KR20170000116U - Freight platform device of liftable construction - Google Patents
Freight platform device of liftable construction Download PDFInfo
- Publication number
- KR20170000116U KR20170000116U KR2020150004393U KR20150004393U KR20170000116U KR 20170000116 U KR20170000116 U KR 20170000116U KR 2020150004393 U KR2020150004393 U KR 2020150004393U KR 20150004393 U KR20150004393 U KR 20150004393U KR 20170000116 U KR20170000116 U KR 20170000116U
- Authority
- KR
- South Korea
- Prior art keywords
- movable platform
- hull
- guide rail
- platform
- cargo
- Prior art date
Links
Images
Classifications
-
- B63B27/02—
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/10—Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/14—Arrangement of ship-based loading or unloading equipment for cargo or passengers of ramps, gangways or outboard ladders ; Pilot lifts
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Ship Loading And Unloading (AREA)
- Jib Cranes (AREA)
Abstract
The present invention relates to a platform mechanism installed on a ship 10 for guiding the loading and unloading of cargo, comprising: a guide rail 20 vertically fixed to one side of the ship 10; A movable platform (30) installed on the guide rail (20) so as to be movable up and down, and connected to receive power from the hull (10); And a position fixing means (40) installed to interlock the engagement between the hull (10) and the movable platform (30).
Accordingly, there is an effect of preventing the damage by reducing the impact due to the up and down movement of the hull caused by the waves during the off-loading and unloading process of loading and unloading the cargo between the offshore structure and the supply line.
Description
The present invention relates to a cargo platform, and more particularly, to a cargo platform mechanism of a vertically moving structure for loading and unloading cargo including various equipment between an offshore structure and a supply ship.
Often, offshore structures such as FPSO are loaded or unloaded for maintenance. In case of overboard lifting by lifting the equipment directly by using the crane, there is a risk of shock between the lifting equipment and the supply deck due to the up and down movement of the hull due to the waves. As a result, off-peak lifting operations are usually limited on high waves in offshore structures.
As a countermeasure thereto, prior art documents such as Korean Patent Registration No. 0471180 (Prior Art 1) and Korean Patent Registration No. 1400008 (Prior Art 2) can be reviewed.
The prior art document 1 includes a rotating device installed between an upper structure and a lower structure for facilitating rotation of the lower structure; And a rotation angle fixing device provided on one side of the rotation device for adjusting a rotation angle of the rotation device. Therefore, it is expected that the time required for shipment and unloading of special baggage will be shortened and safety will be improved.
Prior Art 2 is a wire disposed outside the accommodation space to raise and lower a target object; A lifting / lowering control unit including a crane that adjusts the length of the wire; And a flow decay unit coupled to the object to provide an external force such that the wire maintains a tension state corresponding to the rising and falling of the object and the flow of the object is prevented. Accordingly, the effect of reducing the flow of the object by the movement of the ship is expected.
However, in the prior art document 1, it is difficult to solve the fluctuation in the up and down direction even if the angle of rotation is adjusted as a structure suitable for special cargo. In the prior art document 2, since the object is raised and lowered in the accommodation space formed in the ship, Is insufficient.
In order to solve the above-mentioned problems, the present invention provides a cargo platform mechanism of a vertically moving structure for reducing impact due to up and down movement of a hull caused by waves by applying a vertical movement guide rail and a movable platform have.
In order to achieve the above object, the present invention provides a platform mechanism installed on a hull for guiding the loading and unloading of cargo, comprising: a guide rail vertically fixed to one side of a hull; A movable platform movable up and down on the guide rail and connected to receive power from the hull; And a position fixing means installed to interlock the engagement between the hull and the movable platform.
As a detailed configuration of the present invention, the guide rail is characterized by having a plurality of guide rollers on at least two surfaces.
As a detailed configuration of the present invention, the movable platform is connected to a wire rope of a crane and receives power of up and down movement.
As a detailed construction of the present invention, the movable platform has a flap which is rotatably movable at one end via a hinge.
As a detailed construction of the present invention, the position fixing means includes a toothed belt provided adjacent to the guide roller, a pivotal table rotatably mounted on the movable platform, and teeth fixed to one end of the pivotal table so as to be engageable with the toothed belt .
As described above, according to the present invention, there is an effect of preventing the damage by reducing the impact due to the up and down movement of the hull caused by the waves during the off-loading and unloading process of loading and unloading cargo between the offshore structure and the supply ship.
In addition, the present invention can be manufactured with a relatively simple and inexpensive lightweight structure, and has the effect of eliminating the additional cost by using the power of the installed crane.
Fig. 1 is a schematic view showing the entirety of the platform mechanism according to the present invention
Fig. 2 is a configuration diagram showing the platform of the mechanism according to the present invention separated. Fig.
3 is a schematic view showing a position fixing means of the mechanism according to the present invention
4 is a schematic diagram showing an operating state of the apparatus according to the present invention;
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
The present invention proposes a platform mechanism installed on the
According to the present invention, the
As a detailed configuration of the present invention, the
According to the present invention, a
As a detailed configuration of the present invention, the
As a detailed configuration of the present invention, the
According to the present invention, the position fixing means 40 is provided so as to interlock the engagement between the
The position fixing means 40 includes a toothed table 25 provided adjacent to the
When the
4, when the
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention as defined by the appended claims. Accordingly, such variations or modifications should fall within the scope of the utility model registration claims of the present invention.
10: Hull 12: Crane
15: wire rope 20: guide rail
22: Guide roller 25: Toothed belt
30: a
34: flap 36: hinge
40: Position fixing means 41:
43: Hinge 45: Toothed
47:
Claims (5)
A guide rail 20 vertically fixed to one side of the hull 10;
A movable platform (30) installed on the guide rail (20) so as to be movable up and down, and connected to receive power from the hull (10); And
And a position fixing means (40) installed to interlock the engagement between the hull (10) and the movable platform (30).
Wherein the guide rail (20) has a plurality of guide rollers (22) on at least two sides.
Wherein the movable platform (30) is connected to the wire rope (15) of the crane (12) and receives power of up and down movement.
Wherein the movable platform (30) is provided with a flap (34) capable of turning through a hinge (36) at one end thereof.
The position fixing means 40 includes a toothed belt 25 provided adjacent to the guide roller 22, a pivotal table 41 which is rotatably mounted on the movable platform 30, And a tooth (45) fixed to be engaged with the toothed belt (25).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020150004393U KR20170000116U (en) | 2015-06-30 | 2015-06-30 | Freight platform device of liftable construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020150004393U KR20170000116U (en) | 2015-06-30 | 2015-06-30 | Freight platform device of liftable construction |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20170000116U true KR20170000116U (en) | 2017-01-09 |
Family
ID=57797572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020150004393U KR20170000116U (en) | 2015-06-30 | 2015-06-30 | Freight platform device of liftable construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20170000116U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110498020A (en) * | 2019-08-28 | 2019-11-26 | 宜昌东江造船有限公司 | Amphibious type LNG tank formula container loading and unloading ship and costume changing method |
KR20220040076A (en) | 2020-09-23 | 2022-03-30 | 삼성중공업 주식회사 | System for generating cargo transfer route of crane |
KR20220114788A (en) | 2021-02-09 | 2022-08-17 | 삼성중공업 주식회사 | Container for marine loading and unloading |
CN117602018A (en) * | 2024-01-23 | 2024-02-27 | 威海瀚克船舶科技有限公司 | Springboard equipment convenient for loading and unloading goods stably |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100471180B1 (en) | 2002-08-05 | 2005-03-08 | 김이수 | Multi-purpose lifting device |
KR101400008B1 (en) | 2012-09-06 | 2014-05-28 | 삼성중공업 주식회사 | An Object Lifting Devices for Ships to Reduce the Flux |
-
2015
- 2015-06-30 KR KR2020150004393U patent/KR20170000116U/en not_active Application Discontinuation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100471180B1 (en) | 2002-08-05 | 2005-03-08 | 김이수 | Multi-purpose lifting device |
KR101400008B1 (en) | 2012-09-06 | 2014-05-28 | 삼성중공업 주식회사 | An Object Lifting Devices for Ships to Reduce the Flux |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110498020A (en) * | 2019-08-28 | 2019-11-26 | 宜昌东江造船有限公司 | Amphibious type LNG tank formula container loading and unloading ship and costume changing method |
CN110498020B (en) * | 2019-08-28 | 2021-09-24 | 湖北东船重工有限公司 | Amphibious LNG tank container reloading ship and reloading method |
KR20220040076A (en) | 2020-09-23 | 2022-03-30 | 삼성중공업 주식회사 | System for generating cargo transfer route of crane |
KR20220114788A (en) | 2021-02-09 | 2022-08-17 | 삼성중공업 주식회사 | Container for marine loading and unloading |
CN117602018A (en) * | 2024-01-23 | 2024-02-27 | 威海瀚克船舶科技有限公司 | Springboard equipment convenient for loading and unloading goods stably |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102320381B (en) | Intelligent following type passenger boarding bridge | |
KR20170000116U (en) | Freight platform device of liftable construction | |
NL2004337C2 (en) | Method for use with maintenance of offshore wind turbines, and assembly comprising a vessel and a lift device. | |
CN108639253B (en) | A kind of improved ship pulls in shore attachment device | |
CN101857075B (en) | Lifting system of slipway | |
CN115258979A (en) | Ship lifting device based on image monitoring and method thereof | |
EP2697111B1 (en) | Vessel comprising a crane | |
KR20130124743A (en) | Tower having automatic height adjusting type passage way between ship and wharf | |
CN202208360U (en) | Intelligent follow-up passenger boarding bridge | |
US8636157B2 (en) | Screw-driven vertically-elevating cab | |
JP2015168485A (en) | Crane device, work ship, and work method of ocean wind power generation facility | |
CN101337575A (en) | Anchor handling device | |
KR100895112B1 (en) | Device for pulling out a Ship | |
CN202542723U (en) | Control cabin regulating mechanism and engineering machine | |
KR101477081B1 (en) | Side rolling type hatch cover apparatus | |
CN108840206B (en) | Material receiving device of super high-rise building construction lifter | |
KR101762829B1 (en) | Jigs for lifting | |
CN111332407A (en) | Anchor chain lifter and using method thereof | |
CN203889688U (en) | Chained car loader | |
CN205023740U (en) | Hoist girder safety door hook stop device | |
KR102616078B1 (en) | Weight transfer apparatus and marine structure with the same | |
KR20170034236A (en) | Ship lift import | |
CN106092616A (en) | Wheel alignment meter lowering or hoisting gear and wheel alignment meter | |
JP4851870B2 (en) | Upper limit position stop mechanism | |
JP2006281887A (en) | Boat lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |