KR100451954B1 - Constructing method for reinforcing and protecting the slope using wire block - Google Patents
Constructing method for reinforcing and protecting the slope using wire block Download PDFInfo
- Publication number
- KR100451954B1 KR100451954B1 KR10-2001-0068369A KR20010068369A KR100451954B1 KR 100451954 B1 KR100451954 B1 KR 100451954B1 KR 20010068369 A KR20010068369 A KR 20010068369A KR 100451954 B1 KR100451954 B1 KR 100451954B1
- Authority
- KR
- South Korea
- Prior art keywords
- wire block
- slope
- support hole
- grouting
- nail
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/205—Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
- E01F7/04—Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
- E01F7/045—Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
- E02D5/808—Ground anchors anchored by using exclusively a bonding material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
본 발명은 와이어블록을 이용한 사면 보강 및 보호 방법에 관한 것으로, 와이어블록(110)의 중앙지지구(111)에 형성된 지지공(111a)을 통하여 지중으로 그라우팅(140)하여 네일(130)을 끼우고 여기에 중앙지지구(111)를 고정시켜 세팅하는 세팅단계와, 상기 세팅된 와이어블록(110)에 새로운 와이어블록을 순차적으로 연접되게 연결부재(120)로 연결하는 연결단계와, 상기 연결작업이 완료되면 지형의 굴곡이나 지질의 특성 등을 감안하여 중앙지지구(111)에 형성된 지지공(111a)이나 연결부재(120)의 지지공(123) 또는 아이볼트(113)의 지지공(113a)을 통하여 선택적으로 그라우팅(140)하는 지중 그라우팅단계와, 상기 그라우팅(140)이 완전 경화되면 노출되는 네일(130)의 단부에 각각의 지지공(111a,123,113a)을 끼워 볼트링 등으로 견고하게 지지하는 네일 고정단계, 및 상기 볼트링이 완료되면 연결부재(120)를 더욱 조여 와이어블록(110)과 와이어블록(110)이 최대한 당겨지도록 하여 조립된 와이어블록(110)을 사면에 완전하게 밀착시키는 마무리단계로 구성하므로 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화할 뿐만 아니라 사면에서 강한 압력이 상승하더라도 붕괴되는 것을 최소화하고 신속하게 복구할 수 있도록 하며 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있고 와이어블록을 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시킬 수 있도록 하는 효과가 있다.The present invention relates to a method for reinforcing and protecting a slope using a wire block, and grouting (140) into the ground through the support hole (111a) formed in the central support 111 of the wire block 110 to fit the nail 130 The setting step of fixing and setting the central support 111 here, the connecting step of connecting the new wire block to the set wire block 110 to the connection member 120 in order to sequentially connect, and the connection operation is completed In view of the topography or geological characteristics of the terrain through the support hole 111a formed in the central support 111 or the support hole 123 of the connecting member 120 or the support hole 113a of the eye bolt 113. Underground grouting step to selectively grout 140, and each support hole (111a, 123, 113a) to the end of the nail 130, which is exposed when the grouting 140 is completely cured, and firmly supported by a bolt ring, etc. Nail fixing step, and the ball When the ring is completed, further tighten the connecting member 120 so that the wire block 110 and the wire block 110 are pulled as much as possible, so that the wire block 110 is assembled in a finishing step so as to be in close contact with the slope. In addition to maximizing the bearing capacity by firmly reinforcing and protecting the located slopes, it is possible to minimize collapse and recover quickly even when strong pressure rises on the slope. It can be reassembled or replaced with new wire block to reassemble it firmly so that it can be quickly reinforced in case of signs of collapse or partial collapse to prevent the collapse of the entire slope in advance. It is effective to maximize the.
Description
본 발명은 와이어블록을 이용한 사면 보강 및 보호 방법에 관한 것으로, 상세하게는 낙석지역 등의 사면을 보호 및 보강하여 낙석 발생 또는 붕괴되는 것을 미연에 방지할 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법에 관한 것이다.The present invention relates to a slope reinforcement and protection method using a wire block, and in particular, slope reinforcement and protection using a wire block to prevent the occurrence or collapse of falling rocks by protecting and reinforcing slopes such as rockfall areas. It is about a method.
일반적으로 종래에는 낙석지역 등의 사면에 낙석방지망을 밀착되게 덮고 낙석방지망의 상면에 와이어를 가로와 세로로 다수개 설치하여 낙석방지망을 견고하게 지지하도록 하여 사면에서 발생될 수 있는 안전사고를 방지하도록 하였다.In general, by covering the rockfall protection net closely on the slope of the rockfall area and the like and installing a plurality of wires horizontally and vertically on the top of the rockfall prevention net to firmly support the rockfall prevention net so as to prevent safety accidents that may occur on the slope. It was.
이러한 종래의 기술은 사면의 지반 거동 등으로 인하여 압력이 크게 발생하는 경우 거의 무용지물에 가까워 사면 전체가 붕괴되어 심각한 안전사고를 일으키는 문제점이 있었다.Such a prior art has a problem that when the pressure is largely generated due to the ground behavior of the slope, the slope is almost obsolete and the entire slope collapses causing serious safety accidents.
특히, 사면은 도로 공사로 인하여 도로의 측면에 주로 위치하게 되므로 사고 발생 후 교통의 흐름을 원활하게 하기 위하여 신속하게 복구하여야 하나 낙석방지망의 경우 사면에 대한 보강이 전혀 없이 단순히 낙석방지망으로 떨어져 내리는 몇 개의 낙석만을 차단하게 되므로 수압 또는 토압에 의한 지반거동 등으로 큰 압력이 작용할 때에 사면 전체가 붕괴될 우려가 높은 문제점이 있었다.In particular, the slope is mainly located on the side of the road due to the road construction, so it must be quickly restored to smooth the flow of traffic after an accident. Since only the rockfalls of the dog are blocked, there is a high possibility that the entire slope will collapse when a large pressure is applied due to ground pressure caused by water pressure or soil pressure.
나아가, 사면 전체가 붕괴되면, 이를 복구하기 위한 시간과 인력이 상당히 투입되어야 하므로 복구비가 상승되고 교통의 흐름을 차단하는 문제점이 발생하였다.Furthermore, when the entire slope collapses, a considerable amount of time and manpower must be invested to recover it, resulting in an increase in recovery cost and a problem of blocking traffic flow.
특히, 사면을 보강하는 경우에는 사면에 콘크리트 블록을 표면에 상호 연접되게 다수개 시공하여 보강하는 경우도 있으나 이는 사면에서 직접 거푸집을 순차적으로 설치하고 여기에 철근 골조 등을 설치한 다음 콘크리트 몰탈 등을 부어 경화시켜 사면을 보강하므로 사면의 경사로 인하여 시공이 매우 까다롭고 심지어 경사가 큰 사면인 경우 시공 자체가 불가능한 문제점이 있었다.In particular, in case of reinforcing the slope, there may be a case of reinforcing by constructing a plurality of concrete blocks on the slope so as to be mutually connected to the surface. Pour hardening to reinforce the slope, so the construction is very difficult due to the slope of the slope, even if the slope is a large slope there was a problem that the construction itself is impossible.
나아가 이러한 콘크리트 블록은 가변성이 전혀 없어 지반 거동의 초기 현상이 발생되면 이에 적절하게 대응할 수 없을 뿐만 아니라 부분 붕괴시 지형의 변화로 인하여 재시공하기 거의 불가능하여 넓은 면적을 다시 시공하여야 하는 문제점이 있었다.Furthermore, these concrete blocks are not variable at all, so if an initial phenomenon of ground behavior occurs, not only can not appropriately cope with this problem, it is almost impossible to reconstruct due to the change of the terrain during partial collapse, there was a problem to rebuild a large area.
더불어 이러한 콘크리트 블록은 시공의 번거롭고 까다로움으로 인하여 공사비가 크게 상승되고 공사 기간이 오래 걸릴 뿐만 아니라 사면의 지지력이 거의 표면에서만 작용하므로 사면에 대한 지지력의 떨어지는 문제점이 있었다.In addition, due to the cumbersome and cumbersome construction of the concrete block, the construction cost is greatly increased and the construction period takes a long time, and the bearing capacity of the slope acts only on the surface.
따라서 본 발명의 주 목적은 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화하도록 하므로 토압이나 수압의 상승으로 인한 지반 거동이 크게 발생하더라도 사면을 견고하게 지지하여 붕괴되는 것을 억제시킬 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Therefore, the main object of the present invention is to firmly reinforce and protect the slopes located on the side of the road to maximize its bearing capacity, so that even if the ground behavior due to the earth pressure or the rise of water pressure is large, the slopes can be firmly supported and collapsed. It is to provide a slope reinforcement and protection method using a wire block.
본 발명의 다른 목적은 사면에서 강한 압력이 상승하더라도 붕괴되는 것을최소화하여 신속하게 복구할 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Another object of the present invention is to provide a slope reinforcement and protection method using a wire block to minimize the collapse even if a strong pressure rises on the slope to quickly recover.
본 발명의 다른 목적은 사면을 간편하고 신속하게 보호, 보강할 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Another object of the present invention is to provide a slope reinforcement and protection method using a wire block that can be easily and quickly protect, reinforced.
본 발명의 다른 목적은 사면의 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Another object of the present invention is that when the partial collapse or initial collapse of the slope occurs, these parts can be separated and reassembled firmly or replaced with new wire blocks to be reassembled firmly, thereby quickly reinforcing the signs of collapse or partial collapse. The present invention provides a method for reinforcing and protecting slopes using wire blocks that can prevent the collapse of the entire slope in advance.
본 발명의 다른 목적은 사면을 간편하고 신속하게 보강할 수 있도록 하므로 공사기간을 단축시키고 코스트를 저감할 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Another object of the present invention is to provide a method for reinforcing and protecting a slope using a wire block to shorten the construction period and reduce the cost, so that the slope can be easily and quickly reinforced.
본 발명의 다른 목적은 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시키고 낙석지역을 보강하여 그 효과를 극대화시킬 수 있도록 하는 와이어블록을 이용한 사면 보강 및 보호 방법을 제공하는 데 있다.Another object of the present invention is to provide a slope reinforcement and protection method using a wire block to be installed on the surface of the rockfall prevention net to maximize the rockfall prevention effect and reinforce the rockfall area to maximize the effect.
도 1 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법으로 시공된 상태를 나타낸 전체 사시도.1 is an overall perspective view showing a state constructed by the slope reinforcement and protection method using a wire block according to the present invention.
도 2 는 본 발명에 따른 사면 보강 및 보호 방법에 사용되는 와이어블록을 나타낸 정면도.Figure 2 is a front view showing a wire block used in the slope reinforcement and protection method according to the present invention.
도 3 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법의 네일 설치부분을 상세하게 나타낸 단면도.Figure 3 is a cross-sectional view showing in detail the nail installation portion of the slope reinforcement and protection method using a wire block according to the present invention.
도 4 는 본 발명에 따른 사면 보강 및 보호 방법의 와이어블록 연결상태를 나타낸 상세도.Figure 4 is a detailed view showing a wire block connection state of the slope reinforcement and protection method according to the invention.
도 5 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법을 낙석방지망에 시공한 상태를 나타낸 사시도.Figure 5 is a perspective view showing a state in which the construction of the slope reinforcement and protection method using a wire block according to the present invention to the rockfall prevention net.
*도면의 주요 부분의 부호의 설명*Explanation of symbols of main part of drawing
10 : 사면 11 : 그라우팅공10: slope 11: grouting ball
110 : 와이어블록 111 : 중앙지지구110: wire block 111: center support
111a : 지지공 112 : 와이어111a: support hole 112: wire
113 : 아이볼트 113a : 지지공113: eye bolt 113a: support ball
114 : 몰딩부 120 : 연결부재114: molding part 120: connecting member
121 : 나사공 122 : 체결공121: screw hole 122: fastening hole
123 : 지지공 130 : 네일123: support ball 130: nail
140 : 그라우팅 150 : 낙석방지망140: grouting 150: rockfall prevention net
이러한 목적을 달성하기 위하여 본 발명의 와이어블록을 이용한 사면 보강 및 보호 방법은 와이어블록의 중앙지지구에 형성된 지지공을 통하여 지중으로 그라우팅하여 네일을 끼우고 여기에 중앙지지구를 고정시켜 세팅하는 세팅단계와, 상기세팅된 와이어블록에 새로운 와이어블록을 순차적으로 연접되게 연결부재로 연결하는 연결단계와, 상기 연결작업이 완료되면 지형의 굴곡이나 지질의 특성 등을 감안하여 중앙지지구에 형성된 지지공이나 연결부재의 지지공 또는 아이볼트의 지지공을 통하여 선택적으로 그라우팅하는 지중 그라우팅단계와, 상기 그라우팅이 완전 경화되면 노출되는 네일의 단부에 각각의 지지공을 끼워 볼트링 등으로 견고하게 지지하는 네일 고정단계, 및 상기 볼트링이 완료되면 연결부재를 더욱 조여 와이어블록과 와이어블록이 최대한 당겨지도록 하여 조립된 와이어블록을 사면에 완전하게 밀착시키는 마무리단계로 구성함을 그 기술적 구성상의 기본 특징으로 한다.Slope reinforcement and protection method using the wire block of the present invention in order to achieve this object is the setting step of setting the nail by the grout to the ground through the support hole formed in the central support of the wire block and fixed to the central support The connecting step of connecting the new wire block to the set wire block in order to be connected in sequence, and when the connection is completed, the support hole or connecting member formed in the central support in consideration of the characteristics of the curvature of the terrain or geology Underground grouting step of selectively grouting through the support hole or eyebolt support of the nail, nail fixing step of firmly supporting each other with a bolt ring, etc. by inserting each support hole at the end of the exposed nail when the grouting is completely cured, When the bolt ring is completed, further tighten the connecting member to wire block and wire And that the blocks constituting the wire block assembly to ensure maximum pull final stage to completely close contact with the surface as the basic feature of the technical construction.
위와 같이 구성된 본 고안의 바람직한 실시 예를 첨부된 도면을 참조하면서 상세히 설명하면 다음과 같다.When described in detail with reference to the accompanying drawings a preferred embodiment of the present invention configured as described above are as follows.
도 1 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법으로 시공된 상태를 나타낸 전체 사시도이고, 도 2 는 본 발명에 따른 사면 보강 및 보호 방법에 사용되는 와이어블록을 나타낸 정면도이며, 도 3 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법의 네일 설치부분을 상세하게 나타낸 단면도이고, 도 4 는 본 발명에 따른 사면 보강 및 보호 방법의 와이어블록 연결상태를 나타낸 상세도이며, 도 5 은 본 발명에 따른 와이어블록을 이용한 사면 보강 및 보호 방법을 낙석방지망에 시공한 상태를 나타낸 사시도이다.1 is an overall perspective view showing a state constructed by the slope reinforcement and protection method using a wire block according to the present invention, Figure 2 is a front view showing a wire block used in the slope reinforcement and protection method according to the present invention, Figure 3 Is a cross-sectional view showing in detail the nail installation portion of the slope reinforcement and protection method using a wire block according to the present invention, Figure 4 is a detailed view showing a wire block connection state of the slope reinforcement and protection method according to the present invention, Figure 5 Is a perspective view showing a state in which the construction of the slope reinforcement and protection method using a wire block according to the present invention to the rockfall prevention net.
도1 내지 도5에 나타낸 바와 같이, 본 발명의 와이어블록(110)을 이용한 사면 보강 및 보호 방법은 와이어블록(110)의 중앙지지구(111)에 형성된 지지공(111a)을 통하여 지중으로 그라우팅(140)하여 네일(130)을 끼우고 여기에 중앙지지구(111)를 고정시켜 세팅하는 세팅단계와, 상기 세팅된 와이어블록(110)에 새로운 와이어블록을 순차적으로 연접되게 연결부재(120)로 연결하는 연결단계와, 상기 연결작업이 완료되면 지형의 굴곡이나 지질의 특성 등을 감안하여 중앙지지구(111)에 형성된 지지공(111a)이나 연결부재(120)의 지지공(123) 또는 아이볼트(113)의 지지공(113a)을 통하여 선택적으로 그라우팅(140)하는 지중 그라우팅단계와, 상기 그라우팅(140)이 완전 경화되면 노출되는 네일(130)의 단부에 각각의 지지공(111a,123,113a)을 끼워 볼트링 등으로 견고하게 지지하는 네일 고정단계, 및 상기 볼트링이 완료되면 연결부재(120)를 더욱 조여 와이어블록(110)과 와이어블록(110)이 최대한 당겨지도록 하여 조립된 와이어블록(110)을 사면에 완전하게 밀착시키는 마무리단계로 구성한다.As shown in Figures 1 to 5, the slope reinforcement and protection method using the wire block 110 of the present invention through the support hole (111a) formed in the central support 111 of the wire block 110 grouting to the ground ( 140) the nail 130 is inserted and the setting step of fixing the central support 111 to the setting step, and the new wire block to the wire block 110 is sequentially connected to the connecting member 120 to be connected in sequence. When the connection step is completed, and the connection operation is completed in consideration of the characteristics of the curvature of the terrain or geological features such as the support hole (111a) or the support hole 123 or the eye bolt (120) formed in the central support 111 Underground grouting step of selectively grouting (140) through the support hole (113a) of 113, and each support hole (111a, 123, 113a) at the end of the nail 130 is exposed when the grouting 140 is fully cured To firmly support it with bolt rings, etc. When the fixing step, and the bolt ring is completed, further tightening the connection member 120 so that the wire block 110 and the wire block 110 is pulled to the maximum, the finishing step of completely contacting the assembled wire block 110 to the slope It consists of.
상기 세팅단계는 와이어블록(110)을 사면의 모서리부분이나 하부 또는 일측방에 설치함이 바람직하나 지형의 특성을 고려하여 그 위치를 제한하는 것은 아니다.In the setting step, it is preferable to install the wire block 110 in the corner portion or the bottom or one side of the slope, but the position is not limited in consideration of the characteristics of the terrain.
여기서 세팅 단계의 와이어블록(110)은 사면에 가체결한 상태에서 지지하는 경우도 있다.In this case, the wire block 110 in the setting step may be supported in a state of being pre-tightened to the slope.
이 경우에는 와이어블록(110)의 조립이 완료된 후 가체결 상태의 와이어블록을 지중 그라우팅 단계에서 그라우팅하도록 한다.In this case, after the assembly of the wire block 110 is completed, the wire block in the pre-tightening state is grouted in the underground grouting step.
상기 연결단계에서는 연결부재(120)를 완전히 조립하지 아니하고 마무리단계에서 완전하게 조립하도록 하여 와이어블록(110)이 완전히 고정된 상태에서 와이어(112)의 충분히 당길 수 있도록 함이 바람직하다.In the connecting step, it is preferable not to completely assemble the connecting member 120, but to completely assemble in the finishing step so that the wire block 110 can be sufficiently pulled of the wire 112 in a completely fixed state.
여기서 사면의 면적이 비교적 넓은 경우에는 연결단계를 단위별 나누어 마무리단계까지 진행 후 다시 연접되게 연결단계를 수행할 수 도 있다.In this case, when the area of the slope is relatively large, the connection step may be performed by dividing the connection step by unit and proceeding to the finishing step.
상기 지중 그라우팅단계는 지형의 특성을 고려하여 와이어블록(110)의 중앙지지구(111)에 형성된 지지공(111a)이나 아이볼트(113)의 지지공(113a) 또는 연결부재(120)의 지지공(123)을 통하여 선택적으로 그라우팅(140)함이 바람직하나 모두를 그라우팅(140)할 수 도 있다.In the underground grouting step, the support hole 111a or the support hole 113a of the eye bolt 113 or the connection member 120 formed in the central support 111 of the wire block 110 in consideration of the characteristics of the terrain. Optionally grouting 140 through 123 is preferred, but all may be grouted 140.
상기 네일 고정단계는 지중 그라우팅단계에서 지지된 네일(130)이 콘크리트의 경화로 완전히 고정되면 지지공(111a,113a,123)으로 노출된 네일(130)의 돌출부분에 볼트 등을 체결하여 연접되게 연결된 와이어블록(110)을 견고하게 사면에 지지되도록 한다.In the nail fixing step, when the nail 130 supported in the underground grouting step is completely fixed by hardening of concrete, the nail 130 is connected by fastening a bolt or the like to the protrusion of the nail 130 exposed by the supporting holes 111a, 113a, and 123. The connected wire block 110 is firmly supported on the slope.
상기 마무리단계는 네일 고정단계에서 견고하게 지지된 와이어블록(110)의 연결한 연결부재(120)를 회전시켜 연결된 와이어(112)가 팽팽하게 되도록하여 사면에 밀착되게하여 지면을 보다 효과적으로 지지할 수 있도록 한다.The finishing step is to rotate the connection member 120 of the wire block 110 firmly supported in the nail fixing step so that the connected wire 112 is tightened to be in close contact with the slope to support the ground more effectively. Make sure
한편 본 발명에 사용되는 와이어블록(110)은 수직으로 지지공(111a)을 형성한 중앙지지구(111)와, 상기 중앙지지구(111)를 중심으로 결합된 다양한 형상의 와이어(112)와, 상기 와이어(112)의 외곽에 끼워져 위치하는 아이볼트(113)로 구성된다.Meanwhile, the wire block 110 used in the present invention includes a central support 111 having a vertically formed support hole 111a, a wire 112 having various shapes coupled to the central support 111, and the It consists of an eye bolt 113 is inserted into the outer portion of the wire 112.
여기서 와이어(112)는 상호 교차지점 등에 몰딩부(114)를 형성하여 와이어(112)가 임의의 일정 형상을 유지하도록 할 수 도 있다.In this case, the wires 112 may be provided with the molding part 114 to cross each other, such that the wires 112 may maintain an arbitrary shape.
나아가 와이어(112)는 중앙지지구(111)를 중심으로 상하나 좌우 또는 상하좌우로 대칭되게 형성되어 있다.Furthermore, the wire 112 is formed symmetrically in the upper, left, right, or up, down, left and right about the center support 111.
더불어 아이볼트(113)의 대용으로는 후크 형상의 볼트 등을 사용할 수 도 있다.In addition, a hook-shaped bolt or the like may be used as an alternative to the eye bolt 113.
또한 아이볼트(113)는 상호 연접되는 다른 와이어블록(110)의 아이볼트(113)를 연결부재(120)로 연결하여 그 간격을 조절할 수 있도록 한다.In addition, the eye bolt 113 is connected to the eye bolt 113 of the other wire block 110 to be connected to each other by the connecting member 120 to adjust the gap.
여기서 연결부재(120)는 좌우 단에 각각 회전방향이 다른 나사공(121)을 길이 방향으로 형성하고 중앙에 수직으로 상기와 같이 그라우팅(140)하여 네일(130)에 고정시킬 수 있도록 하는 지지공(123)을 형성하되 전후 방향으로 중앙 좌우에 체결공(122)을 형성하여 코너에서 4포인트의 아이볼트(113)를 결합시킬 수 있도록 할 수 도 있다.Here, the connection member 120 is a support hole for fixing the nail 130 by forming a screw hole 121 having a different rotational direction at the left and right ends in the longitudinal direction and grouting 140 as described above perpendicularly to the center. 123 may be formed, but a fastening hole 122 may be formed at the center left and right in the front-rear direction so that the four eye bolts 113 may be coupled at the corners.
또한 연결부재(120)는 일반적인 턴버클을 사용하여 상호 연결할 수 도 있다.In addition, the connection member 120 may be interconnected using a general turnbuckle.
이러한 본 발명의 작용을 설명하면 다음과 같다.Referring to the operation of the present invention as follows.
본 발명은 와이어블록(110)을 이용하여 사면의 전체를 와이어(112)로 엮어 서 이를 표면에 팽팽하게 밀착시키게 되고 다수의 그라우팅(140)으로 고정된 네일에 와이어블록(110)을 견고하게 고정시킴으로써 수압이나 토압이 크게 상승으로 사면이 붕괴되는 것을 방지할 수 있는 것이다.In the present invention, the entire surface of the slope using the wire block 110 is wired to the wire 112 and tightly adhered to the surface thereof, and the wire block 110 is firmly fixed to the nail fixed with a plurality of groutings 140. This can prevent the slope from collapsing due to the large increase in water pressure and earth pressure.
특히 이러한 크다란 장점에도 불구하고 신속하게 시공할 수 있고 부분시공이나 블록 단위의 보수가 가능하며 사전에 붕괴의 징후가 발생되면 붕괴 징후 지역만을 별도로 보강할 수 있다.In particular, despite this great advantage, it can be quickly constructed, partially constructed or repaired on a block-by-block basis.
또한 와이어블록(110)의 조립과 동시에 그라우팅 작업을 진행할 수 도 있으며 이 경우 단시간 내에 전체 사면을 보강할 수 있다.In addition, the grouting operation may be performed simultaneously with the assembly of the wire block 110, in which case the entire slope may be reinforced within a short time.
나아가, 낙석지역에서 낙석방지망(150)을 설치한 후 와이어블록(110)을 설치하는 경우에는 낙석방지망(115)과 함께 사면을 견고하게 지지하므로 사면 보강 및 보호는 물론 낙석의 방지 효과를 크게 향상시킨다.Furthermore, when installing the rock block 110 after installing the rockfall prevention net 150 in the rockfall area, because the rock solid support the slope firmly with the rockfall prevention net 115, the slope reinforcement and protection as well as significantly improve the prevention of rockfall Let's do it.
이상에서 살펴본 바와 같이, 본 발명의 와이어블록(110)을 이용한 사면 보강 및 보호 방법은 와이어블록(110)의 중앙지지구(111)에 형성된 지지공(111a)을 통하여 지중으로 그라우팅(140)하여 네일(130)을 끼우고 여기에 중앙지지구(111)를 고정시켜 세팅하는 세팅단계와, 상기 세팅된 와이어블록(110)에 새로운 와이어블록을 순차적으로 연접되게 연결부재(120)로 연결하는 연결단계와, 상기 연결작업이 완료되면 지형의 굴곡이나 지질의 특성 등을 감안하여 중앙지지구(111)에 형성된 지지공(111a)이나 연결부재(120)의 지지공(123) 또는 아이볼트(113)의 지지공(113a)을 통하여 선택적으로 그라우팅(140)하는 지중 그라우팅단계와, 상기 그라우팅(140)이 완전 경화되면 노출되는 네일(130)의 단부에 각각의 지지공(111a,123,113a)을 끼워 볼트링 등으로 견고하게 지지하는 네일 고정단계, 및 상기 볼트링이 완료되면 연결부재(120)를 더욱 조여 와이어블록(110)과 와이어블록(110)이 최대한 당겨지도록 하여 조립된 와이어블록(110)을 사면에 완전하게 밀착시키는 마무리단계로 구성하므로 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화할 뿐만 아니라 사면에서 강한 압력이 상승하더라도 붕괴되는 것을 최소화하고 신속하게 복구할 수 있도록 하며 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있고 와이어블록을 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시킬 수 있도록 하는 효과가 있다.As described above, the slope reinforcement and protection method using the wire block 110 of the present invention by grouting 140 to the ground through the support hole (111a) formed in the central support 111 of the wire block 110 nail Inserting step 130 and the setting step of fixing the central support 111 to the setting step, and connecting step of connecting the new wire block to the connection member 120 to be sequentially connected to the set wire block 110 and When the connection operation is completed, the support hole 111a or the support hole 123 or the eye bolt 113 of the support member 111a or the connection member 120 formed in the central support 111 in consideration of the feature of the terrain and the curve of the geology, etc. Underground grouting step of selectively grouting 140 through the ball 113a, and each support hole 111a, 123, 113a is inserted into the end of the nail 130 exposed when the grouting 140 is completely hardened and bolt ring Nails firmly supported by the back Step, and when the bolt ring is completed by further tightening the connection member 120 to the wire block 110 and the wire block 110 is pulled to the maximum as a finishing step to completely contact the assembled wire block 110 on the slope As a result, it is possible to firmly reinforce and protect the slopes located on the side of the road to maximize its bearing capacity, to minimize the collapse and to quickly recover the collapse even when a strong pressure rises on the slope. The parts can be separated and reassembled firmly or replaced with new wire blocks to be reassembled firmly so that they can be quickly reinforced in case of signs of collapse or partial collapse to prevent the collapse of the entire slope in advance and the wire blocks to the surface of the rockfall protection net. It is effective to maximize the effect of preventing rockfall by installing.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0068369A KR100451954B1 (en) | 2001-11-03 | 2001-11-03 | Constructing method for reinforcing and protecting the slope using wire block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0068369A KR100451954B1 (en) | 2001-11-03 | 2001-11-03 | Constructing method for reinforcing and protecting the slope using wire block |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030037387A KR20030037387A (en) | 2003-05-14 |
KR100451954B1 true KR100451954B1 (en) | 2004-10-08 |
Family
ID=29567864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0068369A KR100451954B1 (en) | 2001-11-03 | 2001-11-03 | Constructing method for reinforcing and protecting the slope using wire block |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100451954B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100689080B1 (en) * | 2004-11-19 | 2007-03-08 | 주식회사 오륙개발 | A method of construction for reinforcement and landscape architecture to an incline plane |
KR100945384B1 (en) * | 2008-05-02 | 2010-03-04 | 장을식 | Support Structure for Artificial Rock Wall at Slopes |
CN105275002B (en) * | 2015-11-17 | 2018-01-09 | 中国铁道科学研究院铁道建筑研究所 | slope protection structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55161123A (en) * | 1979-06-01 | 1980-12-15 | Yamaguchi Kosan Kk | Sg-reinforced piping method |
JPH08232268A (en) * | 1995-02-27 | 1996-09-10 | Yamau:Kk | Slope block and method for protecting face of slope using same |
JPH1088577A (en) * | 1996-09-11 | 1998-04-07 | Dairin:Kk | Construction method for stabilizing slope |
KR20010086663A (en) * | 2000-03-02 | 2001-09-15 | 최홍기 | A method and apparatus for reinforcing slope stability using connecting wire |
JP2002180472A (en) * | 2000-10-06 | 2002-06-26 | Tokyo Seiko Co Ltd | Construction method and device for stabilizing slope |
-
2001
- 2001-11-03 KR KR10-2001-0068369A patent/KR100451954B1/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55161123A (en) * | 1979-06-01 | 1980-12-15 | Yamaguchi Kosan Kk | Sg-reinforced piping method |
JPH08232268A (en) * | 1995-02-27 | 1996-09-10 | Yamau:Kk | Slope block and method for protecting face of slope using same |
JPH1088577A (en) * | 1996-09-11 | 1998-04-07 | Dairin:Kk | Construction method for stabilizing slope |
KR20010086663A (en) * | 2000-03-02 | 2001-09-15 | 최홍기 | A method and apparatus for reinforcing slope stability using connecting wire |
JP2002180472A (en) * | 2000-10-06 | 2002-06-26 | Tokyo Seiko Co Ltd | Construction method and device for stabilizing slope |
Also Published As
Publication number | Publication date |
---|---|
KR20030037387A (en) | 2003-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101707523B1 (en) | Precast concrete block for cascade retaining wall for slope protection And method of constructing a retaining wall using the same | |
KR102264250B1 (en) | Block style reinforced soil retaining wall and constructing method thereof | |
KR100844104B1 (en) | Unit for supporting center of double tunnel | |
KR100451954B1 (en) | Constructing method for reinforcing and protecting the slope using wire block | |
KR102009686B1 (en) | Wirenet assembly for reinforcing slopes and constructing method thereof | |
KR101005469B1 (en) | The method which expands the pedestrian passage | |
JP2005325564A (en) | Buffer structure of concrete dam and its construction method | |
KR100483967B1 (en) | Wire block for reinforcing and protecting the slope | |
KR100466491B1 (en) | Rock bolt linking reinforcement equipment | |
JP5758512B2 (en) | Method for reinforcing rock fall protection fence and rock fall protection fence | |
KR200263621Y1 (en) | Wire block for reinforcing and protecting the slope | |
KR100505154B1 (en) | Merhod for protecting and reinforcing slopes | |
KR100483964B1 (en) | Wire block for reinforcing and protecting the slope | |
KR200270165Y1 (en) | Wire block for reinforcing and protecting the slope | |
KR100964721B1 (en) | Block for road extension | |
KR20020058928A (en) | constructing method for protecting and enforcing the slope | |
KR20060004582A (en) | Wall for prevention of earth and water from being collapsed | |
JPH0649964B2 (en) | Lock shade protection structure | |
KR102541697B1 (en) | Retaining wall construction method using intaglio panel with anchor head sealing and panel cap | |
CN218540722U (en) | Anti-collapse reinforcing device for foundation construction | |
KR200298683Y1 (en) | Apparatus to reinforce a slope | |
KR101059539B1 (en) | Block for road extension | |
KR200281831Y1 (en) | Rockfall prevention fence prefab | |
KR200236308Y1 (en) | A Connecting Structure of Culvert | |
KR200245955Y1 (en) | Fence for Rockslide Prevention |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
N231 | Notification of change of applicant | ||
FPAY | Annual fee payment |
Payment date: 20121005 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20130903 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20140924 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20150909 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20160919 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20170912 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20190814 Year of fee payment: 16 |