RU34183U1 - Frame of the water bottling workshop - Google Patents
Frame of the water bottling workshop Download PDFInfo
- Publication number
- RU34183U1 RU34183U1 RU2003123950/20U RU2003123950U RU34183U1 RU 34183 U1 RU34183 U1 RU 34183U1 RU 2003123950/20 U RU2003123950/20 U RU 2003123950/20U RU 2003123950 U RU2003123950 U RU 2003123950U RU 34183 U1 RU34183 U1 RU 34183U1
- Authority
- RU
- Russia
- Prior art keywords
- steel
- frame according
- columns
- beams
- crossbars
- Prior art date
Links
Landscapes
- Heat Treatment Of Articles (AREA)
Description
20031239502003123950
КАЦИ.П, KATSI.P,
ШУХАРДИНА.А.SHUKHARDINA.A.
ЖЕРЕБИНВ.Ф БЕКРЕНЁВ Г.Н..ZHEREBINV.F BEKRENYOV G.N ..
Кл. Е 04 В 1/00Cl. E 04 V 1/00
КАРКАС ЦЕХА РОЗЛИВА ВОДЫWATER FILLING SHOP FRAME
Полезная модель относится к строительному комплексу и, в частности, к производству каркасов цехов разлива водыThe utility model relates to a construction complex and, in particular, to the production of frames of water spill shops
Известн каркас цеха розлива воды, включающий взаимосвязанные между собой и смонтированные на основании колонны, балки, ригели, соединения и крепёжные элементы- (см. Политехнический словарь, М., С.Э., 1989 г., с. 46).A well-known frame of the water bottling workshop, including interconnected and mounted on the basis of columns, beams, crossbars, joints and fasteners, is used (see Polytechnical Dictionary, M., S.E., 1989, p. 46).
Известен также каркас цеха розлива воды, включающий взаимосвязанные собой и смонтированные на основании колонны, балки, ригели, соединения и крепёжные элементы- (см. Политехнический словарь М., С.Э., 1989 г., с. 213).The framework of the water bottling workshop is also known, including interconnected and mounted on the basis of columns, beams, crossbars, joints and fasteners - (see Polytechnical Dictionary M., S.E., 1989, p. 213).
Педостатками известных полезных моделей является относительно низкие технологические возможности и высокие энергозатраты.The disadvantages of the known utility models is the relatively low technological capabilities and high energy consumption.
Цель полезной модели - повышение технологических возможностей и снижение энергозатрат.The purpose of the utility model is to increase technological capabilities and reduce energy costs.
Достигается это тем, что колонны выполнены составными по высоте и расположены в плане в виде прямоугольника с выполненным слева закруглённым углом, при этом колонны закруглённого угла смещены друг относительно друга по кривой линии, балка закруглённого угла выполнена многогранной по кривой линии расположения колонн закруглённого угла, а ригели последнего выиолнеиы разновеликими и расположены с наклоном-,|This is achieved by the fact that the columns are made integral in height and are arranged in a plan in the form of a rectangle with a rounded corner made to the left, while the columns of the rounded corner are displaced relative to each other along a curved line, the beam of the rounded corner is made multifaceted along the curve of the location of the columns of the rounded corner, and the crossbars of the last high-altitude line are of different sizes and are located with an inclination,
Целесообразно, чтобы колонны выполнены из листового металла Полезно, чтобы колонны были выполнены из легированной сталиIt is advisable that the columns are made of sheet metal. It is useful that the columns are made of alloy steel
Целесообразно, чтобы колонны были выполнены из конвертерной стали Полезно, чтобы колонны были выполнены из мартеновской стали Целесообразно, чтобы колонны были выполнены из электростали Шлезно, чтобы колонны были выполнены из спокойной стали Целесообразно, чтобы колонны были выполнены из полуспокойной стали Полезно, чтобы колонны были выполнены из кипящей сталиIt is advisable that the columns be made of converter steel. It is advisable that the columns be made of open-hearth steel. It is advisable that the columns be made of electric steel. Shlezno, that the columns are made of mild steel. It is advisable that the columns be made of semi-steel. It is useful that the columns be made boiling steel
Целесообразно, чтобы колонны были выполнены из стали с рафинирующими переплавамиIt is advisable that the columns were made of steel with refining remelts
.ПолезнОу чтобы колонны были выполнены из углеродистой стали Целесообразно, чтобы колонны были выполнены из легированной стали Полезно, чтобы балки и ригеля были выполнены из листового металла Целесообразно, чтобы балки и ригеля были выполнены из легированной стали Полезно, чтобы балки и ригеля были выполнены из конвертерной стали Целесообразно, чтобы балки и ригеля были выполнены из мартеновской стали Полезно, чтобы балки и ригеля были выполнены из электростали Целесообразно, чтобы балки и ригеля были выполнены из спокойной стали Целесообразно, чтобы балки и ригеля были выполнены из полуспокойной стали Полезно, чтобы балки и ригеля были выполнены из кипящей стали Целесообразно, чтобы балки и ригеля были выполнены из стали с рафинирующими переплавамиIt is useful that the columns are made of carbon steel. It is advisable that the columns are made of alloy steel. It is useful that the beams and crossbars are made of sheet metal. It is advisable that the beams and crossbars are made of alloy steel. It is useful that the beams and crossbar are made of converter steel. steel It is advisable that the beams and the crossbar were made of open-hearth steel It is useful that the beams and the crossbar are made of electric steel It is advisable that the beams and the crossbar be made of mild steel Oring to beams and crossbars are made of semi-killed steel is advantageous that the beam and pins were made of steel boiling Advantageously, beams and pins were made of steel with refining remelting
Полезно, чтобы балки и ригеля были выполнены из углеродистой стали Целесообразно, чтобы балки и ригеля были выполнены из легированной стали Полезно, чтобы соединения балок и ригелей были выполнены с симметрично расположенными накладкамиIt is useful that the beams and beams are made of carbon steel It is advisable that the beams and beams are made of alloy steel It is useful that the joints of beams and beams are made with symmetrically located overlays
Целесообразно, чтобы соединения многогранной балки были выполнены с Тобразными накладкамиIt is advisable that the joints of the polyhedral beams are made with T-shaped overlays
Каркас соответствует всем требованиям признаков «полезной модели, а именно:The frame meets all the requirements of the features of the "utility model, namely:
MV:6f 595 U v ак Признаку наличия конструктивного элемента, поскольку колонны расположены в плане в виде прямоугольника признаку наличия связи между элементами, поскольку колонны выполнены слева с закруглённым углом признаку взаимного располоу/сения элементов, посколькуколонны закруглённого угла смещены друг относительно друга по кривой линии, признаку формы выполнения элементов, поскольку балка закруглённого угла выполнена многогранной по кривой линии расположения колонн закруглённого угла, . признаку формы связи элементами, поскольку ригели последнего выполнены разновеликими признаку параметров и их взаимосвязи, поскольку ригели последнего выполнены расположеными с наклоном признаку МИЛ я, из которого выполнен элемент, поскольку колонны были выполнены из легированной стали На фиг. 1 изображена схема каркаса цеха разлива воды, вид в прямоугольной онометрии на фиг, 2 - то же , вид сверху на фиг. 3 -то же,, схема закруглённого угла, вид сверху, на фиг. 4- то же, схема правого угла, вид сверху, на фиг. 5 - то же, разрез А-А на фиг. 3, на фиг. 6 - то же, разрез Г-Г на фиг. 3 Каркас цеха разлива воды включает взаимосвязанные между собой и смонтированные на основании колонны 1, балки 2, ригели 3, соединения 4 и крепёжные элементы 5-, при этом колонны 1 выполнены составными по высоте и расположены в плане в виде прямоугольника 6 с выполненным слева закруглённым углом 7, при этом колонны 1 закруглённого 1/гла 7 смещены друг относительно друга по кривой линии 8, балка 2 закруглённого угла 7 выполнена многогранной по кривой линии расположения колонн 1 закруглённого угла, а я л у,: С MV: 6f 595 U v ak The sign of the presence of a structural element, since the columns are arranged in a plan in the form of a rectangle, the sign of the relationship between the elements, since the columns are made on the left with a rounded corner, they indicate the relative position of the elements, since the columns of the rounded corner are displaced relative to each other along a curved line , to the sign of the form of execution of the elements, since the beam of the rounded corner is made polyhedral along the curve of the arrangement of columns of the rounded corner,. to the sign of the form of communication with the elements, since the crossbars of the latter are made different to the characteristic of the parameters and their relationship, since the crossbars of the latter are made inclined to the sign of the MIL I of which the element is made, since the columns were made of alloy steel. FIG. 1 shows a diagram of the frame of a water spill workshop, a view in rectangular onometry in FIG. 2 is the same, a top view in FIG. 3 is the same, rounded corner diagram, top view, in FIG. 4- same, diagram of the right corner, top view, in FIG. 5 is the same, section AA in FIG. 3, in FIG. 6 is the same, section GG in FIG. 3 The frame of the water bottling workshop includes columns 1, beams 2, crossbars 3, connections 4 and fasteners 5- interconnected and mounted on the base, while columns 1 are made height-height and arranged in a plan in the form of a rectangle 6 with a rounded left corner angle 7, while columns 1 rounded 1 / gl 7 are offset relative to each other along a curved line 8, beam 2 of a rounded corner 7 is made polyhedral along a curved line of arrangement of columns 1 of a rounded corner, and I have: C
.oiQCd yso.oiQCd yso
ригели 3 последнего выполнены разновеликими и расположены с наклоном, причём колонны 1 выполнены из листового металла, из легированной стали, или из конвертерной стали, или из мартеновской стали, или из электростали, или из «СПОКОЙНОЙ стали, или из полуспокойной стали, или из кипящей стали, или из стали с рафинирующими переплавами, или из углеродистой стали, или ,из легированной стали, балки 2 и ригеля 3 выполнены из листового металла, из легированной стали, или из конвертерной стали, или из мартеновской стали, или из электростали, или из спокойной стали, или из полуспокойной стали, или из кипящей стали, или из стали с рафинирующими переплавами, или из углеродистой стали, из легированной стали, а соединения 4 балок 2 и ригелей 3 выполнены с симметрично расположенными накладками 9, или с Т-образными накладками 10the crossbars 3 of the latter are made of different sizes and are inclined, and the columns 1 are made of sheet metal, alloy steel, or of converter steel, or of open-hearth steel, or of electric steel, or of “QUIET steel, or of semi-quiet steel, or of boiling steel, or from steel with refining remelting, or from carbon steel, or from alloy steel, beams 2 and crossbar 3 are made of sheet metal, alloy steel, or converter steel, or open-hearth steel, or electric steel, or calm steel, or from semi-quiet steel, or from boiling steel, or from steel with refining remelts, or from carbon steel, from alloy steel, and the joints of 4 beams 2 and crossbars 3 are made with symmetrically located plates 9, or with T-shaped plates 10
Работакаркакса осуществляется следующим образом:The work of the park is as follows:
Вначале подготавливают к работе взаимосвязанные между собой и смонтированные на основании колонны 1, балки 2, ригели 3, соединения 4 и крепёжные элементы 5-, при этом колонны 1 выполняют составными по высоте и располагают в плане в виде прямоугольника 6 с выполнением слева закруглённым углом 7, при этом колонны 1 закруглённого угла 7 смещают друг относительно друга по кривой линии 8, балку 2 закруглённого угла 7 выполняют многогранной по кривой линии расположения колонн 1 закруглённого угла, а ригели 3 последнего выполняют разновеликими и располагают с наклоном, причём колонны 1 выполняют из листового металла, из легированной стали, или из конвертерной стали, или из мартеновской стали, или из электростали, или из спокойной стали, или из полуспокойной стали, или из кипящей стали, или из стали с рафинирующими переплавами, или из углеродистой стали, или ,из легированной стали, балки 2 и ригеля 3 выполняют из листового металла, из легированной стали, или из конвертерной стали, или из мартеновской стали, илииз эАектростали, или из спокойной стали, или из полуспокойной стали, или из кипящей стали, или из стали с рафинирующими переплавами, или из углеродистой стали, из легированнойFirst, interconnected and mounted on the base of the column 1, the beam 2, the crossbars 3, the joints 4 and the fasteners 5- are prepared for work, while the columns 1 are made integral in height and arranged in a plan in the form of a rectangle 6 with a rounded corner 7 on the left in this case, the columns 1 of the rounded corner 7 are displaced relative to each other along the curved line 8, the beam 2 of the rounded corner 7 is made polyhedral along the curved line of the location of the columns 1 of the rounded corner, and the crossbars 3 of the latter are made different and split they are inclined, and columns 1 are made of sheet metal, alloy steel, or of converter steel, or of open-hearth steel, or of electric steel, or of mild steel, or of semi-quiet steel, or of boiling steel, or of steel with refining remelting, or of carbon steel, or of alloy steel, beam 2 and crossbar 3 are made of sheet metal, alloy steel, or of converter steel, or of open-hearth steel, or of eEktrostal, or of mild steel, or of semi-quiet steel, or from boiling hundred whether or from steel with refining remelting, or from carbon steel, from alloyed
стали, а соединения 4 балок 2 и ригелей 3 выполняют с симметрично расположенными накладками 9, или с Т-образными накладками 10, затем к работе подключают все узлы и цикл повторяют.steel, and the connections of 4 beams 2 and crossbars 3 are performed with symmetrically located plates 9, or with T-shaped plates 10, then all nodes are connected to the work and the cycle is repeated.
июз-гл-зд оyuz-hl-zd
Claims (25)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2003123950/20U RU34183U1 (en) | 2003-08-06 | 2003-08-06 | Frame of the water bottling workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2003123950/20U RU34183U1 (en) | 2003-08-06 | 2003-08-06 | Frame of the water bottling workshop |
Publications (1)
Publication Number | Publication Date |
---|---|
RU34183U1 true RU34183U1 (en) | 2003-11-27 |
Family
ID=38314567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2003123950/20U RU34183U1 (en) | 2003-08-06 | 2003-08-06 | Frame of the water bottling workshop |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU34183U1 (en) |
-
2003
- 2003-08-06 RU RU2003123950/20U patent/RU34183U1/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU34183U1 (en) | Frame of the water bottling workshop | |
JP4229713B2 (en) | Solar array | |
CN205463755U (en) | Simple and easy hydraulic pressure steel sheet bender | |
CN206014261U (en) | A kind of steel crane beam flatness adjustment equipment | |
CN207827812U (en) | A kind of bridge mobile hoisting holder | |
CN105649204A (en) | Aluminum alloy sunlight room | |
CN114086594B (en) | Support welding tool for offshore wind power jacket | |
CN212000656U (en) | Construction device for river-crossing special-shaped steel bridge | |
CN222455814U (en) | Cross-canal suspension type liftable mobile working platform | |
CN211840797U (en) | Device for overturning vehicle body framework | |
RU34182U1 (en) | The frame of the fitness center | |
CN208702146U (en) | Adjustable template fixture for cast-in-place concrete column | |
CN101772998B (en) | Ground level levelling instrument | |
CN211490174U (en) | H-shaped steel welding device | |
CN217169021U (en) | Prefabricated box girder inner box bottom plate tooth block prestress tensioning support | |
CN111774803A (en) | Mail steamer sheet metal upset frock | |
CN214303040U (en) | Hexagonal pavilion landscape device | |
CN208866638U (en) | Public bus floor endpiece matrix tablet beam welding tooling | |
CN217054528U (en) | Connecting structure of major diameter view ring and steel structure bridge | |
CN216786786U (en) | Construction device for steel box girder structure of upper span subway | |
CN215048235U (en) | Balance arm with hanging type walking platform | |
CN212714528U (en) | Self-anchored bracket construction platform suitable for supporting of bridge crane supporting legs | |
CN210413288U (en) | Manufacturing platform for main beam of bridge girder erection machine | |
CN218562978U (en) | Hanging basket connection structure is assembled in high altitude to hexagonal rhombus truss | |
CN212613842U (en) | Simple adjustable type fixing and correcting device for steel structure installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM1K | Utility model has become invalid (non-payment of fees) |
Effective date: 20060807 |
|
NF1K | Reinstatement of utility model |
Effective date: 20080127 |
|
PC1K | Assignment of utility model |
Effective date: 20080617 |
|
RH1K | Copy of utility model granted that was duplicated for the russian federation |
Effective date: 20080829 |
|
MM1K | Utility model has become invalid (non-payment of fees) |
Effective date: 20100807 |