RU2010132224A - Способ и устройство для бурения и заканчивания при программируемом давлении и программируемом градиенте давления - Google Patents
Способ и устройство для бурения и заканчивания при программируемом давлении и программируемом градиенте давления Download PDFInfo
- Publication number
- RU2010132224A RU2010132224A RU2010132224/03A RU2010132224A RU2010132224A RU 2010132224 A RU2010132224 A RU 2010132224A RU 2010132224/03 A RU2010132224/03 A RU 2010132224/03A RU 2010132224 A RU2010132224 A RU 2010132224A RU 2010132224 A RU2010132224 A RU 2010132224A
- Authority
- RU
- Russia
- Prior art keywords
- pressure
- wellbore
- seal
- zone
- pressure zone
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 35
- 238000005553 drilling Methods 0.000 claims abstract 20
- 238000002955 isolation Methods 0.000 claims abstract 4
- 238000009434 installation Methods 0.000 claims abstract 3
- 239000011248 coating agent Substances 0.000 claims abstract 2
- 238000000576 coating method Methods 0.000 claims abstract 2
- 238000012544 monitoring process Methods 0.000 claims abstract 2
- 239000000565 sealant Substances 0.000 claims abstract 2
- 230000000087 stabilizing effect Effects 0.000 claims abstract 2
- 239000012530 fluid Substances 0.000 claims 5
- 230000015572 biosynthetic process Effects 0.000 claims 3
- 230000005540 biological transmission Effects 0.000 claims 1
- 238000005520 cutting process Methods 0.000 claims 1
- 230000005284 excitation Effects 0.000 claims 1
- 230000035699 permeability Effects 0.000 claims 1
- 238000005086 pumping Methods 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 claims 1
- 238000007789 sealing Methods 0.000 claims 1
- 239000003566 sealing material Substances 0.000 claims 1
- 238000004804 winding Methods 0.000 claims 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
1. Способ бурения при программируемом давлении, содержащий следующие стадии: ! изоляция кольцевого пространства с созданием первой зоны давления и второй зоны давления в стволе скважины; ! определение давления в первой зоне давления и во второй зоне давления; ! регулировка перепада давления между первой и второй зонами давления для получения конкретного градиента давления; и !бурение в первой зоне давления в стволе скважины с динамической регулировкой давления в первой зоне давления. ! 2. Способ по п.1, дополнительно содержащий упрочнение первой зоны давления в стволе скважины во время бурения. ! 3. Способ по п.1, дополнительно содержащий уравнивание давления в первой зоне давления с давлением во второй зоне давления. ! 4. Способ по п.1, дополнительно содержащий продолжение бурения в первой зоне давления после уравнивания давления и установку уплотнения в другой точке в стволе скважины. ! 5. Способ по п.2, дополнительно содержащий гидравлическую изоляцию первой зоны давления. ! 6. Способ по п.2, в котором этап упрочнения содержит один из следующих выбранных способов стабилизирования первой зоны давления: покрытие ствола скважины герметиком; развертывание втулки, цементирование обсадной колонны по месту установки, расширение расширяющегося трубного элемента, спуск и развертывание плотно прилегающих непрерывных полос или формирование гравийного фильтра. ! 7. Способ по п.1, дополнительно содержащий непрерывный мониторинг пластового давления и глубины в первой зоне давления с созданием потенциального профиля потока в пробуренной скважине. ! 8. Способ по п.1, дополнительно содержащий модулирование давления в первой з
Claims (32)
1. Способ бурения при программируемом давлении, содержащий следующие стадии:
изоляция кольцевого пространства с созданием первой зоны давления и второй зоны давления в стволе скважины;
определение давления в первой зоне давления и во второй зоне давления;
регулировка перепада давления между первой и второй зонами давления для получения конкретного градиента давления; и
бурение в первой зоне давления в стволе скважины с динамической регулировкой давления в первой зоне давления.
2. Способ по п.1, дополнительно содержащий упрочнение первой зоны давления в стволе скважины во время бурения.
3. Способ по п.1, дополнительно содержащий уравнивание давления в первой зоне давления с давлением во второй зоне давления.
4. Способ по п.1, дополнительно содержащий продолжение бурения в первой зоне давления после уравнивания давления и установку уплотнения в другой точке в стволе скважины.
5. Способ по п.2, дополнительно содержащий гидравлическую изоляцию первой зоны давления.
6. Способ по п.2, в котором этап упрочнения содержит один из следующих выбранных способов стабилизирования первой зоны давления: покрытие ствола скважины герметиком; развертывание втулки, цементирование обсадной колонны по месту установки, расширение расширяющегося трубного элемента, спуск и развертывание плотно прилегающих непрерывных полос или формирование гравийного фильтра.
7. Способ по п.1, дополнительно содержащий непрерывный мониторинг пластового давления и глубины в первой зоне давления с созданием потенциального профиля потока в пробуренной скважине.
8. Способ по п.1, дополнительно содержащий модулирование давления в первой зоне давления и измерение потенциального профиля потока для определения пластового давления и проницаемости.
9. Способ по п.1, дополнительно содержащий непрерывное возбуждение пласта ультразвуковой энергией и измерение скорости звука в пласте при модулировании давления в первой зоне давления с определением характеристик пласта без гидроразрыва первой зоны давления.
10. Способ по п.1, дополнительно содержащий динамическую передачу скважинной информации во время бурения из первой зоны давления на поверхность и прием сигналов управления с поверхности.
11. Способ по п.10, в котором скважинную информацию передают через кабелированную бурильную трубу.
12. Способ по п.1, дополнительно содержащий определение потенциала продуктивности каждой зоны давления в скважине во время бурения в первой зоне давления.
13. Способ по п.1, дополнительно содержащий управление направлением бурового долота в первой зоне давления с использованием информации, определенной блоком управления, связанным с одним или несколькими датчиками, размещенными в первой зоне давления.
14. Способ бурения ствола скважины при программируемом давлении, содержащий следующие стадии:
размещение кольцевого уплотнения вблизи дальнего конца бурильной трубы, оборудованной компоновкой низа бурильной колонны, обеспечивающего непрерывное перемещение бурильной трубы;
ввод кольцевого уплотнения в контакт со стволом скважины для создания переменного давления в кольцевом пространстве, примыкающем к компоновке низа бурильной колонны под уплотнением в стволе скважины;
бурение ствола скважины с использованием компоновки низа бурильной колонны с поддержанием кольцевого уплотнения; и
поддержание давления в стволе скважины с дальней стороны уплотнения во время бурения ствола при перепаде давления относительно давления с ближней стороны уплотнения.
15. Способ по п.14, дополнительно содержащий удаление бурового раствора и выбуренной породы через уплотнение без высвобождения уплотнения.
16. Способ по п.14, в котором давление в стволе скважины ниже давления в кольцевом пространстве с противоположной стороны кольцевого уплотнения.
17. Способ регулирования давления текучей среды в бурящемся стволе скважины, содержащий следующие стадии:
установка перемещающегося уплотнения ствола скважины между бурильной трубой и поверхностью ствола скважины вблизи нижнего конца бурильной колонны;
определение первого давления текучей среды на поверхности призабойной зоны скважины и второго давления в кольцевом пространстве между стволом скважины и бурильной колонной с противоположной стороны уплотнения ствола скважины;
регулировка давления на поверхности призабойной зоны скважины прокачкой текучей среды от поверхности призабойной зоны скважины через уплотнение ствола скважины в кольцевое пространство во время бурения;
перемещение уплотнения ствола скважины по ходу бурения на поверхности призабойной зоны скважины.
18. Способ по п.17, в котором перемещаемое уплотнение осуществляется приведением в действие скважинного трактора.
19. Способ по п.17, в котором перемещаемое уплотнение осуществляется перемещением винта.
20. Способ по п.17, дополнительно содержащий размещение уплотнения ствола скважины на поверхности призабойной зоны скважины.
21. Способ по п.17, в котором уплотнение ствола скважины является втулкой.
22. Способ по п.17, в котором уплотнение ствола скважины является уплотняющим материалом, взаимодействующим с поверхностью ствола скважины.
23. Способ по п.17, в котором уплотнение ствола скважины является расширяющейся обсадной колонной.
24. Способ по п.17, в котором уплотнение ствола скважины является плотно прилегающей полосой.
25. Устройство для бурения при програмируемом давлении, содержащее бурильную компоновку, соединяющуюся с дальним концом бурильной колонны, первый датчик давления, размещенный вблизи бурильной компоновки, уплотнение избирательного ввода в контакт для изоляции дальнего конца бурильной колонны от кольцевого пространства, образованного между бурильной колонной и соседней кольцевой стенкой, при этом уплотнение способно перемещаться с продвижением вперед бурильной компоновки, второй датчик давления, размещенный с противоположной стороны уплотнения для сравнительного измерения перепада давления между дальним концом бурильной компоновки и кольцевым пространством, и, по меньшей мере, один насос для удаления текучей среды из области вблизи дальнего конца бурильной компоновки через уплотнение в кольцевое пространство.
26. Устройство по п.25, дополнительно содержащее уплотнение, упрочняющее пласт.
27. Устройство по п.25, в котором уплотнение является втулкой.
28. Устройство по п.25, в котором соседняя кольцевая стенка является стволом скважины.
29. Устройство по п.25, в котором соседняя кольцевая стенка является обсадной колонной.
30. Устройство по п.25, в котором уплотнение является плотно прилегающей спиральной обмоткой.
31. Устройство по п.27, в котором ближний конец втулки скреплен с обсадной колонной перед развертыванием в пласте.
32. Устройство по п.25, которое представляет собой буровое долото с обратной промывкой и центральным выпуском и расширитель.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/968,010 | 2007-12-31 | ||
US11/968,010 US7775299B2 (en) | 2007-04-26 | 2007-12-31 | Method and apparatus for programmable pressure drilling and programmable gradient drilling, and completion |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2010132224A true RU2010132224A (ru) | 2012-02-10 |
RU2455453C2 RU2455453C2 (ru) | 2012-07-10 |
Family
ID=40856006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2010132224/03A RU2455453C2 (ru) | 2007-12-31 | 2008-12-29 | Способ и устройство для бурения и заканчивания при программируемом давлении и программируемом градиенте давления |
Country Status (7)
Country | Link |
---|---|
US (1) | US7775299B2 (ru) |
EP (1) | EP2268890B1 (ru) |
JP (1) | JP5325233B2 (ru) |
CN (1) | CN102007264B (ru) |
CA (1) | CA2711192C (ru) |
RU (1) | RU2455453C2 (ru) |
WO (1) | WO2009088825A2 (ru) |
Families Citing this family (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8579047B2 (en) * | 2008-07-11 | 2013-11-12 | Norman DeVerne Houston | Downhole reservoir effluent column pressure restraining apparatus and methods |
US9089928B2 (en) | 2008-08-20 | 2015-07-28 | Foro Energy, Inc. | Laser systems and methods for the removal of structures |
US20120067643A1 (en) * | 2008-08-20 | 2012-03-22 | Dewitt Ron A | Two-phase isolation methods and systems for controlled drilling |
US9664012B2 (en) | 2008-08-20 | 2017-05-30 | Foro Energy, Inc. | High power laser decomissioning of multistring and damaged wells |
US9669492B2 (en) | 2008-08-20 | 2017-06-06 | Foro Energy, Inc. | High power laser offshore decommissioning tool, system and methods of use |
US8025108B2 (en) * | 2008-09-04 | 2011-09-27 | New Era Petroleum, Llc. | Subterranean methods of processing hydrocarbon fluid-containing deposits and hydrocarbon recovery arrangements for recovering hydrocarbon-containing fluid from hydrocarbon-containing deposits |
US8453760B2 (en) * | 2009-08-25 | 2013-06-04 | Baker Hughes Incorporated | Method and apparatus for controlling bottomhole temperature in deviated wells |
US20120211228A1 (en) * | 2009-08-31 | 2012-08-23 | Troshko Andrey A | Artificial Lift Modeling Methods and Systems |
US8680704B1 (en) * | 2009-09-18 | 2014-03-25 | Taylor Valve Technology, Inc. | Wellhead pressure reduction and electrical power generation |
US10267092B2 (en) | 2009-10-05 | 2019-04-23 | Halliburton Energy Services, Inc. | Single-assembly system and method for one-trip drilling, casing, cementing and perforating |
US8887838B2 (en) * | 2010-02-05 | 2014-11-18 | Baker Hughes Incorporated | Cutting element and method of orienting |
US8997899B2 (en) | 2010-02-05 | 2015-04-07 | Baker Hughes Incorporated | Cutting element, cutter tool and method of cutting within a borehole |
WO2011119675A1 (en) * | 2010-03-23 | 2011-09-29 | Halliburton Energy Services Inc. | Apparatus and method for well operations |
RU2465452C1 (ru) * | 2011-04-01 | 2012-10-27 | Государственное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" | Способ регулирования технологических параметров бурения скважин и компоновка низа бурильной колонны для осуществления способа |
BR112014000754A2 (pt) | 2011-07-12 | 2017-02-14 | Halliburton Energy Services Inc | rastreamento de fluidos injetados em ressonância magnética nuclear (rmn) |
US8973676B2 (en) | 2011-07-28 | 2015-03-10 | Baker Hughes Incorporated | Active equivalent circulating density control with real-time data connection |
US20130049983A1 (en) | 2011-08-26 | 2013-02-28 | John Rasmus | Method for calibrating a hydraulic model |
US9228430B2 (en) | 2011-08-26 | 2016-01-05 | Schlumberger Technology Corporation | Methods for evaluating cuttings density while drilling |
US9394783B2 (en) | 2011-08-26 | 2016-07-19 | Schlumberger Technology Corporation | Methods for evaluating inflow and outflow in a subterranean wellbore |
NO338637B1 (no) * | 2011-08-31 | 2016-09-26 | Reelwell As | Trykkregulering ved bruk av fluid på oversiden av et stempel |
US9091121B2 (en) * | 2011-12-23 | 2015-07-28 | Saudi Arabian Oil Company | Inflatable packer element for use with a drill bit sub |
US9115559B2 (en) * | 2012-03-21 | 2015-08-25 | Saudi Arabian Oil Company | Inflatable collar and downhole method for moving a coiled tubing string |
US9022113B2 (en) * | 2012-05-09 | 2015-05-05 | Baker Hughes Incorporated | One trip casing or liner directional drilling with expansion and cementing |
AU2012382062B2 (en) * | 2012-06-05 | 2016-07-21 | Halliburton Energy Services, Inc. | Methods and systems for performance of subterranean operations using dual string pipes |
MY176955A (en) | 2012-12-28 | 2020-08-27 | Halliburton Energy Services Inc | Expanded mud pulse telemetry |
RU2622280C2 (ru) | 2013-02-21 | 2017-06-13 | Хэллибертон Энерджи Сервисиз, Инк. | Системы и способы оптимизации создания скважины в сланцевой формации |
WO2014194210A1 (en) * | 2013-05-31 | 2014-12-04 | Halliburton Energy Services, Inc. | Well monitoring, sensing, control, and mud logging on dual gradient drilling |
RU2644172C2 (ru) * | 2013-07-31 | 2018-02-08 | Хэллибертон Энерджи Сервисиз, Инк. | Инструмент для очистки основного ствола скважины |
WO2015094367A1 (en) * | 2013-12-20 | 2015-06-25 | Halliburton Energy Services Inc. | Dynamic determination of a single equivalent circulating density ("ecd") using multiple ecds along a wellbore |
RU2550117C1 (ru) * | 2013-12-24 | 2015-05-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" | Способ регулирования условий процесса бурения скважины и компоновка низа буровой колонны для его осуществления |
EP2947259A1 (en) * | 2014-05-19 | 2015-11-25 | Welltec A/S | Downhole string for drilling through a low pressure zone |
US9663992B2 (en) * | 2014-08-26 | 2017-05-30 | Baker Hughes Incorporated | Downhole motor for extended reach applications |
EP3283727B1 (en) * | 2015-04-14 | 2020-01-08 | BP Corporation North America Inc. | System and method for drilling using pore pressure |
CN106156389A (zh) * | 2015-04-17 | 2016-11-23 | 普拉德研究及开发股份有限公司 | 用于自动执行的井规划 |
RU2598268C1 (ru) * | 2015-10-13 | 2016-09-20 | Федеральное государственное бюджетное учреждение науки Институт Земной коры Сибирского отделения Российской академии наук | Способ первичного вскрытия сложного кавернозно-трещинного карбонатного нефтегазонасыщенного пласта горизонтальным стволом большой протяженности |
US10260331B2 (en) * | 2016-11-03 | 2019-04-16 | Nabors Drilling Technologies Usa, Inc. | Autodrilling control with annulus pressure modification of differential pressure |
JP6786069B2 (ja) | 2017-01-26 | 2020-11-18 | 国立大学法人 東京大学 | 坑井掘削用ビット及びそれを用いた坑井掘削方法 |
CN106837239B (zh) * | 2017-02-28 | 2023-01-13 | 中国海洋石油总公司 | 一种旋转尾管固井用液压推靠式橡胶密封水泥头 |
CN109723402A (zh) * | 2017-10-30 | 2019-05-07 | 中国石油天然气股份有限公司 | 一种套管控压固井工艺 |
CN110374528B (zh) * | 2019-07-29 | 2023-09-29 | 中海石油(中国)有限公司湛江分公司 | 一种深水钻井中降低ecd钻井液喷射装置 |
EP3816394B1 (en) * | 2019-10-30 | 2023-11-29 | L&T Mining Solutions Oy | A method and a drill bit for sealing a blasthole wall |
WO2021203643A1 (zh) * | 2020-04-06 | 2021-10-14 | 中国石油化工股份有限公司 | 用于气体反循环钻井的分流装置 |
CN111622697B (zh) * | 2020-06-01 | 2021-12-07 | 西南石油大学 | 一种深海双层管井底三通道压力控制系统及控制方法 |
CN114169558B (zh) * | 2020-09-11 | 2024-10-15 | 中国石油化工股份有限公司 | 一种用于预测钻井井涌风险的方法及系统 |
EP4359643A1 (en) * | 2021-06-22 | 2024-05-01 | Services Pétroliers Schlumberger | Processes for injection of fluids into a wellbore via drill pipe |
US11725473B2 (en) | 2022-01-03 | 2023-08-15 | Saudi Arabian Oil Company | System and method for protecting a packer during deployment |
US12134949B2 (en) | 2022-12-21 | 2024-11-05 | Schlumberger Technology Corporation | Processes for injection of fluids into a wellbore |
US12110749B1 (en) | 2023-03-21 | 2024-10-08 | Saudi Arabian Oil Company | Wellbore tractor with inverted toroid |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4630691A (en) * | 1983-05-19 | 1986-12-23 | Hooper David W | Annulus bypass peripheral nozzle jet pump pressure differential drilling tool and method for well drilling |
JP2849416B2 (ja) * | 1989-11-20 | 1999-01-20 | 応用地質株式会社 | ボーリング孔内への圧力可変式注水装置 |
CA2155918C (en) * | 1994-08-15 | 2001-10-09 | Roger Lynn Schultz | Integrated well drilling and evaluation |
DE69629901T2 (de) * | 1995-03-31 | 2004-07-22 | Baker-Hughes Inc., Houston | Vorrichtung und verfahren zum isolieren und testen einer formation |
US5954137A (en) | 1995-11-09 | 1999-09-21 | Baker Hughes Incorporated | Apparatus and method for avoiding formation impairment during completion of wellbores |
AUPN703195A0 (en) * | 1995-12-08 | 1996-01-04 | Bhp Australia Coal Pty Ltd | Fluid drilling system |
US5873420A (en) | 1997-05-27 | 1999-02-23 | Gearhart; Marvin | Air and mud control system for underbalanced drilling |
US6923273B2 (en) * | 1997-10-27 | 2005-08-02 | Halliburton Energy Services, Inc. | Well system |
US6367566B1 (en) * | 1998-02-20 | 2002-04-09 | Gilman A. Hill | Down hole, hydrodynamic well control, blowout prevention |
US7096975B2 (en) * | 1998-07-15 | 2006-08-29 | Baker Hughes Incorporated | Modular design for downhole ECD-management devices and related methods |
US8011450B2 (en) * | 1998-07-15 | 2011-09-06 | Baker Hughes Incorporated | Active bottomhole pressure control with liner drilling and completion systems |
US6530437B2 (en) * | 2000-06-08 | 2003-03-11 | Maurer Technology Incorporated | Multi-gradient drilling method and system |
US6575244B2 (en) * | 2001-07-31 | 2003-06-10 | M-I L.L.C. | System for controlling the operating pressures within a subterranean borehole |
US6877571B2 (en) * | 2001-09-04 | 2005-04-12 | Sunstone Corporation | Down hole drilling assembly with independent jet pump |
BRPI0212667B1 (pt) * | 2001-09-20 | 2016-06-14 | Baker Hughes Inc | sistema de perfuração e método para perfurar um furo de poço |
US6732804B2 (en) | 2002-05-23 | 2004-05-11 | Weatherford/Lamb, Inc. | Dynamic mudcap drilling and well control system |
US6957698B2 (en) * | 2002-09-20 | 2005-10-25 | Baker Hughes Incorporated | Downhole activatable annular seal assembly |
US7086481B2 (en) | 2002-10-11 | 2006-08-08 | Weatherford/Lamb | Wellbore isolation apparatus, and method for tripping pipe during underbalanced drilling |
RU2229586C1 (ru) * | 2002-10-17 | 2004-05-27 | Шарифов Махир Зафар-оглы | Регулятор-отсекатель шарифова |
JP4017111B2 (ja) * | 2003-04-04 | 2007-12-05 | 株式会社熊谷組 | 大深度ボーリング孔内計測装置の設置方法 |
WO2006032663A1 (en) * | 2004-09-22 | 2006-03-30 | Shell Internationale Research Maatschappij B.V. | Method of drilling a lossy formation |
US7836973B2 (en) * | 2005-10-20 | 2010-11-23 | Weatherford/Lamb, Inc. | Annulus pressure control drilling systems and methods |
US8151904B2 (en) * | 2006-06-30 | 2012-04-10 | Baker Hughes Incorporated | Method for improved well control with a downhole device |
-
2007
- 2007-12-31 US US11/968,010 patent/US7775299B2/en not_active Expired - Fee Related
-
2008
- 2008-12-29 JP JP2010541509A patent/JP5325233B2/ja not_active Expired - Fee Related
- 2008-12-29 WO PCT/US2008/088427 patent/WO2009088825A2/en active Application Filing
- 2008-12-29 CN CN200880127729.8A patent/CN102007264B/zh not_active Expired - Fee Related
- 2008-12-29 RU RU2010132224/03A patent/RU2455453C2/ru not_active IP Right Cessation
- 2008-12-29 EP EP08869978.0A patent/EP2268890B1/en not_active Not-in-force
- 2008-12-29 CA CA2711192A patent/CA2711192C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CA2711192A1 (en) | 2009-07-09 |
CN102007264B (zh) | 2014-01-29 |
EP2268890B1 (en) | 2014-07-16 |
US7775299B2 (en) | 2010-08-17 |
JP2011508125A (ja) | 2011-03-10 |
JP5325233B2 (ja) | 2013-10-23 |
CN102007264A (zh) | 2011-04-06 |
US20080264690A1 (en) | 2008-10-30 |
RU2455453C2 (ru) | 2012-07-10 |
WO2009088825A3 (en) | 2009-10-08 |
WO2009088825A2 (en) | 2009-07-16 |
EP2268890A2 (en) | 2011-01-05 |
CA2711192C (en) | 2013-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2010132224A (ru) | Способ и устройство для бурения и заканчивания при программируемом давлении и программируемом градиенте давления | |
DK181053B1 (en) | Packer sealing element with non-swelling layer | |
AU2011318325B2 (en) | Remotely controllable fluid flow control assembly | |
US6994170B2 (en) | Expandable sand control screen assembly having fluid flow control capabilities and method for use of same | |
CN101929335B (zh) | 地层流体的集中取样 | |
RU2010127299A (ru) | Способ и система для гидроразрыва подземных пластов во время их бурения | |
EP3768938B1 (en) | Multi-zone well testing | |
EP1898044A3 (en) | Annulus pressure control drilling systems and methods | |
EA200101263A1 (ru) | Способ создания ствола скважины | |
CA2517883A1 (en) | Full bore lined wellbores | |
CA2640150C (en) | System and method for fracturing while drilling | |
US9605517B2 (en) | Wellbore assembly for injecting a fluid into a subsurface formation, and method of injecting fluids into a subsurface formation | |
CA2880638A1 (en) | Remedial technique for maintaining well casing | |
US11098547B2 (en) | Freeing stuck tubulars in wellbores | |
US20180155988A1 (en) | Method of drilling a borehole in an earth formation | |
CA2849516C (en) | Well completion method to allow dual monitoring of reservoir saturation and pressure | |
RU2520033C1 (ru) | Способ строительства горизонтальной нефтедобывающей скважины | |
RU2410532C1 (ru) | Способ свабирования скважины | |
US20160369603A1 (en) | Redressing method and redressed completion system | |
EP3106605A1 (en) | Redressing method and redressed completion system | |
GB2592811A (en) | Method of gravel packing open holes | |
Bybee | Expandable Tubulars Facilitate Improved Well Stimulation and Production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20171230 |