JPS6257957A - Sliver ending in spinning machine - Google Patents

Sliver ending in spinning machine

Info

Publication number
JPS6257957A
JPS6257957A JP19391985A JP19391985A JPS6257957A JP S6257957 A JPS6257957 A JP S6257957A JP 19391985 A JP19391985 A JP 19391985A JP 19391985 A JP19391985 A JP 19391985A JP S6257957 A JPS6257957 A JP S6257957A
Authority
JP
Japan
Prior art keywords
bobbin
shino
full
small
grain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19391985A
Other languages
Japanese (ja)
Other versions
JP2502969B2 (en
Inventor
Yoshio Kawasaki
義雄 川崎
Tatsutake Horibe
達丈 堀部
Kazuo Yamada
一夫 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshinbo Holdings Inc
Howa Machinery Ltd
Original Assignee
Howa Machinery Ltd
Nisshinbo Industries Inc
Nisshin Spinning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Machinery Ltd, Nisshinbo Industries Inc, Nisshin Spinning Co Ltd filed Critical Howa Machinery Ltd
Priority to JP19391985A priority Critical patent/JP2502969B2/en
Priority to EP19860306816 priority patent/EP0213962B1/en
Priority to DE8686306816T priority patent/DE3681233D1/en
Publication of JPS6257957A publication Critical patent/JPS6257957A/en
Application granted granted Critical
Publication of JP2502969B2 publication Critical patent/JP2502969B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H15/00Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To surely carry out sliver ending in operation of a spinning machine by simple action, by leading sliver ends of a full bobbins to be exchanged with small package bobbins during spinning above trumpets, placing the sliver ends on slivers of small package bobbins and changing over the sliver bobbins. CONSTITUTION:The front row bobbin hangers 19 and the back row bobbin hangers 20 with respectively hung medium package bobbins (1b) and small package bobbins (1c) are changed by a sliver changing machine 10, and sliver ending is carried out to perform sliver exchange. The sliver ending is carried out by end picking of slivers of full bobbins (1a), holding sliver end and guiding the sliver ends above trumpets 6, placing the sliver ends on slivers of small package bobbins (1c) during spinning, releasing the holding of the sliver ends of the full bobbins (1a) and cutting the slivers of the small package bobbins (1c) at the same time.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は精紡機における篠継方法に関する。より詳しく
は精紡機においてボビンハンガーに吊下されて紡出して
いる篠巻ボビンが小玉となったときに、その小玉ボビン
の篠にその小玉ボビンの篠と交換する満ボビンの篠を篠
継ぎする方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for connecting threads in a spinning machine. More specifically, when a spinning bobbin suspended from a bobbin hanger in a spinning machine becomes a small bobbin, the thread of the full bobbin to be replaced with the thread of the small bobbin is connected to the thread of the small bobbin. Regarding the method.

[従来の技術とその問題点〕 精紡機のボビンハンガーに吊下げられている篠巻ボビン
が空になったり、小玉ボビンになったときは、その篠巻
ボビンを満ボビンに交換し、満ボビンの篠を小玉ボビン
の篠に篠継ぎするかあるいは改めて満ボビンの篠を精紡
機の牽伸部に挿入することが必要である。
[Conventional technology and its problems] When the Shinomaki bobbin hanging from the bobbin hanger of a spinning machine becomes empty or becomes a small bobbin, replace the Shinomaki bobbin with a full bobbin, It is necessary to join the thread of the small bobbin to the thread of the small bobbin, or to insert the thread of the full bobbin into the drafting section of the spinning frame.

しかしながら篠巻ボビンの篠は周知のように僅かな撚り
が付与されているだけでフワフワしているので、軽く引
張るだけで篠が切れてしまう。このような弱い篠を機械
的に篠継ぎすることは困難のために従来は例えば特開昭
60−71724に開示されているように精紡機の機台
に沿って走行する篠交換機によって精紡機のボビンハン
ガーに装着されている小玉ボビンと予備レールのボビン
ハンガーに装着されている満ボビンを交換するだけの作
業を自動化するに留まり、篠継ぎ作業は人手によらざる
を得なかった。
However, as is well known, the shin of the Shinomaki bobbin is fluffy due to a slight twist, so the shin will break just by pulling it lightly. Because it is difficult to mechanically splice such weak wires, conventionally, as disclosed in Japanese Patent Laid-Open No. 60-71724, spinning machines are connected by a wire exchanger that runs along the frame of the spinning machine. The automated work was limited to replacing the small bobbin attached to the bobbin hanger and the full bobbin attached to the bobbin hanger on the spare rail, and the splicing work had to be done manually.

〔問題点を解決するための手段〕[Means for solving problems]

そこで本発明は、従来不可能とされていた篠i↓(作業
の自動化を図り得るようにした精紡機における篠継方法
を11供しようとするもので、ボビンハンガーに吊下さ
れて紡出している篠巻ボビンが小玉となったとき、先ず
、その小玉ボビンと交換する満ボビンの篠を口出し、そ
の篠端を把持してトランペット上方に導いて、紡出中の
小玉ボビンの篠に重合させた後、満ボビンの篠端の把持
を開放するとともに小玉ボビンの篠を切断して篠継ぎを
行うことを特徴としている。
Therefore, the present invention aims to provide a method for spinning machines that can automate the work, which was previously thought to be impossible. When the Shinomaki bobbin currently in use becomes small balls, first take out the Shino of the full bobbin to be replaced with the small bobbin, grasp the end of the Shino and guide it above the trumpet, and polymerize it into the Shino of the small bobbin being spun. After that, the grip on the shin end of the full bobbin is released, and the shin of the small bobbin is cut to perform the shin joint.

〔実施例〕〔Example〕

以下添付図面に示した実施例に、基いて本発明を詳述す
る。
The present invention will be described in detail below based on embodiments shown in the accompanying drawings.

本実施例による精紡機における篠継ぎは、精動機のスピ
ンドル列に沿って配置されたボビンハンガーに装着され
ている篠巻ボビンが小玉になった際に、その小玉ボビン
を精紡機のクリールの前列ボビンハンガーの手前上方に
配設された予備レールに支持された予備ボビンハンガー
に吊下された満ボビンと交換する際に行われる。したが
って篠継作業は広義の篠交換作業の一部であり、広義の
篠交換作業は満ボビンと小玉ボビンの交換作業、満ボビ
ンの篠の紡出中の小玉ボビンの篠への篠継作業、さらに
前記作業に関連した満ボビンの篠のロービングガイドへ
の引掛は作業等を含んで構成される。
In the spinning machine according to this embodiment, when the Shinomaki bobbin attached to the bobbin hanger arranged along the spindle row of the spinning machine becomes a small bobbin, the small bobbin is transferred to the front row of the creel of the spinning machine. This is done when replacing a full bobbin suspended from a spare bobbin hanger supported by a spare rail placed above the front of the bobbin hanger. Therefore, the Shino transfer work is a part of the Shino replacement work in a broad sense, and the Shino replacement work in a broad sense is the replacement work of a full bobbin and a small bobbin, the work of replacing the Shino of a small bobbin with a Shino during spinning of a full bobbin, Furthermore, hooking a full bobbin to the roving guide related to the above-mentioned work includes work and the like.

前記広義の篠交換作業は第1図(正面図)および第2図
(側面図)に示す篠交換機50を用いて行われる。篠交
換機50は第3図に示すように、精紡機の機台の両側に
精紡機のスピンドル列に沿って移動可能に配設される。
The Shino exchange work in a broad sense is performed using a Shino exchange machine 50 shown in FIG. 1 (front view) and FIG. 2 (side view). As shown in FIG. 3, the Shino exchanger 50 is disposed on both sides of the frame of the spinning machine so as to be movable along the spindle row of the spinning machine.

第3図に示すように、精紡機の機台3の中央部に機台長
手方向に適宜な間隔で精紡クリールのクリールピラー4
が樹立され、精紡機の牽伸部5上方には、上記クリール
ピラー4に支持ブラケット18、支持ブラケット13お
よび吊下杆14を用いて支持された前・後2本のレール
11 、12に夫々ボビンハンガー19 、20が支承
されている。これらボビンハンガー19 、20には小
玉ボビンICと中玉ボビン1bが吊下されている。これ
ら前後レール11 、12のボビンハンガー19 、2
0は第4図で小玉ボビンICと中玉ボビン1bの位置と
して示すように、牽伸部5の2ピツチ毎すなわち2スピ
ンドルピツチ毎に夫々前後に対向するように配設されて
いる。この前レール11のボビンハンガー1つを前列ボ
ビンハンガー19、後レール12のボビンハンガー20
を後列ボビンハンガー20と記す。
As shown in Fig. 3, creel pillars 4 of the spinning creel are placed at appropriate intervals in the longitudinal direction of the spinning machine in the center of the spinning frame 3.
is established, and above the drafting section 5 of the spinning machine, there are two front and rear rails 11 and 12 supported by the creel pillar 4 using a support bracket 18, a support bracket 13, and a hanging rod 14, respectively. Bobbin hangers 19 and 20 are supported. A small bobbin IC and a medium bobbin 1b are suspended from these bobbin hangers 19 and 20. These front and rear rails 11, 12 bobbin hangers 19, 2
As shown in FIG. 4 as the positions of the small bobbin IC and the medium bobbin 1b, the small bobbin IC and the medium bobbin 1b are arranged so as to face each other every two pitches of the drafting section 5, that is, every two spindle pitches. One bobbin hanger on this front rail 11 is connected to the front row bobbin hanger 19 and the bobbin hanger 20 on the rear rail 12.
is referred to as a rear row bobbin hanger 20.

前記前・後列ボビンハンガー19 、20の中間部下方
に略リング状のロービングガイド2が第3図に示すよう
にクリールピラー4に支持杆9を用いて支持されている
。このロービングガイド2は第18図(A)に示すよう
に開口部2Cを有するリング形状に作られ且つ開口部2
Cに対向する側に内側に突出する隆起部2aが、開口部
2CにtA接する両側に第18図(B)に示すように上
方に突出する爪部2bが設けられている。この爪部2b
は内方へ突出するように設けてあっても良い。前記隆起
部2aは前列のボビン1cと後列のボビン1bから供給
される篠を分離するのに役立ち、前記爪部2bはロービ
ングガイド2に篠継ぎされた後の満ボビンの篠を篠掛け
するのに役立つ。
As shown in FIG. 3, a substantially ring-shaped roving guide 2 is supported by a support rod 9 on a creel pillar 4 below the middle of the front and rear bobbin hangers 19 and 20. As shown in FIG. 18(A), this roving guide 2 is made into a ring shape having an opening 2C.
A protrusion 2a protrudes inwardly on the side opposite C, and claws 2b protrude upward as shown in FIG. 18(B) on both sides in contact with the opening 2C. This claw part 2b
may be provided so as to protrude inward. The raised portion 2a serves to separate the wire supplied from the front row bobbin 1c and the rear row bobbin 1b, and the claw portion 2b serves to hang the wire of the full bobbin after the wire is spliced to the roving guide 2. useful for.

前記前列ボビンハンガー19の手前上方には前記支持ブ
ラゲノト13の先端部に取付けられた予備レール15が
機台長手方向に沿って配設されている。この予備レール
15は断面形状 形の下部が開口した中空柱状体に形成
されており、その開口端からボビンキャリノヂ17が出
入り自在に挿入され、予備レール15に沿って移動可能
である。
Above the front row bobbin hanger 19, a spare rail 15 attached to the tip of the support bracket 13 is disposed along the longitudinal direction of the machine. The preliminary rail 15 is formed into a hollow columnar body with an open bottom in cross section, and the bobbin carrier nozzle 17 is inserted into and out of the open end of the column, and is movable along the preliminary rail 15.

ボビンキャリソヂ17は予備ボビンハンガー24を有し
、このボビンハンガー24には第3図に示すように、満
ボビン1aが吊下されると共に後述の広義の篠摸作業の
後には小玉ボビン1cを吊下さ辻ることができる。
The bobbin carrier body 17 has a spare bobbin hanger 24, as shown in FIG. You can cross paths.

篠継ぎを伴う篠模作業は第3図に示すように、前列ボビ
ンハンガー19の小玉ボビン1cと予備ボビンハンガー
15の満ボビン1aとの間で行われる。篠摸作業終了後
には前列ボビンハンガー19の満ボビン1aの篠Rはロ
ービングガイド2、トランペット6を経て牽伸部5のバ
ンクローラ5aに供給され、スピンドル25によって加
熱されて糸に形成される。糸の紡出が進むにつれて前列
ボビンハンガー19の満ボビン1aはその篠が消費され
て中玉ボビンとなり、一方後列ボビンハンガー20の中
玉ボビン1bもその篠が消費されて小玉ボビンとなる。
As shown in FIG. 3, the shading work accompanied by shin splicing is performed between the small bobbin 1c of the front row bobbin hanger 19 and the full bobbin 1a of the spare bobbin hanger 15. After finishing the thread drafting work, the thread R of the full bobbin 1a of the front row bobbin hanger 19 is supplied to the bank roller 5a of the drafting section 5 via the roving guide 2 and the trumpet 6, where it is heated by the spindle 25 and formed into yarn. As yarn spinning progresses, the full bobbin 1a of the front row bobbin hanger 19 consumes its grain and becomes a medium-sized bobbin, while the grain of the medium-sized bobbin 1b of the rear row bobbin hanger 20 also consumes its grain and becomes a small-ball bobbin.

その際第3図に示す篠入換機10を用いて前列ボビンハ
ンガー19と後列ボビンハンガー20を夫々の中玉ボビ
ンと小玉ボビンを吊下させたまま入換え、その結果第3
図に示したボビン配列にし、その後に再び篠継ぎを伴う
篠交換を行う。前記篠入換えは夫々のボビンハンガー1
9 、20を夫々のレールu、12から外した後に18
0°旋回させることによって達成される。その詳細な構
成は本発明と同一の出願人による特公昭60−1484
8号公報に開示されており、且つ篠入換作業は本願発明
の主要部でないのでその詳細な説明は省略する。一方満
ボビンの予備ボビンハンガー24への供給は粗紡機位置
で満ボビンを挿着し、これをキャリッヂバー17と共に
精紡機の予備レール15上の所定位置に移動させること
によって達成される。
At that time, the front row bobbin hanger 19 and the rear row bobbin hanger 20 are replaced using the Shino shunter 10 shown in FIG.
Arrange the bobbin as shown in the figure, and then perform the thread exchange again with the thread joint. The above Shino replacement is for each bobbin hanger 1.
After removing 9 and 20 from the respective rails u and 12, 18
This is achieved by turning 0°. Its detailed structure is disclosed in Japanese Patent Publication No. 60-1484 by the same applicant as the present invention.
This is disclosed in Japanese Patent No. 8, and since the Shino replacement work is not a main part of the present invention, a detailed explanation thereof will be omitted. On the other hand, the supply of a full bobbin to the spare bobbin hanger 24 is accomplished by inserting the full bobbin at the roving machine position and moving it together with the carriage bar 17 to a predetermined position on the spare rail 15 of the spinning machine.

前述のように篠交換機50は精紡機の機台前面に沿って
、すなわちスピンドル25の列に沿って移動可能である
。篠交換機50の本体51の下側には第1図〜第3図に
示すように、重輪51a、本体51の精紡機に対向する
側面にガイドローラ29、本体51の中に走行用モータ
21と走行用モータ21と随動するスクロールカム22
が設ケられている。−力積紡機のスピンドルレール26
には取付ブラケット27を介してガイドレール28が付
設され、そのガイドレール28の外(11,11i面に
は前列ボビンハンガー19のピッチ間隔と等しい間隔を
置いてガイドビン30が多数植設されている。前記ガイ
ド1コーラ29はガ・イドレール28上を回動可能であ
り、したがってスクロールカム22にガイドビン30を
係合させながらスクロールカム22を回転させることに
よって、篠交換機50を精紡機のスピンドル列に沿って
移動させ、且つ所定位置に停−止させることができる。
As described above, the Shino changer 50 is movable along the front face of the spinning frame, that is, along the row of spindles 25. As shown in FIGS. 1 to 3, the lower side of the main body 51 of the Shino exchanger 50 includes a heavy wheel 51a, a guide roller 29 on the side of the main body 51 facing the spinning machine, and a running motor 21 inside the main body 51. and a traveling motor 21 and a scroll cam 22 that moves with it.
is provided. - Spindle rail 26 of impulse spinning machine
A guide rail 28 is attached via a mounting bracket 27, and a large number of guide bins 30 are installed on the outside of the guide rail 28 (11, 11i surfaces at intervals equal to the pitch interval of the front row bobbin hanger 19). The guide 1 coke 29 is rotatable on the guide rail 28, and therefore, by rotating the scroll cam 22 while engaging the guide bin 30 with the scroll cam 22, the shino exchanger 50 can be rotated on the spindle of a spinning frame. It can be moved along the row and stopped at a predetermined position.

次に篠交換機50の構成について説明する。篠交換a5
0には篠継ぎと篠交換を所定の順序で行うための各種機
構とこれら機構の駆動機構が装備されている。すなわち
第1図に例示した1度に6本の前列ボビンハンガー19
上の小玉ボビンlcを6木の予備ボビンハンガー24上
の満ボビン1aと交換してBwEぎする篠交換機50に
おいて、中央に1個配置された昇降機構31によって!
ji−降運動されると共に前後動じ、且つ6個のペッグ
を回転可能に支承する満ボビン交換へノド52と、前記
満ボビン交換へ・ノド昇降機構31の両側に配置され且
つ昇降機構41a、41bによって昇降運動されると共
に前後動し、夫々3個のバンクを回転可能に支承する小
玉ボビン交換ヘッド55と、篠交換機本体51内に収容
されたプロア23からホース23aを経て連結されてそ
の吸引作用によって満ボビンの篠端を引出す6個の口出
しノズル62と、満ボビンの篠端を紡出中の小ボビンの
篠に重合させる6個の篠継ぎヘッド60と、満ボビンの
篠をロービングガイド2に篠掛けする篠社トはプレート
58と、前記各部材を所定のサイクルで移動させるそれ
ぞれの駆動手段が配設されている。以下第1図から第1
8図を参照して前記夫々の構成要素の説明を行う。
Next, the configuration of the Shino switch 50 will be explained. Shino exchange a5
0 is equipped with various mechanisms for performing the thread joining and thread replacement in a predetermined order, as well as drive mechanisms for these mechanisms. That is, six front row bobbin hangers 19 at a time as illustrated in FIG.
In the Shino exchange machine 50 that exchanges the upper small bobbin lc with the full bobbin 1a on the 6-wood spare bobbin hanger 24 for BwE, by the raising and lowering mechanism 31 arranged in the center!
ji- A full bobbin exchange throat 52 that moves back and forth while being moved downward and rotatably supports six pegs, and a full bobbin exchange throat 52 that is arranged on both sides of the full bobbin exchange throat lifting mechanism 31 and lifting mechanisms 41a and 41b. The small bobbin exchange head 55, which moves up and down as well as moves back and forth, and rotatably supports three banks, is connected to the proar 23 housed in the Shino exchanger main body 51 via a hose 23a, and has its suction action. 6 nozzles 62 for pulling out the thin end of a full bobbin, six connecting heads 60 for superimposing the thin end of the full bobbin on the thin end of the small bobbin being spun, and a roving guide 2 for pulling out the thin end of the full bobbin. A plate 58 and drive means for moving each of the members in a predetermined cycle are provided for the plate 58. From Figure 1 below,
The respective constituent elements will be explained with reference to FIG.

先ず満ボビン交換ヘッド52について説明する。First, the full bobbin exchange head 52 will be explained.

この満ボビン交換ヘッド52のチェンジパー71には6
個の満ボビン交換ヘッド用ペッグ53が回動可能に配設
されている(第11図)。前記ペッグ53を用いて第3
図に示した位置の満ボビン1aを小玉ボビンICの位置
に移動させるためにはベツグ53を上下動し、且つ前移
動させることが必要である。第5図に示すように6個の
ベツグ53が配設されているチェンジパー71は内側リ
ンク75と外側リンク76を主要部とするリンク機構を
介して第1図に示す満ボビン交換ヘッド昇降機構31の
昇降体37の上部に配設される。昇降体37には垂直方
向に平行している2本のチェイン36a、36bが連結
されており、このチェイン36a、36bを篠交換機5
0内に配設された満ボビン交換へノド昇降機構用モータ
32を用いて上下両方向に移動させることにより昇降体
37は上下動される。すなわちモータ32の軸33には
チェインホイール33aが取付けられ、このチェインホ
イール33aの回転はチェイン33bとチェインホイー
ル34aを介して篠交換機50の本体51に回動可能に
支承された軸34に伝達される。軸34の両端にはチェ
インホイール35a、35bが取付けられ、このチェイ
ンホイール35a、35bに掛けられた前述のチェイン
36a、36bはその一端が昇降体37の下方に直接連
結され、他方は本体51の上方に回動可能に配設された
チェインホイール39a。
The change par 71 of this full bobbin exchange head 52 has 6
Full bobbin exchange head pegs 53 are rotatably arranged (FIG. 11). Using the peg 53, the third
In order to move the full bobbin 1a at the position shown in the figure to the position of the small bobbin IC, it is necessary to move the bed 53 up and down and forward. As shown in FIG. 5, the changer 71 on which six bets 53 are arranged is connected to the full bobbin exchange head lifting/lowering mechanism shown in FIG. 31 is arranged on the upper part of the elevating body 37. Two vertically parallel chains 36a, 36b are connected to the elevating body 37, and these chains 36a, 36b are connected to the Shino exchanger 5.
The elevating body 37 is moved up and down by moving the gutter elevating mechanism motor 32 both up and down to replace the full bobbin disposed in the bobbin. That is, a chain wheel 33a is attached to the shaft 33 of the motor 32, and the rotation of the chain wheel 33a is transmitted to the shaft 34 rotatably supported on the main body 51 of the Shino exchanger 50 via the chain 33b and chain wheel 34a. Ru. Chain wheels 35a, 35b are attached to both ends of the shaft 34, and one end of the aforementioned chains 36a, 36b hung on the chain wheels 35a, 35b is directly connected to the lower part of the elevating body 37, and the other end is connected to the lower part of the main body 51. A chain wheel 39a is rotatably disposed upward.

39bを経て昇降体37の上方に連結されており、した
がって軸34の回転によって昇降体37の上下移動が達
成される。その際昇降体37は本体51に垂直に設けた
ガイド部材38a、38bに摺動自在に嵌装されている
ので垂直方向での正確な移動が確保される。次に満ボビ
ン交換ヘッド52の前後動運動は第5図に示す満ボビン
交換ヘッド前後動機構によって行われる。昇降体37の
上方にはハウジング77が設けられ、ハウジング77内
のモータ86の回転は減速機85、歯車84 、83を
経てアーム82を揺動し、その揺動運動はアーム82の
先端に設けられた摺動ピン81、摺動ピン81が係合す
る揺動アーム80の長孔80aを介して揺動アーム80
に伝えられる。ハウジング77に枢着されたビン79に
は外側リンク76の下端と揺動アーム80が固着されて
いる。それによって駆動歯車84の矢印方向の往復回転
運動は揺動アーム80と外側リンク76の矢印方向の揺
動運動を生ずる。外側リンク76の上端には枢着ピン7
4を介してチェンジバー支持部材72の一端が連結され
、支持部材72の他端にはチェンジパー71が固着され
ている。一方チエンシバー支持部材72の中間部分には
枢着ピン73が設けられ、この枢着ピン73を介して内
側リンク75の上端が連結される。内側リンク75の下
端は枢着ビン7日を介してハウジング77に連結される
。したがって外側リンク76の矢印方向の揺動運動によ
ってチェンジハーフ1上のベツグ53を垂直方向に姿勢
を保った状態で、精紡機に対して前後動させ、予備ボビ
ンハンガー24の直下位置と前列ボビンハンガー19の
直下位置とに移動させ得るようになっている。
It is connected to the upper part of the elevating body 37 via the shaft 39b, so that the vertical movement of the elevating body 37 is achieved by rotation of the shaft 34. At this time, since the elevating body 37 is slidably fitted into guide members 38a and 38b provided perpendicularly to the main body 51, accurate movement in the vertical direction is ensured. Next, the full bobbin exchange head 52 is moved back and forth by a full bobbin exchange head back and forth movement mechanism shown in FIG. A housing 77 is provided above the elevating body 37, and the rotation of a motor 86 inside the housing 77 swings the arm 82 through a reducer 85, gears 84, 83, and the swinging motion is produced by a motor 86 provided at the tip of the arm 82. The sliding pin 81 is connected to the swinging arm 80 through the elongated hole 80a of the swinging arm 80 with which the sliding pin 81 engages.
can be conveyed to. A lower end of the outer link 76 and a swing arm 80 are fixed to a pin 79 which is pivotally connected to the housing 77 . Thereby, the reciprocating rotational movement of drive gear 84 in the direction of the arrow causes a swinging movement of swing arm 80 and outer link 76 in the direction of the arrow. A pivot pin 7 is provided at the upper end of the outer link 76.
4, one end of the change bar support member 72 is connected to the other end of the support member 72, and a change bar 71 is fixed to the other end of the support member 72. On the other hand, a pivot pin 73 is provided at the middle portion of the chain bar support member 72, and the upper end of the inner link 75 is connected via this pivot pin 73. The lower end of inner link 75 is connected to housing 77 via a pivot pin. Therefore, by the swinging motion of the outer link 76 in the direction of the arrow, the bet 53 on the change half 1 is moved back and forth with respect to the spinning machine while maintaining its vertical position, and is moved to a position directly below the spare bobbin hanger 24 and the front row bobbin hanger. It can be moved to a position directly below No. 19.

次ぎに満ボビン交換ヘッド52における満管ボビン用ペ
ッグ53とその回転機構を第10図〜第13図を参照し
て説明する。第1図および第11図に示すように満ボビ
ン交換ヘッド52のチェンジハーフ1には2スピンドル
ピツチの間隔で6個のペッグ53 (53a 、 53
b 、 53c 、 53d 、 53e 。
Next, the full bobbin peg 53 in the full bobbin exchange head 52 and its rotation mechanism will be explained with reference to FIGS. 10 to 13. As shown in FIGS. 1 and 11, the change half 1 of the full bobbin exchange head 52 has six pegs 53 (53a, 53
b, 53c, 53d, 53e.

53f)が配設される。これらペッグ53は後述の篠交
換の作動について詳細に説明されるように、篠交換の諸
ステップにおいて満ボビンから篠を巻戻したり、巻取っ
たりするために回転されるようになっている。さらにこ
れらペッグ53は篠交換作動の当初において1本置きの
ものを第10図↓こ示すように、他のペッグ53に対し
て別個に180゛回転させ得るようになっている。その
理由は次に示すように本実施例における満ボビンの篠端
の口出しを良好に行う為である。すなわち粗紡機で巻取
られたン1カポビンの篠の篠端は粗紡機におけるフライ
ヤーのプレッサー位置が前列と後列とで180゜位相が
異なっているので、前列のものが後列のものに対して1
80”反対側に配置される。従って、粗紡機で玉揚した
前後列の満ボビンを1つ置きに間に入れて一列に並び換
え、その−列状の満ボビンをボビンキャリノヂ17を用
いて予備レール15に吊下させると、これらの満ボビン
の篠1aの篠端1aeは第10図(A)に示すように1
つ置きに180°反対側に位置される。すなわち第10
図(ハ)において(al 、 (C1、(e)の位置に
ある満ボビンの篠の篠端1aeが口出しノズル62に対
向した位置にある場合には、(bl 、 (d) 、 
(nの位置にある満ボビンの篠の篠端1aeは口出しノ
ズル62の反対側にある。このままの状態で口出しノズ
ル62によって口出しする為に6個の満ボビンを一斉に
戻し回転させると、満ボビン相互の間隔が一般に小さい
ので口出しノズル62と反対側に位置していた篠端が口
出しノズル62に到る迄の間にその篠端が隣の満ボビン
の周面に付着してその満ボビンに巻付けられ、口出し不
能になることがある。そこで篠交換の作動の当初に(b
l 、 (dl 、 (flの位置にある満ボビン1a
を予め巻取り方向へ180°回転させて第10図(B)
に示すように6本の満ボビンのMI5i1aeを口出し
ノズル62に対向するように揃え、然る後6個の満ボビ
ンを巻戻し方向へ回転させるようにしである。なお、満
ボビン相互の間隔が大きいときには、予め巻取り方向へ
回転させることなく最初から巻戻し方向へ一斉に回転さ
せれば良い。前記のように6本のペッグ53を1本置き
に回転可能にするために、第11図および第12図に示
すように各ペッグ53をチェンジパー71に回転自在に
支持させ、それらのベツグ53の内3つのペッグ53a
 、 53c 、 53eをそれぞれのペッグの下方に
設けたプーリ162a 、 162c 、 162eを
介してベルト163で回転可能にし、また他の3つのベ
ツグ53b 、 53d 、 53 fを同じくプーリ
ー162b。
53f) is provided. These pegs 53 are adapted to be rotated in order to unwind or wind up the wire from a full bobbin during the steps of the wire exchange, as will be explained in detail below regarding the operation of the wire exchange. Furthermore, at the beginning of the replacement operation, every other peg 53 can be rotated 180 degrees with respect to the other pegs 53, as shown in FIG. The reason for this is, as will be described below, to ensure that the tip of the full bobbin in this embodiment can be taken out well. In other words, since the presser position of the flyer on the roving frame is 180° different in phase between the front row and the rear row, the edge of the grain of the capobin wound on the roving frame is 180 degrees different from that of the front row than that of the rear row.
80" are arranged on the opposite side. Therefore, the front and rear rows of full bobbins doffed by the roving machine are rearranged into a row with every other row in between, and the full bobbins in the row are placed in reserve using the bobbin carriage 17. When suspended from the rail 15, the edges 1ae of the edges 1a of these full bobbins are 1 as shown in FIG. 10(A).
They are placed every other 180 degrees on opposite sides. That is, the 10th
In figure (c), when the shin end 1ae of the full bobbin at the position of (al, (C1, e) is in the position facing the outlet nozzle 62, (bl, (d),
(The end 1ae of the full bobbin at position n is on the opposite side of the outlet nozzle 62. In this state, if all six full bobbins are returned and rotated at the same time in order to be fed by the outlet nozzle 62, Since the distance between the bobbins is generally small, by the time the shin edge located on the opposite side to the outlet nozzle 62 reaches the outlet nozzle 62, the shin edge is attached to the circumferential surface of the adjacent full bobbin, and the full bobbin is It may become wrapped around the body and become impossible to access.Therefore, at the beginning of the Shino exchange operation,
Full bobbin 1a at position l, (dl, (fl)
Figure 10 (B)
As shown in the figure, the six full bobbins MI5i1ae are aligned so as to face the outlet nozzle 62, and then the six full bobbins are rotated in the unwinding direction. Note that when the distance between full bobbins is large, it is sufficient to rotate them all at once in the unwinding direction from the beginning without rotating them in the winding direction in advance. In order to make the six pegs 53 rotatable every other time as described above, each peg 53 is rotatably supported by the changer 71 as shown in FIGS. Three pegs 53a
, 53c, and 53e are rotatable by a belt 163 via pulleys 162a, 162c, and 162e provided below the respective pegs, and the other three pegs 53b, 53d, and 53f are also rotated by the pulley 162b.

162d 、 162fを介してベルト164で回転可
能にしである。そして、前記ベルト163 、164を
駆動プーリ57a、54aを介して駆動するモータ57
 、54をチェンジハーフ1上に取着しである。図中1
61a〜161iはそれぞれのヘルl−163、164
を案内するガイドプーリである。第10図に示すように
(bl 、 +dl 。
It is rotatable by a belt 164 via 162d and 162f. A motor 57 drives the belts 163 and 164 via drive pulleys 57a and 54a.
, 54 are mounted on the change half 1. 1 in the diagram
61a to 161i are each hell l-163, 164
This is a guide pulley that guides the As shown in FIG. 10 (bl, +dl.

ff1位置の1本置きの満ボビン1aを予め巻取り方向
(時計方向)へ180°回転するにはモータ54を第1
1図において反時計方向へ回転し、満ボビンla全体を
巻戻し方向(反時計方向)へ回転するためにはモータ5
4 、57を第11図において時計方向へ同時に回転す
ればよい。
In order to rotate every other full bobbin 1a at the ff1 position 180° in the winding direction (clockwise), the motor 54 is first rotated.
In order to rotate counterclockwise in Figure 1 and rotate the entire full bobbin la in the unwinding direction (counterclockwise), motor 5 is required.
4 and 57 in the clockwise direction in FIG. 11 at the same time.

満管ボビン用ペッグ53は第13図(第12図のペッグ
53a 、53c 、53eに対応する)に示すように
、チェンジパー71に取付けた軸受によって支持!To
166を回転自在に支承させてこの支持軸166の上端
部にボビンの下部孔に嵌脱可能な嵌合部166aを設け
、その支持軸166の中間部には外周に鍔状の受部16
7aを有する筒形のボビン受止体167を上下動可能に
嵌合させると共に、そのボビン受止体167を支持軸1
66の基部に嵌着されたばね受板168との間に介在し
たばね169で嵌合部下部孔より大きい径に形成してボ
ビンを支持し得るようになっており、ボビン受正体16
7の筒状部外周は前記嵌合部166aと同じか或は小さ
い外径に形成され、ボビンの下部孔に嵌合させ得るよう
になっている。
The full bobbin peg 53 is supported by a bearing attached to the changer 71, as shown in FIG. 13 (corresponding to pegs 53a, 53c, and 53e in FIG. 12)! To
166 is rotatably supported, and the upper end of this support shaft 166 is provided with a fitting part 166a that can be fitted and removed into the lower hole of the bobbin, and the middle part of the support shaft 166 is provided with a flange-shaped receiving part 16 on the outer periphery.
A cylindrical bobbin receiving body 167 having a diameter 7a is fitted so as to be movable up and down, and the bobbin receiving body 167 is attached to the support shaft 1.
The spring 169 interposed between the spring receiving plate 168 fitted to the base of the bobbin receiving body 16 is formed to have a larger diameter than the lower hole of the fitting part and can support the bobbin.
The outer periphery of the cylindrical portion 7 is formed to have the same or smaller outer diameter than the fitting portion 166a, so that it can be fitted into the lower hole of the bobbin.

次に小玉ボビン交換ヘッド55について説明する。小玉
ボビン交換ヘッド55もまた稜紡機に対して上下動と前
後動させるように構成させることが必要である。そのた
めの機構は前記満ボビン交換ヘッドの場合と略同様であ
り、上下動を与えるための機構が第1図に示す如く満ボ
ビン交換ヘッド昇降機構31の両側に夫々3個の小玉ボ
ビン用ベツグ56に対して上下動を与える小ボビン交換
ヘッド昇降機構41a、41bが設けられている。それ
ぞれの昇降機構41a、41bの昇降体47a、47b
には垂直方向に平行して延びる夫々2本のチェイン45
a、46bと46c、46dが連結され、このチェイン
46a 、 46b 、 46c 、 46dを篠交換
機50の本体51内に配設された小玉ボビン交換ヘッド
昇降機構用モータ42を用いて上下両方向に移動させる
ことによって昇降体47a、47bは上下動される。
Next, the small bobbin exchange head 55 will be explained. It is also necessary that the small bobbin exchange head 55 be configured to move up and down and back and forth with respect to the edge spinning machine. The mechanism for this purpose is almost the same as that for the full bobbin exchange head, and the mechanism for providing vertical movement is three small bobbin beds 56 on each side of the full bobbin exchange head lifting mechanism 31, as shown in FIG. Small bobbin exchange head lifting and lowering mechanisms 41a and 41b are provided for vertically moving the small bobbin exchange head. Lifting bodies 47a, 47b of respective lifting mechanisms 41a, 41b
have two chains 45 each extending in parallel in the vertical direction.
a, 46b, 46c, and 46d are connected, and the chains 46a, 46b, 46c, and 46d are moved both up and down using a small bobbin exchange head lifting mechanism motor 42 disposed within the main body 51 of the Shino exchanger 50. As a result, the elevating bodies 47a and 47b are moved up and down.

チ、イン46a 、 46b 、 46c 、 46d
の移動をチェイン46aを例にして示せばモータ42の
回転をモータ出力軸に固着したチェインホイール43a
、チェイン43b、連軸44に固着したチェインホイー
ル114aを介して連軸44に伝え、連軸44の回転を
チェインホイール45aによってチェイン46aに伝達
することによって行われる。一方小玉ボビン交換ヘッド
55の前後動運動は第5図を参照として示した満ボビン
交換ヘッド52の前後動運動機構と同様な機構を用いて
行えるようにし、ベツグ56を第3図に示す待機位置と
、予備ボビンハンガー24の直下位置と前列ボビンハン
ガー19の直下位置とに夫々移動させ得るようにしであ
る。
H, in 46a, 46b, 46c, 46d
To illustrate the movement of the chain 46a as an example, the rotation of the motor 42 is controlled by the chain wheel 43a fixed to the motor output shaft.
, the rotation of the link shaft 44 is transmitted to the link shaft 44 via the chain 43b and the chain wheel 114a fixed to the link shaft 44, and the rotation of the link shaft 44 is transmitted to the chain 46a by the chain wheel 45a. On the other hand, the back and forth movement of the small bobbin exchange head 55 can be performed using a mechanism similar to the back and forth movement mechanism of the full bobbin exchange head 52 shown in FIG. , and can be moved to a position directly below the spare bobbin hanger 24 and a position directly below the front row bobbin hanger 19, respectively.

小玉ボビン交換へノド55におけるペッグ56の構成は
第13図に示した満管ボビン用ペッグ53の構成と同じ
であり、一方それぞれのペッグ56を回転させる機構は
第11図および第12図に示した満ボビン用ペッグ53
の回転機構と類似する。ただし小玉ボビン交換ヘッド5
5のそれぞれ3個のペッグ56は常に同一方向に同時に
回転させればよく、したがってペッグ56を駆動するた
めのベルトおよびそのためのモータは左右の小玉ボビン
交換ヘッド55毎に1偏設ければよい。
The configuration of the pegs 56 in the small bobbin exchange throat 55 is the same as the configuration of the full bobbin peg 53 shown in FIG. 13, while the mechanism for rotating each peg 56 is shown in FIGS. 11 and 12. Peg 53 for Tamman bobbin
It is similar to the rotation mechanism of However, small bobbin exchange head 5
It is sufficient that the three pegs 56 of each of the three pegs 56 of the pegs 56 are always rotated simultaneously in the same direction, and therefore, one belt and a motor for driving the pegs 56 may be provided for each of the left and right small bobbin exchange heads 55.

次に口出しノズル作動機構、篠継ヘッド作動機構および
篠掛はプレート作動機構を順次説明するが第1図に示し
た篠交換機においては前記3種類の作動機構の作動が同
一の軸に3枚の動作カムを並設させている左右一対の口
出しノズル・篠継ヘッド・篠掛はプレート動作機構65
によって与えられているので先ずこの動作機構65を第
6図を参照して説明する。第6図に示すように1本の回
動可能なカム軸93に篠継ぎ動作カム66、口出し動作
カム67、篠掛は動作カム68が並べて固定されている
。そわぞれのカム66 、67 、68に対応してカム
フォロワ94とカムフォロワ94を指示するカムレバー
95が夫々設けられ、カムレバー95の一端は篠交換機
50の本体51にピン96を介して枢着され、他端には
動作用ロッド97 、9B、。
Next, we will sequentially explain the outlet nozzle operating mechanism, the Shinogake head operating mechanism, and the Shinokake plate operating mechanism. A pair of left and right outlet nozzles, Shinogake heads, and Shinogake, in which operating cams are arranged side by side, are plate operating mechanisms 65.
First, this operating mechanism 65 will be explained with reference to FIG. As shown in FIG. 6, a connecting operation cam 66, a lead-out operation cam 67, and a connecting operation cam 68 are fixed to one rotatable cam shaft 93 side by side. A cam follower 94 and a cam lever 95 for directing the cam follower 94 are provided corresponding to the respective cams 66 , 67 , 68 , and one end of the cam lever 95 is pivotally connected to the main body 51 of the Shino exchanger 50 via a pin 96 . At the other end are operating rods 97, 9B,.

99が夫々回動可能に連結されている。第6図において
はカムフォロワ94とカムレバー95は1個しか図示し
ていないが、それぞれの動作カム66゜67 、68に
対応してカムフォロワとカムレバーが設けられ、篠継ぎ
ヘッド動作用ロッド97、口出しノズル動作用ロッド9
8および篠掛はプレート動作用ロッド99が上方、又は
下方に伸びるように配置される。左右一対のカム軸93
の回転は篠交換a50の本体51内に配置されたモータ
87の回転を減速a88、チェインホイール89、チェ
イン91、を経てチェインホイール90の回転とし、そ
の回転を通しの長い中間軸90a及び互いに噛合う歯車
92a 、92b 、92c (第1図において右側の
ものは図示省略)を経て左右のカム軸93に伝達するこ
とによって達成される。
99 are rotatably connected to each other. Although only one cam follower 94 and one cam lever 95 are shown in FIG. 6, a cam follower and a cam lever are provided corresponding to the respective operating cams 66, 67, and 68, and a rod 97 for operating the shinoni head and an outlet nozzle are provided. Operation rod 9
8 and shinokake are arranged so that the plate operating rod 99 extends upward or downward. A pair of left and right cam shafts 93
The rotation of the motor 87 arranged in the main body 51 of the Shino exchange a50 is made into the rotation of the chain wheel 90 through the deceleration a88, the chain wheel 89, and the chain 91, and the rotation is caused by the rotation of the chain wheel 90 through the long intermediate shaft 90a and the mutually meshing. This is achieved by transmitting the signal to the left and right camshafts 93 via matching gears 92a, 92b, and 92c (the one on the right in FIG. 1 is not shown).

次に第7図を参照して口出しノズル62及び口出しノズ
ル作動機構を説明する。この口出しノズル作動機構は左
右に一対対称的に設けられているが、第1図において右
側のもののみ説明し、左側のものは説明を省略する。口
出しノズル62はその下端のノズル取付ブ、ラケット1
38を介して口出しノズル支持パイプ139に固定的に
連結され、ブロア23からホース23aを介して口出し
ノズル支持パイプ139の両端に達した吸引気流によっ
て口出しノズル62の先端から満ボビンlaの篠端を引
出す役割を果す。口出しした篠端をWlヘッド60に導
くために口出しノズル62の先端を第7図に軌跡140
で示す曲線で移動させるようになっている。
Next, the outlet nozzle 62 and outlet nozzle operating mechanism will be explained with reference to FIG. Although this outlet nozzle operating mechanism is provided symmetrically on the left and right, only the one on the right in FIG. 1 will be explained, and the explanation on the one on the left will be omitted. The outlet nozzle 62 is connected to the nozzle mounting block at the lower end of the racket 1.
38 to the outlet nozzle support pipe 139, and the suction airflow reaching both ends of the outlet nozzle support pipe 139 from the blower 23 via the hose 23a removes the thin end of the full bobbin la from the tip of the outlet nozzle 62. It plays the role of drawing out. In order to guide the protruded Shinobata to the Wl head 60, the tip of the protruding nozzle 62 is traced 140 as shown in FIG.
It is designed to move along the curve shown in .

なお第1図に示した篠交換機50においては2スピンド
ルピンチの間隔をあけて6個の口出しノズル62が支持
パイプ139に固着されている。第6図で説明した動作
機構65の口出し動作カム67による口出しノズル動作
用ロッド98の運動はピン123を介してセクターギヤ
121にピン122を中心とした揺動運動を与え、この
揺動運動は歯車124、セクターギヤ125を介して昇
降アーム+27にピン126を中心とした揺動運動を与
える。
In the Shino exchanger 50 shown in FIG. 1, six outlet nozzles 62 are fixed to the support pipe 139 at intervals of two spindle pinches. The movement of the outlet nozzle operating rod 98 by the outlet operation cam 67 of the operating mechanism 65 explained in FIG. A swinging motion about a pin 126 is applied to the lifting arm +27 via a gear 124 and a sector gear 125.

篠交換機50の本体51には直線状の2本のロッド13
3を有する平行ガイド132が配設されており、スライ
ダ128の」一方部分128aには長孔129が設けら
れ、この長孔129の中に昇降アーム127の先端に設
けられた摺動ビン131が摺動自在に嵌込まれ、それに
よって昇降アーム127を矢印方向に揺動させるとスラ
イダ128を平行ガイド132に沿って上下動させるこ
とができるようになっている。スライダ下方部分128
 bの右端は口出しノズル支持パイプ139の一端部を
回動自在に支持している。篠交JA機50の本体51に
は口出しノズル62の先端の軌道を規定する湾曲ガイド
孔135を有する案内プレート134が配設され、この
湾曲ガイド孔135に係合する摺動ピン136が連結ア
ーム137の一端に設けられ、連結アーム137の他端
は口出しノズル支持バイブ139に一体に連結されてい
る。従ってスライダ128が上昇すると口出しノズル6
2自体が上昇すると共に、摺動ピン136が湾曲ガイド
孔135に沿って案内されるごとによって口出しノズル
62をパイプ139を中心として回動させ、口出しノズ
ル62の先端を140で示す軌跡に沿って移動させるこ
とになる。口出しノズル62の先端内部に篠を切断する
のに役立つコームを設けておくとよい。
The main body 51 of the Shino exchanger 50 has two straight rods 13.
A long hole 129 is provided in one portion 128a of the slider 128, and a sliding pin 131 provided at the tip of the lifting arm 127 is inserted into the long hole 129. The slider 128 is slidably fitted so that when the lifting arm 127 is swung in the direction of the arrow, the slider 128 can be moved up and down along the parallel guide 132. Slider lower portion 128
The right end of b rotatably supports one end of the outlet nozzle support pipe 139. A guide plate 134 having a curved guide hole 135 that defines the trajectory of the tip of the outlet nozzle 62 is disposed in the main body 51 of the Shinoko JA machine 50, and a sliding pin 136 that engages with the curved guide hole 135 is attached to the connecting arm. The connecting arm 137 is provided at one end of the connecting arm 137, and the other end of the connecting arm 137 is integrally connected to the outlet nozzle supporting vibe 139. Therefore, when the slider 128 rises, the outlet nozzle 6
2 itself rises, and each time the sliding pin 136 is guided along the curved guide hole 135, the outlet nozzle 62 is rotated around the pipe 139, and the tip of the outlet nozzle 62 is moved along the trajectory indicated by 140. It will be moved. It is preferable to provide a comb inside the tip of the outlet nozzle 62 to help cut the wire.

次に第8図を参照して篠継ヘッド60及び篠継ヘッド作
動機構を説明する。この篠継ヘッド作動機構も左右に一
対対称に設けられている。篠継ヘッド60は前記口出し
ノズル62によって満ボビンから引出されたa=を紡出
中の小玉ボビンの篠に重合し、重合後に小玉ボビンの篠
を切断する装置である。なお、第1図に示した篠交換機
50においては6個の8継ヘツド60が前述の口出しノ
ズル62に対応して篠継ヘッド支持バー148(第17
図参照)に配設されている。1N継ヘツド60は口出し
ノズル62が篠端を吸引している時には第8図に示すよ
うに、篠継ヘッド支持バー148から垂直下方に向いて
口出しノズル6・2との干渉を避けるようになっており
、次に篠端を把持してその篠端を紡出中の小玉ボビンの
篠と重合させるために反時計方向に回動させたり、第8
図において右方に移動させなければならない。篠継ヘッ
ド60にごのような運動を与える篠継へ・7ド作!7I
機構は第6図で示した動作機構65の篠継動作カム66
によるB k’Jtへ、ノドf)J作用ロッド97の下
向きの移動を揺動アーム141を介して内側リンク14
6と外側リンク147に時間差を与えて時計方向に回動
させる機構である。内側リンク146と外側リンク 1
47は枢着+1=145によって篠交換N50の本体5
1に回動可能に支持され、同時に夫々引張スプリング1
52 、153によって反時計方向に引張られており、
内側リンク 146はストッパー51hに受止められて
いる。前記枢着軸145は本体51に固着した左右一対
の支持体51e、5Leによって回動れ、外側リンク1
47の下端部が固着されている。
Next, the Shinotsugi head 60 and the Shinotsugi head operating mechanism will be explained with reference to FIG. This Shinotsugu head operating mechanism is also provided symmetrically in a pair on the left and right. The thread joint head 60 is a device that superimposes the a= drawn out from the full bobbin by the outlet nozzle 62 into the thread of the small bobbin being spun, and cuts the thread of the small bobbin after the polymerization. In addition, in the Shino exchanger 50 shown in FIG.
(see figure). When the outlet nozzle 62 is suctioning the edge, the 1N joint head 60 is directed vertically downward from the edge joint head support bar 148 to avoid interference with the outlet nozzles 6 and 2, as shown in FIG. Next, the shinodashi is held and rotated counterclockwise in order to polymerize the shinodashi with the shinobin of the small bobbin being spun.
It must be moved to the right in the diagram. A 7-do work for Shinotsugu that gives a similar motion to the Shinotsugu head 60! 7I
The mechanism is the Shinotsugu operating cam 66 of the operating mechanism 65 shown in FIG.
B k'
6 and the outer link 147 with a time difference to rotate them clockwise. Inner link 146 and outer link 1
47 is the main body 5 of Shino exchange N50 by pivot +1 = 145
1, and at the same time each tension spring 1
It is pulled counterclockwise by 52 and 153,
The inner link 146 is received by the stopper 51h. The pivot shaft 145 can be rotated by a pair of left and right supports 51e and 5Le fixed to the main body 51, and the outer link 1
The lower end of 47 is fixed.

枢着軸;145の端部にはセクターギ・ヤ144が固着
されており、このセクターギヤー144は揺動アーム1
41と一体のギヤー1418と噛合っている。外側リン
ク147の上端にはピン151が設けられ、連結リンク
150の長孔150aに係合している。
A sector gear 144 is fixed to the end of the pivot shaft 145, and this sector gear 144 is connected to the swing arm 1.
It meshes with a gear 1418 that is integrated with 41. A pin 151 is provided at the upper end of the outer link 147 and engages with a long hole 150a of the connecting link 150.

自記内側リンク146の上端は篠継ヘッド支持バー14
8の端面に一体に突設したピン149を回りJ自在に支
持しており、そのピン149に前記連結リンク150の
上端が固着され、これにより篠継ヘッド支持バー148
は連結リンク150の揺動によりピン149を中心とし
て回動可能である。
The upper end of the self-recording inner link 146 is connected to the Shinotsugu head support bar 14
The upper end of the connecting link 150 is fixed to the pin 149, and the upper end of the connecting link 150 is fixed to the pin 149.
is rotatable about the pin 149 by the rocking of the connecting link 150.

したがって篠継ヘッド動作用ロッド97の下向きの移動
によって揺動アーム141がピン143を中心として反
時計方向に回動すると、外側リンク147はセクターギ
ヤー144及び枢着1=t4sを介してスプリング15
3の引張力に抗して時計方向に揺動して外側リンク14
7の上端のピン151を右方に押し連結リンク150を
ピン149を中心として反時計方向に回す。その結果篠
継ヘッド支持バー148は篠継ヘッド60と共に反時計
方向に回る。
Therefore, when the swing arm 141 rotates counterclockwise about the pin 143 due to the downward movement of the rod 97 for operating the Shinotsugu head, the outer link 147 is connected to the spring 15 via the sector gear 144 and the pivot 1=t4s.
The outer link 14 swings clockwise against the tensile force of 3.
Push the pin 151 at the upper end of 7 to the right and turn the connecting link 150 counterclockwise around the pin 149. As a result, the Shinotsugi head support bar 148 rotates counterclockwise together with the Shinotsugi head 60.

この回動運動は連結リンク150が第8図に示された位
置からピン149を通過する垂直線に対して対称の反対
側の位置迄続き、その結果篠継ヘノド60はほぼ水平位
置になる。さらに篠継ヘッド動作用ロッド97が下方に
移動して外側リンク147が時計方向にさらに回動する
とピン151が長孔150aの下端に当接し、その後は
ピン149が連結リンク150によって右方に引かれて
内側リンク146を%= 145を中心として回動させ
、それに伴って水平方向に向いた篠継ヘッド60は15
4て示した軌跡に沿って紡出中の小玉ボビンICからの
篠Rに向けて進むことになる。
This pivoting movement continues with the connecting link 150 from the position shown in FIG. 8 to a position symmetrically opposite to the vertical passing through the pin 149, so that the sash joint henode 60 is in a substantially horizontal position. When the rod 97 for operating the Shinotsugu head further moves downward and the outer link 147 further rotates clockwise, the pin 151 comes into contact with the lower end of the elongated hole 150a, and then the pin 149 is pulled to the right by the connecting link 150. The inner link 146 is rotated around %=145, and the horizontally oriented Shinotsugu head 60 is rotated at 15%.
4, it will proceed towards Shino R from the small bobbin IC which is currently being spun.

精紡機における満ボヒンの配置位置と牽伸部5の位置は
通常第4図に示すように精紡機のスピンドルの172ピ
ンチだけずれている。そこで満ボビンの篠を口出し、そ
の篠を′PJ′mヘンドロ0に把持牽伸部5側に172
スピンドルピツチだけ横移動させる必要がある。そのた
めに第1図に示ずように篠継ヘッド横移動機構61が設
けられ、枢着軸145を移動させるようにしである。篠
継ヘッド横移動機構61は本体51に止着された減速機
付モータ217と、そのモータ217によって回転させ
られるウオーム218と、ウオーム218と噛合するウ
ォーJ、;(−イールを有し、ピン155aを中心とし
て揺動されるアーム155とから成り、そのアーム15
5の揺動によってロッド145を第1図において右又は
左へ選択的に移動させるようになっている。
The arrangement position of the spinning frame and the position of the drafting section 5 in the spinning frame are usually shifted by 172 pinches of the spindle of the spinning frame, as shown in FIG. Then, take out the full bobbin Shino, hold the Shino in the 'PJ'm hand drawer 0, and place it on the drafting part 5 side at 172.
Only the spindle pitch needs to be moved laterally. For this purpose, as shown in FIG. 1, a lateral movement mechanism 61 for the joint head is provided to move the pivot shaft 145. The Shinotsugu head lateral movement mechanism 61 includes a motor 217 with a reducer fixed to the main body 51, a worm 218 rotated by the motor 217, a worm J meshing with the worm 218; It consists of an arm 155 that swings about 155a, and the arm 15
By swinging 5, the rod 145 is selectively moved to the right or left in FIG.

次に第14図から第17図を参照して篠継ヘッド60の
構造とその作動方法を説明する。第14図に篠継ヘッド
の一実施例の平面図を示し、第15図にその側面図を示
す。第14図および第15図に示す篠継ヘッド60はそ
の先端部に篠案内溝173が形成された篠継ヘッド本体
171とその本体171の上側表面に平行な平面内で前
記篠案内溝173を横切って往復動可能な篠把持レバー
174とから成る。本体171は断面コの字形状の篠継
ヘッド支持バー148に固定されている。篠把持レバー
174は本体171に固定された枢着ピン178にその
中央付近で回動可能に支持され、一方その後端にはピン
179が突設されている。第15図に示すように、篠継
ヘッド支持バー148には摺動可能に篠把持しバー作v
1バー182が配設され、その作動バー182には先端
にピン179を収容する開口部を有する作動部材181
が固定されている。篠把持レバー174の先端の篠把持
部175の両側面の篠把持面175a 、 175bに
対向する篠把持面176a 、 177aをそれぞれ有
するニップピース176 、177が篠案内溝173の
両側の位置で本体171の上側表面に固定して配設され
る。本体171の先端には篠案内溝173に篠を案内す
るための三角形状の篠案内開口部172が形成され、そ
の篠案内開口部172の片側側面には導管184を経て
送られる空気を篠案内溝173の奥部下方向に噴出させ
るノズル183の開口部を設けである。
Next, with reference to FIGS. 14 to 17, the structure of the shinotsugi head 60 and its operating method will be described. FIG. 14 shows a plan view of an embodiment of the Shinotsugu head, and FIG. 15 shows a side view thereof. The Shinogi head 60 shown in FIGS. 14 and 15 has a Shinogi head main body 171 having a Shino guide groove 173 formed at its tip, and a Shinogi head body 171 that has a Shinogi guide groove 173 in a plane parallel to the upper surface of the main body 171. The gripping lever 174 is configured to have a gripping lever 174 that can reciprocate horizontally. The main body 171 is fixed to a cylindrical head support bar 148 having a U-shaped cross section. The Shino grip lever 174 is rotatably supported near the center by a pivot pin 178 fixed to the main body 171, and has a pin 179 protruding from its rear end. As shown in FIG.
1 bar 182 is disposed, and the actuating bar 182 has an actuating member 181 having an opening for accommodating the pin 179 at its tip.
is fixed. Nip pieces 176 and 177, which have respective gripping surfaces 176a and 177a opposite to gripping surfaces 175a and 175b on both sides of the gripping portion 175 at the tip of the gripping lever 174, are attached to the main body 171 at positions on both sides of the gripping groove 173. It is fixedly disposed on the upper surface. A triangular-shaped shell guide opening 172 for guiding the shell to the shell guide groove 173 is formed at the tip of the main body 171, and one side of the shell guide opening 172 is provided with a triangle-shaped shell guide opening 172 for guiding the shell to the shell guide groove 173. An opening for a nozzle 183 is provided to eject water toward the bottom of the groove 173.

このノズル183から噴出する空気流は紡出中の小玉ボ
ビンの篠に重合させる満ボビンの篠端の折れ曲りを延ば
すのに役立つ。第14図(A)は作動バー182が右側
に移動して篠把持レバー174の篠把持面175aとニ
ップピース177の篠把持面177aとの間に小玉ボビ
ンの篠(図示せず)を把持する場合及び満ボビンの篠を
篠工内溝173に導く為の待機状態の篠把持レバー17
4の位置を示す。篠継ヘッド60が第8図を参照して説
明した篠継ヘッド60の垂直位置に位置された状態にお
いて満ボビンICと口出しノズル62間を延びる篠は篠
案内開口部172を経て篠案内溝173に導入された上
で篠把持レバー174が第14図(C)の状態のように
篠把持部175が右側に回動して篠把持レバー174と
ニップピース176によって把持され、その後篠継ヘッ
ド60が垂直位置から水平位置へ移動される間に、口出
しノズル62との間の篠は篠把持レバー174による把
持点の下流側で筆先状に切断され、その結果8案内溝1
73中に紡出中の小玉ボビンの篠と重合されることにな
る筆先状の篠端が位置されることになる。この状態で篠
継ヘッド60は第8図に実線154で示す軌跡に沿って
紡出中の小玉ボビンの篠Rに近づけられると共に篠継ヘ
ッド横移動機構61によって第1図において右又は左へ
172スピンドルピツチ横移動され、これによりトラン
ペット5に導入されている紡出中の小玉ボビンの篠Rが
篠案内溝173の中に導入され、前記満ボビンの篠端は
その小玉ボビンの篠Rに重合される。次に第14図(B
)に示すように篠把持レバー174の篠把持部175が
左側に回動して中立の位置に移動され、これにより満ボ
ビンの篠端は小玉ボビンの篠Rに誘導されてI−ランベ
ット6内に重合状態で導入される。その後、前記満ボビ
ンの篠端が牽伸部5のハックローラ5aに導入された時
点で第14図(A)に示ずように篠把持部175が左側
へ最大限回動されて篠把持レバー174の篠把持部17
5の左側の把持面175aと左側のニップピース177
の把持面177aとの間に小玉ボビンの篠Rを把持する
。かくして篠継ヘッド60の下流側の篠は牽伸部5に向
けて紡出するので篠継ぎされた部分は下流に進み、その
篠継部分の上流の篠Rは篠把持レバー174と左側のニ
ップピース177で把持されているので引っ張り切断さ
れて篠継ぎが完了する。其後、篠把持レバー174が中
立位置に回動し、篠Rの把持は解放される。
The air flow ejected from this nozzle 183 serves to lengthen the bending of the grain end of the full bobbin which is polymerized into the grain of the small bobbin during spinning. FIG. 14(A) shows a case where the actuation bar 182 moves to the right and grips a small bobbin (not shown) between the gripping surface 175a of the gripping lever 174 and the gripping surface 177a of the nip piece 177. and a Shino gripping lever 17 in a standby state for guiding a full bobbin into the Shino work inner groove 173.
4 position is shown. When the Shino joint head 60 is positioned in the vertical position described with reference to FIG. 14(C), the Shino gripping part 175 rotates to the right and is gripped by the Shino gripping lever 174 and the nip piece 176, and then the Shino joint head 60 is While being moved from the vertical position to the horizontal position, the wire between the outlet nozzle 62 is cut into a brush tip shape on the downstream side of the gripping point by the wire gripping lever 174, and as a result, the 8 guide grooves 1
In 73, a brush tip-like grain end which is to be polymerized with the grain of the small bobbin during spinning is placed. In this state, the Shino joint head 60 is brought close to the Shino R of the small bobbin being spun along the trajectory shown by the solid line 154 in FIG. 8, and moved to the right or left 172 in FIG. The spindle pitch is moved laterally, whereby the grain R of the small bobbin being spun, which has been introduced into the trumpet 5, is introduced into the grain guide groove 173, and the grain end of the full bobbin is superimposed on the grain R of the small bobbin. be done. Next, Figure 14 (B
), the Shino gripping part 175 of the Shino gripping lever 174 is rotated to the left and moved to the neutral position, whereby the Shino end of the full bobbin is guided to the Shino R of the small bobbin and placed in the I-run bet 6. is introduced in a polymerized state. Thereafter, when the thin end of the full bobbin is introduced into the hack roller 5a of the drafting section 5, the thin gripping section 175 is rotated to the left as much as possible as shown in FIG. 14(A), and the thinning gripping lever is 174 Shino grip part 17
5's left gripping surface 175a and left nip piece 177
The small bobbin Shino R is gripped between the gripping surface 177a and the gripping surface 177a. In this way, the shino on the downstream side of the shino joint head 60 is spun toward the drafting section 5, so the spliced part advances downstream, and the shino R upstream of the shino jointed part is connected to the shino grip lever 174 and the nip piece on the left side. Since it is gripped at 177, it is pulled and cut to complete the shinonitsu. Thereafter, the Shino gripping lever 174 rotates to the neutral position, and the grip on Shino R is released.

次に第17図を参照して篠把持レバー174の回動運動
を作動する作動バー182の摺動運動を説明する。第1
7図に示すように、篠継ヘッド支持バー148に収容さ
れている作動バー182には6個の篠継ヘッド60のそ
れぞれの作動部材181が固定されている。作動バー1
82には’6M 4Iヘツド支持バー148に止着され
た4個の作動室バー摺動用ソレノイド185のプランジ
ャ189がL形部材188、ピン200及び孔186を
介して夫々連結される。それぞれのソレノイド185は
通電されない時にはプランジャ189は自由に動くこと
ができ、通電されるとプランジャ189が投入されるよ
うになっている。
Next, referring to FIG. 17, the sliding movement of the actuating bar 182 that operates the rotational movement of the Shino gripping lever 174 will be explained. 1st
As shown in FIG. 7, an operating member 181 of each of the six Shinogi heads 60 is fixed to an actuating bar 182 housed in the Shinogi head support bar 148. Actuation bar 1
The plungers 189 of four working chamber bar sliding solenoids 185 fixed to the '6M 4I head support bar 148 are connected to the L-shaped member 188, the pin 200, and the hole 186, respectively. When each solenoid 185 is not energized, the plunger 189 can freely move, and when energized, the plunger 189 is closed.

前記ピン200は孔186を介して作動室バー182に
係合して作動バー182にプランジャの運動を伝達する
。その際にピン200が係合する孔186の形状はソレ
ノイド185a 、 185dに対応する孔186a 
、 186dは作動中バー182の移動方向へ長い長孔
とし、ソレノイド185b 、 185cに対応する孔
186b 、 186cは作動バー182の移動方向と
直交する方向へ長い長孔に形成されている。第17図(
A)に示すように、ソレノイド185cに通電(ON)
すると、プランジャ 189がソレノイド185cに弓
1込まれてピン20Oc 1士右側に矢印Cで示すよう
に移動して作動バー182を矢印×1で示すように右側
に移動し、その結果篠把持レバー174の先端175は
左側に回動してニップピース176に当接し満ボビンの
篠を把持することになる(第14図(C)参照)、次に
篠把持レバー174を第14図(B)に示した中立の位
置にするためには、第17図(B)に示すようにソレノ
イド185dに通電(ON)L、ピン200dを矢印り
の方向に移動することによって、作動中バー182を矢
印X2の方向に移動させる。同時にソレノ・イド185
aにも通電し、ソレノイド185aのプランジャ189
が引込まれたままの位置を保っているので、作動tバー
182は長孔186aの右端がピン200 aに当接し
て中立位置に位置決めされる。
The pin 200 engages the working chamber bar 182 through the hole 186 and transmits the movement of the plunger to the working bar 182. At this time, the shape of the hole 186 with which the pin 200 engages is the hole 186a corresponding to the solenoids 185a and 185d.
, 186d are elongated holes extending in the direction of movement of the operating bar 182, and holes 186b, 186c corresponding to the solenoids 185b, 185c are formed as elongated holes extending in a direction perpendicular to the direction of movement of the operating bar 182. Figure 17 (
As shown in A), energize (ON) the solenoid 185c.
Then, the plunger 189 is inserted into the solenoid 185c, moves the pin 20C to the right as shown by arrow C, moves the actuating bar 182 to the right as shown by arrow The tip 175 rotates to the left and comes into contact with the nip piece 176 to grip a full bobbin (see Figure 14 (C)). Next, the Shino gripping lever 174 is shown in Figure 14 (B). In order to bring the operating bar 182 to the neutral position, turn on the solenoid 185d and move the pin 200d in the direction of the arrow as shown in FIG. 17(B). move in the direction. At the same time, Soleno Ido 185
a is also energized, and the plunger 189 of the solenoid 185a
Since the t-bar 182 remains in the retracted position, the right end of the long hole 186a abuts the pin 200a, and the actuating T-bar 182 is positioned at the neutral position.

さらに篠把持レバー174を第14図(A)に示した紡
出中の小玉ボビンの篠を把持する位置に移動するために
は、第17図(C)に示すように、ソレノイド185b
を通@ (ON ) シ、プランジャ189を引込むこ
とによってピン200bを矢印Bの方向に移動し、作動
=バー182を矢印X3の方向に移動する。
Furthermore, in order to move the grain gripping lever 174 to the position shown in FIG. 14(A) where it grips the grain of the small bobbin being spun, the solenoid 185b is used as shown in FIG. 17(C).
By retracting the plunger 189, the pin 200b is moved in the direction of arrow B, and the actuation bar 182 is moved in the direction of arrow X3.

前記工程を繰返すことによって篠継ヘッド60における
篠把持レバー174の往復回動運動を所定の計画に基づ
いて達成・することができる。
By repeating the above steps, the reciprocating rotational movement of the Shino gripping lever 174 in the Shino joint head 60 can be achieved based on a predetermined plan.

第16図に篠継ヘンドロ0の他の実施例を示す。FIG. 16 shows another embodiment of Shinotsugu Hendro 0.

このH′mヘッド60では第16図([3)で示す側面
図から容易に判るように篠把持レバーとして満ボビン篠
用のレバー174aと小玉ボビンから紡出中のB、R用
のレバー174bの2本が用いられていることが第15
図の篠継ヘッド60と異る。したがって作動バーもそれ
に対応して、満ボビン篠用の作動バー182aとWl用
の作動バー182bとが用いられ、篠Rを重合予定部よ
り上流で切断すると共に、第14図、第15図で示した
篠継ヘッド60の場合と同様に作動して満ボビンの篠端
を小玉ボビンの篠Rに重合して篠継ぎを完了する。
In this H'm head 60, as can be easily seen from the side view shown in FIG. 16 ([3)], a lever 174a for holding a full bobbin and a lever 174b for B and R during spinning from a small bobbin are used as the gripping levers. The fact that two of these are used is the 15th
This is different from the Shinotsugu head 60 shown in the figure. Therefore, correspondingly, the operating bar 182a for full bobbin line and the operating bar 182b for Wl are used to cut line R upstream from the planned polymerization area and to It operates in the same manner as in the case of the shown joint head 60, and the joint end of the full bobbin is overlapped with the joint R of the small bobbin to complete the joint.

次に第9図を参照して篠掛はプレート作動機構′を説明
する。この篠掛はプレート作動機構も左右に一対対称に
設けられている。篠掛はプレート58は篠継の終了した
満ボビンの篠をローピングガイド2に掛けるためのプレ
ートであり、そのためには第9図で曲線116で示した
軌跡に沿って篠掛はプレート58を移動させなければな
らない。
Next, with reference to FIG. 9, Shinokake will explain the plate actuation mechanism'. The plate operating mechanism of this Shinokake is also provided symmetrically on the left and right. The Shinokake plate 58 is a plate for hanging the fully loaded bobbin Shino on the roping guide 2. To do so, the Shinokake plate 58 must be moved along the trajectory shown by the curve 116 in FIG. I have to let it happen.

なお第1図に示した篠交換機50においては詫掛はプレ
ート58は篠交換機50の長手方向に延びる一枚のプレ
ートとして形成されている。篠掛はプレート作動機構は
第6図で示した動作機構65の篠掛は動作カム68によ
る篠掛はプレート動作用ロッド95の下向きの移動を外
側リンク101 と内側リンク 102とを併合したリ
ンク機構の運動によって篠掛はプレート58に所期の移
動軌跡を与えるものである。すなわちセクタギヤ104
は本体51にピン109を介して十■着してあり、篠掛
はプレート動作用ロッド95の下向きの移動によってピ
ン109を中心として時計方向に回動し、その運動はセ
クターギヤー105の反時計方向の回動をもたらす。こ
のセクターギヤー105は本体51に取着された支持体
103によって回動自在でかつ長手方向へ摺動自在に支
承されている軸112に固着され、この軸112に前記
外側リンク 101の上端が固着されている。外側リン
ク101の下端は連結リンク107に植設したピン11
4aと支持バー108の後端に植設したピン115aに
回動自在に枢着されている。
In the Shino exchanger 50 shown in FIG. 1, the cross plate 58 is formed as a single plate extending in the longitudinal direction of the Shino exchanger 50. The plate operating mechanism is a link mechanism that combines the outer link 101 and the inner link 102 to move the plate operating rod 95 downward by the operating cam 68 of the operating mechanism 65 shown in FIG. By this movement, the Shinokake gives the plate 58 a desired movement trajectory. That is, sector gear 104
is attached to the main body 51 via a pin 109, and the shaft rotates clockwise around the pin 109 by the downward movement of the plate operating rod 95, and the movement is caused by the counterclockwise rotation of the sector gear 105. brings about a rotation in direction. This sector gear 105 is fixed to a shaft 112 which is supported rotatably and slidably in the longitudinal direction by a support 103 attached to the main body 51, and the upper end of the outer link 101 is fixed to this shaft 112. has been done. The lower end of the outer link 101 has a pin 11 implanted in the connecting link 107.
4a and a pin 115a implanted at the rear end of the support bar 108 so as to be rotatable.

支持体103に回動自在でかつ軸方向へ移動自在に軸1
17を支承し、連結リンク106の一端を軸117に他
端を前記軸112に夫々回動自在でかつ前記112の軸
方向の移動を軸117に伝達するようになっている。そ
してこの軸117に内側リンク 102の上端を固着し
、内側リンク102の下つ:イは前記の連結リンク10
7とピン113で連結されている。連結リンク107に
植設したピン114aに小山車114を模着し、支持レ
バー108に植設したピン115aに小山車115楔着
し、小歯車114と115が噛合っている。
A shaft 1 is attached to the support 103 so as to be rotatable and movable in the axial direction.
17, one end of the connecting link 106 is rotatable about the shaft 117, and the other end is rotatable about the shaft 112, and the movement of the link 112 in the axial direction is transmitted to the shaft 117. Then, the upper end of the inner link 102 is fixed to this shaft 117, and the lower end of the inner link 102: A is the connecting link 10 described above.
7 and a pin 113. A small float 114 is modeled on a pin 114a implanted in the connecting link 107, and a small float 115 is wedged onto a pin 115a implanted in the support lever 108, so that the small gears 114 and 115 mesh with each other.

両側の支持レバー108の先端部に板状の篠掛はプレー
ト58が懸架固着されている(第1図参照)図示は省略
したが篠継ぎの終った満ボビンの篠をロービングガイド
2に恵く際、篠の左右方向の位置を規制するために篠掛
はプレートの先端側には(第9図の右側)6個の■状の
ガイF用切欠きが形成されている。かかる+14成につ
きセクターギヤー 105の反時計方向の回動に伴い外
側リンク101と内側リンク102は共に反時計方向に
回動し、外側リンク101の揺動端に近づいてくると外
側リンク 101と内側リンク 102、連結リンク1
07の連結長さの関係で連結リンク107がピン114
aを支点にして反時計方向に回され、ごれに伴い小1幻
車114に噛合っている小歯車115が時計方向に回さ
れるので篠掛はプレート58の先端は第9図の軌跡11
6のように移動し、外側リンク101の揺動端に来たと
きにはロービングガイド2の上方において篠掛はプレー
ト58が機台側へ傾いて、満ボビンの篠をロービングガ
イド2内へ導くようになっている。
A plate 58 is suspended and fixed to the tips of the support levers 108 on both sides (see Figure 1).Although not shown, the roving guide 2 is provided with a full bobbin that has been spliced. At this time, in order to regulate the lateral position of the shinokake, six square-shaped notches for the guide F are formed on the tip side of the plate of the shinokake (on the right side in FIG. 9). Due to this +14 formation, the outer link 101 and the inner link 102 both rotate counterclockwise as the sector gear 105 rotates counterclockwise, and as they approach the swinging end of the outer link 101, the outer link 101 and the inner link rotate. Link 102, connected link 1
Due to the connection length of 07, the connection link 107 is connected to the pin 114.
It is rotated counterclockwise with a as a fulcrum, and as the small gear 115 meshing with the small 1st gear 114 is rotated clockwise, the tip of the plate 58 will follow the trajectory shown in Figure 9. 11
6, and when it comes to the swinging end of the outer link 101, the plate 58 of the Shinogake above the roving guide 2 tilts toward the machine base, so that the Shinogake plate 58 with a full bobbin is guided into the roving guide 2. It has become.

次に篠掛りプレート58を横移動させる機構を説明する
。篠掛はプレート58は第18図に示したロービングガ
イド2の爪部2bに満管ボビン1aの篠を掛けるために
例えば201移?)Jさせるために第1図に示した篠掛
はプレート横移動機構59によって移動さ−Uられる。
Next, a mechanism for laterally moving the shinokake plate 58 will be explained. For example, the plate 58 is moved 201 in order to hang the pin of the full bobbin 1a on the claw portion 2b of the roving guide 2 shown in FIG. 1) is moved by the plate lateral movement mechanism 59.

篠掛はプレート横移動ale 59は本体51に止着さ
れた減速機付モータ117と、そのモータ117によっ
て歯車117aを介して回転させられる。ウオーム11
8と、ウオーム118と噛合するウオームホイールを−
◇:!1に有し、ピン119aを中心として、第1図に
おいて右又は左へ選択的にI工動して篠掛はプレート作
動機構の軸112を横移動させるアーム119から成る
。第9図に示すように軸112の横移動によって外側リ
ンク101および連結リンク106を経て内側リンク1
02が同時に横移動され、それによって満ボビンの篠 
゛を保持した篠掛はプレート58もまた横移動される。
The lateral movement of the plate 59 is rotated by a motor 117 with a speed reducer fixed to the main body 51 and a gear 117a by the motor 117. Warm 11
8 and the worm wheel that meshes with the worm 118 -
◇:! 1, and the arm 119 selectively moves to the right or left in FIG. 1 about a pin 119a to laterally move the shaft 112 of the plate actuating mechanism. As shown in FIG. 9, by the lateral movement of the shaft 112, the inner link 1
02 is moved horizontally at the same time, and the full bobbin Shino
The plate 58 of the Shinokake holding the plate 58 is also moved laterally.

この篠掛はプレート58の横移動は篠掛はプレート58
が上昇されて篠をロービングガイド2内に導いた状態で
行われ、その結果ロービングガイド2の爪部2bに篠が
かけられる。
This Shinokake is plate 58. The horizontal movement of Shinokake is plate 58.
This is carried out with the roving guide 2 being raised to guide the liner into the roving guide 2, and as a result, the liner is applied to the claw portion 2b of the roving guide 2.

篠交換機には前述のようにそれぞれモータを有する各種
の作動機構が設けられている。後述の篠交換機の作動の
説明で明らかなように口出しノズル、篠継ヘッド、篠掛
はプレート、満(小玉)ボビン交換ヘッドの移動はそれ
ぞれ所定順序にしたがって行われる。そのために前記各
種の作動機+11中のモータは篠交換機50の本体51
内に配設されたコントローラ300からの指令に基づい
て所定の順序にしたがって作動され、それによって満ボ
ビンと小玉ボビンの交換が行われると共に満ボビンの篠
を紡出中の小玉ボビンの篠への篠継ぎが行われる。前記
コントローラの構成およびその作用は公知のものである
ので、詳細な説明は省略する。
As mentioned above, the Shino exchanger is provided with various operating mechanisms each having a motor. As will be clear from the explanation of the operation of the Shino changer to be described later, the movement of the outlet nozzle, the Shino connection head, the Shino hook plate, and the full (small bobbin) bobbin change head is performed in a predetermined order. For this purpose, the motors in the various actuators +11 are connected to the main body 51 of the Shino exchanger 50.
It is operated according to a predetermined order based on commands from the controller 300 disposed in the controller 300, thereby exchanging the full bobbin and the small bobbin, and also transferring the full bobbin to the small bobbin that is currently being spun. Shinotsugi is performed. Since the configuration and operation of the controller are well known, detailed explanation will be omitted.

次に、前記構成の篠交換550を用いて広義の篠交換す
なわち満ボビンと小玉ボビンの交換と篠継ぎの作業を行
う場合について説明する。先ず第3図に示すように、紡
出が進んで精紡機のクリールの前列のボビンハンガー1
9に吊下されたボビンが小玉ボビンICになり、後列の
ボビンハンガー20に吊下されたボビンが中玉ボビン1
bになった時、篠交換機50のガイドローラ29を精紡
機のガイドレール28上に載せ、篠交換機50を精紡機
に接合させる。この特進には予め精紡機の予備レール1
5上に精紡機の前列のボビンハンガー19の位置に対面
して配置された予備ボビンハンガー24に満ボビン1a
を吊下させておく。なお後列のボビンハンガー20に吊
下されているボビンが小玉となって篠交換が必要となっ
た場合には、予め前述の篠入換機10を用いて前列に小
玉ボビンが配置されるようにしておく。
Next, a case will be described in which the Shino exchange 550 having the above configuration is used to perform Shino exchange in a broad sense, that is, exchange of a full bobbin and a small bobbin, and a Shino joining operation. First, as shown in Figure 3, when spinning progresses, the bobbin hanger 1 in the front row of the creel of the spinning machine
The bobbin suspended from 9 is the small bobbin IC, and the bobbin suspended from the bobbin hanger 20 in the back row is the medium bobbin 1.
At the time b, the guide roller 29 of the Shino exchanger 50 is placed on the guide rail 28 of the spinning machine, and the Shino exchanger 50 is connected to the spinning machine. For this special train, we have prepared a spare rail 1 for the spinning machine in advance.
5, a full bobbin 1a is placed on a spare bobbin hanger 24 arranged facing the position of the bobbin hanger 19 in the front row of the spinning machine.
Let it hang. In addition, if the bobbin suspended from the bobbin hanger 20 in the rear row becomes a small bobbin and it becomes necessary to replace the bobbin, the above-mentioned bobbin shunter 10 is used to arrange the small bobbin in the front row in advance. I'll keep it.

篠交換機50は走行モータ21でスクロールカム22を
駆動することによって精紡機の前面に沿って走行し、小
玉ボビン1cの6木に対応する位置に停止する。この位
置において一連の篠交換と篠継ぎの作業が順次行われる
。以下その作業を第19図を参+tqして説明する。
The Shino changer 50 travels along the front surface of the spinning machine by driving the scroll cam 22 with the travel motor 21, and stops at a position corresponding to the 6-piece of the small bobbin 1c. At this position, a series of operations for replacing the wire and joining the wire are performed in sequence. The operation will be explained below with reference to FIG. 19.

先ず前列の小玉ボビン1cは残存する篠が少くなり、篠
交換を必要とする状態となっている(第19図(1))
。この状態になったときに第19図(2)に示すように
予備レール15のボビンハンガー24に吊り下がった満
ポビン1aの直下に対応した満ボビン交換ヘッド52が
昇降機構31によって上昇し、満ボビン交換ヘッド52
のペッグ53が満ボビン1a下部に嵌合して満ボビン1
aをボビンハンガー24から外す。満水ビン1 a ヲ
(D セた満ボビン交換ヘッド52は下降して第19図
(1)に示した元の位置に戻り、また満ボビン交換ヘッ
ド52の下降に合わせて口出しノズル62が口出しノズ
ル作動機構により上昇し、下降した満ポビン1aの篠端
の高さ位置に口出しノズル62の吸込口が対応する位置
で口出しノズル62は停止する(第19図(3))。次
に、満ボビン交換ヘッド52に内蔵されたペッグ回転機
構のモータ54が上方からみて反時計方向に回転し、篠
端が口出しノズル62とは反対側にある1つ置きの満ボ
ビンを予め巻取り方向へ180°回転させ、それらの満
ボビンの篠端を口出しノズル62側へ移動させる。
First of all, the small bobbin 1c in the front row has less remaining shine and is in a state where it needs to be replaced (Fig. 19 (1)).
. When this state is reached, as shown in FIG. 19 (2), the full bobbin exchange head 52 corresponding to the position immediately below the full bobbin 1a suspended from the bobbin hanger 24 of the spare rail 15 is raised by the lifting mechanism 31, and Bobbin exchange head 52
The peg 53 fits into the lower part of the full bobbin 1a, and the full bobbin 1
Remove a from the bobbin hanger 24. Full bobbin exchange head 52 descends and returns to the original position shown in FIG. The outlet nozzle 62 stops at a position where the suction port of the outlet nozzle 62 corresponds to the height of the edge of the fully loaded bobbin 1a that has been raised by the operating mechanism and lowered (FIG. 19 (3)). The motor 54 of the peg rotation mechanism built into the exchange head 52 rotates counterclockwise when viewed from above, and preliminarily rotates every other full bobbin, the end of which is on the opposite side of the outlet nozzle 62, by 180 degrees in the winding direction. The bobbins are rotated and the thin ends of the full bobbins are moved to the outlet nozzle 62 side.

その後モータ54 、57を時計方向に回転して6個の
満ボビンを巻戻し方向へ回転させると共に、口出しノズ
ル62に7゛′ロア23による吸引力が作用する。これ
により口出しノズル62の吸引口は夫々対応する満ボビ
ンの篠端を確実に吸引して満ボビン1aの篠を口出しす
る(第19図(4))。満ボビン1aの回転と口出しノ
ズル62の吸引を継続しながら口出しノズル62は下降
して元の位置に戻り、その陥凹出しされた謹は篠継ヘッ
ド60の篠案内溝173に入る(第19図(5))。篠
継ヘッド60のソレノイド185cに通電し、篠把持レ
バー174が作動してB把持部175とニップピース1
76間に満ボビン篠を把持ル、同時に下向きの垂直状態
にあった篠継ヘッドが篠継ヘッド作動機構により横向き
の略水平状態になり、その際に満ボビン1aの篠は口出
しノズル62の先端内部に装着されたコームに引掛かり
、篠継ヘッド60における把持点と口出しノズル62と
の間で切断されて篠端が形成される(第19図(6))
。次に、篠端が形成された満ボビンの篠を把持したまま
篠継ヘッド60は篠継ヘッド作動機構により精紡機の牽
伸部5に向けて前進する。′B継ヘッド60は前進する
途中で一旦前進を停止し、小玉ボビンの篠が導入ドルピ
ッチ分だけ横移動して精紡機の牽伸部5上流のトランペ
ット6に対応する精紡機の長手方向の位置を取り、その
後前進を再開して満ボビンの篠の篠端はトランペット6
の上部に達する迄進む。
Thereafter, the motors 54 and 57 are rotated clockwise to rotate the six full bobbins in the unwinding direction, and the suction force by the 7'' lower 23 is applied to the outlet nozzle 62. As a result, the suction ports of the outlet nozzles 62 reliably suck the edges of the corresponding full bobbins and extract the edges of the full bobbins 1a (FIG. 19 (4)). While continuing the rotation of the full bobbin 1a and suction by the outlet nozzle 62, the outlet nozzle 62 descends and returns to its original position, and the recessed sag enters the sag guide groove 173 of the sag joint head 60 (No. 19). Figure (5)). The solenoid 185c of the Shino joint head 60 is energized, the Shino gripping lever 174 is activated, and the B gripping portion 175 and the nip piece 1 are moved.
76, the full bobbin 1a is gripped, and at the same time, the thread head, which was in a downward vertical position, is brought to a sideways, almost horizontal state by the thread joint head operating mechanism, and at this time, the thread of the full bobbin 1a is held at the tip of the outlet nozzle 62. It is caught by the comb installed inside and is cut between the gripping point on the shin joint head 60 and the outlet nozzle 62 to form a shin end (FIG. 19 (6))
. Next, the thread joint head 60 moves forward toward the drafting section 5 of the spinning frame by the thread joint head operating mechanism while holding the full bobbin grain on which the grain edge has been formed. 'The B-joint head 60 temporarily stops moving forward while moving forward, and the thread of the small bobbin moves laterally by the amount of the introduced dollar pitch to the position in the longitudinal direction of the spinning machine corresponding to the trumpet 6 upstream of the drafting section 5 of the spinning machine. After that, the forward movement was resumed, and Shinohata of Shino with a full bobbin was on trumpet 6.
Continue until you reach the top of the .

その際紡出中の小玉ボビンの篠は篠継ヘッド60の篠案
内溝173に入り、満ボビンの篠に重なる。
At this time, the grain of the small bobbin being spun enters the grain guide groove 173 of the grain joining head 60, and overlaps with the grain of the full bobbin.

なお篠継ヘッド60が前進する際、満ボビン交換ヘッド
52のペッグ回転機構によって満ボビンは反時計方向に
回転して、篠を巻きほどき篠継ヘッド60の前進によっ
て生ずる篠の切断を防止し、同時に巻きほどいた篠のた
るみを保持させるために、篠掛はプレート58は篠掛は
プレート作動機構により少し上昇する。篠継ヘッド60
が前進を停止した後、篠継ヘッド60のソレノイド18
5a 。
Note that when the Shino joint head 60 advances, the full bobbin is rotated counterclockwise by the peg rotation mechanism of the full bobbin exchange head 52 to unwind the Shino and prevent the Shino from being cut due to the advance of the Shino joint head 60. At the same time, in order to hold the slack in the unwound shin, the shinokake plate 58 is slightly raised by the shinokake plate operating mechanism. Shinotsugu head 60
stops moving forward, the solenoid 18 of the Shinotsugu head 60
5a.

185bに通電し、篠把持レバーが中立位置に回って満
ボビンの篠の把持を゛開放し、解放された満ボビン1a
の篠は紡出中の小玉ボビンの篠に誘五されてその篠と共
にトランペット6に挿入され、満ボビン1aの篠端が牽
伸部5のハックローラ5aに把持された後、篠継ヘッド
60のソレノイ)”185bに通電し、篠把持レバー1
74がさらに回って篠把持部175とニップピース17
7との間で小玉ボビンの篠を把持する。小玉ボビンの寝
はMff Naヘッド60で把持されているのでバフク
ローラとの間でドラフトされて切断される(第19図(
7))。篠継ぎを終った満ボビン1aは満ボビン交換ヘ
ッド52によって予備ボビンハンガー24へ装着しない
限度近く迄再−ヒ昇して停止する。その際満ボビン交換
ヘッド52のペッグ回転機構によって満ボビン1aが反
時計方向に回転して謹を巻きほどき、満ボビン1aの上
界によって生ずる篠の切断を防止し、同時に篠掛はプレ
ート58がさらにロービングガイド2の近くまで上昇し
て巻きほどかれた満ボビン1aの篠のたるみを保持する
。この間に篠継ヘンドロ0のソレノイド185a 、 
185dに通電して篠把持レバー174を中立位置に移
動させ、これにより篠把持レバー174による小玉ボビ
ンの篠の把持が開放されると共に満ボビン1aの篠が篠
継ヘッド60から外れる位置迄篠継ヘッド60は後退し
て停止する(第19図(8))。小玉ボビン交換へフド
55が前後動機構及び昇降機構によりクリールの前列の
小玉ボビンの直下まで前進して上界し、前列のボビンハ
ンガー19から小玉ボビン1cを外す(第19図(9)
)。小玉ボビンをのせた小玉ボビン交換ヘッド55は下
降しく第19図00))、後退して元の位置に戻る。(
第19図00)。小玉ボビン交換ヘッド55に内蔵され
たペッグ回転機構によって小玉ボビンが上部から見て時
計方向に回転して切断された篠を巻取る。小玉ボビン交
換ヘッド55が元に戻ると共に、満ボビン交換ヘッド5
2が下降して元に戻る。その際満ボビン交換へ、ド52
のベツグ回転機構によって満ボビン1aが時計方向に適
量回転して篠を巻取り、満ボビン交換ヘッド52の下降
によって生ずる篠のたるみを適正に保つ。篠掛はプレー
ト58が最大限)二界した後篠掛はプレート)英検動機
構59により横移動して満ボビン1aの篠を精紡機に設
置されたロービングガイド2に通して掛ける。同時に篠
継ヘッド60が後退して元に戻る。後退途中で篠継ヘッ
ド60は後退を停止し、横移動して精紡機の長手方向に
見てクリールのボビンに対応する位置まで戻される(第
19図0δ)。後退し終った篠継ヘッド60は略水平状
態から垂直状態に戻される(第19図0■)。満ボビン
交換ヘッド52が前列のボビンハンガー19の直下まで
前進し、上界してボビンハンガー19に満ボビン1aを
装着する。その際満ボビン交換へソド52のベツグ回転
機構によって満ボビン、laが時計方向に適量回転して
満ボビン交換ヘッド52の前進・上昇によって生じる篠
のたるみを適正に保つ。其後小玉ボビン交換ヘッド55
が予備レール15の予備ボビンハンガー24の直下まで
前進し、上昇してボビンハンガー24に小玉ボビンを装
着する。篠掛はプレート58が下降および途中で横移動
して元に戻る(第19図041)。小玉ボビン交換ヘッ
ド55が下降、後退して元に戻り、満ボビン交換ヘッド
52が下降、後退して元に戻る(第19図05))。
185b is energized, the Shino gripping lever turns to the neutral position, releases the Shino grip on the full bobbin, and the full bobbin 1a is released.
The grain is attracted by the grain of the small bobbin being spun and inserted into the trumpet 6 together with the grain. After the grain end of the full bobbin 1a is gripped by the hack roller 5a of the drafting section 5, the grain is transferred to the grain joint head 60. Solenoid)" 185b is energized, and the Shino grip lever 1
74 rotates further and the Shino grip part 175 and the nip piece 17
7. Grip the small bobbin's Shino. Since the small bobbin is held by the Mff Na head 60, it is drafted and cut between it and the buff crawler (see Fig. 19).
7)). The full bobbin 1a that has completed the splicing is raised again by the full bobbin exchange head 52 until it reaches the limit where it will not be attached to the spare bobbin hanger 24, and then stopped. At this time, the full bobbin 1a is rotated counterclockwise by the peg rotation mechanism of the full bobbin exchange head 52 to unwind the peg, thereby preventing the peg from being cut due to the upper limit of the full bobbin 1a, and at the same time, the peg rotation mechanism of the peg rotation mechanism of the full bobbin exchange head 52 prevents the peg from being cut due to the upper limit of the full bobbin 1a. further rises close to the roving guide 2 and holds the slack of the fully unwound bobbin 1a. During this time, solenoid 185a of Shinotsugu Hendro 0,
185d to move the Shino gripping lever 174 to the neutral position, thereby releasing the grip of the small bobbin by the Shino gripping lever 174, and moving the Shino joint to the position where the Shino of the full bobbin 1a is removed from the Shino joint head 60. The head 60 moves backward and stops (FIG. 19(8)). To replace the small bobbin, the hood 55 advances to just below the small bobbin in the front row of the creel using the forward/backward movement mechanism and the lifting mechanism, moves upward, and removes the small bobbin 1c from the bobbin hanger 19 in the front row (Fig. 19 (9)).
). The small bobbin exchange head 55 carrying the small bobbin moves downward (FIG. 19 00)) and retreats to return to its original position. (
Figure 1900). A peg rotation mechanism built into the small bobbin exchange head 55 rotates the small bobbin clockwise when viewed from above, and winds up the cut wire. When the small bobbin exchange head 55 returns to its original position, the full bobbin exchange head 5
2 goes down and returns to normal. At that time, replace the full bobbin, de 52
The full bobbin 1a is rotated by an appropriate amount in the clockwise direction by the begging rotation mechanism to wind up the wire, and the slack in the wire caused by the lowering of the full bobbin exchange head 52 is properly maintained. After the Shinokake plate 58 is at its maximum limit, the Shinokake plate 58 is laterally moved by the English inspection mechanism 59 to pass the Shino of the full bobbin 1a through the roving guide 2 installed in the spinning machine and hang it. At the same time, the Shinotsugu head 60 retreats and returns to its original position. During the retreat, the shin joint head 60 stops retreating, moves laterally, and returns to a position corresponding to the creel bobbin when viewed in the longitudinal direction of the spinning machine (FIG. 19, 0δ). After the retreat, the Shinotsugu head 60 is returned from a substantially horizontal state to a vertical state (FIG. 19, 0-2). The full bobbin exchange head 52 moves forward to just below the bobbin hanger 19 in the front row, moves upward, and attaches the full bobbin 1a to the bobbin hanger 19. At this time, the full bobbin la is rotated by an appropriate amount in the clockwise direction by the rotating mechanism of the full bobbin exchange head 52 to properly maintain the slack of the thread caused by the forward movement and elevation of the full bobbin exchange head 52. Then small bobbin exchange head 55
advances to just below the spare bobbin hanger 24 of the spare rail 15, rises, and attaches the small bobbin to the bobbin hanger 24. In Shinokake, the plate 58 descends, moves laterally on the way, and returns to its original position (FIG. 19, 041). The small bobbin exchange head 55 descends, retreats, and returns to its original position, and the full bobbin exchange head 52 descends, retreats, and returns to its original position (FIG. 19, 05)).

かくして−サイクルの篠交換作業が終了し、篠交換機5
0は前列のボビンハンガー19の6個分だけ横移動して
停止し、前記篠交換作業を精紡機の一端から他端へ順次
繰返す。
Thus, the Shino exchange work of the cycle is completed, and the Shino exchange machine 5
0 moves laterally by six bobbin hangers 19 in the front row and then stops, and the thread exchange operation is repeated sequentially from one end of the spinning frame to the other end.

篠交換機50は次の手順で篠交換、篠継ぎ作業を行って
も良い。満ボビン交換ヘッド52を上昇して満ボビン1
aをぺ・7グ53に嵌着した後(第19図(2))小玉
ボビン交換ヘッド55を前進、上昇させて小玉ボビン1
cを前列ボビンハンガーから外して元位置へ戻る。満ボ
ビン1aと小玉ボビンICは第19図00の位置関係で
小玉ボビンICの篠が゛紡出されている。次で満ボビン
交換へ・ノド52を下降して前記同様に満ボビン1aか
ら篠端を口出しした後その篠端を7+58vヘツド60
に把持してトランペット上方に導いて篠継ぎを行う。篠
継ぎが終った後は満ボビン1aを前列ボビンハンガーI
9に吊下し、小玉ボビンlcはロービングガイド2から
垂れ下っている篠を巻き取った後予(+itiレールの
予備ボビンハンガー24に吊下させみ。
The Shino exchanger 50 may perform the Shino exchange and Shino joint work in accordance with the following procedure. Raise the full bobbin exchange head 52 and remove the full bobbin 1.
After fitting a into the peg 53 (Fig. 19 (2)), the small bobbin exchange head 55 is advanced and raised to remove the small bobbin 1.
Remove c from the front row bobbin hanger and return to the original position. The full bobbin 1a and the small bobbin IC are spun in the positional relationship shown in FIG. Next, move on to replacing the full bobbin - Lower the throat 52 and take out the thin end from the full bobbin 1a in the same way as above, then transfer the bright end to the 7+58v head 60.
Grip it and guide it above the trumpet to perform Shinotsugi. After the Shino-tsugi is finished, move the full bobbin 1a to the front row bobbin hanger I.
9, and the small bobbin lc is suspended from the spare bobbin hanger 24 of the rail after winding up the thread hanging from the roving guide 2.

このように紡出中の小玉ボビンICを小玉ボビン交換ヘ
ッド55のベツグ56に載置して篠継ぎを行う場合には
、小玉ボビンlcからロービングガイド2に渡っている
紡出中の篠が小玉ボビンICの前方の満ポビン1aと干
渉しないように小玉ボビンICを反時計方向に回転して
適量のたるみを持たせ、篠継ぎ作業が終るまで篠の紡出
量に相当する速さで小玉ボビンICの巻きほどき回転を
続ける必要がある。しかしこの方法によると、前記第2
2図の実施例における篠継完了後満ボビン1aと小玉ボ
ビンICの交換の際両ボビンの干渉を避けるために満ボ
ビン1aを上方へ退避させる動作(第19図(9)〜0
υの満ボビン1aの動作)を省略することができる。
In this way, when the small bobbin IC being spun is placed on the bed 56 of the small bobbin exchange head 55 and the shin splicing is performed, the shino being spun from the small bobbin lc to the roving guide 2 is connected to the small bobbin. Rotate the small bobbin IC counterclockwise so as not to interfere with the full-bobbin 1a in front of the bobbin IC to give an appropriate amount of slack, and rotate the small bobbin IC at a speed equivalent to the spinning amount of the shin until the shin splicing work is completed. It is necessary to continue unwinding and rotating the IC. However, according to this method, the second
In the embodiment shown in FIG. 2, when replacing the full bobbin 1a and the small bobbin IC after the completion of the connection, the full bobbin 1a is retracted upward to avoid interference between both bobbins (FIG. 19 (9) to 0).
The operation of the full bobbin 1a of υ can be omitted.

本実施例においては篠継ヘッド60が満ボビン1aの中
心に対応するように設けであるので篠継ヘッド60の前
進途中で172スピンドルピンチ分だけ横移動を行って
トランペット6と対応させるようにしているがこの1/
2スピンドルピンチ分の横移動は同一精紡機で最初左側
へ横移動したら次の篠交換の際には右側へ横移動させる
。即ち左横移動右横移動を交互に行って小玉ボビンIc
−が紡出している側のトランペット6の上方へ篠継ヘッ
ド60を導いて行くようにすることは云うまでもない。
In this embodiment, since the Shinotsugi head 60 is provided so as to correspond to the center of the full bobbin 1a, the Shinotsugi head 60 is moved laterally by 172 spindle pinches while it is moving forward, so that it corresponds to the trumpet 6. There is this 1/
The lateral movement for two spindle pinches is performed using the same spinning machine, and the spinning machine is first moved to the left side, and then moved to the right side during the next change of wire. In other words, the small bobbin Ic is alternately moved horizontally to the left and horizontally to the right.
It goes without saying that - should guide the Shinotsugu head 60 above the trumpet 6 on the spinning side.

篠継ヘッド60と口出しノズル62をスピンドルピンチ
分だけ横移動できるよう設計し、トランペット6と対応
する位置で満ボビンlaの篠端を口出しするようにすれ
ば篠継ヘッド60の前進途中における横移動のり3作を
行なわなくても良くなる。此の場合は満ボビン1aから
篠端を口出しする前に篠継ヘッド60と口出しノズル6
2を小玉ボビンICが紡出しているトランペ・7ト6に
対応する位置に予め移動させておくことになる。
If the Shinotsugi head 60 and the outlet nozzle 62 are designed to be able to move laterally by the amount of spindle pinch, and the Shino end of the full bobbin la is brought out at the position corresponding to the trumpet 6, the lateral movement of the Shinotsugi head 60 during forward movement can be avoided. You don't have to do three glue operations. In this case, before taking out the shin end from the full bobbin 1a, the shin joint head 60 and the shin end nozzle 6 are connected.
2 is moved in advance to a position corresponding to the trumpet 7 to 6 spun by the small bobbin IC.

父日出しノズル62をトランペット6に対応する位置に
設は篠継ヘッド60をスピンドルピッチ分移動できるよ
うに位置させたときには篠継ヘッド60の前進途中の横
移動をスピンドルピンチ分横移動と横移動無しセ交互に
行うことになる。父日出しノズル62の吸引気流を篠の
撚りと逆方向の旋回気流を発生ずるようにすると満ボビ
ン1aから口出しノズル62内に吸引された篠端が撚り
戻されて分離して行く。尚満ボビン1aからの篠端の口
出しはブラシ、モケット等に篠端を付着させるようにし
ても良い。そして、この口出し用のブラシや口出しノズ
ル62の吸引口を篠交換ja、50の待機位置から予備
レールに吊下っている満ボビン1aの外周に対伺する位
置まで昇降可能に設計すると予備レールに吊下げたま\
で満ボビン1aの篠端を口出しして篠継ぎを行い、篠継
ぎが終ってから小玉ボビンICを取外して篠交換をすれ
ば良いことになるが、口出し用ブラシや口出しノズルの
昇降量を大きくしなければならないので篠交換機50が
大型となる。また、上記実施例では篠継ぎ後、紡出中の
小玉ボビンの篠の切断を篠把持゛レバー174とニップ
ピース177で把持し、ハックローラー5aの紡出によ
り篠を引き切IVrするようにしているが、篠把持レバ
ー174の下面と上記実施例のニップピース177の上
面が摺り合うように構成し、篠把持レバー174の下面
とニップピースの上面で鋏のように篠を切断するように
しても本発明を逸脱するものではない。又前記篠把持レ
バー、174の篠案内溝173を横切る往復動は篠把持
レバー174を作動バー182に固着して平行移動で行
っても良い。また、複数の篠継ヘッド60の篠把持レバ
ー174を同一の作動バー182にて作動させる場合、
各篠継ヘッド60における篠把持が確実に行われるよう
に篠把持レバー174 と作動バー182間にばねを介
在させると良い。
When the sunrise nozzle 62 is set at a position corresponding to the trumpet 6, and the Shinotsugu head 60 is positioned so that it can move by the spindle pitch, the lateral movement of the Shinotsugu head 60 during its forward movement is changed to the lateral movement by the spindle pinch. It will be done alternately. When the suction airflow of the winding nozzle 62 is made to generate a swirling airflow in the direction opposite to the twisting of the windshield, the windshield ends drawn into the winding nozzle 62 from the full bobbin 1a are twisted back and separated. The Shinohata may be brought out from the Naoman bobbin 1a by attaching the Shinohata to a brush, a moquette, or the like. If the suction port of the pick-up brush and pick-up nozzle 62 is designed to be able to be raised and lowered from the standby position of the Shino exchange ja, 50 to a position opposite to the outer periphery of the full bobbin 1a suspended on the spare rail, Hanging Tama\
Now, it would be fine to put out the thread end of the full bobbin 1a and perform the thread joint, and after the thread joint is finished, remove the small bobbin IC and replace the thread, but it is necessary to increase the lifting amount of the threading brush and the threading nozzle. Therefore, the Shino switching device 50 becomes large. Further, in the above embodiment, after splicing, the cutting of the grain of the small bobbin during spinning is gripped by the grain gripping lever 174 and the nip piece 177, and the grain is pulled off by spinning by the hack roller 5a and IVr. However, the present invention may be arranged so that the lower surface of the shinobi gripping lever 174 and the upper surface of the nip piece 177 of the above embodiment rub against each other, so that the shinobi can be cut like scissors by the lower surface of the shinobi gripping lever 174 and the upper surface of the nip piece. It does not deviate from this. Further, the reciprocating movement of the Shino grip lever 174 across the Shino guide groove 173 may be performed by fixing the Shino grip lever 174 to the operating bar 182 and moving it in parallel. Furthermore, when the Shino grip levers 174 of a plurality of Shino joint heads 60 are operated by the same actuation bar 182,
It is preferable to interpose a spring between the blade gripping lever 174 and the actuating bar 182 so that each blade connection head 60 can reliably grip the blade.

〔発明の効果〕〔Effect of the invention〕

以上のように本発明にあっては、ボビンハンガーに吊下
されて紡出している篠巻ボビンが小玉となったとき、先
ずその小玉ボビンと交換する満ボビンの篠を口出し、そ
の篠端を把持してトランペy I・上方に導いて、紡出
中の小玉ボビンの篠に重合させた後、満ボビンの篠端の
把持を開放するとともに小玉ボビンの篠を切断して篠継
ぎを行うようにしたので、精紡機の運転中に篠継ぎを簡
単な動作によって確実にかつ短時間に行うことができ、
篠継ぎ作業の自動化を図ることができる。そして篠継ぎ
された満ボビンの篠をロービングガイドに引掛ける作業
を自動的に行うことにより篠継ぎと篠交換の完全自動化
を図ることができる。又満ボビンの篠端の口出しを口出
しノズルの吸引気流によるときには弱い篠の口出しを確
実に行うことができて実用的である。
As described above, in the present invention, when the Shinomaki bobbin that is being spun by hanging from the bobbin hanger becomes a small bobbin, first, the Shino of the full bobbin to be replaced with the small bobbin is taken out, and the Shino end is After gripping and guiding it upward to polymerize the grain of the small bobbin being spun, release the grip on the end of the grain of the full bobbin and cut the grain of the small bobbin to perform grain joining. As a result, the threading can be performed reliably and in a short time with simple movements while the spinning machine is running.
It is possible to automate the seaming work. By automatically hooking the thread of a full bobbin that has been spliced onto the roving guide, it is possible to completely automate the thread splicing and thread replacement. In addition, when the thin end of a full bobbin is tapped by the suction airflow of the tip nozzle, it is possible to reliably pull out a weak dark edge, which is practical.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本願の実施例を示すもので、第1図は篠交換機正
面図、第2図は篠交換機の主要部を示す側断面図、第3
図は篠交換機と精紡機との関係を示す断面図、第4図は
篠交換機のボビン交換ヘッドと精紡機の対応関係を示す
平面図、第5図は満ボビン交換ヘッド前後動機構を示す
篠交換機の一部断面図、第6図は口出し・篠継ぎ・篠掛
は動作機構を示す篠交換機の一部断面図、第7図は口出
しノズル作動機構を示す篠交換機の一部断面図、第8図
は篠継ヘッド作動機構を示す篠交換機の一部断面図、第
9図は篠掛はプレート作動機構を示す篠交換機の一部断
面図、第10図は満ボビンの篠端の位置について粗紡機
構りと篠交換機で交換される場合との関係を示す説明図
、第11図は満ボビン交換ヘッドのベツグ回転機構を示
す平面図、第12図は第11図の線XII−XITによ
る正面図、第13図は篠交換機のベツグを示す軸断面図
、第継ヘッドの他の実施例を示す正面図(A)と側面図
(B)、第17図は篠継ヘッドの篠把持レバーの作動機
構を説明する平面図、第18図はロービングガイドを示
す平面図(A)と正面図(B)、第19図fil〜05
)は篠交換機の作動を順に示す説明図。 la・・・満ボビン、   1c・・・小玉ボビン、5
・・・牽伸部、      6・・・1−ランベット、
1つ・・・小玉ボビン用ボビンハンガー、24・・・予
備ボビンハンガー、 50・・・篠交換機、 53・・・満管ボビン用ベツグ、 56・・・小玉ボビン用ベツグ、 60・・・篠継ヘッド、 62・・・口出しノズル、 174・・・篠把持レバー、 176、177・・・ニップピース。 第2(支) 第60 第7回 (α)   (b)   (c)  (d)   (e
)   (f)(α)   (b)   (c)   
(d)   (e)   (f)第10回 第13回 (A)              (B)第14図 (C) 第14回 第15回 (A)            (B)第16図 (A) 2C (B) 第18回 N)         (2) 第19 口 第19 (支) 第 (11)        (+2) 19回 第
The drawings show an embodiment of the present application, and Fig. 1 is a front view of the Shino exchanger, Fig. 2 is a side sectional view showing the main parts of the Shino exchanger, and Fig. 3 is a side sectional view showing the main parts of the Shino exchanger.
The figure is a sectional view showing the relationship between the Shino exchanger and the spinning machine, Figure 4 is a plan view showing the correspondence between the bobbin exchange head of the Shino exchanger and the spinning machine, and Figure 5 is the Shino exchange head back and forth movement mechanism. FIG. 6 is a partial cross-sectional view of the Shino exchanger showing the operating mechanism for the outlet, Shino-tsugi, and Shinokake; FIG. 7 is a partial cross-sectional view of the Shino exchanger showing the outlet nozzle operating mechanism; Figure 8 is a partial cross-sectional view of the Shino exchanger showing the Shino connection head operating mechanism, Figure 9 is a partial cross-section of the Shino exchanger showing the Shinogake plate operation mechanism, and Figure 10 is the position of the Shino end of a full bobbin. An explanatory diagram showing the relationship between the roving mechanism and the case of exchange with the Shino exchanger, Fig. 11 is a plan view showing the begging rotation mechanism of the full bobbin exchange head, and Fig. 12 is a front view taken along line XII-XIT in Fig. 11. Fig. 13 is an axial sectional view showing the beng of the Shino exchanger, a front view (A) and a side view (B) showing another embodiment of the second joint head, and Fig. 17 shows the Shino grip lever of the Shino joint head. A plan view explaining the operating mechanism, Fig. 18 is a plan view (A) and a front view (B) showing the roving guide, Fig. 19 fil~05
) is an explanatory diagram showing the operation of the Shino switch in order. la...full bobbin, 1c...small bobbin, 5
...drafting section, 6...1-ranbet,
1...Bobbin hanger for small bobbin, 24...Spare bobbin hanger, 50...Shino exchanger, 53...Belt for full bobbin, 56...Belt for small bobbin, 60...Shino Joint head, 62... Outlet nozzle, 174... Shino grip lever, 176, 177... Nip piece. 2nd (branch) 60th 7th (α) (b) (c) (d) (e
) (f) (α) (b) (c)
(d) (e) (f) 10th 13th (A) (B) Fig. 14 (C) 14th 15th (A) (B) Fig. 16 (A) 2C (B) 18th N) (2) 19th 19th (branch) 11th (+2) 19th

Claims (1)

【特許請求の範囲】 1、ボビンハンガーに吊下されて紡出している篠継ボビ
ンが小玉となったとき、先ずその小玉ボビンと交換する
満ボビンの篠を口出し、その篠端を把持してトランペッ
ト上方に導いて、紡出中の小玉ボビンの篠に重合させた
後、満ボビンの篠端の把持を開放するとともに小玉ボビ
ンの篠を切断して篠継ぎを行うことを特徴とする精紡機
における篠継方法。 2、満ボビンの外周に口出しノズルの吸引口を対向させ
、満ボビン巻戻し方向に回転せさて篠端を前記吸引口に
吸引した後口出しノズルを移動させて所定長の篠を口出
しすることを特徴とする特許請求の範囲第1項記載の精
紡機における篠継方法。 3、小玉ボビンの重合部の上流で篠を把持することによ
って紡出中の小玉ボビンの篠を切断することを特徴とす
る特許請求の範囲第1項記載の精紡機における篠継方法
。 4、ボビンハンガーに吊下されて紡出している篠巻ボビ
ンが小玉となったとき、先ずその小玉ボビンと交換する
満ボビンの篠を口出し、その篠端を把持してトランペッ
ト上方に導いて、紡出中の小玉ボビンの篠に重合させた
後、満ボビンの篠端の把持を開放するとともに、小玉ボ
ビンの篠を切断して篠継ぎを行い、次いで篠継ぎされて
満ボビンから紡出している篠をロービングガイドに引掛
けることを特徴とする精紡機における篠継方法。 5、篠継ぎされて満ボビンから紡出している篠をロービ
ングガイドの上方へ導いた後、横へ移動させてロービン
グガイドに引掛けることを特徴とする特許請求の範囲第
4項記載の精紡機における篠継方法。
[Scope of Claims] 1. When a Shinotsugu bobbin that is being spun while hanging from a bobbin hanger becomes a small bobbin, first take out a full bobbin to be replaced with the small bobbin and grasp the end of the bobbin. A spinning machine characterized by guiding the trumpet upward and polymerizing the grain of the small bobbin during spinning, and then releasing the grip on the end of the grain of the full bobbin and cutting the grain of the small bobbin to perform grain joining. Shinotsugu method in. 2. Place the suction port of the pick-up nozzle to face the outer circumference of the full bobbin, rotate the full bobbin in the unwinding direction, suck the end of the thread into the suction port, and then move the pick-up nozzle to pick out the thread of a predetermined length. A method for splicing in a spinning machine according to claim 1, characterized in that: 3. A method for connecting threads in a spinning machine according to claim 1, characterized in that the threads of the small bobbin during spinning are cut by grasping the threads upstream of the overlapping part of the small bobbins. 4. When the Shinomaki bobbin that is being spun from the bobbin hanger becomes a small bobbin, first take out the full bobbin to replace the small bobbin, grasp the end of the bobbin, and guide it above the trumpet. After polymerizing the grain of the small bobbin during spinning, the grip on the grain end of the full bobbin is released, the grain of the small bobbin is cut and the grain is joined, and then the grain is joined and the grain is spun from the full bobbin. A method for joining a thread in a spinning machine, which is characterized by hooking a thread on a roving guide. 5. A spinning machine according to claim 4, characterized in that the spun spun spun from a full bobbin is guided above the roving guide, then moved laterally and hooked on the roving guide. Shinotsugu method in.
JP19391985A 1985-09-04 1985-09-04 Shinotsuji method for spinning machines Expired - Lifetime JP2502969B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP19391985A JP2502969B2 (en) 1985-09-04 1985-09-04 Shinotsuji method for spinning machines
EP19860306816 EP0213962B1 (en) 1985-09-04 1986-09-03 Roving-piecing method in spinning frame and roving-piecing head for carrying out said method
DE8686306816T DE3681233D1 (en) 1985-09-04 1986-09-03 METHOD AND DEVICE FOR CONNECTING ROOF IN SPINNING MACHINES.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19391985A JP2502969B2 (en) 1985-09-04 1985-09-04 Shinotsuji method for spinning machines

Publications (2)

Publication Number Publication Date
JPS6257957A true JPS6257957A (en) 1987-03-13
JP2502969B2 JP2502969B2 (en) 1996-05-29

Family

ID=16315920

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19391985A Expired - Lifetime JP2502969B2 (en) 1985-09-04 1985-09-04 Shinotsuji method for spinning machines

Country Status (1)

Country Link
JP (1) JP2502969B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6452828A (en) * 1987-08-20 1989-02-28 Howa Machinery Ltd Sliver exchanging machine in fine spinning frame
US5343689A (en) * 1990-03-22 1994-09-06 Howa Machinery, Ltd. Method and apparatus for synchronously piecing roving for a continuous feeding thereof to a ring spinning frame
US5586428A (en) * 1993-07-26 1996-12-24 Kabushiki Kaisha Toyoda Jidoshokki Seisakusho Roving bobbin changing method and apparatus for spinning machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6452828A (en) * 1987-08-20 1989-02-28 Howa Machinery Ltd Sliver exchanging machine in fine spinning frame
US5343689A (en) * 1990-03-22 1994-09-06 Howa Machinery, Ltd. Method and apparatus for synchronously piecing roving for a continuous feeding thereof to a ring spinning frame
US5586428A (en) * 1993-07-26 1996-12-24 Kabushiki Kaisha Toyoda Jidoshokki Seisakusho Roving bobbin changing method and apparatus for spinning machine

Also Published As

Publication number Publication date
JP2502969B2 (en) 1996-05-29

Similar Documents

Publication Publication Date Title
EP0213962B1 (en) Roving-piecing method in spinning frame and roving-piecing head for carrying out said method
EP0258188B1 (en) Method for piecing rovings and exchanging roving bobbins in a ring spinning frame and working machine for carrying out this method
JPS6257957A (en) Sliver ending in spinning machine
US5396758A (en) Method of respinning-in on open-end spinning machines and a device for carrying out the method
JPS6253425A (en) Sliver exchanging machine for fine spinning frame
JP3240763B2 (en) Spinning machine for roving yarn
JPS6014848B2 (en) Shino change method in spinning machine
JPS6253426A (en) Method of exchanging sliver in fine spinning frame
JPH0547651B2 (en)
JP2513447B2 (en) Shinotsugi device
CN206814919U (en) A kind of collective doffing device of spinning frame
JPH0718531A (en) Method for cutting tail yarn in simultaneous doffing in fine spinning machine or the like
JPH02127368A (en) Rough yarn exchanging method for fine spinning machine
JPH07103496B2 (en) Shinobing machine in spinning machine
JPH09323868A (en) Winding device
JPH05247749A (en) Pick finding in automatic connection of sliver in spinning frame
JPH0742624B2 (en) Shino exchange method in spinning machine
JPH0324540Y2 (en)
JPH08100335A (en) Simultaneous cop-change of fine spinning frame
JP2979735B2 (en) Peg unit in Shino exchange
JPH0274635A (en) Sliver-stretching method for full bobbin
JP2580948B2 (en) How to change traveler
JPH0232378B2 (en) ITOKARYORIKINIOKERUPATSUKEEJINOTAMAAGEHOHOOYOBISOCHI
JPH0742627B2 (en) Bottom thread gripping device for spinning machine etc.
JPH0411652B2 (en)