[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR101471583B1 - System of decision support in procurement phase of liquefied natural gas(lng) plant - Google Patents

System of decision support in procurement phase of liquefied natural gas(lng) plant Download PDF

Info

Publication number
KR101471583B1
KR101471583B1 KR1020130015439A KR20130015439A KR101471583B1 KR 101471583 B1 KR101471583 B1 KR 101471583B1 KR 1020130015439 A KR1020130015439 A KR 1020130015439A KR 20130015439 A KR20130015439 A KR 20130015439A KR 101471583 B1 KR101471583 B1 KR 101471583B1
Authority
KR
South Korea
Prior art keywords
evaluation
management
project
decision support
procurement
Prior art date
Application number
KR1020130015439A
Other languages
Korean (ko)
Other versions
KR20140102039A (en
Inventor
박환표
진경호
한재구
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020130015439A priority Critical patent/KR101471583B1/en
Publication of KR20140102039A publication Critical patent/KR20140102039A/en
Application granted granted Critical
Publication of KR101471583B1 publication Critical patent/KR101471583B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

LNG 플랜트 사업수행 과정에서 필요한 의사결정사항들을 구조화된 의사결정체계로 지원함으로써, 각 사업주체들의 LNG 플랜트 구매조달단계의 사업관리 매뉴얼 및 의사결정지원 모듈을 적용할 수 있고, 또한, 사용자가 LNG 플랜트 사업을 수행함에 있어서 사업정보의 구성이 편리하도록 표준데이터를 제공하는, LNG 플랜트의 구매조달시 의사결정지원 시스템이 제공된다. LNG 플랜트의 구매조달시 의사결정지원 시스템은, 시스템 관리자가 의사결정지원 시스템을 관리할 수 있도록 프로젝트의 생성/수정/삭제의 프로젝트 관리, 사용자 권한 부여 및 프로젝트별 사용자 연계를 관리하는 프로젝트 관리부; 시스템 관리자에 의해 수행되고, 정보의 생성/수정/삭제와 의사결정을 위한 평가기준 및 평가 방법을 표준으로 생성하는 표준데이터 관리부; 표준데이터 관리부에서 생성된 표준데이터를 복사하여 수정/삭제하거나, 사업정보에서 신규로 생성할 수 있게 하여 해당 프로젝트의 평가기준을 생성하고, 해당 프로젝트만의 특징적인 항목을 추가/수정/삭제하는 사업정보 관리부; 및 사용자에 의해 수행되고, 해당 프로젝트를 평가하고, 평가결과에 따른 게이트 이동에 대한 판단을 제공하는 의사결정 지원부를 포함한다.It is possible to apply the business management manual and decision support module of LNG plant purchase procurement phase of each business entity by supporting the decision making items necessary for the LNG plant business execution process in a structured decision making system, A decision support system for purchasing procurement of LNG plants is provided, which provides standard data to facilitate the construction of business information in conducting business. The LNG plant procurement decision support system consists of a project management unit that manages the project management, user authorization and project user association for project creation / modification / deletion so that the system administrator can manage the decision support system; A standard data management unit, which is performed by a system administrator and generates an evaluation standard and an evaluation method for generating / modifying / deleting information and making a decision; It is a project to copy / modify / delete the standard data generated by the standard data management unit or to create the evaluation criterion of the project by making it possible to newly create from the project information and to add / modify / An information management unit; And a decision support unit that is performed by the user, evaluates the project, and provides a determination as to the gate movement according to the evaluation result.

Figure R1020130015439
Figure R1020130015439

Description

LNG 플랜트의 구매조달시 의사결정지원 시스템 {SYSTEM OF DECISION SUPPORT IN PROCUREMENT PHASE OF LIQUEFIED NATURAL GAS(LNG) PLANT}[0001] The present invention relates to a system for supporting procurement of LNG plants,

본 발명은 LNG 플랜트의 의사결정지원 시스템에 관한 것으로, 보다 구체적으로, 액화천연가스(Liquefied Natural Gas: 이하 "LNG") 플랜트(Plant)의 구매조달 단계에서 필요한 의사결정사항들을 구조화된 의사결정체계로 지원하는 LNG 플랜트의 구매조달시 의사결정지원 시스템에 관한 것이다.The present invention relates to a decision support system for an LNG plant, and more particularly, to a decision support system for a LNG plant, more specifically, a decision support system for a LNG plant, And a decision support system for purchasing procurement of an LNG plant.

최근, 전 산업적 분야에서 첨단 IT와 전통산업의 융합으로 새로운 부가가치와 시장을 창출하려는 융합 및 복합 연구가 활발히 진행 중에 있고, 국내의 열악한 플랜트 환경을 개선하고자 하는 정부 차원의 의지가 고취되고 있는 상황이다. 이에 대응하여 액화천연가스(LNG) 플랜트 사업관리 등 요소기술에 대한 욕구가 높아지면서 플랜트 산업에 첨단 IT 기술의 적용 가능성이 높아지는 상황이다. 특히, LNG는 새로운 에너지로서 각광받고 있으며, LNG 시장은 지속적으로 수요가 증가함에 따라 천연가스 보유국에서 대규모의 LNG 플랜트 발주가 늘어나고 있는 추세이다.In recent years, convergence and hybrid researches have been actively carried out to create new added value and market through the convergence of cutting-edge IT and traditional industries in all industrial fields, and government's willingness to improve the poor plant environment in Korea is being encouraged . In response, the demand for elemental technologies such as LNG plant business management has increased, and the application of cutting-edge IT technology to the plant industry is increasing. In particular, LNG is emerging as a new energy source, and as LNG market continues to increase in demand, large-scale LNG plant orders are increasing in natural gas-producing countries.

이러한 LNG 플랜트 시장에서는 건설비용의 최소화를 통한 경쟁력 확보, 기술 개발을 통한 생산성 향상과 이의 분석을 하고자 하는 욕구가 있으며, 고객의 입장에서는 공기를 단축하여, 조기 생산을 통한 수익 창출과 투자자본의 최소화 및 투자 자금의 조기회수를 원하고 있다.In the LNG plant market, there is a desire to secure competitiveness through minimizing construction costs, to improve productivity through technology development and to analyze its effect. In terms of customers, it is necessary to shorten the air and generate profit through early production and minimize investment capital And early withdrawal of investment funds.

또한, LNG 건설업체는 사업관리의 효율화를 위한 노하우 축적과 구매조달 능력을 확보하여 유사프로젝트 수행 시, 경쟁력 강화와 해당 사업의 위험을 최소화 하고, 수익을 극대화하고자 노력하고 있으며, 업계 전분야에서 대외 경쟁업체 대비 경쟁력 확보의 필요성이 충만한 상태이다.In addition, LNG construction companies are striving to enhance their competitiveness, minimize risks and maximize profits when carrying out similar projects by accumulating know-how and procurement ability for efficiency in business management. There is a need to secure competitiveness compared to competitors.

이러한 LNG 플랜트 건설사업은 다른 대형 건설사업과 마찬가지로 기획, 설계, 구매 및 조달, 시공 및 시운전, 운영 및 유지보수 등 전 단계에 걸친 업무를 일괄하여 수행하는 사업으로서, 해당사업에 진출하기 위해서는 공정기술을 포함한 설계기술 및 시공기술 뿐만 아니라 해당 사업과 관련한 체계적인 기술 기준과 절차에서부터 시공 경험과 노하우의 축적, 관리기법 등의 확보가 필수적이다.As with other large-scale construction projects, the LNG plant construction business is a project that performs all the tasks of planning, designing, purchasing and procurement, construction and commissioning, operation and maintenance in a lump sum, It is essential to acquire systematic technical standards and procedures related to the project, accumulation of construction experience and know-how, and management techniques.

그러나 이러한 LNG 플랜트 사업의 프로세스 및 위험도 평가체계 정립, LNG 플랜트 생애주기 규명 및 통합지식관리, 통합 표준데이터 컨버터 등은 국내에서도 정보분류체계, EPC 프로세스 개발 착수, 부분 개발완료 및 상용화 단계로서, 국내의 기술수준은 미국, EU, 일본 등의 주요 선진국 보다 50~70% 수준에 불과하며, 국내 기업 중 다수의 후발주자 혹은 중견기업들은 체계화된 지식관리시스템을 가지고 있지 못하거나 일부 기능만을 구비한 시스템을 보유 중에 있으므로, 기업들의 경쟁력 향상에 도움이 될 수 있는 의사결정 지원 시스템의 개발이 필요한 실정이다.However, the establishment of process and risk assessment system for LNG plant business, the life cycle identification of LNG plant, integrated knowledge management, and integrated standard data converter have started to develop information classification system, EPC process, partial development and commercialization stage in Korea. The level of technology is only 50 ~ 70% of that of major developed countries such as the US, EU, and Japan. Many of the domestic companies, such as latecomers or midsize companies, do not have a systematic knowledge management system, It is necessary to develop a decision support system that can help companies improve their competitiveness.

대한민국 공개특허번호 제2012-105626호(공개일: 2012년 9월 26일), 발명의 명칭: "LNG 플랜트 유지관리 시스템 및 방법"Korean Patent Publication No. 2012-105626 (Publication date: September 26, 2012), title of the invention: "LNG plant maintenance system and method" 대한민국 등록특허번호 제10-1069202호(출원일: 2009년 12월 29일), 발명의 명칭: "최적 LNG 플랜트 정보 처리 방법 및 이를 지원하는 단말기"Korean Patent No. 10-1069202 filed on December 29, 2009, entitled " Optimal LNG plant information processing method and terminal supporting the same " 대한민국 등록특허번호 제10-1052585호(출원일: 2009년 12월 29일), 발명의 명칭: "LNG 플랜트 지원 시스템 및 이를 지원하는 사용자 인터페이스"Korean Patent No. 10-1052585 filed on Dec. 29, 2009, entitled "LNG plant support system and user interface supporting it"

전술한 문제점을 해결하기 위한 본 발명이 이루고자 하는 기술적 과제는, LNG 플랜트 사업수행 과정에서 필요한 의사결정사항들을 구조화된 의사결정체계로 지원함으로써, 각 사업주체들의 LNG 플랜트 구매조달단계의 사업관리 매뉴얼 및 의사결정지원 모듈을 적용할 수 있는, LNG 플랜트의 구매조달시 의사결정지원 시스템을 제공하기 위한 것이다.The technical problem to be solved by the present invention to solve the above-mentioned problems is to support the decision-making items required in the LNG plant business execution process in a structured decision-making system, thereby providing a business management manual of the LNG plant procurement phase of each business entity And to provide a decision support system for purchase procurement of an LNG plant, to which a decision support module can be applied.

본 발명이 이루고자 하는 다른 기술적 과제는, 사용자가 LNG 플랜트 사업을 수행함에 있어서, 사업정보의 구성이 편리하도록 표준데이터를 제공하고, 사업정보 구성 시 사용자의 편의성을 도모할 수 있는, LNG 플랜트의 구매조달시 의사결정지원 시스템을 제공하기 위한 것이다.It is another object of the present invention to provide an LNG plant which can provide standard data for a user to easily construct business information in the LNG plant business, And to provide a decision support system for procurement.

전술한 기술적 과제를 달성하기 위한 수단으로서, 본 발명에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 액화천연가스(Liquefied Natural Gas: LNG) 플랜트(Plant)의 구매조달시 의사결정지원 시스템에 있어서, 시스템 관리자가 의사결정지원 시스템을 관리할 수 있도록 사용자 인터페이스 모듈에 따라 프로젝트의 생성/수정/삭제의 프로젝트 관리, 사용자 권한 부여 및 프로젝트별 사용자 연계를 관리하는 프로젝트 관리부; 시스템 관리자에 의해 수행되고, 평가항목 정의 모듈 및 평가기준 정의 모듈에 따라 정보의 생성/수정/삭제와 의사결정을 위한 평가기준 및 평가 방법을 표준으로 생성하는 표준데이터 관리부; 상기 표준데이터 관리부에서 생성된 표준데이터를 복사하여 수정/삭제하거나, 사업정보에서 신규로 생성할 수 있게 하여 해당 프로젝트의 평가기준을 생성하고, 해당 프로젝트만의 특징적인 항목을 추가/수정/삭제하는 사업정보 관리부; 사용자에 의해 수행되고, 분석 알고리즘 모듈에 따라 해당 프로젝트를 평가하고, 평가결과에 따른 게이트 이동에 대한 판단을 제공하는 의사결정 지원부; 및 사용자를 등록 및 수정하고, 사용자의 메뉴 및 모듈별 권한을 부여하며, 의사결정지원 시스템에서 공통적으로 사용되는 코드 데이터를 유지관리가 편리하도록 공통코드로 집중 관리하는 시스템 관리부를 포함하되, 상기 표준데이터 관리부의 평가항목 정의 모듈은, LNG 플랜트의 구매조달 단계에서 게이트, 게이트별 카테고리, 카테고리별 평가항목을 생성하고, 생성된 평가항목에 따른 리스크, 대응방안을 사용자가 정의할 수 있는 기능을 제공하고; 상기 표준데이터 관리부의 평가기준 정의 모듈은, 의사결정지원을 위한 평가항목에 대한 평가 기준을 정의할 수 있도록 게이트/카테고리/평가 표준(Evaluation Criteria) 관계에서 의사결정항목 단위로 다수의 평가 방법을 선택할 수 있게 하며, 결정된 평가 방법을 게이트단위의 의사결정지원을 위한 계량적 점수로 표현하여 게이트의 이동 여부를 판단할 수 있는 평가 기준을 관리자가 선택하여 정의할 수 있게 하며; 그리고 상기 의사결정 지원부의 분석 알고리즘 모듈은 의사결정 평가항목에 따른 점수화 및 게이트의 이동 여부에 대한 기준을 제공하고, 유연한 평가 적용을 위해서 알고리즘 구현을 시스템의 객체로 정의하며, 상기 분석 알고리즘 모듈은 의사결정 로직에 따라 핵심적인 의사결정 평가항목인 전략적 목표와의 부합성, 투자수익목표 부합성, 안전기준 및 품질기준에 대한 부합성에 기초하여 의사결정 항목을 결정하는 것을 특징으로 한다.As a means for achieving the above technical object, a decision support system for purchasing procurement of an LNG plant according to the present invention includes a decision support system for purchase procurement of a liquefied natural gas (LNG) plant A project management unit for managing project management, user authorization, and user association for each project according to a user interface module so that a system administrator can manage a decision support system; A standard data management unit, which is performed by the system administrator and generates standards, evaluation criteria, and evaluation methods for generating / modifying / deleting information and decision making according to the evaluation item definition module and the evaluation criteria definition module; The standard data generated by the standard data management unit can be copied and modified / deleted, or the standard data generated by the standard data management unit can be newly generated from the business information, thereby generating evaluation criteria of the corresponding project and adding / correcting / deleting characteristic items Business information management; A decision support unit, which is performed by the user, evaluates the project according to the analysis algorithm module, and provides a determination as to the gate movement according to the evaluation result; And a system management unit for registering and modifying a user, granting authority for each menu and module of a user, and concentrating and managing code data commonly used in a decision support system in a common code so as to facilitate maintenance, The evaluation item definition module of the data management section generates evaluation items for each gate, gate, and category in the purchasing procurement stage of the LNG plant, and provides the function that allows the user to define the risks and countermeasures according to the generated evaluation items and; The evaluation criterion definition module of the standard data management unit selects a plurality of evaluation methods in units of decision items in a gate / category / evaluation standard relationship so as to define evaluation criteria for the evaluation items for decision support And to allow the administrator to select and define an evaluation criterion that can determine whether the gate is moving by expressing the determined evaluation method as a quantitative score for decision support of the gate unit; The analysis algorithm module of the decision support unit provides a criterion for scoring according to the decision evaluation item and the movement of the gate, and defines an algorithm implementation as an object of the system for flexible evaluation application, The decision logic is characterized by decision-making decisions based on compliance with strategic decision-making items, such as strategic decision-making, compliance with investment returns, target compliance, safety standards and quality standards.

삭제delete

삭제delete

삭제delete

여기서, 상기 프로젝트 관리부의 사용자 인터페이스 모듈은, 로그인 화면, 의사결정지원 메인 화면, 평가항목 생성/수정/삭제, 평가 기준 생성/수정/삭제, 알고리즘 정의, 분석결과 시각화의 화면을 제공하며, LNG 플랜트 전반에 걸쳐 사용할 수 있도록 다중 프로젝트를 구성하고, 프로젝트 생성 및 각 프로젝트별 사용자 관리 기능을 제공하는 것을 특징으로 한다.Here, the user interface module of the project management unit provides a login screen, a main screen for decision support, an evaluation item creation / modification / deletion, evaluation criterion creation / modification / deletion, algorithm definition and analysis result visualization screen, It is composed of multiple projects so that they can be used throughout the project, and provides the project creation and user management function for each project.

본 발명에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 프로젝트 관리를 위한 프로젝트 관리 데이터 및 시스템 관리를 위한 시스템 관리 데이터가 저장되는 시스템 DB; 표준데이터가 저장되는 표준데이터 DB; 해당 프로젝트별 사업정보 관리를 위한 사업정보 데이터가 저장되는 사업정보 DB; 및 표준 리스크 관리, 사업정보 리스크 관리 및 평가 관리를 위해 제공되며, 의사결정을 위한 평가와 평가결과를 관리하도록 카테고리 또는 평가항목별 평가내용이 저장되는 평가 DB를 추가로 포함할 수 있다.A decision support system for procurement of an LNG plant according to the present invention includes a system DB for storing project management data for project management and system management data for system management; A standard data DB in which standard data is stored; A business information DB storing business information data for managing business information for each project; And standard risk management, business information risk management, and evaluation management, and may include an evaluation DB in which evaluation items for categories or evaluation items are stored to manage evaluation and evaluation results for decision making.

여기서, 상기 시스템 DB에 저장된 프로젝트 관리 데이터는 다수의 프로젝트를 수용할 수 있도록 사용자별로 하나 이상의 프로젝트에 각각 다른 권한을 가질 수 있고, 상기 시스템 관리 데이터는 사용자별로 권한이 부여되어, 공통정보가 코드화되어 통합 관리되는 것을 특징으로 한다.Here, the project management data stored in the system DB may have different rights to one or more projects for each user so that a plurality of projects can be accommodated. The system management data is authorized for each user, and common information is coded Integrated management.

여기서, 상기 표준데이터 DB에 저장된 표준데이터는 해당 프로젝트별 사용자에게 표준으로 제공되고, 상기 프로젝트의 형태별로 관리되는 것을 특징으로 한다.Here, the standard data stored in the standard data DB is provided as a standard to a user of the corresponding project, and is managed according to the type of the project.

여기서, 상기 사업정보 DB에 저장된 사업정보 데이터는 사용자가 해당 프로젝트에 맞게 구성하고, 상기 표준데이터 관리의 정보를 복사하여 사용하며, 상기 표준데이터의 생성/수정/삭제를 독립적으로 관리하는 것을 특징으로 한다.Here, the business information data stored in the business information DB may be configured according to a user's project, copy and use the standard data management information, and independently manage generation / modification / deletion of the standard data. do.

여기서, 상기 평가 DB의 표준 리스크 관리는 시스템에서 프로젝트별 사용자에게 표준으로 제공되는 표준 리스크 관리의 데이터가 관리되며, 표준 리스크 관리 데이터도 프로젝트의 형태별로 관리될 수 있도록 구성되고, 상기 평가 DB의 사업정보 리스크 관리는 사용자가 각 프로젝트에 맞게 사업정보를 구성하여 표준 리스크 관리의 정보를 복사하여 사용하고, 생성/수정/삭제를 독립적으로 관리할 수 있도록 구성되며, 상기 평가 DB의 평가 관리는 Pre-Stage, On-Stage, Post-Stage 별로 권한자가 해당 평가 항목을 평가하며, 리스크관리자의 평가 진행 및 관리에 따라 평가가 진행되고, 평가 내용은 평가 결과 화면에서 확인할 수 있도록 구성되는 것을 특징으로 한다.Here, the standard risk management of the evaluation DB is configured such that standard risk management data provided as a standard to a user for each project in the system is managed, standard risk management data can also be managed according to the type of project, The information risk management is configured such that the user can organize the business information according to each project, copy and use the standard risk management information, and independently manage the generation / modification / deletion. The evaluator evaluates the evaluation items according to the stage manager, the stage manager, the on-stage manager, the post-stage manager, the risk manager, and the evaluation result is displayed on the evaluation result screen.

본 발명에 따르면, LNG 플랜트 사업수행 과정에서 필요한 의사결정사항들을 구조화된 의사결정체계로 지원함으로써, 부족한 사업관리의 역량을 보완하고, 각 사업주체들의 니즈를 만족시키고자 LNG 플랜트 구매조달단계의 사업관리 매뉴얼 및 의사결정지원 모듈의 효율적인 적용방안과 사례를 제시할 수 있다. 이에 따라 LNG 플랜트 사업의 경쟁력 향상에 기여할 수 있다.According to the present invention, by supporting the decision-making matters necessary for the LNG plant business process in a structured decision-making system, the LNG plant procurement phase of the LNG plant procurement stage Management Manual and Decision Support Module. This will contribute to improving the competitiveness of the LNG plant business.

본 발명에 따르면, 사용자가 LNG 플랜트 사업을 수행함에 있어서, 사업정보의 구성이 편리하도록 표준데이터를 제공하고, 사업정보 구성 시 사용자의 편의성을 도모할 수 있다. 특히, 의사결정지원 시스템의 통합관리가 가능하도록 다수 프로젝트의 생성 및 관리, 프로젝트별 사용자 관리, 메뉴/모듈별 권한관리 등의 시스템 관리 기능을 확대함으로써, 의사결정지원 시스템의 편리성과 활용성을 최대화시킬 수 있다.According to the present invention, when a user performs an LNG plant business, it is possible to provide standard data so that the configuration of the business information is convenient, and to facilitate the user's convenience in configuring the business information. In particular, maximizing convenience and utility of decision support system by expanding system management functions such as creation and management of multiple projects, user management by project, rights management by menu / module, etc. for integrated management of decision support system .

도 1은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 개략적인 구성도이다.
도 2는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에 적용되는 스테이지-게이트(Stage-게이트) 모델의 게이트 상의 의사결정로직 개념을 설명하기 위한 도면이다.
도 3은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 구체적인 구성도이다.
도 4는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템을 웹화면으로 구성할 경우의 메뉴 구성도이다.
도 5는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 기능 구성을 구체적으로 설명하기 위한 도면이다.
도 6a 및 도 6b는 각각 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 요구사항 및 이에 대응하는 입력 및 출력을 예시하는 테이블이다.
도 7a 내지 도 7g는 각각 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에서 표준데이터 관리를 위한 화면 설계를 구체적으로 설명하기 위한 도면들이다.
도 8은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 메인 화면을 예시하는 도면이다.
도 9는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 프로젝트 관리 화면을 예시하는 도면이다.
도 10은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 표준데이터 관리 화면을 예시하는 도면이다.
도 11은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 사업정보 관리 화면을 예시하는 도면이다.
도 12는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 구매조달 의사결정지원(Procurement DM) 화면을 예시하는 도면이다.
도 13은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 리스크 의사결정지원(리스크 DM) 화면을 예시하는 도면이다.
도 14는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 시스템 관리 화면을 예시하는 도면이다.
1 is a schematic block diagram of a decision support system for procurement of an LNG plant according to an embodiment of the present invention.
FIG. 2 is a diagram for explaining a decision logic concept on a gate of a stage-gate model applied to a decision support system for procurement of an LNG plant according to an embodiment of the present invention.
3 is a specific configuration diagram of a decision support system for procurement of an LNG plant according to an embodiment of the present invention.
FIG. 4 is a diagram illustrating a menu structure when a decision support system for purchasing procurement of an LNG plant according to an embodiment of the present invention is configured as a web screen.
5 is a diagram for explaining a functional configuration of a decision support system for procurement of an LNG plant according to an embodiment of the present invention.
FIGS. 6A and 6B are tables illustrating the requirements of the procurement support system for purchase procurement of the LNG plant according to the embodiment of the present invention, and the corresponding inputs and outputs.
FIGS. 7A to 7G are diagrams for explaining a screen design for standard data management in a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention, respectively.
FIG. 8 is a view illustrating a main screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.
FIG. 9 is a view illustrating a project management screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.
FIG. 10 is a view illustrating a standard data management screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.
FIG. 11 is a diagram illustrating a business information management screen when implementing a web screen of a decision support system for purchase procurement of an LNG plant according to an embodiment of the present invention.
FIG. 12 is a view illustrating a Procurement DM screen when implementing a web screen of a decision support system in procurement of an LNG plant according to an embodiment of the present invention.
FIG. 13 is a diagram illustrating a risk decision support (risk DM) screen at the time of implementation of a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.
FIG. 14 is a view illustrating a system management screen when implementing a web screen of a decision support system for purchase procurement of an LNG plant according to an embodiment of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

먼저, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 평가기준 및 의사결정지원 알고리즘에 따라 사용자 편리성을 확보한 인터페이스로서, 시스템 통합 관리 기능, 사용자 관리 기능 및 의사결정 지원 사용자 화면을 제공한다.First, the decision support system for purchasing procurement of an LNG plant according to an embodiment of the present invention is an interface that secures user convenience according to an evaluation standard and a decision support algorithm, and includes an integrated system management function, a user management function, Provide a support user screen.

여기서, 상기 의사결정지원 알고리즘은 평가항목을 도출하여 전문가 및 결정권자의 결정을 지원하며, 평가항목 및 평가기준을 정의하고, 개발된 분석 알고리즘이 적용된다. 즉, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 평가항목/평가기준 도출, 평가 알고리즘 구현 및 사용자 인터페이스를 중심으로, LNG 플랜트 사업을 성공적으로 수행할 수 있도록 의사결정지원 알고리즘이 적용된다.Here, the decision support algorithm derives evaluation items, supports experts and decision makers, defines evaluation items and evaluation criteria, and applies the developed analysis algorithm. That is, the decision support system for purchasing procurement of the LNG plant according to the embodiment of the present invention is based on the evaluation item / evaluation criterion derivation, the evaluation algorithm implementation, and the user interface, Support algorithms are applied.

도 1은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 개략적인 구성도이고, 도 2는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에 적용되는 스테이지-게이트(Stage-게이트) 모델의 게이트 상의 의사결정 로직 개념을 설명하기 위한 도면이다.FIG. 1 is a schematic diagram of a decision support system for purchase procurement of an LNG plant according to an embodiment of the present invention. FIG. 2 is a schematic diagram of a decision support system for purchasing procurement of an LNG plant according to an embodiment of the present invention. FIG. 4 is a diagram for explaining the decision logic concept on the gate of a stage-gate (model) gate.

도 1을 참조하면, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템(100)은, 크게, 프로젝트 관리부(110), 표준데이터 관리부(120), 사업정보 관리부(130) 및 의사결정 지원부(140)를 포함하며, 이때, 데이터베이스로서 시스템 DB, 표준데이터 DB, 사업정보 DB, 평가 DB 등을 포함한다.Referring to FIG. 1, the procurement decision support system 100 of an LNG plant according to an embodiment of the present invention includes a project management unit 110, a standard data management unit 120, a business information management unit 130, And a decision support unit 140. The database 140 includes a system DB, a standard data DB, a business information DB, and an evaluation DB.

프로젝트 관리부(110)는 의사결정지원 시스템의 관리를 위해 사용자 인터페이스 모듈에 따라 프로젝트의 생성/수정/삭제의 프로젝트 관리, 사용자 권한 부여 및 프로젝트별 사용자 연계를 시스템 관리자(200)가 관리할 수 있게 한다.In order to manage the decision support system, the project management unit 110 allows the system manager 200 to manage project management, user authorization, and user association for each project according to the user interface module .

표준데이터 관리부(120)는 시스템 관리자(200)에 의해 수행되고, 평가항목 정의 모듈 및 평가기준 정의 모듈에 따라 정보의 생성/수정/삭제와 의사결정을 위한 평가기준 및 평가 방법을 표준으로 생성한다. 이후, 사업 관리자(프로젝트 관리자)(300)는 표준데이터를 활용하여 해당 프로젝트의 기능을 구성할 수 있게 된다. 여기서, 상기 표준데이터 관리부(120)는 다수의 프로젝트를 관리하는 총괄 관리자, 예를 들면, 시스템 관리자(200)가 주로 사용한다.The standard data management unit 120 is performed by the system manager 200 and generates an evaluation criterion and an evaluation method for generating / modifying / deleting information and decision making according to the evaluation item definition module and the evaluation criterion definition module as a standard . Thereafter, the project manager (project manager) 300 can utilize the standard data to configure the functions of the project. Here, the standard data management unit 120 is mainly used by a general manager that manages a plurality of projects, for example, the system manager 200.

사업정보 관리부(130)는 상기 표준데이터 관리부(120)에서 생성된 표준데이터를 복사하여 수정/삭제하거나, 사업정보에서 신규로 생성할 수 있도록 하여, 해당 프로젝트의 평가기준을 생성하고, 해당 프로젝트만의 특징적인 항목을 추가/수정/삭제할 수 있다. 이때, 상기 사업정보 관리부(130)는 사업 관리자(300)에 의해 수행될 수 있다.The business information management unit 130 may copy and modify / delete the standard data generated by the standard data management unit 120 or may generate a new criterion based on the business information to generate evaluation criteria for the corresponding project, Can be added / modified / deleted. At this time, the business information management unit 130 may be performed by the business manager 300.

의사결정 지원부(140)는 분석 알고리즘 모듈에 따라 해당 프로젝트를 평가하고, 평가결과에 따른 게이트 이동에 대한 판단이 사용자(400)에 의해 수행된다. The decision support unit 140 evaluates the project according to the analysis algorithm module, and the determination of the gate movement according to the evaluation result is performed by the user 400. [

구체적으로, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템(100)은, 평가항목 정의 모듈, 평가기준 정의 모듈, 분석 알고리즘 모듈 및 사용자 인터페이스 모듈에 의해 구현될 수 있다.Specifically, the procurement support system 100 for purchase procurement of an LNG plant according to an embodiment of the present invention may be implemented by an evaluation item definition module, an evaluation criteria definition module, an analysis algorithm module, and a user interface module.

상기 평가항목 정의 모듈은, LNG 플랜트의 구매조달 단계에서 게이트, 게이트별 카테고리, 카테고리별 평가항목을 생성하고, 생성된 평가항목에 따른 리스크, 대응방안을 사용자가 정의할 수 있는 기능을 제공한다.The evaluation item definition module generates an evaluation item for each gate, gate, and category in the purchase procurement stage of the LNG plant, and provides a function for the user to define a risk and a countermeasure according to the generated evaluation item.

상기 평가기준 정의 모듈은, 의사결정지원을 위한 평가항목에 대한 평가 기준을 정의할 수 있도록 게이트/카테고리/평가 표준(Evaluation Criteria) 관계에서 의사결정항목 단위로 다수의 평가 방법을 선택할 수 있게 하며, 이때 결정된 평가 방법을 게이트단위의 의사결정지원을 위한 계량적 점수로 표현함으로써, 게이트의 이동 여부를 판단할 수 있도록 평가 기준을 관리자가 선택하여 정의할 수 있다.The evaluation criterion definition module allows a plurality of evaluation methods to be selected in units of decision items in a gate / category / evaluation criterion relation so as to define an evaluation criterion for evaluation items for decision support, At this time, by expressing the determined evaluation method as a quantitative score for decision support of the gate unit, the administrator can select the evaluation criterion so as to judge whether or not the gate is moved.

또한, 상기 분석 알고리즘 모듈은, 평가항목에 따른 점수화 및 게이트의 이동 여부에 대한 기준을 제공하게 되며, 유연한 평가 적용을 위해서 알고리즘 구현을 시스템의 객체로 정의하고, 가변성, 확장성 및 편리성을 확보함으로써, 후속적인 변경 가능성에 대응할 수 있고, 알고리즘의 변경에 따른 수정을 최소화할 수 있다.In addition, the analysis algorithm module provides a criterion for scoring according to the evaluation item and moving the gate. In order to apply the flexible evaluation, the algorithm implementation is defined as an object of the system, and the flexibility, scalability and convenience are secured So that it is possible to cope with the subsequent possibility of change, and to minimize the modification due to the change of the algorithm.

여기서, LNG 플랜트 사업의 의사결정 지원 시스템을 구현하기 위한 의사결정 로직은, 도 2에 도시된 바와 같이, 핵심적인 의사결정 평가항목인 전략적 목표와의 부합성, 투자수익목표 부합성, 안전기준 및 품질기준에 대한 부합성을 토대로 게이트 Review Factor를 구성하고, Go-No Go의 Sub게이트와 위험도와 관리수준 점수에 의한 Scored Sub게이트로 구분하여 의사결정을 수행할 수 있다. 예를 들면, 분석 알고리즘은 평가항목에 따른 점수화 및 게이트의 이동 여부에 대한 기준을 제공하게 되며, 유연한 평가 적용을 위해서 알고리즘 구현을 시스템의 객체로 정의하여, 가변성과 확장성, 편리성을 확보하여, 후속적인 변경 가능성에 대응하여야 하며, 알고리즘의 변경에 따른 수정을 최소화할 수 있다.Here, the decision logic for implementing the decision support system of the LNG plant business includes, as shown in FIG. 2, a combination of the strategic decision target items, strategic goals, We can construct a gate review factor based on the quality criterion and divide it into sub-gates of Go-No Go and scored sub gates based on risk and management level scores. For example, the analysis algorithm provides criteria for scoring according to the evaluation items and the movement of the gate. In order to apply the flexible evaluation, the algorithm implementation is defined as the object of the system, and the variability, , It must respond to the possibility of subsequent changes, and it is possible to minimize modifications due to changes in the algorithm.

또한, 상기 사용자 인터페이스 모듈은, 인터넷 기반의 LNG 플랜트 의사결정지원시스템으로서, 로그인 화면, 의사결정지원 메인 화면, 평가항목 생성/수정/삭제, 평가 기준 생성/수정/삭제, 알고리즘 정의, 분석결과 시각화의 화면을 제공하며, LNG 플랜트 전반에 걸쳐 사용할 수 있도록 다중 프로젝트를 구성하고, 프로젝트 생성 및 각 프로젝트별 사용자 관리 기능을 제공할 수 있다.Also, the user interface module is an Internet-based LNG plant decision support system that includes a login screen, a main screen for decision support, an evaluation item creation / modification / deletion, evaluation criterion generation / modification / deletion, algorithm definition, , And can organize multiple projects for use throughout the entire LNG plant and provide project management and user management functions for each project.

한편, 도 3은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 구체적인 구성도이고, 도 4는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템을 웹화면으로 구성할 경우의 메뉴 구성도이다.FIG. 3 is a specific configuration diagram of a decision support system for purchase procurement of an LNG plant according to an embodiment of the present invention. FIG. 4 is a flowchart illustrating a decision support system for purchase procurement of an LNG plant according to an embodiment of the present invention. Screen as shown in Fig.

도 3 및 도 4를 참조하면, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템(100)은, 프로젝트 관리부(110), 표준데이터 관리부(120), 사업정보 관리부(130), 의사결정 지원부(140), 시스템 관리부(150) 및 커뮤니티 관리부(160)를 포함한다.3 and 4, a procurement support system 100 for purchasing procurement of an LNG plant according to an embodiment of the present invention includes a project management unit 110, a standard data management unit 120, a business information management unit 130, A decision support unit 140, a system management unit 150, and a community management unit 160.

프로젝트 관리부(110)는 프로젝트의 생성/수정/삭제 기능과, 사용자 관리, 메뉴관리, 권한관리와 같이 의사결정지원 시스템의 관리 영역을 다루는 기능으로서, 일반 사용자가 아닌 시스템 관리자가 주로 사용하는 기능으로 구성된다.The project management unit 110 is a function that manages the management area of the decision support system such as the creation / modification / deletion of the project and the user management, the menu management, and the rights management. .

표준데이터 관리부(120)는 다수의 프로젝트를 관리하는 총괄 관리자가 주로 사용하는 영역으로 정보의 생성/수정/삭제와 의사결정을 위한 평가기준, 평가 방법을 표준으로 생성하여 사업 관리자(프로젝트 관리자)가 표준데이터를 활용하여, 쉽고 편리하게 해당 프로젝트의 기능을 구성할 수 있다.The standard data management unit 120 is an area mainly used by the general manager who manages a plurality of projects. The standard data management unit 120 is a standard for creating / modifying / deleting information, and an evaluation standard and an evaluation method for decision making, Using standard data, you can easily and conveniently configure the functions of the project.

사업정보 관리부(130)는 표준데이터 관리부(120)에서 생성된 표준데이터를 복사하여 수정/삭제하거나, 사업정보에서 신규로 생성할 수 있도록 하여, 해당 프로젝트의 평가기준을 생성하는 기능과 해당 프로젝트만의 특징적인 항목을 추가/수정/삭제할 수 있다.The business information management unit 130 can copy and modify / delete the standard data generated by the standard data management unit 120 or generate new evaluation data from the business information, Can be added / modified / deleted.

의사결정 지원부(140)는 평가기능과 평가결과에 따른 게이트 이동에 대한 판단을 하는 기능으로 구성된다.The decision support unit 140 is composed of a function for performing an evaluation function and a function for determining a gate shift according to an evaluation result.

시스템 관리부(150)는 사용자(400)를 등록 및 수정하고, 사용자의 메뉴 및 모듈별 권한을 부여할 수 있으며, 의사결정지원 시스템에서 공통적으로 사용되는 코드 등의 데이터는 유지관리가 편리하도록 공통코드로 집중 관리할 수 있게 한다.The system management unit 150 can register and modify the user 400, grant authority for each menu and module of the user, and data such as code commonly used in the decision support system can be shared code To be able to concentrate on management.

커뮤니티 관리부(160)는 공지사항, 게시판, 개인정보 및 FAQ 기능을 제공한다.The community management unit 160 provides notifications, bulletin boards, personal information, and FAQ functions.

본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 데이터베이스는, 프로젝트 및 시스템을 관리하기 위한 시스템 DB, 표준데이터 관리를 위한 표준데이터 DB, 각 프로젝트별 사업정보 관리를 위한 사업정보 DB, 및 의사결정을 위한 평가와 평가결과를 관리하는 평가 DB로 구분될 수 있다.The database of the procurement support system for purchase procurement of the LNG plant according to the embodiment of the present invention includes a system DB for managing projects and systems, a standard data DB for managing standard data, business information DB, and an evaluation DB for managing decision-making and evaluation results for decision-making.

이때, 프로젝트 및 시스템을 관리하기 위한 시스템 DB는 프로젝트 관리 및 시스템 관리 데이터를 저장하며, 이때, 상기 프로젝트 관리는 다수의 프로젝트를 수용할 수 있는 구조로서 사용자별로 하나 이상의 프로젝트에 각각 다른 권한을 가질 수 있는 구조로 구성되고, 상기 시스템 관리는 사용자별로 3단계 메뉴까지의 권한을 부여할 수 있으며, LNG 플랜트 구매조달단계 의사결정지원 시스템에서 사용되는 공통정보는 코드화하여 통합 관리될 수 있다.At this time, the system DB for managing the project and the system stores the project management and the system management data. At this time, the project management is a structure capable of accommodating a plurality of projects, And the system management can grant the authority up to the third level menu for each user, and the common information used in the LNG plant procurement stage decision support system can be coded and integratedly managed.

표준데이터 DB는 표준데이터를 저장하며, 이에 따라 시스템에서 프로젝트별 사용자에게 표준으로 제공되는 표준데이터가 관리되며, 표준데이터도 프로젝트의 형태별로 관리될 수 있도록 구성된다.The standard data DB stores standard data, so standard data provided as a standard to users of each project is managed in the system, and standard data can be managed in accordance with the type of project.

사업정보 DB는 해당 프로젝트에 맞게 구성된 사업정보 데이터를 저장하며, 사용자가 해당 프로젝트에 맞게 사업정보를 구성하고, 표준데이터 관리의 정보를 복사하여 사용하고, 상기 표준데이터의 생성/수정/삭제를 독립적으로 관리할 수 있다.The business information DB stores business information data structured in accordance with the project. The user constructs business information according to the project, copies the standard data management information, and creates / modifies / deletes the standard data independently .

평가 DB는 카테고리 또는 평가항목별 평가내용을 저장하며, 이때, 카테고리 또는 평가항목별 평가 권한자가 해당 평가내용을 평가할 수 있으며, 해당 프로젝트의 사업 관리자의 평가 및 평가완료에 따라 게이트 진행 여부를 판단할 수 있다.The evaluation DB stores evaluation contents for each category or evaluation item. At this time, the evaluation authority for each category or evaluation item can evaluate the evaluation contents and judge whether the gate is proceeded according to the evaluation and evaluation of the project manager of the project .

구체적으로, 상기 평가 DB는 표준 리스크 관리, 사업정보 리스크 관리 및 평가 관리를 위해 제공된다. 표준 리스크 관리는 시스템에서 프로젝트별 사용자에게 표준으로 제공되는 표준 리스크 관리의 데이터가 관리되며, 표준 리스크 관리 데이터도 프로젝트의 형태별로 관리될 수 있도록 구성할 수 있다.Specifically, the evaluation DB is provided for standard risk management, business information risk management, and evaluation management. Standard risk management can be configured so that standard risk management data provided as a standard to the users of the project in the system is managed and standard risk management data can be managed according to the type of project.

사업정보 리스크 관리는 사용자가 각 프로젝트에 맞게 사업정보를 구성하는 것으로, 표준 리스크 관리의 정보를 복사하여 사용하지만, 생성/수정/삭제를 독립적으로 관리할 수 있도록 구성할 수 있다.Business Information Risk Management is a way to organize business information according to each project. Users can copy and use standard risk management information, but they can be configured to manage creation / modification / deletion independently.

평가 관리는 Pre-Stage, On-Stage, Post-Stage 별로 권한자가 해당 평가 항목을 평가할 수 있으며, 리스크관리자의 평가 진행 및 관리에 따라 평가가 진행되고, 평가 내용은 평가 결과 화면에서 확인할 수 있도록 구성할 수 있다.Evaluation management can be performed by pre-Stage, On-Stage, and Post-Stage, and the evaluation can be performed according to the progress and management of the risk manager. can do.

한편, 도 5는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 기능 구성을 구체적으로 설명하기 위한 도면이고, 도 6a 및 도 6b는 각각 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 요구사항 및 이에 대응하는 입력 및 출력을 예시하는 테이블이다.5A and 5B are views for explaining a functional configuration of a decision support system for purchasing procurement of an LNG plant according to an embodiment of the present invention. FIGS. 6A and 6B are views showing an LNG plant according to an embodiment of the present invention, Is a table illustrating the requirements of the decision support system at the time of purchase procurement and the corresponding inputs and outputs.

도 5를 참조하면, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 총괄 시스템과 프로젝트 시스템으로 구분될 수 있고, 상기 총괄 시스템은 프로젝트 관리부(110) 및 표준데이터 관리부(120)로 구성되고, 상기 프로젝트 시스템은 사업정보 관리부(130) 및 의사결정 지원부(140)로 구성될 수 있다. 즉, 상기 총괄 시스템은 프로젝트의 생성 및 관리와 표준데이터를 관리하는 모듈로 구성되며, 상기 프로젝트 시스템은 프로젝트의 권한자가 사업정보 관리를 생성 및 관리, 의사결정을 위한 평가와 평가결과를 확인하는 모듈로 구성된다. 즉, 도 5에 도시된 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템(100)은, 도 6a 및 도 6b에 도시된 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 요구사항 및 이에 대응하는 입력 및 출력에 대응하여 구현된다.5, the decision support system for purchase procurement of an LNG plant according to an exemplary embodiment of the present invention can be divided into an overall system and a project system. The overall system includes a project management unit 110 and a standard data management unit 120, and the project system may include a business information management unit 130 and a decision support unit 140. That is, the collective system is composed of a module for managing the generation and management of the project and the standard data, and the project system includes a module for creating and managing the business information management, an evaluation for decision making, . In other words, the procurement decision support system 100 of the LNG plant according to the embodiment of the present invention shown in FIG. 5 can be used for procuring procurement of the LNG plant according to the embodiment of the present invention shown in FIGS. 6A and 6B Is implemented corresponding to the requirements of the decision support system and corresponding inputs and outputs.

한편, 도 7a 내지 도 7g는 각각 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에서 표준데이터 관리를 위한 화면 설계를 구체적으로 설명하기 위한 도면들이다.7A to 7G are views for explaining a screen design for standard data management in a decision support system for procurement of an LNG plant according to an embodiment of the present invention.

본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에서 표준데이터 관리를 위한 화면 설계는, 크게, 표준데이터 관리, 사업정보 관리, 의사결정 지원의 3가지로 구성된다. 여기서, 상기 표준데이터 관리는 LNG 플랜트 구매조달단계 의사결정 지원 시스템 관리자가 주로 사용하는 화면으로 구성되며, 상기 사업정보 관리 및 상기 의사결정지원은 사업 관리자(프로젝트 관리자) 또는 사용자가 사용하는 화면으로 구성될 수 있다The screen design for the standard data management in the decision support system at the procurement procurement of the LNG plant according to the embodiment of the present invention consists largely of three kinds of standard data management, business information management, and decision support. Here, the standard data management is constituted by screens mainly used by the LNG plant procurement phase decision support system manager, and the business information management and the decision support are composed of a screen used by the business manager (project manager) or the user Be able to

도 7a 내지 도 7g는 각각 프로젝트 형태별 표준데이터를 관리하는 화면으로서, 사용 게이트, 카테고리, 평가항목의 정의와 매뉴얼, Key Input의 표준데이터 관리와 평가항목별 대응방법을 시스템 관리자가 관리하는 화면으로 구성된다.Figs. 7A to 7G are screens for managing standard data for each project type, and are composed of screens used by a system administrator to define usage gates, categories, evaluation items, manuals, standard data management of key inputs, do.

구체적으로, 도 7a는 표준 프로세스 관리 화면으로서, 프로젝트 형태별로 게이트를 신규 등록 또는 수정할 수 있다.Specifically, FIG. 7A is a standard process management screen, and a gate can be newly registered or modified for each project type.

또한, 도 7b는 게이트별 표준 Goal(범위) 관리 화면으로서, 게이트별 표준 Goal/범위 관리는 표준 프로세스 관리에서 구성된 게이트별로 카테고리를 구성하고, 사업관리 목표 등의 상세정보를 등록/수정/삭제할 수 있다.FIG. 7B shows a standard Goal (scope) management screen for each gate. The standard Goal / scope management for each gate constitutes a category for each gate configured in the standard process management and can register / modify / delete detailed information such as business management goals have.

또한, 도 7c는 Goal/범위별 표준 평가항목 관리 화면으로서, 카테고리별 표준 평가항목 관리는 표준 Goal/범위 관리에서 구성된 카테고리별로 표준 평가항목을 구성하고, 평가항목의 상세정보를 등록/수정/삭제할 수 있다.FIG. 7C is a screen for managing standard items by Goal / scope. In the category standard item management, a standard item is configured for each category configured in standard Goal / range management, and detailed information of the item is registered / modified / deleted .

또한, 도 7d는 게이트별 표준 매뉴얼 관리 화면으로서, 표준 프로세스 관리에서 구성된 게이트별로 표준 매뉴얼을 등록/수정/삭제할 수 있다.FIG. 7D is a standard manual management screen for each gate, which can register / modify / delete a standard manual for each gate configured in standard process management.

또한, 도 7e는 평가항목별 표준 대응방법 관리 화면으로서, 표준 평가항목 관리에서 구성된 평가항목별로 표준 대응방법을 등록/수정할 수 있다FIG. 7E shows a standard response method management screen for each evaluation item, which can register / modify the standard response method for each evaluation item configured in the standard evaluation item management

또한, 도 7f는 게이트별 표준 리스크 관리의 세부단계 관리 화면으로서, 표준 리스크 관리의 세부단계 관리는 게이트별로 해당 단계를 등록/수정/삭제할 수 있다.FIG. 7F is a detailed step management screen of standard risk management for each gate, and detailed step management for standard risk management can register / modify / delete the step for each gate.

또한, 도 7g는 표준 리스크 관리의 세부단계별 리스크 요인 관리 화면으로서, 표준 리스크 관리의 리스크 요인 관리는 세부단계별로의 리스크 용인을 등록/수정/삭제할 수 있으며, 등록요인, 관리전략, Action Plan 등의 세부정보를 관리할 수 있다.FIG. 7G is a detailed risk factor management screen of the standard risk management. The risk factor management of the standard risk management can register / modify / delete the risk tolerance for each detailed step. You can manage the details.

전술한 7a 내지 7g는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에서 표준데이터 관리를 위한 화면 설계를 나타내며, 이와 유사하게 사업정보 관리를 위한 화면(도시되지 않음)을 설계할 수 있다.7a to 7g illustrate a screen design for standard data management in a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention, and similarly, a screen (not shown) for managing business information is designed can do.

구체적으로, 사업정보 관리 화면은, 프로젝트별 사업정보를 관리하는 화면으로 LNG 플랜트 구매조달단계 의사결정 지원 시스템에 프로젝트를 개설 후, 사업 관리자(프로젝트 관리자) 또는 사용자가 게이트, 카테고리, 평가항목의 정의와 매뉴얼과 평가항목별 대응방법을 관리하는 화면으로 구성된다.Specifically, the project information management screen is a screen for managing project information for each project. After the project is opened in the LNG plant procurement phase decision support system, the business manager (project manager) or the user defines the gate, And a screen for managing manual and evaluation methods for each evaluation item.

이때, 상기 프로세스 관리화면은 표준데이터의 정보를 복사하여 게이트를 구성하거나, 사업 관리자(프로젝트 관리자)가 생성/수정/삭제할 수 있다.At this time, the process management screen may copy the information of the standard data to form a gate, or a business manager (project manager) may create / modify / delete the standard data.

또한, 상기 게이트별 Goal/범위 관리는 표준데이터의 정보를 복사하여 카테고리를 구성하거나, 사업 관리자(프로젝트 관리자)가 카테고리 구성을 생성/수정/삭제할 수 있다.In addition, the goal / scope management for each gate may constitute a category by copying the standard data information, or a business manager (project manager) may create / modify / delete the category configuration.

또한, 상기 카테고리별 평가항목 관리는 표준데이터 정보를 복사하여 평가항목을 구성하거나, 사업 관리자(프로젝트 관리자) 또는 사용자가 평가항목의 구성을 생성/수정/삭제할 수 있다.Further, the category item evaluation item management may copy the standard data information to construct the evaluation item, or the business manager (the project manager) or the user may create / modify / delete the configuration of the evaluation item.

또한, 상기 프로세스 관리에서 구성된 게이트별로 표준데이터의 매뉴얼 정보를 복사하여 구성하거나, 사업 관리자(프로젝트 관리자) 또는 사용자가 매뉴얼을 생성/수정/삭제할 수 있다.Further, manual data of the standard data may be copied and configured for each gate configured in the process management, or a business manager (project manager) or a user may create / modify / delete the manual.

또한, 상기 평가항목 관리에서 구성된 평가항목별로 대응방법을 표준데이터의 정보를 복사하여 구성하거나, 사업 관리자(프로젝트 관리자) 또는 사용자가 평가항목별 대응방법을 생성/수정/삭제할 수 있다.Further, the correspondence method may be constituted by copying the information of the standard data for each evaluation item configured in the evaluation item management, or the business manager (the project manager) or the user can create / modify / delete the corresponding method for each evaluation item.

또한, 상기 게이트별 리스크 세부단계 관리는 표준 리스크 관리의 정보를 복사하여 세부단계 관리항목을 구성하거나, 리스크 관리자가 세부단계 관리항목의 구성을 생성/수정/삭제할 수 있다.In addition, the risk detail step management for each gate may constitute detailed step management items by copying standard risk management information or the risk manager can create / modify / delete the configuration of detailed step management items.

또한, 상기 리스크 관리의 세부단계 관리항목에서 구성된 항목별로의 리스크 요인관리 항목을 표준 리스크 관리의 정보를 복사하여 구성하거나, 리스크 관리자가 리스크 요인 항목을 생성/수정/삭제할 수 있다.
In addition, the risk factor management item for each item constituted in the detailed step management item of the risk management may be constituted by copying the information of standard risk management, or the risk manager may create / modify / delete the risk factor item.

이하, 도 8 내지 도 14를 참조하여, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템이 웹화면으로 구현된 것을 구체적으로 설명하기로 한다.Hereinafter, a decision support system for purchasing procurement of an LNG plant according to an embodiment of the present invention will be described in detail with reference to FIG. 8 through FIG. 14. FIG.

도 8은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 메인 화면을 예시하는 도면이다.FIG. 8 is a view illustrating a main screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.

본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시, 도 8에 도시된 바와 같이, 의사결정자가 복수의 프로젝트를 관리하기 위해, 프로젝트를 선택할 수 있는 기능과 해당 프로젝트의 의사결정 현황을 시각적으로 파악할 수 있도록 메인화면(500)의 중앙에 배치하고, 다양한 정보의 접근이 쉽도록 중앙부에 공지사항, 게시판 및 정보의 변경사항을 목록으로 표현할 수 있다.As shown in FIG. 8, when a decision screen is displayed on the web screen of the decision support system in procurement of an LNG plant according to an embodiment of the present invention, The decision status of the project can be visually grasped at the center of the main screen 500 and the change of announcements, bulletin boards and information can be displayed in a central part for easy access of various information.

구체적으로, 도 8에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 프로젝트 관리(510), 표준데이터 관리(520), 사업정보 관리(530), Procurement DM(540), 리스크 EM(550) 및 시스템 관리(560) 등이 메인 화면(500)의 상단에 메뉴로 제공될 수 있다.8, the procurement support system for purchase procurement of the LNG plant according to the embodiment of the present invention includes a project management 510, a standard data management 520, a business information management 530, The Procurement DM 540, the risk EM 550 and the system management 560 may be provided as a menu at the top of the main screen 500.

다음으로, 도 9는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 프로젝트 관리 화면을 예시하는 도면이다.9 is a view illustrating a project management screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.

도 9에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시, 프로젝트관리 기능은 프로젝트의 신규 생성, 수정 및 삭제 기능과 사용자 관리, 메뉴관리, 권한관리와 같이 의사결정지원 시스템의 관리 영역을 다루는 기능으로서, 일반 사용자가 아닌 시스템 관리자가 주로 사용하는 기능으로 구성된다. 이러한 프로젝트 관리(511)는 프로젝트 관리 및 프로젝트별 사용자 관리를 포함한다.As shown in FIG. 9, in implementing the web screen of the decision support system at procurement procurement of the LNG plant according to the embodiment of the present invention, the project management function includes a function of creating, modifying and deleting a project, , And privilege management, and is composed of functions that are mainly used by system administrators rather than general users. This project management 511 includes project management and user management for each project.

구체적으로, 상기 프로젝트 관리(512)는 시스템 관리자가 프로젝트를 개설하여 해당 프로젝트의 책임자를 지정하고, 의사결정 지원을 위한 중요도 인수를 등록 및 관리할 수 있도록 구성된다. Specifically, the project manager 512 is configured so that the system manager can establish a project, designate a responsible person of the project, and register and manage the importance factor for decision support.

또한, 상기 프로젝트별 사용자 관리는 시스템 관리자가 프로젝트별 사용자를 관리하는 화면(도시되지 않음)으로서, 사용자가 하나 이상의 프로젝트에 참여할 수 있도록 구성된다.In addition, the user management for each project is a screen (not shown) for the system administrator to manage the users for each project, and the user can participate in one or more projects.

다음으로, 도 10은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 표준데이터 관리 화면을 예시하는 도면이다.Next, FIG. 10 is a view illustrating a standard data management screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.

도 10에 도시된 표준데이터 관리 화면은 시스템 관리자가 주로 사용하는 영역으로서, 평가항목의 정보를 프로젝트 형식별로 관리하거나 의사결정을 위한 평가기준 및 방법을 표준으로 생성하여 사용자가 표준데이터를 활용하여 쉽게 프로젝트의 의사결정지원 기능을 생성할 수 있게 한다. 이러한 표준 데이터 관리(521)는 표준 프로세스 관리, Goal/범위 관리, 평가항목 관리, 매뉴얼 관리, 대응방법 관리, 리스크 관리 및 자재관리를 포함한다. The standard data management screen shown in FIG. 10 is an area mainly used by the system administrator. It manages the information of the evaluation items according to the project type or generates the evaluation standard and method for decision making as a standard so that the user can easily Allows you to create decision support functions for your project. This standard data management 521 includes standard process management, Goal / scope management, evaluation item management, manual management, response method management, risk management, and material management.

구체적으로, 상기 표준 프로세스 관리(522)는 표준데이터 관리를 위한 프로젝트 형식을 생성/수정/삭제할 수 있으며, 프로젝트 형태별로 표준이 되는 게이트를 생성/수정/삭제할 수 있다.Specifically, the standard process management 522 can create / modify / delete a project format for standard data management, and can create / modify / delete standard gates for each project type.

또한, 상기 Goal/범위 관리는 게이트 구성 정보를 바탕으로 카테고리를 구성할 수 있으며, 각각의 카테고리에 대한 사업관리 목표 등의 상세 정보를 생성/수정/삭제할 수 있다.In addition, the Goal / range management can constitute a category based on the gate configuration information, and can generate / modify / delete detailed information such as a business management target for each category.

또한, 상기 평가항목 관리는, 카테고리 구성 정보를 바탕으로 평가항목을 구성할 수 있으며, 각각의 평가항목에 대한 의사결정 지수유형을 지정할 수 있다.Further, the evaluation item management can constitute an evaluation item based on the category configuration information, and can designate a decision index type for each evaluation item.

또한, 상기 매뉴얼 관리는, 표준데이터의 게이트 구성 정보별로 매뉴얼을 첨부파일 형식으로 등록 및 관리할 수 있다.In addition, the manual management can register and manage a manual in an attached file format for each gate configuration information of standard data.

또한, 상기 대응방법 관리는 표준데이터의 평가항목의 구성 정보별로 대응방법 정보를 첨부파일 형식으로 등록 및 관리할 수 있다.Also, the management of the corresponding method can register and manage the corresponding method information in the attached file format for each configuration information of the evaluation items of the standard data.

또한, 상기 리스크 관리는 세부단계 관리 및 표준 리스크 관리를 포함하며, 상기 세부단계 관리는 표준데이터의 게이트 구성 정보별로 표준리스크 관리의 세부단계를 등록 및 관리할 수 있고, 상기 표준 리스크 관리는 세부단계 관리 항목별로의 리스크 요인 항목을 등록 및 관리할 수 있으며, 총괄 담당, 관리전략, 대응방안 및 Action Plan 등의 정보도 등록 및 관리할 수 있다.Further, the risk management may include detailed step management and standard risk management, and the detailed step management may register and manage detailed steps of standard risk management for each gate configuration information of the standard data, It is possible to register and manage risk factor items by management item, and information such as general charge, management strategy, countermeasure plan and action plan can also be registered and managed.

다음으로, 도 11은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 사업정보 관리 화면을 예시하는 도면이다.11 is a diagram illustrating a business information management screen when implementing a web screen of a decision support system for procurement of procurement of an LNG plant according to an embodiment of the present invention.

도 11에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 사업정보 관리 화면은, 사업 관리자(프로젝트 관리자) 및 사용자가 주로 사용하는 영역으로서, 평가항목의 정보를 프로젝트 형식별로 관리하거나 또는 의사결정을 위한 평가기준과 방법을 표준으로 생성하여 사용자가 표준데이터를 활용하여 쉽게 프로젝트의 의사결정지원 기능을 생성할 수 있게 한다. 이러한 사업정보 관리(531)는 프로세스 관리, Goal/범위 관리, 평가항목 관리, 매뉴얼 관리, 대응방법 관리 및 리스크 관리를 포함한다.11, the business information management screen at the time of implementing the web screen of the decision support system at the procurement procurement of the LNG plant according to the embodiment of the present invention is a region mainly used by the business manager (project manager) and the user , The evaluation item information is managed according to the project type or the evaluation standard and method for decision making are created as standard so that the user can easily generate the decision support function of the project by utilizing the standard data. This business information management 531 includes process management, Goal / scope management, evaluation item management, manual management, response method management, and risk management.

구체적으로, 상기 프로세스 관리(532)는 게이트 정보를 표준데이터의 정보를 복사하여 게이트를 구성하거나, 사업 관리자(프로젝트 관리자)가 생성/수정/삭제할 수 있다.Specifically, the process management unit 532 may generate the gate information by copying the information of the standard data, or may create / modify / delete the business information by the business manager (project manager).

또한, 상기 Goal/범위 관리는, 게이트 구성 정보를 바탕으로 카테고리를 표준데이터 정보를 복사하여 구성하거나, 사용자가 생성/수정/삭제 및 사업관리 목표 등의 상세정보를 관리할 수 있다.In addition, the Goal / range management can configure the category by copying the standard data information based on the gate configuration information, or manage detailed information of the user such as creation / modification / deletion and business management target.

또한, 상기 평가항목 관리는 카테고리 구성 정보를 바탕으로 평가항목을 표준데이터에서 복사하여 구성하거나, 사용자가 생성/수정/삭제할 수 있으며, 평가항목에 대해서 의사결정 지수유형을 지정하고 평가항목별로 평가자를 지정할 수 있다.In addition, the evaluation item management may be configured by copying the evaluation items from the standard data based on the category configuration information, or by creating / correcting / deleting the user items, designating a decision index type for the evaluation items, Can be specified.

또한, 상기 매뉴얼 관리는, 구성된 게이트별로 표준데이터 정보의 매뉴얼을 복사하여 구성하거나, 사용자가 매뉴얼을 생성/수정/삭제할 수 있으며, 매뉴얼은 첨부파일 형식으로 관리할 수 있다.Also, the manual management may be configured by copying a manual of standard data information for each gate configured, or a user may create / modify / delete a manual, and manage the manual in an attached file format.

또한, 상기 대응방법 관리는, 구성된 평가항목별로 표준데이터 정보의 대응방법을 복사하여 구성하거나, 사용자가 평가항목별 대응방법을 생성/수정/삭제할 수 있으며, 대응방법은 첨부파일 형식으로 관리할 수 있다.In addition, the management of the response method can be configured by copying the correspondence method of the standard data information according to the configured evaluation items, or the user can create / modify / delete the correspondence method according to the evaluation item, have.

또한, 상기 리스크 관리는 세부단계 관리, 리스크 요인 관리 및 리스크 체크리스트를 포함하며, 상기 세부단계 관리는 구성된 게이트별로 표준 리스크 관리의 세부단계 항목을 복사하여 구성하거나, 리스크 관리자가 세부단계를 생성/수정/삭제할 수 있다. 또한, 리스크 요인 관리는 세부단계 관리 항목별로의 리스크 요인 항목을 표준 리스크 관리에서 복사하여 구성하거나, 리스크 관리자가 등록 및 관리할 수 있도록 구성하며, 총괄 담당, 관리전략, 대응방안 및 Action Plan 등의 정보도 복사 또는 사용자 입력으로 등록 및 관리할 수 있다. 또한, 리스크 체크리스트는 표준 리스크 관리에서 제공하는 리스크 체크리스트의 항목을 리스크 관리자가 선택하여 표준 리스크 관리의 정보를 복사하여 구성한 후, 해당 항목별 상세정보를 등록 및 관리할 수 있다.The risk management includes a detailed step management, a risk factor management, and a risk check list. The detailed step management may be performed by copying and configuring detailed step items of the standard risk management for each gate configured. Alternatively, Can be modified / deleted. In addition, the risk factor management consists of copying the risk factors for each detail level management item from standard risk management, or configuring the risk manager to register and manage the risk manager. Information can also be registered and managed by copying or user input. In addition, the risk check list can be created by copying and configuring the standard risk management information by selecting the item of the risk check list provided by the standard risk management, and then registering and managing the detailed information for each item.

다음으로, 도 12는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 구매조달 의사결정지원(Procurement DM) 화면을 예시하는 도면이다.Next, FIG. 12 is a view illustrating a Procurement DM screen when implementing a web screen of a decision support system for procurement of an LNG plant according to an embodiment of the present invention.

도 12에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 구매조달 의사결정지원(Procurement DM)의 평가는 사업별 중점 관리 자재/장비를 선택한 후, 각 자재별 평가 문항을 선정하여 이루어진다. 이때, 단위 엔지니어의 권한이 부여된 항목에 대한 평가와 분야별 책임자의 담당 카테고리별 평가를 완료한 후, 프로젝트의 총괄 책임자가 최종 평가를 하며, 평가가 종료되면 해당 게이트의 의사결정 지원 정보를 확인할 수 있다. 이러한 구매조달 의사결정지원(541)은 평가 및 평가결과 조회를 포함한다.As shown in FIG. 12, in the procurement procurement of the LNG plant according to the embodiment of the present invention, the evaluation of procurement decision support (Procurement DM) in the web screen of the decision support system is performed by selecting the key point management material / After that, evaluation items for each material are selected. At this time, after the unit engineer completes the evaluation of the authorized items and the category manager in charge of each field, the general manager of the project performs the final evaluation. When the evaluation is finished, the decision support information of the gate is confirmed have. This procurement decision support (541) includes an evaluation and an inquiry of the evaluation result.

구체적으로, 상기 평가(552)는, 구매조달 단계의 평가에 앞서, 사업에서 중점적으로 관리할 자재와 장비를 선택한다. 이때, 각 자재와 장비의 패키징 형태에 따라 Long-lead Item(LLI)와 Bulk를 지정하게 되며, 각 패키지는 사업정보 관리에서 선정한 프로세스와 평가 항목을 따라 평가가 이루어진다. 또한, 단위 엔지니어는 평가항목별로 권한이 부여된 항목에 대해서 평가를 한 후, 분야별 책임자가 카테고리별로 평가할 수 있고, 평가항목별로 기준 점수 이하로 체크되면 대응방법을 확인할 수 있으며, 해당 게이트의 매뉴얼을 참고할 수 있다.Specifically, the evaluation 552 selects materials and equipment to be centrally managed in the business prior to evaluation of the procurement step. At this time, Long-lead Item (LLI) and Bulk are specified according to the packaging form of each material and equipment. Each package is evaluated according to the process and evaluation items selected in the business information management. In addition, the unit engineer can evaluate the items authorized by the evaluation items, and then, by category, the responsible person can evaluate them by category. If it is checked below the standard score for each evaluation item, the corresponding method can be confirmed. You can refer to it.

또한, 상기 평가결과 조회는, 단위 엔지니어와 분야별 책임자의 평가를 확인 후, 총괄 책임자의 평가가 진행되며 평가가 완료되면, 의사결정지원을 위한 계량적 점수가 수식에 의해 계산되어 전체성과지수를 확인할 수 있다. 이때, 의사결정지원은 전체 성과지수와 리스크지수의 점수를 토대로 현재의 상태를 가시적으로 확인할 수 있다.In addition, in the evaluation result inquiry, after the evaluation of the unit engineer and the manager in charge of the field, the evaluation of the general manager is performed, and when the evaluation is completed, the quantitative score for the decision support is calculated by the formula, . At this time, the decision support can visually confirm the present state based on the score of the overall performance index and the risk index.

다음으로, 도 13은 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 리스크 의사결정지원(리스크 DM) 화면을 예시하는 도면이다.Next, FIG. 13 is a diagram illustrating a risk decision support (risk DM) screen at the time of implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.

도 13에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 리스크 의사결정지원(리스크 DM)에서, 리스크관리의 평가는 전술한 Procurement DM단계에서 선정한 자재들을 바탕으로, Sole Vendor인지 아닌지를 지정하여 각 Vendor별 리스크 평가 항목을 선정하여 이루어진다. 이러한 리스트 의사결정지원(541)은 평가 및 평가결과 조회를 포함하며, 상기 평가(552)는 Pre-Stage 평가, On-Stage 평가 및 Post-Stage 평가로 이루어지며, Pre-Stage 평가 후 도출된 리스크 요인 항목을 On-Stage에서 차수별로 평가가 재진행되며, On-Stage 평가 종료 후 Post-Stage에서 On-Stage 리스크 요인 항목을 제외한 Pre-Stage 평가 항목을 재평가 후 평가가 종료되는 단계로 구성할 수 있다. 이후, 평가가 종료되면 해당 게이트의 평가결과 및 평가 내용을 확인할 수 있다.As shown in FIG. 13, in the risk decision support (risk DM) at the time of implementing the Web screen of the decision support system at the procurement procurement of the LNG plant according to the embodiment of the present invention, the evaluation of the risk management is performed in the Procurement DM step Based on the materials selected by the vendor, whether the Sole Vendor or not, by selecting the risk assessment items for each vendor. The list decision support 541 includes evaluation and evaluation result inquiry, and the evaluation 552 includes pre-stage evaluation, on-stage evaluation, and post-stage evaluation, The factor items are re-evaluated on the on-stage basis by level. After the on-stage evaluation is completed, the pre-stage evaluation items excluding the on-stage risk factor items in the post-stage can be constituted as the stage after the re- have. Thereafter, when the evaluation is finished, the evaluation result and evaluation content of the gate can be confirmed.

구체적으로, 상기 Pre-Stage 평가는 관리할 자재와 리스크 요인관리 항목을 선택한 후, 평가를 사용자별로 진행할 수 있으며, 평가자의 목록 확인 및 평가 내용을 확인할 수 있다. 또한, 상기 On-Stage는, 상기 Pre-Stage의 평가결과에 따라 도출된 리스크 요인 항목을 리스크 관리자가 정의한 차수 및 평가 기간에 맞춰 사용자별로 평가를 진행할 수 있으며, 평가자의 목록 확인 및 평가 내용을 확인할 수 있다. 또한, 상기 Post-Stage는 상기 On-Stage 평가의 리스크 요인 항목을 제외한 Pre-Stage의 리스크 요인 항목을 사용자별로 평가를 진행할 수 있으며, 평가자의 목록 확인 및 평가 내용을 확인할 수 있다.Specifically, in the pre-stage evaluation, after selecting the material to be managed and the risk factor management item, the evaluation can be performed on a user-by-user basis, and the list of the evaluator can be confirmed and the evaluation contents can be confirmed. In addition, the on-stage can evaluate the risk factors derived according to the pre-stage evaluation result according to the degree and the evaluation period defined by the risk manager, and check the evaluation list of the evaluator and the evaluation contents . In addition, the Post-Stage can evaluate the risk factor items of the Pre-Stage except for the risk factor items of the on-stage evaluation, by user, and confirm the list of the evaluator and the evaluation contents.

또한, 상기 평가결과 조회는, 게이트별로 진행된 평가 결과를 확인할 수 있으며, 리스크 관리 지수 및 Pre-Stage, On-Stage, Post-Stage 별로의 평가 내용도 확인할 수 있다.In addition, the evaluation result inquiry can confirm the evaluation result progressed by gates, and the evaluation contents of the risk management index, pre-stage, on-stage, and post-stage can be confirmed.

다음으로, 도 14는 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 시스템 관리 화면을 예시하는 도면이다.Next, FIG. 14 is a view illustrating a system management screen when implementing a web screen of a decision support system in procurement procurement of an LNG plant according to an embodiment of the present invention.

도 14에 도시된 바와 같이, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 웹화면 구현시 시스템 관리는, 사용자를 등록 및 수정하고, 사용자의 메뉴 및 모듈별 권한을 부여할 수 있으며, 의사결정지원 시스템에서 공통적으로 사용되는 코드 등의 데이터는 유지관리가 편리하도록 공통코드로 집중 관리할 수 있다. 이러한 시스템 관리(561)는 OBS 관리, 프로젝트 마스터, 권한관리 및 공통코드 관리 등을 포함한다.As shown in FIG. 14, the system management at the time of implementation of the web screen of the decision support system at the procurement procurement of the LNG plant according to the embodiment of the present invention registers and corrects the user, And data such as codes commonly used in a decision support system can be concentratedly managed in a common code for easy maintenance. This system management 561 includes OBS management, project master, rights management, and common code management.

구체적으로, 사용자 관리는 시스템 관리자가 OBS의 구성 및 사용자의 신규 등록 및 수정할 수 있다.Specifically, the user management can be configured by the system administrator and newly registered and modified by the user.

또한, 상기 권한 관리(562)는 시스템 관리자는 권한 그룹을 구성하고, 각 그룹에 맞는 메뉴와 모듈의 권한을 구성할 수 있다. 이때, 그룹에 사용자를 등록함으로써 사용자가 속한 그룹의 권한 정보를 상속받아 사용할 수 있다.In addition, the rights manager 562 may configure the rights groups and configure rights for menus and modules for the groups. At this time, by registering the user in the group, the user can inherit the authority information of the group to which the user belongs.

한편, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 의사결정지원 시스템을 구성하는 각 모듈의 알고리즘을 개선하고 기능을 고도화시킴에 따라, 기존에 개발된 설계단계 의사결정 지원 모듈의 기능을 고도화시키고, 통합된 환경에서 시스템이 운영될 수 있도록 LNG 플랜트의 구매조달시 의사결정지원 시스템을 구축하였다. 예를 들면, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 프로세스 관리를 통합시킴으로써 설계단계 의사결정 지원을 위한 프로세스 관리와 구매조달 단계 의사결정 지원을 위한 프로세스 관리, Goal, 평가항목 관리를 하나의 통합된 시스템에서 이루어질 수 있다.Meanwhile, the decision support system for purchasing procurement of the LNG plant according to the embodiment of the present invention improves the algorithm of each module constituting the decision support system and upgrades the function, In order to enhance the functions of the support modules and to enable the system to operate in an integrated environment, a decision support system was established for procurement of LNG plants. For example, the procurement support system for purchasing procurement of an LNG plant according to an embodiment of the present invention includes process management for supporting design stage decision support by integrating process management, process management for procurement stage decision support, , Evaluation item management can be done in one integrated system.

또한, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 리스크 관리 역시 설계단계와 구매조달 단계를 통합된 환경에서 관리할 수 있다.Also, the decision support system for purchasing procurement of the LNG plant according to the embodiment of the present invention can manage the risk management in the integrated environment of the design stage and the procurement procurement stage.

또한, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템은, 분석 알고리즘 모듈에 의해 분석된 결과를 시각화하는 기능을 고도화시키고, 사용자 평가 인터페이스를 개선하여 사용자 편의성을 높이고 입력을 최소화할 수 있다.In addition, the decision support system for purchasing procurement of the LNG plant according to the embodiment of the present invention enhances the function of visualizing the analyzed result by the analysis algorithm module, improves the user evaluation interface, can do.

또한, 리스크 평가는 Pre-stage, On-stage, Post-stage의 세 단계를 거치기 때문에 평가를 위해 많은 입력을 필요로 한다. 따라서 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템의 리스크 평가는 평가자의 입력을 최소화할 수 있도록 전 단계에서 입력한 항목을 기본값으로 표현할 수 있다.In addition, risk assessment requires a lot of input for evaluation because it goes through three stages of pre-stage, on-stage, and post-stage. Therefore, the risk assessment of the decision support system at the procurement procurement of the LNG plant according to the embodiment of the present invention can represent the items inputted at the previous stage as default values so as to minimize the input of the evaluator.

결국, 본 발명의 실시예에 따른 LNG 플랜트의 구매조달시 의사결정지원 시스템에 따르면, LNG 플랜트 사업수행 과정에서 필요한 의사결정사항들을 구조화된 의사결정체계로 지원함으로써, 부족한 사업관리의 역량을 보완하고, 각 사업주체들의 니즈를 만족시키고자 LNG 플랜트 구매조달단계의 사업관리 매뉴얼 및 의사결정지원 모듈의 적용방안과 사례를 제시할 수 있다. 또한, 사용자가 사업을 수행함에 있어서, 사업정보의 구성이 편리하도록 표준데이터를 제공하고, 사업정보 구성 시 사용자의 편의성을 도모할 수 있고, 특히, 의사결정지원 시스템의 통합관리가 가능하도록 다수 프로젝트의 생성 및 관리, 프로젝트별 사용자 관리, 메뉴/모듈별 권한관리 등의 시스템 관리 기능을 확대함으로써, 의사결정지원 시스템의 편리성과 활용성을 최대화시킬 수 있다.As a result, according to the decision support system for purchasing procurement of the LNG plant according to the embodiment of the present invention, it is possible to supplement the lack of business management capability by supporting a decision making system necessary for the LNG plant business execution process in a structured decision system In order to satisfy the needs of each business entity, the project management manual and the decision support module of the LNG plant procurement stage can be suggested and applied. In addition, in performing a business, users can provide standard data for convenient configuration of business information, facilitate user's convenience in configuring business information, and more particularly, And user management for each project, and rights management for each menu / module, the convenience and usability of the decision support system can be maximized.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

100: LNG 플랜트의 구매조달시 의사결정지원 시스템
110: 프로젝트 관리부
120: 표준데이터 관리부
130: 사업정보 관리부
140: 의사결정 지원부
150: 시스템 관리부
160: 커뮤니티 관리부
200: 시스템 관리자
300: 사업 관리자
400: 사용자
100: LNG plant procurement decision support system
110: Project Management Department
120: Standard data management unit
130: Business Information Management Department
140: Decision Support
150:
160: Community Management Department
200: System Administrator
300: Business Manager
400: User

Claims (12)

액화천연가스(Liquefied Natural Gas: LNG) 플랜트(Plant)의 구매조달시 의사결정지원 시스템에 있어서,
시스템 관리자가 의사결정지원 시스템을 관리할 수 있도록 사용자 인터페이스 모듈에 따라 프로젝트의 생성/수정/삭제의 프로젝트 관리, 사용자 권한 부여 및 프로젝트별 사용자 연계를 관리하는 프로젝트 관리부;
시스템 관리자에 의해 수행되고, 평가항목 정의 모듈 및 평가기준 정의 모듈에 따라 정보의 생성/수정/삭제와 의사결정을 위한 평가기준 및 평가 방법을 표준으로 생성하는 표준데이터 관리부;
상기 표준데이터 관리부에서 생성된 표준데이터를 복사하여 수정/삭제하거나, 사업정보에서 신규로 생성할 수 있게 하여 해당 프로젝트의 평가기준을 생성하고, 해당 프로젝트만의 특징적인 항목을 추가/수정/삭제하는 사업정보 관리부;
사용자에 의해 수행되고, 분석 알고리즘 모듈에 따라 해당 프로젝트를 평가하고, 평가결과에 따른 게이트 이동에 대한 판단을 제공하는 의사결정 지원부; 및
사용자를 등록 및 수정하고, 사용자의 메뉴 및 모듈별 권한을 부여하며, 의사결정지원 시스템에서 공통적으로 사용되는 코드 데이터를 유지관리가 편리하도록 공통코드로 집중 관리하는 시스템 관리부
를 포함하되,
상기 표준데이터 관리부의 평가항목 정의 모듈은, LNG 플랜트의 구매조달 단계에서 게이트, 게이트별 카테고리, 카테고리별 평가항목을 생성하고, 생성된 평가항목에 따른 리스크, 대응방안을 사용자가 정의할 수 있는 기능을 제공하고;
상기 표준데이터 관리부의 평가기준 정의 모듈은, 의사결정지원을 위한 평가항목에 대한 평가 기준을 정의할 수 있도록 게이트/카테고리/평가 표준(Evaluation Criteria) 관계에서 의사결정항목 단위로 다수의 평가 방법을 선택할 수 있게 하며, 결정된 평가 방법을 게이트단위의 의사결정지원을 위한 계량적 점수로 표현하여 게이트의 이동 여부를 판단할 수 있는 평가 기준을 관리자가 선택하여 정의할 수 있게 하며; 그리고
상기 의사결정 지원부의 분석 알고리즘 모듈은 의사결정 평가항목에 따른 점수화 및 게이트의 이동 여부에 대한 기준을 제공하고, 유연한 평가 적용을 위해서 알고리즘 구현을 시스템의 객체로 정의하며, 상기 분석 알고리즘 모듈은 의사결정 로직에 따라 핵심적인 의사결정 평가항목인 전략적 목표와의 부합성, 투자수익목표 부합성, 안전기준 및 품질기준에 대한 부합성에 기초하여 의사결정 항목을 결정하는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
In a procurement decision support system for a Liquefied Natural Gas (LNG) plant,
A project management unit for managing project management, user authorization, and user association for each project according to a user interface module so that a system administrator can manage a decision support system;
A standard data management unit, which is performed by the system administrator and generates standards, evaluation criteria, and evaluation methods for generating / modifying / deleting information and decision making according to the evaluation item definition module and the evaluation criteria definition module;
The standard data generated by the standard data management unit can be copied and modified / deleted, or the standard data generated by the standard data management unit can be newly generated from the business information, thereby generating evaluation criteria of the corresponding project and adding / correcting / deleting characteristic items Business information management;
A decision support unit, which is performed by the user, evaluates the project according to the analysis algorithm module, and provides a determination as to the gate movement according to the evaluation result; And
A system management unit for registering and modifying a user, granting authority for each menu and module of a user, and concentrating management of common code data commonly used in a decision support system into a common code for easy maintenance
, ≪ / RTI &
The evaluation item definition module of the standard data management unit generates an evaluation item for each gate, gate, and category in the purchase procurement step of the LNG plant, and has a function of defining a risk according to the generated evaluation item, ≪ / RTI >
The evaluation criterion definition module of the standard data management unit selects a plurality of evaluation methods in units of decision items in a gate / category / evaluation standard relationship so as to define evaluation criteria for the evaluation items for decision support And to allow the administrator to select and define an evaluation criterion that can determine whether the gate is moving by expressing the determined evaluation method as a quantitative score for decision support of the gate unit; And
Wherein the analysis algorithm module of the decision support unit provides a criterion for scoring according to a decision evaluation item and a movement of a gate and defines an algorithm implementation as an object of the system for applying a flexible evaluation, The decision making process of the LNG plant is characterized in that decisions are made based on compliance with strategic decision-making items such as strategic decision-making, investment incentive target synthesis, safety standards and quality standards. Decision Support System.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 제1항에 있어서,
상기 프로젝트 관리부의 사용자 인터페이스 모듈은, 로그인 화면, 의사결정지원 메인 화면, 평가항목 생성/수정/삭제, 평가 기준 생성/수정/삭제, 알고리즘 정의, 분석결과 시각화의 화면을 제공하며, LNG 플랜트 전반에 걸쳐 사용할 수 있도록 다중 프로젝트를 구성하고, 프로젝트 생성 및 각 프로젝트별 사용자 관리 기능을 제공하는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
The method according to claim 1,
The user interface module of the project management unit provides a login screen, a main screen for decision support, an evaluation item creation / modification / deletion, evaluation criterion creation / modification / deletion, algorithm definition and analysis result visualization screen, Wherein the plurality of projects are constructed so as to be usable over time, and a project is created and a user management function is provided for each project, the decision support system for purchasing procurement of the LNG plant.
제1항에 있어서,
프로젝트 관리를 위한 프로젝트 관리 데이터 및 시스템 관리를 위한 시스템 관리 데이터가 저장되는 시스템 DB;
표준데이터가 저장되는 표준데이터 DB;
해당 프로젝트별 사업정보 관리를 위한 사업정보 데이터가 저장되는 사업정보 DB; 및
표준 리스크 관리, 사업정보 리스크 관리 및 평가 관리를 위해 제공되며, 의사결정을 위한 평가와 평가결과를 관리하도록 카테고리 또는 평가항목별 평가내용이 저장되는 평가 DB
를 추가로 포함하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
The method according to claim 1,
System DB for storing project management data and system management data for system management;
A standard data DB in which standard data is stored;
A business information DB storing business information data for managing business information for each project; And
Standard risk management, business information risk management, and evaluation management, and the evaluation DB for storing assessment contents for categories or evaluation items to manage evaluation and evaluation results for decision making
, The procurement decision support system of an LNG plant.
제8항에 있어서,
상기 시스템 DB에 저장된 프로젝트 관리 데이터는 다수의 프로젝트를 수용할 수 있도록 사용자별로 하나 이상의 프로젝트에 각각 다른 권한을 가질 수 있고, 상기 시스템 관리 데이터는 사용자별로 권한이 부여되어, 공통정보가 코드화되어 통합 관리되는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
9. The method of claim 8,
The project management data stored in the system DB may have different rights to one or more projects for each user so as to accommodate a plurality of projects. The system management data is authorized for each user, and common information is coded, Wherein the LNG plant is provided with a plurality of liquefied natural gas (LNG) plants.
제8항에 있어서,
상기 표준데이터 DB에 저장된 표준데이터는 해당 프로젝트별 사용자에게 표준으로 제공되고, 상기 프로젝트의 형태별로 관리되는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
9. The method of claim 8,
Wherein the standard data stored in the standard data DB is provided as a standard to a user of the corresponding project and managed according to the type of the project.
제8항에 있어서,
상기 사업정보 DB에 저장된 사업정보 데이터는 사용자가 해당 프로젝트에 맞게 구성하고, 상기 표준데이터 관리의 정보를 복사하여 사용하며, 상기 표준데이터의 생성/수정/삭제를 독립적으로 관리하는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
9. The method of claim 8,
Wherein the business information data stored in the business information DB is configured according to a user's project, the standard data management information is copied and used, and the generation / modification / deletion of the standard data is independently managed. Decision support system for purchase procurement of plant.
제8항에 있어서,
상기 평가 DB의 표준 리스크 관리는 시스템에서 프로젝트별 사용자에게 표준으로 제공되는 표준 리스크 관리의 데이터가 관리되며, 표준 리스크 관리 데이터도 프로젝트의 형태별로 관리될 수 있도록 구성되고, 상기 평가 DB의 사업정보 리스크 관리는 사용자가 각 프로젝트에 맞게 사업정보를 구성하여 표준 리스크 관리의 정보를 복사하여 사용하고, 생성/수정/삭제를 독립적으로 관리할 수 있도록 구성되며, 상기 평가 DB의 평가 관리는 Pre-Stage, On-Stage, Post-Stage 별로 권한자가 해당 평가 항목을 평가하며, 리스크관리자의 평가 진행 및 관리에 따라 평가가 진행되고, 평가 내용은 평가 결과 화면에서 확인할 수 있도록 구성되는 것을 특징으로 하는 LNG 플랜트의 구매조달시 의사결정지원 시스템.
9. The method of claim 8,
The standard risk management of the evaluation DB is configured such that the standard risk management data provided as a standard to the users of the project in the system is managed and the standard risk management data can be managed by the type of the project, Management is configured so that a user can organize business information according to each project, copy and use standard risk management information, and independently manage creation / modification / deletion, and evaluation management of the evaluation DB is performed in Pre-Stage, The on-stage and the post-stage, the evaluation item is evaluated by the authorized person, the evaluation is progressed according to the progress and management of the evaluation of the risk manager, and the evaluation content is confirmed on the evaluation result screen. Decision support system for purchasing procurement.
KR1020130015439A 2013-02-13 2013-02-13 System of decision support in procurement phase of liquefied natural gas(lng) plant KR101471583B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130015439A KR101471583B1 (en) 2013-02-13 2013-02-13 System of decision support in procurement phase of liquefied natural gas(lng) plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130015439A KR101471583B1 (en) 2013-02-13 2013-02-13 System of decision support in procurement phase of liquefied natural gas(lng) plant

Publications (2)

Publication Number Publication Date
KR20140102039A KR20140102039A (en) 2014-08-21
KR101471583B1 true KR101471583B1 (en) 2014-12-10

Family

ID=51747081

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130015439A KR101471583B1 (en) 2013-02-13 2013-02-13 System of decision support in procurement phase of liquefied natural gas(lng) plant

Country Status (1)

Country Link
KR (1) KR101471583B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8927961B2 (en) 2007-10-08 2015-01-06 Lg Innotek Co., Ltd. Semiconductor light emitting device and method for manufacturing the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102079580B1 (en) 2017-07-03 2020-02-20 동의대학교 산학협력단 System and Method for Providing business consulting for LNG supply solutions

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010054843A (en) * 1999-12-08 2001-07-02 이계철 Apparatus for supporting the local network consolidation planning
KR20090062417A (en) * 2007-12-13 2009-06-17 대림산업 주식회사 All working process management system of all working process using e.v.m.s progrem
KR20110076699A (en) * 2009-12-29 2011-07-06 (주) 한길아이티 System for supporting lng plant and user interface thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010054843A (en) * 1999-12-08 2001-07-02 이계철 Apparatus for supporting the local network consolidation planning
KR20090062417A (en) * 2007-12-13 2009-06-17 대림산업 주식회사 All working process management system of all working process using e.v.m.s progrem
KR20110076699A (en) * 2009-12-29 2011-07-06 (주) 한길아이티 System for supporting lng plant and user interface thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
[대한설비공학회 2011 하계학술발표대회 논문집] LNG 플랜트 사업관리 의사결정지원체계 구조화 방안(2011) *
[대한설비공학회 2011 하계학술발표대회 논문집] LNG 플랜트 사업관리 의사결정지원체계 구조화 방안(2011)*

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8927961B2 (en) 2007-10-08 2015-01-06 Lg Innotek Co., Ltd. Semiconductor light emitting device and method for manufacturing the same

Also Published As

Publication number Publication date
KR20140102039A (en) 2014-08-21

Similar Documents

Publication Publication Date Title
Venkatesh et al. System architecture for blockchain based transparency of supply chain social sustainability
Russell et al. Operations and supply chain management
Klun et al. Business process management–at the crossroads
Nuryakin et al. Do green innovation and green competitive advantage mediate the effect of green marketing orientation on SMEs’ green marketing performance?
Ntabe et al. A systematic literature review of the supply chain operations reference (SCOR) model application with special attention to environmental issues
Tran et al. How do innovation intermediaries add value? Insight from new product development in fashion markets
Strähle et al. Key aspects of sustainability in fashion retail
Hailu et al. Evaluation of key success factors influencing ERP implementation success
Lundvall National innovation systems and globalization
Dreiling et al. From conceptual process models to running systems: A holistic approach for the configuration of enterprise system processes
Nagariya et al. Sustainable service supply chain management: from a systematic literature review to a conceptual framework for performance evaluation of service only supply chain
Raut et al. Supplier selection using integrated multi-criteria decision-making methodology
Tian et al. Bounds of relative regret limit in p‐robust supply chain network design
Ergu et al. A framework for SaaS software packages evaluation and selection with virtual team and BOCR of analytic network process
Tam et al. Impact of COVID-19 and innovative ideas for a sustainable fashion supply chain in the future
US20080133589A1 (en) Management of an operations chain through customizable applications and components
Bulsara et al. Supply chain performance measurement–an exploratory study
Huda et al. Modeling university business incubator for SMEs digitalisation
Mahdiloo et al. A novel data envelopment analysis model for solving supplier selection problems with undesirable outputs and lack of inputs
KR101471583B1 (en) System of decision support in procurement phase of liquefied natural gas(lng) plant
Semerádová et al. Evaluative framework for digital competitiveness
Chesbrough et al. Advancing services innovation: Five key concepts
Harnisch Enterprise-level packaged software acquisition: A structured literature review through the lens of IT governance
Zancul et al. Product lifecycle management functional reference model for software support
Nawroth et al. A Conceptual Approach for Business Model Innovation Including Strategic Simulations as Digital Prototypes for Decision Support

Legal Events

Date Code Title Description
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20181203

Year of fee payment: 5