[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR200437253Y1 - Installation structure of post - Google Patents

Installation structure of post Download PDF

Info

Publication number
KR200437253Y1
KR200437253Y1 KR2020070014959U KR20070014959U KR200437253Y1 KR 200437253 Y1 KR200437253 Y1 KR 200437253Y1 KR 2020070014959 U KR2020070014959 U KR 2020070014959U KR 20070014959 U KR20070014959 U KR 20070014959U KR 200437253 Y1 KR200437253 Y1 KR 200437253Y1
Authority
KR
South Korea
Prior art keywords
protective cover
concrete foundation
fastening means
ground
fixing plate
Prior art date
Application number
KR2020070014959U
Other languages
Korean (ko)
Inventor
신일균
Original Assignee
사단법인 한국교통장애인협회
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 사단법인 한국교통장애인협회 filed Critical 사단법인 한국교통장애인협회
Priority to KR2020070014959U priority Critical patent/KR200437253Y1/en
Application granted granted Critical
Publication of KR200437253Y1 publication Critical patent/KR200437253Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

본 고안은 지주를 지면에 수직으로 설치하기 위한 지주설치구조에 있어서, 지면 아래에 일정 깊이 매몰되도록 설치되는 콘크리트 기초부와; 하면이 상기 콘크리트 기초부의 상면과 접촉하며, 상기 지주의 하단부에 일체로 고정 설치되는 고정판과; 상기 콘크리트 기초부의 상부측에 해당되는 지중에 위치되되, 상기 고정판의 상면과 상기 지주의 하단 외면에 일체로 부착 설치되는 다수의 보강리브와; 하단부는 상기 콘크리트 기초부내에 위치되어 고정되고 상단부는 상기 콘크리트 기초부의 상면으로 돌출되어 상기 고정판을 관통한 후 상기 보강리브 사이로 돌출되는 다수의 앙카볼트와, 상기 고정판의 상면으로 돌출된 상기 앙카볼트의 돌출부에 나사 결합되는 너트로 이루어진 체결수단과; 상단부는 지면으로부터 돌출되어 상기 지주의 외면과 접촉되도록 감싸고, 나머지는 상기 콘크리트 기초부의 상부측에 해당되는 지중에 위치되어 상기 보강리브들 사이 공간으로 흙이 유입되는 것을 방지하기 위해 상기 고정판과 보강리브 및 체결수단을 함께 감싸는 체결수단 보호커버와; 상기 체결수단 보호커버의 상단부의 내면과 이에 대응되는 지주의 외면 사이에 설치되는 빗물 유입 방지링을 포함하며, 상기 체결수단 보호커버는, 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버와 우측 보호커버로 이루어지며, 상기 힌지의 반대편측의 상기 좌측 보호커버와 우측 보호커버에는 체결볼트에 의해 결합되는 고정편이 형성된 것을 특징으로 한다.The present invention is a strut installation structure for installing the strut perpendicular to the ground, the concrete foundation is installed so as to be buried under a certain depth; A fixing plate having a lower surface in contact with the upper surface of the concrete foundation and fixedly installed at the lower end of the support; Located in the ground corresponding to the upper side of the concrete foundation, a plurality of reinforcing ribs are integrally attached to the upper surface of the fixed plate and the lower outer surface of the support; A lower end portion is positioned and fixed in the concrete foundation portion, and an upper end portion of the anchor bolt protrudes to the upper surface of the concrete foundation portion and passes through the fixing plate and protrudes between the reinforcing ribs, and the anchor bolt protruding to the upper surface of the fixing plate. Fastening means comprising a nut screwed to the protrusion; The upper end protrudes from the ground and wraps to be in contact with the outer surface of the strut, and the rest is located in the ground corresponding to the upper side of the concrete foundation to prevent soil from entering the space between the reinforcing ribs. And a fastening means protective cover surrounding the fastening means; And a rainwater inflow prevention ring installed between an inner surface of an upper end of the fastening means protective cover and an outer surface of a support corresponding to the fastening means, wherein the fastening means protective cover is formed in the same shape that is symmetrical and rotated through a hinge. While being made of a left protective cover and a right protective cover that can be separated or coupled to the left and right, the left protective cover and the right protective cover on the opposite side of the hinge is characterized in that the fixing piece is coupled by a fastening bolt.

지주, 보강리브, 보호커버, 콘크리트 기초부, 앙카볼트, 너트 Shoring, Reinforcing Rib, Protective Cover, Concrete Foundation, Anchor Bolt, Nut

Description

지주설치구조{Installation structure of post}Shoring installation structure

본 고안은 도로 표지판 또는 가로등용 지주설치구조에 관한 것이다.The present invention relates to a strut installation structure for a road sign or a street lamp.

일반적으로, 도로에는 운전자 및 보행자의 안전을 위해 도로 안내표지판, 가로등 등의 교통안전시설이 설치되는데, 이 교통안전시설은 지면에 대해 수직으로 설치되는 지주의 상부에 도로 표지판 또는 가로등을 설치하는 것이다.In general, road safety signs such as road signs and street lamps are installed on the road for the safety of drivers and pedestrians. This traffic safety facility is to install road signs or street lamps on tops of posts perpendicular to the ground. .

도 1은 통상적인 지주설치구조의 일례를 나타낸 도면이다.1 is a view showing an example of a conventional strut mounting structure.

도시된 바와 같이, 지주 설치구조는, 일부는 인도(人道)측의 지면 상부로 일정 높이 돌출됨과 아울러 나머지는 인도측의 지면 아래로 매몰되게 설치되는 콘크리트 기초부(6)와, 일부는 콘크리트 기초부(6)의 상면으로부터 돌출됨과 아울러 나머지는 콘크리트 기초부(6)에 내장되도록 콘크리트 기초부(6)의 타설시 함께 설치되는 다수의 앙카볼트(6a)와, 콘크리트 기초부(6)의 상면으로 돌출된 앙카볼트(6a)가 삽입되어 돌출됨과 아울러 콘크리트 기초부(6)의 상면과 접촉하는 고정판(2)을 하단부에 일체로 구비한 지주(1)와, 고정판(2)의 상면으로 돌출된 앙카볼트(6a)에 나사 결합되어 고정판(2)이 콘크리트 기초부(6)에 고정되도록 하는 고정 너트(6b)와, 고정판(2)의 상면과 지주(1)의 하단 외면에 동시에 일체로 부착 설치됨과 아울 러 지주(1)의 외면을 따라 일정한 간격으로 지면으로부터 돌출되게 설치되는 삼각형 형상의 보강리브(3)로 구성되어 있다.As shown, the strut installation structure is a concrete foundation (6) which is installed to be partly projected a certain height above the ground on the side of the side of the side of India (Indo) side, and buried under the ground of the side of the side of the side of the side, and part of the concrete foundation A plurality of anchor bolts 6a installed at the time of pouring the concrete foundation 6 and the top surface of the concrete foundation 6 so as to protrude from the upper surface of the section 6 and the rest are embedded in the concrete foundation 6. The anchor bolt 6a protruding from the protrusion is inserted and protrudes, and the support plate 1 integrally provided at the lower end with the fixing plate 2 contacting the upper surface of the concrete foundation part 6 and protrudes to the upper surface of the fixing plate 2. The fixing nut 6b which is screwed to the fixed anchor bolt 6a so that the fixing plate 2 is fixed to the concrete foundation 6 and the upper surface of the fixing plate 2 and the bottom outer surface of the support 1 at the same time. Along the outer surface of the strut (1) as well as attached It consists of triangular reinforcement ribs 3 which protrude from the ground at intervals.

여기서, 보강리브(3)는 고정판(2)과 지주(1)의 결합력을 향상시킴과 아울러 지주(1)가 세워진 상태를 지속적으로 보강 유지하는 역할을 한다.Here, the reinforcing rib (3) serves to improve the bonding force between the fixing plate (2) and the support (1) and to continuously reinforce and maintain the state in which the support (1) is standing.

한편, 지주(1)의 상부에는 도로표지판(5)이 설치되어 있다.On the other hand, the road sign 5 is provided in the upper part of the support 1.

이와 같은 지주설치구조에서는, 보강판(2)과 보강리브(3) 및 콘크리트 기초부(6)가 지면 상부로 돌출되어 있기 때문에 보행자가 인도를 보행하던중 보강리브(3)에 걸려서 넘어지거나, 특히 보행자가 유아인 경우에는 특히 보강리브(3)에 잘 걸려 넘어지는 문제점이 있었다.In such a strut installation structure, since the reinforcement plate 2, the reinforcement ribs 3, and the concrete foundation 6 protrude above the ground, the pedestrian walks on the reinforcement ribs 3 while walking, or falls down. In particular, when the pedestrian is an infant, there was a problem of falling over the reinforcement ribs 3 in particular.

아울러, 보강판(2)과 보강리브(3) 및 콘크리트 기초부(6)가 지면 상부로 돌출된 구조이기 때문에 미관상 좋지 않은 문제점도 있었다.In addition, since the reinforcing plate 2 and the reinforcing ribs 3 and the concrete foundation 6 are protruded to the top of the ground, there was also a problem that is not good appearance.

이러한 문제점을 해결하기 위한 종래 기술의 일례로 대한민국 등록실용실안공보 제20-0413200호가 있는데, 이 기술에는 콘크리트 기초부의 상면에 베이스가 장착되는 가로등에 있어서, 상기 가로등의 지주의 하측, 베이스 및 콘크리트 기초부의 일측면을 동시에 커버하는 좌측 커버부와; 상기 좌측 커버부와 대응되는 형상으로 형성되어 상기 좌측 커버부와 체결되는 우측 커버부로 이루어진 베이스 커버가 개시되어 있다.An example of the prior art to solve this problem is the Republic of Korea Utility Model Publication No. 20-0413200, which includes a base mounted on the upper surface of the concrete foundation, the lower side of the strut of the street lamp, the base and the concrete foundation A left cover part which simultaneously covers one side of the part; Disclosed is a base cover formed of a shape corresponding to the left cover part and including a right cover part fastened to the left cover part.

전술한 대한민국 등록실용실안공보 제20-0413200호의 기술은 베이스 커버에 의해 지면 상부로 돌출된 보강판과 보강리브 및 콘크리트 기초부를 보이지 않게 되어 미감이 향상되는 이점이 있었다.The technique of the Republic of Korea Utility Model Application No. 20-0413200 described above has the advantage that the aesthetics are improved by not showing the reinforcing plate and reinforcing ribs and the concrete foundation protruding to the upper surface by the base cover.

그러나, 다음과 같은 문제점 있었다.However, there were the following issues.

첫째, 베이스 커버로 지면 상부로 돌출된 보강판과 보강리브 및 콘크리트 기초부가 보이지 않도록 가리더라도, 지면 상부에 새로운 구조물인 베이스 커버가 여전히 돌출되어 있는 상태이기 때문에 보행자가 보행시 콘크리트 기초부 또는 보강리브가 아닌 베이스 커버에 의해 걸려 넘어지게 되는 문제점도 있었다.First, even if the cover covers the reinforcement plate, the reinforcement rib and the concrete foundation protruding from the top of the ground so that the base cover is invisible, the concrete cover or reinforcement rib is There was also a problem of being tripped over by the base cover.

둘째, 베이스 커버의 장착 과정에 대해서 설명하면, 콘크리트 기초부에 가로등의 베이스를 설치한 후에, 좌측 커버부와 우측 커버부로 가로등 지부의 하측과 베이스 및 콘크리트 기초부를 동시에 감싼 다음, 좌측 커버부와 우측 커버부를 서로 일부 겹쳐지게 가결합 한 후, 이들의 일부 겹쳐진 부분에 복수개의 스크류를 이용하여 가결합 상태를 완전 결합 상태가 되도록 하는데, 좌측 커버부와 우측 커버부를 상호 맞대어 결합하기 위해서는 스크류의 개수를 복수개 사용하는 관계로 설치 시공 시간이 많이 걸리는 문제점도 있었다.Secondly, when the base cover is installed, the base of the street light is installed on the concrete foundation, and then the left cover and the right cover cover the lower side of the lamp post and the base and the concrete foundation at the same time. After the cover parts are partially coupled to each other and then overlapped with each other, a plurality of screws are used to partially join the overlapped parts so that the temporary coupling state is completely combined. In order to engage the left cover part and the right cover part together, the number of screws is increased. There was also a problem that it takes a lot of installation time because of the use of a plurality.

한편, 다른 종래 기술로, 보강판과 보강리브 및 콘크리트 기초부가 지면 상부로 돌출된 구조이기 때문에 미관을 저해하는 문제점을 해결하기 위해 대한민국 등록특허 10-0588445호에는 지면 아래로 일정 크기의 공간부를 형성하고, 이 공간부의 바닥에 기초 콘크리트 구조물을 앵커볼트가 구비되도록 타설하며, 전주의 하단부에 고정 설치된 상부 플레이트를 기초 콘크리트 구조물에 위치시켜 너트를 매개로 앵커볼트에 고정한 다음, 이 상부 플레이트와 앵커볼트와 너트 및 공간부내에 있는 전주를 에워싸도록 주 콘크리트 구조물을 타설한 후, 마지막으로, 공간부를 흙으로 메우도록 하여 전주를 설치하는 기술이 개시되어 있다.On the other hand, in the prior art, in order to solve the problem of inhibiting aesthetics because the reinforcement plate and the reinforcement ribs and the concrete foundation is projected to the upper surface, the Republic of Korea Patent No. 10-0588445 forms a predetermined size space below the ground And, at the bottom of the space part, the foundation concrete structure is placed so that the anchor bolt is provided, and the upper plate fixed to the lower end of the pole is placed on the foundation concrete structure, and fixed to the anchor bolt through the nut, and then the upper plate and the anchor bolt After the main concrete structure is poured so as to surround the nut and the pole located in the space portion, and finally, the technique of installing the pole by filling the space portion with soil is disclosed.

전술한 종래 기술중 대한민국 등록특허 10-0588445호는, 지면 아래에 전주를 매설하여 지면 상부로는 전주만 보이도록 하여 미관을 좋게 한다는 점은 있으나, 다음과 같은 문제점이 있었다.Republic of Korea Patent No. 10-0588445 of the above-described prior art, there is a point to improve the aesthetics so that only the pole is visible to the top of the floor by embedding the poles under the ground, there are the following problems.

첫째, 차도 확장시 인도의 일부를 차도로 변경해야 하는 경우에는, 인도에 설치된 전주의 위치를 다른 위치로 이동시켜야 하는 데, 우선 공간부에 매워진 흙을 모두 파헤친 후, 이 상부 플레이트와 앵커볼트와 너트 및 공간부내에 있는 전주를 에워싸는 주 콘크리트 구조물을 파쇄하여 해체한 다음, 너트를 풀어 앵커볼트로부터 상부 플레이트를 분리하는 순서로 진행된다.First, when a part of a sidewalk needs to be changed to a driveway when the road is extended, the position of the poles installed in the sidewalk must be moved to another position. First, after digging all the soil filled in the space part, the upper plate and the anchor bolt And dismantle and dismantle the main concrete structure surrounding the poles in the nut and the space, and then proceed to remove the nut and separate the upper plate from the anchor bolt.

그러나, 주 콘크리트 구조물에 의해 이 상부 플레이트와 앵커볼트와 너트 및 공간부내에 있는 전주가 에워싸여져 있기 때문에 주 콘크리트 구조물의 특성상 너트와 앵커볼트의 접속 부분에 있는 콘크리트를 모두 제거할 수 없어, 너트를 앵커볼트로부터 제거할 수 없게 된다. 따라서 강제적으로 상부 플레이트 근방에서 전주를 절단하여 전주 부분만을 일단 분리한 다음, 나머지 상부 플레이트와 앵커볼트와 너트를 공간부로부터 인출하기 위해 기초 콘크리트 구조물을 강제로 파쇄하게 된다.However, because the main concrete structure is surrounded by the upper plate, the anchor bolt, the nut and the poles in the space, it is impossible to remove all the concrete at the connection part between the nut and the anchor bolt due to the characteristics of the main concrete structure. It cannot be removed from the anchor bolt. Therefore, the electric pole is forcibly cut near the upper plate to separate the electric pole part once, and then the basic concrete structure is forcibly crushed to withdraw the remaining upper plate, the anchor bolt and the nut from the space part.

결과적으로, 전술한 종래 기술중 대한민국 등록특허 10-0588445호에 개시된 기술은 차도 확장시 인도의 일부를 차도로 변경해야 하는 경우에 인도에 설치된 전주의 위치를 다른 위치로 이동시키고자 할 경우에는 이동시키고자 할 전주를 재사용할 수 없는 단점이 있으며, 비록 전주를 재사용하지 않을 목적이라도 전주를 설 치하기 위한 구성 부재를 제거하는 작업이 난해할 뿐만 아니라 제거 시간도 오래 걸리는 문제점이 있었다.As a result, the technique disclosed in the Republic of Korea Patent No. 10-0588445 of the above-described prior art is to move when moving the position of Jeonju installed in India when the part of the road must be changed to the road when the road is extended There is a disadvantage that can not reuse the pole to be made, even if the purpose is not to reuse the pole was not only difficult to remove the components for installing the pole, but also takes a long time to remove.

본 고안의 목적은 상기와 같은 문제점을 해결하기 위해 창안된 것으로, 고정판과 보강리브 및 앙카볼트/너트로 이루어진 체결수단으로 빗물 유입 방지링에 의해 빗물이 유입되지 않게 됨과 아울러 흙을 메워 지면을 형성할 경우에 체결수단 보호커버에 의해 흙이 고정판과 보강리브 및 앙카볼트/ 너트로 이루어진 체결수단측으로 유입되지 않게 함으로써, 장기간 사용시 고정판과 보강리브 및 앙카볼트와 너트로 이루어진 체결수단의 부식을 방지함으로써 내구성을 향상시킬 수 있으며, 더 나아가 너트를 푸는 작업을 용이하게 실시할 수 있도록 한 지주설치구조를 제공한다.An object of the present invention was devised to solve the above problems, and it is a fastening means consisting of a fixed plate, reinforcing ribs and anchor bolts / nuts to prevent rainwater from being introduced by the rainwater inflow prevention ring, and form a ground to fill the soil. In this case, the soil is prevented from entering the fastening means consisting of the fixing plate, the reinforcing rib and the anchor bolt / nut by means of the fastening means protection cover, thereby preventing corrosion of the fastening means consisting of the fixing plate, the reinforcing rib and the anchor bolt and nut during long-term use. It is possible to improve the durability, and furthermore, to provide a support structure to facilitate the loosening of the nut.

본 고안의 다른 목적은, 체결수단 보호커버가 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버와 우측 보호커버로 이루어지며, 힌지의 반대편측의 좌측 보호커버와 우측 보호커버에 체결볼트에 의해 결합되는 고정편이 형성된 구조로 구성함으로써, 이의 설치 및 분리 작업을 매우 용이하게 실시할 수 있도록 한 지주설치구조를 제공한다.Another object of the present invention, the fastening means protective cover is made of the same shape to the left and right symmetrical, it is made of a left protective cover and a right protective cover that can be separated or combined left and right while rotating through the hinge, the opposite side of the hinge By providing a structure in which the fixing piece is coupled to the left side protective cover and the right side protective cover by the fastening bolt is formed, it provides a support installation structure so that the installation and detachment work thereof can be carried out very easily.

본 고안의 또 다른 목적은, 최종적으로 흙으로 메워 지면을 형성한 후, 보도블록을 설치한 상태에서 체결수단 보호커버의 상단부가 노출되어 있기는 하나, 상단부 일부분만 노출되어 있는 구조가 되어, 보행자의 보행시 방해 요소가 되지 않게 되어, 보강리브에 걸려 넘어지는 폐단을 방지할 수 있으며, 더 나아가 미적 감 각을 향상시킴과 아울러 체결수단 보호커버의 상단부에 부가적으로 빗물 유입 방지링의 외면에 설치된 야광 표시부에 의해 야간에 통행하는 사용자(보행자 또는 차량 운전자)에게 지주가 설치된 위치를 확인시켜 줄 수 있도록 한 지주설치구조를 제공한다.Another object of the present invention, after forming the ground finally filled with soil, the upper part of the fastening means protective cover is exposed in the state of installing the sidewalk block, but only a portion of the upper part is exposed, the pedestrian It does not become an obstacle when walking, and prevents the end of falling over the reinforcing rib, and further improves the aesthetic sense and additionally on the outer surface of the rainwater inflow prevention ring at the upper end of the fastening means protection cover. Provides a strut installation structure that allows the user (pedestrian or vehicle driver) to pass at night by the installed luminous display unit to confirm the position where the strut is installed.

상기와 같은 목적을 달성하기 위한 본 고안은, 지주를 지면에 수직으로 설치하기 위한 지주설치구조에 있어서, 지면 아래에 일정 깊이 매몰되도록 설치되는 콘크리트 기초부와; 하면이 상기 콘크리트 기초부의 상면과 접촉하며, 상기 지주의 하단부에 일체로 고정 설치되는 고정판과; 상기 콘크리트 기초부의 상부측에 해당되는 지중에 위치되되, 상기 고정판의 상면과 상기 지주의 하단 외면에 일체로 부착 설치되는 다수의 보강리브와; 하단부는 상기 콘크리트 기초부내에 위치되어 고정되고 상단부는 상기 콘크리트 기초부의 상면으로 돌출되어 상기 고정판을 관통한 후 상기 보강리브 사이로 돌출되는 다수의 앙카볼트와, 상기 고정판의 상면으로 돌출된 상기 앙카볼트의 돌출부에 나사 결합되는 너트로 이루어진 체결수단과; 상단부는 지면으로부터 돌출되어 상기 지주의 외면과 접촉되도록 감싸고, 나머지는 상기 콘크리트 기초부의 상부측에 해당되는 지중에 위치되어 상기 보강리브들 사이 공간으로 흙이 유입되는 것을 방지하기 위해 상기 고정판과 보강리브 및 체결수단을 함께 감싸는 체결수단 보호커버와; 상기 체결수단 보호커버의 상단부의 내면과 이에 대응되는 지주의 외면 사이에 설치되는 빗물 유입 방지링을 포함하며, 상기 체결수단 보호커버는, 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버와 우측 보호커버로 이루어지며, 상기 힌지의 반대편측의 상기 좌측 보호커버와 우측 보호커버에는 체결볼트에 의해 결합되는 고정편이 형성된 것을 특징으로 한다.The present invention for achieving the above object, in the support structure for installing the support vertically to the ground, the concrete foundation is installed so as to be buried under a certain depth; A fixing plate having a lower surface in contact with the upper surface of the concrete foundation and fixedly installed at the lower end of the support; Located in the ground corresponding to the upper side of the concrete foundation, a plurality of reinforcing ribs are integrally attached to the upper surface of the fixed plate and the lower outer surface of the support; A lower end portion is positioned and fixed in the concrete foundation portion, and an upper end portion of the anchor bolt protrudes to the upper surface of the concrete foundation portion and passes through the fixing plate and protrudes between the reinforcing ribs, and the anchor bolt protruding to the upper surface of the fixing plate. Fastening means comprising a nut screwed to the protrusion; The upper end protrudes from the ground and wraps to be in contact with the outer surface of the strut, and the rest is located in the ground corresponding to the upper side of the concrete foundation to prevent soil from entering the space between the reinforcing ribs. And a fastening means protective cover surrounding the fastening means; And a rainwater inflow prevention ring installed between an inner surface of an upper end of the fastening means protective cover and an outer surface of a support corresponding to the fastening means, wherein the fastening means protective cover is formed in the same shape that is symmetrical and rotated through a hinge. While being made of a left protective cover and a right protective cover that can be separated or coupled to the left and right, the left protective cover and the right protective cover on the opposite side of the hinge is characterized in that the fixing piece is coupled by a fastening bolt.

본 고안에 따른 지주설치구조에 따르면, 다음과 같은 효과를 기대할 수 있게 된다.According to the strut installation structure according to the present invention, the following effects can be expected.

첫째, 본 고안은 고정판과 보강리브 및 앙카볼트/너트로 이루어진 체결수단으로 빗물 유입 방지링에 의해 빗물이 유입되지 않게 됨과 아울러 흙을 메워 지면을 형성할 경우에 체결수단 보호커버에 의해 흙이 고정판과 보강리브 및 앙카볼트/ 너트로 이루어진 체결수단측으로 유입되지 않게 함으로써, 장기간 사용시 고정판과 보강리브 및 앙카볼트와 너트로 이루어진 체결수단의 부식을 방지함으로써 내구성을 향상시킬 수 있으며, 더 나아가 너트를 푸는 작업을 용이하게 실시할 수 있다.First, the present invention is a fastening means consisting of a fixed plate and a reinforcing rib and an anchor bolt / nut prevents rainwater from entering by the rainwater inflow prevention ring, and the soil is fixed by the fastening means protective cover when the soil is filled It is possible to improve the durability by preventing corrosion of the fastening means consisting of the fixing plate and the reinforcing rib and the anchor bolt and the nut during long-term use, by preventing the inflow to the fastening means of the reinforcing rib and the anchor bolt / nut. Work can be performed easily.

둘째, 본 고안은 체결수단 보호커버가 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버와 우측 보호커버로 이루어지며, 힌지의 반대편측의 좌측 보호커버와 우측 보호커버에 체결볼트에 의해 결합되는 고정편이 형성된 구조로 구성함으로써, 이의 설치 및 분리 작업을 매우 용이하게 실시할 수 있다.Second, the present invention is made of the same shape that the fastening means protective cover is left and right symmetrical, made of a left protective cover and a right protective cover that can be separated or combined left and right while rotating through the hinge, the opposite side of the hinge By constructing a structure in which a fixing piece is coupled to the left protective cover and the right protective cover by a fastening bolt, the installation and detachment thereof can be performed very easily.

셋째, 콘크리트 기초부의 상면의 위치를 차도보다 낮게 형성함으로써, 차도 확장시, 별도로 이 콘크리트 기초부를 파쇄하거나 손상시키지 않고 그대로 사용할 수 있는 잇점도 있으며, 더 나아가 차도 확장시 지주를 다른 위치로 이동하게 되 면, 앙카볼트와 콘크리트 기초부만 남게 되는데, 이 위에 차도 확장용 아스팔트를 시공할 수 있게 된다.Third, by forming the position of the upper surface of the concrete foundation lower than the roadway, there is an advantage that can be used as it is, without breaking or damaging the concrete foundation separately when expanding the roadway, and further, to move the strut to another position when the roadway expansion. Only cotton, anchor bolts and concrete foundations will be left, which will allow the construction of road extension asphalt.

이하, 본 고안에 의한 지주구조에 대한 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명하기로 한다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the strut structure according to the present invention will be described in detail.

도 2는 본 고안에 의한 지주설치구조를 나타낸 단면도이고, 도 3은 본 고안에 따른 체결수단 보호커버를 나타낸 사시도이다.2 is a cross-sectional view showing a strut installation structure according to the present invention, Figure 3 is a perspective view showing a fastening means protective cover according to the present invention.

도시된 바와 같이, 본 고안은 지주(10)를 지면에 수직으로 설치하기 위한 지주설치구조에 있어서, 콘크리트 기초부(60)와, 고정판(20)과, 보강리브(30)와, 체결수단과, 체결수단 보호커버(40)와, 빗물 유입 방지링(50)을 포함하여 이루어진다.As shown in the present invention, in the strut installation structure for vertically installing the strut 10 on the ground, the concrete foundation 60, the fixed plate 20, the reinforcing ribs 30, the fastening means and , The fastening means protective cover 40, and comprises a rain water inlet prevention ring (50).

콘크리트 기초부(60)는 지면 아래에 일정 깊이 매몰되도록 설치된다.Concrete foundation 60 is installed to be buried below a certain depth.

고정판(20)은, 하면이 콘크리트 기초부(60)의 상면과 접촉하며, 지주(10)의 하단부에 일체로 고정 설치된다.The fixing plate 20 has a lower surface in contact with the upper surface of the concrete foundation 60 and is integrally fixed to the lower end of the support 10.

보강리브(30)는 다수개로 이루어지며, 콘크리트 기초부(60)의 상부측에 해당되는 지중에 위치되되, 고정판(20)의 상면과 지주(10)의 하단 외면에 일체로 부착 설치되는데, 일례로 용접의 방법에 의해 설치되는 것으로, 지주(10)가 세워져 있을때 그 상태가 유지되도록 보강하는 역할을 한다.Reinforcing rib 30 is made of a plurality, located in the ground corresponding to the upper side of the concrete foundation 60, is installed integrally attached to the upper surface of the fixed plate 20 and the lower outer surface of the support 10, an example It is installed by the method of furnace welding, and serves to reinforce so that the state is maintained when the support 10 is upright.

체결수단은, 다수의 앙카볼트(61)와, 너트(62)로 구성되는 바, 앙카볼트(61)의 하단부는 콘크리트 기초부(60)내에 위치되어 고정되고, 앙카볼트(61)의 상단부 는 콘크리트 기초부(60)의 상면으로 돌출되어 고정판(20)을 관통한 후 보강리브(30) 사이로 돌출된다.The fastening means is composed of a plurality of anchor bolts 61 and nuts 62. The lower end of the anchor bolt 61 is positioned and fixed in the concrete foundation 60, and the upper end of the anchor bolt 61 is Protrudes to the upper surface of the concrete foundation 60, penetrates through the fixing plate 20 and protrudes between the reinforcing ribs (30).

그리고, 너트(62)는 고정판(20)의 상면으로 돌출된 상기 앙카볼트(61)의 돌출부(61a)에 나사 결합된다.In addition, the nut 62 is screwed to the protrusion 61a of the anchor bolt 61 protruding to the upper surface of the fixing plate 20.

다음으로, 체결수단 보호커버(40)는, 상단부는 지면으로부터 돌출되어 지주(10)의 외면과 접촉되도록 감싸고, 나머지는 콘크리트 기초부(60)의 상부측에 해당되는 지중에 위치되어 보강리브(30)들 사이 공간으로 흙이 유입되는 것을 방지하기 위해 고정판(20)과 보강리브(30) 및 체결수단을 함께 감싸는 구성으로 이루어진다.Next, the fastening means protective cover 40, the upper end is projected from the ground wraps so as to contact with the outer surface of the support 10, the rest is located in the ground corresponding to the upper side of the concrete foundation 60 is reinforced rib ( In order to prevent the soil from entering the space between the 30 is made of a configuration surrounding the fixing plate 20 and the reinforcing rib 30 and the fastening means together.

여기서, 상기 체결수단 보호커버(40)는, 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지(41)를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버(40a)와 우측 보호커버(40b)로 이루어지며, 힌지(41)의 반대편측의 좌측 보호커버(40a)와 우측 보호커버(40b)에는 체결볼트(44)에 의해 결합되는 고정편(42)(43)이 형성된다.Here, the fastening means protective cover 40 is made of the same shape, which is symmetrical left and right, while being rotated via the hinge 41, the left protective cover 40a and the right protective cover that can be separated or combined left and right ( 40b), the left side protective cover 40a and the right side protective cover 40b on the opposite side of the hinge 41, the fixing piece (42) 43 is coupled by the fastening bolt 44 is formed.

이와 같이, 본 고안에 다른 체결수단 보호커버(40)와 같이 구성함으로써, 차도 확장시 인도의 일부를 차도로 변경해야 하는 경우, 지주(10)를 다른 위치로 이동시켜야 하는데, 이때 체결볼트(44) 하나만을 분리함으로써 힌지(41)를 중심으로회동시켜 좌측 보호커버(40a)와 우측 보호커버(40b)를 벌려 지주(10)로부터 용이하게 분리함과 아울러 분리 시간도 단축시킬 수 있다.In this way, by configuring as the other fastening means protection cover 40 in the present invention, when a part of the roadway to change the roadway to extend the driveway, the support (10) should be moved to another position, the fastening bolt 44 By removing only one), the hinge 41 can be pivoted to open the left protective cover 40a and the right protective cover 40b to easily separate from the support 10 and shorten the separation time.

아울러, 체결수단 보호커버(40)를 설치하고자 할 경우에는 힌지(41)를 중심 으로 하여 회동시켜 좌측 보호커버(40a)와 우측 보호커버(40b)를 서로 마주하도록 한 상태에서 체결볼트(44) 하나만으로 체결함으로써, 체결수단 보호커버(40)를 용이하게 설치함과 아울러 그 설치 시간도 단축시킬 수 있게 된다.In addition, when the fastening means protective cover 40 is to be installed, the fastening bolt 44 is rotated around the hinge 41 so that the left protective cover 40a and the right protective cover 40b face each other. By fastening only one, it is possible to easily install the fastening means protective cover 40, and also to shorten its installation time.

마지막으로, 빗물 유입 방지링(50)은 체결수단 보호커버(40)의 상단부의 내면과 이에 대응되는 지주(10)의 외면 사이에 설치되어 빗물이 체결수단 보호커버(40)의 상단부의 내면과 이에 대응되는 지주(10)의 외면 사이로 유입되는 것을 방지하는 역할을 하는 것으로, 그 재질은 신축성이 있는 재질로 일례로 고무 재질을 사용할 수 있다.Finally, the rain water inlet prevention ring 50 is installed between the inner surface of the upper end of the fastening means protective cover 40 and the outer surface of the support 10 corresponding to the rain water is the inner surface of the upper end of the fastening means protective cover 40 and Corresponding to the role of preventing the inflow between the outer surface of the support 10, the material may be used as an example of the elastic material as a rubber material.

본 고안에 의한 빗물 유입 방지링(50)의 구조는 다양한 실시예가 있을 수 있으나, 본 고안에서는 도 3에 도시된 바와 같이, 좌측 보호커버용 빗물 유입방지링(51)과, 우측 보호커버용 빗물 유입방지링(52)으로 이루어진다.The rainwater inflow prevention ring 50 according to the present invention may have a variety of embodiments, but in the present invention, as shown in FIG. 3, the left protection cover rainwater inflow prevention ring 51 and the right protection cover rainwater It consists of an inflow prevention ring (52).

좌측 보호커버용 빗물 유입방지링(51)은, 하단이 개구되어 좌측 보호커버(40a)의 상단부가 삽입되게 삽입부(51d)가 형성되도록 이격된 한쌍의 외측 수직부(51a)/내측 수직부(51b)와, 상기 외측 수직부(51a)와 내측 수직부(51b) 각각의 상단을 연결하는 연결부(51c)로 이루어진다.Rainwater inflow prevention ring 51 for the left protective cover is a pair of outer vertical portion 51a / inner vertical portion spaced apart so that the lower end is opened so that the insertion portion 51d is formed to insert the upper end of the left protective cover 40a. And a connecting portion 51c connecting the upper ends of the outer vertical portion 51a and the inner vertical portion 51b.

다음으로, 우측 보호커버용 빗물 유입방지링(52)은, 하단이 개구되어 상기 우측 보호커버(40b)의 상단부가 삽입되게 삽입부(52d)가 형성되도록 이격된 한쌍의 외측 수직부(52a)/내측 수직부(52b)와, 상기 외측 수직부(52a)와 내측 수직부(52b) 각각의 상단을 연결하는 연결부(52c)로 이루어진다.Next, the rain protection inflow prevention ring 52 for the right protective cover is a pair of outer vertical portion 52a spaced so that the lower end is opened so that the insertion portion 52d is formed so that the upper end of the right protective cover 40b is inserted. The inner vertical part 52b and the connection part 52c which connects the upper end of each of the outer vertical part 52a and the inner vertical part 52b.

전술한 본 고안의 빗물 유입 방지링(50)을 좌측 보호커버용 빗물 유입방지 링(51)과, 우측 보호커버용 빗물 유입방지링(52)으로 구성하되, 이들 구성이 "∩"자 형상으로 삽입부(51d)(52d)를 가진 구성으로 형성함으로써, 빗물 유입방지 기능도 수행함과 아울러 좌측 보호커버(40a)와 우측 보호커버(40b) 각각의 상단부와 상호 조립 및 분리성도 향상시킬 수 있으며, 후술하는 야광표시부(53)를 부착시킬 수 있는 기능도 부가적으로 수행될 수 있다.The rainwater inflow prevention ring 50 of the present invention described above is composed of a rainwater inflow prevention ring 51 for the left protective cover and a rainwater inflow prevention ring 52 for the right protective cover, but these configurations have a shape of "∩". By forming the configuration having the insertion portions 51d and 52d, it is possible to prevent rainwater inflow and improve the mutual assembly and separation with the upper ends of each of the left protective cover 40a and the right protective cover 40b. A function capable of attaching the luminous display unit 53 to be described later may also be additionally performed.

한편, 본 고안의 빗물 유입 방지링(50)을 구성하는 좌측 보호커버용 빗물 유입 방지링(52)과 우측 보호커버용 빗물 유입 방지링(52)중 적어도 어느 하나의 외측 수직부(51a)(52a)의 외면에는 야간에 식별이 가능하도록 야광 표시부(53)가 구비되는 바, 이 야광 표시부(53)는 야광 기능을 갖는 야광 도료 또는 테이프 타입으로 구성할 수 있으며, 테이프 타입인 경우에는 외측 수직부(51a)(52a)의 외면에 접착제를 매개로 하여 부착한다.On the other hand, at least any one of the outer vertical portion 51a of the rain protection inflow prevention ring 52 for the left protective cover and the rainwater inflow prevention ring 52 for the right protective cover constituting the rainwater inflow prevention ring 50 of the present invention ( The outer surface of the 52a) is provided with a luminous display unit 53 so as to be distinguished at night. The luminous display unit 53 may be formed of a luminous paint or a tape type having a luminous function. It adheres to the outer surface of the part 51a, 52a through an adhesive agent.

이와 같이, 빗물 유입 방지링(50)에 야광 표시부(53)를 부착함에 따라 야간에 통행하는 사용자(보행자 또는 차량 운전자)에게 지주(10)가 설치된 위치를 확인시켜 줄 수 있게 된다.As such, by attaching the luminous display unit 53 to the rainwater inflow prevention ring 50, the user (pedestrian or vehicle driver) who passes at night can check the location in which the support 10 is installed.

도면중 미설명 부호 70은 지주(10)의 상부에 설치되는 도로표지판(5)이며, 도시하지는 않았지만, 도로 표지판 대시에 가로등을 설치할 수 있음은 물론이다.In the figure, reference numeral 70 is a road sign 5 installed on the upper part of the support 10, although not shown, it is a matter of course that a street lamp can be installed on the road sign dash.

이하, 본 고안의 구성에 따른 지주를 설치하는 순서를 설명하기로 한다.Hereinafter, the procedure for installing the struts according to the constitution of the present invention will be described.

먼저, 지면 아래에 일정 깊이 매몰되도록 콘크리트를 타설하여 콘크리트 기초부(60)를 형성한다.First, concrete is poured to be buried below a certain depth to form a concrete foundation 60.

이때, 콘크리트 기초부(60)의 타설시 하단부는 콘크리트 기초부(60)내에 위치되어 고정되고, 상단부는 콘크리트 기초부의 상부면으로 돌출되도록 다수의 앙카볼트(61)가 함께 설치되도록 한다.At this time, when placing the concrete foundation 60, the lower end is positioned and fixed in the concrete foundation 60, the upper end is to be installed with a plurality of anchor bolts 61 to protrude to the upper surface of the concrete foundation.

한편, 지주(10)의 하단부에는 가장자리부에 앙카볼트(61)의 개수에 대응하여 다수의 앙카볼트 삽입공(20a)이 관통 형성된 고정판(20)을 용접등의 방법을 이용하여 고정 부착한다.On the other hand, the lower end of the support 10 is fixed to the fixing plate 20, through which a plurality of anchor bolt insertion holes 20a penetrated in correspondence to the number of anchor bolts 61 at the edge portion, by using a welding method or the like.

다음으로, 고정판(20)의 상면과 지주(10)의 하단 외면에 용접등의 방법을 이용하여 다수의 보강리브(30)를 고정 부착한다.Next, a plurality of reinforcing ribs 30 are fixedly attached to the upper surface of the fixing plate 20 and the lower outer surface of the support 10 by using a welding method.

이때, 보강리브(30)를 고정판(20)에 형성된 삽입공(20a)을 제외한 나머지 부분에 부착하여, 앙카볼트(61)가 삽입공(20a)으로 삽입되어 돌출되는 것을 방해하지 않도록 한다.At this time, the reinforcing rib 30 is attached to the remaining portions except the insertion hole 20a formed in the fixing plate 20, so that the anchor bolt 61 is inserted into the insertion hole 20a so as not to prevent the protrusion.

상기와 같은 과정을 모두 준비한 상태에서, 지주(10)를 수직으로 세워 고정판(20)을 콘크리트 기초부(60)의 상면과 접촉하도록 하되, 콘크리트 기초부(60)의 상면으로 돌출된 앙카볼트(61)의 돌출부(61a)가 고정판(20)에 형성된 앙카볼트 삽입공(20a)을 통해 고정판(20)의 상면으로 돌출되도록 한다.In a state in which all the above-described process is prepared, the support plate 10 is vertically placed so that the fixing plate 20 is in contact with the upper surface of the concrete foundation 60, and the anchor bolt protrudes to the upper surface of the concrete foundation 60. The protrusion 61a of the 61 is projected to the upper surface of the fixing plate 20 through the anchor bolt insertion hole 20a formed in the fixing plate 20.

이후, 너트(62)를 이용하여, 고정판(20)의 상면으로 돌출된 앙카볼트(61)의 돌출부(61a)에 나사 결합하여, 고정판(20)을 콘크리트 기초부(60)의 상면에 고정시켜 지주(10)를 수직 설치 과정을 완료한다.Thereafter, the nut 62 is screwed to the protrusion 61a of the anchor bolt 61 protruding to the upper surface of the fixing plate 20, thereby fixing the fixing plate 20 to the upper surface of the concrete foundation 60. Complete the vertical installation process of the post (10).

이후 과정은 마무리 과정으로, 체결수단 보호커버(40)를 이용하여, 체결수단 보호커버(40)의 상단부는 지면으로부터 돌출되어 지주(10)의 외면과 접촉되도록 감싸고, 나머지는 콘크리트 기초부(60)의 상부측에 해당되는 지중에 위치되어 보강리브(30)들 사이 공간으로 흙이 유입되는 것을 방지하기 위해 고정판(20)과 보강리브(30) 및 체결수단을 함께 감싸는 과정을 실시한다.After the process is a finishing process, using the fastening means protective cover 40, the upper end of the fastening means protective cover 40 is projected from the ground to wrap in contact with the outer surface of the support 10, the rest of the concrete foundation (60) Located in the ground corresponding to the upper side of the) is carried out a process of wrapping the fixing plate 20 and the reinforcing rib 30 and the fastening means together to prevent the soil from entering the space between the reinforcing ribs (30).

여기서, 체결수단 보호커버(40)를 설치하는 경우를 좀더 상세하게 설명하면, 힌지(41)를 중심으로 하여 회동시켜 좌측 보호커버(40a)와 우측 보호커버(40b)를 서로 마주하도록 한 상태에서 체결볼트(44) 하나만으로 체결하게 되면, 좌측 보호커버(40a)와 우측 보호커버(40b) 각각의 상단부는 지주(10)의 외면에 접촉된 상태로 이를 감싸게 되고, 나머지는 고정판(20)과 보강리브(30) 및 체결수단을 함께 감싸게 된다.Here, the case in which the fastening means protective cover 40 is described in more detail, in a state in which the left protective cover 40a and the right protective cover 40b face each other by pivoting around the hinge 41. When fastening with only one fastening bolt 44, the upper end of each of the left protective cover (40a) and the right protective cover (40b) is wrapped in contact with the outer surface of the support (10), the rest is fixed plate 20 and The reinforcing rib 30 and the fastening means are wrapped together.

따라서, 체결수단 보호커버(40)를 용이하게 설치함과 아울러 그 설치 시간도 단축시킬 수 있게 된다.Therefore, the fastening means protective cover 40 can be easily installed, and the installation time thereof can be shortened.

한편, 상기 체결수단 보호커버(40)를 설치할 때, 빗물 유입 방지링(50)도 함께 개재한 후, 병행하게 된다.On the other hand, when installing the fastening means protective cover 40, the rain water inlet prevention ring 50 is also interposed together, and then in parallel.

즉, 좌측 보호커버용 빗물 유입 방지링(51)의 삽입부(51d)내로 좌측 보호커버(40a)의 상단부가 삽입되도록 하고, 우측 보호커버용 빗물 유입 방지링(52)의 삽입부(52d)내로 우측 보호커버(40b)의 상단부가 삽입되도록 한다.That is, the upper end portion of the left protective cover 40a is inserted into the insertion portion 51d of the left protective cover rainwater inflow prevention ring 51, and the insertion portion 52d of the right protective cover rainwater inflow prevention ring 52 is inserted. The upper end portion of the right protective cover 40b is inserted into it.

이렇게 좌측 보호커버(40a)와 우측 보호커버(40b) 각각의 상단부에 빗물 유입방지링(51)(52)을 각각 개재하여, 체결수단 보호커버(40)를 장착하게 되면, 이들 빗물 유입방지링(51)(52)의 내측 수직부(51b)(52b)는 압착되면서 지주(10)의 외면 에 밀착되어 빗물이 유입되지 않게 된다.The rainwater inflow prevention rings 51 and 52 are interposed on the upper ends of the left protection cover 40a and the right protection cover 40b, respectively, and when the fastening means protection cover 40 is mounted, these rainwater inflow prevention rings The inner vertical portions 51b and 52b of the 51 and 52 are pressed to be in close contact with the outer surface of the support 10 so that rainwater does not flow.

이후, 좌측 보호커버용 빗물 유입 방지링(52)과 우측 보호커버용 빗물 유입 방지링(52)중 적어도 어느 하나의 외측 수직부(51a)(52a)의 외면에는 야간에 식별이 가능하도록 야광 표시부(53)를 부착하는 작업을 실시하는데, 이 야광 표시부(53)는 빗물 유입 방지링(50)의 외면에 사전에 부착될 수도 있고, 테이프 타입인 경우에는 전술한 바와 같이, 마지막 공정으로 부착할 수 있음은 물론이다.Thereafter, the luminous display unit may be visible on the outer surface of at least one of the outer vertical portions 51a and 52a of the left protective cover rainwater inflow prevention ring 52 and the right protective cover rainwater inflow prevention ring 52. The luminous display unit 53 may be attached to the outer surface of the rainwater inflow prevention ring 50 in advance. In the case of the tape type, the luminous display unit 53 may be attached in the last step. Of course it can.

다음으로, 콘크리트 기초부(60)의 상면에 일정 높이로 흙을 메워 지면을 형성하게 되며, 지면에는 보도블록을 설치할 수 있다.Next, the ground is formed on the upper surface of the concrete foundation 60 to a certain height to form a ground, it can be installed on the ground sidewalk block.

여기서, 흙을 메워 지면을 형성하는 경우, 보도블록을 설치할 여유 공간을 고려하여 체결수단 보호커버(40)의 상단부에 설치된 빗물 유입 방지링(50)은 흙으로 메워지지 않도록 남겨둔다.Here, in the case of forming the ground to fill the soil, the rain water inlet prevention ring 50 installed in the upper end of the fastening means protection cover 40 in consideration of the free space to install the sidewalk block is left so as not to be filled with soil.

상기와 같이, 콘크리트 기초부(60)의 상면에 흙을 메워 지면을 형성하더라고 본 고안에 의한 체결수단 보호커버(40)에 의해 상기 보강리브(30)들 사이 공간으로 흙이 유입되는 것이 원천적으로 방지된다.As described above, even if the soil is formed on the top surface of the concrete foundation 60, the soil is introduced into the space between the reinforcing ribs 30 by the fastening means protective cover 40 according to the present invention. Is prevented.

따라서, 지주(10)를 이동시키기 위해 너트(62)를 푸는 작업을 원활하게 진행할 수 있다.Therefore, the work to loosen the nut 62 in order to move the support 10 can proceed smoothly.

만약, 본 고안에서와 같이, 체결수단 보호커버(40)를 설치하지 않고 흙을 메워 지면을 형성하게 되면, 흙이 너트(62)와 앙카볼트(61) 사이의 틈새로 끼여들어가 부식을 일으키며, 시간이 오래 경과할수록 너트(62)를 풀기 어려운 상태가 된다.If, as in the present invention, to form the ground filling the soil without installing the fastening means protective cover 40, the soil is inserted into the gap between the nut 62 and the anchor bolt 61, causing corrosion, The longer the time passes, the more difficult the nut 62 is to be loosened.

한편, 본 고안은, 차도 확장시 인도의 일부를 차도로 변경해야 하는 경우, 지주(10)를 다른 위치로 이동시켜야 하는데, 이때 체결볼트(44) 하나만을 분리함으로써 힌지(41)를 중심으로 회동시켜 좌측 보호커버(40a)와 우측 보호커버(40b)를 벌려 지주(10)로부터 용이하게 분리함과 아울러 분리 시간도 단축시킬 수 있다.On the other hand, in the present invention, when a part of the sidewalk to be changed to the roadway when extending the driveway, the support (10) has to be moved to another position, in which case only one fastening bolt 44 is rotated around the hinge (41). By opening the left protective cover (40a) and the right protective cover (40b) can be easily separated from the support (10) and can also shorten the separation time.

따라서, 본 고안은 고정판(20)과 보강리브(30) 및 앙카볼트(61)와 너트(62)로 이루어진 체결수단으로 빗물 유입 방지링(50)에 의해 빗물이 유입되지 않게 됨과 아울러 흙을 메워 지면을 형성할 경우에 체결수단 보호커버(40)에 의해 흙이 고정판(20)과 보강리브(30) 및 앙카볼트(61)와 너트(62)로 이루어진 체결수단측으로 유입되지 않게 함으로써, 장기간 사용시 고정판(20)과 보강리브(30) 및 앙카볼트(61)와 너트(62)로 이루어진 체결수단의 부식을 방지함으로써 내구성을 향상시킬 수 있게 된다.Therefore, the present invention is a fastening means consisting of the fixing plate 20 and the reinforcing ribs 30 and the anchor bolt 61 and the nut 62, the rainwater is not introduced by the rainwater inflow prevention ring 50 and the soil is filled In the case of forming the ground, the fastening means protective cover 40 prevents the soil from flowing into the fastening means consisting of the fixing plate 20, the reinforcing ribs 30, and the anchor bolt 61 and the nut 62, so that when used for a long time By preventing corrosion of the fastening means consisting of the fixing plate 20 and the reinforcing rib 30 and the anchor bolt 61 and the nut 62 can be improved durability.

그리고, 본 고안은 도 2에 도시된 바와 같이, 콘크리트 기초부(60)의 상면의 위치를 차도보다 낮게 형성함으로써, 차도 확장시, 별도로 이 콘크리트 기초부(60)를 파쇄하거나 손상시키지 않고 그대로 사용할 수 있는 잇점도 있다.In addition, the present invention, as shown in Figure 2, by forming the position of the upper surface of the concrete foundation 60 lower than the driveway, when extending the roadway, the concrete foundation 60 can be used as it is without breaking or damage separately There are also benefits.

즉, 차도 확장시 지주(10)를 다른 위치로 이동하게 되면, 앙카볼트(61)와 콘크리트 기초부(60)만 남게 되는데, 이 위에 차도 확장용 아스팔트를 시공하면 된다. 만약, 도 2에 도시된 바와 같이 콘크리트 기초부(60)를 차도보다 약간 높게 형성하더도 차도 확장시 외부로 노출된 앙카볼트(61)와 콘크리트 기초부(60)위에 차도 확장용 아스팔트의 시공이 가능하다.In other words, when moving the support 10 when moving the road to another position, only the anchor bolt 61 and the concrete foundation 60 is left, the above-mentioned road extension asphalt construction. If the concrete foundation 60 is formed slightly higher than the roadway as shown in FIG. 2, the construction of the road extension asphalt on the anchor bolt 61 and the concrete base 60 exposed to the outside when the roadway is extended is It is possible.

그리고, 본 고안에 따르면, 최종적으로 흙으로 메워 지면을 형성한 후, 보도 블록을 설치한 상태에서 체결수단 보호커버의 상단부가 노출되어 있기는 하나, 상단부 일부분만 노출되어 있는 구조가 되어, 보행자의 보행시 방해 요소가 되지 않게 되어, 종래와 같이 보강리브에 걸려 넘어지는 폐단을 방지할 수 있으며, 더 나아가 미적 감각을 향상시킴과 아울러 체결수단 보호커버의 상단부에 부가적으로 빗물 유입 방지링의 외면에 설치된 야광 표시부에 의해 야간에 통행하는 사용자(보행자 또는 차량 운전자)에게 지주가 설치된 위치를 확인시켜 줄 수 있게 된다.In addition, according to the present invention, after the ground is finally filled with soil, the upper end of the fastening means protective cover is exposed in the state where the sidewalk block is installed, but only a portion of the upper end is exposed, so that the As it does not become an obstacle when walking, it can prevent the closed end from falling over the reinforcing rib as in the prior art, and further improve the aesthetic sense and additionally the rainwater inflow prevention ring at the upper end of the fastening means protective cover. By the luminous display unit installed in the user (pedestrian or vehicle driver) to pass at night it is possible to confirm the location where the support is installed.

그리고, 본 고안에 따르면, 차도 확장시 지주를 다른 위치로 이동시키고자 콘크리트 기초부로부터 지주를 분리한 경우에, 이 분리된 지주를 그대로 재활용할 수 있는 잇점이 있다.In addition, according to the present invention, when the strut is separated from the concrete foundation to move the strut to another position when the road is extended, there is an advantage that can be recycled as it is.

도 1은 종래 기술에 따른 지주설치구조의 일례를 나타낸 도면.1 is a view showing an example of a support structure according to the prior art.

도 2는 본 고안에 의한 지주설치구조를 나타낸 단면도.Figure 2 is a cross-sectional view showing the strut installation structure according to the present invention.

도 3은 본 고안에 따른 체결수단 보호커버를 나타낸 사시도.Figure 3 is a perspective view showing a fastening means protective cover according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 지주10: prop

20 : 고정판20: fixed plate

30 : 보강리브30: reinforcement rib

40 : 체결수단 보호커버40: fastening means protective cover

40a : 좌측 보호커버40a: Left protective cover

40b : 우측 보호커버40b: Right side protective cover

50 : 빗물 유입 방지링50: rainwater inflow prevention ring

53 : 야광표시부53: luminous display unit

60 : 콘크리트 기초부60: concrete foundation

61 : 앙카볼트61: anchor bolt

62 : 너트62: nut

Claims (2)

지주(10)를 지면에 수직으로 설치하기 위한 지주설치구조에 있어서,In the strut installation structure for installing the strut 10 perpendicular to the ground, 지면 아래에 일정 깊이 매몰되도록 설치되는 콘크리트 기초부(60)와;A concrete foundation 60 installed to be buried below a certain depth; 하면이 상기 콘크리트 기초부(60)의 상면과 접촉하며, 상기 지주(10)의 하단부에 일체로 고정 설치되는 고정판(20)과;A fixing plate 20 having a lower surface in contact with the upper surface of the concrete foundation part 60 and fixedly installed at the lower end of the support 10; 상기 콘크리트 기초부(60)의 상부측에 해당되는 지중에 위치되되, 상기 고정판(20)의 상면과 상기 지주(10)의 하단 외면에 일체로 부착 설치되는 다수의 보강리브(30)와;Located in the ground corresponding to the upper side of the concrete foundation 60, a plurality of reinforcing ribs 30 are integrally attached to the upper surface of the fixed plate 20 and the lower outer surface of the support 10; 하단부는 상기 콘크리트 기초부(60)내에 위치되어 고정되고 상단부는 상기 콘크리트 기초부(60)의 상면으로 돌출되어 상기 고정판(20)을 관통한 후 상기 보강리브(30) 사이로 돌출되는 다수의 앙카볼트(61)와, 상기 고정판(20)의 상면으로 돌출된 상기 앙카볼트(61)의 돌출부(61a)에 나사 결합되는 너트(62)로 이루어진 체결수단과;A plurality of anchor bolts are located at the lower end of the concrete foundation 60 and fixed, and the upper end protrudes to the upper surface of the concrete foundation 60 to penetrate the fixing plate 20 and then protrude between the reinforcing ribs 30. (61) and a fastening means consisting of a nut (62) screwed to the protrusion (61a) of the anchor bolt (61) protruding to the upper surface of the fixing plate (20); 상단부는 지면으로부터 돌출되어 상기 지주(10)의 외면과 접촉되도록 감싸고, 나머지는 상기 콘크리트 기초부(60)의 상부측에 해당되는 지중에 위치되어 상기 보강리브(30)들 사이 공간으로 흙이 유입되는 것을 방지하기 위해 상기 고정판(20)과 보강리브(30) 및 체결수단을 함께 감싸는 체결수단 보호커버(40)와;The upper end protrudes from the ground and wraps to be in contact with the outer surface of the support 10, and the rest is located in the ground corresponding to the upper side of the concrete foundation 60, the soil flows into the space between the reinforcing ribs 30 Fastening means protection cover 40 surrounding the fixing plate 20 and the reinforcing rib 30 and the fastening means together to prevent being; 상기 체결수단 보호커버(40)의 상단부의 내면과 이에 대응되는 지주(10)의 외면 사이에 설치되는 빗물 유입 방지링(50)을 포함하며,It includes a rainwater inflow prevention ring 50 is installed between the inner surface of the upper end of the fastening means protective cover 40 and the outer surface of the support 10 corresponding thereto, 상기 체결수단 보호커버(40)는, 좌우 대칭되는 동일한 형상으로 이루어지되, 힌지(41)를 매개로 하여 회동되면서 좌우로 분리 또는 결합될 수 있는 좌측 보호커버(40a)와 우측 보호커버(40b)로 이루어지며, 상기 힌지(41)의 반대편측의 상기 좌측 보호커버(40a)와 우측 보호커버(40b)에는 체결볼트(44)에 의해 결합되는 고정편(42)(43)이 형성된 것을 특징으로 하는 지주설치구조.The fastening means protective cover 40 is made of the same shape to be symmetrical, left and right protection cover 40a and right protection cover 40b which can be separated or coupled from side to side while being rotated via the hinge 41. And, the left side protective cover (40a) and the right side of the protective cover (40b) on the opposite side of the hinge 41, characterized in that the fixing pieces (42, 43) are coupled by the fastening bolt 44 is formed Strut installation structure. 제 1 항에 있어서,The method of claim 1, 상기 빗물 유입 방지링(50)은,The rainwater inflow prevention ring 50, 하단이 개구되어 상기 좌측 보호커버(40a)의 상단부가 삽입되게 삽입부(51d)가 형성되도록 이격된 한쌍의 외측 수직부(51a)/내측 수직부(51b)와, 상기 외측 수직부(51a)와 내측 수직부(51b) 각각의 상단을 연결하는 연결부(51c)로 이루어진 좌측 보호커버용 빗물 유입 방지링(51)과;A pair of outer vertical portions 51a / inner vertical portions 51b spaced apart so that the insertion portion 51d is formed so that the lower end is opened so that the upper end portion of the left protective cover 40a is inserted, and the outer vertical portions 51a. Rainwater inflow prevention ring 51 for the left protective cover made of a connecting portion 51c for connecting the upper end of each of the inner vertical portion 51b; 하단이 개구되어 상기 우측 보호커버(40b)의 상단부가 삽입되게 삽입부(52d)가 형성되도록 이격된 한쌍의 외측 수직부(52a)/내측 수직부(52b)와, 상기 외측 수직부(52a)와 내측 수직부(52b) 각각의 상단을 연결하는 연결부(52c)로 이루어진 우측 보호커버용 빗물 유입 방지링(52)를 포함하며,A pair of outer vertical portions 52a / inner vertical portions 52b spaced apart so that the insertion portion 52d is formed so that the lower end is opened so that the upper end portion of the right protective cover 40b is inserted, and the outer vertical portion 52a And rainwater inflow prevention ring 52 for the right protective cover made of a connecting portion (52c) connecting the upper end of each of the inner vertical portion (52b), 상기 좌측 보호커버용 빗물 유입 방지링(52)과 우측 보호커버용 빗물 유입 방지링(52)중 적어도 어느 하나의 외측 수직부(51a)(52a)의 외면에는 야간에 식별이 가능하도록 야광 표시부(53)가 구비된 것을 특징으로 하는 지주설치구조.At least one of the outer vertical portions 51a and 52a of the left protective cover rainwater inflow prevention ring 52 and the right protective cover rainwater inflow prevention ring 52 is provided with a luminous display unit so as to be identified at night. 53) is characterized in that the holding structure for installation.
KR2020070014959U 2007-01-24 2007-09-07 Installation structure of post KR200437253Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020070014959U KR200437253Y1 (en) 2007-01-24 2007-09-07 Installation structure of post

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR2020070001312 2007-01-24
KR2020070014959U KR200437253Y1 (en) 2007-01-24 2007-09-07 Installation structure of post

Publications (1)

Publication Number Publication Date
KR200437253Y1 true KR200437253Y1 (en) 2007-11-16

Family

ID=41637926

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020070014959U KR200437253Y1 (en) 2007-01-24 2007-09-07 Installation structure of post

Country Status (1)

Country Link
KR (1) KR200437253Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100850799B1 (en) 2008-01-25 2008-08-07 (주)디엔테크 Structure for establishment post of traffic sign board
KR102036688B1 (en) * 2019-05-16 2019-11-26 조광섭 Foundation structure cover of pillar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100850799B1 (en) 2008-01-25 2008-08-07 (주)디엔테크 Structure for establishment post of traffic sign board
KR102036688B1 (en) * 2019-05-16 2019-11-26 조광섭 Foundation structure cover of pillar

Similar Documents

Publication Publication Date Title
KR101066030B1 (en) Pillar and hand hole cover apparatus for easy adjusting hight and gradient
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR100947852B1 (en) Joint Structure Betweeen Street Lighting Pole and Base
JP2013040467A (en) Pole foundation block for curb combination type protective fence
KR20120022381A (en) Flower bed for inflowing prevention of gravel and sand
KR200437253Y1 (en) Installation structure of post
KR101179252B1 (en) Pillar cover apparatus for easy adjusting up and down
KR20090102355A (en) Lower part protection structure for roadlamp and others
KR100935790B1 (en) The reclamation style street lamp fundamental unit and the street lamp establishment method which uses this
KR100920128B1 (en) A support structure object for a road traffic equipment and construction method
KR101007729B1 (en) A Multipurpose Pole
KR20110137644A (en) A fixing structure of pillar and construction method thereof
JP3012551B2 (en) Overhanging sidewalk structure
KR100920127B1 (en) A support structure object for a road traffic equipment and construction method
KR101095957B1 (en) Structure of bridge shaped road sign and construction method thereof
JPH0258610A (en) Repair of median strip and fender block used therefor
KR20090105887A (en) Pole construction method
KR100867433B1 (en) Mounting apparatus to set up something
KR20090084038A (en) A fabric of pillar and method for executing thereof
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR20060026832A (en) A supporter of a mile post and a street lamp
KR100961987B1 (en) Post cover
KR20100037687A (en) Base structure for fixing support of street base pillar and installation method thereof
JP3531862B2 (en) Pole type sign-mounted concrete gutter for gutter
KR100561748B1 (en) The reclaiming understructure foundation for raising a pillar of facilities in the public works and roads

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20110823

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee