KR101312604B1 KR1020100135527A KR20100135527A KR101312604B1 KR 101312604 B1 KR101312604 B1 KR 101312604B1 KR 1020100135527 A KR1020100135527 A KR 1020100135527A KR 20100135527 A KR20100135527 A KR 20100135527A KR 101312604 B1 KR101312604 B1 KR 101312604B1
Authority
KR
South Korea
Prior art keywords
retaining wall
wall block
rainwater
geogrid
storage member
Prior art date
Application number
KR1020100135527A
Other languages
Korean (ko)
Other versions
KR20120073695A (en
Inventor
김윤춘
Original Assignee
(주)코단에코크리트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)코단에코크리트 filed Critical (주)코단에코크리트
Priority to KR1020100135527A priority Critical patent/KR101312604B1/en
Publication of KR20120073695A publication Critical patent/KR20120073695A/en
Application granted granted Critical
Publication of KR101312604B1 publication Critical patent/KR101312604B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/42Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities
    • E04B2/44Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls
    • E04B2/46Walls having cavities between, as well as in, the elements; Walls of elements each consisting of two or more parts, kept in distance by means of spacers, at least one of the parts having cavities using elements having specially-designed means for stabilising the position; Spacers for cavity walls by interlocking of projections or inserts with indentations, e.g. of tongues, grooves, dovetails
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Environmental Sciences (AREA)
  • Revetment (AREA)

Abstract

본 발명은, 상호 적층되어 옹벽을 구성하며, 적층된 옹벽 사이로 지오그리드(GD)가 개입되어 고정되는 옹벽블록에 있어서, 상기 옹벽블록은, 전체적으로 사각형상으로 이루는 옹벽블록본체(11)와; 옹벽블록본체(11)의 저면과 상면에 각각 형성되되, 수직축을 기준으로 저면 좌측과 상면 우측으로 편향되게 형성되는 돌기(12) 및 요홈(13)으로 구성된 것을 특징으로 한다.
본 발명의 실시 예에 따르면, 옹벽블록의 고정성을 확실하게 담보할 수 있을 뿐만 아니라, 충격으로 인한 지오그리드의 손상 및 끊어지는 문제를 원천적으로 해소할 수 있다.
The present invention provides a retaining wall block in which a geogrid (GD) is interposed between the stacked retaining walls to be laminated to each other to form a retaining wall, wherein the retaining wall block comprises: a retaining wall block body (11) formed as a whole; It is formed on the bottom and upper surface of the retaining wall block body 11, respectively, characterized in that consisting of the projection 12 and the groove 13 is formed to be deflected to the bottom left and the upper right side relative to the vertical axis.
According to the embodiment of the present invention, it is possible to securely secure the retaining wall block, as well as to solve the problem of damage and breaking of the geogrid due to the impact.

Description

옹벽블록{Revetment Block}Retaining Block

본 발명은 조적의 강도를 높여 토사의 압력에도 잘 견딜 수 있는 옹벽블록에 관한 것이다.
The present invention relates to a retaining wall block that can withstand the pressure of the soil well by increasing the strength of the masonry.

일반적으로 옹벽블록은 하천, 도로 또는 각종 토목공사의 법면에 축조되어 토사의 유실로 인한 변형 및 붕괴를 방지하기 위한 옹벽을 형성하는 것으로서, 이러한 옹벽은 아파트단지조성, 토로절성토부 시공, 사면의 안정성 확보를 위한 시공, 그 밖에 수로 및 제방공사 등에 널리 사용되고 있다.In general, the retaining wall block is constructed on the surface of a river, road, or various civil works to form a retaining wall to prevent deformation and collapse due to the loss of soil. Such a retaining wall is used for the construction of apartment complexes, the construction of the soil section, and the slopes. It is widely used in construction for securing stability, in addition to waterways and embankments.

전술한 바와 같은 일반적인 옹벽블록은 상·하의 블록층 사이에 지오그리드(Geogrid)를 삽입하여 조적하기 때문에 매우 빠르게 시공할 수 있는 이점이 있는데 반하여, 단순히 지오그리드를 물고 있는 구조이기 때문에, 복토압력에 대한 지지력이 상당히 취약하여 쉽게 붕괴되는 문제가 있었으며, 복토가 연약하여 붕괴될 경우 지오그리드가 쉽게 블록층에서 너무나도 쉽게 이탈되는 문제가 있었다.General retaining wall block as described above has the advantage that can be installed very quickly because the geogrid (Geogrid) is inserted between the upper and lower block layers, while the structure is simply holding the geogrid, the bearing capacity for the cover pressure There was a problem that this was very fragile and easily collapsed, and when the cover was weak and collapsed, the geogrid easily escaped from the block layer too easily.

한편, 상기와 같은 옹벽블록은 지오그리드를 단순히 개입시켜 물고 있는 구조를 이루고 있어 지오그리가 외력을 받게 되면 외력에 의해 쉽게 변형 및 손상되는 문제가 있으며, 한번 손상된 지오그리드는 복토층을 전부 걷어내고 전부 재시공하지 않는 이상에는 교체가 어렵기 때문에 이를 외력으로부터 보호해야할 필요성이 강구되어져 왔다.
On the other hand, the retaining wall block as described above has a structure that simply bite through the geogrid, so that the geogrid is easily deformed and damaged by the external force when the geogrid is subjected to an external force, and once damaged, the geogrid removes all the cover layer and reconstructs it. Unless it is difficult to replace, there has been a need to protect it from external forces.

본 발명은 상기와 같은 문제를 해소하기 위하여 안출된 것으로서, 단순한 구성을 통해 복토압력에 대한 지지력을 강화시켜 붕괴의 위험을 최소화할 수 있는 옹벽블록을 제공하려는데 그 목적이 있다.The present invention has been made to solve the above problems, it is to provide a retaining wall block that can minimize the risk of collapse by strengthening the bearing capacity for the cover pressure through a simple configuration.

본 발명의 다른 목적은, 지오그리드고정부재를 통해 지오그리드를 견실히 고정하면서도 외력으로부터 지오그리드가 손상되는 것을 방지할 수 있는 옹벽블록을 제공하려는 것이다.
Another object of the present invention is to provide a retaining wall block that can securely fix the geogrid through the geogrid fixing member while preventing the geogrid from being damaged from external force.

상기 목적을 달성하기 위한 본 발명은, According to an aspect of the present invention,

상호 적층되어 옹벽을 구성하며, 적층된 옹벽 사이로 지오그리드가 개입되어 고정되는 옹벽블록에 있어서,In the retaining wall block is laminated with each other to form a retaining wall, the geogrid is interposed between the laminated retaining wall is fixed,

상기 옹벽블록은,The retaining wall block,

전체적으로 사각형상으로 이루는 옹벽블록본체와;Retaining wall block body formed in a rectangular shape as a whole;

옹벽블록본체의 저면과 상면에 각각 형성되되, 수직축을 기준으로 저면 좌측과 상면 우측으로 편향되게 형성되는 돌기 및 요홈으로 구성된 것을 특징으로 한다.
It is formed on the bottom and the top surface of the retaining wall block body, respectively, characterized in that consisting of projections and grooves are formed to be deflected to the bottom left and the top right side relative to the vertical axis.

본 발명의 옹벽블록본체는,Retaining wall block body of the present invention,

전면에 형성되는 요부와, 양측 방향으로 관통되는 저장부재설치부와, 저장부재설치부로 우수가 유입될 수 있도록 배면에서부터 저장부재설치부로 갈수록 하향경사지는 구조를 갖는 우수유입부와, 저장부재설치부로 공급된 우수가 배출될 수 있도록 저장부재설치부에서 전면으로 갈수록 하향경사는 구조를 갖는 우수배출부를 갖춘 제1본체부와;A recess formed on the front surface, a storage member mounting portion penetrating in both directions, a rainwater inflow portion having a structure inclined downward from the back to the storage member installation portion so that rainwater can flow into the storage member installation portion, and the storage member installation portion. A first main body part having a rainwater discharge part having a downward slope from the storage member installation part to the front side so that the supplied rainwater may be discharged;

제1본체부의 요부에 대응되는 철부와, 우수배출부와 상호 연통되어 내부로 우수가 공급되는 우수유입로를 갖추고서, 제1본체부에 착탈가능하게 설치되어 식생공간을 제공하는 제2본체부로 구성된 것을 특징으로 한다.
A second body part having a convex part corresponding to the main part of the first body part and a rainwater inflow path communicating with the rainwater discharge part and supplying rainwater to the inside, and detachably installed in the first body part to provide a vegetation space. Characterized in that configured.

본 발명의 경우, 제1본체부의 저장부재설치부에는 우수유입부로부터 유입된 우수를 저장 및 저류할 수 있도록 우수저장부재가 더 보강 구비되는 것을 특징으로 한다.
In the case of the present invention, the storage member installation portion of the first body portion is characterized in that the rainwater storage member is further reinforced to store and store the rainwater introduced from the rainwater inlet.

본 발명의 경우, 우수저장부재(14)는 스펀지인 것을 특징으로 한다.
In the case of the present invention, the storm storage member 14 is characterized in that the sponge.

본 발명의 경우, 옹벽블록본체의 돌기 및 요홈에는 장착부가 형성되고, 승강돌기를 갖춘 지오그리드 고정부재가 장착부에 승강가능하게 고정핀을 매개로 설치되어 지오그리드를 S자 형태로 맞물어 고정하는 것을 특징으로 한다.
In the present invention, the projections and grooves of the retaining wall block body is provided with a mounting portion, the geogrid fixing member having a lifting projection is installed via the fixing pin so as to be elevated to the mounting portion is characterized in that the geogrid is fixed by engaging the S-shape. It is done.

본 발명의 경우, 지오그리드 고정부재는 탄성력을 지닌 합성고무재인 것을 특징으로 한다.
In the present invention, the geogrid fixing member is characterized in that the synthetic rubber material having an elastic force.

상기와 같은 구성으로 이루어진 본 발명은, 지오그리드를 지오그리드고정부재를 매개로 고정하기 때문에 옹벽블록의 고정성을 확실하게 담보할 수 있을 뿐만 아니라, 지오그리드고정부재의 경우 탄성력을 지닌 합성고무재로 구성되므로, 지오그리드가 고정된 상태에서 외부로부터 수직하중이 작용하더라도 이를 수용할 수 있어 충격으로 인한 지오그리드의 손상 및 끊어지는 문제를 원천적으로 해소할 수 있다.
According to the present invention having the above-described configuration, since the geogrid is fixed through the geogrid fixing member, the retaining wall block can be reliably secured, and the geogrid fixing member is composed of a synthetic rubber material having elastic force. Even if the vertical load is applied from the outside while the geogrid is fixed, it can accommodate the damage and breakage of the geogrid due to the impact.

도 1은 본 발명에 따른 옹벽블록의 제1실시 예를 도시한 사시도.
도 2는 도 1의 설치상태를 도시한 도면.
도 3 내지 도 5는 본 발명에 따른 옹벽블록의 제2실시 예를 도시한 결합사시도와 분해사시도 및 단면도.
도 6은 제2실시 예의 설치상태를 도시한 도면.
도 7 내지 도 9는 본 발명에 따른 옹벽블록의 제3실시 예를 도시한 결합사시도와 분해사시도 및 단면도.
도 10은 제3실시 예의 설치상태를 도시한 도면.
1 is a perspective view showing a first embodiment of a retaining wall block according to the present invention.
2 is a view showing an installation state of FIG.
3 to 5 is a perspective view and an exploded perspective view and a cross-sectional view showing a second embodiment of the retaining wall block according to the present invention.
6 is a view showing an installation state of the second embodiment;
7 to 9 is a perspective view and an exploded perspective view and a cross-sectional view showing a third embodiment of the retaining wall block according to the present invention.
10 is a view showing an installation state of the third embodiment.

이하, 첨부된 도면에 의거하여 상세히 설명한다.
Hereinafter, with reference to the accompanying drawings will be described in detail.

도 1은 본 발명에 따른 옹벽블록의 제1실시 예로서, 상기 옹벽블록(1)은, 옹벽블록본체(11)와 돌기(12) 및 요홈(13)으로 구성된다.Figure 1 is a first embodiment of the retaining wall block according to the present invention, the retaining wall block 1 is composed of a retaining wall block body 11, a projection 12 and the groove (13).

상기 옹벽블록본체(11)는 전체적인 형상이 사각형상으로서, 바람직하게는 육면체형상으로 이루고 있다. 상기 옹벽블록본체(11)의 전면은 외부로 노출되는 면으로서, 필요에 따라 자연석과 같은 모양으로 가공하거나 또는 다양한 도안 및 문자가 새겨넣을 수 있다. 한편, 상기 옹벽블록본체(11)의 경우 필요에 따라 제조상의 비용 및 무게에 따른 운송비의 점감을 위해 도 3에 도시된 바와 같이 측 방향으로 개방된 구멍을 형성할 수 있다. 한편, 상기 옹벽블록본체(11)의 저면과 상면에는 돌기(12)와 이에 대응하는 요홈(13)이 일체로 형성된다. 본 실시 예의 경우 상기 옹벽블록본체(11)는 계단식으로 적층 시공되는 구조를 채택하고 있기 때문에 수직축을 기준으로 저면 왼편에 돌기(12)를 형성하였다면 요홈(13)은 상면 오른편에 형성하는 것이 바람직하다. 상기 돌기(12)와 요홈(13)은 필요에 따라 반대로 시공될 수 있다.
The retaining wall block body 11 has an overall shape of a rectangular shape, and preferably has a hexahedral shape. The front surface of the retaining wall block body 11 is a surface exposed to the outside, and may be processed into a shape such as natural stone or engraved with various patterns and characters as necessary. On the other hand, in the case of the retaining wall block body 11, as shown in Figure 3 to form a hole in the lateral direction for the reduction of the transportation cost according to the manufacturing cost and weight, if necessary. On the other hand, the bottom 12 and the upper surface of the retaining wall block body 11 is formed with a projection 12 and the corresponding groove 13 is integrally formed. In the present embodiment, since the retaining wall block main body 11 adopts a stepped stacking structure, if the protrusion 12 is formed on the left side of the bottom with respect to the vertical axis, the recess 13 is preferably formed on the upper right side. . The protrusions 12 and the recesses 13 may be constructed in reverse as needed.

도 2를 참조하여 본 발명에 따른 옹벽블록(1)의 설치과정을 설명하면 다음과 같다. Referring to Figure 2 describes the installation process of the retaining wall block 1 according to the present invention.

도 2에 도시된 바와 같이, 토사의 법면(法面)을 따라 옹벽블록(1)을 순차적으로 적층 시공해 나간다. 이때, 토사의 경우 연약지반인 경우에는, 지오그리드(GD)가 토사층에 적용되어 보강되는데, 토사의 법면으로 노출된 지오그리드(GD)는 옹벽블록본체(11)의 상면에 배치한 상태에서 지오그리드(GD)를 돌기(12)와 요홈(13)을 매개로 맞물어 고정하므로서, 토사의 압력에도 잘 견딜 수 있는 옹벽블록을 시공할 수 있다.
As shown in FIG. 2, the retaining wall block 1 is sequentially stacked along the normal surface of the soil. At this time, in the case of earth and sand, in the case of soft ground, geogrid (GD) is applied to the soil layer and reinforced, the geogrid (GD) exposed to the soil surface of the soil is geogrid (GD) in a state arranged on the upper surface of the retaining wall block body (11) ) By fixing the projection 12 and the groove 13 as a medium, it is possible to construct a retaining wall block that can withstand the pressure of the soil well.

도 3 내지 도 5는 본 발명에 따른 옹벽블록(1-1)의 제2실시 예로서, 상기 옹벽블록(1-1)은, 옹벽블록본체(11)와 돌기(12), 요홈(13) 및 우수저장부재(14)로 구성된다.3 to 5 show a second embodiment of the retaining wall block 1-1 according to the present invention. The retaining wall block 1-1 includes a retaining wall block body 11, a protrusion 12, and a recess 13. And rainwater storage member 14.

상기 옹벽블록본체(11)는 제1본체부(11a)와 제2본체부(11b)로 구성된다. The retaining wall block body 11 is composed of a first body portion 11a and a second body portion 11b.

상기 제1본체부(11a)는 전체적으로 육면체형상을 이루고 것으로서, 전면에는 평면에서 보았을 때 T자형을 이루는 요부(11a-1)가 형성되고, 외면에는 외향으로 관통되어 우수저장부재(14)가 삽입되는 저장부재설치부(11a-2)가 형성되며, 저장부재설치부(11a-2)를 기준으로 우측과 좌측에는 각각 저장부재설치부(11a-2)와 연결되는 우수유입부(11a-3)와 우수배출부(11a-4)가 설치된다. 특히, 상기 우수유입부(11a-3)는 일단이 배면과 연통되고, 타단이 저장부재설치부(11a-2)와 연통되는 것으로서, 일단에서 타단으로 갈수록 하향경사는 구조를 이루고 있어 토사를 통해 유입되는 우수를 용이하게 저장부재설치부(11a-2)로 유도할 수 있다. 본 실시 예의 경우 구체적으로 도시하지는 아니하였지만, 필요에 따라 우수유입부(11a-3)에는 모래 또는 작은 돌멩이가 유입되는 것을 방지할 수 있도록 별도의 필터를 설치하는 것이 바람직하다. 한편, 상기 우수배출부(11a-4)는 일단이 저장부재설치부(11a-2)와 연통되고, 타단이 전면으로 개방되는 것으로서, 이 역시 일단에서 타단으로 갈수록 하향경사지는 구조를 이루고 있어 우수저장부재(14)에 함침된 우수가 전면을 향해 용이하게 배출될 수 있도록 하였다.
The first body portion 11a has a hexahedral shape as a whole, and a recessed portion 11a-1 having a T shape when viewed in plan view is formed on the front surface thereof, and the rainwater storage member 14 is inserted through the outer surface thereof. The storage member mounting portion 11a-2 is formed, and the rainwater inlet portion 11a-3 is connected to the storage member installation portion 11a-2 on the right and left sides of the storage member installation portion 11a-2, respectively. ) And storm drain 11a-4 are installed. In particular, the rain inlet (11a-3) is one end is in communication with the back, the other end is in communication with the storage member installation portion (11a-2), the downward slope from one end to the other end forms a structure through the earth and sand Rainwater that flows in can be easily guided to the storage member installation portion (11a-2). Although not shown in detail in the present embodiment, it is preferable to install a separate filter in the rainwater inlet (11a-3) to prevent the inflow of sand or small stones as necessary. On the other hand, the rainwater discharge portion (11a-4) is one end is in communication with the storage member installation portion (11a-2), the other end is open to the front, this also has a structure that is inclined downward from one end to the other end The rainwater impregnated in the storage member 14 can be easily discharged toward the front.

상기 제2본체부(11b)는 배면에 요부(11a-1)에 대응되는 철부(11b-1)가 형성되고, 철부(11b-1)에는 내부 즉, 내측공간부와 상호 연통되는 우수유입로(11b-2)가 형성된다. 본 실시 예의 경우 우수유입로(11b-2)의 일단은 제1본체부(11a)의 우수배출부(11a-4)의 타단과 상호 연통되는 구조를 이루고 있어 우수배출부(11a-4)로부터 용이하게 우수를 공급받을 수 있게 된다. 상기 제2본체부(11b)의 공간부(미도시)에는 꽃과 나무 등이 식생된다.
The second body portion 11b has a convex portion 11b-1 corresponding to the recessed portion 11a-1 on its rear surface, and a rainwater inflow passage communicating with the inner, that is, inner space portion in the convex portion 11b-1. (11b-2) is formed. In this embodiment, one end of the storm inflow passage 11b-2 has a structure in communication with the other end of the storm drain 11a-4 of the first body portion 11a, and thus from the storm drain 11a-4. The rainwater can be easily supplied. Flowers and trees are planted in the space portion (not shown) of the second body portion 11b.

한편, 상기 제1본체부(11a)의 저장부재설치부(11a-2)에 설치되는 우수저장부재(14)는 우수를 최대한 머금을 수 있을 스펀지와 같은 부재를 적용하는 것이 바람직하다. 상기 우수저장부재(14)는 우수를 머금었을 때에 옹벽블록본체(11)의 중량과 더해지기 때문에 토사가 우수에 의해 전방으로 쏠리더라도 이를 확실히 지지해 줄 수 있다.On the other hand, the rainwater storage member 14 is installed in the storage member installation portion (11a-2) of the first body portion (11a) it is preferable to apply a member such as a sponge that can hold the rainwater to the maximum. Since the rainwater storage member 14 is added to the weight of the retaining wall block body 11 when rainwater is contained, the earth and sand can be surely supported even if the soil is moved forward by rainwater.

상기 돌기(12)와 요홈(13)은 앞서 언급한 제1실시 예의 옹벽블록(1)과 동일하므로, 이에 대한 설명은 생략하도록 한다.
Since the protrusion 12 and the recess 13 are the same as the retaining wall block 1 of the first embodiment, the description thereof will be omitted.

도 6을 참조하여 본 발명에 따른 옹벽블록(1-1)의 설치과정 및 작용을 설명하면 다음과 같다. Referring to Figure 6 describes the installation process and operation of the retaining wall block (1-1) according to the present invention.

도 6에 도시된 바와 같이, 제1본체부(11a)의 요부(11a-1)로 제2본체부(11b)의 철부(11b-1)를 삽입하여 상호 결합한 상태에서 토사의 법면(法面)을 따라 옹벽블록(1-1)을 순차적으로 적층 시공해 나아간다. 이때, 토사의 경우 연약지반에 해당되므로, 지오그리드(GD)가 토사층에 보강되는데, 토사의 법면으로 노출된 지오그리드(GD)는 옹벽블록본체(11)의 상면에 배치하고, 배치된 지오그리드(GD)를 돌기(12)와 요홈(13)을 매개로 맞물어 고정하면 된다. 그리고, 상기 제2본체부(11b)의 공간부에는 식물을 식생할 수 있도록 흙을 채워주고, 식물을 식생한다.
As shown in Fig. 6, the surface of the earth and sand in the state in which the convex portions 11b-1 of the second main body 11b are inserted into and joined to the recesses 11a-1 of the first main body 11a. ), The retaining wall block 1-1 is sequentially laminated. At this time, in the case of earth and sand is a soft ground, the geogrid (GD) is reinforced to the soil layer, the geogrid (GD) exposed to the soil surface of the soil is disposed on the top surface of the retaining wall block body 11, the geogrid (GD) disposed It is enough to engage the projection 12 and the groove 13 through the medium. Then, the space part of the second body portion 11b is filled with soil to plant the plants, and the plants are planted.

상기와 같이 시공된 상태에서 우기에 접어들게 되면, 토사로 우수가 스며들게 되는데, 이때 스며드는 우수는 토사의 법면을 향해 개구된 우수유입부(11a-3)를 통해 유입되어 저장부재설치부(11a-2)에 삽입된 우수저장부재(14)로 전달된다. 우수저장부재(14)는 유입되는 우수를 최대한 저장하고 있다가 잉여의 우수를 우수배출부(11a-4)를 통해 배출하게 되고, 배출되는 우수는 제2본체부(11b)의 우수유입로(11b-2)를 통해 식물이 식생된 공간으로 제공된다.
When rain enters the rainy season in the construction state as described above, rainwater is permeated into the earth and sand, the rainwater permeates through the rainwater inlet (11a-3) opened toward the surface of the earth and sand storage member installation portion (11a-) 2) is delivered to the rainwater storage member (14) inserted. The rainwater storage member 14 stores the rainwater flowing in as much as possible and discharges the surplus rainwater through the rainwater discharge portion 11a-4, and the rainwater discharged is the rainwater inflow path of the second body portion 11b ( Through 11b-2) the plant is provided to the vegetation space.

상기와 같은 기술적 구성은 특히 여름철 건기에 접어들었을 때에 제2본체부(11b)에 식생된 식물은 물을 공급받기가 어려운데 이때 우수저장부재(14)에 저장된 우수가 증발되면서 우수유입로(11b-2)를 통해 식물이 식생된 공간으로 전달될 수 있어 식생된 식물이 말라죽는 것을 방지할 수 있다.
The technical configuration as described above is difficult to receive water when the vegetation planted in the second main body portion 11b when entering the summer dry season, in which the rainwater stored in the rainwater storage member 14 is evaporated. The plant can be transferred to the vegetation space through 2) to prevent the vegetation from drying out.

도 7 내지 도 9는 본 발명에 따른 옹벽블록(1-2)의 제3실시 예로서, 전체적인 구성은 제1실시 예의 옹벽블록(1)과 동일하며, 다만, 지오그리드고정부재(15)가 더 보강 구비된다는 점에서 그 차이가 있다.7 to 9 show a third embodiment of the retaining wall block 1-2 according to the present invention, and the overall configuration is the same as the retaining wall block 1 of the first embodiment, except that the geogrid fixing member 15 is further provided. There is a difference in that it is provided with reinforcement.

상기 옹벽블록(1-2)은, 옹벽블록본체(11)와 돌기(12), 요홈(13) 및 지오그리드고정부재(15)로 구성된다. The retaining wall block 1-2 is composed of a retaining wall block body 11, a projection 12, a recess 13, and a geogrid fixing member 15.

상기 옹벽블록본체(11)은 앞서 언급한 제1실시 예의 옹벽블록본체(11)와 동일하므로, 그 설명은 생략하도록 한다.Since the retaining wall block body 11 is the same as the retaining wall block body 11 of the first embodiment, the description thereof will be omitted.

상기 돌기(12)와 요홈(13)에는 지오그리드고정부재(15)의 승강돌기(15a)가 삽입될 수 있도록 장착부(12a,13a)가 형성된다. 상기 장착부(12a,13a)에 삽입된 승강돌기(15a)는 고정핀(P)을 매개로 고정된다.Mounting portions 12a and 13a are formed in the protrusions 12 and the recesses 13 so that the lifting protrusions 15a of the geogrid fixing member 15 can be inserted therein. The lifting protrusions 15a inserted into the mounting parts 12a and 13a are fixed through the fixing pin P.

상기 지오그리드고정부재(15)는 전체적인 형상이 사다리꼴형상을 이루며 탄성력을 지닌 합성고무재로서, 길이방향의 외면에는 상호 대향되게 승강돌기(15a)가 형성되고, 승강돌기(15a)의 외면에는 고정핀(P)이 삽입되어 관통될 수 있도록 장공(미도시)이 형성된다. 상기 장공(미도시)를 통해 승강돌기(15a)는 승하강이 가능하게 된다. 그리고, 돌기(12)와 요홈(13)에 설치된 한 쌍의 지오그리드고정부재(15)는 상호 접합했을 때에 사각형태를 이루게 된다. The geogrid fixing member 15 is a synthetic rubber material having an elastic force with an overall shape having a trapezoidal shape, and the lifting protrusions 15a are formed on the outer surface in the longitudinal direction so as to face each other, and the fixing pins on the outer surface of the lifting protrusions 15a. A long hole (not shown) is formed so that P can be inserted therethrough. The lifting projections 15a may be lifted and lowered through the long hole (not shown). Then, the pair of geogrid fixing members 15 provided in the projection 12 and the groove 13 form a rectangular shape when bonded to each other.

한편, 본 실시 예에 적용된 지오그리드고정부재(15)는 필요에 따라 제2실시 예의 옹벽블록(1-1)에 적용될 수 있으므로, 본 실시 예에 한정하여 해석하는 것은 바람직하지 않다.
On the other hand, since the geogrid fixing member 15 applied to the present embodiment can be applied to the retaining wall block 1-1 of the second embodiment as needed, it is not preferable to limit the analysis to the present embodiment.

도 10을 참조하여 본 발명에 따른 옹벽블록(1-2)의 설치과정 및 작용을 설명하면 다음과 같다. Referring to Figure 10 describes the installation process and operation of the retaining wall block (1-2) according to the present invention.

도 10에 도시된 바와 같이, 토사의 법면(法面)을 따라 옹벽블록(1-2)을 순차적으로 적층 시공해 나간다. 이때, 토사의 경우 연약지반에 해당되므로, 지오그리드(GD)가 토사층에 보강되는데, 토사의 법면으로 노출된 지오그리드(GD)는 다음과 같은 방법에 의해 고정한다.As shown in FIG. 10, the retaining wall blocks 1-2 are sequentially stacked along the normal surface of the soil. At this time, in the case of the earth and sand is soft ground, the geogrid (GD) is reinforced to the soil layer, the geogrid (GD) exposed to the soil surface of the soil is fixed by the following method.

우선, 기초가 되는 옹벽블록(1-2)의 요홈(13)의 장착부(13a)에 승강가능하게 고정된 지오그리드고정부재(15)를 파지한 상태에서 상방으로 들어올린 다음, 한 쌍의 승강돌기(15a) 사이로 지오그리드(GD)의 선단면을 밀어 넣어 반대쪽으로 충분히 인출하고, 인출된 지오그리드(GD)를 이용해 지오그리드고정부재(15)의 경사면에 얹혀 준다.First, a pair of lifting projections are lifted upward in a state of holding the geogrid fixing member 15 which is fixed to the mounting portion 13a of the recess 13 of the retaining wall block 1-2, which is the base. Push the front end surface of the geogrid (GD) between the (15a) and withdraw sufficiently to the opposite side, using the drawn geogrid (GD) is placed on the inclined surface of the geogrid fixing member (15).

그 다음 적층 시공될 옹벽블록(1-2)을 얹혀 주게 되는데, 이때 적층 시공될 옹벽블록(1-2)의 돌기(12)에 승강가능하게 고정된 지오그리드고정부재(15)를 앞서 언급한 지오그리드고정부재(15)의 경사면에 맞대어서 지오그리드(GD)를 움직이지 않도록 한번 고정한 다음, 고정된 지오그리드(GD)의 선단부를 적층 시공될 옹벽블록(1-2)의 돌기(12)에 고정된 승강돌기(15a) 사이로 지오그리드(GD)의 선단부를 삽입하여 관통시켜 준다. 지오그리드(GD)가 설치되었을 때의 형상을 측면에서 보게 되면 S자 형상(도 10의 확대도면 참고)을 이룬다. 상기와 같은 방법으로 지오그리드(GD)를 고정하면 된다.
Then, the retaining wall block (1-2) to be laminated is put on, where the geogrid fixing member (15) mentioned above is fixed to the projection 12 of the retaining wall block (1-2) to be stacked. The geogrid GD is fixed once against the inclined surface of the fixing member 15 so as not to move, and then the lifting end fixed to the protrusion 12 of the retaining wall block 1-2 is to be laminated by the fixed geogrid GD. The tip of the geogrid GD is inserted between the protrusions 15a to penetrate. When the shape of the geogrid (GD) is installed when viewed from the side forms an S-shape (see enlarged drawing of FIG. 10). The geogrid GD may be fixed in the same manner as described above.

본 발명에 따르면, 상기 지오그리드(GD)를 지오그리드고정부재(15)를 매개로 고정하기 때문에 옹벽블록(1-2)의 고정성을 확실하게 담보할 수 있다. 또한, 지오그리드고정부재(15)의 경우 탄성력을 지닌 합성고무재로 구성되므로, 지오그리드(GD)가 고정된 상태에서 외부로부터 수직하중이 작용하더라도 이를 수용할 수 있어 충격으로 인한 지오그리드(GD)의 손상 및 끊어지는 문제를 원천적으로 해소할 수 있다.
According to the present invention, since the geogrid (GD) is fixed through the geogrid fixing member 15, it is possible to securely secure the retaining wall block (1-2). In addition, since the geogrid fixing member 15 is composed of a synthetic rubber material having an elastic force, even if the geogrid (GD) is fixed, even if the vertical load from the outside can be accommodated damage to the geogrid (GD) due to impact And the problem of disconnection can be fundamentally solved.

본 발명은 기재된 구체적인 실시 예에 대해서만 상세하게 설명되어 있지만, 본 발명의 기술사상범위 내에서 다양하게 변형 및 수정할 수 있음은 당업자에게 있어서 당연한 것이며, 이러한 변형 및 수정은 첨부된 특허청구범위에 속함은 당연한 것이다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. It is natural.

1. 1-1. 1-2: 옹벽블록 11: 옹벽블록본체
11a: 제1본체 11a-1: 요부 11a-2: 저장부재설치부
11a-3: 우수유입부 11a-4: 우수배출부 11b: 제2본체
11b-1: 철부 11b-2: 우수유입로 12: 돌기
13: 요홈 14: 우수저장부재 15: 지오그리드고정부재
15a: 승강돌기 P: 고정핀 GD: 지오그리드
1.1-1. 1-2: retaining wall block 11: retaining wall block body
11a: first body 11a-1: main portion 11a-2: storage member mounting portion
11a-3: rainwater inlet 11a-4: rainwater outlet 11b: second body
11b-1: Iron 11b-2: Rainwater inlet 12: Protrusion
13: Groove 14: Storm storage member 15: Geogrid fixing member
15a: Lifting protrusion P: Push pin GD: Geogrid

Claims (6)

전체적으로 사각형상으로 이루는 옹벽블록본체(11)와, 옹벽블록본체(11)의 저면과 상면에 각각 형성되되, 수직축을 기준으로 저면 좌측과 상면 우측으로 편향되게 형성되는 돌기(12) 및 요홈(13)으로 구성되어져 상호 적층되어 옹벽을 구성하며, 적층된 옹벽 사이로 지오그리드(GD)가 개입되어 고정되는 옹벽블록에 있어서,
상기 옹벽블록본체(11)의 돌기(12) 및 요홈(13)에는,
장착부(12a,13a)가 형성되고, 승강돌기(15a)를 갖춘 지오그리드 고정부재(15)가 장착부(12a,13a)에 승강가능하게 고정핀(P)을 매개로 설치되어 지오그리드(GD)를 S자 형태로 맞물어 고정하는 것을 특징으로 하는 옹벽블록.
Retaining wall block body 11 and the retaining wall block body 11 which are generally formed in a quadrangular shape, projections 12 and grooves 13 formed on the bottom surface and the upper surface of the retaining wall block body 11, respectively, are deflected to the left side and the upper surface right side of the vertical axis. In the retaining wall block which is composed of) and is laminated to each other to form a retaining wall, and the geogrid (GD) is interposed between the laminated retaining wall,
In the projections 12 and the recesses 13 of the retaining wall block body 11,
The mounting portions 12a and 13a are formed, and the geogrid fixing member 15 having the lifting projections 15a is installed through the fixing pins P so that the mounting portions 12a and 13a can be raised and lowered. Retaining wall block, characterized in that the fixing in the form of a ruler.
제1항에 있어서,
상기 옹벽블록본체(11)는,
전면에 형성되는 요부(11a-1)와, 양측 방향으로 관통되는 저장부재설치부(11a-2)와, 저장부재설치부(11a-2)로 우수가 유입될 수 있도록 배면에서부터 저장부재설치부(11a-2)로 갈수록 하향경사지는 구조를 갖는 우수유입부(11a-3)와, 저장부재설치부(11a-2)로 공급된 우수가 배출될 수 있도록 저장부재설치부(11a-2)에서 전면으로 갈수록 하향경사는 구조를 갖는 우수배출부(11a-4)를 갖춘 제1본체부(11a)와;
제1본체부(11a)의 요부(11a-1)에 대응되는 철부(11b-1)와, 우수배출부(11a-4)와 상호 연통되어 내부로 우수가 공급되는 우수유입로(11b-2)를 갖추고서, 제1본체부(11a)에 착탈가능하게 설치되어 식생공간을 제공하는 제2본체부(11b)로 구성된 것을 특징으로 하는 옹벽블록.
The method of claim 1,
The retaining wall block body 11,
The storage member mounting portion from the back so that rainwater flows into the recessed portion 11a-1 formed on the front surface, the storage member installation portion 11a-2 penetrating in both directions, and the storage member installation portion 11a-2. Downward to 11a-2, the rain slope inlet 11a-3 having a structure and the storage member mounting portion 11a-2 to discharge the rainwater supplied to the storage member mounting portion 11a-2. The first body portion (11a) having a rainwater discharge portion (11a-4) having a structure inclined downward toward the front from the;
The rainwater inflow passage 11b-2 which is connected to the convex portion 11b-1 corresponding to the recessed portion 11a-1 of the first body portion 11a and the rainwater discharge portion 11a-4 and supplied with rainwater. Retaining wall block having a second body portion (11b) having a), detachably installed in the first body portion (11a) to provide a vegetation space.
제2항에 있어서,
상기 제1본체부(11a)의 저장부재설치부(11a-2)에는 우수유입부(11a-3)로부터 유입된 우수를 저장 및 저류할 수 있도록 우수저장부재(14)가 더 보강 구비되는 것을 특징으로 하는 옹벽블록.
3. The method of claim 2,
The storage member mounting portion 11a-2 of the first body portion 11a is further provided with a rainwater storage member 14 so as to store and store rainwater introduced from the rainwater inflow portion 11a-3. Retaining wall block characterized in that.
제3항에 있어서,
상기 우수저장부재(14)는 스펀지인 것을 특징으로 하는 옹벽블록.
The method of claim 3,
Retaining wall block, characterized in that the storm storage member 14 is a sponge.
제1항 내지 제4항 중 어느 한 항에 있어서,
상기 지오그리드 고정부재(15)는 탄성력을 지닌 합성고무재인 것을 특징으로 하는 옹벽블록.
5. The method according to any one of claims 1 to 4,
Retaining wall block is characterized in that the geogrid fixing member 15 is a synthetic rubber material having an elastic force.
삭제delete
KR1020100135527A 2010-12-27 2010-12-27 Revetment Block KR101312604B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100135527A KR101312604B1 (en) 2010-12-27 2010-12-27 Revetment Block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100135527A KR101312604B1 (en) 2010-12-27 2010-12-27 Revetment Block

Publications (2)

Publication Number Publication Date
KR20120073695A KR20120073695A (en) 2012-07-05
KR101312604B1 true KR101312604B1 (en) 2013-10-14

Family

ID=46708015

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100135527A KR101312604B1 (en) 2010-12-27 2010-12-27 Revetment Block

Country Status (1)

Country Link
KR (1) KR101312604B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851572A (en) * 2020-08-03 2020-10-30 岭南水务集团有限公司 Self-embedded ecological building block, retaining wall and construction method of retaining wall
KR102257983B1 (en) * 2021-02-02 2021-05-28 주식회사 에코 Retaining wall structure for ground reinforcement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200384476Y1 (en) * 2005-02-28 2005-05-16 오준영 retaining wall block
KR100603532B1 (en) 2006-05-12 2006-07-20 (주)금성종합건축사사무소 Block structure for installing at wall of road
KR100660394B1 (en) 2006-07-28 2006-12-22 (주)이젠바텀 Vegetative block for reinforced earth retaining wall
KR20100081698A (en) * 2009-01-07 2010-07-15 민승기 Eco-Friendly Retaining Wall Block

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200384476Y1 (en) * 2005-02-28 2005-05-16 오준영 retaining wall block
KR100603532B1 (en) 2006-05-12 2006-07-20 (주)금성종합건축사사무소 Block structure for installing at wall of road
KR100660394B1 (en) 2006-07-28 2006-12-22 (주)이젠바텀 Vegetative block for reinforced earth retaining wall
KR20100081698A (en) * 2009-01-07 2010-07-15 민승기 Eco-Friendly Retaining Wall Block

Also Published As

Publication number Publication date
KR20120073695A (en) 2012-07-05

Similar Documents

Publication Publication Date Title
KR101583664B1 (en) Vegetation unit and slope greening method using vegetation unit
JP4210312B2 (en) Building
KR20120049106A (en) Prefabricated shore protection block
KR101312604B1 (en) Revetment Block
KR100821946B1 (en) Reinforcement block
KR101025260B1 (en) Slope stabilization method which uses prefabricated shore protection block and coir mat
KR102148692B1 (en) Water permeable block
JP4967105B2 (en) Seismic isolation method for buildings
KR100644413B1 (en) A tree-planting block for vegetation
KR100947845B1 (en) A shore protection block having excellent ground fixing force
CN207331710U (en) A kind of slope greening soil-water protection structure
KR101388870B1 (en) Rainwater storaging facility and method for building the facility
KR101308822B1 (en) Binding structure of vegetation and revetment block and method for constructing using the same
KR100892421B1 (en) Vegetation revetment block
KR200440047Y1 (en) Block for reinforcing wall
KR101294664B1 (en) Permeability tetrapod
KR200397518Y1 (en) Natural block
US20230295894A1 (en) Retaining wall structure
KR200376814Y1 (en) Revetment Block Unit for Plants in Ground
KR100709103B1 (en) The mega green block
CN212375800U (en) Ecological supporting construction of hydraulic engineering
KR20090044391A (en) Drainbord
KR100662876B1 (en) Vegetable block install construction for liver ecosystem protection
KR200438545Y1 (en) A planting block
KR101940716B1 (en) Block and gravity retaininig wall using the same

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161005

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191004