US20050144866A1 - Preformed portable slab for use as a foundation or splash pad for industrial equipment - Google Patents
Preformed portable slab for use as a foundation or splash pad for industrial equipment Download PDFInfo
- Publication number
- US20050144866A1 US20050144866A1 US10/941,705 US94170504A US2005144866A1 US 20050144866 A1 US20050144866 A1 US 20050144866A1 US 94170504 A US94170504 A US 94170504A US 2005144866 A1 US2005144866 A1 US 2005144866A1
- Authority
- US
- United States
- Prior art keywords
- slab
- cement
- feet
- concrete
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D90/00—Component parts, details or accessories for large containers
- B65D90/22—Safety features
- B65D90/24—Spillage-retaining means, e.g. recovery ponds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/38—Foundations for large tanks, e.g. oil tanks
Definitions
- the present invention relates to portable pads or slabs, particularly to portable precast slabs for use as temporary, removable, or permanent foundations for industrial equipment, bulk storage tanks, cryogenic liquid pumps, and the like, and related methods of making and using the slab. It is also suitable as a protective surface, for example as an off loading or splash pad for liquid oxygen, or liquid hydrogen, or other cryogenic liquids.
- FIG. 1 is a perspective view of one embodiment of the invention.
- FIG. 2 is a view of a reinforcing means of an embodiment of the invention.
- FIG. 3 is a side view of an attachment means of an embodiment of the invention.
- FIG. 4 is a side view of an attachment means of an embodiment of the invention.
- FIG. 5 is a top view of an embodiment of the invention.
- FIG. 6 is a cross-sectional side view of an embodiment of the invention.
- FIG. 7A is a cross-sectional side lengthwise view of an embodiment of the invention.
- FIG. 7B is a cross-sectional side endwise view of an embodiment of the invention.
- FIG. 7C is a side view of an attachment means of an embodiment of the invention.
- FIG. 8 is a side view of an attachment means of an alternate embodiment of the invention.
- the present invention relates to portable pads or slabs comprised of precast concrete or cement for use as temporary or removable foundations for industrial equipment, bulk storage tanks, cryogenic liquid pumps, heat exchangers and associated equipment such as manifolds, distillation columns, small buildings, and the like.
- Certain suppliers will also lease expensive equipment such as a bulk storage tanks to third parties that is used in conjunction with the purchase of commodities such as liquid nitrogen and oxygen that are used and replenished on a regular basis. Due to the limited duration of the supply contracts and/or leases, it may be unfeasible for these business owners to permanently install bulk storage tanks or other industrial equipment. In such a case, a foundation for the bulk storage tank or other industrial equipment is necessary, and a slab/pad that is portable and removable can be used in conjunction with the storage tank or other industrial equipment.
- Supplier response time can be also be shortened; by inventorying portable pads, equipment can be installed in less time.
- Portable structures are also useful in locations such as easements and leased premises where permanent structures are forbidden and the structures and equipment can be readily moved or relocated.
- the invention contemplates a portable precast slab, with or without reinforcement, which is used as a foundation or splash pad.
- the slab/pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and a weight bearing slab/pad is preferably at least about 6 inches to about 24 inches or more, and may be up to about 48 inches thick.
- the thickness of the pad is also important to prevent the slab from breaking apart during lifting, loading, handling, use, and the like.
- the slab is preferably at least about 6 feet in length, and may be up to about 20 feet in length. Of course in other embodiments, slabs of similar square footage ranges may also be preferable.
- the slab is preferably at least about 6 feet in width, and may be up to about 12 feet in width and even wider with the ultimate limitation being portability.
- a slab of the dimensions of 10′ ⁇ 15′ ⁇ 16′′ has been especially advantageous for use as a foundation for cryogenic storage tanks.
- slabs of the dimensions of 10′ ⁇ 15′ by 6′′ thick, 10′ ⁇ 15′ by 16′′ thick, and 10′ ⁇ 15′ by 12′′ thick have been found to be especially desirous for use as a foundation for cryogenic storage tanks.
- the sixteen-inch thick slab that is 10′ ⁇ 15′ weighs approximately 29,250 pounds.
- the slab can be used as a foundation for a variety of industrial equipment and/or components.
- the slab may be used indoors or outdoors.
- the invention also contemplates a portable precast slab, with or without reinforcement, which is used as a splash pad for the offloading of liquid cryogens, especially those that are flammable.
- Certain types of substrates such as asphalt are flammable, and the dripping of certain cryogens such as oxygen onto asphalt can start a fire.
- a cement or concrete surface or substrate is not flammable.
- this invention is also directed to slabs that are used as splash pads. No special coating or films are required on the surface of the cement or concrete in order for them to be used as splash pads.
- slabs of this invention that are used as a foundation for industrial equipment can also be used as splash pads, with or without holding industrial equipment. If the slab is to be used as only a splash pad and not as a weight bearing foundation, it does not require that the slab be of the same thickness as the slab that is used as a foundation. If for example the splash pad and foundation pad are to be placed adjacent to one another, slabs of the same thickness may be easier to install.
- splash pads may be used alone or in conjunction with slabs that are used as a foundation.
- the splash pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and is at least about 2 inches to about 48 inches, but is more preferably at least about 2 inches to 6 inches in thickness.
- the splash pad is preferably a minimum of about 6 feet in length, and may be up to about 20 feet in length or more.
- the splash pad is preferably a minimum of about 6 feet in width, and may be up to about 12 feet in width or more.
- a preferable splash pad is of a length of about 4 feet and a width of about 8 feet.
- the preferable splash pad is of a length of about 8 feet and a width of about 8 feet.
- splash pads of similar square footage may also be used. In all other respects, the splash pad can have the same characteristics and features of the foundation pad.
- the slabs/pads may have a means for attachment that allows the slab to be lifted and/or moved.
- the means for attachment may comprise a variety of apparatus, known to one skilled in the art such as at least one lift pin or eye loop that is accessible from the top or side surfaces of the slab/pad, and that may or may not be recessed.
- the slab could also be designed to be moved by a forklift, or alternatively may be rigged without any specific attachment apparatus.
- the slab/pad may also have a plurality of apertures that are cast into the slab and that are visible from the top or side surfaces.
- the apertures can be used for a variety of purposes such as to hold posts or to install fence posts therein.
- the slab/pad may interconnect or interface with another slab or pad that may be portable or permanent. This may include at least one side surface that is shaped and/or sized to interconnect or interface with at least one side surface of another slab.
- the slab/pad may have structural reinforcement. If so a variety of means known to one skilled in the art may be used to reinforce the concrete or cement.
- the industrial equipment comprises a bulk oxygen or hydrogen storage tank
- an at least 10 foot length by 10 foot width area on the top surface should be available for liquid oxygen delivery after the bulk storage tank is placed on the surface of the slab (i.e., an offloading area for the working end of a tanker truck), or a splash pad may be placed adjacent to the foundation that has the same or similar width area.
- the slab if the slab is used for a bulk storage tank, the slab should at least support a storage tank that is filled with at least up to about 300 to about 3000 gallons of liquid or more.
- the pads may be used for tanks holding any other liquids and having any other function. The pads have also been used for Argon and Nitrogen tanks.
- the pads that are used for cryogenic liquid pumps or other industrial equipment have a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and is at least about 4 inches to about 16 inches, but is more preferably at least about 4 inches to about 10 inches in thickness.
- the pads used for cryogenic pumps are preferably a minimum of about 6 feet in length, at least about 15 feet in length, and may be up to about 25 feet in length or more.
- a pad that is 8′8′′ ⁇ 24′ by 8′′ thick is one such size that has been used to hold a number of high-pressure cryogenic liquid pumps. Other pads of various thickness and sizes are also contemplated for use to hold such pumps.
- the pad/slab structure must be portable and movable, it is preferably light enough so that it can be lifted by equipment that is commonly used to lift apparatuses, such as cranes and forklifts. Is should also be weighted and sized so that it can be carried by a vehicle that can safely travel on roads (with or without permits) or other carriers such as boats.
- This invention also contemplates a method of making and using a portable precast reinforced cement or concrete slab.
- the precast slab/pad 2 has a top surface 4 , a plurality of side surfaces 6 , and a lower surface 8 .
- a precast or premolded slab means a slab, pad, foundation, or foundation component that is formed by casting cement into a form or mold at a different location, prior to the time of actual use as a slab, pad, or foundation for industrial equipment.
- the slab 2 also has a length 10 , a width 12 , and a thickness 14 .
- the slab has a thickness of at least about 6 inches to about 24 inches.
- the slabs that are used for foundations are preferably comprised of reinforced cement or concrete 24 and preferably have an attachment means 16 , which allows the slab to be lifted. Again, splash pads may also have such attachment means.
- Attachment means are typically employed to lift and/or move the precast slab, pad, or foundation elements.
- the term attachment means refers to a device or apparatus that can be incorporated into the slab that allows the slab to be moved or movable.
- the means for attachment may essentially comprise lift pins, lift rings, lift bolts, and the like and a combination thereof that are preferably are cast steel, or other such apparatus known or used by one skilled in the art for such purposes.
- the means for the attachment are preferably accessible from the top surface and/or side surface.
- the cable may be directly wrapped around or looped through the attachment means, and for example in attachment means with a loop clips, hooks and the like that is attached to cable can be inserted into or through the eye of the loop or around the other types of attachment means.
- the attachment means can also be used to secure other elements to the precast slabs, including elements from the industrial equipment such as tie down lines, ground lines, and the like used by one skilled in the art.
- top surface of the pad When installed, the top surface of the pad is horizontal with regard to the ground/substrate, and the pad should be level or substantially level.
- side surfaces refer to the edges or other regions of the slabs between the top and bottom surfaces, and where a vertical side surface may begin.
- the slab should be heavy enough to provide a force great enough to resist sliding and movement during wind and seismic events as well as displacement, overturning and/or sliding of the equipment such as a bulk storage tank during such events. Additional weight can also be added on site, and consist of concrete, cement, or other weights, such as steel, lead, and water. Piers, gripping members, or other methods known to one skilled in the art can be used in conjunction with the slab to resist sliding and overturning forces.
- the slab should be sized such that it is capable of bearing the weight of the industrial equipment that sits upon the surface of the slab.
- the design criteria of the preferred embodiment of the slab/pad should resist moving during wind or seismic events.
- the slab/pad should preferably withstand wind speeds of about 100 mph, such as that caused by a hurricane, and preferably should withstand seismic zone 4 conditions.
- the slab/pad may comprise a unitary piece, or multiple pieces that are placed adjacent to each other that touch or abut each other.
- a single piece slab/pad is preferable as it is easier and to set up. If a large slab is required, such as one larger than 15 feet long by 10 feet wide, or, there are weight or transportation problems, a slab comprised of multiple pieces would be more desirable. Yet, there may be disadvantages to using a slab/pad comprised of multiple pieces as is may be more difficult to level multiple pieces, the assembly may be awkward, and the pieces may come apart.
- FIG. 1 shows a slab/pad comprised of multiple pieces with overlapping portions 9 in a stepped fashion that interface or interconnect.
- the slab/pad pieces can fit together in a variety of ways similar to puzzle pieces and may have a uniform depth at the edges with interlocking or interfitting projections and recesses, or may instead be square or rectangular pieces or other shaped pieces that abut one another.
- the side surfaces are preferably the area where two pieces are joined together or placed adjacent to one another to form a pad or a slab. If so, at least on one side of the slab may have the ability to interconnect and/or interface other pads or slabs, portable or not, in order to create a larger surface. Should it become necessary to join the portable foundation to another, numerous joining means are possible that can be used to connect one slab/pad to another.
- the slab/pad of FIG. 1 may also be comprised of a unitary piece, and would lack overlapping portions 9 .
- the slab/pad may be of any shape.
- the slab used as a foundation will be shaped and sized so that there will be a perimeter of slab left after the industrial equipment is placed on the slab.
- the slab may be circular, rectangular, square, or of other shapes that will fit into the area designated for the slab.
- a certain slab area is desirable. For example, if the slab is used as foundation for a bulk storage tank, in an embodiment, at least about an 8 foot length by an 8 foot width area on the top surface that is adjacent to the tank should be available for liquid oxygen delivery after the bulk storage tank is placed upon the pad or slab to comply with industry requirements for liquid oxygen systems.
- the slab/pad may be made a variety of ways that are known or used by one skilled in the art.
- concrete or cement can be poured into a form that that sits on a table, similar to wooden forms that are built by contractors when foundations are constructed on-site, and the table must be designed to bear the weight of the filled form.
- the forms may be made of plastic, wood, metal and other durable materials.
- the forms are preferably steel as is the table. Once the concrete or cement is cured, which typically takes about 1-2 weeks, the sides of the form are removed leaving the slab/pad sitting on the steel table. When the concrete or cement dries, it pulls away from the table and the slab can be lifted off the table.
- Other methods of molding as well as other types of concrete or cement may be used that are known or used by one skilled in the art.
- Adequate curing is essential to obtaining good quality concrete or cement and contributes to the durability and the wear resistance of the slab/pad.
- the concrete or cement should not dry out prematurely, but should retain moisture and gradually dry in order to build up strength and gain durability and wear resistance.
- the amount of time required to cure will depend upon the size and thickness of the slab pieces as well as type of concrete or cement used.
- the slab/pad can be covered with plastic sheeting after the mold is filled.
- a commercial curing compound may be sprayed, brushed or rolled onto the surface of the concrete or cement.
- a water-reducing admixture such as one that meets ASTM C494 standards may also be mixed into the concrete or cement. Further, it is preferable that calcium chloride admixtures be avoided.
- the bottom of the slab/pad is concrete or cement.
- the plates or other apparatuses may also be attached or joined to the bottom of the slab/pad.
- rebar or other metal or other materials that are rigid or semirigid could be could be molded into or otherwise attached the bottom of the concrete or cement pad/slab.
- the cement that is used is preferably conventional cement, such as Portland cement, ASTM C 150, Type 1.
- the concrete that is used is preferably conventional concrete, such as Portland cement, ASTM C 150, Type 1, which has an ultimate compressive strength of at least about 2000 psi, and preferably to about 4000 psi.
- high strength concrete could also be used for at least a portion of the slab/pad.
- the maximum water cement ratio is preferably about 0.45, with normal weight aggregate such as ASTM C33, with preferably no more than about 5% voids in the concrete.
- Other aggregates, and criteria that are known or used by one skilled in the art can also be used with respect to the choice of concrete or cement, aggregate, and percentage of voids in the concrete or cement.
- a portion of lightweight concrete or cement may also be used to form the slab/pad.
- Varying densities of concrete or cement can also be used to increase the stability of the slab.
- higher density concrete or cement may be used in certain areas, such as the perimeter and edges, with lighter weight concrete or cement in locations such as the center.
- the slab/pad can be weighted such as at the edges to increase the stability of the slab/pad.
- the concrete or cement is preferably reinforced.
- a plurality of wires, rebars, rods, bars, plates, gravel, glass, glass fibers, or carbon fibers and a combination thereof can be used as a reinforcing means and are cast into the concrete or cement.
- Bars or rods 22 , and rebars 26 such as those made from metal, fiberglass, or polymers or a combination thereof are preferably used to reinforce the concrete or cement slab. See FIG. 1 . Rebars are the most preferable.
- the preferable rebar comply with ASTM A 615 specification, and are grade 60 bars. Other standards known or used by one skilled in the art may also be used. If the bars are bent or deformed, they are preferably bent or deformed while cold. Further, the rebar or rods may also be formed into a support frame, and if desired, the means for attachment can be is removably or securably attached to the support frame, rebar, or rods. Preferably, there is at least a 2-inch to 3-inch thickness of concrete or cement that covers the rebars, bars, or rods, or plates. If glass, gravel, pebbles, broken stone, slag, or carbon fibers are chosen, they are preferably interspersed throughout the concrete or cement. See e.g. FIG. 8 . The rebars or rods are placed in the form at the time of casting and act to strengthen the slab after the slab has cured.
- conventional rebar 26 such as ASTM A36 steel is used.
- the rebars may be arranged and spaced in a variety of ways.
- the rebars or rods are no more than about 3 feet apart, and are preferably about 12 inches to about 18 inches on center with respect to each other.
- the rebars are preferably at least about #3 to about #10 rebar which is equivalent to about 3 ⁇ 8 inch in diameter to about 1 ⁇ fraction (1/4 ) ⁇ inches in diameter or more.
- rebar of a greater diameter can also be used.
- the rebars may be parallel to one another and are preferably further criss-crossed.
- the rebar may be one layer thick, made into a 3 dimensional support frame, or instead two layers or more of rebars can be used.
- the top rebars can be #5 or 5 ⁇ 8 rebar in diameter, are criss-crossed, and are spaced about 16 inches each way, while the bottom rebars are #8 rebar or 1 inch in diameter and are criss-crossed with spacing about 12 inches to about 18 inches on center from each rebar.
- the rebar may be staggered and spaced such that rebar is present about every 6 inches to about every 8 inches.
- the rebar is preferably overlapped at the spliced areas 27 , such as in accordance with ACI 318, and preferably not less than 40 bar diameter, not less than about 1 inch to about 6 inches of rebar in the lapped area. See e.g., FIG. 7A .
- Other criteria known or used by one skilled in the art may also suffice.
- the rebars or rods can also be prestressed prior to molding, if desired. Prestressed refers to an object that is stretched and stressed prior to being molded in the slab.
- the slab is portable, it preferably has a means of attachment that allows the slab to be moved and/or lifted, such as by a cable.
- the term cable refers to a line, strand, or chain or other such devices known or used by one skilled in the art that are which may be attached or connected to the attachment means.
- a variety of apparatuses can be incorporated into the slab/pad that allows the slab/pad to be moved.
- the means for attachment may comprise lift pins or lift rings that are preferably are cast steel, or other such apparatus known or used by one skilled in the art and are preferably accessible on and from the top or side surface.
- FIG. 3 is a cross-section of a lift pin that is removably attachable to the slab.
- the pin 30 is steel and has an enlarged head 32 that allows cable 40 to be wrapped around the head, and has a threaded end 34 that is insertable into corresponding threads 36 in a metal housing 38 .
- FIG. 3 shows the use of gravel 39 in a cement matrix 40 . Mortar could also be used. Of course the concrete may also be comprised of cement or mortar with pebbles, broken stone, or slag.
- the lift pin or other attachment means are accessible from the top, they are preferably perpendicular to the top surface of the slab. If they are accessible from the side surface, they are preferably perpendicular to the side surface(s).
- One such lifting pin is supplied by Jenson Pre-Cast, and is an 8-ton lift pin. Preferably, the lift pins do not extend beyond the top surface of the concrete or cement.
- attachments known as “knuckles” are attached to embedded lift pins, and cables are attached to the “knuckles”.
- FIG. 4 shows an attachment means that has a looped end 42 that protrudes from the top surface 4 of the slab 2 that is embedded in the 24 slab.
- the eye loop allows for cable hooks to be inserted into the eye 44 of the loop.
- the attachment means do not protrude from the surface, and are preferably recessed as in FIG. 7C .
- the eyebolt may be threaded on one end and looped on the other end.
- FIG. 7B and 7C shows a further embodiment of an attachment means that is a pin 50 having an enlarged end 52 at both the surface of the slab and the end that is embedded into the slab.
- the pin may be located in a recessed surface 5 of the slab so that it does not protrude above the top surface of the slab. This can be accomplished by placing a cap on top of the pin to create the void at the top of the lifting pin.
- FIG. 8 shows an anchor bolt 54 with similar stress and weight bearing capabilities that has an enlarged end 58 that allows cables to be attached thereto.
- the anchor bolt may be embedded directly into the concrete or cement, such as at a depth of 12 inches 56 .
- attachment means such as a lift pin or bolt
- All of the foregoing pins and attachment means are preferably placed within the form before the concrete or cement is poured into the form or mold and/or before the concrete or cement begins to dry.
- the attachment means may also be installed after the concrete or cement is cured. For example, a hole could be drilled through the pad and a rod with a hook or eyelet with a bottom plate would be installed. Also the holes may be filled with epoxy after the attachment means is inserted.
- the attachment means should be placed at a certain depth that precludes them from pulling out of the concrete or cement, such as a depth of at least about 4 to about 8 inches to about 12 inches to 14 inches or more. Of course the depth will be limited by the thickness of the slab.
- the slab when used as a foundation is preferably at least about 1 foot thick to about 4 feet thick, depending upon the specific use. For example, in a slab that is 16 inches thick, the attachment means such as a pin is preferably inserted to a depth of about 12 inches.
- the embedded end of the attachment means may be attached to the rebar, such as by wrapping the embedded end of the attachment means around the rebar or otherwise securably or removably attaching the attachment means to the rebar.
- one or multiple means for attachment may be used.
- the number and spacing of the means for attachment should be apparent to one skilled in the art and will depend upon the strength of the attachment means as compared to the weight and size of the slab so that stresses do not break the means for attachment or cause the attachment means to pull out of the slab.
- the slab 2 of FIG. 5 has a plurality of separate means for attachment, and in an embodiment that is 10 feet width by 15 feet length and 16 inches thick, three to four 8-ton lift pins are used.
- the means for attachment should be spaced and located so that the slab will be approximately level and easy to control when it is moved and placed upon the ground or other substrate.
- the substrate 18 such as asphalt or ground upon which the slab is placed is preferably level prior to placing the slab on the substrate or ground. See FIG. 7A .
- the surface will preferably be leveled by a layer not more than about 1 ⁇ 2 inch depth to about 1 foot depth of about 1 ⁇ 4 inch to about 1 ⁇ 2 inch, or more size angular aggregate below the pad, such as by Air Liquide America.
- the slab can be leveled after it is placed upon the substrate or ground.
- the slab it is preferable that the slab not be installed on wet or soft soil.
- the preferable allowable soil bearing pressure is at least about 1000 psf (pounds per square foot). Also, preferably, there will be positive drainage from the substrate.
- the slab can immediately be used as a foundation for industrial equipment 66 such as a bulk storage tank 64 that can be placed directly upon the top surface of the slab. See FIGS. 5, 7A . Any equipment can be placed upon the slab as long as the slab meets the seismic load demands of the equipment, as determined by a structural engineer or other person skilled in the art.
- industrial equipment 66 such as a bulk storage tank 64 that can be placed directly upon the top surface of the slab. See FIGS. 5, 7A . Any equipment can be placed upon the slab as long as the slab meets the seismic load demands of the equipment, as determined by a structural engineer or other person skilled in the art.
- the slab is used to support a storage tank that is placed upon the top surface, the additional weight from the stored liquid must be taken into account with respect to the size and thickness of the slab.
- the storage tank can be filled with up to about 1500 to about 3000 gallons of liquid oxygen.
- the weight of a storage tank with about 1500 gallons of liquid is about 28,100 pounds, and a storage tank with about 3000 gallons of liquid is about 47,000 pounds.
- multiple apertures 70 which can hold fence posts can be incorporated, into the slab, such as by molding or drilled into the molded slab. See FIG. 5 .
- the apertures 70 may comprise blind holes that extend part way through the depth of the slab, or may comprise holes that extend through the thickness of the slab. See FIGS. 6, 7A .
- the holes may be of a diameter that is sufficient to receive fence posts. For example 4-inch diameter holes are used to receive 3-inch diameter fence posts that are installed in the field. To create the holes, 4-inch PVC capped pipe is placed in the mold/form before the concrete or cement is poured. The PVC pipes create the multiple 4-inch diameter voids.
- holes at least in every corner of a rectangular or square slab. It may also be advantageous to provide additional holes for the fence posts 7 . For example, in a 15 foot long by 10 foot wide slab that holds a bulk storage tank or vessel 64 , it has been determined that at least nine holes should be molded into the slab.
- the slab must preferably also adequately drain. In most circumstances, a flat slab will adequately drain.
- the slab may further have a plurality of furrows 75 in the top surface of the slab to ensure drainage of water from the slab. See FIG. 5 .
- Furrows may be incorporated by pressing a form into at least a portion of the top surface of the concrete or cement, which has not hardened, or the furrows may be made by other ways known to one skilled in the art. However, the furrows should be strategically located so that they do not cause the top surface of the slab to be unlevel. Further, the concrete or cement may be finished by a broom before it hardens so that the top surface is not slick.
- a vessel leg plate 62 of the vessel leg 66 is also anchored to the slab, such as by an anchor bolt and epoxy.
- a hole of a diameter of approximately 3 ⁇ 4′′ to about 11 ⁇ 2′′ that may extend as deep as the thickness of the slab is drilled into the slab and/or vessel leg plate at the desired position, then an epoxy pack is inserted and is ruptured by the bolt, mixing the epoxy portions together.
- a nut may then be installed upon the bolt to further secure the leg plate, which is accessible through a portion of the vessel leg that is typically open.
- Hilti supplies such epoxies and anchor bolts, and other such adhesives and fasteners are also commercially available.
- a layer of grout 60 may also be used between the vessel plate and the top surface 4 of the slab.
- the legs or portions of other types of industrial equipment may also be secured to the slab.
- a method of using a portable precast slab as a foundation for industrial equipment comprises: providing a portable precast slab that has a top surface, a plurality of side surfaces, a lower surface, a length, a width, and a thickness. During use, the lower surface of the slab is placed on ground, and the level of the slab is checked and/or the slab is leveled. Next, at least one piece of industrial equipment can be placed on the top surface of the slab.
- the method also contemplates the step of casting reinforcing means into the concrete or cement, wherein the reinforcing means is selected from the group consisting essentially of wires, rebars, rods, bars, plates, gravel, glass, or carbon fibers or a combination thereof.
- the method also comprises the step of providing means for moving or lifting the slab that is accessible from the top surface or side surface of the slab.
- the means for lifting or moving may be selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, an anchor bolt, and a combination thereof.
- the means for attachment may be securably attached or removably attachable.
- the method further comprises the step of attaching a cable to the lifting means and lifting the slab.
- the industrial equipment may comprise a bulk storage tank. If so, it may be desirable to provide a slab that has at least a 10-foot length by a 10-foot width area on the top surface adjacent to the tank that is available for liquid oxygen delivery after the bulk storage tank is placed on the top surface of the slab.
- the slab may comprise multiple pieces and the pieces may be placed adjacent to each other to form the slab.
- fencing may be installed around the perimeter of the slab and/or the industrial equipment.
- this method may further comprise the step of using at least a portion of the slab as a splash pad.
- a method for making a precast reinforced slab that is used as a foundation for at least one bulk storage tank or system comprises providing a mold or form, at least partially filling the mold with concrete and placing at least one rebar or rod within the concrete or cement to reinforce the concrete or cement, wherein at least one rebar or rod has at least one lift pin or means for attachment that is integral with or removably attached to the at least one rebar.
- the rebars or rods are covered with concrete or cement.
- the concrete or cement is allowed to dry and/or cure, thereby forming a slab/pad, wherein the slab/pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness.
- the slab is removed from the form when the slab is at least partially dried.
- the apertures have a variety of uses and for example can be used to install fence posts therein.
- the mold or form provides at least one side surface shaped so that the slab is capable of interconnecting or interfacing with at least one side surface of another slab.
- a plurality of rebars or rods are used as a reinforcing means, and the rebar is placed parallel to one another and/or in a criss-cross fashion.
- the rebars or rods are arranged to form a three-dimensional support structure that is cast into the concrete or cement. Also in this method, the rebar or rod may be prestressed prior to molding.
- the slab is dried and/or cured prior to use.
- At least a portion of lightweight concrete or cement or other materials designed to reduce the weight of the preformed pad may be used to form the slab.
- a plurality of furrows may be made in the top surface of the slab to ensure drainage of water from the top surface of the slab.
- the slab preferably has at least a 10-foot width by 10-foot length area on the top surface that will be available for liquid oxygen delivery after the bulk storage tank is placed on the top surface of the slab.
- the method of invention also contemplates the creation of a cryogenic liquid storage and supply system, which can be easily installed and removed as desired.
- Various embodiments of the invention include a cryogenic liquid storage tank; and optionally, one or more of the following pieces of equipment, which are typically used in the industrial gas industry: a vaporizer; a pressure control means; a gas filtering means; a telemetry unit means; a pump means; a tank filling means; piping, a piping support; a gas storage cylinder; and a splash pad.
- the cryogenic system has a fence enclosure.
- the fence enclosure is added for safety reasons to protect against unauthorized entry by personnel not trained to properly operate the cryogenic system. Additionally, the fencing provides a demarcation of the boundary lines between what belongs to the cryogenic system owner and what does not.
- the method further includes installing the concrete foundation at substantially the same time as any other members of the system.
- the foundation is placed into position by offloading it with a crane. Once the system is no longer required at the specific location, the system is disassembled in accordance with standard engineering practices. The equipment is first removed, and then the slab is removed in a similar manner as it was installed.
- each of its pieces is available, either separately or together, for use at another location.
- the entire system, including the foundation is re-assembled for use at another location.
- the invention also contemplates an apparatus for storing and supplying cryogenic liquids comprising at least one portable pre-cast slab foundation, as described earlier in the specification, and a cryogenic liquid storage tank.
- Preferred embodiments include one or more of the following pieces of equipment, which are typically used in the industrial gas industry: a vaporizer; a pressure control means; a gas filtering means; a telemetry unit means; a pump means; a tank filling means; piping, a piping support; a gas storage cylinder; and a splash pad.
- the stored cryogenic liquid contained in the tank may be nitrogen, oxygen, argon, carbon dioxide, hydrogen, and helium.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Foundations (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
- This application claims the benefit of U.S. Provisional Application No. 60/503,961, filed Sep. 19, 2003, and the benefit of U.S. patent application Ser. No. 10/768,945, filed Jan. 30, 2004.
- The present invention relates to portable pads or slabs, particularly to portable precast slabs for use as temporary, removable, or permanent foundations for industrial equipment, bulk storage tanks, cryogenic liquid pumps, and the like, and related methods of making and using the slab. It is also suitable as a protective surface, for example as an off loading or splash pad for liquid oxygen, or liquid hydrogen, or other cryogenic liquids.
-
FIG. 1 is a perspective view of one embodiment of the invention. -
FIG. 2 is a view of a reinforcing means of an embodiment of the invention. -
FIG. 3 is a side view of an attachment means of an embodiment of the invention. -
FIG. 4 is a side view of an attachment means of an embodiment of the invention. -
FIG. 5 is a top view of an embodiment of the invention. -
FIG. 6 is a cross-sectional side view of an embodiment of the invention. -
FIG. 7A is a cross-sectional side lengthwise view of an embodiment of the invention. -
FIG. 7B is a cross-sectional side endwise view of an embodiment of the invention. -
FIG. 7C is a side view of an attachment means of an embodiment of the invention. -
FIG. 8 is a side view of an attachment means of an alternate embodiment of the invention. - For purposes of the description of this invention, the terms “upper,” “lower,” “left,” “vertical,” “horizontal,” “top,” “bottom,” “lower,” “side,” and other related terms shall be defined in relation to embodiments of the present invention as described herein and as illustrated in the accompanying figures. However, it is to be understood that the invention may assume various alternative structures and processes and still be within the scope and meaning of this disclosure. Further, it is to be understood that any specific dimensions and/or physical characteristics related to the embodiments disclosed herein are capable of modification and alteration while still remaining within the scope of the present invention and are, therefore, not intended to be limiting. The present invention relates to portable pads or slabs comprised of precast concrete or cement for use as temporary or removable foundations for industrial equipment, bulk storage tanks, cryogenic liquid pumps, heat exchangers and associated equipment such as manifolds, distillation columns, small buildings, and the like.
- The use of portable or preformed structures that can readily be transferred to another location and/or can be used immediately after delivery and set up is very advantageous. In certain locations permanent foundations cannot be installed and/or there is a need for a foundation that can immediately be used. In other situations, rather than purchasing and installing permanent industrial equipment and components, a business owner may choose to lease portions of equipment for a certain duration, and such equipment may be best set up on a foundation, which may also be leased.
- Certain suppliers will also lease expensive equipment such as a bulk storage tanks to third parties that is used in conjunction with the purchase of commodities such as liquid nitrogen and oxygen that are used and replenished on a regular basis. Due to the limited duration of the supply contracts and/or leases, it may be unfeasible for these business owners to permanently install bulk storage tanks or other industrial equipment. In such a case, a foundation for the bulk storage tank or other industrial equipment is necessary, and a slab/pad that is portable and removable can be used in conjunction with the storage tank or other industrial equipment.
- Additionally, business strategies as well as investment and accounting principles may necessitate portable equipment and components. Supplier response time can be also be shortened; by inventorying portable pads, equipment can be installed in less time.
- Portable structures are also useful in locations such as easements and leased premises where permanent structures are forbidden and the structures and equipment can be readily moved or relocated.
- The invention contemplates a portable precast slab, with or without reinforcement, which is used as a foundation or splash pad. The slab/pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and a weight bearing slab/pad is preferably at least about 6 inches to about 24 inches or more, and may be up to about 48 inches thick. The thickness of the pad is also important to prevent the slab from breaking apart during lifting, loading, handling, use, and the like. Further, the slab is preferably at least about 6 feet in length, and may be up to about 20 feet in length. Of course in other embodiments, slabs of similar square footage ranges may also be preferable. Similarly, the slab is preferably at least about 6 feet in width, and may be up to about 12 feet in width and even wider with the ultimate limitation being portability. In an embodiment, a slab of the dimensions of 10′×15′×16″ has been especially advantageous for use as a foundation for cryogenic storage tanks. In another embodiment, slabs of the dimensions of 10′×15′ by 6″ thick, 10′×15′ by 16″ thick, and 10′×15′ by 12″ thick have been found to be especially desirous for use as a foundation for cryogenic storage tanks. The sixteen-inch thick slab that is 10′×15′ weighs approximately 29,250 pounds.
- The slab can be used as a foundation for a variety of industrial equipment and/or components. The slab may be used indoors or outdoors. The invention also contemplates a portable precast slab, with or without reinforcement, which is used as a splash pad for the offloading of liquid cryogens, especially those that are flammable. Certain types of substrates such as asphalt are flammable, and the dripping of certain cryogens such as oxygen onto asphalt can start a fire. In contrast, a cement or concrete surface or substrate is not flammable. As such, this invention is also directed to slabs that are used as splash pads. No special coating or films are required on the surface of the cement or concrete in order for them to be used as splash pads.
- Of course the slabs of this invention that are used as a foundation for industrial equipment can also be used as splash pads, with or without holding industrial equipment. If the slab is to be used as only a splash pad and not as a weight bearing foundation, it does not require that the slab be of the same thickness as the slab that is used as a foundation. If for example the splash pad and foundation pad are to be placed adjacent to one another, slabs of the same thickness may be easier to install.
- Further splash pads may be used alone or in conjunction with slabs that are used as a foundation. Just like the slabs used as a foundation, the splash pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and is at least about 2 inches to about 48 inches, but is more preferably at least about 2 inches to 6 inches in thickness. The splash pad is preferably a minimum of about 6 feet in length, and may be up to about 20 feet in length or more.
- In an embodiment, the splash pad is preferably a minimum of about 6 feet in width, and may be up to about 12 feet in width or more. In a further embodiment, a preferable splash pad is of a length of about 4 feet and a width of about 8 feet. In another embodiment, the preferable splash pad is of a length of about 8 feet and a width of about 8 feet. Of course, in other embodiments, splash pads of similar square footage may also be used. In all other respects, the splash pad can have the same characteristics and features of the foundation pad.
- Further, the slabs/pads may have a means for attachment that allows the slab to be lifted and/or moved. The means for attachment may comprise a variety of apparatus, known to one skilled in the art such as at least one lift pin or eye loop that is accessible from the top or side surfaces of the slab/pad, and that may or may not be recessed. The slab could also be designed to be moved by a forklift, or alternatively may be rigged without any specific attachment apparatus.
- The slab/pad may also have a plurality of apertures that are cast into the slab and that are visible from the top or side surfaces. The apertures can be used for a variety of purposes such as to hold posts or to install fence posts therein.
- Further, the slab/pad may interconnect or interface with another slab or pad that may be portable or permanent. This may include at least one side surface that is shaped and/or sized to interconnect or interface with at least one side surface of another slab.
- The slab/pad may have structural reinforcement. If so a variety of means known to one skilled in the art may be used to reinforce the concrete or cement.
- Also, if the industrial equipment comprises a bulk oxygen or hydrogen storage tank, preferably an at least 10 foot length by 10 foot width area on the top surface should be available for liquid oxygen delivery after the bulk storage tank is placed on the surface of the slab (i.e., an offloading area for the working end of a tanker truck), or a splash pad may be placed adjacent to the foundation that has the same or similar width area. In an embodiment, if the slab is used for a bulk storage tank, the slab should at least support a storage tank that is filled with at least up to about 300 to about 3000 gallons of liquid or more. Of course the pads may be used for tanks holding any other liquids and having any other function. The pads have also been used for Argon and Nitrogen tanks.
- Just like the slabs used as a foundation and splash pads, the pads that are used for cryogenic liquid pumps or other industrial equipment have a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness, wherein the thickness varies and is at least about 4 inches to about 16 inches, but is more preferably at least about 4 inches to about 10 inches in thickness. The pads used for cryogenic pumps are preferably a minimum of about 6 feet in length, at least about 15 feet in length, and may be up to about 25 feet in length or more. A pad that is 8′8″×24′ by 8″ thick is one such size that has been used to hold a number of high-pressure cryogenic liquid pumps. Other pads of various thickness and sizes are also contemplated for use to hold such pumps.
- Because the pad/slab structure must be portable and movable, it is preferably light enough so that it can be lifted by equipment that is commonly used to lift apparatuses, such as cranes and forklifts. Is should also be weighted and sized so that it can be carried by a vehicle that can safely travel on roads (with or without permits) or other carriers such as boats.
- This invention also contemplates a method of making and using a portable precast reinforced cement or concrete slab.
- As shown in
FIG. 1 , the precast slab/pad 2 has atop surface 4, a plurality ofside surfaces 6, and alower surface 8. A precast or premolded slab means a slab, pad, foundation, or foundation component that is formed by casting cement into a form or mold at a different location, prior to the time of actual use as a slab, pad, or foundation for industrial equipment. Theslab 2 also has alength 10, awidth 12, and athickness 14. Preferably, the slab has a thickness of at least about 6 inches to about 24 inches. The slabs that are used for foundations are preferably comprised of reinforced cement or concrete 24 and preferably have an attachment means 16, which allows the slab to be lifted. Again, splash pads may also have such attachment means. - Attachment means are typically employed to lift and/or move the precast slab, pad, or foundation elements. The term attachment means refers to a device or apparatus that can be incorporated into the slab that allows the slab to be moved or movable. For example, the means for attachment may essentially comprise lift pins, lift rings, lift bolts, and the like and a combination thereof that are preferably are cast steel, or other such apparatus known or used by one skilled in the art for such purposes. The means for the attachment are preferably accessible from the top surface and/or side surface. The cable may be directly wrapped around or looped through the attachment means, and for example in attachment means with a loop clips, hooks and the like that is attached to cable can be inserted into or through the eye of the loop or around the other types of attachment means. According to the present invention, the attachment means can also be used to secure other elements to the precast slabs, including elements from the industrial equipment such as tie down lines, ground lines, and the like used by one skilled in the art.
- When installed, the top surface of the pad is horizontal with regard to the ground/substrate, and the pad should be level or substantially level. The term side surfaces refer to the edges or other regions of the slabs between the top and bottom surfaces, and where a vertical side surface may begin.
- The slab should be heavy enough to provide a force great enough to resist sliding and movement during wind and seismic events as well as displacement, overturning and/or sliding of the equipment such as a bulk storage tank during such events. Additional weight can also be added on site, and consist of concrete, cement, or other weights, such as steel, lead, and water. Piers, gripping members, or other methods known to one skilled in the art can be used in conjunction with the slab to resist sliding and overturning forces.
- The slab should be sized such that it is capable of bearing the weight of the industrial equipment that sits upon the surface of the slab. For example, the design criteria of the preferred embodiment of the slab/pad should resist moving during wind or seismic events. For example, the slab/pad should preferably withstand wind speeds of about 100 mph, such as that caused by a hurricane, and preferably should withstand
seismic zone 4 conditions. - The slab/pad may comprise a unitary piece, or multiple pieces that are placed adjacent to each other that touch or abut each other. A single piece slab/pad is preferable as it is easier and to set up. If a large slab is required, such as one larger than 15 feet long by 10 feet wide, or, there are weight or transportation problems, a slab comprised of multiple pieces would be more desirable. Yet, there may be disadvantages to using a slab/pad comprised of multiple pieces as is may be more difficult to level multiple pieces, the assembly may be awkward, and the pieces may come apart.
FIG. 1 shows a slab/pad comprised of multiple pieces with overlappingportions 9 in a stepped fashion that interface or interconnect. Alternatively, the slab/pad pieces can fit together in a variety of ways similar to puzzle pieces and may have a uniform depth at the edges with interlocking or interfitting projections and recesses, or may instead be square or rectangular pieces or other shaped pieces that abut one another. In cases where multiple pieces are used to make a slab, pad, or foundation, the side surfaces are preferably the area where two pieces are joined together or placed adjacent to one another to form a pad or a slab. If so, at least on one side of the slab may have the ability to interconnect and/or interface other pads or slabs, portable or not, in order to create a larger surface. Should it become necessary to join the portable foundation to another, numerous joining means are possible that can be used to connect one slab/pad to another. Several stakes may be used around the perimeter of the slab, or a frame may be installed around the perimeter of the slab to ensure that the slab pieces do not come apart. Alternatively, metal strap portions may be placed around the joint areas. The slab/pad ofFIG. 1 may also be comprised of a unitary piece, and would lack overlappingportions 9. - The slab/pad may be of any shape. Preferably, the slab used as a foundation will be shaped and sized so that there will be a perimeter of slab left after the industrial equipment is placed on the slab. In some applications, the slab may be circular, rectangular, square, or of other shapes that will fit into the area designated for the slab. In certain applications, a certain slab area is desirable. For example, if the slab is used as foundation for a bulk storage tank, in an embodiment, at least about an 8 foot length by an 8 foot width area on the top surface that is adjacent to the tank should be available for liquid oxygen delivery after the bulk storage tank is placed upon the pad or slab to comply with industry requirements for liquid oxygen systems.
- The slab/pad may be made a variety of ways that are known or used by one skilled in the art. For example, concrete or cement can be poured into a form that that sits on a table, similar to wooden forms that are built by contractors when foundations are constructed on-site, and the table must be designed to bear the weight of the filled form. The forms may be made of plastic, wood, metal and other durable materials. The forms are preferably steel as is the table. Once the concrete or cement is cured, which typically takes about 1-2 weeks, the sides of the form are removed leaving the slab/pad sitting on the steel table. When the concrete or cement dries, it pulls away from the table and the slab can be lifted off the table. Other methods of molding as well as other types of concrete or cement may be used that are known or used by one skilled in the art.
- Adequate curing is essential to obtaining good quality concrete or cement and contributes to the durability and the wear resistance of the slab/pad. During the curing process, the concrete or cement should not dry out prematurely, but should retain moisture and gradually dry in order to build up strength and gain durability and wear resistance. The amount of time required to cure will depend upon the size and thickness of the slab pieces as well as type of concrete or cement used. To slow the drying, the slab/pad can be covered with plastic sheeting after the mold is filled. Alternatively, a commercial curing compound may be sprayed, brushed or rolled onto the surface of the concrete or cement. Also, for example, a water-reducing admixture such as one that meets ASTM C494 standards may also be mixed into the concrete or cement. Further, it is preferable that calcium chloride admixtures be avoided.
- In an embodiment, the bottom of the slab/pad is concrete or cement. Of course the plates or other apparatuses may also be attached or joined to the bottom of the slab/pad. For example to increase friction between the soil and the foundation or to grip the substrate, rebar or other metal or other materials that are rigid or semirigid could be could be molded into or otherwise attached the bottom of the concrete or cement pad/slab.
- The cement that is used is preferably conventional cement, such as Portland cement, ASTM C 150, Type 1. The concrete that is used is preferably conventional concrete, such as Portland cement, ASTM C 150, Type 1, which has an ultimate compressive strength of at least about 2000 psi, and preferably to about 4000 psi. Of course, high strength concrete could also be used for at least a portion of the slab/pad. The maximum water cement ratio is preferably about 0.45, with normal weight aggregate such as ASTM C33, with preferably no more than about 5% voids in the concrete. Other aggregates, and criteria that are known or used by one skilled in the art can also be used with respect to the choice of concrete or cement, aggregate, and percentage of voids in the concrete or cement. Depending upon the weight requirements, a portion of lightweight concrete or cement may also be used to form the slab/pad.
- Varying densities of concrete or cement can also be used to increase the stability of the slab. For example, higher density concrete or cement may be used in certain areas, such as the perimeter and edges, with lighter weight concrete or cement in locations such as the center. Also the slab/pad can be weighted such as at the edges to increase the stability of the slab/pad.
- For durability, the concrete or cement is preferably reinforced. For example, a plurality of wires, rebars, rods, bars, plates, gravel, glass, glass fibers, or carbon fibers and a combination thereof can be used as a reinforcing means and are cast into the concrete or cement. Bars or
rods 22, andrebars 26 such as those made from metal, fiberglass, or polymers or a combination thereof are preferably used to reinforce the concrete or cement slab. SeeFIG. 1 . Rebars are the most preferable. - In an embodiment, the preferable rebar comply with ASTM A 615 specification, and are
grade 60 bars. Other standards known or used by one skilled in the art may also be used. If the bars are bent or deformed, they are preferably bent or deformed while cold. Further, the rebar or rods may also be formed into a support frame, and if desired, the means for attachment can be is removably or securably attached to the support frame, rebar, or rods. Preferably, there is at least a 2-inch to 3-inch thickness of concrete or cement that covers the rebars, bars, or rods, or plates. If glass, gravel, pebbles, broken stone, slag, or carbon fibers are chosen, they are preferably interspersed throughout the concrete or cement. See e.g.FIG. 8 . The rebars or rods are placed in the form at the time of casting and act to strengthen the slab after the slab has cured. - Preferably,
conventional rebar 26, such as ASTM A36 steel is used. The rebars may be arranged and spaced in a variety of ways. Preferably, the rebars or rods are no more than about 3 feet apart, and are preferably about 12 inches to about 18 inches on center with respect to each other. Also, the rebars are preferably at least about #3 to about #10 rebar which is equivalent to about ⅜ inch in diameter to about 1{fraction (1/4 )} inches in diameter or more. Of course, rebar of a greater diameter can also be used. Further, the rebars may be parallel to one another and are preferably further criss-crossed. The rebar may be one layer thick, made into a 3 dimensional support frame, or instead two layers or more of rebars can be used. For example, in an embodiment, the top rebars can be #5 or ⅝ rebar in diameter, are criss-crossed, and are spaced about 16 inches each way, while the bottom rebars are #8 rebar or 1 inch in diameter and are criss-crossed with spacing about 12 inches to about 18 inches on center from each rebar. Further, when two layers are used and the rebar is criss-crossed, the rebar may be staggered and spaced such that rebar is present about every 6 inches to about every 8 inches. - If the slab/pad is such a length that extensions must be used to splice the rebars to each other, the rebar is preferably overlapped at the spliced
areas 27, such as in accordance with ACI 318, and preferably not less than 40 bar diameter, not less than about 1 inch to about 6 inches of rebar in the lapped area. See e.g.,FIG. 7A . Other criteria known or used by one skilled in the art may also suffice. The rebars or rods can also be prestressed prior to molding, if desired. Prestressed refers to an object that is stretched and stressed prior to being molded in the slab. - Because the slab is portable, it preferably has a means of attachment that allows the slab to be moved and/or lifted, such as by a cable. The term cable refers to a line, strand, or chain or other such devices known or used by one skilled in the art that are which may be attached or connected to the attachment means. A variety of apparatuses can be incorporated into the slab/pad that allows the slab/pad to be moved. For example, the means for attachment may comprise lift pins or lift rings that are preferably are cast steel, or other such apparatus known or used by one skilled in the art and are preferably accessible on and from the top or side surface.
FIG. 3 is a cross-section of a lift pin that is removably attachable to the slab. Thepin 30 is steel and has anenlarged head 32 that allowscable 40 to be wrapped around the head, and has a threadedend 34 that is insertable intocorresponding threads 36 in a metal housing 38.FIG. 3 , shows the use ofgravel 39 in acement matrix 40. Mortar could also be used. Of course the concrete may also be comprised of cement or mortar with pebbles, broken stone, or slag. - If the lift pin or other attachment means are accessible from the top, they are preferably perpendicular to the top surface of the slab. If they are accessible from the side surface, they are preferably perpendicular to the side surface(s). One such lifting pin is supplied by Jenson Pre-Cast, and is an 8-ton lift pin. Preferably, the lift pins do not extend beyond the top surface of the concrete or cement. In an embodiment, attachments known as “knuckles” are attached to embedded lift pins, and cables are attached to the “knuckles”.
- Lift pins are also sold by other companies such as Conac, and come in varying strengths ranging from at least about 1 ton to about 26 tons. The required strength of the lift pin will depend upon weight, thickness, and size of the slab/pad or other such factors known or used by one skilled in the art.
FIG. 4 shows an attachment means that has a loopedend 42 that protrudes from thetop surface 4 of theslab 2 that is embedded in the 24 slab. The eye loop allows for cable hooks to be inserted into theeye 44 of the loop. Preferably, the attachment means do not protrude from the surface, and are preferably recessed as inFIG. 7C . The eyebolt may be threaded on one end and looped on the other end.FIG. 7B and 7C shows a further embodiment of an attachment means that is apin 50 having anenlarged end 52 at both the surface of the slab and the end that is embedded into the slab. Also, the pin may be located in a recessedsurface 5 of the slab so that it does not protrude above the top surface of the slab. This can be accomplished by placing a cap on top of the pin to create the void at the top of the lifting pin. As a further alternative,FIG. 8 shows ananchor bolt 54 with similar stress and weight bearing capabilities that has anenlarged end 58 that allows cables to be attached thereto. The anchor bolt may be embedded directly into the concrete or cement, such as at a depth of 12inches 56. - If the attachment means such as a lift pin or bolt is not attached to the rebar, it is preferable to embed the attachment means at least about one-half to about three-fourths of the width of the slab so that the attachment means will not pull out of the slab when the slab is lifted and/or lowered by attaching cables and the like to the attachment means.
- All of the foregoing pins and attachment means are preferably placed within the form before the concrete or cement is poured into the form or mold and/or before the concrete or cement begins to dry. However, the attachment means may also be installed after the concrete or cement is cured. For example, a hole could be drilled through the pad and a rod with a hook or eyelet with a bottom plate would be installed. Also the holes may be filled with epoxy after the attachment means is inserted.
- The attachment means should be placed at a certain depth that precludes them from pulling out of the concrete or cement, such as a depth of at least about 4 to about 8 inches to about 12 inches to 14 inches or more. Of course the depth will be limited by the thickness of the slab. The slab when used as a foundation is preferably at least about 1 foot thick to about 4 feet thick, depending upon the specific use. For example, in a slab that is 16 inches thick, the attachment means such as a pin is preferably inserted to a depth of about 12 inches. Alternatively, the embedded end of the attachment means may be attached to the rebar, such as by wrapping the embedded end of the attachment means around the rebar or otherwise securably or removably attaching the attachment means to the rebar.
- Depending upon the size and thickness of the slab, one or multiple means for attachment may be used. The number and spacing of the means for attachment should be apparent to one skilled in the art and will depend upon the strength of the attachment means as compared to the weight and size of the slab so that stresses do not break the means for attachment or cause the attachment means to pull out of the slab. For example, in
FIG. 1 , there is only one means forattachment 16 that is located at or near the center of eachslab 2. In contrast, theslab 2 ofFIG. 5 has a plurality of separate means for attachment, and in an embodiment that is 10 feet width by 15 feet length and 16 inches thick, three to four 8-ton lift pins are used. In any case, the means for attachment should be spaced and located so that the slab will be approximately level and easy to control when it is moved and placed upon the ground or other substrate. - The
substrate 18 such as asphalt or ground upon which the slab is placed is preferably level prior to placing the slab on the substrate or ground. SeeFIG. 7A . If the surface is not level, the surface will preferably be leveled by a layer not more than about ½ inch depth to about 1 foot depth of about ¼ inch to about ½ inch, or more size angular aggregate below the pad, such as by Air Liquide America. Alternatively, the slab can be leveled after it is placed upon the substrate or ground. For stability, it is preferable that the slab not be installed on wet or soft soil. To ensure stability, the preferable allowable soil bearing pressure is at least about 1000 psf (pounds per square foot). Also, preferably, there will be positive drainage from the substrate. - After the slab is installed, there is no waiting for the slab to dry as it is already dried and cured prior to moving the slab. Therefore the slab can immediately be used as a foundation for
industrial equipment 66 such as abulk storage tank 64 that can be placed directly upon the top surface of the slab. SeeFIGS. 5, 7A . Any equipment can be placed upon the slab as long as the slab meets the seismic load demands of the equipment, as determined by a structural engineer or other person skilled in the art. - Further, if the slab is used to support a storage tank that is placed upon the top surface, the additional weight from the stored liquid must be taken into account with respect to the size and thickness of the slab. For example, in an embodiment, for a slab that is 15 foot long by 10 foot wide slab, and 16 inches thick, the storage tank can be filled with up to about 1500 to about 3000 gallons of liquid oxygen. The weight of a storage tank with about 1500 gallons of liquid is about 28,100 pounds, and a storage tank with about 3000 gallons of liquid is about 47,000 pounds.
- If it is desirable to install fencing around the perimeter of the slab and/or the industrial equipment,
multiple apertures 70 which can hold fence posts can be incorporated, into the slab, such as by molding or drilled into the molded slab. SeeFIG. 5 . Theapertures 70 may comprise blind holes that extend part way through the depth of the slab, or may comprise holes that extend through the thickness of the slab. SeeFIGS. 6, 7A . The holes may be of a diameter that is sufficient to receive fence posts. For example 4-inch diameter holes are used to receive 3-inch diameter fence posts that are installed in the field. To create the holes, 4-inch PVC capped pipe is placed in the mold/form before the concrete or cement is poured. The PVC pipes create the multiple 4-inch diameter voids. At a minimum, it is preferable to provide holes at least in every corner of a rectangular or square slab. It may also be advantageous to provide additional holes for the fence posts 7. For example, in a 15 foot long by 10 foot wide slab that holds a bulk storage tank orvessel 64, it has been determined that at least nine holes should be molded into the slab. - The slab must preferably also adequately drain. In most circumstances, a flat slab will adequately drain. As an alternative, the slab may further have a plurality of
furrows 75 in the top surface of the slab to ensure drainage of water from the slab. SeeFIG. 5 . Furrows may be incorporated by pressing a form into at least a portion of the top surface of the concrete or cement, which has not hardened, or the furrows may be made by other ways known to one skilled in the art. However, the furrows should be strategically located so that they do not cause the top surface of the slab to be unlevel. Further, the concrete or cement may be finished by a broom before it hardens so that the top surface is not slick. - In an embodiment, a
vessel leg plate 62 of thevessel leg 66, such as for a bulk storage tank, is also anchored to the slab, such as by an anchor bolt and epoxy. In an embodiment, a hole of a diameter of approximately ¾″ to about 1½″ that may extend as deep as the thickness of the slab is drilled into the slab and/or vessel leg plate at the desired position, then an epoxy pack is inserted and is ruptured by the bolt, mixing the epoxy portions together. A nut may then be installed upon the bolt to further secure the leg plate, which is accessible through a portion of the vessel leg that is typically open. For example, Hilti supplies such epoxies and anchor bolts, and other such adhesives and fasteners are also commercially available. Of course other such methods of securing the vessel leg and leg plate known to one skilled in the art may also be used. In an embodiment, a layer ofgrout 60 may also be used between the vessel plate and thetop surface 4 of the slab. The legs or portions of other types of industrial equipment may also be secured to the slab. - Again, a method of using a portable precast slab as a foundation for industrial equipment is contemplated comprises: providing a portable precast slab that has a top surface, a plurality of side surfaces, a lower surface, a length, a width, and a thickness. During use, the lower surface of the slab is placed on ground, and the level of the slab is checked and/or the slab is leveled. Next, at least one piece of industrial equipment can be placed on the top surface of the slab.
- The method also contemplates the step of casting reinforcing means into the concrete or cement, wherein the reinforcing means is selected from the group consisting essentially of wires, rebars, rods, bars, plates, gravel, glass, or carbon fibers or a combination thereof.
- The method also comprises the step of providing means for moving or lifting the slab that is accessible from the top surface or side surface of the slab. The means for lifting or moving may be selected from the group consisting essentially of at least one lift pin, at least one lift ring, at least one lift bolt, an anchor bolt, and a combination thereof. The means for attachment may be securably attached or removably attachable. Also, the method further comprises the step of attaching a cable to the lifting means and lifting the slab.
- In this method, for example, the industrial equipment may comprise a bulk storage tank. If so, it may be desirable to provide a slab that has at least a 10-foot length by a 10-foot width area on the top surface adjacent to the tank that is available for liquid oxygen delivery after the bulk storage tank is placed on the top surface of the slab.
- The slab may comprise multiple pieces and the pieces may be placed adjacent to each other to form the slab.
- Further in this method, fencing may be installed around the perimeter of the slab and/or the industrial equipment.
- Also this method may further comprise the step of using at least a portion of the slab as a splash pad.
- A method is also contemplated for making a precast reinforced slab that is used as a foundation for at least one bulk storage tank or system that comprises providing a mold or form, at least partially filling the mold with concrete and placing at least one rebar or rod within the concrete or cement to reinforce the concrete or cement, wherein at least one rebar or rod has at least one lift pin or means for attachment that is integral with or removably attached to the at least one rebar. Next, the rebars or rods are covered with concrete or cement.
- Then, the concrete or cement is allowed to dry and/or cure, thereby forming a slab/pad, wherein the slab/pad has a top surface, a bottom surface, a plurality of side surfaces, a length, a width, and a thickness. The slab is removed from the form when the slab is at least partially dried. In this method, there may also be a plurality of apertures that are cast into the slab that are visible from the top surface. The apertures have a variety of uses and for example can be used to install fence posts therein.
- In this method, the mold or form provides at least one side surface shaped so that the slab is capable of interconnecting or interfacing with at least one side surface of another slab.
- Further, in this method, a plurality of rebars or rods are used as a reinforcing means, and the rebar is placed parallel to one another and/or in a criss-cross fashion.
- Further, where a plurality of rebars or rods are used as a reinforcing means, the rebars or rods are arranged to form a three-dimensional support structure that is cast into the concrete or cement. Also in this method, the rebar or rod may be prestressed prior to molding.
- In this method, the slab is dried and/or cured prior to use.
- In this method, at least a portion of lightweight concrete or cement or other materials designed to reduce the weight of the preformed pad may be used to form the slab.
- Further, as part of this method, a plurality of furrows may be made in the top surface of the slab to ensure drainage of water from the top surface of the slab.
- Additionally, if the pad is used as a foundation for a bulk storage tank, the slab preferably has at least a 10-foot width by 10-foot length area on the top surface that will be available for liquid oxygen delivery after the bulk storage tank is placed on the top surface of the slab.
- The method of invention also contemplates the creation of a cryogenic liquid storage and supply system, which can be easily installed and removed as desired. Various embodiments of the invention include a cryogenic liquid storage tank; and optionally, one or more of the following pieces of equipment, which are typically used in the industrial gas industry: a vaporizer; a pressure control means; a gas filtering means; a telemetry unit means; a pump means; a tank filling means; piping, a piping support; a gas storage cylinder; and a splash pad.
- In one preferred embodiment, the cryogenic system has a fence enclosure. The fence enclosure is added for safety reasons to protect against unauthorized entry by personnel not trained to properly operate the cryogenic system. Additionally, the fencing provides a demarcation of the boundary lines between what belongs to the cryogenic system owner and what does not.
- The method further includes installing the concrete foundation at substantially the same time as any other members of the system. As described earlier, the foundation is placed into position by offloading it with a crane. Once the system is no longer required at the specific location, the system is disassembled in accordance with standard engineering practices. The equipment is first removed, and then the slab is removed in a similar manner as it was installed.
- Once the system is dismantled, each of its pieces is available, either separately or together, for use at another location. In one preferred embodiment, the entire system, including the foundation, is re-assembled for use at another location.
- The invention also contemplates an apparatus for storing and supplying cryogenic liquids comprising at least one portable pre-cast slab foundation, as described earlier in the specification, and a cryogenic liquid storage tank. Preferred embodiments include one or more of the following pieces of equipment, which are typically used in the industrial gas industry: a vaporizer; a pressure control means; a gas filtering means; a telemetry unit means; a pump means; a tank filling means; piping, a piping support; a gas storage cylinder; and a splash pad.
- The stored cryogenic liquid contained in the tank may be nitrogen, oxygen, argon, carbon dioxide, hydrogen, and helium.
- The details associated with the construction of such a portable pad suitable for this use have been previously described.
- It is noted that the methods and embodiment of apparatus described herein in detail for exemplary purposes is of course subject to many different variations in structure, design, application and methodology. Because many varying and different embodiments may be made within the scope of the inventive concept(s) herein taught, and because many modifications may be made in the embodiment herein detailed in accordance with the descriptive requirements of the law, it is to be understood that the details herein are to be interpreted as illustrative and not in a limiting sense.
- Further, it will be understood that many additional changes in the details, materials, steps and arrangement of parts, which have been herein described and illustrated in order to explain the nature of the invention, may be made by those skilled in the art within the principle and scope of the invention as expressed in the appended claims. Thus, the present invention is not intended to be limited to the specific embodiments in the examples given above and/or the attached drawings.
Claims (61)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/941,705 US20050144866A1 (en) | 2003-09-19 | 2004-09-15 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
CA002539381A CA2539381A1 (en) | 2003-09-19 | 2004-09-16 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
JP2006526727A JP2007505794A (en) | 2003-09-19 | 2004-09-16 | Pre-formed portable slab for use as a foundation or anti-scatter pad for industrial equipment |
EP04769395A EP1675787A1 (en) | 2003-09-19 | 2004-09-16 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
PCT/IB2004/003014 WO2005028340A1 (en) | 2003-09-19 | 2004-09-16 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
US11/368,173 US20060248848A1 (en) | 2003-09-19 | 2006-03-03 | Performed slab for use as a foundation or splash pad for industrial equipment |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US50396103P | 2003-09-19 | 2003-09-19 | |
US10/941,705 US20050144866A1 (en) | 2003-09-19 | 2004-09-15 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/368,173 Continuation-In-Part US20060248848A1 (en) | 2003-09-19 | 2006-03-03 | Performed slab for use as a foundation or splash pad for industrial equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050144866A1 true US20050144866A1 (en) | 2005-07-07 |
Family
ID=37134143
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/768,945 Abandoned US20050072115A1 (en) | 2003-09-19 | 2004-01-30 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
US10/941,705 Abandoned US20050144866A1 (en) | 2003-09-19 | 2004-09-15 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/768,945 Abandoned US20050072115A1 (en) | 2003-09-19 | 2004-01-30 | Preformed portable slab for use as a foundation or splash pad for industrial equipment |
Country Status (2)
Country | Link |
---|---|
US (2) | US20050072115A1 (en) |
CN (1) | CN100548835C (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070251184A1 (en) * | 2006-04-17 | 2007-11-01 | Steven Schumann | Self-supporting modular wall |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
US20110126481A1 (en) * | 2009-12-01 | 2011-06-02 | Henrik Stiesdal | Concrete tower |
US20120126469A1 (en) * | 2010-11-22 | 2012-05-24 | Howard Hassman | Anti-vibration laundry pad sub-floor reinforcement pad |
WO2013134703A1 (en) * | 2012-03-08 | 2013-09-12 | Tim Sylvester | Apparatus and method for servicing pavement |
US9145679B2 (en) | 2012-06-14 | 2015-09-29 | Xtreme Manufacturing, Llc | Form assembly for concrete slabs and methods of assembling same |
US20160177530A1 (en) * | 2014-12-17 | 2016-06-23 | Richard and Carolyn Koberg Living Trust | Pad for support of equipment and method of producing same |
US9574340B1 (en) * | 2014-07-31 | 2017-02-21 | Marrk Scoggins | Protective enclosure for concrete anchor bolts |
US9920490B2 (en) | 2016-01-05 | 2018-03-20 | Integrated Roadways, Llc | Modular pavement system |
US10407838B1 (en) | 2017-02-06 | 2019-09-10 | Integrated Roadways, Llc | Modular pavement slab |
US12043968B1 (en) * | 2023-09-05 | 2024-07-23 | Axiom Carbon Index, Llc | Carbon credit exchange system and method for reduced-carbon-emission portland cement concrete slabs-on-ground |
US12139871B1 (en) * | 2021-10-25 | 2024-11-12 | Glenn P. Gillen | Precast deep foundation system |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070086858A1 (en) * | 2005-10-18 | 2007-04-19 | Secureusa, Inc. | Shallow mounted fixed vehicle barrier device |
US20090056270A1 (en) * | 2007-09-05 | 2009-03-05 | Bando Dante | Prefabricated Custom Patios and Method |
CN101820156B (en) * | 2010-03-26 | 2012-05-23 | 黄贺明 | Combined cable groove |
US9206581B2 (en) * | 2011-01-07 | 2015-12-08 | Jonathan David Mollick | Modular and reconfigurable playground support structure |
US20150167260A1 (en) * | 2013-12-13 | 2015-06-18 | Baltazar Siqueiros | Method and apparatus for lifting and securing a concrete panel in place above a road bed |
SE539783C2 (en) * | 2014-04-04 | 2017-11-28 | Modulgrund I Sverige Ab | Building structure formed of building elements, method of forming a building structure and a joint |
RU2561441C1 (en) * | 2014-05-05 | 2015-08-27 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный архитектурно-строительный университет" (ФГБОУ ВПО "ТюмГАСУ") | Slabby and finned shallow foundation |
CN108374948A (en) * | 2018-02-24 | 2018-08-07 | 河南省晟源起重机械有限公司 | A kind of lifting equipment bottom precast support device and its construction method |
EP3844124A4 (en) * | 2018-08-27 | 2022-08-31 | Solidia Technologies, Inc. | Multi-step curing of green bodies |
SE544082C2 (en) * | 2019-05-22 | 2021-12-14 | Inventhor Sweden Ab | Container support system for reinforcement of ground surfaces for container handling and method for mounting such a system |
US11781331B1 (en) * | 2019-06-25 | 2023-10-10 | Joseph Toomey | Portable water park |
US11634908B1 (en) * | 2020-03-20 | 2023-04-25 | Illinois Tool Works Inc. | Functionally reinforced concrete slab |
CN113246300A (en) * | 2021-05-21 | 2021-08-13 | 贵州互惠混凝土机械服务有限公司 | Integrated concrete mixing plant convenient to assemble and carry |
US20230417042A1 (en) * | 2022-06-24 | 2023-12-28 | PohlCon GmbH | Protecting connector |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2964918A (en) * | 1957-03-11 | 1960-12-20 | Union Carbide Corp | Method and apparatus for dispensing gas material |
US3407551A (en) * | 1966-09-26 | 1968-10-29 | Us Industries Inc | Removable feed storage bin construction |
US4660344A (en) * | 1983-11-02 | 1987-04-28 | Gaudelli Edmond N | Apparatus and procedure for forming pre-shaped interlocking cement slabs |
US5020667A (en) * | 1989-09-05 | 1991-06-04 | Harry Bush | Portable hazardous waste pallet structure |
US5386699A (en) * | 1993-05-12 | 1995-02-07 | American Gas & Technology, Inc. | Method and apparatus for liquifying natural gas for fuel for vehicles and fuel tank for use therewith |
US5644893A (en) * | 1991-11-29 | 1997-07-08 | Neighbours; Gregory John | Method and apparatus for constructing multi-storey buildings |
US5720135A (en) * | 1994-06-21 | 1998-02-24 | Modular Steel Systems, Inc. | Prefabricated modular vehicle parking structure |
US5865346A (en) * | 1997-01-07 | 1999-02-02 | Del Zotto; William M. | Self-contained fueling system and method |
US5881527A (en) * | 1995-04-21 | 1999-03-16 | Hasco, L.P. | Portable precast concrete slabs for storage facility |
US5893479A (en) * | 1997-07-17 | 1999-04-13 | Berberat; Henry | Storage tank vault |
US20020153041A1 (en) * | 2001-04-20 | 2002-10-24 | Paul Drube | Liquid cylinder manifold system |
US6923145B2 (en) * | 2003-03-20 | 2005-08-02 | Michael Wahl | Flume flush floor for livestock |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB195570A (en) * | 1922-09-11 | 1923-04-05 | Henry Arthur Leaver | Improvements in or relating to roads and pavements |
US4993872A (en) * | 1983-12-28 | 1991-02-19 | Con/Span Culvert Systems, Inc. | Precast concrete culvert system |
US4918891A (en) * | 1987-05-12 | 1990-04-24 | U.M.C., Inc. | Precast concrete foundation elements and system and method of using same |
IL91978A (en) * | 1989-10-12 | 1991-12-15 | Igal Erel | Modular prefabricated structure,the elements comprising it and a method for combining them |
FR2821232A1 (en) * | 2001-02-16 | 2002-08-23 | Consulting A | Electrical energy distribution unit modular prefabricated site construction unit having two ground base sections supporting cross girder which supports electrical cupboard above ground. |
AT410109B (en) * | 2001-04-25 | 2003-02-25 | Otto Ritzinger | Prefabricated concrete slab foundation |
-
2004
- 2004-01-30 US US10/768,945 patent/US20050072115A1/en not_active Abandoned
- 2004-09-15 US US10/941,705 patent/US20050144866A1/en not_active Abandoned
- 2004-09-16 CN CN200480026925.8A patent/CN100548835C/en not_active Expired - Fee Related
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2964918A (en) * | 1957-03-11 | 1960-12-20 | Union Carbide Corp | Method and apparatus for dispensing gas material |
US3407551A (en) * | 1966-09-26 | 1968-10-29 | Us Industries Inc | Removable feed storage bin construction |
US4660344A (en) * | 1983-11-02 | 1987-04-28 | Gaudelli Edmond N | Apparatus and procedure for forming pre-shaped interlocking cement slabs |
US5020667A (en) * | 1989-09-05 | 1991-06-04 | Harry Bush | Portable hazardous waste pallet structure |
US5644893A (en) * | 1991-11-29 | 1997-07-08 | Neighbours; Gregory John | Method and apparatus for constructing multi-storey buildings |
US5386699A (en) * | 1993-05-12 | 1995-02-07 | American Gas & Technology, Inc. | Method and apparatus for liquifying natural gas for fuel for vehicles and fuel tank for use therewith |
US5720135A (en) * | 1994-06-21 | 1998-02-24 | Modular Steel Systems, Inc. | Prefabricated modular vehicle parking structure |
US5881527A (en) * | 1995-04-21 | 1999-03-16 | Hasco, L.P. | Portable precast concrete slabs for storage facility |
US5865346A (en) * | 1997-01-07 | 1999-02-02 | Del Zotto; William M. | Self-contained fueling system and method |
US5893479A (en) * | 1997-07-17 | 1999-04-13 | Berberat; Henry | Storage tank vault |
US20020153041A1 (en) * | 2001-04-20 | 2002-10-24 | Paul Drube | Liquid cylinder manifold system |
US6923145B2 (en) * | 2003-03-20 | 2005-08-02 | Michael Wahl | Flume flush floor for livestock |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070251184A1 (en) * | 2006-04-17 | 2007-11-01 | Steven Schumann | Self-supporting modular wall |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
US20110126481A1 (en) * | 2009-12-01 | 2011-06-02 | Henrik Stiesdal | Concrete tower |
US8220212B2 (en) * | 2009-12-01 | 2012-07-17 | Siemens Aktiengesellschaft | Concrete tower |
US20120126469A1 (en) * | 2010-11-22 | 2012-05-24 | Howard Hassman | Anti-vibration laundry pad sub-floor reinforcement pad |
US9340930B2 (en) | 2012-03-08 | 2016-05-17 | Integrated Roadways, Llc | Apparatus and method for servicing pavement |
WO2013134703A1 (en) * | 2012-03-08 | 2013-09-12 | Tim Sylvester | Apparatus and method for servicing pavement |
US9145679B2 (en) | 2012-06-14 | 2015-09-29 | Xtreme Manufacturing, Llc | Form assembly for concrete slabs and methods of assembling same |
US9574340B1 (en) * | 2014-07-31 | 2017-02-21 | Marrk Scoggins | Protective enclosure for concrete anchor bolts |
US20160177530A1 (en) * | 2014-12-17 | 2016-06-23 | Richard and Carolyn Koberg Living Trust | Pad for support of equipment and method of producing same |
US9670639B2 (en) * | 2014-12-17 | 2017-06-06 | Richard and Carolyn Koberg Living Trust | Pad for support of equipment and method of producing same |
US9920490B2 (en) | 2016-01-05 | 2018-03-20 | Integrated Roadways, Llc | Modular pavement system |
US10407838B1 (en) | 2017-02-06 | 2019-09-10 | Integrated Roadways, Llc | Modular pavement slab |
US12139871B1 (en) * | 2021-10-25 | 2024-11-12 | Glenn P. Gillen | Precast deep foundation system |
US12043968B1 (en) * | 2023-09-05 | 2024-07-23 | Axiom Carbon Index, Llc | Carbon credit exchange system and method for reduced-carbon-emission portland cement concrete slabs-on-ground |
Also Published As
Publication number | Publication date |
---|---|
US20050072115A1 (en) | 2005-04-07 |
CN100548835C (en) | 2009-10-14 |
CN1852847A (en) | 2006-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050144866A1 (en) | Preformed portable slab for use as a foundation or splash pad for industrial equipment | |
US8544227B2 (en) | Structural support column with base embedded within a foundation and method of forming | |
US20060248848A1 (en) | Performed slab for use as a foundation or splash pad for industrial equipment | |
US20080184640A1 (en) | Movable building and building foundation | |
US20080072511A1 (en) | Partially prefabricated modular foundation system | |
CN109706846B (en) | High and narrow bridge capping beam through steel bar construction method for slope foundation | |
US20100325819A1 (en) | Bridge approach and abutment construction and method | |
EP0146592A1 (en) | Prestressed component retaining wall system | |
US20020067960A1 (en) | Reinforced concrete panel and method of manufacture | |
KR20090076991A (en) | Post tension block system with superstrongbloks | |
US4972641A (en) | Leave-in-place cantilever concrete foundation form | |
US11248390B1 (en) | Light-weight, high strength, polymer concrete support blocks, and systems incorporating same | |
CN111997066A (en) | Manufacturing and construction method of assembled prestressed anchor cable frame beam for slope reinforcement | |
CN107143141A (en) | External wall of high-rise building warming plate construction | |
EP1675787A1 (en) | Preformed portable slab for use as a foundation or splash pad for industrial equipment | |
US20060034654A1 (en) | Temporary driveway | |
WO2013184005A1 (en) | Modular foundation resistant to ground movement | |
US6808156B2 (en) | Method and apparatus for molding concrete into a bridge or other structure | |
CN111648256A (en) | Pier body reinforcing construction method | |
CN111395382A (en) | Prefabricated foundation for power transmission engineering | |
US20060034652A1 (en) | Temporary driveway | |
CN111827239A (en) | Construction method of assembled berthing pier | |
US20080163577A1 (en) | Method and apparatus for mobile stem wall | |
JP2808438B2 (en) | Laying the plate | |
CN213952218U (en) | Enlarged footing prestressed concrete stock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: AIR LIQUIDE AMERICA L.P., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHAPPELL, RALPH L.;TOWLES, CHRISTOPHER V.;REEL/FRAME:015517/0057;SIGNING DATES FROM 20041212 TO 20041213 |
|
AS | Assignment |
Owner name: AIR LIQUIDE INDUSTRIAL U.S. LP, TEXAS Free format text: MERGER;ASSIGNOR:AIR LIQUIDE IC LLC;REEL/FRAME:021701/0129 Effective date: 20041231 Owner name: AIR LIQUIDE IC LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:AIR LIQUIDE AMERICA L.P.;REEL/FRAME:021701/0124 Effective date: 20041222 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |