KR102606905B1 - Transformer and high voltage switchgear - Google Patents
Transformer and high voltage switchgear Download PDFInfo
- Publication number
- KR102606905B1 KR102606905B1 KR1020230074469A KR20230074469A KR102606905B1 KR 102606905 B1 KR102606905 B1 KR 102606905B1 KR 1020230074469 A KR1020230074469 A KR 1020230074469A KR 20230074469 A KR20230074469 A KR 20230074469A KR 102606905 B1 KR102606905 B1 KR 102606905B1
- Authority
- KR
- South Korea
- Prior art keywords
- terminal
- coil
- electrically connected
- connection
- secondary side
- Prior art date
Links
- 238000004804 winding Methods 0.000 claims abstract description 11
- 238000005259 measurement Methods 0.000 claims abstract description 7
- 230000007935 neutral effect Effects 0.000 claims description 25
- 230000009466 transformation Effects 0.000 claims 6
- 238000010586 diagram Methods 0.000 description 12
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 10
- 238000009434 installation Methods 0.000 description 8
- 230000005611 electricity Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007850 degeneration Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F38/00—Adaptations of transformers or inductances for specific applications or functions
- H01F38/20—Instruments transformers
- H01F38/22—Instruments transformers for single phase ac
- H01F38/28—Current transformers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R15/00—Details of measuring arrangements of the types provided for in groups G01R17/00 - G01R29/00, G01R33/00 - G01R33/26 or G01R35/00
- G01R15/14—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks
- G01R15/18—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using inductive devices, e.g. transformers
- G01R15/183—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using inductive devices, e.g. transformers using transformers with a magnetic core
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/42—Circuits specially adapted for the purpose of modifying, or compensating for, electric characteristics of transformers, reactors, or choke coils
- H01F27/422—Circuits specially adapted for the purpose of modifying, or compensating for, electric characteristics of transformers, reactors, or choke coils for instrument transformers
- H01F27/427—Circuits specially adapted for the purpose of modifying, or compensating for, electric characteristics of transformers, reactors, or choke coils for instrument transformers for current transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/015—Boards, panels, desks; Parts thereof or accessories therefor
- H02B1/04—Mounting thereon of switches or of other devices in general, the switch or device having, or being without, casing
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)
Abstract
본 발명은 수전용 변압기 및 이를 포함하는 고압 수배전반 설비에 관한 것으로서, 상기 수전용 변압기는 대전류가 소전류로 변환된 변성 전류를 출력하는 복수의 계기용 변류기들; 상기 복수의 계기용 변류기들과 전기적으로 연결되며 제 1 결선을 갖는 1차측 코일들을 포함하는 1차측 권선부; 상기 제 1 결선과 다르거나 동일한 제 2 결선을 갖는 복수의 2차측 코일들을 포함하는 2차측 권선부; 및 상기 2차측 권선부의 2차측 코일들과 한전계량기와 연결된 중계단자 사이를 연결하는 제 1 연결 배선을 포함하며, 상기 2차측 코일들에 고전압이 저전압으로 변환된 변성 전압이 유도되며, 상기 고전압과 상기 대전류는 한전으로부터 수용가로 공급되는 특고압이고, 상기 저전압과 상기 소전류는 변성 출력으로서 상기 한전계량기의 계측을 위해 상기 한전계량기로 공급될 수 있다. The present invention relates to a power reception transformer and a high-voltage switchgear facility including the same, wherein the power reception transformer includes a plurality of instrument current transformers that output a modified current in which a large current is converted into a small current; a primary winding unit electrically connected to the plurality of instrument current transformers and including primary coils having a first connection; a secondary winding unit including a plurality of secondary coils having a second connection that is different from or the same as the first connection; and a first connection wire connecting the secondary coils of the secondary winding unit and a relay terminal connected to the KEPCO meter, wherein a transformed voltage obtained by converting a high voltage into a low voltage is induced in the secondary coils, and the high voltage and The large current is an extra high voltage supplied from KEPCO to the customer, and the low voltage and the small current are modified outputs and can be supplied to the KEPCO meter for measurement by the KEPCO meter.
Description
본 발명은 전기 설비에 관한 것으로서, 더욱 상세하게는 수전용 변압기 및 이를 포함하는 고압 수배전반 설비에 관한 것이다.The present invention relates to electrical equipment, and more specifically, to power receiving transformers and high-voltage switchgear equipment including the same.
고압의 전기를 수용가에 공급하기 위해서 고압 수배전반 설비가 설치될 수 있다. 일반적으로 상기 고압 수배전반 설비는 자동 고장 구간 개폐기(Air Insulated Section Switch(AISS) 또는 Auto Section Switch(ASS)), 계기용 변성기(Metering Out Fit: MOF), 변압기(Transformer: TR) 및 한전계량기(예, 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 같은 사업자 측정 장치)로 구성될 수 있다. 상기 AISS는 고장 구간을 구분 분리하는 스위치로서, 공급 신뢰도 향상과 수용가의 정전사고를 방지를 위해서 수용가에 사고를 자동 분리하여 상기 정전사고의 파급 확대 방지의 목적으로 사용될 수 있다. 상기 MOF는 수전되는 고전압(예: 3상 22.9kV AC 또는 3상 22.5kV AC, 60Hz) 및 대전류를 상기 한전계량기에서 사용하는 저전압(예: 110V)과 소전류로 변성하여 상기 저전압 및 상기 소전류를 상기 한전계량기로 제공한다. 한편, 상기 고전압 및 상기 대전류는 상기 MOF에 의해 상기 저전압 및 상기 소전류로 변성되며 동시에 일부 상기 변압기로 제공될 수 있다. 상기 변압기는 상기 고전압을 3상 또는 단상 380V 및 220V로 변환할 수 있다. 상기 변압기의 결선 방식은 필요에 따라 Δ-Δ, Δ-Y, Y-Y, Y-Δ, 단상-단상 결선 방식을 포함하여 3상의 고전압을 380V 또는 220V로 적절하게 변환할 수 있다. 그리고 상기 한전계량기는 전력량을 측정하는 장치로서, 전압 및 전류, 역률을 측정하여 유효 소모 전력량과 무효 소모 전력량을 계산 및 표시할 수 있다. 구체적으로, 상기 한전계량기는 상기 MOF에 의해 변성된 전압 및 전류(이하, 변성 출력이라 지칭함)를 제공받아 유·무효 전력을 산출 및 표시할 수 있다. 상기 변성 출력은 MOF에서 유·무효 전력을 측정할 수 있게 변환된 전압과 전류 출력을 지칭한다.High-voltage switchgear facilities may be installed to supply high-voltage electricity to consumers. In general, the high-voltage switchgear equipment includes an automatic fault section switch (Air Insulated Section Switch (AISS) or Auto Section Switch (ASS)), a metering out fit (MOF), a transformer (TR), and an electric power meter (e.g. , it can be composed of operator measurement devices such as peak demand meter (DM), reactive power meter (VAR), reactive power meter (VARH), and integrated power meter (WH). The AISS is a switch that classifies and separates fault sections, and can be used to prevent the spread of power outages by automatically separating faults to customers in order to improve supply reliability and prevent power outages at customers. The MOF transforms the high voltage (e.g., 3-phase 22.9kV AC or 3-phase 22.5kV AC, 60Hz) and large current received into the low voltage (e.g., 110V) and small current used in the KEPCO meter, and the low voltage and the small current is provided by the KEPCO meter. Meanwhile, the high voltage and the large current are converted into the low voltage and the small current by the MOF and can be provided to some of the transformers at the same time. The transformer can convert the high voltage into three-phase or single-phase 380V and 220V. The wiring method of the transformer can appropriately convert three-phase high voltage to 380V or 220V, including Δ-Δ, Δ-Y, Y-Y, Y-Δ, and single-phase-single-phase wiring, as needed. And the KEPCO meter is a device that measures the amount of power, and can calculate and display the amount of active power consumption and the amount of reactive power consumption by measuring voltage, current, and power factor. Specifically, the KEPCO meter can receive voltage and current transformed by the MOF (hereinafter referred to as transformed output) and calculate and display active and reactive power. The transformed output refers to the converted voltage and current output so that active and reactive power can be measured in the MOF.
그러나, 상기 MOF는 독립된 장치로 별도의 비용으로 제작되어 설치되고 수배전반이 설치되는 장소에 추가의 설치 공간을 필요로 하여 수용가의 시설물에 설치 시 이를 위한 공간을 확보하기가 어렵고 비용이 많이 소요되는 문제점이 있다.However, the MOF is an independent device that is manufactured and installed at a separate cost and requires additional installation space at the location where the switchgear is installed, making it difficult to secure space for it when installed in the customer's facility, which is a problem that costs a lot of money. There is.
또한 상기 MOF와 변압기(TR) 각각의 부피 및 절연 거리 유지 확보 등의 이유로 수배전반의 콤팩트화를 이루는데 한계가 있으며, 상기 MOF와 상기 변압기(TR)를 별도로 제작하기 때문에 제작에 소요되는 부품의 증가로 인한 수배전반의 설치비용이 증가할 수 있다.In addition, there are limitations in achieving compactness of the switchgear due to the need to maintain the volume and insulation distance of the MOF and the transformer (TR), and because the MOF and the transformer (TR) are manufactured separately, the number of parts required for manufacturing increases. This may increase the installation cost of the switchboard.
본 발명이 해결하고자 하는 기술적 과제는, 고압 수배전반의 설치 공간을 최소화하며 수배전반을 콤팩트화 하여 설치 비용을 개선시키는 수전용 변압기를 제공하는 것이다.The technical problem to be solved by the present invention is to provide a power receiving transformer that minimizes the installation space of the high-voltage switchboard and improves installation costs by making the switchboard compact.
또한, 전술한 수전용 변압기를 포함하는 고압 수배전반 설비를 제공하는 것이다.In addition, a high-voltage switchgear facility including the above-described power receiving transformer is provided.
본 발명의 일 실시예에 따르면, 대전류가 소전류로 변환된 변성 전류를 출력하는 복수의 계기용 변류기들; 상기 복수의 계기용 변류기들과 전기적으로 연결되며 제 1 결선을 갖는 1차측 코일들을 포함하는 1차측 권선부; 상기 제 1 결선과 다르거나 동일한 제 2 결선을 갖는 복수의 2차측 코일들을 포함하는 2차측 권선부; 및 상기 2차측 권선부의 2차측 코일들과 한전계량기와 연결된 중계단자 사이를 연결하는 제 1 연결 배선을 포함하며, 상기 2차측 코일들에 고전압이 저전압으로 변환된 변성 전압이 유도되며, 상기 고전압과 상기 대전류는 한전으로부터 수용가로 공급되는 특고압이고, 상기 저전압과 상기 소전류는 변성 출력으로서 상기 한전계량기의 계측을 위해 상기 한전계량기로 공급되는 수전용 변압기가 제공될 수 있다.According to one embodiment of the present invention, a plurality of instrument current transformers that output a modified current in which a large current is converted into a small current; a primary winding unit electrically connected to the plurality of instrument current transformers and including primary coils having a first connection; a secondary winding unit including a plurality of secondary coils having a second connection that is different from or the same as the first connection; and a first connection wire connecting the secondary coils of the secondary winding unit and a relay terminal connected to the KEPCO meter, wherein a transformed voltage obtained by converting a high voltage into a low voltage is induced in the secondary coils, and the high voltage and The large current is an extra high voltage supplied from KEPCO to the consumer, and the low voltage and the small current are transformed outputs. A power receiving transformer supplied to the KEPCO meter may be provided for measurement by the KEPCO meter.
일 실시예에 따르면, 상기 제 1 결선이 델타(Δ) 결선이고 상기 제 2 결선이 Y 결선인 경우, 1차측 제 1 코일의 제 2 단자는 1차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 2 단자는 1차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되고, 2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고, 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자, 및 상기 2차측 제 3 코일의 제 2 단자는 접지단자와 연결되며, 상기 제 1 연결 배선은 상기 2차측 제 1 코일 상에 배치된 제 1 탭(tap)과 상기 중계단자의 P1 단자를 연결하는 제 1 배선, 상기 2차측 제 2 코일 상에 배치된 제 2 탭(tap)과 상기 중계단자의 P2 단자를 연결하는 제 2 배선, 상기 2차측 제 3 코일 상에 배치된 제 3 탭(tap)과 상기 중계단자의 P3 단자를 연결하는 제 3 배선 및 상기 접지단자와 연결된 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자 및 상기 2차측 제 3 코일의 제 2 단자와 상기 중계단자의 P0 단자를 연결하는 제 4 배선을 포함할 수 있다. 상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결될 수 있다. 상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 저전압보다 높을 수 있다. According to one embodiment, when the first connection is a delta (Δ) connection and the second connection is a Y connection, the second terminal of the first coil on the primary side is electrically connected to the first terminal of the second coil on the primary side. , the second terminal of the second coil on the primary side is electrically connected to the first terminal of the third coil on the primary side, and the second terminal of the third coil on the primary side is electrically connected to the first terminal of the first coil on the primary side. The first terminal of the first coil on the secondary side is electrically connected to the first output terminal, the first terminal of the second coil on the secondary side is electrically connected to the second output terminal, and the first terminal of the third coil on the secondary side is electrically connected to the first output terminal. It is electrically connected to a third output terminal, and the second terminal of the first coil on the secondary side, the second terminal of the second coil on the secondary side, and the second terminal of the third coil on the secondary side are connected to a ground terminal, The first connection wire is a first wire connecting a first tab disposed on the first coil of the secondary side and the P1 terminal of the relay terminal, and a second tab disposed on the second coil of the secondary side. ) and a second wire connecting the P2 terminal of the relay terminal, a third wire connecting a third tab disposed on the third coil of the secondary side and the P3 terminal of the relay terminal, and a third wire connected to the ground terminal. It may include a fourth wire connecting the second terminal of the secondary first coil, the second terminal of the secondary second coil, the second terminal of the secondary third coil, and the P0 terminal of the relay terminal. . The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer, and the first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer. It is electrically connected, and the first terminal of the third coil on the primary side may be electrically connected to the third input terminal through a third instrument current transformer. The line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal may be higher than the low voltage.
일 실시예에 따르면, 상기 제 1 결선이 델타(Δ) 결선이고 상기 제 2 결선이 델타(Δ) 결선인 경우, 1차측 제 1 코일의 제 2 단자는 1차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 2 단자는 1차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되고, 2차측 제 1 코일의 제 2 단자는 2차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 2차측 제 2 코일의 제 2 단자는 2차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 2차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되며, 상기 2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 상기 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 상기 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고, 2차측 제 4 코일의 제 1 단자는 상기 중계단자의 P1 단자와 전기적 연결되고, 2차측 제 5 코일의 제 1 단자는 상기 중계단자의 P2 단자와 전기적 연결되고, 2차측 제 6 코일의 제 1 단자는 상기 중계단자의 P3 단자와 전기적 연결되고, 상기 2차측 제 4 코일의 제 2 단자, 상기 2차측 제 5 코일의 제 2 단자 및 상기 2차측 제 6 코일의 제 2 단자는 중성점과 연결되며, 상기 제 1 연결 배선은 상기 2차측 제 4 코일. 제 5 코일 및 제 6 코일의 Y 결선을 포함할 수 있다. 상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결될 수 있다. 상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 저전압보다 높을 수 있다.According to one embodiment, when the first connection is a delta (Δ) connection and the second connection is a delta (Δ) connection, the second terminal of the first coil on the primary side is connected to the first terminal of the second coil on the primary side. electrically connected, the second terminal of the second coil on the primary side is electrically connected to the first terminal of the third coil on the primary side, and the second terminal of the third coil on the primary side is the first terminal of the first coil on the primary side. is electrically connected to, the second terminal of the first coil on the secondary side is electrically connected to the first terminal of the second coil on the secondary side, and the second terminal of the second coil on the secondary side is electrically connected to the first terminal of the third coil on the secondary side. electrically connected, the second terminal of the secondary third coil is electrically connected to the first terminal of the primary first coil, and the first terminal of the secondary first coil is electrically connected to the first output terminal, The first terminal of the second coil on the secondary side is electrically connected to the second output terminal, the first terminal of the third coil on the secondary side is electrically connected to the third output terminal, and the first terminal of the fourth coil on the secondary side is electrically connected to the third output terminal. It is electrically connected to the P1 terminal of the relay terminal, the first terminal of the fifth coil on the secondary side is electrically connected to the P2 terminal of the relay terminal, and the first terminal of the sixth coil on the secondary side is electrically connected to the P3 terminal of the relay terminal. connected, the second terminal of the fourth coil on the secondary side, the second terminal of the fifth coil on the secondary side, and the second terminal of the sixth coil on the secondary side are connected to a neutral point, and the first connection wire is connected to the secondary side. 4th coil. It may include a Y connection of the fifth coil and the sixth coil. The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer, and the first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer. It is electrically connected, and the first terminal of the third coil on the primary side may be electrically connected to the third input terminal through a third instrument current transformer. The line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal may be higher than the low voltage.
일 실시예에 따르면, 상기 제 1 결선이 Y 결선이고 상기 제 2 결선이 Y 결선인 경우, 1차측 제 1 코일의 제 1 단자는 제 1 입력 단자와 전기적 연결되고, 1차측 제 2 코일의 제 1 단자는 제 2 입력 단자와 전기적 연결되고, 1차측 제 3 코일의 제 1 단자는 제 3 입력 단자와 전기적 연결되고, 상기 1차측 제 1 코일의 제 2 단자, 상기 1차측 제 2 코일의 제 2 단자 및 상기 1차측 제 3 코일의 제 2 단자는 제 1 중성점과 연결되며, 2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고, 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자, 및 상기 2차측 제 3 코일의 제 2 단자는 제 2 중성점과 연결되며, 상기 제 1 연결 배선은 상기 2차측 제 1 코일 상에 배치된 제 1 탭(tap)과 상기 중계단자의 P1 단자를 연결하는 제 1 배선, 상기 2차측 제 2 코일 상에 배치된 제 2 탭(tap)과 상기 중계단자의 P2 단자를 연결하는 제 2 배선, 상기 2차측 제 3 코일 상에 배치된 제 3 탭(tap)과 상기 중계단자의 P3 단자를 연결하는 제 3 배선 및 상기 제 2 중성점과 상기 중계단자의 P0 단자를 연결하는 제 4 배선을 포함할 수 있다. 상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결될 수 있다. 상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 저전압보다 높을 수 있다.According to one embodiment, when the first connection is a Y connection and the second connection is a Y connection, the first terminal of the first coil on the primary side is electrically connected to the first input terminal, and the first terminal of the second coil on the primary side is electrically connected to the first input terminal. 1 terminal is electrically connected to the second input terminal, the first terminal of the third coil on the primary side is electrically connected to the third input terminal, the second terminal of the first coil on the primary side, the second terminal of the second coil on the primary side 2 terminal and the second terminal of the third coil on the primary side are connected to the first neutral point, the first terminal of the first coil on the secondary side is electrically connected to the first output terminal, and the first terminal of the second coil on the secondary side is electrically connected to the first neutral point. It is electrically connected to a second output terminal, and the first terminal of the secondary third coil is electrically connected to the third output terminal, the second terminal of the secondary first coil, the second terminal of the secondary second coil, And the second terminal of the third coil on the secondary side is connected to a second neutral point, and the first connection wire connects a first tab disposed on the first coil on the secondary side and the P1 terminal of the relay terminal. A first wire connecting a second tab disposed on the second coil of the secondary side and the P2 terminal of the relay terminal, a third tab disposed on the third coil of the secondary side ) and a third wire connecting the P3 terminal of the relay terminal and a fourth wire connecting the second neutral point and the P0 terminal of the relay terminal. The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer, and the first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer. It is electrically connected, and the first terminal of the third coil on the primary side may be electrically connected to the third input terminal through a third instrument current transformer. The line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal may be higher than the low voltage.
일 실시예에서, 상기 복수의 계기용 변류기들의 변성 전류를 상기 중계단자로 공급하는 제 2 연결 배선을 포함할 수 있다. 상기 제 2 연결 배선은 제 1 계기용 변류기의 제 1 출력단자와 상기 중계단자의 1S 단자를 연결하는 제 5 배선, 제 2 계기용 변류기의 제 1 출력단자와 상기 중계단자의 2S 단자를 연결하는 제 6 배선, 제 3 계기용 변류기의 제 1 출력단자와 상기 중계단자의 3S 단자를 연결하는 제 7 배선, 상기 제 1 계기용 변류기의 제 2 출력단자와 상기 중계단자의 1L 단자를 연결하는 제 8 배선, 상기 제 2 계기용 변류기의 제 2 출력단자와 상기 중계단자의 2L 단자를 연결하는 제 9 배선 및 상기 제 3 계기용 변류기의 제 2 출력단자와 상기 중계단자의 3L 단자를 연결하는 제 10 배선을 포함할 수 있다.In one embodiment, it may include a second connection wire that supplies the degeneration current of the plurality of instrument current transformers to the relay terminal. The second connection wire is a fifth wire connecting the first output terminal of the first instrument current transformer and the 1S terminal of the relay terminal, and a fifth wire connecting the first output terminal of the second instrument current transformer and the 2S terminal of the relay terminal. 6th wiring, 7th wiring connecting the 1st output terminal of the 3rd instrument current transformer and the 3S terminal of the relay terminal, and 7th wiring connecting the 2nd output terminal of the 1st instrument current transformer and the 1L terminal of the relay terminal. 8 wiring, a 9th wiring connecting the 2nd output terminal of the second instrument current transformer and the 2L terminal of the relay terminal, and a 9th wiring connecting the 2nd output terminal of the third instrument current transformer and the 3L terminal of the relay terminal. May contain 10 wires.
일 실시예에서, 상기 한전계량기는 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 또는 이들의 조합을 포함할 수 있다.In one embodiment, the KEPCO meter may include a peak demand meter (DM), a reactive power meter (VAR), a reactive power meter (VARH), a total power meter (WH), or a combination thereof.
본 발명의 다른 실시예에 따르면, 전술한 수전용 변압기를 포함하는 고압 수배전반 설비가 제공될 수 있다.According to another embodiment of the present invention, a high-voltage switchgear facility including the above-described power receiving transformer can be provided.
본 발명의 일 실시예에 따르면, 고압 수배전반에 별도의 MOF 장치 대신 변압기의 2차측 코일이 계기용 변압기 기능을 갖도록 변압기의 2차측 코일들과 한전계량기와 연결된 중계단자 사이를 연결하는 제 1 연결 배선을 포함함으로써, 고압 수배전반의 설치 공간을 최소화하며 수배전반을 콤팩트화 하여 소요되는 부품 및 설치 비용을 개선시키는 수전용 변압기를 제공할 수 있다.According to one embodiment of the present invention, instead of a separate MOF device in the high-voltage switchgear, the first connection wire connecting the secondary coils of the transformer and the relay terminal connected to the KEPCO meter so that the secondary coil of the transformer has the function of an instrument transformer. By including, it is possible to provide a power receiving transformer that minimizes the installation space of the high-voltage switchgear and improves the parts and installation costs by making the switchboard compact.
또한, 변압기와 MOF를 하나의 함체에 수용 가능함으로써 고압 수배전반의 콤팩트화를 실현할 수 있어 도심 등 협소한 장소에도 용이하게 고압 수배전반을 설치할 수 있다.In addition, since the transformer and MOF can be accommodated in one enclosure, compaction of the high-voltage switchgear can be realized, making it possible to easily install the high-voltage switchgear even in narrow places such as the city center.
또한, 본 발명의 다른 실시예에 따르면, 전술한 이점을 갖는 고압 수배전반 설비가 제공될 수 있다.Additionally, according to another embodiment of the present invention, a high-voltage switchgear facility having the above-described advantages can be provided.
도 1a와 도 1b는 본 발명의 제 1 실시예에 따른 수전용 변압기의 회로 결선도이다.
도 1c는 도 1a와 도 1b의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다.
도 2a와 도 2b는 본 발명의 제 2 실시예에 따른 수전용 변압기의 회로 결선도이다.
도 2c는 도 2a와 도 2b의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다.
도 3a 내지 도 3c는 본 발명의 제 3 실시예에 따른 수전용 변압기의 회로 결선도이다.
도 3d는 도 3a 내지 도 3c의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다.1A and 1B are circuit wiring diagrams of a power receiving transformer according to the first embodiment of the present invention.
FIG. 1C is a diagram showing one of three transformers constituting the power receiving transformer of FIGS. 1A and 1B.
Figures 2a and 2b are circuit wiring diagrams of a power receiving transformer according to a second embodiment of the present invention.
FIG. 2C is a diagram showing one of three transformers constituting the power receiving transformer of FIGS. 2A and 2B.
3A to 3C are circuit wiring diagrams of a power receiving transformer according to a third embodiment of the present invention.
FIG. 3D is a diagram showing one of three transformers constituting the power receiving transformer of FIGS. 3A to 3C.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings.
본 발명의 실시예들은 당해 기술 분야에서 통상의 지식을 가진 자에게 본 발명을 더욱 완전하게 설명하기 위하여 제공되는 것이며, 하기 실시예는 여러 가지 다른 형태로 변형될 수 있으며, 본 발명의 범위가 하기 실시예에 한정되는 것은 아니다. 오히려, 이들 실시예는 본 개시를 더욱 충실하고 완전하게 하고, 당업자에게 본 발명의 사상을 완전하게 전달하기 위하여 제공되는 것이다. The embodiments of the present invention are provided to more completely explain the present invention to those skilled in the art, and the following examples may be modified into various other forms, and the scope of the present invention is as follows. It is not limited to examples. Rather, these embodiments are provided to make the disclosure more faithful and complete, and to fully convey the spirit of the invention to those skilled in the art.
도면에서 동일 부호는 동일한 요소를 지칭한다. 또한, 본 명세서에서 사용된 바와 같이, 용어 "및/또는"은 해당 열거된 항목 중 어느 하나 및 하나 이상의 모든 조합을 포함한다.In the drawings, like symbols refer to like elements. Additionally, as used herein, the term “and/or” includes any one and all combinations of one or more of the corresponding listed items.
본 명세서에서 사용된 용어는 실시예를 설명하기 위하여 사용되며, 본 발명의 범위를 제한하기 위한 것이 아니다. 또한, 본 명세서에서 단수로 기재되어 있다 하더라도, 문맥상 단수를 분명히 지적하는 것이 아니라면, 복수의 형태를 포함할 수 있다. 또한, 본 명세서에서 사용되는 "포함한다(comprise)" 및/또는 "포함하는(comprising)"이란 용어는 언급한 형상들, 숫자, 단계, 동작, 부재, 요소 및/또는 이들 그룹의 존재를 특정하는 것이며, 다른 형상, 숫자, 동작, 부재, 요소 및/또는 그룹들의 존재 또는 부가를 배제하는 것이 아니다.The terms used herein are used to describe examples and are not intended to limit the scope of the invention. In addition, even if described in the specification as a singular number, plural forms may be included unless the context clearly indicates singularity. Additionally, as used herein, the terms "comprise" and/or "comprising" specify the presence of stated features, numbers, steps, operations, members, elements and/or groups thereof. It does not exclude the presence or addition of other shapes, numbers, movements, members, elements and/or groups.
또한, 당해 기술 분야에서 숙련된 자들에게 있어서, 다른 형상에 "인접하여(adjacent)" 배치된 구조 또는 형상은 상기 인접하는 형상에 중첩되거나 하부에 배치되는 부분을 가질 수도 있다. Additionally, for those skilled in the art, a structure or shape disposed “adjacent” to another shape may have a portion that overlaps or is disposed beneath the adjacent shape.
본 명세서에서, "아래로(below)", "위로(above)", "상부의(upper)", "하부의(lower)", "수평의(horizontal)" 또는 "수직의(vertical)"와 같은 상대적 용어들은, 도면들 상에 도시된 바와 같이, 일 구성 부재, 층 또는 영역들이 다른 구성 부재, 층 또는 영역과 갖는 관계를 기술하기 위하여 사용될 수 있다. 이들 용어들은 도면들에 표시된 방향뿐만 아니라 소자의 다른 방향들도 포괄하는 것임을 이해하여야 한다.As used herein, “below,” “above,” “upper,” “lower,” “horizontal,” or “vertical.” Relative terms such as may be used to describe the relationship that one component, layer or region has with another component, layer or region, as shown in the drawings. It should be understood that these terms encompass not only the directions indicated in the drawings, but also other directions of the device.
이하에서, 본 발명의 실시예들은 본 발명의 이상적인 실시예들(및 중간 구조들)을 개략적으로 도시하는 단면도들을 참조하여 설명될 것이다. 이들 도면들에 있어서, 예를 들면, 부재들의 크기와 형상은 설명의 편의와 명확성을 위하여 과장될 수 있으며, 실제 구현시, 도시된 형상의 변형들이 예상될 수 있다. 따라서, 본 발명의 실시예는 본 명세서에 도시된 영역의 특정 형상에 제한된 것으로 해석되어서는 아니 된다. 또한, 도면의 부재들의 참조 부호는 도면 전체에 걸쳐 동일한 부재를 지칭한다.Hereinafter, embodiments of the invention will be described with reference to cross-sectional views schematically showing ideal embodiments (and intermediate structures) of the invention. In these drawings, for example, the size and shape of members may be exaggerated for convenience and clarity of explanation, and in actual implementation, variations in the depicted shapes may be expected. Accordingly, embodiments of the present invention should not be construed as limited to the specific shape of the area shown herein. Additionally, reference signs for members in the drawings refer to the same members throughout the drawings.
본 발명은 대전류가 소전류로 변환된 전류(이하 변성 전류라 칭함)를 출력하는 복수의 계기용 변류기들, 상기 복수의 계기용 변류기들과 전기적으로 연결되며 제 1 결선을 갖는 1차측 코일들을 포함하는 1차측 권선부, 상기 제 1 결선과 다르거나 동일한 제 2 결선을 갖는 2차측 코일들을 포함하는 2차측 권선부 및 상기 2차측 코일들과 한전계량기의 단자 사이를 연결하는 제 1 연결 배선을 포함하며, 상기 2차측 코일들에 고전압이 저전압으로 변환된 변성 전압이 유도되며, 상기 고전압과 상기 대전류는 한전으로부터 수용가로 공급되는 특고압이고, 상기 저전압과 상기 소전류는 변성 출력으로서 최대수요 전력량, 무효 전력, 무효 전력량을 계측하기 위해 상기 한전계량기로 공급될 수 있다.The present invention includes a plurality of instrument current transformers that output a current converted from a large current to a small current (hereinafter referred to as deformed current), and primary coils that are electrically connected to the plurality of instrument current transformers and have a first connection. It includes a primary side winding section, a secondary side winding section including secondary side coils having a second connection that is different from or the same as the first connection, and a first connection line connecting between the secondary side coils and the terminal of the electricity meter. In the secondary coils, a transformed voltage obtained by converting the high voltage to a low voltage is induced. The high voltage and the large current are extra high voltages supplied from KEPCO to customers, and the low voltage and the small current are the transformed output, which is the maximum demand power, It can be supplied to the KEPCO meter to measure reactive power and the amount of reactive power.
도 1a와 도 1b는 본 발명의 제 1 실시예에 따른 수전용 변압기의 회로 결선도이고, 도 1c는 도 1a와 도 1b의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다. 상기 3개의 변압기는 3개의 단상 변압기 또는 1개의 3상 변압기로 구성될 수 있다. 바람직하게 도 1a와 도 1b에서는 상기 3개의 변압기는 1개의 3상 변압기일 수 있다.FIGS. 1A and 1B are circuit wiring diagrams of the power receiving transformer according to the first embodiment of the present invention, and FIG. 1C is a diagram showing one of three transformers constituting the power receiving transformer of FIGS. 1A and 1B. The three transformers may be comprised of three single-phase transformers or one three-phase transformer. Preferably, in FIGS. 1A and 1B, the three transformers may be one three-phase transformer.
도 1a와 도 1b를 참조하면, 수전용 변압기(100)는 입력단(IT), 출력단(OT), 3개의 1차측 코일(C11, C12, C13)과 3개의 2차측 코일(C21, C22, C23) 및 3개의 1차측 코일(C11, C12, C13)과 각각 결합되는 계기용 변류기(CT1, CT2, CT3: current transformer)를 포함할 수 있다. 입력단(IT)은 3개의 입력단자(L1, L2, L3)를 가지며, 출력단(OT)은 4개의 출력단자(LV1, LV2, LV3, E)를 포함할 수 있다. 3개의 입력단자(L1, L2, L3)는 한전으로부터 3상 전력을 공급받는 단자로서, 각각 a상, b상, c상(또는 R-S-T 상 또는 u-v-w)을 갖는다. 3개의 출력 단자(LV1, LV2, LV3)는 각각 입력단자(L1, L2, L3)에 대응되는 출력 단자이고, 출력단자(E)는 접지 단자(또는 중성점)일 수 있다.Referring to FIGS. 1A and 1B, the power receiving transformer 100 includes an input terminal (IT), an output terminal (OT), three primary coils (C11, C12, C13), and three secondary coils (C21, C22, C23). ) and instrument current transformers (CT1, CT2, CT3: current transformers) that are respectively combined with the three primary coils (C11, C12, C13). The input terminal (IT) has three input terminals (L1, L2, L3), and the output terminal (OT) may include four output terminals (LV1, LV2, LV3, E). The three input terminals (L1, L2, L3) are terminals that receive three-phase power from KEPCO, and each has a phase, b phase, and c phase (or R-S-T phase or u-v-w). The three output terminals (LV1, LV2, and LV3) are output terminals corresponding to the input terminals (L1, L2, and L3), respectively, and the output terminal (E) may be a ground terminal (or neutral point).
일 실시예에서, 3개의 1차측 코일(C11, C12, C13)은 델타(Δ) 결선(WC1)을 갖고, 3개의 2차측 코일(C21, C22, C23)은 Y 결선(WC2)을 갖는다. 구체적으로, 3개의 1차측 코일(C11, C12, C13)의 델타(Δ) 결선(WC1)을 위해서, 1차측 코일(C11)의 일단부(P1)는 계기용 변류기(CT1)를 통해 입력단자(L1)와 연결되고, 1차측 코일(C11)의 타단부(P2)와 1차측 코일(C12)의 일단부(P3)는 리드선(CC1)을 통해 연결될 수 있다. 또한, 1차측 코일(C12)의 일단부(P3)는 계기용 변류기(CT2)를 통해 입력단자(L2)와 연결되고, 1차측 코일(C12)의 타단부(P4)와 1차측 코일(C13)의 일단부(P5)는 리드선(CC2)을 통해 연결될 수 있다. 더하여, 1차측 코일(C13)의 일단부(P5)는 계기용 변류기(CT3)를 통해 입력단자(L3)와 연결되고, 1차측 코일(C13)의 타단부(P6)와 1차측 코일(C11)의 일단부(P1)는 리드선(CC3)을 통해 연결될 수 있다. 즉, 3개의 1차측 코일(C11, C12, C13)은 3개의 리드선(CC1, CC2, CC3)을 통해 델타(Δ) 결선(WC1)을 갖는다.In one embodiment, the three primary coils (C11, C12, C13) have a delta (Δ) connection (WC1) and the three secondary coils (C21, C22, C23) have a Y connection (WC2). Specifically, for the delta (Δ) connection (WC1) of the three primary coils (C11, C12, C13), one end (P1) of the primary coil (C11) is connected to the input terminal through the instrument current transformer (CT1). It is connected to (L1), and the other end (P2) of the primary side coil (C11) and one end (P3) of the primary side coil (C12) may be connected through the lead wire (CC1). In addition, one end (P3) of the primary coil (C12) is connected to the input terminal (L2) through the instrument current transformer (CT2), and the other end (P4) of the primary coil (C12) and the primary coil (C13) ) can be connected to one end (P5) through a lead wire (CC2). In addition, one end (P5) of the primary coil (C13) is connected to the input terminal (L3) through the instrument current transformer (CT3), and the other end (P6) of the primary coil (C13) and the primary coil (C11) are connected to the input terminal (L3). ) may be connected through a lead wire (CC3). That is, the three primary coils (C11, C12, and C13) have a delta (Δ) connection (WC1) through the three lead wires (CC1, CC2, and CC3).
일 실시예에서, 3개의 2차측 코일(C21, C22, C23)의 Y 결선(WC2)을 위해서, 2차측 코일(C21)의 일단부(S1)는 출력단자(LV1)와 연결되고, 2차측 코일(C21)의 타단부(S2)는 접지단자(E)와 연결되고, 2차측 코일(C22)의 일단부(S3)는 출력단자(LV2)와 연결되고, 2차측 코일(C22)의 타단부(S4)는 접지단자(E)와 연결되며, 2차측 코일(C23)의 일단부(S5)는 출력단자(LV3)와 연결되고, 2차측 코일(C23)의 타단부(S6)는 접지단자(E)와 연결될 수 있다. 즉, 2차측 코일(C21, C22, C23)의 타단부(S2, S4, S6)는 중성점(또는 접지단자(E))을 통해 묶임으로써 Y 결선(WC2)을 갖는다.In one embodiment, for the Y connection (WC2) of the three secondary coils (C21, C22, C23), one end (S1) of the secondary coil (C21) is connected to the output terminal (LV1), and the secondary coil (C21, C22, C23) is connected to the output terminal (LV1). The other end (S2) of the coil (C21) is connected to the ground terminal (E), one end (S3) of the secondary coil (C22) is connected to the output terminal (LV2), and the other end of the secondary coil (C22) is connected to the output terminal (LV2). The end (S4) is connected to the ground terminal (E), one end (S5) of the secondary coil (C23) is connected to the output terminal (LV3), and the other end (S6) of the secondary coil (C23) is grounded. It can be connected to terminal (E). That is, the other ends (S2, S4, S6) of the secondary coils (C21, C22, C23) are connected through the neutral point (or ground terminal (E)) to have a Y connection (WC2).
더하여, 3개의 2차측 코일(C21, C22, C23)은 각각 탭(tap)(T1, T2, T3)을 포함하며, 탭(tap)(T1)과 접지단자(E)을 이용하여 계기용 변압기(PT1)를 구성할 수 있으며, 탭(tap)(T2)과 접지단자(E)을 이용하여 계기용 변압기(PT2)를 구성할 수 있으며, 탭(tap)(T3)과 접지단자(E)을 이용하여 계기용 변압기(PT3)를 구성할 수 있다. 또한, 각각의 탭(tap)(T1, T2, T3)은 중계단자(DM-TB)의 P1, P2, P3 단자와 연결되며, 2차측 코일(C21, C22, C23)의 타단부(S2, S4, S6)는 중계단자(DM-TB)의 P0 단자와 연결될 수 있다. 중계단자(DM-TB)의 P0 단자는 접지단자(E) 또는 Y 결선(WC2)의 중성점과 연결될 수 있다. In addition, the three secondary coils (C21, C22, C23) each include a tap (T1, T2, T3), and the instrument transformer uses the tap (T1) and the ground terminal (E). (PT1) can be configured, and the instrument transformer (PT2) can be configured using the tap (T2) and the ground terminal (E), and the instrument transformer (PT2) can be configured using the tap (T3) and the ground terminal (E). You can configure an instrument transformer (PT3) using . In addition, each tap (T1, T2, T3) is connected to the P1, P2, and P3 terminals of the relay terminal (DM-TB), and the other end (S2, S4, S6) can be connected to the P0 terminal of the relay terminal (DM-TB). The P0 terminal of the relay terminal (DM-TB) can be connected to the ground terminal (E) or the neutral point of the Y connection (WC2).
더하여, 수전용 변압기(100)의 출력 단자(LV1, LV2, LV3, E)는 누전 경보기의 영상전류를 검출하는 영상변류기(ZCT)(미도시함)와 연결될 수 있으며, 수전용 변압기(100)와 영상변류기(ZCT)(미도시함)는 하나의 함체에 수용될 수 있다.In addition, the output terminals (LV1, LV2, LV3, E) of the power receiving transformer 100 may be connected to a zero-phase current transformer (ZCT) (not shown) that detects the zero-phase current of the earth leakage alarm, and the power receiving transformer 100 and a zero phase current transformer (ZCT) (not shown) can be accommodated in one enclosure.
도 1c를 참조하면, 입력단자(L1, L2, L3)을 통해 1차측 코일(C11, C12, C13)에 대략 22.9kV의 1차 전압(고전압)이 공급될 때, 1차측 코일(C11, C12, C13)의 22.9kV의 1차 전압은 1차측 코일(C11, C12, C13)의 권선수와 2차측 코일(C21, C22, C23)의 권선수에 의해 380V 및 220V의 2차측의 선간전압과 상전압이 2차측 코일(C21, C22, C23)에 유도될 수 있다. 또한, 본 발명에서는 2차측 코일(C21, C22, C23)의 탭(T1, T2, T3)을 통해서 구현된 계기용 변압기(PT1, PT2, PT3)는 22.9kV의 1차 전압(고전압)을 저전압(예: 약 110V)으로 변성하여 출력할 수 있다. Referring to FIG. 1C, when a primary voltage (high voltage) of approximately 22.9 kV is supplied to the primary coils (C11, C12, and C13) through the input terminals (L1, L2, and L3), the primary coils (C11, C12) , C13)'s primary voltage of 22.9kV is determined by the secondary line-to-line voltage of 380V and 220V by the number of turns of the primary coils (C11, C12, C13) and the secondary coils (C21, C22, C23). Phase voltage can be induced in the secondary coils (C21, C22, C23). In addition, in the present invention, the instrument transformer (PT1, PT2, PT3) implemented through the taps (T1, T2, T3) of the secondary coils (C21, C22, C23) transforms the primary voltage (high voltage) of 22.9 kV into a low voltage. It can be converted to (e.g. about 110V) and output.
일 실시예에서, 수전용 변압기(100)는 한전계량기(예: 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 등등) 계측을 목적으로, 입력단자(L1, L2, L3)을 통해 한전으로부터 공급되는 고전압 및 대전류를 저전압(약 110V)과 소전류(약 5A)로 변성(이하 변성출력이라 칭함)하여 이를 상기 한전계량기로 제공할 수 있다. 상기 DM은 부하가 사용하는 전력 중 피크전력을 측정하여 한전으로 송출하는 계기이고, 상기 WH는 한달 동안의 전력을 적산하여 한달동안 사용한 총 전력량을 측정하는 계기이고, 상기 VAR은 무효전력을 측정하는 계기이며, VARH는 무효 전력을 측정하고 계량하는 계기이다.In one embodiment, the power receiving transformer 100 is for the purpose of measuring KEPCO meters (e.g., maximum demand meter (DM), reactive watt hour meter (VAR), reactive watt hour meter (VARH), integrated watt hour meter (WH), etc.), and has an input terminal. The high voltage and large current supplied from KEPCO through (L1, L2, L3) can be converted into low voltage (about 110V) and low current (about 5A) (hereinafter referred to as transformed output) and provided to the KEPCO meter. The DM is an instrument that measures peak power among the power used by the load and transmits it to KEPCO, the WH is an instrument that integrates the power for a month and measures the total amount of power used in a month, and the VAR is a device that measures reactive power. VARH is an instrument that measures and meters reactive power.
상기 한전계량기의 계측을 위해서, 수전용 변압기(100)는 상기 한전계량기와 연결되는 중계단자(DM-TB)와 결합될 수 있다. 중계단자(DM-TB)는 상기 한전계량기와 수전용 변압기(100) 사이에 배치되며, 수전용 변압기(100)와 상기 한전계량기 사이를 전기적으로 연결시킬 수 있다. 중계단자(DM-TB)는 1S, P1, 2S, P2, 3S, P3, P0, 1L, 2L, 3L를 포함하는 10개의 단자를 가지며, 1S, 2S, 3S, 1L, 2L, 3L 단자는 계기용 변류기(CT)와 연결되는 단자이고, P3, P2, P1, P0 단자는 계기용 변압기(PT)와 연결되는 단자이다. 구체적으로, 계기용 변류기(CT1)의 출력단은 중계단자(DM-TB)의 1S와 1L 단자와 연결되고, 계기용 변류기(CT2)의 출력단은 중계단자(DM-TB)의 2S와 2L 단자와 연결되고, 계기용 변류기(CT3)의 출력단은 중계단자(DM-TB)의 3S와 3L 단자와 연결될 수 있다. 반면, 계기용 변압기(PT1)의 출력단은 중계단자(DM-TB)의 P1와 P0 단자와 연결되고, 계기용 변압기(PT2)의 출력단은 중계단자(DM-TB)의 P2와 P0 단자와 연결되고, 계기용 변압기(PT3)의 출력단은 중계단자(DM-TB)의 P3와 P0 단자와 연결될 수 있다. 여기서, 계기용 변압기(PT1, PT2, PT3)을 구성하는 2차측 코일(C21, C22, C23)의 탭(T1, T2, T3)과 중계단자(DM-TB)의 P3, P2, P1, P0 단자 사이의 배선을 제 1 연결 배선(WL1)이라 칭하고, 계기용 변류기(CT1, CT2, CT3)의 출력단과 중계단자(DM-TB)의 1S, 2S, 3S, 1L, 2L, 3L 단자 사이의 배선을 제 2 연결 배선(WL2)이라 칭한다.For measurement of the KEPCO meter, the power receiving transformer 100 may be coupled to a relay terminal (DM-TB) connected to the KEPCO meter. The relay terminal (DM-TB) is disposed between the KEPCO meter and the power receiving transformer 100, and can electrically connect the power receiving transformer 100 and the KEPCO meter. The relay terminal (DM-TB) has 10 terminals including 1S, P1, 2S, P2, 3S, P3, P0, 1L, 2L, and 3L, and the 1S, 2S, 3S, 1L, 2L, and 3L terminals are connected to the instrument. This terminal is connected to the current transformer (CT), and terminals P3, P2, P1, and P0 are terminals connected to the instrument transformer (PT). Specifically, the output terminal of the instrument current transformer (CT1) is connected to the 1S and 1L terminals of the relay terminal (DM-TB), and the output terminal of the instrument current transformer (CT2) is connected to the 2S and 2L terminals of the relay terminal (DM-TB). connected, and the output terminal of the instrument current transformer (CT3) can be connected to the 3S and 3L terminals of the relay terminal (DM-TB). On the other hand, the output terminal of the instrument transformer (PT1) is connected to the P1 and P0 terminals of the relay terminal (DM-TB), and the output terminal of the instrument transformer (PT2) is connected to the P2 and P0 terminals of the relay terminal (DM-TB). The output terminal of the instrument transformer (PT3) can be connected to the P3 and P0 terminals of the relay terminal (DM-TB). Here, the tabs (T1, T2, T3) of the secondary coils (C21, C22, C23) constituting the instrument transformer (PT1, PT2, PT3) and P3, P2, P1, P0 of the relay terminal (DM-TB) The wiring between the terminals is called the first connection wiring (WL1), and the wiring between the output terminal of the instrument current transformer (CT1, CT2, CT3) and the 1S, 2S, 3S, 1L, 2L, and 3L terminals of the relay terminal (DM-TB) The wiring is referred to as the second connection wiring (WL2).
도 2a와 도 2b는 본 발명의 제 2 실시예에 따른 수전용 변압기의 회로 결선도이고, 도 2c는 도 2a와 도 2b의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다. 상기 3개의 변압기는 3개의 단상 변압기 또는 1개의 3상 변압기로 구성될 수 있다. 바람직하게 도 2a와 도 2b에서는 상기 3개의 변압기는 1개의 3상 변압기일 수 있다.FIGS. 2A and 2B are circuit wiring diagrams of a power receiving transformer according to a second embodiment of the present invention, and FIG. 2C is a diagram showing one of three transformers constituting the power receiving transformer of FIGS. 2A and 2B. The three transformers may be comprised of three single-phase transformers or one three-phase transformer. Preferably, in FIGS. 2A and 2B, the three transformers may be one three-phase transformer.
도 2a와 도 2b를 참조하면, 수전용 변압기(200)는 입력단(IT), 출력단(OT), 3개의 1차측 코일(C11, C12, C13)과 6개의 2차측 코일(C21, C22, C23, C31, C32, C33) 및 3개의 1차측 코일(C11, C12, C13)과 각각 결합되는 계기용 변류기(CT1, CT2, CT3)를 포함할 수 있다. 입력단(IT)은 3개의 입력단자(L1, L2, L3)를 가지며, 출력단(OT)은 4개의 출력단자(LV1, LV2, LV3, E)를 포함할 수 있다. 3개의 입력단자(L1, L2, L3)는 한전으로부터 3상 전력을 공급받는 단자로서, 각각 a상, b상, c상(또는 R-S-T 상 또는 u-v-w)을 갖는다. 4개의 출력 단자(LV1, LV2, LV3)은 각각 입력단자(L1, L2, L3)에 대응되는 출력 단자이고, 출력단자(E)는 중성점 또는 접지와 연결되는 단자일 수 있다.2A and 2B, the power receiving transformer 200 includes an input terminal (IT), an output terminal (OT), three primary coils (C11, C12, C13), and six secondary coils (C21, C22, C23). , C31, C32, C33) and three primary coils (C11, C12, C13) and instrument current transformers (CT1, CT2, CT3), respectively. The input terminal (IT) has three input terminals (L1, L2, L3), and the output terminal (OT) may include four output terminals (LV1, LV2, LV3, E). The three input terminals (L1, L2, L3) are terminals that receive three-phase power from KEPCO, and each has a phase, b phase, and c phase (or R-S-T phase or u-v-w). The four output terminals (LV1, LV2, and LV3) are output terminals corresponding to the input terminals (L1, L2, and L3), respectively, and the output terminal (E) may be a terminal connected to the neutral point or ground.
일 실시예에서, 3개의 1차측 코일(C11, C12, C13)은 제 1 델타(Δ) 결선(WC1)을 갖고, 3개의 2차측 코일(C21, C22, C23)은 제 2 델타(Δ) 결선(WC2)을 갖고, 3개의 2차측 코일(C31, C32, C33)은 Y 결선(WC3)을 갖는다. 도 2c와 같이 2차측 코일(C21)과 코일(C31)은 직렬 배치되어 1차측 코일(C11)에 대응하는 2차측 코일을 구성하며, 2차측 코일(C22)과 코일(C32)은 직렬 배치되어 1차측 코일(C12)에 대응하는 2차측 코일을 구성하고, 2차측 코일(C23)과 코일(C33)은 직렬 배치되어 1차측 코일(C13)에 대응하는 2차측 코일을 구성할 수 있다. 즉, 1개 1차측 코일에 대응하여 2개의 2차측 코일이 배치된 구조를 갖는다. In one embodiment, the three primary coils (C11, C12, C13) have a first delta (Δ) connection (WC1) and the three secondary coils (C21, C22, C23) have a second delta (Δ) connection. It has a connection (WC2), and the three secondary coils (C31, C32, C33) have a Y connection (WC3). As shown in Figure 2c, the secondary coil (C21) and coil (C31) are arranged in series to form a secondary coil corresponding to the primary coil (C11), and the secondary coil (C22) and coil (C32) are arranged in series. A secondary coil corresponding to the primary coil C12 may be formed, and the secondary coil C23 and the coil C33 may be arranged in series to form a secondary coil corresponding to the primary coil C13. That is, it has a structure in which two secondary coils are arranged corresponding to one primary coil.
구체적으로, 3개의 1차측 코일(C11, C12, C13)의 제 1 델타(Δ) 결선(WC1)을 위해서, 1차측 코일(C11)의 일단부(P1)는 계기용 변류기(CT1)를 통해 입력단자(L1)와 연결되고, 1차측 코일(C11)의 타단부(P2)와 1차측 코일(C12)의 일단부(P3)는 리드선(CC1)을 통해 연결될 수 있다. 또한, 1차측 코일(C12)의 일단부(P3)는 계기용 변류기(CT2)를 통해 입력단자(L2)와 연결되고, 1차측 코일(C12)의 타단부(P4)와 1차측 코일(C13)의 일단부(P5)는 리드선(CC2)을 통해 연결될 수 있다. 더하여, 1차측 코일(C13)의 일단부(P5)는 계기용 변류기(CT3)를 통해 입력단자(L3)와 연결되고, 1차측 코일(C13)의 타단부(P6)와 1차측 코일(C11)의 일단부(P1)는 리드선(CC3)을 통해 연결될 수 있다. 즉, 3개의 1차측 코일(C11, C12, C13)은 3개의 리드선(CC1, CC2, CC3)을 통해 제 1 델타(Δ) 결선(WC1)을 갖는다.Specifically, for the first delta (Δ) connection (WC1) of the three primary coils (C11, C12, C13), one end (P1) of the primary coil (C11) is connected through the instrument current transformer (CT1). It is connected to the input terminal (L1), and the other end (P2) of the primary coil (C11) and one end (P3) of the primary coil (C12) may be connected through the lead wire (CC1). In addition, one end (P3) of the primary coil (C12) is connected to the input terminal (L2) through the instrument current transformer (CT2), and the other end (P4) of the primary coil (C12) and the primary coil (C13) ) can be connected to one end (P5) through a lead wire (CC2). In addition, one end (P5) of the primary coil (C13) is connected to the input terminal (L3) through the instrument current transformer (CT3), and the other end (P6) of the primary coil (C13) and the primary coil (C11) are connected to the input terminal (L3). ) may be connected through a lead wire (CC3). That is, the three primary coils (C11, C12, C13) have a first delta (Δ) connection (WC1) through three lead wires (CC1, CC2, CC3).
비슷하게, 3개의 2차측 코일(C21, C22, C23)의 제 2 델타(Δ)(WC2)을 위해서, 2차측 코일(C21)의 일단부(S1)는 출력단자(LV1)와 연결되고, 2차측 코일(C21)의 타단부(S2)와 2차측 코일(C22)의 일단부(S5)는 제 1 리드선을 통해 연결될 수 있다. 또한, 2차측 코일(C22)의 일단부(S5)는 출력단자(LV2)와 연결되고, 2차측 코일(C22)의 타단부(S6)와 2차측 코일(C23)의 일단부(S9)는 제 2 리드선을 통해 연결될 수 있다. 더하여, 2차측 코일(C23)의 일단부(S9)는 출력단자(LV3)와 연결되고, 2차측 코일(C23)의 타단부(S10)와 2차측 코일(C21)의 일단부(S1)는 제 3 리드선을 통해 연결될 수 있다. 즉, 3개의 2차측 코일(C21, C22, C23)은 3개의 리드선을 통해 제 2 델타(Δ)(WC2)을 갖는다.Similarly, for the second delta (Δ) (WC2) of the three secondary coils (C21, C22, C23), one end (S1) of the secondary coil (C21) is connected to the output terminal (LV1), and 2 The other end S2 of the primary coil C21 and one end S5 of the secondary coil C22 may be connected through a first lead wire. In addition, one end (S5) of the secondary coil (C22) is connected to the output terminal (LV2), and the other end (S6) of the secondary coil (C22) and one end (S9) of the secondary coil (C23) are connected to the output terminal (LV2). It can be connected through a second lead wire. In addition, one end (S9) of the secondary coil (C23) is connected to the output terminal (LV3), and the other end (S10) of the secondary coil (C23) and one end (S1) of the secondary coil (C21) are connected to the output terminal (LV3). It can be connected through a third lead wire. That is, the three secondary coils (C21, C22, C23) have a second delta (Δ) (WC2) through the three lead wires.
3개의 2차측 코일(C31, C32, C33)의 Y 결선(WC3)을 위해서, 2차측 코일(C31)의 일단부(S3)는 중계단자(DM-TB)의 단자(P1)와 연결되고, 2차측 코일(C31)의 타단부(S4)는 중계단자(DM-TB)의 단자(P0)와 연결되고, 2차측 코일(C32)의 일단부(S7)는 중계단자(DM-TB)의 단자(P2)와 연결되고, 2차측 코일(C32)의 타단부(S8)는 중계단자(DM-TB)의 단자(P0)와 연결되고, 2차측 코일(C33)의 일단부(S11)는 중계단자(DM-TB)의 단자(P3)와 연결되고, 2차측 코일(C33)의 타단부(S12)는 중계단자(DM-TB)의 단자(P0)와 연결될 수 있다. 2차측 코일(C31, C32, C33)의 타단부(S4, S8, S12)은 중성점을 통해 묶임으로써 Y 결선(WC3)을 갖는다. 본 발명에서 3개의 2차측 코일(C31, C32, C33)은 각각 계기용 변압기(PT1), 계기용 변압기(PT2), 계기용 변압기(PT3)으로서 기능할 수 있다.For the Y connection (WC3) of the three secondary coils (C31, C32, C33), one end (S3) of the secondary coil (C31) is connected to the terminal (P1) of the relay terminal (DM-TB), The other end (S4) of the secondary coil (C31) is connected to the terminal (P0) of the relay terminal (DM-TB), and one end (S7) of the secondary coil (C32) is connected to the relay terminal (DM-TB). It is connected to the terminal (P2), the other end (S8) of the secondary coil (C32) is connected to the terminal (P0) of the relay terminal (DM-TB), and one end (S11) of the secondary coil (C33) is connected to the It is connected to the terminal (P3) of the relay terminal (DM-TB), and the other end (S12) of the secondary coil (C33) may be connected to the terminal (P0) of the relay terminal (DM-TB). The other ends (S4, S8, and S12) of the secondary coils (C31, C32, and C33) have a Y connection (WC3) by being tied through a neutral point. In the present invention, the three secondary coils (C31, C32, C33) can function as an instrument transformer (PT1), an instrument transformer (PT2), and an instrument transformer (PT3), respectively.
더하여, 수전용 변압기(200)의 출력 단자(LV1, LV2, LV3)는 누전 경보기의 영상전류를 검출하는 영상변류기(ZCT)(미도시함)와 연결될 수 있으며, 수전용 변압기(200)와 영상변류기(ZCT)(미도시함)는 하나의 함체에 수용될 수 있다.In addition, the output terminals (LV1, LV2, and LV3) of the power receiving transformer 200 can be connected to a zero-phase current transformer (ZCT) (not shown) that detects the zero-phase current of the earth leakage alarm, and the power receiving transformer 200 and the zero-phase current transformer (ZCT) (not shown) can be connected to A current transformer (ZCT) (not shown) may be housed in one enclosure.
도 2c를 참조하면, 입력단자(L1, L2, L3)을 통해 1차측 코일(C11, C12, C13)에 대략 22.9kV의 1차 전압(고전압)이 공급될 때, 1차측 코일(C11, C12, C13)의 22.9kV의 1차 전압은 1차측 코일(C11, C12, C13)의 권선수와 2차측 코일(C21, C22, C23)의 권선수에 의해 380V 및 220V의 2차측의 선간전압과 상전압이 2차측 코일(C21, C22, C23)에 유도될 수 있으며, 1차측 코일(C11, C12, C13)의 권선수와 계기용 변압기(PT1, PT2, PT3)로서 기능하는 2차측 코일(C31, C32, C33)의 권선수에 의해, 22.9kV의 1차 전압(고전압)을 저전압(예: 약 110V)으로 변성 출력할 수 있다. Referring to FIG. 2C, when a primary voltage (high voltage) of approximately 22.9 kV is supplied to the primary coils (C11, C12, and C13) through the input terminals (L1, L2, and L3), the primary coils (C11, C12) , C13)'s primary voltage of 22.9kV is determined by the secondary line-to-line voltage of 380V and 220V by the number of turns of the primary coils (C11, C12, C13) and the secondary coils (C21, C22, C23). Phase voltage can be induced in the secondary coils (C21, C22, C23), the number of turns of the primary coils (C11, C12, C13) and the secondary coil (PT1, PT2, PT3) that functions as an instrument transformer (PT1, PT2, PT3). Depending on the number of turns (C31, C32, C33), the primary voltage (high voltage) of 22.9 kV can be converted to a low voltage (e.g. about 110 V) and output.
일 실시예에서, 수전용 변압기(200)는 한전계량기(예: 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 등등) 계측을 목적으로, 입력단자(L1, L2, L3)을 통해 한전으로부터 공급되는 고전압 및 대전류를 저전압(약 110V)과 소전류(약 5A)로 변성(이하 변성출력이라 칭함)하여 이를 상기 한전계량기로 제공할 수 있다. 상기 한전계량기의 계측을 위해서, 수전용 변압기(100)는 상기 한전계량기와 연결되는 중계단자(DM-TB)와 결합될 수 있다. 중계단자(DM-TB)는 상기 한전계량기 또는 수전용 변압기(100)에 배치되며, 수전용 변압기(100)와 상기 한전계량기 사이를 전기적으로 연결시킬 수 있다. 구체적으로, 계기용 변류기(CT1)의 출력단은 중계단자(DM-TB)의 1S와 1L 단자와 연결되고, 계기용 변류기(CT2)의 출력단은 중계단자(DM-TB)의 2S와 2L 단자와 연결되고, 계기용 변류기(CT3)의 출력단은 중계단자(DM-TB)의 3S와 3L 단자와 연결될 수 있다. 반면, 계기용 변압기(PT1)로서 기능하는 2차측 코일(C31)의 S3 단자는 중계단자(DM-TB)의 P1 단자와 연결되고, 2차측 코일(C31)의 S4 단자는 중계단자(DM-TB)의 P0 단자와 연결될 수 있다. 계기용 변압기(PT2)로서 기능하는 2차측 코일(C32)의 S7 단자는 중계단자(DM-TB)의 P2 단자와 연결되고, 2차측 코일(C32)의 S8 단자는 중계단자(DM-TB)의 P0 단자와 연결될 수 있다. 마지막으로 계기용 변압기(PT3)로서 기능하는 2차측 코일(C33)의 S11 단자는 중계단자(DM-TB)의 P3 단자와 연결되고, 2차측 코일(C32)의 S12 단자는 중계단자(DM-TB)의 P0 단자와 연결될 수 있다. 여기서, 계기용 변압기(PT1, PT2, PT3)을 구성하는 2차측 코일(C31, C32, C33)과 중계단자(DM-TB)의 P3, P2, P1, P0 단자 사이의 배선을 제 1 연결 배선(WL1)이라 칭하고, 계기용 변류기(CT1, CT2, CT3)의 출력단과 중계단자(DM-TB)의 1S, 2S, 3S, 1L, 2L, 3L 단자 사이의 배선을 제 2 연결 배선(WL2)이라 칭한다.In one embodiment, the power receiving transformer 200 is for the purpose of measuring KEPCO meters (e.g., maximum demand meter (DM), reactive watt hour meter (VAR), reactive watt hour meter (VARH), integrated watt hour meter (WH), etc.), and has an input terminal. The high voltage and large current supplied from KEPCO through (L1, L2, L3) can be converted into low voltage (about 110V) and low current (about 5A) (hereinafter referred to as transformed output) and provided to the KEPCO meter. For measurement of the KEPCO meter, the power receiving transformer 100 may be coupled to a relay terminal (DM-TB) connected to the KEPCO meter. The relay terminal (DM-TB) is disposed on the KEPCO meter or the power receiving transformer 100 and can electrically connect the power receiving transformer 100 and the KEPCO meter. Specifically, the output terminal of the instrument current transformer (CT1) is connected to the 1S and 1L terminals of the relay terminal (DM-TB), and the output terminal of the instrument current transformer (CT2) is connected to the 2S and 2L terminals of the relay terminal (DM-TB). connected, and the output terminal of the instrument current transformer (CT3) can be connected to the 3S and 3L terminals of the relay terminal (DM-TB). On the other hand, the S3 terminal of the secondary coil (C31), which functions as an instrument transformer (PT1), is connected to the P1 terminal of the relay terminal (DM-TB), and the S4 terminal of the secondary coil (C31) is connected to the relay terminal (DM-TB). TB) can be connected to the P0 terminal. The S7 terminal of the secondary coil (C32), which functions as an instrument transformer (PT2), is connected to the P2 terminal of the relay terminal (DM-TB), and the S8 terminal of the secondary coil (C32) is connected to the relay terminal (DM-TB). It can be connected to the P0 terminal of Lastly, the S11 terminal of the secondary coil (C33), which functions as an instrument transformer (PT3), is connected to the P3 terminal of the relay terminal (DM-TB), and the S12 terminal of the secondary coil (C32) is connected to the relay terminal (DM-TB). TB) can be connected to the P0 terminal. Here, the wiring between the secondary coils (C31, C32, C33) constituting the instrument transformer (PT1, PT2, PT3) and the P3, P2, P1, and P0 terminals of the relay terminal (DM-TB) is called the first connection wiring. It is called (WL1), and the wiring between the output terminal of the instrument current transformer (CT1, CT2, CT3) and the 1S, 2S, 3S, 1L, 2L, 3L terminal of the relay terminal (DM-TB) is the second connection wiring (WL2). It is called.
도 3a 내지 도 3c는 본 발명의 제 3 실시예에 따른 수전용 변압기(300)의 회로 결선도이고, 도 3d는 도 3a 내지 도 3c의 수전용 변압기를 구성하는 3개의 변압기 중 하나를 나타내는 도면이다. 상기 3개의 변압기는 3개의 단상 변압기 또는 1개의 3상 변압기로 구성될 수 있다. 도 3a는 3개 단상 변압기로 구현한 경우이고, 도 3b는 1개의 3상 변압기로 구현한 경우이다.FIGS. 3A to 3C are circuit wiring diagrams of the power receiving transformer 300 according to the third embodiment of the present invention, and FIG. 3D is a diagram showing one of the three transformers constituting the power receiving transformer of FIGS. 3A to 3C. . The three transformers may be comprised of three single-phase transformers or one three-phase transformer. Figure 3a shows a case implemented with three single-phase transformers, and Figure 3b shows a case implemented with one three-phase transformer.
도 3a와 도 3c를 참조하면, 수전용 변압기(300)는 입력단(IT), 출력단(OT), 3개의 1차측 코일(C11, C12, C13)과 3개의 2차측 코일(C21, C22, C23) 및 3개의 1차측 코일(C11, C12, C13)과 각각 결합되는 계기용 변류기(CT1, CT2, CT3)를 포함할 수 있다. 입력단(IT)은 4개의 입력 단자(L1, L2, L3, N)을 가지며, 출력단(OT)은 4개의 출력단자(LV1, LV2, LV3, E)를 포함할 수 있다. 4개의 입력단자(L1, L2, L3)는 한전으로부터 3상 전력을 공급받는 단자로서, 각각 a상, b상, c상(또는 R-S-T 상 또는 u-v-w)을 갖는다. 입력단자(N)는 접지 단자이거나 중성점일 수 있다. 3개의 출력 단자(LV1, LV2, LV3)은 각각 입력단자(L1, L2, L3)에 대응되는 출력 단자이고, 출력단자(E)는 접지 단자이거나 중성점일 수 있다.Referring to FIGS. 3A and 3C, the power receiving transformer 300 includes an input terminal (IT), an output terminal (OT), three primary coils (C11, C12, C13), and three secondary coils (C21, C22, C23). ) and three primary coils (C11, C12, C13) and instrument current transformers (CT1, CT2, CT3), respectively. The input terminal (IT) has four input terminals (L1, L2, L3, N), and the output terminal (OT) may include four output terminals (LV1, LV2, LV3, E). The four input terminals (L1, L2, L3) are terminals that receive three-phase power from KEPCO, and each has a phase, b phase, and c phase (or R-S-T phase or u-v-w). The input terminal (N) may be a ground terminal or a neutral point. The three output terminals (LV1, LV2, and LV3) are output terminals corresponding to the input terminals (L1, L2, and L3), respectively, and the output terminal (E) may be a ground terminal or a neutral point.
일 실시예에서, 3개의 1차측 코일(C11, C12, C13)은 제 1 Y 결선(WC1)을 갖고, 3개의 2차측 코일(C21, C22, C23)은 제 2 Y 결선(WC4)을 갖는다. 구체적으로, 3개의 1차측 코일(C11, C12, C13)의 제 1 Y 결선(WC1)을 위해서, 1차측 코일(C11)의 일단부(P1)는 입력단자(L1)와 연결되고, 1차측 코일(C11)의 타단부(P2)는 중성점(N)과 연결되고, 1차측 코일(C12)의 일단부(P3)는 입력 단자(L2)와 연결되고, 1차측 코일(C12)의 타단부(P4)는 중성점(N)과 연결되며, 1차측 코일(C13)의 일단부(P5)는 입력단자(L3)와 연결되고, 1차측 코일(C13)의 타단부(P6)는 중성점(N)과 연결될 수 있다. 1차측 코일(C11, C12, C13)의 타단부(P2, P4, P6)는 중성점(N)을 통해 묶임으로써 제 1 Y 결선(WC1)을 갖는다. 중성점(N)은 접지 단자와 연결될 수 있다.In one embodiment, the three primary coils (C11, C12, C13) have a first Y connection (WC1) and the three secondary coils (C21, C22, C23) have a second Y connection (WC4). . Specifically, for the first Y connection (WC1) of the three primary coils (C11, C12, C13), one end (P1) of the primary coil (C11) is connected to the input terminal (L1), and the primary coil (C11) is connected to the input terminal (L1). The other end (P2) of the coil (C11) is connected to the neutral point (N), one end (P3) of the primary coil (C12) is connected to the input terminal (L2), and the other end of the primary coil (C12) is connected to the input terminal (L2). (P4) is connected to the neutral point (N), one end (P5) of the primary coil (C13) is connected to the input terminal (L3), and the other end (P6) of the primary coil (C13) is connected to the neutral point (N). ) can be connected to. The other ends (P2, P4, P6) of the primary coils (C11, C12, C13) are connected through the neutral point (N) and have a first Y connection (WC1). The neutral point (N) may be connected to the ground terminal.
일 실시예에서, 3개의 2차측 코일(C21, C22, C23)의 제 2 Y 결선(WC4)을 위해서, 2차측 코일(C21)의 일단부(S1)는 출력단자(LV1)와 연결되고, 2차측 코일(C21)의 타단부(S2)는 접지단자(E)과 연결되고, 2차측 코일(C22)의 일단부(S3)는 출력단자(LV2)와 연결되고, 2차측 코일(C22)의 타단부(S4)는 접지단자(E)과 연결되며, 2차측 코일(C23)의 일단부(S5)는 출력단자(LV3)와 연결되고, 2차측 코일(C23)의 타단부(S6)는 접지단자(E)과 연결될 수 있다. 2차측 코일(C21, C22, C23)의 타단부(S2, S4, S6)은 접지단자(E)을 통해 묶임으로써 제 2 Y 결선(WC4)을 갖는다. 접지단자(E)는 제 2 Y 결선(WC4)의 중성점과 연결될 수 있다.In one embodiment, for the second Y connection (WC4) of the three secondary coils (C21, C22, C23), one end (S1) of the secondary coil (C21) is connected to the output terminal (LV1), The other end (S2) of the secondary coil (C21) is connected to the ground terminal (E), one end (S3) of the secondary coil (C22) is connected to the output terminal (LV2), and the secondary coil (C22) The other end (S4) is connected to the ground terminal (E), one end (S5) of the secondary coil (C23) is connected to the output terminal (LV3), and the other end (S6) of the secondary coil (C23) is connected to the output terminal (LV3). Can be connected to the ground terminal (E). The other ends (S2, S4, S6) of the secondary coils (C21, C22, C23) are connected through the ground terminal (E) to have a second Y connection (WC4). The ground terminal (E) may be connected to the neutral point of the second Y connection (WC4).
3개의 2차측 코일(C21, C22, C23)은 각각 탭(tap)(T1, T2, T3)을 가지고 있으며, 탭(tap)(T1)과 접지단자(E)을 이용하여 계기용 변압기(PT1)를 구성할 수 있으며, 탭(tap)(T2)과 접지단자(E)을 이용하여 계기용 변압기(PT2)를 구성할 수 있으며, 탭(tap)(T3)과 접지단자(E)을 이용하여 계기용 변압기(PT3)를 구성할 수 있다. 또한, 각각의 탭(tap)(T1, T2, T3)은 중계단자(DM-TB)의 P1, P2, P3 단자와 연결되며, 2차측 코일(C21, C22, C23)의 타단부(S2, S4, S6)는 중계단자(DM-TB)의 P0 단자와 연결될 수 있다. 중계단자(DM-TB)의 P0 단자는 접지단자(E2)과 연결될 수 있다.The three secondary coils (C21, C22, C23) each have a tap (T1, T2, T3), and the instrument transformer (PT1) uses the tap (T1) and the ground terminal (E). ) can be configured, and the instrument transformer (PT2) can be configured using the tap (T2) and the ground terminal (E), and the instrument transformer (PT2) can be configured using the tap (T3) and the ground terminal (E). Thus, an instrument transformer (PT3) can be configured. In addition, each tap (T1, T2, T3) is connected to the P1, P2, and P3 terminals of the relay terminal (DM-TB), and the other end (S2, S4, S6) can be connected to the P0 terminal of the relay terminal (DM-TB). The P0 terminal of the relay terminal (DM-TB) may be connected to the ground terminal (E2).
더하여, 수전용 변압기(300)의 출력 단자(LV1, LV2, LV3, E)는 누전 경보기의 영상전류를 검출하는 영상변류기(ZCT)(미도시함)와 연결될 수 있으며, 수전용 변압기(300)와 영상변류기(ZCT)(미도시함)는 하나의 함체에 수용될 수 있다.In addition, the output terminals (LV1, LV2, LV3, E) of the power receiving transformer 300 can be connected to a zero-phase current transformer (ZCT) (not shown) that detects the zero-phase current of the earth leakage alarm, and the power receiving transformer 300 and a zero phase current transformer (ZCT) (not shown) can be accommodated in one enclosure.
도 3d를 참조하면, 입력단자(L1, L2, L3)을 통해 1차측 코일(C11, C12, C13)에 대략 22.9kV의 1차 전압(고전압)이 공급될 때, 1차측 코일(C11, C12, C13)의 22.9kV의 1차 전압은 1차측 코일(C11, C12, C13)의 권선수와 2차측 코일(C21, C22, C23)의 권선수에 의해 380V 및 220V의 2차측의 선간전압과 상전압이 2차측 코일(C21, C22, C23)에 유도될 수 있다. 또한, 본 발명에서는 2차측 코일(C21, C22, C23)의 탭(T1, T2, T3)을 통해서 구현된 계기용 변압기(PT1, PT2, PT3)는 22.9kV의 1차 전압(고전압)을 저전압(예: 약 110V)으로 변성하여 출력할 수 있다. Referring to FIG. 3d, when a primary voltage (high voltage) of approximately 22.9 kV is supplied to the primary coils (C11, C12, and C13) through the input terminals (L1, L2, and L3), the primary coils (C11, C12) , C13)'s primary voltage of 22.9kV is determined by the secondary line-to-line voltage of 380V and 220V by the number of turns of the primary coils (C11, C12, C13) and the secondary coils (C21, C22, C23). Phase voltage can be induced in the secondary coils (C21, C22, C23). In addition, in the present invention, the instrument transformer (PT1, PT2, PT3) implemented through the taps (T1, T2, T3) of the secondary coils (C21, C22, C23) transforms the primary voltage (high voltage) of 22.9 kV into a low voltage. It can be converted to (e.g. about 110V) and output.
일 실시예에서, 수전용 변압기(300)는 한전계량기(예: 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 등등) 계측을 목적으로, 입력단자(L1, L2, L3)을 통해 한전으로부터 공급되는 고전압 및 대전류를 저전압(약 110V)과 소전류(약 5A)로 변성(이하 변성출력이라 칭함)하여 이를 상기 한전계량기로 제공할 수 있다. 상기 한전계량기의 계측을 위해서, 수전용 변압기(100)는 상기 한전계량기와 연결되는 중계단자(DM-TB)와 결합될 수 있다. 중계단자(DM-TB)는 상기 한전계량기 또는 수전용 변압기(100)에 배치되며, 수전용 변압기(100)와 상기 한전계량기 사이를 전기적으로 연결시킬 수 있다. 계기용 변류기(CT1)의 출력단은 중계단자(DM-TB)의 1S와 1L 단자와 연결되고, 계기용 변류기(CT2)의 출력단은 중계단자(DM-TB)의 2S와 2L 단자와 연결되고, 계기용 변류기(CT3)의 출력단은 중계단자(DM-TB)의 3S와 3L 단자와 연결될 수 있다. 반면, 계기용 변압기(PT1)의 출력단은 중계단자(DM-TB)의 P1와 P0 단자와 연결되고, 계기용 변압기(PT2)의 출력단은 중계단자(DM-TB)의 P2와 P0 단자와 연결되고, 계기용 변압기(PT3)의 출력단은 중계단자(DM-TB)의 P3와 P0 단자와 연결될 수 있다. 여기서, 계기용 변압기(PT1, PT2, PT3)을 구성하는 2차측 코일(C21, C22, C23)의 탭(T1, T2, T3)과 중계단자(DM-TB)의 P3, P2, P1, P0 단자 사이의 배선을 제 1 연결 배선(WL1)이라 칭하고, 계기용 변류기(CT1, CT2, CT3)의 출력단과 중계단자(DM-TB)의 1S, 2S, 3S, 1L, 2L, 3L 단자 사이의 배선을 제 2 연결 배선(WL2)이라 칭한다.In one embodiment, the power receiving transformer 300 is for the purpose of measuring KEPCO meters (e.g., maximum demand meter (DM), reactive watt hour meter (VAR), reactive watt hour meter (VARH), integrated watt hour meter (WH), etc.), and has an input terminal. The high voltage and large current supplied from KEPCO through (L1, L2, L3) can be converted into low voltage (about 110V) and low current (about 5A) (hereinafter referred to as transformed output) and provided to the KEPCO meter. For measurement of the KEPCO meter, the power receiving transformer 100 may be coupled to a relay terminal (DM-TB) connected to the KEPCO meter. The relay terminal (DM-TB) is disposed on the KEPCO meter or the power receiving transformer 100 and can electrically connect the power receiving transformer 100 and the KEPCO meter. The output terminal of the instrument current transformer (CT1) is connected to the 1S and 1L terminals of the relay terminal (DM-TB), and the output terminal of the instrument current transformer (CT2) is connected to the 2S and 2L terminals of the relay terminal (DM-TB). The output terminal of the instrument current transformer (CT3) can be connected to the 3S and 3L terminals of the relay terminal (DM-TB). On the other hand, the output terminal of the instrument transformer (PT1) is connected to the P1 and P0 terminals of the relay terminal (DM-TB), and the output terminal of the instrument transformer (PT2) is connected to the P2 and P0 terminals of the relay terminal (DM-TB). The output terminal of the instrument transformer (PT3) can be connected to the P3 and P0 terminals of the relay terminal (DM-TB). Here, the tabs (T1, T2, T3) of the secondary coils (C21, C22, C23) constituting the instrument transformer (PT1, PT2, PT3) and P3, P2, P1, P0 of the relay terminal (DM-TB) The wiring between the terminals is called the first connection wiring (WL1), and the wiring between the output terminal of the instrument current transformer (CT1, CT2, CT3) and the 1S, 2S, 3S, 1L, 2L, and 3L terminals of the relay terminal (DM-TB) The wiring is referred to as the second connection wiring (WL2).
종래에는 한전계량기(예: DM, VAR, VARH, WH 등등) 계측을 목적으로 계기용 변성기(Metering Out Fit: MOF)가 수전용 변압기(100)의 전단에 설치된다. 상기 MOF는 CT(current transformer)와 PT(Potential Transformer)를 한 세트로 구성되어 철재함(또는 함체)에 배치되어 고전압 및 대전류를 저전압과 소전류로 변성하여 상기 한전계량기로 공급할 수 있다. 그러나, 종래 MOF는 독립된 장치로 별도의 비용으로 제작되어 설치되고 수배전반이 설치되는 장소에 추가의 설치 공간을 필요로 하여 수용가의 시설물에 설치 시 이를 위한 공간을 확보하기가 어렵고 비용이 많이 소모된다. Conventionally, a metering out fit (MOF) is installed in front of the power receiving transformer 100 for the purpose of measuring KEPCO meters (e.g. DM, VAR, VARH, WH, etc.). The MOF consists of a set of CT (current transformer) and PT (potential transformer) and is placed in a steel box (or enclosure) to transform high voltage and large current into low voltage and small current and supply them to the KEPCO meter. However, the conventional MOF is manufactured and installed as an independent device at a separate cost and requires additional installation space at the location where the switchgear is installed, making it difficult to secure space for it when installed in a customer's facility and high cost.
반면, 본원 발명에서는 별도의 판넬 형태의 MOF 기기 대신에, 수전용 변압기(100) 내부에 계기용 변류기(CT1, CT2, CT3)를 수용하고, 3개의 2차측 코일(C21, C22, C23)의 탭(tap)(T1, T2, T3)을 이용하여 계기용 변압기(PT1, PT2, PT3)를 구성함으로써, 별도의 비용으로 제작된 MOF 기기를 사용하지 않아도 되기 때문에 수배전반의 설치 공간을 줄일 수 있으며 비용을 줄일 수 있다. 또한 MOF 기기를 설치할 필요가 없으므로 공사 기간을 단축시킬 수 있다.On the other hand, in the present invention, instead of a separate panel-type MOF device, an instrument current transformer (CT1, CT2, CT3) is accommodated inside the power receiving transformer 100, and the three secondary coils (C21, C22, C23) are installed. By configuring instrument transformers (PT1, PT2, PT3) using taps (T1, T2, T3), the installation space of the switchgear can be reduced because there is no need to use MOF devices manufactured at separate costs. Costs can be reduced. Additionally, since there is no need to install MOF devices, the construction period can be shortened.
또한, 종래 계기용 변성기의 과전류 강도는 계기용 변성기의 전류비를 고려하여 결정될 수 있다. 22.9kV 수용가의 계기용 변성기의 전류비가 5/5 ~ 15/5 범위를 갖는 경우 과전류 강도는 150배이고, 전류비가 20/5 ~ 50/5 범위를 갖는 경우 과전류 강도는 75배로 결정하고 있다. 1차 전류가 해당 전류비 범위에 대응하는 과전류 강도의 배수만큼 흐르더라도 열적, 기계적으로 문제가 없음을 의미한다. 즉, 종래에는 전류비가 5/5 ~ 15/5 범위에서 최대 2.25KA(=150*15) 과전류가 흐르더라도 또는 전류비가 20/5 ~ 50/5 범위에서 최대 3.75KA(=75*50) 과전류가 흐르더라도 열적, 기계적으로 문제가 없도록 MOF가 설계된다.Additionally, the overcurrent strength of a conventional instrument transformer can be determined by considering the current ratio of the instrument transformer. If the current ratio of the instrument transformer for a 22.9kV customer is in the range of 5/5 to 15/5, the overcurrent intensity is determined to be 150 times, and if the current ratio is in the range of 20/5 to 50/5, the overcurrent intensity is determined to be 75 times. This means that there is no thermal or mechanical problem even if the primary current flows as much as a multiple of the overcurrent intensity corresponding to the corresponding current ratio range. That is, conventionally, even if up to 2.25KA (=150*15) overcurrent flows in the current ratio range of 5/5 to 15/5, or up to 3.75KA (=75*50) overcurrent in the current ratio range of 20/5 to 50/5, The MOF is designed so that there are no thermal or mechanical problems even if there is a flow.
그러나, 본 발명에서는 별도의 계기용 변압기(PT)를 사용하지 않고 대신 변압기의 2차측 코일을 사용하여 계기용 변압기를 구현함으로써, 상대적으로 MOF에 사용되는 코일보다 큰 굵기 및 큰 강도를 갖는 변압기의 코일을 이용하여 종래보다 더 큰 과전류(예: 대략 12.5KA)를 허용할 수 있다. However, in the present invention, the instrument transformer is implemented using the secondary coil of the transformer instead of using a separate instrument transformer (PT), so that the transformer has a relatively larger thickness and greater strength than the coil used in the MOF. By using a coil, larger overcurrents (e.g., approximately 12.5KA) can be tolerated than before.
이상에서 설명한 본 발명이 전술한 실시예 및 첨부된 도면에 한정되지 않으며, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 변형 및 변경이 가능하다는 것은, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various substitutions, modifications, and changes are possible without departing from the technical spirit of the present invention. It will be clear to those who have knowledge.
100, 200, 300: 수전용 변압기
IT: 입력단
OT: 출력단
L1, L2, L3: 입력단자
LV1, LV2, LV3: 출력단자
N: 중성점
E: 접지단자
P1-P6: 1차측 코일의 단자
S1-S12: 2차측 코일의 단자
CC1, CC2, CC3: 리드선
DM-TB: 중계단자
CT1, CT2, CT3: 계기용 변류기
PT1, PT2, PT3: 계기용 변압기
WC1, WC2, WC3, WC4: 델타 결선 또는 Y 결선100, 200, 300: Transformer for power supply
IT: Input stage
OT: Output stage
L1, L2, L3: Input terminal
LV1, LV2, LV3: Output terminals
N: neutral point
E: Ground terminal
P1-P6: Terminals of primary coil
S1-S12: Terminals of secondary coil
CC1, CC2, CC3: Lead wire
DM-TB: relay terminal
CT1, CT2, CT3: Instrument current transformer
PT1, PT2, PT3: Instrument transformer
WC1, WC2, WC3, WC4: Delta or Y connection
Claims (14)
상기 복수의 계기용 변류기들과 전기적으로 연결되며 제 1 결선을 갖는 1차측 코일들을 포함하는 1차측 권선부;
상기 제 1 결선과 다르거나 동일한 제 2 결선을 갖는 복수의 2차측 코일들을 포함하는 2차측 권선부; 및
상기 2차측 권선부의 2차측 코일들과 한전계량기의 중계단자 사이를 연결하는 제 1 연결 배선을 포함하며,
상기 2차측 코일들에 변성 전압이 유도되며,
상기 변성 전류와 상기 변성 전압은 상기 한전계량기의 계측을 위해 상기 한전계량기로 공급되는 수전용 변압기.A plurality of instrument current transformers that output transformed current;
a primary winding unit electrically connected to the plurality of instrument current transformers and including primary coils having a first connection;
a secondary winding unit including a plurality of secondary coils having a second connection that is different from or the same as the first connection; and
It includes a first connection wire connecting the secondary coils of the secondary winding unit and the relay terminal of the KEPCO meter,
A transformation voltage is induced in the secondary coils,
The transformation current and the transformation voltage are supplied to the KEPCO meter for measurement by the KEPCO meter.
상기 제 1 결선이 델타(Δ) 결선이고 상기 제 2 결선이 Y 결선인 경우,
1차측 제 1 코일의 제 2 단자는 1차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 2 단자는 1차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되고,
2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고, 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자, 및 상기 2차측 제 3 코일의 제 2 단자는 중성점과 연결되며,
상기 제 1 연결 배선은 상기 2차측 제 1 코일 상에 배치된 제 1 탭(tap)과 상기 중계단자의 P1 단자를 연결하는 제 1 배선, 상기 2차측 제 2 코일 상에 배치된 제 2 탭(tap)과 상기 중계단자의 P2 단자를 연결하는 제 2 배선, 상기 2차측 제 3 코일 상에 배치된 제 3 탭(tap)과 상기 중계단자의 P3 단자를 연결하는 제 3 배선 및 상기 중성점과 연결된 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자 및 상기 2차측 제 3 코일의 제 2 단자와 상기 중계단자의 P0 단자를 연결하는 제 4 배선을 포함하는 수전용 변압기.According to claim 1,
If the first connection is a delta (Δ) connection and the second connection is a Y connection,
The second terminal of the first coil on the primary side is electrically connected to the first terminal of the second coil on the primary side, and the second terminal of the second coil on the primary side is electrically connected to the first terminal of the third coil on the primary side, The second terminal of the third coil on the primary side is electrically connected to the first terminal of the first coil on the primary side,
The first terminal of the first coil on the secondary side is electrically connected to the first output terminal, the first terminal of the second coil on the secondary side is electrically connected to the second output terminal, and the first terminal of the third coil on the secondary side is electrically connected to the third output terminal. It is electrically connected to an output terminal, and the second terminal of the first coil on the secondary side, the second terminal of the second coil on the secondary side, and the second terminal of the third coil on the secondary side are connected to a neutral point,
The first connection wire is a first wire connecting a first tab disposed on the first coil of the secondary side and the P1 terminal of the relay terminal, and a second tab disposed on the second coil of the secondary side ( a second wire connecting a tap) and the P2 terminal of the relay terminal, a third wire connecting a third tap disposed on the third coil of the secondary side and the P3 terminal of the relay terminal, and a third wire connected to the neutral point. For power reception, including a fourth wire connecting the second terminal of the secondary first coil, the second terminal of the secondary second coil, the second terminal of the secondary third coil, and the P0 terminal of the relay terminal. Transformers.
상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고,
상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고,
상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결되는 수전용 변압기.According to claim 2,
The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer,
The first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer,
A power receiving transformer wherein the first terminal of the third coil on the primary side is electrically connected to the third input terminal through a third instrument current transformer.
상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 변성 전압보다 높은 수전용 변압기.According to claim 2,
A power receiving transformer wherein the line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal is higher than the transformation voltage.
상기 제 1 결선이 델타(Δ) 결선이고 상기 제 2 결선이 델타(Δ) 결선인 경우,
1차측 제 1 코일의 제 2 단자는 1차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 2 코일의 제 2 단자는 1차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 1차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되고,
2차측 제 1 코일의 제 2 단자는 2차측 제 2 코일의 제 1 단자와 전기적 연결되고, 상기 2차측 제 2 코일의 제 2 단자는 2차측 제 3 코일의 제 1 단자와 전기적 연결되고, 상기 2차측 제 3 코일의 제 2 단자는 상기 1차측 제 1 코일의 제 1 단자와 전기적 연결되며, 상기 2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 상기 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 상기 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고,
2차측 제 4 코일의 제 1 단자는 상기 중계단자의 P1 단자와 전기적 연결되고, 2차측 제 5 코일의 제 1 단자는 상기 중계단자의 P2 단자와 전기적 연결되고, 2차측 제 6 코일의 제 1 단자는 상기 중계단자의 P3 단자와 전기적 연결되고, 상기 2차측 제 4 코일의 제 2 단자, 상기 2차측 제 5 코일의 제 2 단자 및 상기 2차측 제 6 코일의 제 2 단자는 중성점과 연결되며,
상기 제 1 연결 배선은 상기 2차측 제 4 코일. 제 5 코일 및 제 6 코일의 Y 결선을 포함하는 수전용 변압기.According to claim 1,
If the first connection is a delta (Δ) connection and the second connection is a delta (Δ) connection,
The second terminal of the first coil on the primary side is electrically connected to the first terminal of the second coil on the primary side, and the second terminal of the second coil on the primary side is electrically connected to the first terminal of the third coil on the primary side, The second terminal of the third coil on the primary side is electrically connected to the first terminal of the first coil on the primary side,
The second terminal of the first coil on the secondary side is electrically connected to the first terminal of the second coil on the secondary side, and the second terminal of the second coil on the secondary side is electrically connected to the first terminal of the third coil on the secondary side, The second terminal of the third coil on the secondary side is electrically connected to the first terminal of the first coil on the primary side, the first terminal of the first coil on the secondary side is electrically connected to the first output terminal, and the second terminal on the secondary side The first terminal of the coil is electrically connected to the second output terminal, and the first terminal of the third coil on the secondary side is electrically connected to the third output terminal,
The first terminal of the fourth coil on the secondary side is electrically connected to the P1 terminal of the relay terminal, the first terminal of the fifth coil on the secondary side is electrically connected to the P2 terminal of the relay terminal, and the first terminal of the sixth coil on the secondary side is electrically connected to the P2 terminal of the relay terminal. The terminal is electrically connected to the P3 terminal of the relay terminal, and the second terminal of the fourth coil on the secondary side, the second terminal of the fifth coil on the secondary side, and the second terminal of the sixth coil on the secondary side are connected to the neutral point. ,
The first connection wire is the fourth coil on the secondary side. A power receiving transformer including Y connections of the fifth and sixth coils.
상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고,
상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고,
상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결되는 수전용 변압기.According to claim 5,
The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer,
The first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer,
A power receiving transformer wherein the first terminal of the third coil on the primary side is electrically connected to the third input terminal through a third instrument current transformer.
상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 변성 전압보다 높은 수전용 변압기.According to claim 5,
A power receiving transformer wherein the line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal is higher than the transformation voltage.
상기 제 1 결선이 Y 결선이고 상기 제 2 결선이 Y 결선인 경우,
1차측 제 1 코일의 제 1 단자는 제 1 입력 단자와 전기적 연결되고, 1차측 제 2 코일의 제 1 단자는 제 2 입력 단자와 전기적 연결되고, 1차측 제 3 코일의 제 1 단자는 제 3 입력 단자와 전기적 연결되고, 상기 1차측 제 1 코일의 제 2 단자, 상기 1차측 제 2 코일의 제 2 단자 및 상기 1차측 제 3 코일의 제 2 단자는 제 1 중성점과 연결되며,
2차측 제 1 코일의 제 1 단자는 제 1 출력 단자와 전기적 연결되고, 2차측 제 2 코일의 제 1 단자는 제 2 출력 단자와 전기적 연결되고, 2차측 제 3 코일의 제 1 단자는 제 3 출력 단자와 전기적 연결되고, 상기 2차측 제 1 코일의 제 2 단자, 상기 2차측 제 2 코일의 제 2 단자, 및 상기 2차측 제 3 코일의 제 2 단자는 제 2 중성점과 연결되며,
상기 제 1 연결 배선은 상기 2차측 제 1 코일 상에 배치된 제 1 탭(tap)과 상기 중계단자의 P1 단자를 연결하는 제 1 배선, 상기 2차측 제 2 코일 상에 배치된 제 2 탭(tap)과 상기 중계단자의 P2 단자를 연결하는 제 2 배선, 상기 2차측 제 3 코일 상에 배치된 제 3 탭(tap)과 상기 중계단자의 P3 단자를 연결하는 제 3 배선 및 상기 제 2 중성점과 상기 중계단자의 P0 단자를 연결하는 제 4 배선을 포함하는 수전용 변압기.According to claim 1,
If the first connection is a Y connection and the second connection is a Y connection,
The first terminal of the first coil on the primary side is electrically connected to the first input terminal, the first terminal of the second coil on the primary side is electrically connected to the second input terminal, and the first terminal of the third coil on the primary side is electrically connected to the third input terminal. It is electrically connected to the input terminal, and the second terminal of the first coil of the primary side, the second terminal of the second coil of the primary side, and the second terminal of the third coil of the primary side are connected to the first neutral point,
The first terminal of the first coil on the secondary side is electrically connected to the first output terminal, the first terminal of the second coil on the secondary side is electrically connected to the second output terminal, and the first terminal of the third coil on the secondary side is electrically connected to the third output terminal. It is electrically connected to an output terminal, and the second terminal of the first coil on the secondary side, the second terminal of the second coil on the secondary side, and the second terminal of the third coil on the secondary side are connected to a second neutral point,
The first connection wire is a first wire connecting a first tab disposed on the first coil of the secondary side and the P1 terminal of the relay terminal, and a second tab disposed on the second coil of the secondary side ( a second wire connecting a tap) and the P2 terminal of the relay terminal, a third wire connecting a third tap disposed on the third coil of the secondary side and the P3 terminal of the relay terminal, and the second neutral point. and a fourth wiring connecting the P0 terminal of the relay terminal.
상기 1차측 제 1 코일의 제 1 단자는 제 1 계기용 변류기를 통해 제 1 입력단자와 전기적 연결되고,
상기 1차측 제 2 코일의 제 1 단자는 제 2 계기용 변류기를 통해 제 2 입력단자와 전기적 연결되고,
상기 1차측 제 3 코일의 제 1 단자는 제 3 계기용 변류기를 통해 제 3 입력단자와 전기적 연결되는 수전용 변압기.According to claim 8,
The first terminal of the first coil on the primary side is electrically connected to the first input terminal through a first instrument current transformer,
The first terminal of the second coil on the primary side is electrically connected to the second input terminal through a second instrument current transformer,
A power receiving transformer wherein the first terminal of the third coil on the primary side is electrically connected to the third input terminal through a third instrument current transformer.
상기 제 1 출력 단자, 상기 제 2 출력 단자 및 상기 제 3 출력 단자들로부터 출력되는 선간 전압 또는 상전압은 상기 변성 전압보다 높은 수전용 변압기.According to claim 8,
A power receiving transformer wherein the line-to-line voltage or phase-to-phase voltage output from the first output terminal, the second output terminal, and the third output terminal is higher than the transformation voltage.
상기 복수의 계기용 변류기들의 변성 전류를 상기 중계단자로 공급하는 제 2 연결 배선을 포함하는 수전용 변압기.According to claim 1,
A power receiving transformer including a second connection wire that supplies transformed currents of the plurality of instrument current transformers to the relay terminal.
상기 제 2 연결 배선은
제 1 계기용 변류기의 제 1 출력단자와 상기 중계단자의 1S 단자를 연결하는 제 5 배선, 제 2 계기용 변류기의 제 1 출력단자와 상기 중계단자의 2S 단자를 연결하는 제 6 배선, 제 3 계기용 변류기의 제 1 출력단자와 상기 중계단자의 3S 단자를 연결하는 제 7 배선, 상기 제 1 계기용 변류기의 제 2 출력단자와 상기 중계단자의 1L 단자를 연결하는 제 8 배선, 상기 제 2 계기용 변류기의 제 2 출력단자와 상기 중계단자의 2L 단자를 연결하는 제 9 배선 및 상기 제 3 계기용 변류기의 제 2 출력단자와 상기 중계단자의 3L 단자를 연결하는 제 10 배선을 포함하는 수전용 변압기.According to claim 11,
The second connection wiring is
A fifth wire connecting the first output terminal of the first instrument current transformer and the 1S terminal of the relay terminal, a sixth wire connecting the first output terminal of the second instrument current transformer and the 2S terminal of the relay terminal, and a third wire. A seventh wire connecting the first output terminal of the instrument current transformer and the 3S terminal of the relay terminal, an eighth wire connecting the second output terminal of the first instrument current transformer and the 1L terminal of the relay terminal, and the second wire. A number including a 9th wire connecting the second output terminal of the instrument current transformer and the 2L terminal of the relay terminal and a 10th wire connecting the 2nd output terminal of the third instrument current transformer and the 3L terminal of the relay terminal. Dedicated transformer.
상기 한전계량기는 최대수요 전력량계(DM), 무효 전력계(VAR), 무효 전력량계(VARH), 적산 전력계(WH) 또는 이들의 조합을 포함하는 수전용 변압기.According to claim 1,
The KEPCO meter is a power receiving transformer including a maximum demand meter (DM), a reactive power meter (VAR), a reactive power meter (VARH), a total power meter (WH), or a combination thereof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020230074469A KR102606905B1 (en) | 2023-06-09 | 2023-06-09 | Transformer and high voltage switchgear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020230074469A KR102606905B1 (en) | 2023-06-09 | 2023-06-09 | Transformer and high voltage switchgear |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102606905B1 true KR102606905B1 (en) | 2023-11-29 |
Family
ID=88969219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020230074469A KR102606905B1 (en) | 2023-06-09 | 2023-06-09 | Transformer and high voltage switchgear |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102606905B1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100012823U (en) * | 2009-06-17 | 2010-12-27 | 엘에스산전 주식회사 | Metering out fit |
KR20110027179A (en) * | 2009-09-10 | 2011-03-16 | 주식회사 케이피 일렉트릭 | A mof combined transformer |
KR101133107B1 (en) * | 2011-08-23 | 2012-04-06 | 조영숙 | Instrument transformer comprising high voltage ct and low voltage pt , all in one transformer using the same, and all in one incoming and distributing pannel using the same |
KR101237875B1 (en) * | 2012-09-04 | 2013-02-27 | 파워에너텍 주식회사 | Power receiving and distributing board |
-
2023
- 2023-06-09 KR KR1020230074469A patent/KR102606905B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100012823U (en) * | 2009-06-17 | 2010-12-27 | 엘에스산전 주식회사 | Metering out fit |
KR20110027179A (en) * | 2009-09-10 | 2011-03-16 | 주식회사 케이피 일렉트릭 | A mof combined transformer |
KR101133107B1 (en) * | 2011-08-23 | 2012-04-06 | 조영숙 | Instrument transformer comprising high voltage ct and low voltage pt , all in one transformer using the same, and all in one incoming and distributing pannel using the same |
KR101237875B1 (en) * | 2012-09-04 | 2013-02-27 | 파워에너텍 주식회사 | Power receiving and distributing board |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100295645A1 (en) | Transformer Arrangement | |
Palanisamy et al. | Basic Electrical and Instrumentation Engineering | |
KR100787964B1 (en) | Out-door type metering out-fit (mof)having electronics transformer with auxiliary power supply device & pd detection sensor | |
KR102606905B1 (en) | Transformer and high voltage switchgear | |
JP2007525933A (en) | Superconducting current limiting system and superconducting current limiting method | |
CA2701669C (en) | Various methods and apparatuses for an integrated zig-zag transformer | |
JP4711878B2 (en) | Bidirectional metering instrument transformer and bidirectional power metering system | |
JP5935554B2 (en) | Iron resonance prevention device and receiving / transforming equipment using the same | |
CN102709045A (en) | Combined mutual inductor | |
KR101133107B1 (en) | Instrument transformer comprising high voltage ct and low voltage pt , all in one transformer using the same, and all in one incoming and distributing pannel using the same | |
KR100832876B1 (en) | Ct winding method of mof | |
Donahue et al. | Performance testing of the Sandy Pond HVDC converter | |
EP1667293B1 (en) | Electricity substation | |
US10389261B2 (en) | Portable electrical generator system for providing temporary distribution of single-phase and three-phase power | |
CN202633020U (en) | Combined transformer | |
Gross | Sensitive Ground Relaying of AC Generators [includes discussion] | |
KR200305100Y1 (en) | A unite type for MOF | |
US3312896A (en) | Transformer phase converter adapted to have wattmeter current terminals connected inseries with primary to measure total power supplied | |
KUMAR | PRACTICAL TRAINING REPORT ON OPERATION & MAINTENANCE (UNDER 11KV) | |
JPH0426765B2 (en) | ||
Fortescue | A study of some three-phase systems | |
CN202633019U (en) | Combined transformer | |
KR101463568B1 (en) | Powerline system, powerline communication apparatus, and method for installing powerline communication apparatus | |
US2132179A (en) | System for operating alternating current switchboard instruments | |
JP4104104B2 (en) | 4-winding transformer applied substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |