SU1147816A2 - Mooring pile - Google Patents

Mooring pile Download PDF

Info

Publication number
SU1147816A2
SU1147816A2 SU833657909A SU3657909A SU1147816A2 SU 1147816 A2 SU1147816 A2 SU 1147816A2 SU 833657909 A SU833657909 A SU 833657909A SU 3657909 A SU3657909 A SU 3657909A SU 1147816 A2 SU1147816 A2 SU 1147816A2
Authority
SU
USSR - Soviet Union
Prior art keywords
radial
massive
plates
flange
depressions
Prior art date
Application number
SU833657909A
Other languages
Russian (ru)
Inventor
Александр Иванович Котов
Владимир Михайлович Кириллов
Original Assignee
Ленинградский Институт Водного Транспорта
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский Институт Водного Транспорта filed Critical Ленинградский Институт Водного Транспорта
Priority to SU833657909A priority Critical patent/SU1147816A2/en
Application granted granted Critical
Publication of SU1147816A2 publication Critical patent/SU1147816A2/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Piles And Underground Anchors (AREA)
  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

1. ПРИЧАЛЬНЫЙ ПАЛ по авт. св. № 1055808, отличают щ и и с   тем, что, с целью повышени  эффективности работы пала в услови х слабых грунтов, он снабжен шарнирно сопр женными с фланцем радиальными массивными плитами, имеющими ребристую поверхность в контактирующих с грунтом част х. 2. Причальный пал по п.1, о т личающийс  тем, что радиальные массивные плиты выполнены с взаимным зацеплением в виде выступов II впадин на смежных гран х. (Л 4 СХ) а1. mooring pal on auth. St. No. 1055808, they are distinguished by the fact that, in order to increase the efficiency of the work in conditions of weak soils, it is equipped with pivotally flanged radial massive slabs having a ribbed surface in parts in contact with the ground. 2. The berth fell in accordance with claim 1, characterized in that the radial massive plates are made with mutual engagement in the form of protrusions of the second depressions on adjacent faces. (L 4 CX) a

Description

Изобретение относитс  к портостроению .This invention relates to a port building.

По основному авт. св. № 1055808 известен причальный пал в виде предварительно напр женной системы, включающей одиночную сваю и охватывающую ее коаксиальную оболочку с фланцем на нижнем конце, а также отбойным и нат жным приспособлени ми с компенсатором - на верхнем ll .According to the main author. St. No. 1055808 is known for mooring in the form of a prestressed system comprising a single pile and a coaxial envelope enclosing it with a flange at the lower end, as well as fender and tension devices with a compensator - at the upper ll.

В этой конструкции нагрузка на грунт передаетс .через жесткий фланец, что в услови х залегани  слабых грунтов типа глинисто-суглинистых илов создает неблагопри тное напр женно-деформированное состо ние массива в зонах, примыкающих к внешним кромкам фланца даже при значительных его размерах. Кроме того, дл  обеспечени  расчетного предварительного напр жени  всей системы требуетс  значительное заглубление сваи.In this design, the load on the soil is transmitted through a rigid flange, which, under the conditions of the occurrence of weak soils such as clay-loamy silts, creates an unfavorable stress-strain state of the massif in the zones adjacent to the outer edges of the flange, even with its considerable dimensions. In addition, a significant pile depth is required to provide the estimated prestress of the entire system.

Цель изобретени  - повышение эффективности работы пала в услови х . слабых грунтов.The purpose of the invention is to increase the efficiency of the work in conditions. weak soils.

Поставленна  цель достигаетс  тем, что пал снабжен шарнирно сопр женными с фланцем радиальными массивньми плитами, имеющими ребристую поверхность в контактирующих с грунтом част х.This goal is achieved by the fact that the pallet is equipped with pivotally flanged radial massive plates that have a ribbed surface in parts in contact with the ground.

Кроме того, радиальные массивные плиты могут иметь взаимное зацепление в виде выступов и впадин на смежных гран х.In addition, radial massive plates can have mutual engagement in the form of protrusions and depressions on adjacent faces x.

На фиг. 1 показано устройство, вертикальный разрез; на Лиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows a device, a vertical section; on league. 2 shows section A-A in FIG. one.

Устройство включает погруженную в грунт сваю 1 и охватывающую ее коаксиальную оболочку 2 с отбойным приспособлением 3 и нат жным приспособлением с компенсатором 4 на верхнем конце, а также с фланцем 5 и массивными радиальными плитами 6 на нижнем. Совместимость работы фпанца 5 и плит 6 с наход щимс  под ними деформируемым грунтом достигнута благодар  шарнирному сопр жению 7, взаимному зацеплению плит в виде выступов и впадин 8 на смежных гран х плит, а также ребристой поверхности плит € в част х, контактирующих с грунтом.The device includes a pile 1 immersed in the ground and a coaxial shell 2 enclosing it with a fender 3 and a tension device with a compensator 4 at the upper end, as well as with a flange 5 and massive radial plates 6 at the bottom. Compatibility of the work of punch 5 and plates 6 with the deformable soil under them is achieved due to the hinge junction 7, mutual engagement of the plates in the form of protrusions and depressions 8 on the adjacent plate faces, as well as the ribbed surface of the plates in parts in contact with the ground.

478162478162

С плавучих средств или с подмостей погружают сваю 1, затем на нее насаживают коаксиальную оболочку 2 с фланцем 5, на верхней поверхности 5 которого предварительно смонтированы детали шарнирных сопр жений 7, Hanpmiep, в виде щпилек. После зтого последовательно опускают радиальные массивные плиты 6 так, чтобыA pile 1 is immersed from the floating equipment or scaffolding, then a coaxial casing 2 with a flange 5 is mounted on it, on the upper surface 5 of which the parts of the hinge joints 7, Hanpmiep, in the form of spikes are pre-mounted. After this, the radial massive plates 6 are successively lowered so that

10 обеспечивалось их шарнирное сопр жение с фланцем 5 и взаимное зацепление по смежным гран м. Затем монтируют нат жное приспособление с компенсатором 4 и отбойное приспособление 3 и придают всей системе расчетное предварительное напр жение. При необходимости дл  лучшего контакта с грунтом плиты 6 во врем  строительства пригружают временной статической или динамической нагрузкой.10, their articulated coupling with flange 5 and mutual engagement along adjacent facets were ensured. Then, a tension device with a compensator 4 and a breaker device 3 were mounted and the calculated preliminary voltage was given to the entire system. If necessary, for better contact with the soil, the plates 6 during construction are loaded with temporary static or dynamic load.

Шарнирное сопр жение плит с фланцем , обеспечивающее возможность поворота плит 6 в вертикальной плоскости , гарантирует их надежньй контактThe hinged coupling of the plates with the flange, which makes it possible to turn the plates 6 in the vertical plane, ensures their reliable contact

5 с грунтом в процессе его уплотнени  и осадки всей системы в целом. Выступы и впадины 8 на смежных гран х плит 6 не преп тствуют их перемещени м в вертикальной плоскости.5 with the soil in the process of its compaction and precipitation of the whole system. The protrusions and depressions 8 on the adjacent faces of the plates 6 do not hinder their movements in the vertical plane.

Таким образом, радиальные массивные плиты создают дополнительный гибкий массивный фланец-воротник, обеспечивающий существенное увеличе- ние объема грунта, вовлекаемого в работу на горизонтальные нагрузки. Кроме того, создаютс  более благопри тные услови  уплотнени  грунта под фланцем и вокруг него, способп ствующие ускоренному повышению его прочности во врем  эксплуатахщи пала . При этом диаметр фланца согласно расчетам может быть уменьшен приблизительно на 30% с одновременнымThus, the radial massive plates create an additional flexible massive flange-collar, providing a significant increase in the volume of soil involved in the work on horizontal loads. In addition, more favorable soil compaction conditions are created under the flange and around it, which contribute to an accelerated increase in its strength during operation. The diameter of the flange according to the calculations can be reduced by approximately 30% with simultaneous

.снижением расхода стали на его изготовление не менее чем в 2,5 раза.Reducing the consumption of steel for its production not less than 2.5 times.

Все это позволит возводить отбой ные палы в услови х .мощных напластований слабых грунтов (глинисто-суглинистых илов) без их предварительного уплонени  и закреплени  и без использовани  дорогосто щих труб из легированной стали с переменной трлщиной стенок.All this will make it possible to build breakaway palms under conditions of powerful bedding of weak soils (clay-loamy silt) without their preliminary plating and fixing and without using expensive pipes made of alloyed steel with a variable thickness.

(риг. 2(rig 2

8eight

Claims (2)

1. ПРИЧАЛЬНЫЙ ПАЛ по авт. св. № 1055808, отличают щ и й с я тем, что, с целью повышения эффективности работы пала в условиях слабых грунтов, он снабжен шарнирно сопряженными с фланцем радиальными массивными плитами, имеющими ребристую поверхность в контактирующих с грунтом частях.1. BIRTHDAY PAL by ed. St. No. 1055808, they are distinguished by the fact that, in order to increase the efficiency of the fall in soft soils, it is equipped with radial massive plates pivotally coupled to the flange, having a ribbed surface in parts in contact with the soil. 2. Причальный пал по п.1, о т личающийся тем, что радиальные массивные плиты выполнены с взаимным зацеплением в виде выступов и впадин на смежных гранях.2. The berth fell according to claim 1, characterized in that the radial massive slabs are mutually engaged in the form of protrusions and depressions on adjacent faces.
SU833657909A 1983-09-29 1983-09-29 Mooring pile SU1147816A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833657909A SU1147816A2 (en) 1983-09-29 1983-09-29 Mooring pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833657909A SU1147816A2 (en) 1983-09-29 1983-09-29 Mooring pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU1055808 Addition

Publications (1)

Publication Number Publication Date
SU1147816A2 true SU1147816A2 (en) 1985-03-30

Family

ID=21087453

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833657909A SU1147816A2 (en) 1983-09-29 1983-09-29 Mooring pile

Country Status (1)

Country Link
SU (1) SU1147816A2 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР 1055808, кл. Е 02 В 3/22, 1982. *

Similar Documents

Publication Publication Date Title
SU1147816A2 (en) Mooring pile
US4655642A (en) Arctic structure of composite wall construction
US1998803A (en) Compound foundation for plural wells
JPH0220769B2 (en)
RU2347866C2 (en) Method of constructing process platforms
CN212863775U (en) Plate-type lifting lug structure for hoisting construction of large concrete prefabricated part
CA1202493A (en) Offshore platform base
JPS61261556A (en) Reinforcement of connection part of pillar and beam/slab in inverse impact construction method
CN213869893U (en) Reserved structure for long-term construction of subway station end
JPH01268920A (en) Caisson construction work
SU1672077A1 (en) Method for laying underground pipeline
KR920003676Y1 (en) Revetment block
SU1373750A1 (en) Enclosure structure
RU1790643C (en) Pile
JP2792553B2 (en) Breakwater caisson and method of connecting them
RU2130526C1 (en) Ice-resistant sea platform and method for its erection
JPH0132335B2 (en)
SU1094896A1 (en) Method of constructing ramp-type pier
SU1145085A1 (en) Sinkable well
KR200157899Y1 (en) Fabricated culvert formed connection
JPS60141913A (en) Manufacture and installation of ferro-concrete structure having curved surface
JPS60250194A (en) Shield tunnel partial enlarging construction method
CN111139723A (en) Self-anchored steel corrugated plate and crushed stone combined arch bridge
JPH0427333B2 (en)
SU1477815A1 (en) Method of constructing embankment from blocks