KR100633418B1 - Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method - Google Patents
Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method Download PDFInfo
- Publication number
- KR100633418B1 KR100633418B1 KR1020040026426A KR20040026426A KR100633418B1 KR 100633418 B1 KR100633418 B1 KR 100633418B1 KR 1020040026426 A KR1020040026426 A KR 1020040026426A KR 20040026426 A KR20040026426 A KR 20040026426A KR 100633418 B1 KR100633418 B1 KR 100633418B1
- Authority
- KR
- South Korea
- Prior art keywords
- drainage
- bamboo
- soft ground
- horizontal
- rod
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1685—Shapes cylindrical
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0071—Wood
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
본 발명은 배수용 대나무봉 및 이를 이용한 연약지반 처리공법 및 수평배수공법에 관한 것으로, 대나무 마디의 격벽이 천공되어 대나무봉 내부에 배수로가 형성되며, 대나무봉의 둘레부에 다수의 배수공이 형성되는 것을 특징으로 하는 배수용 대나무봉과 이를 연직배수재로서 이용하는 연약지반 처리공법 및 이를 유공관으로서 이용하는 수평배수공법을 제공한다.The present invention relates to a bamboo rod for drainage, and a soft ground treatment method and a horizontal drainage method using the same, wherein a partition wall of a bamboo node is perforated to form a drainage path in the bamboo rod, and a plurality of drainage holes are formed at the periphery of the bamboo rod. There is provided a bamboo bar for drainage, a soft ground treatment method using the vertical drainage material, and a horizontal drainage method using the same as a perforated pipe.
배수, 대나무, 배수공, 연약지반, 연직배수재, 유공관Drainage, Bamboo, Drainage, Soft Ground, Vertical Drainage, Merit Pipe
Description
도 1은 본 발명의 일 실시예에 의한 대나무봉의 종단면도,1 is a longitudinal sectional view of a bamboo bar according to an embodiment of the present invention,
도 2는 본 발명에 따른 대나무봉을 이용한 연약지반 처리공법의 시공상태도,Figure 2 is a construction state of the soft ground treatment method using a bamboo bar according to the present invention,
도 3은 연약지반 내에 연직배수재로서의 배수용 대나무봉을 시공하는 개략 단면도,3 is a schematic cross-sectional view of constructing a bamboo rod for drainage as a vertical drainage material in a soft ground;
도 4는 본 발명에 따른 대나무봉을 이용한 수평배수공법의 단면도,4 is a cross-sectional view of the horizontal drainage method using a bamboo rod according to the present invention,
도 5는 본 발명에 따른 대나무봉을 다발 형태로 한 경우의 단면도이다.5 is a cross-sectional view of the bamboo rod according to the present invention in the form of a bundle.
< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>
10 : 배수용 대나무봉 11 : 격벽10: bamboo stick for drainage 11: bulkhead
12 : 둘레부 12a : 배수공12:
13 : 배수로 14 : 토사 침투홈13: drain 14: soil infiltration groove
본 발명은 배수용 대나무봉 및 이를 이용한 연약지반 처리공법 및 수평배수공법에 관한 것으로, 특히 연약지반 내에 연직배수재를 설치하여 연약지반을 개량하는 연약지반 처리공법 또는 연약지반 상부에 유공관을 부설한 후 모래 등을 포설하여 수평배수층을 형성하는 수평배수공법에 있어서 상기 연직배수재 혹은 상기 유공관으로서 대나무봉을 사용하는 연약지반 처리공법 및 수평배수공법, 이러한 용도용도 등으로 사용될 수 있는 배수용 대나무봉에 관한 것이다.The present invention relates to a bamboo rod for drainage, and a soft ground treatment method and a horizontal drainage method using the same, in particular after installing a vertical drainage material in the soft ground to lay a soft ground treatment method or a soft ground on top of the soft ground. In the horizontal drainage method of laying sand and the like to form a horizontal drainage layer, a soft ground treatment method and a horizontal drainage method using bamboo rods as the vertical drainage material or the hollow pipe, and a drainage bamboo bar that can be used for such use purposes, etc. will be.
연약지반은 호소매립지, 간척지 등과 같이 높은 함수율을 가진 토양으로 구성된 지형으로서, 이러한 연약지반은 하중에 취약하기 때문에 토목 또는 건축공사를 행하기 전에 지반강화작업을 우선적으로 시행하여야 한다.Soft ground is composed of soils with high water content such as landfills and reclaimed land. Since these soft grounds are vulnerable to loads, ground reinforcement should be carried out prior to civil engineering or construction work.
연약지반 처리공법의 일종인 연직배수공법(vertical drain method)은 연약한 점토층 내에 인공적으로 연직배수재를 설치하여 배수거리를 단축시켜서 압밀을 촉진시키는 공법이다. 이러한 공법으로서 모래를 연직배수재로 사용하는 샌드드레인공법(sand drain method), 모래의 유출을 방지하기 위하여 포대 속에 모래를 채운 팩드레인공법(pack drain method), 특수가공된 플라스틱재를 사용하는 페이퍼드레인공법(paper drain method) 등이 널리 알려져 있다.The vertical drain method, which is a kind of soft ground treatment method, is a method of promoting consolidation by shortening the drainage distance by artificially installing a vertical drainage material in a soft clay layer. As such a method, sand drain method using sand as a vertical drainage, a pack drain method filled with sand in a bag to prevent sand leakage, and paper drain using specially processed plastic materials Paper drain methods and the like are widely known.
샌드드레인공법은 점토층에 일정한 간격으로 천공을 한 후 투수성이 큰 모래를 채워 모래기둥을 형성한 후 성토 등에 의해 상재하중을 가하는 것으로, 이 상재 하중이 점토층에 압력을 가하면 간극수는 연직방향과 샌드드레인으로의 수평방향으로 배출되어 점토층의 압밀침하가 촉진되는 것이다.In the sand draining method, the clay layer is drilled at regular intervals, filled with highly permeable sand to form a column of sand, and a load is applied to the clay layer. It is discharged in the horizontal direction to the drain to promote consolidation settlement of the clay layer.
샌드드레인공법의 경우 심도에 따른 지형변화가 있고 특히 높은 함수비의 연약층에서는 모래기둥 단면의 불균일, 불연속 시공이 발생할 수 있으며, 압밀 진행에 따른 과도한 응력집중으로 모래 기둥의 절단 등의 문제가 발생할 수 있다. In the case of the sand drain method, the topography changes according to the depth, and especially in the soft layer of high water content, non-uniformity and discontinuous construction of the cross section of the sand column may occur, and problems such as cutting the sand column due to excessive stress concentration due to the consolidation process may occur. .
한편, 샌드드레인을 박기 전에 연약지반 표면에 수평모래층(sand mat)을 깔며, 이는 연약지반의 압밀침하를 위한 상부 배수층의 역할과 성토층 속으로 지하수가 상승하는 것을 차단하고 시공장비의 주행성을 확보하는 지지층의 역할을 위한 것이다.On the other hand, sand sand is laid on the surface of soft ground before sand draining, which acts as an upper drainage layer for consolidation and settlement of soft ground and blocks groundwater from rising into the fill layer and ensures the operability of construction equipment. It is for the role of the support layer.
팩드레인공법은 투수성이 있는 합성수지로 된 포대에 모래를 채워 드레인재로 사용하는 것이다.Pack drain method is to fill sand bag made of permeable synthetic resin and use it as drain material.
팩드레인 공법의 경우, 시공 도중에 드레인재가 지중으로 빠진다거나 드레인재가 꼬여서 윗부분과 아랫부분이 단절될 수 있으며, 또한 직경이 비교적 작기 때문에 압밀 도중에 끊어질 수 있는 문제가 있다.In the case of the pack drain method, the drain material may fall into the ground during construction, or the drain material may be twisted to cut off the upper part and the lower part, and because the diameter is relatively small, there is a problem that it may be broken during consolidation.
페이퍼드레인공법은 종이재질의 카드보드(card board) 또는 합성수지재의 플라스틱보드(plastic board) 등의 페이퍼(paper)가 들어있는 맨드렐(mandrel, tube)를 점토층에 삽입한 후 페이퍼를 남겨두고 맨드렐만을 빼내면, 이 페이퍼가 연직배수 통로의 역할을 하여 압밀을 촉진시키는 것이다.The paper drainage method inserts a mandrel (tube) containing paper, such as a card board made of paper or a plastic board made of synthetic resin, into a clay layer, and then leaves the paper and mandrel. When the bay is pulled out, the paper acts as a vertical drainage passage to promote consolidation.
페이퍼드레인공법의 경우, 통수단면이 고르지 못하여 횡방향의 토압으로 통수단면이 축소되어 흐름저항(웰레지스턴스, well resistance)이 많이 걸리고, 굴곡 될 경우 유로가 차단되어 간극수의 흡수 성능 저하가 문제가 된다.In the case of the paper drain method, the through surface is uneven and the through surface is reduced due to the transverse earth pressure, so that the flow resistance (well resistance, well resistance) takes a lot. .
이러한 종래의 일반적인 연직배수공법의 문제점을 해결하기 위한 시도가 있었다.There has been an attempt to solve the problems of the conventional vertical drainage method.
본 명세서에 일체화된 국내 공개특허공보 공개번호 특2001-0104411호 "튜브형 배수관을 이용한 준설토 연약지반의 탈수 촉진을 위한 시공법 및 튜브형 배수관", 국내 공개특허공보 특2001-0035468호 "인프레이티드드레인을 이용한 점성토 연약지반의 압밀탈수 촉진 시공법 및 인프레이티드드레인", 국내 공개특허공보 특2002-0074847호 "2중 연직배수구조를 통한 연약지반 강화시스템 및 그 시공방법" 등이 이에 해당한다.Korean Laid-Open Patent Publication No. 2001-0104411 "Integration method and tubular drainage pipe for promoting dehydration of soft ground of dredged soil using tube-type drain pipe", Korean Patent Laid-Open Publication No. 2001-0035468 "Using inflated drain Consolidation dehydration promotion method and infused drainage of soft soils of cohesive soils, and Korean Patent Publication No. 2002-0074847, "Soft ground reinforcement system through double vertical drainage structure and its construction method", and the like.
그러나 상기의 방법들은 모두 연직배수재로서 합성수지 계열을 사용하고 있다.However, the above methods all use synthetic resin series as vertical drainage.
이러한 합성수지재는 인공적으로 제조되는 것으로서 그 제조공정이 복잡할 뿐만 아니라 제품단가가 높아 상용화되기 어렵다는 단점이 있다.Such synthetic resin material is manufactured artificially, and the manufacturing process is not only complicated, but also has a disadvantage in that it is difficult to be commercialized due to high product cost.
또한 합성수지 계열의 연직배수재가 지반에 매설될 경우, 압밀침하가 완료된 후에도 합성수지 계열의 연직배수재는 지반에 그대로 남아 환경오염을 유발시킨다.In addition, when the vertical drainage of synthetic resin is buried in the ground, the vertical drainage of the synthetic resin remains intact on the ground even after consolidation settlement is completed, causing environmental pollution.
또한 종래부터 연약지반 상부에 유공관을 수평으로 부설한 후 모래 등을 포설하여 수평배수층을 형성하는 수평배수공법이 널리 알려져 있다.In addition, the horizontal drainage method of forming a horizontal drainage layer by laying sand and the like after laying the perforated pipe horizontally on the soft ground has been widely known.
이러한 유공관의 경우에도 배수가 완료된 후 지반에 그대로 남아 환경오염을 유발하는 문제가 있었다.Even in the case of these perforated pipes, there is a problem of causing environmental pollution after the drainage is completed.
또한 연직배수재 혹은 유공관 등이 매설된 후 필요에 따라 그 지역을 다시 굴착할 필요가 있을 경우 연직배수재 혹은 유공관의 제거에 막대한 공사비가 투입되어야 한다.In addition, if the vertical drainage or merit pipes are buried, and there is a need to excavate the area again, a huge construction cost should be invested in the removal of the vertical drainage or merit pipes.
따라서 본 발명의 목적은, 연직배수재 또는 유공관 등으로 사용될 수 있는 친환경적인 재료를 제공하기 위한 것이다.Therefore, an object of the present invention, to provide an environmentally friendly material that can be used as a vertical drainage or perforated pipes.
즉, 적어도 압밀침하 내지 배수가 완료될 동안의 기간동안은 연직배수재 또는 유공관 등으로 사용될 수 있을 정도의 내구력을 보유하면서도 압밀침하 내지 배수가 완료된 후에는 자연상태에서 자연스럽게 분해가 진행되는 재료를 제공하기 위한 것이다.That is, to provide a material that retains durability enough to be used as a vertical drainage or perforated pipe, at least during the period of consolidation settlement or drainage, but naturally decomposes in a natural state after the settlement or drainage is completed. It is for.
또한 본 발명의 목적은, 연직배수재 또는 유공관 등으로 사용될 수 있는 재료 중에서 자연환경에서 자연적으로 발생하여 성장하는 재료로서 도처에서 용이하게 매우 경제적인 가격으로 제공될 수 있는 재료를 제공하기 위한 것이다.It is also an object of the present invention to provide a material that can be easily and everywhere available at a very economical price as a material naturally occurring and growing in a natural environment among materials that can be used as a vertical drainage or perforated pipe.
또한 본 발명의 목적은 필요에 따라서는 제거가 매우 용이한 연직배수재 또는 유공관의 재료를 제공하기 위한 것이다.It is also an object of the present invention to provide a material for vertical drainage or perforated pipe that is very easy to remove as necessary.
또한 본 발명의 목적은 상기와 같이 친환경적인 재료를 이용하여 연약지반 처리공법 혹은 수평배수공법을 시행하는 방법을 제공하는 것이다.
It is also an object of the present invention to provide a method for implementing a soft ground treatment method or a horizontal drainage method using environmentally friendly materials as described above.
상기의 과제를 해결하기 위하여 본 발명은, 대나무봉에 있어서 : 대나무 마디의 격벽이 천공되어 대나무봉 내부에 배수로가 형성되며, 대나무봉의 둘레부에 다수의 배수공이 형성되는 것을 특징으로 하는 배수용 대나무봉을 제공한다.In order to solve the above problems, the present invention, in the bamboo rod: the partition wall of the bamboo bar is perforated to form a drainage path in the bamboo rod, the drainage bamboo, characterized in that a plurality of drainage holes are formed in the periphery of the bamboo rod Provide a rod.
본 발명의 다른 사상으로, 연약지반 내에 연직배수재를 설치하여 지반의 압밀을 촉진시키는 연약지반 처리공법에 있어서, 상기 연직배수재로서 상기의 배수용 대나무봉을 사용하는 것을 특징으로 한다.According to another aspect of the present invention, in the soft ground treatment method for installing a vertical drainage material in the soft ground to promote consolidation of the ground, the above-mentioned drainage bamboo bar is used as the vertical drainage material.
본 발명의 또다른 사상으로, 연약지반 상부에 유공관을 부설한 후 모래 등을 포설하여 수평배수층을 형성하는 수평배수공법에 있어서 : 상기 유공관으로서 상기의 배수용 대나무봉을 사용하는 것을 특징으로 한다.In still another aspect of the present invention, in the horizontal drainage method of forming a horizontal drainage layer by laying sand and the like after laying a hole on the soft ground, the above-mentioned drainage bamboo bar is used as the hole.
이하 본 발명의 일 실시예에 따라 그 구성과 작용을 상세히 설명한다.Hereinafter will be described in detail the configuration and operation according to an embodiment of the present invention.
도 1은 본 발명의 일 실시예에 의한 대나무봉의 종단면도이다.1 is a longitudinal cross-sectional view of a bamboo bar according to an embodiment of the present invention.
통상적인 대나무봉(10)은 둘레부(12)와 대나무 마디의 격벽(11)으로 이루어져 있다.
대나무봉의 경우 자연환경에서 자연적으로 발생하여 성장하는 재료로서 도처에서 용이하게 매우 경제적인 가격으로 구입할 수 있다.Bamboo sticks are naturally occurring and growing materials in the natural environment and can be easily purchased at very economical prices everywhere.
또한 대나무봉의 경우 대나무 마디의 격벽만을 천공하는 것만으로도 별도의 제조공정없이 중공의 봉형태를 가지기때문에, 일반적인 유공관 등에 비하여 제조방법이 매우 용이하다.In addition, in the case of bamboo rods, only the perforation of the partition wall of the bamboo bar has a hollow rod shape without a separate manufacturing process, and thus the manufacturing method is very easy as compared to general perforated pipes.
또한 대나무봉의 경우 일반적인 나무 등과 달리 수중에서도 난분해성 성질을 가지므로 연직배수재 또는 배수용 유공관으로 사용되기에 적합하며, 일정 정도의 기간이 경과하면 자연적으로 분해되므로 환경오염의 우려가 없다. In addition, bamboo rods are not suitable for being used as vertical drainage or drainage pipes because they have hardly degradable properties in water, unlike ordinary trees.There is no risk of environmental pollution since they decompose naturally after a certain period of time.
또한 대나무봉의 경우 일반적인 나무 등에 비하여 횡하중 및 축하중에 대한 저항력이 크다.In addition, bamboo rods are more resistant to lateral loads and celebrations than ordinary trees.
삭제delete
본 실시예의 경우 대나무 마디의 격벽(11)은 천공되어 있다. 대나무 마디의 격벽(11)이 천공되는 크기는 필요에 따라 적절하게 조정될 수 있으며, 격벽(11)이 완전히 천공되어 격벽(11)의 흔적이 남지 않을 수도 있다.In the present embodiment, the
따라서 대나무 마디의 격벽(11)이 천공되면, 대나무봉(10)은 그 길이방향을 따라 대나무봉(10) 내부에 배수로(13)가 형성된다.Therefore, when the
본 실시예의 경우 대나무봉(10)의 둘레부(12)에는 다수의 배수공(12a)이 형성되어 있다.In this embodiment, a plurality of
따라서 대나무봉(10)의 외곽에 간극수가 존재할 경우 그 간극수는 배수공(12a)을 따라 유입되어 배수로(13)를 따라 흘러갈 수 있다.Therefore, when there is a gap water outside the
본 대나무봉의 제조를 위하여 온전한 대나무봉에 직접 격벽 천공과 배수공 형성 작업을 수행할 수 있다.For the manufacture of this bamboo bar can be carried out for the bulkhead perforation and drainage forming work directly on the intact bamboo bar.
또한 본 대나무봉에 격벽 천공 작업을 수행하기 위하여, 온전한 대나무봉을 길이방향을 따라 이등분으로 절단한 후 격벽 제거 작업을 수행하는 방안이 고려될 수 있다. 격벽 제거 작업 수행 후 격벽이 제거된 대나무봉 조각을 다시 합쳐 대나무봉의 외부 혹은 내부에서 대나무봉 조각을 결합하는 방법이 고려될 수 있다. 경우에 따라서는 3조각 혹은 4조각으로 절단하여 격벽 제거 작업을 수행하는 방법이 고려될 수도 있다.In addition, in order to perform the barrier rib drilling operation on the bamboo rod, a method of performing the barrier rib removal operation after cutting the intact bamboo rod in two equal parts along the longitudinal direction may be considered. After performing the bulkhead removal operation, a method of combining the bamboo stick pieces on the outside or the inside of the bamboo stick by re-joining the bamboo stick pieces from which the bulkhead is removed may be considered. In some cases, a method of removing the partition wall by cutting into three or four pieces may be considered.
상기와 같이 대나무봉이 절단된 후 다시 결합되는 경우에도 이는 본 발명의 권리범위에 속하는 것이다.Even if the bamboo bar is cut and bonded again as described above it is within the scope of the present invention.
도 2는 본 발명에 따른 대나무봉을 이용한 연약지반 처리공법의 시공상태도이며, 이하에서는 도 2를 이용하여 대나무봉을 이용한 연약지반 처리공법을 설명한다.Figure 2 is a construction state of the soft ground treatment method using a bamboo bar according to the present invention, hereinafter will be described a soft ground treatment method using a bamboo bar using FIG.
연약지반 처리공법은 연약지반 내에 연직배수재를 설치하여 지반의 압밀을 촉진시키는 공법을 말하여, 이미 다양한 방법이 널리 알려져 있으며, 본 발명은 연약지반 처리공법의 연직배수재를 상기의 배수용 대나무봉을 이용하는 것에 관한 것이다.Soft ground treatment method refers to a method for promoting the consolidation of the ground by installing a vertical drainage in the soft ground, a variety of methods are already known, the present invention is the vertical drainage of the soft ground treatment method of the bamboo rod for drainage It is about using.
따라서 이하의 실시예는 본 발명의 하나의 실시예에 불과하며, 본 발명의 범위는 이하의 실시예에 한정되지 않는다.Therefore, the following embodiments are merely one embodiment of the present invention, the scope of the present invention is not limited to the following embodiments.
먼저 연약지반 표면에 모래 등을 포설하여 수평배수층(20, sand mat)을 형성한다. 이는 연약지반의 압밀침하를 위한 상부 배수층의 역할과 성토층 속으로 지하수가 상승하는 것을 차단하고 시공장비의 주행성을 확보하는 지지층의 역할을 수행하기 위한 것이다. First, sand is laid on the surface of the soft ground to form a horizontal drainage layer 20 (sand mat). This is to play the role of the upper drainage layer for consolidation settlement of the soft ground and to support the groundwater to block the rise of groundwater into the fill layer and to secure the runability of construction equipment.
이후 하단부에 원추형 구조로 개폐구가 마련된 강관에 배수용 대나무봉(10)을 삽입한 후 배수용 대나무봉(10)이 삽입된 상태에서 강관을 소정의 깊이로 연약지반에 박아 넣는다.After inserting the bamboo pole for
다음으로 강관을 인발하면 연약지반 내부에 배수용 대나무봉(10)만이 남게 된다. 즉, 강관의 인발시 배수용 대나무봉(10)의 하단에 의하여 원추형 개폐구가 확개되어 강관만이 인발되는 것이다.Next, when drawing the steel pipe, only the
이후 성토(30)를 하여 지표면에 상재하중을 가한다. 이 상재하중은 점토층에 압력을 가하고, 점토층 내의 간극수는 연직방향과 배수용 대나무봉(10)의 배수공으로의 수평방향으로 배출되어 점토층의 압밀침하가 촉진된다.After the fill (30) is applied to the earth surface load. This load is applied to the clay layer, and the pore water in the clay layer is discharged in the vertical direction and in the horizontal direction to the drain hole of the
연약지반 내에 배수용 대나무봉을 사용될 경우 배수용 대나무봉은 연직배수재로서의 역할 뿐만 아니라 여타 재료에 비하여 축방향의 하중에 견디는 힘이 크므로 일종의 기초로서의 역할을 수행할 수 있다.When the bamboo pole for drainage is used in the soft ground, the bamboo pole for drainage not only functions as a vertical drainage material but also has a greater force to endure the axial load than other materials, and thus may serve as a kind of foundation.
도 3은 연약지반 내에 연직배수재로서의 배수용 대나무봉을 시공하는 개략 단면도이다.3 is a schematic cross-sectional view of constructing a bamboo rod for drainage as a vertical drainage material in a soft ground;
배수용 대나무봉(10)은 정착구(110)에 의하여 점토층에 삽입될 수 있다.The
배수용 대나무봉(10)의 하단부는 경사지게 절단되어 그 끝단이 점토층에 용이하게 삽입될 수 있도록 형성되어 있다.The lower end of the bamboo pole for
배수용 대나무봉(10)의 하단부에는 그 하단부를 통하여 점토층이 내부로 침입하는 것을 방지하기 위하여 철망 또는 합성섬유 재질의 천 등으로 이루어진 보호캡(15)이 장착될 수 있지만, 실시예에 따라서는 보호캡(15)없이 사용할 수도 있다.The lower end of the bamboo rod for
배수용 대나무봉(10)의 둘레부 외면에는 토사 침투홈(14)이 복수개 형성되어 있다. 토사 침투홈(14)은 대나무봉의 하단부로 편향되게 함몰되어 있으며, 바람직하게는 토사 침투홈(14)의 하부 종단면은 수평으로 형성되어 있다. 따라서 배수용 대나무봉(10)이 점토층에 삽입되면, 토사 침투홈(14)으로 점토층의 토사가 침입하며, 토사 침투홈(14)으로 침투된 토사는 배수용 대나무봉(10)이 점토층 상부로 빠져나가는 것을 막아주는 역할을 수행한다.A plurality of
즉, 토사 침투홈(14)은 배수용 대나무봉(10)의 상방향 이동에 대한 저항성을 가지나, 배수용 대나무봉(10)의 하방향 이동에 대한 저항성이 거의 없다.That is, the
본 실시예의 경우 다수의 배수공(12a)이 토사 침투홈(14)과 별도로 형성되지만, 경우에 따라서는 토사 침투홈(14)이 배수용 대나무봉(10)의 둘레부(12) 내면에까지 연장되어, 토사 침투홈(14)에 배수공(12a)이 함께 형성되도록 할 수도 있다. In the present embodiment, a plurality of
지면의 상부에서는 정착구(110, collet chuck)를 이용하여 배수용 대나무봉(10)을 지반에 삽입한다.The upper portion of the ground is inserted into the
삭제delete
삭제delete
도 4은 본 발명에 따른 대나무봉을 이용한 수평배수공법의 단면도이며, 이하에서는 도 4를 이용하여 대나무봉을 이용한 수평배수공법을 설명한다.4 is a cross-sectional view of a horizontal drainage method using a bamboo rod according to the present invention, hereinafter will be described a horizontal drainage method using a bamboo rod using FIG.
수평배수공법은 유공관을 부설한 후 모래 등을 포설하여 수평배수층을 형성하여 공법을 말하며, 이미 다양한 방법들이 널리 알려져 있으며, 본 발명은 수평배수공법의 유공관으로서 상기의 배수용 대나무봉을 이용하는 것에 관한 것이다. The horizontal drainage method refers to a method of forming a horizontal drainage layer by laying sand and the like after laying a hollow hole, and various methods are already known. The present invention relates to the use of the above-mentioned drainage bamboo bar as a hollow pipe of the horizontal drainage method. will be.
따라서 이하의 실시예는 본 발명의 하나의 실시예에 불과하며, 본 발명의 범위는 이하의 실시예에 한정되지 않는다.Therefore, the following embodiments are merely one embodiment of the present invention, the scope of the present invention is not limited to the following embodiments.
먼저 연약지반에 트렌치(trench, 40)를 마련한다.First, a trench 40 is formed in the soft ground.
다음으로 트렌치(40)에 바닥모래(51)를 포설하며 그 상부에 배수용 대나무봉(10)을 대체로 수평으로 설치한다. 통상적으로 배수용 대나무봉(10)은 배수를 원활히 하기 위하여 일정 정도의 슬로프(slope)를 두고 설치한다.Next, the
다음으로 연약지반 상부 전체에 모래를 포설하여 수평배수층(50)을 형성한다.Next, sand is deposited on the entire upper part of the soft ground to form a
따라서 연약지반 내의 물은 수평배수층(50)으로 이동한 후, 수평배수층(50)의 하부에 매설된 배수용 대나무봉(10)의 배수공(12a)을 통해 배수용 대나무봉(10) 내부로 유입되어, 대나무봉(10) 내부의 배수로(13)를 따라 흘러나간다.Therefore, the water in the soft ground flows into the
물론 이와 같은 수평배수공법은 상기의 연약지반 처리공법에서의 수평배수층(10)의 배수방식에도 이용될 수 있다. Of course, such a horizontal drainage method can also be used in the drainage method of the
또한 본 실시예에 도시하지 않았지만, 본 배수용 대나무봉을 연직배수재 또는 유공관으로 이용할 경우 본 배수용 대나무봉을 부직포 등을 이용하여 외부에서 감싸서 이용하거나 본 배수용 대나무봉 내부 또는 외부에 충진재를 삽입 또는 부설하여 사용하는 방식이 고려될 수 있다.In addition, although not shown in the present embodiment, when using this drainage bamboo rods as vertical drainage or perforated pipes, the drainage bamboo rods may be wrapped around the outside using a nonwoven fabric or the like, or a filler may be inserted into or inside the drainage bamboo rods. Alternatively, the method of laying and using may be considered.
도 5는 본 배수용 대나무봉을 다발 형태로 한 경우의 단면도이다. Figure 5 is a cross-sectional view in the case of the bundle of drainage bamboo rods.
본 배수용 대나무봉을 도 5와 같이 다발 형태로 하여 연약지반 처리공법 또는 수평배수공법 등에 사용하는 방법이 고려될 수 있다. 도 5에서는 배수용 대나무봉을 다발 형태로 묶는 구성에 관하여 도시하지 않았지만, 복수의 배수용 대나무봉을 다발 형태로 묶는 구성으로서는 단순히 결속선 또는 노끈 등을 이용하여 묶는 방법 외에도 다양한 방법이 제안될 수 있을 것이다.This drainage bamboo bar in the form of a bundle as shown in Figure 5 may be considered a method of using the soft ground treatment method or horizontal drainage method. Although not shown in Figure 5 with respect to the configuration for tying the bamboo sticks for drainage in bundle form, as a configuration for tying a plurality of bamboo sticks for drainage in a bundle form, various methods in addition to the method of tying using a tie or a rope may be proposed. There will be.
이와같이 다발형태로 사용할 경우 시공속도를 향상시킬 수 있어 경제적인 시공이 가능할 뿐만 아니라 압밀침하속도의 증가 내지 수평배수기간의 단축을 도모할 수 있다.In this way, when used in the form of a bundle, the construction speed can be improved, and economical construction is possible, and the consolidation settlement speed can be increased or the horizontal drainage period can be shortened.
본 발명에 의하여 적어도 압밀침하 내지 배수가 완료될 동안의 기간동안은 연직배수재 또는 유공관 등으로 사용될 수 있을 정도의 내구력을 보유하면서도 압밀침하 내지 배수가 완료된 후에는 자연상태에서 자연스럽게 분해가 진행되는 배수용 대나무봉이 제공된다.According to the present invention, at least during the period during which the consolidation settlement or drainage is completed, while maintaining durability enough to be used as a vertical drainage or perforated pipe, etc. Bamboo sticks are provided.
또한 본 발명에 의하여, 연직배수재 또는 유공관 등으로 사용될 수 있는 재료 중에서 자연환경에서 자연적으로 발생하여 성장하는 재료로서 도처에서 용이하게 매우 경제적인 가격으로 구입할 수 있는 배수용 대나무봉이 제공된다.In addition, according to the present invention, as a material naturally occurring and growing in a natural environment among materials that can be used as a vertical drainage or perforated pipe, there is provided a bamboo bar for drainage that can be easily purchased at a very economical price everywhere.
또한 본 발명에 의하여, 필요에 따라서는 제거가 매우 용이한 연직배수재 또는 유공관으로서의 배수용 대나무봉이 제공된다.In addition, according to the present invention, there is provided a bamboo rod for drainage as a vertical drainage or perforated pipe which is very easy to remove as necessary.
삭제delete
또한 본 발명에 의하여, 일종의 기초로서의 역할을 수행할 수 있는 연약지반의 연직배수재를 제공한다.In addition, according to the present invention, it provides a vertical drainage of soft ground that can serve as a kind of basis.
또한 본 발명에 의하여, 상기의 배수용 대나무봉을 이용하는 연약지반 처리공법 및 수평배수공법을 제공한다.
In addition, the present invention provides a soft ground treatment method and a horizontal drainage method using the bamboo bar for drainage.
Claims (4)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20030056306 | 2003-08-14 | ||
KR1020030056306 | 2003-08-14 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050018573A KR20050018573A (en) | 2005-02-23 |
KR100633418B1 true KR100633418B1 (en) | 2006-10-16 |
Family
ID=37228098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040026426A KR100633418B1 (en) | 2003-08-14 | 2004-04-17 | Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100633418B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200142999A (en) * | 2019-06-14 | 2020-12-23 | 한연덕 | perforated bamboo pipe for trees planting and planting method of trees using the same |
KR102279743B1 (en) | 2020-07-19 | 2021-07-19 | 나항도 | Perforated tube with forest promoting structure using baboo, manufacturing method thereof and construction method thereof |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100681349B1 (en) * | 2004-05-13 | 2007-02-09 | 정대익 | The improvement method for the strengthening to strength the soft ground using to good-environment drain materia and the system for realtime monitering to mothod thereof |
KR100675338B1 (en) * | 2004-07-29 | 2007-01-29 | 한국해양수산개발원 | The support power calculation method of the soft ground reinforced with bamboo net |
KR100802168B1 (en) * | 2007-08-09 | 2008-02-11 | (주)우주엔지니어링 | Tenderness ground reinforcement structure using bamboo |
CN102182169A (en) * | 2011-03-11 | 2011-09-14 | 上海市园林科学研究所 | Method for improving saline-alkali soil and soil ditch structure |
CN105040674B (en) * | 2015-07-02 | 2017-01-18 | 中国矿业大学 | Method for calculating consolidation degree of high-replacement-rate discrete material pile composite foundation |
CN110397021A (en) * | 2019-08-12 | 2019-11-01 | 上海建工二建集团有限公司 | Prefabricated variable-diameter hole tubular pile structure for soft foundation treatment and construction method thereof |
JP6989900B2 (en) * | 2019-11-14 | 2022-01-12 | みらい建設工業株式会社 | Bamboo drain material and liquefaction countermeasure construction method |
CN113309070A (en) * | 2021-06-01 | 2021-08-27 | 浙江大学 | Drainage moso bamboo for soft soil foundation treatment and construction method thereof |
-
2004
- 2004-04-17 KR KR1020040026426A patent/KR100633418B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200142999A (en) * | 2019-06-14 | 2020-12-23 | 한연덕 | perforated bamboo pipe for trees planting and planting method of trees using the same |
KR102273069B1 (en) * | 2019-06-14 | 2021-07-02 | 한연덕 | perforated bamboo pipe for trees planting and planting method of trees using the same |
KR102279743B1 (en) | 2020-07-19 | 2021-07-19 | 나항도 | Perforated tube with forest promoting structure using baboo, manufacturing method thereof and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20050018573A (en) | 2005-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105970911B (en) | A kind of processing method of big thickness collapsible loess | |
CN104264557B (en) | One is partly filled out and is partly dug ecological road structure and construction method | |
CN103882884B (en) | A kind of anchor cable geo-grid retaining structure and construction method thereof | |
CN108442365B (en) | Anti-blocking reinforced permeable pile and construction method | |
CN103835284A (en) | Karst area drilling cast-in-place pile structure and construction method | |
KR100802168B1 (en) | Tenderness ground reinforcement structure using bamboo | |
JP4803472B1 (en) | Ground stabilization method | |
KR100633418B1 (en) | Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method | |
JP4097671B2 (en) | Ground injection method | |
JP2009179945A (en) | Well conduit for road and its construction method | |
KR200352267Y1 (en) | Slope-reinforcing structure for soil nailing having function of drainage | |
CN208201874U (en) | A kind of open-cell cloth bag grouting structure | |
CN103590390B (en) | A kind of stream is moulded shape reinforced soft soil ground structure and adds solid method | |
KR101008478B1 (en) | Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure | |
CN206467677U (en) | Foundation pit side-wall drainage arrangement | |
JP4499001B2 (en) | Filling reinforcement method and filling | |
JP4961538B2 (en) | Ground stabilization method | |
CN204849819U (en) | Environmental retaining wall | |
CN212316950U (en) | Slope structure | |
KR101440250B1 (en) | Vertical drainage material construction method for riprap layer | |
CN113550341A (en) | Deep rapid dewatering dynamic consolidation device and method | |
KR102699632B1 (en) | Stabilization of the surface layer for dredged soil ponds and embankment | |
JP4157531B2 (en) | Ground injection method | |
KR100956316B1 (en) | Grouting method using composite drawdown well for confined aquifer | |
TWI494484B (en) | Deep injection structure of permeable pavement and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
J201 | Request for trial against refusal decision | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20051013 Effective date: 20060830 |
|
S901 | Examination by remand of revocation | ||
GRNO | Decision to grant (after opposition) | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120727 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20130906 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140919 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |