KR830001621B1 - Apparatus for manufacturing slide fasteners with Garigam insertion slot - Google Patents

Apparatus for manufacturing slide fasteners with Garigam insertion slot Download PDF

Info

Publication number
KR830001621B1
KR830001621B1 KR1019790004659A KR790004659A KR830001621B1 KR 830001621 B1 KR830001621 B1 KR 830001621B1 KR 1019790004659 A KR1019790004659 A KR 1019790004659A KR 790004659 A KR790004659 A KR 790004659A KR 830001621 B1 KR830001621 B1 KR 830001621B1
Authority
KR
South Korea
Prior art keywords
fastener
slider
fastener chain
upper frame
injection molding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
KR1019790004659A
Other languages
Korean (ko)
Other versions
KR830000871A (en
Inventor
미노루 우에다
Original Assignee
요시다 다다오
요시다 고오교오 가부시키가이샤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 요시다 다다오, 요시다 고오교오 가부시키가이샤 filed Critical 요시다 다다오
Priority to KR1019790004659A priority Critical patent/KR830001621B1/en
Publication of KR830000871A publication Critical patent/KR830000871A/en
Application granted granted Critical
Publication of KR830001621B1 publication Critical patent/KR830001621B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A44HABERDASHERY; JEWELLERY
    • A44BBUTTONS, PINS, BUCKLES, SLIDE FASTENERS, OR THE LIKE
    • A44B19/00Slide fasteners
    • A44B19/42Making by processes not fully provided for in one other class, e.g. B21D53/50, B21F45/18, B22D17/16, B29D5/00

Landscapes

  • Slide Fasteners (AREA)

Abstract

내용 없음.No content.

Description

개리감삽구가 부착된 슬라이드 파스너의 제조장치Apparatus for manufacturing slide fasteners with Garigam insertion slot

제1도는 본 발명에 의한 장치의 한가지 실시예를 나타내는 사시도.1 is a perspective view showing one embodiment of the device according to the invention.

제2도는 제1도에 도시된 장치의 측면도.2 is a side view of the apparatus shown in FIG.

제3도는 제1도에 도시된 장치의 프레임 부분의 평면도.3 is a plan view of the frame portion of the apparatus shown in FIG.

제4도는 밑틀과 윗틀 부분의 확대 단면도.4 is an enlarged cross-sectional view of the bottom frame and the upper frame part.

제5도는 제4도의 개략적인 우측면도.5 is a schematic right side view of FIG.

제6도 (a)-(d)는 발명 장치에 의한 제조방법의 공정을 나타내는 설명도이다.(A)-(d) is explanatory drawing which shows the process of the manufacturing method by an invention apparatus.

본 발명은 개리감삽구가 부착된 슬라이드 파스너의 제조장치에 관한 것으로서, 특히 슬라이더의 삽입, 개리감삽구의 사출성형, 체인 절단 등의 일련의 공정을 완전 자동으로 능률적으로 수행할 수 있는 새로운 제조 장치를 제공하는 것이다.The present invention relates to a device for manufacturing a slide fastener with a clearance insertion slot, and more particularly, to a novel manufacturing apparatus that can efficiently and efficiently perform a series of processes such as inserting a slider, injection molding of a clearance insertion slot, and cutting a chain. To provide.

이하, 본 발명의 일실시예를 도면에 따라 구체적으로 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

제1도 내지 제3도에 있어서, 프레임(1)상에는 파스너 체인(F)(F')의 펀치 및 절단장치 (2), 부품 공급장치(3), 슬라이더 감삽장치(4), 개리감삽입구의 사출성형기(5) 및 파스너 체인(F)(F')의 파지이송장치(6)(6')가 설치되어 있다. 상기 절단장치(2)는, 프레임(1)상에 고정된 밑틀(7)과 이 밑틀(7)상에 설치된 윗틀(8)로 이루어진다. 이 윗틀(8)은 안내 프레임(9)(9)에 승강 가능하게 부착된 테이프 누름부재(10),펀치부재(11) 및 절단부재(12)로 이루어진다(제4도 참조). 테이프 누름부재(10)와 펀치부재(11)는 협동해서 승강하고, 절단부재(12)는 2개 부재(10)(11)의 움직임과 관계없이 승강하도록 되어있다.1 to 3, on the frame 1, the punch and cutting device 2 of the fastener chains F and F ', the component supply device 3, the slider inserting device 4, and the opening insertion slot The injection molding machine 5 and the gripper conveying apparatus 6 and 6 'of the fastener chain F (F') are provided. The cutting device 2 comprises a base 7 fixed on the frame 1 and a top frame 8 provided on the base 7. The upper frame 8 consists of a tape pressing member 10, a punch member 11 and a cutting member 12 attached to the guide frames 9 and 9 so as to be lifted and lowered (see Fig. 4). The tape pressing member 10 and the punch member 11 are raised and lowered in cooperation, and the cutting member 12 is raised and lowered regardless of the movement of the two members 10 and 11.

상기 슬라이더 감삽장치(4)는 지지축(13)을 받침점으로 하여 거의 수평위치로 부터 수직위치까지 요동 운동하도록 되어있다.The slider interpolation device 4 is configured to oscillate from a substantially horizontal position to a vertical position with the support shaft 13 as a supporting point.

그리고, 수평위치에서 부품 공급장치(3)로 부터 슈트(14)를 거쳐 이송된 슬라이더(S)를 파스너체인(F)의 이동경로상에 배치한다.And the slider S conveyed from the component supply apparatus 3 via the chute 14 in a horizontal position is arrange | positioned on the movement path of the fastener chain F. As shown in FIG.

상기 파지 이송장치(6)(6')에는 프레임(1)의 전후방향을 향하여 이 프레임(1)에 고정된 안내봉(36)이 있다. 이 안내봉(36)에는 접동체(15a)(15b)가 접동이 자유롭고 부착되어 있고, 이 접동체(15a)(15b)에 고착된 봉(16)에는 한쌍의 그립퍼(17a)(17b)가 부착되어 있다. 접동체(15a)(15b)는 정방향 및 역방향으로 회전하는 무단벨트(18)에 고정되어 있다. 그리고, 윗틀(8)과 밑틀(7)의 전방에는 로울러 이송장치(19)(19')가 설치되어 있다.The gripping feeder 6, 6 ′ has a guide rod 36 fixed to the frame 1 toward the front and rear direction of the frame 1. Sliding bodies 15a and 15b are freely attached to the guide rod 36, and a pair of grippers 17a and 17b are attached to the rod 16 fixed to the sliding bodies 15a and 15b. Attached. The sliding bodies 15a and 15b are fixed to the endless belt 18 rotating in the forward and reverse directions. And roller feeders 19 (19 ') are provided in front of the upper frame 8 and the lower frame 7.

이 로울러 이송장치(19)(19')는 하부에 배치된 구동로울러(20)와, 상부에 배치된 상하이동이 가능한 펀치로울러(pinch roller)(21)로 이루어진다.The roller conveying apparatus 19, 19 'is composed of a drive roller 20 disposed at the bottom, and a pinch roller 21 capable of moving up and down.

사출성형기(5)는 합성수지제의 개리감삽구 파스너 체인(F)(F')의 단부에 사출성형하는 것으로서, 한쪽 파스너 체인(F)에는 상자체(23)와 상자봉(22)을, 그리고 다른쪽 파스너 체인(F')에는 접봉(蝶棒)(24)을 성형 부착한다. 완성된 개리감삽구가 부착된 파스너 체인(F1)(F1')은 스크레이퍼(scraper)(도시되지 않음)등에 의하여 밑으로 낙하되어서 배출부(25)로부터 바깥쪽으로 배출되도록 되어있다.The injection molding machine (5) is injection molding at the end of a synthetic resin fastener insertion fastener chain (F) (F '). The fastener chain (F) has a box (23) and a box (22), and On the other fastener chain F ', a sealing bar 24 is molded. The fastener chain F 1 (F 1 ′) with the completed Gary entry slot is dropped downward by a scraper (not shown) or the like so as to be discharged outward from the discharge section 25.

참조부호(P1),(P2),(P3),(P4),(P5)는 각각 검지기를 나타내고 있다(제6도 참조). 검지기(P1)는 파스너 체인(F)(F')의 스페이스부분(26)을 검지하는 것으로서, 엘레멘트(27)가 제거되어 있는스페이스부분(26)이 파스너 체인(F)(F')의 이동에 의해 가동레버(28)의 선단부에 위치하면 이 가동레버(28)가 약간 하강하고, 계석해서 스페이스부분(26)의 후단에 위치하는 제1엘레멘트(27a)가 가동레버(28)의 선단부에 닿으면 가동레버(28)가 약간 상승한다. 검지기(P1)는 이와같은 하강 및 상승동작을 검지하여서, 후술하는 바와 같이 파스너체인의 이송을 정지시킨다. 검지기(P2)는 윗틀(8)의 테이프 누름부재(10) 및 펀치부재(11)의 하강위치를 검지하는 것이며, 검지기(P3)(P4)(P5)는 각각 그립퍼(17a)(17b)의 후퇴위치, 전진단(前進端)감속위치, 전진단 정지위치를 검지하는 것이다.Reference numerals P 1 , P 2 , P 3 , P 4 , and P 5 denote detectors, respectively (see FIG. 6). The detector P 1 detects the space portion 26 of the fastener chain F (F '), and the space portion 26 from which the element 27 is removed is the portion of the fastener chain F (F'). When the movable lever 28 is positioned at the distal end of the movable lever 28, the movable lever 28 is slightly lowered, and the first element 27a positioned at the rear end of the space portion 26 is located at the distal end of the movable lever 28. When it touches, the movable lever 28 slightly rises. The detector P 1 detects such a lowering and raising operation and stops the transfer of the fastener chain as described later. The detector P 2 detects the lowering position of the tape pressing member 10 and the punch member 11 of the upper frame 8, and the detectors P 3 (P 4 ) and P 5 are respectively grippers 17a. The retraction position, the forward forward deceleration position, and the forward forward stop position of (17b) are detected.

파스너 체인(F)(F')은 제1도에 도시된 바와같이 앞 단계의 공정에서 스페이스부분(26)이 형성되어 이 스페이스부분(26)에 보강필름(29)이 접착되고, 또 스페이스부분(26)의 앞부분에 위치하는 엘레멘트의 후단부에는 상지구(30)가 가공되어 있다. 파스너 체인은 엘레멘트(27)(27)가 교합된 상태에서 안내로울러(31)에 이송되어 분리부재(32)에 의해 분리되며, 그후 상하이동이 가능한 인장로울러(33)(33')로부터 안내로울러(34)를 거쳐 장치내로 이송된다.As shown in FIG. 1, the fastener chains F and F 'have a space portion 26 formed thereon, and the reinforcement film 29 is bonded to the space portion 26. The upper strip 30 is machined in the rear end of the element located at the front of the (26). The fastener chain is transferred to the guide roller 31 in the state in which the elements 27 and 27 are engaged and separated by the separating member 32, and thereafter, the fastener chain is moved from the tension rollers 33 and 33 'to be movable. Is transferred into the device via 34).

이하, 제6도를 참조하면서 장치의 작동을 설명한다.The operation of the apparatus will now be described with reference to FIG.

슬라이드 파스너는 일반적으로 길이가 짧은 것과 길이가 긴 것이 있으며, 따라서 파스너 체인(F)(F')의 스페이스부분(26)의 상호간의 간격도 짧은 파스너의 경우에는 짧고 긴 파스너의 경우에는 길게 되어 있다. 본 발명의 장치에 의하면, 길리의 길고 짧음을 불분하고 능률적인 제조가 가능하다. 이하, 짧은 파스너의 경우와 긴 파스너의 경우로 나누어 설명한다. 여기서, 짧은 파스너란 스페이스 사이의 간격이 절단장치(2)와 사출성형기(5) 사이의 칫수보다 짧은 것을 말하며, 긴 파스너란 반대로 그 칫수보다 긴 것을 말한다.The slide fasteners are generally short and long, so that the spacing between the space portions 26 of the fastener chains F and F 'is also long in the case of short and long fasteners. . According to the apparatus of the present invention, long and short lengths of length are unclear and efficient production is possible. Hereinafter, it demonstrates dividing into the case of a short fastener and the case of a long fastener. Here, the short fastener means that the spacing between the spaces is shorter than the dimension between the cutting device 2 and the injection molding machine 5, and the long fastener, on the contrary, is longer than the dimension.

(A) 짧은 파스너의 경우 ;(A) for short fasteners;

(가). 제6(a)도에서와 같이 윗틀(8), 핀치로울러(21), 슬라이더 감삽장치(4) 및 사출성형기(5)의 윗틀(5a)이 모두 상승위치에 있고, 파스너 체인(F)(F')〔한쪽 파스너 체인(F')은 도시하지 않았음〕의 스페이스부분(26)은 윗틀(8)과 밑틀(7)의 사이에 위치하고 있다. 또한, 파지 이송장치(6)의 그립퍼(17a)(17b)는 후퇴위치에서 파스너 체인(F)(F')의 선단부를 파지하고 있다. 이것을 초기상태라고 한다.(end). As shown in FIG. 6 (a), the upper frame 8, the pinch roller 21, the slider subtractor 4, and the upper frame 5a of the injection molding machine 5 are all in the lifted position, and the fastener chain F ( The space portion 26 of F ') (one fastener chain F' is not shown) is located between the upper frame 8 and the lower frame 7. Moreover, the grippers 17a and 17b of the gripper conveying apparatus 6 hold | grip the front-end | tip part of the fastener chain F (F ') in a retreat position. This is called the initial state.

(나). 부품 공급장치(3), 슈트(14)를 거쳐서 이송되며 온 슬라이더(S)를 슬라이더 감삽장치(4)가 잡아쥐고 수직위까지 요동하여서, 슬라이더(S)를 파스너 체인(F)의 이동경로상에 도입한다. 무단벨트(18)가 구동되어 파지 이송장치(6)(6')가 파스너 체인(F)(F')을 파지한 채로 전진하기 시작하고, 이와 동시에 회전하고 있는 구동로울러(20)상에 핀치로울러(21)가 하강하며, 그립퍼(17a)(17b)에 의해서 이송되어온 파스너 체인(F)(F')은 이들 로울러 사이에 끼워져 이송된다〔제6도(b)참조〕.(I). The slider (S) is conveyed through the component supply device (3) and the chute (14), and the slider subtractor (4) is grasped and swinged vertically so that the slider (S) is moved on the fastener chain (F). To be introduced. The endless belt 18 is driven and the gripper feeder 6, 6 'starts to move forward while holding the fastener chains F and F', and at the same time the pinch on the rotating drive roller 20 The roller 21 descends, and the fastener chains F (F ') conveyed by the grippers 17a and 17b are sandwiched between these rollers and conveyed (see FIG. 6 (b)).

(다) 그립퍼(17a)(17b)가 더욱 전진하면, 한쪽의 파스너 체인(F)이 슬라이더(S)에 삽입된다. 이와같이 삽입된 후, 슬라이더(S)는 슬라이더 감삽장치(4)로 부터 이탈한다〔제6도(b)〕.(C) When the grippers 17a and 17b are further advanced, one fastener chain F is inserted into the slider S. After being inserted in this way, the slider S is detached from the slider subtractor 4 (FIG. 6B).

(라) 그립퍼(17b)가 검지기(P4)로 검지되면, 파지 이송장치(6)(6') 및 로울러 이송장치(19)(19')는 저속 이송으로 바뀌고, 이들 이송장치(6)(6'),(19)(19')에 의하여 파스너 체인(F)(F')이 저속으로 전진한다. 그리고, 스페이스부분(26)의 제1엘레멘트(27a)가 검지기(P1)로 검지되면, 이 신호에 의하여 파지 이송장치(6)(6') 및 로울러 이송장치(19)(19')가 정지하여 파스너 체인의 이동이 정지됨과 동시에 윗틀(8)이 하강한다. 또, 테이프 누름부재(10)로 테이프를 누름과 동시에 펀치부재(11)로 보강필름(29)에 펀치부(35)를 형성하여서, 박리장치 가공을 시행한다. 또한, 테이프 누름부재(10)의 하강에 의한 검지기(P2)의 신호에 따라 절단부재(12)가 완복운동(하강→상승)하고, 이에 의해 파스너 체인(F)(F')은 스페이스부분(26)에서 절단된다〔제6도(c)〕.(D) When the gripper 17b is detected by the detector P 4 , the gripper feeder 6, 6 'and the roller feeder 19, 19' are changed to low speed feed, and these feeder 6 The fastener chains F and F 'are advanced at low speed by 6' and 19 and 19 '. Then, when the first element 27a of the space portion 26 is detected by the detector P 1 , the gripping feeder 6, 6 ′ and the roller feeder 19, 19 ′ are driven by this signal. At the same time, the fastener chain stops moving and the upper frame 8 descends. Further, at the same time the tape is pressed by the tape pressing member 10, the punching member 35 is formed on the reinforcing film 29 by the punching member 11, and the peeling apparatus processing is performed. In addition, the cutting member 12 loosens (falls and then rises) in response to the signal of the detector P 2 due to the lowering of the tape pressing member 10, whereby the fastener chains F and F 'are space portions. It is cut | disconnected in (26) [FIG. 6 (c)].

(마). 파지 이송장치(6)(6') 및 로울러 이송장치(19)(19')가 다시 구동(저속)되고, 그립퍼(17b)가 검지기(P5)에 검지되면 파지 이송장치(6)가 정지하며, 단위 파스너 체인(파스너 1개분의 길이로 절단된 것을 의미함)(F1)(F1')의 선단은 사출성형기(5)의 성형부에 일치된다. 또, 로울러 이송장치(19)(19')는 정지하고 (정지하지 않아도 됨), 핀치로울러(21)는 상승한다. 이어서, 사출성형기(5)의 윗틀(5a)이 이동하여 단위 파스너 체인(F1)의 선단에 상자체(23)와 상자봉(22)이, 그리고 다른쪽 단위 파스너 체인(F1')에 접봉(24)이 사출 성형된다. 사출성형이 완료된 후, 단위 파스너 체인(F1)(F1')은 스크레이퍼 등의 배출수단에 의하여 아랫쪽의 배출부(25)로 낙하된다〔제6도(d)〕.(hemp). Gripping the transfer device 6 (6 ') when and a roller feeding device (19) (19') is re-driven (low speed), the gripper (17b) is detected in the detector (P 5), the grip transport unit 6 stops And the tip of the unit fastener chain (meaning to be cut to the length of one fastener) F 1 (F 1 ′) corresponds to the molding part of the injection molding machine 5. Moreover, the roller feeder 19 (19 ') stops (it does not need to stop), and the pinch roller 21 raises. Subsequently, the upper frame 5a of the injection molding machine 5 is moved to the box 23 and the box rod 22 at the tip of the unit fastener chain F 1 , and to the other unit fastener chain F 1 ′. The fold 24 is injection molded. After the injection molding is completed, the unit fastener chains F 1 (F 1 ′) fall to the lower discharge portion 25 by a discharge means such as a scraper (Fig. 6 (d)).

동시에 그립퍼(17a)(17b)가 후퇴하여 검지기(P3)에 의해 그립퍼(17b)의 후퇴위치가 검지되며, 이 검지 신호에 따라 그립퍼(17a)(17b)가 다음번 파스너 체인(F)(F')을 파지하고, 이어서 윗틀(8)이 상승하여 제6(a)도의 상태로 된다. 이하, 마찬가지의 동작을 되풀이함으로써 개리감삽구가 부착된 파스너를 연속적으로 제조하는 것이다.At the same time, the grippers 17a and 17b retreat, and the retracted position of the grippers 17b is detected by the detector P 3 , and the gripper 17a and 17b is next fastened by the fastener chain F and F according to the detection signal. ') Is gripped, and then the upper frame 8 is raised to the state of FIG. 6 (a). In the following, the same operation is repeated to continuously manufacture the fastener with the insertion opening.

상기 작동에 있어서는, (다)의 공정에서 슬라이더가 삽통된 후에 (마)의 공정에서 검지기(P1)가 제1 엘레멘트(27a)를 검지하여 체인의 이송을 정지시키고 윗틀(8)의 하강에 의하여 펀치가공 및 절단을 행하고 있으나, 매우 짧은 파스너의 경우에는 파스너 체인이 슬라이더(S)에 도달하기 이전에 스페이스부분(26)이 윗틀(8)과 밑틀(7)사이에 도달하여서, 검지기(P1)가 제1엘레멘트(27a)를 검지할 경우가 있을 수도 있다.In the above operation, after the slider is inserted in the process of (c), the detector P 1 detects the first element 27a in the process of (e) to stop the conveyance of the chain and to lower the upper frame 8. Although punching and cutting are performed by the above, in the case of a very short fastener, the space portion 26 reaches between the upper frame 8 and the lower frame 7 before the fastener chain reaches the slider S, so that the detector P 1 ) may detect the first element 27a.

이런 경우에는 상기(다)의 공정이 (라)의 공정 다음에 행하여 진다.In such a case, the above step (c) is performed after the step (d).

(B) 긴 파스너의 경우 ;(B) for long fasteners;

(가)내지 (다)의 공정은(A)의 경우와 동일하다.The process of (a)-(c) is the same as that of (A).

(라). 그립퍼(17b)가 검지기(P4)로 검지되면 파지 이송장치(6)(6')와 로울러 이송장치(19)(19')가 저속으로 바뀌어 파스너 체인(F)(F')은 저속으로 이송되고, 그립퍼(17b)가 검지기(P5)로 검지되면 파지 이송장치(6)(6')가 정지하여 파스너 체인의 선단은 사출성형기(5)의 성형부에 일치하며 사출성형기(5)의 윗틀이 하강함에 의해 성형을 시작하고, 성형이 완료되면 그립퍼(17a)(17b)가 제6도(a)의 위치로 복귀하여 검지기(P3)로 검지된다.(la). When the gripper 17b is detected by the detector P 4 , the gripper feeder 6, 6 ′ and the roller feeder 19, 19 ′ change to low speed, and the fastener chains F and F ′ move to low speed. When the gripper 17b is detected by the detector P 5 , the gripper feeder 6, 6 ′ stops, and the tip of the fastener chain coincides with the molding part of the injection molding machine 5, and the injection molding machine 5 Molding starts by lowering the upper frame of the, and when the molding is completed, the grippers 17a and 17b return to the position of Fig. 6 (a) and are detected by the detector P 3 .

이와같이, 긴 파스너의 경우에는 파스너 체인이 사출성형기(5)에 도달한 시점〔파지 이송장치장치(6)(6')의 이송은 정지하고 있다〕에서 스페이스부분(26)은 아직 윗틀(8)과 밑틀(7)에 까지 도달하지 못하였으므로 로울러 이송장치(19)(19')에 의한 체인 이송동작이 계속되며, 제1엘리멘트(27a)가 검지기(P1)에 검지되었을 때에 이 검지신호에 따라 핀치로울러(21)가 상승함으로써 체인의 이송이 완전히 정지된다.As described above, in the case of the long fastener, at the time when the fastener chain reaches the injection molding machine 5 (the conveyance of the holding device 6, 6 'is stopped), the space portion 26 is still the upper frame 8 The chain conveying operation by the roller feeder 19 (19 ') is continued since it has not reached the end 7 and the bottom frame 7, and when the first element 27a is detected by the detector P 1 , As a result, the pinch roller 21 is raised so that the conveyance of the chain is completely stopped.

또한, 검지기(P1)의 신호에 따라 윗틀(8)이 하강하여 테이프 누름가공과 펀치가공을 행하는 동시에, 그립퍼(17a)(17b)가 다음번 파스너 체인을 잡는다. 그리고, 테이프 누름부재(10)의 하강에 의한 검지기(P2)로 부터의 신호에 따라 절단부재(12)가 왕복동작하여서 파스너 체인을 절단한다. 이어서, 윗틀(8)이 상승하여 제6(a)도의 상태로 되고, 이하(가) 내지 (라)의 동작을 되풀이하는 것이다.In addition, the upper frame 8 is lowered in accordance with the signal of the detector P 1 to perform tape pressing and punching, and the grippers 17a and 17b next hold the fastener chain. Then, the cutting member 12 reciprocates in accordance with the signal from the detector P 2 due to the lowering of the tape pressing member 10 to cut the fastener chain. Subsequently, the upper frame 8 is raised to the state of FIG. 6 (a), and the following operations (a) to (d) are repeated.

이상과 같이, 본 발명에 의하면 파스너 체인의 소정 길이로의 절단, 슬라이더의 삽입, 개리감삽구의 성형부착 등과 같은 일련의 공정이 완전자동으로 능률적으로 이루어짐과 동시에, 길이의 길고 짧음에 관계없이 어떠한 파스너에도 적용될 수 있는 효과가 있다.As described above, according to the present invention, a series of processes such as cutting the fastener chain to a predetermined length, inserting the slider, forming and attaching the opening and closing hole, etc. are performed efficiently and completely at the same time. There is also an effect that can be applied to fasteners.

Claims (1)

밑틀상에 배치된 테이프 누름부재 및 절단부재를 포함하여 승강 가능한 윗틀과 이 윗틀과 밑틀의 전방에 배치된 사출성형기와, 윗틀 및 밑틀과 사출성형기의 사이를 전진 후퇴하며 전진시에 테이프를 파지하는 그립퍼를 가진 파지 이송장치와, 슬라이더를 지지하여 파스너 체인의 통과위치에 배치시키는 슬라이더 감삽장치를 설치한 것을 특징으로 하는 개리감삽구가 부착된 파스너의 제조장치.A retractable upper mold including a tape pressing member and a cutting member disposed on the underframe, and an injection molding machine disposed in front of the upper frame and the underframe, and retreating between the upper frame, the underframe and the injection molding machine, and holding the tape at the time of advancing. A gripper feeder having a gripper, and a slider inserter for supporting the slider and placing the slider at a passing position of the fastener chain.
KR1019790004659A 1979-12-28 1979-12-28 Apparatus for manufacturing slide fasteners with Garigam insertion slot Expired KR830001621B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019790004659A KR830001621B1 (en) 1979-12-28 1979-12-28 Apparatus for manufacturing slide fasteners with Garigam insertion slot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019790004659A KR830001621B1 (en) 1979-12-28 1979-12-28 Apparatus for manufacturing slide fasteners with Garigam insertion slot

Publications (2)

Publication Number Publication Date
KR830000871A KR830000871A (en) 1983-04-28
KR830001621B1 true KR830001621B1 (en) 1983-08-19

Family

ID=19214031

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019790004659A Expired KR830001621B1 (en) 1979-12-28 1979-12-28 Apparatus for manufacturing slide fasteners with Garigam insertion slot

Country Status (1)

Country Link
KR (1) KR830001621B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100599547B1 (en) * 2005-03-21 2006-07-13 이동율 Slide Fastener Reinforcement Film Attachment Device

Also Published As

Publication number Publication date
KR830000871A (en) 1983-04-28

Similar Documents

Publication Publication Date Title
US4369560A (en) Method of manufacturing slide fasteners
US7255638B2 (en) Handling system for sausages
KR840002315B1 (en) Mechanism for intermittently feeding tape-like articles
CN109066249B (en) USB wire automatic molding machine
JPS6122661B2 (en)
CN109016338B (en) Jig slideway mechanism for USB wire forming equipment and USB wire automatic forming machine
WO2018205861A1 (en) Clothes hang tag automatic production line
JP2001018194A (en) Automatic punching device
US4122594A (en) Method for engaging a slider automatically on a slide fastener chain
KR910006548B1 (en) Elongated Goods Processing Unit
KR20110101925A (en) Automatic supply and retrieval device for semiconductor package lead frame magazine
KR830001621B1 (en) Apparatus for manufacturing slide fasteners with Garigam insertion slot
US4337113A (en) Apparatus for manufacture of sleeves and/or pockets for separator plates
US4627807A (en) Apparatus for manufacturing slide fastener with separable end stop
CN112704304B (en) Zipper cutting, threading and stop-fastening machine and stop-fastening device
US4131993A (en) Means for engaging a slider automatically on a slide fastener chain
JP3545164B2 (en) Method and apparatus for forming space in slide fastener chain
US5059275A (en) Paper feed preparatory device
CN108789588B (en) Full-automatic manipulator cut-off machine
CN219628977U (en) Zipper puller penetrating machine for multi-pendant puller
KR100414993B1 (en) Apparatus for simultaneously forming upper and lower ends of slide fasteners
CN111920150A (en) Novel puller mounting machine
CN213550105U (en) Novel puller mounting machine
US4895694A (en) Apparatus for aligning nuclear fuel pellets
CN116278018B (en) Zipper rubberizing punching equipment

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 19791228

PG1605 Publication of application before grant of patent

Comment text: Decision on Publication of Application

Patent event code: PG16051S01I

Patent event date: 19830720

PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 19831026

PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 19831111

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 19831111

End annual number: 3

Start annual number: 1

PR1001 Payment of annual fee

Payment date: 19860520

Start annual number: 4

End annual number: 4

PR1001 Payment of annual fee

Payment date: 19870520

Start annual number: 5

End annual number: 5

PR1001 Payment of annual fee

Payment date: 19880610

Start annual number: 6

End annual number: 6

PR1001 Payment of annual fee

Payment date: 19890527

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 19900625

Start annual number: 8

End annual number: 8

PR1001 Payment of annual fee

Payment date: 19910709

Start annual number: 9

End annual number: 9

PR1001 Payment of annual fee

Payment date: 19920722

Start annual number: 10

End annual number: 10

PR1001 Payment of annual fee

Payment date: 19930728

Start annual number: 11

End annual number: 11

PR1001 Payment of annual fee

Payment date: 19940729

Start annual number: 12

End annual number: 12

PC1801 Expiration of term