram of a computer.
- a time period between events (i.e. job or processing) in the business flow is called a transition period, and the transition period is considered as being almost equal to a job processing time.
- Various factors e.g. the business flow or other factors
- the jobs or systems including a case of a portion of them whose transition period is determined based on the business flow are considered, and it is automatically judged whether or not the reduction of the transition period, that is, the efficiency improvement of the business processing can be made by changing the business flow.
- the judgement of whether or not the job or system is to be considered is based on whether or not the transition period has the correlation with the business flow.
- the presence of the correlation is judged based on whether or not the standard deviation of the transition periods for a section of the same inter-event transition is less than a threshold, and when the standard deviation of the transition periods is less than the threshold, it is judged that the correlation exists.
- this embodiment assumes following matters. Namely, the same kind of the process instance is executed two or more times. Generally, because it is unknown whether or not the correlation between the business flow and the transition period exists, a process to judge whether or not the correlation exists is carried out. However, it is impossible to calculate the standard deviation for the process instance that was executed only once. In case where the same kind of process instance is executed two or more times, when the transition periods of the section of the same inter-event transition have a close value for the respective process instances (namely, the standard deviation is less than the threshold.), it can be judged that the correlation between the transition period of the section and the business flow exists.
- the average value and the standard deviation are calculated for each of the transition period from A to B, the transition period from B to C and the transition period from C to D.
- the calculated results are depicted in FIG. 1 .
- the standard deviations of the transition period from A to B and the transition period from C to D are less than the threshold “0.5”, and it is judged that the transition from A to B and the transition from C to D have the correlation.
- the standard deviation of the transition period from B to C largely exceeds the threshold “0.5”, it is judged that the transition from B to C has no correlation.
- the transition period from A to E and the transition period from C to D are equal to or greater than the threshold “0.5”, and it is judged that the transition from A to E and the transition from C to D have no correlation.
- the transition period from E to C is less than the threshold “0.5”, it is judged that the transition from E to C has the correlation.
- the transition from C to D is common to the first and second process instances, and when the average value and the standard deviation of the transition periods for a section from C to D are calculated for all process instances of the first and second process instances, the results are obtained as depicted in FIG. 3 . It is judged for the transition from C to D in the first process instance has the correlation, but it is judged for the transition from C to D in the second process instance has no correlation. In addition, because the result of all of 7 times depicted in FIG. 3 exceeds the threshold “0.5”, it is judged that the result of all of 7 times has no correlation.
- the transition from C to D is executed in the processing order of the first process instance with a predictable and fixed transition period, but the transition from C to D is executed in the other processing order with an unpredictable transition period, and the transition period is determined based on factors other than the business flow.
- this embodiment introduces a business flow analysis apparatus 100 as depicted in FIG. 4 .
- the business flow analysis apparatus 100 has a process instance generator 1 that generates data of process instances from data stored in one or plural databases (e.g.
- a process instance storage 3 storing process instances generated by the process instance generator 1 ; an input unit 7 that accepts inputs of a processing section to be considered, constraint conditions and the like; a process instance extractor 5 that carries out a processing to extract data of the process instance to be processed from the process instance storage 3 according to the input data from the input unit 7 ; an extracted process instance storage 9 storing data of the process instances extracted by the process instance extractor 5 ; a transition period processing unit 11 that carries out a processing for the transition period as will be explained in the following by using data stored in the extracted process instance storage 9 ; an extracted type data storage 13 storing a processing result of the transition period processing unit 11 ; an improvement data extractor 15 that carries out a processing to extract improvement data of the business flow according to data from the input unit 7 by using data stored in the extracted process instance storage 9 and the extracted type data storage 13 ; the improvement data storage 17 storing a processing result of the improvement
- the process instance generator 1 carries out a process to generate process instances by using data stored in the databases, and to group the generated process instances and stores processing results into the process instance storage 3 ( FIG. 5 : step S 1 ).
- data as depicted in FIG. 6 is stored in a table A of the database 210
- data as depicted in FIG. 7 is stored in a table B of the database 210
- data as depicted in FIG. 8A is stored in a table C of the database 220 .
- an identifier to identify a case a processing type (i.e. event name) and a processing time are registered.
- the process instance generator 1 extracts records whose identifiers are the same. For example, when records whose identifier is “ID001” and to which a star mark is attached are extracted, data as depicted in FIG. 8B is obtained.
- process instance including the processes A, B, C and D is identified as one type, and the process instances including the same processes are collected, and they are stored into the process instance storage 3 .
- the input unit 7 prompts the user to designate the processing section to be considered, accepts the designation of the processing section from the user, and outputs data of the designation to the process instance extractor 5 (step S 3 ).
- the plural processing sections may be designated, and the entire specific process instance type may be designated.
- the input unit 7 prompts the user to designate constraint conditions, accepts the designation of the constraint conditions from the user, and outputs data of the designation to the improvement data extractor 15 (step S 5 ).
- the constraint conditions may not be designated.
- the process instance extractor 5 extracts data of the process instances including the designated processing section from the process instance storage 3 , and stores the extracted data into the extracted process instance storage 9 (step S 7 ). As depicted in FIGS. 1 and 2 , all of the process instances having the section from the process C to the process D are extracted. When plural processing sections are designated, the process instances including either of the transitions corresponding to the designated processing sections are extracted.
- the transition period processing unit 11 calculates the average value and the standard deviation of the transition periods for each type of the extracted process instances and the entire extracted processing instances, by using data of the process instances stored in the extracted process instance storage 9 , and temporarily stores the calculation results into the extracted type data storage 13 (step S 9 ).
- the transition period processing unit 11 calculates the transition periods based on the difference between the time of the start process and the time of the end process in the designated processing section.
- the processing section is a section from the process B to the process C
- the difference between the time (1/11 11:07:56) of the process B and the time (1/11 12:09:47) of the process C is calculated to obtain the transition period “1:00”.
- the average value and the standard deviation of the transition periods for the processing section are calculated.
- the average value and the standard deviation of the transition periods for the section from the process C to the process D are calculated.
- the average value and the standard deviation of the transition periods for the processing section is also calculated. For example, when there are only the first and second process instance types, as depicted in FIGS. 1 and 2 , the average value and the standard deviation of the transition periods for the section from the process C to the process D are calculated for the entire of the first and second process instance types as depicted in FIG. 3 .
- the transition period processing unit 11 sets a threshold of the standard deviation (step S 11 ).
- the threshold of the standard deviation may be a fixed value, or may be calculated by a ratio for the average value or the like. Furthermore, the user may set it.
- the transition period processing unit 11 judges whether or not the standard deviation for all of the process instance types and the standard deviations for the respective types are equal to or greater than the threshold (step S 13 ).
- process instances as depicted in FIG. 10 are extracted. Namely, following process instance types exist: (1) First process instance type including standard specification car, body assembly, body assembly check, body painting, engine joining, and option. (2) Second process instance type including special specification car, body assembly, body assembly check, body painting, engine joining, and option. (3) Third process instance type including special specification car, body assembly, body assembly check, body painting, engine joining, and no option. (4) Fourth process instance type including standard specification car, body assembly, body assembly check, body painting, engine joining, and no option.
- the process section is a section from the body painting to the engine joining and the threshold is “0.5”, it is judged that the condition at the step S 13 is satisfied.
- the condition that the standard deviation for the entire of the types and the standard deviations for the respective types are equal to or greater than the threshold is satisfied, it is indicated that it is impossible to predict the transition period of the processing section and the transition period is determined based on a factor other than the business flow, even if any business flow (also called “route”) is selected. Therefore, there is almost no room to reduce the transition period even if any business flow is selected.
- the transition period processing unit 11 stores data representing “impossible to improve” into the extracted type data storage 13 .
- the improvement data extractor 15 stores the data representing “impossible to improve” into the improvement data storage 17 as it is.
- the output unit 19 outputs data representing that no improvement point can be extracted to an output device such as a display device or printer based on data representing “impossible to improve”, which is stored in the improvement data storage 17 (step S 17 ).
- the transition period processing unit 11 judges whether or not the standard deviation for the entire of the types and the standard deviations for the respective types are less than the threshold (step S 15 ).
- the processing section is a section from the body assembly check to the body painting as depicted in FIG. 12
- all of the standard deviations for the first to fourth process instance types are “0.1” and less than the threshold “0.5”, and the standard deviation for all types is also less than the threshold.
- the transition periods for the section from the body assembly check to the body painting are almost fixed values (almost “1.0h” as depicted in FIG. 12 ) regardless of the business flows. Therefore, there is almost no room to reduce the transition period by selecting the business flow.
- the processing shifts to the step S 17 , and as described above, data representing that the improvement point cannot be extracted is outputted.
- the processing shifts to a processing of FIG. 13 through a terminal A.
- the transition period processing unit 11 groups plural types whose routes prior to the processing section are the same among the process instances stored in the extracted process instance storage 9 (step S 19 ). For example, when the process instances as depicted in FIG. 10 exist and the processing section is a section from the body assembly to the body assembly check, a route, which passes through the event “standard specification car” to the body assembly, (first and fourth process instance types) and a route, which passes through an event “special specification car” to the body assembly, (second and third process instances) exist. Thus, the process instance types are grouped according to the routes prior to the processing section.
- the transition period processing unit 11 calculates the average value and the standard deviation of the transition periods for the processing section, for each group, and stores the calculation results into the extracted type data storage 13 , for example (step S 21 ).
- the process section is a section from the body assembly to the body assembly check
- the standard deviation for all of the process instance types exceeds the threshold “0.5”
- the standard deviation for the second process instance type exceeds the threshold “0.5”. Therefore, the section from the body assembly to the body assembly check will be processed at the step S 19 and subsequent steps.
- the prior event i.e.
- the prior event i.e. route
- the prior event is “special specification car”. Therefore, when the average value and the standard deviation of the transition periods are calculated for the first and fourth process instance types, “2.4h” and “0.2” are obtained. On the other hand, when the average value and the standard deviation of the transition periods are calculated for the second and third process instance types, “4.2h” and “1.0” are obtained. Therefore, when the prior route is “standard specification car”, like the first and fourth process instance types whose standard deviation is less than the threshold and which has the correlation, the transition periods for the section from the body assembly to the body assembly check are almost unique “2.4h”.
- the transition period processing unit 11 judges whether or not any group is constructed at the step S 19 (step S 23 ).
- the processing shifts to step S 29 .
- the transition period processing unit 11 judges based on data calculated at the step S 21 , whether or not any group whose standard deviation for the processing section is less than the threshold exists (step S 25 ).
- the group of the first and second process instance types is identified.
- the transition period processing unit 11 identifies process instance types belonging to a group whose standard deviation for the processing section is less than the threshold and whose average value is less than the average value for all types or whose value calculated by adding the standard deviation to the average value is less than the average value for all types, and stores data of the identified process instance type into the extracted type data storage 13 (step S 27 ).
- the transition period processing unit 11 judges whether or not any type whose standard deviation for the processing section is less than the threshold exists (step S 29 ).
- the processing shifts to the step S 17 , and when the condition at the step S 27 is satisfied after grouping for each prior route, the process instance types are extracted at the step S 27 . Therefore, the process instance types, which were not extracted at the step S 25 or S 27 are processed at this step. As depicted in FIG.
- the second and third process instance types are processed at the step S 29 , and the third process instance type whose standard deviation is less than the threshold “0.5” is identified among them.
- This third process instance type has the correlation with the entire of the business flow. Basically, because the transition period for the processing section is settled after the entire of the business flow is fixed, there is almost no room to reduce the transition period even when this business flow is selected.
- the transition period processing unit 11 identifies a process instance type whose standard deviation for the processing section is less than the threshold and whose average value is less than the average value for all types or whose value calculated by adding the standard deviation to the average value is less than the average value for all types, and stores data of the identified process instance type into the extracted type data storage 13 (step S 31 ).
- the standard deviation for the processing section in the third process instance type is less than the threshold.
- the average value is “3.9h”
- this average value exceeds the average value “3.3h” for all types Therefore, the condition at the step S 31 is not satisfied. Therefore, no process instance type is extracted in the example of FIG. 15 .
- the processing shifts to the step S 33 .
- data as depicted in FIG. 16 is stored in the extracted type data storage 13 , in the aforementioned example.
- corresponding event (processing) names or IDs are included.
- the improvement data extractor 15 extracts only a type satisfying the constraint condition among the process instance types stored in the extracted type data storage 13 (step S 33 ).
- the constraint condition is a condition that a specific event (process) is passed or not passed, for example, and only the process instance type satisfying this condition will be processed in the following.
- the processing shifts to a processing of FIG. 17 through a terminal B.
- the improvement data extractor 15 extracts events and inter-event transitions common to the process instance types stored in the extracted type data storage 13 , and stores the extracted data into the improvement data storage 17 , for example (step S 35 ).
- the first and fourth process instance types are extracted
- the common events are “standard specification car”, “body assembly”, “body assembly check”, “body painting”, and “engine joining”
- the common inter-event transitions are transition “from the standard specification car to the body assembly”, “from the body assembly to the body assembly check”, “from body assembly check to the body painting” and “from the body painting to the engine joining”.
- the improvement data extractor 15 extracts events and inter-event transitions, which do not appear in the types other than the process instance types stored in the extracted type data storage 13 , among the extracted common events and the common inter-event transitions, and stores the extracted data into the improvement data storage 17 (step S 37 ).
- the types other than the process instance types stored in the extracted type data storage 13 are identified from the extracted process instance storage 9 .
- events “special specification car”, “body assembly”, “body assembly check”, “body painting”, “engine joining”, “option” and “no option” are included in the second and third process instance types
- the inter-event transitions “from the special specification car to the body assembly” “from the body assembly to the body assembly check”, “from the body assembly check to the body painting”, “from the body painting to the engine joining”, “from the engine joining to the option” and “from the engine joining to the no option” are included in the second and third process instance types. Therefore, the event satisfying the condition at the step S 37 is “the standard specification car”, and the inter-event transition satisfying the condition at the step S 37 is the transition “from the standard specification car to the body assembly”.
- the improvement data extractor 15 extracts events and inter-event transitions, which do not appear in the process instance types stored in the extracted type data storage 13 , among the events and the inter-event transitions, which appear in the types other than the process instance types stored in the extracted type data storage 13 , and stores the extracted data into the improvement data storage 17 (step S 39 ).
- the event satisfying the condition at the step S 39 is “the special specification car”
- the inter-event transition satisfying the condition at the step S 39 is the transition “from the special specification car to the body assembly”.
- A- 1 ) indicates the event extracted at the step S 37
- A- 2 ) indicates the inter-event transition extracted at the step S 37
- B- 1 ) indicates the event extracted at the step S 39
- B- 2 ) indicates the inter-event transition extracted at the step S 39 .
- A- 1 ) and A- 2 ) mean that it is possible to reduce the transition period by adopting the event or inter-event transition.
- B- 1 ) and B- 2 ) mean it is possible to reduce the transition period when the event or inter-event transition is not adopted.
- the first and fourth process instance types must be adopted in order to realize A- 1 ), A- 2 ), B- 1 ) and B- 2 ).
- the processing section is “the section from the body assembly to the body assembly check”
- the improvement effect in case where the respective conditions in FIG. 18 are adopted may be calculated by the difference between the average value for that case and the average value for all types.
- the output unit 19 outputs data stored in the improvement data storage 17 to the output device to show the data to the user (step S 41 ).
- data as depicted in FIG. 19 is shown.
- the meanings of A- 1 ), A- 2 ), B- 1 ) and B- 2 ) may be specifically shown.
- the improvement effect may be shown for each case.
- the effective improvement points to reduce the transition period for the processing section can be automatically extracted based on the correlation with the prior route and/or the correlation with the entire flow. Furthermore, it becomes possible to show, as the improvement effect, the difference between the average value of the transition periods in case where the improvement points are adopted and the average value for all types.
- FIGS. 20 to 32 the second and third examples will be explained by using FIGS. 20 to 32 .
- the processing section is a section from the entire check to the shipping, and all of 6 process instance types are processed.
- the constraint condition is a condition that it passes through the “joining” event. All process instance types also satisfy this constraint condition.
- the average value and the standard deviation of the section from the entire check to the shipping for all types are “1.3h” and “1.0”
- the average value and the standard deviation for the first process instance type are “0.5h” and “0.1”
- the average value and the standard deviation for the second process instance type are “1.7h” and “0.1”
- the average value and the standard deviation for the third process instance type are “1.2h” and “0.2”
- the average value and the standard deviation for the fourth process instance type are “0.6h” and “0.1”
- the average value and the standard deviation for the fifth process instance type are “1.8h” and “0.1”
- the average value and the standard deviation for the sixth process instance type are “1.0h” and “0.3”.
- the processing shifts to the step S 29 .
- the process instance type whose standard deviation for the processing section is less than the threshold “0.5” is extracted.
- all process instance types are extracted in this example.
- the process instance type having the improvement effect is only a process instance type whose value calculated by adding the standard deviation to the average value is less than the average value for all types, only first and fourth process instance types are identified at the step S 31 .
- the process instance types extracted by the transition period processing unit 11 are the process instance types as depicted in FIG. 22 .
- the events common to the first and fourth process instance types are “body assembly”, “body assembly check”, “body painting”, “engine assembly”, “engine assembly check”, “joining”, “parts installation”, “entire check” and “shipping”.
- the inter-event transition common to the first and fourth process instance types are transitions “from the body assembly to the body assembly check”, “from the body assembly check to the body painting”, “from the engine assembly to the engine assembly check”, “from the joining to the parts installation”, “from parts installation to the entire check” and “from the entire check to the shipping”.
- the events and inter-event transitions which do not appear in the process instance types ( FIG. 25 ) other than the processing instance types depicted in FIG. 22 , are extracted among the events and inter-event transitions depicted in FIGS. 23 and 24 .
- no pertinent events and inter-event transitions exist.
- the events “the option installation” and “repair” and the transitions “from the parts installation to the option installation”, “from the option installation to the entire check”, “from the entire check to the repair” and “from the repair to the entire check” are identified at the step S 39 , as depicted in FIG. 26 .
- the process instance types that do not include “the option installation” and “the repair” the reduction of the transition period is expected.
- the extracted inter-event transitions are covered by the condition that “the option installation” and “the repair” are not included.
- the average value of the transition periods for the processing section in the first and fourth process instance types is calculated, and the difference between the calculated average value and the average value for all types is calculated. Then, the output unit 19 outputs data as depicted in FIG. 27 , for example.
- the processing will be explained by using the third example. Also here, it is assumed that the process instance types depicted in FIG. 20 are extracted. However, the processing section is the entire process, and the constraint condition is a condition that it passes through “the option installation”. When the processing section is the entire process, the process instance types are narrowed at the step S 7 by the constraint condition. The second and fifth process instance types that it passes through “the option installation” are identified among the process instance types in FIG. 20 .
- the average value and the standard deviation of the transition periods for each process instance type are values as depicted in FIG. 28 .
- the average value and the standard deviation of the transition periods for all types are not calculated, because the flow contents are largely different. Therefore, at the steps S 13 and S 15 , “No routes” are adopted. Furthermore, because no group is constructed, the processing shifts from the step S 23 to the step S 29 , and it is judged whether or not the process instance type whose standard deviation is less than the threshold exists.
- the second and fifth process instance types are identified.
- the process instance type whose average value is the largest is used as the reference at the step S 31 , and the process instance type whose standard deviation of the processing section is less than the threshold and whose average value is less than the largest average value (or whose value calculated by adding the standard deviation to the average value is less than the largest average value) is extracted.
- the second process instance type is extracted. Namely, the second process instance type is identified as the improvement candidate.
- the inter-event transitions which do not appear in the fifth process instance type among the inter-event transitions depicted in FIG. 30 , are the transitions “from the body painting to the engine assembly” and “from the engine assembly check to the joining” as depicted in FIG. 31 .
- the extraction results as depicted in FIGS. 31 and 32 are shown to the user.
- the improvement points are a point that the transitions “from the body painting to the engine assembly” and “from the engine assembly check to the joining” are included and a point that the transitions “from the engine assembly check to the body assembly” and “from the body painting to the joining” are not included.
- the aforementioned points are summarized as follows: the work for the engine should be carried out after the work for the body, but the work for the body should not be carried out after the work for the engine.
- the processing section is the entire flow
- a processing including a lot of exceptions is carried out.
- the judgement may be made based on the average value and the standard deviation of the transition periods for the entire flow along with the aforementioned processing flow.
- the functional block diagram depicted in FIG. 4 is a mere example, and does not always correspond to an actual program module configuration.
- the order of the steps may be exchanged and the steps may be executed in parallel as long as the same processing results can be obtained.
- the classification and grouping of the process instances they may be carried out all together at the step that the processing section is designated, or they may be carried out separately, as mentioned above.
- a business flow analysis method includes: extracting a series of transaction records for each case from a database storing transaction records for processing results of respective performed jobs, generating, for each of the cases, a process instance including job names and time data of the performed jobs, which are arranged in a time series, and storing data of the process instance into a process instance storage device; classifying process instances satisfying a designated condition among process instances stored in the process instance storage device (e.g.
- the classifying may include a processing to classify the process instances according to the process instance types and to group the process instance types); calculating, for each classification of the process instances, an average value and a standard deviation of transition periods that are differences between a start time and an end time of a job section to be processed, in the process instances satisfying the designated condition, and storing the calculated average value and the calculated standard deviation into a storage device (the average value and the standard deviation of the transition periods for all process instances satisfying the designated condition may be calculated); identifying a classification of the process instances satisfying a predetermined condition representing that it is possible to reduce a transition period of the job section, based on the average value and said standard deviation, which are stored in the storage device; comparing either of jobs and inter-job transitions, which are included in the process instance belonging to the identified classification of the process instances satisfying the predetermined condition, with either of jobs and inter-job transitions, which are included in the process instances belonging to classifications of process instances that do not satisfy the predetermined condition, to extract either of a feature job and a feature inter-job
- the feature job i.e. event
- feature inter-job transition i.e. inter-event transition
- the difference between the average value of the transition periods for the job section to be considered in case where the process instances satisfying the predetermined condition are adopted and the average value of the transition periods for the job section to be considered for all of the process instances may be shown.
- the predetermined condition may be a condition to extract a classification whose standard deviation of the transition periods is less than a first threshold and whose average value of the transition periods is relatively short, when a standard deviation of the transition periods for all of the process instances satisfying the designated condition is greater than a second threshold.
- the predetermined condition may be a condition to extract a classification whose standard deviation of the transition periods is less than a first threshold and whose average value of the transition periods or value calculated by adding the standard deviation to the average value of the transition periods is less than an average value of transition periods for all of the process instances satisfying the designated condition, when a standard deviation of the transition periods for all of the process instances satisfying the designated condition is greater than a second threshold.
- the classification for which the sufficient effect is statistically expected is extracted.
- the classifying may include: first classifying the process instances satisfying the designated condition among the process instances stored in the process instance data storage device into each of process instances whose job names are completely identical; and second classifying the process instances classified at the first classifying into each of process instances whose route prior to the job section to be processed is identical.
- a classification of the process instances whose route prior to the job section to be processed is identical has a priority in the identifying.
- the effective classification having the correlation with the route prior to the job section to be processed is extracted, preferentially.
- the aforementioned predetermined condition may include a condition of a job to be included in the process instance.
- the constraint condition may be used as the predetermined condition to narrow the process instances.
- the business flow analysis apparatus 100 is a computer device as shown in FIG. 33 . That is, a memory 2501 (storage device), a CPU 2503 (processor), a hard disk drive (HDD) 2505 , a display controller 2507 connected to a display device 2509 , a drive device 2513 for a removable disk 2511 , an input device 2515 , and a communication controller 2517 for connection with a network are connected through a bus 2519 as shown in FIG. 33 .
- An operating system (OS) and an application program for carrying out the foregoing processing in the embodiment are stored in the HDD 2505 , and when executed by the CPU 2503 , they are read out from the HDD 2505 to the memory 2501 .
- OS operating system
- an application program for carrying out the foregoing processing in the embodiment are stored in the HDD 2505 , and when executed by the CPU 2503 , they are read out from the HDD 2505 to the memory 2501 .
- the CPU 2503 controls the display controller 2507 , the communication controller 2517 , and the drive device 2513 , and causes them to perform necessary operations.
- intermediate processing data is stored in the memory 2501 , and if necessary, it is stored in the HDD 2505 .
- the application program to realize the aforementioned functions is stored in the removable disk 2511 and distributed, and then it is installed into the HDD 2505 from the drive device 2513 . It may be installed into the HDD 2505 via the network such as the Internet and the communication controller 2517 .
- the hardware such as the CPU 2503 and the memory 2501 , the OS and the necessary application programs systematically cooperate with each other, so that various functions as described above in details are realized.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Debugging And Monitoring (AREA)
Abstract
Description
- This application is a continuing application, filed under 35 U.S.C. section 111(a), of International Application PCT/JP2008/062561, filed Jul. 11, 2008.
- This technique relates to an analysis technique of a business flow.
- For instance, a technique to automatically generate a business flow by collecting and analyzing data generated in a business application system used in a company or the like in order to carryout a Business Process Re-engineering (BPR) has already been known. In this technique, because the business flow is extracted from transaction data generated by actually carrying out jobs, the business flow whose frequency is less is identified as an exceptional flow by analyzing the occurrence frequencies of the respective business flows to show this exceptional flow to the user.
- In the aforementioned technique, a state of the business flow, which is currently carried out, can be grasped. However, it is impossible to automatically extract an improvement candidate of the business flow.
- A business flow analysis method includes: extracting a series of transaction records for each case from a database storing transaction records for processing results of respective performed jobs, generating, for each of the cases, a process instance including job names and time data of the performed jobs, which are arranged in a time series, and storing data of the process instance into a process instance storage device; classifying process instances satisfying a designated condition among process instances stored in the process instance storage device; calculating, for each classification of the process instances, an average value and a standard deviation of transition periods that are differences between a start time and an end time of a job section to be processed, in the process instances satisfying the designated condition, and storing the calculated average value and the calculated standard deviation into a storage device; identifying a classification of the process instances satisfying a predetermined condition representing that it is possible to reduce a transition period of the job section, based on the average value and said standard deviation, which are stored in the storage device; comparing either of jobs and inter-job transitions, which are included in the process instance belonging to the identified classification of the process instances satisfying the predetermined condition, with either of jobs and inter-job transitions, which are included in the process instances belonging to classifications of process instances that do not satisfy the predetermined condition, to extract either of a feature job and a feature inter-job transition, which are included in the process instance belonging to the identified classification of the process instances satisfying the predetermined condition, and either of a feature job and a feature inter-job transition, which are included in the process instances belonging to the classifications of the process instances that do not satisfy the predetermined condition; and outputting the extracted data as improvement candidates into an output device.
- The object and advantages of the embodiment will be realized and attained by means of the elements and combinations particularly pointed out in the claims.
- It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory and are not restrictive of the embodiment, as claimed.
-
FIG. 1 is a diagram to explain an average value and standard deviation of transition periods; -
FIG. 2 is a diagram to explain the average value and standard deviation of the transition periods; -
FIG. 3 is a diagram to explain the average value and standard deviation of the transition periods; -
FIG. 4 is a functional diagram of a business flow analysis apparatus relating to an embodiment; -
FIG. 5 is a diagram depicting a processing flow in the embodiment; -
FIG. 6 is a diagram depicting an example of data stored in a table A; -
FIG. 7 is a diagram depicting an example of data stored in a table B; -
FIG. 8A is a diagram depicting an example of data stored in a table C; -
FIG. 8B is a diagram to explain a process instance; -
FIG. 9 is a diagram to explain the transition period; -
FIG. 10 is a diagram depicting process instance types to be processed in a first example; -
FIG. 11 is a diagram to explain a processing for the first example; -
FIG. 12 is a diagram to explain the processing for the first example; -
FIG. 13 is a diagram to explain a processing in the embodiment; -
FIG. 14 is a diagram to explain the processing for the first example; -
FIG. 15 is a diagram to explain the processing for the first example; -
FIG. 16 is a diagram depicting process instance types extracted as improvement candidates in the first example; -
FIG. 17 is a diagram depicting the processing in the embodiment; -
FIG. 18 is a diagram depicting events and inter-event transitions to be shown, which are extracted in the first example; -
FIG. 19 is a diagram depicting one example of data to be shown to the user in the first example; -
FIG. 20 is a diagram depicting processing instance types to be processed in the second example; -
FIG. 21 is a diagram depicting schematically superimposed process instance types to be processed in the second example; -
FIG. 22 is a diagram depicting the process instance types extracted as the improvement candidate in the second example; -
FIG. 23 is a diagram depicting events common to the process instance types extracted as the improvement candidates in the second example; -
FIG. 24 is a diagram depicting inter-event transitions common to the process instance types extracted as the improvement candidates in the second example; -
FIG. 25 is a diagram depicting the process instance types other than the improvement candidates in the second example; -
FIG. 26 is a diagram depicting the events and inter-event transitions to be shown, which are extracted in the second example; -
FIG. 27 is a diagram depicting data to be shown to the user in the second example; -
FIG. 28 is a diagram depicting the average value and standard deviation of the transition periods in a third example; -
FIG. 29 is a diagram depicting events in the process instances extracted as the improvement candidate in the third example; -
FIG. 30 is a diagram depicting inter-event transitions in the process instances extracted as the improvement candidates in the third example; -
FIG. 31 is a diagram depicting the inter-event transitions extracted in the third example; -
FIG. 32 is a diagram depicting the inter-event transitions extracted in the third example; and -
FIG. 33 is a functional block diagram of a computer. - In this embodiment, a time period between events (i.e. job or processing) in the business flow is called a transition period, and the transition period is considered as being almost equal to a job processing time. Various factors (e.g. the business flow or other factors) determine this transition period, depending on the business or system to be considered. However, in this embodiment, the jobs or systems (including a case of a portion of them) whose transition period is determined based on the business flow are considered, and it is automatically judged whether or not the reduction of the transition period, that is, the efficiency improvement of the business processing can be made by changing the business flow. The judgement of whether or not the job or system is to be considered is based on whether or not the transition period has the correlation with the business flow. Specifically, the presence of the correlation is judged based on whether or not the standard deviation of the transition periods for a section of the same inter-event transition is less than a threshold, and when the standard deviation of the transition periods is less than the threshold, it is judged that the correlation exists.
- Incidentally, this embodiment assumes following matters. Namely, the same kind of the process instance is executed two or more times. Generally, because it is unknown whether or not the correlation between the business flow and the transition period exists, a process to judge whether or not the correlation exists is carried out. However, it is impossible to calculate the standard deviation for the process instance that was executed only once. In case where the same kind of process instance is executed two or more times, when the transition periods of the section of the same inter-event transition have a close value for the respective process instances (namely, the standard deviation is less than the threshold.), it can be judged that the correlation between the transition period of the section and the business flow exists.
- For example, when a process instance that the jobs are executed in order of process A, process B, process C and process D was executed tree times, the average value and the standard deviation are calculated for each of the transition period from A to B, the transition period from B to C and the transition period from C to D. The calculated results are depicted in
FIG. 1 . According to the calculation results depicted inFIG. 1 , the standard deviations of the transition period from A to B and the transition period from C to D are less than the threshold “0.5”, and it is judged that the transition from A to B and the transition from C to D have the correlation. On the other hand, because the standard deviation of the transition period from B to C largely exceeds the threshold “0.5”, it is judged that the transition from B to C has no correlation. - Second, it is assumed that somewhat similar but different process instances exist. In order to identify what portion in the process instances influences the transition period, it is assumed that plural process instances having a little different portion exist. For example, it is assumed that a second process instance that the jobs are executed in order of process A, process E, process C and process D, as depicted in
FIG. 2 , exists, in addition to the first process instance that the jobs are executed in order of process A, process B, process C and process D, as depicted inFIG. 1 . Because the second process instances were executed four times, the average values and the standard deviations can be calculated for each of the transition period from A to E, the transition period from E to C and the transition period from C to D. According to the calculation results depicted inFIG. 2 , the transition period from A to E and the transition period from C to D are equal to or greater than the threshold “0.5”, and it is judged that the transition from A to E and the transition from C to D have no correlation. On the other hand, because the transition period from E to C is less than the threshold “0.5”, it is judged that the transition from E to C has the correlation. - The transition from C to D is common to the first and second process instances, and when the average value and the standard deviation of the transition periods for a section from C to D are calculated for all process instances of the first and second process instances, the results are obtained as depicted in
FIG. 3 . It is judged for the transition from C to D in the first process instance has the correlation, but it is judged for the transition from C to D in the second process instance has no correlation. In addition, because the result of all of 7 times depicted inFIG. 3 exceeds the threshold “0.5”, it is judged that the result of all of 7 times has no correlation. - According to the total circumstances, it is judged that the transition from C to D is executed in the processing order of the first process instance with a predictable and fixed transition period, but the transition from C to D is executed in the other processing order with an unpredictable transition period, and the transition period is determined based on factors other than the business flow.
- Under the aforementioned assumptions, this embodiment introduces a business
flow analysis apparatus 100 as depicted inFIG. 4 . As depicted inFIG. 4 , the business flow analysis apparatus 100 has a process instance generator 1 that generates data of process instances from data stored in one or plural databases (e.g. databases 210 and 220) and carries out a processing to group the same type of process instance; a process instance storage 3 storing process instances generated by the process instance generator 1; an input unit 7 that accepts inputs of a processing section to be considered, constraint conditions and the like; a process instance extractor 5 that carries out a processing to extract data of the process instance to be processed from the process instance storage 3 according to the input data from the input unit 7; an extracted process instance storage 9 storing data of the process instances extracted by the process instance extractor 5; a transition period processing unit 11 that carries out a processing for the transition period as will be explained in the following by using data stored in the extracted process instance storage 9; an extracted type data storage 13 storing a processing result of the transition period processing unit 11; an improvement data extractor 15 that carries out a processing to extract improvement data of the business flow according to data from the input unit 7 by using data stored in the extracted process instance storage 9 and the extracted type data storage 13; the improvement data storage 17 storing a processing result of the improvement data extractor 15; and an output unit 19 that outputs data stored in the improvement data storage 17. - Next, processing contents of the business
flow analysis apparatus 100 depicted inFIG. 4 will be explained by usingFIGS. 5 to 32 . First, theprocess instance generator 1 carries out a process to generate process instances by using data stored in the databases, and to group the generated process instances and stores processing results into the process instance storage 3 (FIG. 5 : step S1). - For example, data as depicted in
FIG. 6 is stored in a table A of thedatabase 210, data as depicted inFIG. 7 is stored in a table B of thedatabase 210, and data as depicted inFIG. 8A is stored in a table C of thedatabase 220. In the tables depicted inFIGS. 6 to 8A , an identifier to identify a case, a processing type (i.e. event name) and a processing time are registered. Here, theprocess instance generator 1 extracts records whose identifiers are the same. For example, when records whose identifier is “ID001” and to which a star mark is attached are extracted, data as depicted inFIG. 8B is obtained. Namely, it is understood from the processing time, that a processing is carried out in order of process A, process B, process C and process D. Thus, the process instance including the processes A, B, C and D is identified as one type, and the process instances including the same processes are collected, and they are stored into theprocess instance storage 3. - Next, the
input unit 7 prompts the user to designate the processing section to be considered, accepts the designation of the processing section from the user, and outputs data of the designation to the process instance extractor 5 (step S3). The plural processing sections may be designated, and the entire specific process instance type may be designated. In addition, theinput unit 7 prompts the user to designate constraint conditions, accepts the designation of the constraint conditions from the user, and outputs data of the designation to the improvement data extractor 15 (step S5). However, the constraint conditions may not be designated. - After that, the
process instance extractor 5 extracts data of the process instances including the designated processing section from theprocess instance storage 3, and stores the extracted data into the extracted process instance storage 9 (step S7). As depicted inFIGS. 1 and 2 , all of the process instances having the section from the process C to the process D are extracted. When plural processing sections are designated, the process instances including either of the transitions corresponding to the designated processing sections are extracted. - Then, the transition
period processing unit 11 calculates the average value and the standard deviation of the transition periods for each type of the extracted process instances and the entire extracted processing instances, by using data of the process instances stored in the extractedprocess instance storage 9, and temporarily stores the calculation results into the extracted type data storage 13 (step S9). First, as depicted inFIG. 9 , the transitionperiod processing unit 11 calculates the transition periods based on the difference between the time of the start process and the time of the end process in the designated processing section. When the processing section is a section from the process B to the process C, the difference between the time (1/11 11:07:56) of the process B and the time (1/11 12:09:47) of the process C is calculated to obtain the transition period “1:00”. Then, for each type of the process instances, the average value and the standard deviation of the transition periods for the processing section are calculated. As depicted inFIGS. 1 and 2 , when the processing section is a section from the process C to the process D, the average value and the standard deviation of the transition periods for the section from the process C to the process D are calculated. Furthermore, for all types of the process instances, the average value and the standard deviation of the transition periods for the processing section is also calculated. For example, when there are only the first and second process instance types, as depicted inFIGS. 1 and 2 , the average value and the standard deviation of the transition periods for the section from the process C to the process D are calculated for the entire of the first and second process instance types as depicted inFIG. 3 . - Furthermore, the transition
period processing unit 11 sets a threshold of the standard deviation (step S11). The threshold of the standard deviation may be a fixed value, or may be calculated by a ratio for the average value or the like. Furthermore, the user may set it. - Then, the transition
period processing unit 11 judges whether or not the standard deviation for all of the process instance types and the standard deviations for the respective types are equal to or greater than the threshold (step S13). - Here, it is assumed that process instances as depicted in
FIG. 10 are extracted. Namely, following process instance types exist: (1) First process instance type including standard specification car, body assembly, body assembly check, body painting, engine joining, and option. (2) Second process instance type including special specification car, body assembly, body assembly check, body painting, engine joining, and option. (3) Third process instance type including special specification car, body assembly, body assembly check, body painting, engine joining, and no option. (4) Fourth process instance type including standard specification car, body assembly, body assembly check, body painting, engine joining, and no option. - Then, as depicted in
FIG. 11 , when the average value and the standard deviation for the section from the body assembly to the body assembly check are calculated for 4 types of process instances, “3.3h” and “0.9” are obtained for the entire of the process instance types, “2.4h” and “0.1” are obtained for the first process instance type, “4.8h” and “1.1” are obtained for the second process instance type, “3.9h” and “0.2” are obtained for the third process instance type, and “2.4h” and “0.2” are obtained for the fourth process instance type. In addition, when the average and the standard deviation for the section from the body assembly check to the body painting are calculated for 4 types of process instances, “1.0h” and “0.1” are obtained for the entire of the process instance types, “1.1h” and “0.1” are obtained for the first process instance type, “0.9h” and “0.1” are obtained for the second process instance type, “1.0h” and “0.1” are obtained for the third process instance type, “1.0h” and “0.1” are obtained for the fourth process instance type. Furthermore, when the average value and the standard deviation for the section from the body painting to the engine joining are calculated for 4 types of process instances, “4.6h” and “2.8” are obtained for the entire of the process instance types, “0.7h” and “0.9” are obtained for the first process instance type, “9.3h” and “2.7” are obtained for the second process instance type, “2.6h” and “1.4” are obtained for the third process instance type, and “6.8h” and “3.1” are obtained for the fourth process instance type. - In such a case, when the process section is a section from the body painting to the engine joining and the threshold is “0.5”, it is judged that the condition at the step S13 is satisfied. Thus, when the condition that the standard deviation for the entire of the types and the standard deviations for the respective types are equal to or greater than the threshold is satisfied, it is indicated that it is impossible to predict the transition period of the processing section and the transition period is determined based on a factor other than the business flow, even if any business flow (also called “route”) is selected. Therefore, there is almost no room to reduce the transition period even if any business flow is selected.
- Therefore, when the condition at the step S13 is satisfied, the transition
period processing unit 11 stores data representing “impossible to improve” into the extractedtype data storage 13. When the data representing “impossible to improve” is stored in the extractedtype data storage 13, theimprovement data extractor 15 stores the data representing “impossible to improve” into theimprovement data storage 17 as it is. Theoutput unit 19 outputs data representing that no improvement point can be extracted to an output device such as a display device or printer based on data representing “impossible to improve”, which is stored in the improvement data storage 17 (step S17). - On the other hand, when the condition at the step S13 is not satisfied, the transition
period processing unit 11 judges whether or not the standard deviation for the entire of the types and the standard deviations for the respective types are less than the threshold (step S15). In the example ofFIGS. 10 and 11 , when the processing section is a section from the body assembly check to the body painting as depicted inFIG. 12 , all of the standard deviations for the first to fourth process instance types are “0.1” and less than the threshold “0.5”, and the standard deviation for all types is also less than the threshold. In such a case, it is understood that the transition periods for the section from the body assembly check to the body painting are almost fixed values (almost “1.0h” as depicted inFIG. 12 ) regardless of the business flows. Therefore, there is almost no room to reduce the transition period by selecting the business flow. - Therefore, when the condition at the step S15 is satisfied, the processing shifts to the step S17, and as described above, data representing that the improvement point cannot be extracted is outputted. On the other hand, when the condition at the step S15 is not satisfied, the processing shifts to a processing of
FIG. 13 through a terminal A. - Shifting to the explanation of the processing of
FIG. 13 , the transitionperiod processing unit 11 groups plural types whose routes prior to the processing section are the same among the process instances stored in the extracted process instance storage 9 (step S19). For example, when the process instances as depicted inFIG. 10 exist and the processing section is a section from the body assembly to the body assembly check, a route, which passes through the event “standard specification car” to the body assembly, (first and fourth process instance types) and a route, which passes through an event “special specification car” to the body assembly, (second and third process instances) exist. Thus, the process instance types are grouped according to the routes prior to the processing section. - After that, when the grouping can be made, the transition
period processing unit 11 calculates the average value and the standard deviation of the transition periods for the processing section, for each group, and stores the calculation results into the extractedtype data storage 13, for example (step S21). For example, as depicted inFIG. 14 , when the process section is a section from the body assembly to the body assembly check, the standard deviation for all of the process instance types exceeds the threshold “0.5” and the standard deviation for the second process instance type exceeds the threshold “0.5”. Therefore, the section from the body assembly to the body assembly check will be processed at the step S19 and subsequent steps. Then, as described above, as for the first and fourth process instance types, the prior event (i.e. route) is “standard specification car” and as for the second and third process instance types, the prior event (i.e. route) is “special specification car”. Therefore, when the average value and the standard deviation of the transition periods are calculated for the first and fourth process instance types, “2.4h” and “0.2” are obtained. On the other hand, when the average value and the standard deviation of the transition periods are calculated for the second and third process instance types, “4.2h” and “1.0” are obtained. Therefore, when the prior route is “standard specification car”, like the first and fourth process instance types whose standard deviation is less than the threshold and which has the correlation, the transition periods for the section from the body assembly to the body assembly check are almost unique “2.4h”. Furthermore, in such a case, because the average value “2.4h”, which is shorter than the average “3.3h” for all of the types, is calculated, it can be understood that the prior route “standard specification car” in the first and fourth process instance types is a route having the improvement effect. - In order to carry out such judgment, the transition
period processing unit 11 judges whether or not any group is constructed at the step S19 (step S23). When no group is constructed, namely, groups, which are the same as the original process instance types, are constructed, the processing shifts to step S29. - On the other hand, when any group is constructed at the step S19, the transition
period processing unit 11 judges based on data calculated at the step S21, whether or not any group whose standard deviation for the processing section is less than the threshold exists (step S25). In the aforementioned example, the group of the first and second process instance types is identified. When any group whose standard deviation for the processing section is less than the threshold exists, the transitionperiod processing unit 11 identifies process instance types belonging to a group whose standard deviation for the processing section is less than the threshold and whose average value is less than the average value for all types or whose value calculated by adding the standard deviation to the average value is less than the average value for all types, and stores data of the identified process instance type into the extracted type data storage 13 (step S27). In the aforementioned example, the average value of the transition periods for the processing section in the first and fourth process instance types is “2.4h” and the standard deviation is “0.2”. Therefore, “2.4h” or “2.6h (=2.4h+0.2)” is less than the average value “3.3h” for all types. Therefore, data of the first and fourth process instance type is stored into the extractedtype data storage 13. Incidentally, when this condition is not satisfied, no data is extracted, because the possibility to reduce the transition period is low. The processing shifts to the step S29. However, the process instance types extracted at the step S27 is not processed. - Furthermore, the transition
period processing unit 11 judges whether or not any type whose standard deviation for the processing section is less than the threshold exists (step S29). In the processing flow up to this step, when all of the standard deviations for the processing section are less than the threshold, the processing shifts to the step S17, and when the condition at the step S27 is satisfied after grouping for each prior route, the process instance types are extracted at the step S27. Therefore, the process instance types, which were not extracted at the step S25 or S27 are processed at this step. As depicted inFIG. 15 , when the processing section is a section from the body assembly to the body assembly check, the second and third process instance types are processed at the step S29, and the third process instance type whose standard deviation is less than the threshold “0.5” is identified among them. This third process instance type has the correlation with the entire of the business flow. Basically, because the transition period for the processing section is settled after the entire of the business flow is fixed, there is almost no room to reduce the transition period even when this business flow is selected. - When any process instance type satisfying the condition at the step S29 exists, the transition
period processing unit 11 identifies a process instance type whose standard deviation for the processing section is less than the threshold and whose average value is less than the average value for all types or whose value calculated by adding the standard deviation to the average value is less than the average value for all types, and stores data of the identified process instance type into the extracted type data storage 13 (step S31). In the example ofFIG. 15 , the standard deviation for the processing section in the third process instance type is less than the threshold. However, because the average value is “3.9h”, this average value exceeds the average value “3.3h” for all types Therefore, the condition at the step S31 is not satisfied. Therefore, no process instance type is extracted in the example ofFIG. 15 . The processing shifts to the step S33. - When the processing is carried out up to this step, data as depicted in
FIG. 16 is stored in the extractedtype data storage 13, in the aforementioned example. In the example ofFIG. 16 , for each process instance type, corresponding event (processing) names or IDs are included. - The
improvement data extractor 15 extracts only a type satisfying the constraint condition among the process instance types stored in the extracted type data storage 13 (step S33). The constraint condition is a condition that a specific event (process) is passed or not passed, for example, and only the process instance type satisfying this condition will be processed in the following. The processing shifts to a processing ofFIG. 17 through a terminal B. - Shifting to the explanation of a processing in
FIG. 17 , theimprovement data extractor 15 extracts events and inter-event transitions common to the process instance types stored in the extractedtype data storage 13, and stores the extracted data into theimprovement data storage 17, for example (step S35). In the aforementioned example, the first and fourth process instance types are extracted, the common events are “standard specification car”, “body assembly”, “body assembly check”, “body painting”, and “engine joining”, and the common inter-event transitions are transition “from the standard specification car to the body assembly”, “from the body assembly to the body assembly check”, “from body assembly check to the body painting” and “from the body painting to the engine joining”. - Furthermore, the
improvement data extractor 15 extracts events and inter-event transitions, which do not appear in the types other than the process instance types stored in the extractedtype data storage 13, among the extracted common events and the common inter-event transitions, and stores the extracted data into the improvement data storage 17 (step S37). The types other than the process instance types stored in the extractedtype data storage 13 are identified from the extractedprocess instance storage 9. In the aforementioned example, events “special specification car”, “body assembly”, “body assembly check”, “body painting”, “engine joining”, “option” and “no option” are included in the second and third process instance types, and the inter-event transitions “from the special specification car to the body assembly” “from the body assembly to the body assembly check”, “from the body assembly check to the body painting”, “from the body painting to the engine joining”, “from the engine joining to the option” and “from the engine joining to the no option” are included in the second and third process instance types. Therefore, the event satisfying the condition at the step S37 is “the standard specification car”, and the inter-event transition satisfying the condition at the step S37 is the transition “from the standard specification car to the body assembly”. - Furthermore, the
improvement data extractor 15 extracts events and inter-event transitions, which do not appear in the process instance types stored in the extractedtype data storage 13, among the events and the inter-event transitions, which appear in the types other than the process instance types stored in the extractedtype data storage 13, and stores the extracted data into the improvement data storage 17 (step S39). In the aforementioned example, the event satisfying the condition at the step S39 is “the special specification car”, and the inter-event transition satisfying the condition at the step S39 is the transition “from the special specification car to the body assembly”. - Thus, when data extracted by the
improvement data extractor 15 at the steps S37 and S39 is summarized, data as depicted inFIG. 18 is obtained. A-1) indicates the event extracted at the step S37, A-2) indicates the inter-event transition extracted at the step S37, B-1) indicates the event extracted at the step S39, and B-2) indicates the inter-event transition extracted at the step S39. A-1) and A-2) mean that it is possible to reduce the transition period by adopting the event or inter-event transition. On the other hand, B-1) and B-2) mean it is possible to reduce the transition period when the event or inter-event transition is not adopted. - Incidentally, because there are only 4 process instance types as depicted in
FIG. 10 in the aforementioned example, the first and fourth process instance types must be adopted in order to realize A-1), A-2), B-1) and B-2). When the processing section is “the section from the body assembly to the body assembly check”, it is possible to calculate the difference between the average value of the transition periods, which is calculated for the group including the first and fourth process instance types, and the average value for all types as depicted inFIG. 14 . Namely, 0.9h=“3.3h”−“2.4h” is obtained. Thus, the improvement effect in case where the respective conditions inFIG. 18 are adopted may be calculated by the difference between the average value for that case and the average value for all types. - Finally, the
output unit 19 outputs data stored in theimprovement data storage 17 to the output device to show the data to the user (step S41). For example, data as depicted inFIG. 19 is shown. Incidentally, the meanings of A-1), A-2), B-1) and B-2) may be specifically shown. In addition, the improvement effect may be shown for each case. - By carrying out the aforementioned processing, the effective improvement points to reduce the transition period for the processing section can be automatically extracted based on the correlation with the prior route and/or the correlation with the entire flow. Furthermore, it becomes possible to show, as the improvement effect, the difference between the average value of the transition periods in case where the improvement points are adopted and the average value for all types.
- Next, in order to make it easy to understand the aforementioned processing flow, the second and third examples will be explained by using
FIGS. 20 to 32 . At this time, as depicted inFIG. 20 , it is assumed that 6 process instance types are extracted. Incidentally, the processing section is a section from the entire check to the shipping, and all of 6 process instance types are processed. Incidentally, the constraint condition is a condition that it passes through the “joining” event. All process instance types also satisfy this constraint condition. - When the process instances depicted in
FIG. 20 are superimposed to schematically depict them, a figure as depicted inFIG. 21 is obtained. As depicted inFIG. 21 , the average value and the standard deviation of the section from the entire check to the shipping for all types are “1.3h” and “1.0”, the average value and the standard deviation for the first process instance type are “0.5h” and “0.1”, the average value and the standard deviation for the second process instance type are “1.7h” and “0.1”, the average value and the standard deviation for the third process instance type are “1.2h” and “0.2”, the average value and the standard deviation for the fourth process instance type are “0.6h” and “0.1”, the average value and the standard deviation for the fifth process instance type are “1.8h” and “0.1”, and the average value and the standard deviation for the sixth process instance type are “1.0h” and “0.3”. From this, it is judged that the condition at the step S13 is not satisfied and the condition at the step S15 is not also satisfied. In addition, because the routes prior to the processing section are different among the 6 process instance types, the grouping cannot be made. Namely, at the step S23, the processing shifts to the step S29. At the step S29, the process instance type whose standard deviation for the processing section is less than the threshold “0.5” is extracted. However, all process instance types are extracted in this example. However, because the process instance type having the improvement effect is only a process instance type whose value calculated by adding the standard deviation to the average value is less than the average value for all types, only first and fourth process instance types are identified at the step S31. Namely, the process instance types extracted by the transitionperiod processing unit 11 are the process instance types as depicted inFIG. 22 . - Furthermore, as depicted in
FIG. 23 , when the step S35 is carried out, the events common to the first and fourth process instance types are “body assembly”, “body assembly check”, “body painting”, “engine assembly”, “engine assembly check”, “joining”, “parts installation”, “entire check” and “shipping”. Moreover, as depicted inFIG. 24 , the inter-event transition common to the first and fourth process instance types are transitions “from the body assembly to the body assembly check”, “from the body assembly check to the body painting”, “from the engine assembly to the engine assembly check”, “from the joining to the parts installation”, “from parts installation to the entire check” and “from the entire check to the shipping”. - Furthermore, at the step S37, the events and inter-event transitions, which do not appear in the process instance types (
FIG. 25 ) other than the processing instance types depicted inFIG. 22 , are extracted among the events and inter-event transitions depicted inFIGS. 23 and 24 . Here, no pertinent events and inter-event transitions exist. - On the other hand, as for the events and inter-event transitions that do not appear in the process instance types depicted in
FIG. 22 among the process instance types depicted inFIG. 25 , the events “the option installation” and “repair” and the transitions “from the parts installation to the option installation”, “from the option installation to the entire check”, “from the entire check to the repair” and “from the repair to the entire check” are identified at the step S39, as depicted inFIG. 26 . Namely, by adopting the process instance types that do not include “the option installation” and “the repair”, the reduction of the transition period is expected. Incidentally, the extracted inter-event transitions are covered by the condition that “the option installation” and “the repair” are not included. As for the improvement effect, the average value of the transition periods for the processing section in the first and fourth process instance types is calculated, and the difference between the calculated average value and the average value for all types is calculated. Then, theoutput unit 19 outputs data as depicted inFIG. 27 , for example. - Furthermore, the processing will be explained by using the third example. Also here, it is assumed that the process instance types depicted in
FIG. 20 are extracted. However, the processing section is the entire process, and the constraint condition is a condition that it passes through “the option installation”. When the processing section is the entire process, the process instance types are narrowed at the step S7 by the constraint condition. The second and fifth process instance types that it passes through “the option installation” are identified among the process instance types inFIG. 20 . - Incidentally, the average value and the standard deviation of the transition periods for each process instance type are values as depicted in
FIG. 28 . However, the average value and the standard deviation of the transition periods for all types are not calculated, because the flow contents are largely different. Therefore, at the steps S13 and S15, “No routes” are adopted. Furthermore, because no group is constructed, the processing shifts from the step S23 to the step S29, and it is judged whether or not the process instance type whose standard deviation is less than the threshold exists. Here, the second and fifth process instance types are identified. However, because the average value and the standard deviation for all types are not calculated, the process instance type whose average value is the largest is used as the reference at the step S31, and the process instance type whose standard deviation of the processing section is less than the threshold and whose average value is less than the largest average value (or whose value calculated by adding the standard deviation to the average value is less than the largest average value) is extracted. In this example, because the average value of the transition periods for the second process instance type is “7.5h”, and the average value of the transition periods for the fifth process instance type is “9.0h”, the second process instance type is extracted. Namely, the second process instance type is identified as the improvement candidate. - Moreover, because only one process instance type is extracted at the step S35, all events and all inter-event transitions of the second process instance type are extracted. The events as depicted in
FIG. 29 are extracted. Furthermore, the inter-event transitions as depicted inFIG. 30 are extracted. - No event, which does not appear in the fifth process instance type, exists among the events depicted in
FIG. 29 . Furthermore, the inter-event transitions, which do not appear in the fifth process instance type among the inter-event transitions depicted inFIG. 30 , are the transitions “from the body painting to the engine assembly” and “from the engine assembly check to the joining” as depicted inFIG. 31 . - On the other hand, no event, which does not appear in the second process instance type, exists among the events, which appear in the fifth process instance type. However, as for the inter-event transition, transitions “from the engine assembly check to the body assembly” and “from the body painting to the joining” are identified as depicted in
FIG. 32 . - Thus, the extraction results as depicted in
FIGS. 31 and 32 are shown to the user. According to this extraction results, the improvement points are a point that the transitions “from the body painting to the engine assembly” and “from the engine assembly check to the joining” are included and a point that the transitions “from the engine assembly check to the body assembly” and “from the body painting to the joining” are not included. In short, the aforementioned points are summarized as follows: the work for the engine should be carried out after the work for the body, but the work for the body should not be carried out after the work for the engine. - Incidentally, as for the aforementioned example that the processing section is the entire flow, a processing including a lot of exceptions is carried out. However, the judgement may be made based on the average value and the standard deviation of the transition periods for the entire flow along with the aforementioned processing flow.
- Although the explanation of this embodiment was made, this technique is not limited to this embodiment. For example, the functional block diagram depicted in
FIG. 4 is a mere example, and does not always correspond to an actual program module configuration. Furthermore, as for the processing flow, the order of the steps may be exchanged and the steps may be executed in parallel as long as the same processing results can be obtained. In addition, as for the classification and grouping of the process instances, they may be carried out all together at the step that the processing section is designated, or they may be carried out separately, as mentioned above. - The aforementioned embodiment is outlined as follows:
- Namely, a business flow analysis method includes: extracting a series of transaction records for each case from a database storing transaction records for processing results of respective performed jobs, generating, for each of the cases, a process instance including job names and time data of the performed jobs, which are arranged in a time series, and storing data of the process instance into a process instance storage device; classifying process instances satisfying a designated condition among process instances stored in the process instance storage device (e.g. the classifying may include a processing to classify the process instances according to the process instance types and to group the process instance types); calculating, for each classification of the process instances, an average value and a standard deviation of transition periods that are differences between a start time and an end time of a job section to be processed, in the process instances satisfying the designated condition, and storing the calculated average value and the calculated standard deviation into a storage device (the average value and the standard deviation of the transition periods for all process instances satisfying the designated condition may be calculated); identifying a classification of the process instances satisfying a predetermined condition representing that it is possible to reduce a transition period of the job section, based on the average value and said standard deviation, which are stored in the storage device; comparing either of jobs and inter-job transitions, which are included in the process instance belonging to the identified classification of the process instances satisfying the predetermined condition, with either of jobs and inter-job transitions, which are included in the process instances belonging to classifications of process instances that do not satisfy the predetermined condition, to extract either of a feature job and a feature inter-job transition, which are included in the process instance belonging to the identified classification of the process instances satisfying the predetermined condition, and either of a feature job and a feature inter-job transition, which are included in the process instances belonging to the classifications of the process instances that do not satisfy the predetermined condition; and outputting the extracted data as improvement candidates into an output device.
- When such a processing is carried out, data for the improvement candidate can be automatically shown to the user. Therefore, it is possible to quantitatively obtain the improvement candidate to be adopted, in objective view, not depending on the conventional experience of the user. Especially, when the contents of the business flow are complicated, this processing is particularly effective. Incidentally, the feature job (i.e. event) and feature inter-job transition (i.e. inter-event transition) are event and inter-event transition, which appear only in the process instance type itself. Furthermore, as the improvement effect, the difference between the average value of the transition periods for the job section to be considered in case where the process instances satisfying the predetermined condition are adopted and the average value of the transition periods for the job section to be considered for all of the process instances may be shown.
- Incidentally, the predetermined condition may be a condition to extract a classification whose standard deviation of the transition periods is less than a first threshold and whose average value of the transition periods is relatively short, when a standard deviation of the transition periods for all of the process instances satisfying the designated condition is greater than a second threshold. By adopting such a condition, the classification for which the improvement is expected is extracted.
- Furthermore, the predetermined condition may be a condition to extract a classification whose standard deviation of the transition periods is less than a first threshold and whose average value of the transition periods or value calculated by adding the standard deviation to the average value of the transition periods is less than an average value of transition periods for all of the process instances satisfying the designated condition, when a standard deviation of the transition periods for all of the process instances satisfying the designated condition is greater than a second threshold. The classification for which the sufficient effect is statistically expected is extracted.
- In addition, the classifying may include: first classifying the process instances satisfying the designated condition among the process instances stored in the process instance data storage device into each of process instances whose job names are completely identical; and second classifying the process instances classified at the first classifying into each of process instances whose route prior to the job section to be processed is identical. In such a case, a classification of the process instances whose route prior to the job section to be processed is identical has a priority in the identifying. Thus, the effective classification having the correlation with the route prior to the job section to be processed is extracted, preferentially.
- Incidentally, the aforementioned predetermined condition may include a condition of a job to be included in the process instance. The constraint condition may be used as the predetermined condition to narrow the process instances.
- Incidentally, it is possible to create a program causing a computer to execute the aforementioned processing, and such a program is stored in a computer readable storage medium or storage device such as a flexible disk, CD-ROM, DVD-ROM, magneto-optic disk, a semiconductor memory, and hard disk. In addition, the intermediate processing result is temporarily stored in a storage device such as a main memory or the like.
- In addition, the business
flow analysis apparatus 100 is a computer device as shown inFIG. 33 . That is, a memory 2501 (storage device), a CPU 2503 (processor), a hard disk drive (HDD) 2505, adisplay controller 2507 connected to adisplay device 2509, adrive device 2513 for aremovable disk 2511, aninput device 2515, and acommunication controller 2517 for connection with a network are connected through abus 2519 as shown inFIG. 33 . An operating system (OS) and an application program for carrying out the foregoing processing in the embodiment, are stored in theHDD 2505, and when executed by theCPU 2503, they are read out from theHDD 2505 to thememory 2501. As the need arises, theCPU 2503 controls thedisplay controller 2507, thecommunication controller 2517, and thedrive device 2513, and causes them to perform necessary operations. Besides, intermediate processing data is stored in thememory 2501, and if necessary, it is stored in theHDD 2505. In this embodiment of this invention, the application program to realize the aforementioned functions is stored in theremovable disk 2511 and distributed, and then it is installed into theHDD 2505 from thedrive device 2513. It may be installed into theHDD 2505 via the network such as the Internet and thecommunication controller 2517. In the computer as stated above, the hardware such as theCPU 2503 and thememory 2501, the OS and the necessary application programs systematically cooperate with each other, so that various functions as described above in details are realized. - All examples and conditional language recited herein are intended for pedagogical purposes to aid the reader in understanding the invention and the concepts contributed by the inventor to furthering the art, and are to be construed as being without limitation to such specifically recited examples and conditions, nor does the organization of such examples in the specification relate to a showing of the superiority and inferiority of the invention. Although the embodiments of the present inventions have been described in detail, it should be understood that the various changes, substitutions, and alterations could be made hereto without departing from the spirit and scope of the invention.
Claims (7)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2008/062561 WO2010004643A1 (en) | 2008-07-11 | 2008-07-11 | Workflow analysis program, method, and device |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2008/062561 Continuation WO2010004643A1 (en) | 2008-07-11 | 2008-07-11 | Workflow analysis program, method, and device |
Publications (2)
Publication Number | Publication Date |
---|---|
US20110106577A1 true US20110106577A1 (en) | 2011-05-05 |
US8244570B2 US8244570B2 (en) | 2012-08-14 |
Family
ID=41506774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/987,570 Active US8244570B2 (en) | 2008-07-11 | 2011-01-10 | Business flow analysis method and apparatus |
Country Status (3)
Country | Link |
---|---|
US (1) | US8244570B2 (en) |
JP (1) | JP5024451B2 (en) |
WO (1) | WO2010004643A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110208691A1 (en) * | 2010-01-20 | 2011-08-25 | Alibaba Group Holding Limited | Accessing Large Collection Object Tables in a Database |
US20110295647A1 (en) * | 2008-12-05 | 2011-12-01 | Hisaya Ishibashi | Manufacturing plan drawing-up system and method |
US9471459B2 (en) | 2013-07-18 | 2016-10-18 | Fujitsu Limited | Information acquisition method and information acquisition apparatus |
US20180152466A1 (en) * | 2016-11-30 | 2018-05-31 | Cisco Technology, Inc. | Estimating feature confidence for online anomaly detection |
US20230052034A1 (en) * | 2021-08-13 | 2023-02-16 | Edgeverve Systems Limited | Method and system for analyzing process flows for a process performed by users |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5664050B2 (en) * | 2010-09-13 | 2015-02-04 | 富士通株式会社 | Information processing method, program, and apparatus |
JP5735998B2 (en) * | 2013-03-27 | 2015-06-17 | ビッグローブ株式会社 | Operation system |
US10699232B1 (en) | 2016-03-10 | 2020-06-30 | Amdocs Development Limited | System, method, and computer program for resolving production business issues associated with a software product |
US11314561B2 (en) * | 2020-03-11 | 2022-04-26 | UiPath, Inc. | Bottleneck detection for processes |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6198980B1 (en) * | 1998-11-06 | 2001-03-06 | John Costanza Institute Of Technology | System and method for designing a mixed-model manufacturing process |
US20020026257A1 (en) * | 2000-05-03 | 2002-02-28 | General Electric Company | Capability analaysis of assembly line production |
US20030171972A1 (en) * | 2002-01-28 | 2003-09-11 | James Heskin | Scheduling system and method |
US20050065830A1 (en) * | 2003-09-24 | 2005-03-24 | Xerox Corporation | System and method for the acquisition and analysis of data for print shop performance evaluation and adjustment |
US20050076059A1 (en) * | 2003-10-03 | 2005-04-07 | Fujitsu Limited | Apparatus and method for business process tracking and business process tracking program, and recording medium thereof |
US6922600B1 (en) * | 2004-04-28 | 2005-07-26 | International Business Machines Corporation | System and method for optimizing manufacturing processes using real time partitioned process capability analysis |
US7379782B1 (en) * | 2007-03-26 | 2008-05-27 | Activplant Corporation | System and method of monitoring and quantifying performance of an automated manufacturing facility |
US20080195433A1 (en) * | 2006-08-16 | 2008-08-14 | James Robert Glenn | Dynamic Value Stream Mapping Software |
US7415421B2 (en) * | 2003-02-12 | 2008-08-19 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for implementing an engineering change across fab facilities |
US20090177610A1 (en) * | 2006-09-15 | 2009-07-09 | Fujitsu Limited | Information processing method and apparatus for business process analysis |
US20100005469A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and System for Defining One Flow Models with Varied Abstractions for Scalable lean Implementations |
US7818351B2 (en) * | 2006-07-19 | 2010-10-19 | Fujitsu Limited | Apparatus and method for detecting a relation between fields in a plurality of tables |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2613090B2 (en) | 1988-07-22 | 1997-05-21 | トヨタ自動車株式会社 | Instruction to input work |
JPH07141426A (en) | 1993-11-19 | 1995-06-02 | Nippon Telegr & Teleph Corp <Ntt> | Network flow management device |
JP2004355095A (en) | 2003-05-27 | 2004-12-16 | Renesas Technology Corp | Production management method |
JP4266014B2 (en) * | 2005-02-25 | 2009-05-20 | 富士通株式会社 | Business information management program |
JP2007004414A (en) | 2005-06-23 | 2007-01-11 | Hitachi Ltd | Compound service component destination solving method |
JP2007279861A (en) | 2006-04-04 | 2007-10-25 | Mitsubishi Electric Corp | Business process management device, method and program |
JP2007334408A (en) * | 2006-06-12 | 2007-12-27 | Hitachi Systems & Services Ltd | Business history analyzing system, business history analyzing device, business history analyzing method, business history analyzing program and recording medium |
JP4376887B2 (en) * | 2006-11-02 | 2009-12-02 | 日本電信電話株式会社 | Method, apparatus, and program for extracting cause compensation for business efficiency degradation in business process |
-
2008
- 2008-07-11 WO PCT/JP2008/062561 patent/WO2010004643A1/en active Application Filing
- 2008-07-11 JP JP2010519605A patent/JP5024451B2/en active Active
-
2011
- 2011-01-10 US US12/987,570 patent/US8244570B2/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6198980B1 (en) * | 1998-11-06 | 2001-03-06 | John Costanza Institute Of Technology | System and method for designing a mixed-model manufacturing process |
US20020026257A1 (en) * | 2000-05-03 | 2002-02-28 | General Electric Company | Capability analaysis of assembly line production |
US6631305B2 (en) * | 2000-05-03 | 2003-10-07 | General Electric Company | Capability analysis of assembly line production |
US20030171972A1 (en) * | 2002-01-28 | 2003-09-11 | James Heskin | Scheduling system and method |
US7415421B2 (en) * | 2003-02-12 | 2008-08-19 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for implementing an engineering change across fab facilities |
US20050065830A1 (en) * | 2003-09-24 | 2005-03-24 | Xerox Corporation | System and method for the acquisition and analysis of data for print shop performance evaluation and adjustment |
US20050076059A1 (en) * | 2003-10-03 | 2005-04-07 | Fujitsu Limited | Apparatus and method for business process tracking and business process tracking program, and recording medium thereof |
US6922600B1 (en) * | 2004-04-28 | 2005-07-26 | International Business Machines Corporation | System and method for optimizing manufacturing processes using real time partitioned process capability analysis |
US7818351B2 (en) * | 2006-07-19 | 2010-10-19 | Fujitsu Limited | Apparatus and method for detecting a relation between fields in a plurality of tables |
US20080195433A1 (en) * | 2006-08-16 | 2008-08-14 | James Robert Glenn | Dynamic Value Stream Mapping Software |
US20090177610A1 (en) * | 2006-09-15 | 2009-07-09 | Fujitsu Limited | Information processing method and apparatus for business process analysis |
US7379782B1 (en) * | 2007-03-26 | 2008-05-27 | Activplant Corporation | System and method of monitoring and quantifying performance of an automated manufacturing facility |
US20100005469A1 (en) * | 2008-07-02 | 2010-01-07 | International Business Machines Corporation | Method and System for Defining One Flow Models with Varied Abstractions for Scalable lean Implementations |
Non-Patent Citations (1)
Title |
---|
Gur Mosheiov, "Minimizing Total Completion Time and Total Deviation of Job Completion Times from a Restrictive Due-Date," 165 European Journal of Operational Research 20-33 (2005) * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110295647A1 (en) * | 2008-12-05 | 2011-12-01 | Hisaya Ishibashi | Manufacturing plan drawing-up system and method |
US20110208691A1 (en) * | 2010-01-20 | 2011-08-25 | Alibaba Group Holding Limited | Accessing Large Collection Object Tables in a Database |
US9471459B2 (en) | 2013-07-18 | 2016-10-18 | Fujitsu Limited | Information acquisition method and information acquisition apparatus |
US20180152466A1 (en) * | 2016-11-30 | 2018-05-31 | Cisco Technology, Inc. | Estimating feature confidence for online anomaly detection |
US10701092B2 (en) * | 2016-11-30 | 2020-06-30 | Cisco Technology, Inc. | Estimating feature confidence for online anomaly detection |
US20230052034A1 (en) * | 2021-08-13 | 2023-02-16 | Edgeverve Systems Limited | Method and system for analyzing process flows for a process performed by users |
US11847598B2 (en) * | 2021-08-13 | 2023-12-19 | Edgeverve Systems Limited | Method and system for analyzing process flows for a process performed by users |
Also Published As
Publication number | Publication date |
---|---|
JP5024451B2 (en) | 2012-09-12 |
WO2010004643A1 (en) | 2010-01-14 |
JPWO2010004643A1 (en) | 2011-12-22 |
US8244570B2 (en) | 2012-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8244570B2 (en) | Business flow analysis method and apparatus | |
Baier et al. | Bridging abstraction layers in process mining by automated matching of events and activities | |
US8224762B2 (en) | Information processing method and apparatus for business process analysis | |
Lee et al. | Mining transportation logs for understanding the after-assembly block manufacturing process in the shipbuilding industry | |
US9588832B2 (en) | Data preprocessing device and method associated with a failure risk level of a target system | |
JP5762857B2 (en) | Dependency evaluation apparatus and evaluation method between software development products | |
US20140188547A1 (en) | Business flow processing method and apparatus | |
US20130096894A1 (en) | Automatic insertion point identification in model merging operations | |
JP5038667B2 (en) | Business efficiency evaluation method and business efficiency evaluation program | |
US8266599B2 (en) | Output from changed object on application | |
Jalali | Aspect mining in business process management | |
WO2022215205A1 (en) | Work process classification device, work process classification method and program | |
KR20230058857A (en) | Multi-machine and performance based continuous production planning global optimization scheduling method and device | |
Briggs et al. | Mixed-model production system design for aircraft assembly | |
Fernández-Ropero et al. | Repairing business process models as retrieved from source code | |
KR20160085514A (en) | The selection method of representative technology using social network mining | |
Esposito et al. | MANA: Identifying and mining unstructured business processes | |
JP2019185582A (en) | Data preparation method pertaining to data utilization and system for data utilization | |
JP5664050B2 (en) | Information processing method, program, and apparatus | |
Nurlaili et al. | Performance Evaluation of Inductive Miner for Internship Program Workflow | |
JP2003345955A (en) | System and method for providing problem estimate and improvement process | |
Subramaniam et al. | Workflow process models: discovering decision point locations by analyzing data dependencies | |
JP2010153588A (en) | Program, apparatus and method for analyzing data | |
Dumasia et al. | Review paper on concept drift in process mining | |
JP6664306B2 (en) | Similar document extracting device, similar document extracting method and similar document extracting program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: FUJITSU LIMITED, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:NAKAZATO, KATSUHISA;REEL/FRAME:025620/0775 Effective date: 20101122 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
CC | Certificate of correction | ||
FPAY | Fee payment |
Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 12 |