Method for mining of boundary ore resources in opencast flank zones

Info

Publication number
RU1786259C
RU1786259C SU914898579A SU4898579A RU1786259C RU 1786259 C RU1786259 C RU 1786259C SU 914898579 A SU914898579 A SU 914898579A SU 4898579 A SU4898579 A SU 4898579A RU 1786259 C RU1786259 C RU 1786259C
Authority
RU
Russia
Prior art keywords
ore
mining
quarry
carried out
transport
Prior art date
Application number
SU914898579A
Other languages
Russian (ru)
Inventor
Алексей Александрович Чижов
Original Assignee
Институт горного дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела filed Critical Институт горного дела
Priority to SU914898579A priority Critical patent/RU1786259C/en
Application granted granted Critical
Publication of RU1786259C publication Critical patent/RU1786259C/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Изобретение может быть использовано при отработке законтурных запасов карьера . Цель - снижение затрат на обеспечение транспортной св зи между горизонтами карьера при сохранении ее во врем  отработки уступа. С рабочей площадки карьера проход т подземные подготовительно-нарезные выработки. Выемку законтурных запасов полезного ископаемого осуществл ют открытыми камерами с формированием закладочного массива. Отработку камер ведут част ми. Каждую часть камеры закладывают твердеющей смесью после ее отработки . Отработку последующей части начинают после набора прочности закладочного массива в предыдущей части (слое). Перемещение транспорта по уступу осуществл ют в процессе отработки камеры. 7 ил.The invention can be used in the development of contour reserves of the quarry. The goal is to reduce the cost of providing transport links between the horizons of the quarry while maintaining it during mining of the ledge. Underground pit mines run from the quarry site. The extraction of mineral reserves is carried out using open chambers with the formation of a filling array. Testing of the chambers is carried out in parts. Each part of the chamber is laid with a hardening mixture after it has been worked out. The development of the subsequent part begins after the strength of the filling mass in the previous part (layer) is set. Moving the vehicle along the ledge is carried out in the process of testing the chamber. 7 ill.

Description

Изобретение относитс  к технологии открытой разработки полезных ископаемых и может быть использовано при отработке законтурных запасов карьера.The invention relates to open pit mining technology and can be used in the development of open pit mining reserves.

Известен способ разработки законтурных запасов руды в прибортовых зонах карьера, включающий проведение с рабочей площадки уступа транспортной штольни , выемку руды камерами с буровзрывной отбойкой, выпуск ее в штольню и закладку выработанного пространства камер твердеющей смесью с формированием закладочного массива.There is a method of developing near-ore ore reserves in dash areas of a quarry, including carrying out a ledge of a transport adit from a working platform, excavating ore with chambers with drill-and-blasting blasting, releasing it into an adit, and laying the mined-out chamber space with a hardening mixture with the formation of a filling array.

Недостаток способа - значительные потери руды в барьерном целике.The disadvantage of this method is significant loss of ore in the rear pillar.

Наиболее близок к предлагаемому способ разработки законтурных запасов руды в прибортовых зонах карьера, включающий проведение с рабочей площадки карьера транспортной штольни, выемку руды открытыми камерами от границ рудного тела в сторону карьерного пространства с буровзрывной отбойкой, выпуск ее в штольню и закладку выработанного пространства камер твердеющей смесью с формированием закладочного массива. Способ обеспечивает сохранность предельного контура карьера и сокращение потерь руды во внешней приконтурной зоне карьера.Closest to the proposed method is the development of near-ore ore reserves in the dash areas of the open pit, including carrying out a transport adit from the open pit working site, excavating ore with open chambers from the ore body boundaries to the open pit area with drill-and-blast blasting, releasing it into the adit and filling up the worked out chamber space with a hardening mixture with the formation of the filling array. The method ensures the safety of the limiting contour of the pit and the reduction of ore losses in the outer marginal zone of the pit.

Однако известный способ имеет следующий недостаток. Практика доработки месторождений открыто-подземным способом подтверждает, что ее эффективность повышаетс  при одновременном ведении открытых работ и подземной доработке прибортовых запасов через карьерные транспортные системы. Поэтому возможность сохранени  транспортных площадок на рудных уступах при одновременной отработке законтурных запасов позволит ликви- дировать существующий недостаток известного способа разработки.However, the known method has the following disadvantage. The practice of refining deposits by the open-underground method confirms that its efficiency is improved while conducting open-cast mining and underground refining of equipment reserves through open pit transportation systems. Therefore, the possibility of preserving transport platforms on ore ledges while simultaneously developing near-surface reserves will eliminate the existing drawback of the known development method.

Цель изобретени  - снижение затрат на обеспечение транспортной св зи между The purpose of the invention is to reduce the cost of providing transport links between

0000

оabout

hOhO

ел оate about

ризонтами карьера при сохранении ее во врем  отработки уступа.the quarry’s umbrellas while maintaining it during mining of the ledge.

Указанна  цель достигаетс  тем, что в известном способе отработки законтурных запасов руды в прибортовых зонах карьера, включающем проходку подготовительно- нарезных выработок, движение по рабочим площадкам уступа транспорта, отбойку руды камерами с перепуском на подготовительно-нарезные выработки, закладку выработанного пространства твердеющей смесью с формированием закладочного массива, отработку камер ведут част ми, а закладку производ т вслед за их отработкой , причем транспорт перемещают по оставшейс  части рабочей площадки.This goal is achieved by the fact that in the known method of mining near-ore reserves in ore zones of the quarry, including the excavation of pre-cut workings, movement along the working platforms of the ledge of the transport, breaking the ore with chambers with a bypass to the pre-cut workings, laying of the worked out space with a solidifying mixture with formation the filling array, the chambers are worked out in parts, and the laying is carried out after their working out, and the transport is moved along the remaining part of the working platform.

На фиг. 1 показана подготовка запасов к выемке; на фиг. 2 - выпуск руды и закладка смеси в первом слое; на фиг. 3 - подготовка к отработке второго сло ; на фиг. 4 - выпуск руды и закладка в третьем слое; на фиг. 5 - выпуск руды и закладка в п том слое; на фиг. б - пор док отработки запасов вертикальными сло ми; на фиг. 7 - транспортна  св зь при отработке законтурных запасов.In FIG. 1 shows the preparation of stocks for excavation; in FIG. 2 - ore production and laying of the mixture in the first layer; in FIG. 3 - preparation for working out the second layer; in FIG. 4 - ore production and laying in the third layer; in FIG. 5 - ore production and laying in the fifth layer; in FIG. b - stock mining order in vertical layers; in FIG. 7 - transport communication during the development of marginal reserves.

Способ осуществл ют следующим образом . После выхода открытых горных работ вблизи законтурной залежи на предельный контур 1 на дне карьера образуетс  рабоча  площадка 2, с которой осуществл ют проходку подземных подготовительно-нарезных выработок: транспортной штольни 3 и ортов-заездов 4. Затем в рудном массиве, лежащем над штольней 3, от границ рудного тела в сторону карьерного пространства начинают вести отработку открытых камер част ми, дл  чего осуществл ют выемку первого сло  5 с выходом его на рабочую площадку уступа 6 (фиг. 2). Дл  выемки сло  производ т бурение скважин 7, которые, как правило, бур т из подземных выработок, чтобы не создавать помех движению транспорта по рабочим площадкам 6 уступа (фиг. 3). После.взрывани  производ т перепуск отбитой руды из вертикального сло  на подготовительно-нарезные выработки 3 и 4 и одновременно ведут подачу твердеющей смеси с рабочих площадок рудных уступов. Отбойку следующей части камеры - второго сло  - начинают после формировани  закладочного массива первом слое. Таким образом последовательно отрабатывают три сло , при этом оставл ют подпорный целик 8, служащий дл  формировани  закладочного массива в третьем слое (фиг. 4). Руду выпускают и транспортируют по штольне 3 самоходными погрузочно-доставочными машинами, аThe method is carried out as follows. After the opencast mining operations near the margin deposit to the boundary circuit 1, a working platform 2 is formed at the bottom of the quarry, from which underground preparatory-cut workings are carried out: transport adit 3 and unit-races 4. Then, in the ore mass lying above adit 3, from the boundaries of the ore body toward the quarry space, the open chambers are started to be mined in parts, for which the first layer 5 is excavated with its exit to the working platform of ledge 6 (Fig. 2). To remove the layer, wells 7 are drilled, which, as a rule, are drilled from underground workings so as not to interfere with the movement of transport along the working platforms 6 of the ledge (Fig. 3). After blasting, the beaten ore is transferred from the vertical layer to the pre-cut workings 3 and 4 and at the same time they feed the hardening mixture from the working platforms of the ore ledges. The flashing of the next part of the chamber - the second layer - begins after the formation of the filling array of the first layer. Thus, three layers are worked out sequentially, while retaining the pillar 8, which serves to form the backfill array in the third layer (Fig. 4). Ore is produced and transported through the adit by 3 self-propelled loading and delivery vehicles, and

в карьере перегружают на примен емый при доработке транспорт. in a quarry, they are loaded onto the transport used in the refinement.

После формировани  закладочного массива в третьем слое и набора им требуемой прочности срабатывают подпорный целик 8. При этом контур бывшего рудного уступа мен етс  на контур отработанного четвертого сло  9 который получаетс  в результате свободного истечени  закладочной смеси.After forming the filling mass in the third layer and gaining the required strength, the supporting pillar 8 is activated. In this case, the contour of the former ore ledge is changed to the contour of the spent fourth layer 9, which is obtained as a result of free flow of the filling mixture.

Устойчивость предельного борта карьера сохран етс ,The stability of the limit side of the quarry is maintained,

В такой же последовательности отрабатывают п тый слой, при котором подпорным целиком будет служить оставшийс The fifth layer is worked out in the same sequence, in which the remaining

рудный массив 10, который после формировани  закладочного массива срабатываетс  (фиг. 5). На этом отработка камер част ми (вертикальными сло ми) заканчиваетс . Пор док отработки запасов открытыхore array 10, which is triggered after formation of the filling array (Fig. 5). This completes the development of the chambers in parts (vertical layers). Open Dock Mining Open

камер показан на фиг. 6. Отработку открытых камер осуществл ют через р д в последовательности, указанной римскими цифрами и учитывающей врем  подготовки и выпуска руды, а также набора прочностиcameras shown in FIG. 6. The processing of open chambers is carried out through a series in the sequence indicated by Roman numerals and taking into account the time of preparation and production of ore, as well as the set of strength

твердеющей закладки всего р да. Последовательна  отработка слоев каждой открытой камеры при условии отбойки последующего сло  после формировани  закладочного массива в предыдущем слоеhardening bookmarks of the whole series. Sequential development of the layers of each open chamber under the condition of breaking the next layer after the formation of the filling array in the previous layer

позвол ет сохранить транспортную св зь на рабочей площадке.Allows you to save transport communications on the job site.

Предлагаемый способ позвол ет осуществить отработку законтурных запасов прибортовых зон карьера без нарушени The proposed method allows for the development of near-margin reserves of near-mine quarry zones without violating

Claims (1)

транспортной системы карьера располагаемой на рудных уступах, а также вести одновременную отработку как контурных, так и законтурных запасов месторождени . Формула изобретени a transport system of a quarry located on ore ledges, and also to conduct simultaneous mining of both contour and contour reserves of the deposit. The claims Способ отработки законтурных запасов руды в прибортовых зонах карьера, включа- . ющий проходку подземных подготовительно-нарезных выработок, движение по рабочим площадкам уступа транспорта, отбойку руды камерами с перепуском на под- готовительно-нарезные выработки, закладку выработанного пространства твердеющей смесью с формированием закладочного массива, отличающийс A method of mining near-ore reserves in ore zones of a quarry, including. digging underground preparation and cutting workings, moving along working platforms of a ledge of a transport, breaking the ore with chambers with a bypass to preparation and cutting workings, laying the worked out space with a hardening mixture with the formation of a filling mass, different тем, что, с целью снижени  затрат на обеспечение транспортной св зи между горизонтами карьера при сохранении ее во врем  отработки уступа, отработку камер ведут част ми, а закладку производ т вследthe fact that, in order to reduce the cost of providing transport communication between the horizons of the quarry while maintaining it during the mining of the ledge, the mining of chambers is carried out in parts, and bookmarking is carried out after за их отработкой, причем транспорт перемещают по оставшейс  части рабочей площадки .after their development, and the transport is moved along the remainder of the working platform. f hf h 69299116929911 г. ЈЈ иг. 7 ig. 7
SU914898579A 1991-01-02 1991-01-02 Method for mining of boundary ore resources in opencast flank zones RU1786259C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU914898579A RU1786259C (en) 1991-01-02 1991-01-02 Method for mining of boundary ore resources in opencast flank zones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU914898579A RU1786259C (en) 1991-01-02 1991-01-02 Method for mining of boundary ore resources in opencast flank zones

Publications (1)

Publication Number Publication Date
RU1786259C true RU1786259C (en) 1993-01-07

Family

ID=21553336

Family Applications (1)

Application Number Title Priority Date Filing Date
SU914898579A RU1786259C (en) 1991-01-02 1991-01-02 Method for mining of boundary ore resources in opencast flank zones

Country Status (1)

Country Link
RU (1) RU1786259C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 926285, кл. Е 21 С 41 /00, 1980. Авторское свидетельство СССР Ns 1104274,кл. Е 21 С 41/00, 1983. *

Similar Documents

Publication Publication Date Title
RU1786259C (en) Method for mining of boundary ore resources in opencast flank zones
SU1314060A1 (en) Method of combination mining of mineral deposits
RU2280765C1 (en) Ore body development method
RU2453700C2 (en) Method for selective development of upland mineral estate reserves
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
RU2685590C1 (en) Method for open development of steeply-dipping deposits of round shape with internal dumping
SU1104274A1 (en) Method of working ore reserves behind controur in quarry near-edge areas
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU1703817A1 (en) Method of mining ore deposits
RU2148713C1 (en) Method for opencast mining of sloping and steep deposits of minerals
SU403853A1 (en) '-' "- INVENTIONS
SU877010A1 (en) Method of preparing quarry levels
SU1176076A1 (en) Method of restructuring an open mine
SU742589A1 (en) Method of mining super-thin sharply assending seams
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
SU1129354A1 (en) Method of underground working of mineral deposits
SU1461942A1 (en) Method of mining thick ore deposits
RU2052111C1 (en) Method for mining steeply dipping ore bodies
SU901529A1 (en) Method for working thick ore deposits
SU1751336A1 (en) Method of mining thick steep coal seams
SU898071A1 (en) Method of working ore deposits
SU1317128A1 (en) Method of mining thick ore deposits
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU1051280A1 (en) Method of mining minerals
RU2093679C1 (en) Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals