KR100966530B1 - Structure for linkage of expansion joint and construction method - Google Patents

Structure for linkage of expansion joint and construction method Download PDF

Info

Publication number
KR100966530B1
KR100966530B1 KR1020090049829A KR20090049829A KR100966530B1 KR 100966530 B1 KR100966530 B1 KR 100966530B1 KR 1020090049829 A KR1020090049829 A KR 1020090049829A KR 20090049829 A KR20090049829 A KR 20090049829A KR 100966530 B1 KR100966530 B1 KR 100966530B1
Authority
KR
South Korea
Prior art keywords
coupling
expansion joint
socket
joint device
concrete
Prior art date
Application number
KR1020090049829A
Other languages
Korean (ko)
Inventor
장성호
고완상
Original Assignee
(주)유니트엔지니어링
고완상
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)유니트엔지니어링, 고완상 filed Critical (주)유니트엔지니어링
Priority to KR1020090049829A priority Critical patent/KR100966530B1/en
Application granted granted Critical
Publication of KR100966530B1 publication Critical patent/KR100966530B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/065Joints having sliding plates
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: A structure for coupling an expansion joint and a construction method thereof are provided to enable a worker to conveniently and securely couple an expansion joint, and to improve compressive stress and shearing stress. CONSTITUTION: A structure for coupling an expansion joint comprises an expansion joint(10), a socket(20), and a reinforcement structure(30), and a clip(40). The expansion joint is arranged in a space(S) in which concrete(BC) is placed. A stud bolt(11) is formed in the expansion joint. The socket is buried in the side surface of the space. The reinforcement structure is coupled to the socket. The clip is composed of an upper joint and a lower joint. The upper joint is composed of a first coupling groove and a first joint. The first coupling groove is coupled to the stud bolt. The lower joint is composed of a second coupling groove and a second joint. The second joint is coupled to the reinforcement structure.

Description

신축이음장치의 결합 구조 및 시공방법{Structure for linkage of expansion joint and construction method}Structure for linkage of expansion joint and construction method

본 발명은 신축이음장치의 결합 구조에 관한 것으로, 더욱 상세하게는 간단한 구성에 의한 제작단가의 절감 및 작업자의 편의성을 도모함과 동시에 교량상판의 내구성 향상 및 작업공정을 간소화하면서 신축이음장치의 결합이 견고함은 물론 신축이음장치에 전달되는 압축/전단응력 및 균열방지효과가 우수해 지며, 소켓의 제1 바디의 재 사용으로 신축이음장치의 보수시 콘크리트 구조물의 파손에 따른 콘크리트 구조물의 내구성을 저하시키는 요인을 제거 가능하면서, 클립의 높이조절부에 의해 다양한 종류 및 크기로 이루어진 신축이음장치에 적용 가능한 신축이음장치의 결합 구조 및 시공방법에 관한 것이다.The present invention relates to a coupling structure of expansion joints, and more particularly, to reduce the manufacturing cost and convenience of the operator by a simple configuration, while improving the durability of the bridge deck and simplifying the work process, the coupling of expansion joints It is not only rigid but also excellent in compressive / shear stress and crack prevention effect delivered to expansion joints. Reuse of the first body of the socket reduces the durability of concrete structures due to breakage of concrete structures when repairing expansion joints. The present invention relates to a coupling structure and a construction method of an expansion joint device applicable to expansion joint devices made of various types and sizes by means of height adjustment of the clip.

일반적으로 교량 등에는 신축이음장치가 설치된다.In general, expansion joints are installed in bridges and the like.

도 1은 종래의 신축이음장치 결합 구조를 도시한 것으로, 교량상판을 구성하는 슬래브 콘크리트 타설시 교량과 교량연결부에 단턱부(C)를 형성시키기 위하여 상기 교량과 교량연결부 각각에 블록 아웃부를 형성시키게 된다.Figure 1 shows a conventional expansion joint coupling structure, to form a block out in each of the bridge and the bridge connection to form a step portion (C) in the bridge and bridge connection when placing slab concrete constituting the bridge deck do.

이러한 단턱부(C)에는 U자 형상의 철근(130)이 설치되며, 스터드 볼트(111)을 형성한 신축이음장치(110)가 배치되며, 상기 스터드 볼트(111)와 철근(130)의 위치를 조정하여 용접을 통해 결합하고, 상기 블록아웃부에 후타설 콘크리트(101)를 구성하게 된다.The stepped portion (C) is provided with a U-shaped reinforcement 130, the expansion joint device 110 is formed with a stud bolt 111 is disposed, the position of the stud bolt 111 and the reinforcement 130 Coupling is adjusted by welding, to form the post-casting concrete 101 in the block out portion.

상기와 같은 구조로 이루어진 종래의 신축이음장치 결합 구조(200)는 신축이음장치(110)와 교량 및 교량연결부와의 연결시 후타설콘크리트(101)가 타설되는 공간의 측면 및 하측면에 형성된 콘크리트의 일부를 걷어내고 철근(131)을 노출시킨 후 노출된 철근(131)과 신축이음장치(110)를 용접으로 결합하기 때문에, 교량 및 교량연결부의 내구성 저하 및 작업공정이 복잡하였으며, 신축이음장치(110)의 스터드 볼트(111)와 U자 형상의 철근(130)을 용접함에 있어, 위치를 잘 배치하여야만 용접을 할 수 있기 때문에, 시공시 번거로움이 발생하였으며, 특히, 유지보수시에는 블롯아웃부의 공간이 협소하여 용접을 함에 있어서 사용자의 불편함을 과중시키는 결과를 초래하였을 뿐만 아니라, 그에 따른 시공시간이 길어져 장시간 동안 차량통제를 하기 때문에, 교통체증을 일으키는 문제점이 있었다.Conventional expansion joint coupling structure 200 made of the above structure is the concrete formed on the side and the lower side of the space in which the post-installed concrete 101 is poured when the expansion joint 110 and the bridge and bridge connecting portion After removing a part of and exposing the reinforcing bars 131 and then joining the exposed reinforcing bars 131 and expansion joints 110 by welding, the durability and work process of the bridge and bridge connection was complicated, expansion joints In welding the stud bolt 111 of the (110) and the U-shaped reinforcement (130), because the welding can be done only if the position is well arranged, troublesome construction occurred, in particular, during maintenance As the space of the out part is narrow, it causes not only the inconvenience of the user in welding, but also the construction time is long and the vehicle is controlled for a long time. The cause was a problem.

또한, 교체작업을 위해 후타설 콘크리트(101)를 파쇄하여 신축이음장치(110)를 교체하려 할 때에는 신축이음장치(110)의 스터드 볼트(111)와 철근(130)이 용접으로 결합되어 있기 때문에, 이를 제거하는데 많은 시간이 소요될 뿐만 아니라, 배근된 철근(130)의 제거시 단턱부(C)를 파쇄함으로써 교량 자체의 내구성을 저하하는 요인으로 작용하였다.In addition, when replacing the expansion joint device 110 by crushing the post-pouring concrete 101 for the replacement operation, because the stud bolt 111 and the reinforcement 130 of the expansion joint device 110 is joined by welding In addition, it takes a long time to remove it, and acted as a factor of lowering the durability of the bridge itself by crushing the stepped portion (C) when removing the reinforcement reinforcement (130).

상기와 같은 문제점을 해결하기 위한 본 발명의 신축이음장치의 결합 구조 및 시공방법은 유간의 양 측면에 형성되어 있는 콘크리트 구조물과, 상기 콘크리트 구조물 상단에 형성된 후타설 콘크리트가 타설되는 공간부에 배치되는 스터드 볼트를 포함하는 신축이음장치와; 상기 콘크리트 구조물의 측면에 매립되어 형성된 소켓과; 상기 소켓에 결합하는 철근 구조물 및; 상기 신축이음장치의 스터드 볼트가 결합할 수 있는 제1 결합홈과 상기 제1 결합홈 일측의 제1 결합부를 포함하는 상부 결합부와, 상기 상부 결합부와 대향되게 배치되며, 철근 구조물과 결합할 수 있는 제2 결합홈과 상기 제2 결합홈 일측의 제2 결합부를 포함하는 하부 결합부로 구성된 클립;으로 이루어진 것을 특징으로 한다.Coupling structure and construction method of the expansion joint device of the present invention for solving the problems as described above is disposed in the space portion on which the concrete structure and the post-pouring concrete formed on the upper side of the concrete structure is placed Expansion joint including a stud bolt; A socket formed embedded in a side of the concrete structure; A reinforcing bar structure coupled to the socket; An upper coupling part including a first coupling groove to which the stud bolts of the expansion joint device can be coupled and a first coupling portion on one side of the first coupling groove, are disposed to face the upper coupling portion, and to be coupled to the reinforcing structure; And a clip formed of a lower coupling portion including a second coupling groove and a second coupling portion on one side of the second coupling groove.

본 발명의 신축이음장치의 결합 구조 및 시공방법의 소켓은 내측에 제1 삽입부를 형성한 금속재질의 제1 바디와 상기 제1 바디와 접착수단에 의해 결합하며, 내측으로 철근 구조물과 결합할 수 있는 제2 삽입부를 형성한 합성수지 재질의 제2 바디로 이루어진 것을 특징으로 한다.The socket of the coupling structure and construction method of the expansion joint device of the present invention is coupled to the first body and the first body and the bonding means made of a metal formed with the first insertion portion inside, and can be coupled to the reinforcing structure inward. Characterized in that the second body of the synthetic resin material formed a second insertion portion.

본 발명의 신축이음장치의 결합 구조 및 시공방법의 클립의 상, 하부 결합부 사이에는 높이조절부가 더 형성되어 있는 것을 특징으로 한다.The height adjusting portion is further formed between the upper and lower coupling portions of the clip of the coupling structure and construction method of the expansion joint device of the present invention.

본 발명의 신축이음장치의 결합 구조 및 시공방법에 형성된 클립의 높이조절부는 높이조절 볼트와 높이조절 너트로 구성되는 것을 특징으로 한다.The height adjusting portion of the clip formed in the coupling structure and construction method of the expansion joint device of the present invention is characterized by consisting of a height adjustment bolt and a height adjustment nut.

본 발명의 신축이음장치의 결합 구조 및 시공방법은 간단한 구조의 소켓과 철근 구조물, 클립을 이용하여 신축이음장치를 설치함으로써, 시공시 제작단가를 낮추면서 작업자의 편의성을 도모할 수 있으며, 신축이음장치를 견고하게 결합할 수 있을 뿐만 아니라, 철근 구조물과 클립이 후타설 콘크리트 타설시 프레임 역할을 수행하여 압축 응력 및 전단 응력이 우수해짐은 물론 균열방지효과를 얻을 수 있다.Coupling structure and construction method of expansion joint device of the present invention by installing the expansion joint using a simple structure of the socket and the reinforcement structure, the clip, it is possible to reduce the manufacturing cost during construction, and to facilitate the operator's convenience, expansion joint Not only can the device be firmly coupled, but the reinforcing structure and the clip can act as a frame for post-casting concrete, resulting in excellent compressive and shear stresses as well as crack prevention.

또한, 신축이음장치의 설치시 공간부의 바닥면 및 측면의 콘크리트 구조물을 더 걷어내어 공간부의 측면 및 바닥면의 철근을 노출시키는 작업을 하지 않아도 되기 때문에, 콘크리트 구조물의 내구성 향상 및 작업공정의 단순화를 이룰 수 있다.In addition, when the expansion joint is installed, it is not necessary to further remove the bottom and side concrete structures of the space part to expose the reinforcing bars of the side and bottom parts of the space part, thereby improving durability of the concrete structure and simplifying the work process. Can be achieved.

그리고 분리 가능한 형태의 제1, 2 바디를 구성하여, 신축이음장치의 교체시 제2 바디만을 교체하여 사용하기 때문에 재사용이 가능하다.In addition, by configuring the first body and the second body of the detachable form, it is possible to reuse because only the second body is used to replace the expansion joint device.

아울러, 클립의 높이조절부에 의해 다양한 종류 및 크기로 구성된 신축이음장치에 적용하여 신축이음장치의 스터드 볼트와 철근 구조물을 연결할 수 있는 유용한 발명이다.In addition, it is a useful invention that can be connected to the stud bolt and the reinforcing structure of the expansion joint by applying to the expansion joint consisting of various types and sizes by the height adjustment portion of the clip.

이하, 첨부된 도면을 이용하여 본 발명의 구성을 더욱 상세히 살펴보면 다음과 같다.Hereinafter, the configuration of the present invention with reference to the accompanying drawings in more detail.

우선, 도 2에서와 같이 콘크리트 구조물(C)과 상기 콘크리트 구조물(C) 상단에 후타설 콘크리트(BC)가 타설될 수 있는 공간부(S)에 스터드 볼트(11)를 형성한 신축이음장치(10)가 구성된다.First, as shown in FIG. 2, the expansion joint apparatus in which the stud bolts 11 are formed in the concrete structure C and the space S in which the post-casting concrete BC may be poured on top of the concrete structure C ( 10) is configured.

상기 신축이음장치(10)는 설치되는 위치에 따라 다양한 형상, 크기로 이루어지는 것은 당연하다.The expansion joint device 10 is naturally made of various shapes, sizes depending on the installation position.

그리고 소켓(20)은 상기 콘크리트 구조물(C)에 형성되어 있는 공간부(S)의 측면에 매립되어 형성된다.And the socket 20 is embedded is formed in the side of the space portion (S) formed in the concrete structure (C).

도 3에서 도시된 바와 같이 상기 소켓(20)은 콘크리트 구조물(C) 내측에 매립되며 내측으로 제1 삽입부(21a)를 형성한 금속재질의 제1 바디(21)와, 콘크리트 구조물(C)의 측벽 단부에 배치되되 상기 제1 바디(21)와 접착수단에 의해 결합되며, 내측으로는 철근 구조물(30)을 결합할 수 있는 제2 삽입부(22a)를 형성한 합성수지 재질의 제2 바디(22)로 이루어져 있다.As shown in FIG. 3, the socket 20 is embedded in the concrete structure C and the first body 21 made of a metal material having the first inserting portion 21a therein, and the concrete structure C. A second body of synthetic resin material disposed at an end of the side wall of the second body 21 and coupled to the first body 21 by an adhesive means, and having a second inserting portion 22a formed therein for coupling the reinforcing structure 30 to the inside thereof. It consists of (22).

여기서, 상기 소켓(20)의 접착수단은 통상적으로 이용하는 접착제, 양면 테이프 등을 이용할 수 있으며, 상기 소켓(20)의 제1, 2 바디(21, 22)에 형성된 제1, 2 삽입부(21a, 22a)에 결합할 수 있는 철근 구조물(30)은 통상의 끼워 맞춤 공차에의해 결합이 이루어지도록 형성함이 바람직하다.Here, the adhesive means of the socket 20 may be a commonly used adhesive, double-sided tape, etc., the first and second insertion portion 21a formed in the first and second bodies 21 and 22 of the socket 20. Rebar structure 30 that can be coupled to, 22a) is preferably formed so that the coupling is made by a conventional fitting tolerance.

한편, 클립(40)은 상, 하부 결합부(41, 42)로 구성되는데, On the other hand, the clip 40 is composed of upper, lower coupling parts 41, 42,

도 4에서와 같이 상부 결합부(41)는 신축이음장치(10)의 스터드 볼트(11)가 결합하는 제1 결합홈(41a)과 상기 제1 결합홈(41a)을 통상의 볼트(도면에 미도시)를 이용하여 분리 및 결합할 수 있는 제1 결합부(41b)로 이루어져 있으며, As shown in FIG. 4, the upper coupling portion 41 includes a first coupling groove 41a and a first coupling groove 41a to which the stud bolts 11 of the expansion joint 10 are coupled. It consists of a first coupling portion 41b that can be separated and combined using (not shown),

하부 결합부(42)는 상기 상부 결합부(42)와 대향된 구조로 이루어지되, 철근 구조물(30)과 결합하는 제2 결합홈(42a)과 제2 결합홈(42a)을 통상의 볼트(도면에 미도시)를 이용하여 분리 및 결합할 수 있는 제2 결합부(42b)로 구성되어 있다.
즉, 도면에서와 같이 상부 결합부(41)의 양 측면을 가압하여, 양 측면에 형성되어 있는 제1 결합부(41b)가 내측 방향으로 이동해 각각의 제1 결합부(41b)가 겹쳐지도록 함으로써, 분리 및 결합이 가능하게 되는 것이며, 이러한 작용관계는 하부 결합부(42)에서도 적용됨은 당연한 것이다.
The lower coupling portion 42 has a structure opposite to the upper coupling portion 42, and the second coupling groove 42a and the second coupling groove 42a which are coupled to the reinforcing structure 30 are usually bolts ( It is composed of a second coupling portion (42b) that can be separated and combined using (not shown in the figure).
That is, by pressing both sides of the upper coupling portion 41 as shown in the drawing, the first coupling portion 41b formed on both sides is moved inward direction so that each of the first coupling portion 41b overlaps , Separation and coupling will be possible, and this working relationship is naturally applied to the lower coupling portion (42).

여기서, 상기 상, 하부 결합부(41, 42) 사이에는 다양한 종류 및 크기로 이루어진 신축이음장치(10)에 적용 가능하도록 높이조절 볼트(43a)와 높이조절 너트(43b)로 구성된 높이조절부(43)를 더 형성할 수 있다.Here, between the upper and lower coupling parts 41 and 42, the height adjusting part composed of a height adjusting bolt 43a and a height adjusting nut 43b to be applicable to the expansion and contraction device 10 made of various types and sizes ( 43) may be further formed.

아울러, 상기 클립(40)은 신축이음장치(10)의 스터드 볼트(11)와 철근 구조 물(30)과의 결합시 1개소 또는 그 이상의 개수로 형성할 수 있음은 당연한 것이다.In addition, it is obvious that the clip 40 may be formed in one or more numbers when the stud bolt 11 and the reinforcing structure 30 of the expansion joint 10 are coupled to each other.

상기와 같은 구성으로 이루어진 본 발명의 신축이음장치의 결합 구조의 바람직한 실시 예를 살펴보면 다음과 같다.Looking at a preferred embodiment of the coupling structure of the expansion joint device of the present invention made of a configuration as described above are as follows.

우선, 콘크리트 구조물(C)의 공간부(S) 측벽의 소정의 높이에 소켓(20)을 형성(S10)하고, 상기 소켓(20)에 철근 구조물(30)을 결합(S20)한다.First, the socket 20 is formed at a predetermined height of the side wall of the space S of the concrete structure C (S10), and the reinforcing structure 30 is coupled to the socket 20 (S20).

여기서, 상기 철근 구조물(30)은 소켓(20)을 구성하는 금속재질의 제1 바디(21)의 제1 삽입부(21a)와 합성수지 재질의 제2 바디(22)의 제2 삽입부(22a)에 결합하도록 한다.Here, the reinforcing structure 30 is the first insertion portion 21a of the first body 21 of the metal constituting the socket 20 and the second insertion portion 22a of the second body 22 of the synthetic resin material. )).

그런 후, 콘크리트 구조물(C)의 공간부(S)에 신축이음장치(10)를 배치하고, 상기 신축이음장치(10)에 형성되어 있는 스터드 볼트(11)와 철근 구조물(30)을 연결할 수 있는 클립(40)을 설치한다.(S30)Then, the expansion joint device 10 is disposed in the space portion S of the concrete structure C, and the stud bolt 11 formed in the expansion joint device 10 and the reinforcing structure 30 can be connected. Install the clip 40. (S30)

상기 클립(40)은 상부 결합부(41)의 제1 결합부(41b)를 이용하여 제1 결합홈(41a)을 분리하고 신축이음장치(10)의 스터드 볼트(11)에 제1 결합홈(41a)을 결합한 후, 제1 결합부(41b)를 이용하여 제1 결합홈(41a)를 결합하여 상부 결합부(41)와 신축이음장치(10)에 형성된 스터드 볼트(11)와의 결합을 완료하고, 하부 결합부(42)도 상기 상부 결합부(41)와 마찬가지로 제2 결합부(42b)를 이용해 제2 결합홈(42a)을 분리하고 철근 구조물(30)에 제2 결합홈(42a)을 결합한 후, 제2 결합부(42b)를 이용해 하부 결합부(42)와 철근 구조물(30)의 결합을 완료한다.The clip 40 separates the first coupling groove 41a by using the first coupling portion 41b of the upper coupling portion 41, and the first coupling groove on the stud bolt 11 of the expansion joint 10. After the coupling 41a, the first coupling groove 41a is coupled using the first coupling portion 41b to bond the upper coupling portion 41 with the stud bolt 11 formed on the expansion joint 10. After completion, the lower coupling portion 42 also separates the second coupling groove 42a using the second coupling portion 42b similarly to the upper coupling portion 41, and the second coupling groove 42a in the reinforcing structure 30. ) Is combined, the coupling of the lower coupling portion 42 and the reinforcing structure 30 is completed by using the second coupling portion 42b.

이때, 상기 신축이음장치(10)는 다양한 형태의 것을 이용할 수 있기 때문에 크기 및 종류에 따라 스터드 볼트(11)와 철근 구조물(30) 사이의 거리가 달라질 수 있다.At this time, since the expansion joint 10 may use a variety of forms, the distance between the stud bolt 11 and the reinforcing structure 30 may vary depending on the size and type.

이에 본 발명에서는 클립(40)의 상, 하부 결합부(41, 42) 사이에 높이조절 볼트(43a)와 높이조절 너트(43b)로 이루어진 높이조절부(43)를 이용하여 상, 하부 결합부(41, 42)의 높이를 조절함으로써, 다양한 신축이음장치(10)에 적용이 가능하게 된다.In the present invention, the upper and lower engaging portions using the height adjusting portion 43 made of a height adjusting bolt 43a and a height adjusting nut 43b between the upper and lower engaging portions 41 and 42 of the clip 40. By adjusting the heights of the 41 and 42, it is possible to apply to various expansion joints 10.

또한, 상기 클립(40)은 신축이음장치(10)의 스터드 볼트(11)와 철근 구조물(30)과의 결합시 결합력을 높이기 위해 다수를 연결할 수도 있다.In addition, the clip 40 may be connected to a plurality in order to increase the coupling force when coupling the stud bolt 11 and the reinforcing structure 30 of the expansion joint device 10.

그런 후, 콘크리트 구조물(C)의 공간부(S)에 후타설 콘크리트(BC)를 타설함으로써 신축이음장치(10)의 설치가 완료된다.Then, the installation of the expansion joint device 10 is completed by pouring the post-pouring concrete (BC) in the space (S) of the concrete structure (C).

일반적으로, 신축이음장치(10)의 경우 차량 소통이 많은 교량 등에 설치되는 바, 압축력에 의한 균열이 발생하는 경우가 잦아지게 되며, 특히, 후타설 콘크리트(BC)의 경우, 콘크리트 구조물(C)이 형성된 이후에 타설되기 때문에 균열이 발생할 수 있는 현상이 더욱 잦아지게 된다.In general, in the case of the expansion joint device 10 is installed in a bridge with a lot of vehicle communication, cracks are often generated due to the compressive force, in particular, in the case of post-casting concrete (BC), concrete structure (C) Since it is poured after it is formed, the phenomenon that a crack may occur becomes more frequent.

하지만, 본 발명에서와 같이 후타설 콘크리트(BC)가 타설되는 공간부(S)에 신축이음장치(10)와 콘크리트 구조물(C)이 일체화될 수 있도록 철근 구조물(30) 및 신축이음장치(10)의 스터드 볼트(11)를 연결하는 구조로 형성하게 되면, 견고한 결합력 및 압축 응력, 전단 응력이 우수해 지게 되며, 특히, 상기 철근 구조물(30)과 클립(40) 및 신축이음장치(10)의 스터드 볼트(11)가 후타설 콘크리트(BC) 내에서 프레임(뼈대)와 같은 역할을 수행하여 후타설 콘크리트(BC)의 균열을 방지할 수 있게 되는 것이다.
또한, 소켓(20)을 통해 콘크리트 구조물(C)과 신축이음장치(10)를 연결할 수 있도록 하여, 종래와 같이 공간부(S)의 측면 및 바닥면을 파내어 철근을 노출시키는 작업을 하지 않아도 되기 때문에 콘크리트 구조물(C)의 내구성 및 작업공정을 단순화할 수 있다.
However, the reinforcing structure 30 and the expansion joint device 10 so that the expansion joint 10 and the concrete structure C may be integrated in the space S in which the post-pouring concrete BC is poured, as in the present invention. When the stud bolt 11 is formed in a structure connecting the stud bolt 11, the firm coupling force, the compressive stress, and the shear stress are excellent. In particular, the reinforcing structure 30, the clip 40, and the expansion joint device 10 are provided. The stud bolt 11 is to act as a frame (frame) in the post-casting concrete (BC) is to prevent the cracking of the post-casting concrete (BC).
In addition, by allowing the concrete structure (C) and the expansion joint device 10 to be connected through the socket 20, it is not necessary to dig the side and bottom surface of the space (S) as in the prior art to expose the reinforcing bars Therefore, the durability and work process of the concrete structure (C) can be simplified.

아울러, 신축이음장치(10)는 통상 3-4년 정도면 수명이 다하여 교체작업을 하여야 하는데, 이때, 본 발명에서는 철근 구조물(30)을 결합하는 소켓(20)의 제2 바디(22)가 분리 가능하기 때문에, 후타설 콘크리트(BC)를 제거한 상태에서 철근 구조물(30)의 제거시 철근 구조물(30)을 절단한 후, 콘크리트 구조물(C)에 매립된 소켓(20)의 제1 바디(21)는 그대로 사용하면서 제2 바디(22)만 교체하여 사용할 수 있기 때문에, 제1 바디(21)의 제거하기 위해 콘크리트 구조물(C)의 공간부(S) 측면의 콘크리트 구조물(C)을 파괴하지 않아도 되어 콘크리트 구조물(C)의 내구성을 유지할 수 있게 되는 것이다.In addition, the expansion joint 10 is usually about 3-4 years or so should be replaced by the replacement work, in this case, in the present invention, the second body 22 of the socket 20 for coupling the reinforcing structure 30 is Since it is separable, the first body of the socket 20 embedded in the concrete structure (C) after cutting the reinforcing structure (30) at the time of removal of the reinforced structure (30) in the state of removing the post-installed concrete (BC) ( 21 can be used as it is, only the second body 22 can be replaced, so that the concrete structure C on the side of the space S of the concrete structure C is removed to remove the first body 21. Do not have to be able to maintain the durability of the concrete structure (C).

상술한 실시 예는 본 발명의 가장 바람직한 실시 예를 기재한 것이지만, 본 발명은 이에 한정되지 않고 본 발명의 기술적 사상에서 벗어나지 않는 범위 내에서 다양한 형태로 실시 가능함을 명시한다.Although the above-described embodiment has described the most preferred embodiment of the present invention, it is noted that the present invention is not limited thereto and may be implemented in various forms without departing from the technical spirit of the present invention.

도 1은 종래의 신축이음장치의 설치상태를 도시한 상태도.1 is a state diagram showing an installation state of a conventional expansion joint device.

도 2는 본 발명에 따른 신축이음장치의 결합 구조를 도시한 정면도.Figure 2 is a front view showing a coupling structure of the expansion joint according to the present invention.

도 3은 본 발명에 따른 소켓을 도시한 상태도.Figure 3 is a state diagram showing a socket according to the present invention.

도 4는 본 발명에 따른 클립을 도시한 상태도.4 is a state diagram showing a clip according to the present invention.

◈도면 주요 부분에 대한 부호의 설명◈◈Description of code for main parts of drawing

C : 콘크리트 구조물 S : 공간부C: concrete structure S: space part

10 : 신축이음장치 11 : 스터드 볼트10: expansion joint 11: stud bolt

20 : 소켓 21 : 제1 바디20: socket 21: first body

21a : 제1 삽입부 22 : 제2 바디21a: first insertion portion 22: second body

22a : 제1 볼트부 22a : 제2 삽입부22a: 1st bolt part 22a: 2nd insertion part

30 : 철근 구조물 40 : 클립30: reinforced structure 40: clip

41 : 상부 결합부 41a : 제1 결합홈41: upper coupling portion 41a: first coupling groove

41b : 제1 결합부 42 : 하부 결합부41b: first coupling portion 42: lower coupling portion

42a : 제2 결합홈 42b : 제2 결합부42a: second coupling groove 42b: second coupling portion

43 : 높이조절부 43a : 높이조절 볼트43: height adjustment portion 43a: height adjustment bolt

43b : 높이조절 너트 50 : 신축이음장치의 결합 구조43b: height adjustment nut 50: coupling structure of expansion joint

Claims (5)

유간(d)의 양 측면에 형성되어 있는 콘크리트 구조물(C)과, Concrete structures (C) formed on both sides of the oil gap (d), 상기 콘크리트 구조물(C) 상단에 형성된 후타설 콘크리트(BC)가 타설되는 공간부(S)에 배치되는 스터드 볼트(11)를 포함하는 신축이음장치(10)와;An expansion joint device 10 including a stud bolt 11 disposed in the space S in which the post-pouring concrete BC formed on the concrete structure C is poured; 상기 콘크리트 구조물(C)에 형성된 공간부(S)의 측면에 매립되어 형성된 소켓(20)과;A socket 20 formed in a side of the space S formed in the concrete structure C; 상기 소켓(20)에 결합하는 철근 구조물(30) 및;A reinforcing bar structure 30 coupled to the socket 20; 상기 신축이음장치(10)의 스터드 볼트(11)가 결합할 수 있는 제1 결합홈(41a)과 상기 제1 결합홈(41a) 일측의 제1 결합부(41b)를 포함하는 상부 결합부(41)와, 상기 상부 결합부(41)와 대향되게 배치되며, 철근 구조물(30)과 결합할 수 있는 제2 결합홈(42a)과 상기 제2 결합홈(42a) 일측의 제2 결합부(42b)를 포함하는 하부 결합부(42)로 구성된 클립(40);으로 이루어진 것에 특징이 있는 신축이음장치의 결합 구조.An upper coupling part including a first coupling groove 41a to which the stud bolt 11 of the expansion joint device 10 can be coupled and a first coupling portion 41b on one side of the first coupling groove 41a ( 41, a second coupling groove 42a disposed to face the upper coupling portion 41 and capable of coupling with the reinforcing structure 30, and a second coupling portion at one side of the second coupling groove 42a ( The coupling structure of the expansion joint device characterized in that consisting of; clip (40) consisting of a lower coupling portion 42, including 42b). 제 1항에 있어서, 상기 소켓(20)은 내측에 철근 구조물(30)과 결합할 수 있도록 제1 삽입부(21a)를 형성한 금속재질의 제1 바디(21)와 상기 제1 바디(21)와 접착수단에 의해 결합하며, 내측으로는 철근 구조물(30)과 결합할 수 있는 제2 삽입부(22a)를 형성한 합성수지 재질의 제2 바디(22)로 이루어진 것에 특징이 있는 신축이음장치의 결합 구조.According to claim 1, The socket 20 is a metal body and the first body 21 and the first body 21 formed with a first inserting portion (21a) to be coupled to the reinforcing structure 30 therein And a bonding means, and the inside of the expansion joint device characterized in that the second body 22 made of a synthetic resin material formed with a second inserting portion (22a) that can be combined with the reinforcing structure 30 Combined structure. 제 1항에 있어서, 상기 클립(40)의 상, 하부 결합부(41, 42) 사이에는 높이조절부(43)가 더 형성되어 있는 것에 특징이 있는 신축이음장치의 결합 구조.The coupling structure of the expansion joint according to claim 1, wherein a height adjusting portion (43) is further formed between the upper and lower coupling portions (41, 42) of the clip (40). 제 3항에 있어서, 상기 클립(40)의 높이조절부(43)는 높이조절 볼트(43a)와 높이조절 너트(43b)로 구성되는 것에 특징이 있는 신축이음장치의 결합 구조.The coupling structure of the expansion joint according to claim 3, wherein the height adjusting part (43) of the clip (40) is composed of a height adjusting bolt (43a) and a height adjusting nut (43b). 유간(d)의 양 측면에 형성되어 있는 콘크리트 구조물(C)과, 상기 콘크리트 구조물(C) 상단에 형성된 후타설 콘크리트(BC)가 타설되는 공간부(S)에 배치되는 스터드 볼트(11)를 포함하는 신축이음장치(10)와; 상기 콘크리트 구조물(C)에 형성된 공간부(S)의 측면에 매립되어 형성된 소켓(20)과; 상기 소켓(20)에 결합하는 철근 구조물(30) 및; 상기 신축이음장치(10)의 스터드 볼트(11)가 결합할 수 있는 제1 결합홈(41a)과 상기 제1 결합홈(41a) 일측의 제1 결합부(41b)를 포함하는 상부 결합부(41)와, 상기 상부 결합부(41)와 대향되게 배치되며, 철근 구조물(30)과 결합할 수 있는 제2 결합홈(42a)과 상기 제2 결합홈(42a) 일측의 제2 결합부(42b)를 포함하는 하부 결합부(42)로 구성된 클립(40);으로 이루어진 신축이음장치의 결합 구조의 시공방법에 있어서,The stud bolt 11 is disposed in the concrete structure (C) formed on both sides of the oil gap (d) and the space (S) in which the post-pouring concrete (BC) formed on the top of the concrete structure (C) is poured. Expansion joint device 10 including; A socket 20 formed in a side of the space S formed in the concrete structure C; A reinforcing bar structure 30 coupled to the socket 20; An upper coupling part including a first coupling groove 41a to which the stud bolt 11 of the expansion joint device 10 can be coupled and a first coupling portion 41b on one side of the first coupling groove 41a ( 41, a second coupling groove 42a disposed to face the upper coupling portion 41 and capable of coupling with the reinforcing structure 30, and a second coupling portion at one side of the second coupling groove 42a ( In the construction method of the coupling structure of the expansion joint device consisting of; Clip 40 consisting of a lower coupling portion 42 including 42b), 콘크리트 구조물(C)의 공간부(S) 측벽에 소켓(20)을 형성하는 소켓형성단계(S10);A socket forming step (S10) of forming a socket 20 on a side wall of the space S of the concrete structure C; 상기 소켓(20)에 철근 구조물(30)을 결합하는 철근 구조물 결합단계(S30);Reinforcing structure coupling step (S30) for coupling the reinforcing structure 30 to the socket 20; 콘크리트 구조물(C)의 공간부(S)에 신축이음장치(10)를 배치하고, 신축이음장치(10)의 스터드 볼트(11)와 철근 구조물(30)을 클립(40)을 이용하여 결합하는 연결단계(S30);로 이루어진 것에 특징이 있는 신축이음장치의 결합 구조를 이용한 시공방법.The expansion joint device 10 is disposed in the space S of the concrete structure C, and the stud bolt 11 and the reinforcing structure 30 of the expansion joint device 10 are coupled using the clip 40. Connection step (S30); Construction method using a coupling structure of the expansion joint device characterized in that consisting of.
KR1020090049829A 2009-06-05 2009-06-05 Structure for linkage of expansion joint and construction method KR100966530B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090049829A KR100966530B1 (en) 2009-06-05 2009-06-05 Structure for linkage of expansion joint and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090049829A KR100966530B1 (en) 2009-06-05 2009-06-05 Structure for linkage of expansion joint and construction method

Publications (1)

Publication Number Publication Date
KR100966530B1 true KR100966530B1 (en) 2010-06-29

Family

ID=42370517

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090049829A KR100966530B1 (en) 2009-06-05 2009-06-05 Structure for linkage of expansion joint and construction method

Country Status (1)

Country Link
KR (1) KR100966530B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192743A (en) * 2016-07-20 2016-12-07 成都鹏程路桥机械有限公司 A kind of bridge extension joint capable of rapid positioning
CN109356024A (en) * 2018-11-26 2019-02-19 重庆工程职业技术学院 A kind of telescopic device of highway bridge
KR20200019034A (en) * 2018-08-13 2020-02-21 구동길 A Expansion Joint Apparatus for Bridge Structure with a Adjusting Height and Presetting
KR102082965B1 (en) * 2018-12-27 2020-03-02 한국건설기술연구원 Continuous equipment for expansion joint of bridge, and bridge construction method using the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003213611A (en) 2002-01-28 2003-07-30 Motonosuke Arai Structure for road bridge joint part, construction method for expansion joint to road bridge joint part and repairing method for road bridge joint part
KR100734807B1 (en) 2006-05-30 2007-07-06 홍석희 The structure that separated and integrated mutual between expansion joint, prestressed non-shrinkage concrete and bridge deck slab, the construction method of this

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003213611A (en) 2002-01-28 2003-07-30 Motonosuke Arai Structure for road bridge joint part, construction method for expansion joint to road bridge joint part and repairing method for road bridge joint part
KR100734807B1 (en) 2006-05-30 2007-07-06 홍석희 The structure that separated and integrated mutual between expansion joint, prestressed non-shrinkage concrete and bridge deck slab, the construction method of this

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192743A (en) * 2016-07-20 2016-12-07 成都鹏程路桥机械有限公司 A kind of bridge extension joint capable of rapid positioning
KR20200019034A (en) * 2018-08-13 2020-02-21 구동길 A Expansion Joint Apparatus for Bridge Structure with a Adjusting Height and Presetting
KR102123412B1 (en) * 2018-08-13 2020-06-26 구동길 A Expansion Joint Apparatus for Bridge Structure with a Adjusting Height and Presetting
CN109356024A (en) * 2018-11-26 2019-02-19 重庆工程职业技术学院 A kind of telescopic device of highway bridge
KR102082965B1 (en) * 2018-12-27 2020-03-02 한국건설기술연구원 Continuous equipment for expansion joint of bridge, and bridge construction method using the same

Similar Documents

Publication Publication Date Title
TWI634255B (en) Method for forming a plurality of beams connected in series
JP6370729B2 (en) Road bridge protective fence installation method
KR20060093092A (en) The use of the bearing installation is involved the precast block and it for construction method of the bearing installation and the replacing methodof bearing installation
KR102008773B1 (en) Elastic form precast joint member and quick construction method of bridge expansion joint using of the same
KR100966530B1 (en) Structure for linkage of expansion joint and construction method
KR100770006B1 (en) Vertical connection steel-bar reinforcing structure of precast concreate column
KR101817968B1 (en) Repair reinforcement method of bridge with a expansion joint
KR100689658B1 (en) Concrete closing device
JP6074378B2 (en) Expansion device replacement method and temporary lining plate structure
KR101308053B1 (en) Precast Concrete Column Connecting Structure Using The Low Bending Moment Zone
KR102193641B1 (en) Thin precast pavement structure, construction method of thin precast pavement, and manufacturing method of thin precast pavement
KR100609184B1 (en) Joint Structure of Precast Concrete Beam and Column Unit
JP4625763B2 (en) Composite structure of main girder and precast slab
KR20170035386A (en) Precast concrete slabs using joint block
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR100653283B1 (en) Method for connecting reinforced concrete structures
CN112144859A (en) Prefabricated laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
KR100622935B1 (en) Horizontal extension joint structuer and joint method using thereof
KR100710583B1 (en) Hybrid system of pc column and steel beam
KR101488503B1 (en) Manufacturing methods of concrete block having embedded steel piece for connecting blocks
CN214144646U (en) Laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
JP6969909B2 (en) How to reinforce steel synthetic girders
KR20070001411A (en) Bridge deck with stay-in-place precast concrete panel and its construction method
US20070068105A1 (en) Concrete form
JP6995584B2 (en) Bearing replacement method for existing concrete girders

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130604

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140602

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150603

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160608

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170621

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180509

Year of fee payment: 9