[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

KR101213588B1 - Tie Cable for Ground Embankment - Google Patents

Tie Cable for Ground Embankment Download PDF

Info

Publication number
KR101213588B1
KR101213588B1 KR1020110030038A KR20110030038A KR101213588B1 KR 101213588 B1 KR101213588 B1 KR 101213588B1 KR 1020110030038 A KR1020110030038 A KR 1020110030038A KR 20110030038 A KR20110030038 A KR 20110030038A KR 101213588 B1 KR101213588 B1 KR 101213588B1
Authority
KR
South Korea
Prior art keywords
cable
fixed
anchor
tie
retaining wall
Prior art date
Application number
KR1020110030038A
Other languages
Korean (ko)
Other versions
KR20120111522A (en
Inventor
윤준식
이종규
Original Assignee
(주)진산이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)진산이엔지 filed Critical (주)진산이엔지
Priority to KR1020110030038A priority Critical patent/KR101213588B1/en
Publication of KR20120111522A publication Critical patent/KR20120111522A/en
Application granted granted Critical
Publication of KR101213588B1 publication Critical patent/KR101213588B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0025Adhesives, i.e. glues
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

통상의 지반 성토용 타이케이블은 설치 작업이 난해하거나, 절개지를 성토하여 획득되는 가용토지의 면적이 줄어드는 문제가 있다. 따라서 타이케이블을 설치하는 작업을 옹벽구조물의 안쪽에서 할 수 있게 하는 구조의 타이케이블이 필요하다.
본 발명의 타이케이블은 상기와 같은 기술적 과제를 해결하기 위하여, 지반 절개부위의 암반에 고정되는 한 가닥의 앵커케이블, 옹벽구조물에 고정되는 두 가닥의 고정케이블, 그리고 상기 앵커케이블과 고정케이블을 결속하는 결속브래킷으로 구성된다.
본 발명의 타이케이블은 중간에 인장결속부가 있으므로, 타이케이블의 양단을 각각 절개부위 암반과 옹벽구조물에 인장을 가하지 않는 상태에서 단순히 고정하고, 장력을 주는 인장작업을 옹벽구조물의 안쪽인 절개부위와 옹벽구조물 사이에서 작업할 수 있으므로 타이케이블 설치작업이 용이하고, 옹벽구조물 밖에 작업공간이 필요하지 않으므로 성토되는 토지의 면적을 넓게 할 수 있다.
Conventional ground fill tie cable has a problem that the installation work is difficult, or the area of the available land obtained by laying the incision is reduced. Therefore, there is a need for a tie cable having a structure that enables the installation of tie cables to be performed inside the retaining wall structure.
In order to solve the technical problem as described above, the tie cable of the present invention binds one strand of anchor cable fixed to the rock of the ground cut portion, two strands of cable fixed to the retaining wall structure, and binds the anchor cable and the fixed cable. It consists of a binding bracket.
Since the tie cable of the present invention has a tension binding portion in the middle, both ends of the tie cable are simply fixed in a state where no tension is applied to the cut portion rock and the retaining wall structure, and a tensioning operation is applied to the cut portion inside the retaining wall structure. It is possible to work between the retaining wall structures, so it is easy to install tie cables, and since the work space is not required outside the retaining wall structures, the area of the land to be filled can be increased.

Description

지반 성토용 타이케이블{Tie Cable for Ground Embankment}Tie Cable for Ground Embankment

본 발명은 토목시공기술에 관한 것으로서, 좀 더 자세하게는 절개된 지반 부위를 성토하는데 사용되는 타이케이블에 관한 것이다.The present invention relates to a civil construction technology, and more particularly to a tie cable used to fill in the cut ground site.

최근에 대형 건물을 포함한 대규모 구조물을 축조하기 위하여 지반을 절개하는 경우가 많은데, 지반을 절개할 때는 경사면의 미끄럼에 의한 붕괴를 방지하기 위하여 경사각이 일정각도 이하가 되도록 완만하게 절개하여야 한다.Recently, in order to build a large-scale structure including a large building, the ground is often cut. When cutting the ground, the inclination angle should be gently cut to a certain angle to prevent the collapse of the slope.

상기와 같이 지반을 완만하게 절개하면, 경사가 완만한 절개부위의 토지는 활용할 수 없는 문제가 있다. 따라서 절개부위의 토지를 효과적으로 활용하기 위하여 절개부위를 다시 성토하여 활용할 수 있도록 하는 것이 보통이다.If the ground is gently cut as described above, there is a problem that the land of the inclined portion with a gentle slope cannot be utilized. Therefore, in order to effectively use the land of the incision site, it is common to make the incision site available again.

절개지를 성토하여 성토지반을 형성한 구조는 도 1에 도시한 바와 같은데, 절개지 앞 성토할 부위에 H-빔 등을 이용하여 옹벽구조물을 설치하고, 절개지의 지반과 이 옹벽구조물을 다수 개의 타이케이블(Tie Cable)로 결속한 다음, 절개지의 암반과 옹벽구조물 사이의 공간에 토사를 채워서 지반을 성토한다.The structure in which the ground is formed by filling the incision is as shown in FIG. 1, and the retaining wall structure is installed by using an H-beam or the like in the portion to be filled in front of the incision, and the ground of the incision and the plurality of tie cables Bind it with (Tie Cable) and fill the ground with the soil filled in the space between the rock and the retaining wall structure of the incision.

상기와 같이 지반을 성토할 때 사용하는 통상의 타이케이블은 와이어로프의 한쪽 끝에는 앵커를 구비하고, 다른 쪽 끝에는 인장결속부를 구비하여 제작된다. 상기 앵커는 절개지의 경사지반에 천공된 앵커구멍에 삽입하여 에폭시 등의 접착제로 접착하여 절개지의 암반에 고정되고, 상기 인장결속부는 와이어로프에 일정한 장력이 걸리도록 큰 힘으로 당긴 후 옹벽구조물에 결속하여 고정한다.Conventional tie cables used to fill the ground as described above are manufactured with an anchor at one end of the wire rope and a tension binding part at the other end. The anchor is inserted into the anchor hole perforated on the inclined ground of the incision, and then bonded with an adhesive such as epoxy, and fixed to the rock of the incision. To fix it.

통상의 타이케이블은 인장결속부를 옹벽구조물에 결속하여 고정하는 작업을 옹벽구조물의 바깥에서 하여야 하는데, 옹벽구조물의 전방에 건물 등의 구조물이 인접하여 있는 등 작업공간이 충분치 않을 경우, 타이케이블 설치작업이 아주 난해하거나 불가능한 경우도 있다. 만약 충분한 타이케이블 설치를 위한 작업공간을 확보하기 위하여 옹벽구조물을 절개지와 가깝게 하면, 타이케이블 설치작업은 용이하나 절개지와 가까워진 거리만큼 활용할 수 있는 토지의 면적이 감소하는 문제점이 있다.
In general, tie cables should be fixed outside the retaining wall structure to bind and fix the tension binding part to the retaining wall structure. If there is not enough work space such as a structure such as a building adjacent to the retaining wall structure, the tie cable is installed. Sometimes this is very difficult or impossible. If the retaining wall structure is close to the incision in order to secure a working space for sufficient tie cable installation, the tie cable installation is easy, but there is a problem in that the area of the land that can be utilized by the distance close to the incision is reduced.

통상의 지반 성토용 타이케이블은 상기와 같이 설치 작업이 난해하거나, 절개지를 성토하여 획득되는 가용토지의 면적이 줄어드는 문제가 있다.Conventional ground fill tie cables are difficult to install as described above, or there is a problem that the area of the available land obtained by laying the incision is reduced.

따라서 타이케이블을 설치하는 작업을 옹벽구조물의 안쪽에서 할 수 있게 하는 구조의 타이케이블이 필요하다.Therefore, there is a need for a tie cable having a structure that enables the installation of tie cables to be performed inside the retaining wall structure.

본 발명의 타이케이블은 상기와 같은 기술적 과제를 해결하기 위하여, 지반 절개부위의 암반에 고정되는 한 가닥의 앵커케이블(1), 옹벽구조물에 고정되는 두 가닥의 고정케이블(2), 그리고 상기 앵커케이블(1)과 고정케이블(2)을 결속하는 결속브래킷(3)으로 구성된다.
In order to solve the above technical problem, the tie cable of the present invention, one strand anchor cable (1) is fixed to the rock of the ground cut portion, two strands of the fixed cable (2) fixed to the retaining wall structure, and the anchor It is composed of a binding bracket (3) for binding the cable (1) and the fixed cable (2).

본 발명의 타이케이블은 중간에 인장결속부가 있으므로, 타이케이블의 양단을 각각 절개부위 암반과 옹벽구조물에 인장을 가하지 않는 상태에서 단순히 고정하고, 장력을 주는 인장작업을 옹벽구조물의 안쪽인 절개부위와 옹벽구조물 사이에서 작업할 수 있다.Since the tie cable of the present invention has a tension binding portion in the middle, both ends of the tie cable are simply fixed in a state where no tension is applied to the cut portion rock and the retaining wall structure, and a tensioning operation is applied to the cut portion inside the retaining wall structure. Can work between retaining walls.

이에 따라 본 발명의 타이케이블을 사용하면, 타이케이블 설치작업이 용이하고, 옹벽구조물 밖에 작업공간이 필요하지 않으므로 성토되는 토지의 면적을 넓게 할 수 있다.
Accordingly, when the tie cable of the present invention is used, the tie cable installation work is easy, and since the work space is not required outside the retaining wall structure, the area of the land to be filled can be widened.

도 1은 통상의 타이케이블을 이용한 성토지반의 구성도이다.
도 2는 본 발명의 지반 성토용 타이케이블을 이용한 성토지반의 구성도이다.
도 3은 본 발명인 타이케이블의 구성도이다.
도 4는 결속브래킷의 단면도이다.
도 5는 타이케이블의 다른 실시예이다.
1 is a block diagram of a fill ground using a conventional tie cable.
Figure 2 is a block diagram of a ground soil using a tie cable for ground fill of the present invention.
3 is a block diagram of a tie cable of the present invention.
4 is a cross-sectional view of the binding bracket.
5 is another embodiment of a tie cable.

본 발명의 타이케이블은 도 2에 도시한 바와 같이, 지반 절개부위의 암반과 옹벽구조물 사이에 다수 개가 설치되는데, 도 3에 도시한 바와 같이, 지반 절개부위의 암반에 고정되는 한 가닥의 앵커케이블(1), 옹벽구조물에 고정되는 두 가닥의 고정케이블(2), 그리고 상기 앵커케이블(1)과 고정케이블(2)을 결속하는 결속브래킷(3)으로 구성된다. As shown in Figure 2, the tie cable of the present invention, a plurality of dogs are installed between the rock and the retaining wall structure of the ground cut portion, as shown in Figure 3, one strand of anchor cable fixed to the rock of the ground cut portion (1), two strands of fixed cable (2) fixed to the retaining wall structure, and a binding bracket (3) for binding the anchor cable (1) and the fixed cable (2).

앵커케이블(1)은 앵커와이어로프(11)의 한쪽 끝에 앵커(12)가 구비된 것인데, 앵커와이어로프(11)로는 통상의 와이어로프를 사용되고, 앵커(12)는 상기 앵커와이어로프(11)의 일단에 고정된다. 앵커(12)는 중심부에 와이어로프가 삽입되어 고정되는 구멍이 있어 이 구멍에 앵커와이어로프(11)가 삽입되어 고정되고, 외주면에는 다수의 돌기가 형성되어 있다.The anchor cable 1 is provided with an anchor 12 at one end of the anchor wire rope 11, the anchor wire rope 11 is used as a conventional wire rope, anchor 12 is the anchor wire rope 11 Is fixed at one end. The anchor 12 has a hole in which a wire rope is inserted and fixed in the center thereof, and an anchor wire rope 11 is inserted and fixed in the hole, and a plurality of protrusions are formed on the outer circumferential surface thereof.

앵커케이블(1)은 앵커(12)를 지반 절개부위의 암반에 뚫린 앵커구멍에 삽입한 후 에폭시 수지 등의 접착제를 주입하여 경화시키는 그라우팅(Grouting) 공법으로 절개부위의 암반에 고정된다.The anchor cable 1 is fixed to the rock at the incision site by a grouting method in which the anchor 12 is inserted into the anchor hole drilled in the rock at the incision site and then injected with an adhesive such as epoxy resin to cure.

고정케이블(2)은 고정와이어로프(21)의 양단에 결합부(22)가 구비된 것인데, 한쪽 끝은 옹벽구조물에 그리고 다른 쪽 끝은 결속브래킷(3)에 결합된다.Fixing cable (2) is provided with a coupling portion 22 at both ends of the fixing wire rope 21, one end is coupled to the retaining wall structure and the other end to the binding bracket (3).

고정케이블(2)의 결합부(22)는 옹벽구조물과 결속브래킷(3)에 결합될 수 있는 임의의 구조라도 가능하나, 도 3의 단면도에 도시한 바와 같이, 한쪽 끝에는 수나사(221)를 형성하고 다른 쪽 끝에는 고정와이어로프(21)가 삽입되는 로프구멍(222)을 형성하여, 로프구멍(222)에 고정와이어로프(21)를 삽입한 후 압착하여 고정와이어로프(21)와 결합하는 구조로 하는 것이 좋다. 결합부(22)에는 하중분산판(223)을 구비하여 하중을 분산시키는 것이 좋다. 결합부(22)는 각각 고정너트(224)와 와셔(225)를 이용하여 옹벽구조물과 결속브래킷(3)에 고정할 수 있다.The coupling portion 22 of the fixing cable 2 may be any structure that can be coupled to the retaining wall structure and the binding bracket 3, but as shown in the cross-sectional view of FIG. 3, one end of the male screw 221 is formed. And the other end to form a rope hole 222 into which the fixed wire rope 21 is inserted, insert the fixed wire rope 21 into the rope hole 222, and then compress and couple the fixed wire rope 21 to the fixed wire rope 21. It is good to do. Coupling portion 22 is provided with a load distribution plate 223 is good to distribute the load. The coupling part 22 may be fixed to the retaining wall structure and the binding bracket 3 by using the fixing nut 224 and the washer 225, respectively.

결속브래킷(3)의 종단면은 도 4에 도시한 바와 같은데, 일정 두께의 바닥판(31)의 양측에는 상기 고정케이블(2)이 결합되는 고정케이블결합공(32)이 형성되고, 가운데에는 상기 앵커케이블(1)이 통과하는 앵커케이블결합공(33)이 뚫려 있고, 그리고 앵커케이블결합공(33)에는 타이앵커(34)가 결합된다.The longitudinal cross-section of the binding bracket 3 is as shown in Figure 4, both sides of the bottom plate 31 of a predetermined thickness is formed with a fixed cable coupling hole 32 to which the fixed cable 2 is coupled, the center of the An anchor cable coupling hole 33 through which the anchor cable 1 passes is drilled, and a tie anchor 34 is coupled to the anchor cable coupling hole 33.

타이앵커(34)는 상기 결속브래킷(3)의 앵커케이블결합공(33)이 있는 자리에 결합되는데, 일정길이의 원기둥 형상의 몸체(341)에 중심축을 따라 관통하는 관통공(342)이 형성되고, 관통공(342)의 한쪽에는 원추형자리(343)가 형성되어 있다. 그리고 원추형자리(343)에는 고정쐐기(344)가 결합된다.The tie anchor 34 is coupled to the position where the anchor cable coupling hole 33 of the binding bracket 3 is formed, and a through hole 342 penetrating along the central axis is formed in the cylindrical body 341 of a predetermined length. In addition, a conical seat 343 is formed in one of the through holes 342. And the fixed wedge 344 is coupled to the conical seat (343).

고정쇄기(344)는 도 4의 상세도에 도시한 바와 같이, 외면이 상기 타이앵커(34)의 원추형자리(343)에 삽입되는 것으로서, 외주면은 원추형자리(343)의 경사와 같은 기울기의 경사(S)가 형성되고, 중심축을 따라서는 상기 앵커케이블(1)이 통과하는 구멍(H)이 형성되어 있으며, 측면에는 1개 이상의 절개홈(C)이 형성되어 있다. 그리고 구멍(H)에는 나사산과 유사한 요철돌기(X)를 형성하여 앵커와이어로프(11)를 단단히 고정할 수 있게 하는 것이 좋다.As shown in the detailed view of FIG. 4, the fixed wedge 344 is inserted into the conical seat 343 of the tie anchor 34, and the outer circumferential surface is inclined at the same slope as that of the conical seat 343. (S) is formed, a hole (H) through which the anchor cable (1) passes along the central axis is formed, one or more incision groove (C) is formed on the side. And the hole (H) is good to form a concave-convex protrusion (X) similar to the thread to be able to securely anchor the anchor wire rope (11).

타이앵커(34)의 몸체(341)는 바닥판(31)에 단순히 올려둘 수도 있으나, 용접, 억지끼워맞춤 또는 나사결합 등의 방법으로 부착하는 것이 사용이 편리하다.The body 341 of the tie anchor 34 may simply be placed on the bottom plate 31, but it is convenient to attach it by welding, interference fitting, or screwing.

고정케이블(2)의 결합부(22) 중 결속브래킷(3)에 결합되는 것은 결합부(22)를 사용하는 대신에, 도 5에 도시한 바와 같이 상기 결속브래킷(3)에 사용되는 타이앵커(34)를 사용하여 고정케이블(2)을 결속브래킷(3)에 결합할 수 있다.Coupled to the binding bracket 3 of the coupling portion 22 of the fixed cable 2 is a tie anchor used for the binding bracket 3 as shown in FIG. 5 instead of using the coupling portion 22. (34) can be used to couple the fixed cable (2) to the binding bracket (3).

상기와 같이 구성된 본 발명의 타이케이블은 다음과 같이 사용한다.The tie cable of the present invention configured as described above is used as follows.

앵커케이블(1)의 앵커와이어로프(11)에 결합된 앵커(12)를 지반 절개부위의 암반에 뚫린 앵커구멍에 삽입하여 고정하고, 고정케이블(2)의 고정와이어로프(21)의 양단은 각각 결합부(22)를 이용하여 옹벽구조물과 결속브래킷(3)에 결합한다. 그리고 암반에 고정되지 않은 앵커와이어로프(11)의 끝을 결속브래킷(3)의 앵커케이블결합공(33)와 타이앵커(34)의 관통공(342)을 통과시키고, 앵커와이어로프(11)의 끝에 고정쐐기(344)를 결합한다.The anchor 12 coupled to the anchor wire rope 11 of the anchor cable 1 is inserted into the anchor hole drilled in the rock of the ground incision and fixed, and both ends of the fixing wire rope 21 of the fixing cable 2 are fixed. Each of the coupling portion 22 is used to couple to the retaining wall structure and the binding bracket 3. And the end of the anchor wire rope 11 that is not fixed to the rock through the anchor cable coupling hole 33 of the binding bracket 3 and the through hole 342 of the tie anchor 34, anchor wire rope 11 At the end of the fixing wedge 344 is coupled.

상기와 같이 앵커케이블(1)이 결속브래킷(3)에 결합한 상태에서 기구를 이용하여 앵커케이블(1)에 충분한 장력이 걸리도록 당긴 후, 고정쐐기(344)를 원추형자리(343)에 삽입하고 앵커케이블(1)을 당기는 기구를 제거하고, 타이앵커(34) 외부로 길게 노출된 앵커와이어로프(11)를 절단한다. 앵커와이어로프(11)를 절단한 후, 타이앵커(34)의 끝에는 마개(35)를 설치하여 절단된 앵커와이어로프(11)의 끝부분이 부식되는 것을 방지하고 고정쐐기(344)로 토사가 유입되는 것을 방지할 수 있다.After pulling the anchor cable 1 to the anchor cable 1 with sufficient tension in the state in which the anchor cable 1 is coupled to the binding bracket 3 as described above, the fixing wedge 344 is inserted into the conical seat 343. Remove the mechanism for pulling the anchor cable (1), and cut the anchor wire rope (11) long exposed to the outside of the tie anchor (34). After cutting the anchor wire rope 11, the end of the tie anchor 34 is provided with a stopper 35 to prevent the end of the cut anchor wire rope 11 to be corroded, and the earth and sand with the fixing wedge 344 Inflow can be prevented.

상기와 같이 앵커케이블(1)을 결속브래킷(3)에 결합하면, 앵커케이블(1)의 장력이 고정쇄기(344)를 타이앵커(34)의 몸체(341)쪽으로 당기게 되고, 고정쇄기(344)는 절개홈(C)이 오므라들면서 앵커케이블(1)의 앵커와이어로프(11)를 더욱 단단하게 압착하여 앵커케이블(1)이 결속브래킷(3)에서 빠지지 않게 한다.
When the anchor cable (1) is coupled to the binding bracket (3) as described above, the tension of the anchor cable (1) pulls the fixing anchor 344 toward the body 341 of the tie anchor 34, the fixing anchor 344 ) Presses the anchor wire rope 11 of the anchor cable 1 more firmly as the incision groove C retracts so that the anchor cable 1 does not fall out of the binding bracket 3.

1 : 앵커케이블, 2 : 고정케이블, 3 : 결속브래킷,
11 : 앵커와이어로프, 12 : 앵커,
21 : 고정와이어로프, 22 : 결합부,
31 : 바닥판, 32 : 고정케이블결합공, 33 : 앵커케이블결합공,
34 : 타이앵커, 35 : 마개.
1: anchor cable, 2: fixed cable, 3: binding bracket,
11: anchor wire rope, 12: anchor,
21: fixed wire rope, 22: coupling portion,
31: bottom plate, 32: fixed cable coupling hole, 33: anchor cable coupling hole,
34: tie anchor, 35: stopper.

Claims (2)

지반의 절개 부위를 성토하여 성토지반을 형성하는데 사용하는 것으로서,
지반 절개부위의 암반에 고정되는 것으로서, 앵커와이어로프(11)의 한쪽 끝에 지반 절개부위의 암반에 뚫린 앵커구멍에 삽입된 후 접착제로 고정되는 앵커(12)를 구비한 한 가닥의 앵커케이블(1);
옹벽구조물에 고정되는 것으로서, 고정와이어로프(21)의 양쪽 끝에 각각 결합부(22)가 구비되고, 한쪽 끝이 옹벽구조물에 고정되는 두 가닥의 고정케이블(2);
그리고, 상기 한 가닥의 앵커케이블(1)의 한쪽 끝과 상기 두 가닥의 고정케이블(2) 각각의 한쪽 끝이 결속되는 것으로서, 일정 두께의 바닥판(31)의 양측에는 상기 고정케이블(2)의 결합부(22)가 결합되는 고정케이블결합공(32)이 형성되고, 가운데에는 상기 앵커케이블(1)이 통과하는 앵커케이블결합공(33)이 뚫려 있고, 그리고 상기 앵커케이블결합공(33)이 형성된 곳에 결합되는 것으로서 일정길이의 원기둥 형상의 몸체(341)에 중심축을 따라 관통공(342)이 형성되고 상기 관통공(342)의 한쪽에는 원추형자리(343)가 형성되고 상기 원추형자리(343)에는 외주면에 경사(S)가 형성되고 중심축을 따라서 상기 앵커케이블(1)의 앵커와이어로프(11)가 통과하는 구멍(H)이 형성되어 있으며 측면에는 1개 이상의 절개홈(C)이 형성되어 있는 고정쐐기(344)가 결합되는 결속브래킷(3);
으로 구성되는, 타이케이블.
It is used to fill the incision site of the ground to form the fill ground,
One strand of anchor cable (1) having an anchor (12) fixed to a rock of the ground incision and inserted into an anchor hole drilled in the rock of the ground incision (11) at one end of the ground (11) );
As fixed to the retaining wall structure, the coupling portion 22 is provided at each end of the fixed wire rope 21, two ends of the fixed cable (2) fixed to the retaining wall structure;
One end of the anchor cable 1 of one strand and one end of each of the fixed cables 2 of the two strands are bound together, and the fixing cable 2 is provided on both sides of the bottom plate 31 having a predetermined thickness. Fixed cable coupling hole 32 is formed to be coupled to the coupling portion 22, the anchor cable coupling hole 33 is passed through the anchor cable (1) in the center, and the anchor cable coupling hole 33 ) Is formed where the through hole 342 is formed along a central axis in a cylindrical body 341 having a predetermined length, and a conical seat 343 is formed at one side of the through hole 342 and the conical seat ( 343, an inclination S is formed on the outer circumferential surface, and a hole H through which the anchor wire rope 11 of the anchor cable 1 passes is formed along the central axis, and at least one incision groove C is formed at the side. Bonding bra that the fixed wedge 344 is formed is coupled 3;
Composed of tie cable.
제1항에 있어서,
상기 고정케이블(2)의 결합부(22)는,
한쪽 끝에는 수나사(221)를 형성하고 다른 쪽 끝에는 상기 고정와이어로프(21)가 삽입되는 로프구멍(222)을 형성하여, 로프구멍(222)에 고정와이어로프(21)를 삽입한 후 압착하여 고정와이어로프(21)와 결합되는 구조로서, 고정너트(224)를 이용하여 옹벽구조물과 결속브래킷(3)에 결합되는 것을 특징으로 하는,
타이케이블.
The method of claim 1,
Coupling portion 22 of the fixed cable (2),
One end forms a male screw 221 and the other end forms a rope hole 222 into which the fixing wire rope 21 is inserted. The fixing wire rope 21 is inserted into the rope hole 222 and then compressed and fixed. As a structure that is coupled to the wire rope 21, characterized in that coupled to the retaining wall structure and the binding bracket (3) using a fixing nut 224,
Tie cable.
KR1020110030038A 2011-04-01 2011-04-01 Tie Cable for Ground Embankment KR101213588B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110030038A KR101213588B1 (en) 2011-04-01 2011-04-01 Tie Cable for Ground Embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110030038A KR101213588B1 (en) 2011-04-01 2011-04-01 Tie Cable for Ground Embankment

Publications (2)

Publication Number Publication Date
KR20120111522A KR20120111522A (en) 2012-10-10
KR101213588B1 true KR101213588B1 (en) 2012-12-18

Family

ID=47282214

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110030038A KR101213588B1 (en) 2011-04-01 2011-04-01 Tie Cable for Ground Embankment

Country Status (1)

Country Link
KR (1) KR101213588B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101237241B1 (en) * 2012-06-26 2013-02-26 임찬영 Set anchor apparatus for breast wall structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335329B (en) * 2020-03-31 2024-06-14 江苏东合南岩土科技股份有限公司 Construction method of foundation pit supporting system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100843166B1 (en) 2005-09-09 2008-07-02 주식회사 삼지이앤씨건축사사무소 Ground anchor of removal wire
JP2011047242A (en) 2009-08-28 2011-03-10 Kyokado Eng Co Ltd Reinforced soil structure and anchoring structure of banking reinforcing material

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100843166B1 (en) 2005-09-09 2008-07-02 주식회사 삼지이앤씨건축사사무소 Ground anchor of removal wire
JP2011047242A (en) 2009-08-28 2011-03-10 Kyokado Eng Co Ltd Reinforced soil structure and anchoring structure of banking reinforcing material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101237241B1 (en) * 2012-06-26 2013-02-26 임찬영 Set anchor apparatus for breast wall structure

Also Published As

Publication number Publication date
KR20120111522A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
KR101150125B1 (en) the ground anchor with spreading anchor-head part and the construct method of ground anchor therewith
KR101072527B1 (en) Retaining wall structure using twisted steel wire
KR100930829B1 (en) Pannel have rockbolt coupler
JP6262814B1 (en) Protection method for embankment slope
KR101713525B1 (en) Chiropractors permanent anchor friction
KR101510297B1 (en) A removable prestressing steel pipe soil nailing structure
KR101471487B1 (en) multipurpose load dispersion style ground anchor assembly
KR101041362B1 (en) Earth anchor for reinforcing and stabilizing slopes and the ground stabilization method using the same
KR101213588B1 (en) Tie Cable for Ground Embankment
KR101202845B1 (en) Hybrid ground reinforcing method by earth anchor and soil nail
KR20120050605A (en) Structure of reinforcing net of tunnel
KR101047085B1 (en) Pretension soil nail structure with deformed bar, and construction method thereof
KR101243281B1 (en) Steel strand cable bolts and rock bolts for settlement body construction equipment
KR20150050012A (en) Retaining Wall and Construction Method thereof
KR102221759B1 (en) Ground and slope reinforcement anchor grouting device
KR100776620B1 (en) Bar Type Anchor
KR100690014B1 (en) Use steel material that have spiral plate struction
JP6296963B2 (en) Natural ground reinforcement method and structure
KR101257387B1 (en) The Rataining Wall
KR101471478B1 (en) multipurpose load dispersion style removal anchor
KR20110016223A (en) Upward type ground reinforcement equipment using a compressed and dispersed composite anchor with a drain and constructing method the same
KR100913320B1 (en) Multifunctional complex type anchor body
KR101018386B1 (en) Tension member removable earth anchor
KR101368055B1 (en) Anchor head device
KR200454729Y1 (en) Earth anchor anchor fixture

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151123

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161122

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20171227

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181205

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191212

Year of fee payment: 8