[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

RU941U1 - Pile support - Google Patents

Pile support Download PDF

Info

Publication number
RU941U1
RU941U1 RU94004746/33U RU94004746U RU941U1 RU 941 U1 RU941 U1 RU 941U1 RU 94004746/33 U RU94004746/33 U RU 94004746/33U RU 94004746 U RU94004746 U RU 94004746U RU 941 U1 RU941 U1 RU 941U1
Authority
RU
Russia
Prior art keywords
pile
column
reinforced
support
longitudinal rods
Prior art date
Application number
RU94004746/33U
Other languages
Russian (ru)
Inventor
Андрей Будимирович Пономарев
Вадим Григорьевич Офрихтер
Original Assignee
Андрей Будимирович Пономарев
Вадим Григорьевич Офрихтер
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Андрей Будимирович Пономарев, Вадим Григорьевич Офрихтер filed Critical Андрей Будимирович Пономарев
Priority to RU94004746/33U priority Critical patent/RU941U1/en
Application granted granted Critical
Publication of RU941U1 publication Critical patent/RU941U1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Свайная опора, содержащая сваю-колонну с торцевым закладным элементом, армированную по длине четырьмя продольными стержнями и соединенным с ними спиральным элементом, и траверсу, установленную на свае-колонне и закрепленную на ней посредством торцевого закладного элемента, отличающаяся тем, что свая-колонна армирована по длине как минимум четырьмя дополнительными продольными стержнями, соединенными со спиральным элементом, и снабжена двумя боковыми элементами, установленными в верхней части сваи-колонны на ее боковых противоположных гранях для крепления траверсы.A pile support comprising a pile column with an end embedded element, lengthwise reinforced with four longitudinal rods and a spiral element connected to them, and a crosshead mounted on the pile column and secured to it by an end embedded element, characterized in that the pile column is reinforced along the length of at least four additional longitudinal rods connected to the spiral element, and is equipped with two side elements mounted in the upper part of the pile columns on its opposite sides faces for mounting the beam.

Description

Wff r ffl/ . ioMci ,СВАЙНАЯ .ОПОРА Полезная модель относится к строительству,в . частности,к конструкциям свайных опор для монтажа эстакад трубопроводов и кабельных линий. Уровень техники. Известна свайцая опора,содержащая две сваи-колонны и установленную на них траверсу. Каждая свая-колонна армирована по длине четырьмя продольньйш стержнями и соединенным с этими стержнями спиральным элементом, при этом траверса закреплена на сваях-колоннах посредством торцевых закладных элементов, расположенных в верхних частях свай-колонн (альбом типовых конструкций и деталей зданий и сооружений Госстроя СССР, серия 3.015-5 Свайные опоры и фундаменты. для отдельно стоящих опор и одноярусных эстакад под технологические трубопроводы.-Е, 1976 г.)./ . фичина, препятствующая получению в аналоге требуемого технического результата,заключается в наличии в конструкции свайной опоры, двух свай-колонн. Опоры с двумя сваями-колоннёлии невозможно применять в стесненных условиях строительной площадки, в местах интенсивной прокладки подземных инженерных коммуникаций., Кроме того, установка опор с двумя сваями-колоннами требует значительных материальных затрат. Известна свайная опора, содержащая сваю-колонну, армированную „ . « . по длине . четырьмя продольными стержнями и соединенным с ними спиральным элементом, и траверсу. Траверса закреплена на свае-колонне посредством торцевого закладного элемента, расположенного в верхней T/ /fOice части сваи-колонны чальбом типовых конструкций и деталей зданий и . E02D 27/16 , Kx E02D 2 . J jCJ 27/42 , i ,. V . . ; .. . ;- э ;;. ... . ,; сооружений Госстроя СССР, серия 3.015-5 Свайные опоры и фундаменты для отдельно стоящих опор и одноярусных эстакад под технологические трубопроводы.-М г. - прототип). . . Признаки известной свайной опоры, совпадаюЩзяе с признаками заявляемой,, заключаются в наличии сваи-колонны, армированной по длине четырьмя продольными стержнями и соединенным с ними спиральным элементом, закладного элемента в верхней торцевой части сваи-колонны и траверсы, закрепленной на свае колонне Посредством закладного элемента. Причина, препятствующая получению в известном техническом решении требуемого технического результата, заключается в недостаточном армировании сваи-колонны и наличии у нее лишь одного закладного элемента (в торцевЬй части) для крепления траверсы . Это снижает допустимую нагрузку на свайную опору (не более 5-ти тонн), а-выполнение узла сопряжения-траверсы со сваей-колонной (узел сопряжения представляет собой сложную конструкцию) трудоемко и требует значительного расхода металла. Сущность полезной модели. Полезная модель направлена на решение задачи монтажа инженерных коммуникаций на эстагшдах в стесненных условиях строительной площадки в местах интенсивной, прокладки подземных инженерных коммуникаций при повышенных требованиях к несущей способности опоры. Технический результат, который может быть получен при осуществлении полезной модели, заключается в увеличении прочности свайной при условии ее односвайного исполнения, а также в упрощении узла сопряжения сваи-колонны с траверсой. . Данный технический результат.достигается за счет того, что в известной свайной опоре для инженерных коммуникащй, содержащей . сваю-колонну с торцевым закладным элементом, армированную по длине четырьмя продольными стержнями и соединенным с ними спиральным эле . - . . . . ментом, и траверсу, установленную на свае-колонне и закрепленную на ней посредством торцевого закладного элемента, свая-колонна армирована по длине как минимум четырьмя дополнительными продольными стержнями, соединенными со спиральным элементом, -и дополнительно снабжена двумя боковыми закладными элементами, установленными в. верхней части- сваи-колонны На ее боковых противоположных гранях, для крепления траверсы. , - На фиг, 1 приведен общий вид свайной опоры; на фиг. 2 - узел сопряжения сваи-колонны с траверсой; на фиг. 3 - армирование верхней части сваи-колонны (головы сваи); на фиг. 4 - вид lA-A на фиг. 3. Свайная опора содержит сваю-колонну 1 и установленную на ней траверсу 2. Свая-колонна 1 по всей длине армирована четырьмя основными 3 и четырьмя (или б9лее) дополнительными стержнями 4 и соединенным с ними по всей их длине спиральным элементом 5. В верхней части сваи-колонны 1 установлены три закладных элемента - торцевой 6 и боковые 7. Траверса 2 установлена своей средней частью на свае-колонне 1. Траверса 2 непосредственно приварена к закладному / . . элементу б, а с боковыми закладными элементами 7 соединена, посредством укосин 8.: Свайную опору изготавливают следующим образом. В качестве сваи-колонны можно использовать сваю для „ энергетического строи тельства (типовой проект Северо-Западного отделения проектного института Энергосетьпроект,. серия 3.407-115 - Ленинград, 1976 г.), изготовленную в заводских условиях с дополнительными закладными элементами 7 в верхней ее части на боковых противоположных гранях. Свая для энергетического строительства выполнена в виде же,лезобетонного ствола, армированного по длине восемью продольными I -Wff r ffl /. ioMci, PILING. SUPPORT The utility model relates to construction, c. in particular, to the construction of pile supports for the installation of pipe racks and cable lines. The prior art. Known pile support containing two pile columns and a traverse installed on them. Each pile-column is reinforced with four longitudinal rods in length and a spiral element connected to these rods, while the cross-beam is fixed to the column piles by means of end embedded elements located in the upper parts of the pile columns (an album of typical designs and details of buildings and structures of the USSR Gosstroy, 3.015-5 series Pile supports and foundations.for freestanding supports and single-tier overpasses for process pipelines.-E, 1976) ./. A feature that impedes obtaining the required technical result in an analogue is the presence of two pile piles in the construction of a pile support. Supports with two pillars-columns cannot be used in the cramped conditions of a construction site, in places of intensive laying of underground utilities. In addition, the installation of supports with two piles-columns requires significant material costs. Known pile support containing a pile column, reinforced ". ". by lenght . four longitudinal rods and a spiral element connected to them, and a traverse. The traverse is fixed to the pile-column by means of an end embedded element located in the upper T / /Oice part of the pile-column by a chalb of typical designs and details of buildings and. E02D 27/16, Kx E02D 2. J jCJ 27/42, i,. V. . ; .. ; - e ;;. ... ,; Gosstroy of the USSR, series 3.015-5 Pile supports and foundations for freestanding supports and single-tier overpasses for process pipelines. -M. - prototype). . . The signs of the known pile support, which coincides with the features of the claimed one, are the presence of a pile column, reinforced in length with four longitudinal rods and a spiral element connected to them, a embedded element in the upper end part of the pile column and a beam, fixed to the column pile By means of a embedded element . The reason that prevents obtaining the required technical result in a known technical solution is the insufficient reinforcement of the pile-column and the presence of only one embedded element (in the end part) for securing the beam. This reduces the permissible load on the pile support (not more than 5 tons), and the implementation of the interface unit-traverse with the pile-column (the interface unit is a complex structure) is laborious and requires significant metal consumption. The essence of the utility model. The utility model is aimed at solving the problem of installation of engineering communications on scaffolds in the cramped conditions of a construction site in places of intensive laying of underground utilities with increased requirements for the bearing capacity of the support. The technical result that can be obtained by implementing the utility model is to increase the strength of the pile provided that it is single-piled, as well as to simplify the interface between the pile column and the beam. . This technical result. Is achieved due to the fact that in the well-known pile support for engineering communications, containing. pile-column with an end embedded element, reinforced in length by four longitudinal rods and a spiral element connected to them. -. . . . cantilever, and the crosshead mounted on the pile-column and fixed to it by means of the end embedded element, the pile-column is reinforced along the length of at least four additional longitudinal rods connected to the spiral element, and is additionally equipped with two lateral embedded elements installed in. the top of the pile-columns On its opposite sides of the sides, for mounting the beam. , - Fig. 1 shows a general view of a pile support; in FIG. 2 - node pair piles-columns with traverse; in FIG. 3 - reinforcement of the upper part of the pile-columns (pile heads); in FIG. 4 is a view of lA-A in FIG. 3. The pile support contains a pile column 1 and a crosshead installed on it 2. The pile column 1 is reinforced along its entire length with four main 3 and four (or more) additional rods 4 and a spiral element 5 connected to them along their entire length 5. In the upper three embedded elements are installed on the part of the pile-column 1 - end 6 and side 7. The cross-beam 2 is installed with its middle part on the pile-column 1. The cross-beam 2 is directly welded to the mortgage /. . element b, and with the side embedded elements 7 connected by means of jib 8.: Pile support is made as follows. As a pile column, you can use a pile for energy construction (a typical project of the North-Western branch of the Energosetproekt design institute, series 3.407-115 - Leningrad, 1976), manufactured in the factory with additional embedded elements 7 in its upper part on lateral opposite faces. The pile for energy construction is made in the form of a reinforced concrete trunk reinforced with eight longitudinal lengths I -

Ю saj Yu saj

стержнями и соединенным с ними по всей длиЯе спиральным элементом, и снабженного закладным элементом в торцевой части. Сваю-колонну забивают в грунт до проектной отметки. Для забивки свай используют дизель-молоты с весом ударной части не менее 1,.8-2,б тонны. После забивки сваи в грунт на ней устанавливают траверсу 2. Траверсу 2 крепят к свае-колонне 1 посредством торцевого закладного элемента 6 и закладных элементов 7, установленных в верхней части сваи-колонны на ее боковых противоположных гранях, путем устройства узла сопряжения сваи-колонны с траверсой в виде укосин 8. При-небольших нагрузках на свайную опору (до 5 тонн) устройство узла сопряжение необязательно. Траверса крепится к свае-колонне только посредством приварки ее к закладному элементу 6. .rods and connected with them along the entire length of the spiral element, and equipped with a mortgage element in the end part. The pile-column is driven into the ground to the design level. For hammering piles, diesel hammers are used with a weight of the shock of at least 1, .8-2, b tons. After driving the piles into the ground, a traverse 2 is installed on it. The traverse 2 is attached to the pile column 1 by means of an end embedded element 6 and embedded elements 7 installed in the upper part of the pile column on its opposite sides, by means of a unit for interfacing the pile column with traverse in the form of jib 8. When-small loads on the pile support (up to 5 tons), the assembly of the node pairing is optional. The traverse is attached to the pile-column only by welding it to the embedded element 6..

Согласно требованиям СНиП 2. 02. 03-85 был выполнен расчет свай на совместное, действие вертикальных, горизонтальных нагрузок и момента, приложенных к голове сваи. Расчет выполнялся с целью определения максимального горизонтального перемещения головы сваи-колонны иг, максимального изгибающего момента Мизг., действующего на поперечное сечение сваи-колонны и проверки прочности сваи-колонны. Результаты расчета показали, что необходимая прочность свайной опорыAccording to the requirements of SNiP 2. 02. 03-85, the piles were calculated for the combined effect of vertical, horizontal loads and the moment applied to the pile head. The calculation was carried out in order to determine the maximum horizontal movement of the head of the pile-column of yokes, the maximum bending moment Mizg. Acting on the cross section of the pile-column and check the strength of the pile-column. The calculation results showed that the necessary strength of the pile support

.. ..

обеспечивается. Свайная опора воспринимает нагрузку до 35 тонн.provided. Pile support accepts a load of up to 35 tons.

..

Claims (1)

Свайная опора, содержащая сваю-колонну с торцевым закладным элементом, армированную по длине четырьмя продольными стержнями и соединенным с ними спиральным элементом, и траверсу, установленную на свае-колонне и закрепленную на ней посредством торцевого закладного элемента, отличающаяся тем, что свая-колонна армирована по длине как минимум четырьмя дополнительными продольными стержнями, соединенными со спиральным элементом, и снабжена двумя боковыми элементами, установленными в верхней части сваи-колонны на ее боковых противоположных гранях для крепления траверсы.A pile support comprising a pile column with an end embedded element, lengthwise reinforced with four longitudinal rods and a spiral element connected to them, and a crosshead mounted on the pile column and secured to it by an end embedded element, characterized in that the pile column is reinforced along the length of at least four additional longitudinal rods connected to the spiral element, and is equipped with two side elements mounted in the upper part of the pile columns on its opposite sides faces for mounting the beam.
RU94004746/33U 1994-02-11 1994-02-11 Pile support RU941U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU94004746/33U RU941U1 (en) 1994-02-11 1994-02-11 Pile support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU94004746/33U RU941U1 (en) 1994-02-11 1994-02-11 Pile support

Publications (1)

Publication Number Publication Date
RU941U1 true RU941U1 (en) 1995-10-16

Family

ID=48263297

Family Applications (1)

Application Number Title Priority Date Filing Date
RU94004746/33U RU941U1 (en) 1994-02-11 1994-02-11 Pile support

Country Status (1)

Country Link
RU (1) RU941U1 (en)

Similar Documents

Publication Publication Date Title
CN102839675A (en) Long-span pre-stress fish belly sill for foundation pit support and mounting method thereof
CN112982432A (en) Prestressed concrete foundation pit supporting structure and construction method
CN210342375U (en) Concrete laminated slab
KR100776964B1 (en) underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this
RU941U1 (en) Pile support
KR200207380Y1 (en) A column's reinforcing rod for a round pier
CN207739130U (en) A kind of concrete-filled double skin steel tube bridge pier
CN215165648U (en) Vertical bearing device of reverse construction area structure that can retrieve
CN210529716U (en) Adjacent foundation pit soil body supporting construction
CN212248256U (en) Beam type connecting structure of front wall and rear pile combined support
CN210737587U (en) Cantilever type retaining wall structure
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN85108550A (en) Prestressed concrete foundation pile
KR200451731Y1 (en) Concrete Filed Tube
CN217232861U (en) Anti-seismic reinforcing structure of masonry structure wall
CN212772395U (en) Double-row pile and steel inclined strut deep foundation pit supporting structure and deep foundation pit supporting system
CN212561550U (en) Draw and dig basis and expand bottom section supporting construction
CN212053184U (en) Basement bearing structure
CN215926046U (en) Combined assembled plate type foundation
KR102291349B1 (en) High Strength Concrete PreStressed Pile for Construction of Composite and Earth Retaining Wall
CN216006626U (en) Anchor cable shear sleeve
CN220725715U (en) Split-level support assembly climbing frame structure applied to outer wall
CN217537034U (en) CFG shaped steel composite foundation pile
CN210482043U (en) Ultrahigh-toughness concrete anti-seismic bridge tower structure
CN202610807U (en) Horizontal drawing and inclined anchoring type supporting structure for foundation pits