KR20060009992A - Method for building and removing mould of bridge and multistage mould - Google Patents
Method for building and removing mould of bridge and multistage mould Download PDFInfo
- Publication number
- KR20060009992A KR20060009992A KR1020040058538A KR20040058538A KR20060009992A KR 20060009992 A KR20060009992 A KR 20060009992A KR 1020040058538 A KR1020040058538 A KR 1020040058538A KR 20040058538 A KR20040058538 A KR 20040058538A KR 20060009992 A KR20060009992 A KR 20060009992A
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- formwork
- vertical
- stage
- wall formwork
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 발명은, 주두부 가시설 상에 외벽거푸집 세트를 안착시키는 제 1단계; 외벽거푸집 세트에 의하여 확보된 공간에 바닥 콘크리트를 형성하는 제 2단계; 바닥 콘크리트 상면에 시스템 서포터를 안착시키고, 외측면이 외벽거푸집 세트의 내측면과 일정거리 이격되도록 수직 내벽판을 설치하는 제 3단계; 1단 콘크리트를 타설하는 제 4단계; 수직 내벽판을 외부로 인출하는 제 5단계; 수평 내벽판을 시스템 서포터 상단부에 결합시키는 제 6단계; 수평 내벽판과 외벽거푸집 세트 상측에 2단 콘크리트를 형성하는 제 7단계; 수평 내벽판과 시스템 서포터를 분해하여 외부로 인출하고, 외벽거푸집 세트를 떼어내는 제 8단계를 포함하도록 구성되어, 내벽거푸집과 외벽거푸집을 설치 및 해체하는데 소요되는 시간을 단축시킬 수 있고 작업의 안전성 및 자재의 재활용성을 향상시킬 수 있으며 내벽거푸집 및 외벽거푸집을 제작하는 공정을 간단히 함으로써 공사비용을 절감시킬 수 있는 교량 거푸집 탈착방법 및 다단식 거푸집을 제공한다.The present invention, the first step of seating the outer wall die set on the head head temporary facility; A second step of forming floor concrete in the space secured by the outer wall formwork set; A third step of installing a system supporter on the bottom concrete upper surface, and installing a vertical inner wall plate such that an outer surface is spaced a predetermined distance from an inner surface of the outer wall formwork set; A fourth step of pouring one-stage concrete; A fifth step of drawing out the vertical inner wall plate to the outside; Coupling a horizontal inner wall plate to the upper end of the system supporter; A seventh step of forming two-stage concrete above the horizontal inner wall plate and the outer wall formwork set; It is configured to include the eighth step of disassembling the horizontal inner wall plate and the system supporter to take it to the outside and removing the outer wall formwork set, which can shorten the time required to install and dismantle the inner wall formwork and the outer wall formwork, And it can improve the recyclability of the material and provides a bridge form desorption method and multi-stage formwork that can reduce the construction cost by simplifying the process of manufacturing the inner wall formwork and the outer wall formwork.
교각, 거푸집, 콘크리트, 외벽, 내벽, 가시설 벤트, 주두부Pier, formwork, concrete, outer wall, inner wall, temporary vent, head tofu
Description
도 1a 내지 도 1c는 교량의 주두부 시공을 위한 종래의 거푸집 착탈과정을 도시한다.Figures 1a to 1c shows a conventional formwork detachment process for the main head construction of the bridge.
도 2는 본 발명에 의한 교량 거푸집 탈착방법의 순서도이다.2 is a flow chart of the bridge formwork desorption method according to the present invention.
도 3a는 주두부 가시설에 외벽거푸집 세트를 결합시키는 형상을 도시한다.Figure 3a shows the shape of coupling the outer wall formwork set to the head head temporary fixture.
도 3b는 수직 외벽판이 기울어지도록 형성되는 외벽거푸집 세트의 형상을 도시한다.Figure 3b shows the shape of the outer wall formwork set is formed so that the vertical outer wall plate is inclined.
도 4는 외벽거푸집 세트의 결합이 완료된 이후에 바닥 콘크리트를 형성하는 형상을 도시한다.Figure 4 shows the shape to form the floor concrete after the completion of the combination of the outer wall formwork set.
도 5 내지 도 6은 수직 내벽판과 시스템 서포터를 설치하는 형상을 도시한다.5 to 6 show the shape of installing the vertical inner wall plate and the system supporter.
도 7은 수직 외벽판과 수직 내벽판 사이에 1단 콘크리트를 형성하는 형상을 도시한다.7 shows a shape of forming one-stage concrete between the vertical outer wall plate and the vertical inner wall plate.
도 8은 수평 내벽판을 설치하는 형상을 도시한다.8 shows a shape of installing a horizontal inner wall plate.
도 9는 수평 내벽판 상측에 2단 콘크리트를 형성하는 형상을 도시한다.9 shows a shape of forming two-stage concrete above the horizontal inner wall plate.
도 10내지 도 11은 외벽 및 내벽거푸집 세트를 해체하는 형상을 도시한다.10 to 11 show a shape of dismantling the outer wall and the inner wall formwork set.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
100 : 외벽거푸집 세트 110 : 1단 외벽거푸집100: outer wall formwork set 110: one-stage outer wall formwork
111, 121 : 수직 외벽판 112, 122 : 수평빔111, 121: vertical
113, 123 : 수직빔 114, 125 : 버팀용 턴버클113, 123:
120 : 2단 외벽거푸집 125 : 수평 외벽판120: two-stage outer wall formwork 125: horizontal outer wall plate
130 : 가시설 벤트 132 : 스크류잭130: provisional vent 132: screw jack
200 : 내벽거푸집 세트 210 : 수직 내벽판200: inner wall die set 210: vertical inner wall plate
212 : 폼-타이 220 : 시스템 서포터212: form-tie 220: system supporter
230 : 수평 내벽판 310 : 바닥 콘크리트230: horizontal inner wall plate 310: floor concrete
320 : 1단 콘크리트 330 : 2단 콘크리트320: 1st stage concrete 330: 2nd stage concrete
본 발명은 교량의 주두부 시공 시 거푸집을 파손시키지 아니하고 탈착시키는 방법 및 이와 같은 시공이 가능하도록 구성되는 다단식 거푸집에 관한 것으로, 더 상세하게는 주두부 가시설 상단에 제작이 완료된 거푸집을 인양하여 설치한 후 콘크리트 타설을 하고, 콘크리트의 양생이 완료되면 거푸집을 분해하지 아니한 채로 떼어냄으로써, 교량 시공 공정을 단순화시킬 수 있고 거푸집 제작에 소요되는 시간 및 비용을 절감할 수 있도록 구성되는 거푸집 탈착방법과 상기와 같은 방법으로 탈착될 수 있도록 구성되는 다단식 거푸집에 관한 것이다.The present invention relates to a multi-stage formwork configured to be detachable without damaging the formwork during the construction of the main head of the bridge, and more specifically, to the installation of the completed form on top of the main head head temporary installation After the concrete is poured and the curing of the concrete is completed, the formwork is removed without disassembling, thereby simplifying the bridge construction process and reducing the time and cost required for formwork. It relates to a multi-stage formwork configured to be detachable in the same way.
통상적인 교량의 주두부 시공은, 내벽거푸집과 외벽거푸집을 제작한 후 콘크리트 타설을 하고, 콘크리트 양생이 완료되면 내벽거푸집 및 외벽거푸집을 해체하여 제거하는 단계로 구성된다.The main head construction of a conventional bridge is composed of concrete pouring after the inner wall formwork and the outer wall formwork, and dismantles and removes the inner wall formwork and the outer wall formwork when the concrete curing is completed.
이하 첨부된 도면을 참조하여 교량의 주두부 시공을 위한 종래의 거푸집과 거푸집 탈착방법에 관하여 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described with respect to the conventional formwork and formwork desorption method for the construction of the main head of the bridge.
도 1a 내지 도 1c는 교량의 주두부 시공을 위한 종래의 거푸집 착탈과정을 도시한다.Figures 1a to 1c shows a conventional formwork detachment process for the main head construction of the bridge.
종래의 방법으로 거푸집을 설치하는 경우, 우선 도 1a에 도시된 바와 같이 주두부 가시설(10) 상면에 수직 외벽판(22)과 지지구조체(25)을 설치하고 다수의 조각판넬(32)을 연결하여 내벽거푸집(30)을 설치한 후, 일정 높이로 콘크리트를 타설하여 바닥 콘크리트(40)를 형성한다.In the case of installing the formwork according to the conventional method, as shown in FIG. 1A, first, a vertical
바닥 콘크리트(30)가 일정강도 이상 양생되면 도 1b에 도시된 바와 같이 지지구조체(25) 상면에 동바리(26)를 설치하고, 동바리(26)에 하중이 인가되는 구조로 수평 외벽판(24)을 설치함으로써 외벽거푸집(20)을 완성한다. 외벽거푸집(20)이 완성되면, 수평 외벽판(24) 상단부까지 콘크리트를 타설하여 1단 콘크리트(50)를 형성하는데, 이때 1단 콘크리트(50)는 내벽거푸집(30)을 구성하는 조각판넬(32)의 인출이 가능한 판넬 인출구가 형성되도록 타설된다.When the
바닥 콘크리트(40) 및 1단 콘크리트(50)의 양생이 완료되면 외벽거푸집(20) 및 내벽거푸집(30)을 해체하게 되는데, 이때 외벽거푸집(20)은 도 1c에 도시된 바와 같이 동바리(26), 수평 외벽판(24), 지지구조체(25), 수직 외벽판(22)이 각각 분리되어 해체되고, 내벽거푸집(30)은 각 조각판넬(32)이 분리된 후 판넬 인출구를 통하여 인출되는 방법으로 해체된다.When curing of the
그러나, 상기와 같은 방법으로 거푸집(20, 30)을 설치 및 해체하는 경우, 수직 외벽판(22)의 수직을 유지하기가 매우 어려울 뿐만 아니라 작업이 매우 위험하고, 수평 외벽판(24)에 동바리(26)를 설치하기 위해서는 동바리용 벤트를 별도로 제작하여 설치해야하며, 동바리용 벤트의 무게를 가산하여 주두부 가시설(10)의 부재를 더 견고하게 제작하여야 하므로 가시설의 중량 또한 늘어나게 된다는 문제점이 있었다. However, in the case of installing and dismantling the
또한, 내벽거푸집(30)을 설치하는 과정에 있어서도 각 조각판넬(32)을 결합시켜야 하므로 설치시간이 오래 걸릴 뿐만 아니라, 내벽거푸집(30) 해체 시 각 조각판넬(32)을 분리해서 뜯어내야 하므로 자재의 손실이 증가되고 한번 설치된 내벽거푸집(30)을 그대로 재사용할 수 없으므로 시공시간이 증가하게 된다는 단점도 있었다.In addition, in the process of installing the
본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 내벽거푸집과 외벽거푸집을 설치 및 해체하는데 소요되는 시간을 단축시킬 수 있고, 작업의 안전성 및 자재의 재활용성을 향상시킬 수 있으며, 내벽거푸집 및 외벽거푸집을 제작하는 공정을 간단히 함으로써 공사비용을 절감시킬 수 있는 교량 거푸집 탈착방법 및 다단식 거푸집을 제공하는데 목적이 있다.
The present invention has been made to solve the above problems, can shorten the time required to install and dismantle the inner wall formwork and the outer wall formwork, can improve the safety of work and recycling of materials, the inner wall formwork And by simplifying the process of manufacturing the outer wall formwork is to provide a bridge formwork desorption method and multi-stage formwork that can reduce the construction cost.
상기와 같은 목적을 달성하기 위한 본 발명에 의한 교량 거푸집 설치방법은, 주두부 가시설 상에 콘크리트 타설이 가능한 공간이 확보되도록 외벽거푸집 세트를 안착시키는 제 1단계; 외벽거푸집 세트에 의하여 확보된 공간에 시스템 서포터를 안착시키고, 외측면이 외벽거푸집 세트의 내측면과 일정거리 이격되도록 수직 내벽판을 설치하는 제 2단계; 외벽거푸집 세트와 수직 내벽판 사이에 팀버(Timber) 인출구가 형성되도록 1단 콘크리트를 타설하는 제 3단계; 수직 내벽판을 외부로 인출하는 제 4단계; 외측 끝단이 1단 콘크리트의 내측면 전체에 밀착되도록 형성되는 수평 내벽판을 시스템 서포터 상단부에 결합시키는 제 5단계; 수평 내벽판과 외벽거푸집 세트 상측에 2단 콘크리트를 형성하는 제 6단계; 수평 내벽판과 시스템 서포터를 분해하여 팀버 인출구를 통해 외부로 인출하고, 외벽거푸집 세트를 떼어내는 제 7단계를 포함하도록 구성된다.Bridge formwork installation method according to the present invention for achieving the above object, the first step of seating the outer wall formwork set to secure a space that can be cast concrete on the head head temporary facility; A second step of mounting a system supporter in a space secured by the outer wall form set, and installing a vertical inner wall plate such that an outer surface is spaced a predetermined distance from an inner surface of the outer wall form set; A third step of pouring the first stage concrete so that a Timber outlet is formed between the outer formwork set and the vertical inner wall plate; A fourth step of drawing out the vertical inner wall plate to the outside; A fifth step of coupling a horizontal inner wall plate formed so that the outer end is in close contact with the entire inner surface of the first stage concrete to the upper end of the system supporter; A sixth step of forming two-stage concrete above the horizontal inner wall plate and the outer wall formwork set; And a seventh step of disassembling the horizontal inner wall plate and the system supporter, taking it out through the timbre outlet, and removing the outer wall formwork set.
외벽거푸집 세트는, 수직높이 조절이 가능한 구조로 구성되는 가시설 벤트와, 수직 외벽판과 수평빔으로 구성되는 하나 이상의 외벽거푸집을 포함하여 구성되고; 제 1단계는, 주두부 가시설 상면에 가시설 벤트를 결합하는 1-1단계와, 가시설 벤트 상면에 외벽거푸집을 결합하는 1-2단계를 포함하여 구성되고; 제 7단계는, 가시설 벤트의 수직높이를 낮추는 7-1단계와, 외벽거푸집을 인양하는 7-2단계를 포 함하여 구성된다.The outer wall formwork set includes a temporary vent having a structure capable of vertical height adjustment, and at least one outer wall formwork composed of a vertical outer wall plate and a horizontal beam; The first step includes steps 1-1 for coupling the temporary vent to the upper surface of the temporary head temporary facility and 1-2 steps for coupling the outer wall formwork to the upper surface of the temporary vent; The seventh step includes steps 7-1 for lowering the vertical height of the provisional vent and step 7-2 for lifting the outer wall formwork.
외벽거푸집은, 수직 외벽판과 수평빔으로 형성되어 가시설 벤트 상면에 결합되는 1단 외벽거푸집과, 상단부에 수평 외벽판을 구비하여 1단 외벽거푸집 상면에 결합되는 2단 외벽거푸집을 포함하여 구성되고; 7-2단계는, 2단 외벽거푸집을 인양하는 단계와, 1단 외벽거푸집을 인양하는 단계를 포함하도록 구성된다.The outer wall formwork includes a first stage outer wall formwork formed of a vertical outer wall plate and a horizontal beam and coupled to an upper surface of a temporary facility vent, and a second stage outer wall formwork coupled to an upper surface of a first stage outer wall formwork having a horizontal outer wall plate at an upper end thereof. ; Step 7-2 is configured to include lifting the two-stage outer wall formwork and lifting the first-stage outer wall formwork.
이때, 1단 외벽거푸집은, 1단 콘크리트의 높이에 따라 수직 방향으로 둘 이상 적재되어 설치되도록 구성될 수 있다. At this time, the first stage outer wall formwork, it may be configured to be installed two or more in the vertical direction depending on the height of the first stage concrete.
2단계에서 수직 내벽판을 설치하는 방법은, 폼-타이(Form-tie)를 이용하여 외벽거푸집 세트의 내측면과 일정거리 이격되도록 외벽거푸집 세트에 결합시키도록 구성되고; 제 4단계는, 폼-타이를 제거한 후 수직 내벽판을 외부로 인양하도록 구성된다.The method of installing the vertical inner wall plate in the second step is configured to be coupled to the outer wall formwork set so as to be spaced a certain distance from the inner surface of the outer wall formwork set using a form-tie; The fourth step is configured to lift the vertical inner wall plate outward after removing the form-tie.
또한, 본 발명에 의한 다단식 거푸집은, 수평 및 수직 하중을 견딜 수 있는 일체형 구조로 형성되며, 수직 콘크리트 타설이 가능한 공간이 확보되도록 중심부가 비어있는 구조로 주두부 가시설 상면에 결합되는 둘 이상의 외벽거푸집 세트와; 외측면이 외벽거푸집 내측면에 일정간격 이격되도록 결합되는 내벽거푸집 세트를 포함하여 구성된다.In addition, the multi-stage formwork according to the present invention is formed of an integral structure capable of withstanding horizontal and vertical loads, two or more outer wall formwork coupled to the upper surface of the head head temporary structure in a structure in which the center is empty so as to secure space for vertical concrete pouring A set; It is configured to include an inner wall form set is coupled to the outer surface is spaced apart from the inner wall form a predetermined interval.
외벽거푸집 세트는, 수직높이 조절이 가능한 구조로 구성되는 가시설 벤트와, 수직 외벽판과 수평빔이 결합되도록 구성되는 하나 이상의 외벽거푸집을 포함하도록 구성된다. The outer wall formwork set is configured to include a provisional vent having a structure capable of adjusting the vertical height, and at least one outer wall formwork configured to couple the vertical outer wall plate and the horizontal beam.
이때, 외벽거푸집은, 가시설 벤트 상면에 결합되는 1단 외벽거푸집과; 상측 면에 콘크리트 타설이 가능한 형상으로 형성되는 수평 외벽판이 이 상단부에 추가로 구비되어 1단 외벽거푸집 상면에 결합되는 2단 외벽거푸집을 포함하여 구성된다. 또한, 외벽거푸집은, 양 끝단이 수직 외벽판과 수평빔에 결합되어 수직 외벽판을 지지하도록 구성되며, 자체 길이 조절이 가능한 구조로 구성되는 버팀용 턴버클을 추가로 구비한다.At this time, the outer wall formwork, the first stage outer wall formwork coupled to the upper surface of the vent vent; A horizontal outer wall plate formed in a shape capable of placing concrete on the upper side is additionally provided at the upper end and includes a two-stage outer wall formwork coupled to the upper surface of the first stage formwork. In addition, the outer wall formwork is coupled to the vertical outer wall plate and the horizontal beam both ends are configured to support the vertical outer wall plate, and further includes a turnbuckle for the brace is configured of a structure capable of self-length adjustment.
내벽거푸집 세트는, 외측면이 외벽거푸집 세트의 내측면과 일정거리 이격되도록 결합되는 수직 내벽판과; 외벽거푸집 세트보다 낮은 높이를 갖도록 제작되어 외벽거푸집 세트간의 사이에 위치되는 시스템 서포터와; 시스템 서포터 상단에 결합되는 수평 내벽판을 포함하여 구성된다.The inner wall form set includes a vertical inner wall plate coupled to an outer surface to be spaced apart from the inner surface of the outer wall form set by a predetermined distance; A system supporter fabricated to have a lower height than the outer wall formwork set and positioned between the outer wall formwork sets; It is configured to include a horizontal inner wall plate coupled to the top of the system supporter.
이때, 수직 내벽판은, 폼-타이에 의하여 외벽거푸집 세트의 내측면과 일정거리 이격되도록 외벽거푸집 세트에 결합된다. 또한, 시스템 서포터는, 일정 크기 이상의 수직하중을 지지할 수 있으며, 결합 및 분해가 가능한 구조로 구성된다.At this time, the vertical inner wall plate is coupled to the outer wall form set to be spaced a predetermined distance from the inner surface of the outer wall form set by the form-tie. In addition, the system supporter, which can support a vertical load of a predetermined size or more, is composed of a structure that can be combined and disassembled.
이하, 첨부된 도면을 참조하여 본 발명에 의한 교량 거푸집 탈착방법 및 다단식 거푸집의 실시예를 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of the bridge formwork desorption method and multistage formwork according to the present invention.
도 2는 본 발명에 의한 교량 거푸집 탈착방법의 순서도이다.2 is a flow chart of the bridge formwork desorption method according to the present invention.
도 2에 도시된 바와 같이 본 발명에 의한 교량 거푸집 탈착방법은, 스크류잭이 결합되어 수직높이 조절이 가능한 구조로 구성되는 가시설 벤트와, 콘크리트와 직접 접촉되는 수직 외벽판과 각 수직 외벽판의 직립을 위한 수평빔으로 구성되는 둘 이상의 외벽거푸집 세트를 주두부 가시설 상에 콘크리트 타설이 가능한 공간이 확보되도록 안착 및 결합시키는 제 1단계(S10); 외벽거푸집 세트에 의하여 확보된 공간에 시스템 서포터를 안착시키고, 외측면이 외벽거푸집 세트의 내측면과 일정거리 이격되도록 수직평판 형상의 수직 내벽판을 설치하는 제 2단계(S20); 외벽거푸집 세트와 수직 내벽판 사이로 콘크리트를 타설하여 팀버 인출구를 구비하는 수직 벽 형상의 1단 콘크리트를 형성하는 제 3단계(S30); 1단 콘크리트가 일정 크기의 강도를 갖도록 양생되면, 1단 콘크리트 내측벽면에 결합되어있는 수직 내벽판을 떼어 외부로 인출하는 제 4단계(S40); 외측 끝단이 1단 콘크리트의 내측면 상단에 밀착되도록 형성되는 수평 내벽판을 시스템 서포터 상단부에 결합시키는 제 5단계(S50); 수평 내벽판 상측과 외벽콘크리트 세트 상측에 콘크리트를 타설하여 교각의 상판부위가 되는 2단 콘크리트를 형성하는 제 6단계(S60); 2단 콘크리트의 양생이 완료되면 수평 내벽판과 시스템 서포터를 분해하여 팀버 인출구를 통해 외부로 인출하고, 외벽거푸집 세트를 떼어내는 제 7단계(S70)를 포함하도록 구성된다.Bridge form desorption method according to the present invention, as shown in Figure 2, the temporary construction of a structure that can be adjusted vertical height is coupled to the screw jack, a vertical outer wall plate and each vertical outer wall plate in direct contact with concrete A first step (S10) of seating and combining two or more outer wall formwork sets configured as horizontal beams for securing concrete space on the head head temporary facility; A second step (S20) of seating the system supporter in a space secured by the outer wall formwork set and installing a vertical inner wall plate having a vertical flat plate shape so that the outer surface is spaced a predetermined distance from the inner surface of the outer wall formwork set; A third step (S30) of forming concrete between the outer wall formwork set and the vertical inner wall plate to form a vertical wall-shaped first stage concrete having a timbre outlet; When the first-stage concrete is cured to have a certain size of strength, a fourth step (S40) of removing the vertical inner wall plate coupled to the first-stage concrete inner wall surface to the outside; A fifth step (S50) of coupling a horizontal inner wall plate formed so that the outer end is in close contact with the upper end of the inner surface of the first stage concrete to the upper end of the system supporter; A sixth step (S60) of forming concrete on the upper side of the horizontal inner wall plate and the upper side of the outer concrete set to form two-stage concrete that becomes the upper plate portion of the piers; When curing of the two-stage concrete is completed, the horizontal inner wall plate and the system supporter are disassembled and drawn out to the outside through the timber outlet, and the seventh step (S70) of removing the outer wall formwork set is configured.
제 1단계(S10)는 외벽거푸집 세트에 의하여 확보된 공간에 일정높이의 바닥 콘트리트를 형성하는 단계를 더 포함하고; 제 2단계에서 시스템 서포터는, 하측 끝단이 바닥 콘트리트 상면에 밀착되도록 안착된다.The first step (S10) further comprises the step of forming a floor concrete of a certain height in the space secured by the outer wall form set; In the second step, the system supporter is seated so that the lower end is in close contact with the upper surface of the bottom concrete.
이때, 제 1단계는 주두부 가시설 상면에 가시설 벤트를 먼저 결합시킨 후 가시설 벤트 상면에 외벽거푸집을 결합하도록 구성됨이 바람직하고, 제 7단계는 스크류잭을 동작시켜 가시설 벤트의 수직높이를 낮춘 후 외벽거푸집을 인양하여 해체시키도록 구성되어야 한다. In this case, the first step is preferably configured to couple the temporary vent to the upper surface of the temporary head temporary facility, and then combine the outer wall formwork to the upper surface of the temporary vent, and the seventh step is to lower the vertical height of the temporary vent by operating the screw jack It should be configured to lift and dismantle the formwork.
외벽거푸집이 수직 외벽판과 수평빔으로 형성되어 가시설 벤트 상면에 결합되는 1단 외벽거푸집과, 상단부에 수평 외벽판을 구비하여 1단 외벽거푸집 상면에 결합되는 2단 외벽거푸집으로 분리되어 구성되는 경우, 외부거푸집을 인양하여 해체할 때에는 2단 외벽거푸집을 먼저 인양하여 해체한 후 1단 외벽거푸집을 인양하여 해체하여야 한다.When the outer wall formwork is formed into a vertical outer wall plate and a horizontal beam, it is separated into a one-stage outer wall formwork coupled to the upper surface of the temporary facility vent, and a horizontal outer wall form on the upper end and a two-stage outer wall formwork coupled to the upper surface of the first stage outer wall formwork. In case of disassembling by lifting external formwork, second stage outer wall formwork should be lifted first and then dismantled.
또한, 1단 콘크리트가 높게 형성되어야 하는 경우에는, 1단 외벽거푸집을 수직 방향으로 다수 적재함으로써 외벽거푸집 세트 전체의 높이를 높이도록 한다. In addition, when the first-stage concrete is to be formed high, by loading a large number of first-stage outer wall formwork in the vertical direction to increase the height of the entire outer wall formwork set.
2단계에서 수직 내벽판을 외벽거푸집 세트의 내측면과 일정거리 이격되도록 외벽거푸집 세트에 결합시킬 때 폼-타이(Form-tie)를 이용함이 바람직하며, 이에 따라 수직 내벽판을 해체하는 제 4단계에서는 폼-타이를 먼저 제거한 후 수직 내벽판을 외부로 인양하도록 구성되어야 한다.In the second step, it is preferable to use a form-tie when combining the vertical inner wall plate with the outer wall form set so as to be spaced apart from the inner surface of the outer wall form set by a certain distance. Should be configured to first remove the form-tie and then to lift the vertical inner wall to the outside.
도 3a는 주두부 가시설에 외벽거푸집 세트를 결합시키는 형상을 도시한다.Figure 3a shows the shape of coupling the outer wall formwork set to the head head temporary fixture.
도 3a에 도시된 바와 같이 주두부 가시설(10)의 상면에 결합되는 외벽거푸집 세트(100)는, 중단에 스크류잭(132)이 결합되어 수직높이 조절이 가능한 구조로 구성되는 가시설 벤트(130)와, 가시설 벤트(130) 상면에 결합되는 다수의 1단 외벽거푸집(110)과, 1단 외벽거푸집(110) 상면에 결합되는 2단 외벽거푸집(120)을 포함하여 구성된다.As shown in FIG. 3A, the outer wall formwork set 100 coupled to the upper surface of the head head
1단 외벽거푸집(110)과 2단 외벽거푸집(120)은, 콘크리트와 직접 접촉되어 콘크리트를 일정한 형상으로 형성시키는 수직 외벽판(111, 121)과, 외벽거푸집의 직립을 위한 수평빔(112, 122)과, 상부 하중을 지지하는 동바리 역할을 하는 수직빔(113, 123)과, 양 끝단이 수직 외벽판(111, 121)과 수평빔(112, 122)에 결합되어 수직 외벽판(111, 121)을 지지하도록 구성되며 자체 길이 조절이 가능한 구조로 구 성되는 버팀용 턴버클(114, 125)을 포함하여 구성된다. The first stage
또한, 2단 외벽거푸집(120)에는 상측면에 콘크리트 타설이 가능한 형상으로 형성되는 수평 외벽판(124)이 상단부에 추가로 구비되는데, 수평 외벽판(124)의 상측면에 타설되어 양생되는 콘크리트는 차후 주두부의 상판이 된다.In addition, the two-stage
이때, 1단 외벽거푸집(110), 2단 외벽거푸집(120), 가시설 벤트(130)는 모두 주두부 가시설(10)에 결합되기 이전에 독립적으로 제작된다. 따라서 사용자는 사전에 미리 독립적으로 제작된 1단 외벽거푸집(110), 2단 외벽거푸집(120), 가시설 벤트(130)를 인양하여 체결만 시키면 외벽거푸집 세트(100)를 완성할 수 있으므로, 현장에서 직접 외벽거푸집을 제작할 때보다 시공시간을 대폭 단축시킬 수 있을 뿐만 아니라 1단 외벽거푸집(110), 2단 외벽거푸집(120), 가시설 벤트(130)를 수차례 재사용 할 수 있으므로 공사비용을 대폭 감소시킬 수 있게 된다.At this time, the first stage
본 실시예에서 1단 외벽거푸집(110)은 2개가 수직으로 적재되도록 구성되고 있으나, 외벽거푸집 세트(100)의 전체 높이가 낮게 설정되어야 하는 경우 1단 외벽거푸집(110)은 하나만 적용될 수 있고, 외벽거푸집 세트(100)의 전체 높이가 높게 설정되어야 하는 경우에는 셋 이상의 1단 외벽거푸집(110)이 수직으로 적재되도록 적용될 수 있다. 또한, 외벽거푸집 세트(100)의 전체 높이가 매우 낮게 설정되어야 하는 경우, 1단 외벽거푸집(110)이 생략되고 가시설 벤트(130)의 상면에 2단 외벽거푸집(120)이 직접 결합될 수도 있다.In the present embodiment, one stage
도 3b는 수직 외벽판이 기울어지도록 형성되는 외벽거푸집 세트의 형상을 도시한다.Figure 3b shows the shape of the outer wall formwork set is formed so that the vertical outer wall plate is inclined.
본 발명에 적용되는 수직 외벽판(111, 121)은 반드시 수직으로 세워지도록 한정되지 아니하고, 교각의 형상에 따라 도 3b에 도시된 바와 같이 일정 각도로 기울어지도록 설치될 수 있다.The vertical
이때, 수직 외벽판(111, 121)은, 1단 외벽거푸집(110)과 2단 외벽거푸집(120)의 분리가 용이하도록, 상측 끝단에 비하여 하측 끝단이 주두부 가시설(10)의 수직 중심축에 가깝게 기울어지도록 설치됨이 바람직하다. 1단 외벽거푸집(110)과 2단 외벽거푸집(120)을 분리하는 공정은 이하 별도의 도면을 참조하여 설명하기로 한다.At this time, the vertical outer wall plate (111, 121), the lower end is the vertical center axis of the main head
도 4는 외벽거푸집 세트의 결합이 완료된 이후에 바닥 콘크리트를 형성하는 형상을 도시하고, 도 5 내지 도 6은 수직 내벽판과 시스템 서포터를 설치하는 형상을 도시한다.Figure 4 shows the shape of forming the bottom concrete after the completion of the combination of the outer wall form set, Figures 5 to 6 shows the shape of installing the vertical inner wall plate and the system supporter.
외벽거푸집 세트(100)의 설치가 완료되면 도 4에 도시된 바와 같이 외벽거푸집 세트(100) 사이로 일정량의 콘크리트를 타설하여 일정한 양생기간을 둠으로써 바닥 콘크리트(310)를 형성한 후, 도 5에 도시된 바와 같이 수직 내벽판(210)과 시스템 서포터(220)를 바닥 콘크리트(310) 상면에 안착되도록 결합한다. 이때, 수직 내벽판(210)은 최종적으로 도 6에 도시된 바와 같이 시스템 서포터(220)의 사방을 감싸도록 결합된다.When the installation of the outer wall form set 100 is completed, as shown in Figure 4, after placing a certain amount of concrete between the outer wall form set 100 to form a certain curing period, after the
본 발명에 적용되는 내벽거푸집 세트(200)는, 수직 내벽판(210)과, 시스템 서포터(220)와, 수평 내벽판(230)(미도시)을 포함하여 구성되는데, 이 중 수평 내벽판(230)은 차후 단계에서 적용되므로 수평 내벽판(230)에 관한 설명은 별도의 도 면을 참조하여 설명하도록 한다.The inner wall formwork set 200 applied to the present invention includes a vertical
1단 외벽거푸집(110), 2단 외벽거푸집(120), 가시설 벤트(130)와 마찬가지로 수직 내벽판(210)과 시스템 서포터(220) 역시 사전에 미리 독립적으로 제작된 것으로써, 시공 현장에서 내벽거푸집을 제작하던 종래기술에 비하여 시공기간을 단축시킬 수 있으며 공사비용을 감소시킬 수 있게 된다. Like the first stage
또한, 수직 내벽판(210)은 외측면이 수직 외벽판(111, 121)의 내측면과 일정거리 이격되도록 결합되며, 시스템 서포터(220)는 바닥 콘크리트(310)의 상면에 안착되었을 때 상측 끝단이 수평 외벽판(124)보다 낮게 위치되도록 구성된다. In addition, the vertical
이때, 수직 내벽판(210)은 도 5에 도시된 바와 같이 폼-타이(212)에 의하여 수직 외벽판(111, 121)의 내측면과 일정거리 이격되도록 수직 외벽판(111, 121)에 결합된다. 그러나 폼-타이(212)를 이용하여 수직 내벽판(210)을 외벽판에 결합시키는 방법은 하나의 실시예일 뿐이며, 수직 외벽판(111, 121)의 내측면과 일정거리 이격되도록 수직 내벽판(210)을 결합시키는 방법은 다양한 공법으로 변경되어 적용될 수 있다. At this time, the vertical
도 7은 수직 외벽판과 수직 내벽판 사이에 1단 콘크리트를 형성하는 형상을 도시한다.7 shows a shape of forming one-stage concrete between the vertical outer wall plate and the vertical inner wall plate.
도 6에 도시된 바와 같이 수직 내벽판(210)과 시스템 서포터(220)의 설치가 완료되면, 도 7에 도시된 바와 같이 수직 내벽판(210)과 수직 외벽판(111, 121) 사이에 콘크리트를 타설하여 팀버(Timber) 인출구(미도시)를 구비하는 1단 콘크리트(320)를 형성한다. 팀버 인출구는 콘크리트 타설이 완료되면 수직 내벽판(210)과 시스템 서포터(220)를 외부로 인출시키기 위해 제작되는 출구로서, 모든 공사가 완료된 후 내부 구조 점검자의 통로 역할을 하는 점검구로 활용된다. When the installation of the vertical
바닥 콘크리트(310)와 마찬가지로 1단 콘크리트(320) 역시 일정 기간 양생을 하여 일정 크기 이상의 강도가 생기도록 하고, 1단 콘크리트(320)에 일정 크기 이상의 강도가 생기게 되면, 폼-타이(212)를 해체한 후 수직 내벽판(210)을 인양하여 분리시킨다.Like the
이때, 수직 내벽판(210)은, 종래기술과 같이 조각조각 분해 되지 아니하고, 전체가 일체로 분리되므로 또 다른 콘크리트 시공에 재사용될 수 있다. 따라서 본 발명에 의한 수직 내벽판(210)을 사용하면, 수직 내벽판(210)의 분리 시 발생되는 자재의 손실을 감소시킬 수 있을 뿐만 아니라 콘크리트 시공을 할 때마다 수직 내벽판(210)을 새롭게 제작할 필요가 없다는 장점이 있다.At this time, the vertical
또한, 시스템 서포터(220)는 분해 및 조립이 가능하며, 분해 되었을 때 각 부품이 팀버 인출구를 통하여 인출될 수 있는 형상 및 크기로 형성된다. In addition, the
도 8은 수평 내벽판을 설치하는 형상을 도시하고, 도 9는 수평 내벽판 상측에 2단 콘크리트를 형성하는 형상을 도시한다.FIG. 8 shows a shape of installing a horizontal inner wall plate, and FIG. 9 shows a shape of forming two-stage concrete above the horizontal inner wall plate.
수직 내벽판(210)의 해체가 완료되면, 도 8에 도시된 바와 같이 외측 끝단이 1단 콘크리트(320)의 내측면 상단에 밀착되도록 형성되는 수평 내벽판(230)을 시스템 서포터(220)의 상단에 결합시킨다. When dismantling of the vertical
수평 내벽판(230)의 결합이 완료되면, 도 9에 도시된 바와 같이 수평 내벽판(230)과 1단 콘크리트(320)와 수평 외벽판(124)의 각 상면에 콘크리트를 타설하여 2단 콘크리트(330)를 형성한다. 수평 내벽판(230)과 1단 콘크리트(320)와 수평 외벽판(124)은 상호 밀착되도록 형성되므로, 상면에 타설되는 콘크리트는 하부로 흘러내리지 아니하고 양생된다.When the coupling of the horizontal
이때, 수평 내벽판(230)과 시스템 서포터(220)는 일정 크기의 하중을 견딜 수 있으며 분해 및 조립이 가능한 구조로 구성된다.At this time, the horizontal
상기와 같은 과정을 통하여 타설 및 양생되는 바닥 콘크리트(310)와 1단 콘크리트(320)와 2단 콘크리트(330)가 교량의 주두부를 이루게 된다. Through the above process, the
도 10내지 도 11은 외벽 및 내벽거푸집 세트를 해체하는 형상을 도시한다.10 to 11 show a shape of dismantling the outer wall and the inner wall formwork set.
2단 콘크리트(330)의 양생이 완료되면, 도 10에 도시된 바와 같이 시스템 서포터(220)와 수평 내벽판(230)을 차례로 분해한 후 팀버 인출구를 통하여 외부로 인출시킨다. When curing of the two-
또한, 외벽거푸집 세트(100)를 분해하기 위해서는 먼저, 스크류잭(132)을 회전시켜 가시설 벤트(130)의 수직높이를 낮춘다. 이와 같이 가시설 벤트(130)의 수직 높이가 낮아지면, 가시설 벤트(130)의 상면에 결합된 1단 외벽거푸집(110) 및 2단 외벽거푸집(120)은 하향으로 이동하여 각 콘크리트(310~330)와의 결합이 해제 된다.In addition, in order to disassemble the outer wall formwork set 100, first, the vertical height of the
가시설 벤트(130)의 수직높이 하강이 완료되면, 도 11에 도시된 바와 같이 1단 외벽거푸집(110)과 2단 거푸집 간의 결합을 해제한 후 2단 외벽거푸집(120)을 인양하여 분리시키고, 1단 외벽거푸집(110)과 가시설 벤트(130) 간의 결합을 해제한 후 1단 외벽거푸집(110)을 인양하여 분리시킨 후, 마지막으로 가시설 벤트(130) 을 인양하여 분리시킨다. 이때, 1단 외벽거푸집(110)과, 2단 외벽거푸집(120)과, 가시설 벤트(130)는 자체 하중이 크므로, 크레인에 의하여 인양됨이 바람직하다.When the vertical height descending of the
이와 같이 1단 외벽거푸집(110)과, 2단 외벽거푸집(120)과, 가시설 벤트(130)는 자체 형상을 그대로 유지하며 분리되므로, 또 다른 콘크리트 시공 현장에 그대로 재사용될 수 있게 된다.Thus, the first stage
이상, 본 발명을 바람직한 실시 예를 사용하여 상세히 설명하였으나, 본 발명의 범위는 특정 실시 예에 한정되는 것은 아니며, 첨부된 특허 청구범위에 의하여 해석되어야 할 것이다. 또한, 이 기술분야에서 통상의 지식을 습득한 자라면, 본 발명의 범위에서 벗어나지 않으면서도 많은 수정과 변형이 가능함을 이해하여야 할 것이다.As mentioned above, although this invention was demonstrated in detail using the preferable embodiment, the scope of the present invention is not limited to a specific embodiment and should be interpreted by the attached claim. In addition, those skilled in the art should understand that many modifications and variations are possible without departing from the scope of the present invention.
본 발명에 따른 교량 거푸집 탈착방법 및 다단식 거푸집을 이용하면, 내벽거푸집과 외벽거푸집을 설치 및 해체하는데 소요되는 시간을 단축시킬 수 있고, 작업의 안전성 및 자재의 재활용성을 향상시킬 수 있으며, 내벽거푸집 및 외벽거푸집을 제작하는 공정을 간단히 함으로써 공사비용을 절감시킬 수 있다는 장점이 있다.By using the bridge formwork desorption method and the multi-stage formwork according to the present invention, it is possible to shorten the time required to install and dismantle the inner wall formwork and the outer wall formwork, to improve the safety of the work and the recyclability of the material, the inner wall formwork And by simplifying the process of manufacturing the outer wall formwork there is an advantage that can reduce the construction cost.
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040058538A KR100697302B1 (en) | 2004-07-27 | 2004-07-27 | Method for building and removing mould of bridge and multistage mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040058538A KR100697302B1 (en) | 2004-07-27 | 2004-07-27 | Method for building and removing mould of bridge and multistage mould |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0021365U Division KR200365933Y1 (en) | 2004-07-27 | 2004-07-27 | Multistage mould of bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060009992A true KR20060009992A (en) | 2006-02-02 |
KR100697302B1 KR100697302B1 (en) | 2007-03-20 |
Family
ID=37120384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040058538A KR100697302B1 (en) | 2004-07-27 | 2004-07-27 | Method for building and removing mould of bridge and multistage mould |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100697302B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102274260B1 (en) * | 2020-02-06 | 2021-07-08 | 동진피씨이(주) | Pc column with bracket and the manufacturing method for the same |
US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102441003B1 (en) | 2021-02-04 | 2022-09-06 | (주)이알코리아 | Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie |
-
2004
- 2004-07-27 KR KR1020040058538A patent/KR100697302B1/en active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102274260B1 (en) * | 2020-02-06 | 2021-07-08 | 동진피씨이(주) | Pc column with bracket and the manufacturing method for the same |
US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
Also Published As
Publication number | Publication date |
---|---|
KR100697302B1 (en) | 2007-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106869489A (en) | Super High Core Walls Structure level and vertical synchronous construction top module system and construction method | |
JP4252177B2 (en) | Steel / concrete composite structure pier construction method | |
CN102900024A (en) | Overturning die plate for large-scale concrete structure and using method for overturning die plate | |
KR101204966B1 (en) | Construction method for confine concrete member of steel plate girder with reinforced bending moment | |
KR100697302B1 (en) | Method for building and removing mould of bridge and multistage mould | |
KR102089758B1 (en) | Formwork structure supported by column unit | |
KR101140884B1 (en) | Gangform device constructed for wall and constructing method this using | |
KR200365933Y1 (en) | Multistage mould of bridge | |
KR100817883B1 (en) | Slab mold setting structure | |
KR102430362B1 (en) | Structure for precast construction of inner cone of silo and precast construction method of inner cone of silo using the same | |
KR101171746B1 (en) | Method execution silo | |
CN205296829U (en) | Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system | |
KR101069022B1 (en) | Box-Form having Falling Prevention Function | |
KR102277374B1 (en) | Formwork System and Method for Reverse Casting Construction to Apartment Structures | |
CN105525629A (en) | Construction method and device of subway station | |
KR102425501B1 (en) | Silo construction method using precast and slip foam | |
KR200419013Y1 (en) | Temporary bridge consruction system using composite slab girder | |
CN111559691A (en) | Construction method of top cover type hanging bracket for die assembly and hoisting of prefabricated stand column reinforcement cage | |
CN214394729U (en) | Protection device for prefabricated stand reinforcing bar frame protective layer cushion | |
KR200230089Y1 (en) | Shifting up and down system of continuous preflex composite girder on temporary support | |
CN220129104U (en) | Hollow precast column mould | |
KR20090022451A (en) | The underground wall body gang form and will reach and construction method of the underground wall body which it uses | |
CN219196714U (en) | Integral lifting template and template system thereof | |
CN212836618U (en) | A integral operation platform in capital for prefabricated stand concrete placement | |
KR102121363B1 (en) | Functional supporter and constructing method for a protrusion of construction structure using the same, and the construction structure constructed by the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130219 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140204 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150223 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160202 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20170118 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20180313 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190313 Year of fee payment: 13 |