[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

US10385653B2 - Single-trip, open-hole wellbore isolation assembly - Google Patents

Single-trip, open-hole wellbore isolation assembly Download PDF

Info

Publication number
US10385653B2
US10385653B2 US15/748,930 US201515748930A US10385653B2 US 10385653 B2 US10385653 B2 US 10385653B2 US 201515748930 A US201515748930 A US 201515748930A US 10385653 B2 US10385653 B2 US 10385653B2
Authority
US
United States
Prior art keywords
liner
wellbore
open
valve
stabilizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US15/748,930
Other versions
US20190003279A1 (en
Inventor
Roberto Francisco SCHULDES
Kevin Wendell ARDOIN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Assigned to HALLIBURTON ENERGY SERVICES, INC. reassignment HALLIBURTON ENERGY SERVICES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ARDOIN, Kevin Wendell, SCHULDES, Roberto Francisco
Publication of US20190003279A1 publication Critical patent/US20190003279A1/en
Application granted granted Critical
Publication of US10385653B2 publication Critical patent/US10385653B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B2034/002
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/04Ball valves

Definitions

  • the present disclosure relates generally to an isolation assembly used in an open-hole section of a wellbore, and specifically, to a single-trip, open-hole isolation assembly.
  • an open-hole well may be temporarily or permanently abandoned for a variety of reasons.
  • a first hydraulic seal such as concrete
  • a mechanical seal such as a valve and a bridge plug
  • a second hydraulic seal is then provided between the surface of the well and the mechanical seal.
  • FIG. 1 is a schematic illustration of an offshore oil and gas platform operably coupled to single-trip wellbore isolation assembly, according to an exemplary embodiment of the present disclosure
  • FIG. 2 illustrates a sectional view of the single-trip, open-hole wellbore isolation assembly of FIG. 1 , according to an exemplary embodiment of the present disclosure
  • FIG. 3 is a flow chart illustration of a method of operating the assembly of FIG. 2 , according to an exemplary embodiment
  • FIG. 4 illustrates a sectional view of the assembly of FIG. 2 during a step of the method of FIG. 3 , according to an exemplary embodiment of the present disclosure
  • FIG. 5 illustrates a sectional view of the assembly of FIG. 2 during another step of the method of FIG. 3 , according to an exemplary embodiment of the present disclosure.
  • the apparatus in the figures is turned over, elements described as being “below” or “beneath” other elements or features would then be oriented “above” the other elements or features.
  • the exemplary term “below” may encompass both an orientation of above and below.
  • the apparatus may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein may likewise be interpreted accordingly.
  • FIG. 1 is a schematic illustration of an offshore oil and gas platform generally designated 10 , operably coupled by way of example to a single-trip, open-hole isolation assembly according to the present disclosure. Such an assembly could alternatively be coupled to a semi-sub or a drill ship as well.
  • FIG. 1 depicts an offshore operation, it should be understood by those skilled in the art that the apparatus according to the present disclosure is equally well suited for use in onshore operations.
  • FIG. 1 depicts a vertical wellbore, it should be understood by those skilled in the art that the apparatus according to the present disclosure is equally well suited for use in wellbores having other orientations including horizontal wellbores, slanted wellbores, multilateral wellbores or the like.
  • a semi-submersible platform 15 may be positioned over a submerged oil and gas formation 20 located below a sea floor 25 .
  • a subsea conduit 30 may extend from a deck 35 of the platform 15 to a subsea wellhead installation 40 , including blowout preventers 45 .
  • the platform 15 may have a hoisting apparatus 50 , a derrick 55 , a travel block 60 , a hook 65 , and a swivel 70 for raising and lowering pipe strings, such as a substantially tubular, axially extending working string 75 .
  • a wellbore 80 extends through the various earth strata including the formation 20 , with a portion of the wellbore 80 having a casing string 85 cemented therein.
  • Disposed in the wellbore 80 is a single-trip, open-hole isolation assembly 90 .
  • the assembly 90 includes an elongated based pipe, or liner 95 , and a mechanical isolation device, which may include a valve 100 and a liner stabilizer 105 .
  • the assembly 90 may be coupled to the working string 75 via a running tool 113 , which includes a shifting tool 115 (shown in FIG. 2 ).
  • FIG. 2 illustrates a sectional view of the assembly 90 of FIG. 1 .
  • the liner 95 is adapted to extend adjacent an open-hole and cased-hole interface (a location within the wellbore 80 where the casing string 85 ends and the open-hole section of the wellbore 80 begins).
  • the liner stabilizer 105 is generally positioned above the valve 100 , but may alternatively be positioned adjacent or below the valve 100 , as shown in FIG. 2 .
  • the liner 95 may be a liner of any size and has an inner surface that forms a fluid flow passage 95 a for moving fluids in a direction from the surface of the well into an annulus 120 that is formed between the assembly 90 and the wellbore 80 .
  • the valve 100 may form a portion of the fluid flow passage 95 a and is adapted to allow the flow of fluids from the surface of the well, through the fluid flow passage 95 a , and into the annulus 120 when in an open position and is adapted to prevent the flow of fluids through the valve 100 and through the fluid flow passage 95 a when in a closed position.
  • the valve 100 may be a ball valve or any other type of valve that is capable of preventing flow of a fluid through the valve in both an uphole direction indicated by numeral 122 in FIG. 2 (“uphole direction 122 ”) and a downhole direction indicated by numeral 124 in FIG. 2 (“downhole direction 124 ”). That is, the valve 100 is a bi-directional barrier valve that prevents bi-directional flow.
  • the liner stabilizer 105 may be hydraulic, mechanical, and/or expandable.
  • the liner stabilizer 105 includes any one or more of an expandable liner hanger, a modified liner hanger, heavy weight packer, etc. so that the liner stabilizer provides a bi-directional annulus seal between a first section 120 a of the annulus 120 and a second section 120 b of the annulus 120 and generally suspends the liner 95 in the wellbore 80 .
  • the liner stabilizer 105 is a bi-directional annulus seal hanger.
  • the liner stabilizer 105 includes both a liner hanger assembly and a packer assembly.
  • the liner stabilizer 105 omits the packer assembly and includes a liner hanger assembly that also provides a bi-directional annulus seal between the first section 120 a of the annulus 120 and the second section 120 b of the annulus 120 . Additionally, in other embodiments, the liner stabilizer 105 omits the liner hanger assembly and includes a packer assembly that also suspends the liner 95 in the wellbore 80 .
  • the liner stabilizer 105 is generally positioned within the casing 85 and above the open-hole and cased-hole interface.
  • the working string 75 extends from the surface of the well and forms a flow passage 75 a .
  • the working string 75 may include the running tool 113 and the shifting tool 115 that is sized to shift the valve 100 from an open position to a closed position and/or from a closed position to an open position.
  • the working string 75 is removable from the assembly 90 .
  • the flow passage 75 a When attached to the assembly 90 , the flow passage 75 a is in fluid communication with the flow passage 95 a .
  • the flow passage 75 a is in fluid communication with the wellbore 80 .
  • FIG. 3 is a flow chart illustration of a method 150 of operating the assembly of FIG. 2 and includes setting a first hydraulic seal with the mechanical barrier forming a portion of the flow path 95 a at step 155 ; setting the mechanical barrier at step 160 ; and setting a second hydraulic seal at step 165 .
  • the step 155 includes setting the first hydraulic seal with the mechanical barrier forming a portion of the flow path 95 a .
  • the step 155 may include substeps of positioning at least a portion of the liner 95 within the open-hole section of the wellbore 80 at substep 155 a ; injecting a hardenable fluid 170 such has cement through the mechanical barrier (i.e., the valve 100 and liner stabilizer 105 ) that forms the flowpath 95 a at substep 155 b ; and hardening the hardenable fluid to set a first cement plug 175 at substep 155 c .
  • the valve 100 is in the open position such that the passage 75 a is in fluid communication with the passage 95 a .
  • At least a portion of the liner 95 extends within an open-hole section of the wellbore 80 and another portion extends within the cased-hole section of the wellbore at the step 155 .
  • cement or other hardenable fluid flows through the passage 75 a , through the valve 100 , and through the passage 95 a in the direction 124 . After exiting the liner 95 , the cement flows into the annulus 120 and uphole in the direction 122 such that the cement engages the casing 85 . A portion of the cement remains in the flow path 95 a .
  • the cement in the flow path 95 a and the cement in the annulus 120 form the first cement plug 175 .
  • the first cement plug 175 is set in place and the liner 95 is secured in the first cement plug 175 at the substep 155 c .
  • the first cement plug 175 hardens, or sets, to form a hydraulic seal to plug the open-hole section of the wellbore 80 and fluidically isolate the open-hole section of the wellbore 80 from the wellhead, or the surface of the well.
  • the hydraulic seal prevents fluids from exiting the formation 20 and entering the annulus 120 .
  • the step 160 may include the substeps of setting the liner stabilizer 105 at substep 160 a and closing the valve 100 at substep 160 b .
  • the liner stabilizer 105 is set.
  • the liner stabilizer 105 may be set by dropping a setting ball from the surface of the well down through the fluid passage 75 a . The setting ball may then engage the liner stabilizer 105 to set the liner stabilizer 105 .
  • the liner stabilizer 105 is a bi-directional annulus seal hanger
  • setting the liner stabilizer 105 fluidically isolates the first portion 120 a of the annulus 120 from the second portion 120 b of the annulus.
  • the liner stabilizer 105 defines the boundaries of first portion 120 a and the second portion 120 b .
  • setting the liner stabilizer 105 secures the liner 95 relative to the casing 85 .
  • the working string 75 and/or the running tool 113 is detached or removed from the assembly 90 .
  • the shifting tool 115 shifts the position of the valve 100 from the open position to the closed position.
  • the detachment of the working string 75 and/or the running tool 113 triggers the closure of the valve 100 .
  • Closing the valve 100 fluidically isolates a first portion of 95 aa of the flow passage 95 a from a second portion 95 ab of the flow passage 95 a , with the boundaries of the first portion 95 aa and the second portion 95 ab defined by the valve 100 .
  • the open-hole section of the wellbore (and the first cement plug 175 ) is fluidically isolated from the surface of the well and from the working string 75 . That is, the first portion 120 a of the annulus 120 is fluidically isolated from the second portion 120 b of the annulus 120 and the first portion 95 aa of the flow passage 95 a is fluidically isolated from the second portion 95 ab of the flow passage 95 a.
  • the step 165 may include the substeps of covering the liner stabilizer 105 and the valve 100 with hardenable fluid to create a second cement plug at substep 165 a and hardening the hardenable fluid to set the second cement plug at substep 165 b .
  • hardenable fluid such as cement flows downhole through the flow passage 75 a of the working string and into the wellbore 80 .
  • the hardenable fluid flows into the second portion 120 b of the annulus 120 and the second portion 95 ab of the flow path 95 a .
  • the hardenable fluid covers the liner stabilizer 105 and the valve 100 to form a second cement plug 180 .
  • the hardenable fluid is hardened to set the second cement plug 180 .
  • the second cement plug 180 hardens, or sets, to form a second hydraulic seal.
  • the second hydraulic seal fluidically isolates the valve 100 , the liner stabilizer 105 , and the open-hole portion of the wellbore 80 . That is, the second hydraulic seal fluidically isolates the first hydraulic seal and the mechanical barrier from the surface of the well.
  • the method 150 is completed in one “trip” downhole. That is, the running tool 113 remains downhole during and between the steps 155 and 160 and between the steps 160 and 165 .
  • the method 150 results in a dual barrier above a hydrocarbon zone, which is often required in an open-hole plug and abandonment operation.
  • the method 150 and the apparatus 90 results in a one-trip dual barrier. Considering the wellbore may be miles long, completing a trip downhole may take days to complete.
  • using the method 150 and/or the use of the assembly 90 reduces the amount of time needed to install a dual barrier in an abandoned welt, resulting in reduced operation costs.
  • the method 150 may also include the steps of pressure testing each of the first hydraulic seal, the mechanical barrier, and the second hydraulic seal for integrity of the barrier. Additionally, the method 150 may also include a step of retrieving the working string 75 and the running tool 113 from the wellbore after the substep 165 a.
  • steps, processes, and procedures are described as appearing as distinct acts, one or more of the steps, one or more of the processes, and/or one or more of the procedures may also be performed in different orders, simultaneously and/or sequentially.
  • the steps, processes and/or procedures may be merged into one or more steps, processes and/or procedures.
  • one or more of the operational steps in each embodiment may be omitted.
  • some features of the present disclosure may be employed without a corresponding use of the other features.
  • one or more of the above-described embodiments and/or variations may be combined in whole or in part with any one or more of the other above-described embodiments and/or variations.
  • Embodiments of the method may generally include extending a liner that is attached to a working string into the open-hole section of the wellbore, the liner having an interior flow passage; injecting a first hardenable fluid into the working string so that the first hardenable fluid: flows through a valve that separates a first portion of the interior flow passage from a second portion of the interior flow passage; and fills a first annulus formed between the liner and the open-hole section of the wellbore to plug the open-hole section of the wellbore; and closing the valve to fluidically isolate the first portion of the interior flow passage from the second portion of the interior flow passage.
  • the method may include any one of the following elements, alone or in combination with each other:
  • At least one of the first hardenable material and the second hardenable material is cement.
  • Embodiments of the apparatus may generally include extending a liner within a wellbore and adjacent an interface between the open-hole section of the wellbore and a cased section of the wellbore; injecting a first hardenable fluid through a fluid passage formed in the liner and into an annulus formed between the liner and the open-hole section of the wellbore to form a first cement plug; mechanically isolating the first cement plug from a surface of the well, including: closing a bi-directional valve that is coupled to the liner and that forms a portion of the fluid passage; and setting a bi-directional annulus seal liner stabilizer that is coupled to the liner; and covering the bi-directional annulus seal liner stabilizer and the bi-directional valve with a second hardenable fluid to form a second cement plug.
  • the apparatus may include any one of the following elements, alone or in combination with each other:
  • At least one of the first hardenable material and the second hardenable material is cement. Setting the liner stabilizer that is coupled to the liner results in the liner being secured to the cased section of the wellbore.
  • Embodiments of the apparatus may generally include a liner that forms an interior fluid flow passage; a liner stabilizer attached to the liner; and a valve forming a portion of the interior fluid flow passage and positioned between a first portion of the interior fluid flow passage and a second portion of the interior fluid flow passage; wherein the wellbore is plugged in a single trip using the single-trip isolation assembly.
  • the apparatus may include any one of the following elements, alone or in combination with each other:

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A method of isolating an open-hole section of a wellbore includes positioning, a liner, a valve, and a liner hanger that are attached to a working string adjacent an interface between the open-hole section and a cased section of the wellbore. The method includes injecting cement through the liner and the valve to form a first balanced cement plug within the open-hole section of the wellbore. Generally, the liner, the valve, and the liner hanger are secured within the balanced cement plug. After the balanced cement plug is set, the liner hanger is actuated and the liner, the valve, and the liner hanger are detached from the working string, which causes the valve to close and creates a mechanical barrier between the balanced cement plug and the working string. Additionally, the mechanical barrier is covered in cement to form another balanced cement plug.

Description

TECHNICAL FIELD
The present disclosure relates generally to an isolation assembly used in an open-hole section of a wellbore, and specifically, to a single-trip, open-hole isolation assembly.
BACKGROUND
Often, an open-hole well may be temporarily or permanently abandoned for a variety of reasons. Generally, when a portion of an open-hole well is abandoned, a first hydraulic seal, such as concrete, is provided between the portion of the open-hole well to be abandoned and the wellhead, or the surface of the well. Then, a mechanical seal, such as a valve and a bridge plug, is provided between the first hydraulic seal and the surface of the well. Finally, a second hydraulic seal is then provided between the surface of the well and the mechanical seal. The process of providing the first and second hydraulic seals and the mechanical seal includes multiple trips downhole. That is, a first trip is generally required to set the first hydraulic seal and a second trip is required to set the mechanical seal and the second hydraulic seal. Considering the wellbore may be miles long, this may take days to complete, which requires the use of rig equipment and increases the operation cost of the well.
BRIEF DESCRIPTION OF THE DRAWINGS
Various embodiments of the present disclosure will be understood more fully from the detailed description given below and from the accompanying drawings of various embodiments of the disclosure. In the drawings, like reference numbers may indicate identical or functionally similar elements.
FIG. 1 is a schematic illustration of an offshore oil and gas platform operably coupled to single-trip wellbore isolation assembly, according to an exemplary embodiment of the present disclosure;
FIG. 2 illustrates a sectional view of the single-trip, open-hole wellbore isolation assembly of FIG. 1, according to an exemplary embodiment of the present disclosure;
FIG. 3 is a flow chart illustration of a method of operating the assembly of FIG. 2, according to an exemplary embodiment;
FIG. 4 illustrates a sectional view of the assembly of FIG. 2 during a step of the method of FIG. 3, according to an exemplary embodiment of the present disclosure; and
FIG. 5 illustrates a sectional view of the assembly of FIG. 2 during another step of the method of FIG. 3, according to an exemplary embodiment of the present disclosure.
DETAILED DESCRIPTION
Illustrative embodiments and related methods of the present disclosure are described below as they might be employed in a single-trip, open-hole isolation assembly and method of operating the same. In the interest of clarity, not all features of an actual implementation or method are described in this specification. It will of course be appreciated that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time-consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of this disclosure. Further aspects and advantages of the various embodiments and related methods of the disclosure will become apparent from consideration of the following description and drawings.
The foregoing disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed. Further, spatially relative terms, such as “beneath,” “below,” “lower,” “above,” “upper,” “uphole,” “downhole,” “upstream,” “downstream,” and the like, may be used herein for ease of description to describe one element or feature's relationship to another element(s) or feature(s) as illustrated in the figures. The spatially relative terms are intended to encompass different orientations of the apparatus in use or operation in addition to the orientation depicted in the figures. For example, if the apparatus in the figures is turned over, elements described as being “below” or “beneath” other elements or features would then be oriented “above” the other elements or features. Thus, the exemplary term “below” may encompass both an orientation of above and below. The apparatus may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein may likewise be interpreted accordingly.
FIG. 1 is a schematic illustration of an offshore oil and gas platform generally designated 10, operably coupled by way of example to a single-trip, open-hole isolation assembly according to the present disclosure. Such an assembly could alternatively be coupled to a semi-sub or a drill ship as well. Also, even though FIG. 1 depicts an offshore operation, it should be understood by those skilled in the art that the apparatus according to the present disclosure is equally well suited for use in onshore operations. By way of convention in the following discussion, though FIG. 1 depicts a vertical wellbore, it should be understood by those skilled in the art that the apparatus according to the present disclosure is equally well suited for use in wellbores having other orientations including horizontal wellbores, slanted wellbores, multilateral wellbores or the like. Accordingly, it should be understood by those skilled in the art that the use of directional terms such as “above,” “below,” “upper,” “lower,” “upward,” “downward,” “uphole,” “downhole” and the like are used in relation to the illustrative embodiments as they are depicted in the figures, the upward direction being toward the top of the corresponding figure and the downward direction being toward the bottom of the corresponding figure, the uphole direction being toward the surface of the well, the downhole direction being toward the toe of the well.
Referring still to the offshore oil and gas platform example of FIG. 1, a semi-submersible platform 15 may be positioned over a submerged oil and gas formation 20 located below a sea floor 25. A subsea conduit 30 may extend from a deck 35 of the platform 15 to a subsea wellhead installation 40, including blowout preventers 45. The platform 15 may have a hoisting apparatus 50, a derrick 55, a travel block 60, a hook 65, and a swivel 70 for raising and lowering pipe strings, such as a substantially tubular, axially extending working string 75.
As in the present example embodiment of FIG. 1, a wellbore 80 extends through the various earth strata including the formation 20, with a portion of the wellbore 80 having a casing string 85 cemented therein. Disposed in the wellbore 80 is a single-trip, open-hole isolation assembly 90. Generally, the assembly 90 includes an elongated based pipe, or liner 95, and a mechanical isolation device, which may include a valve 100 and a liner stabilizer 105. The assembly 90 may be coupled to the working string 75 via a running tool 113, which includes a shifting tool 115 (shown in FIG. 2).
FIG. 2 illustrates a sectional view of the assembly 90 of FIG. 1. Referring to FIG. 2, the liner 95 is adapted to extend adjacent an open-hole and cased-hole interface (a location within the wellbore 80 where the casing string 85 ends and the open-hole section of the wellbore 80 begins). The liner stabilizer 105 is generally positioned above the valve 100, but may alternatively be positioned adjacent or below the valve 100, as shown in FIG. 2.
The liner 95 may be a liner of any size and has an inner surface that forms a fluid flow passage 95 a for moving fluids in a direction from the surface of the well into an annulus 120 that is formed between the assembly 90 and the wellbore 80.
The valve 100 may form a portion of the fluid flow passage 95 a and is adapted to allow the flow of fluids from the surface of the well, through the fluid flow passage 95 a, and into the annulus 120 when in an open position and is adapted to prevent the flow of fluids through the valve 100 and through the fluid flow passage 95 a when in a closed position. The valve 100 may be a ball valve or any other type of valve that is capable of preventing flow of a fluid through the valve in both an uphole direction indicated by numeral 122 in FIG. 2 (“uphole direction 122”) and a downhole direction indicated by numeral 124 in FIG. 2 (“downhole direction 124”). That is, the valve 100 is a bi-directional barrier valve that prevents bi-directional flow.
The liner stabilizer 105 may be hydraulic, mechanical, and/or expandable. In one or more exemplary embodiments, the liner stabilizer 105 includes any one or more of an expandable liner hanger, a modified liner hanger, heavy weight packer, etc. so that the liner stabilizer provides a bi-directional annulus seal between a first section 120 a of the annulus 120 and a second section 120 b of the annulus 120 and generally suspends the liner 95 in the wellbore 80. Thus, the liner stabilizer 105 is a bi-directional annulus seal hanger. In some embodiments, the liner stabilizer 105 includes both a liner hanger assembly and a packer assembly. However, in other embodiments, the liner stabilizer 105 omits the packer assembly and includes a liner hanger assembly that also provides a bi-directional annulus seal between the first section 120 a of the annulus 120 and the second section 120 b of the annulus 120. Additionally, in other embodiments, the liner stabilizer 105 omits the liner hanger assembly and includes a packer assembly that also suspends the liner 95 in the wellbore 80. The liner stabilizer 105 is generally positioned within the casing 85 and above the open-hole and cased-hole interface.
The working string 75 extends from the surface of the well and forms a flow passage 75 a. The working string 75 may include the running tool 113 and the shifting tool 115 that is sized to shift the valve 100 from an open position to a closed position and/or from a closed position to an open position. The working string 75 is removable from the assembly 90. When attached to the assembly 90, the flow passage 75 a is in fluid communication with the flow passage 95 a. When detached from the assembly 90, the flow passage 75 a is in fluid communication with the wellbore 80.
FIG. 3 is a flow chart illustration of a method 150 of operating the assembly of FIG. 2 and includes setting a first hydraulic seal with the mechanical barrier forming a portion of the flow path 95 a at step 155; setting the mechanical barrier at step 160; and setting a second hydraulic seal at step 165.
Referring to FIG. 4, the step 155 includes setting the first hydraulic seal with the mechanical barrier forming a portion of the flow path 95 a. The step 155 may include substeps of positioning at least a portion of the liner 95 within the open-hole section of the wellbore 80 at substep 155 a; injecting a hardenable fluid 170 such has cement through the mechanical barrier (i.e., the valve 100 and liner stabilizer 105) that forms the flowpath 95 a at substep 155 b; and hardening the hardenable fluid to set a first cement plug 175 at substep 155 c. Generally, during the substep 155 a, the valve 100 is in the open position such that the passage 75 a is in fluid communication with the passage 95 a. At least a portion of the liner 95 extends within an open-hole section of the wellbore 80 and another portion extends within the cased-hole section of the wellbore at the step 155. During the substep 155 b, cement or other hardenable fluid flows through the passage 75 a, through the valve 100, and through the passage 95 a in the direction 124. After exiting the liner 95, the cement flows into the annulus 120 and uphole in the direction 122 such that the cement engages the casing 85. A portion of the cement remains in the flow path 95 a. Together, the cement in the flow path 95 a and the cement in the annulus 120 form the first cement plug 175. As the hardenable fluid hardens, the first cement plug 175 is set in place and the liner 95 is secured in the first cement plug 175 at the substep 155 c. The first cement plug 175 hardens, or sets, to form a hydraulic seal to plug the open-hole section of the wellbore 80 and fluidically isolate the open-hole section of the wellbore 80 from the wellhead, or the surface of the well. The hydraulic seal prevents fluids from exiting the formation 20 and entering the annulus 120.
Referring to FIG. 5, and at the step 160, the mechanical barrier is set. The step 160 may include the substeps of setting the liner stabilizer 105 at substep 160 a and closing the valve 100 at substep 160 b. At the substep 160 a, the liner stabilizer 105 is set. In one exemplary embodiment, the liner stabilizer 105 may be set by dropping a setting ball from the surface of the well down through the fluid passage 75 a. The setting ball may then engage the liner stabilizer 105 to set the liner stabilizer 105. As the liner stabilizer 105 is a bi-directional annulus seal hanger, setting the liner stabilizer 105 fluidically isolates the first portion 120 a of the annulus 120 from the second portion 120 b of the annulus. The liner stabilizer 105 defines the boundaries of first portion 120 a and the second portion 120 b. Additionally, setting the liner stabilizer 105 secures the liner 95 relative to the casing 85. At the substep 160 b, the working string 75 and/or the running tool 113 is detached or removed from the assembly 90. When the running tool 113 is detached from the assembly 90, or directly before or after the running tool 113 is detached from the liner 95, the shifting tool 115 shifts the position of the valve 100 from the open position to the closed position. In one embodiment, the detachment of the working string 75 and/or the running tool 113 triggers the closure of the valve 100. Closing the valve 100 fluidically isolates a first portion of 95 aa of the flow passage 95 a from a second portion 95 ab of the flow passage 95 a, with the boundaries of the first portion 95 aa and the second portion 95 ab defined by the valve 100. With the valve 100 closed and the liner stabilizer 105 set, the open-hole section of the wellbore (and the first cement plug 175) is fluidically isolated from the surface of the well and from the working string 75. That is, the first portion 120 a of the annulus 120 is fluidically isolated from the second portion 120 b of the annulus 120 and the first portion 95 aa of the flow passage 95 a is fluidically isolated from the second portion 95 ab of the flow passage 95 a.
At the step 165, the second hydraulic seal is set. The step 165 may include the substeps of covering the liner stabilizer 105 and the valve 100 with hardenable fluid to create a second cement plug at substep 165 a and hardening the hardenable fluid to set the second cement plug at substep 165 b. At the substep 165 a, hardenable fluid such as cement flows downhole through the flow passage 75 a of the working string and into the wellbore 80. The hardenable fluid flows into the second portion 120 b of the annulus 120 and the second portion 95 ab of the flow path 95 a. The hardenable fluid covers the liner stabilizer 105 and the valve 100 to form a second cement plug 180. At the substep 165 b, the hardenable fluid is hardened to set the second cement plug 180. The second cement plug 180 hardens, or sets, to form a second hydraulic seal. The second hydraulic seal fluidically isolates the valve 100, the liner stabilizer 105, and the open-hole portion of the wellbore 80. That is, the second hydraulic seal fluidically isolates the first hydraulic seal and the mechanical barrier from the surface of the well.
In an exemplary embodiment, the method 150 is completed in one “trip” downhole. That is, the running tool 113 remains downhole during and between the steps 155 and 160 and between the steps 160 and 165. Thus, the method 150 results in a dual barrier above a hydrocarbon zone, which is often required in an open-hole plug and abandonment operation. Thus, the method 150 and the apparatus 90 results in a one-trip dual barrier. Considering the wellbore may be miles long, completing a trip downhole may take days to complete. Thus, using the method 150 and/or the use of the assembly 90 reduces the amount of time needed to install a dual barrier in an abandoned welt, resulting in reduced operation costs.
In an exemplary embodiment, the method 150 may also include the steps of pressure testing each of the first hydraulic seal, the mechanical barrier, and the second hydraulic seal for integrity of the barrier. Additionally, the method 150 may also include a step of retrieving the working string 75 and the running tool 113 from the wellbore after the substep 165 a.
In several exemplary embodiments, while different steps, processes, and procedures are described as appearing as distinct acts, one or more of the steps, one or more of the processes, and/or one or more of the procedures may also be performed in different orders, simultaneously and/or sequentially. In several exemplary embodiments, the steps, processes and/or procedures may be merged into one or more steps, processes and/or procedures. In several exemplary embodiments, one or more of the operational steps in each embodiment may be omitted. Moreover, in some instances, some features of the present disclosure may be employed without a corresponding use of the other features. Moreover, one or more of the above-described embodiments and/or variations may be combined in whole or in part with any one or more of the other above-described embodiments and/or variations.
Thus, a method of isolating an open-hole section of a wellbore has been described. Embodiments of the method may generally include extending a liner that is attached to a working string into the open-hole section of the wellbore, the liner having an interior flow passage; injecting a first hardenable fluid into the working string so that the first hardenable fluid: flows through a valve that separates a first portion of the interior flow passage from a second portion of the interior flow passage; and fills a first annulus formed between the liner and the open-hole section of the wellbore to plug the open-hole section of the wellbore; and closing the valve to fluidically isolate the first portion of the interior flow passage from the second portion of the interior flow passage. For any of the foregoing embodiments, the method may include any one of the following elements, alone or in combination with each other:
    • Setting a liner stabilizer attached to the liner to fluidically isolate a first portion of a second annulus formed between the liner and a cased section of the well from a second portion of the second annulus.
    • Detaching the liner from the working string.
    • Injecting a second hardenable fluid into the working string so that the second hardenable fluid flows into the wellbore to cover the liner, the valve, and the liner stabilizer with the second hardenable fluid.
    • Injecting the first hardenable fluid into the working string to fill the first annulus formed between the liner and the open-hole section of the wellbore forms a first cement plug that is a first hydraulic seal.
    • Closing the valve and setting the liner stabilizer creates a mechanical barrier between the first cement plug and the working string.
    • Injecting a second hardenable fluid into the working string so that the second hardenable fluid flows into the wellbore to cover the liner, the valve, and the liner stabilizer with the second hardenable fluid creates a second cement plug that is a second hydraulic seal.
At least one of the first hardenable material and the second hardenable material is cement.
    • Detaching the liner from the working string closes the valve.
    • Surrounding at least a portion of the liner with the first hardenable material such that the liner is secured in the first cement plug.
    • The liner hanger is a bi-directional annulus seal liner hanger.
    • The valve is a bi-directional valve.
Thus, a method of isolating an open-hole section of a wellbore has been described. Embodiments of the apparatus may generally include extending a liner within a wellbore and adjacent an interface between the open-hole section of the wellbore and a cased section of the wellbore; injecting a first hardenable fluid through a fluid passage formed in the liner and into an annulus formed between the liner and the open-hole section of the wellbore to form a first cement plug; mechanically isolating the first cement plug from a surface of the well, including: closing a bi-directional valve that is coupled to the liner and that forms a portion of the fluid passage; and setting a bi-directional annulus seal liner stabilizer that is coupled to the liner; and covering the bi-directional annulus seal liner stabilizer and the bi-directional valve with a second hardenable fluid to form a second cement plug. For any of the foregoing embodiments, the apparatus may include any one of the following elements, alone or in combination with each other:
At least one of the first hardenable material and the second hardenable material is cement. Setting the liner stabilizer that is coupled to the liner results in the liner being secured to the cased section of the wellbore.
    • Securing the liner within the first cement plug.
    • Detaching the liner from a working string that extends to the surface of the well.
Thus, a single-trip isolation assembly for use in a wellbore has been described. Embodiments of the apparatus may generally include a liner that forms an interior fluid flow passage; a liner stabilizer attached to the liner; and a valve forming a portion of the interior fluid flow passage and positioned between a first portion of the interior fluid flow passage and a second portion of the interior fluid flow passage; wherein the wellbore is plugged in a single trip using the single-trip isolation assembly. For any of the foregoing embodiments, the apparatus may include any one of the following elements, alone or in combination with each other:
    • A shifting tool engaging the valve, the shifting tool having a first position associated with the valve being in an open position and a second position associated with the valve being in a closed position.
    • The liner stabilizer is a bi-directional annulus seal liner stabilizer and the valve is a bi-directional valve.
The foregoing description and figures are not drawn to scale, but rather are illustrated to describe various embodiments of the present disclosure in simplistic form. Although various embodiments and methods have been shown and described, the disclosure is not limited to such embodiments and methods and will be understood to include all modifications and variations as would be apparent to one skilled in the art. Therefore, it should be understood that the disclosure is not intended to be limited to the particular forms disclosed. Accordingly, the intention is to cover all modifications, equivalents and alternatives falling within the spirit and scope of the disclosure as defined by the appended claims.

Claims (5)

What is claimed is:
1. A method of isolating an open-hole section of a wellbore, the method comprising:
extending a liner within the wellbore and adjacent an interface between the open-hole section of the wellbore and a cased section of the wellbore;
injecting a first hardenable fluid so that the first hardenable fluid:
flows through a first portion of a fluid passage formed in the liner, through a bi-directional valve that separates the first portion of the fluid passage from a second portion of the fluid passage, and through the second portion of the fluid passage;
exits the liner into an annulus at a location downhole from the bi-directional valve, the annulus being formed between the liner and the open-hole section of the wellbore; and
at least partially fills the second portion of the fluid passage and the annulus to form a first cement plug in the open-hole section of the wellbore;
mechanically isolating the first cement plug from a surface location from which the wellbore extends, comprising:
closing the bi-directional valve to fluidically isolate the first portion of the fluid passage from the second portion of the fluid passage; and
setting a bi-directional annulus seal liner stabilizer that is coupled to the liner;
and
covering the bi-directional annulus seal liner stabilizer and the bi-directional valve with a second hardenable fluid to form a second cement plug.
2. The method of claim 1, wherein at least one of the first hardenable fluid and the second hardenable fluid is cement.
3. The method of claim 1, wherein setting the liner stabilizer that is coupled to the liner results in the liner being secured to the cased section of the wellbore.
4. The method of claim 1, further comprising securing the liner within the first cement plug.
5. The method of claim 1, further comprising detaching the liner from a working string that extends to the surface location from which the wellbore extends.
US15/748,930 2015-10-02 2015-10-02 Single-trip, open-hole wellbore isolation assembly Active US10385653B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2015/053744 WO2017058249A1 (en) 2015-10-02 2015-10-02 Single-trip, open-hole wellbore isolation assembly

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2015/053744 A-371-Of-International WO2017058249A1 (en) 2015-10-02 2015-10-02 Single-trip, open-hole wellbore isolation assembly

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/513,852 Continuation US10689944B2 (en) 2015-10-02 2019-07-17 Single trip, open-hole wellbore isolation assembly

Publications (2)

Publication Number Publication Date
US20190003279A1 US20190003279A1 (en) 2019-01-03
US10385653B2 true US10385653B2 (en) 2019-08-20

Family

ID=58427803

Family Applications (2)

Application Number Title Priority Date Filing Date
US15/748,930 Active US10385653B2 (en) 2015-10-02 2015-10-02 Single-trip, open-hole wellbore isolation assembly
US16/513,852 Active US10689944B2 (en) 2015-10-02 2019-07-17 Single trip, open-hole wellbore isolation assembly

Family Applications After (1)

Application Number Title Priority Date Filing Date
US16/513,852 Active US10689944B2 (en) 2015-10-02 2019-07-17 Single trip, open-hole wellbore isolation assembly

Country Status (2)

Country Link
US (2) US10385653B2 (en)
WO (1) WO2017058249A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10851618B2 (en) * 2017-11-27 2020-12-01 Conocophillips Company Method and apparatus for cementing and cleaning a reservoir liner
GB2594599B (en) * 2019-01-07 2022-10-12 Halliburton Energy Services Inc Actuatable obstruction member for control lines
EP4314479A4 (en) * 2021-03-29 2024-09-18 Conocophillips Co Method and apparatus for use in plug and abandon operations
US11808108B2 (en) 2021-08-17 2023-11-07 Weatherford Technology Holdings, Llc Dual position isolator seal
CN114111679B (en) * 2021-11-08 2024-01-05 中国科学院武汉岩土力学研究所 Monitoring system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5950733A (en) 1996-01-24 1999-09-14 Schlumberger Technology Corporation Formation isolation valve
US20080251253A1 (en) * 2007-04-13 2008-10-16 Peter Lumbye Method of cementing an off bottom liner
US20120080190A1 (en) * 2010-10-01 2012-04-05 Rytlewski Gary L Zonal contact with cementing and fracture treatment in one trip
US20120175113A1 (en) 2011-01-10 2012-07-12 Halliburton Energy Services, Inc. Controlled hydrostatic pressure completion system
US8327933B2 (en) * 2008-08-20 2012-12-11 Baker Hughes Incorporated Arrangement and method for sending and/or sealing cement at a liner hanger
US20130000899A1 (en) * 2010-10-28 2013-01-03 Weatherford/Lamb, Inc. One Trip Toe-to-Heel Gravel Pack and Liner Cementing Assembly
US20130118752A1 (en) 2011-11-16 2013-05-16 Weatherford/Lamb, Inc. Managed pressure cementing
US20140124220A1 (en) * 2012-10-26 2014-05-08 Halliburton Energy Services, Inc. Mechanically actuated device positioned below mechanically actuated release assembly utilizing j- slot device
US20140216746A1 (en) 2012-03-09 2014-08-07 Halliburton Energy Services, Inc. Plugging and Abandoning a Well Using a Set-Delayed Cement Composition Comprising Pumice
WO2014137314A1 (en) 2013-03-04 2014-09-12 Halliburton Energy Services, Inc. Abandonment and containment system for gas wells

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5950733A (en) 1996-01-24 1999-09-14 Schlumberger Technology Corporation Formation isolation valve
US20080251253A1 (en) * 2007-04-13 2008-10-16 Peter Lumbye Method of cementing an off bottom liner
US8327933B2 (en) * 2008-08-20 2012-12-11 Baker Hughes Incorporated Arrangement and method for sending and/or sealing cement at a liner hanger
US20120080190A1 (en) * 2010-10-01 2012-04-05 Rytlewski Gary L Zonal contact with cementing and fracture treatment in one trip
US20130000899A1 (en) * 2010-10-28 2013-01-03 Weatherford/Lamb, Inc. One Trip Toe-to-Heel Gravel Pack and Liner Cementing Assembly
US20120175113A1 (en) 2011-01-10 2012-07-12 Halliburton Energy Services, Inc. Controlled hydrostatic pressure completion system
US20130118752A1 (en) 2011-11-16 2013-05-16 Weatherford/Lamb, Inc. Managed pressure cementing
US20140216746A1 (en) 2012-03-09 2014-08-07 Halliburton Energy Services, Inc. Plugging and Abandoning a Well Using a Set-Delayed Cement Composition Comprising Pumice
US20140124220A1 (en) * 2012-10-26 2014-05-08 Halliburton Energy Services, Inc. Mechanically actuated device positioned below mechanically actuated release assembly utilizing j- slot device
WO2014137314A1 (en) 2013-03-04 2014-09-12 Halliburton Energy Services, Inc. Abandonment and containment system for gas wells

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
International Search Report and Written Opinion for International Application PCT/US2015/053744 issued by the Korean Intellectual Property Office dated Jun. 21, 2016, 10 pages.

Also Published As

Publication number Publication date
US20190338618A1 (en) 2019-11-07
WO2017058249A1 (en) 2017-04-06
US20190003279A1 (en) 2019-01-03
US10689944B2 (en) 2020-06-23

Similar Documents

Publication Publication Date Title
US10689944B2 (en) Single trip, open-hole wellbore isolation assembly
RU2362005C2 (en) Method of conservation, completion and repair of well
US7367395B2 (en) Sand control completion having smart well capability and method for use of same
US7191832B2 (en) Gravel pack completion with fiber optic monitoring
US20100294495A1 (en) Open Hole Completion Apparatus and Method for Use of Same
US20130180709A1 (en) Well Completion Apparatus, System and Method
US11111764B2 (en) Wellbore annular safety valve and method
US11542782B2 (en) Ball seat release apparatus
US8434561B2 (en) Controlled hydrostatic pressure completion system
US20070261856A1 (en) Method and system for retrieving riser for storm evacuation
US20100096134A1 (en) Well Systems and Associated Methods Incorporating Fluid Loss Control
US11753906B2 (en) Ball seat release apparatus including sliding shear sleeve
AU2011354746B2 (en) Controlled hydrostatic pressure completion system
CA2843868C (en) Controlled hydrostatic pressure completion system
US11428052B2 (en) Jumper tube support member
US20160160638A1 (en) Sandface liner with power, control and communication link via a tie back string
AU2013242780A1 (en) Controlled Hydrostatic Pressure Completion System

Legal Events

Date Code Title Description
AS Assignment

Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SCHULDES, ROBERTO FRANCISCO;ARDOIN, KEVIN WENDELL;REEL/FRAME:044776/0347

Effective date: 20151006

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4