JPS6433329A - Construction of precast structure - Google Patents

Construction of precast structure

Info

Publication number
JPS6433329A
JPS6433329A JP18783087A JP18783087A JPS6433329A JP S6433329 A JPS6433329 A JP S6433329A JP 18783087 A JP18783087 A JP 18783087A JP 18783087 A JP18783087 A JP 18783087A JP S6433329 A JPS6433329 A JP S6433329A
Authority
JP
Japan
Prior art keywords
columns
sleeves
precast
beams
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18783087A
Other languages
Japanese (ja)
Inventor
Tsuguhiko Yoshino
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP18783087A priority Critical patent/JPS6433329A/en
Publication of JPS6433329A publication Critical patent/JPS6433329A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE: To save the labor by inserting top end protrudent main reinforcements in sleeves of precast columns, bonding steel frame beams between the precast columns, filling mortar in the sleeves and laying a slab over the beams. CONSTITUTION: Reinforced concrete columns A' are erected on site up to about a half the floor height on the first floor. Precast columns A are installed on the columns A' through an overlaid mortar 6 so that the top end protrusions of column main reinforcements 1 of the columns A' are inserted in sleeves 2 of the columns A, the both ends of a steel frame beam B are bonded to a steel frame 4 of each column A through a bonding board 7 and a high-strength bolts 8, nonshrinking mortar is charged in lower end sleeves 2 of the columns A to bond the column main reinforcements 1 of the upper and lower columns A, A', the upper columns A are installed on the columns A, the columns A are bonded mutually similarly, the beams B are assembled and a slab is installed. Similarly a precast structure is constructed.
JP18783087A 1987-07-29 1987-07-29 Construction of precast structure Pending JPS6433329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18783087A JPS6433329A (en) 1987-07-29 1987-07-29 Construction of precast structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18783087A JPS6433329A (en) 1987-07-29 1987-07-29 Construction of precast structure

Publications (1)

Publication Number Publication Date
JPS6433329A true JPS6433329A (en) 1989-02-03

Family

ID=16212982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18783087A Pending JPS6433329A (en) 1987-07-29 1987-07-29 Construction of precast structure

Country Status (1)

Country Link
JP (1) JPS6433329A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6187229B1 (en) 1995-11-10 2001-02-13 Nissei Plastic Industrial Co., Ltd. Process for injection molding information recording disks
JP2003129569A (en) * 2001-10-22 2003-05-08 Tokyo Electric Power Co Inc:The Mixed construction of beam and column
JP2009085250A (en) * 2007-09-27 2009-04-23 Kawasaki Heavy Ind Ltd Temporary rivet and processing method using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6187229B1 (en) 1995-11-10 2001-02-13 Nissei Plastic Industrial Co., Ltd. Process for injection molding information recording disks
JP2003129569A (en) * 2001-10-22 2003-05-08 Tokyo Electric Power Co Inc:The Mixed construction of beam and column
JP2009085250A (en) * 2007-09-27 2009-04-23 Kawasaki Heavy Ind Ltd Temporary rivet and processing method using the same

Similar Documents

Publication Publication Date Title
JP3752999B2 (en) Upper and lower integrated bridge and its construction method
US3374592A (en) Precast column with shear-head sections
JPS6433329A (en) Construction of precast structure
JP2883898B2 (en) PC pillar and PC pillar construction method
GB1572843A (en) Building and/or a building method using columns of cruciform section and beams
JPH02300439A (en) Prefabricating method
JPH02221535A (en) Connecting structure for pillar and beam
JPH05272197A (en) Prestressed concrete member
JPH0728269Y2 (en) Precast beams
JPS627339B2 (en)
JPH05195539A (en) Steel-framed column base
JPS5712730A (en) Foundation work employing a precast reinforced concrete foundation beam
JPH0447737B2 (en)
JPH0781307B2 (en) How to build a skyscraper
JPH01137032A (en) Method of lap joint construction of main reinforcement in post and beam joining section
JP2757032B2 (en) Construction method of underground building with pillars with capital by reverse hitting method
JPH01287336A (en) Steel frame reinforced concrete lamination construction
JPH0350847B2 (en)
JP2677189B2 (en) Steel beam for joining reinforced concrete columns
JPS60253636A (en) Building structure
JPH032435A (en) Construction method for jointing column and steel frame reinforced-concrete beam to each other
JPS6414446A (en) Method of constructing reinforced concrete structure using beam in one direction as steel framed beam
JPS63103140A (en) Open structure of pillar and beam of multistoried building
JP2554535B2 (en) Steel beam / reinforced concrete column composite construction method
JPH04120332A (en) Construction method of large-span frame