Construction method of pipe sleeve that is used in the construction of nuclear power plant Download PDF

Info

Publication number
KR101438099B1
KR101438099B1 KR1020130071298A KR20130071298A KR101438099B1 KR 101438099 B1 KR101438099 B1 KR 101438099B1 KR 1020130071298 A KR1020130071298 A KR 1020130071298A KR 20130071298 A KR20130071298 A KR 20130071298A KR 101438099 B1 KR101438099 B1 KR 101438099B1
Authority
KR
South Korea
Prior art keywords
pipe sleeve
power plant
nuclear power
construction
sleeve
Prior art date
Application number
KR1020130071298A
Other languages
Korean (ko)
Inventor
정환락
Original Assignee
대도건철(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대도건철(주) filed Critical 대도건철(주)
Priority to KR1020130071298A priority Critical patent/KR101438099B1/en
Application granted granted Critical
Publication of KR101438099B1 publication Critical patent/KR101438099B1/en

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D1/00Details of nuclear power plant
    • G21D1/02Arrangements of auxiliary equipment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a construction method of a pipe sleeve used in constructing a nuclear power plant. The construction method of the pipe sleeve used in constructing the nuclear power plant comprises a steel bar arrangement step of arranging a steel bar at a position where the pipe sleeve formed in one body with a wall body is constructed in constructing the nuclear power plant; a pipe sleeve temporary installation step of inserting the pipe sleeve by cutting and bending the arranged steel bar; a pipe sleeve installation step of building a mould at both ends of the temporarily installed pipe sleeve, adjusting a position of the pipe sleeve and fixating the pipe sleeve with the mould; and a finishing step of depositing and curing concrete in the mould and disjointing the mould. The present invention provides the construction method of the pipe sleeve used in constructing the nuclear power plant, being equipped with sleeve fixating units to freely adjust the position of the pipe sleeve installed on a wall body for pipe passageways with structures used only in constructing the nuclear power plant, thereby enhancing precision when the structures are installed.

Description

원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법{CONSTRUCTION METHOD OF PIPE SLEEVE THAT IS USED IN THE CONSTRUCTION OF NUCLEAR POWER PLANT}TECHNICAL FIELD [0001] The present invention relates to a method of constructing a pipe sleeve for use in construction of a nuclear power plant,

본 발명은 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법에 관한 것으로 더욱 상세하게는, 원자력발전소의 건설에서 벽체 거푸집의 내부에 삽입되어 거푸집 탈거 후, 건물의 벽체와 일체화되어 구조물과의 배관 통로로 사용되는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법에 관한 것이다.The present invention relates to a method of constructing a pipe sleeve used in the construction of a nuclear power plant, and more particularly, to a method of constructing a pipe sleeve, which is inserted into a wall mold in the construction of a nuclear power plant, To a method of constructing a pipe sleeve used in the construction of a nuclear power plant.

일반적으로 건설현장에서 배관 통로는 거푸집을 세우고 콘크리트를 타설하여 양생시킨 후, 거푸집을 해체하는 과정을 거치거나, 거푸집을 세우지 않고 외부에 노출시키게 된다.Generally, in the construction site, the piping passage is formed by pouring the concrete, pouring the concrete, and then releasing the form, or exposing it to the outside without forming the form.

그러나, 원자력발전소의 건설에서는 원자력발전소의 특성상 구조물들과의 오차없는 시공을 위해, 배관 통로로 사용되는 별도의 파이프슬리브가 건물벽체와 일체화되어 설치되게 된다.However, in the construction of a nuclear power plant, a separate pipe sleeve, which is used as a pipe passage, is integrated with the building wall for installation without any error with respect to the structure due to the nature of the nuclear power plant.

따라서, 통상적인 건설현장에서 사용되는 시공방법으로는 파이프슬리브와 건물벽체의 내구성이 떨어지거나, 구조물들과의 시공시 유격으로 인한 오차발생 또는 외부노출로 인해 안정성이 떨어지는 문제가 있다.Therefore, in the conventional construction method, there is a problem that the durability of the pipe sleeve and the building wall is inferior or the stability is poor due to an error caused by the clearance at the time of construction with the structures or external exposure.

본 발명은 이와 같은 문제점을 해결하기 위한 것으로, 슬리브고정구들을 구비하여 원자력발전소의 건설에서만 사용되는 구조물들과의 배관 통로를 위한 벽체에 설치되는 파이프슬리브의 위치를 자유롭게 조절가능하여 구조물들 설치시 정밀도를 향상시키는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법을 제공하는 데 있다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problems and it is an object of the present invention to provide a pipe sleeve having a sleeve fixture and being capable of freely adjusting a position of a pipe sleeve installed on a wall for piping passage with structures used for construction of a nuclear power plant, To provide a method of constructing a pipe sleeve for use in the construction of a nuclear power plant.

또, 장공홀, 정공홀을 통해 숙련자가 아니더라도 파이프슬리브의 설치위치 오차를 최소화함과 아울러, 거푸집과의 고정력을 증가시키는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법도 제공하는 데 있다.Another object of the present invention is to provide a method of constructing a pipe sleeve for use in construction of a nuclear power plant that minimizes an installation position error of a pipe sleeve even if it is not a skilled person through a long hole hole and a hole hole and increases fixing force with a die.

또한, 슬리브고정구들을 몸체의 양단으로부터 10~15㎜ 이격되게 설치되어 볼트 조임시, 장력이 증가되는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법도 제공하는 데 있다.It is also an object of the present invention to provide a method of constructing a pipe sleeve used in the construction of a nuclear power plant in which the sleeve fasteners are installed at a distance of 10 to 15 mm from both ends of the body so that tension is increased when the bolts are tightened.

상기 목적을 달성하기 위한 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법은 원자력발전소의 건설에서 벽체와 일체화되는 파이프슬리브가 시공되는 위치에 철근을 배근하는 철근배근단계; 상기 배근된 철근을 컷팅 및 밴딩하여 파이프슬리브를 삽입하는 파이프슬리브 가설치단계; 상기 가설치된 파이프슬리브의 양단에 거푸집을 세우고 파이프슬리브의 위치를 조절하여 거푸집과 고정하는 파이프슬리브 설치단계; 및 상기 거푸집에 콘크리트 타설 및 양생한 후, 거푸집을 해체하는 마무리 단계;를 포함하여 구성된다.In order to accomplish the above object, there is provided a method of constructing a pipe sleeve for use in construction of a nuclear power plant according to the present invention, comprising the steps of: placing a reinforcing bar at a position where a pipe sleeve integrated with a wall is constructed; A pipe sleeve mounting step of cutting and bending the reinforced steel to insert the pipe sleeve; A step of setting a pipe sleeve at both ends of the inserted pipe sleeve and fixing the pipe sleeve by adjusting the position of the pipe sleeve; And a finishing step of dismantling the dies after placing and curing concrete in the dies.

상기 파이프슬리브는 길이를 가지며 양단이 개구된 파이프 형상의 몸체; 상기 몸체의 좌우 양단에 둘레를 따라 소정의 거리를 두고 등간격으로 고정되게 설치되어 거푸집에 몸체를 고정하도록 한 ㄴ자 형상의 슬리브고정구들; 및 상기 슬리브고정구들에 각각 관통되게 형성되어 거푸집에 몸체의 설치 위치를 자유롭게 조절가능하도록 한 홀들;로 이루어지는 것이 바람직하다.The pipe sleeve includes a pipe-shaped body having a length and open at both ends; A plurality of sleeve fasteners fixed at equal intervals at both left and right ends of the body at predetermined intervals along the circumference to fix the body to the formwork; And holes which are respectively formed in the sleeve fasteners so as to be freely adjustable in installation positions of the body on the formwork.

또, 상기 홀들은 장공홀 또는 정공홀 중 선택된 어느 하나이거나 전부인 것이 바람직하다.It is preferable that the holes are any one of a long hole or a hole.

또한, 상기 슬리브고정구들은 몸체의 양단으로부터 10~15㎜ 이격되게 설치되어 거푸집에 볼트 조임시, 장력을 증가하는 것이 바람직하다.Further, it is preferable that the sleeve fasteners are spaced 10 to 15 mm from both ends of the body, and the tension is increased when the bolts are fastened to the formwork.

상기 해결수단에 의한 본 발명은 슬리브고정구들을 구비하여 원자력발전소의 건설에서만 사용되는 구조물들과의 배관 통로를 위한 벽체에 설치되는 파이프슬리브의 위치를 자유롭게 조절가능하여 구조물들 설치시 정밀도를 향상시키는 효과가 있다.According to the present invention, the position of the pipe sleeve installed on the wall for the piping passage with the structures used only for the construction of the nuclear power plant can be freely adjusted by providing the sleeve fasteners, .

또, 장공홀, 정공홀을 통해 숙련자가 아니더라도 파이프슬리브의 설치위치 오차를 최소화함과 아울러, 거푸집과의 고정력을 증가시키는 효과도 있다.In addition, it is possible to minimize the installation error of the pipe sleeve even though it is not a skilled person through the long hole and the hole, and also has an effect of increasing the fixing force with the die.

또한, 슬리브고정구들을 몸체의 양단으로부터 10~15㎜ 이격되게 설치되어 볼트 조임시, 장력이 증가되는 효과도 있다.In addition, the sleeve fasteners are installed at a distance of 10 to 15 mm from both ends of the body, so that the tension is increased when the bolts are tightened.

도 1은 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 개략도.
도 2는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 사시도.
도 3은 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 정면도.
도 4는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 측면도.
도 5는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 사용상태도.
1 is a schematic view of a method of constructing a pipe sleeve used in the construction of a nuclear power plant of the present invention.
2 is a perspective view of a pipe sleeve of a pipe sleeve construction method used in construction of a nuclear power plant of the present invention.
3 is a front view of a pipe sleeve of a pipe sleeve construction method used in construction of a nuclear power plant of the present invention.
4 is a side view of a pipe sleeve of a pipe sleeve construction method used in construction of a nuclear power plant of the present invention.
FIG. 5 is a view showing a state of using a pipe sleeve in a construction method of a pipe sleeve used in construction of a nuclear power plant of the present invention. FIG.

본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브(10)의 시공방법은 홀(15)을 갖는 슬리브고정구(13)들을 구비하여 거푸집(1)과 설치시 파이프슬리브(10)의 위치 이동이 용이하고, 고정력을 증대시켜 정밀도 및 내구성이 향상되도록 구성하였다.The method of constructing the pipe sleeve 10 used in the construction of the nuclear power plant of the present invention includes the sleeve fasteners 13 having the holes 15 to facilitate positioning of the mold 1 and the pipe sleeve 10 during installation And the precision and durability are improved by increasing the fixing force.

이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 개략도, 도 2는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 사시도, 도 3은 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 정면도, 도 4는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 측면도, 도 5는 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법의 파이프슬리브 사용상태도를 나타낸 도면이다.FIG. 1 is a schematic view of a method of constructing a pipe sleeve used in the construction of a nuclear power plant of the present invention, FIG. 2 is a perspective view of a pipe sleeve of a method of constructing a pipe sleeve used in construction of a nuclear power plant of the present invention, Fig. 4 is a side view of a pipe sleeve of a pipe sleeve construction method used in construction of a nuclear power plant of the present invention, Fig. 5 is a side view of a pipe sleeve of a nuclear power plant of the present invention, Fig. FIG. 5 is a view showing a state of use of a pipe sleeve in a construction method of a pipe sleeve used in construction; FIG.

도 1 내지 도 5에 나타낸 바와 같이, 본 발명의 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법은 철근배근단계(S10), 파이프슬리브 가설치단계(S20), 파이프슬리브 설치단계(S30), 마무리 단계(S40)를 포함하여 구성된다.
As shown in FIGS. 1 to 5, a method of constructing a pipe sleeve used in the construction of a nuclear power plant of the present invention includes a reinforcing step S10, a pipe sleeve installation step S20, a pipe sleeve installation step S30, And finishing step S40.

상기 철근배근단계(S10)는 원자력발전소의 건설에서 벽체와 일체화되는 파이프슬리브(10)가 시공되는 위치에 파이프슬리브(10)의 길이에 맞게 철근을 배근하는 단계이다.The reinforcing steel reinforcing step S10 is a step of reinforcing the reinforcing bars in accordance with the length of the pipe sleeve 10 at a position where the pipe sleeve 10 integrated with the wall is constructed in the construction of a nuclear power plant.

상기 파이프슬리브(10)는 몸체(11), 슬리브고정구(13)들, 홀(15)로 이루어진다.The pipe sleeve 10 is composed of a body 11, a sleeve fixture 13, and a hole 15.

상기 몸체(11)는 길이를 가지며 양단이 개구된 파이프 형상으로 건물의 벽체에 매립되어 구조물과의 시공시 배관 통로로 사용되어 구조물들의 시공시 주요 부품이나 배선 또는 에너지원들의 통로로 사용되며, 외부로 노출되는 것을 방지한다.The body 11 is a pipe having a length and open at its both ends and is embedded in a wall of a building and used as a pipe passage at the time of construction with the structure to be used as a passage for main components, .

이때, 몸체(11)의 길이는 설치되는 벽체의 두께에 따라 얼마든지 변경 실시될 수 있다.At this time, the length of the body 11 can be changed as much as the thickness of the wall to be installed.

상기 슬리브고정구(13)는 ㄴ자 형상으로 몸체(11)의 좌우 양단에 둘레를 따라 소정의 거리를 두고 등간격으로 고정되게 다 수개가 설치된다.The sleeve fasteners 13 are formed in a square shape and are arranged at equal intervals at a predetermined distance along the circumference at both left and right ends of the body 11.

이러한, 슬리브고정구(13)는 통상의 볼트(미도시)를 통해 거푸집(1)에 몸체(11)를 견고하게 고정한다.The sleeve fixture 13 securely fixes the body 11 to the mold 1 through a normal bolt (not shown).

상기 홀(15)들은 슬리브고정구(13)들에 각각 관통되게 형성된다.The holes (15) are formed to penetrate the sleeve fasteners (13), respectively.

이러한, 홀(15)들은 거푸집(1)에 몸체(11)의 설치 위치를 자유롭게 조절가능하도록 하여 파이프슬리브(10)의 위치 이동이 용이하고, 고정력을 증대시켜 정밀도 및 내구성이 향상된다.The holes (15) allow the position of the body (11) to be freely adjustable in the die (1), so that the position of the pipe sleeve (10) can be easily moved and the precision and durability can be improved.

이때, 상기 홀(15)들은 장공홀(15a) 또는 정공홀(15b) 중 선택된 어느 하나이거나 전부임을 특징으로 하여 정밀도와 고정력이 증대하는 것이 바람직하다.At this time, the holes 15 may be any one selected from the long hole 15a and the hole 15b, or all of the hole 15a and 15b.

또, 상기 슬리브고정구(13)들은 몸체(11)의 양단으로부터 10~15㎜ 이격되게 설치되어 거푸집(1)에 볼트(미도시) 조임시, 장력을 증가하는 것이 바람직하다.The sleeve fasteners 13 are preferably spaced 10 to 15 mm from both ends of the body 11 to increase the tension when the bolts (not shown) are fastened to the formwork 1. [

상기 파이프슬리브 가설치단계(S20)는 배근된 철근(C)을 컷팅 및 밴딩하여 파이프슬리브(10)를 삽입하는 단계이다.The step S20 of installing the pipe sleeve is a step of inserting the pipe sleeve 10 by cutting and bending the inserted reinforcing bars C.

이때, 상기 철근(C)은 파이프슬리브(10)의 파이프 형상으로 컷팅 및 밴딩 하는 것이 바람직하다.At this time, it is preferable that the reinforcing bars (C) are cut and bent in a pipe shape of the pipe sleeve (10).

상기 파이프슬리브 설치단계(S30)는 가설치된 파이프슬리브(10)의 양단에 거푸집(1)을 세우고 파이프슬리브(10)의 위치를 조절하여 거푸집(1)과 고정하는 단계이다.The pipe sleeve installation step S30 is a step of setting the mold 1 at both ends of the installed pipe sleeve 10 and fixing the pipe sleeve 10 to the mold 1 by adjusting the position of the pipe sleeve 10. [

이때, 파이프슬리브(10)의 위치는 슬리브고정구(13)의 장공홀(15a)을 통해 조절하고 조절후, 홀(15)들에 통상의 볼트(미도시)를 삽입하여 고정하는 것이 바람직하다.At this time, it is preferable that the position of the pipe sleeve 10 is adjusted through the elongated hole 15a of the sleeve fixture 13, and then fixed by inserting a normal bolt (not shown) into the holes 15.

상기 마무리 단계(S40)는 거푸집(1)에 콘크리트(Z) 타설 및 양생한 후, 거푸집(1)을 해체하는 단계이다.The finishing step S40 is a step of dismantling the mold 1 after the concrete Z is placed and cured in the mold 1.

이러한, 마무리 단계(S40)후, 파이프슬리브의 내부로 원자력발전소의 내부에서 사용되는 구조물들과 배관 및 에너지원의 통로로 사용된다.After the finishing step (S40), it is used as a passage for piping and energy sources inside the pipe sleeve inside the nuclear power plant.

이와 같은 본 발명은 슬리브고정구들을 구비하여 원자력발전소의 건설에서만 사용되는 구조물들과의 배관 통로를 위한 벽체에 설치되는 파이프슬리브의 위치를 자유롭게 조절가능하여 구조물들 설치시 정밀도를 향상시키는 효과가 있다.
The present invention has the effect of improving the accuracy in installation of the structures by providing the sleeve fasteners and freely adjusting the position of the pipe sleeve installed on the wall for the pipe passage with the structures used only for the construction of the nuclear power plant.

본 발명에 의해, 슬리브고정구들을 구비하여 원자력발전소의 건설에서만 사용되는 구조물들과의 배관 통로를 위한 벽체에 설치되는 파이프슬리브의 위치를 자유롭게 조절가능하여 구조물들 설치시 정밀도를 향상시키는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법을 제공한다.According to the present invention, it is possible to freely adjust the position of a pipe sleeve installed on a wall for piping passages with structures that are used only for the construction of a nuclear power plant by having the sleeve fasteners, thereby improving the precision in installation of the nuclear power plant The method of the present invention provides a method of constructing a pipe sleeve.

또, 장공홀, 정공홀을 통해 숙련자가 아니더라도 파이프슬리브의 설치위치 오차를 최소화함과 아울러, 거푸집과의 고정력을 증가시키는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법도 제공한다.The present invention also provides a method of constructing a pipe sleeve for use in construction of a nuclear power plant that minimizes installation error of a pipe sleeve even if not an expert through a long hole hole and a hole hole, and increases fixing force with a die.

또한, 슬리브고정구들을 몸체의 양단으로부터 10~15㎜ 이격되게 설치되어 볼트 조임시, 장력이 증가되는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법도 제공한다.Also provided is a method of constructing a pipe sleeve for use in the construction of a nuclear power plant where the sleeve fasteners are spaced 10 to 15 mm from both ends of the body to increase tension when bolted.

S10:철근배근단계
S20:파이프슬리브 가설치단계
S30:파이프슬리브 설치단계
S40:마무리 단계
1:거푸집
10:파이프슬리브
11:몸체
13:슬리브고정구
15:홀
15a:장공홀
15b:정공홀
C:철근
Z:콘크리트
S10: Reinforcement step
S20: Pipe sleeve installation phase
S30: Pipe sleeve installation steps
S40: Finishing step
1: Form
10: Pipe sleeve
11: Body
13: Sleeve fastener
15: Hall
15a: Long hole
15b: hole
C: Rebar
Z: Concrete

Claims (4)

원자력발전소의 건설에서 벽체와 일체화되는 파이프슬리브(10)가 시공되는 위치에 철근(C)을 배근하는 철근배근단계(S10);
상기 배근된 철근(C)을 컷팅 및 밴딩하여 파이프슬리브(10)를 삽입하는 파이프슬리브 가설치단계(S20);
상기 가설치된 파이프슬리브(10)의 양단에 거푸집(1)을 세우고 파이프슬리브(10)의 위치를 조절하여 거푸집(1)과 고정하는 파이프슬리브 설치단계(S30); 및
상기 거푸집(1)에 콘크리트(Z) 타설 및 양생한 후, 거푸집(1)을 해체하는 마무리 단계(S40);를 포함하여 구성되며,
상기 파이프슬리브(10)는 길이를 가지며 양단이 개구된 파이프 형상의 몸체(11);
상기 몸체(11)의 좌우 양단에 둘레를 따라 소정의 거리를 두고 등간격으로 고정되게 설치되어 거푸집(1)에 몸체(11)를 고정하도록 한 ㄴ자 형상의 슬리브고정구(13)들; 및
상기 슬리브고정구(13)들에 각각 관통되게 형성되어 거푸집(1)에 몸체(11)의 설치 위치를 자유롭게 조절가능하도록 한 홀(15)들;로 이루어짐을 특징으로 하고,
상기 슬리브고정구(13)들은 몸체(11)의 양단으로부터 10~15㎜ 이격되게 설치되어 거푸집(1)에 볼트 조임시, 장력을 증가하는 것을 특징으로 하는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법.
A reinforcing steel reinforcing step (S10) for reinforcing the reinforcing steel (C) at a position where the pipe sleeve (10) integrated with the wall is constructed in the construction of a nuclear power plant;
A pipe sleeve mounting step (S20) of cutting and bending the reinforced steel (C) to insert the pipe sleeve (10);
A pipe sleeve installation step (S30) for setting the mold (1) at both ends of the installed pipe sleeve (10) and fixing the position of the pipe sleeve (10) to the mold (1); And
And a finishing step (S40) of dismounting the formwork (1) after the concrete (Z) is laid and cured in the formwork (1)
The pipe sleeve (10) has a pipe-shaped body (11) having a length and open at both ends;
Shaped sleeve fasteners 13 fixed at equal intervals at a predetermined distance along the circumference at both left and right ends of the body 11 to fix the body 11 to the formwork 1; And
And holes 15 formed through the sleeve fasteners 13 so as to freely adjust the mounting position of the body 11 on the mold 1,
The sleeve fasteners 13 are installed at a distance of 10 to 15 mm from both ends of the body 11 to increase tension when the bolts are fastened to the formwork 1. The construction of the pipe sleeve used in the construction of a nuclear power plant Way.
삭제delete 제 1항에 있어서, 상기 홀(15)들은 장공홀(15a) 또는 정공홀(15b) 중 선택된 어느 하나이거나 전부임을 특징으로 하는 원자력발전소의 건설에서 사용되는 파이프슬리브의 시공방법. The method as claimed in claim 1, wherein the holes (15) are one or more selected from the long hole (15a) or the hole (15b). 삭제delete
KR1020130071298A 2013-06-21 2013-06-21 Construction method of pipe sleeve that is used in the construction of nuclear power plant KR101438099B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130071298A KR101438099B1 (en) 2013-06-21 2013-06-21 Construction method of pipe sleeve that is used in the construction of nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130071298A KR101438099B1 (en) 2013-06-21 2013-06-21 Construction method of pipe sleeve that is used in the construction of nuclear power plant

Publications (1)

Publication Number Publication Date
KR101438099B1 true KR101438099B1 (en) 2014-09-25

Family

ID=51759454

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130071298A KR101438099B1 (en) 2013-06-21 2013-06-21 Construction method of pipe sleeve that is used in the construction of nuclear power plant

Country Status (1)

Country Link
KR (1) KR101438099B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200485853Y1 (en) * 2017-06-12 2018-03-06 주식회사 어드밴건설 Fixing apparatus for sleeve installation of reinforced concrete constructions
KR20200109817A (en) * 2019-03-14 2020-09-23 필립산업 (주) Bracket For Tube Used With Concrete Form For Making Through-hole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200188474Y1 (en) * 1997-12-23 2000-07-15 정광진 Sleeve passing through wall for connecting pipe
KR200288395Y1 (en) 2002-06-15 2002-09-09 이영근 Piercing sleeve for using structure
KR20100052759A (en) * 2008-11-11 2010-05-20 주식회사 영화키스톤건축사사무소 Sleeve
KR20110130838A (en) * 2010-05-28 2011-12-06 승원엔지니어링 주식회사 Piercing sleeve for building and construction method using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200188474Y1 (en) * 1997-12-23 2000-07-15 정광진 Sleeve passing through wall for connecting pipe
KR200288395Y1 (en) 2002-06-15 2002-09-09 이영근 Piercing sleeve for using structure
KR20100052759A (en) * 2008-11-11 2010-05-20 주식회사 영화키스톤건축사사무소 Sleeve
KR20110130838A (en) * 2010-05-28 2011-12-06 승원엔지니어링 주식회사 Piercing sleeve for building and construction method using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200485853Y1 (en) * 2017-06-12 2018-03-06 주식회사 어드밴건설 Fixing apparatus for sleeve installation of reinforced concrete constructions
KR20200109817A (en) * 2019-03-14 2020-09-23 필립산업 (주) Bracket For Tube Used With Concrete Form For Making Through-hole
KR102290463B1 (en) * 2019-03-14 2021-08-18 필립산업(주) Bracket For Tube Used With Concrete Form For Making Through-hole

Similar Documents

Publication Publication Date Title
KR101506782B1 (en) In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete
JP6357960B2 (en) Repair and reinforcement methods for existing tunnels
KR20190101312A (en) Magnetic type embeded anchor and construction method of facility by using it
CN108952165B (en) Construction method for prefabricating and embedding row of sleeve pipe assemblies
CN105888108A (en) Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
US20130283724A1 (en) Utility dowel bracket
KR101438099B1 (en) Construction method of pipe sleeve that is used in the construction of nuclear power plant
JP2016169493A (en) Structure and method for reinforcing existing concrete structure
KR101186053B1 (en) Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab
KR20090088106A (en) The fixation means which is bought in the concrete structure
CN108915085A (en) The pre-buried assembling module of beam bottom constructional column anchor bar and construction method
JP6616629B2 (en) Grating mounting structure and method
CN212478549U (en) Sleeve pipe embedding structure
CN109826441B (en) Lateral pre-embedding installation method for C-shaped hafen groove of concrete structure
JP2011074632A (en) Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure
KR20190101313A (en) Magnetic type embeded anchor and construction method of facility by using it
KR20110130838A (en) Piercing sleeve for building and construction method using the same
KR200469316Y1 (en) Pipe sleeve that is used in the construction of nuclear power plant
CN203441094U (en) Embedded part of hydraulic climbing formwork
KR101550712B1 (en) Construction structure of reinforced concrete building and construction method thereof
KR20120049687A (en) Pipe support for construction
JP7018869B2 (en) Fixture
KR102494159B1 (en) Pipe protection block structure, And the method for building the structure
KR102182284B1 (en) Composite girder using corrugated steel plate and its manufacturing method
KR101533934B1 (en) A Couple tie for concrete form controlled coupling length

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee