[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR850001026Y1 - Fluid pressure leakage detector - Google Patents

Fluid pressure leakage detector Download PDF

Info

Publication number
KR850001026Y1
KR850001026Y1 KR2019830004633U KR830004633U KR850001026Y1 KR 850001026 Y1 KR850001026 Y1 KR 850001026Y1 KR 2019830004633 U KR2019830004633 U KR 2019830004633U KR 830004633 U KR830004633 U KR 830004633U KR 850001026 Y1 KR850001026 Y1 KR 850001026Y1
Authority
KR
South Korea
Prior art keywords
conduit
short axis
fluid
pressure
expansion
Prior art date
Application number
KR2019830004633U
Other languages
Korean (ko)
Other versions
KR840007698U (en
Inventor
이영구
Original Assignee
이영구
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이영구 filed Critical 이영구
Priority to KR2019830004633U priority Critical patent/KR850001026Y1/en
Publication of KR840007698U publication Critical patent/KR840007698U/en
Application granted granted Critical
Publication of KR850001026Y1 publication Critical patent/KR850001026Y1/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2807Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipes
    • G01M3/2815Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipes using pressure measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L7/00Measuring the steady or quasi-steady pressure of a fluid or a fluent solid material by mechanical or fluid pressure-sensitive elements
    • G01L7/02Measuring the steady or quasi-steady pressure of a fluid or a fluent solid material by mechanical or fluid pressure-sensitive elements in the form of elastically-deformable gauges
    • G01L7/08Measuring the steady or quasi-steady pressure of a fluid or a fluent solid material by mechanical or fluid pressure-sensitive elements in the form of elastically-deformable gauges of the flexible-diaphragm type

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)

Abstract

내용 없음.No content.

Description

유체압력 누출 검지기Fluid Pressure Leak Detector

제1도는 일반적인 유체공급계통을 나타내는 블럭도.1 is a block diagram showing a general fluid supply system.

제2도는 본 고안의 구조를 도시하는 단면도.2 is a cross-sectional view showing the structure of the present invention.

제3도는 본 고안이 공지의 밸브 차단 회로를 동작시키는 예를 도시하는 블럭도.3 is a block diagram showing an example in which the present invention operates a known valve shut-off circuit.

제4도는 본 고안의 작용을 설명하기 위한 개략도로서 제4(a)도는 도관내의 압력 최대일때의 개략도, 제4(b)도는 급속누출시의 작동을 도시하는 개략도, 제4(c)도는 완속 누출시의 작동을 도시하는 개략도.4 is a schematic diagram illustrating the operation of the present invention. FIG. 4 (a) is a schematic diagram of the maximum pressure in the conduit, FIG. 4 (b) is a schematic diagram showing the operation during rapid leakage, and FIG. 4 (c) is a slow diagram. Schematic diagram showing operation in case of leakage.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

3 : 도관 6 : 제1검지실3: conduit 6: first detection room

7 : 제2검지실 8,9 : 신축막7: 2nd detection room 8,9: expansion membrane

10 : 장축 12 : 단축10: long axis 12: short axis

11 : 대공 13 : 소공11: great anti-aircraft 13

본 고안은 유체압력 누출검지기에 관한 것이다.The present invention relates to a fluid pressure leak detector.

파이프라인을 통하여 급송되는 유체는 대체로 제1도의 도시와 같이 유체저장탱크로부터 레규레이터를 거쳐 도관을 통해 밸브로 급송되어진다. 이때, 급송라인이 외적인 요인에 의하여 파손되어지면, 상당량의 유체 누출을 감수해야만 하고 더우기 급송중의 유체가 인화성일때는 보다 더 큰 사고를 일으키는 요인이 될 수도 있다. 따라서 유체누출을 감지하여 경보 또는 안전처리를 행하는 장치가 필요하게 된다.Fluid fed through the pipeline is generally fed from the fluid storage tank to the valve via a conduit via a regulator, as shown in FIG. At this time, if the feeding line is broken by an external factor, a large amount of fluid leakage must be taken, and even when the feeding fluid is flammable, it may cause a larger accident. Therefore, there is a need for a device that detects a fluid leak and performs an alarm or safety treatment.

유체의 누출을 감지하는 장치가 종래부터 여러가지가 제안되어 있으나 주로 볼밸브가 유체압의 변화에 따라 변위되어 도관을 폐쇄하도록 한 것과 전자 차단회로를 이용하는 것 및 가스와 같이 기체로 된 경우에 유체 통로를 저수실로 경유시켜 저수실에서 기포를 일으키도록 하므로써 이때의 기포발생량을 목측하여 유체누출 여부를 알수 있도록 한 것등으로 대별된다.Various devices have been conventionally proposed for detecting a leak of fluid, but the ball valve is displaced according to the change of the fluid pressure to close the conduit, the electronic shutoff circuit, and the fluid passage in the case of gas such as gas. By passing through to the reservoir, bubbles are generated in the reservoir, so that the amount of bubbles generated at this time is observed so that fluid leakage can be known.

상기한 방식은 어느 것이나 정밀한 제작을 요구하는 반면에, 오작동이 심하고 실용적인 못된다는 결점이 있다.While all of the above methods require precise fabrication, there is a drawback that malfunctions are severe and not practical.

본 고안은 파이프 라인내의 유체압을 일정범위내로 유지시켜 주어 누출에 의해 관내압이 저하될때 이를 감지하여 별도의 차단장치 및 경보장치등을 동작시킬 수 있도록 한 유체압력 누추 검지기를 제공함에 그 목적이 있으며 부차적인 목적은 유체압력 누출을 감지함에도 급속누출의 검지와 완속누출의 검지로 구분해서 차등검지를 행하는 것에 의해 보다 신속하고 정확하게 감지할 수 있는 유체압력누출검지기를 제공함에 있다.The object of the present invention is to provide a fluid pressure leak detector that maintains the fluid pressure in the pipeline within a certain range and detects when the internal pressure decreases due to leakage to operate a separate shutoff device and alarm device. A secondary object of the present invention is to provide a fluid pressure leak detector that can detect a fluid leak quickly and accurately by performing differential detection by detecting a rapid leak and a slow leak.

본 고안은 상술한 목적에 따라 2개의 별실로 구획된 하우징을 도관상에 설치하고 이 하우징의 내부에 다이어 후램이나 벨로우즈와 같은 신축막을 장치함과 아울러 이 신축막에 각각 장축과 단축을 연설하여 신축막의 신축에 따라 장축과 단축이 슬라이드 되도록 구성하고 각각의 장축과 단축에는 스윗칭 기구와 스윗칭 동작기구를 부설하는 한편 2개의 별실마다 대공과 소공을 천설하여 양다이어 후램의 신축 속도에 차등이 생기도록 구성한 것으로 이를 첨부 도면에 따라 상세히 설명하면 다음과 같다.The present invention installs a housing divided into two separate rooms on a conduit according to the above-mentioned purpose, and installs a telescoping membrane such as a diaphragm or a bellows inside the housing, and expands and contracts the telescoping membrane to the telescoping membrane respectively. According to the expansion and contraction of the membrane, the long axis and the short axis are configured to slide, and each of the long axis and the short axis is equipped with a switching mechanism and a switching operation mechanism. If so described in detail according to the accompanying drawings as follows.

제2도의 도시와 같이 인레트(1)와 아웃레트(2)를 보유하는 도관(3)상에 격벽(4)으로 분할된 하우징(5)을 결착시켜 제1검지실(6)과 제2검지실(7)을 일체 형성하고, 또한 도관(3)과 양검지실(7)(6) 사이의 경계부에 각각 신축막(8)(9)를 개재시켜서 양검지실(6)(7)이 전기한 도관(3)과는 별개의 공간을 이루도록 구성함과 아울러 전기한 제1검지실(6)의 신축막(8)에는 장축(10)을 연설하고, 상방에 대공(11)을 천설해 놓으며 또한 제2검지실(7)의 신축막(9)에는 단축(12)를 연설하고 상방에 소공(13)을 천설한다.As shown in FIG. 2, the first detection chamber 6 and the second detection chamber 6 are attached by binding the housing 5 divided by the partition wall 4 onto the conduit 3 having the inlet 1 and the outlet 2 as shown in FIG. The detection chamber 7 is integrally formed, and both detection chambers 6 and 7 are electrically connected to each other at the boundary between the conduit 3 and the both detection chambers 7 and 6 via the expansion and contraction membranes 8 and 9 respectively. In addition to the conduit (3) to form a separate space, the first detection chamber (6) of the expansion membrane (8), the long axis (10) in the speech, and the air hole (11) in the upper place Moreover, the short axis 12 is made to speak to the expansion and contraction film 9 of the 2nd detection chamber 7, and the small hole 13 is installed above.

이러한 구조에 의해 장축(10)과 단축(12)의 상단은 하우징(5)의 외부로 길고 짧게 돌출된다. 돌출된 장축(10)은 그 선단에 가동자석(14)이 부착된다.Due to this structure, the upper ends of the long axis 10 and the short axis 12 protrude long and short to the outside of the housing 5. The protruding long shaft 10 has a movable magnet 14 attached to the tip thereof.

한편 단축(12)의 상단에는 아암(16)이 직교방향으로 설치되고, 전기한 가동자석(14)과 대응하는 일측에 제1리이드 스윗치(17)를 부착하고 타측에는 제2리이드 스윗치(18)를 부착한다.On the other hand, an arm 16 is installed at an upper end of the short axis 12 in an orthogonal direction, and the first lead switch 17 is attached to one side corresponding to the movable magnet 14 described above, and the second lead switch 18 is mounted on the other side thereof. Attach.

전기한 제1리이드(17)는 가동자석(14)의 자계범위내에 놓여지거나 벗어날때 온-오프되어지도록 평상시에는 가동자석(14)과 간격 L을 두고 병치하게 된다. 또한 제2리이드스윗치(18)는 제2검지실(7)의 상면에 고착되는 고정자석(15)과 간격 L'를 두고 병치되어 동일하게 온-오프 된다.The first lead 17 described above is normally juxtaposed with the movable magnet 14 at an interval L so that the first lead 17 is turned on or off when placed within the magnetic field range of the movable magnet 14. Further, the second lead switch 18 is juxtaposed with the stator magnet 15 fixed to the upper surface of the second detection chamber 7 at an interval L 'and is turned on in the same manner.

장축(10)과 단축(12)의 노출부위인 상단은 캡(19)에 의해 밀봉되어지며 캡(19)의 내측에는 전기한 장축(10)의 가동자석(14)이 상방으로 치솟았을때 동작되는 제3리이드 스윗치(20)를 부착한다.The upper end, which is the exposed portion of the long axis 10 and the short axis 12, is sealed by the cap 19, and operates inside the cap 19 when the movable magnet 14 of the long axis 10 is raised upward. The third lead switch 20 is attached.

제1, 2, 3리이드 스윗치(17)(18)(20)는 모두 상개형 스윗치이며 전술한 제1 및 제2검지실(6)(7)은 그 노출부가 캡(19)에 의해 피복된다. 상술한 구성에 의해 도관(3)내에 유압이 채워져서 제1 및 제2검지실(6)(7)의 고유압력보다 큰 압력이 되면 신축막(8)(9)은 팽창되어짐과 동시에 장축(10)과 단축(12)는 연동하여 상방으로 슬라이드 되어진다. 이때 장축(10)과 단축(12)의 상승속도는 양검지실(6)(7)에 뚫려진 대공(11)과 소공(13)의 직경비에 의해 상이하게 된다. 즉 외기의 출입량이 큰 대공(11)측의 장축(10)이 기압의 출입이 비교적 곤란한 소공(13)측의 단측(12)보다 빨리 상승하게 된다. 이와같은, 장, 단축(10)(11)의 속도차에 따라 차등 검지가 행해지는 것이다.The first, second and third lead switches 17, 18 and 20 are all open switch types, and the first and second detection chambers 6 and 7 described above are covered by the cap 19. . When the hydraulic pressure is filled in the conduit 3 by the above-described configuration and the pressure is greater than the intrinsic pressure of the first and second detection chambers 6 and 7, the expansion and contraction membranes 8 and 9 are expanded and at the same time 10) and the short axis 12 are slid upward in cooperation. At this time, the ascending speed of the long axis 10 and the short axis 12 is different by the diameter ratio of the large hole 11 and the small hole 13 drilled in both detection chamber (6) (7). In other words, the long axis 10 on the large hole 11 side with a large amount of inflow and outflow of the outside air rises faster than the short side 12 on the small hole 13 side where the pressure is relatively difficult to enter and exit. The differential detection is performed according to the speed difference between the long and short axes 10 and 11 as described above.

본 고안에서 제1 및 제2검지실(6)(7)내에 설치된 제1, 2, 3리이드 스윗치(17)(18)(20)는 제3도의 도시와 같이 공지의 밸브 차단회로 C에 접속되어져서 전자밸브 V의 차단기 S를 동작시켜주게 된다. 이하 공지의 밸브 차단회로에 본 고안을 연결시켜 동작되는 작용효과를 설명한다.In the present invention, the first, second and third lead switches 17, 18 and 20 installed in the first and second detection chambers 6 and 7 are connected to a known valve shutoff circuit C as shown in FIG. The circuit breaker S of the solenoid valve V is operated. Hereinafter will be described the operation and effect by connecting the present invention to a known valve shut-off circuit.

먼저 전자밸브 V의 스윗치 SW1를 온시키면 전자밸브 V가 열려져서 도관(3)내에 압력이 채워지게 되고 장축(10)과 단축(12)는 제4(a)도의 도시와 같이 연동 상승하게 되며 이때 장축(10)이 단축(12) 보다 빨리 상승되어 제3리이드 스윗치(20)가 온으로 되면 밸브 차단회로 C의 이상유무 점검회로 a에 신호가 인가되어 전자밸브 V는 닫혔다가 지연회로 b에 의해 1 10초가 유리된 후 정상상태일때만 전자밸브 V가 다시 열린다. 즉, 제1 및 제2리이드 스윗치(17)(18)로부터 이상 유무점검회로로 신호가 보내지지 않은 경우에 전자밸브 V는 다시 연리게 된다.First, when the switch SW 1 of the solenoid valve V is turned on, the solenoid valve V is opened to fill the pressure in the conduit 3, and the long axis 10 and the short axis 12 are interlocked with each other as shown in FIG. 4 (a). At this time, when the long shaft 10 rises faster than the short shaft 12 and the third lead switch 20 is turned on, a signal is applied to the abnormality check circuit a of the valve shutoff circuit C so that the solenoid valve V is closed, and then to the delay circuit b. The solenoid valve V is reopened only when steady state is released after 1 10 seconds is released. That is, when no signal is sent from the first and second lead switches 17 and 18 to the abnormality check circuit, the solenoid valve V is opened again.

이 상태에서 도관(3)내의 압력이 급락되는 사태가 발생하면 도관(3)과 제1 및 제2검지실(6)(7)간에는 커다란 압력차가 발생하게 되어 양신축막(8)(9)는 부압을 받게된다. 그러나 제1검지실(6)은 제2검지실(7)보다 외기의 출입량이 크기 때문에 양검지실(6)(7) 사이에도 부압의 차가 생기게 되므로 양 신축막(8)(9)의 복원속도는 상이하게 된다.In this state, when a pressure drop in the conduit 3 occurs, a large pressure difference is generated between the conduit 3 and the first and second detection chambers 6 and 7, so that the expansion and contraction membranes 8 and 9 Will receive negative pressure. However, since the first detection chamber 6 has a larger amount of inflow and outflow than the second detection chamber 7, there is a difference in negative pressure between the two detection chambers 6 and 7. Therefore, the restoration speed of both expansion and contraction membranes 8 and 9 is increased. Will be different.

따라서 장축(10)은 단축(12)보다 빨리 하강하게 되므로 제4(b)도의 도시와 같이 장축(10)의 가동자석(14)은 단축(12)의 제1리이드스윗치(17)와 조우하여 이를 온시키게 되어 그 결과 밸브 차단회로 C의 스윗칭회로 d가 동작되며 그 신호는 차단지령회로 e를 거쳐 차단기 s와 경보기 f에 인가되므로써 전자밸브 V는 닫혀지고 별도의 경보장치가 동작하게 된다.Therefore, since the long axis 10 descends faster than the short axis 12, the movable magnet 14 of the long axis 10 encounters the first lead switch 17 of the short axis 12, as illustrated in FIG. 4 (b). As a result, the switching circuit d of the valve blocking circuit C is operated, and the signal is applied to the breaker s and the alarm f through the blocking command circuit e so that the solenoid valve V is closed and a separate alarm device is operated.

상기 과정에 있어서 장축(10)이 단축(12)보다 빨리 하강 연동함은 급속 누출시에만 가능한 것으로 유체의 누출량이 미미한 완속누출시에는 제1 및 제2검지실(6)(7) 사이의 부압차는 생기지 않는다. 즉, 단축(12)이 완속 누출을 검지하여 하강 연동될 정도의 부압은 장축(10)을 단축(12)보다 빨리 하강 연동시킬 정도의 힘을 발휘하지 못하기 때문에 완속 누출시에는 장축(10)과 단축(12)의 하강속도는 거의 같게 된다.In the above process, the long axis 10 descends faster than the short axis 12 and is interlocked only in the case of rapid leakage, and the negative pressure between the first and second detection chambers 6 and 7 in the case of slow leakage with a small amount of fluid leakage. No tea That is, since the negative pressure as long as the short axis 12 detects a slow leak and is interlocked with the downward movement does not exert a force enough to lower and interlock the long axis 10 faster than the short axis 12, the long axis 10 at the time of slow leakage. The descending speeds of and short axis 12 are approximately equal.

그러므로 장축(10)의 가동자석(14)과 단축(12)의 제1리이드 스윗치(17)는 조우할 수 없게 되지만 그러나 단축(12)의 제2리이드 스윗치(18)가 제3(c)도의 도시와 같이 고정자석(15)과 조우하게 되어 밸브차단 회로 C의 스윗칭회로 f를 동작시켜 주어 차단지령회로 e에 인가시켜 줌으로써 차단기 s와 경보기 g를 동작시켜 전자밸브 V는 닫히고 별도의 경보장치가 동작하게 되는 것이다.Therefore, the movable magnet 14 of the long shaft 10 and the first lead switch 17 of the short axis 12 are not able to meet, but the second lead switch 18 of the short axis 12 is in the third (c) degree. As shown in the figure, it encounters the stationary magnet 15 and operates the switching circuit f of the valve blocking circuit C and applies it to the blocking command circuit e to operate the breaker s and the alarm g so that the solenoid valve V is closed and a separate alarm device is provided. Will be working.

[실시예]EXAMPLE

제3(a)도의 도시와 같이 인테트(1)측에 레규레이터 R과 병설되는 전자밸브 V를 연결하고 도관(3)내의 유압이 제1 및 제2검지실(6)(7)의 내압에 비해 비례치로 최대 100, 최소 50이 되도록 임의로 선정하여 최대 100에서 장축(10)과 단축(12)이 상사점까지 슬라이드하고 최소 50에서 장축(10)과 단축(12)이 하사점까지 슬라이드 되도록 한 다음 급속누출시에 장축(10)과 단축(12)의 슬라이드 속도비가 2:1이 될수 있는 직경비로 대공(11)과 소공(13)을 뚫어 놓는다. 시험은 도관(3)이 폐쇄된 상태에서 급속누출이 발생할 때와 도관(3)이 개방되어 유체가 공급되는 상태에서 완속 누출이 발생하는 2가지의 경우를 상정하여 행하였다.As shown in FIG. 3 (a), the solenoid valve V provided with the regulator R is connected to the inlet 1 side, and the hydraulic pressure in the conduit 3 is the internal pressure of the first and second detection chambers 6 and 7. Randomly select so that the maximum axis 100 and the minimum axis 50 are proportional to each other, so that the long axis 10 and the short axis 12 slide to the top dead center at a maximum of 100, and the long axis 10 and the short axis 12 slide to the bottom dead center at a minimum of 50. Then, during rapid leakage, the large holes 10 and the small holes 12 are drilled at a diameter ratio such that the slide speed ratio of the long axis 10 and the short axis 12 is 2: 1. The test was carried out assuming two cases of rapid leakage occurring in a state where the conduit 3 was closed and a slow leak occurring when the conduit 3 was opened to supply fluid.

위 실시예에 있어서 전자밸브 V는 가스관용 전자밸브이고 급속누출이라 함은 관내압이 급락되는 것을 말하고 완속누출이라 함은 서서히 관내압이 떨어지는 것을 말한다.In the above embodiment, the solenoid valve V is a solenoid valve for a gas pipe, and rapid leakage refers to a sudden drop in internal pressure, and slow release refers to a drop in internal pressure gradually.

먼저 도관(3)이 폐쇄된 상태에서는 도관(3)내의 압력이 100으로 되자 신축막(8)(9)이 상사점까지 팽창하여 장축(10)의 가동자석(14)이 제3리이드 스윗치(20)를 동작시키자 전자밸브 V는 공지된 바와같이 110초간 폐쇄되었다가 도관(3)의 파손신호가 인가되지 않자 다시 개방되었으며, 단축(12)의 제1리이드 스윗치(17)는 전기한 장축(10)의 가동 자석(14)과 일정한 간격 L을 두고 또한 제2리이드 스윗치(18)는 고정자석(15)과 간격 L'를 두고 병치된 상태로 되었다.First, in the state in which the conduit 3 is closed, when the pressure in the conduit 3 reaches 100, the expansion and contraction membranes 8 and 9 expand to the top dead center, so that the movable magnet 14 of the long shaft 10 moves to the third lead switch ( 20, the solenoid valve V was closed for 110 seconds as is known, and then opened again when the breakage signal of the conduit 3 was not applied, and the first lead switch 17 of the short axis 12 was opened. The second lead switch 18 is placed in a state of being juxtaposed with the movable magnet 14 of FIG.

이어서 도관(3) 파열시를 상정하여 급속히 도관(3)내의 압력이 최저치 이하로 되도록 급락시키자 장축(10)과 단축(12)은 거의 동시에 하강연동되었고, 그러나 장축(10)의 슬라이드 속도가 상대적으로 빠르게 급히 슬라이드 되어졌다. 그 결과 단축(12)이 완전히 하강도기도 전에 장축(10)의 고정자석(14)이 단축(12)의 제1리이드스윗치(17)와 조우하여 동작시킴으로써 밸브차단회로 C가 작동되어 전자밸브 V는 폐쇄되었다. 따라서 도관(3)내의 잔류유체 이상의 손실량은 발생치 않았다.Subsequently, when the rupture of the conduit 3 was assumed and the pressure in the conduit 3 rapidly dropped to be below the minimum value, the long axis 10 and the short axis 12 were lowered and linked at the same time, but the slide speed of the long axis 10 was relatively low. Slided quickly and quickly. As a result, the valve interrupting circuit C is activated by operating the stator magnet 14 of the long shaft 10 in contact with the first lead switch 17 of the short shaft 12 before the shaft 12 is fully lowered. Was closed. Therefore, no loss of residual fluid abnormality in the conduit 3 occurred.

다음에 도관(3)이 개방된 상태에서의 가스누출이 발생하는 경우를 상정하여 시험을 행하였다. 이 경우에는 유체의 공급량과 누출량의 차이에 의해 보통 완속누출이 되는 예가 많았고 따라서 도관(3)내의 압력은 서서히 저하되어지며 이로 인하여 장축(10)의 가동자석(14)은 단축(12)의 제1리이드 스윗치(17)에 간격 L을 두고 하강하게 되어 밸브 차단회로 C를 동작시킬 수 없었으나 도관(3)내의 최저압력치 50이 될 무렵에 단축(12)의 제2리이드 스윗치(18)가 고정자석(15)에 조우되어 동작함으로써 전자밸브 V가 폐쇄됨과 동시에 도관(3)의 오손을 경보하여 주었다.Next, the test was performed assuming that a gas leak occurred in the state in which the conduit 3 was opened. In this case, there are many examples of slow leakage due to the difference between the fluid supply amount and the leakage amount. Therefore, the pressure in the conduit 3 gradually decreases, which causes the movable magnet 14 of the long shaft 10 to be removed from the shaft 12. Although the valve shut-off circuit C could not be operated due to the lowering of the one-lead switch 17 at an interval L, the second lead switch 18 of the short axis 12 was closed when the minimum pressure value 50 in the conduit 3 was reached. By operating in contact with the stationary magnet 15, the solenoid valve V was closed and the contamination of the conduit 3 was alerted.

이 경우에 있어서 가스콕크를 통한 유체유출량과 외적요인에 의한 누출량의 합이 유체공급량에 상당하는 때에는 본 고안의 유체압력 누출검지기가 작동될 수 있는 여건이 되지 않으나 일반적으로 이러한 여건이 조성될 가능성은 거의 없으므로 본 고안의 사응에는 사실상 아무런 영향을 줄수가 없다.In this case, when the sum of the amount of fluid leaked through the gas cock and the amount of leakage due to external factors is equivalent to the amount of fluid supply, the fluid pressure leak detector of the present invention is not a condition that can be operated. There is almost no effect on the response of the present invention.

상술한 실시예에 본 고안의 검지기를 사용하는 일예에 불과한 것으로 이와같은 차등검지에 의한 효과는 그 기술사상의 범위를 일탈하지 않고 여러 형태로의 변형 사용이 가능하다.It is just an example of using the detector of the present invention in the above-described embodiment, the effect of the differential detection can be used in various forms without departing from the scope of the technical idea.

Claims (1)

하우징(5)의 내부를 제1 및 제2검지실(6)(7)를 구획하고 그 일측면에 각각 신축막(8)(9)를 설치하며, 신축막(8)의 중앙에는 선단에 가동자석(14)이 부착된 장축(10)을 설치하고, 신축막(9)의 중앙에는 선단에 아암(16)이 횡설된 단축(12)를 설치하여, 아암(16)의 일측단에는 전기한 장축(10)의 가동자석(14)에 의해 동작되는 제1리이드스윗치(17)를 부착하고 타측단에는 제2검지실(7)에 설치된 고정자석(15)에 의해 동작되는 제2리이드스윗치(18)를 부착함과 아울러 전기한 제1 및 제2검지실(6)(7)을 각각 대공(11)과 소공(13)이 뚫려지고 캡(19)에 의해 피복되며 캡(19)의 내측면에는 전기한 장축(10)의 가동자석(14)에 의해 동작되는 제3리이드스윗치(20)를 고정 설치하여 이루어지는 유체압력누출 검지기.The interior of the housing 5 is divided into the first and second detection chambers 6 and 7 and the expansion and contraction membranes 8 and 9 are provided on one side thereof, respectively, and at the tip end in the center of the expansion and contraction membrane 8. The long shaft 10 with the movable magnet 14 attached thereto is installed, and the short axis 12 with the arm 16 rolled up is provided at the front end in the center of the expansion membrane 9, and at one end of the arm 16 The first lead switch 17 operated by the movable magnet 14 of one long shaft 10 is attached, and the second lead switch operated by the fixed magnet 15 installed in the second detection chamber 7 is attached to the other end. While attaching the 18, the first and second detection chambers 6 and 7 described above are drilled and covered by the cap 19 and the cap 19, respectively. A fluid pressure leak detector formed by fixing a third lead switch (20) operated by the movable magnet (14) of the long shaft (10).
KR2019830004633U 1983-05-23 1983-05-23 Fluid pressure leakage detector KR850001026Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019830004633U KR850001026Y1 (en) 1983-05-23 1983-05-23 Fluid pressure leakage detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019830004633U KR850001026Y1 (en) 1983-05-23 1983-05-23 Fluid pressure leakage detector

Publications (2)

Publication Number Publication Date
KR840007698U KR840007698U (en) 1984-12-26
KR850001026Y1 true KR850001026Y1 (en) 1985-05-25

Family

ID=19230069

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019830004633U KR850001026Y1 (en) 1983-05-23 1983-05-23 Fluid pressure leakage detector

Country Status (1)

Country Link
KR (1) KR850001026Y1 (en)

Also Published As

Publication number Publication date
KR840007698U (en) 1984-12-26

Similar Documents

Publication Publication Date Title
US4487226A (en) Failure sensing hydraulic accumulator and system
US3992941A (en) Liquid level measuring apparatus
US3626760A (en) Leak detection cyclic pumping control
US3719203A (en) Safety valve for oil filled cable
US4129141A (en) Scram valve
JPH0310894B2 (en)
US4193417A (en) Fluid check valve device
US4428401A (en) Failure sensing hydraulic accumulator and system
KR850001026Y1 (en) Fluid pressure leakage detector
JP3693917B2 (en) Safety valve control device
JP2739115B2 (en) Leak alarm device for mechanical seal
US3860026A (en) Automatic air vent
JP2007514159A (en) Inspection device for pressure of fluid flowing in liquid or duct stored in tank
JPS607024A (en) Hydraulic pneumatic controller for electric circuit breaker
US2811168A (en) Liquid level control valves
US4409443A (en) Pressure responsive electrical switching apparatus
US4104122A (en) Liquid absorbent safety device for a nuclear reactor
JPS6143653B2 (en)
CN219317766U (en) Valve actuating mechanism with leakage detection port
JPS62198727A (en) Detecting method for leak of hydraulic pressure
RU2208730C2 (en) Automatic unit for emergency closing cock in main gas lines
US3014491A (en) Automatic vacuum valve
KR100303475B1 (en) Gas flow shutoff valve in case of gas leakage
SU1295126A1 (en) Safety valve
RU2037717C1 (en) Automatic safety device used to shut off the gas line at its breakage

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 19910525

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee