KR102696621B1 - Method for reinforcing wall panel using natural rock - Google Patents

Method for reinforcing wall panel using natural rock Download PDF

Info

Publication number
KR102696621B1
KR102696621B1 KR1020210097472A KR20210097472A KR102696621B1 KR 102696621 B1 KR102696621 B1 KR 102696621B1 KR 1020210097472 A KR1020210097472 A KR 1020210097472A KR 20210097472 A KR20210097472 A KR 20210097472A KR 102696621 B1 KR102696621 B1 KR 102696621B1
Authority
KR
South Korea
Prior art keywords
bolt
natural stone
foundation
computer
reinforcing
Prior art date
Application number
KR1020210097472A
Other languages
Korean (ko)
Other versions
KR20230016263A (en
Inventor
최종선
Original Assignee
최종선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최종선 filed Critical 최종선
Priority to KR1020210097472A priority Critical patent/KR102696621B1/en
Publication of KR20230016263A publication Critical patent/KR20230016263A/en
Application granted granted Critical
Publication of KR102696621B1 publication Critical patent/KR102696621B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

본 명세서에 개시된 내용은 너트 결합을 통해 자연석과 경사면을 연결하는 전산볼트 또는 앵커의 길이 조절이 가능하고 작업이 용이하한 자연석을 이용한 옹벽 보강 방법의 제공에 관한 것이다.
본 명세서에 개시된 내용의 일 실시예에 따르면, 자연석을 이용한 옹벽 보강 방법은 지반에 기초부재를 시공하는 기초시공단계, 상기 기초부재의 상부에 자연석을 세우는 자연석설치단계, 상기 자연석의 후방에 앵커볼트를 고정시키는 볼트고정단계, 상기 기초부재에 전산볼트의 일단을 연결하는 전산볼트연결단계, 상기 전산볼트의 타단 및 상기 앵커볼트를 연결하는 앵커볼트연결단계 및 상기 자연석의 후방에 토사를 메우는 토사메움단계를 포함한다.
The present specification discloses a method for reinforcing a retaining wall using natural stone, which is easy to work with and allows for adjusting the length of a computerized bolt or anchor connecting the natural stone and a slope through a nut combination.
According to one embodiment of the content disclosed in the present specification, a method for reinforcing a retaining wall using natural stone includes a foundation construction step of constructing a foundation member on ground, a natural stone installation step of erecting a natural stone on top of the foundation member, a bolt fixing step of fixing an anchor bolt to the rear of the natural stone, a computer bolt connection step of connecting one end of the computer bolt to the foundation member, an anchor bolt connection step of connecting the other end of the computer bolt and the anchor bolt, and a soil filling step of filling soil to the rear of the natural stone.

Description

자연석을 이용한 옹벽 보강 방법{METHOD FOR REINFORCING WALL PANEL USING NATURAL ROCK}{METHOD FOR REINFORCING WALL PANEL USING NATURAL ROCK}

본 명세서에 개시된 내용은 옹벽 보강 방법에 관한 것으로, 더욱 상세하게는 자연석을 이용한 옹벽 보강 방법에 관한 것이다. The present specification relates to a method for reinforcing a retaining wall, and more particularly, to a method for reinforcing a retaining wall using natural stone.

본 명세서에서 달리 표시되지 않는 한, 이 식별항목에 설명되는 내용들은 이 출원의 청구항들에 대한 종래 기술이 아니며, 이 식별항목에 기재된다고 하여 종래기술이라고 인정되는 것은 아니다.Unless otherwise indicated herein, the matters described in this identifier are not prior art to the claims of this application, and their description in this identifier is not intended to be an admission that they are prior art.

일반적으로 토사의 붕괴를 막는 구조물을 통칭하여 옹벽이라고 하고, 옹벽의 축조는 토사를 절토하여 절토면에 설치하는 절토부옹벽과 성토지에 설치하는 성토부옹벽으로 나뉜다.In general, a structure that prevents the collapse of soil is called a retaining wall, and the construction of a retaining wall is divided into a cut retaining wall installed on the cut surface by cutting the soil, and a fill retaining wall installed on the fill area.

기존에 사용되는 옹벽을 보강하는 방법은 네일공법이 있지만 용접부위의 모재의 열변형으로 인한 강도 저하, 용접부위의 녹방지작업공정으로 인한 공정지연, 앵커와 철근의 길이변화가 난해하여 이음철근을 제단하는 작업에 의한 공정 지연 등의 문제점이 발생된다.There is a method of reinforcing existing retaining walls using the nail method, but there are problems such as a decrease in strength due to thermal deformation of the base material at the welding area, a delay in the process due to the rust prevention work process at the welding area, and a delay in the process due to the work of cutting the connecting reinforcing bars because the length change of the anchor and reinforcing bars is difficult.

또한, 옹벽을 보강하는 방법 중에 그리드공법이 있지만 앵커와 그리드보의 연결 시 간격의 조정이 불가능한 점, 연결볼트들 각각의 길이를 측정하여 제단 및 결합하면서 발생되는 공정의 지연 등의 문제점이 발생된다.In addition, there is a grid method among the methods of reinforcing retaining walls, but there are problems such as the impossibility of adjusting the spacing when connecting anchors and grid beams, and the delay in the process that occurs when measuring the length of each connecting bolt and cutting and joining them.

따라서, 공정의 지연을 초래하는 공정들을 회피하고 앵커의 길이조절이 가능하며 완제품을 설치만하면 숙련된 작업자가 아니더라도 옹벽 보강이 가능한 공법 개발이 필요하다.Therefore, it is necessary to develop a method that avoids processes that cause delays in the process, allows for anchor length adjustment, and allows reinforcement of retaining walls even by non-skilled workers by simply installing the finished product.

이와 관련하여 한국 등록특허공보 제10-1530871호는 띠형 섬유보강재를 이용한 자연석 옹벽 구조물 및 그 시공방법을 개시하고 있고 한국 등록특허공보 제10-1528725호는 자연석을 이용한 경사면 보강공법을 개시하고 있다. In this regard, Korean Patent Publication No. 10-1530871 discloses a natural stone retaining wall structure using a belt-shaped fiber reinforcement material and a construction method thereof, and Korean Patent Publication No. 10-1528725 discloses a slope reinforcement method using natural stone.

그러나 기존 발명들은 보강 공법의 작업시간을 단축시키는 발명은 개시하지 않고 있다.However, existing inventions do not disclose inventions that shorten the working time of reinforcement methods.

한국 등록특허공보 제10-1530871호Korean Patent Publication No. 10-1530871 한국 등록특허공보 제10-1528725호Korean Patent Publication No. 10-1528725

너트 결합을 통해 자연석과 경사면을 연결하는 전산볼트 또는 앵커의 길이 조절이 가능하고 작업이 용이하한 자연석을 이용한 옹벽 보강 방법을 제공함에 있다.The present invention provides a method for reinforcing a retaining wall using natural stone, which is easy to work with and allows for adjustment of the length of a computerized bolt or anchor connecting natural stone and a slope through a nut combination.

또한, 상술한 바와 같은 기술적 과제들로 한정되지 않으며, 이하의 설명으로부터 또 다른 기술적 과제가 도출될 수도 있음은 자명하다.In addition, it is obvious that the technical tasks are not limited to the technical tasks described above, and that other technical tasks may be derived from the following description.

개시된 내용의 일 실시예에 의하면, 자연석을 이용한 옹벽 보강 방법은 지반에 기초부재를 시공하는 기초시공단계, 상기 기초부재의 상부에 자연석을 세우는 자연석설치단계, 상기 자연석의 후방에 앵커볼트를 고정시키는 볼트고정단계, 상기 기초부재에 전산볼트의 일단을 연결하는 전산볼트연결단계, 상기 전산볼트의 타단 및 상기 앵커볼트를 연결하는 앵커볼트연결단계 및 상기 자연석의 후방에 토사를 메우는 토사메움단계를 포함한다.According to one embodiment of the disclosed content, a method for reinforcing a retaining wall using natural stone includes a foundation construction step of constructing a foundation member on ground, a natural stone installation step of erecting a natural stone on top of the foundation member, a bolt fixing step of fixing an anchor bolt to the rear of the natural stone, a computer bolt connection step of connecting one end of the computer bolt to the foundation member, an anchor bolt connection step of connecting the other end of the computer bolt and the anchor bolt, and a soil filling step of filling soil to the rear of the natural stone.

또한, 상기 기초시공단계는 기초 및 보강콘크리트 타설하고, 상기 자연석의 후방에 형성된 경사지대의 경사면 절취한 후 네일철근을 삽입 및 그라우트 주입할 수 있다.In addition, the above-mentioned basic construction step can include pouring the basic and reinforced concrete, cutting the slope of the slope formed at the rear of the natural stone, inserting nail reinforcement bars, and injecting grout.

또한, 상기 기초시공단계는 기초 및 보강콘크리트 타설 후 상하부로 연장된 수직바의 일부를 상기 기초 및 보강콘크리트에 인서트 결합할 수 있다.In addition, the above-mentioned foundation construction step can insert and connect a portion of the vertical bars extending upward and downward after pouring the foundation and reinforced concrete into the foundation and reinforced concrete.

또한, 상기 전산볼트연결단계는 상기 기초부재의 단부에 플레이트 형태의 앵커판을 너트 결합하고, 상기 기초부재에 인접한 위치에서 상기 앵커판 및 상기 전산볼트의 일단을 결합할 수 있다.In addition, the computer bolt connection step can connect a plate-shaped anchor plate with a nut to an end of the base member, and connect one end of the anchor plate and the computer bolt at a position adjacent to the base member.

또한, 상기 전산볼트연결단계는 링 형태의 아이너트의 일단에 형성된 통공에 상기 기초부재의 단부를 삽입하고, 상기 전산볼트의 일단 및 상기 아이너트의 타단을 서로 볼트 결합할 수 있다.In addition, the computer bolt connection step may insert an end of the base member into a hole formed in one end of a ring-shaped eye nut, and bolt one end of the computer bolt and the other end of the eye nut to each other.

또한, 상기 앵커볼트연결단계는 클립에 형성된 홀들 각각에 상기 전산볼트 및 앵커볼트의 단부를 관입한 후 상기 전산볼트 및 앵커볼트의 단부에 너트를 체결할 수 있다.In addition, the anchor bolt connection step can be performed by inserting the ends of the computer bolt and anchor bolt into each of the holes formed in the clip, and then fastening a nut to the ends of the computer bolt and anchor bolt.

또한, 상기 볼트고정단계 및 전산볼트연결단계 사이에는 일단 및 타단이 상기 앵커볼트의 단부의 전후방에 각각 결합되어 소정의 공간을 둘러싸는 형태의 클립을 상기 앵커볼트에 결합하고 그물형태의 그리드의 전방에 부착된 그리드바를 상기 공간에 삽입하는 그리드연결단계를 더 포함할 수 있다.In addition, between the bolt fixing step and the computer bolt connecting step, a clip having one end and the other end connected to the front and rear of the end of the anchor bolt and surrounding a predetermined space may be connected to the anchor bolt, and a grid connecting step of inserting a grid bar attached to the front of a mesh-shaped grid into the space may be further included.

또한, 상기 토사의 상부에서 상기 기초시공단계부터 상기 토사메움단계까지 반복 시공할 수 있다.In addition, construction can be repeated from the foundation construction stage to the soil filling stage on top of the soil.

본 명세서에 개시된 일 실시예에 따르면, 자연석을 이용한 옹벽 보강 방법은 자연석에 결합되는 앵커 및 전산볼트 사이의 길이 조절이 가능하여 체결 편의성이 개선되고 공정소요시간이 감소되는 장점이 있다.According to one embodiment disclosed in the present specification, a method for reinforcing a retaining wall using natural stone has the advantage of improving the convenience of fastening and reducing the process time by allowing adjustment of the length between an anchor and a screw bolt to be connected to the natural stone.

또한, 자연석을 이용한 옹벽 보강 방법은 지형에 따라 그리드를 사용하여 자연석들을 안정적으로 고정시킬 수 있고, 클립과 앵커판을 이용하여 볼트들의 연결 편의성이 개선되며, 그리드의 인장을 조절가능한 장점이 있다.In addition, the method of reinforcing a retaining wall using natural stones has the advantages of being able to stably fix natural stones using a grid according to the terrain, improving the convenience of connecting bolts using clips and anchor plates, and being able to control the tension of the grid.

아울러, 이와 같은 기재된 본 발명의 효과는 발명자가 인지하는지 여부와 무관하게 기재된 내용의 구성에 의해 당연히 발휘되게 되는 것이므로 상술한 효과는 기재된 내용에 따른 몇 가지 효과일 뿐 발명자가 파악 또는 실재하는 모든 효과를 기재한 것이라 인정되어서는 안 된다.In addition, since the effects of the present invention described above are naturally exerted by the composition of the described contents regardless of whether the inventor is aware of them, the above-described effects are only some of the effects according to the described contents, and should not be recognized as describing all the effects known or actually existing by the inventor.

또한, 본 발명의 효과는 명세서의 전체적인 기재에 의해서 추가로 파악되어야 할 것이며, 설사 명시적인 문장으로 기재되어 있지 않더라도 기재된 내용이 속하는 기술분야에서 통상의 지식을 가진 자가 본 명세서를 통해 그러한 효과가 있는 것으로 인정할 수 있는 효과라면 본 명세서에 기재된 효과로 보아야 할 것이다.In addition, the effects of the present invention should be additionally understood by the entire description of the specification, and even if it is not explicitly described in a sentence, if it is an effect that can be recognized as such by a person with ordinary skill in the technical field to which the described content belongs through this specification, it should be regarded as an effect described in this specification.

도 1은 본 명세서의 자연석을 이용항 옹벽 보강 방법으로 제작되는 보강 구조물의 측면모식도.
도 2는 도 1의 보강 구조물의 평면도.
도 3은 도 1의 자연석을 이용한 옹벽 보강 방법의 순서도.
도 4는 본 명세서의 다른 실시예에 따른 자연석을 이용한 옹벽 보강 방법으로 제작되는 보강 구조물의 측면모식도.
도 5는 도 4의 보강 구조물의 평면도.
도 6은 도 4의 자연석을 이용한 옹벽 보강 방법의 순서도.
Figure 1 is a side schematic diagram of a reinforcement structure manufactured using the natural stone retaining wall reinforcement method of this specification.
Figure 2 is a plan view of the reinforcing structure of Figure 1.
Figure 3 is a flow chart of the method for reinforcing a retaining wall using natural stone of Figure 1.
FIG. 4 is a side schematic diagram of a reinforcing structure manufactured using a method for reinforcing a retaining wall using natural stone according to another embodiment of the present specification.
Figure 5 is a plan view of the reinforcing structure of Figure 4.
Figure 6 is a flow chart of the method for reinforcing a retaining wall using natural stone of Figure 4.

이하, 첨부된 도면을 참조하여 바람직한 실시예에 따른 자연석을 이용한 옹벽 보강 방법의 구성, 동작 및 작용효과에 대하여 살펴본다. 참고로, 이하 도면에서, 각 구성요소는 편의 및 명확성을 위하여 생략되거나 개략적으로 도시되었으며, 각 구성요소의 크기는 실제 크기를 반영하는 것은 아니다, 또한 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성요소를 지칭하며 개별 도면에서 동일 구성에 대한 도면 부호는 생략하기로 한다. Hereinafter, with reference to the attached drawings, the configuration, operation, and effect of a method for reinforcing a retaining wall using natural stone according to a preferred embodiment will be described. For reference, in the drawings below, each component is omitted or schematically illustrated for convenience and clarity, and the size of each component does not reflect the actual size. In addition, the same reference numerals refer to the same components throughout the specification, and drawing numerals for the same configuration in individual drawings are omitted.

도 1 및 2에 도시된 바와 같이, 자연석을 이용한 옹벽 보강 방법(1)은 기초시공단계(S110), 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150) 및 토사메움단계(S160)를 포함한다.As shown in Figures 1 and 2, the method (1) for reinforcing a retaining wall using natural stone includes a foundation construction step (S110), a natural stone installation step (S120), a bolt fixing step (S130), a computerized bolt connection step (S140), an anchor bolt connection step (S150), and a soil filling step (S160).

자연석을 이용한 옹벽 보강 방법(1)은 제작되는 자연석의 높이가 증가되는 경우, 토사메움단계(S160) 이후에 기초시공단계(S110), 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150) 및 토사메움단계(S160)를 반복하여 수직하게 적층되는 자연석(10, 11, 12)들이 현재 위치에 안정적으로 고정되도록 보강한다.A method for reinforcing a retaining wall using natural stones (1) repeats the foundation construction stage (S110), natural stone installation stage (S120), bolt fixing stage (S130), computer bolt connection stage (S140), anchor bolt connection stage (S150), and soil filling stage (S160) after the soil filling stage (S160) when the height of the natural stones being manufactured increases, thereby reinforcing the vertically stacked natural stones (10, 11, 12) so that they are stably fixed in their current positions.

기초시공단계(S110)에서 기초부재인 네일철근(100)의 일단 및 중앙부는 천공된 경사면(50)에 삽입하고, 시멘트, 모르타르 또는 약제 중 어느 하나로 이루어진 그라우트를 상기 천공에 주입하여 네일철근(100)을 경사면(50)을 이루는 지반에 고정한다.In the basic construction stage (S110), one end and the center of the nail reinforcement (100), which is a basic member, are inserted into a perforated inclined surface (50), and grout made of cement, mortar or any one of the chemicals is injected into the perforation to secure the nail reinforcement (100) to the ground forming the inclined surface (50).

기초시공단계(S110)에서 토사 또는 암벽으로 이루어진 경사면(50)의 하부에 또 다른 기초부재인 기초콘크리트(110)를 타설하고, 기초콘크리트(110)의 상부에 보강콘크리트(120)를 타설한다.In the basic construction stage (S110), another basic material, basic concrete (110), is poured on the lower part of a slope (50) made of soil or rock, and reinforced concrete (120) is poured on top of the basic concrete (110).

자연석설치단계(S120)에서 보강콘크리트(120)가 경화되기 전에 자연석(10)의 하부 일부분을 보강콘크리트(120)에 인서트하고, 자연석(10)의 나머지 부분은 지면과 수직하도록 상부를 향해 연장된다.In the natural stone installation step (S120), before the reinforced concrete (120) hardens, a lower portion of the natural stone (10) is inserted into the reinforced concrete (120), and the remaining portion of the natural stone (10) extends upwards so as to be perpendicular to the ground.

볼트고정단계(S130)에서 케미컬앵커볼트(130)의 일단은 자연석(10)의 배면에 형성된 천공에 삽입하여 고정시키고, 케미컬앵커볼트(130)의 타단은 일단에서 후방을 향해 경사면(50)과 이격되는 위치까지 소정의 거리만큼 연장된다.In the bolt fixing step (S130), one end of the chemical anchor bolt (130) is inserted into a hole formed on the back surface of the natural stone (10) and fixed, and the other end of the chemical anchor bolt (130) is extended from one end to a position separated from the inclined surface (50) toward the rear by a predetermined distance.

전산볼트연결단계(S140)에서 전산볼트(140)의 일단은 네일철근(100)의 타단과 결합된 앵커판(150)의 타단을 관통하고, 앵커판(150)의 후방에 배치되는 너트와 결합되어 앵커판(150)에 고정된다.In the computer bolt connection step (S140), one end of the computer bolt (140) penetrates the other end of the anchor plate (150) connected to the other end of the nail reinforcement bar (100), and is fixed to the anchor plate (150) by being connected to a nut placed at the rear of the anchor plate (150).

전산볼트연결단계(S140)에서 전산볼트(140)의 일단은 앵커판(150)의 코너쪽에 인접한 위치에서 앵커판(150)을 관통하는 관통공(152)을 관통하여 너트와 결합된다.In the computer bolt connection step (S140), one end of the computer bolt (140) is connected to the nut by passing through a through hole (152) that passes through the anchor plate (150) at a position adjacent to the corner of the anchor plate (150).

전산볼트연결단계(S140)에서 네일철근(100)의 타단은 사각 플레이트 형태로 형성되는 앵커판(150)의 중공(151)을 관통하여 앵커판(150)의 전방에서 너트와 결합된다.In the computer bolt connection step (S140), the other end of the nail reinforcement (100) penetrates the hollow (151) of the anchor plate (150) formed in the shape of a square plate and is connected to a nut at the front of the anchor plate (150).

따라서, 전산볼트연결단계(S140)에서 작업자는 앵커판(150)의 위치를 변경시키면서 전산볼트(140)의 위치를 조절하여 전산볼트(140) 및 케미컬앵커볼트(130)의 결합위치를 편리하게 조절가능한 장점이 있다.Therefore, in the computer bolt connection step (S140), the worker can conveniently adjust the connection position of the computer bolt (140) and the chemical anchor bolt (130) by changing the position of the anchor plate (150) and adjusting the position of the computer bolt (140).

또한, 전산볼트연결단계(S140)에서 전산볼트(140)는 연장방향이 지면과 수평하도록 배치되거나 일단에서 전방 및 상부를 향해 경사지게 연장되도록 배치될 수 있으며, 앵커판(150)의 전면이 전방 및 상부를 향하도록 기울어진 상태에서도 전산볼트(140)의 일단은 관통공(152)을 관통하여 앵커판(150)의 후방에 배치될 수 있다.In addition, in the computer bolt connection step (S140), the computer bolt (140) may be arranged so that the extension direction is horizontal to the ground or may be arranged so that it extends at an angle from one end toward the front and top, and even when the front of the anchor plate (150) is inclined toward the front and top, one end of the computer bolt (140) may pass through the through hole (152) and be arranged at the rear of the anchor plate (150).

즉 전산볼트(140)의 일단의 외경은 관통공(152)의 내경보다 작기때문에 전산볼트(140)의 일단은 전산볼트(140)의 타단 위치에 상관없이 관통공(152)을 관통한 후 앵커판(150)과 결합이 가능하므로, 편리하게 전산볼트(140)의 타단 위치를 변경시키면서 전산볼트(140)를 케미컬앵커볼트(130)의 타단에 연결할 수 있다.That is, since the outer diameter of one end of the computer bolt (140) is smaller than the inner diameter of the through hole (152), one end of the computer bolt (140) can be connected to the anchor plate (150) after passing through the through hole (152) regardless of the position of the other end of the computer bolt (140), so the computer bolt (140) can be conveniently connected to the other end of the chemical anchor bolt (130) while changing the position of the other end of the computer bolt (140).

또한, 전산볼트연결단계(S140)에서 복수의 전산볼트(140)들 각각의 일단이 관통공(152)들 각각에 삽입되어 앵커판(150)과 결합될 수 있고, 각각의 타단은 클립(160)을 관통하여 클립(160)과 결합될 수 있다.In addition, in the computer bolt connection step (S140), one end of each of the plurality of computer bolts (140) can be inserted into each of the through holes (152) and connected to the anchor plate (150), and the other end of each can be connected to the clip (160) by passing through the clip (160).

앵커볼트연결단계(S150)에서 전산볼트(140)의 타단은 일단에서 전방을 향해 소정의 거리만큼 연장되어 케미컬앵커볼트(130)의 타단과 인접한 위치에서 케미컬앵커볼트(130)와 교차되면서 클립(160)과 결합한다.In the anchor bolt connection step (S150), the other end of the computer bolt (140) extends forward from one end by a predetermined distance and intersects with the chemical anchor bolt (130) at a position adjacent to the other end of the chemical anchor bolt (130) and is combined with the clip (160).

앵커볼트연결단계(S150)에서 전산볼트(140)의 타단은 사각 플레이트 형태의 클립(160)의 일측면을 관통하여 클립(160)의 전방에 배치되고, 너트와 결합되어 클립(160)과 결합한다.In the anchor bolt connection step (S150), the other end of the computer bolt (140) penetrates one side of a square plate-shaped clip (160) and is placed in front of the clip (160), and is combined with a nut to be combined with the clip (160).

앵커볼트연결단계(S150)에서 전산볼트(140)의 타단은 앵커판(150)에 결합된 전산볼트(140)의 일단을 축으로 다양한 위치로 이동하면서 케미컬앵커볼트(130)와 교차시킨다.In the anchor bolt connection step (S150), the other end of the computer bolt (140) intersects with the chemical anchor bolt (130) while moving to various positions with one end of the computer bolt (140) connected to the anchor plate (150) as an axis.

앵커볼트연결단계(S150)에서 케미컬앵커볼트(130)의 타단은 클립(160)의 타측면을 관통하여 클립(160)의 타측면 후방에 배치되고, 너트와 결합시켜 클립(160)에 고정시킨다.In the anchor bolt connection step (S150), the other end of the chemical anchor bolt (130) penetrates the other side of the clip (160) and is placed at the rear of the other side of the clip (160), and is fixed to the clip (160) by combining with a nut.

토사메움단계(S160)에서 토사(170)는 자연석(10) 및 경사면(50) 사이에서 보강콘크리트(120)의 상부에 채워지고, 토사(170)는 자연석(10)의 상부면보다 상대적으로 낮은 수평선상까지 채워지고 다져진다.In the soil filling step (S160), soil (170) is filled on top of the reinforced concrete (120) between the natural stone (10) and the slope (50), and the soil (170) is filled and compacted to a horizontal line that is relatively lower than the upper surface of the natural stone (10).

토사(170)가 일정한 높이의 수평선상까지 채워진 후에는 토사(170)의 상부에서 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150) 및 토사메움단계(S160)를 수차례 반복 시공하여 복수의 자연석(11, 12)들을 적층시키며 옹벽 보강이 가능하다.After the soil (170) is filled to a horizontal line of a certain height, the natural stone installation step (S120), the bolt fixing step (S130), the computer bolt connection step (S140), the anchor bolt connection step (S150), and the soil filling step (S160) are repeated several times on top of the soil (170) to stack multiple natural stones (11, 12) and reinforce the retaining wall.

본 실시예에 따른 자연석을 이용한 옹벽 보강 방법(2)은 기초바(200), 아이너트(210, 220)를, 케미컬앵커볼트(132, 134, 136, 138), 전산볼트(142, 144), 그리드(250, 260), 자연석설치단계(S170), 볼트고정단계(S180) 및 그리드연결단계(S190)를 제외하면, 도 1 내지 3의 자연석을 이용한 옹벽 보강 방법과 실질적으로 동일하므로, 동일한 참조번호와 명칭을 사용하고 중복된 설명은 생략한다.The method (2) for reinforcing a retaining wall using natural stone according to the present embodiment is substantially the same as the method for reinforcing a retaining wall using natural stone of FIGS. 1 to 3, except for the foundation bar (200), eye nuts (210, 220), chemical anchor bolts (132, 134, 136, 138), computer bolts (142, 144), grids (250, 260), natural stone installation step (S170), bolt fixing step (S180), and grid connection step (S190), and therefore the same reference numbers and names are used, and duplicate descriptions are omitted.

도 4 내지 6에 도시된 바와 같이, 자연석을 이용한 옹벽 보강 방법(2)은 기초시공단계(S110), 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150), 토사메움단계(S160), 자연석설치단계(S170), 볼트고정단계(S180) 및 그리드연결단계(S190)를 포함한다.As shown in Figures 4 to 6, the method for reinforcing a retaining wall using natural stone (2) includes a foundation construction step (S110), a natural stone installation step (S120), a bolt fixing step (S130), a computerized bolt connection step (S140), an anchor bolt connection step (S150), a soil filling step (S160), a natural stone installation step (S170), a bolt fixing step (S180), and a grid connection step (S190).

자연석을 이용한 옹벽 보강 방법(2)은 옹벽의 높이를 증가시키기 위해 토사메움단계(S160) 이후에 자연석설치단계(S170), 볼트고정단계(S180) 및 그리드연결단계(S190) 대신에 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150) 및 토사메움단계(S160)를 반복하여 수직하게 적층되는 자연석(10, 11, 12)들이 현재 위치에 안정적으로 고정되도록 보강할 수 있다.A method for reinforcing a retaining wall using natural stones (2) can reinforce vertically stacked natural stones (10, 11, 12) so that they are stably fixed in their current positions by repeating the natural stone installation step (S120), the bolt fixing step (S130), the computer bolt connection step (S140), the anchor bolt connection step (S150), and the soil filling step (S160) instead of the natural stone installation step (S170), the bolt fixing step (S180), and the grid connection step (S190) after the soil filling step (S160) to increase the height of the retaining wall.

기초시공단계(S110)에서 경사면(50)의 전방 하부에 기초부재인 기초콘크리트(110)가 타설되고, 기초콘크리트(110)가 경화되기 전에 상하부로 원기둥 형태로 연장된 기초바(200)의 일단이 기초콘크리트(110)에 인서트된다.In the basic construction stage (S110), the foundation concrete (110), which is a foundation material, is poured at the front lower portion of the slope (50), and before the foundation concrete (110) hardens, one end of a foundation bar (200) that extends upward and downward in a cylindrical shape is inserted into the foundation concrete (110).

기초시공단계(S110)에서 기초콘크리트(110)가 경화된 후 기초콘크리트(110)의 상부에는 보강콘크리트(120)가 타설되어 기초바(200)의 중앙부가 보강콘크리트(120)에 인서트된다.In the basic construction stage (S110), after the foundation concrete (110) has hardened, reinforced concrete (120) is poured on top of the foundation concrete (110) and the central portion of the foundation bar (200) is inserted into the reinforced concrete (120).

보강콘크리트(120)는 아이너트(210), 전산볼트(142) 및 케미컬앵커볼트(132)의 설치 유무에 따라 전산볼트연결단계(S140) 이후에 기초콘크리트(110)의 상부에 타설될 수 있다.Reinforced concrete (120) can be poured on top of the foundation concrete (110) after the computer bolt connection step (S140) depending on whether eye nuts (210), computer bolts (142), and chemical anchor bolts (132) are installed.

기초시공단계(S110)에서 기초바(200)의 타단은 보강콘크리트(120)의 상부를 향해 돌출되고, 자연석(10)에 연결되는 케미컬앵커볼트(132, 134)들의 개수 증가에 따라 상부를 향해 연장될 수 있다.In the basic construction stage (S110), the other end of the foundation bar (200) protrudes toward the upper part of the reinforced concrete (120) and can extend upward as the number of chemical anchor bolts (132, 134) connected to the natural stone (10) increases.

자연석설치단계(S120)에서 자연석(10)은 보강콘크리트(120)가 경화되기 전에 하부 일부분이 보강콘크리트(120)의 전방 안쪽에 인서트되고, 나머지 부분은 지면과 수직하도록 상부를 향해 연장된다.In the natural stone installation step (S120), the lower part of the natural stone (10) is inserted into the front inner side of the reinforced concrete (120) before the reinforced concrete (120) hardens, and the remaining part extends upwards so as to be perpendicular to the ground.

볼트고정단계(S130)에서 케미컬앵커볼트(132)의 일단은 자연석(10)의 배면 하부에 형성된 천공에 삽입되어 고정되고, 케미컬앵커볼트(132)의 타단은 일단에서 후방 및 하부를 향해 경사지게 소정의 거리만큼 연장된다.In the bolt fixing step (S130), one end of the chemical anchor bolt (132) is inserted into and fixed into a hole formed in the lower back surface of the natural stone (10), and the other end of the chemical anchor bolt (132) is extended from one end toward the rear and lower side by a predetermined distance.

볼트고정단계(S130)에서, 케미컬앵커볼트(134)의 일단은 케미컬앵커볼트(132)의 상부에 이격된 위치에서 자연석(10)의 배면에 형성된 천공에 삽입되어 고정되고, 케미컬앵커볼트(134)의 타단은 일단에서 후방 및 하부를 향해 경사지게 소정의 거리만큼 연장된다.In the bolt fixing step (S130), one end of the chemical anchor bolt (134) is inserted into and fixed in a hole formed on the back surface of the natural stone (10) at a position spaced from the upper portion of the chemical anchor bolt (132), and the other end of the chemical anchor bolt (134) is extended from one end toward the rear and bottom by a predetermined distance.

전산볼트연결단계(S140)에서 전산볼트(142)의 일단은 기초바(200)에 연결된 아이너트(210)에 결합되고, 이 경우, 보강콘크리트(120)는 아이너트(210) 및 전산볼트(142)가 서로 연결된 상태에서 기초콘크리트(110)의 상부에 타설된다.In the computer bolt connection step (S140), one end of the computer bolt (142) is connected to an eye nut (210) connected to a foundation bar (200), and in this case, the reinforcing concrete (120) is poured on top of the foundation concrete (110) while the eye nut (210) and the computer bolt (142) are connected to each other.

전산볼트연결단계(S140)에서 아이너트(210, 220) 각각의 일단은 링 형태로 형성되고, 기초바(200)를 둘러싸며 하강되어 기초바(200)와 연결되며, 아이너트(210, 220) 각각의 타단은 일단의 일부분이 너트 형태로 후방을 향해 돌출되어 전산볼트(142, 144) 각각의 일단과 볼트 결합된다.In the computer bolt connection step (S140), one end of each of the eye nuts (210, 220) is formed in a ring shape, and is lowered to surround the base bar (200) and connected to the base bar (200), and the other end of each of the eye nuts (210, 220) is bolt-connected with one end of each of the computer bolts (142, 144) by having a portion of one end protrude rearward in the shape of a nut.

전산볼트연결단계(S140)에서 전산볼트(144)의 일단은 기초바(200)의 타단에 연결된 아이너트(220)의 타단에 볼트 결합되고, 전산볼트(144)의 타단은 전방 및 상부를 향해 연장되도록 배치된다.In the computer bolt connection step (S140), one end of the computer bolt (144) is bolted to the other end of an eye nut (220) connected to the other end of the base bar (200), and the other end of the computer bolt (144) is arranged to extend forward and upward.

전산볼트연결단계(S140)에서 아이너트(210, 220)의 내경은 기초바(200)의 외경보다 크게 제작될 수 있고, 이에 따라 아이너트(210, 220)는 일단이 기초바(200)에 연결된 상태에서 아이너트(210, 220)의 타단은 전방 상부 또는 하부를 향해 경사지게 배치해둔 상태로 전산볼트(142, 144)와 연결될 수 있다. In the computer bolt connection step (S140), the inner diameter of the eye nut (210, 220) can be manufactured to be larger than the outer diameter of the base bar (200), and accordingly, the eye nut (210, 220) can be connected to the computer bolt (142, 144) with one end connected to the base bar (200) and the other end of the eye nut (210, 220) inclined toward the upper or lower front.

앵커볼트연결단계(S150)에서 전산볼트(142)의 일단이 보강콘크리트(120)에 인서트되고 전산볼트(142)의 타단이 케미컬앵커볼트(132)의 타단과 일부 교차된 상태에서 전산볼트(142)의 타단은 클립(160)을 통해 케미컬앵커볼트(132)와 연결된다.In the anchor bolt connection step (S150), one end of the computer bolt (142) is inserted into the reinforced concrete (120), and the other end of the computer bolt (142) partially intersects with the other end of the chemical anchor bolt (132), and the other end of the computer bolt (142) is connected to the chemical anchor bolt (132) through a clip (160).

앵커볼트연결단계(S150)에서 전산볼트(142)의 타단은 클립(160)의 일측면을 관통하여 클립(160)의 전방에 배치되고, 너트와 결합되어 클립(160)에 고정되며, 케미컬앵커볼트(132)의 타단은 클립(160)의 타측면을 관통하여 클립(160)의 후방에 배치된 상태에서 너트와 결합된다.In the anchor bolt connection step (S150), the other end of the computer bolt (142) is positioned at the front of the clip (160) by penetrating one side of the clip (160), and is fixed to the clip (160) by being combined with a nut, and the other end of the chemical anchor bolt (132) is positioned at the rear of the clip (160) by penetrating the other side of the clip (160) and is combined with a nut.

앵커볼트연결단계(S150)에서 전산볼트(144)의 타단이 케미컬앵커볼트(132)의 타단과 일부 교차된 상태에서 전산볼트(144)의 타단은 클립(160)을 통해 케미컬앵커볼트(134)와 연결된다.In the anchor bolt connection step (S150), the other end of the computer bolt (144) is partially intersected with the other end of the chemical anchor bolt (132), and the other end of the computer bolt (144) is connected to the chemical anchor bolt (134) through a clip (160).

앵커볼트연결단계(S150)에서 전산볼트(144)의 타단은 클립(160)의 일측면을 관통하여 클립(160)의 전방에 배치되고, 너트와 결합되어 클립(160)에 고정되며, 케미컬앵커볼트(134)의 타단은 클립(160)의 타측면을 관통하여 클립(160)의 후방에 배치된 상태에서 너트와 결합된다.In the anchor bolt connection step (S150), the other end of the computer bolt (144) is positioned in front of the clip (160) by penetrating one side of the clip (160), and is fixed to the clip (160) by being combined with a nut, and the other end of the chemical anchor bolt (134) is positioned in the rear of the clip (160) by penetrating the other side of the clip (160) and is combined with a nut.

토사메움단계(S160)에서 토사(170)는 자연석(10) 및 경사면(50) 사이에서 보강콘크리트(120)의 상부에 채워지고, 토사(170)는 자연석(10)의 상부면보다 상대적으로 낮은 수평선상까지 채워지고 다져진다.In the soil filling step (S160), soil (170) is filled on top of the reinforced concrete (120) between the natural stone (10) and the slope (50), and the soil (170) is filled and compacted to a horizontal line that is relatively lower than the upper surface of the natural stone (10).

토사메움단계(S160)에서 토사(170)가 일정한 높이의 수평선상까지 채워진 후에는 토사(170)의 상부에서 자연석을 이용한 옹벽 보강 방법(1)에 해당되는 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150) 및 토사메움단계(S160)를 수차례 반복 시공하면서 복수의 자연석(11, 12)들을 적층시킬 수 있다.After the soil (170) is filled to a horizontal line of a certain height in the soil filling step (S160), the natural stone installation step (S120), bolt fixing step (S130), computer bolt connection step (S140), anchor bolt connection step (S150), and soil filling step (S160) corresponding to the method for reinforcing a retaining wall using natural stones (1) on top of the soil (170) are repeated several times to stack a plurality of natural stones (11, 12).

자연석설치단계(S170)에서 자연석(11)은 자연석(10)의 후방에서 토사(170)의 전방 상부에 하부 일부분이 세워지고, 자연석(11)의 나머지 부분은 자연석(10)의 연장방향과 동일하도록 상부로 연장된다.In the natural stone installation step (S170), the lower part of the natural stone (11) is installed on the upper front side of the soil (170) at the rear of the natural stone (10), and the remaining part of the natural stone (11) is extended upwards in the same direction as the extension of the natural stone (10).

볼트고정단계(S180)에서 케미컬앵커볼트(134)의 일단은 자연석(11)의 배면 하부를 관통하여 자연석(11)과 결합되고, 타단은 후방을 향해 소정의 거리만큼 연장된다.In the bolt fixing step (S180), one end of the chemical anchor bolt (134) penetrates the lower part of the back surface of the natural stone (11) and is combined with the natural stone (11), and the other end extends toward the rear a predetermined distance.

볼트고정단계(S180)에서 복수의 케미컬앵커볼트(134)는 자연석(11)의 높이나 중량에 따라 자연석(11) 배면의 상하부 또는 좌우 양측으로 이격되면서 다양한 위치에 결합될 수 있다.In the bolt fixing step (S180), a plurality of chemical anchor bolts (134) can be attached at various locations while being spaced apart from each other on the upper and lower parts or left and right sides of the back surface of the natural stone (11) depending on the height or weight of the natural stone (11).

그리드연결단계(S190)에서 그리드(250)는 격자구조의 그물망 형태로 형성되는 보강재로서, 전방에는 일측 또는 타측을 향해 연장되는 그리드바(251)가 형성되고, 클립(165)을 통해 케미컬앵커볼트(136)와 결합된다.In the grid connection step (S190), the grid (250) is a reinforcing material formed in the form of a mesh-like grid structure, and a grid bar (251) extending toward one side or the other is formed in the front, and is connected to a chemical anchor bolt (136) through a clip (165).

그리드연결단계(S190)에서 그리드(250)는 자연석(11)의 후방에 토사(170)를 채운 후 토사(170)의 상부면에 밀착되도록 배치된 상태에서 클립(165)을 통해 케미컬앵커볼트(136)와 연결된다.In the grid connection step (S190), the grid (250) is placed in close contact with the upper surface of the soil (170) after filling the rear of the natural stone (11) with soil (170) and is connected to the chemical anchor bolt (136) through the clip (165).

그리드연결단계(S190)에서 그리드바(251) 및 그리드(250)의 전방 일부분은 케미컬앵커볼트(136)의 하부에 배치되고, 그리드바(251)는 케미컬앵커볼트(136)에 결합된 클립(165)을 관통하며 클립(165)과 결합된다.In the grid connection step (S190), the grid bar (251) and a front portion of the grid (250) are placed below the chemical anchor bolt (136), and the grid bar (251) penetrates the clip (165) connected to the chemical anchor bolt (136) and is connected to the clip (165).

그리드연결단계(S190)에서 클립(165)의 일단은 케미컬앵커볼트(136)의 전방에 결합되고, 중앙부는 일단에서 후방 및 하부에 형성되논 그리드연결공간(166)을 둘러싸는 링 형태로 연장되며, 타단은 중앙부에서 상부로 연장되어 케미컬앵커볼트(134)와 결합된다. In the grid connection step (S190), one end of the clip (165) is connected to the front of the chemical anchor bolt (136), the central portion extends in a ring shape surrounding the grid connection space (166) formed at the rear and bottom from one end, and the other end extends upward from the central portion and is connected to the chemical anchor bolt (134).

그리드연결단계(S190)에서 그리드바(251)가 그리드연결공간(166)에 삽입된 후 너트를 케미컬앵커볼트(136)의 타단에 결합시키고, 클립(165)의 타단까지 이동시키면, 클립(165)이 너트에 의해 전방으로 이동되면서 그리드바(251)를 전방으로 이동시킨다.In the grid connection step (S190), after the grid bar (251) is inserted into the grid connection space (166), the nut is connected to the other end of the chemical anchor bolt (136) and moved to the other end of the clip (165), and the clip (165) is moved forward by the nut, thereby moving the grid bar (251) forward.

그리드연결단계(S190)에서 클립(165)이 너트에 의해 전방으로 이동되면 그리드바(251)가 그리드(250)를 당기기 때문에 그리드(250)가 펼쳐지고, 그리드(250)와 토사(170)의 상부면의 밀착면이 개선된다.In the grid connection step (S190), when the clip (165) is moved forward by the nut, the grid bar (251) pulls the grid (250), so the grid (250) is spread out, and the contact surface between the grid (250) and the upper surface of the soil (170) is improved.

그리드연결단계(S190)에서 그리드(250)가 토사(170)의 상부에서 케미컬앵커볼트(136)와 연결된 이후에는 추가로 토사(170)를 그리드(250)의 상부에 채운 후 그리드(260)를 토사(170)의 상부에 배치하고 케미컬앵커볼트(138)에 그리드(260)를 연결한다.In the grid connection step (S190), after the grid (250) is connected to the chemical anchor bolt (136) on top of the soil (170), soil (170) is additionally filled on top of the grid (250), and then the grid (260) is placed on top of the soil (170) and connected to the chemical anchor bolt (138).

그리드연결단계(S190)에서 그리드(250, 260)들을 자연석(11)의 후방에 설치하는 것은 경사면(50)의 상부에 일정한 길이의 평면(55)이 형성되고, 후방에 경사면(57)이 형성되는 지형에 적합하다.Installing grids (250, 260) at the rear of natural stone (11) in the grid connection step (S190) is suitable for terrain where a plane (55) of a certain length is formed on the upper side of the slope (50) and a slope (57) is formed at the rear.

한편, 자연석을 이용한 옹벽 보강 방법(2)은 기초시공단계(S110) 및 자연석설치단계(S120) 이후에 볼트고정단계(S180) 및 그리드연결단계(S190)를 진행하여 그리드(250)를 보강콘크리트(120)의 상부에 배치시킬 수 있다.Meanwhile, the method for reinforcing a retaining wall using natural stone (2) can be performed by performing a bolt fixing step (S180) and a grid connection step (S190) after the foundation construction step (S110) and the natural stone installation step (S120) to place the grid (250) on top of the reinforcing concrete (120).

또한, 자연석을 이용한 옹벽 보강 방법(2)은 그리드(250)가 보강콘크리트(120)의 상부에 배치된 상태에서 토사메움단계(S160)를 거친 후 토사(170)의 위에서 다시 기초시공단계(S110), 자연석설치단계(S120), 볼트고정단계(S130), 전산볼트연결단계(S140), 앵커볼트연결단계(S150), 토사메움단계(S160), 자연석설치단계(S170), 볼트고정단계(S180) 및 그리드연결단계(S190)를 거치면서 진행될 수 있다.In addition, the method (2) for reinforcing a retaining wall using natural stone can be performed by going through a soil filling step (S160) while the grid (250) is placed on top of the reinforced concrete (120), and then going through a foundation construction step (S110), a natural stone installation step (S120), a bolt fixing step (S130), a computer bolt connection step (S140), an anchor bolt connection step (S150), a soil filling step (S160), a natural stone installation step (S170), a bolt fixing step (S180), and a grid connection step (S190) on top of the soil (170).

즉, 자연석을 이용한 옹벽 보강 방법(2)은 자연석(10, 11, 12)들 각각의 후방에 순서대로 그리드(250), 전산볼트(142)와 케미컬앵커볼트(132)가 연결된 기초바(200) 및 그리드(260)가 배치되도록 시공이 가능하고, 그리드(250), 전산볼트(142)와 케미컬앵커볼트(132)가 연결된 기초바(200) 및 그리드(260)의 배열을 달리하여 다양하게 시공이 가능하다.That is, the method for reinforcing a retaining wall using natural stones (2) can be constructed so that a foundation bar (200) and a grid (260) connected to a grid (250), a computer bolt (142) and a chemical anchor bolt (132) are arranged in order behind each of the natural stones (10, 11, 12), and various constructions can be performed by changing the arrangement of the foundation bar (200) and the grid (260) connected to the grid (250), the computer bolt (142) and the chemical anchor bolt (132).

또한, 기초시공단계(S110)에서 진행되는 기초콘크리트(110) 및 보강콘크리트(120)는 자연석(10)뿐만 아니라 자연석(11, 12)의 후방에 시공될 수 있고, 지형에 따라, 기초바(200), 전산볼트(142, 144) 및 케미컬앵커볼트(132, 134) 대신에 케미컬앵커볼트(136) 및 그리드(250)만 자연석(10, 11, 12)의 후방에 시공될 수 있다.In addition, the foundation concrete (110) and reinforced concrete (120) performed in the foundation construction stage (S110) can be constructed not only on the natural stone (10) but also behind the natural stone (11, 12), and depending on the terrain, only the chemical anchor bolt (136) and grid (250) can be constructed behind the natural stone (10, 11, 12) instead of the foundation bar (200), the computer bolt (142, 144) and the chemical anchor bolt (132, 134).

이때, 자연석을 이용한 옹벽 보강 방법(2)의 시공단계는 기초시공단계(S110), 자연석설치단계(S120), 볼트고정단계(S180), 그리드연결단계(S190) 및 토사메움단계(S160)의 순서대로 진행될 수 있다.At this time, the construction stages of the method for reinforcing a retaining wall using natural stone (2) can be carried out in the following order: foundation construction stage (S110), natural stone installation stage (S120), bolt fixing stage (S180), grid connection stage (S190), and soil filling stage (S160).

도 5에 도시된 바와 같이, 상대적으로 상부에 배치되는 자연석(11)은 하부에 배치되는 자연석(10)들의 사이에 해당되는 위치에서 후방에 배치되어 자연석(10)들의 배면에 밀착되므로 하부에 배치되는 자연석(10)들에 의해 상부에 배치되는 자연석(11)이 안정적으로 고정되는 장점이 있다. As shown in Fig. 5, the natural stone (11) placed relatively higher is placed rearward at a position corresponding to the natural stones (10) placed lower, and is in close contact with the back surface of the natural stones (10), so there is an advantage in that the natural stone (11) placed higher is stably fixed by the natural stones (10) placed lower.

그리드(250)의 전방에 설치되는 그리드바(251)는 케이블타이를 통해 그리드(250)와 연결되고, 그리드(250, 260)들이 배치되는 공간에 채워지는 토사(170)는 그리드(250, 260)들의 위치를 견고하게 유지시킨다.The grid bar (251) installed in front of the grid (250) is connected to the grid (250) through a cable tie, and the soil (170) filled in the space where the grids (250, 260) are placed firmly maintains the positions of the grids (250, 260).

그리드(250, 260)들이 배치되는 위치에 채워지는 토사(170)의 상부에는 기초콘크리트(110) 및 보강콘크리트(120)가 타설될 수 있고, 이 경우, 기초콘크리트(110) 및 보강콘크리트(120)의 중량에 의해 그리드(250, 260)들이 안정적으로 고정되는 장점이 있다.Foundation concrete (110) and reinforced concrete (120) can be poured on top of the soil (170) that is filled in the location where the grids (250, 260) are placed. In this case, there is an advantage in that the grids (250, 260) are stably fixed by the weight of the foundation concrete (110) and reinforced concrete (120).

한편, 자연석(10)의 후방에는 기초바(200)가 상부로 관통하도록 그리드(250)가 배치되어 케미컬앵커볼트(136)를 통해 자연석(10)에 결합될 수 있고, 기초바(200)의 타단은 전산볼트(144) 및 케미컬앵커볼트(134)를 통해 자연석(10)과 결합될 수 있다.Meanwhile, a grid (250) is arranged at the rear of the natural stone (10) so that a foundation bar (200) can penetrate upward and be joined to the natural stone (10) through a chemical anchor bolt (136), and the other end of the foundation bar (200) can be joined to the natural stone (10) through a computerized bolt (144) and a chemical anchor bolt (134).

이 때 기초바(200) 및 그리드(250)가 동시에 배치되므로, 그리드(250)가 기초바(200)에 의해 전방 또는 후방 이동이 제한되어 토사(170) 내부에서 안정적으로 고정된다. At this time, since the foundation bar (200) and the grid (250) are placed simultaneously, the grid (250) is stably fixed inside the soil (170) by restricting forward or backward movement by the foundation bar (200).

또한, 자연석(10)의 후방에는 도 1의 네일철근(100), 전산볼트(140), 앵커판(150) 및 케미컬앵커볼트(130)가 기초바(200), 전산볼트(144) 및 케미컬앵커볼트(134)와 함께 배치될 수 있고, 추가로 그리드(250) 및 케미컬앵커볼트(136)가 배치될 수 있다.In addition, the nail reinforcement bar (100), the computer bolt (140), the anchor plate (150) and the chemical anchor bolt (130) of Fig. 1 can be placed at the rear of the natural stone (10) together with the foundation bar (200), the computer bolt (144) and the chemical anchor bolt (134), and additionally, a grid (250) and the chemical anchor bolt (136) can be placed.

따라서, 네일철근(100), 기초바(200) 및 그리드(250)가 동시에 자연석(10, 11, 12) 중 어느 하나의 후방에 함께 배치되어 안정적으로 자연석(10, 11, 12)을 고정시킬 수 있다.Accordingly, the nail reinforcement (100), the foundation bar (200), and the grid (250) can be simultaneously placed at the rear of one of the natural stones (10, 11, 12) to stably fix the natural stone (10, 11, 12).

이상 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 설명하였지만, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적인 것이 아닌 것으로서 이해되어야 하고, 본 발명의 범위는 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 등가 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.Although the preferred embodiments of the present invention have been described with reference to the attached drawings, the embodiments described in this specification and the configurations illustrated in the drawings are only the most preferred embodiments of the present invention and do not represent all of the technical ideas of the present invention, and it should be understood that there may be various equivalents and modified examples that can replace them at the time of this application. Therefore, it should be understood that the embodiments described above are exemplary and not restrictive in all respects, and the scope of the present invention is indicated by the claims described below rather than the detailed description, and all changes or modifications derived from the meaning and scope of the claims and the equivalent concepts should be interpreted as being included in the scope of the present invention.

1, 2: 자연석을 이용한 옹벽 보강 방법
10, 11, 12: 자연석
110: 기초콘크리트
120: 보강콘크리트
130: 케미컬앵커볼트
140: 전산볼트
150: 앵커판
160, 165: 클립
170: 토사
1, 2: Reinforcing a retaining wall using natural stone
10, 11, 12: Natural Stone
110: Foundation concrete
120: Reinforced concrete
130: Chemical anchor bolt
140: Computer Bolt
150: Anchor board
160, 165: Clip
170: Tosa

Claims (8)

지반에 기초부재를 시공하는 기초시공단계;
상기 기초부재의 상부에 자연석을 세우는 자연석설치단계;
상기 자연석의 후방에 앵커볼트를 고정시키는 볼트고정단계;
상기 기초부재에 전산볼트의 일단을 연결하는 전산볼트연결단계;
상기 전산볼트의 타단 및 상기 앵커볼트를 연결하는 앵커볼트연결단계; 및
상기 자연석의 후방에 토사를 메우는 토사메움단계;를 포함하며,
상기 기초시공단계는, 기초콘크리트 타설 후 상기 기초콘크리트가 경화되기 전 상하부로 연장된 기초바의 일측이 상기 기초콘크리트에 인서트 결합되고,
상기 전산볼트연결단계에서 아이너트는 일측이 돌출된 링 형태로 중공을 형성하여 중공을 통해 상기 기초바에 삽입결합되고 중공의 크기가 상기 기초바의 직경보다 커 경사각도가 조절되며 돌출된 부분이 너트 형태로 상기 전산볼트의 일단과 나사결합하고,
상기 기초콘크리트 경화 후 상기 기초바와 전산볼트의 일부와 상기 아이너트가 매몰되고 상기 기초바의 타측이 노출되도록 상기 기초콘크리트 위에 보강콘크리트가 타설되며,
상기 자연석의 하부는 상기 보강콘크리트가 경화되기 전에 상기 보강콘크리트에 인서트되고,
너트로 그리드바가 삽입결합되는 클립이 상기 앵커볼트에 결합되는 위치를 조절하여 상기 그리드바에 결합되는 그리드의 인장력을 조절하는 그리드연결단계;를 포함하며,
상기 클립은 일측이 개방된 링 형태로 이루어져 형성된 소정 공간에 그리드의 전방이 결합되는 상기 그리드바가 삽입결합되고 개방된 일측 양단이 돌출되어 돌출된 부분에 각각 상기 앵커볼트가 삽입되는 홀을 포함하여 상기 앵커볼트와 삽입결합하는 것을 특징으로 하는 자연석을 이용한 옹벽 보강 방법.
Foundation construction stage where foundation materials are constructed on the ground;
A natural stone installation step of erecting natural stones on top of the above foundation material;
Bolt fixing step for fixing an anchor bolt to the rear of the above natural stone;
A computer bolt connection step for connecting one end of a computer bolt to the above-mentioned base member;
An anchor bolt connection step for connecting the other end of the above computer bolt and the above anchor bolt; and
Includes a soil filling step for filling soil behind the above natural stone;
The above-mentioned basic construction step is, after pouring the basic concrete, before the basic concrete hardens, one side of the basic bar extending upwards and downwards is inserted and joined to the basic concrete.
In the above computer bolt connection step, the eye nut is formed in a hollow ring shape with one side protruding, and is inserted and connected to the base bar through the hollow, and the size of the hollow is larger than the diameter of the base bar so that the inclination angle is adjusted, and the protruding part is screw-connected with one end of the computer bolt in the form of a nut.
After the above foundation concrete has hardened, the above foundation bar and part of the computer bolt and the above eye nut are buried, and the other side of the above foundation bar is exposed, and reinforcing concrete is poured on the above foundation concrete.
The lower part of the above natural stone is inserted into the above reinforced concrete before the above reinforced concrete hardens,
A grid connection step for controlling the tensile force of a grid connected to the grid bar by adjusting the position at which a clip into which a grid bar is inserted and connected with a nut is connected to the anchor bolt;
A method for reinforcing a retaining wall using natural stone, characterized in that the clip is formed in a ring shape with one side open, the grid bar is inserted and joined to the front of the grid in a predetermined space, and the open one-side ends protrude and each protrudes, including a hole into which the anchor bolt is inserted, so as to be inserted and joined with the anchor bolt.
제1항에 있어서, 상기 기초시공단계는,
기초 및 보강콘크리트 타설하고, 상기 자연석의 후방에 형성된 경사지대의 경사면 절취한 후 네일철근을 삽입 및 그라우트 주입하는 것을 특징으로 하는 자연석을 이용한 옹벽 보강 방법.
In the first paragraph, the basic construction stage is
A method for reinforcing a retaining wall using natural stone, characterized by pouring foundation and reinforcing concrete, cutting the slope of the slope formed at the rear of the natural stone, inserting nail reinforcement bars, and injecting grout.
삭제delete 제1항에 있어서, 상기 전산볼트연결단계는,
상기 기초부재의 단부에 플레이트 형태의 앵커판을 너트 결합하고, 상기 기초부재에 인접한 위치에서 상기 앵커판 및 상기 전산볼트의 일단을 결합하는 것을 특징으로 하는 자연석을 이용한 옹벽 보강 방법.
In the first paragraph, the computer bolt connection step,
A method for reinforcing a retaining wall using natural stone, characterized by connecting a plate-shaped anchor plate with a nut to an end of the above foundation member, and connecting one end of the anchor plate and the above-mentioned computerized bolt at a position adjacent to the above-mentioned foundation member.
삭제delete 제1항에 있어서, 상기 앵커볼트연결단계는,
클립에 형성된 홀들 각각에 상기 전산볼트 및 앵커볼트의 단부를 관입한 후 상기 전산볼트 및 앵커볼트의 단부에 너트를 체결하는 것을 특징으로 하는 자연석을 이용한 옹벽 보강 방법.
In the first paragraph, the anchor bolt connection step,
A method for reinforcing a retaining wall using natural stone, characterized by inserting the ends of the computer bolts and anchor bolts into each of the holes formed in the clip and then fastening nuts to the ends of the computer bolts and anchor bolts.
삭제delete 제1항에 있어서,
상기 토사의 상부에서 상기 기초시공단계부터 상기 토사메움단계까지 반복 시공하는 것을 특징으로 하는 자연석을 이용한 옹벽 보강 방법.








In the first paragraph,
A method for reinforcing a retaining wall using natural stone, characterized in that construction is repeated from the foundation construction stage to the soil filling stage on top of the above soil.








KR1020210097472A 2021-07-26 2021-07-26 Method for reinforcing wall panel using natural rock KR102696621B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210097472A KR102696621B1 (en) 2021-07-26 2021-07-26 Method for reinforcing wall panel using natural rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210097472A KR102696621B1 (en) 2021-07-26 2021-07-26 Method for reinforcing wall panel using natural rock

Publications (2)

Publication Number Publication Date
KR20230016263A KR20230016263A (en) 2023-02-02
KR102696621B1 true KR102696621B1 (en) 2024-08-19

Family

ID=85225468

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210097472A KR102696621B1 (en) 2021-07-26 2021-07-26 Method for reinforcing wall panel using natural rock

Country Status (1)

Country Link
KR (1) KR102696621B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101206668B1 (en) * 2012-02-07 2012-11-29 김진호 Multilayer revetment structure using natural strones
KR101869060B1 (en) 2017-08-02 2018-07-19 더베스트테크 주식회사 Retaining wall using block
KR102118320B1 (en) 2020-02-17 2020-06-03 더베스트테크 주식회사 Retaining Wall Structure with Muck Pile and Retaining Wall Construction Method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101378123B1 (en) * 2012-07-18 2014-03-24 김창식 Retaining Wall Having Natural Rock And Construction Method Thereof
KR101499422B1 (en) * 2013-07-16 2015-03-05 손화윤 safety embankment cutting slope construction method
KR101528725B1 (en) 2014-09-23 2015-06-15 주식회사 대목환경건설 The slope reinforcement method using natural stone
KR101530871B1 (en) 2015-01-09 2015-06-23 이재경 Retaining Wall Having Natural Rock And Construction Method Thereof
KR102185956B1 (en) * 2019-01-24 2020-12-02 정재윤 Fastening apparatus for retaining wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101206668B1 (en) * 2012-02-07 2012-11-29 김진호 Multilayer revetment structure using natural strones
KR101869060B1 (en) 2017-08-02 2018-07-19 더베스트테크 주식회사 Retaining wall using block
KR102118320B1 (en) 2020-02-17 2020-06-03 더베스트테크 주식회사 Retaining Wall Structure with Muck Pile and Retaining Wall Construction Method

Also Published As

Publication number Publication date
KR20230016263A (en) 2023-02-02

Similar Documents

Publication Publication Date Title
US6536181B1 (en) Composite retaining wall and construction method for underground structure
KR101058520B1 (en) Earth retaining wall using phc pile and construction method of the same
KR101212972B1 (en) Retaining wall using multi reinforcment and construction method thereof
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
JP6703845B2 (en) Foundation structure
JP4433066B2 (en) Wall structure with permanent anchor construction, wall construction method with permanent anchor construction,
KR20110077334A (en) Retaining wall structure and construction method of the retaining wall structure
KR101682510B1 (en) Construction method of retaining wall to secure safety using PC panel and permanent anchor
KR102696621B1 (en) Method for reinforcing wall panel using natural rock
JP6166072B2 (en) Earth retaining structure and earth retaining method
KR101521946B1 (en) Enlarged capital of steel framed reinforced concrete column
KR102476068B1 (en) Retaining wall structure with multidirectional anchor fixtures and construction method thereof
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
KR102696620B1 (en) Construction method of reinforced wall panel using beam
KR102382845B1 (en) Thrust pile with prestress and self-supporting type pile construction using it
KR102702162B1 (en) Construction method of reinforced wall panel using rebar
JP7230313B2 (en) Basement structure and construction method of basement
KR20140006345A (en) Top down method and building construction using the same
KR101298399B1 (en) Support for a upper reinforcing bar of footings
KR102535321B1 (en) Girder it stops for the top down construction of the underground structure
KR102652376B1 (en) Method for forming retaining wall using impermeable wall and earth anchor with improved support strength
JP7501868B2 (en) Retaining wall construction method
KR102613254B1 (en) Self-standing fixing type pile and construction method of earth retaining facilities including it
JP2509162B2 (en) Slope stable structure as in-plane structure
KR102657300B1 (en) Panel type retaining wall construction method using color panel and retaining wall

Legal Events

Date Code Title Description
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant