[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR20050049461A - Management system and the method for examination paper - Google Patents

Management system and the method for examination paper Download PDF

Info

Publication number
KR20050049461A
KR20050049461A KR1020050037380A KR20050037380A KR20050049461A KR 20050049461 A KR20050049461 A KR 20050049461A KR 1020050037380 A KR1020050037380 A KR 1020050037380A KR 20050037380 A KR20050037380 A KR 20050037380A KR 20050049461 A KR20050049461 A KR 20050049461A
Authority
KR
South Korea
Prior art keywords
scoring
test
image
answer sheet
student
Prior art date
Application number
KR1020050037380A
Other languages
Korean (ko)
Inventor
최현묵
Original Assignee
주식회사 이지다큐
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 이지다큐 filed Critical 주식회사 이지다큐
Priority to KR1020050037380A priority Critical patent/KR20050049461A/en
Publication of KR20050049461A publication Critical patent/KR20050049461A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B7/00Electrically-operated teaching apparatus or devices working with questions and answers

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Electrically Operated Instructional Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 각 학교에서 시험이 시행된 직후 시험답안지를 스캐닝하고 그 이미지를 저장하여 추후 발생될 수 있는 열람요구에 대응할 수 있도록 하는 시험답안지의 관리 시스템 및 그 방법에 관한 것으로서, The present invention relates to a test sheet management system and a method for scanning a test answer sheet immediately after the test is carried out in each school and storing the image so as to respond to a reading request that may occur later.

시험이 수행된 직후 곧바로 스캐너를 이용하여 시험답안지의 이미지를 입력하도록 함으로써 추후 시험답안지의 교체 또는 수정이 불가능하도록 하고, 객관식의 채점이 자동으로 이루어지는 동시에 주관식 채점의 경우는 채점자의 채점이유 등이 입력되어 관리되도록 함으로써 추후 학생이나 학부모가 시험성적에 대하여 이의신청이 있는 경우에 열람이 가능하도록 하며, 모든 시험답안지의 채점이 이루어진 후 통계를 수행하고 각 학생별로 석차를 제공할 수 있도록 하는 것을 특징으로 한다.Immediately after the test is performed, an image of the answer sheet can be entered immediately by using a scanner, so that it is impossible to replace or modify the answer sheet in the future, and the objective scoring is automatically performed, and in the case of the subjective scoring, the grading score is input. In the future, students or parents can view the test scores if they have any objection to the test scores, and after all the test answers have been graded, perform statistics and provide a ranking for each student. do.

Description

시험답안지의 관리 시스템 및 그 방법{MANAGEMENT SYSTEM AND THE METHOD FOR EXAMINATION PAPER}MANAGEMENT SYSTEM AND THE METHOD FOR EXAMINATION PAPER}

본 발명은 시험답안지의 관리 시스템 및 그 방법에 관한 것으로서, 보다 상세하게는 각 학교에서 시험이 시행된 직후 시험답안지를 스캐닝하고 그 이미지를 저장하여 추후 발생될 수 있는 열람요구에 대응할 수 있도록 하는 시험답안지의 관리 시스템 및 그 방법에 관한 것이다.The present invention relates to a system and method for managing a test answer sheet, and more particularly, to test a test answer sheet immediately after each test is conducted in each school and to store the image so as to respond to a reading request that may be generated later. The management system of the answer sheet and a method thereof.

최근, 교육인적자원부에서의 대학수학능력시험의 기준발표에 따라 고등학교에서의 내신성적이 중요한 부분을 차지하게 되었다. 또한, 각 고등학교의 입학시험에서도 중학교에서의 내신성적을 주로 반영하고 있다. 그로 인해 학생 및 학부모들은 중간고사, 기말고사 등 각 학교에서 시행되고 있는 여러 시험에 대한 관심이 집중되고 있으며, 시험결과의 조작에 대한 우려를 나타내고 있는 실정이다.In recent years, according to the announcement of the standard of the College Scholastic Ability Test by the Ministry of Education and Human Resources Development, the high school grade has become an important part. In addition, the entrance examination of each high school mainly reflects the resistance of the middle school. As a result, students and parents are paying attention to the various tests being conducted in each school, such as midterm and final exams, and they are concerned about the manipulation of the test results.

국내의 중고등학교(일부 초등학교 포함)의 성적처리 및 대학입시, 강의 평가, 기타 학원의 성적처리, 수학능력평가, 각종 국가자격시험, 운전면허시험 등의 대부분의 평가방법으로 1980년대 이후에 OMR(Optical Mark Reader) 카드가 대부분 이용되고 있다.Most of the evaluation methods such as grades and university entrance examinations, lecture evaluations, other school grades, mathematics skills assessments, various national qualification tests, and driver's license tests in Korea, have been conducted since the 1980s. Optical Mark Reader) cards are mostly used.

이러한 OMR 카드를 사용할 경우, 이들을 판독하기 위해 OMR 카드 리더기가 사용되어, OMR 카드 상에 표시된 타이밍 마크(timing mark)를 이용하여 순간적으로 빛이 통과하면서 센서를 통해 마크를 감지하는 방식이 사용되고 있다. 이 외에도 답안지를 채점하기 위한 장치 및 방법에 대한 기술에 많이 제시되고 있는데, 대한민국특허출원번호 제10-2003-0077736호가 그 일예가 될 수 있다.When such an OMR card is used, an OMR card reader is used to read them, and a method of detecting a mark through a sensor while passing light instantaneously using a timing mark displayed on the OMR card is used. In addition, a number of techniques and methods for scoring the answer sheet have been presented, and Korean Patent Application No. 10-2003-0077736 may be an example.

상기 출원된 발명에 따르면 답안지 채점 장치는, 적어도 하나 이상의 답 표시부와, 답 표시점을 포함하는 채점 대상인 답안지 이미지를 입력받는 입력수단과; 소정의 기본답안배열과 정답 텍스트 파일을 저장하는 저장수단과; 상기 저장수단으로부터 기본답안배열을 읽어들여 상기 답안지 이미지로부터 상기 기본답안배열에 대응하는 상기 답 표시점만을 포함하는 답 표시점 이미지를 추출하는 추출모듈과; 상기 추출 모듈로부터 추출된 답 표시점 이미지의 답 표시점을 상기 기본답안배열의 행과 열을 기준으로 구분하고, 상기 행과 열로 상기 답 표시점에 대한 위치정보를 생성하고, 상기 위치정보를 포함하는 텍스트 파일을 생성하는 생성모듈과; 상기 저장수단으로부터 상기 정답 텍스트 파일을 읽어들여 상기 생성된 텍스트 파일과 비교하되, 상기 생성된 텍스트 파일의 위치정보와 정답 텍스트 파일의 위치정보를 서로 비교하는 비교모듈과; 상기 입력수단과, 저장수단과, 추출모듈과, 생성모듈 및 비교모듈을 제어하여, 상기 채점 대상인 답안지 이미지를 입력받아 상기 채점 결과를 상기 저장수단에 저장하는 제어수단으로 이루어지는 것을 특징으로 한다.According to the present invention, the answer sheet scoring apparatus comprises: input means for receiving at least one answer display unit and an answer sheet image to be scored including an answer display point; Storage means for storing a predetermined basic answer array and a correct answer text file; An extraction module for reading a basic answer array from the storage means and extracting an answer display point image including only the answer display points corresponding to the basic answer array from the answer sheet image; The answer display points of the answer display point image extracted from the extraction module are divided based on the rows and columns of the basic answer array, generate the position information on the answer display points by the rows and columns, and include the position information. A generation module for generating a text file; A comparison module which reads the correct text file from the storage means and compares the generated text file with the generated text file, comparing position information of the generated text file with position information of the correct answer text file; And controlling means for controlling the input means, the storage means, the extraction module, the generation module, and the comparison module to receive the answer sheet image as the scoring target and to store the scoring result in the storage means.

그러나, 종래의 어떤 발명에서도 시험답안지를 보관하는 것에 대한 기술은 제시되지 않고 있으며, 각 중고등학교 등에서는 시험답안지를 서류로 보관하고 있는 실정이다.However, in any of the prior inventions, there is no description of storing test answer sheets, and each secondary school or the like keeps the test answer sheets as documents.

그로 인해 답안지의 교체, 수정 등으로 내신성적이 조작되는 경우가 발생될 수 있으며, 학생이나 학부모가 시험성적에 대하여 불만을 나타내는 경우에도 이를 해소하기 위하여 많은 어려움이 발생되고 있다.As a result, internal grades may be manipulated due to replacement or correction of the answer sheet, and even if a student or parent complains about the test scores, many difficulties arise.

본 발명은 상기와 같은 종래 기술의 제반 문제점을 해결하기 위해 안출된 것으로서, 그 목적은 시험이 수행된 직후 곧바로 스캐너를 이용하여 시험답안지의 이미지를 입력하도록 함으로써 추후 시험답안지의 교체 또는 수정이 불가능하도록 하는 시험답안지의 관리 시스템 및 그 방법을 제공하는데 있다.The present invention has been made to solve the above problems of the prior art, the purpose is to immediately input the image of the test answer sheet using a scanner immediately after the test is performed so that later replacement or correction of the test answer sheet is impossible. To provide a test system and a method for managing the test sheet.

또한, 본 발명의 다른 목적은 객관식의 채점이 자동으로 이루어지는 동시에 주관식 채점의 경우는 채점자의 채점이유 등이 입력되어 관리되도록 함으로써 추후 학생이나 학부모가 시험성적에 대하여 이의신청이 있는 경우에 열람이 가능하도록 하는 시험답안지의 관리 시스템 및 그 방법을 제공하는데 있다.In addition, another object of the present invention is that the objective scoring is automatically performed, and in the case of the subjective scoring, the grading reason of the grader is inputted and managed so that the student or the parent can later read the objection against the test score. The present invention provides a test system and a method for managing an answer sheet.

또한, 본 발명의 다른 목적은 모든 시험답안지의 채점이 이루어진 후 통계를 수행하고 각 학생별로 석차를 제공할 수 있는 시험답안지의 관리 시스템 및 그 방법을 제공하는데 있다.In addition, another object of the present invention is to provide a test answer sheet management system and method that can perform statistics after each test answer sheet is scored and provide a table for each student.

상기의 목적을 달성하기 위한 본 발명의 제1 특징에 따르면, 시험답안지의 이미지를 입력받기 위한 이미지 입력부와; 상기 이미지 입력부를 통해 입력된 시험답안지의 이미지를 입력받아 객관식 문항의 채점을 수행하고, 채점자에 의한 주관식 문항의 채점결과를 입력받아 이를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산하는 성적처리부와; 관리자 및 주관식 채점자에 의해 동작되며 주관식 문항의 채점결과 및 채점이유를 입력할 수 있도록 하며, 접속자에 대한 정보를 입력받아 상기 성적처리부로 제공하는 제어신호 입력부와; 상기 이미지 입력부를 통해 입력된 시험답안지의 이미지를 저장하며, 상기 성적처리부에서 수행된 성적처리 결과 및 상기 제어신호 입력부를 통해 입력된 주관식 문항의 채점이유, 접속자에 대한 정보, 접속시간을 저장하는 데이터 저장부와; 학생, 학부모 또는 관리자로부터의 열람요구가 있는 경우에 상기 데이터 저장부에 저장되어 있는 시험답안지의 이미지, 주관식 문항의 채점이유 등을 호출하여 디스플레이 함으로써 열람이 이루어지도록 하거나, 관리자의 요구가 있는 경우에 전체적인 통계 및 각 학생별 석차 등을 표시하는 디스플레이부를 포함하여 구성되는 것을 특징으로 하는 시험답안지의 관리 시스템을 제공한다.According to a first aspect of the present invention for achieving the above object, an image input unit for receiving an image of the test answer sheet; Input the image of the test answer sheet inputted through the image input unit to perform multiple-choice question scoring, input the scoring result of the subject-choice question by the scorer, process the grade by adding them together, and calculate the overall statistics and the student's ranking, etc. And grade processing unit; A control signal input unit which is operated by a manager and a subjective grader and inputs a scoring result and a scoring reason of the subjective question, and receives information about a visitor and provides the grader with the grade processing unit; Stores an image of a test answer sheet input through the image input unit, and stores the grading result of the score processing performed by the grade processing unit and the subjective questions inputted through the control signal input unit, information on the visitor, and access time. A storage unit; When a request is made from a student, a parent, or an administrator, the reading is made by calling and displaying an image of a test answer sheet stored in the data storage unit, a grading reason of a subjective question, or the like, or when there is a request from an administrator. It provides a test answer sheet management system, characterized in that it comprises a display unit for displaying the overall statistics and each student's rankings.

이때, 본 발명의 부가적인 특징에 따르면, 관리감독 기관에서 접속하거나 교내외의 관리자 또는 선생님이 접속하는 경우에 인트라넷 통신망(INTRANET) 및 인터넷 통신망(INTERNET)을 통해 외부와의 통신이 가능하도록 하며, 데이터의 전송을 수행하는 통신부를 더 포함하여 구성될 수 있다.In this case, according to an additional feature of the present invention, when connected from a management supervisory institution or an administrator or teacher outside the school, it is possible to communicate with the outside through an intranet communication network (INTRANET) and the Internet communication network (INTERNET), data It can be configured to further include a communication unit for performing the transmission.

상기의 목적을 달성하기 위한 본 발명의 제2 특징에 따르면, 시험이 종료된 직후 시험답안지의 이미지를 입력받아 학생정보와 결합하여 저장하는 제1 과정; 객관식 문항의 채점을 수행하고 그 결과를 저장하는 제2 과정; 채점자가 접속하여 주관식 문항의 채점을 수행하고, 채점자 정보, 주관식 문항의 채점결과, 채점이유 및 채점시간을 저장하는 제3 과정; 객관식 문항의 채점결과와 주관식 문항의 채점결과를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산하고 그 결과를 저장하는 제4 과정; 및 열람요구가 있는 경우에 시험답안지 이미지, 채점자 정보, 채점결과, 채점이유, 채점시간, 전체적인 통계 및 각 학생별 석차 중 어느 하나 이상을 호출하여 디스플레이 함으로써 열람이 이루어지도록 하는 제5 과정;을 포함하여 이루어지는 것을 특징으로 하는 시험답안지의 관리방법을 제공한다.According to a second aspect of the present invention for achieving the above object, a first step of receiving an image of the test answer sheet immediately after the end of the test combined with the student information to store; A second process of scoring multiple-choice questions and storing the results; A third step of connecting the scorer to perform the scoring of the subjective question, and storing the scorer information, the scoring result of the subjective question, the scoring reason and the scoring time; A fourth step of processing the grades by combining the scoring results of the multiple-choice questions and the scoring results of the multiple-choice questions, calculating the overall statistics and the students' rankings, and storing the results; And a fifth process of calling and displaying any one or more of a test answer sheet image, a grader information, a scoring result, a scoring reason, a scoring time, an overall statistics, and a student's ranking when there is a request for reading. It provides a management method of the test answer sheet, characterized in that made.

이때, 본 발명의 부가적인 특징에 따르면, 상기 제5 과정에서는 접속자 인증을 수행하는 단계와, 접속자 정보 및 접속시간을 저장하는 단계가 포함되어 이루어지는 것이 바람직하다.At this time, according to an additional feature of the present invention, it is preferable that the fifth step includes performing accessor authentication and storing accessor information and access time.

본 발명의 상술한 목적과 여러 가지 장점은 이 기술분야에 숙련된 사람들에의해, 첨부된 도면을 참조하여 후술되는 본 발명의 바람직한 실시예로부터 더욱 명확하게 될 것이다.The above object and various advantages of the present invention will become more apparent from the preferred embodiments of the present invention described below with reference to the accompanying drawings by those skilled in the art.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하고자 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

첨부도면 도 1은 본 발명을 구현하기 위한 시스템의 구성을 개략적으로 나타내는 블록도이고, 도 2는 본 발명에 의하여 시험답안지의 관리를 수행하는 과정을 개략적으로 나타내는 흐름도이다.1 is a block diagram schematically illustrating a configuration of a system for implementing the present invention, and FIG. 2 is a flowchart schematically illustrating a process of managing a test answer sheet according to the present invention.

상기 첨부도면 도 1을 참조하면, 참조번호 10은 이미지 입력부, 20은 성적처리부, 30은 제어신호 입력부, 40은 데이터 저장부, 50은 디스플레이부, 60은 통신부, 70은 통신망, 80은 외부 컴퓨터를 나타낸다.Referring to FIG. 1, reference numeral 10 is an image input unit, 20 is a grade processing unit, 30 is a control signal input unit, 40 is a data storage unit, 50 is a display unit, 60 is a communication unit, 70 is a communication network, and 80 is an external computer. Indicates.

상기 이미지 입력부(10)는 시험답안지의 이미지를 입력받기 위한 스캐너(SCANNER)로서, 이미지를 읽어들일 수 있는 다양한 장치가 사용될 수 있는데 많은 시험답안지를 단시간 내에 읽어들이기 위하여 고속스캐너를 사용하는 것이 바람직하다.The image input unit 10 is a scanner for receiving an image of a test answer sheet, and various devices capable of reading an image may be used. It is preferable to use a fast scanner to read many test answer sheets in a short time. .

상기 성적처리부(20)는 상기 이미지 입력부(10)를 통해 입력된 시험답안지의 이미지를 입력받아 객관식 문항의 채점을 수행하고, 채점자에 의한 주관식 문항의 채점결과를 입력받아 이를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산한다.The grade processing unit 20 receives an image of a test answer sheet inputted through the image input unit 10 to perform multiple-choice question scoring, and receives a scoring result of a subjective question by a grader and processes the grade by adding the scores. Calculate overall statistics and student grades.

상기 제어신호 입력부(30)는 관리자 및 주관식 채점자에 의해 동작되며 주관식 문항의 채점결과 및 채점이유를 입력할 수 있도록 하며, 접속자에 대한 정보를 입력받는다.The control signal input unit 30 is operated by a manager and a subjective scorer to input a scoring result and a scoring reason of the subjective question, and receive information on a visitor.

상기 데이터 저장부(40)는 상기 이미지 입력부(10)를 통해 입력된 시험답안지의 이미지를 저장하는 기능을 하며, 상기 성적처리부(20)에서 수행된 성적처리 결과 및 상기 제어신호 입력부(30)를 통해 입력된 주관식 문항의 채점이유, 접속자에 대한 정보, 접속시간 등 다양한 데이터를 저장한다.The data storage unit 40 stores an image of a test answer sheet inputted through the image input unit 10, and performs a result of the grade processing performed by the grade processing unit 20 and the control signal input unit 30. It stores various data such as grading reason of the short answer questions, information on the visitor, access time, etc.

상기 디스플레이부(50)는 학생, 학부모 또는 관리자로부터의 열람요구가 있는 경우에 상기 데이터 저장부(40)에 저장되어 있는 시험답안지의 이미지, 주관식 문항의 채점이유 등을 호출하여 디스플레이 함으로써 열람이 이루어지도록 한다. 또한, 관리자의 요구가 있는 경우에 전체적인 통계 및 각 학생별 석차 등을 표시하게 된다.When the display unit 50 has a reading request from a student, a parent, or a manager, the display unit 50 displays the image of the test answer sheet stored in the data storage unit 40 and displays the grading reason of the subjective question and displays the call. To lose. In addition, when requested by the administrator, the overall statistics and the student-specific rankings will be displayed.

상기 통신부(60)는 교육인적자원부 등으로 포함하여 관리감독 기관과 시스템이 연결되는 경우에 외부와의 통신이 가능하도록 하며, 교내 또는 교외에서 관리자 또는 선생님의 접속이 가능하도록 한다.The communication unit 60, such as the Ministry of Education and Human Resources, to enable communication with the outside when the management and supervisory institutions and the system is connected, and to enable the connection of the administrator or teacher in the school or suburbs.

상기 통신망(70)은 상기 통신부(60)를 통해 교내 및 교외에서의 접속이 가능하도록 인트라넷 통신망(INTRANET) 및 인터넷 통신망(INTERNET)을 모두 포함한다.The communication network 70 includes both an intranet communication network (INTRANET) and an internet communication network (INTERNET) to enable access in and out of the school through the communication unit 60.

상기 외부 컴퓨터(80)는 교내 또는 교외에서 관리자 또는 선생님이 접속하는 컴퓨터를 포함하여, 관리감독 기관의 컴퓨터를 모두 포함한다.The external computer 80 includes all computers of a supervisory authority, including a computer connected to an administrator or a teacher in a school or a suburb.

상기와 같이 구성된 시스템의 동작을 첨부도면 도 2에 따라 상세히 설명하고자 한다.The operation of the system configured as described above will be described in detail with reference to FIG. 2.

먼저, 각 학교에서 중간고사 또는 기말고사 등의 시험이 수행되면(S11 단계 참조), 시험이 종료된 직후 시험감독관에 의해 상기 이미지 입력부(10)가 동작하여 시험답안지의 이미지를 입력받게 된다.(S12 단계 참조) 이때, 고속스캐너를 사용하게 되면 분당 60매 이상의 스캐닝이 가능하기 때문에 대부분의 학교에서는 시험 종료 후 10분 이내에 모든 학생의 시험답안지를 입력받을 수 있을 것으로 기대된다.First, when a test such as a midterm or a final exam is performed in each school (see step S11), the image input unit 10 is operated by a test supervisor immediately after the test is completed to receive an image of a test answer sheet. At this time, if the high-speed scanner is used, more than 60 sheets of scanning are possible per minute, so most schools are expected to receive all student's answer sheets within 10 minutes after the test is finished.

이와 같이 시험답안지의 이미지 입력이 이루어지는 동안에 추후의 수정이 불가능하도록 백업본이 형성되도록 하는 것이 바람직하다.As such, it is desirable to make a backup copy to prevent further modification during the image input of the test answer sheet.

상기와 같은 과정에 의해 모든 시험답안지의 이미지 입력이 이루어지면 해당 이미지는 성적처리부(20)를 통해 학생정보와 결합되어 데이터 저장부(40)에 저장되며(S13 단계 참조), 상기 성적처리부(20)에서는 객관식 문항의 채점을 수행하고 그 결과를 데이터 저장부(40)에 저장한다.(S14 단계 참조) 이때, 객관식 문항의 채점은 통상적인 OMR(Optical Mark Reader) 카드, OCR(Optical Character Recognition) 카드를 처리하는 과정으로 수행될 수 있으며, 상기 제시된 출원발명 즉, 대한민국특허출원번호 제10-2003-0077736호에 상세히 기재되어 있으므로 그 설명은 생략하기로 한다.When the image input of all the test answer sheet is made by the above process, the image is combined with the student information through the grade processing unit 20 and stored in the data storage unit 40 (see step S13), and the grade processing unit 20 ), The multiple choice item is scored and the result is stored in the data storage unit 40 (see step S14). In this case, the multiple choice item is scored using a conventional optical mark reader (OMR) card and an optical character recognition (OCR). It may be performed as a process of processing the card, it is described in detail in the above-described application invention, that is, the Republic of Korea Patent Application No. 10-2003-0077736 it will be omitted.

그후, 각 과목의 채점자가 접속하여 주관식 문항의 채점을 수행하게 되는데, 상기 성적처리부(20)는 제어신호 입력부(30)를 통해 채점자에 대한 정보와 채점자에 의한 주관식 문항의 채점결과 및 채점이유를 입력받아 상기 데이터 저장부(40)에 저장하게 된다.(S15 단계 참조)Then, the grader of each subject is connected to perform the scoring of the subjective questions, the grade processing unit 20 through the control signal input unit 30, the score information and the grading result of the subjective questions by the scorer through the control signal input unit 30 The input is stored in the data storage unit 40 (see step S15).

상기 주관식 문항의 채점이 이루어진 후 상기 성적처리부(20)는 객관식 문항의 채점결과와 주관식 문항의 채점결과를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산하고, 그 결과를 상기 데이터 저장부(40)에 저장하게 된다.(S16 단계 참조)After the subjective questions are scored, the grade processing unit 20 processes the grade by adding the scored results of the multiple-choice questions and the scored results of the subjective questions, and calculates the overall statistics and the student's ranking, and calculates the result of the data. It is stored in the storage unit 40 (see step S16).

상기의 과정이 이루어지는 동안에 데이터 저장부(40)에는 시험답안지의 이미지, 주관식 문항의 채점이유, 채점자에 대한 정보, 채점시간 등 모든 데이터가 저장된다.During the above process, the data storage unit 40 stores all data such as an image of a test answer sheet, a grading reason for a short answer question, information on a scorer, and a scoring time.

한편, 채점결과 등에 대하여 학생 또는 학부모가 이의신청을 하고 상기 제어신호 입력부(30)를 통해 학생, 학부모 또는 관리자로부터의 열람요구가 있는 경우에 상기 성적 처리부(30)에서는 데이터 저장부(40)에 저장되어 있는 시험답안지의 이미지, 주관식 문항의 채점이유 등을 호출하여 디스플레이 함으로써 열람이 이루어지도록 한다.(S17 단계 참조) 이때, 관리자의 요구가 있는 경우에 전체적인 통계 및 각 학생별 석차 등을 표시하게 된다. 이때, 접속자 인증을 수행하여 접속자 정보 및 접속시간 등을 모두 저장하게 된다.(S18 단계 참조)On the other hand, when a student or a parent makes an objection about a scoring result or the like and a request for reading from a student, a parent, or an administrator is requested through the control signal input unit 30, the grade processing unit 30 sends a data storage unit 40 to the data storage unit 40. The reading is made by calling and displaying the image of the test answer sheet and the grading reason of the short answer question (see step S17). In this case, when the manager requests, the overall statistics and the student's class difference are displayed. do. At this time, the accessor authentication is performed to store all the accessor information and the access time. (See step S18.)

한편, 상기 열람요구가 통신부(60)를 통해 외부에서 이루어지는 경우에는 접속자에 대한 인증을 수행하고, 시험답안지의 이미지 및 주관식 문항의 채점이유 등을 포함하여 요구하는 정보를 통신부(60)를 통해 전송하여 외부 컴퓨터(80)의 화면에 디스플레이 되도록 한다.(S19 단계 참조) 이 경우에도 접속자 정보 및 접속시간 등을 모두 저장하게 된다.On the other hand, when the reading request is made from the outside through the communication unit 60, authentication of the visitor is performed, and the requested information is transmitted through the communication unit 60, including the image of the test answer sheet and the grading of the subjective question. In this case, the visitor information and the access time are all stored.

이상의 본 발명은 상기에 기술된 실시예들에 의해 한정되지 않고, 당업자들에 의해 다양한 변형 및 변경을 가져올 수 있으며, 이는 첨부된 청구항에서 정의되는 본 발명의 취지와 범위에 포함된다.The present invention is not limited to the embodiments described above, and various modifications and changes can be made by those skilled in the art, which are included in the spirit and scope of the present invention as defined in the appended claims.

이상에서 살펴본 바와 같이, 본 발명에 의한 시험답안지의 관리 시스템 및 그 방법은 시험이 수행된 직후 곧바로 스캐너를 이용하여 시험답안지의 이미지를 입력하도록 함으로써 추후 시험답안지의 교체 또는 수정이 불가능하도록 하여 내신성적에 대한 신뢰도를 향상시킬 수 있는 효과가 있다.As described above, the test sheet management system and the method according to the present invention by using the scanner immediately after the test is performed to input the image of the test answer sheet, so that it is impossible to replace or modify the test answer sheet in the future There is an effect to improve the reliability for.

또한, 객관식의 채점이 자동으로 이루어지는 동시에 주관식 채점의 경우는 채점자의 채점이유 등이 입력되어 관리되도록 함으로써 추후 학생이나 학부모가 시험성적에 대하여 이의신청이 있는 경우에 열람이 가능하도록 하여 분쟁을 방지할 수 있는 효과가 있다.In addition, the objective scoring is automatically performed, and in case of the subjective scoring, the grading reason of the scoring system is inputted and managed so that the student or the parent can view the examination result in the future to prevent the dispute. It can be effective.

또한, 모든 시험답안지의 채점이 이루어진 후 통계를 수행하고 각 학생별로 석차를 제공할 수 있도록 함으로써 선생님들의 성적처리 시간을 줄여줄 수 있는 효과가 있다.In addition, it is possible to reduce the teacher's grade processing time by performing statistics after all the test answer sheets have been scored and providing a ranking for each student.

도 1은 본 발명을 구현하기 위한 시스템의 구성을 개략적으로 나타내는 블록도1 is a block diagram schematically showing the configuration of a system for implementing the present invention.

도 2는 본 발명에 의하여 시험답안지의 관리를 수행하는 과정을 개략적으로 나타내는 흐름도2 is a flowchart schematically showing a process of performing a test answer sheet management according to the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

10 : 이미지 입력부 20 : 성적처리부10: image input unit 20: grade processing unit

30 : 제어신호 입력부 40 : 데이터 저장부30: control signal input unit 40: data storage unit

50 : 디스플레이부 60 : 통신부50: display unit 60: communication unit

70 : 통신망 80 : 외부 컴퓨터70: communication network 80: external computer

Claims (4)

시험답안지의 이미지를 입력받기 위한 이미지 입력부와; An image input unit for receiving an image of a test answer sheet; 상기 이미지 입력부를 통해 입력된 시험답안지의 이미지를 입력받아 객관식 문항의 채점을 수행하고, 채점자에 의한 주관식 문항의 채점결과를 입력받아 이를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산하는 성적처리부와;Input the image of the test answer sheet inputted through the image input unit to perform multiple-choice question scoring, input the scoring result of the subject-choice question by the scorer, process the grade by adding them together, and calculate the overall statistics and the student's ranking, etc. And grade processing unit; 관리자 및 주관식 채점자에 의해 동작되며 주관식 문항의 채점결과 및 채점이유를 입력할 수 있도록 하며, 접속자에 대한 정보를 입력받아 상기 성적처리부로 제공하는 제어신호 입력부와;A control signal input unit which is operated by a manager and a subjective grader and inputs a scoring result and a scoring reason of the subjective question, and receives information about a visitor and provides the grader with the grade processing unit; 상기 이미지 입력부를 통해 입력된 시험답안지의 이미지를 저장하며, 상기 성적처리부에서 수행된 성적처리 결과 및 상기 제어신호 입력부를 통해 입력된 주관식 문항의 채점이유, 접속자에 대한 정보, 접속시간을 저장하는 데이터 저장부와;Stores an image of a test answer sheet input through the image input unit, and stores the grading result of the score processing performed by the grade processing unit and the subjective questions inputted through the control signal input unit, information on the visitor, and access time. A storage unit; 학생, 학부모 또는 관리자로부터의 열람요구가 있는 경우에 상기 데이터 저장부에 저장되어 있는 시험답안지의 이미지, 주관식 문항의 채점이유 등을 호출하여 디스플레이 함으로써 열람이 이루어지도록 하거나, 관리자의 요구가 있는 경우에 전체적인 통계 및 각 학생별 석차 등을 표시하는 디스플레이부를 포함하여 구성되는 것을 특징으로 하는 시험답안지의 관리 시스템.When a request is made from a student, a parent, or an administrator, the reading is made by calling and displaying an image of a test answer sheet stored in the data storage unit, a grading reason of a subjective question, or the like, or when there is a request from an administrator. Test answer sheet management system, characterized in that it comprises a display unit for displaying the overall statistics and each student's rankings. 제 1 항에 있어서, The method of claim 1, 관리감독 기관에서 접속하거나 교내외의 관리자 또는 선생님이 접속하는 경우에 인트라넷 통신망(INTRANET) 및 인터넷 통신망(INTERNET)을 통해 외부와의 통신이 가능하도록 하며, 데이터의 전송을 수행하는 통신부를 더 포함하여 구성되는 것을 특징으로 하는 시험답안지의 관리 시스템.When connected from a supervisory institution or by an administrator or teacher outside the school, communication with the outside is possible through an intranet network (INTRANET) and an internet communication network (INTERNET), and further includes a communication unit for transmitting data. Test management sheet, characterized in that the management system. 시험이 종료된 직후 시험답안지의 이미지를 입력받아 학생정보와 결합하여 저장하는 제1 과정; A first step of receiving an image of a test answer sheet immediately after the test is completed and combining it with student information and storing the same; 객관식 문항의 채점을 수행하고 그 결과를 저장하는 제2 과정; A second process of scoring multiple-choice questions and storing the results; 채점자가 접속하여 주관식 문항의 채점을 수행하고, 채점자 정보, 주관식 문항의 채점결과, 채점이유 및 채점시간을 저장하는 제3 과정; A third step of connecting the scorer to perform the scoring of the subjective question, and storing the scorer information, the scoring result of the subjective question, the scoring reason and the scoring time; 객관식 문항의 채점결과와 주관식 문항의 채점결과를 합하여 성적을 처리하는 동시에 전체적인 통계 및 각 학생별 석차 등을 계산하고 그 결과를 저장하는 제4 과정; 및 A fourth step of processing the grades by combining the scoring results of the multiple-choice questions and the scoring results of the multiple-choice questions, calculating the overall statistics and the students' rankings, and storing the results; And 열람요구가 있는 경우에 시험답안지 이미지, 채점자 정보, 채점결과, 채점이유, 채점시간, 전체적인 통계 및 각 학생별 석차 중 어느 하나 이상을 호출하여 디스플레이 함으로써 열람이 이루어지도록 하는 제5 과정;을 포함하여 이루어지는 것을 특징으로 하는 시험답안지의 관리방법.A fifth process of calling and displaying one or more of a test answer sheet image, a grader information, a grading result, grading reason, grading time, overall statistics, and a student's ranking when there is a request for reading; and Management method of the test answer sheet, characterized in that made. 제 3 항에 있어서, The method of claim 3, wherein 상기 제5 과정에서는 접속자 인증을 수행하는 단계와,In the fifth process, the accessor authentication is performed; 접속자 정보 및 접속시간을 저장하는 단계가 포함되어 이루어지는 것을 특징으로 하는 시험답안지의 관리방법.And a step of storing visitor information and access time.
KR1020050037380A 2005-05-04 2005-05-04 Management system and the method for examination paper KR20050049461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050037380A KR20050049461A (en) 2005-05-04 2005-05-04 Management system and the method for examination paper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050037380A KR20050049461A (en) 2005-05-04 2005-05-04 Management system and the method for examination paper

Publications (1)

Publication Number Publication Date
KR20050049461A true KR20050049461A (en) 2005-05-25

Family

ID=37247889

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050037380A KR20050049461A (en) 2005-05-04 2005-05-04 Management system and the method for examination paper

Country Status (1)

Country Link
KR (1) KR20050049461A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100795951B1 (en) * 2006-01-09 2008-01-21 조범준 System for grading examination paper and control method
WO2011046369A2 (en) * 2009-10-13 2011-04-21 Kim Jae Woo Image material database system and learning system and learning method using same
KR101389766B1 (en) * 2012-04-25 2014-04-28 주식회사 유플러스시스템 Scoring System using Scan File and Method therefor
CN113095650A (en) * 2021-04-02 2021-07-09 西安博冠教育科技有限公司 Question group-based multi-evaluation intelligent scoring method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100795951B1 (en) * 2006-01-09 2008-01-21 조범준 System for grading examination paper and control method
WO2011046369A2 (en) * 2009-10-13 2011-04-21 Kim Jae Woo Image material database system and learning system and learning method using same
WO2011046369A3 (en) * 2009-10-13 2011-09-15 Kim Jae Woo Image database system and learning system and method using same
KR101389766B1 (en) * 2012-04-25 2014-04-28 주식회사 유플러스시스템 Scoring System using Scan File and Method therefor
CN113095650A (en) * 2021-04-02 2021-07-09 西安博冠教育科技有限公司 Question group-based multi-evaluation intelligent scoring method

Similar Documents

Publication Publication Date Title
Farrell et al. Assessment and learning technologies: An overview
Elliott et al. Improving test performance of students with disabilities... on district and state assessments
US20160293036A1 (en) System and method for adaptive assessment and training
De Jager et al. Institutionalizing information literacy in tertiary education: Lessons learned from South African programs
Collier et al. Test review: Texas English language proficiency assessment system (TELPAS)
Tweissi et al. The accuracy of AI-based automatic proctoring in online exams
Cohen et al. The change we cannot see: Instructional quality and classroom observation in the era of common core
Scott et al. Next generation technology-enhanced assessment: Global perspectives on occupational and workplace testing
Sticht The year 2002 in review
Auletto et al. Selecting a reading intervention program for struggling readers: A case study of an urban district
Al-Saadi et al. An analysis of the writing needs of Omani EFL students for the development of grade 11 English program
KR20050049461A (en) Management system and the method for examination paper
Mason et al. The impact of formal assessment procedures on teaching and learning in art and design in secondary schools
Van Wyk et al. Developing reading in a first-year academic literacy course
Thonney et al. The Relationship between cumulative credits and student learning outcomes: A cross-sectional assessment
KR20110061847A (en) System and method for providing scoring test problem using answer reader and questions setting interface
Andrews The use of goal setting and progress self-monitoring with formative assessment in community college to increase academic achievement and self-efficacy
Ozdemir et al. Meeting the core competencies for public health professionals using backward design
Le The Impact of Demographic Information on EFL Teachers' Responses to ELT Pedagogical Reforms.
Chen et al. South Carolina Assessment Evaluation Report# 3
Level Training Manual
Prajapat et al. Towards realization of assessment module using learning management system for integrated course
KR102667282B1 (en) The method eof smart onlin lecture and system thereo
Zapf The relationship between preschool experiences and attainment of literacy skills in kindergarten
Harrington THE ASSOCIATION OF ADMINISTRATORS'LEARNING STYLES, BACKGROUND DIFFERENCES, AND TEACHER APPRAISAL JUDGMENTS

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application