Supporting structure of mold Download PDFInfo
- Publication number
- KR200352506Y1 KR200352506Y1 KR20-2004-0007517U KR20040007517U KR200352506Y1 KR 200352506 Y1 KR200352506 Y1 KR 200352506Y1 KR 20040007517 U KR20040007517 U KR 20040007517U KR 200352506 Y1 KR200352506 Y1 KR 200352506Y1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- support member
- formwork
- fixed
- auxiliary
- Prior art date
Links
- 239000000463 material Substances 0.000 claims abstract description 94
- 238000009415 formwork Methods 0.000 claims abstract description 55
- 239000004567 concrete Substances 0.000 claims description 17
- 230000008878 coupling Effects 0.000 claims description 8
- 238000010168 coupling process Methods 0.000 claims description 8
- 238000005859 coupling reaction Methods 0.000 claims description 8
- 239000011120 plywood Substances 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 239000004566 building material Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 239000010421 standard material Substances 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- BQCADISMDOOEFD-UHFFFAOYSA-N Silver Chemical compound [Ag] BQCADISMDOOEFD-UHFFFAOYSA-N 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000011796 hollow space material Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 229910052709 silver Inorganic materials 0.000 description 1
- 239000004332 silver Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G25/04—Shores or struts; Chocks telescopic
- E04G25/06—Shores or struts; Chocks telescopic with parts held together by positive means
- E04G25/061—Shores or struts; Chocks telescopic with parts held together by positive means by pins
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G2025/003—Supports therefor, e.g. tripods
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 고안은 거푸집 지지구조에 관한 것으로서, 벽체를 형성하기 위해 거푸집의 설치에 따라 지면으로부터 연결 지지대와 함께 버팀재로서 거푸집에 받는 횡압을 지지하는 고정 지지재 및 고정 지지재로부터 상하 조정되는 보조 지지재를 규격자재로서 판매되는 중공형의 사각기둥을 이용함으로써, 제작이 간단해 짐은 물론, 연결 지지대측으로부터 버팀재로서 지지력을 향상시킴과 동시에, 고정 지지재 내부로부터 보조 지지재를 인출하여 높이를 조정할 수 있는 구조의 채택으로 거푸집의 횡압을 충분히 지지하기에 유리한 이점이 있다.The present invention relates to a formwork supporting structure, which is fixed up and down from a fixed support and a fixed support for supporting the transverse pressure received by the formwork as a support along with the connecting support from the ground according to the installation of the formwork to form a wall By using a hollow rectangular column sold as a standard material, not only can the production be simplified, but also the support force can be improved from the connection support side as a support material, and the auxiliary support material can be drawn out from the inside of the fixed support material. The adoption of an adjustable structure has the advantage of being able to fully support the transverse pressure of the formwork.
또한, 사각기둥 형상을 갖는 상기 고정 지지재로부터 보조 지지재의 형상이 갖는 특성상 보관, 운반성이 용이하며, 거푸집으로부터 설치 및 해체한 다음 재 설치시에도 내구성을 유지하여 건축자재로서 재사용에 따른 자재비용을 현저히 절감할 수 있는 효과가 있다.In addition, the characteristics of the shape of the auxiliary support from the fixed support having a rectangular pillar shape is easy to store and transport, and to maintain the durability even when installed and dismantled and reinstalled from the formwork material cost of reuse as building materials There is an effect that can be significantly reduced.
Description
본 고안은 거푸집을 이용한 콘크리트 벽체의 형성시키는 것에 관한 것으로서, 좀더 상세하게는, 거푸집을 고정하는 고정 지지재 및 보조 지지재의 구조를 개선하여 거푸집 설치 및 철거가 용이하도록 하고, 제작에 따른 비용을 현저히 절감할 수 있도록 하면서 기존의 지지대에 비해 내구성을 보다 향상시킬 수 있는 거푸집 지지구조에 관한 것이다.The present invention relates to the formation of concrete walls using formwork, and more specifically, to improve the structure of the fixed support and auxiliary supporting material for fixing the formwork to facilitate the installation and dismantling of the formwork, significantly reducing the cost of manufacturing The present invention relates to a formwork supporting structure that can improve the durability compared to the existing support while allowing to save.
일반적으로 콘크리트물을 타설하여 양생과정을 거쳐 얻어지는 건축물의 벽체, 합벽은 지하층 공사를 할 때에 거푸집을 양측으로 설치하여 콘크리트를 타설하지 못하고 한 쪽은 터파기 한 쪽의 흑에 지지되고, 다른 한 쪽만 거푸집을 설치하여 시공하는 콘크리트 벽을 말하는 것으로, 이는 여러 층으로 이루어진 콘크리트 건축물의 경우에 지층에 철근이 배근된 콘크리트 바닥면을 구축한 다음 이 콘크리트 바닥면에 수평 및 수직으로 거푸집을 설치한 후 상기 거푸집 내부와 바닥면에 시멘트 몰탈(콘크리트)을 충진시키는 작업의 반복으로 다층의 건축물을 축조하게 된다.In general, the walls and plywood walls of buildings, which are obtained through the curing process by pouring concrete materials, are installed on both sides when building the basement, so that one side is supported by black on one side of the trench and the other side only. Refers to the concrete wall installed by installing the formwork, which means that in the case of a multi-storey concrete structure, the concrete floor surface is reinforced with reinforcement on the ground floor, and then the formwork is installed horizontally and vertically on the concrete floor surface. The repetition of filling cement mortar (concrete) inside the formwork and the bottom surface makes a multi-layered building.
따라서, 이와 같은 다층 건축물의 축조에는 벽체와 슬라브를 시공하기 위해서 설치되는 거푸집의 수평과 수직설치를 안정되게 작업하는 것이 무엇보다도 중요하다.Therefore, in the construction of such a multi-layered building, it is of utmost importance to stably work the horizontal and vertical installation of the formwork installed for constructing walls and slabs.
이러한 콘크리트 합벽을 시공하기 위하여 콘크리트 합벽을 위한 거푸집을 지지해 주기 위한 지지재와, 상기한 지지재를 바닥에 고정시켜 주는 지지재 브라켓및 상기한 지지재에 형성된 다수의 결합공에 결합되어 지지해 주는 다수의 버팀재, 그리고 상기한 다수의 버팀재를 바닥에 고정시켜 주는 버팀재 브라켓으로 구성되는 콘크리트 합벽 거푸집 지지장치는 출원번호 실용신안등록출원 제1997-013700호에서 개시된 바 있고, 본 출원인이 이를 토대로서 실용신안등록출원 하여 등록실용신안 제291994호 및 등록실용신안 제298098호(명칭: 거푸집 지지구조)로서 등록 받은 바 있다.In order to construct such concrete plywood, it is coupled to the support material for supporting the formwork for the concrete plywood, the support material bracket for fixing the support material to the floor, and a plurality of coupling holes formed in the support material. The concrete plywood formwork supporting device, which is composed of a plurality of support materials and a support bracket for fixing the support materials to the floor, has been disclosed in Application No. Utility Model Registration No. 1997-013700, and the present applicant Based on this, he applied for utility model registration and registered as Utility Model No. 291994 and Registration Utility Model No. 298098 (name: formwork supporting structure).
상기의 등록실용신안 제298098호의 구성을 살피면 첨부된 도 1 및 도 2에서 도시된 바와 같다.Looking at the configuration of the Utility Model No. 298098 is the same as shown in Figures 1 and 2 attached.
거푸집(A)이 설치되는 측면 바닥으로부터 일부분 매립 설치된 앵커볼트(AC)를 관통 설치하기 위한 받침부(14)가 하부에 마련되고, 수직되는 양측면에 연결공(11)이 등간격으로 형성된 다수개의 고정 지지재(10)와, 상기 앵커볼트(AC)에 관통 체결되는 와셔(16) 및 너트(18)와, 상기 고정 지지재(10)로부터 직각되는 지점의 바닥면에 고정 설치되는 버팀재 브라켓(40)과, 상기 고정 지지재(10)와 버팀재 브라켓(40)에 양단이 연결되어 거푸집의 횡압을 지지하기 위한 다수의 버팀재(30)로 이루어진 거푸집의 지지구조에 있어서, 상기 고정 지지재(10)의 받침부(14)에 일치되기 위해 경사지는 연결부(51)가 길이방향 일측에 형성되고, 타측은 상기 버팀재 브라켓(40)에 연결 설치되는 연결 지지대(50)와, 상기 연결 지지대(50)의 연결부(51)상에 관통되는 앵커볼트(AC)의 양측으로 평행하게 위치되어 상기 와셔(16) 및 너트(18)에 의해 고정되는 복수개의 보강파이프(80)로 구성된다.A base portion 14 is provided at a lower portion for installing the anchor bolt AC partially embedded from the bottom of the side on which the formwork A is installed, and a plurality of connection holes 11 are formed at equal intervals on both vertical sides. Fixed support member 10, washer 16 and nut 18 fastened to the anchor bolt (AC) and the support bracket is fixed to the bottom surface of the point perpendicular to the fixed support member 10 40 and a support structure for a formwork comprising a plurality of support materials 30 for supporting lateral pressure of the formwork, both ends of which are connected to the fixed support material 10 and the support material bracket 40, wherein the fixed support Connecting portion 51 is inclined to match the support portion 14 of the ash 10 is formed on one side in the longitudinal direction, the other side is connected to the support bracket 50 is installed to the support bracket 40, the connection To both sides of the anchor bolt (AC) penetrated on the connecting portion 51 of the support 50 It is composed of a plurality of reinforcing pipes (80) positioned in parallel and fixed by the washer (16) and nut (18).
또한, 상기 고정 지지재(10)와 버팀재 브라켓(40)의 각 길이방향에 상기 버팀재(30)의 양단을 걸어 지지하기 위한 보울트(a)가 너트(b)에 의해 등간격으로 설치되고, 상기 보울트(a)에 삽입 지지되기 위한 버팀재(30)의 일단은 소정 깊이를 갖는 끼움홈(32)이 형성되며, 타단은 상기 보울트(a)에 관통 설치되도록 한 구조이다.In addition, bolts (a) for holding and supporting both ends of the support member 30 in each longitudinal direction of the fixed support member 10 and the support member bracket 40 are installed at equal intervals by the nut (b). One end of the support material 30 to be inserted and supported by the bolt (a) is formed with a fitting groove 32 having a predetermined depth, and the other end is a structure that is installed through the bolt (a).
참고적으로 기입된 부호(SP)는 거푸집에 부설되는 지지파이프를 나타내고 (60)은 버팀재(30)에 설치되어 그 길이를 조절 및 고정하기 위한 체결부재(일명 :자키)이다.Reference numeral SP written for reference indicates a support pipe to be placed in the formwork (60) is a fastening member (aka: jockey) is installed on the support material 30 to adjust and fix its length.
상기 고정 지지재에 대한 구체적인 구성은 상기 등록실용신안에서 기재되어 있지 않지만 도시된 도면을 참조하여 임의의 명칭으로서 해당부분을 설명하기로 한다.Although the specific configuration for the fixed support member is not described in the registration utility model, the corresponding part will be described as an arbitrary name with reference to the drawings.
상기 고정 지지재(10)의 형상 구조는, 단면이 ㄷ자 형상을 갖는 형강을 상호 대응되게 형성한 것으로서, 길이방향에 형성된 연결공(11a)을 통해 일정간격으로 보울트(a)와 너트(b)로서 체결되는 구조이고, 그 상부에는 높이를 조정할 수 있도록 가변형의 보조 지지재(20)가 상하 소정범위에서 슬라이딩 가능하게 설치되어 상기 버팀재(30)를 통해 수직되는 거푸집(A)을 지지할 수 있게 한 구조이다.Shape structure of the fixed support member 10, the cross section is formed to correspond to each other the cross-shaped cross section, the bolt (a) and the nut (b) at regular intervals through the connection hole (11a) formed in the longitudinal direction It is a structure that is fastened as, the upper portion of the variable auxiliary support material 20 is installed so as to be slidable in a predetermined range up and down to support the formwork (A) vertical through the support material (30). It is a structure.
상기 보조 지지재(20) 또한, 고정 지지재(10)와 동일하게 ㄷ자 형상을 갖는 한 쌍의 형강을 일정간격을 유지되게 제작한 것으로, 길이방향 양측면에는 상호 보울트(a)와 너트(b)의 체결로서, 상기 버팀재(30)의 일단을 지지하는 구조이고, 고정 지지재(10)의 상부에 걸려 지지될 수 있도록 그 대응되는 양측의 일단은 연결판재(21-1)로서 연결되고, 그 하부는 상기 고정 지지재의 상부로부터 안내되기 위해 개방된 형상구조이다.The auxiliary support member 20 is also manufactured to maintain a constant interval of a pair of shaped steel having a U-shape in the same manner as the fixed support member 10, the mutual bolt (a) and the nut (b) on both sides in the longitudinal direction As the fastening of the structure, and supports the one end of the support material 30, one end of the corresponding both sides are connected as a connecting plate material 21-1 so as to be caught and supported on the top of the fixed support material 10, The lower portion is of a shape structure open for guiding from the upper portion of the fixed support.
통상 수직으로 조합되어 위치된 각각의 거푸집(A)을 수직으로 지지하는 상기 고정 지지재(10) 및 보조 지지재(20)의 제작은 ㄷ자 형상을 갖는 한 쌍의 형강으로 일정길이가 절단되고, 그 간격유지에 있어 고정 지지재(10)는 연결 지지대(50)측과 연결되기 위한 받침부(14)가 부착되고, 상기 보조 지지재(20)의 경우는 연결판재(21-1)의 부착으로서 그 간격이 조정된다.Usually, the fixed support member 10 and the auxiliary support member 20 for vertically supporting each formwork A positioned vertically in combination are cut to a predetermined length by a pair of shaped steel having a U-shape, In the interval maintaining, the support member 14 is attached to the fixed support member 10 to be connected to the connecting support member 50 side, and in the case of the auxiliary support member 20, the attachment of the connecting plate member 21-1. As the interval is adjusted.
그러나, 상기와 같은 구조는 상호 ㄷ자 형상을 갖는 한 쌍의 형강이 대응됨에 있어 그 사이에는 볼트와 너트로서 연결되기는 하나, 수직으로서 간격유지는 우선 다수개의 볼트(a)와 너트(b)의 체결로서 이루어지기 때문에 보울트와 너트의 체결 부품수가 많아지는 단점이 있다.However, in the structure as described above, since a pair of section steels having a cross-shaped shape correspond to each other as bolts and nuts therebetween, the gaps are vertically maintained so that a plurality of bolts a and nuts b are first fastened. Because it is made as a disadvantage that the number of fastening parts of the bolt and nut increases.
상기 보울트와 너트의 체결에 있어서, 일부는 상호 ㄷ자 형상을 갖는 한 쌍의 형강을 연결하기 위한 목적이고, 또 하나의 목적은 해당하는 위치에서 연결 지지대(50)측으로부터 경사지게 설치된 버팀재(30)가 위치하는 각도에 따라 버팀재의 일단을 받쳐줄 수 있는 보울트(a)와 너트(b)의 체결 공정이 추가적으로 필요하게 된다.In the fastening of the bolt and the nut, a part is for connecting a pair of section steels having a cross-shaped shape, and another object is a support material 30 installed to be inclined from the side of the connecting support 50 at a corresponding position. According to the angle at which is located, the fastening process of the bolt (a) and the nut (b) that can support one end of the support material is additionally required.
한편, 상기와 같은 고정 지지재(10), 연결 지지대(50) 및 그 외 버팀재(30)의 실시가 완료된 상태에서의 콘크리트 타설로서 벽체를 형성함에 있어 타설된 콘크리트는 양생 이전까지는 거푸집(A)의 전면에 전반적으로 횡압이 발생되는데, 이때 거푸집을 밀착 지지하는 고정 지지재와 보조 지지재가 겹쳐진 깊이(도면에서"X"부분)가 작으면 작을수록 취약해지는 단점으로 붕괴의 위험이 있거나, 수직 벽체의 양생이 제대로 이루어지지 않는 부실공사로 이어지는 문제점이 있었다.On the other hand, in forming the wall as concrete pouring in the state in which the implementation of the fixed support 10, the connecting support 50 and the other support material 30 as described above is completed, the cast concrete until the curing (A) The lateral pressure is generally generated on the front of the), and the smaller the depth ("X" in the drawing) where the fixed support material and the auxiliary support material closely support the formwork, the weaker the weakness is. There was a problem that led to poor work that the curing of the wall is not properly made.
상기 보조 지지재의 경우, 고정 지지재가 갖는 전체적인 길이에 비해 고정 지지재의 내측면으로부터 상부에서 일정구간 정도만 그 위치를 조정할 수 없기 때문에 취약부분이 되고, 높이조절 범위가 작은 문제점이 있었다.In the case of the auxiliary support material, there is a problem in that the position is a weak part, because the position can only be adjusted from the inner surface of the fixed support material from the upper side of the fixed support material by only a certain distance from the upper side of the fixed support material, there is a problem that the height adjustment range is small.
상기와 같은 고정 지지재에 대한 보조 지지재는 현장에서의 조립 및 해체에 많은 시간이 걸리고, 각 ㄷ자 형의 형강을 이용하여 조립하기 때문에, 보울트와 너트의 체결정도 또는 재사용에 따라 발생될 수 있는 비틀림 등의 보관 및 취급불량의 요인의 발생은 재 설치에 따른 내구성을 고려해야 하는 문제점이 있었다.Auxiliary support material for the fixed support material as described above takes a lot of time in the assembly and disassembly in the field, because the assembly using each of the U-shaped steel, twisting that may occur due to the degree of bolting and nut fastening or reuse The occurrence of poor storage and handling factors, such as there was a problem to consider the durability of the reinstallation.
본 고안은 종래의 문제점을 해결하기 위하여 안출한 것으로, 연결 지지대 측의 버팀재 브라켓트와 고정 지지재측에 버팀재의 양단을 고정 설치하여 거푸집을 지지하도록 한 구조에 있어, 고정 지지재와 높이를 가변시켜 지지시킬 수 있는 보조 지지재의 구조를 개선하여 제작에 따른 단가를 절감하면서 내구성은 향상시키고, 설치 사용상에 있어 거푸집 설치 및 해체작업을 보다 신속하게 할 수 있도록 하며, 보관 및 운반을 용이하게 할 수 있도록 하는데 그 목적이 있다.The present invention has been made to solve the conventional problems, in the structure to support the formwork by fixing both ends of the support material on the support bracket side and the fixed support side of the connection support side, by varying the fixed support material and height By improving the structure of auxiliary supporting material that can be supported, it can reduce the cost of manufacturing and improve the durability, make the form installation and dismantling work more quickly in installation use, and make it easy to store and transport. Its purpose is to.
상기 목적을 달성하기 위한 본 고안의 거푸집 지지구조는, 콘크리트 합벽의 일측면에 설치되어 거푸집을 수직으로 지지하기 위한 고정 지지재와, 상기 고정 지지재에 설치되어 높이를 연장하여 지지하는 보조 지지재와, 상기 고정 지지재에 직각되게 연결 설치되며, 일측에 버팀재 브라켓이 마련된 연결 지지대와, 상기 고정지지재와 버팀재 브라켓에 양단이 연결되고, 소정위치에 신축 길이조정을 위한 체결부재가 마련된 버팀재를 다수개 포함하여 구성된 거푸집 지지구조에 있어서, 상기 고정 지지재는 중공형으로 사각형체를 갖으며, 길이방향 양 측면에 보조 지지재를 고정하기 위한 결합공이 등 간격으로 배열 형성된 본체와, 상기 중공형의 본체 상부 및 하부 내측에 ㅠ 자형으로 설치되어 보조 지지재를 안내 지지하는 가이드와, 상기 가이드가 설치된 본체의 전면 외측에 다수개 부착 설치되어 상기 연결 지지대측으로부터 연결된 버팀재의 일단을 지지하는 제1받침재와, 상기 제1받침재가 설치되는 본체의 하부 전면에 경사지게 부착 설치되어 지면으로부터 앵커볼트와 함께 보강파이프로서 본체를 고정하기 위한 받침부로 구성되고, 상기 보조 지지재는 가이드의 내부직경의 폭에 안내되도록 중공형의 사각형체를 갖으며, 길이방향 양 측면에 고정 지지재로부터 일정높이에서 구비되는 보울트와 너트의 체결로서 고정되는 연결공이 등 간격으로 배열 형성된 본체와, 상기 본체의 일단에 부착 설치되어 고정 지지재의 가이드로부터 보조 지지재의 완전한 진입을 제어하는 걸림편과, 상기 고정 지지재로부터 안내되는 보조 지지재의 연결공에 구비되는 보울트와 너트로서 부착 설치되어 버팀재의 일단을 지지하는 제2받침재로 구성되어 지지되도록 한 것이 특징이다.Formwork support structure of the present invention for achieving the above object is a fixed support material for vertically supporting the formwork is installed on one side of the concrete plywood, and an auxiliary support material installed on the fixed support material to extend the height And, installed at right angles to the fixed support material, the connecting support is provided with a support bracket on one side, both ends are connected to the fixed support and the support bracket, a fastening member for adjusting the stretch length is provided at a predetermined position In the formwork supporting structure comprising a plurality of the support material, the fixed support member has a hollow rectangular shape, the main body formed with equally spaced coupling holes for fixing the auxiliary support material on both sides in the longitudinal direction, and The guide and the guide is installed in the upper body and the lower inside of the hollow body to support the auxiliary support material, And a plurality of first support members attached to the front outer side of the main body to support the one end of the support material connected from the connecting support side, and are inclinedly attached to the lower front surface of the main body on which the first support members are installed. Together with a support for fixing the body as a reinforcing pipe, the auxiliary support has a hollow rectangular body to be guided to the width of the inner diameter of the guide, and is provided at a certain height from the fixed support on both sides in the longitudinal direction A connection hole fixed as a fastening of the bolt and the nut is arranged at equal intervals, a locking piece attached to one end of the main body to control the complete entry of the auxiliary support material from the guide of the fixed support material, and guided from the fixed support material. As a bolt and nut provided in the connection hole of the auxiliary support material, It is characterized by being composed of a second support member supporting one end.
도 1은 종래 거푸집이 설치된 상태를 도시한 사시도,1 is a perspective view showing a state in which a conventional formwork is installed,
도 2는 종래 거푸집이 설치된 상태를 도시한 측면도,Figure 2 is a side view showing a state in which the conventional formwork is installed,
도 3은 본 고안에 따른 거푸집이 설치된 상태를 도시한 사시도,3 is a perspective view showing a state in which the formwork is installed according to the present invention,
도 4는 본 고안에 따른 고정 지지재와 보조 지지재를 분리하여 도시한 사시도,Figure 4 is a perspective view showing the separation of the fixed support and auxiliary support according to the present invention,
도 5는 본 고안에 따른 거푸집의 설치상태를 도시한 측면도,Figure 5 is a side view showing the installation state of the formwork according to the present invention,
도 6은 본 고안에 따른 고정 지지재와 보조 지지재의 사용된 상태를 예시한 종단면도,Figure 6 is a longitudinal cross-sectional view illustrating a used state of the fixing support and auxiliary support according to the present invention,
도 7은 본 고안에 따른 거푸집의 횡압을 지지하는 상태를 도시한 고정 지지재의 평면도.7 is a plan view of a fixed support member showing a state of supporting the lateral pressure of the formwork according to the present invention.
◎ 도면의 주요부분에 대한 부호의 설명 ◎◎ Explanation of symbols for main part of drawing
10: 고정 지지재 12: 가이드10: fixed support material 12: guide
20: 보조 지지재 30: 버팀재20: auxiliary support material 30: support material
40: 버팀재 브라켓 50: 연결 지지대40: support bracket 50: connection support
A: 거푸집A: formwork
이하, 첨부된 도 3 및 도 7을 참조하여 본 고안에 대하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to FIGS. 3 and 7.
첨부된 도 3은 본 고안에 따른 거푸집이 설치된 상태를 도시한 사시도이고,도 4는 본 고안에 따른 고정 지지재와 보조 지지재를 분리하여 도시한 사시도이며, 도 5는 본 고안에 따른 거푸집의 설치상태를 도시한 측면도이고, 도 6은 본 고안에 따른 고정 지지재와 보조 지지재의 사용된 상태를 예시한 종단면도이며, 도 7은 본 고안에 따른 거푸집의 횡압을 지지하는 상태를 도시한 고정 지지재의 평면도이다.Attached Figure 3 is a perspective view showing a state in which the formwork according to the present invention is installed, Figure 4 is a perspective view showing the separation of the fixing support and the auxiliary support according to the present invention, Figure 5 is a formwork according to the present invention Figure 6 is a side view showing the installation state, Figure 6 is a longitudinal cross-sectional view illustrating the used state of the fixed support and auxiliary support material according to the present invention, Figure 7 is a fixed view showing a state of supporting the lateral pressure of the formwork according to the present invention It is a top view of a support material.
콘크리트 합벽의 일측면에 설치되어 거푸집(A)을 수직으로 지지하기 위한 고정 지지재(10)와, 상기 고정 지지재(10)에 설치되어 높이를 연장하여 지지하는 보조 지지재(20)와, 상기 고정 지지재(10)에 직각되게 연결 설치되며, 일측에 버팀재 브라켓(40)이 마련된 연결 지지대(50)와, 상기 고정 지지재(10)와 버팀재 브라켓(40)에 양단이 연결되고, 소정위치에 신축 길이조정을 위한 체결부재(60)가 마련된 버팀재(30)를 다수개 포함하여 구성된 거푸집 지지구조에 있어서,A fixed support member 10 installed on one side of the concrete plywood to vertically support the formwork A, and an auxiliary support member 20 installed on the fixed support member 10 to extend and support height; It is connected to the fixed support 10 at a right angle and is connected to the support 50 is provided with a support bracket 40 on one side, and both ends are connected to the fixed support 10 and the support bracket 40, In the formwork supporting structure comprising a plurality of brace material 30 is provided with a fastening member 60 for adjusting the stretch length in a predetermined position,
상기 고정 지지재(10)는 중공형으로 사각형체로 길이방향 양 측면에 보조 지지재(20)를 고정하기 위한 결합공(11a)이 등 간격으로 배열 형성된 본체(11)와, 상기 중공형의 본체(11) 상부 및 하부 내측에 ㅠ 자형으로 설치되어 보조 지지재(20)를 안내 지지하는 가이드(12)와, 상기 가이드(12)가 설치된 본체(11)의 전면 외측에 다수개 부착 설치되어 상기 연결 지지대(50)측으로부터 연결된 버팀재(30)의 일단을 지지하는 제1받침재(13)와, 상기 제1받침재(13)가 설치되는 본체(11)의 하부 전면에 경사지게 부착 설치되어 지면으로부터 앵커볼트(AC)와 함께 보강파이프(80)로서 본체(11)를 고정하기 위한 받침부(14)로 구성된다.The fixed support member 10 is a hollow body and a rectangular body, the coupling body 11a for fixing the auxiliary support member 20 on both sides in the longitudinal direction are arranged at equal intervals, and the hollow body (11) the guide 12 for supporting the auxiliary support material 20 and installed in the upper and lower inner side ㅠ, and a plurality of guides are installed on the outside of the front surface of the main body 11 in which the guide 12 is installed. The first support member 13 supporting one end of the support material 30 connected from the connecting support 50 side, and the first support member 13 is installed inclinedly attached to the lower front surface of the main body 11 is installed; It is composed of a support portion 14 for fixing the main body 11 as a reinforcing pipe 80 together with the anchor bolt (AC) from the ground.
상기 제1받침재(13)는 ㄷ자형의 브라켓 내부 양측에 환봉형의 지지축(13a) 양단이 관통 설치된 것이다. 여기서 상기 지지축(13a)은 버팀재(30)가 지지되기위한 직경을 수용할 수 있는 길이로 설치됨이 바람직하다. 이는 버팀재(30)의 좌우 유동을 방지하기 위함이다.The first support member 13 is provided with both ends of the round rod-shaped support shaft 13a on both sides of the c-shaped bracket. Here, the support shaft 13a is preferably installed to a length that can accommodate the diameter for the support material 30 is supported. This is to prevent the left and right flow of the support material (30).
또한, 상기 보조 지지재(20)는 가이드(12)의 내부직경의 폭에 안내되도록 중공형의 사각형체로 길이방향 양 측면에 고정 지지재(10)로부터 일정높이에서 구비되는 보울트(a)와 너트(b)의 체결로서 고정되는 연결공(21a)이 등 간격으로 배열 형성된 본체(21)와, 상기 본체(21)의 일단에 부착 설치되어 고정 지지재(10)의 가이드(12)로부터 보조 지지재(20)의 완전한 진입을 제어하는 걸림편(22)과, 상기 고정 지지재(10)로부터 안내되는 보조 지지재(20)의 연결공(21a)에 구비되는 보울트(a)와 너트(b)로서 부착 설치되어 버팀재(30)의 일단을 지지하는 제2받침재(23)로 구성된다.In addition, the auxiliary support member 20 is a hollow rectangular body so as to be guided to the width of the inner diameter of the guide 12, the bolt (a) and the nut provided at a predetermined height from the fixed support member 10 on both sides in the longitudinal direction (b) the connection hole 21a fixed as the fastening of (b) is attached to one end of the main body 21 formed at equal intervals and the main body 21 is supported by the guide 12 of the fixed support member 10 The locking piece 22 for controlling the full entry of the ash 20 and the bolt a and the nut b provided in the connection hole 21a of the auxiliary support 20 guided from the fixed support 10. And a second supporting member 23 supporting one end of the support material 30.
상기 제2받침재(23)는 보조 지지재(20)에 대하여 분리형으로서 구비되고, ㄷ자형의 브라켓 양측에 상기 보조 지지재(20)의 몸체(21)에 형성된 연결공(21a)과 일치되어 결합되기 위한 통공(23a)이 형성되고, 일측 중앙에는 버팀재(30)를 끼워 지지하기 위한 경사각을 갖는 끼움돌기(23b)가 일체로 형성된 것이다.The second support member 23 is provided as a separate type with respect to the auxiliary support member 20, and coincides with the connection hole 21a formed in the body 21 of the auxiliary support member 20 on both sides of the c-shaped bracket. A through hole 23a for coupling is formed, and a fitting protrusion 23b having an inclination angle for fitting the brace material 30 in one side center is integrally formed.
상기 제2받침재(23)의 끼움돌기(23b)가 갖는 경사각은 보조 지지재(20)의 높이 설정에 따라 경사지는 버팀재(30)의 각도에 따라 다르게 설정된다. 즉, 보조 지지재(20)의 높이에 따라 45°∼65°범위의 끼움돌기(23b)를 부착하는 것으로, 이는 통상 하나의 보조 지지재(20)가 설치되는 높이를 기준하여 각각 경사각이 다른 제2받침부재(23)를 상기 각 끼움돌기(23b)의 경사각을 달리하여 바람직하게는 하나의 보조지지재(20)에 대하여 3개정도 구비함이 바람직하다.The inclination angle of the fitting protrusion 23b of the second support member 23 is set differently according to the angle of the support material 30 inclined according to the height setting of the auxiliary support material 20. That is, attaching the fitting protrusion 23b in the range of 45 ° to 65 ° according to the height of the auxiliary support member 20, which is different from each other based on the height at which one auxiliary support member 20 is installed. The second support member 23 is preferably provided with about three of the auxiliary supporting members 20 by varying the inclination angle of the fitting protrusions 23b.
이와 같은 구조로서 거푸집을 지지하는 본 고안에 대한 작용 및 효과를 설명하면 다음과 같다.Referring to the operation and effects on the present invention to support the formwork as such a structure as follows.
먼저, 합벽 형성에 따라 거푸집(A)을 설치함에 있어, 고정 지지재(10)는 앵커 보울트(AC)에 의해 연결 지지대(50)와 함께 지면으로부터 직각이 되게 설치된다.First, in installing the formwork A in accordance with the formation of the plywood wall, the fixed support member 10 is installed to be perpendicular to the ground with the connection support 50 by the anchor bolt (AC).
상기 고정 지지재(10)로부터 횡으로 하부에 연결 설치되는 연결 지지대(50)측의 버팀재 브라켓(40)은 양단이 연결되는 버팀재(30)에 의해 직각상태를 유지시켜 전반적으로 거푸집(A)에 대해 등 간격지게 설치되는 고정 지지재(10)와 함께 안정적으로 받쳐주게 된다.The brace bracket 40 on the side of the supporting stand 50 installed to be connected to the lower side horizontally from the fixed supporting member 10 is maintained at right angles by the brace material 30 to which both ends are connected. It is supported stably with the fixed support 10 is installed at equal intervals for the).
상기 고정 지지재(10)는 사각기둥 형상으로 그 본체(11)의 전면에 부착 설치된 제1받침재(13)에 버팀재(30)의 일단이 안내되며, 여기서 버팀재(30)의 일단은 ∪자형으로 지지홈(31)이 형성되어 ㄷ자 형의 브라켓에 설치된 지지축(13a)에 걸어 지지하는 것으로서, 이는 하나의 고정 지지재(10)에 부착된 다수개의 제1받침재(13)에 각각 이와 같은 방법으로 지지시켜 준다.The fixed support member 10 has a square pillar shape, one end of the support member 30 is guided to the first support member 13 attached to the front surface of the main body 11, where one end of the support member 30 is The support groove 31 is formed in a U-shape and is supported by the support shaft 13a installed on the U-shaped bracket, which is attached to a plurality of first support members 13 attached to one fixed support 10. Each supports in this way.
상기 제1받침재(13)는 설정된 고정 지지재(10)의 길이에 대하여 버팀재(30)가 안정적으로 받쳐져 지지될 수 있는 높이에 나누어져 부착된 것이다.The first support member 13 is divided into a height that can be supported and supported stably with respect to the set length of the fixed support member 10 is attached.
상기 고정 지지재(10)의 본체(11) 내부측 가이드(12)에 안내된 보조 지지재(20)는 거푸집(A)의 시공되는 높이에 따라 그 높이를 조정하여 상기한 버팀재(30)와 함께 거푸집(A) 측의 상부측을 지지할 수 있다.The auxiliary support member 20 guided by the inner guide 12 of the main body 11 of the fixed support member 10 adjusts its height according to the height of the form A to be supported by the support material 30. And the upper side of the formwork (A) side can be supported.
거푸집(A)의 높이에 대하여 보조 지지재(20)는 고정 지지재(10)에 설치된 가이드(12)로부터 인출하여 길이를 연장시켜준다. 이와 같은 작업은 고정 지지재가 지면으로부터 설치된 상태에서 작업될 수도 있으나, 비교적 작업의 편의성을 위해 고정 지지재를 눕혀 놓은 상태에서 설정된 높이만큼 보조 지지재(20)의 본체(21)를 인출시키되, 이때에는 고정 지지재의 길이방향 양측에 형성된 결합공(11a)으로부터 설치된 보울트(a)와 너트(b)를 해제시킨 상태에서 작업한다.With respect to the height of the formwork A, the auxiliary support member 20 extends from the guide 12 installed in the fixed support member 10 to extend its length. This operation may be performed in a state in which the fixed support is installed from the ground, but withdraws the main body 21 of the auxiliary support 20 by a set height in a state in which the fixed support is laid down for comparative convenience. Work in a state in which the bolt (a) and the nut (b) provided from the coupling hole (11a) formed on both sides in the longitudinal direction of the fixed support member are released.
상기 거푸집(A)의 수직되는 높이에 따라 인출시킨 보조 지지재(20)는 다시 고정 지지재(10)의 결합공(11a)을 통해 보울트(a)를 관통하되, 여기서 보울트(a)의 관통은 내측에 위치하는 보조 지지재(20)의 길이방향에 형성된 연결공(21a)과 일치시킨 상태로 고정 지지재(10)로부터 완전 관통한 다음 너트(b)로서 체결하여 고정 지지재에 대한 보조 지지재(20)를 고정시켜 줄 수 있게 된다.The auxiliary support material 20 drawn out according to the vertical height of the formwork A passes through the bolt a again through the coupling hole 11a of the fixed support material 10, where the penetration of the bolt a is performed. Silver penetrates completely through the fixed support member 10 in a state coinciding with the connecting hole 21a formed in the longitudinal direction of the auxiliary support member 20 located inside, and then tightens as a nut b to assist the fixed support member. It is possible to fix the support material (20).
상기와 같은 상태에서 고정 지지재(10)의 가이드(12)를 통해 소정길이 인출된 보조 지지재(20)는 그 본체(21)에 형성된 연결공(21a)에 제2받침재(23)를 보울트(a)와 너트(b)로서 ㄷ자 형의 브라켓에 형성된 통공(23a)을 통해 체결시켜 준다.In the above state, the auxiliary support member 20 drawn out a predetermined length through the guide 12 of the fixed support member 10 has a second support member 23 in the connection hole 21a formed in the main body 21. The bolt (a) and the nut (b) is fastened through the through hole (23a) formed in the U-shaped bracket.
이때 제2받침재(23)에 일체로 형성된 끼움돌기(23b)는 보조 지지재(20)가 수직으로 세워지는 상태에서 하측방향을 향하는 위치가 되도록 하며, 여기서 제2받침재(23)의 선택은 보조 지지재(20)가 설정된 높이에 따라 이를 지지하도록 한 버팀재(30)의 경사각도와 관련하여 이에 거의 유사한 경사각을 이루도록 끼움돌기(23b)가 부착된 제2받침재(23)를 설치하도록 한 것이다.At this time, the fitting protrusion 23b formed integrally with the second supporting member 23 is to be positioned downward in the state in which the auxiliary supporting member 20 is vertically set up, where the selection of the second supporting member 23 is selected. To install the second support member 23 with the fitting protrusions 23b attached thereto so as to form an inclination angle that is substantially similar thereto with respect to the inclination angle of the support material 30 for supporting the auxiliary support material 20 according to the set height. It is.
상기와 같은 설치가 완성된 상태에서 수직되는 고정 지지재(10)는 본체(11) 하부에 형성한 받침부(14)를 통해 종래와 동일하게 연결 지지대(50)의 연결부(51)를 일치시키고, 지면으로부터 고정된 앵커볼트(AC)를 관통시키되, 관통된 앵커볼트를 기준으로 양측에는 보강파이프(80)를 덧대고 와셔(16)와 너트(18)로서 체결시켜 각각의 수직상으로 설치된 고정 지지재(10)를 횡으로 각 지지시켜 준다.The fixed support member 10 vertically installed in the state as described above is made to match the connection portion 51 of the connection support 50 in the same way as the conventional through the support portion 14 formed in the lower body 11 The anchor bolt (AC) is fixed from the ground, but on both sides of the anchor bolt, the reinforcing pipe 80 is padded and fastened as a washer 16 and a nut 18 to be fixed to each vertically installed. Each support member 10 is laterally supported.
참고로, 상기와 같이 수직으로 설치되는 고정 지지재(10)와 보조 지지재(20)는 거푸집(A)측면에 배열된 지지파이프(SP)에 대하여 철사로 엮어 지지(반생)되도록 한다.For reference, the fixed support member 10 and the auxiliary support member 20 installed vertically as described above are supported by the wires with respect to the support pipe SP arranged on the formwork A side.
상기와 같은 지지구조로서 콘크리트 타설이 이루어지고, 콘크리트의 양생기간동안 지지된 거푸집의 해체는 버팀재의 해체와 함께 보강파이프, 고정 지지재 등의 구성요소를 순차적으로 해체한 다음 거푸집을 떼어내면, 벽체의 시공을 완성하게 된다.As the support structure as above, concrete pouring is performed, and the dismantling of the formwork supported during the curing period of the concrete is performed by dismantling the components such as the reinforcing pipe and the fixed support material with the dismantling of the supporting material, and then removing the formwork, the wall You will complete the construction.
상기 고정 지지재(10) 및 보조 지지재(20)는 사각기둥형상을 갖는 중공형으로서 그 제작은 이미 설정되어진 자재를 이용하기 때문에 제1받침재, 받침부, 가이드 등의 부착과 더불어 고정 지지재에 대한 보조 지지재를 보울트, 너트로서 고정시키기 위한 결합공, 연결공의 천공과정의 제작이 간단해 지는 이점이 있다.Since the fixed support member 10 and the auxiliary support member 20 are hollow having a rectangular pillar shape and manufactured using materials that have already been set, the fixed support member 10 and the support member 20 are fixedly supported together with the attachment of the first support member, the support portion, and the guide. There is an advantage that the manufacturing of the drilling process of the coupling hole, the connection hole for fixing the auxiliary support material for the ash as a bolt, nut.
또한, 상기 고정 지지재에 대하여 보조 지지재는 고정 지지재의 본체에 안내되는 형태로서 자재의 보관 및 운반이 용이하며, 이러한 보관이나 운반과정에서의 손상을 최대한 방지하여 건축자재로서 재사용에 따른 내구성을 보존할 수 있는 이점이 따른다.In addition, the auxiliary support material with respect to the fixed support material is guided to the main body of the fixed support material and easy to store and transport the material, to prevent the damage during the storage or transport process as possible to preserve the durability of reuse as building materials There is an advantage to this.
이상에서와 같이, 본 고안은 거푸집의 설치에 따라 지면으로부터 연결 지지대와 함께 버팀재로서 거푸집에 받는 횡압을 지지하는 고정 지지재 및 고정 지지재로부터 상하 조정되는 보조 지지재를 규격자재로서 판매되는 중공형의 사각기둥을 이용함으로써, 제작이 간단해 짐은 물론, 연결 지지대측으로부터 버팀재로서 지지력을 향상시킴과 동시에, 고정 지지재 내부로부터 보조 지지재를 인출하여 높이를 조정할 수 있는 구조의 채택으로 거푸집의 횡압을 충분히 지지하기에 유리한 이점이 있다.As described above, the present invention is a hollow material sold as a standard material for the support and the support fixed up and down from the fixed support to support the lateral pressure received by the formwork as a support material from the ground with the connecting support from the ground according to the installation of the formwork The use of a square pillar makes it simple to manufacture, improves the bearing capacity as a support material from the side of the connecting support, and adopts a structure that allows the height of the auxiliary support material to be drawn out and adjusted from the inside of the fixed support material. There is an advantage to fully support the lateral pressure of the formwork.
또한, 사각기둥 형상을 갖는 상기 고정 지지재로부터 보조 지지재의 형상이 갖는 특성상 보관, 운반성이 용이하며, 거푸집으로부터 설치 및 해체한 다음 재 설치시에도 내구성을 유지하여 건축자재로서 재사용에 따른 자재비용을 현저히 절감할 수 있는 효과가 있다.In addition, the characteristics of the shape of the auxiliary support from the fixed support having a rectangular pillar shape is easy to store and transport, and to maintain the durability even when installed and dismantled and reinstalled from the formwork material cost of reuse as building materials There is an effect that can be significantly reduced.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0007517U KR200352506Y1 (en) | 2004-03-18 | 2004-03-18 | Supporting structure of mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0007517U KR200352506Y1 (en) | 2004-03-18 | 2004-03-18 | Supporting structure of mold |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200352506Y1 true KR200352506Y1 (en) | 2004-06-04 |
Family
ID=49346849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0007517U KR200352506Y1 (en) | 2004-03-18 | 2004-03-18 | Supporting structure of mold |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200352506Y1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101567727B1 (en) * | 2014-09-01 | 2015-11-09 | 김경호 | A mold supporting device |
KR101818889B1 (en) * | 2017-08-04 | 2018-01-16 | 박세현 | Mold supporting device for pouring concrete |
KR101848229B1 (en) * | 2016-09-07 | 2018-04-12 | 이양선 | Multipurpose form connecting apparatus |
CN108239997A (en) * | 2018-03-28 | 2018-07-03 | 中铁十七局集团第三工程有限公司 | In-situ concrete wall one side formwork system |
KR101945530B1 (en) * | 2016-08-31 | 2019-02-11 | 주식회사 블루폼 | Panel connecting apparatus |
CN110410142A (en) * | 2019-09-04 | 2019-11-05 | 临沂会宝岭铁矿有限公司 | An auxiliary device for constructing a retaining wall and a method for constructing a retaining wall using the auxiliary device |
KR20230093698A (en) * | 2021-12-20 | 2023-06-27 | 목포대학교산학협력단 | Footpath enlarging apparatus for bridge and Construction method using thereof |
-
2004
- 2004-03-18 KR KR20-2004-0007517U patent/KR200352506Y1/en not_active IP Right Cessation
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101567727B1 (en) * | 2014-09-01 | 2015-11-09 | 김경호 | A mold supporting device |
KR101945530B1 (en) * | 2016-08-31 | 2019-02-11 | 주식회사 블루폼 | Panel connecting apparatus |
KR101848229B1 (en) * | 2016-09-07 | 2018-04-12 | 이양선 | Multipurpose form connecting apparatus |
KR101818889B1 (en) * | 2017-08-04 | 2018-01-16 | 박세현 | Mold supporting device for pouring concrete |
CN108239997A (en) * | 2018-03-28 | 2018-07-03 | 中铁十七局集团第三工程有限公司 | In-situ concrete wall one side formwork system |
CN108239997B (en) * | 2018-03-28 | 2024-09-06 | 中铁十七局集团第三工程有限公司 | Cast-in-place concrete wall single-side template system |
CN110410142A (en) * | 2019-09-04 | 2019-11-05 | 临沂会宝岭铁矿有限公司 | An auxiliary device for constructing a retaining wall and a method for constructing a retaining wall using the auxiliary device |
KR20230093698A (en) * | 2021-12-20 | 2023-06-27 | 목포대학교산학협력단 | Footpath enlarging apparatus for bridge and Construction method using thereof |
KR102553176B1 (en) | 2021-12-20 | 2023-07-10 | 목포대학교 산학협력단 | Footpath enlarging apparatus for bridge and Construction method using thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201635388U (en) | Cast-in-place concrete arc outer wall body unilateral formwork system | |
CN101839061A (en) | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof | |
KR101632030B1 (en) | Installation structure and method of steel tube columns and brackets | |
KR102243984B1 (en) | Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof | |
KR20090088107A (en) | Fixing means embedded in concrete structure | |
KR100770006B1 (en) | Reinforcement Structure of PC Column Vertical Reinforcing Bars | |
KR101990065B1 (en) | Joint of PC column using steel block | |
US7802409B2 (en) | System of concrete structures having panel and column portions with rigid member and end of panel portion of one structure received in slot of column portion of adjacent structure | |
KR200352506Y1 (en) | Supporting structure of mold | |
KR101421212B1 (en) | Basement Structure for power mono rail | |
KR200291531Y1 (en) | fixde pin for pipe support | |
KR101220811B1 (en) | construction method for building and form | |
KR200419871Y1 (en) | Metal insert built-in spacer | |
KR200298117Y1 (en) | framable set mold for construction | |
KR101298399B1 (en) | Support for a upper reinforcing bar of footings | |
KR20110007618U (en) | Drop head supporter of supporting post for construction | |
KR200142434Y1 (en) | Setting-up structure of angle | |
KR20100004374U (en) | Walls supporter of a truss type | |
JP7182383B2 (en) | Building foundation construction method | |
KR20180012535A (en) | Angle adjustment tie | |
KR200391986Y1 (en) | Carbon-glass fiber composite concrete mold | |
KR101799237B1 (en) | Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same | |
AU2016203317A1 (en) | Ground Engaging Construction Support | |
KR101825818B1 (en) | clip of integrated angle adjustment tie | |
KR200183468Y1 (en) | Structure for installing angle of construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
UA0108 | Application for utility model registration |
Comment text: Application for Utility Model Registration Patent event code: UA01011R08D Patent event date: 20040318 |
|
REGI | Registration of establishment | ||
UR0701 | Registration of establishment |
Patent event date: 20040527 Patent event code: UR07011E01D Comment text: Registration of Establishment |
|
UR1002 | Payment of registration fee |
Start annual number: 1 End annual number: 1 Payment date: 20040527 |
|
UG1601 | Publication of registration | ||
T201 | Request for technology evaluation of utility model | ||
UT0201 | Request for technical evaluation |
Patent event date: 20040812 Comment text: Request for Technology Evaluation of Utility Model Patent event code: UT02011R01D |
|
UR1001 | Payment of annual fee |
Payment date: 20050521 Start annual number: 2 End annual number: 3 |
|
T701 | Written decision to grant on technology evaluation | ||
UT0701 | Decision on maintenance of utility model |
Patent event date: 20050721 Comment text: Written Decision on Result of Technology Evaluation Patent event code: UT07011S01D |
|
G701 | Re-publication after modification of scope of protection [utility model] | ||
UG1701 | Publication of correction |
Patent event date: 20050725 Comment text: Request for Notification of Correction during Technology Evaluation Patent event code: UG17011E02I |
|
UR1001 | Payment of annual fee |
Payment date: 20070529 Start annual number: 4 End annual number: 4 |
|
UR1001 | Payment of annual fee |
Payment date: 20080515 Start annual number: 5 End annual number: 5 |
|
UR1001 | Payment of annual fee |
Payment date: 20090526 Start annual number: 6 End annual number: 6 |
|
UR1001 | Payment of annual fee |
Payment date: 20100528 Start annual number: 7 End annual number: 7 |
|
UR1001 | Payment of annual fee |
Payment date: 20110530 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20120511 Year of fee payment: 9 |
|
UR1001 | Payment of annual fee |
Payment date: 20120511 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20130528 Year of fee payment: 10 |
|
UR1001 | Payment of annual fee |
Payment date: 20130528 Start annual number: 10 End annual number: 10 |
|
EXPY | Expiration of term | ||
UC1801 | Expiration of term |
Termination category: Expiration of duration Termination date: 20140918 |