KR101731536B1 - Screw pile and construction method thereof - Google Patents
Screw pile and construction method thereof Download PDFInfo
- Publication number
- KR101731536B1 KR101731536B1 KR1020160050772A KR20160050772A KR101731536B1 KR 101731536 B1 KR101731536 B1 KR 101731536B1 KR 1020160050772 A KR1020160050772 A KR 1020160050772A KR 20160050772 A KR20160050772 A KR 20160050772A KR 101731536 B1 KR101731536 B1 KR 101731536B1
- Authority
- KR
- South Korea
- Prior art keywords
- rod
- grout
- screw
- file
- rod portion
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims description 15
- 239000011440 grout Substances 0.000 claims abstract description 45
- 238000009412 basement excavation Methods 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 claims description 15
- 238000002347 injection Methods 0.000 claims description 14
- 239000007924 injection Substances 0.000 claims description 14
- 238000003780 insertion Methods 0.000 claims description 10
- 230000037431 insertion Effects 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000007921 spray Substances 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000011796 hollow space material Substances 0.000 abstract 2
- 239000002689 soil Substances 0.000 description 8
- 238000005553 drilling Methods 0.000 description 5
- 239000000470 constituent Substances 0.000 description 4
- 230000000149 penetrating effect Effects 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 239000000243 solution Substances 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 파일에 관한 것으로서, 보다 상세하게는 지반에 스크류파일을 설치함과 동시에 스크류파일 설치로 교란된 지반에 그라우트를 충전하는 스크류파일 및 그 시공방법에 관한 것이다.The present invention relates to a file, and more particularly, to a screw file for installing a screw file on a ground and charging grout to a ground disturbed by screw file installation, and a construction method thereof.
일반적으로 고층 건축물이나 철근 콘크리트 구조물 등을 축조할 경우에는 그 기초를 견고히 하기 위하여 지반에 파일 또는 H형 빔을 박아서 매설하는 방법으로 기초공사를 진행하고 있으며, 파일 등의 시공은 건축물 및 구조물 등을 축조하는 데 있어서 매우 중요한 공사이다.Generally, in case of building a high-rise building or a reinforced concrete structure, the foundation is being constructed by putting a pile or H-beam in the ground to solidify the foundations, and construction of the pile is carried out by building and structure It is a very important construction to build.
파일을 시공하는 방법으로는 타설시공법과 굴착시공법 등이 소개된 바 있다. The construction method of the pile has been introduced with the piling construction method and the excavation construction method.
전자의 타설시공법은 크롤러주행 장치에 수직으로 설치한 리더(Leader)의 상부에 설치된 권양로우프를 이용하여 중량체의 해머를 상승시켰다가 낙하시켜 파일을 타격하여 삽입시키는 방법과 콤푸레샤의 압축공기를 이용하여 해머를 상승시켰다가 하강시키면서 파일을 타격하여 지반에 삽입시키는 공법이다.In the method of casting electrons, a method is used in which a hammer of a weight is lifted by using a hoisting rope installed on a vertically installed leader on a crawler traveling device, and then dropped and inserted into a pile, and the compressed air of the compressor is used So that the hammer is raised and then lowered, and the file is struck and inserted into the ground.
그리고 후자의 굴착시공방법은 파일연결부에 장착된 스크류 파일을 회전작동시켜 지반에 삽입고정하는 방법으로서, 파일 외부에 그라우팅을 충전하는 작업을 병행하는 것이 일반적이다.The latter excavation method is a method of inserting and fixing a screw file mounted on a pile connecting portion by rotating the pile, and charging the grouting to the outside of the pile is generally performed in parallel.
굴착시공방법은 도심지의 공사에서 소음발생이 적기 때문에 많이 사용되는데 스크류파일의 일측부와 굴착부의 사이 구간에 골고루 그라우팅을 충전하는 것이 매우 중요하다.It is very important to fill the grout evenly between one side of the screw pile and the excavation part because the construction method of the excavation is used frequently because noise is less generated in the construction of the urban area.
이는 스크류파일의 스크류에 의해 굴착부의 토사가 교란되어(토사의 흐트러짐) 지반의 강도가 저하되기 때문이다.This is because the soil of the excavated portion is disturbed by the screw of the screw file (disorder of the soil) and the strength of the ground is lowered.
그러나 굴착시 그라우트가 분사되는 분사공(파일의 측부에 형성)이 막히거나 굴착부의 교란된 토사에 그라우트가 밀실하게 충전되지 않아 말뚝의 지지력이 저하되는 문제가 발생한다.However, there is a problem that the punch hole (formed on the side of the pile) through which the grout is injected at the time of excavation is clogged or the supporting force of the pile is lowered because the grout is not filled tightly in the disturbed soil of the excavation portion.
한국특허 10-2011-0044751호 '스크류파일 시공방법'은 천공기를 이용하여 지반의 최상층에 위치한 매립층을 천공하여 천공부를 형성하는 제1단계와; 상기 천공부에 스크류파일을 삽입하고 스크류파일 단부의 토출공을 통하여 공기를 분사하면서 스크류파일을 회전구동하여 상기 매립층의 하측에 위한 지반의 일부를 천공하는 제2단계와; 회전구동되는 스크류파일의 그라우팅공을 통하여 그라우팅액이 토출되도록 하여 지반을 그라우팅하면서 상기 지반의 저항력에 의하여 발생하는 상기 스크류파일의 토크치를 활용하여 지지층을 판별한 후 상기 지지층까지 상기 스크류파일을 관입하는 제3단계와; 관입된 상기 스크류파일을 지지하는 상기 지지층의 지지력을 증대시키는 제4단계와; 상기 스크류파일의 회전구동이 회복되면 지반을 그라우팅하면서 상기 스크류파일을 일정 깊이로 더 관입시키는 제5단계를; 포함하여 진행함으로써, 스크류파일을 일정 깊이로만 지반에 관입하더라도 지반에 대한 스크류파일의 선단지지력을 향상시키고, 그에 따라 스크류파일을 지반으로 관입하는데 소요되는 시간과 노력을 현저하게 줄일 수 있는 효과가 있다.Korean Patent No. 10-2011-0044751 'Screw pile construction method' includes a first step of forming a perforation by perforating a buried layer located on the uppermost layer of a ground using a perforator; A second step of inserting a screw file into the perforation and rotating the screw file while injecting air through a discharge hole at the end of the screw file to perforate a part of the ground for the lower side of the buried layer; The grouting solution is discharged through the grouting holes of the rotary screw file to grout the ground while discriminating the support layer by utilizing the torque value of the screw file caused by the resistance of the ground and then penetrating the screw file to the support layer A third step; A fourth step of increasing the supporting force of the support layer supporting the inserted screw file; And a fifth step of further penetrating the screw file to a predetermined depth while grouting the ground if the rotational drive of the screw file is restored; It is possible to improve the end bearing capacity of the screw pile to the ground even if the screw pile is penetrated to the ground only to a certain depth and thereby the time and effort required to penetrate the screw pile into the ground can be remarkably reduced .
한국특허 10-2010-0010891호 '그라우팅 겸용 내부관을 가지는 강관파일 및 PHC파일'은 지반의 지지력 보강에 이용되며 봉 형상의 몸체 외주면에 스크류가 형성되어 지반을 천공함과 동시에 파일을 관입할 수 있고, 동일한 컴프레셔의 압력으로도 파일에 주입되는 공기주입압을 더욱 높일 수 있는 공기주입 및 그라우팅 겸용 내부관을 가지는 강관파일 및 PHC파일에 관한 것으로서, 파일 몸체부의 구멍보다 작은 직경을 가지며 상기 구멍내에 설치되는 공기주입관과, 상기 몸체부의 길이방향의 양끝단 부근에 설치되어 상기 공기 주입관이 이탈하지 않도록 상기 몸체부에 고정시키는 고정부를 포함하여 구성되며, 상기 공기주입관의 하부 끝단은 끝단을 향하여 점차 직경이 감소하는 테이퍼 형상으로 형성되어, 별도의 천공작업이 필요하지 않기 때문에, 공사단가를 줄일 수 있으며 시공기간을 단축시킬 수 있고, 또한, 동일한 공기주입압으로도 천공되는 지반에는 더욱 큰 공기압을 적용할 수 있기 때문에 천공 및 배토작업이 더욱 원활하게 이루어질 수 있다.Korean Patent No. 10-2010-0010891 'Steel pipe file and PHC file having grouting combined inner pipe' are used for reinforcing the supporting force of the ground and a screw is formed on the outer surface of the rod body to penetrate the ground and to penetrate the file The present invention relates to a steel pipe pile and a PHC pile having an inner pipe for both air injection and grouting capable of further increasing the air injection pressure to be injected into the pile by the pressure of the same compressor and having a diameter smaller than that of the pile body, And a fixing unit installed near both ends of the body in the longitudinal direction of the body to fix the air injection tube to the body so that the air injection tube does not come off. The lower end of the air injection tube has an end So that a separate drilling operation is not required. Therefore, the construction step It reduces and it is possible to shorten the construction period, and, the same air juipap also has a perforated green body and work can be made more smoothly because there can apply a greater pressure to be ground drilling.
한국특허 10-2013-0011114호 '스크류파일'은 내부에 중공이 형성되고 일측 단부가 경사지게 절개되어 외부와 연통되도록 개구 형성되며 측면에 복수의 그라우팅공이 둘레 방향을 따라 소정 거리 이격되도록 관통 형성된 관상의 로드부와; 상기 로드부의 외주면에 상기 로드부의 길이 방향을 따라 나선 형상으로 형성되어 부착되는 나선부를; 포함하여 구성함으로써, 스크류파일을 이용하여 지반을 천공시에 천공 작업에 소요되는 시간을 단축함과 동시에 천공 작업의 작업성을 높일 수 있는 효과가 있다.Korean Patent No. 10-2013-0011114 'Screw pile' has a hollow inside and one end is sloped and opened so as to communicate with the outside, and a plurality of grouting holes are formed on the side surface at a predetermined distance along the circumferential direction. A rod portion; A spiral portion formed in a spiral shape along the longitudinal direction of the rod portion and attached to an outer circumferential surface of the rod portion; Therefore, it is possible to shorten the time required for drilling the drill when drilling the ground using the screw file, and at the same time, improve the workability of the drilling work.
위 한국특허 10-2013-0011114호와 한국특허 10-2011-0044751호는 파일의 측방향으로 그라우트를 분출하는 분출공이 형성되어 있고, 한국특허 10-2010-0010891호는 파일의 하단부에 굴착방향으로 그라우트가 분출되도록 분사공이 형성된 구조로서, 굴착부의 교란된 토사에 의해 분사공의 막힘이 발생할 수 있고, 이로 인해 그라우트가 밀실하게 충전되지 않을 수 있다.Korean Patent No. 10-2013-0011114 and Korean Patent No. 10-2011-0044751 disclose an ejection hole for ejecting grout in the lateral direction of a pile, and Korean Patent No. 10-2010-0010891 discloses a pile ejection hole In the structure in which the injection hole is formed so that the grout is ejected, the clogging of the injection hole may be caused by the disturbed soil of the excavation portion, and the grout may not be filled tightly.
상술한 종래기술의 도면부호 및 명칭은 그 종래기술의 설명에 한정되어 사용한다. The above-mentioned prior art reference numerals and names are used only in the description of the prior art.
본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 스크류파일의 삽입시 그라우트가 분사되는 분출구의 막힘 현상을 방지할 수 있는 파일 및 그 시공방법을 제시한다.Disclosure of Invention Technical Problem [8] The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a pile and a method of constructing the pile for preventing grooves from being clogged when the pile is inserted.
또한, 그라우트를 굴착부의 교란된 토사부에 밀실하게 충전할 수 있는 스크류파일 및 그 시공방법을 제시한다.Further, a screw pile capable of tightly filling the grout with disturbed slope of the excavation portion and a construction method thereof are presented.
상기 과제의 해결을 위하여 지반 굴착과 함께 그라우트(400)를 분출하는 스크류파일(10)로서, 내부에 중공이 형성된 로드부(100); 상기 로드부(100)의 외주면에 결합됨과 아울러, 상기 로드부(100)의 길이 방향을 따라 비연속적으로 상호 간격을 두고 돌출형성된 스크류부(300); 및 상기 로드부(100)의 하단에 결합된 헤드부(200);를 포함하되. 상기 헤드부(200)의 상부 또는 측부에서 상향으로 형성된 분출공(210)을 통해 상측으로 상기 로드부(100)의 중공으로 채워진 상기 그라우트(400)가 분출된다.In order to solve the above problem, a screw pile (10) for spraying a grout (400) together with a ground excavation, comprising: a rod part (100) having a hollow inside; A
상기 헤드부(200)의 상면은 평평한 구조이고, 하부는 역삼각형 구조로 형성되며, 상기 로드부(100)의 중공과 연통되는 내측 공간부(220)를 구비한 것이 바람직하다.The top portion of the
상기 헤드부(200)의 상부에 형성된 상기 분출공(210)은 상기 로드부(100)의 외측으로 돌출된 상기 헤드부(200)의 상면 가장자리부에 형성된 것이 바람직하다.The
상기 분출공(210)이 형성된 상기 헤드부(200)의 외면에는 상기 분출공(210)을 개폐하기 위해 외측방향으로만 개방구동되는 체크벨브(230)가 설치된 것이 바람직하다.The
상기 스크류부(300)의 직경은 상기 로드부(100)의 하측에서 상측을 따라 점차 커지는 형상으로 상기 로드부(100)에 결합된 것이 바람직하다.It is preferable that the diameter of the
상기 로드부(100)에는 상기 로드부(100)의 길이 방향을 따라 상기 그라우트(400)가 분출되는 복수의 로드부분출공(110)이 상호 간격을 두고 형성된 것이 바람직하다.The
상기 로드부(100)의 길이방향을 따라 이웃하여 형성된 상기 로드부분출공(110)은 상호 엇갈리도록 형성된 것이 바람직하다.The rod
상기 복수의 로드부분출공(110)을 개폐하기 위해 상기 로드부(100)에 상기 체크벨브(230)가 설치된 것이 바람직하다.Preferably, the
본 발명의 일 실시 예에 따른 스크류파일 시공방법은 상기 스크류파일(10)을 지반(20)에 회전구동하여 삽입하는 지반삽입단계; 상기 지반삽입단계에서 상기 로드부(100)의 내공으로 상기 그라우트(400)를 충전하고, 상기 분출공(210)과 상기 로드부분출공(110)을 통해 상기 그라우트(400)를 분출하는 그라우트 분출단계; 상기 스크류파일(10)의 삽입깊이에 따라 상기 스크류파일(10)의 상측 단부에 강관파일을 연결하는 파일연결단계;를 포함한다.The method of constructing a screw file according to an embodiment of the present invention includes: a ground insertion step of rotationally driving the screw file (10) to the ground (20); A grout injection step of filling the
본 발명의 스크류파일은 분출공의 막힘 현상을 방지할 수 있기 때문에 그라우트 분출이 용이하고, 지반의 교란된 토사에 그라우트를 밀실하게 충전할 수 있다.Since the screw pail of the present invention can prevent clogging of the ejection hole, it is easy to eject the grout, and the grout can be filled tightly on the disturbed soil of the ground.
또한, 파일에 형성된 스크류부가 상측을 따라 직경이 커지는 구조로 형성되어 있기 때문에 적은 토크로 파일을 회전삽입 할 수 있다.In addition, since the screw portion formed in the file is formed in a structure having a larger diameter along the upper side, the file can be rotationally inserted with less torque.
그라우트 분출을 위한 분출공이 헤드부(200)의 상부 또는 측부에 형성되어 있기 때문에 파일의 선단부터 교란된 토사부에 그라우트를 밀실하게 충전할 수 있다.Since the ejection holes for ejecting the grout are formed on the upper portion or the side portion of the
도 1은 한국특허 10-2011-0044751호의 스크류파일 지반관입 공정도.
도 2는 한국특허 10-2011-0044751호의 스크류파일 지반관입 후 그라우팅액도포 공정도.
도 3은 한국특허 10-2010-0010891호의 강관파일 단면도.
도 4는 한국특허 10-2013-0011114호의 파일 사시도.
도 5는 본 발명의 일 실시 예에 따른 스크류파일 사시도.
도 6은 본 발명의 일 실시 예에 따른 헤드부 측면도.
도 7은 본 발명의 또 다른 실시 예에 따른 스크류파일 측면도.
도 8은 본 발명의 또 다른 실시 예에 따른 헤드부 측면도.
도 9는 본 발명의 본 발명의 일 실시 예에 따른 체크벨브가 설치된 로드부 측면확대도.
도 10은 본 발명의 일 실시 예에 따른 스크류부 확대도.
도 11은 본 발명의 또 다른 실시 예에 따른 로드부분출공이 형성된 스크류파일 측면도.
도 12는 본 발명의 또 다른 실시 예에 따른 로드부분출공이 형성된 스크류부 확대도.
도 13은 본 발명의 일 실시 예에 따른 지반삽입단계 공정도.
도 14는 본 발명의 일 실시 예에 따른 그라우트 분출단계 및 지반삽입단계 공정도.
도 15는 본 발명의 또 다른 실시 예에 따른 헤드부 그라우트 분출도.FIG. 1 is a process drawing of the screw pile ground of Korean Patent No. 10-2011-0044751.
FIG. 2 is a view showing a process of applying a grouting solution after penetrating a screw pile ground in Korean Patent No. 10-2011-0044751.
3 is a sectional view of a steel pipe file of Korean Patent No. 10-2010-0010891.
FIG. 4 is a perspective view of a file of Korean Patent No. 10-2013-0011114. FIG.
5 is a perspective view of a screw file according to an embodiment of the present invention;
6 is a side view of a head according to an embodiment of the present invention.
7 is a side view of a screw file according to another embodiment of the present invention;
8 is a side view of a head portion according to another embodiment of the present invention.
FIG. 9 is an enlarged side view of a load part provided with a check valve according to an embodiment of the present invention. FIG.
10 is an enlarged view of a screw part according to an embodiment of the present invention;
11 is a side view of a screw file in which a rod portion outlet is formed according to another embodiment of the present invention.
FIG. 12 is an enlarged view of a screw portion having a rod portion outlet according to another embodiment of the present invention; FIG.
FIG. 13 is a process chart of a ground inserting step according to an embodiment of the present invention; FIG.
FIG. 14 is a process chart of a grout injection step and a ground insertion step according to an embodiment of the present invention; FIG.
FIG. 15 is a grout ejection head of a head according to another embodiment of the present invention; FIG.
본 발명인 스크류파일 및 그 시공방법의 실시 예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대해 중복되는 설명은 생략하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring now to the drawings, wherein like reference numerals designate identical or corresponding parts throughout the several views, Is omitted.
또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.
또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.
이하, 첨부 표 및 도면을 참조하여 본 발명의 일 실시 예에 따른 스크류파일 및 그 시공방법에 관하여 상세히 설명한다.Hereinafter, a screw file and a construction method thereof according to an embodiment of the present invention will be described in detail with reference to the accompanying tables and drawings.
지반 굴착과 함께 그라우트(400)를 분출하는 본 발명의 스크류파일(10)은 내부에 중공이 형성된 로드부(100); 로드부(100)의 외주면에 결합됨과 아울러, 로드부(100)의 길이 방향을 따라 비연속적으로 상호 간격을 두고 돌출형성된 스크류부(300); 및 로드부(100)의 하단에 결합된 헤드부(200);를 포함하되. 헤드부(200)의 상부 또는 측부에서 상향으로 형성된 분출공(210)을 통해 로드부(100)의 중공으로 채워진 그라우트(400)가 분출된다.The screw pile (10) of the present invention for ejecting the grout (400) together with the excavation of the ground includes a rod section (100) having a hollow inside thereof; A
이 경우, 헤드부(200)의 상부 또는 측부에 상향으로 분출공(210)이 형성되어 있기 때문에 그라우트의 분출이 용이하고, 파일의 선단부터 밀실하게 그라우트를 충전할 수 있다.In this case, since the
헤드부(200)의 상면은 평평한 구조이고, 하부는 역삼각형 구조로 형성되며, 로드부(100)의 중공과 연통되는 내측 공간부(220)를 구비한 것이 바람직하다.It is preferable that the top surface of the
이 경우, 그라우트는 로드부(100)의 중공부와 공간부(220)에 1차 적으로 충전되고, 분출공을 통해 파일 외부로 분출된다.In this case, the grout is primarily charged into the hollow portion and the
헤드부(200)의 상부에 형성된 분출공(210)은 로드부(100)의 외측으로 돌출된 헤드부(200)의 상면 가장자리부에 형성된 것이 바람직하다.The
이 경우, 분출공(210)은 헤드부(200)의 상부에 형성됨과 아울러, 로드부(100)의 외측으로 돌출된 상면 가장자리부에 형성되기 때문에 그라우트의 분출방향을 파일 선단부에서 상향으로 분출하게 된다. In this case, the
따라서, 선단부의 회전구동에 의해 교란되는 토사에 그라우트를 분사하여 지반을 개량할 수 있다.Therefore, it is possible to improve the ground by spraying grout to the soil which is disturbed by the rotation drive of the tip portion.
분출공(210)이 형성된 헤드부(200)의 외면에는 분출공(210)을 개폐하기 위해 외측방향으로만 개방구동되는 체크벨브(230)가 설치된 것이 바람직하다.It is preferable that a
이 경우, 지반에 삽입된 파일의 분출공이 토사에 의해 막히는 현상을 방지할 수 있다. In this case, it is possible to prevent a phenomenon that the ejection hole of the file inserted in the ground is clogged by the gravel.
이때, 체크벨브의 회전부가 분출공 하부 또는 상부에 위치하도록 설치되어 분출공을 기준으로 외측 하향 또는 외측 상향을 따라 회전개폐되는 구조로 설치된다.At this time, the rotating part of the check valve is installed so as to be positioned below or above the jet hole, and is installed in such a manner that it is opened or closed in the downward or outward upward direction with respect to the jet hole.
스크류부(300)의 직경은 로드부(100)의 하측에서 상측을 따라 점차 커지는 형상으로 로드부(100)에 결합된 것이 바람직하다.It is preferable that the diameter of the
파일을 지반에 삽입하기 위한 토크는 지반의 강도, 파일의 직경에 따라 결정된다.The torque to insert a file into the ground is determined by the strength of the ground and the diameter of the file.
이 경우, 스크류부(300)는 로드부의 상측을 따라 직경이 점차 커지는 구조이기 때문에 적은 회전토크로 파일을 삽입할 수 있다.In this case, since the
로드부(100)에는 로드부(100)의 길이 방향을 따라 그라우트(400)가 분출되는 복수의 로드부분출공(110)이 상호 간격을 두고 형성된 것이 바람직하다.The
이 경우, 파일 외측의 교란된 토사에 그라우트를 밀실 하게 충전할 수 있다.In this case, the grout can be filled tightly with disturbed soil outside the file.
로드부(100)의 길이방향을 따라 이웃하여 형성된 로드부분출공(110)은 상호 엇갈리도록 형성된 것이 바람직하다.It is preferable that the rod portion vent holes 110 formed adjacent to each other along the longitudinal direction of the
이 경우, 파일 외측의 교란된 토사에 더욱 밀실 하게 그라우트를 충전할 수 있다.In this case, the grout can be filled more tightly with disturbed soil outside the file.
복수의 로드부분출공(110)을 개폐하기 위해 로드부(100)에 체크벨브(230)가 설치된 것이 바람직하다.It is preferable that a
이 경우, 로드부분출공(110)이 토사에 의해 막히는 현상을 방지할 수 있다.In this case, it is possible to prevent the
본 발명의 일 실시 예에 따른 스크류파일 시공방법은 스크류파일(10)을 지반(20)에 회전구동하여 삽입하는 지반삽입단계; 지반삽입단계에서 로드부(100)의 내공으로 그라우트(400)를 충전하고, 분출공(210)과 로드부분출공(110)을 통해 그라우트(400)를 분출하는 그라우트 분출단계; 스크류파일(10)의 삽입깊이에 따라 스크류파일(10)의 상측 단부에 강관파일을 연결하는 파일연결단계;를 포함한다.The method of constructing a screw file according to an embodiment of the present invention includes: a ground insertion step of rotationally driving a screw file (10) to a ground (20); A grout injection step of filling the
이상은 본 발명에 의해 구현될 수 있는 바람직한 실시 예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시 예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.
10 : 스크류파일 100 : 로드부
110 : 로드부분출공 200 : 헤드부
210 : 분출공 220 : 공간부
230 : 체크벨브 300 : 스크류부
400 : 그라우트10: screw file 100:
110: rod part introduction 200: head part
210: ejection hole 220:
230: Check valve 300: Screw part
400: Grout
Claims (9)
내부에 중공이 형성된 로드부(100);
상기 로드부(100)의 외주면에 결합됨과 아울러, 상기 로드부(100)의 길이 방향을 따라 비연속적으로 상호 간격을 두고 돌출형성된 스크류부(300); 및
상기 로드부(100)의 하단에 결합된 헤드부(200);를 포함하되.
상기 헤드부(200)는
상면이 평평한 구조이고, 하부는 역삼각형 구조로 형성되며, 상기 로드부(100)의 중공과 연통되는 내측 공간부(220)를 구비하고,
상부 또는 측부에서 상향으로 형성된 분출공(210)을 통해 상측으로 상기 로드부(100)의 중공으로 채워진 상기 그라우트(400)가 분출되며,
상기 헤드부(200)의 상부에 형성된 상기 분출공(210)은 상기 로드부(100)의 외측으로 돌출된 상기 헤드부(200)의 상면 가장자리부에 형성됨과 아울러,
상기 분출공(210)이 형성된 상기 헤드부(200)의 외면에는 상기 분출공(210)을 개폐하기 위해 외측방향으로만 개방구동되는 체크벨브(230)가 설치된 것을 특징으로 하는 스크류파일.
A screw pile (10) for ejecting a grout (400) together with a ground excavation,
A rod portion 100 having a hollow inside thereof;
A screw portion 300 coupled to an outer circumferential surface of the rod portion 100 and protruding from the rod portion 100 along a longitudinal direction of the rod portion 100 at mutually spaced intervals; And
And a head part (200) coupled to a lower end of the rod part (100).
The head part 200
And has an inverted triangular lower part and an inner space part 220 communicating with the hollow of the rod part 100,
The grout (400) filled with the hollow of the rod part (100) is ejected upwardly through an ejection hole (210) formed upward from the upper side or the side part,
The ejection hole 210 formed in the upper part of the head part 200 is formed on the upper edge part of the head part 200 protruding outside the rod part 100,
Wherein a check valve (230) which is driven to open only in an outward direction is installed on an outer surface of the head part (200) on which the spray hole (210) is formed, for opening and closing the spray hole (210).
상기 스크류부(300)의 직경은 상기 로드부(100)의 하측에서 상측을 따라 점차 커지는 형상으로 상기 로드부(100)에 결합된 것을 특징으로 하는 스크류파일.
The method according to claim 1,
Wherein a diameter of the screw part (300) is coupled to the rod part (100) in a shape gradually increasing from the lower side to the upper side of the rod part (100).
상기 로드부(100)에는 상기 로드부(100)의 길이 방향을 따라 상기 그라우트(400)가 분출되는 복수의 로드부분출공(110)이 상호 간격을 두고 형성된 것을 특징으로 하는 스크류파일.
6. The method of claim 5,
Wherein a plurality of rod portion projections (110) through which the grout (400) is spouted are formed in the rod portion (100) along the longitudinal direction of the rod portion (100).
상기 로드부(100)의 길이방향을 따라 이웃하여 형성된 상기 로드부분출공(110)은 상호 엇갈리도록 형성된 것을 특징으로 하는 스크류파일.
The method according to claim 6,
Wherein the rod portion projections (110) formed adjacent to each other along the longitudinal direction of the rod portion (100) are formed to be offset from each other.
상기 복수의 로드부분출공(110)을 개폐하기 위해 상기 로드부(100)에 상기 체크벨브(230)가 설치된 것을 특징으로 하는 스크류파일.
8. The method of claim 7,
And the check valve (230) is installed on the rod part (100) to open / close the plurality of rod part outlets (110).
상기 스크류파일(10)을 지반(20)에 회전구동하여 삽입하는 지반삽입단계;
상기 지반삽입단계에서 상기 로드부(100)의 내공으로 상기 그라우트(400)를 충전하고, 상기 분출공(210)과 상기 로드부분출공(110)을 통해 상기 그라우트(400)를 분출하는 그라우트 분출단계;
상기 스크류파일(10)의 삽입깊이에 따라 상기 스크류파일(10)의 상측 단부에 강관파일을 연결하는 파일연결단계;를 포함하는 것을 특징으로 하는 스크류파일시공방법.A screw file construction method according to any one of claims 6 to 8.
A ground insertion step of rotatingly driving the screw file (10) to the ground (20);
A grout injection step of filling the grout 400 into the inside of the rod part 100 in the ground insertion step and ejecting the grout 400 through the injection hole 210 and the rod part introduction hole 110 ;
And connecting a steel pipe file to an upper end of the screw file (10) according to an insertion depth of the screw file (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160050772A KR101731536B1 (en) | 2016-04-26 | 2016-04-26 | Screw pile and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160050772A KR101731536B1 (en) | 2016-04-26 | 2016-04-26 | Screw pile and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101731536B1 true KR101731536B1 (en) | 2017-04-28 |
Family
ID=58702006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160050772A KR101731536B1 (en) | 2016-04-26 | 2016-04-26 | Screw pile and construction method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101731536B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102003554B1 (en) * | 2018-10-18 | 2019-07-24 | 임완혁 | Screw pile and constructing method thereof |
WO2019169180A1 (en) * | 2018-02-28 | 2019-09-06 | Aptim Intellectual Property Holdings, Llc | Pressure grouted displacement screw piles |
KR102270555B1 (en) | 2021-01-25 | 2021-06-29 | 주식회사 이도구조엔지니어링 | Method for reinforcing ground using grouting bead and helical pile |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3173063B2 (en) * | 1991-09-10 | 2001-06-04 | ミノルタ株式会社 | Color adaptive contour enhancement device and method |
KR101420685B1 (en) | 2013-12-31 | 2014-07-17 | (주)에이엠지그룹건축사사무소 | helix pile |
KR101582857B1 (en) * | 2015-03-18 | 2016-01-07 | 이호경 | the steel pipe pile and the piling method therewith |
-
2016
- 2016-04-26 KR KR1020160050772A patent/KR101731536B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3173063B2 (en) * | 1991-09-10 | 2001-06-04 | ミノルタ株式会社 | Color adaptive contour enhancement device and method |
KR101420685B1 (en) | 2013-12-31 | 2014-07-17 | (주)에이엠지그룹건축사사무소 | helix pile |
KR101582857B1 (en) * | 2015-03-18 | 2016-01-07 | 이호경 | the steel pipe pile and the piling method therewith |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019169180A1 (en) * | 2018-02-28 | 2019-09-06 | Aptim Intellectual Property Holdings, Llc | Pressure grouted displacement screw piles |
US10934678B2 (en) | 2018-02-28 | 2021-03-02 | Aptim Intellectual Property Holdings, Llc | Pressure grouted displacement screw piles |
KR102003554B1 (en) * | 2018-10-18 | 2019-07-24 | 임완혁 | Screw pile and constructing method thereof |
KR102270555B1 (en) | 2021-01-25 | 2021-06-29 | 주식회사 이도구조엔지니어링 | Method for reinforcing ground using grouting bead and helical pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100979929B1 (en) | Slotted mandral for lateral displacement pier and method of use | |
KR101731536B1 (en) | Screw pile and construction method thereof | |
KR101559962B1 (en) | Construction method for underground wall using pile | |
KR100750640B1 (en) | Gravel compaction pilling method reform ground and apparatus thereof | |
KR20120126702A (en) | Screw anchor pile | |
KR101859259B1 (en) | Apparatus to upgrade friction capacity of imbeded hollow type pile and construction method using thereby | |
US20130177359A1 (en) | Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns | |
KR100766859B1 (en) | Apparatus for cast-in-place pile construction with separable injection pipe of concrete and air and method thereof | |
KR101946930B1 (en) | Method for Excavating Vertical Hole using Raise Boring Machine and Packed Steel Pipe | |
KR101416865B1 (en) | Construction method of screw file | |
KR101224440B1 (en) | Construction method of screw file | |
KR102287362B1 (en) | Reinforcement method fot tip of PHC pile using loe fluidity mortar | |
JPH0823137B2 (en) | Sand pile building equipment | |
KR101680106B1 (en) | The screw anchor pile with extended reinforcing plate for earth reinforcement | |
JP3530262B2 (en) | Construction method of pile with water hole | |
KR101337223B1 (en) | Apparatus Equipped with Double Casing for Inserting Plastic Drain Board and Process thereof | |
KR100932952B1 (en) | Piles that have variable end | |
KR101859152B1 (en) | Auger-drilled pile assembly | |
JP5769122B1 (en) | Foundation pile construction method | |
JP6151305B2 (en) | Method for creating filler pile and excavation head used in the method | |
KR100698911B1 (en) | Horizontal Compacting Method of Weak Soil with Filling Pulled-out Pile Hole | |
JP4663803B2 (en) | Ground improvement device | |
JP2711357B2 (en) | Improvement method of construction ground and its drilling equipment. | |
KR20190137293A (en) | Construction method for rotational penetration pile | |
KR102143188B1 (en) | Temporary apparatus using pile and temporary facilities system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GRNT | Written decision to grant |