JPH10237874A - Cofferdam box and construction method for structure using it - Google Patents
Cofferdam box and construction method for structure using itInfo
- Publication number
- JPH10237874A JPH10237874A JP4377497A JP4377497A JPH10237874A JP H10237874 A JPH10237874 A JP H10237874A JP 4377497 A JP4377497 A JP 4377497A JP 4377497 A JP4377497 A JP 4377497A JP H10237874 A JPH10237874 A JP H10237874A
- Authority
- JP
- Japan
- Prior art keywords
- box
- river
- constructing
- cofferdam
- temporary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 21
- 239000011257 shell material Substances 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 abstract description 9
- 239000010959 steel Substances 0.000 abstract description 9
- 238000003466 welding Methods 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract 2
- 238000005553 drilling Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、河川の底あるいは
海底に構造物を構築するための仮締切ボックスおよびこ
れを用いた構造物の構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary deadline box for constructing a structure at the bottom of a river or the sea floor, and a method of constructing a structure using the same.
【0002】[0002]
【従来の技術】従来、連続地中壁等の構造物を河川に構
築する場合、船舶航行の関係および工事の仮締切工によ
る河川流水断面積の減少から施工占用水面が制限される
ため、施工区域を複数に分割し、その都度、鋼矢板等に
より仮締切工を形成して水を締切り、締切り内の水を排
除して、その内側で連続地中壁を構築していた。2. Description of the Related Art Conventionally, when a structure such as a continuous underground wall is constructed on a river, the construction exclusive use water surface is limited due to a decrease in cross-sectional area of the river flow due to ship navigation and a temporary deadline for construction work. The area was divided into a plurality of sections, and each time, a temporary deadline was formed with steel sheet piles and the like to shut off the water, the water in the deadline was eliminated, and a continuous underground wall was built inside.
【0003】[0003]
【発明が解決しようとする課題】上記従来の仮締切工で
は、複数の鋼矢板により締切りを形成しているので、そ
の組立作業や撤去作業に手間が掛かり、施工性が悪いと
いう欠点があった。In the above-mentioned conventional temporary cut-off work, since the cut-off is formed by a plurality of steel sheet piles, the assembling work and the removing work are troublesome and the workability is poor. .
【0004】本発明は上記従来技術の欠点に着目し、こ
れを解決せんとしたものであり、その課題は、仮締切工
の設置作業や撤去作業を容易に実施可能とする仮締切ボ
ックスを提供することにある。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned drawbacks of the prior art, and an object thereof is to provide a temporary deadline box capable of easily performing installation work and removal work of a temporary deadline. Is to do.
【0005】本発明の他の課題は、河川あるいは海中に
構造物を構築するに際して、仮締切工の設置や撤去に手
間が掛からない構造物の構築方法を提供することにあ
る。Another object of the present invention is to provide a method of constructing a structure that does not require installation and removal of temporary deadlines when constructing a structure in a river or sea.
【0006】また本発明の他の課題は、施工時に河川が
急激に増水した場合でも、必要な流水断面積を速やかに
確保できて、流水阻害率を低減することができる仮締切
ボックスを提供する。Another object of the present invention is to provide a temporary deadline box capable of promptly securing a required cross-sectional area of flowing water and reducing a blocking rate of flowing water even when a river suddenly increases in water during construction. .
【0007】[0007]
【課題を解決するための手段】上記課題を解決するため
に、本発明では、内部に一方向に延びる貫通孔としての
閉合する空間を形成する殻材からなり、該殻材の貫通孔
が河川の底あるいは海底から水上まで連通するように、
該殻材を所定長根入れして、これにより貫通孔内を、構
造物を構築するための施工空間として利用可能にしたこ
とを特徴とする仮締切ボックスが提供される。In order to solve the above-mentioned problems, according to the present invention, there is provided a shell material which forms a closed space as a through hole extending in one direction inside, and the through hole of the shell material is a river. From the bottom of the sea or from the sea floor to the water,
A temporary deadline box is provided in which the shell material is inserted into a predetermined length, whereby the inside of the through hole can be used as a construction space for constructing a structure.
【0008】また本発明では、殻材の内部に貫通孔とし
ての閉合空間を備える仮締切ボックスを河川の底あるい
は海底に所定長根入れして、該閉合空間内の水を締め切
り、該閉合空間を、河川の底あるいは海底に構造物を構
築するための施工空間として用いることを特徴とする構
造物の構築方法が提供される。Further, in the present invention, a temporary closing box having a closed space as a through-hole in a shell material is inserted into a bottom of a river or a seabed for a predetermined length, and water in the closed space is shut off. And a method for constructing a structure, wherein the method is used as a construction space for constructing a structure on a river or sea floor.
【0009】本発明の仮締切ボックスにおいて、前記殻
材は、内部に一方向に延びる貫通孔としての閉合空間を
形成できれば、その形状は特に限定されず、例えば、円
環あるいは矩形等の何れの断面形状に形成しても良い。[0009] In the temporary closing box of the present invention, the shape of the shell material is not particularly limited as long as it can form a closed space as a through hole extending in one direction in the inside thereof. It may be formed in a sectional shape.
【0010】[0010]
【実施例】以下、添付図面に基づいて実施例を説明する
が、本発明はこれに限定されるものではない。図1は本
発明の仮締切ボックスを示す斜視図であり、図2は河川
の底に設置した状態の仮締切ボックスを示す断面図であ
り、図3は仮締切ボックス内で構築中の連続地中壁の平
面図であり、図4は図3における一点鎖線IV−IVに沿っ
た断面図であり、図5は仮締切ボックスを用いて連続地
中壁を構築する施工状況を示す側面図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments will be described below with reference to the accompanying drawings, but the present invention is not limited to these embodiments. FIG. 1 is a perspective view showing a temporary deadline box of the present invention, FIG. 2 is a cross-sectional view showing the temporary deadline box installed at the bottom of a river, and FIG. 3 is a continuous ground being constructed in the temporary deadline box. FIG. 4 is a plan view of the inner wall, FIG. 4 is a cross-sectional view taken along dashed-dotted line IV-IV in FIG. 3, and FIG. is there.
【0011】図1において、本発明の仮締切ボックス1
0は、両端にそれぞれ開口13,14を備え、図中Y軸
方向に貫通孔が形成されるように、四枚の鋼板11a,
11b,12a,12bを溶接で接合して形成する。こ
の仮締切ボックス10は、例えば、L×W×H=600
0×2000×2500mm程度の寸法に形成することが
できるが、この寸法は必要に応じて適宜定めることがで
きる。In FIG. 1, a temporary closing box 1 of the present invention is shown.
No. 0 has openings 13 and 14 at both ends, respectively, so that four steel plates 11a and 11a are formed so that a through hole is formed in the Y-axis direction in the figure.
11b, 12a, and 12b are formed by welding. This temporary deadline box 10 is, for example, L × W × H = 600
It can be formed to a size of about 0 × 2000 × 2500 mm, but this size can be appropriately determined as needed.
【0012】前記仮締切ボックス10は、図2に示した
ように海底や河川底に設置され、仮締切工を構成する。
すなわち、仮締切ボックス10の一方の開口(つまり下
部開口14)を河川底21のうえに載置し、上から圧力
を負荷することにより、所定長の根入れ部16が地中に
圧入され、四枚の鋼板11a,11b,12a,12b
の上部区間15が河川の水を締切り、この締切り内の水
を排除することで、ここに構造物を構築するための施工
空間が形成される。The temporary deadline box 10 is installed on the seabed or riverbed as shown in FIG. 2, and forms a temporary deadline.
That is, one of the openings (that is, the lower opening 14) of the temporary closing box 10 is placed on the river bottom 21 and pressure is applied from above, so that the root portion 16 having a predetermined length is pressed into the ground, Four steel plates 11a, 11b, 12a, 12b
The upper section 15 cuts off the water of the river and removes the water in the cutoff, so that a construction space for constructing a structure is formed here.
【0013】次に、前記仮締切ボックス10を用いた連
続地中壁の構築方法について、図3乃至図5を参照して
説明する。最初に、作業桟橋41を施工区域に構築し、
ここからバイブロハンマー(図示せず)等を用いて、仮
締切ボックス10の所定長を河川底21に打ち込む。次
に、仮締切ボックス10内の水を排除して、ここに作業
空間を形成すると共に、作業桟橋41のうえの所定位置
に削孔機40を配置する。そして、削孔機40のオーガ
ー40aにより、仮締切ボックス10で囲まれた河川底
21を順次削孔して連続する複数のソイルセメント柱を
形成し、所定のソイルセメント柱に芯材としてのH形鋼
を建て込み、連続地中壁の先行部30を形成する。な
お、この先行部30は、その上端が、図4に示したよう
に根入れ部16の下端よりも深く位置するように形成す
る。前記先行部30を構築した後、図3において点線1
0で示した位置まで、仮締切ボックス10を移動させ
る。この時、先行部30の一端は、移動した仮締切ボッ
クス10で締切られる領域内に位置する。そして、仮締
切ボックス10の内側で、前記先行部30と同様にして
連続地中壁の後行部31を形成し、その端部を先行部3
0の端部と一体に接合する。上記仮締切ボックス10の
移動工程と、連続地中壁のエレメントの構築工程を順次
繰り返すことによって、連続地中壁を構築することがで
きる。なお、構築した連続地中壁の上端には、適宜、土
納32を載せることにより、ここが損傷しないように保
護しても良い。Next, a method of constructing a continuous underground wall using the temporary closing box 10 will be described with reference to FIGS. First, the work pier 41 is constructed in the construction area,
From here, the predetermined length of the temporary closing box 10 is driven into the river bottom 21 using a vibro hammer (not shown) or the like. Next, water in the temporary closing box 10 is removed to form a work space therein, and the drilling machine 40 is arranged at a predetermined position on the work pier 41. Then, the river bottom 21 surrounded by the temporary deadline box 10 is sequentially drilled by the auger 40a of the drilling machine 40 to form a plurality of continuous soil cement columns. A steel section is erected to form the leading portion 30 of the continuous underground wall. The leading portion 30 is formed such that its upper end is located deeper than the lower end of the root portion 16 as shown in FIG. After constructing the preceding part 30, a dotted line 1 in FIG.
The temporary closing box 10 is moved to the position indicated by 0. At this time, one end of the leading part 30 is located in an area to be closed by the moved temporary closing box 10. Then, a trailing portion 31 of the continuous underground wall is formed inside the temporary closing box 10 in the same manner as the preceding portion 30, and its end is placed in the leading portion 3.
0 and joined together. A continuous underground wall can be constructed by sequentially repeating the step of moving the temporary deadline box 10 and the step of constructing the elements of the continuous underground wall. In addition, the upper end of the constructed continuous underground wall may be appropriately protected with a dowel 32 so as not to be damaged.
【0014】[0014]
【発明の効果】本発明の仮締切ボックスは、内部に一方
向に延びる貫通孔としての閉合空間を形成する殻材から
なり、貫通孔が河川底あるいは海底から水上まで連通す
るように、殻材を所定長根入れすれば仮締切工を形成す
ることができて、これにより貫通孔内は、構造物を構築
するための施工空間として利用可能になった。したがっ
て、従来、鋼矢板を一枚ずつ建て込んで形成していた仮
締切工構築の手間を、大幅に省略することが可能になっ
た。The temporary closing box according to the present invention comprises a shell material forming a closed space as a through hole extending in one direction therein, and the shell material is formed so that the through hole communicates from the riverbed or the seabed to the water surface. When a predetermined length is inserted into the through hole, a temporary closing work can be formed, whereby the inside of the through hole can be used as a construction space for constructing a structure. Therefore, it has become possible to greatly reduce the time and labor for constructing a temporary closing work, which has conventionally been performed by laying steel sheet piles one by one.
【0015】また本発明の構造物の構築方法では、殻材
の内部に貫通孔としての閉合空間を備える仮締切ボック
スを河川の底あるいは海底に所定長根入れして、該閉合
空間内の水を締め切り、該閉合空間を、河川の底あるい
は海底に構造物を構築するための施工空間として用い
る。したがって、河川又は海中に構造物を構築する工事
において、仮締切工の設置や撤去の作業量を、従来より
も大幅に削減することが可能になった。In the method for constructing a structure according to the present invention, a temporary closing box having a closed space as a through hole in a shell material is inserted into the bottom of a river or the seabed for a predetermined length, and water in the closed space is removed. The deadline is to use the closed space as a construction space for constructing structures on the bottom of the river or the sea. Therefore, in the construction of a structure in a river or the sea, the amount of work for installing and removing temporary deadlines can be significantly reduced as compared with the conventional case.
【0016】さらに本発明の仮締切ボックスでは、速や
かな撤去が容易に実施可能となったので、たとえ施工時
に河川が急激に増水した場合でも、仮締切ボックスを撤
去すれば、必要な流水断面積を速やかに確保できて、流
水阻害率を低減することができる。Furthermore, the temporary deadline box of the present invention can be easily removed quickly, so that even if the river suddenly increases in water at the time of construction, if the temporary deadline box is removed, the required cross-sectional area of the flowing water can be reduced. Can be secured promptly, and the flow inhibition rate can be reduced.
【図1】本発明の仮締切ボックスを示す斜視図である。FIG. 1 is a perspective view showing a temporary closing box of the present invention.
【図2】河川の底に設置した状態の仮締切ボックスを示
す断面図である。FIG. 2 is a cross-sectional view showing a temporary deadline box installed at the bottom of a river.
【図3】仮締切ボックス内で構築中の連続地中壁の平面
図である。FIG. 3 is a plan view of a continuous underground wall being built in a temporary deadline box.
【図4】図3における一点鎖線IV−IVに沿った断面図で
ある。FIG. 4 is a sectional view taken along a dashed line IV-IV in FIG.
【図5】仮締切ボックスを用いた連続地中壁構築の施工
状況を示した側面図である。FIG. 5 is a side view showing a construction state of a continuous underground wall construction using a temporary deadline box.
10 仮締切ボックス 11a,11b,12a,12b 鋼板(殻材) 16 根入れ部 20 水面 21 河川底 30,31 連続地中壁(構造物) DESCRIPTION OF SYMBOLS 10 Temporary cut-off box 11a, 11b, 12a, 12b Steel plate (shell material) 16 Root portion 20 Water surface 21 River bottom 30, 31 Continuous underground wall (structure)
Claims (2)
合する空間を形成する殻材からなり、 該殻材の貫通孔が河川の底あるいは海底から水上まで連
通するように、該殻材を所定長根入れして、これにより
貫通孔内を、構造物を構築するための施工空間として利
用可能にしたことを特徴とする仮締切ボックス。1. A shell material that forms a closed space as a through hole extending in one direction therein, and the shell material is connected so that the through hole of the shell material communicates from the bottom of a river or the seabed to the surface of water. A temporary deadline box wherein a predetermined length of root is inserted, whereby the inside of the through hole can be used as a construction space for constructing a structure.
備える仮締切ボックスを河川の底あるいは海底に所定長
根入れして、該閉合空間内の水を締め切り、該閉合空間
を、河川の底あるいは海底に構造物を構築するための施
工空間として用いることを特徴とする構造物の構築方
法。2. A temporary deadline box having a closed space as a through-hole inside a shell material is inserted into a bottom of a river or a seabed for a predetermined length, and water in the closed space is shut off. A method for constructing a structure, wherein the method is used as a construction space for constructing the structure on the bottom or the sea floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4377497A JPH10237874A (en) | 1997-02-27 | 1997-02-27 | Cofferdam box and construction method for structure using it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4377497A JPH10237874A (en) | 1997-02-27 | 1997-02-27 | Cofferdam box and construction method for structure using it |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10237874A true JPH10237874A (en) | 1998-09-08 |
Family
ID=12673111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4377497A Pending JPH10237874A (en) | 1997-02-27 | 1997-02-27 | Cofferdam box and construction method for structure using it |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10237874A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422510A (en) * | 2013-08-29 | 2013-12-04 | 中国水电顾问集团华东勘测设计研究院 | Steel pipe frame type cofferdam structure and construction method |
CN104328792A (en) * | 2013-07-23 | 2015-02-04 | 中交二航局第三工程有限公司 | Bottomless double-wall steel cover box assembling structure |
CN106149739A (en) * | 2016-08-26 | 2016-11-23 | 蚌埠市清泉环保有限责任公司 | Combination type cofferdam |
CN106869150A (en) * | 2017-01-24 | 2017-06-20 | 中国建筑第六工程局有限公司 | Double-wall steel suspension box installing force system conversion method |
CN108286257A (en) * | 2017-05-23 | 2018-07-17 | 陈修棠 | A kind of dress sandbox body deep water weir system |
CN108894238A (en) * | 2018-03-30 | 2018-11-27 | 上海二十冶建设有限公司 | The device and its application method efficiently shaped for rubble cofferdam |
-
1997
- 1997-02-27 JP JP4377497A patent/JPH10237874A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328792A (en) * | 2013-07-23 | 2015-02-04 | 中交二航局第三工程有限公司 | Bottomless double-wall steel cover box assembling structure |
CN103422510A (en) * | 2013-08-29 | 2013-12-04 | 中国水电顾问集团华东勘测设计研究院 | Steel pipe frame type cofferdam structure and construction method |
CN106149739A (en) * | 2016-08-26 | 2016-11-23 | 蚌埠市清泉环保有限责任公司 | Combination type cofferdam |
CN106149739B (en) * | 2016-08-26 | 2018-06-08 | 蚌埠市清泉环保有限责任公司 | Combined type cofferdam |
CN106869150A (en) * | 2017-01-24 | 2017-06-20 | 中国建筑第六工程局有限公司 | Double-wall steel suspension box installing force system conversion method |
CN108286257A (en) * | 2017-05-23 | 2018-07-17 | 陈修棠 | A kind of dress sandbox body deep water weir system |
CN108286257B (en) * | 2017-05-23 | 2020-04-28 | 朱经纬 | Deep water cofferdam system for sand filling box body |
CN108894238A (en) * | 2018-03-30 | 2018-11-27 | 上海二十冶建设有限公司 | The device and its application method efficiently shaped for rubble cofferdam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH10237874A (en) | Cofferdam box and construction method for structure using it | |
JP3829319B2 (en) | Construction method of underground hollow structure and its underground hollow structure | |
JPH09125417A (en) | Basement wall body and asymmetrically closed section steel pile | |
JP2003184075A (en) | Soil cement column strip earth retaining wall and its construction method | |
KR0137053Y1 (en) | Steel earth plate | |
JPH0613770B2 (en) | Method of constructing mountain retaining wall with parent pile | |
JPS63280153A (en) | Underground inverted lining method | |
JP4440799B2 (en) | Ground excavation method | |
JPS6343275Y2 (en) | ||
JPS6011165Y2 (en) | Continuous column pile drilling bit | |
JP2650539B2 (en) | Construction method of underground diaphragm wall | |
JPH03250117A (en) | Construction method of bottom enlarged continuous wall | |
JPH05331840A (en) | Inter-element joint of steel-made underground continuous wall and construction thereof | |
JPH11158891A (en) | Construction of basement for residence | |
JPH0598633A (en) | Steel underground continuous wall and construction method thereof | |
JP3422974B2 (en) | Earth retaining plate | |
JPH0430021A (en) | Constructing method of guide for underground continuous wall | |
JPS63125722A (en) | Construction of underground continuous wall | |
JPH0593422A (en) | Continuous underground steel wall and construction method thereof | |
JPS62288214A (en) | Wall type bottom-expanded piling work | |
JPH03250112A (en) | Continuous underground wall | |
JPH05118030A (en) | Continuous underground wall made of steel and constructing method thereof | |
JP2000045313A (en) | Ground water permeation method making use of soil cement column strip earth retaining wall | |
JPH11200361A (en) | Core material for earth retaining and wall surface member for earth retaining | |
JPH07109731A (en) | Execution method of continuous wall bearing pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040106 |
|
A977 | Report on retrieval |
Effective date: 20060213 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060221 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20060704 |