KR100808676B1 - Method of constructing for hume pipe underground - Google Patents
Method of constructing for hume pipe underground Download PDFInfo
- Publication number
- KR100808676B1 KR100808676B1 KR1020070065650A KR20070065650A KR100808676B1 KR 100808676 B1 KR100808676 B1 KR 100808676B1 KR 1020070065650 A KR1020070065650 A KR 1020070065650A KR 20070065650 A KR20070065650 A KR 20070065650A KR 100808676 B1 KR100808676 B1 KR 100808676B1
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- hume pipe
- hume
- fume pipe
- excavation section
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
- F16L1/10—Accessories therefor, e.g. anchors for aligning
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
Description
도 1과 도 2는 종래 흄관 매설 공법을 예시한 단면도1 and 2 are cross-sectional views illustrating a conventional fume pipe embedding method
도 3은 본 발명에 사용되는 받침블럭의 사시도Figure 3 is a perspective view of the support block used in the present invention
도 4는 도 3의 설치상태 단면도4 is a cross-sectional view of the installation state of FIG.
도 5는 본 발명의 공법으로 시공된 흄관의 매설상태 사시도5 is a perspective view of the buried state of the fume pipe constructed by the method of the present invention
도 6은 도 5의 단면도6 is a cross-sectional view of FIG.
도 7은 본 발명의 흄관연결 후 연결부에 부직포롤을 끼워넣고 몰탈을 충전시킨 상태를 나타낸 단면도7 is a cross-sectional view showing a state in which a non-woven fabric roll is inserted into the connecting portion after filling the fume pipe of the present invention and mortar is filled
도 8은 본 발명의 공법으로 흄관을 굴착부에 시공한 상태를 나타낸 단면도Figure 8 is a cross-sectional view showing a state in which the construction of the fume pipe in the excavation portion by the method of the present invention
[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]
2 : 굴착부 3 : 모래, 골재 4 : 기초콘크리트2: Excavation part 3: Sand, aggregate 4: Foundation concrete
6 : 지주목 7 : 실 9 : 흄관 6: holding neck 7: thread 9: fume pipe
10 : 보강콘크리트 11 : 받침블럭 13 : 흄관안치부 10: reinforced concrete 11: supporting block 13: fume pipe mounting portion
14 : 칸막이판삽입부 15 : 고정핀공 16 : 고정핀 14: partition plate inserting portion 15: fixing pin hole 16: fixing pin
20,20' : 칸막이판 30 : 흄관 31 : 이음부20,20 ': partition plate 30: fume pipe 31: joint
40 : 지반 50 : 보강콘크리트 60 : 부직포롤 40: ground 50: reinforced concrete 60: non-woven fabric roll
70 : 몰탈 80 : 흙70: mortar 80: soil
본 발명은 상,하수관이나 오,폐수관으로 지하에 매설되는 흄관을 신속정확하고 간단한 작업으로 설치할 수 있도록 한 흄관 매설 시공공법에 관한 것이다.The present invention relates to a fume pipe buried construction method that can be installed by a quick, accurate and simple work to install a fume pipe buried underground, such as water, sewage pipe or waste water pipe.
종래 흄관이나 원형관을 지하에 설치하기 위해서는 도 1과 같이 지반(40)을 넓게 굴착하여 굴착부(2)를 만든 다음 바닥에 모래, 골재(3)를 깔고 그 위에 흄관(9)을 올려놓은 다음 보강콘크리트(10)를 타설하여 흄관(9)을 설치하거나, 또는 도 2와 같이 굴착부(2) 바닥에 기초콘크리트(4)를 형성한 다음 그 위에 거푸집(12)을 대고 보강콘크리트(10)를 타설하여 흄관(9)을 설치하였는데, In order to install a conventional fume pipe or a circular tube underground, as shown in Fig. 1, the
종래 이러한 흄관 시공공법은 기초콘크리트가 양생되는 시간을 기다려야 하고 거푸집설치 및 해체작업 등으로 인해 시간적인 낭비와 인력낭비에 따른 인건비 과다지출 등의 문제점이 있었으며, 특히 흄관설치시 굴착부 바닥면의 경사도값에 의한 기울기를 정확히 맞추기가 어려워 흄관을 일렬로 수평되게 시공하기가 매우 어려웠고, 흄관설치 후 흄관 이음부분의 틈새로 누수가 발생되어 보수작업을 수시로 해야 하는 문제점 등이 있었다.Conventionally, such a fume pipe construction method has to wait for the time for the foundation concrete to cure, and there is a problem such as excessive waste of labor due to time waste and manpower waste due to formwork and dismantling work, and in particular, the slope of the bottom surface of the excavation pipe when installing the fume pipe Since it was difficult to accurately match the slope according to the value, it was very difficult to install the fume pipe horizontally in a row, and there was a problem that the water was leaked into the gap of the joint of the fume pipe after the installation of the fume pipe, and thus the maintenance work was frequently performed.
본 발명은 이와 같은 종래 흄관설치시의 문제점들을 해결하기 위하여 개발된 흄관 매설 시공공법에 관한 것으로서, 이하 본 발명을 첨부도면에 의하여 상세히 설명하면 다음과 같다.The present invention relates to a fume pipe buried construction method developed in order to solve such problems in the conventional fume pipe installation, when described in detail by the accompanying drawings as follows.
도 3은 본 발명에 사용되는 흄관 받침블럭으로서, 받침블럭(11)의 중앙에 흄관안치부(13)를 형성하고 고정핀공(15)을 천공하였으며 좌우 양쪽에는 칸막이판삽입부(14)를 형성한 것이다.3 is a fume pipe support block used in the present invention, a hume
도 4는 지반(40)을 굴착한 굴착부(2)의 바닥면에 받침블럭(11)을 깔은 후 고정핀(16)을 고정핀공(15)에 꽂아 받침블럭(11)을 고정시킨 것을 나타낸 것이고,4 shows that the
도 5는 받침블럭(11)에 칸막이판(20)(20')을 끼우고 흄관(30)을 설치한 상태를 나타낸 것이며,5 shows a state in which the
도 6은 도 5의 흄관설치 후 흄관(30)의 유동을 방지하기 위해 보강콘크리트(50)를 타설하고 흙(80)으로 굴착부를 되메우기 한 것을 나타낸 것이다.6 shows that the
이와 같이 본 발명은 1차 받침블럭(11)을 굴착부(2)의 바닥면에 고정시킨 다음 받침블럭(11)의 흄관안치부(13)에 흄관(30)을 설치하는 것으로서, 본 발명의 흄관설치과정을 도 8 도면에 의거 설명을 하면 다음과 같다.As described above, the present invention is to fix the
[흄관설치과정][Fume pipe installation process]
1. 흄관이 설치되는 굴착부(2)의 시점부와 종점부에 지주목(6)을 각각 세운다.1. The holding neck (6) is erected at the starting point and the end point of the excavation part (2) where the fume pipe is installed.
2. 시점부와 종점부에 세워진 지주목(6)에 경사도값을 표시한다.2. The inclination value is displayed on the strut tree (6) which is set up at the start point and the end point.
3. 시점부와 종점부의 경사도값에 맞게 실(7)을 양쪽 지주목(6)에 연결한다.3. Connect the seals (7) to both struts (6) in accordance with the inclination values of the starting point and the end point.
4. 받침블럭(11)의 상단을 실(7) 높이에 맞도록 일직선으로 배치하여 도 4와 같이 설치한다.4. Install the top of the
5. 도 5와 같이 받침블럭(11)과 받침블럭(11)의 칸막이판삽입부(14)에 칸막이판(20)(20')을 각각 끼우고, 흄관안치부(13)에는 흄관(30)을 올려놓고 일렬로 연결시킨다.5. As shown in FIG. 5, the
6. 흄관(30)설치 후 지주목(6)을 뽑아낸 다음 도 7과 같이 흄관(30)이 연결되는 이음부(31)의 틈새로 띠 모양의 부직포롤(60)을 끼워넣은 후 몰탈(70)을 충전시킨다.6. After the fume pipe (30) is installed, the holding neck (6) is pulled out and then the band-shaped nonwoven fabric roll (60) is inserted into the gap of the
7. 몰탈(70) 충전 후 도 6과 같이 보강콘크리트(50)를 타설하고 흙(80)으로 굴착부를 되메우기 하면 본 발명의 흄관설치가 완료되는 것이다.7. After filling the
상술한 바와 같이, 본 발명은 종래 흄관설치시 거푸집설치 후 기초콘크리트를 시공하고 기초콘크리트 위에 흄관을 설치해야 하는 시간적인 낭비와 인력낭비없이, 별도로 제작된 받침블럭을 굴착부의 바닥에 깔고 간단히 그 위에 흄관을 설치하므로서 작업시간 단축 및 거푸집과 인력낭비에 따른 공사비가 대폭 절감되는 효과가 있으며, As described above, the present invention is to install the base concrete after installing the formwork in the conventional fume pipe installation, without the time waste and manpower waste to install the fume pipe on the foundation concrete, separately laying the supporting block on the bottom of the excavation section simply By installing a fume pipe, the work time can be shortened and construction cost due to formwork and manpower was greatly reduced.
지주목에 굴착부 바닥 경사도값을 표시한 후 실을 경사도에 맞게 연결시켜 흄관을 실 높이에 맞추어 일직선으로 설치하고, 흄관이음부에는 부직포롤을 끼우고 몰탈을 충전하여 완전 밀폐를 시키므로서 높은 수밀성을 유지하여 이음부에서 누수가 발생되는 것을 방지할 수 있는 등의 효과가 있는 것으로서,After marking the slope value of the bottom of the excavation part on the strut, connect the thread according to the inclination and install the fume pipe in a straight line according to the thread height.The non-woven fabric roll is inserted into the fume pipe joint and the mortar is filled to ensure high watertightness. It is possible to prevent the leakage from occurring in the joint portion, etc.,
본 발명의 시공공법은 흄관 이외에 원형관 및 이중벽관 등의 설치에도 널리 적용할 수가 있는 것이다.The construction method of the present invention can be widely applied to the installation of circular pipes and double wall pipes in addition to fume pipes.
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065650A KR100808676B1 (en) | 2007-06-29 | 2007-06-29 | Method of constructing for hume pipe underground |
PCT/KR2008/003630 WO2009005244A2 (en) | 2007-06-29 | 2008-06-25 | Method for burying hume pipes and support block used in the method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070065650A KR100808676B1 (en) | 2007-06-29 | 2007-06-29 | Method of constructing for hume pipe underground |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100808676B1 true KR100808676B1 (en) | 2008-03-03 |
Family
ID=39397261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070065650A KR100808676B1 (en) | 2007-06-29 | 2007-06-29 | Method of constructing for hume pipe underground |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100808676B1 (en) |
WO (1) | WO2009005244A2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100885384B1 (en) * | 2008-06-30 | 2009-02-23 | 주식회사 도화종합기술공사 | Sparated type of circular drainlines support block |
KR101064669B1 (en) * | 2008-10-01 | 2011-09-15 | 주식회사 큰숲 | Support block for hume pipe |
CN112982622A (en) * | 2021-03-01 | 2021-06-18 | 中国十七冶集团有限公司 | Method for constructing T-shaped interface area of nodular cast iron pipe |
CN113187954A (en) * | 2021-04-29 | 2021-07-30 | 福建永宏建设工程有限公司 | Construction method of large-caliber nodular cast iron water supply pipe in valley zone |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013006934A2 (en) * | 2011-07-13 | 2013-01-17 | Voga Tecnologia E Projetos Ltda Epp | A method and a system for the fabrication and/or assembly of pipe |
CN106759786A (en) * | 2017-01-17 | 2017-05-31 | 温州市宏泰市政园林建设有限公司 | A kind of storm sewer structure and its construction method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200318079Y1 (en) | 2003-02-06 | 2003-06-28 | 주식회사 한국지중정보 | Supporter for hume pipe |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200274837Y1 (en) * | 2002-01-15 | 2002-05-11 | 주식회사 콘스텍발명사무소 | Hume pipe mounting structure using concrete board without form |
JP2003213752A (en) * | 2002-01-18 | 2003-07-30 | Takayama Metal Industrial Co Ltd | Fixing device of member for flowing water |
KR200318113Y1 (en) * | 2003-03-13 | 2003-06-27 | 정진백 | Pedestal member for hume pipe |
KR200342267Y1 (en) * | 2003-10-22 | 2004-02-18 | 거성건설 주식회사 | Hume concrete pipe establishment structure |
-
2007
- 2007-06-29 KR KR1020070065650A patent/KR100808676B1/en not_active IP Right Cessation
-
2008
- 2008-06-25 WO PCT/KR2008/003630 patent/WO2009005244A2/en active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200318079Y1 (en) | 2003-02-06 | 2003-06-28 | 주식회사 한국지중정보 | Supporter for hume pipe |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100885384B1 (en) * | 2008-06-30 | 2009-02-23 | 주식회사 도화종합기술공사 | Sparated type of circular drainlines support block |
KR101064669B1 (en) * | 2008-10-01 | 2011-09-15 | 주식회사 큰숲 | Support block for hume pipe |
CN112982622A (en) * | 2021-03-01 | 2021-06-18 | 中国十七冶集团有限公司 | Method for constructing T-shaped interface area of nodular cast iron pipe |
CN112982622B (en) * | 2021-03-01 | 2022-05-03 | 中国十七冶集团有限公司 | Method for constructing T-shaped joint area of nodular cast iron pipe |
CN113187954A (en) * | 2021-04-29 | 2021-07-30 | 福建永宏建设工程有限公司 | Construction method of large-caliber nodular cast iron water supply pipe in valley zone |
Also Published As
Publication number | Publication date |
---|---|
WO2009005244A2 (en) | 2009-01-08 |
WO2009005244A3 (en) | 2009-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100808676B1 (en) | Method of constructing for hume pipe underground | |
CN109914472B (en) | Soft soil area assembled comprehensive pipe gallery and construction method thereof | |
CN112609703B (en) | Soil nailing wall support construction process | |
KR100933660B1 (en) | Structure for supporting stone wall for reinforcement and construction method thereof | |
KR20110131549A (en) | Method for constructing nderground structure | |
CN111778994A (en) | Pipe-jacking working well supporting device for municipal pipeline engineering and construction method | |
KR100914158B1 (en) | Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut | |
CN109695247B (en) | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method | |
KR102149473B1 (en) | Prestressing using PC steel wire apply Construction method of underground non-adhesive steel composite concrete tunnel | |
JP2000008394A (en) | Construction method for underground structure such as underground pit for installation of parking lot | |
KR101078080B1 (en) | Earth retaining wall and it's construction method using the precast pile and ground reinforcement | |
US20210017755A1 (en) | Composite wall and methods of constructing a composite wall | |
CN110344439B (en) | Construction method of rear retaining wall drain hole | |
CN113638448A (en) | Working well and construction method thereof, underground pipeline working well device and construction method thereof | |
KR101974826B1 (en) | The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It's Continuous Pile | |
CN115262588B (en) | Assembled self-adaptive slope surface protection structure and construction method thereof | |
CN111379273A (en) | Construction method of corrugated steel comprehensive pipe gallery | |
CN208023591U (en) | A kind of foundation pit supporting construction of steel sheet pile combined deposited pile | |
KR101212959B1 (en) | The Measurement and Reinforcement Method of Retaining Wall Settlement | |
JP2000213026A (en) | Drain pipe installation structure and work execution method therefor | |
CN113818482A (en) | New and old pipe gallery connecting method for reducing uneven settlement | |
CN106368211A (en) | Rectangular concrete piles used for constructing side wall of pipe gallery | |
CN113802670A (en) | Assembly type temporary pipeline comprehensive arrangement structure | |
CN106284299A (en) | For building H type concrete-pile and the diaphram wall of piping lane sidewall | |
CN113106994A (en) | Wide waterproof plate laying method for cover-excavation top-down subway station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
G170 | Publication of correction | ||
LAPS | Lapse due to unpaid annual fee |