[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR101975502B1 - Manufacturing method of composite block and composite block - Google Patents

Manufacturing method of composite block and composite block Download PDF

Info

Publication number
KR101975502B1
KR101975502B1 KR1020180136053A KR20180136053A KR101975502B1 KR 101975502 B1 KR101975502 B1 KR 101975502B1 KR 1020180136053 A KR1020180136053 A KR 1020180136053A KR 20180136053 A KR20180136053 A KR 20180136053A KR 101975502 B1 KR101975502 B1 KR 101975502B1
Authority
KR
South Korea
Prior art keywords
stone
block
concrete
anchor
delete delete
Prior art date
Application number
KR1020180136053A
Other languages
Korean (ko)
Inventor
박준용
이가람
Original Assignee
주식회사 피피에스브릿지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 피피에스브릿지 filed Critical 주식회사 피피에스브릿지
Priority to KR1020180136053A priority Critical patent/KR101975502B1/en
Application granted granted Critical
Publication of KR101975502B1 publication Critical patent/KR101975502B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/008Producing shaped prefabricated articles from the material made from two or more materials having different characteristics or properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/005Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with anchoring or fastening elements for the shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a synthetic block of stone and concrete and a manufacturing method thereof, which are able to form a stonework by using a synthetic block, which is made from stone for a front surface and made from concrete blocks for a rear surface, to present a natural beauty by building an exposed surface of the stonework by using stone, to firmly install the stonework on an inclined surface by using the concrete blocks, to perform a stable construction in terms of structure, to firmly fixate the stone and the concrete blocks, to prevent the stone from escaping, and to easily manufacture the synthetic blocks by using a steel frame divided into a lower frame and an upper frame. To this end, according to the present invention, the synthetic block of stone and concrete comprises: the stone built on a cut ground unit or an embankment ground to be placed on a front surface when being built to express a natural beauty; an anchor installed to allow one side end to be inserted into the stone and to allow the other side end to be exposed to the outside of the stone; and the concrete block molded on and integrated with the stone by the anchor.

Description

석재와 콘크리트의 합성블록 및 그 제작방법{Manufacturing method of composite block and composite block}[0001] The present invention relates to a composite block of stone and concrete,

본 발명은 석재와 콘크리트의 합성블록 및 그 제작방법에 관한 것으로, 석재와 콘크리트블록이 일체로 합성되도록 구성된 합성블록을 이용하여 석축구조체를 시공하게 됨으로써 석축구조체의 전면부에 석재가 노출되어 자연미가 연출되도록 하고 배면의 콘크리트블록의 길이를 다양한 형태로 제작하여 구조적인 안정성이 향상되도록 하며 석재와 콘크리트블록을 견고히 일체화되도록 제작함으로써 석재가 이탈되는 등의 안전사고를 방지할 수 있도록 하는 석재와 콘크리트의 합성블록 및 그 제작방법에 관한 것이다The present invention relates to a composite block of stone and concrete and a method of manufacturing the same, wherein a stone block is constructed by using a synthetic block constructed of a stone and a concrete block integrally combined, And the concrete block of the back side is made variously to improve the structural stability. By making the stone and the concrete block to be firmly integrated, it is possible to prevent the safety accident such as the stone being separated from the stone and the concrete A composite block and a method of manufacturing the same

통상 절토부나 성토부에는 콘크리트옹벽, 보강토옹벽 및 석축쌓기 등으로 토압을 받는 구조물인 옹벽을 형성하게 된다Normally, the retaining wall, which is a structure receiving the earth pressure by the concrete retaining wall, the reinforcing earth retaining wall and the pile building,

상기 콘크리트 옹벽과 보강토 옹벽은 전면에 노출되는 콘크리트로 인해 미관이 저하되는 문제점이 있어왔다.The concrete retaining wall and the reinforcing earth retaining wall have been deteriorated in appearance due to the concrete exposed on the entire surface.

이러한 문제점을 해결하기 위하여 콘크리트옹벽 전면에 문양거푸집을 이용하여 외관을 형성하거나 보강토옹벽블록 제작시 전면에 자연석형태의 문양으로 제작하고 있지만, 재료원 자체가 콘크리트이므로 질감에 한계가 있어서 실질적인 미관 향상 효과는 미미하다는 문제점이 있어 왔다.In order to solve these problems, the exterior of the concrete retaining wall is used to form the exterior, or the reinforced earth retaining wall block is made of a natural stone pattern on the front surface. However, since the material itself is a concrete, There has been a problem that it is insignificant.

한편 상기 문제점을 해결하기 위하여 자연석판을 보강토옹벽블록의 전면에 설치하는 시도가 이루어지고 있는데, 대한민국 공개특허공보 제10-2011-0002580호에 개시된 기술에서는 자연석판을 접착제를 이용하여 보강토 옹벽블록의 전면에 단순히 부착하는 방식을 이용하였다.In order to solve the above problem, an attempt has been made to install a natural slab on the entire surface of a reinforced earth retaining wall block. In the technique disclosed in Korean Patent Laid-Open Publication No. 10-2011-0002580, And simply attached to the front surface.

그러나 접착제를 이용하여 자연석판을 단순히 부착하였을 경우, 시간이 경과되면서 접착제의 열화(劣化)에 의해 자연석판과 보강토 옹벽블록의 전면 사이의 접착력이 저하되면서 자연석판이 탈락되는 현상이 발생하는 문제점이 있다. 특히, 종래 기술에서는 자연석판의 탈락이 갑작스럽게 예고도 없이 발생하게 되고, 탈락된 자연석판이 낙하되면서 안전사고가 발생할 위험이 매우 크다는 문제점이 있다.However, when a natural stone slab is simply attached using an adhesive, the adhesion between the natural stone slab and the front surface of the reinforced earth retaining wall block is deteriorated due to the deterioration of the adhesive over time, have. Particularly, in the related art, there is a problem that the dropout of natural slab suddenly occurs without warning, and the risk of a safety accident due to dropping of the natural slab is very high.

한편 역사, 문화재 지역 및 풍경지역의 토목공사나 주택의 대지조성공사 등에는 석재를 이용하여 석축을 시공할 수 도 있다.On the other hand, it is possible to construct the stone by using the stone for the construction of the earthworks of the civil engineers and the houses in the historical, cultural property area and scenery area.

상기 석축의 안정성에 가장 큰 영향을 미치는 인자는 표면석의 구배와 표면석의 뒷길이 이며, 특히 표면석의 뒷길이는 구조계산에서 요구되는 것보다 작은 것이 시공될 경우에 붕괴의 원인이 되기도 한다.The factors that have the greatest influence on the stability of the stone are the slope of the surface stone and the back side of the surface stone, and in particular, the back side of the surface stone may cause a collapse when a construction smaller than that required in the structural calculation is applied.

공개특허공보 제10-2011-0002580호Japanese Patent Application Laid-Open No. 10-2011-0002580

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 석축을 구성함에 있어 전면은 석재로 구성하고 배면은 콘크리트블록으로 이루어진 합성블록을 통해 석축을 시공하게 됨으로써 석축의 노출면은 석재로 이루어져 자연미가 연출되도록 하고 콘크리트블록을 통해 사면에 견고한 설치가 이루어지게 되어 구조적으로 안정적인 시공이 이루어지도록 하며, 석재와 콘크리트블록의 견고한 고정이 이루어져 석재의 이탈이 방지되도록 하고, 하부틀과 상부틀로 분리된 강재틀을 이용하여 합성블록의 제작이 용이하게 이루어지게 되는 석재와 콘크리트의 합성블록 및 그 제작방법을 제공함에 있다. In order to solve the above-mentioned problems, an object of the present invention is to provide a method for constructing a torsion bar, in which a front surface is made of a stone and a back surface is made of a concrete block, And the concrete block is installed firmly on the slope through the concrete block so that the construction can be stably carried out and the stone and the concrete block are firmly fixed to prevent the stone from coming off. The present invention provides a composite block of stone and concrete and a method of manufacturing the same, wherein the composite block can be easily manufactured using a frame.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 절토나 성토에 의해 형성되는 사면에 축조되고 축조시 전면에 위치하여 자연미가 나타내어지도록 하는 석재; 상기 석재에 일측단이 삽입되도록 설치되고 타측단은 석재의 외측으로 노출되도록 설치되는 앵커; 상기 앵커를 통해 상기 석재에 일체로 성형되는 콘크리트블록;을 포함하여 구성되고, 상기 콘크리트블록은, 상기 앵커를 통해 석재에 일체화되도록 성형되는 블록몸체와, 상기 블록몸체의 상부에서 돌출 형성되고 블록몸체의 폭방향으로 이격되도록 위치하는 2개의 키와, 상기 블록몸체의 하부에서 블록몸체의 폭방향으로 오목하게 형성되어 상기 키가 삽입되도록 하는 키홈과, 상기 2개의 키 사이에 위치하고 블록몸체의 상부방향으로 돌출되게 형성되어 인양장비가 걸려질 수 있도록 하는 러그를 포함하여 구성되며, 상기 콘크리트블록의 폭방향으로 관통하도록 형성되어 인장재의 삽입을 통한 폭 방향으로 이웃하는 블록들과의 인장력 도입이 이루어질 수 있도록 하는 수평인장재설치홀과, 상기 콘크리트블록의 높이 방향으로 관통하도록 형성되어 인장재의 삽입을 통한 높이 방향으로 이웃하는 블록들과의 인장력 도입이 이루어지도록 하는 수직인장재설치홀을 더 포함하여 구성되고, 상기 콘크리트블록의 배면에 형성되어 경사면의 내부에 설치되는 앵커부재와의 연결이 이루어지도록 하는 러그를 더 포함하여 구성되며, 상기 석재는 가장자리부분을 라운딩 처리하여 배수가 원활하게 이루어지도록 구성되고, 상기 콘크리트블록은 블록몸체의 가장자리를 모따기 처리를 하여 이웃하는 블록들과의 사이에 원활한 배수가 이루어지도록 구성된 것을 특징으로 한다.According to an aspect of the present invention, there is provided a stonewall formed on a slope formed by a cut soil or a clayey so as to be placed on a front surface of the stonewall to display natural beauty; An anchor installed at one side of the stone and exposed at the other side of the stone; And a concrete block formed integrally with the stone through the anchor, wherein the concrete block includes: a block body formed to be integrated with the stone through the anchor; and a block body protruding from the upper portion of the block body, A key groove formed in the lower portion of the block body so as to be concave in a width direction of the block body and inserted into the key body; And a lug which is formed to be protruded from the concrete block so that the lifting equipment can be hooked, and is formed so as to penetrate in the width direction of the concrete block, so that the tensile force with the adjacent blocks in the width direction through insertion of the tensile material can be introduced A horizontal tensile re-setting hole formed to penetrate the concrete block in a height direction of the concrete block, And a vertical tension re-installation hole for introducing a tensile force between adjacent blocks in the height direction through insertion of a tensile material, wherein the vertical tension re-installation hole is formed on the back surface of the concrete block and is connected to an anchor member provided inside the inclined surface The concrete block is chamfered at the edge of the block body to form a gap between the block and the neighboring blocks. So that drainage can be smoothly performed.

삭제delete

삭제delete

삭제delete

한편 본 발명은, 절토나 성토에 의해 형성되는 사면에 축조되고 축조시 전면에 위치하여 자연미가 나타내어지도록 하는 석재; 상기 석재에 일측단이 삽입되도록 설치되고 타측단은 석재의 외측으로 노출되도록 설치되는 앵커; 상기 앵커를 통해 상기 석재에 일체로 성형되는 콘크리트블록;을 포함하여 구성되고, 상기 콘크리트블록은, 상기 앵커를 통해 석재에 일체화되도록 성형되는 블록몸체와, 상기 블록몸체의 상부에서 돌출 형성되고 블록몸체의 폭방향으로 이격되도록 위치하는 2개의 키와, 상기 블록몸체의 하부에서 블록몸체의 폭방향으로 오목하게 형성되어 상기 키가 삽입되도록 하는 키홈과, 상기 2개의 키 사이에 위치하고 블록몸체의 상부방향으로 돌출되게 형성되어 인양장비가 걸려질 수 있도록 하는 러그를 포함하여 구성되며, 상기 콘크리트블록의 폭방향으로 관통하도록 형성되어 인장재의 삽입을 통한 폭 방향으로 이웃하는 블록들과의 인장력 도입이 이루어질 수 있도록 하는 수평인장재설치홀과, 상기 콘크리트블록의 높이 방향으로 관통하도록 형성되어 인장재의 삽입을 통한 높이 방향으로 이웃하는 블록들과의 인장력 도입이 이루어지도록 하는 수직인장재설치홀을 더 포함하여 구성되고, 상기 콘크리트블록의 배면에 형성되어 경사면의 내부에 설치되는 앵커부재와의 연결이 이루어지도록 하는 러그를 더 포함하여 구성되며, 상기 석재는 가장자리부분을 라운딩 처리하여 배수가 원활하게 이루어지도록 구성되고, 상기 콘크리트블록은 블록몸체의 가장자리를 모따기 처리를 하여 이웃하는 블록들과의 사이에 원활한 배수가 이루어지도록 구성된 것을 특징으로 하는 석재와 콘크리트의 합성블록 제작방법에 있어서,
석재에 앵커홀을 형성하고 상기 앵커홀에 앵커를 설치하는 앵커 설치단계; 상기 앵커가 설치된 석재를 상부가 개방된 형태로 상단 가장자리에 플랜지가 형성되며 바닥면에 설치되는 2개 이상의 지지프레임에 놓여지는 하부틀의 내부에 거치하되 상기 앵커가 하부틀의 외측으로 노출되도록 설치하는 석재 거치단계; 상기 석재의 가장자리와 하부틀의 내면이 접하는 부분에 실링재를 도포하여 석재의 전면으로 콘크리트가 누출되지 않도록 하는 실링재 도포단계; 상기 하부틀의 상부에 상부틀을 결합하는 상부틀 결합단계; 상기 상부틀의 내부에 콘크리트를 타설하여 석재와 일체화된 콘크리트블록을 형성하는 콘크리트블록 형성단계; 상기 콘크리트가 경화되면 상부틀과 하부틀을 제거하는 탈형단계;를 포함하여 구성되고, 상기 석재 거치단계는 상기 하부틀의 내부에 석재의 경사도에 대응되도록 경사진 형태의 받침판을 설치한 상태에서 석재를 거치하여 앵커가 정위치 되도록 구성되고, 상기 상부틀 결합단계는, 평단면이 ㄷ 형태로 형성되어 측면이 개방되도록 구성되고 하부에 플랜지가 형성된 상부틀몸체의 개방된 측면으로 하부에 플랜지가 형성된 측면커버를 결합하여 일체화한 후 상기 하부틀의 플랜지에 상기 상부틀의 플랜지를 볼트 및 너트로 결합하는 것을 특징으로 한다.
The present invention relates to a stone material which is formed on a slope formed by cut soil or embankment and is located on the front surface at the time of construction so that natural beauty is displayed; An anchor installed at one side of the stone and exposed at the other side of the stone; And a concrete block formed integrally with the stone through the anchor, wherein the concrete block includes: a block body formed to be integrated with the stone through the anchor; and a block body protruding from the upper portion of the block body, A key groove formed in the lower portion of the block body so as to be concave in a width direction of the block body and inserted into the key body; And a lug which is formed to be protruded from the concrete block so that the lifting equipment can be hooked, and is formed so as to penetrate in the width direction of the concrete block, so that the tensile force with the adjacent blocks in the width direction through insertion of the tensile material can be introduced A horizontal tensile re-setting hole formed to penetrate the concrete block in a height direction of the concrete block, And a vertical tension re-installation hole for introducing a tensile force between adjacent blocks in the height direction through insertion of a tensile material, wherein the vertical tension re-installation hole is formed on the back surface of the concrete block and is connected to an anchor member provided inside the inclined surface The concrete block is chamfered at the edge of the block body to form a gap between the block and the neighboring blocks. The method comprising the steps of: preparing a composite block of stone and concrete,
Anchoring step of forming an anchor hole in the stone and providing an anchor in the anchor hole; The stone having the anchor is installed in an upper part of the lower frame which is placed on two or more support frames provided with a flange at the upper edge and the upper part is opened and the anchor is exposed to the outside of the lower frame The stone-erection phase; Applying a sealing material to a portion of the stone that is in contact with the inner surface of the lower frame to prevent leakage of concrete to the front surface of the stone material; An upper frame coupling step of coupling an upper frame to an upper portion of the lower frame; A concrete block forming step of placing a concrete in the upper frame to form a concrete block integrated with the stone; And a demolding step of removing the upper frame and the lower frame when the concrete is hardened. In the stone mounting step, a pedestal plate having a shape inclined so as to correspond to the inclination of the stone is installed in the lower frame, And the anchors are fixedly positioned. In the upper frame engaging step, an open side of an upper frame body having a flat cross-section formed in a d-shape so as to open a side face and a lower flange is formed, And the flanges of the upper frame are coupled to the flanges of the lower frame by bolts and nuts after the side covers are combined and integrated.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이상에서 설명한 바와 같이 본 발명에 의하면, 이와 같이 구성되는 본 발명의 합성블록은 석재에 앵커를 설치해놓은 상태에서 콘크리트를 타설하여 앵커를 통해 석재와 일체화된 콘크리트블록을 형성함으로서 석재와 콘크리트블록의 결합력이 향상되고 이로 인해 석재가 탈락되는 등의 사고를 예방하며 석축구조체의 안정성을 확보할 수 있는 효과가 있다.As described above, according to the present invention, in the composite block of the present invention constructed as described above, the anchor is installed on the stone, and the concrete is laid through the anchor to form a concrete block integrated with the stone, Thereby improving the stability of the stone structure and preventing an accident such as dropping of the stone.

또한 석축구조체의의 전면에 석재가 노출됨으로써 석축구조체의 자연미를 살려 주는 효과가 있다.In addition, the stone is exposed on the entire surface of the stone structure, thereby improving the natural beauty of the stone structure.

또한 석재에 콘크리트블록을 일체화되도록 합성하여 일정한 형태의 합성블록을 제작하게 됨으로써 석재만으로 쌓게 되는 종래의 석축쌓기에 비해 일정한 뒷길이를 가지므로 시공성과 안정성이 우수하고 일부분만 석재로 이루어지고 나머지는 콘크리트로 구성함으로써 자재비를 절감할 수 있는 효과가 있다.In addition, since the concrete block is integrated into the stone to form a certain type of synthetic block, the concrete block has a constant backing compared to the conventional stone piling which is stacked only by the stone, so the workability and stability are excellent, So that the material cost can be reduced.

또한 러그를 통해 합성블록의 권양이 용이하게 이루어지게 됨으로서 시공성이 매우 우수한 효과가 있다.Also, since the synthetic block can be easily lifted through the lug, the workability is very excellent.

또한 인장재를 이용하여 상,하 및 좌,우에 위치한 합성블록들에 인장력을 도입한 후 일체로 연결해줌으로써 구조적으로 매우 안정적인 석축구조체를 형성하는 효과가 있다.In addition, tensile force is applied to the upper, lower, left, and right composite blocks by using a tensile material, and then integrally connected to each other, thereby forming a structurally very stable torsion structure.

또한 합성블록을 제작하는 과정에서 석재가 설치되는 하부틀과 콘크리트블록의 형성을 위한 상부틀로 이루어진 형틀을 통해 제작하게 됨으로써 합성블록의 제작이 용이하게 이루어지는 효과가 있다.In addition, the composite block can be easily manufactured by forming a lower frame to which a stone is installed and a mold frame having an upper frame for forming a concrete block in the process of manufacturing the composite block.

또한 합성블록을 제작하는 과정에서 하부틀에 석재를 넣고 실링재를 도포한 상태에서 상부틀을 설치한 후 콘크리트를 타설하여 콘크리트블록을 형성함으로써 콘크리트가 석재의 전면으로 누출되는 것을 방지해주는 효과가 있다.Also, in the process of manufacturing the composite block, the stone is inserted into the lower frame, the upper frame is installed in the state that the sealing material is applied, and the concrete is laid to form the concrete block, thereby preventing the concrete from leaking to the front of the stone.

또한 석축구조체를 시공하는 과정에서 보강수단을 통해 합성블록의 뒷 길이를 보완해줌으로써 합성블록의 뒷길이를 안정적으로 확보할 수 있는 효과가 있는 매우 유용한 발명이다.In addition, it is a very useful invention that can secure the back road of the composite block by supplementing the rear length of the composite block through the reinforcement means in the process of constructing the torsion bar structure.

도 1 은 본 발명에 의한 합성블록을 나타낸 사시도,
도 2 는 본 발명에 의한 합성블록을 나타낸 단면도,
도 3 은 본 발명에 의한 합성블록에 있어 석재를 다수개 설치한 상태를 나타낸 예시도,
도 4 는 본 발명의 합성블록에 수평인장재설치홀 및 수직인장재설치홀을 더 형성한 상태를 나타낸 예시도,
도 5 는 본 발명의 합성블록을 인장재를 통해 수평방향으로 연결한 상태를 나타낸 예시도,
도 6 은 본 발명에 의한 합성블록을 제작하기 위한 하부틀과 상부틀을 나타낸 예시도,
도 7 는 본 발명에 의한 상부틀의 구조를 나타낸 예시도,
도 8 은 본 발명에 의한 하부틀에 석재를 설치한 상태를 나타낸 예시도,
도 9 는 본 발명에 있어 석재가 설치된 하부틀에 상부틀을 결합하고 콘크리트를 타설하여 콘크리트블록을 형성하는 과정을 나타낸 예시도,
도 10 은 본 발명에 의한 합성블록을 이용하여 석축구조체를 시공한 상태를 나타낸 단면도,
도 11 은 본 발명에 의한 합성블록을 이용하여 시공된 석축구조체를 나타낸 정면도,
도 12 는 본 발명에 의한 합성블록을 이용한 석축구조체의 시공시 그리드와 채움재를 이용한 보강부재를 설치한 상태를 나타낸 예시도,
도 13 은 본 발명에 의한 합성블록을 이용한 석축구조체의 시공시 앵커부재를 포함한 보강부재를 상태를 나타낸 예시도,
도 14는 본 발명의 방향전환블록을 이용하여 사면의 볼록한 회전부에서의 시공상태를 나타낸 예시도,
도 15는 본 발명의 방향전환블록을 이용하여 사면의 오목한 회전부에서의 시공상태를 나타낸 예시도,
도 16 은 본 발명의 방향전환블록과 합성블록을 인장재를 통해 연결한 상태를 나타낸 예시도.
1 is a perspective view showing a composite block according to the present invention,
2 is a cross-sectional view of a composite block according to the present invention,
Fig. 3 is an exemplary view showing a state in which a plurality of stones are installed in the composite block according to the present invention. Fig.
4 is a view showing a state in which a horizontal tension pulling hole and a vertical tension pulling back hole are further formed in the composite block of the present invention,
5 is an illustration showing a state in which the composite blocks of the present invention are connected in a horizontal direction through a tensile member;
6 is a view illustrating an upper frame and a lower frame for manufacturing the composite block according to the present invention,
7 is an exemplary view showing the structure of an upper frame according to the present invention,
8 is a view showing a state where a stone is installed on a lower frame according to the present invention.
9 is a view illustrating a process of joining an upper frame to a lower frame provided with a stone material and forming a concrete block by placing concrete in the present invention.
10 is a cross-sectional view showing a state in which a stone building structure is installed using a composite block according to the present invention,
11 is a front view showing a tile structure constructed using a composite block according to the present invention,
12 is a view showing a state in which a reinforcing member using a grid and a filler material is installed at the time of construction of a tread structure using the composite block according to the present invention,
13 is an exemplary view showing a state of a reinforcing member including an anchor member at the time of construction of a tread structure using the composite block according to the present invention,
14 is an exemplary view showing a construction state in a convex rotating part of a slope using the direction switching block of the present invention,
15 is an exemplary view showing a construction state in a concave turning part of a slope using the direction switching block of the present invention,
16 is an exemplary view showing a state in which a direction switching block and a composite block of the present invention are connected to each other through a tensile member;

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명에 의한 합성블록을 나타낸 사시도, 도 2 는 본 발명에 의한 합성블록을 나타낸 단면도, 도 3 은 본 발명에 의한 합성블록에 있어 석재를 다수개 설치한 상태를 나타낸 예시도로서,FIG. 1 is a perspective view showing a composite block according to the present invention, FIG. 2 is a sectional view showing a composite block according to the present invention, FIG. 3 is an illustration showing a state in which a plurality of stone blocks are installed in a composite block according to the present invention,

본 발명의 합성블록(100)은 다단으로 조적되어 석축구조체를 형성하는 것으로, 조적시에 전면에 위치하여 석축구조체의 자연미가 나타내어지도록 하는 석재(110)와, 상기 석재(110)에 일측단이 삽입되도록 설치되고 타측단은 석재(110)의 외측으로 노출되도록 설치되는 앵커(130)와, 상기 앵커(130)를 통해 석재(110)에 일체로 형성되는 콘크리트블록(120)을 포함하여 구성된다.The composite block 100 according to the present invention is a multi-stage composite stone structure, which comprises a stone 110 positioned on the front surface of the stone structure to show the natural beauty of the stone structure, And a concrete block 120 integrally formed on the stone 110 through the anchor 130. The anchor 130 is installed to be inserted into the stone 110 and the other end is exposed to the outside of the stone 110, .

상기 석재(110)는 합성블록(100)을 조적하여 석축구조체를 시공할 경우 전면에 노출되도록 구성됨으로써 석축구조체의 미관이 향상되고 자연미가 나타나도록 구성된다.When the stone block 110 is assembled with the synthetic block 100 and the stone block structure is installed, the stone block 110 is exposed to the front surface, thereby improving the appearance of the stone structure and showing natural beauty.

이러한 석재(110)는 화강석과 같은 통상의 석재로 구성할 수 있으며 가장자리부분은 라운딩처리하여 배수가 원활하게 이루어지도록 한다.The stone 110 may be made of a common stone such as a granite, and the edges of the stone 110 may be rounded so that the drainage can be smoothly performed.

또한 도 3에서와 같이 석재(110)는 다수개로 구성할 수 도 있으며, 다수개로 구성할 경우에는 각각의 석재(110)에 상기 앵커(130)를 설치하여 콘크리트블록(120)과 일체화되도록 한다.As shown in FIG. 3, the number of the stones 110 may be plural. In the case of a plurality of stones 110, the anchors 130 are installed on the respective stones 110 so as to be integrated with the concrete blocks 120.

상기 앵커(130)는 통상의 셋트앵커로 구성할 수 있으며, 석재(110)가 이탈되지 않도록 2개 이상 설치하여 구성할 수도 있다.The anchor 130 may be formed of a conventional set anchor, and two or more stones 110 may be installed so as not to be detached.

한편 상기 콘크리트블록(120)은, 블록몸체(121)와, 상기 블록몸체(121)의 상부에서 상부방향으로 돌출 형성되고 블록몸체(121)의 폭방향으로 이격되도록 위치하는 2개의 키(122)와, 상기 블록몸체(121)의 하부에서 블록몸체(121)의 폭방향으로 오목하게 형성되어 상기 키(122)가 삽입되도록 하는 키홈(123)과, 상기 2개의 키(122) 사이에 위치하고 블록몸체(121)의 상부방향으로 돌출되게 형성되어 인양장비를 통해 인양이 이루어지도록 하는 러그(128a)를 포함하여 구성된다.The concrete block 120 includes a block body 121 and two keys 122 protruding upward from the upper portion of the block body 121 and spaced apart in the width direction of the block body 121, A key groove 123 recessed in the width direction of the block body 121 at a lower portion of the block body 121 to allow the key 122 to be inserted therein and a key groove 123 positioned between the two keys 122, And a lug 128a protruding upwardly from the body 121 to allow lifting through the lifting equipment.

상기 블록몸체(121)의 가장자리는 모따기 처리를 하여 이웃하는 블록들과의 사이에서 원활한 배수가 이루어질 수 있도록 한다.The edges of the block body 121 are chamfered to allow smooth drainage between adjacent blocks.

한편 상기 키(122)는 키홈(123)보다 배면에 위치되도록 형성되어 합성블록(100)이 배면으로 후퇴되면서 조적되고 이로 인해 석축구조체가 배면방향으로 경사지도록 시공되어 구조적으로 안정적인 석축구조체의 시공이 이루어진다.Meanwhile, the key 122 is formed on the back surface of the key groove 123 so that the synthetic block 100 is assembled while being retreated to the backside, thereby causing the torsion bar structure to be tilted in the backward direction, so that the construction of the structurally stable torsion bar structure .

상기 키(122)와 키홈(123)은 하부에서 상부방향을 향해 폭이 좁아지도록 형성되어 합성블록(100)을 조적하는 과정에서 키(122)에 키홈(123)이 용이하게 삽입되어 시공성이 향상된다.The key 122 and the key groove 123 are formed to have a narrow width from the bottom toward the top so that the key groove 123 is easily inserted into the key 122 in the course of assembling the synthetic block 100, do.

상기 러그(128a)는 인양장비를 통해 인양이 이루어지도록 함으로써 안전하고 정밀한 시공이 이루어지게 된다.The lug 128a is lifted up through the lifting equipment, so that safe and precise construction is achieved.

또한 상기 콘크리트블록(120)은 블록몸체(121)의 폭방향으로 관통하도록 형성되는 수평인장재설치홀(124)을 더 형성할 수 있으며 이러한 수평인장재설치홀(124)은 쉬스관의 설치를 통해 형성된다.The concrete block 120 may further include a horizontal tension re-installation hole 124 formed to pass through the block body 121 in a width direction. The horizontal re-tension re-installation hole 124 may be formed through the installation of a sheath pipe do.

이러한 합성블록(100)은 수평인장재설치홀(124)을 통해 설치되는 인장재(600)를 통해 다수의 합성블록(100)들에 인장력을 도입해줌으로써 합성블록(100)들을 일체화시켜 구조적으로 견고한 시공이 가능하게 된다. The composite block 100 is formed by integrating the composite blocks 100 by introducing a tensile force to a plurality of the composite blocks 100 through a tension member 600 installed through the horizontal tension re-installation holes 124, Lt; / RTI >

한편 상기 수평인장재설치홀(124)의 입구에는 인장재의 정착이 이루어지도록 오목한 형태의 정착홈(125)을 더 형성할 수 있다.Meanwhile, the entrance of the horizontal tension re-installation hole 124 may be further formed with a fixing groove 125 having a concave shape so as to fix the tensile material.

또한 상기 콘크리트블록(120)은 도 4, 5 에서와 같이 블록몸체(121)의 높이 방향으로 관통되도록 형성되어 인장재(600)의 설치가 가능하도록 하는 2개의 수직인장재설치홀(126)을 더 포함하여 구성할 수 있다.4 and 5, the concrete block 120 further includes two vertical tension re-installation holes 126 formed to penetrate through the block body 121 in a height direction thereof to allow the tension member 600 to be installed therein .

상기 수직인장재설치홀(126)은 합성블록(100)의 중심을 기준으로 서로 대칭되도록 위치하여 엇갈리도록 조적되는 합성블록(100)에 인장재(600)의 설치가 이루어지도록 한다.The vertical tension re-installation holes 126 are positioned symmetrically with respect to the center of the composite block 100 so that the tension member 600 is installed on the composite block 100 that is staggered.

상기 수직인장재설치홀(126)을 통해서 인장재(600)를 설치하여 석축구조체의 높이 방향으로 조적되는 합성블록(100)들을 일체로 연결한 후 인장력을 도입하고 정착시킴으로써 석축구조체의 구조적인 안정성을 향상시킬 수 있게 되는 것이다.The tension members 600 are installed through the vertical tension re-installation holes 126 to integrally connect the composite blocks 100 that are assembled in the height direction of the stone structure, and then the tensile force is introduced and fixed to improve the structural stability of the stone structure. .

또한 상기 수직인장재설치홀(126)에 오목하게 형성되는 정착홈(127)을 더 포함하여 구성할 수 있다.Further, it may further comprise a fixing groove 127 formed in the vertical tension re-setting hole 126.

한편 상기와 같이 구성되는 합성블록(100)을 제작하는 과정을 도 6~9를 통해 설명하면, 먼저 석재(110)에 앵커(130)를 설치하여 콘크리트블록(120)의 일체화가 이루어질 수 있도록 하는 앵커설치단계와, 상기 앵커(130)가 설치된 석재(110)를 상부가 개방된 박스형태의 하부틀(200) 내부에 거치하되, 상기 앵커(130)가 하부틀(200)의 외측으로 노출되도록 설치하는 석재 거치단계와, 상기 하부틀(200)에 거치된 석재(110)의 가장자리와 하부틀(200)의 내면이 접하는 부분에 실링재(230)를 도포하여 석재(110)의 전면으로 콘크리트가 누출되지 않도록 하는 실링재 도포단계와, 상기 하부틀(200)의 상부에 상부틀(300)을 결합하는 상부틀 결합단계와, 상기 상부틀(300)의 내부에 콘크리트를 타설하여 상기 석재(110)에 앵커(130)를 통해 일체화되는 콘크리트블록(120)을 형성하는 콘크리트블록 형성단계와, 상기 콘크리트가 경화되어 콘크리트블록(120)이 형성되면 상부틀(300)과 하부틀(200)을 제거하는 탈형단계를 포함하여 구성된다.6 to 9, an anchor 130 is installed on the stone 110 to allow the concrete block 120 to be united with the anchor 130. In this case, The anchor 130 is installed in a box-shaped lower frame 200 having an open upper part and the anchor 130 is exposed to the outside of the lower frame 200 And a sealing material 230 is applied to a portion where the edge of the stone 110 mounted on the lower frame 200 and the inner surface of the lower frame 200 are in contact with each other, The upper frame 300 is coupled to the upper frame 300 and the concrete is inserted into the upper frame 300 to prevent the stone 110 from being leaked. A concrete block 120 that is integrated through an anchor 130, And a demolding step of removing the upper frame 300 and the lower frame 200 when the concrete is hardened and the concrete block 120 is formed.

상기 하부틀(200)은 바닥면에 설치되는 적어도 2개 이상의 지지프레임(400)에 놓여지도록 설치하여 전도를 방지한다.The lower frame 200 is installed on at least two support frames 400 installed on the bottom surface to prevent conduction.

이와 같이 구성되는 하부틀(200)은 상부가 개방되고 내부에 상기 석재(110)가 놓여지는 박스형태의 하부틀몸체(210)와, 상기 하부틀몸체(210)의 내부에서 석재(110)의 구배에 대응되도록 형성되어 석재(110)를 받쳐주는 받침판(220)이 더 설치되어 석재 거치단계에서 석재(110)이 안정적으로 거치될 수 있도록 한다.The lower frame 200 having the above structure includes a lower frame body 210 in the form of a box having an open top and the stone 110 placed therein, A supporting plate 220 formed to correspond to the gradient and supporting the stone 110 is further provided so that the stone 110 can be stably mounted in the stone mounting step.

즉 석재 거치단계에서 석재(110)에 설치된 앵커(130)가 콘크리트블록(120)과의 일체화를 위해 수직한 형태로 위치해야 하는데 석재(110)의 전면이 경사지게 형성됨으로써 하부틀(200)의 내부에 석재(110)를 거치한다 하더라도 앵커(130)는 경사진 형태로 위치하게 되는데, 이때 석재(110)의 전면에 형성된 경사면에 대응되도록 하부틀(200)의 내부에 경사진 형태의 받침판(220)을 설치해 놓음으로써 앵커(130)를 수직하게 위치시킬 수 있게 되고 이로 인해 콘크리트블록(120)과의 일체화가 용이하게 이루이지게 되는 것이다.That is, the anchor 130 installed on the stone 110 must be positioned vertically for integration with the concrete block 120 in the stone installation stage. The front surface of the stone 110 is inclined, The anchor 130 is inclined even if the stone 110 is mounted on the stone 110. At this time, the anchor 130 is sloped to correspond to the inclined surface formed on the front surface of the stone 110, So that the anchor 130 can be positioned vertically, thereby facilitating integration with the concrete block 120.

한편 상기 하부틀몸체(210)의 상단 가장자리에는 상기 상부틀(300)과의 볼트 (500)및 너트(510) 결합을 위한 플랜지(211)가 더 형성된다.A flange 211 for coupling the bolt 500 with the upper frame 300 and the nut 510 is formed on the upper edge of the lower frame body 210.

상기 실링재 도포단계는 하부틀(200)의 내부에 콘크리트를 타설하여 석재(110)과 일체화되는 콘크리트블록(120)을 형성하는 과정에서 타설되는 콘크리트가 석재(110)과 하부틀(200) 사이틈으로 흘러 하부틀(200)의 바닥면으로 유출됨으로써 석재(110)의 전면에 콘크리트가 부착되는 것을 방지하기 위해 도포되는 것이다.The sealing material applying step may be performed in such a manner that the concrete placed in the process of forming the concrete block 120 integrated with the stone material 110 by pouring concrete into the lower frame 200 is separated from the gap between the stone material 110 and the lower frame 200 And flows out to the bottom surface of the lower frame 200 to prevent the concrete from adhering to the entire surface of the stone 110. As shown in FIG.

한편 상기 상부틀 결합단계는 평단면이 ㄷ 형태로 형성되어 측면이 개방되도록 형성되는 상부틀몸체(310)와, 상기 상부틀몸체(310)의 개방된 부분으로 볼트(500) 및 너트(510)를 통해 결합되어 상부틀몸체(310)의 개방부분을 밀폐해주는 측면커버(320)를 포함하여 구성된 상부틀(300)을 하부틀(200)의 상부에 결합하는 과정이다.Meanwhile, the upper frame coupling step may include a top frame body 310 formed to have a flat cross-section and open at its side, and a bolt 500 and a nut 510 as open portions of the upper frame body 310. [ And a side cover 320 which is coupled to the upper frame body 310 and closes an open portion of the upper frame body 310. The upper frame body 300 is coupled to an upper portion of the lower frame 200.

상기 상부틀몸체(310)의 하부와 측면커버(320)의 하부에는 상기 하부틀(200)의 플랜지(211)와 대응되도록 형성되어 볼트(500) 및 너트(510)를 통해 체결이 이루어지게 되는 플랜지(311)(321)가 형성된다.A lower portion of the upper frame body 310 and a lower portion of the side cover 320 are formed to correspond to the flanges 211 of the lower frame 200 and are fastened through the bolts 500 and the nuts 510 Flanges 311 and 321 are formed.

본 발명의 상부틀(300)은 상기와 같이 상부틀몸체(310)와 측면커버(320)을 분리하여 구성함으로서 키홈(123)의 형성에 의해 상부틀을 일체로 밀어서 탈형할 수 없는 문제점을 해결하여 상부틀(300)의 탈형이 용이하게 이루어지게 되는 것이다.The upper frame 300 of the present invention is constructed by separating the upper frame body 310 and the side cover 320 as described above and thus the upper frame can not be pushed integrally by the formation of the key groove 123 So that the upper mold 300 can easily be demolded.

이와 같이 구성되는 상부틀(300)은 상부틀몸체(310)와 측면커버(320)를 조립하여 일체로 구성한 상태에서 상기 하부틀(200)의 상부에 안착시킨 후 하부틀(200)과 결합하게 된다.The upper frame 300 having the above structure is assembled with the upper frame body 310 and the side cover 320 so that the upper frame body 310 and the side cover 320 are integrated with each other, do.

한편 상기 상부틀(300)을 설치한 후 러그(128a)를 설치한 상태에서 상기 콘크리트블록 형성단계를 수행하게 된다.Meanwhile, after the upper frame 300 is installed, the concrete block forming step is performed in a state where the lug 128a is installed.

상기 콘크리트블록 형성단계는 상부틀(300)의 내부로 콘크리트를 타설하여 하부틀(200)의 석재(110)와 콘크리트가 앵커(130)를 통해 일체화된 상태의 콘크리트블록(120)을 형성하게 되는 것이다.In the concrete block forming step, the concrete is placed in the upper frame 300 to form the concrete block 120 in a state where the stone 110 of the lower frame 200 and the concrete are integrated through the anchor 130 will be.

상기 탈형단계는 하부틀(200)에서 상부틀(300)을 분리하고 나머지 하부틀(200)을 제거함으로써 석재(110)과 콘크리트블록(120)이 일체화된 합성블록(100)을 형성하는 과정이다.The demolding step is a process of forming a composite block 100 in which the stone 110 and the concrete block 120 are integrated by separating the upper frame 300 from the lower frame 200 and removing the remaining lower frame 200 .

이와 같이 구성되는 본 발명의 합성블록(100)을 이용한 석축구조체는, 도 10, 11에서와 같이 바닥면에 형성되는 기초부(10)와, 상기 기초부(10)의 상부에 서로 엇갈리도록 다단으로 조적되는 상기 합성블록(100)과, 상기 조적된 합성블록(100)들 중 최상단에 조적된 합성블록(100)의 상부에 조적되는 덮개용 합성블록(101)과, 상기 합성블록(100)들과 덮개용 합성블록(101)들의 배면에 형성되는 배수가 이루어지도록 하는 배수층(700)을 포함하여 구성된다.10 and 11, and the upper part of the base part 10 is provided with a plurality of stepped portions 10a and 10b so as to be offset from each other on the upper part of the base part 10, A cover synthetic block 101 to be assembled on the upper part of the synthetic block 100 which is assembled at the uppermost one of the combined synthetic blocks 100, And a drainage layer (700) for draining water formed on the back surface of the lid synthetic blocks (101).

또한 합성블록(100)은 상기에서 기재된 바와 같이 석재(110)와 콘크리트블록(120) 및 앵커(130)를 포함하여 구성되는 것으로 석재(110)가 외부로 노출되도록 설치되는 것이다.The composite block 100 includes the stone 110, the concrete block 120 and the anchor 130 as described above, and the stone 110 is installed to be exposed to the outside.

상기 덮개용 합성블록(101)은 석축구조체의 전면으로 노출되는 석재(110)와, 상기 석재(110)와 앵커(130)를 통해 일체로 성형되는 콘크리트블록(120)으로 이루어지되 콘크리트블록(120)의 상부에 토사가 채워지기 위한 토사채움 단턱부(129)가 형성된다.The cover synthetic block 101 comprises a stone 110 exposed to the front surface of the stone structure 110 and a concrete block 120 integrally formed with the stone 110 and the anchor 130. The concrete block 120 Is formed on the upper surface of the ground-filling step 129 to fill the soil.

한편 본 발명의 석축구조체는 상기 합성블록(100)들에 연결되고 석축구조체의 배면으로 연장되도록 설치되어 합성블록(100)들을 사면에 견고히 고정해줌으로써 석축구조체의 구조적인 안정성을 향상시켜주는 보강수단(800)을 더 포함하여 구성된다.The torsional structure of the present invention is connected to the composite blocks 100 and is installed to extend to the back surface of the torsional structure to firmly fix the composite blocks 100 to the slope, thereby enhancing the structural stability of the torsional structure. (800).

상기 보강수단(800)은, 도 12에서와 같이 상기 합성블록(100)의 하부에 일측단이 개재되도록 연결되고 타측단은 합성블록(100)의 배면으로 연장된 후 다시 합성블록(100) 방향으로 감겨져 상부에 조적되는 합성블록(100)과의 사이에 개재되도록 설치되는 그리드(810)와, 상기 감겨지도록 설치되는 그리드(810)의 내부에 채워지는 채움재(820)를 포함하여 구성할 수 있다.12, the reinforcement means 800 is connected to the lower portion of the composite block 100 so that one end thereof is interposed and the other end thereof extends to the back surface of the composite block 100, And a filler 820 filled in the grid 810 to be wound so as to be interposed between the composite block 100 and the composite block 100 that is wound on the upper portion of the composite block 100, .

즉 그리드(810)는 일측단이 합성블록(100)의 키(122)에 걸려지도록 설치되고 요구된 길이까지 후방으로 연장되고 상부에 놓여지는 채움재(820)을 ㄷ자형이 되도록 감싸 다음 높이의 합성블록(100)의 키(122)에 고정하게 되는 것이다.That is, the grid 810 is installed so that one end of the grid 810 is hooked to the key 122 of the composite block 100, and the filler material 820 extending rearward to the required length and placed on the top is wrapped in a C shape, The key 122 of the block 100 is fixed.

이러한 보강수단(800)은 합성블록(100)의 안정적인 뒷길이를 확보하여 석축구조체의 구조적인 안정성을 향상시켜주게 되는 것이다.The reinforcing means 800 secures a stable backing of the composite block 100 to improve the structural stability of the stone structure.

한편 상기 보강수단(800)은 도 13에서와 같이 합성블록(100)의 배면에 형성되는 러그(128b)에 일측단이 연결되고 타측단은 사면의 내부에 고정되도록 설치되는 앵커부재(830)로 구성할 수 있다.13, the reinforcing unit 800 includes an anchor member 830 having one end connected to the lug 128b formed on the back surface of the composite block 100 and the other end fixed to the inside of the slope Can be configured.

상기 앵커부재(830)는 어스앵커, 락볼트, 쏘일네일 등 다양한 형태로 구성할 수 있다.The anchor member 830 can be formed in various forms such as an earth anchor, a rock bolt, and a soil nail.

한편 본 발명의 석축구조체는 사면의 회전각도에 대응되어 시공이 가능하도록 방향전환블록(102)을 더 포함하여 구성된다.Meanwhile, the torsion bar structure of the present invention further includes a direction switching block 102 so that the torsion bar structure can be constructed corresponding to the rotation angle of the slope.

상기 방향전환블록(102)은 도 14, 15에서와 같이 석축구조체의 전면으로 노출되는 석재(110)와, 상기 석재(110)와 앵커(130)를 통해 일체로 성형되는 콘크리트블록(120)을 포함하여 구성되되, 사면의 회전각도에 대응되도록 소정의 각도로 절곡된 형태의 절곡부(140)가 더 형성된다.14 and 15, the direction switching block 102 includes a stone 110 exposed to the front surface of the stone structure and a concrete block 120 integrally formed through the stone 110 and the anchor 130 The bent portion 140 is further bent at a predetermined angle to correspond to the angle of rotation of the slope.

이러한 방향전환블록(102) 다단으로 축조시 서로 엇갈리도록 축조되는 블록의 조적구조에 의해 짝수층과 홀수층의 절곡부(140)의 형성위치를 서로 엇갈리게 구성하게 된다.The formation positions of the even-numbered layers and the odd-numbered folded portions 140 are staggered from each other due to the coarse structure of the blocks which are formed so as to be offset from each other in the multi-

또한 도 16에서와 같이 상기 방향전환블록(102)에도 수평인장재설치홀(124)과 수직인장재설치홀(126)을 형성하고 인장재(600)를 설치하여 인장력을 도입함으로써 석축구조체의 폭방향으로 위치하는 합성블록(100)들 및 석축구조체의 높이방향으로 위치하는 방향전환블록(102)과의 견고한 연결 시공이 가능하게 된다.16, a horizontal tension re-installation hole 124 and a vertical tension re-installation hole 126 are formed in the direction switching block 102, and a tension member 600 is installed to introduce a tensile force, It is possible to firmly connect the composite blocks 100 and the direction switching block 102 located in the height direction of the torsion bar structure.

한편 상기와 같이 구성되는 본 발명의 석축구조체의 시공방법은, 먼저 절토 및 성토를 통해 형성되는 경사면의 전방 바닥면을 평탄화하고 기초부(10)를 형성하는 기초형성단계와, 상기 기초부(10)의 상부에 사면의 폭방향을 따라 합성블록(100)을 배열하는 합성블록 배열단계와, 상기 합성블록(100)의 배면에 자갈을 채워 넣어 배수층(700)을 형성하는 배수층 형성단계와, 상기 합성블록(100)의 상부에 다른 합성블록(100)을 교차되도록 조적하여 설계된 높이까지 조적하되, 조적되는 합성블록(100)의 배면에 배수층(700)을 형성하면서 조적하는 연속 조적단계와, 상기 최상단에 조적된 합성블록(100)의 상부에 덮개용 합성블록(101)을 조적하는 덮개용 합성블록 조적단계를 포함하여 구성된다.Meanwhile, the method of constructing the torsion constriction according to the present invention comprises: a foundation forming step of flattening the front bottom surface of the inclined surface formed through the cut soil and the embankment and forming the foundation 10; A drain block formation step of forming a drain layer 700 by filling gravel on the back surface of the composite block 100, and a drainage layer forming step of forming a drainage layer 700 on the back surface of the composite block 100, A consecutive masonry step for masonry formation on the upper part of the composite block 100 so as to intersect the other composite blocks 100 to a height designed to form the masonry layer 700 on the back side of the composite block 100 to be masoned, And a lid synthetic-block building step of laminating the cover synthetic block 101 on the upper part of the synthetic block 100 integrated at the uppermost stage.

상기 기초형성단계는 바닥면을 평탄화하고 평탄화된 바닥면에 기초형성을 위한 블록을 설치하거나 콘크리트를 타설하여 형성되는 것이다.The base forming step is formed by flattening the bottom surface, installing a block for forming the foundation on the flattened floor surface, or placing the concrete.

상기 합성블록(100)은 위에서 기재된 바와 같이 석재(110)와 앵커(130) 및 콘크리트블록(120)을 포함하여 구성되는 것을 알 수 있다.It will be appreciated that the composite block 100 comprises the stone 110, the anchor 130 and the concrete block 120 as described above.

상기 연속 조적단계는 하부에 위치한 합성블록(100)의 키(122)에 조적하고자 하는 합성블록(100)의 키홈(123)이 삽입되도록 하고 상, 하에 위치한 합성블록들(100)이 서로 엇갈리도록 하여 다단으로 조적하는 과정이다.In the continuous joining step, the key groove 123 of the synthetic block 100 to be combined with the key 122 of the synthetic block 100 positioned below is inserted, and the synthetic blocks 100 positioned above and below are interleaved with each other It is a process of collaborating in multi-tiered way.

이때 상기 합성블록(100)은 러그(128a)에 인양장비를 연결하여 인양장비의 작동을 통해 용이하게 운반 및 시공이 이루어질 수 있게 된다.At this time, the composite block 100 can be easily transported and constructed by connecting lifting equipment to the lug 128a and operating the lifting equipment.

또한 상기 합성블록 배열단계와 연속조적단게에서는 상기 콘크리트블록(120)에 형성되는 수평인장재설치홀(124) 및 수직인장재설치홀(126)을 통해 인장재(600)를 설치하여 인장력을 도입함으로서 합성블록(100)들이 상호 일체로 견고히 연결됨으로써 석축구조체의 구조적인 안정성을 확보할 수 있게 된다.In the composite block arranging step and the continuous joint step, a tensile force is installed through the horizontal tension re-installation holes 124 and the vertical tension re-installation holes 126 formed in the concrete block 120, (100) are integrally and solidly connected to each other, the structural stability of the stone structure can be ensured.

한편 상기 합성블록 배열단계와 연속 조적단계에서 합성블록(100)에 보강수단(800)의 일측단을 연결하고 타측단은 사면으로 연장하여 고정시킴으로써 합성블록(100)의 뒷길이를 확보하여 석축구조체의 구조적인 안정성을 향상시켜줄 수 있다.In the composite block arranging step and the continuous assembling step, one end of the reinforcing means 800 is connected to the composite block 100 and the other end is extended and fixed to the slope, thereby securing the back side of the composite block 100, Can be improved.

상기 보강수단(800)은 상기에서 기재된 바와 같이 그리드와 상기 그리드(810)에 감싸여지는 잡석(820)을 포함하여 구성하거나, 사면에 설치되는 앵커부재(830)를 러그(128b)에 연결하도록 구성된다.The reinforcement means 800 may comprise a grid and a rubble 820 wrapped around the grid 810 as described above or may be constructed to connect an anchor member 830 to a lug 128b .

상기 덮개용 합성블록 조적단계는, 최상단에 조적되는 블록에는 토압이 작게 작용하는 구조적인 이점을 이용하여 토사채움 단턱부(129)가 형성된 덮개용 합성블록(101)을 조적하여 토사채움 단턱부(129)를 통해 토사가 보다 많이 채워지게 됨으로 표층토사의 면적을 크게 할 수 있는 것이다. In the step of assembling the lid synthetic block, the lid synthetic block 101 formed with the ladder fillet step 129 is assembled by using the structural advantage that the earth pressure acts on the block to be assembled at the upper end, 129), so that the surface area of the surface layer can be increased.

한편 석축구조체를 시공하는 과정에서 사면이 소정의 회전각도를 갖도록 구성될 경우에는 사면의 회전각도에 대응되도록 절곡부(140)가 형성되어 있는 방향전환블록(102)을 설치하여 합성블록(100)들을 연결하여 시공할 수 있다.On the other hand, when the slope structure is constructed so as to have a predetermined angle of rotation in the process of constructing the torsion bar, the direction changing block 102 having the bent portion 140 is provided to correspond to the angle of rotation of the slope, Can be connected to each other.

이와 같이 구성되는 본 발명은 또한 석재(110)에 앵커(130)를 설치해놓은 상태에서 콘크리트를 타설하여 앵커를 통해 석재(110)와 일체화된 콘크리트블록(120)을 형성함으로서 석재(110)와 콘크리트블록(120)의 결합력이 향상되어 석재(110)가 탈락되는 등의 사고를 예방하고 석축구조체의 안정성을 확보할 수 있다.The present invention configured as described above also has a structure in which concrete is installed in an anchor 130 on a stone 110 and a concrete block 120 integrated with the stone 110 is formed through an anchor so that the stone 110 and concrete The coupling strength of the block 120 is improved, thereby preventing an accident such as the stone 110 falling off, and securing the stability of the stone structure.

또한 석축구조체의 전면에 석재(110)가 노출됨으로써 석축구조체의 자연미를 살려 주는 효과가 있다.Further, the stone 110 is exposed on the entire surface of the torsion bar structure, thereby improving the natural beauty of the torsion bar structure.

또한 러그(128a)를 통해 합성블록(100)의 권양이 용이하게 이루어지게 됨으로서 시공성이 매우 우수하다.Also, since the composite block 100 can be easily lifted up through the lugs 128a, the workability is excellent.

또한 인장재(600)를 이용하여 상,하 및 좌,우에 위치한 합성블록(100)들에 인장력을 도입한 후 일체로 연결해줌으로써 구조적으로 매우 안정적인 석축구조체를 형성할 수 있게 된다.In addition, tensile force is introduced into the composite blocks 100 located at the upper, lower, left, and right positions using the tensile material 600, thereby integrally connecting the composite blocks 100, thereby forming a highly stable tactile structure.

또한 합성블록(100)을 제작하는 과정에서 석재(110)가 설치되는 하부틀(200)과 콘크리트블록(120)의 형성을 위한 상부틀(300)을 별도로 분리하여 구성하고 이를 조립하여 합성블록(100)을 제작하게 됨으로써 합성블록(100)의 제작이 용이하게 이루어지게 된다.The lower frame 200 in which the stone 110 is installed and the upper frame 300 for forming the concrete block 120 are separately formed and assembled to form a composite block 100 100) are manufactured, so that the composite block 100 can be easily manufactured.

또한 합성블록(100)을 제작하는 과정에서 하부틀(200)에 석재(110)를 넣고 실링재(230)를 도포한 상태에서 상부틀(300)을 설치한 후 콘크리트를 타설하여 콘크리트블록(120)을 형성함으로써 콘크리트가 석재(110)의 전면으로 누출되는 것을 방지해주게 된다.The stone block 110 is inserted into the lower frame 200 and the upper frame 300 is installed in a state where the sealant 230 is applied to the concrete block 100, So that the concrete is prevented from leaking to the front surface of the stone 110.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

(10) : 기초부 (100) : 합성블록
(101) : 덮개용 합성블록 (102) : 방향전환 합성블록
(110) : 석재 (120) : 콘크리트블록
(121) : 블록몸체 (122) : 키
(123) : 키홈 (124) : 수평인장재설치홀
(125) : 정착홈 (126) : 수직인장재설치홀
(127) : 정착홈 (128a)(128b) : 러그
(129) : 토사채움 단턱부 (130) : 앵커
(140) : 절곡부 (200) : 하부틀
(210) : 하부틀몸체 (211) : 플랜지
(220) : 받침판 (230) : 실링재
(300) : 상부틀 (310) : 상부틀몸체
(311) : 플랜지 (320) : 측면커버
(321) : 플랜지 (400) : 지지프레임
(500) : 볼트 (510) : 너트
(600) : 인장재 (700) : 배수층
(800) : 보강수단 (810) : 그리드
(820) : 채움재 (830) : 앵커부재
(10): base part (100): composite block
(101): cover synthetic block (102): direction change synthetic block
(110): Stone (120): Concrete block
(121): a block body (122): a key
(123): key groove (124): horizontal tension re-installation hole
(125): Fixing groove (126): Vertical tension re-installation hole
(127): Fixing grooves 128a and 128b: Rug
(129): earth fill step jaw (130): anchor
(140): Bending section (200): Lower frame
(210): a lower frame body (211): a flange
(220): Support plate (230): Sealing material
(300): upper frame (310): upper frame body
(311): flange (320): side cover
(321): flange (400): support frame
(500): bolt (510): nut
(600): tensile material (700): drainage layer
(800): Reinforcement means (810): Grid
(820): Filler (830): Anchor member

Claims (18)

절토나 성토에 의해 형성되는 사면에 축조되고 축조시 전면에 위치하여 자연미가 나타내어지도록 하는 석재(110);
상기 석재(110)에 일측단이 삽입되도록 설치되고 타측단은 석재(110)의 외측으로 노출되도록 설치되는 앵커(130);
상기 앵커(130)를 통해 상기 석재(110)에 일체로 성형되는 콘크리트블록(120);을 포함하여 구성되고,
상기 콘크리트블록(120)은, 상기 앵커(130)를 통해 석재(110)에 일체화되도록 성형되는 블록몸체(121)와, 상기 블록몸체(121)의 상부에서 돌출 형성되고 블록몸체(121)의 폭방향으로 이격되도록 위치하는 2개의 키(122)와, 상기 블록몸체(121)의 하부에서 블록몸체(121)의 폭방향으로 오목하게 형성되어 상기 키(122)가 삽입되도록 하는 키홈(123)과, 상기 2개의 키(122) 사이에 위치하고 블록몸체(121)의 상부방향으로 돌출되게 형성되어 인양장비가 걸려질 수 있도록 하는 러그(128a)를 포함하여 구성되며,
상기 콘크리트블록(120)의 폭방향으로 관통하도록 형성되어 인장재의 삽입을 통한 폭 방향으로 이웃하는 블록들과의 인장력 도입이 이루어질 수 있도록 하는 수평인장재설치홀(124)과, 상기 콘크리트블록(120)의 높이 방향으로 관통하도록 형성되어 인장재(600)의 삽입을 통한 높이 방향으로 이웃하는 블록들과의 인장력 도입이 이루어지도록 하는 수직인장재설치홀(126)을 더 포함하여 구성되고,
상기 콘크리트블록(120)의 배면에 형성되어 경사면의 내부에 설치되는 앵커부재(830)와의 연결이 이루어지도록 하는 러그(128b)를 더 포함하여 구성되며,
상기 석재(110)는 가장자리부분을 라운딩 처리하여 배수가 원활하게 이루어지도록 구성되고,
상기 콘크리트블록(120)은 블록몸체(121)의 가장자리를 모따기 처리를 하여 이웃하는 블록들과의 사이에 원활한 배수가 이루어지도록 구성된 것을 특징으로 하는 석재와 콘크리트의 합성블록.
A stone 110 formed on the slope formed by the cut slab or the embankment and positioned on the front surface at the time of the construction so that natural beauty is displayed;
An anchor 130 installed to be inserted into one side of the stone 110 and exposed to the outside of the other side of the stone 110;
And a concrete block 120 integrally formed with the stone 110 through the anchor 130,
The concrete block 120 includes a block body 121 formed to be integrally formed with the stone 110 through the anchor 130 and a block body 121 protruding from the upper portion of the block body 121, A key groove 123 which is recessed in the width direction of the block body 121 at a lower portion of the block body 121 and into which the key 122 is inserted, And a lug 128a positioned between the two keys 122 and protruding upward from the block body 121 to allow the lifting device to be hooked,
A horizontal tension re-installation hole 124 formed to penetrate the concrete block 120 in a width direction thereof and to introduce a tensile force with adjacent blocks in the width direction through insertion of a tensile material, Further comprising a vertical tension re-installation hole (126) formed to penetrate in a height direction of the tension member (600) so that tensile force is introduced into the blocks adjacent to the height direction through insertion of the tension member (600)
And a lug (128b) formed on the back surface of the concrete block (120) and connected to an anchor member (830) installed in the inclined surface,
The stone 110 is rounded to have smooth edges,
Wherein the concrete block (120) is chamfered at an edge of the block body (121) to smoothly drain the block body (121) with neighboring blocks.
삭제delete 삭제delete 삭제delete 절토나 성토에 의해 형성되는 사면에 축조되고 축조시 전면에 위치하여 자연미가 나타내어지도록 하는 석재(110)와, 상기 석재(110)에 일측단이 삽입되도록 설치되고 타측단은 석재(110)의 외측으로 노출되도록 설치되는 앵커(130)와, 상기 앵커(130)를 통해 상기 석재(110)에 일체로 성형되는 콘크리트블록(120);을 포함하여 구성되고, 상기 콘크리트블록(120)은, 상기 앵커(130)를 통해 석재(110)에 일체화되도록 성형되는 블록몸체(121)와, 상기 블록몸체(121)의 상부에서 돌출 형성되고 블록몸체(121)의 폭방향으로 이격되도록 위치하는 2개의 키(122)와, 상기 블록몸체(121)의 하부에서 블록몸체(121)의 폭방향으로 오목하게 형성되어 상기 키(122)가 삽입되도록 하는 키홈(123)과, 상기 2개의 키(122) 사이에 위치하고 블록몸체(121)의 상부방향으로 돌출되게 형성되어 인양장비가 걸려질 수 있도록 하는 러그(128a)를 포함하여 구성되며, 상기 콘크리트블록(120)의 폭방향으로 관통하도록 형성되어 인장재의 삽입을 통한 폭 방향으로 이웃하는 블록들과의 인장력 도입이 이루어질 수 있도록 하는 수평인장재설치홀(124)과, 상기 콘크리트블록(120)의 높이 방향으로 관통하도록 형성되어 인장재(600)의 삽입을 통한 높이 방향으로 이웃하는 블록들과의 인장력 도입이 이루어지도록 하는 수직인장재설치홀(126)을 더 포함하여 구성되고, 상기 콘크리트블록(120)의 배면에 형성되어 경사면의 내부에 설치되는 앵커부재(830)와의 연결이 이루어지도록 하는 러그(128b)를 더 포함하여 구성되며, 상기 석재(110)는 가장자리부분을 라운딩 처리하여 배수가 원활하게 이루어지도록 구성되고, 상기 콘크리트블록(120)은 블록몸체(121)의 가장자리를 모따기 처리를 하여 이웃하는 블록들과의 사이에 원활한 배수가 이루어지도록 구성된 것을 특징으로 하는 석재와 콘크리트의 합성블록 제작방법에 있어서,
석재(110)에 앵커홀을 형성하고 상기 앵커홀에 앵커(130)를 설치하는 앵커 설치단계;
상기 앵커(130)가 설치된 석재(110)를 상부가 개방된 형태로 상단 가장자리에 플랜지(211)가 형성되며 바닥면에 설치되는 2개 이상의 지지프레임(400)에 놓여지는 하부틀(200)의 내부에 거치하되 상기 앵커(130)가 하부틀(200)의 외측으로 노출되도록 설치하는 석재 거치단계;
상기 석재(110)의 가장자리와 하부틀(200)의 내면이 접하는 부분에 실링재(230)를 도포하여 석재(110)의 전면으로 콘크리트가 누출되지 않도록 하는 실링재 도포단계;
상기 하부틀(200)의 상부에 상부틀(300)을 결합하는 상부틀 결합단계;
상기 상부틀(300)의 내부에 콘크리트를 타설하여 석재(110)와 일체화된 콘크리트블록(120)을 형성하는 콘크리트블록 형성단계;
상기 콘크리트가 경화되면 상부틀(300)과 하부틀(200)을 제거하는 탈형단계;를 포함하여 구성되고,
상기 석재 거치단계는 상기 하부틀(200)의 내부에 석재(110)의 경사도에 대응되도록 경사진 형태의 받침판(220)을 설치한 상태에서 석재(110)를 거치하여 앵커(130)가 정위치 되도록 구성되고,
상기 상부틀 결합단계는, 평단면이 ㄷ 형태로 형성되어 측면이 개방되도록 구성되고 하부에 플랜지(311)가 형성된 상부틀몸체(310)의 개방된 측면으로 하부에 플랜지(321)가 형성된 측면커버(320)를 결합하여 일체화한 후 상기 하부틀(200)의 플랜지(211)에 상기 상부틀의 플랜지(311)(321)를 볼트(500) 및 너트(510)로 결합하는 것을 특징으로 하는 석재와 콘크리트의 합성블록 제작방법.













A stone 110 formed on a slope formed by cutting slabs or embankments and positioned on the front surface at the time of construction so that natural beauty is displayed; And a concrete block 120 formed integrally with the stone 110 through the anchor 130. The concrete block 120 is fixed to the anchor 130 by an anchor 130, A block body 121 formed to be integrally formed with the stone 110 through the block body 130 and two keys protruding from the upper portion of the block body 121 and spaced apart in the width direction of the block body 121 A key groove 123 formed at a lower portion of the block body 121 and recessed in the width direction of the block body 121 so that the key 122 is inserted; And is formed so as to protrude upward in the block body 121, And a lug 128a for allowing the tensile force to be applied to adjacent blocks in the width direction through insertion of the tensile material so as to penetrate the concrete block 120 in the width direction of the concrete block 120. [ A vertical tension re-installation hole 124 which is formed to penetrate in the height direction of the concrete block 120 and to introduce tensile force between the blocks adjacent in the height direction through insertion of the tensile material 600, And a lug 128b formed on the back surface of the concrete block 120 and connected to an anchor member 830 installed inside the inclined surface. The stone block 110 is formed so that drainage is smoothly performed by rounding the edge portion of the stone block 110. The concrete block 120 blocks the edge of the block body 121, In the neighboring blocks and the method for manufacturing composite blocks of stone or concrete which is characterized in that is configured to occur between the smooth drainage of the treatment,
An anchor installation step of forming an anchor hole in the stone 110 and installing the anchor 130 in the anchor hole;
A stone 110 having the anchor 130 installed thereon is provided with a flange 211 at the upper edge of the upper part and a lower frame 200 placed on two or more supporting frames 400 A step of mounting the anchor 130 so that the anchor 130 is exposed to the outside of the lower frame 200;
Applying a sealant (230) to a portion of the stone (110) where the edge of the stone (110) is in contact with the inner surface of the lower frame (200) to prevent concrete from leaking to the front surface of the stone (110);
An upper frame coupling step of coupling the upper frame 300 to the upper part of the lower frame 200;
A concrete block forming step of placing a concrete in the upper frame 300 to form a concrete block 120 integrated with the stone 110;
And a demolding step of removing the upper frame 300 and the lower frame 200 when the concrete is cured,
The step of mounting the stone is performed by mounting a stone 110 on an inside of the lower frame 200 with an inclined plate 220 inclined to correspond to the inclination of the stone 110, Respectively,
The upper frame engaging step may include a side frame having a flange 321 formed at an open side of an upper frame body 310 formed with a flat cross section and opened at its side and having a flange 311 at a lower portion thereof, And the flanges (311) and (321) of the upper frame are coupled to the flanges (211) of the lower frame (200) by the bolts (500) and the nuts (510) And method of making composite block of concrete.













삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020180136053A 2018-11-07 2018-11-07 Manufacturing method of composite block and composite block KR101975502B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180136053A KR101975502B1 (en) 2018-11-07 2018-11-07 Manufacturing method of composite block and composite block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180136053A KR101975502B1 (en) 2018-11-07 2018-11-07 Manufacturing method of composite block and composite block

Publications (1)

Publication Number Publication Date
KR101975502B1 true KR101975502B1 (en) 2019-05-08

Family

ID=66580271

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180136053A KR101975502B1 (en) 2018-11-07 2018-11-07 Manufacturing method of composite block and composite block

Country Status (1)

Country Link
KR (1) KR101975502B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102120647B1 (en) 2019-12-26 2020-06-09 주식회사 피피에스브릿지 Composite blocks of stone and concrete and manufacturing method thereof
CZ308753B6 (en) * 2020-02-06 2021-04-28 Praha 10 Petříš Aleš Building element and producing it

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10128731A (en) * 1996-10-28 1998-05-19 Sekimuro Zouseki:Kk Block for retaining wall and its manufacture
JPH10205053A (en) * 1997-01-24 1998-08-04 Hokushin Kogyo Kk Stone-pitched concrete panel, manufacture thereof and wall-body constructing method by stone-pitched concrete panel
JP2005163271A (en) * 2003-11-28 2005-06-23 Maeda Kosen Co Ltd Constrained soil structure and work execution method therefor
JP2006509931A (en) * 2002-04-29 2006-03-23 レディ−ロック インターナショナル リミテッド ライアビリティ カンパニー System for interconnecting wall block
KR20110002580A (en) 2009-07-02 2011-01-10 강선욱 Revetment-block in front of attached natural ston plats
KR20160002377U (en) * 2014-12-30 2016-07-08 주식회사 팔마 Block Assembly for Retaining Wall
KR101875457B1 (en) * 2017-12-06 2018-07-09 (주)장성산업 Eco-friendly concrete wall block and construction method of concrete wall therewith
KR101864354B1 (en) * 2017-08-07 2018-07-13 (주)케이에이 retaining wall structure of assembly type

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10128731A (en) * 1996-10-28 1998-05-19 Sekimuro Zouseki:Kk Block for retaining wall and its manufacture
JPH10205053A (en) * 1997-01-24 1998-08-04 Hokushin Kogyo Kk Stone-pitched concrete panel, manufacture thereof and wall-body constructing method by stone-pitched concrete panel
JP2006509931A (en) * 2002-04-29 2006-03-23 レディ−ロック インターナショナル リミテッド ライアビリティ カンパニー System for interconnecting wall block
JP2005163271A (en) * 2003-11-28 2005-06-23 Maeda Kosen Co Ltd Constrained soil structure and work execution method therefor
KR20110002580A (en) 2009-07-02 2011-01-10 강선욱 Revetment-block in front of attached natural ston plats
KR20160002377U (en) * 2014-12-30 2016-07-08 주식회사 팔마 Block Assembly for Retaining Wall
KR101864354B1 (en) * 2017-08-07 2018-07-13 (주)케이에이 retaining wall structure of assembly type
KR101875457B1 (en) * 2017-12-06 2018-07-09 (주)장성산업 Eco-friendly concrete wall block and construction method of concrete wall therewith

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102120647B1 (en) 2019-12-26 2020-06-09 주식회사 피피에스브릿지 Composite blocks of stone and concrete and manufacturing method thereof
CZ308753B6 (en) * 2020-02-06 2021-04-28 Praha 10 Petříš Aleš Building element and producing it

Similar Documents

Publication Publication Date Title
KR100495782B1 (en) A Facing panel for reinforced earth wall and its construction method
KR101344063B1 (en) The construction method of steel-concrete underpass
KR20210119861A (en) Slurry wall, construction method for the same and wire mesh assembly
KR101419863B1 (en) Pc panel needless of concrete forms using construction method of cast-in-place step retaining wall for slope reinforcement
KR20220012525A (en) Slurry wall, construction method for the same and wire mesh assembly
KR101975502B1 (en) Manufacturing method of composite block and composite block
KR100936668B1 (en) A composite pile for earth retaining wall and centrifugal force type earth retaining wall using it
JP2007530833A (en) Reinforced soil retaining wall system and construction method
KR101370102B1 (en) Cast-in-place type top-pile and construction process of the same
KR101696854B1 (en) Various assembling construction methods of E shaped precast concrete block retainning wall
JP2000265484A (en) CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
KR102123810B1 (en) Reinforcing Structure for Preventing Scour and Construction Method thereof
KR101963362B1 (en) Reinforced gabion retaining wall capable of completely drainage and construction method thereof
KR101017127B1 (en) Connecting Structure between Foundation and Pier, and Construction Method thereof
KR20090043625A (en) Method for constructing underground slabs using asymmetric girder
KR101159097B1 (en) Precast abutment for longitudinal continuous connection and construction method therefor
KR100650411B1 (en) Tunnel cover plate
KR100647071B1 (en) The method of constructing bloclk for wall
KR101706919B1 (en) Panel retaining walls with displacement forecasting and its construction method
KR101627658B1 (en) Pile beam with shear-keys and Construction method of mixed bridge using Piled beams with shear-key
KR102202598B1 (en) Double wall structure for top-down construction and top-down structure construction method therewith
KR102059470B1 (en) assembling unit for reinforcement of foundation and structrue using it
KR100884391B1 (en) Abreast wall having enhanced supply function on the top of retaining wall and construction method thereof
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
KR100964721B1 (en) Block for road extension

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant