KR100901886B1 - Block fixing foundation for assembly block deveris barrier - Google Patents

Block fixing foundation for assembly block deveris barrier Download PDF

Info

Publication number
KR100901886B1
KR100901886B1 KR1020090016093A KR20090016093A KR100901886B1 KR 100901886 B1 KR100901886 B1 KR 100901886B1 KR 1020090016093 A KR1020090016093 A KR 1020090016093A KR 20090016093 A KR20090016093 A KR 20090016093A KR 100901886 B1 KR100901886 B1 KR 100901886B1
Authority
KR
South Korea
Prior art keywords
block
side wall
pile
bottom plate
prefabricated block
Prior art date
Application number
KR1020090016093A
Other languages
Korean (ko)
Inventor
허경태
Original Assignee
대한민국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대한민국 filed Critical 대한민국
Priority to KR1020090016093A priority Critical patent/KR100901886B1/en
Application granted granted Critical
Publication of KR100901886B1 publication Critical patent/KR100901886B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/40Foundations for dams across valleys or for dam constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

A block anchoring foundation of a prefabricated block check dam is provided to prevent erosion of the prefabricated block and to improve durability of the prefabricated block check clam. A block anchoring foundation(A) of a prefabricated block check dam comprises as follows. Side wall portions(2,2') are combined in the longitudinal direction both end part of the bottom part [bottom portion](1) and it is comprised. Unit bottom plates are brought into contact on the top of the horizontal base and the bottom part is comprised. The side wall part the web portion and flange are integrated. A plurality of bottom pile holes are formed in the unit bottom plate between the web portion of the web portion of one side and the other side. The pile body of the fixing pile(3) is penetrated into the floor file hole toward the lower part and the lower part is installed. The head unit protrudes from the top of the unit bottom plate. The lower part of the prefabricated block is fixedly inserted.

Description

조립식블록 사방댐의 블록 고정 기초{Block fixing foundation for assembly block deveris barrier}Block fixing foundation for assembly block deveris barrier

본 발명은 조립식블록 사방댐의 하부에 설치되어 조립식블록을 암반 또는 지반에 고정시키기는 조립식블록 사방댐의 블록 고정 기초에 관한 것으로서, 보다 상세하게는 수평베이스 위에 기초보강 및 면고르기 기능을 하는 단위바닥판이 서로 맞대어 놓여진 바닥부의 길이방향 양단부에 L자형태의 측벽부가 결합되고, 단위바닥판의 바닥파일홀에 고정파일이 관통 설치되어 고정되어지는 블록 고정 기초에 관한 것이다.The present invention relates to a block fixing foundation of the prefabricated block four-sided dam installed in the lower portion of the prefabricated block four-side dam to fix the prefabricated block to the rock or ground, more specifically, the unit bottom plate having a function of foundation reinforcement and leveling on the horizontal base An L-shaped side wall portion is coupled to both longitudinal ends of the bottom portion which are opposed to each other, and a block fixing foundation in which a fixing pile is installed and fixed through a bottom pile hole of a unit bottom plate.

일반적으로 하천이나 계곡에는 흙이나 모래가 하류로 흘러내리지 못하도록 하거나 산사태 및 홍수로 인한 하류의 피해를 방지하기 위한 방안으로 사방댐이 설치되어 있다. Generally, rivers and valleys are equipped with four-sided dams to prevent soil and sand from flowing downstream or to prevent downstream damage caused by landslides and floods.

상기 사방댐은 대부분 철근콘크리트 또는 무근콘크리트로 시공되는데, 시공과정이 복잡하고 시공기간이 길며 예산이 많이 소용되는 등의 문제점이 있고, 계곡사태를 방지하기 위해서는 5부능선 이상의 상류 계곡에 작은 규모의 사방댐을 다수개 설치하여 작은 돌의 낙석부터 방지하여야 하나 계곡 상류에 필요한 자원 및 장 비들을 운반하기 위해서는 별도의 길을 내야 하거나 길이 없는 곳에 케이블이나 헬기로 자재를 운반할 경우에는 콘크리트와 콘크리트 양생에 필요한 물을 대량으로 운반하기 어려워 산 중턱 이상에는 사방댐을 설치하기 어려운 등의 많은 문제점이 있었다. The four-sided dam is mostly constructed of reinforced concrete or bare concrete, the construction process is complicated, the construction period is long, and the budget is a lot of use, etc., in order to prevent the valley situation, small-sided four-sided dam in the upstream valley of more than five ridges It is necessary to install a large number of them to prevent small rocks from falling down, but to carry resources and equipment necessary upstream of the valley, it is necessary to make a separate road or to carry concrete and concrete curing when transporting materials by cable or helicopter where there is no way. There are many problems, such as difficult to install a large amount of water, it is difficult to install a four-sided dam above the mountainside.

또한, 콘크리트 사방댐을 설치하기 위하여 농경지로 길을 내야 하는 경우에는 토지 소유자가 많은 지단세를 요구하여 설치비용이 증가하고, 수해복구용 사방댐의 경우 동절기에 짧은 시간 동안 많은 양의 콘크리트를 양생할 수 없기 때문에 부득이 공사예산을 다음 해로 이월해야 하는 등의 문제점이 있었다.In addition, when the road to farmland is required to install concrete dams, land owners require a lot of land tax to increase installation costs. In case of flood dams, dams can cure a large amount of concrete for a short time in winter. There was a problem such that the construction budget must be carried forward to the next year.

이러한 문제점을 해결하기 위하여 복잡한 콘크리트 구조물 설치 및 양생과정을 거치지 않고 조립식블록을 이용하여 단기간에 시공이 가능한 조립식블록 사방댐이 개발되었다. In order to solve this problem, a prefabricated block four-sided dam that can be constructed in a short period of time using a prefabricated block without complex concrete structure installation and curing process has been developed.

그러나, 일반적인 사방댐은 철근 콘크리트로 기초공사를 한 후 댐어깨를 설치하고 토석차단부를 구성하는 등의 복잡한 과정을 거쳐 기초 지반을 다지게 되는데, 조립식블록 사방댐의 경우 그 특성상 설치되는 위치가 협소하고, 자재의 운반이나 물의 운반이 어려우므로 콘크리트를 적게 사용하면서도 침식이나 블록의 유실을 방지하기 위한 별도의 고정 기초를 필요로 하게 된다. However, general four-sided dams are made of reinforced concrete, and then grounded through complex processes, such as installing dam shoulders and constructing soil cutouts. Because it is difficult to transport or transport water, it requires a separate fixing foundation to prevent erosion or loss of blocks while using less concrete.

따라서 상기한 문제점을 해소하기 위한 본 발명의 목적은 조립식블록 사방댐의 하부에 수평유지를 위한 바닥부와 블록유실방지를 위한 측벽부가 결합된 블록 고정 기초를 설치함으로써 자재의 운반이나 물의 운반이 어려운 계곡 상류에 콘크리트를 적게 사용하면서도 단기간에 기초 지반을 다질 수 있도록 하고, 조립식블록을 암반 또는 지반에 고정시킴으로써 조립식블록의 유실(流失)이나 침식을 방지하여 조립식블록 사방댐의 내구성을 높이는 것이다.Accordingly, an object of the present invention for solving the above problems is to install a block fixing base combined with a bottom portion for horizontal maintenance and a side wall portion for preventing block loss at the bottom of the prefabricated block four-way dam valley difficult to transport the material or water It is to increase the durability of the prefabricated block four-side dam by preventing the loss or erosion of the prefabricated block by fixing the prefabricated block to the rock or the ground in a short time while using less concrete upstream.

상기한 목적을 달성하기 위한 본 발명에 따른 조립식블록 사방댐의 블록 고정 기초는,Block fixing base of the prefabricated block four-sided dam in accordance with the present invention for achieving the above object,

조립식블록 사방댐의 하부에 설치되어 조립식블록을 암반 또는 지반에 고정시키기 위한 조립식블록 사방댐의 블록 고정 기초(A)에 있어서,In the block fixing foundation (A) of the prefabricated block four-side dam installed in the lower portion of the prefabricated block four-side dam to fix the prefabricated block to the rock or ground,

상기 블록 고정 기초(A)는 바닥부(1)의 길이방향 양단부에 측벽부(2)(2')가 결합되어 구성되어지되, 상기 바닥부(1)는 수평베이스(6)의 상부에 다수개의 단위바닥판(10)이 서로 맞대어져 구성되고, 상기 측벽부(2)(2')는 웹부(21)(21')와 플랜지(22)(22')가 L자형태로 절곡되어 상기 측벽부(2)(2')의 플랜지(22)(22')가 상기 바닥부(1)의 단위바닥판(10) 양측에 결합되며, 상기 일측의 웹부(21)와 타측의 웹부(21') 사이의 단위바닥판(10)에는 다수개의 바닥파일홀(11)이 형성되고, 상기 바닥파일홀(11)에 고정파일(3)의 파일몸체(31)가 관통되어 지지되어지되, 상기 고정파일(3)의 파일몸체(31) 상부의 헤드부(32)가 상기 단위바닥판(10)의 상부로 돌출되어 상기 고정파일(3)의 헤드부(32)에 조립식블록(B)의 하부가 끼워져 고정되어지는 것을 특징으로 한다.The block fixing base (A) is composed of a side wall portion (2) (2 ') is coupled to both ends of the longitudinal direction of the bottom portion 1, the bottom portion 1 is a plurality of the upper portion of the horizontal base (6) Two unit bottom plates 10 are abutted against each other, and the side wall portions 2 and 2 'are formed by L-shaped web portions 21 and 21' and flanges 22 and 22 '. The flanges 22 and 22 'of the side wall portions 2 and 2' are coupled to both sides of the unit bottom plate 10 of the bottom portion 1, and the web portion 21 on one side and the web portion 21 on the other side. A plurality of bottom pile holes 11 are formed in the unit bottom plate 10 between '), and the pile body 31 of the fixed pile 3 is supported through the bottom pile hole 11, The head part 32 of the upper part of the pile body 31 of the fixing pile 3 protrudes to the upper part of the unit bottom plate 10 so that the head block 32 of the fixing pile 3 of the prefabricated block B may be formed. It is characterized in that the lower portion is fitted.

또한, 상기 블록 고정 기초(A)의 측벽부(2) 외측에 길이방향으로 콘크리트측 벽(8)이 형성되어지는 것을 특징으로 한다.In addition, the concrete side wall (8) is formed in the longitudinal direction outside the side wall portion (2) of the block fixing foundation (A).

그리고, 상기 바닥부(1)의 단위바닥판(10)과 측벽부(2)(2')의 플랜지(22)(22')의 결합은 상기 단위바닥판(10)의 양단부와 상기 측벽부(2)(2')의 플랜지(22)(22')에 형성된 앵커파일홀(13)(222)(222')에 상기 고정파일(3)의 파일몸체(31)가 관통되어 지지되어지되, 상기 고정파일(3)의 파일몸체(31) 상부의 헤드부(33)가 상기 측벽부(2)(2')의 플랜지(22)(22') 상부로 돌출되어지거나, 상기 바닥부(1)의 단위바닥판(10)과 측벽부(2)(2')의 플랜지(22)(22')의 결합은 상기 단위바닥판(10)의 양단부와 상기 측벽부(2)(2')의 플랜지(22)(22')에 형성된 앵커파일홀(13)에 앵커파일(7)을 상부에서 타격하여 고정하고, 상기 앵커파일(7)의 상부에 형성된 숫나사부(71)에 너트(72)가 조여져 결합되거나 볼트, 너트로 결합되는 것을 특징으로 한다.In addition, the coupling between the unit bottom plate 10 of the bottom portion 1 and the flanges 22 and 22 'of the side wall portions 2 and 2' is performed at both ends of the unit bottom plate 10 and the side wall portions. (2) The pile body 31 of the fixing pile 3 is supported through the anchor pile holes 13, 222, 222 'formed in the flanges 22, 22' of the 2 '(2'). The head portion 33 of the upper end of the pile body 31 of the fixing pile 3 protrudes upward from the flanges 22 and 22 'of the side wall portions 2 and 2', or the bottom portion ( The coupling between the unit bottom plate 10 of 1) and the flanges 22 and 22 'of the side wall portions 2 and 2' is performed at both ends of the unit bottom plate 10 and the side wall portions 2 and 2 '. The anchor pile 7 is fixed to the anchor pile hole 13 formed at the flange 22 and 22 'of the upper portion by hitting the upper portion of the anchor pile 7, and the nut (71) is formed on the male screw portion 71 formed at the upper portion of the anchor pile 7. 72) is fastened by being coupled to or characterized in that coupled to the bolt, nut.

아울러 상기 측벽부(2)(2')는 다수개의 단위 L자 측벽판(20)(20')이 서로 맞대어져 구성되고, 상기 단위 L자 측벽판(20)(20')의 웹부(21)(21') 상측 외부에는 제1보강대(4)(4')가 설치되어 볼트, 너트로 결합되는 것을 특징으로 한다.In addition, the side wall portions 2 and 2 'are composed of a plurality of unit L-shaped side wall plates 20 and 20' abut each other, and the web portion 21 of the unit L-shaped side wall plates 20 and 20 '. The first reinforcing bar (4) (4 ') is installed on the outer side of the upper (21') is characterized in that it is coupled by bolts, nuts.

따라서, 조립식블록 사방댐의 하부에 바닥부와 L자형태로 절곡된 측벽부가 결합된 블록 고정 기초를 설치함으로써 자재의 운반이나 물의 운반이 어려운 농경지 건너편의 계곡이나 5부능선 내외의 계곡 상류에 복잡한 과정을 거치지 않고 단기간에 기초 지반을 다질 수 있고, 암반 또는 지반에 설치되는 고정파일에 의하여 안정적으로 블록 고정 기초를 설치할 수 있으며, 조립식블록의 유실(流失)이나 침 식을 방지하여 조립식블록 사방댐의 내구성을 높이는 등의 유용한 효과를 제공한다.Therefore, by installing a block fixing foundation combined with a bottom part and a sidewall bent in an L-shape at the bottom of the prefabricated block four-sided dam, a complicated process upstream of the valley across the farmland or the valley within or near the 5-near ridge where it is difficult to transport the material or the water. The foundation ground can be compacted in a short period of time without going through it, and the block fixing foundation can be installed stably by the fixed pile installed on the rock or ground, and the durability of the prefabricated block four-sided dam is prevented by preventing the loss or erosion of the prefabricated block. Provides useful effects such as raising

이하, 본 발명을 첨부된 도면을 참고로 하여 상세히 설명하도록 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일실시예에 따른 사시도이고, 도 2는 본 발명의 일실시예에 따른 분해사시도이다.1 is a perspective view according to an embodiment of the present invention, Figure 2 is an exploded perspective view according to an embodiment of the present invention.

본 발명의 블록 고정 기초는 바닥부(1)의 길이방향 양단부에 측벽부(2)(2')가 결합되어 구성되는 것으로서, 상기 바닥부(1)는 수평베이스(6)의 상부에 다수개의 단위바닥판(10)이 서로 맞대어져 구성된다. The block fixing base of the present invention is composed of side walls (2) and (2 ') coupled to both longitudinal ends of the bottom (1), the bottom (1) is a plurality of the top of the horizontal base (6) The unit bottom plate 10 is comprised against each other.

상기 단위바닥판(10)에는 다수개의 바닥파일홀(11)이 형성되고, 상기 바닥파일홀(11)의 양단부에는 상기 앵커파일홀(13)이 지그재그로 형성된다.A plurality of bottom pile holes 11 are formed in the unit bottom plate 10, and the anchor pile holes 13 are formed in zigzag at both ends of the bottom pile hole 11.

상기 측벽부(2)(2')는 웹부(21)(21')와 플랜지(22)(22')가 L자형태로 절곡되어 일체로 형성되고, 상기 측벽부(2)(2')의 플랜지(22)(22')에도 앵커파일홀(222)(222')이 지그재그로 형성된다.The side wall portions 2 and 2 'are integrally formed by bending the web portions 21 and 21' and the flanges 22 and 22 'in an L-shape, and the side wall portions 2 and 2'. Anchor pile holes 222 and 222 'are also zigzag in the flanges 22 and 22'.

상기 측벽부(2)(2')의 길이는 상기 단위바닥판(10)이 맞대어져 구성된 바닥부(1)의 폭과 동일하게 하는 것이 바람직하며, 상기 측벽부(2)(2')의 높이는 설치되어지는 조립식블록(B)의 높이보다 낮게 형성되는 것이 바람직하다.The length of the side wall portions 2 and 2 'is preferably equal to the width of the bottom portion 1 formed by the unit bottom plate 10 abutting the side wall portions 2 and 2'. The height is preferably formed lower than the height of the prefabricated block (B) to be installed.

상기 단위바닥판(10)에 형성된 바닥파일홀(11)에는 고정파일(3)이 끼워지는데, 상기 고정파일(3)은 원기둥형태의 파일몸체(31) 상부에 상기 파일몸체(31)보다 지름이 넓고, 테이퍼진 헤드부(32)가 형성된다.A fixing pile 3 is inserted into the bottom pile hole 11 formed in the unit bottom plate 10, and the fixing pile 3 has a diameter larger than that of the pile body 31 on the cylindrical pile body 31. This wide, tapered head portion 32 is formed.

상기 바닥파일홀(11)에 고정파일(3)의 파일몸체(31)가 하부로 관통되어 설치되고, 헤드부(32)는 단위바닥판(10)의 상부로 돌출되며, 상기 헤드부(32)에 조립식블록(B)의 하부가 끼워져 고정되어진다.The pile body 31 of the fixed pile 3 penetrates downwardly in the bottom pile hole 11, and the head part 32 protrudes upward from the unit bottom plate 10, and the head part 32. The lower part of the prefabricated block (B) is fitted into the and fixed.

상기 바닥부(1)와 측벽부(2)(2')의 결합은 상기 바닥부(1)의 양단에 측벽부(2)(2')를 위치시킨 후 상기 단위바닥판(10)의 양단부의 앵커파일홀(13)과 상기 측벽부(2)(2')의 플랜지(22)(22')에 형성된 앵커파일홀(222)(222')에 상기 고정파일(3)의 파일몸체(31)가 하부로 관통되어 지지되어지도록 한다. The bottom part 1 and the side wall part 2 and the second part 2 'are coupled to both ends of the bottom part 1 after the side wall parts 2 and 2' are positioned. The pile body of the fixed pile 3 in the anchor pile holes 222 and 222 'formed in the anchor pile hole 13 and the flanges 22 and 22' of the side wall portions 2 and 2 '. 31) to be penetrated downward and supported.

상기 바닥파일홀(11)에서와 마찬가지로, 상기 고정파일(3)의 헤드부(32)는 측벽부(2)(2')의 플랜지(22)(22') 상부로 돌출된다.As in the bottom pile hole 11, the head portion 32 of the fixing pile 3 protrudes above the flanges 22, 22 ′ of the side wall portions 2, 2 ′.

상기 단위바닥판(10)은 금속이나 합성수지 또는 매트로 이루어지는 것이 바람직하며, 측벽부(2)(2')와 고정파일(3)은 금속재로 이루어지는 것이 가장 바람직하다.The unit bottom plate 10 is preferably made of metal, synthetic resin, or mat, and the side wall portions 2, 2 'and the fixing pile 3 are most preferably made of metal.

도 3은 본 발명의 일실시예에 조립식 원통형블록이 설치된 사용상태 단면도, 도 4는 본 발명의 일실시예에 조립식 원통형블록이 설치된 사용상태 정면도로서, 본 발명의 일실시예에 따른 블록 고정 기초는 지반이 암반인 경우에 주로 사용된다. Figure 3 is a cross-sectional view using the prefabricated cylindrical block is installed in one embodiment of the present invention, Figure 4 is a front view of the prefabricated cylindrical block is installed in one embodiment of the present invention, block fixing foundation according to an embodiment of the present invention Is mainly used when the ground is rock.

도 3 및 도 4에서와 같이 지반이 암반(R)인 경우에는 착암기 드릴로 고정파일(3)이 설치될 부분을 수직으로 깊숙히 뚫어 위치를 잡되, 암반이 수평을 유지하지 않는 부분이나 지반이 고르지 못한 부분에는 콘크리트를 수평으로 타설하거나 호박돌, 잡석, 깬돌 등을 채워넣어 수평베이스(6)를 구성한 후 그 상부에 단위바닥 판(10)을 설치한다. When the ground is rock (R) as shown in Figures 3 and 4, the rock drill drills the position where the fixed pile (3) is to be installed vertically and deeply positioned, but the rock does not maintain the level or the ground is uneven If it is not possible to pour concrete horizontally or fill the amber, rubble, crushed stone, etc. to form a horizontal base (6) and then install a unit bottom plate (10) on the top.

그리고, 상기 바닥부(1) 단위바닥판(10)의 바닥파일홀(11)에 고정파일(3)을 하부로 관통시켜 지지되도록 하고, 상기 단위바닥판(10)의 상부로 돌출된 고정파일(3)의 헤드부(31)에 조립식블록(B)의 끼움홈이 끼워져 결합되도록 한다.In addition, the fixing pile 3 is supported to penetrate the bottom pile hole 11 of the bottom portion 1 of the unit bottom plate 10 downward, and the fixing pile protrudes to the upper portion of the unit bottom plate 10. The fitting groove of the prefabricated block (B) is fitted to the head portion 31 of (3) to be coupled.

상기와 같이 설치된 조립식블록 사방댐이 더욱 견고하게 고정되도록 경우에 따라 측벽부(2)(2')의 상부에 콘크리트를 타설하여 콘크리트측벽(3)이 형성되도록 한다.If the prefabricated block four-sided dam installed as described above is more firmly fixed, the concrete side wall (3) is formed by placing concrete on top of the side wall (2) (2 ').

도 5는 본 발명의 이실시예에 따른 사시도이고, 도 6은 본 발명의 이실시예에 따른 분해사시도이다.Figure 5 is a perspective view according to this embodiment of the present invention, Figure 6 is an exploded perspective view according to this embodiment of the present invention.

본 발명의 이실시예는 일실시예와 마찬가지로 바닥부(1)의 길이방향 양단부에 측벽부(2)(2')가 결합되어 구성되는 것으로서, 상기 바닥부(1)는 다수개의 단위바닥판(10)이 서로 맞대어져 구성된다. This embodiment of the present invention is configured to combine the side wall portion (2) (2 ') at both ends in the longitudinal direction of the bottom portion 1 as in one embodiment, the bottom portion 1 is a plurality of unit bottom plate (10) is comprised against each other.

상기 단위바닥판(10)에는 다수개의 바닥파일홀(11)이 형성되고, 상기 바닥파일홀(11)의 양단부에는 상기 앵커파일홀(13)이 지그재그로 형성된다.A plurality of bottom pile holes 11 are formed in the unit bottom plate 10, and the anchor pile holes 13 are formed in zigzag at both ends of the bottom pile hole 11.

상기 측벽부(2)(2')는 웹부(21)(21')와 플랜지(22)(22')가 L자형태로 절곡되어 일체로 형성되고, 상기 측벽부(2)(2')의 플랜지(22)(22')에도 앵커파일홀(222)(222')이 지그재그로 형성되어 상기 앵커파일홀(222)(222')에 앵커파일(7)을 상부에서 타격하여 암반 또는 지반에 지지시키고, 상기 앵커파일(7)의 상부에 형성된 숫나사부(71)에 너트(72)가 조여져 결합되도록 한다.The side wall portions 2 and 2 'are integrally formed by bending the web portions 21 and 21' and the flanges 22 and 22 'in an L-shape, and the side wall portions 2 and 2'. Anchor pile holes 222 and 222 'are also formed in a zigzag form in the flanges 22 and 22' of the flange 22 and 22 ', so that the anchor piles 7 hit the anchor pile holes 222 and 222' from the top of the rock or ground. The nut 72 is fastened to the male screw portion 71 formed on the upper portion of the anchor pile 7 to be coupled thereto.

상기 측벽부(2)(2')의 길이는 상기 단위바닥판(10)이 맞대어져 구성된 바닥부(1)의 폭과 동일하게 하는 것이 바람직하며, 상기 측벽부(2)(2')의 높이는 설치되어지는 조립식블록(B)의 높이보다 낮게 형성되는 것이 바람직하다.The length of the side wall portions 2 and 2 'is preferably equal to the width of the bottom portion 1 formed by the unit bottom plate 10 abutting the side wall portions 2 and 2'. The height is preferably formed lower than the height of the prefabricated block (B) to be installed.

상기 단위바닥판(10)에 형성된 바닥파일홀(11)에는 고정파일(3)이 끼워지는데, 상기 고정파일(3)은 원기둥형태의 파일몸체(31) 상부에 상기 파일몸체(31)보다 지름이 넓고, 테이퍼진 헤드부(32)가 형성된다.A fixing pile 3 is inserted into the bottom pile hole 11 formed in the unit bottom plate 10, and the fixing pile 3 has a diameter larger than that of the pile body 31 on the cylindrical pile body 31. This wide, tapered head portion 32 is formed.

상기 바닥파일홀(11)에 고정파일(3)의 파일몸체(31)가 하부로 관통되어 설치되고, 헤드부(32)는 단위바닥판(10)의 상부로 돌출되며, 상기 헤드부(32)에 조립식블록(B)의 하부가 끼워져 고정되어진다.The pile body 31 of the fixed pile 3 penetrates downwardly in the bottom pile hole 11, and the head part 32 protrudes upward from the unit bottom plate 10, and the head part 32. The lower part of the prefabricated block (B) is fitted into the and fixed.

도 7은 본 발명의 삼실시예에 따른 사시도이고, 도 8은 본 발명의 삼실시예에 따른 분해사시도로서, 바닥부(1)는 다수개의 단위바닥판(10)이 서로 맞대어져 구성된다. 7 is a perspective view according to a third embodiment of the present invention, Figure 8 is an exploded perspective view according to a third embodiment of the present invention, the bottom portion 1 is composed of a plurality of unit bottom plate 10 abut each other.

상기 단위바닥판(10)에는 다수개의 바닥파일홀(11)이 형성되고, 상기 바닥파일홀(11)의 양단부에는 상기 바닥파일홀(11)보다 지름이 작은 나사홀(12)이 일렬로 형성된다. A plurality of bottom pile holes 11 are formed in the unit bottom plate 10, and screw holes 12 having a diameter smaller than that of the bottom pile hole 11 are formed in a row at both ends of the bottom pile hole 11. do.

상기 바닥부(1)의 양측에 측벽부(2)(2')가 결합되어지되, 상기 측벽부(2)(2')는 다수개의 단위 L자측벽판(20)(20')이 맞대어져 구성된다.Sidewall portions 2 and 2 'are coupled to both sides of the bottom portion 1, and the sidewall portions 2 and 2' are joined together by a plurality of unit L-shaped wall plates 20 and 20 '. It is constructed.

상기 단위 L자측벽판(20)(20')은 웹부(21)(21')와 플랜지(22)(22')가 L자형태로 절곡되어 일체로 형성되는 것으로서, 웹부(21)(21')의 높이가 플랜 지(22)(22')의 길이보다 길며, 보통 설치되었을 때 지반의 상부로 약간 돌출되어지는 정도의 높이로 형성되는 것이 바람직하다. The unit L-shaped side wall plates 20 and 20 'are formed integrally by bending the web portions 21 and 21' and the flanges 22 and 22 'in an L-shape. The height of ') is longer than the length of the flanges 22 and 22', and it is preferable that the height of the ') is generally formed so that it slightly protrudes to the upper part of the ground.

조립식블록 사방댐이 설치되는 지반이 암반인 경우에는 암반에 드릴로 홈을 파고 고정파일(3)의 파일몸체(31)를 삽입시킬 수 있지만, 지반이 토사인 경우에는 암반이 나올 때까지 조립식블록 사방댐의 폭만큼 땅을 깊이 판 후 상기 블록 고정 기초를 설치하는 것이다.If the ground where the prefabricated block four-side dam is installed is a rock, a drill can be dug into the rock and the pile body 31 of the fixed pile 3 can be inserted. However, if the ground is earth and sand, the prefabricated block four-sided dam is installed until the rock comes out. After digging the ground deep by the width of the block is to install the foundation.

상기 단위 L자 측벽판(20)(20')의 결속을 강화시키기 위하여 상기 웹부(21)(21') 상측 중앙에는 나사홀(211)이 형성되고, 상기 웹부(21)(21')의 상측 외부에 제1보강대(4)(4')가 설치되어 볼트, 너트로 결합된다. A screw hole 211 is formed at the center of the upper portion of the web portions 21 and 21 'to strengthen the unity of the unit L-shaped side wall plates 20 and 20', and the web portions 21 and 21 ' The first reinforcing bar (4) (4 ') is installed on the outer side of the upper side is coupled to the bolt, nut.

이 때 볼트의 헤드부분이 웹부(21)(21')의 내측으로 향하도록 하여 볼트가 웹부(21)(21')의 내측에서 외측으로 관통되어, 너트에 의하여 제1보강대(4)(4')의 외측에서 결합되도록 하여 측벽부(2)(2')의 내측부분이 평평하여 조립식블록(B)의 설치에 지장이 없도록 한다. At this time, the head portion of the bolt is directed toward the inside of the web portions 21 and 21 'so that the bolt penetrates from the inside of the web portions 21 and 21' to the outside, so that the first reinforcing bar 4 and 4 are driven by the nut. The inner side of the side wall portion (2) (2 ') is flat so that it is coupled to the outside of the') so as not to interfere with the installation of the prefabricated block (B).

상기 단위 L자 측벽판(20)(20')의 플랜지(22)(22') 중앙에도 나사홀(221)(221')이 형성되어 상기 바닥부(1)의 단위바닥판(10) 양측에 볼트, 너트로 결합되는데, 상기 플랜지(22)(22')의 상부에 제2보강대(5)(5')를 추가로 설치하여 상기 단위 L자 측벽판(20)(20')이 더욱 안정적으로 결합될 수 있도록 한다.Screw holes 221 and 221 ′ are also formed at the centers of the flanges 22 and 22 ′ of the unit L-shaped side wall plates 20 and 20 ′ so that both sides of the unit bottom plate 10 of the bottom part 1 are formed. Bolts and nuts, the second reinforcing bars 5 and 5 'are additionally installed on top of the flanges 22 and 22' so that the unit L-shaped side wall plates 20 and 20 'are further provided. Make sure that they can be reliably combined.

상기 제1보강대(4)(4')와 제2보강대(5)(5')에도 볼트, 너트를 위한 다수개의 나사홀(41)(41')(51)(51')이 형성되어 있음은 당연한 것이며, 재질은 금속재로 형성되는 것이 가장 바람직하다.The first reinforcing bar 4, 4 'and the second reinforcing bar 5, 5' are also provided with a plurality of screw holes 41, 41 ', 51, 51' for bolts and nuts. Is a matter of course, and the material is most preferably formed of a metal material.

상기에서 바닥부(1)의 양측에 측벽부(2)(2')를 결합시키는 다양한 방법을 설명하였지만, 상기의 방법 이외에도 금속으로 된 단위바닥판(10)에 측벽부(2)(2')를 직접 용접시켜 결합시킬 수도 있다.Although various methods of coupling the side wall portions 2 and 2 'to both sides of the bottom portion 1 have been described above, the side wall portions 2 and 2' to the metal bottom plate 10 in addition to the above method are described. ) Can also be combined by direct welding.

상기와 같이 구성된 블록 고정 기초(A)에 설치된 조립식블록의 사용상태를 살펴보도록 한다.Look at the state of use of the prefabricated block installed in the block fixing foundation (A) configured as described above.

도 9는 본 발명의 일실시예에 조립식 원통형블록이 설치된 사용상태 사시도, 도 10은 본 발명의 이실시예에 조립식 사각블록이 설치된 사용상태 단면도, 도 11은 본 발명의 삼실시예에 조립식 원통형블록이 설치된 사용상태 정면도로서, 바닥부(1)에 설치된 고정파일(3)의 헤드부(32)에 조립식블록(B) 하부의 끼움홈이 끼움결합되는 것이다. Figure 9 is a perspective view of the prefabricated cylindrical block is installed in one embodiment of the present invention, Figure 10 is a cross-sectional view of the prefabricated rectangular block is installed in this embodiment of the present invention, Figure 11 is a prefabricated cylindrical in a third embodiment of the present invention As a front view of the use state of the block is installed, the fitting groove of the lower portion of the prefabricated block (B) is fitted to the head portion 32 of the fixed pile (3) installed on the bottom (1).

아울러 미도시하였지만, 지반이 암반인 경우에는 물받이가 필요하지 않지만, 지반이 토사(G)인 경우에는 조립식블록 사방댐의 하류 측에 조립식블록이 결합되어 구성된 물받이를 설치하여 조립식블록 사방댐의 하부가 침식되지 않도록 한다.In addition, although not shown, if the ground is rock, the drip is not necessary, but if the ground is earth and sand (G), the bottom of the prefabricated block four-side dam is eroded by installing a drip tray composed of prefabricated blocks coupled to the downstream side of the prefabricated block four-side dam. Do not

이상에서와 같이 본 발명은 상기한 실시예에 한하여 설명하였지만, 본 발명을 이에 한정하지는 않는 것으로, 본 발명의 범주와 사상을 벗어나지 않는 범위 내에서 다양한 변형 실시가 가능함은 물론이다.As described above, the present invention has been described with reference to the above embodiments, but the present invention is not limited thereto, and various modifications can be made without departing from the scope and spirit of the present invention.

도 1은 본 발명의 일실시예에 따른 사시도.1 is a perspective view according to an embodiment of the present invention.

도 2는 본 발명의 일실시예에 따른 분해사시도.Figure 2 is an exploded perspective view according to an embodiment of the present invention.

도 3은 본 발명의 일실시예의 사용상태 단면도.Figure 3 is a cross-sectional view of the use state of one embodiment of the present invention.

도 4는 본 발명의 일실시예의 사용상태 정면도.4 is a front view of a state of use of one embodiment of the present invention.

도 5는 본 발명의 이실시예에 따른 사시도.5 is a perspective view according to this embodiment of the present invention.

도 6은 본 발명의 이실시예에 따른 분해사시도.Figure 6 is an exploded perspective view according to this embodiment of the present invention.

도 7은 본 발명의 삼실시예에 따른 사시도.7 is a perspective view according to a third embodiment of the present invention.

도 8은 본 발명의 삼실시예에 따른 분해사시도.8 is an exploded perspective view according to a third embodiment of the present invention.

도 9는 본 발명의 일실시예에 조립식 원통형블록이 설치된 사용상태 사시도.Figure 9 is a perspective view of the prefabricated cylindrical block is installed in one embodiment of the present invention.

도 10은 본 발명의 이실시예에 조립식 사각블록이 설치된 사용상태 사시도.Figure 10 is a perspective view of the pre-fabricated square block is installed in this embodiment of the present invention.

도 11은 본 발명의 삼실시예에 조립식 원통형블록이 설치된 사용상태 사시도.Figure 11 is a perspective view of the prefabricated cylindrical block is installed in a third embodiment of the present invention.

<도면의 주요 부호에 대한 설명><Description of Major Symbols in Drawing>

1 : 바닥부 10 : 단위바닥판1: bottom part 10: unit bottom plate

11 : 바닥파일홀 13 : 앵커파일홀11: bottom pile hole 13: anchor pile hole

2, 2' : 측벽부 21, 21' : 웹부2, 2 ': side wall portion 21, 21': web portion

22, 22' : 플랜지 3 : 고정파일22, 22 ': Flange 3: Fixed pile

31 : 파일몸체 32 : 헤드부31: pile body 32: head

4, 4' : 제1보강대 5, 5' : 제2보강대4, 4 ': 1st reinforcement bar 5, 5': 2nd reinforcement bar

6 : 수평베이스 7 : 앵커파일6: horizontal base 7: anchor file

8 : 콘크리트측벽8: concrete side wall

Claims (5)

조립식블록 사방댐의 하부에 설치되어 조립식블록을 암반 또는 지반에 고정시키기 위한 조립식블록 사방댐의 블록 고정 기초(A)에 있어서,In the block fixing foundation (A) of the prefabricated block four-side dam installed in the lower portion of the prefabricated block four-side dam to fix the prefabricated block to the rock or ground, 상기 블록 고정 기초(A)는 바닥부(1)의 길이방향 양단부에 측벽부(2)(2')가 결합되어 구성되어지되, 상기 바닥부(1)는 수평베이스(6)의 상부에 다수개의 단위바닥판(10)이 서로 맞대어져 구성되고, 상기 측벽부(2)(2')는 웹부(21)(21')와 플랜지(22)(22')가 L자형태로 절곡되어 상기 측벽부(2)(2')의 플랜지(22)(22')가 상기 바닥부(1)의 단위바닥판(10) 양측에 결합되며, 상기 일측의 웹부(21)와 타측의 웹부(21') 사이의 단위바닥판(10)에는 다수개의 바닥파일홀(11)이 형성되고, 상기 바닥파일홀(11)에 고정파일(3)의 파일몸체(31)가 관통되어 지지되어지되, 상기 고정파일(3)의 파일몸체(31) 상부의 헤드부(32)가 상기 단위바닥판(10)의 상부로 돌출되어 상기 고정파일(3)의 헤드부(32)에 조립식블록(B)의 하부가 끼워져 고정되어지는 것을 특징으로 하는 조립식블록 사방댐의 블록 고정 기초.The block fixing base (A) is composed of a side wall portion (2) (2 ') is coupled to both ends of the longitudinal direction of the bottom portion 1, the bottom portion 1 is a plurality of the upper portion of the horizontal base (6) Two unit bottom plates 10 are abutted against each other, and the side wall portions 2 and 2 'are formed by L-shaped web portions 21 and 21' and flanges 22 and 22 '. The flanges 22 and 22 'of the side wall portions 2 and 2' are coupled to both sides of the unit bottom plate 10 of the bottom portion 1, and the web portion 21 on one side and the web portion 21 on the other side. A plurality of bottom pile holes 11 are formed in the unit bottom plate 10 between '), and the pile body 31 of the fixed pile 3 is supported through the bottom pile hole 11, The head part 32 of the upper part of the pile body 31 of the fixing pile 3 protrudes to the upper part of the unit bottom plate 10 so that the head block 32 of the fixing pile 3 of the prefabricated block B may be formed. Block go of the prefabricated block four-sided dam, characterized in that the lower part is fitted and fixed Basis. 제 1 항에 있어서,The method of claim 1, 상기 블록 고정 기초(A)의 측벽부(2) 외측에 길이방향으로 콘크리트측벽(8)이 형성되어지는 것을 특징으로 하는 조립식블록 사방댐의 블록 고정 기초.Block side of the prefabricated block four-sided dam, characterized in that the concrete side wall (8) is formed in the longitudinal direction outside the side wall portion (2) of the block fixing base (A). 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 바닥부(1)의 단위바닥판(10)과 측벽부(2)(2')의 플랜지(22)(22')의 결합은 상기 단위바닥판(10)의 양단부와 상기 측벽부(2)(2')의 플랜지(22)(22')에 형성된 앵커파일홀(13)(222)(222')에 상기 고정파일(3)의 파일몸체(31)가 관통되어 지지되어지되, 상기 고정파일(3)의 파일몸체(31) 상부의 헤드부(33)가 상기 측벽부(2)(2')의 플랜지(22)(22') 상부로 돌출되어지는 것을 특징으로 하는 조립식블록 사방댐의 블록 고정 기초.The coupling between the unit bottom plate 10 of the bottom part 1 and the flanges 22 and 22 'of the side wall part 2 and 2' is performed at both ends of the unit bottom plate 10 and the side wall part 2. The pile body 31 of the fixed pile 3 is supported by the anchor pile holes 13, 222 and 222 'formed in the flanges 22 and 22' of the flange 2 '. Prefabricated block four sides dam, characterized in that the head portion 33 of the upper pile body 31 of the fixed pile 3 protrudes to the upper side of the flanges 22, 22 'of the side wall portion 2, 2'. Block fixation foundation. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 바닥부(1)의 단위바닥판(10)과 측벽부(2)(2')의 플랜지(22)(22')의 결합은 상기 단위바닥판(10)의 양단부와 상기 측벽부(2)(2')의 플랜지(22)(22')에 형성된 앵커파일홀(13)(222)(222')에 앵커파일(7)을 상부에서 타격하여 고정하고, 상기 앵커파일(7)의 상부에 형성된 숫나사부(71)에 너트(72)가 조여져 결합되어지는 것을 특징으로 하는 조립식블록 사방댐의 블록 고정 기초.The coupling between the unit bottom plate 10 of the bottom part 1 and the flanges 22 and 22 'of the side wall part 2 and 2' is performed at both ends of the unit bottom plate 10 and the side wall part 2. Anchor piles 7 are fixed to the anchor pile holes 13, 222 and 222 'formed at the flanges 22 and 22' of the flange 2 ', and are fixed to each other. Block fixing base of the prefabricated block four-way dam, characterized in that the nut 72 is fastened to the male screw portion 71 formed in the upper portion. 제 1 항에 있어서,The method of claim 1, 상기 측벽부(2)(2')는 다수개의 단위 L자 측벽판(20)(20')이 서로 맞대어져 구성되고, 상기 단위 L자 측벽판(20)(20')의 웹부(21)(21') 상측 외부에는 제1보강대(4)(4')가 설치되어 볼트, 너트로 결합되는 것을 특징으로 하는 조립식블록 사방댐의 블록 고정 기초.The side wall portions 2 and 2 'are composed of a plurality of unit L-shaped side wall plates 20 and 20'butted against each other, and the web portion 21 of the unit L-shaped side wall plates 20 and 20'. (21 ') The outer side of the first reinforcing bar (4) (4') is installed on the block fixing base of the prefabricated block four-way dam, characterized in that coupled to the bolt, nut.
KR1020090016093A 2009-02-26 2009-02-26 Block fixing foundation for assembly block deveris barrier KR100901886B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090016093A KR100901886B1 (en) 2009-02-26 2009-02-26 Block fixing foundation for assembly block deveris barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090016093A KR100901886B1 (en) 2009-02-26 2009-02-26 Block fixing foundation for assembly block deveris barrier

Publications (1)

Publication Number Publication Date
KR100901886B1 true KR100901886B1 (en) 2009-06-09

Family

ID=40982521

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090016093A KR100901886B1 (en) 2009-02-26 2009-02-26 Block fixing foundation for assembly block deveris barrier

Country Status (1)

Country Link
KR (1) KR100901886B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100918026B1 (en) 2009-04-16 2009-09-24 대한민국 Ecotype block devris barrier
KR100922219B1 (en) 2009-07-08 2009-10-20 (주) 에스앤비하이드로 Assembly-type defense-water block
KR100925887B1 (en) 2009-06-03 2009-11-11 대한민국 Devris Barrier using Block and Screen
ES2386607A1 (en) * 2012-05-11 2012-08-23 Universidad De Granada Modular foundation system that can be rapidly installed/removed for the construction of inflatable hydraulic dams and hydraulic dam containing same
CN110485382A (en) * 2019-09-20 2019-11-22 中国电建集团成都勘测设计研究院有限公司 The leakage preventing structure of core-wall concrete cover and core-wall and dam foundation contact site
US20230002992A1 (en) * 2020-06-20 2023-01-05 Institute Of Mountain Hazards And Environment Chinese Academy Of Sciences Method for prevention and control of super large-scale floods and debris flows

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030019946A (en) * 2003-02-22 2003-03-07 윤성호 Drainage structure for slope, and slope reinforcing method using thereof
JP2003119750A (en) 2001-10-09 2003-04-23 Taisei Corp Drag structural body of structure
KR100514502B1 (en) 2005-06-22 2005-09-14 주식회사 도화종합기술공사 Constructing structure for breakwater with sinking prevention structure of seashore
KR100701640B1 (en) 2006-08-22 2007-03-29 주식회사 유일종합기술단 Breakwater Structure for Comings and Goings Tide in Harmony

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003119750A (en) 2001-10-09 2003-04-23 Taisei Corp Drag structural body of structure
KR20030019946A (en) * 2003-02-22 2003-03-07 윤성호 Drainage structure for slope, and slope reinforcing method using thereof
KR100514502B1 (en) 2005-06-22 2005-09-14 주식회사 도화종합기술공사 Constructing structure for breakwater with sinking prevention structure of seashore
KR100701640B1 (en) 2006-08-22 2007-03-29 주식회사 유일종합기술단 Breakwater Structure for Comings and Goings Tide in Harmony

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100918026B1 (en) 2009-04-16 2009-09-24 대한민국 Ecotype block devris barrier
KR100925887B1 (en) 2009-06-03 2009-11-11 대한민국 Devris Barrier using Block and Screen
KR100922219B1 (en) 2009-07-08 2009-10-20 (주) 에스앤비하이드로 Assembly-type defense-water block
ES2386607A1 (en) * 2012-05-11 2012-08-23 Universidad De Granada Modular foundation system that can be rapidly installed/removed for the construction of inflatable hydraulic dams and hydraulic dam containing same
WO2013167787A1 (en) * 2012-05-11 2013-11-14 Universidad De Granada Modular foundation system that can be rapidly installed/removed for the construction of inflatable hydraulic dams and hydraulic dam containing same
CN110485382A (en) * 2019-09-20 2019-11-22 中国电建集团成都勘测设计研究院有限公司 The leakage preventing structure of core-wall concrete cover and core-wall and dam foundation contact site
US20230002992A1 (en) * 2020-06-20 2023-01-05 Institute Of Mountain Hazards And Environment Chinese Academy Of Sciences Method for prevention and control of super large-scale floods and debris flows

Similar Documents

Publication Publication Date Title
US7699558B2 (en) Anti-ram system and method of installation
KR100901886B1 (en) Block fixing foundation for assembly block deveris barrier
KR100243401B1 (en) A supporting structure for laying pipes under the ground
US8956074B2 (en) System and method for repair of bridge abutment and culvert constructions
CN107859054B (en) Construction method of ecological gabion retaining wall
CN111779006A (en) Green assembled slope supporting structure and construction method thereof
CN113089687A (en) Slope protection method and device
RU2541993C2 (en) Georeinforcing system based on tyres
KR102511387B1 (en) Connecting structure of reinforced wall and constructing method thereof
CN112323816A (en) Unloading type combined retaining structure and construction method thereof
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
KR102116085B1 (en) A Eco-friendly retain wall structure
JP3768220B2 (en) Pier structure and pier
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
KR100493516B1 (en) Micro pile and assembly foundation reinforcement structure member and its method for pier
KR100986582B1 (en) Shoring installations for construction work
CN115506382A (en) Construction method for pile plate wall of island building platform
KR101436563B1 (en) Water storage tank and method for constructing thereof
KR100964721B1 (en) Block for road extension
JP4834649B2 (en) Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure
KR100908676B1 (en) Assembly block devris barrier
KR100744972B1 (en) Earth of building land-side protection wall structure
KR101520771B1 (en) H-pile composited with v-shape steel plate and reinforced concrete for open cut construction
KR101335578B1 (en) Molding for constructing perpendicular hall and construction method for perpendicular hall using it
KR101059539B1 (en) Block for road extension

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant