[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR101817293B1 - Temporary structure for water fence and the construction method thereof - Google Patents

Temporary structure for water fence and the construction method thereof Download PDF

Info

Publication number
KR101817293B1
KR101817293B1 KR1020170060246A KR20170060246A KR101817293B1 KR 101817293 B1 KR101817293 B1 KR 101817293B1 KR 1020170060246 A KR1020170060246 A KR 1020170060246A KR 20170060246 A KR20170060246 A KR 20170060246A KR 101817293 B1 KR101817293 B1 KR 101817293B1
Authority
KR
South Korea
Prior art keywords
wall
file
horizontal support
contact
front surface
Prior art date
Application number
KR1020170060246A
Other languages
Korean (ko)
Inventor
박정원
Original Assignee
지더블유이엔씨 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 지더블유이엔씨 주식회사 filed Critical 지더블유이엔씨 주식회사
Priority to KR1020170060246A priority Critical patent/KR101817293B1/en
Application granted granted Critical
Publication of KR101817293B1 publication Critical patent/KR101817293B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Revetment (AREA)

Abstract

본 발명은 물막이용 수중 가시설의 구조 및 이를 시공하는 방법에 관한 것으로서, 수중에 설치되는 콘크리트 구조물의 구축을 위한 가시설에 있어서, 상기 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 것으로서, 수중 바닥면의 암반에까지 근입되는 지주용 H파일과, H파일의 후면에 접하여 설치되는 수평지지빔과, H파일의 전면에 접하여 설치되는 띠장과, 수평지지빔의 후면에 접하여 설치되는 쉬트파일 및, H파일 상단의 전면에 접하여 설치되는 고정대로 구성되는 제1벽체와; 토사의 충진공간이 형성되도록 상기 제1벽체로부터 이격되어 설치되는 것으로서, 수중 바닥면의 암반에까지 근입되는 지주용 H파일과, H파일의 전면에 접하여 설치되는 수평지지빔과, 수평지지빔의 전면에 접하여 설치되는 쉬트파일 및, H파일 상단의 후면에 접하여 설치되는 고정대로 구성되는 제2벽체와; 제1벽체의 고정대와 제2벽체의 고정대 사이를 연결 고정하는 타이바로 이루어지는 것을 특징으로 한다.[0001] The present invention relates to a structure of a water barrier for water and a method of constructing the same, which is installed on the outer side of a work section in which the concrete structure is installed, A horizontal support beam installed in contact with the rear surface of the H file, a wale installed in contact with the front surface of the H file, a sheet file installed in contact with the rear surface of the horizontal support beam, A first wall formed of a fixed base disposed in contact with a front surface of the upper portion; A horizontal support beam installed in contact with the front surface of the H-file; and a horizontal support beam installed in contact with the front surface of the H-file, A second wall formed of a sheet to be installed in contact with the upper surface of the H file, and a fixing table to be attached to a rear surface of the upper surface of the H file; And a tie bar for connecting and fixing the fixing base of the first wall and the fixing base of the second wall is formed.

Description

물막이용 수중 가시설 및 그의 시공방법{TEMPORARY STRUCTURE FOR WATER FENCE AND THE CONSTRUCTION METHOD THEREOF}TECHNICAL FIELD [0001] The present invention relates to a water-

본 발명은 교량의 교각이나 교대, 또는 수중보 등 수중에 설치되어야 하는 콘크리트 구조물을 건식작업으로 구축할 수 있도록 작업장 내부로 물이 스며들지 않도록 하기 위한 물막이용 수중 가시설의 구조 및 이를 시공하는 방법에 관한 것이다.The present invention relates to a construction of a water barrier structure for preventing water from seeping into a worksite so as to construct a concrete structure to be installed in water such as a bridge pier, a bridge, an underwater bridge or the like, and a method of constructing the water barrier structure will be.

수중 또는 유수에 접하여 구조물을 구축하고자 하는 경우, 상기 구조물을 건식작업으로 구축할 수 있도록 가물막이를 미리 설치한다.When a structure is to be constructed in contact with water or water, a parasitic membrane is installed in advance so that the structure can be constructed by a dry process.

이러한 가물막이와 같은 가시설은 임시적으로 설치되는 구조물이나, 그 구조에 변형이 생겨 누수가 발생됨으로써 작업현장에 침수가 발생되는 경우에는 공기가 늘어지고 작업장비에 고장을 일으켜 경제적으로 큰 손실을 일으킬 뿐 아니라, 인명피해까지도 야기시키는 등 사회적으로도 큰 파장을 일으키게 한다.The hypothetical example of such a cauldron is a temporary structure, but when the flooding occurs at the work site due to the occurrence of a leak due to the deformation of the structure, the air is stretched and the work equipment is broken, It also causes damage to people and causes a great wave of society.

따라서 수중에 설치되는 상기의 가시설은 토압이나 수압 등의 외력에 충분히 견딜 수 있는 강도 및 수밀성이 최우선적으로 고려되어야 한다.Therefore, the above-mentioned hypothetical example to be installed in water should be given first priority to the strength and water tightness which can withstand external forces such as earth pressure and water pressure.

도 1은 이러한 가시설의 예를 도시한 것이다.Fig. 1 shows an example of such a hypothesis.

상기의 도 1은 등록특허공보 등록번호 10-1117924에 게재된 복합형 강가시설의 구조를 나타낸 것으로서, 상기 강가시설은 지지층인 암반(R)의 표면까지 토사층(S)에 타입되는 제1쉬트파일(210)과, 상기 제1쉬트파일(210)을 지지하기 위해 상기 암반(R)에 설치된 지주(200)와, 상기 제1쉬트파일(210)의 전면에 설치된 차수벽(270)과, 상기 제1쉬트파일(210)의 배면으로부터 일정 거리 이격된 제2쉬트파일(310)과, 상기 두 제1, 2쉬트파일(210, 310)의 사이에 형성되는 지지벽(220)으로 이루어지되, 상기 지지벽(220)이 형성된 토사층(S)위에는 토사 등의 충전재(S')가 충전된다. 아울러 각 쉬트파일(210,310)과 지주(200)의 상에는 연결부재(230)가 설치되고, 상기 지주(200)의 전면에는 버팀대를 설치하기 위한 띠장(250)이 설치되며, 상기 띠장(250)과 각 쉬트파일(210,310)의 사이에는 수평지지대(240)가 설치된다. FIG. 1 shows the structure of a complex type of riverbed facility disclosed in Registration No. 10-1117924. In the river type facility, a first sheet file A support 200 installed on the rock R to support the first sheet 210 and a water wall 270 installed on a front surface of the first sheet 210, A second sheet file 310 spaced from the back surface of the first sheet file 210 by a predetermined distance and a support wall 220 formed between the first and second sheet files 210 and 310, A filler S 'such as gravel or the like is filled on the soil layer S having the support walls 220 formed thereon. A connection member 230 is installed on each of the sheet files 210 and 210 and the support 200. A wale band 250 for installing a brace is installed on the front surface of the support 200. The wale 250, A horizontal support table 240 is provided between the sheet files 210 and 310.

상기한 선행기술은 한 쌍의 쉬트파일(210,310)사이에 충진재(S')를 충진시켜 벽체를 형성시킴으로써 높은 수밀성과 구조적 안정성을 향상시키고 있으나, 쉬트파일(210,310)과 지주 및 띠장과의 사이 간격이 제각각 다르기 때문에 이들의 사이 간격에 대응하는 연결부재(230)와 수평지지대(240)를 개별적으로 재단해야 하는 작업상의 번거로움으로 공기가 지연되고, 수중작업에서의 용접량 증가로 시공비용이 증가되는 문제점이 있으며, 이들 연결부재(230)와 수평지지대(240)의 재활용이 어려워 자원이 낭비되는 문제점이 있다.The prior art described above improves the watertightness and structural stability by filling the filler S 'between the pair of sheet files 210 and 310 to form a wall. However, the gap between the sheet files 210 and 310, The air is delayed due to the troublesomeness of the operation of separately cutting the connecting member 230 and the horizontal support 240 corresponding to the interval therebetween, and the construction cost is increased due to the increase of the welding amount in the underwater operation And there is a problem in that resources are wasted because it is difficult to recycle the connecting member 230 and the horizontal support 240.

아울러 상기 선행기술은 충진재(S')가 충진되는 쉬트파일(210,310)의 배면에서 연결부재(230)와 수평지지대(240)가 일점지지의 방식으로 설치되어 있어, 쉬트파일(210,310)의 전체면 중 연결부재(230)와 수평지지대(240)가 접하는 부분에서는 집중하중에 의한 변형이 발생할 우려가 있다.In the prior art, the connecting member 230 and the horizontal support 240 are installed on the back surface of the sheet piles 210 and 310 filled with the filler S 'in a one-point support manner, and the entire surface of the sheet piles 210 and 310 There is a possibility that deformation due to a concentrated load occurs at a portion where the connecting member 230 and the horizontal support 240 contact each other.

KRKR 10-111792410-1117924 B1B1

본 발명은 선행기술의 상기한 문제점을 해결하기 위한 것으로서, 수중에서의 가물막이용 가시설의 설치작업이 용이하게 이루어지면서, 현장 작업량을 감축시켜 시공성을 향상시키고, 한 쌍의 쉬트파일 사이에 충진되는 토사 등에 의해 상기 쉬트파일에 작용하는 하중이 이를 지지하는 부재들에 균등하게 분산되도록 하여 쉬트파일에 변형이 발생되지 않도록 하여 구조적인 안정성을 향상시키며, 자재의 재활용이 가능한 수중구조물의 구축을 위한 물막이용 수중 가시설 및 그의 시공방법을 제공함에 그 목적이 있다.It is an object of the present invention to solve the above-mentioned problems of the prior art, and it is an object of the present invention to provide a method and apparatus for installing a floating film in water, The load acting on the sheet pile is uniformly dispersed in the members for supporting the sheet pile, so that deformation does not occur in the sheet pile, thereby improving the structural stability and making the water film for constructing an underwater structure capable of recycling the material And a method of constructing the same.

본 발명은 선행기술의 상기한 문제점을 해결하기 위한 것으로서, 수중에 설치되는 콘크리트 구조물의 구축을 위한 가시설에 있어서, 상기 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 것으로서, 수중 바닥면의 암반에까지 근입되는 지주용 H파일과, H파일의 후면에 접하여 설치되는 수평지지빔과, H파일의 전면에 접하여 설치되는 띠장과, 수평지지빔의 후면에 접하여 설치되는 쉬트파일 및, H파일 상단의 전면에 접하여 설치되는 고정대로 구성되는 제1벽체와; 토사의 충진공간이 형성되도록 상기 제1벽체로부터 이격되어 설치되는 것으로서, 수중 바닥면의 암반에까지 근입되는 지주용 H파일과, H파일의 전면에 접하여 설치되는 수평지지빔과, 수평지지빔의 전면에 접하여 설치되는 쉬트파일 및, H파일 상단의 후면에 접하여 설치되는 고정대로 구성되는 제2벽체와; 제1벽체의 고정대와 제2벽체의 고정대 사이를 연결 고정하는 타이바로 이루어지는 것을 특징으로 하는 수중구조물의 구축을 위한 물막이용 수중 가시설이 제공된다.SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the prior art, and it is an object of the present invention to provide a concrete structure for constructing a concrete structure installed in water. The concrete structure is installed on the outer side of a work section in which the concrete structure is installed, A horizontal support beam provided in contact with the rear surface of the H file, a wale band provided in contact with the front surface of the H file, a sheet file provided in contact with the rear surface of the horizontal support beam, A first wall constituted by a fixed base provided in contact with the first wall; A horizontal support beam installed in contact with the front surface of the H-file; and a horizontal support beam installed in contact with the front surface of the H-file, A second wall formed of a sheet to be installed in contact with the upper surface of the H file, and a fixing table to be attached to a rear surface of the upper surface of the H file; And a tie bar connecting and fixing the fixing block of the first wall to the fixing block of the second wall is provided.

이때 제1,2벽체에 설치되는 수평지지빔은 용접에 의해 H파일에 고정 설치되게 할 수도 있고, 상부로부터 행잉되는 구조로 이루어져 상하 위치만 고정되게 할 수도 있다.At this time, the horizontal support beam installed on the first and second walls may be fixed to the H-file by welding, or may have a structure hanging from the top, so that only the upper and lower positions may be fixed.

본 발명의 또 다른 실시예에 의하면, 수중에 설치되는 콘크리트 구조물의 구축을 위하여 제1벽체와 제2벽체 사이의 충진공간에 토사를 충진하여 가시설을 시공하는 방법에 있어서, a) 상기 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 제1벽체를 위한 H파일과, 상기 제1벽체와 이격되어 설치되는 제2벽체를 위한 H파일을 각각 지중에 설치하는 단계; b) 제1벽체측 H파일의 후면과 제2벽체측 H파일의 전면에 접하도록 수평지지빔을 설치하는 단계; c) 제1벽체측 수평지지빔의 후면과 제2벽체측 수평지지빔의 전면에 접하여 쉬트파일을 각 설치하는 단계; d) 제1벽체측 H파일의 전면 상단과 제2벽체측 H파일의 후면 상단의 각각에 고정대를 설치하는 단계; e) 제1벽체측 고정대와 제2벽체측 고정대의 사이에 타이바를 설치하는 단계; f) 제1벽체와 제2벽체의 사이에 형성된 충진공간에 토사를 충진시키는 단계; g) 제1벽체측 H파일의 전면에 띠장을 설치하는 단계;가 순차로 이루어지는 것을 특징으로 하는 수중구조물의 구축을 위한 물막이용 수중 가시설의 시공방법이 제공된다.According to another embodiment of the present invention, there is provided a method for constructing a concrete structure to be installed in a water by filling a filling space between a first wall and a second wall with soil, the method comprising: a) Installing an H file for a first wall installed outside the work section to be installed and an H file for a second wall installed apart from the first wall; b) installing a horizontal support beam to abut the rear surface of the first wall-side H-file and the front surface of the second wall-side H-file; c) installing each sheet file in contact with the rear surface of the first wall-side horizontal support beam and the front surface of the second wall-side horizontal support beam; d) installing a fixture on each of a front upper end of the first wall-side H-file and a rear-wall upper end of the second wall-side H-file; e) installing a tie bar between the first wall-side fixture and the second wall-side fixture; f) filling the filling space formed between the first wall and the second wall with the gravel; g) installing a wale on the entire surface of the first wall-side H-file; and a step of installing a wale on the front surface of the first wall-side H-file.

본 발명은 수평지지빔을 통해 쉬트파일에 의한 수평하중을 점지지(點支持)가 아닌 선지지(線支持)시킴으로써 상기 쉬트파일의 국부변형을 방지하여 수중 가시설의 구조적 안정성을 대폭 향상시킨다.The present invention prevents lateral deformation of the sheet pile by supporting the horizontal load of the sheet pile through a horizontal support beam instead of a point support, thereby greatly improving the structural stability of the underwater pile.

또한 본 발명은 쉬트파일과 지주의 사이를 지지하기 위한 부재들의 개별적인 재단을 필요로 하지 않고, 수중 용접량을 줄여 줌으로써 시공성의 향상과 공사비절감을 도모할 수 있어 경제적인 시공을 가능하게 한다.Further, the present invention does not require individual cutting of the members for supporting between the sheet file and the support, reduces the amount of underwater welding, thereby improving the workability and reducing the construction cost, thereby enabling economical construction.

또한 본 발명은 수평지지빔을 절단 내지 타부재와의 용접없이 사용할 수 있어 강재의 재활용을 통한 자재의 사용량이 절감되고 환경오염의 발생을 억제할 수 있는 효과를 기대하게 한다.Further, the present invention can use the horizontal support beams without cutting or welding with other members, thereby reducing the amount of material used through recycling of steel materials and suppressing the occurrence of environmental pollution.

도 1은 종래기술에 의한 강가시설의 사시도이다.
도 2는 본 발명의 일 실시예에 의한 수중 가시설의 사시도이다.
도 3은 본 발명에 의한 수중 가시설의 제1벽체와 제2벽체 사이에 타이바가 설치된 상태의 상세도이다.
도 4 내지 10은 본 발명에 의한 수중 가시설의 시공방법에 각 단계별로 도시한 사시도이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a marine facility according to the prior art; FIG.
FIG. 2 is a perspective view of a submerged ship according to an embodiment of the present invention. FIG.
3 is a detailed view showing a tie bar installed between the first wall and the second wall in the underwater condition according to the present invention.
FIGS. 4 to 10 are perspective views illustrating steps in a submerged construction method according to the present invention.

이하에서는 본 발명의 실시예를 첨부된 도면을 참조하여 상세히 설명한다. 그러나 본 발명을 설명함에 있어 공지의 구성을 구체적으로 설명함으로 인하여 본 발명의 기술적 사상을 흐리게 하거나 불명료하게 하는 경우에는 위 공지의 구성에 관한 설명을 생략하기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. However, in order to obscure or obscure the technical idea of the present invention due to the detailed description of the known structure in describing the present invention, the description of the structure of the above known structure will be omitted.

또한 본 발명의 실시예를 설명함에 있어 방향을 나타내는 '전면' 또는 '전방'이라 함은 본 구조물인 수중구조물이 설치되는 방향, 본 발명의 수중 가시설(100)에 의해 형성되는 작업구간의 방향을 의미하는 것이고, '후면' 또는 '후방'이라 함은 상기 작업구간의 바깥방향을 의미하는 것임에 유의할 필요가 있다.In the description of the embodiment of the present invention, the term 'front' or 'front' as a direction indicates a direction in which an underwater structure as a main structure is installed, a direction of a work area formed by the submerged structure 100 of the present invention Quot; rear " or " rear " means the outward direction of the work section.

도 2는 본 발명의 일 실시예에 의한 수중 가시설(100)의 구조를 나타낸 사시도이다.FIG. 2 is a perspective view showing the structure of a submerged membrane 100 according to an embodiment of the present invention.

본 발명의 수중 가시설(100)의 구조는 배면 토사지반이 없는 수중에 물막이용으로 설치되는 가시설에 가장 효율적으로 적용할 수 있는 것으로서, 도 2에 도시된 바와 같이, 하중을 지지하는 지주용 H파일(111,121)과, 수중 가시설(100)의 구성에 따라 그 내부에 충진되는 토사(150)에 의한 측압을 지지하면서 물이 작업구간내로 흘러들어오는 것을 방지하는 쉬트파일(113,123)과, 상기 쉬트파일(113,123)에 작용하는 수평하중을 고르게 분산시켜 상기 H파일(111,121)에 전달하는 수평지지빔(112,122)을 기본으로 구비하면서, 상기 수중 가시설(100)을 구성하는 각 벽체(110,120)의 위치에 따라 띠장(115)이 부가 설치된다.As shown in FIG. 2, the structure of the water hammer 100 according to the present invention can be applied most effectively to a hypothetical case where water is installed in a waterless soil without soil gravel soil, Sheet files 113 and 123 for preventing the water from flowing into the work section while supporting the side pressure by the gravel 150 filled in the water tank 100 according to the construction of the underwater obstacle 100, And horizontal supporting beams 112 and 122 for uniformly distributing the horizontal loads acting on the H files 111 and 121 to the H files 111 and 121. The horizontal supporting beams 112 and 122 are formed on the basis of the positions of the walls 110 and 120 constituting the underwater hypothetical body 100 A welt 115 is additionally provided.

본 발명의 수중 가시설(100)은 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 제1벽체(110)와, 충진공간(C)이 형성되도록 상기 제1벽체(110)로부터 이격되어 설치되는 제2벽체(120) 및, 상기 충진공간(C)에 충진되는 토사(150)로 이루어진다.The water submerged structure 100 of the present invention includes a first wall 110 installed on the outer side of a work section where a concrete structure is installed and a second wall 110 installed apart from the first wall 110 to form a filling space C Two walls 120 and a gravel 150 filled in the filling space C. [

제1벽체(110)는 상기한 바와 같이 지주용 H파일(111)과, 수평지지빔(112), 띠장(115) 및, 쉬트파일(113)로 구성된다.The first wall 110 is constituted by a holding H file 111, a horizontal support beam 112, a wale band 115, and a sheet file 113 as described above.

지주용 H파일(111)은 수중 바닥면의 암반(160)에까지 깊게 근입되도록 하여 제1벽체(110)의 수직하중뿐 아니라, 수중 가시설(100) 내부의 토사(150)에 의한 토압 및 수중 가시설(100) 외부의 각종 수평하중을 지지한다.The holding H file 111 is formed so as to be deeply inserted into the rock bed 160 of the underwater floor so that not only the vertical load of the first wall 110 but also the earth pressure by the soil 150 inside the underwater hypothetical 100, And supports various horizontal loads from the outside of the apparatus 100.

수평지지빔(112)은 상기 H파일(111)의 후면에 접하여 수평방향으로 길게 설치되는 것으로서 다수 개가 상하방향으로 소정의 간격으로 배치된다.The horizontal support beams 112 are provided horizontally long in contact with the rear surface of the H file 111, and a plurality of horizontal support beams 112 are arranged at predetermined intervals in the vertical direction.

수평지지빔(112)은, 쉬트파일(113)에 의해 전달되는 수평하중에 대하여만 H파일(111)에 전달시키는 것이므로. 계획된 정위치를 유지할 수만 있다면 반드시 H파일(111)에 일체로 고정될 필요는 없다. 예컨대 수평지지빔(112)을 용접으로 H파일(111)에 일체화시킴으로써 그 위치가 고정되게 할 수도 있으나, 수평지지빔(112)을 H파일(111)에 일체화시키지 않고 행잉하거나 단순 거치시킴으로써 계획된 높이에서의 위치가 고정되게 할 수도 있다. 이에 관하여는 후술하는 시공과정 중의 수평지지빔(112) 설치와 관련하여 구체적으로 설명한다.Since the horizontal support beam 112 is transmitted to the H file 111 only with respect to the horizontal load transmitted by the sheet file 113, It is not necessarily required to be fixed integrally with the H file 111 as long as the projected correct position can be maintained. It is possible to fix the position of the horizontal support beam 112 by welding it to the H file 111 so as to fix the position of the horizontal support beam 112 by welding or simply mounting the horizontal support beam 112 without integrating the horizontal support beam 112 into the H file 111, So that the position of the light source can be fixed. This will be described in detail with respect to the installation of the horizontal support beams 112 during the construction process described later.

쉬트파일(113)은 상기 수평지지빔(112)의 후면에 접하여 설치된다.The sheet file 113 is installed in contact with the rear surface of the horizontal support beam 112.

상기 쉬트파일(113)은 수밀성의 강판을 절곡한 것으로서, 적어도 기존토사층(151)을 관통하여 하단부가 수중 바닥면의 암반(160)에까지 깊게 근입 설치되어, 제2벽체(120)에 구비되는 쉬트파일(123)과 함께 토사(150)의 충진을 위한 거푸집의 기능을 하면서 수중 가시설(100)의 주된 역할인 방수기능이 이루어지게 한다.The sheet file 113 is formed by bending a watertight steel plate and penetrates at least the existing soil layer 151 so that the lower end of the sheet file 113 is deeply inserted into the rock bed 160 of the underwater floor, Together with the file 123, functions as a form for filling the gravels 150, and a waterproof function, which is a main role of the underwater hypothetical project 100, is performed.

쉬트파일(113)의 하단부 전면에는 H파일(111)의 하단부가 함께 매립되도록 구성되는 차수벽(141)이 더 설치될 수 있다.The lower end of the sheet file 113 may be further provided with a water wall 141 configured to be embedded in the lower end of the H file 111 together.

수평지지빔(112)을 매개로 하여 쉬트파일(113)에 작용하는 수평하중은 띠장(115)을 통해 버팀대(115)로 전달된다.The horizontal load acting on the sheet file 113 via the horizontal support beams 112 is transmitted to the braces 115 through the wales 115.

즉 띠장(115)은 H파일(111)의 전면에 접하여 수평방향으로 설치됨으로써 버팀대(115)에 의한 지지가 가능하도록 하 것으로서, 일정한 간격을 두고 설치되는 다수 개의 각 H파일(111)에 작용하는 수평하중을 균등하게 분산시켜 이를 버팀대(115)에 전달함으로써 제1벽체(110)가 구조적인 안정성을 유지할 수 있게 한다.That is, the wrist strap 115 is provided horizontally in contact with the front surface of the H-file 111, so that the wrist strap 115 can be supported by the brace 115, and the wrist strap 115 acts on a plurality of H files 111 So that the first wall 110 can maintain structural stability by evenly distributing the horizontal load and transmitting it to the braces 115.

수중 가시설(100)의 바깥쪽에 설치되는 제2벽체(120) 역시 지주용 H파일(121)과, 수평지지빔(122), 쉬트파일(123)이 포함되나, 제1벽체(110)와는 달리 띠장(115)이 설치되지 않는다.The second wall 120 installed outside the underwater obstacle 100 also includes a support H file 121, a horizontal support beam 122 and a sheet file 123. However, unlike the first wall 110, The wrist strap 115 is not installed.

즉 제2벽체(120)는 수중 바닥면의 암반(160)에까지 근입되는 지주용 H파일(121)과, 상기 H파일(121)의 전면에 접하여 설치되는 수평지지빔(122)과, 상기 수평지지빔(122)의 전면에 접하여 설치되는 쉬트파일(123)로 구성된다.That is, the second wall 120 includes a support H file 121 extending to the rock 160 of the underwater floor, a horizontal support beam 122 installed in contact with the front surface of the H file 121, And a sheet file 123 provided in contact with the front surface of the support beam 122.

여기에서 H파일(121)과, 수평지지빔(122) 및, 쉬트파일(123)의 구성 및 설치에 관하여는 제1벽체(110)와 다르지 않으므로, 이에 관하여는 제1벽체(110)에서의 설명으로 갈음한다. 또 제1벽체(110)에 상응하는 차수벽(142)은 쉬트파일(123)의 하단부 후면에 설치된다.Since the configuration and installation of the H file 121, the horizontal support beam 122 and the sheet file 123 are not different from the first wall 110, I'll give it a try. Further, the water wall 142 corresponding to the first wall 110 is installed on the rear surface of the lower end of the sheet file 123.

도 3은 상기 본 발명의 수중 가시설의 상부구조에 관한 일 실시예를 보여주는 상세도이다.3 is a detailed view showing an embodiment of the upper structure of the hypothetical underwater according to the present invention.

제1벽체(110)와 제2벽체(120)의 최상단에는 도 3에 도시된 바와 같이, 이들 각 벽체(110,120) 사이의 충진공간(C)에 충진되는 토사(150)의 측압에 의해 벌어지는 것을 방지하기 위한 타이바(130)가 더 설치될 수 있다.As shown in FIG. 3, the uppermost ends of the first wall 110 and the second wall 120 are formed by a side pressure of the gravel 150 filled in the filling space C between the walls 110 and 120 A tie bar 130 may be further provided.

또 제1벽체(110)의 H파일(111) 전면과 제2벽체(120)의 H파일(121) 후면의 각 상단에는 상기 타이바(130)의 설치 및 측압에 대한 효율적인 지지를 위한 고정대(114,124)가 더 설치될 수 있다,The upper surface of the H-file 111 of the first wall 110 and the upper surface of the rear surface of the H-file 121 of the second wall 120 are fixed to a fixing table 114, < RTI ID = 0.0 > 124)

이때 제1벽체(110)에 있어서는 H파일(111)의 전면에 설치되는 띠장(115) 중 최상부에 위치한 띠장(115)을 상기 타이바(130)의 설치를 위한 고정대(115)의 기능을 겸하게 할 수도 있다.At this time, in the first wall 110, the wristband 115 located at the uppermost one of the wands 115 installed on the front surface of the H-file 111 serves as a function of a fixing table 115 for installing the tie bar 130 You may.

아울러 상기의 각 고정대(114,124)에는 타이바(130)의 양단을 고정 지지하기 위한 고정브라켓(131)이 각 구비된다.In addition, the fixing brackets 131 and 124 for fixing both ends of the tie bar 130 are provided on the fixing bars 114 and 124, respectively.

제1벽체(110)와 제2벽체(120) 사이의 충진공간(C)에는 토사(150)가 충진됨으로써 수중 가시설(100)의 구축이 완료된다.The construction of the underwater hypothecation 100 is completed by filling the filler space C between the first wall body 110 and the second wall body 120 with the gravel 150.

지금까지 본 발명의 수중 가시설(100)의 구조에 관하여 설명한 바, 상기한 수중 가시설(100)은 제1벽체(110)와 제2벽체(120)를 동시에 또는 순차로 구축하고, 그 사이에 형성된 충진공간(C)에 토사(150)를 충진시켜 구축되도록 하는 방식으로 시공된다.As described above with respect to the structure of the underwater hypothecic membrane 100 of the present invention, the underwater hypothecic membrane 100 is constructed by simultaneously or sequentially forming the first wall body 110 and the second wall body 120, And the gravel 150 is filled in the filling space C so as to be constructed.

도 4 내지 10은 이러한 수중 가시설(100)의 일 실시예에 의한 시공과정을 각 단계별로 나타낸 것으로서, a) H파일(111,121)을 설치하는 단계, b) 수평지지빔(112,122)을 설치하는 단계, c) 쉬트파일(113,123)을 설치하는 단계, d) 고정대(114,124)를 설치하는 단계, e) 타이바(130)를 설치하는 단계, f) 토사(150)를 충진하는 단계, g) 배수 및 띠장을 설치하는 단계가 순차로 이루어진다. 이를 보다 구체적으로 설명하면 다음과 같다.FIGS. 4 to 10 illustrate a construction process according to an embodiment of the underwater hypothetical 100 according to each step. FIG. 4 to FIG. 10 show a step of installing the H files 111 and 121, b) installing horizontal support beams 112 and 122, c) installing the sheet files 113,123, d) installing the fixing bars 114,124, e) installing the tie bars 130, f) filling the gravels 150, g) And a step of installing a wristband are sequentially performed. This will be described in more detail as follows.

a) a) H파일(111,121)을H files (111, 121) 설치하는 단계(도 4); Installing step (Fig. 4);

교각 등의 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 제1벽체(110)를 위한 H파일(111)과 계획된 벽두께가 이루어지도록 소정의 간격만큼 이격되어 설치되는 제2벽체(120)를 위한 H파일(121)을 지중에 설치하되, 상기 각 H파일(111,121)은 충분한 지지력을 가질 수 있도록 암반의 속에까지 근입되도록 설치한다.An H file 111 for a first wall 110 installed on the outer side of a work section where a concrete structure such as a pier is installed and a second wall 120 installed to be spaced apart by a predetermined distance so as to form a planned wall thickness The H files 121 and 121 are installed in the ground so that the H files 111 and 121 are inserted into the rock bed so as to have a sufficient supporting force.

b) b) 수평지지빔(112,122)을The horizontal support beams 112, 설치하는 단계(도 5); Installing step (Fig. 5);

상기 제1벽체(110)측 H파일(111)의 후면과 제2벽체(120)측 H파일(121)의 전면에 각 접하여 수평지지빔(112,122))을 설치한다.The horizontal support beams 112 and 122 are provided in contact with the rear surface of the H file 111 on the first wall 110 and the H file 121 on the second wall 120 side.

이러한 수평지지빔(112,122)의 설치는, 도 5의 (a)에서와 같이 수평지지빔(112,122)을 H파일(111,121)에 용접 고정시키는 방식으로 이루어지게 할 수 있으나, 앞서 설명한 바와 같이 수평지지빔(112,122)은 상하의 위치를 유지할 수 있도록 설치되면 족하는 것이므로, 이를 H파일(111,121)에 용접 부착시키지 아니하고 상부에서 행잉하는 방식으로 설치되게 할 수도 있다.The horizontal support beams 112 and 122 may be formed by welding the horizontal support beams 112 and 122 to the H files 111 and 121 as shown in FIG. 5A. However, Since the beams 112 and 122 can be installed so as to maintain the vertical positions, they may be installed in a manner of hanging from the top without welding the H files 111 and 121 to the H files 111 and 121.

도 5의 (b)는 수평지지빔(112,122)을 용접으로 H파일(111,121)에 고정시키는 전자의 실시예와는 달리, 후자의 행잉방식을 이용하여 수평지지빔(112,122)을 H파일(111,121)에 접하여 위치시킨 상태를 나타낸 것이다.5 (b) shows the horizontal support beams 112 and 122 in the H files 111 and 121 (FIG. 5) by using the latter hanging method, unlike the former embodiment in which the horizontal support beams 112 and 122 are fixed to the H files 111 and 121 by welding. As shown in Fig.

이를 위해 H파일(111,121)에는 측방향으로 돌출되는 행거브라켓(117)이 더 설치될 수 있고, 상기 행거브라켓(117)에 일단이 고정된 현수케이블(119)의 타단이 고정될 수 있는 걸고리(118)가 수평지지빔(112,122)에 더 구비된다.To this end, the h files 111 and 121 may further include a hanger bracket 117 protruding in the lateral direction. The hanger bracket 117 may be provided with hooks for fixing the other end of the suspension cable 119, 118 are further provided on the horizontal support beams 112, 122.

이러한 행잉방식에 의한 수평지지빔(112,122)의 설치는 수중에서의 용접공정이 발생되지 않도록 함으로써, 시공성의 향상 및 인건비의 절감을 도모하게 할 뿐더러, 향후 가시설의 철거작업을 보다 용이하게 하고, 수평지지빔(112,122)에 아무런 손상없이 그대로 회수 가능하게 하여 자재의 반복 사용에 따른 시공단가를 대폭 감소시키게 하는 등의 경제적인 효과를 발휘하게 한다.The installation of the horizontal support beams 112 and 122 by the hanging method prevents the welding process from occurring in the water, thereby improving the workability and reducing the labor costs. Further, It is possible to recover the support beams 112 and 122 as they are, without damaging them, and to exhibit economical effects such as significantly reducing the construction cost due to repeated use of the material.

c) c) 쉬트파일(113,123)을The sheet files 113, 설치하는 단계(도 6); Installing step (Fig. 6);

H파일(111,121)에 대한 각 수평지지빔(112,122)의 설치가 완료되면, 제1벽체(110)측 수평지지빔(112)의 후면과 제2벽체(120)측 수평지지빔(122)의 전면에 접하여 쉬트파일(113,123)을 각 설치하여, 그 사이에 토사(150)가 충진될 수 있는 충진공간(C)이 형성되도록 한다.When the installation of the horizontal support beams 112 and 122 to the H files 111 and 121 is completed, the rear surface of the horizontal support beams 112 on the first wall 110 and the horizontal support beams 122 on the second wall 120 side The sheet piles 113 and 123 are disposed in contact with the front surface so that a filling space C capable of filling the soil 150 between the sheet piles 113 and 123 is formed.

이때 각 쉬트파일(113,123)의 상부는, 다음 단계에서 설치되는 고정대(114,124)의 설치작업이 수중에서 이루어지지 않도록 수면 위로 노출되도록 하는 것이 바람직하다.At this time, it is preferable that the upper portions of the sheet files 113 and 123 are exposed above the water surface so that the installation work of the fixing stands 114 and 124 installed in the next step is not performed in water.

d) 고정대(114,124)를 설치하는 단계(도 7);d) installing the fixing members 114 and 124 (Fig. 7);

각 쉬트파일(113,123)의 설치가 완료되면, 제1벽체(110)측 H파일(111)의 전면 상단과 제2벽체(120)측 H파일(121)의 후면 상단의 각각에 고정대(114,124)를 설치한다.When the installation of the respective sheet files 113 and 123 is completed, the fixing stands 114 and 124 are fixed to the front upper end of the H file 111 on the first wall 110 side and the rear upper side of the H file 121 on the second wall 120 side, .

상기 고정대(114,124)에는 다음 단계에서의 타이바(130) 설치를 위한 고정브라켓(131)를 미리 설치해 놓는 것이 바람직하다.It is preferable that the fixing brackets 131 and 124 are provided in advance with fixing brackets 131 for mounting the tie bar 130 in the next step.

상기한 a) 내지 d)단계는 제1벽체와 제2벽체에 대하여 동시에 이루어질 수 있으나, 제1벽체에 대한 a) 내지 d)단계의 작업이 완료된 후, 제2벽체에 대한 a) 내지 c)단계의 작업이 진행될 수도 있다.The above steps a) to d) may be simultaneously carried out with respect to the first wall and the second wall, but after the operations of steps a) to d) for the first wall are completed, a) to c) The work of the step may proceed.

e) e) 타이바(130)를The tie bar (130) 설치하는 단계(도 8); Installing step (Fig. 8);

a) 내지 d)단계에 의해 충진공간(C)이 형성되도록 제1벽체(110)와 제2벽체(120)에 대한 설치작업이 완료되면, 각 고정대(114,124)에 타이바를 설치 고정시킴으로써 제1벽체(110)와 제2벽체(120)의 사이 간격이 일정하게 유지될 수 있도록 한다.When the installation work for the first wall 110 and the second wall 120 is completed so that the filling space C is formed by the steps a) to d), the tie bars are fixed to the fixing tables 114, So that the distance between the wall 110 and the second wall 120 can be maintained constant.

f) 토사(150)를 f) sanding the soil 150 충진하는Filled 단계(도 9); Step (FIG. 9);

다음으로 제1벽체(110)와 제2벽체(120) 사이에 형성된 충진공간(C)에 토사(150)를 충진시켜 소정의 두께를 가지는 물막이 벽이 형성되도록 한다.Next, the gravel 150 is filled in the filling space C formed between the first wall 110 and the second wall 120 to form a waterwall having a predetermined thickness.

g) 배수 및 g) drainage and 띠장(115)을The wale band 115 설치는 단계(도 10); Installation is a step (Figure 10);

토사의 충진으로 소정의 두께를 가지는 물막이 벽이 형성되면, 상기 물막이 벽에 의해 구획된 내부의 작업공간에 대한 일부 배수작업과 병행하여 제1벽체(110)측 H파일(111)의 전면에 대한 띠장(115)의 설치작업이 상부에서부터 하부로 순차 이루어진다.When the water film wall having a predetermined thickness is formed by the filling of the gravels, a part of the water on the front surface of the H file 111 on the first wall 110 side The installation work of the wale band 115 is sequentially performed from the upper part to the lower part.

즉 적어도 띠장(115)이 설치되어야 하는 위치까지 일부 배수작업을 진행시켜 H파일(111)의 상부가 충분히 수면위로 노출되도록 한 후, 수중이 아닌 수면 밖에서 용접작업이 이루어지도록 하며, 이러한 일부 배수 후 띠장(115)의 설치를 반복하여 H파일(111)의 전 길이에 대한 띠장(115)의 설치가 완료되도록 한다.That is, at least a drainage operation is performed to a position where at least the wale band 115 is to be installed so that the upper part of the H file 111 is sufficiently exposed on the water surface, and then the welding operation is performed outside the water surface rather than under water. The installation of the wale band 115 is repeated so that the installation of the wale band 115 with respect to the entire length of the H file 111 is completed.

띠장(115)의 설치가 완료되면, 상기 띠장(115)을 매개로 하여 버팀대(116)를 설치함으로써 본 발명의 수중 가시설의 구축은 일단 완료되나, 작업공간에 대한 기존토사층(151) 및 그 하부 암반(160)의 일부에 대한 굴착작업이 이루어져 노출되는 각 H파일(111,121)이 매립되도록 하는 차수벽(141,142)이 더 설치될 수 있음은 앞서 설명한 바와 같다.When the installation of the wale band 115 is completed, the construction of the underwater hypothecation of the present invention is once completed by installing the bracing rod 116 via the wale band 115. However, the existing underground layer 151 and the lower It is possible to further provide water walls 141 and 142 for excavating a part of the rock mass 160 and allowing the exposed H files 111 and 121 to be buried.

이상에서 본 발명은 구체적인 실시 예를 참조하여 상세히 설명하였으나, 상기 실시 예는 본 발명을 이해하기 쉽도록 하기 위한 예시에 불과한 것이므로, 이 분야에서 통상의 지식을 가진 자라면 본 발명의 기술적 사상의 범위 내에서 이를 다양하게 변형하여 실시할 수 있을 것임은 자명한 것이다. 따라서 그러한 변형 예들은 청구범위에 기재된 바에 의해 본 발명의 권리범위에 속한다고 할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the scope of the invention is not limited to the disclosed embodiments, but, on the contrary, It is obvious that it will be possible to carry out various modifications thereof. It is therefore intended that such modifications are within the scope of the invention as set forth in the claims.

100; 수중 가시설 110; 제1벽체
111,121; H파일 112,122; 수평지지빔
113,123; 쉬트파일 114,124; 고정대
115; 띠장 116; 버팀대
117; 행거브라켓 118; 걸고리
119; 현수케이블 120; 제2벽체
130; 타이바 131; 고정브라켓
141,142; 차수벽 150; 토사
151; 기존토사층 160; 암반
C; 충진공간
100; Underwater hypocrisy 110; The first wall
111, 121; H files 112, 122; Horizontal support beam
113, 123; Sheet files 114, 124; Fixture
115; Wale 116; bracing
117; Hanger bracket 118; Hook
119; Suspension cable 120; The second wall
130; Tie bar 131; fixed bracket
141, 142; A water wall 150; Tosa
151; Existing soil layer 160; Rock
C; Filling space

Claims (7)

수중에 설치되는 콘크리트 구조물의 구축을 위한 가시설에 있어서, 상기 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 것으로서, 수중 바닥면의 암반(160)에까지 근입되는 지주용 H파일(111)과, H파일(111)의 후면에 접하여 설치되는 수평지지빔(112)과, H파일(111)의 전면에 접하여 설치되는 띠장(115)과, 수평지지빔(112)의 후면에 접하여 설치되는 쉬트파일(113) 및, H파일(111) 상단의 전면에 접하여 설치되는 고정대(114)로 구성되는 제1벽체(110)와,
토사(150)의 충진공간(C)이 형성되도록 상기 제1벽체(110)로부터 이격되어 설치되는 것으로서, 수중 바닥면의 암반(160)에까지 근입되는 지주용 H파일(121)과, H파일(121)의 전면에 접하여 설치되는 수평지지빔(122)과, 수평지지빔(122)의 전면에 접하여 설치되는 쉬트파일(123) 및, H파일(121) 상단의 후면에 접하여 설치되는 고정대(124)로 구성되는 제2벽체(120)와,
제1벽체(110)의 고정대(114)와 제2벽체(120)의 고정대(124) 사이를 연결 고정하는 타이바(130)로 이루어지되,
상기 H파일(111,121)에는 측방향으로 돌출되는 행거브라켓(117)이 설치되고, 수평지지빔(112,122)은 상기 행거브라켓(117)에 일단이 고정된 현수케이블(119)의 타단에 고정되어 상부에서 행잉되는 구조로 설치되는 것을 특징으로 하는 수중구조물의 구축을 위한 물막이용 수중 가시설.
The H-file 111 is provided on the outer side of the work section in which the concrete structure is installed. The H file 111 extends to the rock 160 of the underwater floor, A horizontal support beam 112 installed in contact with the rear surface of the file 111, a wale band 115 installed in contact with the front surface of the H file 111, and a sheet file 113), and a fixing table (114) provided in contact with a front surface of the upper end of the H file (111)
A holding H file 121 which is installed to be spaced apart from the first wall 110 so as to form a filling space C of the gravel 150 and which is inserted into the rock 160 of the underwater floor, A horizontal support beam 122 installed in contact with the front surface of the H file 121 and a horizontal support beam 122 disposed in contact with the front surface of the H file 121, A second wall body 120 made of a metal,
And a tie bar 130 connecting and fixing the fixing bar 114 of the first wall body 110 and the fixing bar 124 of the second wall body 120,
The h files 111 and 121 are provided with hanger brackets 117 protruding in the lateral direction and the horizontal support beams 112 and 122 are fixed to the other end of the suspension cable 119 having one end fixed to the hanger bracket 117, Wherein the waterproofing structure is installed in a structure that is hanged from the water tank.
삭제delete 삭제delete 삭제delete 수중에 설치되는 콘크리트 구조물의 구축을 위하여 제1벽체(110)와 제2벽체(120) 사이의 충진공간(C)에 토사(150)를 충진하여 가시설을 시공하는 방법에 있어서,
a) 상기 콘크리트 구조물이 설치되는 작업구간의 외곽에 설치되는 제1벽체(110)를 위한 H파일(111)과, 상기 제1벽체(110)와 이격되어 설치되는 제2벽체(120)를 위한 H파일(121)을 각각 지중에 설치하는 단계;
b) 제1벽체(110)측 H파일(111)의 후면과 제2벽체(120)측 H파일(121)의 전면에 접하도록 수평지지빔(112,122)을 설치하되, 상기 H파일(111,121)에 측방향으로 돌출되는 행거브라켓(117)이 설치되고, 상기 행거브라켓(117)에 일단이 고정된 현수케이블(119)의 타단에 고정되어 행잉되는 구조로 수평지지빔(112,122)을 설치하는 단계;
c) 제1벽체(110)측 수평지지빔(112)의 후면과 제2벽체(120)측 수평지지빔(122)의 전면에 접하여 쉬트파일(113,123)을 각 설치하는 단계;
d) 제1벽체(110)측 H파일(111)의 전면 상단과 제2벽체(120)측 H파일(121)의 후면 상단의 각각에 고정대(114,124)를 설치하는 단계;
e) 제1벽체(110)측 고정대(114)와 제2벽체(120)측 고정대(124)의 사이에 타이바(130)를 설치하는 단계;
f) 제1벽체(110)와 제2벽체(120)의 사이에 형성된 충진공간(C)에 토사(150)를 충진시키는 단계;
g) 제1벽체(110)측 H파일(111)의 전면에 띠장(115)을 설치하는 단계;가 순차로 이루어지는 것을 특징으로 하는 수중구조물의 구축을 위한 물막이용 수중 가시설의 시공방법.
A method for constructing a concrete structure by filling a soil (150) in a filling space (C) between a first wall (110) and a second wall (120) in order to construct a concrete structure installed in water,
a H file 111 for a first wall 110 installed on the outer side of a work section where the concrete structure is installed and a second wall 120 installed apart from the first wall 110 H files 121 in the ground;
b) Horizontal support beams 112 and 122 are provided so as to contact the rear surface of the H file 111 on the first wall 110 and the front surface of the H file 121 on the second wall 120. The H files 111 and 121, And installing the horizontal support beams 112 and 122 in a structure in which the hanger bracket 117 protruding laterally is fixed and fixed to the other end of the suspension cable 119 having one end fixed to the hanger bracket 117, ;
c) installing sheet piles 113 and 123 in contact with the rear surface of the horizontal support beam 112 on the first wall 110 and the front surface of the horizontal support beam 122 on the second wall 120;
(d) installing fixtures (114,124) on the front upper end of the H-file (111) on the first wall (110) side and the rear upper end of the H-file (121) on the second wall (120) side;
e) installing a tie bar (130) between the first wall (110) side fixture (114) and the second wall (120) side fixture (124);
f) filling the gravel (150) in a filling space (C) formed between the first wall (110) and the second wall (120);
g) installing wales (115) on the entire surface of the H file (111) on the first wall (110) side.
삭제delete 제5항에 있어서,
상기 g)단계의 띠장(115) 설치는, 작업공간에 대한 일부 배수후 띠장(115)을 H파일(111)에 용접 설치하는 과정을 반복하여 상부에서부터 하부로 순차 설치되게 함으로써, 수면 밖에서 용접작업이 이루어지도록 하는 것을 특징으로 하는 수중구조물의 구축을 위한 물막이용 수중 가시설의 시공방법.
6. The method of claim 5,
The installation of the wale band 115 in the step g) is performed by repeating the process of welding the wale band 115 to the H file 111 by repeating the process of partially draining the wale band 115 to the work space, Wherein the waterproofing structure is constructed so that the waterproofing structure is formed.
KR1020170060246A 2017-05-16 2017-05-16 Temporary structure for water fence and the construction method thereof KR101817293B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170060246A KR101817293B1 (en) 2017-05-16 2017-05-16 Temporary structure for water fence and the construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170060246A KR101817293B1 (en) 2017-05-16 2017-05-16 Temporary structure for water fence and the construction method thereof

Publications (1)

Publication Number Publication Date
KR101817293B1 true KR101817293B1 (en) 2018-02-21

Family

ID=61524454

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170060246A KR101817293B1 (en) 2017-05-16 2017-05-16 Temporary structure for water fence and the construction method thereof

Country Status (1)

Country Link
KR (1) KR101817293B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049418A (en) * 2020-09-25 2020-12-08 中国华西企业有限公司 Aluminium mould corner leak protection thick liquid mechanism
KR102358619B1 (en) * 2021-08-09 2022-02-08 지더블유이엔씨 주식회사 Large depth complex type temporary structure and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100789210B1 (en) * 2007-05-08 2008-01-02 주식회사 드림이엔지 Earthquake construction method using sheet pile and composite beam
KR101107567B1 (en) * 2011-01-04 2012-01-25 주식회사 씨엠파트너스건축사사무소 Joining device of beam structure and vertical steel member for RC structure reverse drilling method, dedicated support frame and construction method using same
KR101117924B1 (en) * 2011-08-04 2012-02-22 박기경 Complex riverside facility and construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100789210B1 (en) * 2007-05-08 2008-01-02 주식회사 드림이엔지 Earthquake construction method using sheet pile and composite beam
KR101107567B1 (en) * 2011-01-04 2012-01-25 주식회사 씨엠파트너스건축사사무소 Joining device of beam structure and vertical steel member for RC structure reverse drilling method, dedicated support frame and construction method using same
KR101117924B1 (en) * 2011-08-04 2012-02-22 박기경 Complex riverside facility and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049418A (en) * 2020-09-25 2020-12-08 中国华西企业有限公司 Aluminium mould corner leak protection thick liquid mechanism
KR102358619B1 (en) * 2021-08-09 2022-02-08 지더블유이엔씨 주식회사 Large depth complex type temporary structure and its construction method

Similar Documents

Publication Publication Date Title
JP4793634B2 (en) Temporary deadline construction method
KR100923078B1 (en) Construction Method of Facade Closure Using Sheet Pile and Band and Underwater Structure Construction Method
JP2018017111A (en) Construction method of water stop working space
KR101817293B1 (en) Temporary structure for water fence and the construction method thereof
EP3420138B1 (en) Anchoring device for a fence
JP3905776B2 (en) Revetment structure
JP3888174B2 (en) Temporary deadline construction method
JP2020070705A (en) Method for constructing lightweight fill retaining wall structure
KR101664668B1 (en) Structure for connecting earth retaining wall
KR100903508B1 (en) '?' Shape Waling Method Separated from the Basement Wall
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
JP5280150B2 (en) Yamadome retaining wall and method of forming Yamadome retaining wall
KR20150010422A (en) Mid supporting beam for temporary soil sheathing work
JP5184393B2 (en) Protective wall and protective wall forming method
JP2015166538A (en) Formwork installation method, formwork and underwater structure
JP2007205142A (en) Built-up fence conduit equipped with single plate sidewall panel
RU2816995C1 (en) Method for construction of hydraulic structures on rocky soils
JP7138281B2 (en) Embankment wall structure
JP4231194B2 (en) Revetment structure
KR200387372Y1 (en) The underwater casing form
JP6792239B2 (en) Scuttling prevention device for steel pipe piles and scuttling prevention method
RU2483154C1 (en) Retaining wall
JP2020190134A (en) Flood prevention sealing structure and construction method for the same
RU2034951C1 (en) Piper and method of its erection
JP2018178429A (en) Construction method of steel pipe and sheet pile well foundation and steel pipe and pile pipe foundation

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20170516

PA0201 Request for examination
PA0302 Request for accelerated examination

Patent event date: 20170516

Patent event code: PA03022R01D

Comment text: Request for Accelerated Examination

PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20170802

Patent event code: PE09021S01D

PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20171012

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20180104

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20180104

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
PR1001 Payment of annual fee

Payment date: 20210208

Start annual number: 4

End annual number: 4

PR1001 Payment of annual fee

Payment date: 20230104

Start annual number: 6

End annual number: 6

PR1001 Payment of annual fee

Payment date: 20240104

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 20250106

Start annual number: 8

End annual number: 8