KR100698878B1 KR1020050133875A KR20050133875A KR100698878B1 KR 100698878 B1 KR100698878 B1 KR 100698878B1 KR 1020050133875 A KR1020050133875 A KR 1020050133875A KR 20050133875 A KR20050133875 A KR 20050133875A KR 100698878 B1 KR100698878 B1 KR 100698878B1
Authority
KR
South Korea
Prior art keywords
steel pipe
braces
pipe braces
brace
connector
Prior art date
Application number
KR1020050133875A
Other languages
Korean (ko)
Inventor
서승권
Original Assignee
(주)핸스건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)핸스건설 filed Critical (주)핸스건설
Priority to KR1020050133875A priority Critical patent/KR100698878B1/en
Application granted granted Critical
Publication of KR100698878B1 publication Critical patent/KR100698878B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A Y-type connection structure of a steel pipe strut is provided to construct easily, and to recycle a connector and the steel pipe strut by expanding the gap of the struts without modifying a temporary retaining wall and connecting the steel pipe strut with a nut. A Y-type connection structure includes two steel pipe struts(100a,100b) inclined and installed at both wales to distribute and transmit force to the wales, a double steel pipe strut(210) spaced from the wales, a connector(300) connected and placed between the steel pipe struts and the double steel pipe strut, a base plate(400) bonded to the steel pipe struts and the double steel pipe strut and combined with the connector, a reinforcing member(500), an assembling member(600), and a wedge(700). An end of an anchor bolt inserted to concrete is protruded for the steel pipe struts, and the base plate is combined with the end of the anchor bolt by a nut.

Description

강관 버팀보의 와이형 연결구조 {Y Type Connecting Structure of Steel Pipe Struts}Y Type Connecting Structure of Steel Pipe Struts}

도 1은 본 발명의 제1실시예에 따른 강관 버팀보의 Y형 연결구조를 나타내는 도면,1 is a view showing a Y-shaped connection structure of the steel pipe support according to the first embodiment of the present invention,

도 2는 도 1의 측단면도,2 is a side cross-sectional view of FIG.

도 3은 본 발명의 제2실시예에 따른 강관 버팀보의 Y형 연결구조를 나타내는 도면,3 is a view showing a Y-type connection structure of the steel pipe support according to the second embodiment of the present invention,

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100,200: 강관 버팀보 300: 연결체100,200: steel pipe brace 300: connector

310: 콘크리트 320: 앵커볼트310: concrete 320: anchor bolt

400: 기초판 500: 보강재400: base plate 500: reinforcing material

600: 체결부재 700: 화타쐐기600: fastening member 700: flaming wedge

800: 띠장800: Sash

본 발명은 강관 버팀보의 Y형 연결구조에 관한 것으로서, 더욱 상세하게는 토류벽의 붕괴를 방지하기 위하여 H파일(Pile) 사이에 설치되는 강관 버팀보가 2중강관이나 큰 직경의 대형 강관으로 사용될 때 Y형태로 강관 버팀보를 연결하는 구조에 관한 것이다.The present invention relates to the Y-shaped connection structure of the steel pipe reinforcement, and more particularly, to prevent the collapse of the earth wall, when the steel pipe reinforcement is installed between the pile (Pile) is used as a double steel pipe or a large diameter large steel pipe Y It relates to the structure of connecting the steel pipe brace in the form.

건설현장에서 지하에 건물의 기초, 지하실 또는 콘크리트 벽체를 축조하기 위하여 해당 지반을 굴토한 후, 굴토면이 토압에 의해 붕괴되는 것을 방지하기 위하여 흙막이 공사를 하게 된다.At the construction site, the ground is excavated to build the foundation, basement, or concrete wall in the basement, and then the earthen block is constructed to prevent the earth surface from collapse by earth pressure.

이러한 흙막이는 소정 간격으로 지반에 설치되는 H파일에 굴토면을 받치는 토류벽을 형성하고 H파일의 일측면에 상하로 일정 간격을 가지면서 수평되게 복수의 띠장이 설치되며, 서로 마주보는 띠장과 띠장 사이에 일정간격으로 수평되게 버팀보가 설치된다.These mudguards are formed in the earth wall to support the pit soil surface in the H pile installed on the ground at predetermined intervals, and a plurality of bands are horizontally installed at regular intervals up and down on one side of the H pile, between the bands and the bands facing each other. The brace is installed horizontally at regular intervals.

지하구조물 시설을 위한 흙막이 공사에서 작업구나 현장의 사유로 상기 버팀보의 간격을 넓혀 작업을 용이하게 할 필요가 있는 바, 이때는 2중이나 직경이 큰 버팀보를 사용하게 된다.It is necessary to facilitate the work by increasing the interval of the brace for the reason of the work site or the site in the construction of the construction for the underground structure facility, this time using a double or large diameter brace.

상기 버팀보를 띠장에 직접 연결하면 띠장이 압력을 견디지 못하므로 그 단부를 Y형으로 벌려 버팀보의 커진 반력을 나누어 띠장에 전달하게 한다.If the brace directly connects to the belt, the belt does not withstand the pressure, so the end is opened in a Y-shape to distribute the increased reaction force of the brace to the belt.

상기와 같이 2중이나 직경이 큰 버팀보를 Y형으로 띠장에 연결함으로써 버팀보의 수를 줄여 작업공간을 확보할 수 있게 한다.As described above, by connecting a double or large diameter brace to the band in Y-type, it is possible to secure a work space by reducing the number of braces.

그런데 종래에는 버팀보로 H형강을 사용하고 H형강 버팀보의 Y형 연결시 현장 용접에 의해 연결하기 때문에 품질 저하, 시공 불편, 공기 증가, 작업안전 확보 미비 및 버팀보의 재활용에 문제가 있었다.However, in the related art, since H-shaped steel is used as the brace and Y-shaped connection of the H-beam brace is connected by on-site welding, there is a problem in quality deterioration, construction inconvenience, increase of air, insufficient work safety, and recycling of the brace.

본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로서, 공사현장에서 터파기시 흙막이 공사에 사용되는 강관 버팀보의 공사중 필요한 작업구의 설치나 공사상의 편의를 위한 버팀보 간격의 확장을 흙막이 가설재의 변경없이 할 수 있으며, 용접 등과 같은 강관 버팀보의 직접 연결을 피하여 너트 연결함으로써 연결이 매우 편리하고 연결체 및 강관 버팀보를 재활용할 수 있는 강관 버팀보의 Y형 연결구조를 제공하는데 그 목적이 있다.The present invention has been made in order to solve the above problems, the expansion of the brace for the installation of work tools necessary for the construction of the steel pipe brace used in the construction site when dig at the construction site or for convenience in construction without changing the masonry temporary materials The purpose of the present invention is to provide a Y-type connection structure of the steel pipe brace, which is very convenient to connect and can be recycled the connector and the steel pipe brace by avoiding the direct connection of the steel pipe brace such as welding.

상술한 목적을 달성하기 위한 본 발명의 실시예에 따른 강관 버팀보의 Y형 연결구조는, 띠장에 미치는 힘을 분산하여 전달할 수 있도록 양측 띠장에 경사지게 설치되는 2개의 강관 버팀보와, 상기 양측 띠장의 내측에 소정거리 이격되어 위치되는 2중강관 버팀보와, 상기 2개의 강관 버팀보와 2중강관 버팀보 사이에 위치되어 2개의 강관 버팀보와 2중강관 버팀보에 연결되는 연결체 및 상기 2개의 강관 버팀보와 2중강관 버팀보에 각각 접합되고 상기 연결체에 각각 접촉되어 상기 연결체에 체결되는 기초판을 포함한다.Y-shaped connection structure of the steel pipe brace according to an embodiment of the present invention for achieving the above object, two steel pipe braces are installed inclined to both side strips so as to distribute the force applied to the strip length, and the inside of the both side strips The double steel pipe brace is located at a predetermined distance apart from the two steel pipe brace and the double steel pipe brace is located between the connection between the two steel pipe brace and double steel pipe brace and the two steel pipe brace and double steel And a base plate respectively bonded to the tube braces and contacting the connecting bodies to be fastened to the connecting bodies.

이하 본 발명의 실시예에 대하여 첨부된 도면을 참고로 그 구성 및 작용을 설명하기로 한다.Hereinafter, the configuration and operation of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 제1실시예에 따른 강관 버팀보의 Y형 연결구조를 나타내는 도면이고, 도 2는 도 1의 측단면도이다.1 is a view showing a Y-shaped connection structure of the steel pipe support according to the first embodiment of the present invention, Figure 2 is a side cross-sectional view of FIG.

도시된 바와 같이, 강관 버팀보(100a,100b,210)와, 연결체(300)와, 기초판 (400)과, 보강재(500)와, 체결부재(600) 및 화타쐐기(700)를 포함하여 이루어진다.As shown, including the steel pipe braces (100a, 100b, 210), the connecting member 300, the base plate 400, the reinforcing material 500, the fastening member 600 and the weft wedge 700 Is done.

양측 띠장(800)의 내측에 위치된 강관 버팀보(100a,100b)의 일측은 화타쐐기(700)에 의해 띠장(800)에 내측으로 약 45° 경사지게 연결되고, 강관 버팀보(100a,100b)의 타측은 연결체(300)에 수직으로 연결되어, 2개의 강관 버팀보(100a,100b)는 연결체(300)에서 띠장으로 갈수록 확장되는 형상을 한다.One side of the steel pipe braces (100a, 100b) located in the inner side of the two strips (800) is inclined by about 45 ° inward to the strip (800) by the weft wedge 700, the other of the steel pipe braces (100a, 100b) The side is vertically connected to the connector 300, the two steel pipe braces (100a, 100b) has a shape that extends toward the strip in the connector 300.

상기 양측 띠장(800) 사이의 중간에 위치하고 상하 또는 전후로 인접된 2중강관 버팀보(210)는 2개의 양측 연결체(300) 사이에 수직으로 연결된다.The double steel tube braces 210 positioned in the middle between the two side strips 800 and adjacent to each other vertically or vertically are vertically connected between the two connecting bodies 300.

상기 연결체(300)는 분기된 2개의 강관 버팀보(100a,100b)와 2중강관 버팀보(210)가 수직 연결되어 힘의 전달이 원활할 수 있도록 적어도 3개 이상의 측면을 갖도록 형성된다.The connecting member 300 is formed to have at least three or more sides so that two branched steel pipe braces 100a and 100b and the double steel pipe brace 210 are vertically connected to facilitate the transfer of force.

상기 3면 중에서 일면은 다른 면보다 넓어 2중강관 버팀보(210)가 연결되고 나머지 면은 2개의 강관 버팀보(100a,100b)가 힘을 분산하여 띠장(800)에 전달할 수 있도록 분기되게 연결된다.One side of the three surfaces is wider than the other surface is connected to the double steel pipe brace 210 and the other side is connected to the branch so that the two steel pipe braces (100a, 100b) to distribute the force to the strip (800).

상기 연결체(300)의 띠장(800) 쪽에 하나의 측면이 더 형성되어 상기 2개의 강관 버팀보(100a,100b) 사이에 띠장(800)과 연결체(300)의 측면에 수직으로 연결되는 제3의 강관 버팀보(미도시)를 구비함으로써 띠장(800)에 미치는 힘을 더 분산하여 전달할 수도 있다.One side is further formed on the side of the strip (800) of the connector 300 is connected between the two steel pipe braces (100a, 100b) vertically connected to the side of the strip (800) and the connector 300 By having a steel pipe brace (not shown) of the force on the belt 800 may be further distributed and transmitted.

상기 연결체(300)는 미도시된 철근을 배근하고 앵커볼트(320)의 단부를 강관 버팀보(100a,100b,210)가 있는 쪽으로 돌출되도록 매입한 후, 콘크리트(310)를 타설하여 양생함으로써 제조된다.The connector 300 is manufactured by placing the end of the anchor bolt 320 protruding toward the steel pipe braces (100a, 100b, 210) with the reinforcing bar not shown, and then curing by pouring concrete 310 do.

상기 강관 버팀보(100a,100b,210)의 일측 단부에는 분기된 2개의 강관 버팀보(100a,100b)나 2중강관 버팀보(210)보다 사이즈가 큰 기초판(400)이 용접 등에 의해 각각 접합되고 상기 각 기초판(400)에는 앵커볼트(320)의 단부를 끼울 수 있도록 미도시된 구멍이 다수 형성된다.At one end of the steel pipe braces (100a, 100b, 210) is a base plate 400 having a larger size than the branched two steel pipe braces (100a, 100b) or double steel pipe brace 210, respectively, by welding and the like Each base plate 400 is formed with a number of holes not shown so as to fit the end of the anchor bolt 320.

상기 기초판(400)이 연결체(300)와 접촉된 상태에서 기초판(400)과 강관 버팀보(100a,100b,210)의 외측면에 보강재(500)가 용접 등에 의해 접합되어 강관 버팀보(100a,100b,210)를 지지한다.In the state where the base plate 400 is in contact with the connecting member 300, the reinforcing material 500 is joined to the outer surface of the base plate 400 and the steel pipe braces 100a, 100b, and 210 by welding or the like, and thus the steel pipe brace 100a. , 100b, 210.

이와 같은 상태에서 연결체(300)에 매입되어 외부로 돌출된 앵커볼트(320)의 단부에 기초판(400)을 끼운 후 너트와 같은 체결부재(600)로 앵커볼트(320)의 단부를 체결함으로써 강관 버팀보(100a,100b,210)가 움직이지 않고 고정된다.In such a state, the base plate 400 is inserted into the end of the anchor bolt 320 which is embedded in the connecting body 300 and protrudes to the outside, and then fastens the end of the anchor bolt 320 with the fastening member 600 such as a nut. By doing so, the steel pipe braces 100a, 100b, and 210 are fixed without moving.

도 3은 본 발명의 제2실시예에 따른 강관 버팀보의 Y형 연결구조를 나타내는 도면이다.3 is a view showing a Y-type connection structure of the steel pipe brace according to the second embodiment of the present invention.

도시된 바와 같이, 강관 버팀보(100a,100b,220)와, 연결체(300)와, 기초판(400)과, 보강재(500)와, 체결부재(600) 및 화타쐐기(700)를 포함하여 이루어진다.As shown, including the steel pipe braces (100a, 100b, 220), the connecting member 300, the base plate 400, the reinforcing material 500, the fastening member 600 and the weft wedge 700 Is done.

양측 띠장(800)의 내측에 위치된 강관 버팀보(100a,100b)의 일측은 화타쐐기(700)에 의해 띠장(800)에 내측으로 약 45° 경사지게 연결되고, 강관 버팀보(100a,100b)의 타측은 연결체(300)에 수직으로 연결되어 2개의 강관 버팀보(100a,100b)는 연결체(300)에서 띠장(800)으로 갈수록 확장되는 형상을 한다.One side of the steel pipe braces (100a, 100b) located in the inner side of the two strips (800) is inclined by about 45 ° inward to the strip (800) by the weft wedge 700, the other of the steel pipe braces (100a, 100b) The side is vertically connected to the connector 300, the two steel pipe braces (100a, 100b) has a shape that extends toward the strip 800 from the connector (300).

상기 양측 띠장(800) 사이의 중간에 위치한 대형 강관 버팀보(220)는 2개의 양측 연결체(300) 사이에 수직으로 연결된다.The large steel pipe brace 220 positioned in the middle between the two side strips 800 is vertically connected between the two connecting members 300.

상기 연결체(300)는 2개의 강관 버팀보(100a,100b)와 대형 강관 버팀보(220)가 수직 연결되어 힘의 전달이 원활할 수 있도록 적어도 3개 이상의 측면을 갖도록 형성된다.The connecting member 300 is formed to have at least three or more sides so that two steel pipe braces (100a, 100b) and large steel pipe braces 220 are vertically connected to facilitate the transfer of force.

상기 3면 중에서 일면은 다른 면보다 넓어 대형 강관 버팀보(220)가 연결되고 그 나머지 면은 2개의 강관 버팀보(100a,100b)가 힘을 분산하여 띠장(800)에 전달할 수 있도록 분기되게 연결된다.One side of the three sides is wider than the other side is connected to the large steel pipe brace 220, the other side is connected to the branch so that the two steel pipe braces (100a, 100b) to distribute the force to the strip (800).

상기 연결체(300)의 띠장(800) 쪽에 하나의 측면이 더 형성되어 상기 2개의 강관 버팀보(100a,100b) 사이에 띠장(800)과 연결체(300)의 측면에 수직으로 연결되는 제3의 강관 버팀보(미도시)를 구비함으로써 띠장(800)에 미치는 힘을 더 분산하여 전달할 수도 있다.One side is further formed on the side of the strip (800) of the connector 300 is connected between the two steel pipe braces (100a, 100b) vertically connected to the side of the strip (800) and the connector 300 By having a steel pipe brace (not shown) of the force on the belt 800 may be further distributed and transmitted.

상기 연결체(300)는 미도시된 철근을 배근하고 앵커볼트(320)의 단부를 강관 버팀보(100a,100b,220)가 있는 쪽으로 돌출되도록 매입한 후 콘크리트(310)를 타설하여 양생함으로써 제조된다.The connector 300 is manufactured by placing the end of the anchor bolt 320 to protrude toward the steel pipe braces (100a, 100b, 220) with the reinforcing bar not shown, and then curing by pouring concrete 310 .

상기 강관 버팀보(100a,100b,220)의 일측 단부에는 분기된 2개의 강관 버팀보(100a,100b)나 대형 강관 버팀보(220)의 사이즈보다 큰 기초판(400)이 용접 등에 의해 각각 접합되고 상기 각각의 기초판(400)에는 앵커볼트(320)의 단부를 끼울 수 있도록 미도시된 구멍이 다수 형성된다.One end of the steel pipe braces (100a, 100b, 220) is a base plate 400 that is larger than the size of the two steel pipe braces (100a, 100b) or large steel pipe braces 220 are respectively joined by welding or the like, respectively The base plate 400 is formed with a plurality of holes not shown so as to fit the end of the anchor bolt 320.

상기 기초판(400)이 연결체(300)와 접촉된 상태에서 기초판(400)과 강관 버팀보(100a,100b,220)의 외측면에 보강재(500)가 용접 등에 의해 각각 접합되어 강관 버팀보(100a,100b,220)를 지지한다.In the state where the base plate 400 is in contact with the connecting body 300, the reinforcement 500 is joined to the outer surface of the base plate 400 and the steel pipe braces 100a, 100b, and 220 by welding or the like, respectively. 100a, 100b, and 220 are supported.

이와 같은 상태에서, 연결체(300)에 매입되어 외부로 돌출된 앵커볼트(320)의 단부에 기초판(400)을 끼운 후 너트와 같은 체결부재(600)로 앵커볼트(320)의 단부를 체결함으로써 강관 버팀보(100a,100b,220)가 움직이지 않도록 고정된다.In such a state, the base plate 400 is inserted into the end of the anchor bolt 320 which is embedded in the connecting body 300 and protrudes to the outside, and then ends the end of the anchor bolt 320 with the fastening member 600 such as a nut. By fastening the steel pipe braces (100a, 100b, 220) is fixed not to move.

이상과 같은 강관 버팀보(100,200)의 Y형 연결은 띠장(800)의 사이즈를 키우지 않고서도 대반력을 받는 2중강관 버팀보(210)나 대형 강관 버팀보(220)의 사용이 가능함으로써 전후로 강관 버팀보(210,220)의 간격을 넓힐 수 있고, 흙막이 작업시 필요한 작업구의 설치를 용이하게 할 수 있으며, 터파기 작업 및 지하구조물의 시공을 용이하게 할 수 있다.The Y-type connection of the steel pipe braces (100,200) as described above is possible to use the double steel pipe braces 210 or large steel pipe braces (220) that are subjected to great force without increasing the size of the belt length (800). It is possible to widen the spacing of 210, 220, facilitate the installation of work tools necessary for the work of the earth block, and facilitate the construction of the trench work and underground structures.

또한, 경사 연결이 쉽지 않은 강관 버팀보(210,220)의 연결을 강관 버팀보(210,220)의 손상없이 너트 체결에 의해 연결함으로써 시공의 편의성은 물론 공기를 줄일 수 있고, 강관 버팀보(100,200) 및 연결체(300)를 재활용할 수 있다.In addition, by connecting the connection of the steel pipe support (210,220) that is not easy to be inclined by the nut fastening without damaging the steel pipe support (210,220), it is possible to reduce the air as well as the convenience of construction, steel pipe support (100,200) and the connector 300 ) Can be recycled.

이상 실시예의 대한 첨부된 도면에서 강관 버팀보(100,210,220)가 원형인 것을 예를 들어 도시하였으나, 사각형 등의 다각형도 본 발명의 청구범위에 속한다고 할 것이고, 강관 버팀보(100,210,220)의 강관은 일반 구간용 재질의 강관과 내진용 재질의 강관을 모두 적용할 수 있음은 물론이다.In the accompanying drawings of the above embodiment for example shown that the steel pipe braces 100,210,220 is circular, but polygons such as square will also belong to the claims of the present invention, the steel pipe of the steel pipe braces (100,210,220) for the general section Of course, both the steel pipe of the material and the steel pipe of the earthquake-resistant material can be applied.

이상 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 발명을 설명하기 위한 목적에서 사용된 것일 뿐 의미 한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것이 아니다.Embodiments of the present invention are disclosed in the drawings and the detailed description, and the specific terms used above are used only for the purpose of describing the present invention, and are used to limit the scope of the present invention as defined in the meaning or claims. It is not.

그러므로 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 발명의 진정한 기술적 보호 범위는 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.Therefore, those skilled in the art can be various modifications and other equivalent embodiments from this, and the true technical protection scope of the present invention should be determined by the technical spirit of the claims.

이상에서 살펴본 바와 같이 본 발명에 의하면, 공사현장에서 터파기시 흙막이 공사에 사용되는 강관 버팀보의 공사중 필요한 작업구의 설치나 공사상의 편의를 위한 버팀보 간격의 확장을 흙막이 가설재의 변경없이 할 수 있으며, 용접과 같은 강관 버팀보의 직접 연결을 피하여 너트 연결함으로써 연결이 매우 편리하고 연결체 및 강관 버팀보를 재활용할 수 있다.As described above, according to the present invention, the expansion of the brace beam spacing for the convenience of construction or installation of work tools necessary during the construction of the steel pipe brace used in the construction site when digging in the construction site can be done without welding, and welding By avoiding the direct connection of steel pipe braces such as nuts, the connection is very convenient and the connector and steel pipe braces can be recycled.

Claims (12)

띠장에 미치는 힘을 분산하여 전달할 수 있도록 양측 띠장에 경사지게 설치되는 2개의 강관 버팀보와;Two steel pipe braces that are installed to be inclined at both sides of the belt so as to distribute and transmit the force applied to the belt; 상기 양측 띠장의 내측에 소정거리 이격되어 위치되는 2중강관 버팀보와;A double steel tube brace positioned at a predetermined distance apart from the inside of the two strips; 상기 2개의 강관 버팀보와 2중강관 버팀보 사이에 위치되어 2개의 강관 버팀보와 2중강관 버팀보에 연결되는 연결체 및A connection body located between the two steel pipe braces and the double steel pipe braces and connected to the two steel pipe braces and the double steel pipe braces; 상기 2개의 강관 버팀보와 2중강관 버팀보에 각각 접합되고 상기 연결체에 각각 접촉되어 상기 연결체에 체결되는 기초판을 포함하는 강관 버팀보의 Y형 연결구조.Y-shaped connecting structure of the steel pipe brace includes a base plate which is respectively bonded to the two steel pipe brace and the double steel pipe brace and the contact plate is fastened to the connecting body. 제 1 항에 있어서,The method of claim 1, 상기 연결체는 콘크리트에 매입된 앵커볼트의 단부가 2개의 강관 버팀보와 2중강관 버팀보가 있는 쪽으로 돌출되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The connector is Y-shaped connection structure of the steel pipe braces, characterized in that the end of the anchor bolt embedded in the concrete protrudes toward the two steel pipe braces and double steel pipe braces. 제 2 항에 있어서,The method of claim 2, 상기 기초판은 강관 버팀보 단부에 용접되어 연결체에 매입된 앵커볼트의 단부에 너트 등의 체결부재에 의해 체결되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The base plate is welded to the end of the steel pipe reinforcement, Y-type connection structure of the steel pipe reinforcement, characterized in that is fastened by a fastening member such as a nut to the end of the anchor bolt embedded in the connector. 제 2 항에 있어서,The method of claim 2, 상기 기초판과 2개의 강관 버팀보의 외측면이나 기초판과 2중강관 버팀보의 외측면에 보강재가 접합되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.Y-shaped connection structure of the steel pipe braces, characterized in that the reinforcing material is bonded to the outer surface of the base plate and the two steel pipe braces or the outer surface of the base plate and double steel pipe braces. 제 2 항에 있어서,The method of claim 2, 상기 연결체는 적어도 3개 이상의 측면을 갖고 각 측면에 수직되게 2개의 강관 버팀보와 2중강관 버팀보가 연결되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The connecting body has at least three or more sides of the Y-type connecting structure of the steel pipe braces, characterized in that two steel pipe braces and double steel pipe braces are connected perpendicular to each side. 제 2 항에 있어서,The method of claim 2, 상기 2개의 강관 버팀보 사이에 띠장과 연결체에 수직으로 연결되는 제3의 강관 버팀보가 더 구비되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.Y-shaped connecting structure of the steel pipe braces, characterized in that the third steel pipe braces are further provided between the two steel pipe braces vertically connected to the belt and the connector. 띠장에 미치는 힘을 분산하여 전달할 수 있도록 양측 띠장에 경사지게 설치되는 2개의 강관 버팀보와;Two steel pipe braces that are installed to be inclined at both sides of the belt so as to distribute and transmit the force applied to the belt; 상기 양측 띠장의 내측에 소정거리 이격되어 위치되는 대형 강관 버팀보와;A large steel pipe supporter positioned at a predetermined distance apart from the inside of the two strips; 상기 2개의 강관 버팀보와 대형 강관 버팀보 사이에 위치되어 2개의 강관 버팀보와 대형 강관 버팀보에 연결되는 연결체 및A connection body located between the two steel pipe braces and the large steel pipe brace and connected to the two steel pipe braces and the large steel pipe brace; 상기 2개의 강관 버팀보와 대형 강관 버팀보에 각각 접합되고 상기 연결체에 각각 접촉되어 상기 연결체에 체결되는 기초판을 포함하는 강관 버팀보의 Y형 연결구조.Y-shaped connecting structure of the steel pipe brace includes a base plate which is joined to the two steel pipe braces and the large steel pipe braces, respectively, and in contact with the connecting body is fastened to the connecting body. 제 7 항에 있어서,The method of claim 7, wherein 상기 연결체는 콘크리트에 매입된 앵커볼트의 단부가 2개의 강관 버팀보와 대형 강관 버팀보가 있는 쪽으로 돌출되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The connector is a Y-type connection structure of the steel pipe brace, characterized in that the end of the anchor bolt embedded in the concrete protrudes toward the two steel pipe brace and large steel pipe brace. 제 8 항에 있어서,The method of claim 8, 상기 기초판은 강관 버팀보 단부에 용접되어 연결체에 매입된 앵커볼트의 단부에 너트 등의 체결부재에 의해 체결되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The base plate is welded to the end of the steel pipe reinforcement, Y-type connection structure of the steel pipe reinforcement, characterized in that is fastened by a fastening member such as a nut to the end of the anchor bolt embedded in the connector. 제 8 항에 있어서,The method of claim 8, 상기 기초판과 2개의 강관 버팀보의 외측면이나 기초판과 대형 강관 버팀보의 외측면에 보강재가 접합되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.Y-type connecting structure of the steel pipe braces, characterized in that the reinforcing material is bonded to the outer surface of the base plate and the two steel pipe braces or the outer surface of the base plate and large steel pipe braces. 제 8 항에 있어서,The method of claim 8, 상기 연결체는 적어도 3개 이상의 측면을 갖고 각 측면에 수직되게 2개의 강관 버팀보와 대형 강관 버팀보가 연결되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.The connector has at least three or more sides of the Y-type connecting structure of the steel pipe braces, characterized in that two steel pipe braces and large steel pipe braces are connected perpendicular to each side. 제 8 항에 있어서,The method of claim 8, 상기 2개의 강관 버팀보 사이에 띠장과 연결체에 수직으로 연결되는 제3의 강관 버팀보가 더 구비되는 것을 특징으로 하는 강관 버팀보의 Y형 연결구조.Y-shaped connecting structure of the steel pipe braces, characterized in that the third steel pipe braces are further provided between the two steel pipe braces vertically connected to the belt and the connector.
KR1020050133875A 2005-12-29 2005-12-29 Y Type Connecting Structure of Steel Pipe Struts KR100698878B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050133875A KR100698878B1 (en) 2005-12-29 2005-12-29 Y Type Connecting Structure of Steel Pipe Struts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050133875A KR100698878B1 (en) 2005-12-29 2005-12-29 Y Type Connecting Structure of Steel Pipe Struts

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020050036944U Division KR200414057Y1 (en) 2005-12-29 2005-12-29 Y Type Connecting Structure of Steel Pipe Struts

Publications (1)

Publication Number Publication Date
KR100698878B1 true KR100698878B1 (en) 2007-03-22

Family

ID=41564244

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050133875A KR100698878B1 (en) 2005-12-29 2005-12-29 Y Type Connecting Structure of Steel Pipe Struts

Country Status (1)

Country Link
KR (1) KR100698878B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908479B1 (en) * 2008-04-04 2009-07-21 최해곤 Multi-girder for construction work and/or civil engineering works
WO2015009124A1 (en) * 2013-07-19 2015-01-22 ㈜써포텍 Strut connection structure for constructing temporary earth retaining structure
KR101542602B1 (en) * 2014-07-22 2015-08-17 주식회사 수창이앤씨 건축사사무소 Equipment of temporary earth protection for building works
CN106351234A (en) * 2016-10-24 2017-01-25 北京工业大学 Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN106351235A (en) * 2016-10-24 2017-01-25 北京工业大学 Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method
KR20180078782A (en) * 2016-12-30 2018-07-10 서경식 Steel pipe strut with 2 way connection member
KR20190105939A (en) 2018-03-07 2019-09-18 (주)핸스 Connection member for strut connection device and strut connection device having the same
CN110670601A (en) * 2019-09-27 2020-01-10 东南大学 Axial force compensation device acting on steel support and using method thereof
KR102076081B1 (en) * 2019-09-04 2020-02-11 주식회사 유앤에스엔지니어링 Strut Connector Assembly
CN115075255A (en) * 2022-05-30 2022-09-20 中国水利水电第十四工程局有限公司 Building is composite set for excavation supporting

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908479B1 (en) * 2008-04-04 2009-07-21 최해곤 Multi-girder for construction work and/or civil engineering works
WO2015009124A1 (en) * 2013-07-19 2015-01-22 ㈜써포텍 Strut connection structure for constructing temporary earth retaining structure
JP2016528406A (en) * 2013-07-19 2016-09-15 サポーテック カンパニー リミテッド Beam connection structure of temporary retaining works for earth retaining
KR101542602B1 (en) * 2014-07-22 2015-08-17 주식회사 수창이앤씨 건축사사무소 Equipment of temporary earth protection for building works
CN106351234A (en) * 2016-10-24 2017-01-25 北京工业大学 Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN106351235A (en) * 2016-10-24 2017-01-25 北京工业大学 Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method
KR20180078782A (en) * 2016-12-30 2018-07-10 서경식 Steel pipe strut with 2 way connection member
KR101915014B1 (en) * 2016-12-30 2018-11-06 서경식 Steel pipe strut with 2 way connection member
KR20190105939A (en) 2018-03-07 2019-09-18 (주)핸스 Connection member for strut connection device and strut connection device having the same
KR102076081B1 (en) * 2019-09-04 2020-02-11 주식회사 유앤에스엔지니어링 Strut Connector Assembly
CN110670601A (en) * 2019-09-27 2020-01-10 东南大学 Axial force compensation device acting on steel support and using method thereof
CN115075255A (en) * 2022-05-30 2022-09-20 中国水利水电第十四工程局有限公司 Building is composite set for excavation supporting

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR101329440B1 (en) Steel pipe strut having an enclosure connector
KR100855098B1 (en) Strut structure as temporary system using a vertical truss at the end and the method thereof
JP3071402B2 (en) Lifting method of structure, jack engaging structure and bracket used in the method
US20060179730A1 (en) Wall structural member and method for constructing a wall structure
KR20080005109A (en) Structure for supporting retaining wall of earth with arch material and method constructing the arch structure
KR100698878B1 (en) Y Type Connecting Structure of Steel Pipe Struts
KR100733719B1 (en) Length control type steel pipe strut
KR100916546B1 (en) Underground temporary structure and constructing method thereof
KR100633796B1 (en) Connecting structure of mid supporting beam for temporary soil sheathing work
KR102478561B1 (en) Connector with insertion groove for wale and strut of earth retaining wall
JP2000352296A (en) Method o constructing passage just under underground structure
KR101074699B1 (en) Cross shape supporting device for earth retaining wall pile
KR20100001516A (en) Joint structure for connecting slant supporter and square steel strut for temporary soil sheathing work
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
KR100945655B1 (en) A tight connection between steel pipe strut and center pile
KR101952669B1 (en) Temporary facility circular retaining wall method using arched steel plate and guide structure
KR200414057Y1 (en) Y Type Connecting Structure of Steel Pipe Struts
CN115110966A (en) Tunnel supporting structure and construction method
CN110671114B (en) Recovery type round vertical shaft supporting device and method
KR20150010422A (en) Mid supporting beam for temporary soil sheathing work
KR100397958B1 (en) The structure timbering of cut with separating wale and the construction method thereof
KR102185246B1 (en) Temporary retaining wall system and construction method thereof
KR20010028793A (en) Precast Retaining Wall Using High Strength Micro Pile
KR100858712B1 (en) Corner connecting apparatus of temporary soil sheathing work

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121231

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140317

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150316

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180316

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190317

Year of fee payment: 13