JPH11148129A - Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile - Google Patents
Connection device of mutual pc concrete piles and steel frame beam and pc concrete pileInfo
- Publication number
- JPH11148129A JPH11148129A JP33229797A JP33229797A JPH11148129A JP H11148129 A JPH11148129 A JP H11148129A JP 33229797 A JP33229797 A JP 33229797A JP 33229797 A JP33229797 A JP 33229797A JP H11148129 A JPH11148129 A JP H11148129A
- Authority
- JP
- Japan
- Prior art keywords
- screw
- holes
- concrete
- concrete pile
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、各種の建設現場
で利用するPCコンクリート杭同士およびPCコンクリ
ートと梁の連結装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for connecting PC concrete piles and connecting PC concrete and beams used in various construction sites.
【0002】[0002]
【従来の技術】図10はPCコンクリート杭の上部と下
部の一部を示す縦断面図である。図において、符号1は
PCコンクリート杭101の頭部側端板、2はPCコン
クリート杭101の継手側端板、3は頭部側端板1、継
手側端板2に略等間隔に空けた穴4、5に通し端部3
a、3bを丸めて抜け止めとしたPC鋼棒、6、7は頭
部側端板1、継手側端板2の穴4、5に隣接して設けた
ねじ穴、8、9はねじ穴6、7に取り付けた引張り部
材、10はPC鋼棒3を囲むように巻き付けたらせん
線、11はPCコンクリート杭101の頭部側端にPC
鋼棒3と平行して該PC鋼棒間に配設した異形鉄筋、1
2、13はPCコンクリート杭101の頭部側端部、継
手側端部の周面に巻き付けスカートである。2. Description of the Related Art FIG. 10 is a longitudinal sectional view showing a part of an upper part and a lower part of a PC concrete pile. In the drawing, reference numeral 1 denotes a head-side end plate of the PC concrete pile 101, 2 denotes a joint-side end plate of the PC concrete pile 101, and 3 denotes a head-side end plate 1 and a joint-side end plate 2 which are spaced at substantially equal intervals. Through holes 3 through holes 4 and 5
PC steel rods rounded out from a and 3b to prevent them from falling off, 6 and 7 are screw holes provided adjacent to holes 4 and 5 of head end plate 1 and joint end plate 2, and 8 and 9 are screw holes Tensile members attached to 6, 7 are helical wires wound around the PC steel bar 3, and 11 is a PC
Deformed reinforcing bars arranged between the PC steel bars in parallel with the steel bars 3;
Reference numerals 2 and 13 denote skirts which are wound around the periphery of the head side end and the joint side end of the PC concrete pile 101.
【0003】次にPCコンクリートの製作について説明
する。まず、引張り部材8、9にジヤッキ等の図示しな
い引張り装置を取り付け、PC鋼棒3に張力を加えた状
態において、例えば遠心力工法によりPC鋼棒3を埋設
するようにPCコンクリート杭101を製作し、コンク
リートが硬化した後、引張り部材8、9から引張り装置
を取り外し、この引張り部材8、9も端板1、2から取
り外す。Next, the production of PC concrete will be described. First, a PC concrete pile 101 is manufactured by attaching a tension device (not shown) such as a jack to the tension members 8 and 9 and applying tension to the PC steel bar 3 so that the PC steel bar 3 is embedded by, for example, a centrifugal force method. After the concrete has hardened, the tension device is removed from the tension members 8 and 9, and the tension members 8 and 9 are also removed from the end plates 1 and 2.
【0004】上記のように製作された既製のPCコンク
リート杭101は、通常、そのまま杭として使用される
が、連結の必要が生じた時には、引張り部材を取り外し
たPCコンクリート同士を図12に示すように、連結す
べき一方のコンクリート杭101の頭部側端板1に他方
のPCコンクリート杭101の継手側端板2を当接させ
て、その当接した頭部側端板1、継手側端板2の当接周
囲を溶接14して接合する。[0004] The ready-made PC concrete pile 101 manufactured as described above is usually used as a pile as it is, but when it becomes necessary to connect it, the PC concrete with the tension member removed is shown in FIG. Then, the joint side end plate 2 of the other PC concrete pile 101 is brought into contact with the head side end plate 1 of one concrete pile 101 to be connected, and the contacted head side end plate 1 and joint side end The contact area of the plate 2 is welded 14 and joined.
【0005】図12は上記PCコンクリート杭同士の他
の連結状態を示す一部の縦断面図である。図において、
15はスカート12、13の外周面に形成して凹凸部、
16は端部同士を当接させた連結すべきPCコンクリー
ト101、101のスカート12、13に跨がって、そ
の外側に巻き付けた連結バンドであり、この連結バンド
の内面には上記凹凸部15と係合する凹凸部17が形成
されている。18は連結バンド16の穴16aを通しス
カートのネジ穴12a、13aにねじ込んで連結バンド
16をスカート12、13に取り付けるボルトであり、
この連結バンド16でPCコンクリート杭101、10
1を連結する。FIG. 12 is a partial longitudinal sectional view showing another connection state of the PC concrete piles. In the figure,
15 is formed on the outer peripheral surface of the skirts 12 and 13 to form an uneven portion,
Reference numeral 16 denotes a connecting band which is wrapped around the skirts 12, 13 of the PC concretes 101, 101 to be connected with their ends abutting each other, and wound around the outside thereof. Is formed. Reference numeral 18 denotes a bolt for attaching the connecting band 16 to the skirts 12 and 13 by screwing the holes 16a of the connecting band 16 into the screw holes 12a and 13a of the skirt,
With this connecting band 16, PC concrete piles 101, 10
Connect 1
【0006】[0006]
【発明を解決しようとする課題】従来のコンクリート杭
の連結は以上のように構成されているので、溶接による
連結では次のような課題がある。 (1)雨天ではコンクリート杭の接合部の溶接ができ
ず、作業工程を順次よく行うことができない。 (2)作業現場に溶接用の電源や溶接機が必要になる。 (3)作業現場での溶接作業なので、熟練した溶接工が
必要になる。 (4)溶接後における溶接部の検査が外観検査しかでき
ず、品質管理上に問題がある。 (5)溶接時における溶接入熱により、コンクリート杭
の中に配設されたPC鋼材、鋼線によるプレストレスの
効果が無くなる恐れがある。 (6)溶接接合では、応力がかかった際、脆性破壊を起
こし、その溶接部においてコンクリート杭が瞬時に破断
する恐れがある。 (7)既製のコンクリート杭を溶接・接合して柱として
使用する場合、強度上および品質管理上問題が生じる。Since the conventional connection of concrete piles is constituted as described above, the connection by welding has the following problems. (1) In rainy weather, the joints of concrete piles cannot be welded, and work steps cannot be sequentially performed well. (2) A welding power source and a welding machine are required at the work site. (3) Since welding work is performed at a work site, a skilled welder is required. (4) Inspection of the welded portion after welding can be performed only by appearance inspection, which is problematic in quality control. (5) Due to the heat input during welding, there is a possibility that the effect of the prestress by the PC steel material and the steel wire disposed in the concrete pile may be lost. (6) In welding, when a stress is applied, brittle fracture is caused, and the concrete pile may be instantaneously broken at the welded portion. (7) When a ready-made concrete pile is welded and joined and used as a pillar, problems arise in strength and quality control.
【0007】また、連結バンドを用いる連結では、特別
な形状のスカートおよび連結バンドを必要とするため高
価であり、連結部の水平方向の強度は連結バンドの肉厚
のみによるため、連結強度に問題がある等の課題があっ
た。Further, the connection using the connecting band requires a specially shaped skirt and a connecting band, which is expensive, and the strength in the horizontal direction of the connecting portion depends only on the thickness of the connecting band. There were issues such as
【0008】この発明は上記のような課題を解決するた
めになされたものであって、PCコンクリート杭の連結
およびPCコンクリート杭と梁との連結を簡単かつ強固
に行うことのできる連結装置を得ることを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a connecting device capable of easily and firmly connecting a PC concrete pile and connecting a PC concrete pile and a beam. The purpose is to:
【0009】[0009]
【課題を解決するための手段】この発明に係るPCコン
クリート杭同士の連結装置は、PC鋼棒を通して抜け止
め的に保持する複数の穴と、前記PC鋼棒に張力を付与
する引張り部材を取り付ける複数のねじ穴とを有し、P
Cコンクリート杭の両端部に取り付けた端板と、前記引
張り部材を取り外した前記ねじ穴と一致する穴を両端の
鍔部に夫々有する連結部材と、この連結部材を前記鍔部
の穴と前記ねじ穴とを一致させて連結すべきPCコンク
リート杭間に配設して該穴から該ねじ穴に螺合し、前記
連結部材を前記端板に固定するねじ部材とを備えたもの
である。According to the present invention, there is provided a connecting device for connecting PC concrete piles to each other, wherein a plurality of holes for retaining the PC steel bars in a retaining manner and a tension member for applying tension to the PC steel bars are attached. Having a plurality of screw holes,
End plates attached to both ends of the C concrete pile, connecting members having holes at both ends corresponding to the screw holes from which the tension members have been removed, and connecting the connecting members to the holes of the flange and the screws. And a screw member which is disposed between the PC concrete piles to be connected in alignment with the hole, screwed into the screw hole from the hole, and fixes the connecting member to the end plate.
【0010】また、この発明に係るPCコンクリート杭
同士の連結装置の連結部材は、棒材の両端部に鍔部を設
け、この鍔部に略等間隔に複数個のねじ部材挿通穴を設
けたものである。The connecting member of the connecting device for connecting PC concrete piles according to the present invention is provided with a flange at both ends of a bar and a plurality of screw member insertion holes at substantially equal intervals in the flange. Things.
【0011】また、この発明に係るPCコンクリート杭
同士の連結装置の連結部材は、放射状にリブを有する棒
材の両端部に鍔部を設け、この鍔部に略等間隔に複数個
のねじ部材挿通穴を設けたものである。The connecting member of the connecting device for connecting PC concrete piles according to the present invention is provided with flanges at both ends of a bar having radial ribs, and a plurality of screw members provided at substantially equal intervals on the flange. An insertion hole is provided.
【0012】また、この発明に係るPCコンクリート杭
と梁の連結装置は、PC鋼棒を通して抜け止め的に保持
する複数の穴と、前記PC鋼棒に張力を付与する引張り
部材を取り付ける複数のねじ穴とを有し、PCコンクリ
ート杭の両端部に取り付けた端板と、前記引張り部材を
取り外した前記ねじ穴と一致する穴を両端の鍔部に夫々
有し、この鍔部に固定部材挿通穴を有する複数の梁連結
面を放射状に突設形成した連結部材と、前記鍔部の穴と
前記ねじ穴とを一致させて連結すべきPCコンクリート
杭間に配設して該穴から該ねじ穴に螺合し、前記連結部
材を前記端板に固定するねじ部材と、前記梁連結面と梁
の連結面とを突き合わせた突き合わせ部を挟持する一対
の連結板と、その連結板を介して前記突き合わせ部を挟
持固定する固定部材とを備えたものである。[0012] In addition, a connecting device for a PC concrete pile and a beam according to the present invention includes a plurality of holes for retaining the PC steel rod in a retaining manner and a plurality of screws for attaching a tension member for applying tension to the PC steel rod. End holes attached to both ends of the PC concrete pile, and holes matching the screw holes from which the tension members have been removed are respectively provided at the flange portions at both ends, and fixing member insertion holes are provided in the flange portions. And a connecting member having a plurality of beam connecting surfaces radially protrudingly formed, and a PC concrete pile to be connected by matching the hole of the flange portion with the screw hole, and disposing the screw hole from the hole. And a screw member for fixing the connection member to the end plate, a pair of connection plates for sandwiching a butted portion where the beam connection surface and the connection surface of the beam are abutted, and via the connection plate Fixing part that clamps and fixes the butted part It is those with a door.
【0013】また、この発明に係るPCコンクリート杭
と梁の連結装置の連結部材は、棒材の両端部に鍔部を設
け、この鍔部に略等間隔に複数個のねじ部材挿通穴と、
固定部材挿通穴を有する複数の梁連結面を放射状に突設
形成したものである。The connecting member of the connecting device for connecting a PC concrete pile and a beam according to the present invention has flanges at both ends of a bar, and a plurality of screw member insertion holes at substantially equal intervals in the flange.
A plurality of beam connecting surfaces having fixing member insertion holes are formed so as to protrude radially.
【0014】また、この発明に係るPCコンクリート杭
と梁の連結装置の連結部材は、放射状にリブを有する棒
材の両端部に鍔部を設け、この鍔部に略等間隔に複数個
のねじ部材挿通穴と、固定部材挿通穴を有する複数の梁
連結面を放射状に突設形成したものである。In the connecting member of the connecting device for connecting a PC concrete pile and a beam according to the present invention, flanges are provided at both ends of a bar having radial ribs, and a plurality of screws are provided on the flange at substantially equal intervals. A plurality of beam connecting surfaces having a member insertion hole and a fixing member insertion hole are formed so as to protrude radially.
【0015】[0015]
【発明の実施の形態】以下、この発明の実施の形態を添
付図面を用いて詳細に説明する。 実施の形態1 この発明は、この引張り部材8、9を取り外した端板
1、2のねじ穴6、7をPCコンクリート杭の連結に利
用することを特徴とするもので、図1はこの発明の実施
の形態1による連結装置を適用してPCコンクリート杭
を連結した状態を示す正面図、図2は引張り部材を取り
付けた状態のPCコンクリートの端部平面図、図3は図
1におけるAーA線に沿う横断平面図、図4はこの連結
装置で用いる連結部材の正面図である。図1から図4に
おいて、穴4(5)とねじ穴6(7)とは夫々独立して
形成してもよいが、図示例は連続してひょうたん形に形
成されている。なお、前記図10に示す従来例と同一部
分には同一符号を付して重複説明を省略する。Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. Embodiment 1 The present invention is characterized in that the threaded holes 6, 7 of the end plates 1, 2 from which the tension members 8, 9 are removed are used for connecting a PC concrete pile, and FIG. FIG. 2 is a front view showing a state in which a PC concrete pile is connected by applying the connecting device according to the first embodiment, FIG. 2 is an end plan view of PC concrete with a tension member attached, and FIG. FIG. 4 is a front view of a connecting member used in this connecting device. 1 to 4, the hole 4 (5) and the screw hole 6 (7) may be formed independently of each other, but the illustrated example is formed in a gourd shape continuously. The same parts as those in the conventional example shown in FIG. 10 are denoted by the same reference numerals, and redundant description will be omitted.
【0016】PCコンクリート杭101同士を連結する
連結部材20は、放射状にリブ21を有する棒材22の
両端部に鍔部23a、23bを設け、この鍔部23a、
23bに略等間隔に複数個のねじ部材挿通穴24a、2
4bを設けたものである。A connecting member 20 for connecting the PC concrete piles 101 is provided with flanges 23a and 23b at both ends of a bar 22 having ribs 21 radially.
23b, a plurality of screw member insertion holes 24a,
4b.
【0017】次にこの連結部材20を用いたPCコンク
リート杭同士の連結動作を説明する。まず、引張り部材
8を取り外した連結すべき一方のPCコンクリート杭1
01の頭部側端板1に、ねじ挿通穴24bを引張り部材
8を取り外したねじ穴6と一致させて連結部材の鍔部2
3bを当接させ、そのねじ部材挿通穴24bに通したね
じ部材としてのボルト25をねじ穴6にねじ込んで、鍔
部23b、つまり連結部材20をPCコンクリート杭1
01の端板1に取り付ける。Next, the connecting operation of the PC concrete piles using the connecting member 20 will be described. First, one PC concrete pile 1 to be connected with the tension member 8 removed.
01, the screw insertion hole 24b is matched with the screw hole 6 from which the tension member 8 is removed, and the flange 2 of the connecting member is formed.
3b, the bolt 25 as a screw member passed through the screw member insertion hole 24b is screwed into the screw hole 6, and the flange portion 23b, that is, the connecting member 20 is connected to the PC concrete pile 1.
01 is attached to the end plate 1.
【0018】次いで連結すべき他方のPCコンクリート
杭101の端板2を、その端板2のねじ穴5を連結部材
20の他方の鍔部23aのねじ部材挿通穴24aに一致
させて当接させ、このねじ部材挿通穴24aに通したね
じ部材としてのボルト25をねじ穴7にねじ込んで、連
結部材20をPCコンクリート杭101の端板2に取り
付け、この連結部材20を介してPCコンクリート杭1
01、101を連結するものである。Next, the end plate 2 of the other PC concrete pile 101 to be connected is brought into contact with the screw hole 5 of the end plate 2 so as to coincide with the screw member insertion hole 24a of the other flange 23a of the connecting member 20. Then, a bolt 25 serving as a screw member passed through the screw member insertion hole 24a is screwed into the screw hole 7, and the connecting member 20 is attached to the end plate 2 of the PC concrete pile 101.
01 and 101 are connected.
【0019】以上のように、この実施の形態1によれ
ば、PCコンクリート杭101の端板1、2に開けられ
ているねじ穴6、7を利用して、連結部材20を取り付
け、この連結部材20を介してPCコンクリート杭同士
をねじ部材で連結することにより、特別なねじ用穴の穿
設・加工を行うことなく、極めて簡単かつ強固にPCコ
ンクリート杭同士をボルト連結することができる。ま
た、PCコンクリート杭同士の連結に溶接を使用するこ
となく、ねじ連結することにより、溶接による課題をす
べて解消することができる。As described above, according to the first embodiment, the connection member 20 is attached by using the screw holes 6 and 7 formed in the end plates 1 and 2 of the PC concrete pile 101, and the connection is performed. By connecting the PC concrete piles with the screw members via the member 20, the PC concrete piles can be extremely easily and firmly connected to each other by bolts without drilling and working a special screw hole. In addition, all the problems caused by welding can be solved by screw connection without using welding for connection between PC concrete piles.
【0020】実施の形態2 図5は連結部材の他の構成を示す斜視図である。前記図
4に示した連結部材20は、間隔保持部として放射状に
リブ21を有する棒材22を用いているが、本実施の形
態2における連結部材30は間隔保持部としての棒材2
2に直交してリブ21を設けたものである。また、図6
に示すように、リブを設けない棒材31の両端部に鍔部
32a、32bを設け、この鍔部に略等間隔に複数個の
ねじ部材挿通穴33a、33bを設けたものでもよい。Embodiment 2 FIG. 5 is a perspective view showing another configuration of the connecting member. The connecting member 20 shown in FIG. 4 uses a bar 22 having ribs 21 radially as a spacing member, but the connecting member 30 in the second embodiment uses a bar member 2 as a spacing member.
2 is provided with a rib 21 orthogonally. FIG.
As shown in (1), the ribs 32 may be provided with flanges 32a and 32b at both ends of the bar 31 without ribs, and the flange may be provided with a plurality of screw member insertion holes 33a and 33b at substantially equal intervals.
【0021】図7は図6に示す連結部材30を使用して
連結したPCコンクリート杭101の連結部の斜面図で
あり、その連結の仕方は前記図1に示す実施の形態1と
同様であるから、その連結作業につては説明を省略す
る。FIG. 7 is a perspective view of a connecting portion of the PC concrete pile 101 connected by using the connecting member 30 shown in FIG. 6, and the connecting method is the same as that of the first embodiment shown in FIG. Therefore, description of the connection operation is omitted.
【0022】以上のように、この実施の形態2のうち、
特に図6に示す構成とすれば、連結部材30の間隔保持
部としてリブを用いない棒材31を使用しているので、
連結部材30の加工時における型抜きが容易となる。こ
の場合、棒材31の径あるいは棒材31が中空の場合は
その肉厚を選定することにより、所望の強度を得ること
ができる。As described above, in the second embodiment,
In particular, according to the configuration shown in FIG. 6, since the bar 31 that does not use a rib is used as the space holding portion of the connecting member 30,
Die removal during processing of the connecting member 30 is facilitated. In this case, a desired strength can be obtained by selecting the diameter of the bar 31 or the thickness of the bar 31 when the bar 31 is hollow.
【0023】実施の形態3 図8はPCコンクリート杭と梁とを連結するために使用
する連結部材40の平面図を示すもので、間隔保持部と
しての棒材41の両端にPCコンクリート杭101と略
同径の鍔部42a、42bを取り付け、この鍔部42
a、42bにPCコンクリート杭の端板のねじ穴6、7
と一致させるねじ通し穴43a、43bを、また固定部
材挿通穴44a、44bを有する複数の梁連結面45a
1〜45a4、45b1〜45b4を上記鍔部に放射状
に突設形成されている。Embodiment 3 FIG. 8 shows a plan view of a connecting member 40 used to connect a PC concrete pile and a beam. PC concrete piles 101 are provided at both ends of a bar 41 as a spacing member. The flanges 42a and 42b having substantially the same diameter are attached.
a, 42b, screw holes 6, 7 in end plate of PC concrete pile
A plurality of beam connecting surfaces 45a having screw through holes 43a, 43b to be coincident with each other and fixing member insertion holes 44a, 44b.
1 to 45a4 and 45b1 to 45b4 are radially projected from the flange.
【0024】次にこの連結部材40を用いてPCコンク
リート杭と梁の連結動作を説明する。図9はPCコンク
リート杭と梁とからなる混合構造体連結部の縦断面図を
示すもので、PCコンクリート杭同士の連結は前記実施
の形態1と同様に行う。Next, the connecting operation of the PC concrete pile and the beam using the connecting member 40 will be described. FIG. 9 is a longitudinal sectional view of a joint portion of a mixed structure composed of a PC concrete pile and a beam. The connection between the PC concrete piles is performed in the same manner as in the first embodiment.
【0025】次いで、連結部材40の鍔部42a、42
bに突設形成された梁連結面45a1〜45a4、45
b1〜45b4に、梁45の端部に突出した連結面46
a、46bを突き合わせ、この突き合わせ部を一対の連
結板50で挟持し、この連結板に開けられた穴47aか
ら梁連結面45a1〜45a4、45b1〜45b4と
連結面46a、46bの夫々の穴44a、44bと48
a、48bに通したボルト51にナット52を螺合させ
て、上記突き合わせ部を連結固定し、上記連結部材40
を介して梁17をPCコンクリート杭101に連結固定
する。Next, the flanges 42a, 42 of the connecting member 40
b, beam connection surfaces 45a1 to 45a4, 45 protrudingly formed
b1 to 45b4, a connecting surface 46 protruding from the end of the beam 45
a, 46b are butted, and the butted portion is sandwiched between a pair of connecting plates 50. Holes 47a formed in the connecting plates are used to form beam connecting surfaces 45a1 to 45a4, 45b1 to 45b4 and respective holes 44a of connecting surfaces 46a, 46b. , 44b and 48
a, a nut 52 is screwed into a bolt 51 passed through 48b, and the butted portion is connected and fixed.
The beam 17 is connected to and fixed to the PC concrete pile 101 via.
【0026】以上のように、この実施の形態3によれ
ば、連結部材40を介して、簡単なねじ止め施工作業に
よって、PCコンクリート杭同士と鉄骨梁45を軸ずれ
を生じることなく、強固に一体化固定することができ
る。As described above, according to the third embodiment, the PC concrete piles and the steel beam 45 can be firmly connected to each other by the simple screwing work via the connecting member 40 without causing any axial displacement. It can be integrally fixed.
【0027】[0027]
【発明の効果】以上のように、この発明によれば、PC
コンクリート杭の端板に穿設された引張り部材取り付け
用のねじ穴を利用して、連結部材を介してPCコンクリ
ート杭同士をねじ部材で連結するように構成したので、
特別なねじ開け加工を行うことなく、極めて簡単かつ強
固にPCコンクリート杭同士をねじ部材で連結すること
ができ、溶接による課題をすべて解消することができる
効果がある。As described above, according to the present invention, the PC
Since the PC concrete piles were connected to each other by the screw members via the connecting members using the screw holes for attaching the tension members drilled in the end plate of the concrete pile,
The PC concrete piles can be extremely easily and firmly connected to each other with a screw member without performing a special screw opening process, and there is an effect that all problems caused by welding can be solved.
【0028】また、この発明によれば、PCコンクリー
ト杭の端板に穿設さられたねじ穴を利用して、PCコン
クリート杭同士をねじ部材で連結する連結部材を介して
梁を連結するように構成したので、少ない部材により、
かつ簡単なねじ止め施工作業によって、PCコンクリー
ト杭同士と鉄骨梁を軸ずれを生じることなく、強固に一
体化固定することができる効果がある。Further, according to the present invention, the beams are connected to each other through the connecting members for connecting the PC concrete piles with the screw members by using the screw holes formed in the end plates of the PC concrete piles. , So with few members,
In addition, by the simple screwing work, there is an effect that the PC concrete piles and the steel beam can be firmly integrated and fixed without causing any axial deviation.
【0029】また、PCコンクリート杭同士、PCコン
クリート杭と梁とを連結する連結部材は、棒材の両端部
に鍔部を設け、この鍔部に略等間隔に複数個のねじ部材
挿通穴を設けた場合、加工時における型抜きが容易とな
り、放射状にリブを有する棒材の両端部に鍔部を設け、
この鍔部に略等間隔に複数個の固定部材挿通穴を設けた
場合、そのリブの数、肉厚等を選択することにより、容
易に所望の強度を得ることができる効果がある。The connecting members for connecting the PC concrete piles and the PC concrete pile and the beam are provided with flange portions at both ends of the bar, and a plurality of screw member insertion holes are provided in the flange portions at substantially equal intervals. If provided, it is easy to remove the mold at the time of processing, provided flanges at both ends of a bar having radial ribs,
In the case where a plurality of fixing member insertion holes are provided at substantially equal intervals in the flange portion, the desired strength can be easily obtained by selecting the number, thickness, and the like of the ribs.
【図1】この発明の実施の形態1による連結装置を適用
してPCコンクリート杭を連結した状態を示す正面図で
ある。FIG. 1 is a front view showing a state where PC concrete piles are connected by applying a connecting device according to Embodiment 1 of the present invention.
【図2】連結前のPCコンクリート杭の端部平面図であ
る。FIG. 2 is an end plan view of a PC concrete pile before connection.
【図3】図1におけるAーA線に沿う横断平面図であ
る。FIG. 3 is a cross-sectional plan view taken along the line AA in FIG.
【図4】この連結装置で用いる連結部材の正面図であ
る。FIG. 4 is a front view of a connecting member used in the connecting device.
【図5】この連結部材の平面図である。FIG. 5 is a plan view of the connecting member.
【図6】連結部材の他の構成を示す斜視図である。FIG. 6 is a perspective view showing another configuration of the connecting member.
【図7】この連結部材を使用して連結したPCコンクリ
ート杭の連結部の斜面図である。FIG. 7 is a perspective view of a connecting portion of the PC concrete pile connected using the connecting member.
【図8】PCコンクリート杭と梁とを連結するために使
用する連結部材の平面図である。FIG. 8 is a plan view of a connecting member used to connect a PC concrete pile and a beam.
【図9】PCコンクリート杭と梁とからなる混合構造体
連結部の縦断面図である。FIG. 9 is a longitudinal sectional view of a joint portion of a mixed structure including a PC concrete pile and a beam.
【図10】PCコンクリート杭の上部および下部の一部
を示す縦断面図である。FIG. 10 is a longitudinal sectional view showing a part of an upper part and a lower part of a PC concrete pile.
【図11】PCコンクリート杭同士の連結状態を示す斜
視図である。FIG. 11 is a perspective view showing a connection state between PC concrete piles.
【図12】PCコンクリート杭同士の他の連結状態を示
す一部の縦断面図である。FIG. 12 is a partial longitudinal sectional view showing another connection state between PC concrete piles.
1,2 端板 3 PC鋼棒 4,5 PC鋼棒挿通穴 6,7 ねじ穴 8,9引張り部材 20,30,40 連結部材 21 リブ 22 棒材 23a,23b,42a,42b 鍔部 24a,24b ねじ部材挿通穴 25 ボルト(ねじ部材) 45 梁 46 連結部 47a,47b ボルト通し穴 51 ボルト 52 ナット 1, 2 end plate 3 PC steel rod 4, 5 PC steel rod insertion hole 6, 7 Screw hole 8, 9 Tension member 20, 30, 40 Connecting member 21 Rib 22 Bar material 23a, 23b, 42a, 42b Flange portion 24a, 24b Screw member insertion hole 25 Bolt (screw member) 45 Beam 46 Connecting part 47a, 47b Bolt through hole 51 Bolt 52 Nut
Claims (6)
複数の穴と、前記PC鋼棒に張力を付与する引張り部材
を取り付ける複数のねじ穴とを有し、PCコンクリート
杭の両端部に取り付けた端板と、前記引張り部材を取り
外した前記ねじ穴と一致する穴を両端の鍔部に夫々有す
る連結部材と、この連結部材を前記鍔部の穴と前記ねじ
穴とを一致させて連結すべきPCコンクリート杭間に配
設して該穴から該ねじ穴に螺合し、前記連結部材を前記
端板に固定するねじ部材とを備えたことを特徴とするP
Cコンクリート杭同士の連結装置。1. A PC concrete stake having a plurality of holes for retaining the PC steel rod in a retaining manner, and a plurality of screw holes for attaching a tension member for applying tension to the PC steel rod, and attached to both ends of a PC concrete pile. End plate, a connecting member having holes in the flanges at both ends corresponding to the screw holes from which the tension members have been removed, and connecting the connecting members so that the holes in the flange and the screw holes are aligned. A screw member disposed between the PC concrete piles to be screwed and screwed into the screw hole from the hole to fix the connecting member to the end plate.
Connection device for C concrete piles.
設け、この鍔部に略等間隔に複数個のねじ部材挿通穴を
設けたことを特徴とする請求項1記載のPCコンクリー
ト杭同士の連結装置。2. The PC according to claim 1, wherein the connecting member has a flange at both ends of the bar, and a plurality of screw member insertion holes at substantially equal intervals in the flange. Connecting device for concrete piles.
棒材の両端部に鍔部を設け、この鍔部に略等間隔に複数
個のねじ部材挿通穴を設けたことを特徴とする請求項1
記載のPCコンクリート杭同士の連結装置。3. The connecting member according to claim 1, wherein flanges are provided at both ends of a rod material having radial ribs, and a plurality of screw member insertion holes are provided in the flange at substantially equal intervals. Item 1
The connecting device for PC concrete piles described in the above.
する複数の穴と、前記PC鋼棒に張力を付与する引張り
部材を取り付ける複数のねじ穴とを有し、PCコンクリ
ート杭の両端部に取り付けた端板と、前記引張り部材を
取り外した前記ねじ穴と一致する穴を両端の鍔部に夫々
有し、この鍔部に固定部材挿通穴を有する複数の梁連結
面を放射状に突設形成した連結部材と、前記鍔部の穴と
前記ねじ穴とを一致させて連結すべきPCコンクリート
杭間に配設して該穴から該ねじ穴に螺合し、前記連結部
材を前記端板に固定するねじ部材と、前記梁連結面と梁
の連結面とを突き合わせた突き合わせ部を挟持する一対
の連結板と、その連結板を介して前記突き合わせ部を挟
持固定する固定部材とを備えたことを特徴とするPCコ
ンクリート杭と梁の連結装置。4. A PC concrete pile having a plurality of holes for retaining the PC steel rod in a retaining manner and a plurality of screw holes for attaching a tension member for applying tension to the PC steel rod. Attached end plates and holes corresponding to the screw holes from which the tension members have been removed are respectively provided at the flanges at both ends, and a plurality of beam connecting surfaces having fixing member insertion holes formed in the flanges radially projectingly formed. The connecting member, the hole of the flange portion and the screw hole are arranged between the PC concrete piles to be connected to be connected and screwed into the screw hole from the hole, and the connecting member is attached to the end plate. A screw member for fixing, a pair of connecting plates for holding a butted portion where the beam connecting surface and the connecting surface of the beam are butted, and a fixing member for holding and fixing the butted portion via the connecting plate. Of PC concrete pile and beam Coupling device.
設け、この鍔部に略等間隔に複数個のねじ部材挿通穴
と、固定部材挿通穴を有する複数の梁連結面を放射状に
突設形成したことを特徴とする請求項1記載のPCコン
クリート杭と梁の連結装置。5. The connecting member is provided with flanges at both ends of a bar, and the flange has a plurality of beam connecting surfaces having a plurality of screw member insertion holes and fixing member insertion holes at substantially equal intervals. 2. The connecting device for connecting a PC concrete pile and a beam according to claim 1, wherein the PC concrete pile and the beam are formed so as to protrude radially.
棒材の両端部に鍔部を設け、この鍔部に略等間隔に複数
個のねじ部材挿通穴と、固定部材挿通穴を有する複数の
梁連結面を放射状に突設形成したことを特徴とする請求
項1記載のPCコンクリート杭と梁の連結装置。6. The connecting member has flanges provided at both ends of a rod material having radial ribs, and the flange has a plurality of screw member insertion holes and a plurality of fixing member insertion holes at substantially equal intervals. 2. A connecting device for connecting a PC concrete pile and a beam according to claim 1, wherein said beam connecting surface is formed so as to protrude radially.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33229797A JPH11148129A (en) | 1997-11-18 | 1997-11-18 | Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33229797A JPH11148129A (en) | 1997-11-18 | 1997-11-18 | Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH11148129A true JPH11148129A (en) | 1999-06-02 |
Family
ID=18253397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33229797A Pending JPH11148129A (en) | 1997-11-18 | 1997-11-18 | Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH11148129A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050053499A (en) * | 2003-12-03 | 2005-06-08 | 김영란 | Attachable and detachable assembly connection device for pretentioned spun high strength concrete pile and execution method therewith |
KR20190026173A (en) * | 2017-09-04 | 2019-03-13 | 정하동 | Joint Apparatus For Piles |
-
1997
- 1997-11-18 JP JP33229797A patent/JPH11148129A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050053499A (en) * | 2003-12-03 | 2005-06-08 | 김영란 | Attachable and detachable assembly connection device for pretentioned spun high strength concrete pile and execution method therewith |
KR20190026173A (en) * | 2017-09-04 | 2019-03-13 | 정하동 | Joint Apparatus For Piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH10140670A (en) | Reinforcement connecting structure between precast concrete blocks and method thereof | |
JPH07252888A (en) | Wood column-beam connecting structure with lug screw bolt | |
JPH11148129A (en) | Connection device of mutual pc concrete piles and steel frame beam and pc concrete pile | |
JP2815817B2 (en) | Joint structure of end plate type steel structure and joining method | |
JP3177731B2 (en) | Reinforcement plate structure and joint member for structure and apparatus for manufacturing the same | |
JPH08260455A (en) | Joint structure of concrete pile | |
JP2005213855A (en) | Mechanical reinforcement joint | |
WO2021014616A1 (en) | Steel reinforced joint, steel reinforced assembly, and precast steel reinforced concrete body | |
JP3158115B1 (en) | Joint structure of steel pipe column and method of construction of the joint structure | |
JP2019183468A (en) | Reinforcement joint and reinforcement assembly, and precast reinforced concrete body | |
JP7425168B1 (en) | How to build a composite structure | |
JP2712023B2 (en) | Structure of beam-to-column joints of steel tubular concrete columns with X-shaped reinforcement | |
JP2006124976A (en) | Mechanical joint for reinforcement | |
JPH08120921A (en) | Form device | |
JP2600194B2 (en) | Lap joint of column main bar | |
KR100587134B1 (en) | Connecting Structure of H Beam By Using Connection Shaft | |
JPH0533606Y2 (en) | ||
JPS6347857B2 (en) | ||
JP2000008546A (en) | Joint of screw steel rod for civil engineering construction and its manufacture | |
JP3084153U (en) | Concrete column reinforcement mechanism | |
JPH05141007A (en) | Structure of connection section for cross-sectional area material of closed type | |
JP2720765B2 (en) | Butt welding method of reinforcing steel | |
JPH09144137A (en) | Structure for jointing concrete filled column and steel beam | |
JPH0681393A (en) | Joint structure at reinforced concrete column and steel-framed beam junction section | |
JP2003119885A (en) | Joining device having a pair of diaphragms for joining reinforced concrete column and horizontal steel beam |