SU620603A1 - Method of bis-development of steep orebodies - Google Patents

Method of bis-development of steep orebodies

Info

Publication number
SU620603A1
SU620603A1 SU772459860A SU2459860A SU620603A1 SU 620603 A1 SU620603 A1 SU 620603A1 SU 772459860 A SU772459860 A SU 772459860A SU 2459860 A SU2459860 A SU 2459860A SU 620603 A1 SU620603 A1 SU 620603A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rocks
zone
excavation
carried out
displacement
Prior art date
Application number
SU772459860A
Other languages
Russian (ru)
Inventor
Виктор Александрович Козлов
Леонид Николаевич Потапов
Юрий Николаевич Попов
Юрий Дмитриевич Нечаев
Анатолий Васильевич Рашкин
Original Assignee
Читинский политехнический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Читинский политехнический институт filed Critical Читинский политехнический институт
Priority to SU772459860A priority Critical patent/SU620603A1/en
Application granted granted Critical
Publication of SU620603A1 publication Critical patent/SU620603A1/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Description

Изобретение относитс  к горной промышленности и может использоватьс  при комбинированной разработке месторождений полезных ископаемых.The invention relates to the mining industry and can be used in the combined mining of mineral deposits.

Известен способ повторной разработки крутопадаюших рудных залежей в зоне вли ни  подземной разработки, включающий выемку горных пород, погрузку и транспортирование горной массы с применением добычных машин, например, экскаваторов или ковшовых погрузчиков flj.There is a known method of redeveloping steep deposits in the zone of influence of underground mining, which includes excavation of rocks, loading and transportation of rock mass using mining machines, for example, excavators or flj.

Однако этот способ не обеспечивает безопасного ведени  горных работ в зоне сдвижени  горных пород.However, this method does not ensure the safe management of mining operations in the zone of displacement of rocks.

Известен также способ повторной разработки крутопадакшшх рудных залежей в зоне вли ни  подземной разработки, включающий последовательную выемку горных пород уступакш, погрузку и транспортирование горной массы 2 .There is also known a method for re-developing steep deposits in ore deposits in the zone of influence of underground mining, which includes the sequential excavation of rocks, the loading, and transportation of rock mass 2.

Такой способ характеризуетс  относительно низкой безопасностью ведени  горных работ, а также значительными потеp  /ra полезного ископаемого.This method is characterized by relatively low safety of mining, as well as significant loss of mineral.

Цель изобретени  - повышение безопасности ведени  горных работ и более полного извлечени  полезного ископаемого из зоны сдвижени  горного массива подThe purpose of the invention is to improve the safety of mining operations and more complete extraction of minerals from the zone of displacement of the mountain range under

воздействием подземной выработки.the impact of underground workings.

Это достигаетс  тем, что выемку горных впород из зоны сдвижени  осуществл ют в первую . очередь со стороны лежачего бока залежи и затем после понижени  гор-This is achieved in that the excavation of the mountain in the rocks from the displacement zone is carried out first. turn from the side of the lying side of the reservoir and then after lowering the mountain

вых работ на один-два уступа со стороны вис чего бока залежи с прмош,ью устанавливаемого вне зоны сдвижени  драглайна с нижним черпанием и максимальным радиусом последнего не менее половины ширины зоны сдвижени , причем выемку горных пород верхних горизонтов осуществл ют по бестранспортной сх;еме с размещением отвалов за границей карьера.One or two steps from the hanging side of the reservoir is from the prmosh, installed outside the dragline displacement zone with the lower scoop and the maximum radius of the latter at least half the displacement zone width, and excavation of the upper horizons is carried out using the best transport infrastructure; placing dumps abroad career.

На чертеже приведена схема повторнойThe drawing shows a rerun

разработки крутопадающих рудных залежей. Способ заключаетс  в следующем. Драглайном 1 с максимальным радиусом черпани  не менее половины ширины зоны сдвижени  2, установленном на рабочемdevelopment of steeply dipping ore deposits. The method is as follows. Dragline 1 with a maximum radius of scooping at least half the width of the displacement zone 2 installed on the working

Claims (2)

горизонте 3, осуществл ют выемку, горных пород из зоны сдвижени  в первую очередь со стороны лежачего бока залежи 4 нижним черпанием с предварительно подготовкой рабочей площадки путем отсыпки предотвала 5. Размещение горнотранспортных машин производ т за грани цей зоны сдвижени . Обрушенные породы после, взрывных работ и предотвал увеличивают толщину , -потолочины 6, снижают опасность про влени  провалов и ликвидируют аварийные услови . После понижени  горных работ на один-два уступа осуществл ют аналогичную выемку горны пород со стороны BHCjnjejX) бока залежи. При отработке верхних горизонтов выемку горных пород осуществл ют по бестранспортной схеме с размещением отвалов за границей карьера. Формула изобретени  Способ повторной разработки крутопада- ющих рудных залежей в зоне вли ни  подземной подработки, включающий последовательную выемку горных пород уступами, погрузку и транспортирование горной мас сы, отличающийс  тем, что;horizon 3, the excavation of rocks from the zone of displacement, primarily from the side of the recumbent side of the deposit 4, is carried out by bottom drawing with preliminary preparation of the working platform by dumping the prefabricated 5. The placement of mining vehicles takes place outside the zone of displacement. Collapsed rocks after, blasting and pre-shaft formation, increase the thickness of the - ceilings 6, reduce the risk of failure, and eliminate emergency conditions. After lowering the mining operations by one or two benches, a similar excavation of rocks from the BHCjnjejX side of the deposit is carried out. When mining the upper horizons, the excavation of rocks is carried out according to a non-transport scheme with the placement of dumps abroad. Claims of Invention A method for redeveloping steeply dipping ore deposits in the zone of influence of underground undermining, including the sequential excavation of rocks by ledges, loading and transportation of rock mass, characterized in that; f S 3 с целью повышени  безопасности ведени  горных работ и более полного извлечени  полезного ископаемого из зоны сдвижени  горного массива под воздействием подземной подработки, выемку горных пород из зоны сдвижени  осуществл ют в первую очередь со стороны лежачего бока залежи и затем после понижени  горных работ на один-два уступа со стороны вис чего бока залежи с помощью устанавпиБаемого вне зоны сдвижени  драглайна с нижним черпанием и максимальным радиусом последнего не менее половины ширигы зоны сдвижени , причем выемку горных пород верхних горизонтов осуществл ют по (бестранспортной схеме с размещением отвалов за границей карьера. Источники информации, прин тые во внимание при экспертизе: 1.Вовк А. А и др. Разработка месторождений полезных ископаемых комбинированным способом. Киев, 1965, с. 32-37. f S 3 with the aim of improving the safety of mining operations and more complete extraction of minerals from the zone of displacement of a mountain massif under the influence of underground work, the excavation of rocks from the zone of displacement is carried out primarily from the side of the recumbent deposit and then after lowering the mining operations by one - two steps from the hanging side of the deposit with the help of an out of the dragline sliding zone with the lower scoop and the maximum radius of the latter not less than half of the shift zone width, and the excavation X-rocks of the upper horizons are carried out according to (non-transport scheme with placement of dumps abroad). Sources of information taken into account during the examination: 1.Vovk A. A and others. Development of mineral deposits in a combined way. Kiev, 1965, p. 32 -37. 2.Куликов В. В. Совместна  и повторна  разработка рудных месторождений. М., 1972, с. 127-150.2.Kulikov V.V. Joint and repeated development of ore deposits. M., 1972, p. 127-150.
SU772459860A 1977-02-01 1977-02-01 Method of bis-development of steep orebodies SU620603A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU772459860A SU620603A1 (en) 1977-02-01 1977-02-01 Method of bis-development of steep orebodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU772459860A SU620603A1 (en) 1977-02-01 1977-02-01 Method of bis-development of steep orebodies

Publications (1)

Publication Number Publication Date
SU620603A1 true SU620603A1 (en) 1978-08-25

Family

ID=20698374

Family Applications (1)

Application Number Title Priority Date Filing Date
SU772459860A SU620603A1 (en) 1977-02-01 1977-02-01 Method of bis-development of steep orebodies

Country Status (1)

Country Link
SU (1) SU620603A1 (en)

Similar Documents

Publication Publication Date Title
SU620603A1 (en) Method of bis-development of steep orebodies
Sahu Application of ripper-dozer combination in surface mines: its applicability and performance study
Bustillo Revuelta et al. Mineral resource extraction
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
SU1323716A1 (en) Method of remining mineral deposits
SU842196A1 (en) Method of mining sloping ore bodies
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU706530A1 (en) Trenching method
SU1285151A1 (en) Method of strip mining of minerals
SU1097793A1 (en) Method of strip mining of horizontal and gently-sloping beds of minerals
SU985290A1 (en) Method of opening-up a mine field adjoining an open mine
SU732531A1 (en) Method for open mining of mineral deposits
SU883442A1 (en) Method of preparing thin unstable ore deposit
Gogolewska Surface and underground mining technology
SU730966A1 (en) Method of conducting stripping work
SU823579A2 (en) Method of remining sloping ore deposits
SU861606A1 (en) Method of mining thin steeply deeping veins
SU1097796A1 (en) Method of underground working of bed deposits of minerals
SU1154468A1 (en) Method of strip mining of sloping beds of mineral fields
SU829950A1 (en) Method of working adjacent sloping beds of minerals
SU875038A1 (en) Method of afterworking of sloping mineral deposits
SU1416694A1 (en) Method of open mining of mineral deposits
SU810974A1 (en) Ore body mining method
RU2093679C1 (en) Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals
SU588377A1 (en) Method of mining thick steep ore deposits