[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

SU1588977A1 - Method of checking load-bearing capacity and installation quality of paired anchorage system - Google Patents

Method of checking load-bearing capacity and installation quality of paired anchorage system Download PDF

Info

Publication number
SU1588977A1
SU1588977A1 SU884450919A SU4450919A SU1588977A1 SU 1588977 A1 SU1588977 A1 SU 1588977A1 SU 884450919 A SU884450919 A SU 884450919A SU 4450919 A SU4450919 A SU 4450919A SU 1588977 A1 SU1588977 A1 SU 1588977A1
Authority
SU
USSR - Soviet Union
Prior art keywords
load
anchors
pipeline
bearing capacity
strength
Prior art date
Application number
SU884450919A
Other languages
Russian (ru)
Inventor
Анатолий Кузьмич Арабский
Давыд Давыдович Люнгрин
Original Assignee
Сибирский научно-исследовательский и проектный институт газонефтепромыслового строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сибирский научно-исследовательский и проектный институт газонефтепромыслового строительства filed Critical Сибирский научно-исследовательский и проектный институт газонефтепромыслового строительства
Priority to SU884450919A priority Critical patent/SU1588977A1/en
Application granted granted Critical
Publication of SU1588977A1 publication Critical patent/SU1588977A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Изобретение относитс  к области прокладки магистральных трубопроводов и позвол ет повысить надежность анкерной системы трубопровода путем испытани  прочности соединений системы под нагрузкой и контрол  ее несущей способности с учетом релаксации напр жений в обводненных грунтах к началу эксплуатации трубопровода. После по влени  в т гах 1 анкеров 2 расчетной по прочности анкеров или податливости грунта выт гивающей нагрузки, создаваемой силовыми цилиндрами 5, сн тие с т г нагрузки производ т через определенный интервал времени частичной релаксации напр жений в грунте, соответствующий началу стабилизации падающей нагрузки. При этом производимую динамометрической машиной остаточную выт гивающую нагрузку перенос т на силовой по с 4 присоединением его к т гам 1 в их напр женном состо нии. 1 ил.The invention relates to the field of laying pipelines and improves the reliability of the anchor system of the pipeline by testing the strength of the connections of the system under load and controlling its bearing capacity, taking into account stress relaxation in flooded soils when the pipeline begins to operate. After the anchors 2 appear in 2 pulls, the pulling load calculated by the strength of the anchors or the soil is compressed by the power cylinders 5, the loads are removed from the loads after a certain period of partial relaxation of the stresses in the soil corresponding to the beginning of the stabilizing of the falling load. At the same time, the residual pulling load produced by the dynamometric machine is transferred to the power unit with its 4 connection to tam 1 in their stressed state. 1 il.

Description

Изобретение относится к строительству и мажет найти применение при прокладке магистральных трубопроводов.The invention relates to construction and may find application in the laying of trunk pipelines.

• Цель изобретения — повышение надежности анкерной системы путем испытаний прочности соединений системы под нагрузкой и контроля ее несущей способности с учетом релаксации напряжений в обводненных грунтах к началу эксплуатации трубо провода.• The purpose of the invention is to increase the reliability of the anchor system by testing the strength of the joints of the system under load and monitoring its bearing capacity, taking into account the relaxation of stresses in flooded soils before the start of operation of the pipe wire.

На чертеже изображена анкерная система на трубопроводе с контролирующим устройством, фронтальный вид.The drawing shows an anchor system on the pipeline with a monitoring device, front view.

I Способ осуществляют следующим образом.I Method is as follows.

' Производят одновременное приложение динамометрической машиной к тягам 1 анкеров 2 нарастающей вытягивающей нагрузки’ с упором на уложенный на грунт или опоры (на чертеже показано) трубопровод 3, перемещение анкеров вверх, снятие с тяг нагрузки динамометрической машины и визуальное обследование параметров соединений, преимущественно сварных швов, прикрепляющих тяги 1 к соединяющему их и налагаемому на трубопровод силовому поясу 4. Динамометрическая машина создает вытягивающую нагрузку парой силовых цилиндров 5, раздвижка которых между трубопроводом 3 и траверсой 6 машины приводит возникновению силы растяжения в под вешенных к траверсе стержнях 7, скрепляемых с концами тяг 1 анкеров. Величины; вытягивающей нагрузки определяют по показанию стрелки манометра (не показан), имеющегося на машине. Указанное перемещение анкеров 2 в грунте производят до появления расчетной по прочности анкеров илй податливости грунта нагрузки. Если подтаЛивость грунта высока и расчетная нагрузка не набирается, то анкерная система бракуется.'A simultaneous application by the dynamometer to the rods 1 of the anchors 2 of the increasing pulling load is performed' with emphasis on the pipe 3 laid on the ground or supports (shown in the drawing), the anchors are moved up, the dynamometer is removed from the rods and a visual inspection of the connection parameters, mainly welds attaching the rods 1 to the power belt 4 connecting them and applied to the pipeline 4. The dynamometer creates a pulling load by a pair of power cylinders 5, the sliding of which between pipeline 3 and traverse 6 of the machine leads to the emergence of tensile forces in the rods 7 suspended from the traverse, fastened to the ends of the rods 1 of the anchors. Values the pulling load is determined by the arrow of a manometer (not shown) available on the machine. The indicated movement of the anchors 2 in the soil is carried out until the load is calculated on the strength of the anchors or the suppleness of the soil. If soil thaw is high and the design load is not gained, then the anchor system is rejected.

С целью повышения надежности контроля после появления расчетной нагрузки снятие с тяг нагрузки динамометрической машины производят через определенный интервал времени (до 20 мин) на частичную релаксацию напряжений в грунте, соответствующий началу стабилизации падающей нагрузки (она примерно вдвое меньше по сравнению с расчетной). При этом производимую динамометрической машиной остаточ ную вытягивающую нагрузку переносят на силовой пояс 4 присоединением (приваркой) последнего, например косынками 8, к тягам 1 в их напряженном состоянии. Окончательная релаксация напряжений в грунте в зоне 5 анкеров 2 протекает 1—3 мес, после чего напряженное состояние тяг исчерпывается полностью, при этом несущая способность анкерной системы может снизиться по сравнению с измеренной через интервал вре· мени наполовину.In order to increase the reliability of control after the design load appears, the load of the dynamometer is removed from the rods after a certain time interval (up to 20 min) for partial relaxation of stresses in the soil, which corresponds to the beginning of stabilization of the falling load (it is approximately half as much as the calculated load). In this case, the residual pulling load produced by the dynamometer is transferred to the power belt 4 by attaching (welding) the latter, for example, with scarves 8, to the rods 1 in their stressed state. The final relaxation of stresses in the soil in zone 5 of anchors 2 takes 1-3 months, after which the stress state of the rods is completely exhausted, while the bearing capacity of the anchor system can be reduced by half compared to that measured over the time interval.

Таким образом, благодаря применению кратковременной выдержки анкеров под нагрузкой на стадии монтажа анкерной системы устранено влияние на несущую способ15 ность системы основной части процесса релаксации грунта, а приваркой силового пояса к тягам в напряженном состоянии последних обеспечено предварительное перед эксплуатацией трубопровода испытание свар* ных шков.Thus, by applying short shutter anchors under load in the step of installation of the anchor system eliminated the influence of the carrier sposob15 NOSTA system main part of the relaxation process of soil and privarkoj power belt for the tie rods in tension past ensured prior to operation of the pipeline testing svar * 2o GOVERNMENTAL shkov.

Claims (1)

Формула изобретенияClaim Способ контроля несущей способности и качества монтажа парной анкерной систе25 мы, заключающийся в одновременном приложении динамометрической машиной к тягам анкеров нарастающей вытягивающей нагрузки с упором на уложенный трубопровод, перемещении их вверх до появления расчетной по прочности анкеров или 30 податливости грунта нагрузки, снятии с тяг нагрузки и визуальном обследовании соединений тяг с налагаемым на трубопровод силовым поясом, отличающийся тем, что, с целью повышения надежности анкерной системы путем испытания прочности соеди35 нений системы под нагрузкой и контроля ее несущей способности с учетом релаксации напряжений в обводненных грунтах к началу эксплуатации трубопровода, снятие с тяг вытягивающей нагрузки динамометрической машины производят через интервал времени частичной релаксации напряжений в грунте, соответствующий началу стабилизации падающей вытягивающей нагрузки, при этом производимую динамометрической машиной остаточную в конце этого интер45 вала времени вытягивающую нагрузку переносят на силовой пояс присоединением последнего к тягам в напряженном состоянии.A method of controlling the bearing capacity and installation quality of a paired anchor system25, which consists in the simultaneous application of a growing machine to the tie rods of the anchors with an increasing pulling load, with emphasis on the laid pipeline, moving them up until the load is rated for the strength of the anchors or 30, removing the load from the rods and visual inspection of link joints with a power belt imposed on the pipeline, characterized in that, in order to increase the reliability of the anchor system by testing the strength The system under load and control of its bearing capacity, taking into account the relaxation of stresses in waterlogged soils before the start of operation of the pipeline, the dynamometer is removed from the tensile loads of the tensile load through the time interval of partial relaxation of stresses in the soil, which corresponds to the beginning of stabilization of the incident pulling load, while the dynamometer is produced the machine, the residual pulling load at the end of this time interval 45 is transferred to the power belt by connecting the latter to the rods am stressed.
SU884450919A 1988-06-28 1988-06-28 Method of checking load-bearing capacity and installation quality of paired anchorage system SU1588977A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884450919A SU1588977A1 (en) 1988-06-28 1988-06-28 Method of checking load-bearing capacity and installation quality of paired anchorage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884450919A SU1588977A1 (en) 1988-06-28 1988-06-28 Method of checking load-bearing capacity and installation quality of paired anchorage system

Publications (1)

Publication Number Publication Date
SU1588977A1 true SU1588977A1 (en) 1990-08-30

Family

ID=21385695

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884450919A SU1588977A1 (en) 1988-06-28 1988-06-28 Method of checking load-bearing capacity and installation quality of paired anchorage system

Country Status (1)

Country Link
SU (1) SU1588977A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677095A (en) * 2020-06-19 2020-09-18 中建富林集团有限公司 Construction method of drainage pipeline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1161770, кл. F 16 L 1/02, 1985. Марь нчик Я. Е. Машины и оборудование дл закреплени трубопроводов винтовыми анкерами. НТО сер.: «Строительные машины, механизмы и оборудование в нефт ной и газовой промышленности, М.: Ротапринт ВНИИСТ, 1975, с. 32, р. 14. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677095A (en) * 2020-06-19 2020-09-18 中建富林集团有限公司 Construction method of drainage pipeline

Similar Documents

Publication Publication Date Title
CN101748898A (en) Method for implementing the middle connection tensioning of cables and device thereof
CN106441683B (en) Steel wire rope tension measuring system with wedge-shaped body and method
SU1588977A1 (en) Method of checking load-bearing capacity and installation quality of paired anchorage system
US3343808A (en) Concrete prestressing apparatus
CN110184954B (en) Bridge prestressed body outer cable dismantling method
GB642589A (en) A compound-reinforcement for concrete structures
CN211234890U (en) Unhooking device with protection system
CN111157205A (en) Unhooking device with protection system and test method thereof
CN212175881U (en) Post-construction anchor cable prestress monitoring and mounting system
CN205562096U (en) Detection apparatus for stretch -draw anchor system anchor power
Burgoyne Tests on beams prestressed with polyaramid tendons
CN208601710U (en) A kind of anchoring part and tension of prestressed tendon equipment
RU2101418C1 (en) Method of extracting anchor link reinforcement and corresponding anchor link
CN114878048A (en) Method for detecting effective prestress under steel strand anchor after grouting
JPS62266461A (en) Pull-out tester for concrete or the like
CN212742654U (en) Post-construction anchor cable prestress sensor mounting system
CN117166618B (en) Arch shell structure system and construction method thereof
CN114518225B (en) Rope clamp anti-sliding bearing capacity test device and method based on boom tensioning
CN212836276U (en) Reinforcing bar meter of easy ligature
CN215218389U (en) Test piece and device for testing anti-shearing performance of full-length bonding anchor rod
CN117248626B (en) Construction method of ultra-large span prestressed tensile beam
CN221819923U (en) Compensation rope replacing device
CN111395413A (en) Post-construction anchor cable prestress sensor mounting system and method
SU1435736A1 (en) Method of stabilizing elasticity modulus of rope-like members
JPH05256750A (en) Short-circuit-strength testing apparatus for power-transmission-line spacer