KR101504106B1 - Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same - Google Patents
Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same Download PDFInfo
- Publication number
- KR101504106B1 KR101504106B1 KR1020130050696A KR20130050696A KR101504106B1 KR 101504106 B1 KR101504106 B1 KR 101504106B1 KR 1020130050696 A KR1020130050696 A KR 1020130050696A KR 20130050696 A KR20130050696 A KR 20130050696A KR 101504106 B1 KR101504106 B1 KR 101504106B1
- Authority
- KR
- South Korea
- Prior art keywords
- bracket
- rail
- floating
- floating rail
- concrete girder
- Prior art date
Links
- 238000005339 levitation Methods 0.000 title claims abstract description 76
- 238000000034 method Methods 0.000 title claims description 24
- 238000007667 floating Methods 0.000 claims abstract description 64
- 239000004567 concrete Substances 0.000 claims abstract description 57
- 230000001360 synchronised effect Effects 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims abstract description 11
- 238000004804 winding Methods 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 230000009471 action Effects 0.000 claims description 5
- 239000011178 precast concrete Substances 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 6
- 238000007796 conventional method Methods 0.000 description 4
- 230000004907 flux Effects 0.000 description 4
- 230000006698 induction Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007665 sagging Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005520 electrodynamics Effects 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 230000001141 propulsive effect Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/30—Tracks for magnetic suspension or levitation vehicles
- E01B25/305—Rails or supporting constructions
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
- E01B2/003—Arrangement of tracks on bridges or in tunnels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Railway Tracks (AREA)
- Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)
Abstract
선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차용 가이드웨이 구조물로서, 콘크리트 거더의 콘크리트 양생시, 브라켓을 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 앵커볼트로 브라켓을 각각 체결함으로써 시공성과 정밀도를 확보할 수 있고, 이에 따라 LSM 방식으로 구동되는 초고속 흡인식 자기부상열차에 용이하게 적용할 수 있으며, 또한, 안내레일을 부상레일 구조물에 탈착 또는 부착이 가능하도록 체결함으로써 부상레일의 취부시 작업성을 향상시킬 수 있고, 또한, 브라켓과 부상레일 구조물이 체결되는 상호 작용면을 V형 블록 형태로 가공하여 취부함으로써, 시공 정밀도를 높일 수 있는, 자기부상열차용 브라켓 매립형 가이드웨이 구조물 및 그 시공 방법이 제공된다.A guiding structure for a super high-speed suction levitation train driven by a linear synchronous motor (LSM) system. When concrete curing of a concrete girder is performed, the brackets are embedded in the left and right sides of the concrete girder, It is possible to secure the workability and accuracy by fastening the brackets to each other, and thus it can be easily applied to a super high-speed suction type magnetic levitation train driven by the LSM system, and furthermore, the guide rail can be detached or attached to the floating rail structure It is possible to improve workability at the time of mounting the floating rails by fastening the brackets and the floating rail structure and to attach the brackets and the floating rail structures to the V- A bracket-embedded guideway structure and a construction method thereof are provided.
Description
본 발명은 자기부상열차용 가이드웨이 구조물에 관한 것으로, 보다 구체적으로, 선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차용 가이드웨이 구조물(Guideway Structure)로서, 브라켓(Bracket)이 콘크리트 거더(Concrete Girder) 상에 매립된 상태로 제공되는 가이드웨이 구조물 및 그 시공 방법에 관한 것이다.The present invention relates to a guideway structure for a magnetic levitation train, and more particularly, to a guideway structure for a super high-speed suction levitation train driven by a linear synchronous motor (LSM) Bracket is provided on a concrete girder in a buried state, and a construction method thereof.
일반적으로, 자기부상열차(Maglev Levitation Train)는 자력을 이용하여 차량을 선로 위에 부상시켜서 움직이는 열차를 말하며, 일반 철도차량에서의 바퀴가 수행하는 지지 및 구동안내 기능은 열차에 설치된 전자석과 궤도 구조물에 설치된 가이드레일 간의 자력에 의하여 수행된다.Generally, a Maglev Levitation Train is a train that moves by moving a vehicle on a track by using a magnetic force. The support and drive guidance function performed by a wheel in a general railway vehicle is applied to an electromagnet and a track structure And is performed by the magnetic force between the guide rails installed.
이러한 자기부상열차가 움직이기 위해서는 열차를 선로로부터 띄우는 힘과 열차를 원하는 방향으로 진행시키는 두 가지의 힘이 필요하다. 열차를 선로에서 띄우는 방법은 크게 자석 양극의 반발력을 이용하는 반발식(Electrodynamic Suspension)과 자석과 자성체간의 인력을 이용하는 흡인식(Electromagnetic Suspension)으로 나눌 수 있다. 일반적으로 반발식은 흡인식보다 제어 측면에서 장점을 갖지만, 저속에서는 코일에 유도된 자속이 차체를 띄울 수 있을 만큼 충분하지 못해 약 100km/h 이하의 속도에서는 바퀴를 사용해야 한다. 이에 비해 흡인식 열차는 차량의 부상력을 제어해 균형을 유지하는 부분이 복잡하지만 저속에서도 부상이 가능하다는 장점이 있다.In order for these maglev trains to move, it is necessary to have the power to lift the train from the track and the two forces to move the train in the desired direction. The method of floating the train on the track can be classified into Electrodynamic Suspension using the repulsion force of the magnet anode and Electromagnetic Suspension using the attraction force between the magnet and the magnetic body. Generally, rebounding has advantages in terms of control rather than absorption, but at low speeds the induced flux in the coil is not enough to lift the car, so the wheels should be used at speeds below about 100 km / h. On the other hand, the suction-and-recognition trains have the advantage of being able to control the lift force of the vehicle to keep the balance, but to be able to be injured even in low speed.
이러한 자기부상열차는 가이드레일과의 직접적인 접촉이 없으므로, 소음 및 진동이 매우 적고, 오염물질을 배출하지 않아 친환경적이며, 고속을 유지할 수 있기 때문에 도시 구간내에서의 차세대 열차 방식으로 각광을 받고 있다. 특히, 도시형 자기부상열차를 도시에 건설할 경우, 건설할 공간이 협소하므로 통상 지면위의 시설물에 방해받지 않도록 교량을 설치하여 지면으로부터 상당한 높이에 레일을 설치하여 운행하는 것이 일반적이다.Since the magnetic levitation trains do not have direct contact with the guide rails, they are very popular in the next generation train system in urban areas because they have very little noise and vibration, do not emit pollutants, are environmentally friendly, and can maintain high speed. Especially, when constructing an urban type magnetic levitation train in the city, it is common to install a bridge at a considerable height from the ground by installing a bridge so as not to be disturbed by the facilities on the ground because the space to construct is narrow.
국내의 경우, 1989년 연구개발이 시작된 이래 최근에는 2006년 시작된 도시형 자기부상열차 실용화 사업을 통해 자기부상열차가 개발되었으며, 2011년에 인천국제공항에 시험선이 건설되었다. 이러한 실용화 사업을 통해 개발된 자기부상열차는 상전도 전자석을 이용한 부상방식을 사용하며, 110km/h의 운행속도를 가진다. 특히, 이러한 인천국제공항 도시형 자기부상철도는 중저속 선형유도 모터(Linear Induction Motor: LIM) 방식의 흡인식 자기부상열차용 가이드웨이가 적용되었다.In Korea, since the research and development started in 1989, magnetic levitation trains have been developed through the commercialization project of an urban type magnetic levitation train, which was started in 2006, and test lines were built at Incheon International Airport in 2011. The magnetic levitation trains developed through this commercialization project use a levitation method using a superconducting electromagnet and have a running speed of 110 km / h. Especially, Incheon International Airport urban type magnetic levitation railway is guided by a medium induction motor (linear induction motor: LIM) guiding way for a suction type magnetic levitation train.
도 1은 종래의 기술에 따른 LIM 방식의 흡인식 자기부상열차용 가이드웨이 구조물을 예시하는 도면이다.1 is a view illustrating a guiding structure for a suction type magnetic levitation train of the LIM type according to a conventional technique.
도 1을 참조하면, 종래의 기술에 따른 중저속 LIM 방식의 흡인식 자기부상열차용 가이드웨이 구조물은, 하부에서 지지하는 다수의 교각(10); 상기 교각(10)의 상부에 구비되어 연속적으로 설치되는 거더(20); 상기 거더(20)의 상부에 간격을 두고 다수 설치되는 크로스암(30); 및 상기 크로스암(30)의 상부에 설치되어 자기부상열차가 운행 가능하도록 하는 가이드레일(40)로 이루어져 있다.Referring to FIG. 1, a conventional guiding structure for a suction type magnetic levitation train of a low-speed LIM type includes a plurality of
상기 거더(20)의 상부에 길이방향을 따라 간격을 두고 다수 설치되는 크로스암(30)은 가이드레일(40)과 체결부재(41)를 통해 체결 및 고정된다. 이때, 상기 체결부재(41)는 볼트(또는 앵커볼트) 및 너트를 사용한다.A plurality of
종래의 기술에 따른 중저속 LIM 방식의 흡인식 자기부상열차용 가이드웨이 구조물은 공중에 설치되어 있기 때문에, 시간이 경과함에 따라 처짐이 발생하고, 온도에 의한 변형이 발생하게 된다.Since the guideway structure for the suction and the magnetic levitation train of the medium and low-speed LIM type according to the conventional technique is installed in the air, sagging occurs over time and deformation due to temperature occurs.
따라서 초기 설치된 가이드레일(40)의 설치 위치가 변형되는 경우, 이를 바로잡기 위해서 그 위치를 조정해야 하는데, 종래의 가이드웨이 구조물에서 소정 길이 단위로 제공되는 가이드레일(40)은 그 하부에 구비되는 일정 규격의 크로스암(30)과 단순히 체결 및 고정되어 있기 때문에, 가이드레일(40)의 수직 및 수평방향 위치를 미세 조정하고자 하는 경우, 유압잭과 같은 장비를 동원하여 가이드레일(40)을 들어 올린 후, 가이드레일(40)과 크로스암(30)의 사이 또는 크로스암(30)의 저면에 라이너(42) 등을 조정하게 된다.Therefore, when the installation position of the initially installed
따라서 기본적으로 레일의 초기 설치시는 물론, 설치 후 사용 도중의 변형에 의해 미세 조정이 필요한 경우에도 일일이 장비를 동원하여 가이드레일(40)을 들어올린 후, 라이너(42)를 수차례 반복하여 착탈하여 조정해야 하므로, 그 작업이 매우 번거롭고, 고도의 숙련된 기술이 요구되며, 궤도 구조물의 설치에 많은 시간과 비용이 소요되는 문제점이 있었다.Therefore, even when fine adjustment is necessary due to deformation of the rail during initial installation as well as after use of the rail, the
또한, 가이드레일(40)을 기준으로 수평방향의 변형이 발생하는 경우, 이를 적절하게 보정할 수단이 강구되지 못하여 심한 변형인 경우에는 해당 구간의 가이드레일(40) 자체를 들어내고 새로운 가이드레일(40)로 교체해야 하는 문제점도 있었다.When a deformation in the horizontal direction occurs on the basis of the
이러한 종래의 기술에 따른 흡인식 자기부상열차용 가이드웨이 구조물은 선형유도 모터(Linear Induction Motor: LIM) 방식의 중저속형에 적용되는 가이드웨이로서, 초고속 자기부상철도 가이드웨이로 적용하기 어렵다.The conventional guiding structure for a suction type magnetic levitation train is a guideway applied to a medium-speed linear induction motor (LIM) type, which is difficult to apply to a super high-speed magnetic levitation rail guideway.
한편, 최근 500km/h 이상의 속도를 갖는 초고속 자기부상열차가 개발되고 있으며, 현재 개발된 초고속 자기부상열차로는 부상방식에서 초전도 방식을 사용한 일본의 MLX와 상전도 방식을 사용한 독일의 트랜스라피드(Transrapid)가 있으며, 추진 방식으로는 위 두 방식 모두 선형동기모터(LSM)를 사용하고 있다. 예를 들면, 독일의 트랜스라피드와 같이 전자기력으로 부상되어 이동하는 시스템의 추진력은 가이드웨이를 따라 길게 고정 배치되어있는 고정자를 갖는 LSM에 의해 공급되고, 부상을 위한 자속을 발생시키는 이동 자극은 자기부상열차의 어셈블리에 설치되어 있다.Recently, super high-speed magnetic levitation trains with speeds of more than 500 km / h have been developed. Currently developed ultra-high-speed magnetic levitation trains include Japan's MLX using a superconducting system in a floating mode, and Translaid Transrapid), and both of these methods use a linear synchronous motor (LSM) as the propulsion method. For example, the propulsive force of a system moving with electromagnetic force such as a transreflector in Germany is supplied by an LSM having a stator fixedly arranged along a guideway, and a moving magnetic pole for generating a magnetic flux for floating It is installed in the assembly of the floating train.
구체적으로, 자기부상 전자석은 지상측 가이드웨이 구조물 측에 설치된 선형 동기모터 고정자(Stator)와 자기부상열차의 어셈블리 측에 설치된 이동자로 구성된다. 구체적으로, 지상에 자기부상열차를 지지할 가이드웨이가 설치되며, 전체 가이드웨이를 따라 선형동기모터(LSM)의 고정자가 지면을 향해 설치된다. 이러한 고정자에 대향하여 차량에 부착된 부상 전자석이 놓이게 된다. 이러한 부상전자석에 전류를 흘려주면 부상력이 발생하는 동시에 진행방향을 따라 자속 방향이 N극과 S극이 교대로 나타나 선형동기모터(LSM)의 이동자로도 쓰이게 된다. 이때, 자기부상열차의 어셈블리의 양 측면에는 회전이나 외란 등에 의한 외부 횡력을 보상하기 위해 안내 전자석이 사용된다.Specifically, the magnetic levitation electromagnet is composed of a linear synchronous motor stator provided on the ground side guideway structure side and a mover provided on the assembly side of the magnetic levitation train. Specifically, a guideway for supporting the magnetic levitation train is provided on the ground, and a stator of the linear synchronous motor (LSM) is installed toward the ground along the entire guideway. A floating electromagnet attached to the vehicle is placed against the stator. When the current is applied to the levitation electromagnet, the levitation force is generated and the direction of the magnetic flux is alternately indicated as the direction of the magnetic flux along the traveling direction so that it is used as the shifter of the linear synchronous motor (LSM). At this time, a guide electromagnet is used on both sides of the assembly of the magnetic levitation train to compensate the external lateral force due to rotation, disturbance, and the like.
또한, 중국의 상하이 자기부상열차의 경우, 초고속 LSM 방식의 흡인식 자기부상열차용 가이드웨이가 적용되었는데, 도 2a, 도 2b 및 도 3을 참조하여 설명한다.In addition, in the case of a Shanghai Maglev train in China, a guideway for an ultrasonic LSM-type suction / pickup maglev train is applied and will be described with reference to Figs. 2A, 2B, and 3. Fig.
도 2a 및 도 2b는 각각 종래의 기술에 따른 초고속 LSM 방식으로 구동되는 흡인식 자기부상열차용 가이드웨이 구조물의 정면 사시도 및 측면 사시도이고, 도 3은 도 2a 및 도 2b에 도시된 가이드웨이 구조물의 문제점을 구체적으로 설명하기 위한 도면으로서, 도 2a에 도면부호 A로 도시된 부분을 구체적으로 나타내는 도면이다.FIGS. 2A and 2B are a front perspective view and a side perspective view, respectively, of a guiding structure for a suction and a magnetic levitation train driven by an ultra-high speed LSM system according to a conventional technique, and FIG. 3 is a cross- Fig. 2 is a diagram specifically showing a portion indicated by a reference numeral A in Fig. 2A. Fig.
도 2a, 도 2b 및 도 3을 참조하면, 종래의 기술에 따른 초고속 LSM 방식으로 구동되는 흡인식 자기부상열차용 가이드웨이 구조물은, 콘크리트 거더(20), 가이드레일(60), 강재 브라켓(71), 고정자 패킷(72), 모터 코일 권선(73), 체결부재(74) 및 앵커로드(75)를 포함한다.2A, 2B, and 3, a conventional guiding structure for a suction and a magnetic levitation train driven by an ultra high speed LSM system includes a
종래의 기술에 따른 초고속 LSM 방식으로 구동되는 흡인식 자기부상열차용 가이드웨이 구조물은, 콘크리트 거더(20)에 앵커로드(75)가 매립된 상태로 제공되고, 상기 콘크리트 거더(20)의 양 측면에 강재 브라켓(71)이 체결되며, 상기 강재 브라켓(71)에 가이드레일(60)이 체결되며, 상기 가이드레일(60)의 하부에 상기 고정자 패킷(72) 및 모터 코일 권선(73)이 취부된다.A guiding structure for a suction and a magnetic levitation train driven by an ultra high speed LSM system according to the related art is provided in a state in which an
또한, 도 2b에서 도면부호 B로 도시된 바와 같이, 강재 브라켓(71)이 일정 간격으로 배치되고, 상기 가이드레일(60)이 상기 강재 브라켓(71)을 감싸도록 체결된다.2B,
도 3은 도 2a에서 도면부호 A로 도시된 부분의 상세도로서, 종래의 기술에 따른 초고속 LSM 방식으로 구동되는 흡인식 자기부상열차용 가이드웨이 구조물의 경우, 도 3에 도시된 바와 같이, 브라켓(71)을 콘크리트 거더(20)의 양생시 매립하게 되는데, 이에 따른 변형으로 인해서, 도면부호 C로 도시된 바와 같이, 체결부재(74)인 볼트에 의한 체결 작업이 어렵고, 가이드웨이 취부시 하부 공간이 협소하여 공구나 손으로 체결하기 어렵다는 문제점이 있다. 또한, 가이드웨이 설치시 X축, Y축 및 Z축에 대한 길이 및 높이 단차에 대한 보정을 위한 미세 조정이 어렵다는 문제점이 있다. 또한, 콘크리트 거더(20)의 적용시 가이드웨이 자중에 의한 처짐 등으로 볼트 체결 작업 등의 설치 작업이 어렵다는 문제점이 있다. 또한, 공장에서 프리캐스트 제작되는 콘크리트 거더(20)의 콘크리트 양생시 브라켓(71)의 정확한 위치 설정과 허용공차 수용을 위한 별도의 장치가 필요하다. 즉, 거푸집의 정밀도 및 고정을 위한 장치 등이 별도로 필요하다는 문제점이 있다.FIG. 3 is a detailed view of a portion indicated by reference symbol A in FIG. 2A. In the case of a guideway structure for a suction and a magnetic levitation train driven by an ultra-high speed LSM system according to the related art, as shown in FIG. 3, The
전술한 문제점을 해결하기 위한 본 발명이 이루고자 하는 기술적 과제는, 콘크리트 거더의 콘크리트 양생시, 브라켓을 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 앵커볼트로 브라켓을 각각 체결함으로써, 시공성과 정밀도를 확보할 수 있는, 자기부상열차용 브라켓 매립형 가이드웨이 구조물 및 그 시공 방법을 제공하기 위한 것이다.In order to solve the above-mentioned problems, the present invention provides a method of improving the workability and accuracy of a concrete girder by cementing concrete brackets on the left and right sides of a concrete girder, The present invention is to provide a buried guideway structure for a bracket for a magnetic levitation train and a construction method thereof.
본 발명이 이루고자 하는 다른 기술적 과제는, 안내레일을 부상레일 구조물에 탈착 또는 부착이 가능하도록 체결함으로써 부상레일의 취부시 작업성을 향상시킬 수 있는, 자기부상열차용 브라켓 매립형 가이드웨이 구조물 및 그 시공 방법을 제공하기 위한 것이다.Another object of the present invention is to provide a guiding structure for a buried bracket for a magnetic levitation train, which can improve workability in mounting the levitation rails by fastening the guide rails so as to be detachable or attachable to the floating rail structure, Method.
본 발명이 이루고자 하는 또 다른 기술적 과제는, 브라켓과 부상레일 구조물이 체결되는 상호 작용면을 V형 블록 형태로 가공하여 취부함으로써, 시공 정밀도를 높일 수 있는, 자기부상열차용 브라켓 매립형 가이드웨이 구조물 및 그 시공 방법을 제공하기 위한 것이다.According to another aspect of the present invention, there is provided a method of manufacturing a bracket-embedded guideway structure for a magnetic levitation train, which can improve the accuracy of construction by machining and attaching the mutually acting surfaces of the bracket and the floating rail structure to form a V- And to provide the method of construction.
전술한 기술적 과제를 달성하기 위한 수단으로서, 본 발명에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물은, 선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차용 가이드웨이 구조물에 있어서, 앵커볼트 및 브라켓의 일부가 측면에 매립되도록 프리캐스트 제작되고, 가이드웨이 구조물이 설치될 교각 상부에 설치되는 콘크리트 거더; 강재(Steel)로 형성되고, 상기 콘크리트 거더의 측면에서 상기 앵커볼트에 체결되는 브라켓(Bracket); 브라켓 체결부재를 사용하여 상기 브라켓에 체결되는 부상레일; 안내레일 체결부재를 사용하여 상기 부상레일 측면에 부착되는 안내레일; 상기 부상레일 하부에 각각 취부되는 고정자 패킷(Stator Packet); 및 상기 부상레일 하부에서 상기 고정자 패킷의 측면에 취부되는 모터 코일 권선(Motor Coil Winding)을 포함하여 구성된다.In order to accomplish the above object, the present invention provides a guided structure for guiding a bracket embedded in a bracket for a magnetic levitation train, comprising: a guideway structure for a super high-speed suction levitation train driven by a linear synchronous motor (LSM) A concrete girder which is precastly formed so that a part of the anchor bolt and the bracket are embedded in the side surface and which is installed on an upper part of a pier on which a guideway structure is to be installed; A bracket formed of steel and fastened to the anchor bolt at a side of the concrete girder; A floating rail which is fastened to the bracket by using a bracket fastening member; A guide rail attached to the side surface of the floating rail using a guide rail fastening member; A stator packet mounted on a lower portion of the floating rail; And a motor coil winding attached to the side of the stator packet at the bottom of the floating rail.
여기서, 상기 브라켓은, 상기 콘크리트 거더의 콘크리트 양생시, 상기 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트로 상기 브라켓을 각각 체결하는 것을 특징으로 한다.The brackets are respectively embedded in the left and right sides of the concrete girder when the concrete of the concrete girder is cured, and the brackets are respectively fastened to the anchor bolts on the left and right sides.
여기서, 상기 앵커볼트는 상기 브라켓과 체결되도록 상기 콘크리트 거더를 관통하는 것을 특징으로 한다.Here, the anchor bolt penetrates through the concrete girder so as to be coupled to the bracket.
여기서, 상기 부상레일은 상기 브라켓과 체결되는 부상레일 구조물의 하부에 취부되는 것을 특징으로 한다.Here, the floating rail is attached to the lower portion of the floating rail structure to be coupled with the bracket.
여기서, 상기 부상레일 구조물과 상기 브라켓을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부하는 것을 특징으로 한다.Here, the mutual action surface for fastening the floating rail structure to the bracket is processed into a V-shaped block (V-block) to improve the accuracy of the installation.
여기서, 상기 V 형상의 블록 위치에서 상기 부상레일 구조물과 상기 브라켓을 상기 브라켓 체결부재를 사용하여 체결한 후, 상기 부상레일 구조물의 하부에 상기 부상레일을 취부하는 것을 특징으로 한다.Here, the floating rail structure and the bracket are fastened using the bracket fastening member at the V-shaped block position, and then the floating rail is attached to a lower portion of the floating rail structure.
여기서, 상기 안내레일은 상기 부상레일의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일 측면에 체결되는 것을 특징으로 한다.Here, the guide rail is fastened to the side surface of the floating rail so as to be detachable or attachable using the guide rail fastening member so as to improve workability when the floating rail is mounted.
전술한 기술적 과제를 달성하기 위한 수단으로서, 본 발명에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법은, LSM 방식으로 구동되는 초고속 자기부상열차용 흡인식 가이드웨이 구조물의 시공 방법에 있어서, a) 앵커볼트 및 브라켓의 일부가 측면에 매립된 프리캐스트 콘크리트 거더를 제작하는 단계; b) 자기부상철도용 가이드웨이를 시공할 교각 상부에 콘크리트 거더를 설치하는 단계; c) 브라켓 체결부재를 사용하여 상기 브라켓과 부상레일을 체결하는 단계; d) 안내레일 체결부재를 사용하여 상기 부상레일 측면에 안내레일을 부착하는 단계; e) 상기 부상레일 하부에 고정자 패킷(Stator Packet)과 모터 코일 권선(Motor Coil Winding)을 취부하는 단계; 및 f) 자기부상열차의 진행방향을 따라 상기 a) 내지 e) 단계를 반복 수행하여 브라켓 매립형 가이드웨이 구조물을 완성하는 단계를 포함하여 이루어진다.According to another aspect of the present invention, there is provided a method of constructing a guideway structure for embedding a bracket for a magnetic levitation train, the method comprising: a) fabricating a precast concrete girder in which a part of the anchor bolt and the bracket are embedded in the side; b) installing a concrete girder at the top of the pier to which the guideways for the magnetic levitation railway are to be installed; c) fastening the bracket and the floating rail using a bracket fastening member; d) attaching a guide rail to the side surface of the floating rail using a guide rail fastening member; e) attaching a stator packet and a motor coil winding to the lower portion of the floating rail; And f) repeating the above steps a) to e) along the traveling direction of the magnetic levitation train to complete the bracket-embedded guideway structure.
여기서, 상기 a) 단계에서 상기 콘크리트 거더의 콘크리트 양생시, 상기 브라켓을 상기 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트로 상기 브라켓을 각각 체결하는 것을 특징으로 한다.In the step a), when the concrete of the concrete girder is cured, the brackets are embedded in the left and right sides of the concrete girder, respectively, and the brackets are fastened to the anchor bolts on the left and right sides.
여기서, 상기 앵커볼트는 상기 브라켓과 체결되도록 상기 콘크리트 거더를 관통하는 것을 특징으로 한다.Here, the anchor bolt penetrates through the concrete girder so as to be coupled to the bracket.
여기서, 상기 c) 단계에서 상기 부상레일이 설치되는 부상레일 구조물과 상기 브라켓을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부하는 것을 특징으로 한다.In the step c), the floating rail structure on which the floating rail is installed and the interaction surface for fastening the bracket are processed into a V-shaped block (V block) to improve the accuracy of the installation.
여기서, 상기 d) 단계의 안내레일은 상기 부상레일의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일 측면에 체결되는 것을 특징으로 한다.Here, the guide rails of step d) are fastened to the side surfaces of the float rails so as to be detachable or attachable using the guide rail fastening members so as to improve workability when the float rails are mounted.
본 발명에 따르면, 콘크리트 거더의 콘크리트 양생시, 브라켓을 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 앵커볼트로 브라켓을 각각 체결함으로써, 시공성과 정밀도를 확보할 수 있고, 이에 따라 선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차에 용이하게 적용할 수 있다.According to the present invention, when the concrete of the concrete girder is cured, the brackets are embedded in the left and right sides of the concrete girder respectively, and the brackets are fastened to the right and left sides with the anchor bolts, And can be easily applied to a super high-speed suction type magnetic levitation train driven by a linear synchronous motor (LSM).
본 발명에 따르면, 안내레일을 부상레일 구조물에 탈착 또는 부착이 가능하도록 체결함으로써 부상레일의 취부시 작업성을 향상시킬 수 있다.According to the present invention, workability at the time of mounting the floating rails can be improved by fastening the guide rails so that they can be attached to or detached from the floating rail structure.
본 발명에 따르면, 브라켓과 부상레일 구조물이 체결되는 상호 작용면을 V형 블록 형태로 가공하여 취부함으로써, 시공 정밀도를 높일 수 있다.According to the present invention, it is possible to improve the accuracy of construction by machining and attaching the mutual action surfaces of the bracket and the floating rail structure to form a V-shaped block.
도 1은 종래의 기술에 따른 중저속 LIM 방식의 흡인식 자기부상열차용 가이드웨이 구조물을 예시하는 도면이다.
도 2a 및 도 2b는 각각 종래의 기술에 따른 초고속 LSM 방식으로 구동되는 흡인식 자기부상열차용 가이드웨이 구조물의 정면 사시도 및 측면 사시도이다.
도 3은 도 2a 및 도 2b에 도시된 가이드웨이 구조물의 문제점을 구체적으로 설명하기 위한 도면이다.
도 4는 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물을 나타내는 도면이다.
도 5는 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물을 구체적으로 나타내는 도면이다.
도 6은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물이 자기부상열차 어셈블리에 결합된 것을 나타내는 정면도이다.
도 7은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물이 자기부상열차 어셈블리에 결합된 것을 나타내는 평면도이다.
도 8은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법을 나타내는 동작흐름도이다.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view illustrating a guideway structure for a pickup type magnetic levitation train according to a conventional technology.
FIGS. 2A and 2B are a front perspective view and a side perspective view, respectively, of a guideway structure for a suction and a magnetic levitation train driven by an ultra-high speed LSM system according to a conventional technique.
FIG. 3 is a view for explaining a problem of the guide way structure shown in FIGS. 2A and 2B.
FIG. 4 is a view showing a bracket embedded guideway structure for a magnetic levitation train according to an embodiment of the present invention.
FIG. 5 is a view illustrating a guideway-type buried bracket for a magnetic levitation train according to an embodiment of the present invention.
FIG. 6 is a front view showing a bracket embedded guideway structure for a maglev train according to an embodiment of the present invention coupled to a magnetic levitation train assembly. FIG.
FIG. 7 is a plan view showing a bracket-embedded guideway structure for a magnetic levitation train according to an embodiment of the present invention coupled to a magnetic levitation train assembly. FIG.
FIG. 8 is a flowchart illustrating a method of constructing a bracket-embedded guideway structure for a magnetic levitation train according to an embodiment of the present invention.
아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.
명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.
도 4는 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물을 나타내는 도면이고, 도 5는 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물을 구체적으로 나타내는 도면이다.FIG. 4 is a view showing a guideway-type guideway structure for a bracket for a magnetic levitation train according to an embodiment of the present invention, and FIG. 5 is a view illustrating a guideway structure for embedding a bracket for a magnetic levitation train according to an embodiment of the present invention.
도 4 및 도 5를 참조하면, 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물(100)은, 선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차용 가이드웨이 구조물로서, 콘크리트 거더(110), 브라켓(120a, 120b), 안내레일(Guidance Rail)(130a, 130b), 고정자 패킷(Stator Packet)(150a, 150b), 모터 코일 권선(Motor Coil Winding)(160a, 160b) 및 브라켓 체결부재(170)를 포함한다.4 and 5, the magnetic guiding train bracket embedded
콘크리트 거더(110)는 앵커볼트(121) 및 브라켓(120a, 120b)의 일부가 측면에 매립되도록 프리캐스트 제작되고, 가이드웨이 구조물이 설치될 교각 상부에 설치된다.The
브라켓(120a, 120b)은 강재(Steel)로 형성되고, 상기 콘크리트 거더(110)의 측면에서 상기 앵커볼트(121)에 체결된다. 이때, 상기 브라켓(120a, 120b)은, 도 5에서 도면부호 D로 도시된 바와 같이, 상기 콘크리트 거더(110)의 콘크리트 양생시, 상기 콘크리트 거더(110)의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트(121)로 상기 브라켓(120a, 120b)이 각각 체결되며, 이때, 상기 앵커볼트(121)는 상기 브라켓(120a, 120b)과 체결되도록 상기 콘크리트 거더(110)를 관통하도록 매립된다.The
부상레일(140a, 140b)은 브라켓 체결부재를 사용하여 상기 브라켓에 체결된다. 이때, 상기 부상레일(140a, 140b)은 상기 브라켓(120a, 120b)과 체결되는 부상레일 구조물(141)의 하부에 취부된다. 여기서, 상기 부상레일 구조물(141)과 상기 브라켓(120a, 120b)을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부한다. 즉, 도 5에서 도면부호 E로 도시된 바와 같이, 상기 V 형상의 블록 위치에서 상기 부상레일 구조물(141)과 상기 브라켓(120a, 120b)을 상기 브라켓 체결부재(170)를 사용하여 체결한 후, 상기 부상레일 구조물(141)의 하부에 상기 부상레일(140a, 140b)을 취부하게 된다.The floating rails 140a and 140b are fastened to the bracket using a bracket fastening member. At this time, the floating
안내레일(130a, 130b)은, 도 5에 도시된 바와 같이, 안내레일 체결부재(131)를 사용하여 상기 부상레일(140a, 140b)의 측면에 부착된다. 이때, 상기 안내레일(130a, 130b)은 상기 부상레일(140a, 140b)의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재(131)를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일(140a, 140b) 측면에 체결된다.The
고정자 패킷(150a, 150b)은 상기 부상레일 하부에 각각 취부되고, 모터 코일 권선(160a, 160b)은 상기 부상레일 하부에서 상기 고정자 패킷(150a, 150b)의 측면에 취부된다.
본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물(100)은, 콘크리트 거더(110)의 콘크리트 양생시, 브라켓(120a, 120b)을 콘크리트 거더(110)의 좌우에 각각 매립하고, 좌우 측면에서 앵커볼트(121)로 브라켓(120a, 120b)을 각각 체결함으로써, 시공성과 정밀도를 확보할 수 있고, 이에 따라 선형동기모터(Linear Synchronous Motor: LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차에 용이하게 적용할 수 있다.The bracket embedded
한편, 도 6은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물이 자기부상열차 어셈블리에 결합된 것을 나타내는 정면도이고, 도 7은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물이 자기부상열차 어셈블리에 결합된 것을 나타내는 평면도이다.FIG. 6 is a front view showing a bracket embedded guideway structure for a maglev train according to an embodiment of the present invention coupled to a magnetic levitation train assembly. FIG. 7 is a cross- Fig. 7 is a plan view showing a guideway structure coupled to a magnetic levitation train assembly.
도 6 및 도 7에 도시된 바와 같이, 본 발명의 실시예에 따른 가이드레일 일체형 강재 상부구조물을 구비한 가이드웨이 구조물은 자기부상열차의 어셈블리(200)와 결합하게 되며, 이때, 전술한 바와 같이, 본 발명의 실시예에 따른 가이드레일 일체형 강재 상부구조물을 구비한 가이드웨이 구조물(100)은, 선형동기모터(LSM) 방식으로 구동되는 초고속 흡인식 자기부상열차용 가이드웨이 구조물(100)로서, 콘크리트 거더(110)의 콘크리트 양생시, 브라켓(120)을 콘크리트 거더(110)의 좌우에 각각 매립하고, 좌우 측면에서 앵커볼트(121)로 브라켓(120)을 각각 체결함으로써, 시공성과 정밀도를 확보할 수 있다. 또한, 안내레일(130)을 부상레일 구조물에 탈착 또는 부착이 가능하도록 체결함으로써 부상레일(14a, 140b)의 취부시 작업성을 향상시킬 수 있고, 브라켓(120)과 부상레일 구조물이 체결되는 상호 작용면을 V형 블록 형태로 가공하여 취부함으로써, 시공 정밀도를 높일 수 있다.6 and 7, a guideway structure including a guide rail integral steel superstructure according to an embodiment of the present invention is combined with the
한편, 도 8은 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법을 나타내는 동작흐름도이다.8 is a flowchart illustrating a method of constructing a bracket-embedded guideway structure for a magnetic levitation train according to an embodiment of the present invention.
전술한 도 5 및 도 8을 참조하면, 본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법은, LSM 방식으로 구동되는 초고속 자기부상열차용 흡인식 가이드웨이 구조물의 시공 방법으로서, 먼저, 앵커볼트(121) 및 브라켓(120a, 120b)의 일부가 측면에 매립된 프리캐스트 콘크리트 거더(110)를 제작한다(S110). 이때, 상기 콘크리트 거더(110)의 콘크리트 양생시, 상기 브라켓(120a, 120b)을 상기 콘크리트 거더(110)의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트(121)로 상기 브라켓(120a, 120b)을 각각 체결한다. 여기서, 상기 앵커볼트(121)는 상기 브라켓(120a, 120b)과 체결되도록 상기 콘크리트 거더(110)를 관통하도록 매립된다.Referring to FIGS. 5 and 8, a method for constructing a buried guideway structure for a magnetic levitation train according to an exemplary embodiment of the present invention includes a construction method of a guiding structure for a high-speed magnetic levitation train driven by an LSM A precast
다음으로, 자기부상철도용 가이드웨이를 시공할 교각 상부에 콘크리트 거더(110)를 설치한다(S120). Next, the
다음으로, 브라켓 체결부재(170)를 사용하여 상기 브라켓(120a, 120b)과 부상레일(140a, 140b)을 체결한다(S130). 즉, 상기 부상레일(140a, 140b)이 설치되는 부상레일 구조물(141)과 상기 브라켓(120a, 120b)을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부하는 것이 바람직하다.Next, the
다음으로, 안내레일 체결부재(131)를 사용하여 상기 부상레일(140a, 140b) 측면에 안내레일(130a, 130b)을 부착한다(S140). 이때, 안내레일(130a, 130b)은 상기 부상레일(140a, 140b)의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재(131)를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일(140a, 140b)의 측면에 체결된다.Next, the
다음으로, 상기 부상레일(140a, 140b)의 하부에 고정자 패킷(Stator Packet)과 모터 코일 권선(Motor Coil Winding)을 취부한다(S150).Next, a stator packet and a motor coil winding are attached to the lower portions of the floating
다음으로, 자기부상열차의 진행방향을 따라 상기 S110 내지 S150 단계를 반복 수행하여 브라켓 매립형 가이드웨이 구조물을 완성한다(S160).Next, the steps S110 to S150 are repeated along the traveling direction of the magnetic levitation train to complete the bracket-embedded guideway structure (S160).
본 발명의 실시예에 따른 자기부상열차용 브라켓 매립형 가이드웨이 구조물이 LSM 방식의 초고속 자기부상열차에 적용할 수 있는 것으로 설명되었지만, LIM 방식의 중저속 자기부상열차에도 적용할 수 있다는 점은 당업자에게 자명하다.Although it has been described that the buried guideway structure for a magnetic levitation train according to an embodiment of the present invention can be applied to an LSM super high-speed magnetic levitation train, it can be applied to a LIM- It is obvious.
전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.
본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.
100: 자기부상열차용 브라켓 매립형 가이드웨이 구조물
110: 콘크리트 거더(Concrete Girder)
120, 120a, 120b: 브라켓
121: 앵커 볼트
130, 130a, 130b: 안내레일(Guidance Rail)
131: 안내레일 체결부재
140, 140a, 140b: 부상레일(Levitation Rail)
141: 부상레일 구조물
150, 150a, 150b: 고정자 패킷(Stator Packet)
160, 160a, 160b: 모터 코일 권선(Motor Coil Winding)
170: 브라켓 체결부재
200: 자기부상열차 어셈블리100: Magnetic levitation train bracket Embedded guideway structure
110: Concrete girder
120, 120a, 120b: bracket
121: Anchor bolt
130, 130a, 130b: guide rail,
131: Guide rail fastening member
140, 140a, 140b: Levitation Rail
141: Lifting rail structure
150, 150a, 150b: Stator Packet
160, 160a, 160b: Motor Coil Winding
170: Bracket fastening member
200: Maglev Train Assembly
Claims (12)
앵커볼트 및 브라켓의 일부가 측면에 매립되도록 프리캐스트 제작되고, 가이드웨이 구조물이 설치될 교각 상부에 설치되는 콘크리트 거더;
강재(Steel)로 형성되고, 상기 콘크리트 거더의 측면에서 상기 앵커볼트에 체결되는 브라켓(Bracket);
브라켓 체결부재를 사용하여 상기 브라켓에 체결되는 부상레일;
안내레일 체결부재를 사용하여 상기 부상레일 측면에 부착되는 안내레일;
상기 부상레일 하부에 각각 취부되는 고정자 패킷(Stator Packet); 및
상기 부상레일 하부에서 상기 고정자 패킷의 측면에 취부되는 모터 코일 권선(Motor Coil Winding)을 포함하며,
상기 부상레일은 상기 브라켓과 체결되는 부상레일 구조물의 하부에 취부되고, 상기 부상레일 구조물과 상기 브라켓을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물.1. A guideway structure for a super high-velocity, aspiration magnetic levitation train driven by a linear synchronous motor (LSM)
A concrete girder which is precastly formed so that a part of the anchor bolt and the bracket is embedded in the side surface and which is installed on the upper part of the bridge where the guide way structure is to be installed;
A bracket formed of steel and fastened to the anchor bolt at a side of the concrete girder;
A floating rail which is fastened to the bracket by using a bracket fastening member;
A guide rail attached to the side surface of the floating rail using a guide rail fastening member;
A stator packet mounted on a lower portion of the floating rail; And
(Motor Coil Winding) mounted on a side of the stator packet at the bottom of the floating rail,
The floating rail is attached to the lower part of the floating rail structure to be fastened to the bracket, and the interaction surface for fastening the floating rail structure to the bracket is processed into a V-shaped block (V block) Wherein the guiding structure is a hollow guiding structure.
상기 브라켓은, 상기 콘크리트 거더의 콘크리트 양생시, 상기 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트로 상기 브라켓을 각각 체결하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물.The method according to claim 1,
Wherein the brackets are respectively embedded in the left and right sides of the concrete girder when the concrete of the concrete girder is cured, and the brackets are fastened to the brackets with the anchor bolts on the left and right sides, respectively.
상기 앵커볼트는 상기 브라켓과 체결되도록 상기 콘크리트 거더를 관통하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물.3. The method of claim 2,
Wherein the anchor bolt penetrates through the concrete girder so as to be coupled to the bracket.
상기 V 형상의 블록 위치에서 상기 부상레일 구조물과 상기 브라켓을 상기 브라켓 체결부재를 사용하여 체결한 후, 상기 부상레일 구조물의 하부에 상기 부상레일을 취부하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물.The method according to claim 1,
Wherein the floating rail structure and the bracket are fastened to each other at the V-shaped block position using the bracket fastening member, and then the floating rail structure is mounted on the lower portion of the floating rail structure. Way structures.
상기 안내레일은 상기 부상레일의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일 측면에 체결되는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물.The method according to claim 1,
Wherein the guide rail is fastened to the side surface of the floating rail so as to be detachable or attachable using the guide rail fastening member so as to improve workability when the floating rail is mounted.
a) 앵커볼트 및 브라켓의 일부가 측면에 매립된 프리캐스트 콘크리트 거더를 제작하는 단계;
b) 자기부상철도용 가이드웨이를 시공할 교각 상부에 콘크리트 거더를 설치하는 단계;
c) 브라켓 체결부재를 사용하여 상기 브라켓과 부상레일을 체결하는 단계;
d) 안내레일 체결부재를 사용하여 상기 부상레일 측면에 안내레일을 부착하는 단계;
e) 상기 부상레일 하부에 고정자 패킷(Stator Packet)과 모터 코일 권선(Motor Coil Winding)을 취부하는 단계; 및
f) 자기부상열차의 진행방향을 따라 상기 a) 내지 e) 단계를 반복 수행하여 브라켓 매립형 가이드웨이 구조물을 완성하는 단계를 포함하며,
상기 c) 단계에서 상기 부상레일이 설치되는 부상레일 구조물과 상기 브라켓을 체결하는 상호 작용면은 시공 정밀도를 높이기 위해 V 형상의 블록(V Block) 형태로 가공하여 취부하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법.A method of constructing a suction guide guideway structure for an ultra high-speed magnetic levitation train driven by an LSM system,
a) fabricating a precast concrete girder in which a part of the anchor bolt and the bracket are embedded in the side;
b) installing a concrete girder at the top of the pier to which the guideways for the magnetic levitation railway are to be installed;
c) fastening the bracket and the floating rail using a bracket fastening member;
d) attaching a guide rail to the side surface of the floating rail using a guide rail fastening member;
e) attaching a stator packet and a motor coil winding to the lower portion of the floating rail; And
f) completing the bracket-embedded guideway structure by repeating the steps a) to e) along the traveling direction of the magnetic levitation train,
Wherein the floating rail structure in which the floating rail is installed in the step c) and the mutual action surface for fastening the bracket are processed into a V-shaped block (V block) Construction method of buried guideway structure.
상기 a) 단계에서 상기 콘크리트 거더의 콘크리트 양생시, 상기 브라켓을 상기 콘크리트 거더의 좌우에 각각 매립하고, 좌우 측면에서 상기 앵커볼트로 상기 브라켓을 각각 체결하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법.9. The method of claim 8,
Wherein the bracket is embedded in the left and right sides of the concrete girder when the concrete of the concrete girder is cured in the step a) and the brackets are fastened to the brackets with the anchor bolts from the right and left sides, respectively. Method of construction of way structures.
상기 앵커볼트는 상기 브라켓과 체결되도록 상기 콘크리트 거더를 관통하는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법.10. The method of claim 9,
Wherein the anchor bolt passes through the concrete girder so as to be coupled to the bracket.
상기 d) 단계의 안내레일은 상기 부상레일의 취부시 작업성이 양호해지도록 상기 안내레일 체결부재를 사용하여 탈착 또는 부착 가능하도록 상기 부상레일 측면에 체결되는 것을 특징으로 하는 자기부상열차용 브라켓 매립형 가이드웨이 구조물의 시공 방법.9. The method of claim 8,
Wherein the guide rails in the step d) are fastened to the side surfaces of the lift rails so as to be detachable or attachable using the guide rail fastening members so as to improve workability when the lift rails are mounted. Construction method of guideway structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130050696A KR101504106B1 (en) | 2013-05-06 | 2013-05-06 | Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130050696A KR101504106B1 (en) | 2013-05-06 | 2013-05-06 | Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20140131732A KR20140131732A (en) | 2014-11-14 |
KR101504106B1 true KR101504106B1 (en) | 2015-03-19 |
Family
ID=52453010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130050696A KR101504106B1 (en) | 2013-05-06 | 2013-05-06 | Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101504106B1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106283947A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail girder construction |
CN106283938A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation is combined framing type support rail girder construction |
CN106283942A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation combined type support rail girder construction |
CN106283939A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation joist type support rail beam transition section structure |
CN106283946A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation is combined framing type support rail beam transition section structure |
CN106283940A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering single line excavation location detached pier pillar support rail girder construction |
CN106283967A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure |
CN106283941A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail beam transition section structure |
CN106283951A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev single line embankment location pile foundation joist type support rail beam transition section structure |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012716B (en) * | 2016-03-23 | 2018-07-31 | 大连奇想科技有限公司 | Symmetrical permanent magnet suspension system and permanent magnetic levitation train rail system |
CN109811601A (en) * | 2019-03-25 | 2019-05-28 | 成都市新筑路桥机械股份有限公司 | A kind of medium-and low-speed maglev system track beam of band rescue rail |
CN110029540B (en) * | 2019-03-26 | 2024-10-29 | 中铁磁浮交通投资建设有限公司 | High-speed magnetic levitation traffic double-line box girder and track structure |
CN110205882B (en) * | 2019-07-12 | 2024-06-11 | 湖南磁浮技术研究中心有限公司 | Medium-low speed magnetic levitation track structure |
CN115434197B (en) * | 2022-08-23 | 2024-09-20 | 中铁宝桥集团有限公司 | Embedded magnetic levitation steel rail structure |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4698895A (en) * | 1984-02-06 | 1987-10-13 | Thyssen Industrie Ag | Method of securing equipment parts to a trackway supporting structure |
KR20030024828A (en) * | 2000-08-04 | 2003-03-26 | 막스 뵈글 바우운터네뭉 게엠베하 운트 콤파니 카게 | Method for production of a connector point on a travel way |
-
2013
- 2013-05-06 KR KR1020130050696A patent/KR101504106B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4698895A (en) * | 1984-02-06 | 1987-10-13 | Thyssen Industrie Ag | Method of securing equipment parts to a trackway supporting structure |
KR20030024828A (en) * | 2000-08-04 | 2003-03-26 | 막스 뵈글 바우운터네뭉 게엠베하 운트 콤파니 카게 | Method for production of a connector point on a travel way |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106283947A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail girder construction |
CN106283938A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation is combined framing type support rail girder construction |
CN106283942A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation combined type support rail girder construction |
CN106283939A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation joist type support rail beam transition section structure |
CN106283946A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation is combined framing type support rail beam transition section structure |
CN106283940A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering single line excavation location detached pier pillar support rail girder construction |
CN106283967A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure |
CN106283941A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail beam transition section structure |
CN106283951A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev single line embankment location pile foundation joist type support rail beam transition section structure |
CN106283947B (en) * | 2016-09-15 | 2017-10-13 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail girder construction |
CN106283967B (en) * | 2016-09-15 | 2017-10-13 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure |
CN106283940B (en) * | 2016-09-15 | 2017-10-13 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering single line excavation location independence pier stud type support rail girder construction |
CN106283939B (en) * | 2016-09-15 | 2017-10-27 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev two-wire excavation location pile foundation joist type support rail beam transition section structure |
CN106283941B (en) * | 2016-09-15 | 2017-11-14 | 中铁第四勘察设计院集团有限公司 | The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire embankment location pile foundation |
CN106283951B (en) * | 2016-09-15 | 2017-11-14 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev single line embankment location pile foundation joist type support rail beam transition section structure |
Also Published As
Publication number | Publication date |
---|---|
KR20140131732A (en) | 2014-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101504106B1 (en) | Guideway structure of bracket burying type for maglev levitation train, and constructing method for the same | |
KR20140131731A (en) | Guideway structure having steel upper structure integrated with guide-rail, and constructing method for the same | |
US8505463B2 (en) | Wheel-type ultra high speed railway system | |
JP4846237B2 (en) | Magnetic suspension system | |
JP2008167636A (en) | Magnetic levitation device | |
CN109914163B (en) | Prefabricated plate type magnetic levitation composite track structure and construction method thereof | |
EP3841249B1 (en) | Magnetic levitation railway system | |
CN108482391A (en) | A kind of magnetcisuspension floating rail train | |
CN110029541B (en) | Longitudinal and transverse beam type high-speed magnetic levitation steel structure track panel | |
KR101469148B1 (en) | Guideway structure having mounting member and concrete girder with end difference, and constructing method for the same | |
JP2595405B2 (en) | Flexible branching device for superconducting maglev railway | |
KR101359725B1 (en) | Combined rail and girder structure for maglev system | |
CN102874261B (en) | A kind of linear motor train traveling gear | |
CN209836687U (en) | High-speed magnetic levitation steel structure track panel with longitudinal and transverse beams | |
KR100832587B1 (en) | Magnetic levitation train using linear synchronous reluctance motor | |
CN210481915U (en) | Prefabricated plate type magnetic levitation composite track structure | |
CN108974055B (en) | Multi-mode optimized driving control method for suspension type magnetic suspension train system | |
CN1827441A (en) | Magnetic levitation train system based on common wheel track | |
CN214245153U (en) | Track structure for high-speed permanent magnet maglev train | |
CN210561503U (en) | High-speed magnetic levitation track containing longitudinal and transverse beam type track panel and bridge beam structure | |
KR101544382B1 (en) | Magnetic levitation system having invertor for current angle | |
CN212243340U (en) | Suspension type magnetic suspension traffic system | |
CN210561502U (en) | High-speed magnetic levitation traffic longitudinal and transverse beam type steel-concrete combined structure track panel | |
CN110182060B (en) | Laminated electromagnetic permanent magnet hybrid suspension system for suspension type maglev train | |
CN210390797U (en) | Laminated electromagnetic permanent magnet hybrid suspension system for suspension type maglev train |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20180314 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20181211 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20191210 Year of fee payment: 6 |