[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JPS6262933A - Roving transportation system - Google Patents

Roving transportation system

Info

Publication number
JPS6262933A
JPS6262933A JP20094685A JP20094685A JPS6262933A JP S6262933 A JPS6262933 A JP S6262933A JP 20094685 A JP20094685 A JP 20094685A JP 20094685 A JP20094685 A JP 20094685A JP S6262933 A JPS6262933 A JP S6262933A
Authority
JP
Japan
Prior art keywords
bobbin
roving
full
spinning
take
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20094685A
Other languages
Japanese (ja)
Other versions
JPH0518926B2 (en
Inventor
Hirotaka Nishikawa
西川 宏隆
Hachiro Yokoyama
横山 八朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howa Machinery Ltd
Original Assignee
Howa Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Machinery Ltd filed Critical Howa Machinery Ltd
Priority to JP20094685A priority Critical patent/JPS6262933A/en
Publication of JPS6262933A publication Critical patent/JPS6262933A/en
Publication of JPH0518926B2 publication Critical patent/JPH0518926B2/ja
Granted legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To provide a roving transportation system capable of properly changing the corresponding relationship between roving frame and fine spinning frame according to the variation of the yarn count and the kind of the spun yarn and transporting a bobbin following the varied relationship of the frames. CONSTITUTION:The optimum grouping of a roving frame group RM and a fine spinning frame group SF is determined based on the operation condition prior to the operation of the groups and the grouping data is registered in a transportation controlling apparatus. When a bobbin is fully wound in the roving frame and the doffing is completed, the full bobbin take-off signal transmission apparatus 63 transmits the full bobbin take-off requiring signal and the frame number of the roving frame is registered in the full bobbin take-off table of a memory means in the order of transmission. On the other hand, when the exchange of sliver is completed in the fine spinning frame and the preparation of the take-off of the residual yarn bobbin is ready, the residual yarn bobbin take-off signal transmission apparatus 64 transmits the residual yarn take-off requiring signal. The frame number of the fine spinning frame is registered in the full bobbin take-off table of a memory means in the order of transmission. The transportation controlling apparatus 68 orders the transportation between the frames in the order of transmission based on the registration data of each table.

Description

【発明の詳細な説明】 産業上の利用分野 この発明は1台又は複数台の粗紡機と複数台の精紡機間
で粗糸の自動搬送を行う粗糸搬送システムに関するもの
で、詳しくは粗紡機で玉揚された満粗糸ボビンを所望の
精紡機へ搬送し、精紡機で篠替された残糸ボビンをロー
ビングストリッパーへ搬送し、ロービングストリッパー
によって残糸処理された空ボビンを所望の粗紡機へ搬送
するようにした粗糸搬送システムに関するものである。
DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application This invention relates to a roving conveyance system that automatically conveys roving between one or more roving frames and a plurality of spinning frames. The full roving bobbin doffed by the spinning machine is transported to the desired spinning machine, the remaining thread bobbin that has been replaced by the spinning machine is transported to the roving stripper, and the empty bobbin treated with the remaining thread by the roving stripper is transferred to the desired roving machine. The present invention relates to a roving conveyance system configured to convey roving yarns to.

従来の技術 従来、この種の粗糸搬送システムとして特開昭50−7
6341に示すようなものが知られている。この従来の
粗糸搬送システムは一台の粗紡機で玉揚した満粗糸ボビ
ンをモルレール式の搬送パレットに挿着し、その搬送パ
レットを滞留部に滞留して精紡クリール分の搬送パレッ
トを$備する。
Conventional technology Conventionally, this type of roving conveyance system was disclosed in Japanese Patent Application Laid-open No. 50-7.
6341 is known. In this conventional roving conveyance system, a full roving bobbin doffed by a single roving machine is inserted into a mole rail type conveyance pallet, and the conveyance pallet is retained in a retention section to carry the conveyance pallet for the spinning creel. Prepare $.

精紡機で最後の巻取りを終えると、精紡クリールの搬送
パレットを自走台車により押出して残粗糸除去装置に搬
送し、その後滞留部の搬送パレットを精紡クリールへ自
走台車により搬送する。残粗糸処理された後の搬送パレ
ットは別の滞留部に滞留された後粗紡機上方へ搬送され
る。
When the final winding is completed on the spinning machine, the transport pallet of the spinning creel is pushed out by a self-propelled cart and transported to the remaining roving removal device, and then the transport pallet in the retention area is transported to the spinning creel by the self-propelled cart. . After the remaining roving yarns have been processed, the conveying pallet is retained in another retaining section and then conveyed above the roving frame.

発明が解決しようとする問題点 従来の粗糸搬送システムにあっては一台の粗紡機と複数
台の精紡機との間即ち1つのグループ内での粗糸搬送を
行うようになっているので、紡出番手や品種等の変更に
対応することができず、粗糸搬送パターンが固定される
大きな問題点がある。
Problems to be Solved by the Invention In the conventional roving conveyance system, the roving is conveyed between one roving frame and a plurality of spinning frames, that is, within one group. However, there is a major problem in that the roving conveyance pattern is fixed and cannot accommodate changes in spinning count, product type, etc.

一般に、粗紡機と精紡機間での粗糸搬送システムにおい
ては、紡出番手や品種等の変化に応じて粗紡機と精紡機
の対応関係を適宜変更してシステムの稼動率を高める必
要があり、粗糸搬送システムにおける粗紡機と精紡機の
グループ編成を容易に変更し得るものが要望されていた
In general, in the roving conveyance system between the roving frame and the spinning frame, it is necessary to increase the operating rate of the system by appropriately changing the correspondence between the roving frame and the spinning frame in response to changes in spinning count, product type, etc. There was a need for something that could easily change the grouping of roving frames and spinning frames in a roving conveyance system.

問題点を解決するための手段 本発明は従来装置の問題点を解決し、前記要求に応える
もので、各粗紡機には満粗糸ボビンの玉揚を完了して満
粗糸ボビンの引取準備ができた時点で満ボビン引取要求
信号を発信する満ボビン引取発信装置を設け、各精紡機
には篠交替を完了して残糸ボビンの引取準備ができた時
点で残糸ボビン引取要求信号を発信する残糸ボビン引取
発信装置と、残糸ボビンが引取られた復温粗糸ボビンが
搬送されて来ていないときに満ボビン要求信号を発信す
る満ボビン要求発信装置とを夫々設け、搬送制御装置に
は粗紡機群の各粗紡機のグループ番号と精紡機群のグル
ープ番号とを外部から任意に入力し得る入力手段と、入
力された各精紡機のグループ番号を登録する粗紡グルー
プテーブルと入力された各精紡機のグループ番号を登録
する精紡グループテーブル、満ボビン引取要求信号が発
信された粗紡機の機台番号を発信順に登録する満ボビン
引取テーブル、残糸ボビン引取要求信号が発信された精
紡機の機台番号を発信順に登録する残糸ボビン引取テー
ブル及び満ボビン要求信号が発信された精紡機の機台番
号を発信順に登録する満ボビン要求テーブルを夫々有す
る記憶手段と、各テーブルの登録データに基づいて同一
グループ内に満ボビン引取要求信号と残糸ボビン引取要
求信号と満ボビン要求信号が夫々発信されている機台が
あるときそれもの信号発信順の機台間において満粗糸ボ
ビン、残糸ボビン及び空ボビンの搬送を行うように粗糸
搬送装置を制御する制御手段とを備えて成ることを特徴
としている。
Means for Solving the Problems The present invention solves the problems of the conventional apparatus and satisfies the above-mentioned requirements, and each roving machine is equipped with a complete doffing of the full roving bobbin and preparation for taking the full roving bobbin. A full bobbin take-up transmitting device is installed that sends a full bobbin take-back request signal when the bobbin is completed, and each spinning machine is equipped with a full bobbin take-back request signal that sends the remaining thread bobbin take-up request signal when the thread shift is completed and the remaining thread bobbin is ready to take-up. A remaining yarn bobbin take-up transmitting device transmits a message, and a full bobbin request transmitting device transmits a full bobbin request signal when the reheated roving bobbin from which the remaining yarn bobbin has been taken is not conveyed. The device includes an input means for inputting the group number of each roving frame in the roving frame group and the group number of the spinning frame group from the outside, and a roving group table and input device for registering the input group number of each spinning frame. A spinning group table that registers the group number of each spinning frame that has been sent, a full bobbin take-off table that registers the machine numbers of the spinning machines that have sent the full bobbin take-back request signal in the order in which they were sent, and a full bobbin take-off table that registers the machine numbers of the spinning machines that have sent the full bobbin take-back request signal. a storage means having a remaining yarn bobbin take-off table for registering the machine numbers of the spinning machines that received the full bobbin request signal in the order of transmission, and a full bobbin request table that registers the machine numbers of the spinning machines that transmitted the full bobbin request signal in the order of transmission; Based on the registered data, if there is a machine in the same group that sends a full bobbin take-off request signal, a remaining thread bobbin take-off request signal, and a full bobbin request signal, respectively, the machine in the order in which the signals are sent is The present invention is characterized by comprising a control means for controlling the roving conveyance device so as to convey the yarn bobbin, the remaining yarn bobbin, and the empty bobbin.

作用 粗紡機群、精紡機群の運転に先立ち、操業条件に基いて
粗紡機と精紡機の最適なグループ編成を決め、そのグル
ープ編成に基づき搬送制御装置の入力手段により各粗紡
機のグループ番号と各精紡機のグループ番号を入力し、
それらのグループ番号を記憶手段の粗紡グループテーブ
ルと精紡グループテーブルに登録する。次に、粗紡機群
と精紡機群の運転を開始する。そして粗紡機において。
Prior to the operation of the roving frame group and the spinning frame group, the optimum grouping of the roving frame and fine spinning frame is determined based on the operating conditions, and based on the grouping, the group number and number of each roving frame are inputted by the input means of the conveyance control device. Enter the group number of each spinning machine,
These group numbers are registered in the roving group table and fine spinning group table of the storage means. Next, the roving frame group and fine spinning frame group start operating. And in the Rover.

満粗糸ボビンの玉揚が完了して満粗糸ボビンの引取準備
ができた時点で満ボビン引取発信装置が満ボビン引取要
求信号を発信すると、その満ボビン引取要求信号を発信
した粗紡機の機台番号が記憶手段の満ボビン引取テーブ
ルに発信順に登録される。また精紡機において、篠交換
を完了して残糸ボビンの引取準備ができた時点で残糸ボ
ビン引取発信装置が残糸ボビン引取要求信号を発信する
と。
When doffing of the full roving bobbin is completed and the full rovin bobbin is ready for take-up, the full bobbin take-up transmitting device sends a full bobbin take-up request signal, and the roving machine that sent the full bobbin take-up request signal is The machine numbers are registered in the full bobbin collection table of the storage means in the order of transmission. Further, in the spinning machine, when the thread exchange is completed and the remaining yarn bobbin is ready to be taken, the remaining yarn bobbin take-up transmitting device sends a remaining yarn bobbin take-up request signal.

その残糸ボビン引取要求信号を発信した精紡機の機台番
号が記憶手段の残糸ボビン引取テーブルに発信順に登録
され、また残糸ボビンが引取られたままになっていると
きに満ボビン要求発信装置が満ボビン要求信号を発信す
ると、その満ボビン要求信号を発信した精紡機の機台番
号が記憶手段の満ボビン要求テーブルに発信順に登録さ
れる。搬送制御装置の制御手段は各テーブルの登録デー
タに基づいて同一グループ内に満ボビン引取要求信号と
残糸ボビン引取要求信号と満ボビン要求信号を発信して
いる機台があるとき、粗糸搬送装置を制御してそれらの
発信順の機台間においてa粗糸ボビン、残糸ボビン及び
空ボビンの搬送を行う。
The machine number of the spinning machine that sent the remaining thread bobbin take-up request signal is registered in the remaining thread bobbin take-off table of the storage means in the order of transmission, and a full bobbin request is sent when the remaining thread bobbin is still being taken. When the device transmits a full bobbin request signal, the machine number of the spinning machine that transmitted the full bobbin request signal is registered in the full bobbin request table of the storage means in the order of transmission. Based on the registered data in each table, the control means of the conveyance control device stops the roving conveyance when there is a machine in the same group that is transmitting a full bobbin withdrawal request signal, a remaining thread bobbin withdrawal request signal, and a full bobbin request signal. The apparatus is controlled to transport the roving bobbin a, the remaining yarn bobbin, and the empty bobbin between the machines in the order of transmission.

実施例 第1図において、1は粗紡機で、多数台が並設されて粗
紡機群RMを構成している。これらの精紡機1には機台
番号が例えば(1)、(2)・・・(n)と符されてい
る。これらの粗紡機1には第2図に示すように自動管替
装置2が配設され、後述のドツフィングレール位置のボ
ビンキャリエージに吊下されている空ボビン3cと粗紡
機1のボビンホイール4にa置されている満粗糸ボビン
3aとを自動交換するようになっている。この自動管替
袋rX12ハ例えば特開昭57−106729号公報に
開示されている一斉管替機5と特開昭58−41919
号公報に開示されているボビン移送装置6とで構成され
ている。この−斉管替機5はボビンホイール4と対応す
る位置に満粗糸ボビン挿着用のペッグ7aと空ボビン挿
着用のペッグ7bを有するベルトコンベヤ7を備え、管
替ヘッド8の前後、上下移動によりボビンホイール4上
の満粗糸ボビン3aをペッグ7aに挿着した後ペッグ7
bに挿着されている空ボビン3cをボビンホイール4」
二に挿着するようになっている。ボビン移送装置6は上
下昇降される昇降体9の上下動によってボビンキャリエ
ージのボビンハンガーに吊下されている空ボビン3cを
取外してペッグ10に挿着し、そのペッグ10と上記ペ
ッグ7bとの間で交替腕11によって空ボビン3cを移
し替え。
Embodiment In FIG. 1, reference numeral 1 denotes a roving frame, and a large number of roving machines are arranged in parallel to form a roving frame group RM. These spinning machines 1 are labeled with machine numbers (1), (2), . . . (n), for example. These roving frames 1 are equipped with an automatic tube changing device 2 as shown in FIG. 2, and an empty bobbin 3c suspended from a bobbin carriage at a dotting rail position, which will be described later, and a bobbin wheel of the roving frame 1 are installed. The full roving bobbin 3a placed at position 4a is automatically replaced. This automatic tube change bag r
The bobbin transfer device 6 is disclosed in the above publication. This simultaneous tube changing machine 5 is equipped with a belt conveyor 7 having a peg 7a for inserting a full roving bobbin and a peg 7b for inserting an empty bobbin at a position corresponding to the bobbin wheel 4, and moves the tube changing head 8 back and forth and up and down. After inserting the full roving bobbin 3a on the bobbin wheel 4 into the peg 7a,
Move the empty bobbin 3c inserted into the bobbin wheel 4 to the bobbin wheel 4.
It is designed to be inserted into the second part. The bobbin transfer device 6 removes the empty bobbin 3c suspended from the bobbin hanger of the bobbin carriage by vertical movement of the elevating body 9 and inserts it into the peg 10, and connects the peg 10 and the peg 7b. The empty bobbin 3c is transferred by the alternating arm 11 in between.

その後ペッグ7aとペッグ10との間で交替腕11によ
って満粗糸ボビン3aを移し替え、昇降体9の上下動に
よって満粗糸ボビン3aをボビンキャリエージのボビン
ハンガーに挿着するようになっている。なお、上記自動
管替装置2としては特公昭51−38814号公報に示
されているように走行式の管替機等種々のものが使用さ
れ、時には人手によってボビンキャリエージのボビンハ
ンガーに挿着される。
Thereafter, the full roving bobbin 3a is transferred between the pegs 7a and the pegs 10 by the alternating arm 11, and the full roving bobbin 3a is inserted into the bobbin hanger of the bobbin carriage by the vertical movement of the elevating body 9. There is. As the automatic pipe changing device 2, various types such as a traveling type pipe changing machine are used as shown in Japanese Patent Publication No. 51-38814, and sometimes the pipe changing device 2 is manually inserted into the bobbin hanger of the bobbin carriage. be done.

次に12は精紡機で、多数台が並設されて精紡機群SF
を構成している。これらの精紡機12にも機台番号が例
えば(1)、(2)・・・(m)と符されている。これ
らの精紡機12には第4図に示すようにクリール13に
前列ボビンハンガー14と後列ボビンハンガー15を有
し、本実施例では例えば第3図、第5図に示すように前
列のボビンハンガー14には満粗糸ボビン3aを仕掛け
、後列のボビンハンガー15には中玉ボビン3dを仕掛
けるようになっている。この精紡機12には特開昭58
−81631号公報に示されているように篠入替機16
がクリール13内を走行し、上記満粗糸ボビン3aが中
玉ボビン3dに、中玉ボビン3dが小玉ボビン3eにな
った時点で、第3図、第5図に示すようにその中玉ボビ
ン3dと小玉ボビン3eをボビンハンガーごと入替え、
第4図に示すように前側ボビンハンガー14に小玉ボビ
ン3eを吊下させるようになっている。また精紡機12
の機台側方には例えば特開昭60−71724号公報に
示されているように篠交替機17が走行し、外側ボビン
ハンガー15の小玉ボビン3eと後述の予備篠レール位
置のボビンキャリエージに吊下されている満粗糸ボビン
3aを順次交替するようになっている。この篠交替機1
7は2本のベツグバー18.19を有し、一方のベツグ
バー18によってボビンキャリエージのボビンハンガー
から満粗糸ボビン3aを抜取り、他方のベツグバー19
が前列ボビンハンガー14から小玉ボビン3eを抜取っ
て篠交替するようになっている。
Next, 12 is a spinning machine, many of which are installed side by side, and the spinning machine group SF
It consists of These spinning machines 12 are also marked with machine numbers, for example, (1), (2), . . . (m). As shown in FIG. 4, these spinning machines 12 have a front row bobbin hanger 14 and a rear row bobbin hanger 15 on the creel 13. In this embodiment, for example, as shown in FIGS. 14 is set with a full roving bobbin 3a, and the rear row bobbin hanger 15 is set with a medium bobbin 3d. This spinning machine 12 is
- Shino shunting machine 16 as shown in Publication No. 81631
runs inside the creel 13, and when the full roving bobbin 3a becomes the medium bobbin 3d and the medium bobbin 3d becomes the small bobbin 3e, the medium bobbin is changed as shown in FIGS. 3 and 5. Replace the 3d and small bobbin 3e with the bobbin hanger,
As shown in FIG. 4, a small bobbin 3e is suspended from the front bobbin hanger 14. Also spinning machine 12
As shown in, for example, Japanese Patent Application Laid-Open No. 60-71724, a Shino changer 17 runs on the side of the machine, and a small bobbin 3e of the outer bobbin hanger 15 and a bobbin carrier at a spare Shino rail position, which will be described later, are installed. The full roving bobbin 3a suspended from the machine is sequentially replaced. This Shino replacement machine 1
7 has two bevel bars 18 and 19, one of which is used to pull out the full roving bobbin 3a from the bobbin hanger of the bobbin carriage, and the other bead bar 19 is pulled out.
The small bobbin 3e is removed from the front row bobbin hanger 14 and replaced.

なお、この篠交替によって予備篠レール位置のボビンキ
ャリエージに吊下された小玉ボビン3eを残糸ボビン3
bという。 次に、粗紡機群RMと精紡機群SF間の粗
糸搬送装置20について説明する。先ず、各粗紡機1の
上方には第1図に示すようにボビンキャリエージ21を
案内するドツフィングレール22が配設されている。こ
のドツフィングレール22は第6図に示すように断面口
形に形成され、水平方向の一対の案内面22aと垂直方
向の一対の案内面22bが形成されている。
In addition, due to this Shino change, the small bobbin 3e suspended from the bobbin carriage at the spare Shino rail position is replaced with the remaining thread bobbin 3.
It's called b. Next, the roving conveyance device 20 between the roving frame group RM and the fine spinning frame group SF will be explained. First, a dotting rail 22 for guiding a bobbin carriage 21 is disposed above each spinning frame 1, as shown in FIG. As shown in FIG. 6, this doffing rail 22 is formed into a mouth-shaped cross section, and has a pair of horizontal guide surfaces 22a and a pair of vertical guide surfaces 22b.

このドツフィングレール22は上記自動管替装置2にお
ける昇降体9のペッグ10の直上を通過するように配置
されている。ボビンキャリエージ21は第8図、第9図
に示すように構成され、23はキャリエージバーで、複
数本がジヨイント24によってピン連結されている。そ
れらのキャリエージバー23の下面には精紡クリール1
3の前列ボビンハンガー14と同数のボビンハンガー2
5がその前列ボビンハンガー14のピッチと同ピツチで
取付けられ、キャリエージバー23の上面には近接体2
6が1つおきのボビンハンガー25と対応する位置に夫
々取付けられている。またキャリエージバー23には両
端近くに一対の支持ローラ27と一対の案内ローラ28
とが設けられ、それらの支持ローラ27がドツフィング
レール22の案内面22aに、案内ローラ28が案内面
22bに夫々案内されている。次に、各精紡機12のク
リール13には第4図に示すように前列ボビンハンガー
14の前方に夫々予備篠レール29が並設されている。
This doffing rail 22 is arranged so as to pass directly above the peg 10 of the elevating body 9 in the automatic pipe changing device 2. The bobbin carriage 21 is constructed as shown in FIGS. 8 and 9, and 23 is a carriage bar, in which a plurality of carriage bars are connected by a pin through a joint 24. The spinning creel 1 is attached to the bottom surface of the carriage bar 23.
3 front row bobbin hangers 14 and the same number of bobbin hangers 2
5 is attached at the same pitch as the front row bobbin hanger 14, and a proximal body 2 is mounted on the upper surface of the carriage bar 23.
6 are attached to positions corresponding to every other bobbin hanger 25. The carriage bar 23 also has a pair of support rollers 27 and a pair of guide rollers 28 near both ends.
The support roller 27 is guided by the guide surface 22a of the dotting rail 22, and the guide roller 28 is guided by the guide surface 22b. Next, as shown in FIG. 4, on the creel 13 of each spinning frame 12, a spare wire rail 29 is arranged in parallel in front of the front row bobbin hanger 14.

これらの予備篠レール29は前記ドツフィングレール2
2と同様に構成され、別のボビンキャリエージ21が移
動自在に導入されている。なお、後述の精紡機群SFの
グループ分けされた各グループにおいて少なくとも]台
の精紡機12における予備篠レール29は、粗糸搬送の
取合いの為にボビンキャリエージ21が導入されていな
い空の状態にしておく。一般に、予備篠レール29のボ
ビンキャリエージ21は篠替の為に使用されるものであ
るから、各グループの何台分の精紡機12の予備篠レー
ル29にボビンキャリエージ21を必要とするかは各グ
ループの篠替サイクル時間に応じて決められる。次に、
上記各ドツフィングレール22と各予備篠レール29と
は第1図に示すように搬送レール30によって連結され
ている。この搬送レール30は各粗紡機1の一端側上方
と各精紡機12の一端側上方とを通る一本のメインレー
ル31と、このメインレール31の途中に並列的に分枝
配設されている残糸処理レール32とで構成され、その
残糸処理レール32の中間部位置に周知のロービングス
トリッパー33が配設されている(なお、上記各レール
22゜29.31.32を総称して単にレールにと記す
ことにする。)。前記メインレール31や残糸処理レー
ル32も上記ドツフィングレール22と同様に構成され
、ボビンキャリエージ21を案内し得るようになってい
る。また、ドツフィングレール22と予備篠レール29
はメインレール31から分枝するブランチレールによっ
て構成されている。上記残糸処理レール32の長さはボ
ビンキャリエージ21の2倍の長さより長く形成し、ロ
ービングストリッパー33によってボビンキャリエージ
21の残糸ボビン3bの残糸処理をしているときにその
ボビンキャリエージ21がメインレール31に突出さな
いようにしである。なお上記残糸処理レール32とロー
ビングストリッパー33は精紡機群SFにおいて異なる
品種のものを紡出するときはその品種に対応する数だけ
設けることが好ましい。
These preliminary Shino rails 29 are the same as the Dotsufin rails 2.
2, and another bobbin carriage 21 is movably introduced. In addition, in each group of the spinning frame group SF to be described later, the spare rail 29 of at least one spinning frame 12 is in an empty state in which no bobbin carriage 21 is introduced for coordination of roving conveyance. Keep it. Generally, the bobbin carriage 21 of the spare thread rail 29 is used for changing the thread, so how many spinning machines 12 in each group do the bobbin carriages 21 need to be included in the spare thread rail 29? is determined according to the replacement cycle time of each group. next,
The dotting rails 22 and the spare rails 29 are connected by conveyance rails 30, as shown in FIG. The conveyance rail 30 includes a main rail 31 that passes above one end of each spinning frame 1 and above one end of each spinning frame 12, and is branched in parallel in the middle of this main rail 31. A well-known roving stripper 33 is disposed in the middle of the remaining yarn processing rail 32 (the above-mentioned rails 22, 29, 31, and 32 are collectively referred to as simply (I will write it on the rail.) The main rail 31 and the remaining thread processing rail 32 are also constructed in the same manner as the dotting rail 22, and are capable of guiding the bobbin carriage 21. In addition, Dotsufin rail 22 and spare Shino rail 29
is composed of branch rails branching off from the main rail 31. The length of the remaining yarn processing rail 32 is formed to be longer than twice the length of the bobbin carriage 21, and when the remaining yarn bobbin 3b of the bobbin carriage 21 is being processed with the roving stripper 33, This is to prevent the age 21 from protruding into the main rail 31. Incidentally, when spinning different types of spinning machines in the spinning machine group SF, it is preferable to provide the remaining yarn processing rails 32 and the roving strippers 33 in numbers corresponding to the types of spinning machines.

次に、上記メインレール31と各ドツフィングレール2
2どの分枝点34には夫々第10図に示すような転轍器
35が設けられている。この転轍器35において、36
はレールKに枢軸37によって枢着された操作レバー、
38はボビンキャリエージ21の案内ローラ28を案内
するように枢軸37に回動自在に取付けられた転轍片で
、この転轍片38は操作レバー36のストッパー36a
にばね39により当接されて操作レバー36と一体回動
するようになっている。40は操作レバー36を回動さ
せるエヤシリンダで、所要時に転轍片38を実線の位置
から仮想線の開放位置に切替えるようになっている。4
2a、42bは転轍片38の切替を確認するリミットス
イッチである。
Next, the main rail 31 and each dot fin rail 2
Each of the two branch points 34 is provided with a switch 35 as shown in FIG. In this switch 35, 36
is an operating lever pivotally connected to the rail K by a pivot 37;
Reference numeral 38 denotes a switching piece rotatably attached to the pivot shaft 37 so as to guide the guide roller 28 of the bobbin carriage 21, and this switching piece 38 is attached to the stopper 36a of the operating lever 36.
The lever 39 is brought into contact with the lever 39 by a spring 39, and rotates together with the operating lever 36. Reference numeral 40 denotes an air cylinder that rotates the operating lever 36, and is designed to switch the switching piece 38 from the position shown by the solid line to the open position shown by the imaginary line when necessary. 4
2a and 42b are limit switches for checking switching of the switching piece 38.

また、上記メインレール31と各予備篠レール29どの
分枝点41にも第11図に示すような転轍器35hが設
けられている。この、転轍器35hは上記転轍器35と
線対照になるように構成してあり、対応する部分と同一
の符号にアルファベットのhを付して重複説明を省略す
る。またメインレール31と残糸処理レール32との分
枝点43.44にはボビンキャリエージ21を一方向へ
のみ案内する略同じ転轍器45.45hが配設されてい
る。これらの転轍器45.45hは第12図、第13図
に示すように回動自在に枢着した転轍片46.46hを
備え、この転轍片46.46hを復帰ばね47.47h
により付勢してストッパー48.48hに当接させてあ
り、ボビンキャリエージ21の案内ローラ28を案内し
て一方側へ分枝させるようになっている。
Furthermore, a switch 35h as shown in FIG. 11 is provided at every branch point 41 of the main rail 31 and each of the spare rails 29. This switch 35h is constructed so as to be line-symmetrical with the switch 35 described above, and the same reference numerals as corresponding parts are given the letter "h" to omit redundant explanation. Further, at branch points 43 and 44 between the main rail 31 and the remaining thread processing rail 32, substantially the same switch 45 and 45h for guiding the bobbin carriage 21 only in one direction is provided. As shown in FIGS. 12 and 13, these switches 45.45h are equipped with switch pieces 46.46h that are rotatably connected, and this switch piece 46.46h is connected to a return spring 47.47h.
The guide roller 28 of the bobbin carriage 21 is guided to branch to one side.

次に上記レールKにはボビンキャリエージ21を移動さ
せる為の送り装置52が第1図に示すようにボビンキャ
リエージ21の長さより短いピッチ間隔で多数配設され
ている。この送り装置52は第6図、第7図に示すよう
に構成されている。
Next, on the rail K, a large number of feeding devices 52 for moving the bobbin carriage 21 are arranged at pitch intervals shorter than the length of the bobbin carriage 21, as shown in FIG. This feeding device 52 is constructed as shown in FIGS. 6 and 7.

この送り装置52において、53はレールにの上面に止
着されたブラケットで、両端部にスイングアーム54.
55が夫々枢着され、これらのスイングアーム54.5
5に軸受箱56.57が夫々取付けられている。これら
の軸受箱56.57はフィードディスク58.59のシ
ャフト58a、59aを回動自在に支承し、また一方の
軸受箱56には駆動モータ60が取付けられ、シャフト
58aを正逆転させ得るようになっている。上記スイン
グアーム54.55の先端部間にばばね61が張設され
、フィードディスク58.59間にキヤリエージバー2
3が存在するときフィードディスク58.59をキャリ
エージバー23に圧接させ、キャリエージバー23が存
在しないときには軸受′M56.57をレールKに当接
させるようになっている。なお、各粗紡機1位置の上記
ボビン移送装置6近くの送り装置52には、第6図、第
7図に示すようにブラケット53にボビンキャリエージ
21の近接体26を検出する近接スイッチ62が取付け
られている。この近接スイッチ62はボビンキャリエー
ジ21をボビンハンガー25の2ピツチ毎に間欠的に移
動させて管替する為のもので、近接体26の検出信号に
よって駆動モータ60を停止させるようにしである。
In this feeding device 52, 53 is a bracket fixed to the upper surface of the rail, and swing arms 54 are attached to both ends.
55 are respectively pivotally connected, and these swing arms 54.5
Bearing boxes 56 and 57 are attached to 5, respectively. These bearing boxes 56, 57 rotatably support the shafts 58a, 59a of the feed disks 58, 59, and a drive motor 60 is attached to one of the bearing boxes 56 so that the shaft 58a can be rotated in the forward and reverse directions. It has become. A spring 61 is stretched between the tips of the swing arms 54 and 55, and the carriage bar 2 is stretched between the feed discs 58 and 59.
When the carriage bar 23 is present, the feed disks 58, 59 are brought into pressure contact with the carriage bar 23, and when the carriage bar 23 is not present, the bearing 'M56, 57 is brought into contact with the rail K. As shown in FIGS. 6 and 7, the feeding device 52 near the bobbin transfer device 6 at the 1 position of each roving frame has a proximity switch 62 mounted on the bracket 53 to detect a nearby body 26 of the bobbin carriage 21. installed. This proximity switch 62 is used to intermittently move the bobbin carriage 21 every two pitches of the bobbin hanger 25 to change the bobbin, and is designed to stop the drive motor 60 in response to a detection signal from the proximity body 26.

次に、上記各粗紡機1には、自動管替装置2が満粗糸ボ
ビン32aをドツフィングレール22のボビンキャリエ
ージ21に吊下させ、満粗糸ボビン3aの玉揚を完了し
て満粗糸ボビン3aの引取準備ができた時点で、自動的
に満ボビン引取要求信号を発信する満ボビン引取発信装
置63が設けられている。この満ボビン引取発信装置6
3は自動管替装置2の一連の管替作業が完了したことを
検出することによって容易に発信することができる。上
記各精紡機12には、篠交換機17が前列ボビンハンガ
ー14の小玉ボビン3eを抜取って予備篠レール29の
ボビンキャリエージ21に吊下させ、篠交替を完了して
残糸ボビン3bの引取準備ができた時点で、自動点にR
側とL側(R側優先)の残糸ボビン引取要求信号を夫々
発信する残糸ボビン引取抛信装置64が設けられている
Next, in each of the above-mentioned roving machines 1, the automatic pipe changing device 2 suspends the full roving bobbin 32a from the bobbin carriage 21 of the dotting rail 22, and completes the doffing of the full roving bobbin 3a to make the full roving bobbin 3a full. A full bobbin take-back transmitting device 63 is provided which automatically sends a full bobbin take-back request signal when the roving bobbin 3a is ready for take-up. This full bobbin collection transmitter 6
3 can be easily transmitted by detecting that the automatic pipe switching device 2 has completed a series of pipe switching operations. In each of the above-mentioned spinning machines 12, a Shino exchange machine 17 extracts the small bobbin 3e from the front row bobbin hanger 14, suspends it from the bobbin carriage 21 of the spare Shino rail 29, completes the Shino exchange, and takes over the remaining yarn bobbin 3b. When you are ready, press R on the automatic point.
A remaining thread bobbin take-up signal device 64 is provided that sends a remaining thread bobbin take-up request signal on the side and L side (priority is given to the R side).

この残糸ボビン引取発信装置64は篠交換機17の一連
の篠交換作業が完了したことを検出することによって容
易に発信することができる。また各精紡機12には予備
篠レール29が残糸ボビン3bが吊下されているボビン
キャリエージ21が引出されて空の状態になっていると
きに自動的にR側とL側(R側優先)の満ボビン要求信
号を夫々発信する満ボビン要求発信装置65が設けられ
ている。この満ボビン要求発信装置65は予備篠レール
29にボビンキャリエージ21が導入されていないこと
を検出し得ように各予備篠レール29に設けたリミット
スイッチ66a、66bを備え。
The remaining yarn bobbin take-up transmitting device 64 can easily send a message by detecting that the series of thread exchange operations of the thread exchanger 17 have been completed. In addition, in each spinning frame 12, when the bobbin carriage 21 on which the remaining thread bobbin 3b is suspended is pulled out and empty, the spare rail 29 is automatically installed on the R side and the L side (R side). A full bobbin request transmitting device 65 is provided which transmits a full bobbin request signal for each of the bobbins (priority). The full bobbin request transmitting device 65 includes limit switches 66a and 66b provided on each spare rail 29 so as to detect that the bobbin carriage 21 is not introduced into the spare rail 29.

これらのリミットスイッチ66a、66bからの信号に
よって満ボビン要求信号を発信するようになっている。
A full bobbin request signal is transmitted by signals from these limit switches 66a and 66b.

またロービングストリッパー33には残糸ボビン受入準
備完了信号を発信する受入許可信号発信装置100 f
J<設けられている。
The roving stripper 33 also has an acceptance permission signal transmitting device 100f that transmits a signal indicating that the remaining thread bobbin is ready to receive.
J< provided.

次に、上記粗糸搬送装置20を制御する搬送制御装置6
8が工場内に設置されている。この搬送制御装置126
8は第14図に示すようにコンピューター装置によって
構成してあり、入力手段69と記憶手段70と制御手段
71とを備えている。この入力手段69はキーボード等
によって構成され、上記粗紡機群RMの各粗紡機1のグ
ループ番号と精紡機群SFの各精紡機12のグループ番
号とを外部から任意に入力し得るようになっている。こ
れらの粗紡機1と精紡機12のグループ番号の入力は記
憶手段7oに予め記憶されている入力プログラムをスタ
ートさせることによって行うが、これらのグループ番号
の入力は予め設定したグループ編成表に基づいて粗紡機
1と精紡機12の機台番号順に順次キーボード入力すれ
ば良く、ここでの入力プログラムの説明を省略する。次
に、上記記憶手段70は、前記入力された各粗紡機1の
グループ番号を第15図(A)に示すように登録する粗
紡グループテーブル70aと、入力された各精紡機12
のグループ番号を第15図(B)に示すように登録する
精紡グループテーブル70bと、満ボビン引取発信装置
63が満ボビン引取要求信号を発信した粗紡機1の機台
番号を第15図(C)に示すように発信順に登録する満
ボビン引取テーブル70cと、残糸ボビン引取発信装置
64がR側とL側の残糸ボビン引取要求信号を発信した
精紡機12の機台番号とR,L側の区別を第15図(D
)に示すように各グループ別に発信順(R側がL側より
優先)に登録する残糸ボビン引取要求テーブル70dと
、満ボビン要求発信装置65がR側とL側の満ボビン要
求信号を発信した精紡機12の機台番号とR,L側の区
別を第15図(E)に示すように各グループ別に発信順
(R側がL側より優先)に登録する満ボビン要求テーブ
ル70eを夫々備えている。上記制御手段71は上記各
テーブル70a、70b、70c、70d、70eの登
録データに基づいて同一グループ内に満ボビン引取要求
信号と残糸ボビン引取要求信号と満ボビン要求信号が夫
々発信されている機台番号が登録されているとき、その
グループ内で粗紡機1におけるドツフィングレール22
の満ボビン付ボビンキャリエージ21を精紡機12の予
備篠レール29へ搬送し、精紡機12における予備篠レ
ール29の残糸ボビン付ボビンキャリエージ21を残糸
処理レール32へ搬送すると共に残糸処理レール32の
残糸処理後の空ボビン付ボビンキャリエージ21を前記
ドツフィングレール22へ搬送するようになっている。
Next, a conveyance control device 6 that controls the roving conveyance device 20
8 are installed in the factory. This conveyance control device 126
8 is constituted by a computer device as shown in FIG. 14, and includes input means 69, storage means 70, and control means 71. This input means 69 is constituted by a keyboard or the like, and allows the group number of each spinning frame 1 of the aforementioned spinning frame group RM and the group number of each spinning frame 12 of the spinning frame group SF to be arbitrarily input from the outside. There is. The group numbers of the roving frame 1 and the spinning frame 12 are entered by starting an input program stored in advance in the storage means 7o, but the group numbers are entered based on a group organization table set in advance. It suffices to enter the information on the keyboard sequentially in the order of the machine numbers of the roving frame 1 and the spinning frame 12, and the explanation of the input program here will be omitted. Next, the storage means 70 stores a roving group table 70a in which the input group number of each spinning frame 1 is registered as shown in FIG.
As shown in FIG. 15(B), the spinning group table 70b registers the group number of the revolving frame 1 to which the full bobbin take-back transmitting device 63 has sent the full bobbin take-back request signal. As shown in C), the full bobbin take-up table 70c is registered in the order of transmission, and the machine number and R of the spinning machine 12 from which the remaining yarn bobbin take-up transmitting device 64 has sent the R-side and L-side remaining yarn bobbin take-up request signals. Figure 15 (D
), the remaining thread bobbin take-back request table 70d is registered in the sending order for each group (R side has priority over L side), and the full bobbin request transmitting device 65 sends full bobbin request signals for the R side and L side. Each machine is provided with a full bobbin request table 70e in which the machine number of the spinning machine 12 and the distinction between the R and L sides are registered for each group in the order of transmission (R side has priority over L side), as shown in FIG. 15(E). There is. The control means 71 transmits a full bobbin withdrawal request signal, a remaining thread bobbin withdrawal request signal, and a full bobbin request signal, respectively, within the same group based on the registered data of the respective tables 70a, 70b, 70c, 70d, and 70e. When the machine number is registered, the dotting rail 22 of the Rover 1 in that group
The bobbin carriage 21 with a full bobbin is conveyed to the spare thread rail 29 of the spinning frame 12, and the bobbin carriage 21 with the remaining yarn bobbin of the spare yarn rail 29 in the spinning machine 12 is conveyed to the residual yarn processing rail 32, and the remaining yarn is removed. The bobbin carriage 21 with an empty bobbin after processing the remaining yarn on the processing rail 32 is transported to the dotting rail 22.

この制御手段71による粗糸搬送制御は予め記憶手段7
oに記憶しである制御プログラムのスタートによって行
うようにしである。この制御プログラムのフローチャー
ト図は第16図のようになっており、次にこの制御プロ
グラムに従って粗糸搬送装置20の作動について説明す
る。
The roving conveyance control by the control means 71 is performed in advance by the storage means 7.
This is done by starting a control program that is stored in .o. A flowchart of this control program is shown in FIG. 16. Next, the operation of the roving conveying device 20 will be explained according to this control program.

先ず、粗紡、精紡工場の操業に先立ち、紡出番手や品種
等の操業条件に応じて粗紡機群RMと精紡機群SFをグ
ループ分けして所要数の粗紡−精紡グループを好ましい
状態に編成する。例えば粗紡機1が(1)〜(4)番迄
の4台、精紡機12が(1)〜(20)番迄の20台の
規模のとき、第1グループを粗紡機(1)と精紡機(1
)〜(6)、第2グループを粗紡機(2)、(3)と精
紡機(7)〜−(15)、第3グループを粗紡機(4)
と精紡機(16)〜(20)に夫々編成したものとして
説明する。次に、上記グループ編成に基づいて各粗紡機
1と精紡機12のグループ番号を機台番号毎に入力手段
69によって順次入力する。このようにして入力された
各粗紡機1と各精紡機12のグループ番号は記憶手段の
粗紡グループテーブル70aと精紡グループテーブル7
0bとに夫々登録される。次に粗紡機群RMと精紡機群
SFの運転を開始するが、その場合残糸処理レール32
にはロービングストリッパー33より粗紡機1側に予め
空ボビン付のボビンキャリエージ21を一本導入してお
く。また各ドツフィングレール22には夫々ボビンキャ
リエージ21を導入しておき、各グループにおける精紡
機12の予備篠レール29には1台の精紡機12例えば
機台番号(6)、(15)、(2o)の予備篠レール2
9を除いて夫々ボビンキャリエージ21を導入しておく
。そして、粗紡機群RMの各粗紡機1においては、紡糸
中に自動管替装置2が作動してボビンキャリエージ21
のボビンハンガー25に吊下されている空ボビン3cを
ベルトコンベヤ7のペッグ7bに挿着する。満管になる
とその粗紡機1が停止した後、自動管替装置2が作動し
てボビンホイール4上の満粗糸ボビン3aをベルトコン
ベヤ7のペッグ7aに玉揚すると共に前記空ボビン3c
をボビンホイール4上に載せ粗紡機の逆転を再び開始す
る。その後ベルトコンベヤ7上の満粗糸ボビン3aをボ
ビン移送装置6によってドツフィングレール22位置に
おけるボビンキャリエージ21のボビンハンガー25に
順次吊下させる。
First, prior to the operation of the roving and spinning mills, the roving machine group RM and the spinning machine group SF are divided into groups according to operating conditions such as spinning count and product type, and the required number of roving and spinning groups are brought into a favorable state. Organize. For example, when the size of the roving frame 1 is 4 (1) to (4), and the spinning frame 12 is 20 (1) to (20), the 1st group is the roving frame (1) and the fine spinning frame (1). Spinning machine (1
) to (6), the second group is the roving frame (2), (3) and the spinning frame (7) to -(15), the third group is the roving frame (4)
The explanation will be made on the assumption that they are organized into spinning machines (16) to (20), respectively. Next, based on the above-mentioned group organization, the group numbers of each roving frame 1 and fine frame 12 are sequentially inputted by the input means 69 for each machine number. The group numbers of each roving frame 1 and each spinning frame 12 input in this way are stored in the roving group table 70a and the spinning group table 7 of the storage means.
0b and 0b, respectively. Next, the operation of the roving frame group RM and the spinning frame group SF is started, but in that case, the remaining yarn processing rail 32
In this case, one bobbin carriage 21 with an empty bobbin is introduced in advance from the roving stripper 33 to the roving frame 1 side. Further, a bobbin carriage 21 is installed in each dotting rail 22, and one spinning frame 12, for example, machine numbers (6), (15), (2o) Spare Shino rail 2
A bobbin carriage 21 is introduced in each case except for 9. In each roving frame 1 of the roving frame group RM, the automatic tube change device 2 operates during spinning to change the bobbin carriage 21.
The empty bobbin 3c suspended from the bobbin hanger 25 is inserted into the peg 7b of the belt conveyor 7. When the roving machine 1 is full, the roving machine 1 is stopped, and then the automatic roving machine 2 is operated to doff the full roving bobbin 3a on the bobbin wheel 4 to the peg 7a of the belt conveyor 7, and also transfer the empty bobbin 3c to the peg 7a of the belt conveyor 7.
is placed on the bobbin wheel 4 and the reversal of the rover is started again. Thereafter, the full roving bobbins 3a on the belt conveyor 7 are sequentially suspended from the bobbin hangers 25 of the bobbin carriage 21 at the dotting rail 22 position by the bobbin transfer device 6.

総ての満粗糸ボビン3aをボビンキャリエージ21のボ
ビンハンガー25に吊下させて管替動作を完了すると、
満ボビン引取発信装置63が満ボビン引取要求信号を発
信する。この満ボビン引取要求信号は搬送制御装置68
に送られ、その満ボビン引取要求信号を発信した粗紡機
1の機台番号が記憶手段70の満ボビン引取テーブル7
0cに発信順に登録される。一方、精紡機群SFの各精
紡機12においては、紡糸中に前列ボビンハンガー14
の満粗糸ボビン3aが中玉ボビン3dに、後列ボビンハ
ンガー15の中玉ボビン3dが小玉ボビン3eになると
、篠入替機16が作動して前列ボビンハンガー14の中
玉ボビン3dと後列ボビンハンガー15の小玉ボビン3
eを入習える。その後筬交替機17が作動して前列ボビ
ンハンガー14の前記小玉ボビン3eと予備篠し−ル2
9位置のボビンキャリエージ21のボビンハンガー25
から吊下されている満粗糸ボビン3aとを順次交替し、
前列ボビンハンガー14に満粗糸ボビン3aを吊下させ
、予備篠レール29のボビンキャリエージ21のボビン
ハンガー25に残糸ボビン3bを吊下させる。そして1
mての残糸ボビン3bをボビンキャリエージ21のボビ
ンハンガー25に吊下させて篠交替動作を完了すると、
残糸ボビン引取発信装置64がR側とL側の残糸ボビン
引取要求信号を発信する。この残糸ボビン引取要求信号
は搬送制御装置68に送られ、その残糸ボビン引取要求
信号を発信した精紡機12の機台番号とR,L側の区別
が記憶手段70の残糸ボビン引取要求テーブル70dに
発信順に登録される。
When all the full roving bobbins 3a are suspended from the bobbin hanger 25 of the bobbin carriage 21 and the tube change operation is completed,
A full bobbin collection transmitting device 63 transmits a full bobbin collection request signal. This full bobbin take-back request signal is sent to the conveyance control device 68.
The machine number of the revolving frame 1 that sent the full bobbin take-back request signal is stored in the full bobbin take-back table 7 of the storage means 70.
0c in the order of outgoing calls. On the other hand, in each spinning frame 12 of the spinning frame group SF, the front row bobbin hanger 14
When the full roving bobbin 3a becomes the medium bobbin 3d and the medium bobbin 3d of the rear row bobbin hanger 15 becomes the small bobbin 3e, the Shino switching machine 16 operates and the medium bobbin 3d of the front row bobbin hanger 14 and the rear row bobbin hanger 15 small bobbin 3
You can learn e. Thereafter, the reed changing machine 17 is activated, and the small bobbin 3e of the front row bobbin hanger 14 is replaced with the spare reed reed reed 2.
Bobbin hanger 25 of bobbin carriage 21 in 9 position
and the full roving bobbin 3a suspended from the
The full roving bobbin 3a is suspended from the front row bobbin hanger 14, and the remaining yarn bobbin 3b is suspended from the bobbin hanger 25 of the bobbin carriage 21 of the preliminary thread rail 29. and 1
When the mth remaining thread bobbin 3b is suspended from the bobbin hanger 25 of the bobbin carriage 21 and the Shino alternation operation is completed,
The remaining yarn bobbin take-up transmitting device 64 sends out R-side and L-side remaining yarn bobbin take-up request signals. This remaining yarn bobbin take-up request signal is sent to the conveyance control device 68, and the machine number of the spinning machine 12 that sent the residual yarn bobbin take-up request signal and the distinction between the R and L sides are stored in the storage means 70 as the remaining yarn bobbin take-up request. They are registered in the table 70d in the order of transmission.

また、各精紡機12の予備篠レール29にボビンキャリ
エージ21が導入されていない場合には、満ボビン要求
発信装置65がR側とL側の満ボビン要求信号を発信す
る。この満ボビン要求信号を搬送制御装置68に送られ
、その満ボビン要求信号を発信した精紡機12の機台番
号とR,L側の区別が記憶手段7oの満ボビン要求デー
プル70eに発信順に登録される。
Further, if the bobbin carriage 21 is not introduced into the spare rail 29 of each spinning frame 12, the full bobbin request transmitting device 65 transmits full bobbin request signals for the R side and the L side. This full bobbin request signal is sent to the conveyance control device 68, and the machine number of the spinning machine 12 that transmitted the full bobbin request signal and the distinction between R and L sides are registered in the full bobbin request table 70e of the storage means 7o in the order of transmission. be done.

そして上記各テーブル70a、70b、70c、70d
、70eへのデータの登録により、何れかのグループに
おいて満ボビン引取要求信号と残糸ボビン引取要求信号
と満ボビン要求信号を夫々発信している機台が揃うと、
第16図の制御プログラムによってそのグループ内での
粗糸搬送が行われる。先ず、制御プログラムの第1ステ
ツプ■においては、粗紡グループテーブル70aにおけ
る満ボビン引取要求信号発信機台の有無を判断し、有る
場合には第2ステツプ■でその粗紡機1の機台番号を抽
出する。次に、第3ステツプ■と第4ステツプ■におC
)で、その抽出した粗紡機1のグループ内において満ボ
ビン要求信号発信機台と残糸ボビン引取要求信号発信機
台の有無を判断し、無い場合には次の満ボビン引取要求
信号発信機台を抽出するように戻り、有る場合には第5
ステツプ■において残糸ボビン受入準備完了信号の有無
によってロービングストリッパー33の受入準備ができ
ているかどうかを判断した後、第6ステツプ■において
搬送経路を使用中かどうかを判断し。
And each of the above tables 70a, 70b, 70c, 70d
, 70e, when the machines that are respectively transmitting the full bobbin withdrawal request signal, the remaining thread bobbin withdrawal request signal, and the full bobbin request signal in any group are aligned.
The control program shown in FIG. 16 causes the roving to be transported within the group. First, in the first step (2) of the control program, it is determined whether there is a full bobbin take-back request signal transmitter stand in the Rover group table 70a, and if there is, the machine number of the Rover machine 1 is extracted in the second step (2). do. Next, press C in the third step ■ and the fourth step ■.
), it is determined whether there is a full bobbin request signal transmitter stand and a remaining yarn bobbin take-off request signal transmitter stand in the group of the extracted Rover 1, and if there is none, the next full bobbin take-back request signal transmitter stand is determined. Go back to extracting the 5th
In step (2), it is determined whether the roving stripper 33 is ready for reception based on the presence or absence of the remaining yarn bobbin reception preparation completion signal, and then, in the sixth step (2), it is determined whether or not the conveyance path is in use.

その結果ロービングストリッパー33の受入準備ができ
ており、しかも搬送経路が使用中でないときには次の第
7ステツプにおいて搬送経路の決定を行う。即ち同一グ
ループ内における最優先の満ボビン引取要求信号を発信
した粗紡機1の機台番号と、最優先の残糸ボビン引取要
求信号を発信した精紡機12の機台番号及びR,L側の
区別と、最優先の満ボビン要求信号を発信した精紡機1
2の機台番号及びR,L側の区別とを決定する。次に、
第8ステツプ■において満ボビン搬送指令が発信される
と、上記満ボビン引取要求信号発信の機台番号の粗紡機
1に対応するドツフィングレール22とメインレール3
1との分枝点34に設けた転轍器35のエヤシリンダ4
0が作動して転轍片38を第10図に仮想線にて示すよ
うに開放位置に回動させ、また満ボビン要求信号発信の
精紡機12のR側(R側優先の為)予備篠レール29と
メインレール31との分枝点41に設けた転轍器35h
のエヤシリンダ40hが作動して転轍片38hを第11
図に仮想線にて示す開放位置に回動させる。その後、第
9ステツプ■において前記転轍器35.35hの切替完
了をリミットスイッチ42a、42ahの信号によって
判断し、切替完了しているときには次の第10ステツプ
[相]において満粗糸ボビン3aの搬送が行われる。即
ち、前記決定された粗紡機1のドツフィングレール22
と精紡機12のR側予備篠レール29とメインレール3
1とに対応する送り装置52の駆動モータ60が作動し
てフィードディスク58を第7図において反時計方向へ
正転させ、これにより上記粗紡機1位置のドツフィング
レール22に案内されている満ボビン付ボビンキャリエ
ージ21はメインレール31を通って上記精紡機12の
R側予備篠レール29に搬送され、その予備篠レール2
9に導入される。なお満ボビン付キャリエージ21が予
備篠レール29に完全に導入されると、そのことをリミ
ットスイッチ(図示省略)等によって検出して駆動モー
タ60を停止させると共に転轍器35.35hを旧に復
させる。次に、第11ステツプOにおいて、上記満ボビ
ン付ボビンキャリエージ21が予備篠レール29に導入
されたことをリミットスイッチ66aの信号によって判
断し、その導入完了を確認すると第12ステップ@で満
ボビン引取テーブル7oCの更新即ち最初のデータを削
除して他のデータを繰り上げる。次に。
As a result, if the roving stripper 33 is ready to be received and the conveyance route is not in use, the conveyance route is determined in the next seventh step. In other words, the machine number of the spinning frame 1 that transmitted the highest priority full bobbin withdrawal request signal within the same group, the machine number of the spinning frame 12 that transmitted the highest priority remaining yarn bobbin withdrawal request signal, and the R and L side machine numbers. Spinning machine 1 that sent the distinction and the highest priority full bobbin request signal
The machine number of No. 2 and the distinction between R and L sides are determined. next,
When a full bobbin transfer command is issued in the eighth step (2), the dotting rail 22 and main rail 3 corresponding to the Rover 1 with the machine number that has issued the full bobbin take-back request signal are
Air cylinder 4 of switch 35 provided at branch point 34 with 1
0 operates to rotate the switching piece 38 to the open position as shown by the imaginary line in FIG. Switch 35h provided at branch point 41 between rail 29 and main rail 31
The air cylinder 40h operates to move the switching piece 38h to the 11th
Rotate it to the open position shown by the phantom line in the figure. Thereafter, in the 9th step (3), the completion of switching of the switch 35, 35h is determined by the signals of the limit switches 42a, 42ah, and if the switching is completed, the full roving bobbin 3a is switched in the next 10th step [phase]. Transport takes place. That is, the dotting rail 22 of the determined roving frame 1
and the R-side spare rail 29 and main rail 3 of the spinning machine 12.
The drive motor 60 of the feed device 52 corresponding to the frame 1 operates to rotate the feed disk 58 in the counterclockwise direction in FIG. The bobbin carriage 21 with a bobbin is conveyed to the R side spare rail 29 of the spinning machine 12 through the main rail 31, and
introduced in 9. Note that when the carriage 21 with a full bobbin is completely introduced into the spare rail 29, this is detected by a limit switch (not shown), etc., and the drive motor 60 is stopped, and the switch 35.35h is restored to the old one. let Next, in the 11th step O, it is judged from the signal of the limit switch 66a that the bobbin carriage 21 with a full bobbin has been introduced into the preliminary line rail 29, and when it is confirmed that the introduction is completed, the bobbin carriage 21 with a full bobbin is introduced into the spare bobbin rail 29. The takeover table 7oC is updated, that is, the first data is deleted and the other data are moved forward. next.

第13ステツプ■において、満ボビン要求信号発信機台
のR,L側の両方の予備篠レール29に満ボビン付ボビ
ンキャリエージ21が導入されたかどうかを判断し、両
方とも完了したときには第14ステツプOにおいて満ボ
ビン要求テーブル70eの最初のR,L側の2つのデー
タを削除すると共に他のデータを繰り上げて更新を行い
、その後第15ステツプ■と第16ステツプのへ進む。
In the 13th step (2), it is determined whether the bobbin carriage 21 with a full bobbin has been introduced into the spare rails 29 on both the R and L sides of the full bobbin request signal transmitter stand, and when both have been completed, the process proceeds to the 14th step. At O, the first two data on the R and L sides of the full bobbin request table 70e are deleted, and the other data is moved up and updated, and then the process proceeds to the 15th step (2) and the 16th step.

これ迄の説明のようにR側しか完了していないときには
直接第15ステツプ と第16ステツプ へ進み、残糸
ボビン搬送指令と空ボビン搬送指令が発信される。この
残糸ボビン搬送指令が発信されると、上記残糸ボビン引
取要求信号の精紡機12のR側予備篠レール29とメイ
ンレール31との分枝点41に設けた転轍器35hの転
轍片38hを開放位置に切替える。その後第17ステツ
プOにおいて前記転轍器35hの切替完了をリミットス
イッチ42ahによって判断し、切替完了しているとき
には次の第18ステツプ[相]において残糸ボビン3b
の搬送が行われる。即ち、前記精紡機、12のR側予備
篠レール29とロービングストリッパー33より精紡機
12側におけるメインレール31及び残糸処理レール3
2とに対応する送り装置52の駆動モータ60が作動し
てフィードディスク58を前記とは逆方向へ逆転させ、
これにより前記R側予備篠レール29に案内されている
残糸ボビン付ボビンキャリエージ21はメインレール3
1を通って残糸処理レール32に搬送される。なお、残
糸ボビン付ボビンキャリエージ21が残糸処理レール3
2の所定位II(ロービングストリッパー33の直前位
置)迄搬送されると、そのことをリミットスイッチ(図
示省略)等によって検出して前記各送り装置t!52の
駆動モータ60を停止させると共に転轍器35hを元の
状態に復帰させる。
As explained so far, when only the R side has been completed, the process directly advances to the 15th step and the 16th step, and a remaining thread bobbin transport command and an empty bobbin transport command are issued. When this residual yarn bobbin transport command is sent, the switch 35h installed at the branch point 41 between the R side spare rail 29 and the main rail 31 of the spinning machine 12 receives the residual yarn bobbin take-up request signal. Switch the piece 38h to the open position. Thereafter, in the 17th step O, it is determined by the limit switch 42ah whether the switching of the switch 35h has been completed, and if the switching has been completed, the remaining yarn bobbin 3b is removed in the next 18th step [phase].
transportation is carried out. That is, the main rail 31 and the remaining yarn processing rail 3 on the spinning machine 12 side from the R-side spare rail 29 and roving stripper 33 of the spinning machine 12.
The drive motor 60 of the feed device 52 corresponding to 2 is operated to reverse the feed disk 58 in the opposite direction,
As a result, the bobbin carriage 21 with the remaining thread bobbin guided to the R side spare rail 29 is moved to the main rail 3.
1 and is conveyed to the remaining yarn processing rail 32. Note that the bobbin carriage 21 with the remaining thread bobbin is connected to the remaining thread processing rail 3.
When the roving stripper 33 is transported to the predetermined position II (the position immediately in front of the roving stripper 33), this is detected by a limit switch (not shown) or the like, and each of the feeding devices t! 52 is stopped, and the switch 35h is returned to its original state.

一方上記空ボビン搬送指令が発信されると、上記満ボビ
ン引取要求信号発信の粗紡機1に対応するドツフィング
レール22とメインレール31との分枝点34に設けた
転轍器35の転轍片38を開放位置に切替え、その後第
19ステツプOにおいて前記転轍片38の切替完了をリ
ミットスイッチ42aによって判断し、切替完了してい
るときには次の第20ステツプOにおいて空ボビン3c
の搬送を行なう。即ち、前記粗紡機1のドツフィングレ
ール22とロービングストリッパー33より粗紡機1側
におけるメインレール31及び残糸処理レール32とに
対応する送り装置52の駆動モータ60が作動してフィ
ードディスク58を逆転させ、これにより前記残糸処理
レール32に案内されている空ボビン付ボビンキャリエ
ージ21はメインレール31を通って前記満ボビン付ボ
ビンキャリエージ21が抜取られた後のドツフィングレ
ール22に搬送される。なお、この空ボビン付ボビンキ
ャリエージ21がドツフィングレール22の所定位置迄
搬送されると、そのことをリミットスイッチ(図示省略
)等によって検出して前記各送り装置52の駆動モータ
60を停止させると共に転轍器35を旧に復させる。次
に、第21ステツプOと第22ステツプOにおいて前記
残糸ボビン3bの搬送と空ボビン3cの搬送とが夫々完
了したかどうかを判断し、両方とも完了しているときは
第23ステツプ0において残糸ボビン3bの引取がR,
L側の両方の予備篠レール29において完了しているか
を判断し、また第24ステツプOにおいてロービングス
トリッパー33による残糸処理信号を発信する。この残
糸処理信号によってロービングストリッパー33が作動
し、残糸処理レール32に搬送された前記残糸ボビン付
ボビンキャリエージ21の残糸ボビン3bが残糸処理さ
れる。また、前記残糸ボビン3bの引取がR,L側の両
方の予備篠レール29において完了しているときには、
第25ステツプ において残糸ボビン引取テーブル70
dの最初のR,L側の2つのデータを削除すると共に他
のデータを繰り上げて更新を行うが、これ迄の説明のよ
うにR側しか完了していないときには再び第1ステツプ
のへ戻り、次の粗糸搬送を上記と同様にして行う。
On the other hand, when the empty bobbin transfer command is issued, the switch 35 installed at the branch point 34 between the dotting rail 22 and the main rail 31 corresponding to the roving frame 1 that has issued the full bobbin take-back request signal is activated. The switching piece 38 is switched to the open position, and then, in the 19th step O, it is determined by the limit switch 42a whether the switching of the switching piece 38 has been completed, and when the switching has been completed, the empty bobbin 3c is removed in the next 20th step O.
transport. That is, the drive motor 60 of the feeding device 52 corresponding to the dotting rail 22 of the roving frame 1 and the main rail 31 and the remaining yarn processing rail 32 on the side of the roving frame 1 from the roving stripper 33 operates to rotate the feed disk 58 in the reverse direction. As a result, the bobbin carriage 21 with empty bobbins guided to the residual yarn processing rail 32 is conveyed through the main rail 31 to the dotting rail 22 after the bobbin carriage 21 with full bobbins has been extracted. Ru. Note that when the bobbin carriage 21 with an empty bobbin is conveyed to a predetermined position on the dotting rail 22, this is detected by a limit switch (not shown) or the like, and the drive motor 60 of each of the feeding devices 52 is stopped. At the same time, the switch 35 is restored to its old state. Next, in the 21st step O and the 22nd step O, it is determined whether the conveyance of the remaining thread bobbin 3b and the conveyance of the empty bobbin 3c have been completed, respectively, and if both have been completed, the process proceeds to the 23rd step 0. When the remaining thread bobbin 3b is picked up R,
It is determined whether or not the process has been completed on both of the L-side preliminary line rails 29, and in the 24th step O, a remaining yarn processing signal is transmitted by the roving stripper 33. The roving stripper 33 is activated by this residual yarn processing signal, and the residual yarn bobbin 3b of the bobbin carriage with residual yarn bobbin 21 conveyed to the residual yarn processing rail 32 is processed for residual yarn. Further, when the picking-up of the remaining thread bobbin 3b has been completed at both the R and L side spare rails 29,
At the 25th step, the remaining thread bobbin take-up table 70
The first two data on the R and L sides of d are deleted, and the other data is moved forward and updated. However, as explained so far, if only the R side has been completed, the process returns to the first step. The next roving is carried out in the same manner as above.

即ち、満ボビン引取テーブル70cに次に登録されてい
る機台番号の粗紡機1の含まれているグループにおいて
粗糸搬送を行なう。また引き続き最初に粗糸搬送を行っ
たグループにおいて再び粗糸搬送を行う場合には、今度
は前回粗糸搬送を行った精紡機12のL側予備篠レール
29に対して行われる。
That is, the roving is carried out in the group that includes the roving frame 1 having the next machine number registered in the full bobbin take-up table 70c. Furthermore, when roving is subsequently carried out again in the group that carried out roving for the first time, this time the roving is carried out on the L-side spare rail 29 of the spinning frame 12 that carried out the previous roving.

上記実施例においては、予め残糸処理レール32に空ボ
ビン付ボビンキャリエージ21を導入しておき、粗糸搬
送の際に満ボビン付ボビンキャリエージ21を粗紡機1
から精紡機12へ、残糸ボビン付ボビンキャリエージ2
1を精紡機12からロービングストリッパー33へ、空
ボビン付ボビンキャリエージ21をロービンゲストリツ
バ−33から元の粗紡機1へ夫々搬送する場合について
説明したが、この粗糸搬送は例えば残糸ボビン付ボビン
キャリエ、−ジ21を精紡機12からロービングストリ
ッパー33へ、満ボビン付ボビンキャリエージ21を粗
紡機1から前記引取後の精紡機12へ、前に残糸ボビン
付ボビンキャリエージをロービングストリッパー33に
よって処理した後の空ボビン付ボビンキャリエージ21
を元の粗紡機1へ夫々搬送するようにしても良い。
In the above embodiment, the bobbin carriage 21 with an empty bobbin is introduced into the residual yarn processing rail 32 in advance, and the bobbin carriage 21 with a full bobbin is transferred to the roving frame 1 when transporting the roving yarn.
to spinning frame 12, bobbin carriage 2 with remaining yarn bobbin
1 from the spinning frame 12 to the roving stripper 33, and the bobbin carriage 21 with empty bobbin from the roving stripper 33 to the original roving frame 1. The bobbin carrier with bobbin, 21, is transferred from the spinning frame 12 to the roving stripper 33, the bobbin carrier 21 with a full bobbin is transferred from the roving frame 1 to the spinning frame 12 after being taken over, and the bobbin carrier with the remaining yarn bobbin is transferred to the roving stripper beforehand. Bobbin carriage 21 with empty bobbin after processing according to No. 33
may be transported to the original roving frame 1, respectively.

発明の効果 以上のように本発明にあっては、各粗紡機に満ボビン引
取要求信号を発信する満ボビン引取発信装置を設け、各
精紡機に残糸ボビン引取要求信号を発信する残糸ボビン
引取発信装置と、満ボビン要求信号を発信する満ボビン
要求発信装置を設け。
Effects of the Invention As described above, in the present invention, each spinning machine is provided with a full bobbin take-up transmitting device that sends a full bobbin take-up request signal, and a remaining yarn bobbin that sends a remaining yarn bobbin take-up request signal to each spinning machine is provided. A collection transmitting device and a full bobbin request transmitting device for transmitting a full bobbin request signal are provided.

搬送制御装置に1よ各粗紡機のグループ番号を登録する
粗紡グループテーブル、各精紡機のグループ番号を登録
する精紡グループテーブル、?aボビン引取要求信号が
発信された粗紡機の機台番号を発信順に登録する満ボビ
ン引取テーブル、残糸ボビン引取要求信号が発信された
精紡機の機台番号を発信順に登録する残糸ボビン引取テ
ーブル及び満ボビン要求信号が発信された精紡機の機台
番号を発信順に登録する満ボビン要求テーブルを有する
記憶手段と、各テーブルの登録データに基いて同一グル
ープ内に各信号が発信されている機台があるときにはそ
れらの信号発信順の機台間において満粗糸ボビン、残糸
ボビン、空ボビンの搬送を行うようにした制御手段とを
備えているので、複数のグループ内での粗糸搬送を1組
の粗糸搬送装置によって効率良く搬送でき、粗糸搬送の
省力化とコスト低減を図ることができる。また搬送制御
装置には各粗紡機のグループ番号と各精紡機のグループ
番号を入力する入力手段を備えているので、粗紡機群の
粗紡機のグループと精紡機群の精紡機のグループとの編
成を外部からの入力によって容易に設定でき、操業条件
に最適なグループ編成に変更できて粗糸搬送の効率化を
図ることができる。
A roving group table that registers the group number of each spinning machine in the transport control device, a spinning group table that registers the group number of each spinning machine, etc. a Full bobbin take-off table that registers the machine numbers of the spinning machines from which the bobbin take-back request signal was sent in the order in which they were sent, and the remaining yarn bobbin take-off table that registers the machine numbers of the spinning machines that sent the remaining thread bobbin take-back request signal in the order in which they were sent. storage means having a table and a full bobbin request table for registering the machine numbers of the spinning machines from which the full bobbin request signals were sent in the order of sending, and each signal being sent within the same group based on the registered data of each table. When there is a machine, a control means is provided to transport a full roving bobbin, a remaining thread bobbin, and an empty bobbin between the machines in the order in which the signals are sent, so that the roving within multiple groups can be transferred. Conveyance can be carried out efficiently by one set of roving conveyance devices, and it is possible to save labor and reduce costs in conveying the roving. In addition, since the conveyance control device is equipped with an input means for inputting the group number of each roving frame and the group number of each spinning frame, it is possible to organize the roving frame group of the roving frame group and the spinning frame group of the spinning frame group. can be easily set by external input, and the group organization can be changed to the optimum group organization for the operating conditions, making it possible to improve the efficiency of roving conveyance.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本願の実施例を示すもので、第1図は粗糸搬送シ
ステムの配置図、第2図は粗紡機位、置の平面図、第3
図は精紡機位置の平面図、第4図は精紡機と篠交替機と
の関係を示す断面図、第5図は篠交替の説明図、第6図
は第1図のVI−VI線位置の拡大断面図、第7図は第
6図の平面図、第8図はボビンキャリエージを示す側面
図、第9図は第8図の一部平面図、第10図は矢印X部
分の転轍器を示す平面図、第11図は矢印■部分の転轍
器を示す平面図、第12図は矢印■部分の転轍器を示す
平面図、第13図は矢印正部分の転轍器を示す平面図、
第14図は搬送制御装置を示す説明図、第15図(A)
、(B)、(C)、(D)、(E)は記憶手段の各テー
ブルを示す説明図、第16図は制御プログラムのフロー
チャート図である。 1・・・粗紡機、12・・・精紡機、 肚・・・粗紡機
群。 SF・・・精紡機群、 20・・・粗糸搬送装置、33
・・・ロービングストリッパー、 63・・・満ボビン
引取発信装置、 64・・・残糸ボビン引取発信装置、
 65・・・満ボビン要求発信装置、 68・・・搬送
制御装置、 69・・・入力手段、 70・・・記憶手
段、 71・・・制御手段特許出願人   豊和工業株
式会社 SS図 第41!1 第6図 第7@ 第9WJ 第10図 第11図 第121!l \、 43. 1′\ @13図 第141!l 第151!!
The drawings show an embodiment of the present application, and Fig. 1 is a layout diagram of the roving conveyance system, Fig. 2 is a plan view of the roving machine position, and Fig. 3 is a plan view of the roving machine position.
The figure is a plan view of the spinning machine position, Figure 4 is a sectional view showing the relationship between the spinning machine and the Shino changing machine, Figure 5 is an explanatory diagram of Shino changing, and Figure 6 is the VI-VI line position in Figure 1. 7 is a plan view of FIG. 6, FIG. 8 is a side view showing the bobbin carriage, FIG. 9 is a partial plan view of FIG. A plan view showing the switch, Fig. 11 is a plan view showing the switch in the area indicated by the arrow ■, Fig. 12 is a plan view showing the switch in the area indicated by the arrow ■, and Fig. 13 is a plan view showing the switch in the area indicated by the arrow. A plan view showing
Fig. 14 is an explanatory diagram showing the conveyance control device, Fig. 15 (A)
, (B), (C), (D), and (E) are explanatory diagrams showing each table of the storage means, and FIG. 16 is a flowchart of the control program. 1...Rovering machine, 12...Spinning machine, 肚...Rovering machine group. SF... Fine spinning machine group, 20... Roving conveyance device, 33
... Roving stripper, 63... Full bobbin take-up transmitting device, 64... Remaining thread bobbin take-up transmitting device,
65...Full bobbin request transmitting device, 68...Transfer control device, 69...Input means, 70...Storage means, 71...Control means patent applicant Howa Kogyo Co., Ltd. SS diagram No. 41! 1 Figure 6 Figure 7 @ 9WJ Figure 10 Figure 11 Figure 121! l \, 43. 1'\ @13Figure 141! l No. 151! !

Claims (1)

【特許請求の範囲】 1、1台又は複数台の粗紡機から成る粗紡機群と複数台
の精紡機から成る精紡機群との間に、各粗紡機で玉揚さ
れた満粗糸ボビンを所要の精紡機へ搬送し、各精紡機で
篠替された残糸ボビンをロービングストリッパーへ搬送
し、ロービングストリッパーで残糸処理された空ボビン
を所要の粗紡機へ搬送するようにした粗糸搬送装置を配
設し、その粗糸搬送装置を搬送制御装置によって制御す
るようにした粗糸搬送システムであって、各粗紡機には
満粗糸ボビンの玉揚を完了して満粗糸ボビンの引取準備
ができた時点で満ボビン引取要求信号を発信する満ボビ
ン引取発信装置を設け、各精紡機には篠交換を完了して
残糸ボビンの引取準備ができた時点で残糸ボビン引取要
求信号を発信する残糸ボビン引取発信装置と、残糸ボビ
ンが引取られているときに満ボビン要求信号を発信する
満ボビン要求発信装置とを夫々設け、前記搬送制御装置
には粗紡機群の各粗紡機のグループ番号と精紡機群の各
精紡機のグループ番号とを外部から任意に入力し得る入
力手段と、入力された各粗紡機のグループ番号を登録す
る粗紡グループテーブル、入力された各精紡機のグルー
プ番号を登録する精紡グループテーブル、満ボビン引取
要求信号が発信された粗紡機の機台番号を発信順に登録
する満ボビン引取テーブル、残糸ボビン引取要求信号が
発信された精紡機の機台番号を発信順に登録する残糸ボ
ビン引取テーブル及び満ボビン要求信号が発信された精
紡機の機台番号を発信順に登録する満ボビン要求テーブ
ルを夫々有する記憶手段と、各テーブルの登録データに
基づいて同一グループ内に満ボビン引取要求信号と残糸
ボビン引取要求信号と満ボビン要求信号が夫々発信され
ている機台があるときそれらの信号発信順の機台間にお
いて満粗糸ボビン、残糸ボビン及び空ボビンの搬送を行
うように粗糸搬送装置を制御する制御手段とを備えて成
ることを特徴とする粗糸搬送システム。 2、各粗紡機に管替用のボビンキャリエージを案内する
ドッフィングレールを夫々配設し、各精紡機には篠替用
のボビンキャリエージを案内する予備篠レールを夫々配
設し、前記各ドッフィングレールと各予備篠レールとを
搬送レールで連結すると共に各連結部には転轍器を配設
し、更に前記各レールにはボビンキャリエージを移動さ
せ得る送り装置をボビンキャリエージより短いピッチ間
隔で配設して粗糸搬送装置を構成したことを特徴とする
特許請求の範囲第1項記載の粗糸搬送システム。 3、搬送レールを一本のメインレールとこのメインレー
ルに並列的に分岐配設した残糸処理レールとで構成し、
各ドッフィングレールと各予備篠レールをメインレール
から分枝するブランチレールによって構成し、前記残糸
処理レールにロービングストリッパーを配設したことを
特徴とする特許請求の範囲第2項記載の粗糸搬送システ
ム。 4、残糸ボビン引取テーブルと満ボビン要求テーブルに
は残糸ボビン引取要求信号と満ボビン要求信号が夫々発
信された精紡機の機台番号を精紡グループテーブルに登
録されているデータに基いてグループ別に発信順に登録
するようにしてあることを特徴とする特許請求の範囲第
1項記載の粗糸搬送システム。 5、粗紡機の管替装置が玉揚した満ボビンをボビンキャ
リエージのボビンハンガーに総て挿着して管替を完了し
たとき満ボビン引取発信装置を作動させ、満ボビン引取
要求信号を自動的に発信するようにしたことを特徴とす
る特許請求の範囲第2項記載の粗糸搬送システム。 6、精紡機の篠交替機が篠替した残糸ボビンをボビンキ
ャリエージのボビンハンガーに総て挿着して篠替を完了
したとき残糸ボビン引取発信装置を作動させ、残糸ボビ
ン引取要求信号を自動的に発信するようにしたことを特
徴とする特許請求の範囲第2項記載の粗糸搬送システム
。 7、予備篠レールにボビンキャリエージが導入されてい
るかどうかを判別し得るように設けたリミットスイッチ
によって満ボビン要求発信装置を構成し、予備篠レール
にボビンキャリエージが存在しないとき満ボビン要求信
号を発信するようにしたことを特徴とする特許請求の範
囲第2項記載の粗糸搬送システム。
[Claims] Between a roving frame group consisting of one or more roving frames and a spinning frame group consisting of a plurality of spinning frames, a full roving bobbin doffed by each roving frame is provided. The roving is transported to the required spinning machine, the remaining thread bobbin that has been replaced by each spinning machine is transported to the roving stripper, and the empty bobbin that has been processed with the remaining thread by the roving stripper is transported to the required roving machine. The roving conveyance system is equipped with a roving device, and the roving conveyance device is controlled by a conveyance control device, and each roving machine has a system in which doffing of a full roving bobbin is completed, and the completion of doffing of the full roving bobbin Each spinning machine is equipped with a full bobbin take-off transmitter that sends a full bobbin take-back request signal when the bobbin is ready to take-up, and when the thread exchange is completed and the remaining thread bobbin is ready to take-up, a full bobbin take-off request signal is sent to each spinning machine. A remaining yarn bobbin take-up transmitting device that transmits a signal and a full bobbin request transmitting device that transmits a full bobbin request signal when the remaining yarn bobbin is being taken are provided, and the conveyance control device is provided with each of the rovering machines. Input means for inputting the group number of a roving frame and the group number of each spinning frame in a spinning frame group from the outside; a roving group table for registering the input group number of each spinning frame; A spinning group table that registers group numbers of spinning machines, a full bobbin take-off table that registers machine numbers of spinning machines from which a full bobbin take-back request signal was sent, and a full bobbin take-off table that registers machine numbers of spinning machines from which a request signal for taking off a remaining yarn bobbin was sent. a storage means having a remaining yarn bobbin take-up table for registering the machine numbers in the order of transmission and a full bobbin request table for registering the machine numbers of the spinning machines from which the full bobbin request signal was transmitted in the order of transmission; Based on this, when there is a machine in the same group that sends a full bobbin take-off request signal, a remaining thread bobbin take-off request signal, and a full bobbin request signal, the full rovin bobbin and the remaining thread bobbin are sent between the machines in the order in which these signals are sent. A roving conveyance system comprising: a control means for controlling a roving conveyance device to convey a yarn bobbin and an empty bobbin. 2. Each spinning frame is provided with a doffing rail for guiding the bobbin carriage for pipe change, and each spinning frame is provided with a spare rail for guiding the bobbin carriage for pipe change, and the above-mentioned Each doffing rail and each preliminary Shino rail are connected by a conveyor rail, and a switch is provided at each connection part, and each rail is equipped with a feeding device capable of moving a bobbin carriage from the bobbin carriage. The roving conveying system according to claim 1, wherein the roving conveying device is constructed by disposing the roving yarns at short pitch intervals. 3. The conveyance rail is composed of one main rail and a remaining yarn processing rail branched in parallel to this main rail,
The roving according to claim 2, characterized in that each doffing rail and each preliminary line rail are constituted by branch rails branching from the main rail, and a roving stripper is disposed on the residual yarn processing rail. Conveyance system. 4. The remaining thread bobbin take-off table and the full bobbin request table contain the machine numbers of the spinning machines from which the remaining thread bobbin take-back request signal and the full bobbin request signal were sent, respectively, based on the data registered in the spinning group table. 2. The roving conveyance system according to claim 1, wherein the roving is registered in the order of transmission by group. 5. When the tube changing device of the roving machine completes the tube change by inserting all the doffed full bobbins into the bobbin hangers of the bobbin carriage, the device activates the full bobbin pickup transmitter and automatically sends a full bobbin pickup request signal. 3. The roving conveyance system according to claim 2, wherein the roving conveyance system transmits a signal. 6. When the thread changing machine of the spinning machine inserts all the replaced remaining thread bobbins into the bobbin hangers of the bobbin carriage and completes the thread changing, the remaining thread bobbin take-up transmitter is activated to request the remaining thread bobbin take-up. The roving conveyance system according to claim 2, characterized in that the signal is automatically transmitted. 7. A full bobbin request transmitting device is configured with a limit switch installed to determine whether or not a bobbin carriage is introduced into the spare rail, and when there is no bobbin carriage in the spare rail, a full bobbin request signal is sent. The roving conveyance system according to claim 2, characterized in that the roving conveyance system transmits the following.
JP20094685A 1985-09-11 1985-09-11 Roving transportation system Granted JPS6262933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20094685A JPS6262933A (en) 1985-09-11 1985-09-11 Roving transportation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20094685A JPS6262933A (en) 1985-09-11 1985-09-11 Roving transportation system

Publications (2)

Publication Number Publication Date
JPS6262933A true JPS6262933A (en) 1987-03-19
JPH0518926B2 JPH0518926B2 (en) 1993-03-15

Family

ID=16432928

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20094685A Granted JPS6262933A (en) 1985-09-11 1985-09-11 Roving transportation system

Country Status (1)

Country Link
JP (1) JPS6262933A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63256727A (en) * 1987-04-09 1988-10-24 Toyota Autom Loom Works Ltd Operation of conveyor of fine spinning machine in fine spinning winder
JPS6461520A (en) * 1987-08-29 1989-03-08 Howa Machinery Ltd Carrying system for roving bobbin
JPS6469475A (en) * 1987-09-10 1989-03-15 Toyoda Automatic Loom Works Roving carrying system
JPH01256468A (en) * 1988-04-07 1989-10-12 Murata Mach Ltd Weft changing system for loom
JPH03122053U (en) * 1990-03-28 1991-12-12
JPH0578036A (en) * 1991-05-21 1993-03-30 Towa Kogyo Kk Automatic magazine conveying device of fine spinning machine
US5628174A (en) * 1994-12-21 1997-05-13 Zinser Textilmaschinen Gmbh Bobbin-changing apparatus
US5724801A (en) * 1994-05-13 1998-03-10 Howa Machinery, Ltd. System to convey bobbins between roving frames and fine spinning frames
CN108048965A (en) * 2018-01-26 2018-05-18 江苏大生集团有限公司 For the three-dimensional creel of thickness connection rail system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63256727A (en) * 1987-04-09 1988-10-24 Toyota Autom Loom Works Ltd Operation of conveyor of fine spinning machine in fine spinning winder
JPS6461520A (en) * 1987-08-29 1989-03-08 Howa Machinery Ltd Carrying system for roving bobbin
JPS6469475A (en) * 1987-09-10 1989-03-15 Toyoda Automatic Loom Works Roving carrying system
JPH01256468A (en) * 1988-04-07 1989-10-12 Murata Mach Ltd Weft changing system for loom
JPH03122053U (en) * 1990-03-28 1991-12-12
JPH0578036A (en) * 1991-05-21 1993-03-30 Towa Kogyo Kk Automatic magazine conveying device of fine spinning machine
US5724801A (en) * 1994-05-13 1998-03-10 Howa Machinery, Ltd. System to convey bobbins between roving frames and fine spinning frames
US5628174A (en) * 1994-12-21 1997-05-13 Zinser Textilmaschinen Gmbh Bobbin-changing apparatus
CN108048965A (en) * 2018-01-26 2018-05-18 江苏大生集团有限公司 For the three-dimensional creel of thickness connection rail system

Also Published As

Publication number Publication date
JPH0518926B2 (en) 1993-03-15

Similar Documents

Publication Publication Date Title
US4033104A (en) Method and device for replacing a sliver container
US5937629A (en) Method and device for supplying empty tubes to winding devices of a textile machine
JP2534727B2 (en) Roving yarn transport system
US4897992A (en) Method and apparatus for transporting roving bobbins in a spinning factory
US3398519A (en) Transporting apparatus for the tube changer of a textile machine
US4535944A (en) Spinning machine with a doffing apparatus
JPS6262933A (en) Roving transportation system
US4999988A (en) Method and apparatus for changing roven bobbins for a textile machine
US4987645A (en) Automatic piecing of overlapped leading and trailing ends of slivers in a textile machine
JPH08157144A (en) Bobbin carrying system in spinning machine
JPH01229829A (en) Method and apparatus for replacing roving bobbin on fiber machine
EP0276569B1 (en) A method and apparatus for transporting articles
EP0311394A1 (en) Bobbin handling system
CN215163410U (en) Sliver can transportation system
US3844099A (en) Method and apparatus for doffing full bobbins on textile machines such as draw-twister
JP2725007B2 (en) Roving bobbin conveyor
JPH01229825A (en) Method and apparatus for producing cheese
JPH04222238A (en) Apparatus for automatically exchanging roving bobbin, which ends fine spinning work, fornew roving bobbin in creel of ring spinning frame
JPS6231671A (en) Automatic doffing machine
JPH0753933B2 (en) Method for transporting roving between the spinning and spinning processes
JPH0518925B2 (en)
JP2552259B2 (en) Transfer device for roving bobbin
JPH09142645A (en) Roving bobbin carrying device
JP2894294B2 (en) Package transport system
EP0419968B1 (en) Manipulation of strand packages or strands in a spinning machine

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees