Connecting structure for steel beam and reinforced concrete beam

Info

Publication number
JPH0868113A
JPH0868113A JP20723394A JP20723394A JPH0868113A JP H0868113 A JPH0868113 A JP H0868113A JP 20723394 A JP20723394 A JP 20723394A JP 20723394 A JP20723394 A JP 20723394A JP H0868113 A JPH0868113 A JP H0868113A
Authority
JP
Japan
Prior art keywords
reinforced concrete
steel
concrete beam
steel frame
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20723394A
Other languages
Japanese (ja)
Other versions
JP3538233B2 (en
Inventor
Shigeru Kamesaki
茂 亀岬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Ando Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ando Corp filed Critical Ando Corp
Priority to JP20723394A priority Critical patent/JP3538233B2/en
Publication of JPH0868113A publication Critical patent/JPH0868113A/en
Application granted granted Critical
Publication of JP3538233B2 publication Critical patent/JP3538233B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE: To firmly connect a steel beam and a reinforced concrete beam, easily manufacture the reinforced concrete beam, make it lightweight, and reduce the cost. CONSTITUTION: This connecting structure connects a steel beam 1 and the end section of a reinforced concrete beam 2. The end section of the reinforced concrete beam 2 is provided with a connecting metal 12 constituted of multiple stud bolts 14 to be buried in concrete 11 and connecting pieces 13 connected to the stud bolts 14 and protruded from the end section of the reinforced concrete beam 2. The connecting metal 12 and the steel beam 1 are connected via a gusset plate 17.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄筋コンクリートま
たは鉄骨鉄筋コンクリート建造物の建設において、大梁
としての鉄骨梁に小梁としての鉄筋コンクリート梁を架
設する際の鉄骨梁と鉄筋コンクリート梁との接合構造に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint structure between a steel beam and a reinforced concrete beam when a reinforced concrete beam as a small beam is erected on a steel beam as a large beam in the construction of a reinforced concrete or a steel reinforced concrete structure.

【0002】[0002]

【従来の技術】鉄筋コンクリートまたは鉄骨鉄筋コンク
リート建造物の建設において、大梁としての鉄骨梁に例
えばH形鋼を用い、この鉄骨梁に小梁としての鉄筋コン
クリート梁を架設する場合、工場等で予め鉄筋コンクリ
ート梁を製造した後、この鉄筋コンクリート梁を建設現
場に輸送して鉄骨梁に連結している。
2. Description of the Related Art In the construction of reinforced concrete or reinforced concrete structures, for example, H-shaped steel is used as a large beam, and when a reinforced concrete beam as a small beam is erected on this steel beam, the reinforced concrete beam is preliminarily used in a factory or the like. After manufacturing, the reinforced concrete beams are transported to the construction site and connected to the steel beams.

【0003】すなわち、鉄筋コンクリート梁を製造は、
主筋、補強筋、腹筋等からなる鉄筋を組立て、これを型
枠の内部に納めた後、型枠の内部にコンクリートを打設
し、コンクリートの硬化後、脱型している。
That is, when manufacturing reinforced concrete beams,
Reinforcing bars consisting of main bars, reinforcing bars, abdominal muscles, etc. are assembled, placed inside a mold, concrete is placed inside the mold, and the concrete is hardened and then demolded.

【0004】そして、鉄筋コンクリート梁は、これを小
梁として用い、大梁としてのH形鋼と連結する場合に
は、従来は、鉄筋コンクリート梁の製造時に、その端部
にH形鋼を所定の長さに切断した鉄骨をセットし、これ
を鉄筋に溶接等で固定した後、コンクリートを打設し、
図8に示すように、鉄筋コンクリート梁aの端部から突
出する鉄骨からなる連結金具bを設けている。
When a reinforced concrete beam is used as a small beam and is connected to an H-shaped steel as a large beam, conventionally, at the time of manufacturing the reinforced concrete beam, an H-shaped steel having a predetermined length is provided at the end thereof. Set the cut steel frame to, fix it to the reinforcing bar by welding etc., then place concrete,
As shown in FIG. 8, a connecting fitting b made of a steel frame protruding from the end of the reinforced concrete beam a is provided.

【0005】連結金具bの基端部はコンクリートcの内
部の鉄筋dに固定されており、先端部は鉄筋コンクリー
ト梁aの端部から突出しており、複数のボルト孔が設け
られている。一方、大梁としてのH形鋼eの上下フラン
ジとウエブに固着されているスチフナプレートhに複数
のボルト孔が設けられており、連結金具bとストフナプ
レートhとの間に2枚のガセットプレートfを掛け渡
し、連結金具bとスチフナプレートhを挟持するととも
にボルトgによって締付けることにより連結し、連結金
具bによって鉄筋コンクリート梁の端部に発生するせん
断力を大梁としてのH形鋼に前記せん断力を伝達させ
る、大梁と鉄筋コンクリート梁の接合構造である。
The base end portion of the connecting metal fitting b is fixed to the reinforcing bar d inside the concrete c, the tip end portion thereof projects from the end portion of the reinforced concrete beam a, and a plurality of bolt holes are provided. On the other hand, a plurality of bolt holes are provided in the upper and lower flanges of the H-shaped steel e as a girder and the stiffener plate h fixed to the web, and two gusset plates are provided between the connecting metal fitting b and the stiffener plate h. f is bridged, and the connecting metal fitting b and the stiffener plate h are sandwiched and connected by tightening with the bolt g, and the shearing force generated at the end of the reinforced concrete beam by the connecting metal fitting b is applied to the H-shaped steel as a large beam. It is a joint structure of a large beam and a reinforced concrete beam that transmits power.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、前述の
ような鉄骨梁と鉄筋コンクリート梁との接合構造は、鉄
筋コンクリート梁の製造時に、その端部にH形鋼を所定
の長さに切断した鉄骨をセットし、これを鉄筋に溶接等
で固定する必要があり、その製造作業が複雑であった。
また、鉄筋コンクリート梁の端部に埋設されたH形鋼か
らなる鉄骨によって鉄筋コンクリート梁が重量アップ、
コストアップする原因となっている。
However, in the joint structure of the steel frame beam and the reinforced concrete beam as described above, at the time of manufacturing the reinforced concrete beam, the steel frame obtained by cutting the H-shaped steel into a predetermined length is set at the end thereof. However, it is necessary to fix it to the reinforcing bar by welding or the like, and its manufacturing work is complicated.
In addition, the weight of the reinforced concrete beam is increased due to the steel frame made of H-shaped steel embedded in the end of the reinforced concrete beam,
This is a cause of cost increase.

【0007】この発明は、前記事情に着目してなされた
もので、その目的とするところは、鉄筋コンクリート梁
の端部の内外に鉄骨等を埋設することなく、大梁として
の鉄骨梁と小梁としての鉄筋コンクリート梁とを強固に
結合でき、また鉄筋コンクリート梁の製造が容易である
と共に、軽量化およびコスト低減化を図ることができる
鉄骨梁と鉄筋コンクリート梁の接合構造を提供すること
にある。
The present invention has been made in view of the above circumstances, and its object is to construct a steel beam and a small beam as a large beam without burying a steel frame or the like inside and outside the ends of the reinforced concrete beam. Another object of the present invention is to provide a joint structure of a steel frame beam and a reinforced concrete beam, which can firmly bond the reinforced concrete beam and the reinforced concrete beam, can be manufactured easily, and can be reduced in weight and cost.

【0008】[0008]

【課題を解決するための手段】この発明は、前述した目
的を達成するために、請求項1は、鉄骨梁と鉄筋コンク
リート梁の端部とを接合する接合構造において、前記鉄
筋コンクリート梁の端部に、コンクリートの内部に埋設
される複数のスタッドボルトと、このスタッドボルトと
結合され前記鉄筋コンクリート梁の端部から突出する連
結片とからなる連結金具を設け、この連結金具と前記鉄
骨梁とをガセットプレートを介して連結したことを特徴
とする。
In order to achieve the above-mentioned object, the present invention provides a joint structure for joining a steel frame beam and an end portion of a reinforced concrete beam to the end portion of the reinforced concrete beam. , A stud bolt embedded in the concrete, and a connecting piece that is connected to the stud bolt and projects from the end of the reinforced concrete beam are provided, and the connecting piece and the steel beam are gusseted. It is characterized by being connected through.

【0009】請求項1において、好ましくは、スタッド
ボルトの周囲にはスパイラル筋が固定されていることを
特徴とする。さらに、好ましくは、鉄筋コンクリート梁
は、プレキャストコンクリートであることを特徴とす
る。
In the first aspect, preferably, a spiral streak is fixed around the stud bolt. Furthermore, preferably, the reinforced concrete beams are precast concrete.

【0010】[0010]

【作用】連結金具は、複数のスタッドボルトと連結片と
からなり、スタッドボルトをコンクリートの内部に埋設
され、連結片が鉄筋コンクリート梁の端部から突出した
構造である。したがって、鉄骨梁に鉄筋コンクリート梁
の端部の連結金具をガセットプレートを介して連結する
ことにより、鉄骨梁に鉄筋コンクリート梁の端部が仮止
めされる。
The connecting fitting is composed of a plurality of stud bolts and a connecting piece, and the stud bolt is embedded inside concrete, and the connecting piece projects from the end of the reinforced concrete beam. Therefore, the end of the reinforced concrete beam is temporarily fixed to the steel beam by connecting the connecting fitting at the end of the reinforced concrete beam to the steel beam through the gusset plate.

【0011】[0011]

【実施例】以下、この発明の各実施例を図面に基づいて
説明する。図1〜図5は第1の実施例を示し、図1〜図
3は鉄骨梁と鉄筋コンクリート梁との接合構造を示す。
図中1は大梁としての鉄骨梁で、2は小梁としての鉄筋
コンクリート梁である。鉄骨梁1はH形鋼によって形成
され、この鉄骨梁1と前記鉄筋コンクリート梁2との接
合部位には鉄骨梁1の長手方向と直角方向にスチフナプ
レート3が一体に設けられている。そして、このスチフ
ナプレート3には複数のボルト孔4が縦一列に穿設され
ている。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 5 show a first embodiment, and FIGS. 1 to 3 show a joint structure between a steel frame beam and a reinforced concrete beam.
In the figure, 1 is a steel beam as a large beam, and 2 is a reinforced concrete beam as a small beam. The steel beam 1 is made of H-shaped steel, and a stiffener plate 3 is integrally provided at a joint portion between the steel beam 1 and the reinforced concrete beam 2 in a direction perpendicular to the longitudinal direction of the steel beam 1. A plurality of bolt holes 4 are vertically formed in the stiffener plate 3.

【0012】前記鉄筋コンクリート梁2は、工場等で製
造された例えばプレキャストコンクリート(PCa)で
あり、下部主筋5、腹筋6、補強筋7、上部主筋8およ
びこれらを連結するあばら筋9等からなる鉄筋10を有
しており、この鉄筋10は上部主筋8およびあばら筋9
の一部を残してコンクリート11に埋設されている。下
部主筋5は鉄筋コンクリート梁内に定着させる。
The reinforced concrete beam 2 is, for example, precast concrete (PCa) manufactured in a factory or the like, and is composed of a lower main bar 5, an abdominal line 6, a reinforcing bar 7, an upper main bar 8 and a stirrup bar 9 connecting them. The reinforcing bar 10 has an upper main bar 8 and a stirrup bar 9.
Is buried in the concrete 11 leaving a part of it. The lower main bar 5 is fixed in the reinforced concrete beam.

【0013】さらに、前記鉄筋コンクリート梁2の端部
には連結金具12が固定されている。この連結金具12
は、図4に示すように、T形の連結片13と、この連結
片13の基端部に端部が固定された複数本のスタッドボ
ルト14およびこのスタッドボルト14の軸を中心とす
るスパイラル筋15とから構成されている。そして、ス
タッドボルト14の先端部には大径部14aが設けら
れ、またスパイラル筋15はその一端部が連結片13に
溶接されている。
Further, a connecting fitting 12 is fixed to the end of the reinforced concrete beam 2. This connecting fitting 12
As shown in FIG. 4, a T-shaped connecting piece 13, a plurality of stud bolts 14 whose ends are fixed to the base end of the connecting piece 13, and a spiral around the axis of the stud bolt 14 are used. It is composed of a muscle 15. A large diameter portion 14a is provided at the tip of the stud bolt 14, and one end of the spiral streak 15 is welded to the connecting piece 13.

【0014】このように構成された連結金具12は、ス
タッドボルト14およびスパイラル筋15は鉄筋10と
ともにコンクリート11に埋設されている。そして、連
結片13の基端部が鉄筋コンクリート梁2の端面から露
出しており、この先端部は鉄筋コンクリート梁2の端面
から突出し、この先端部には複数のボルト孔16が単数
または複数列に穿設されている。
In the connecting fitting 12 thus constructed, the stud bolt 14 and the spiral bar 15 are embedded in the concrete 11 together with the reinforcing bar 10. The base end of the connecting piece 13 is exposed from the end face of the reinforced concrete beam 2, and this tip part projects from the end face of the reinforced concrete beam 2, and a plurality of bolt holes 16 are formed in this end part in a single row or in multiple rows. It is set up.

【0015】前記連結金具12は、スタッドボルト14
の先端部の大径部14aおよびスタッドボルトの周囲の
スパイラル筋15がコンクリート11に埋設されている
ため、スタッドボルト14に抜け方向の外力が加わって
も大径部14aおよびスパイラル筋15がストッパとし
ての役目を果たし、両者の結合力を向上させることがで
きる。
The connecting fitting 12 includes a stud bolt 14
Since the large-diameter portion 14a at the tip of the and the spiral streak 15 around the stud bolt are embedded in the concrete 11, the large-diameter portion 14a and the spiral streak 15 function as stoppers even if external force in the pulling direction is applied to the stud bolt 14. It is possible to improve the binding force between the two.

【0016】また、ガセットプレート17は矩形状の鉄
板等からなり、このガセットプレート17にはスチフナ
プレート3のボルト孔4と連結片13のボルト孔16に
対応する複数のボルト孔18が単数または複数列に穿設
されている。
The gusset plate 17 is made of a rectangular iron plate or the like, and the gusset plate 17 has a plurality of bolt holes 18 corresponding to the bolt holes 4 of the stiffener plate 3 and the bolt holes 16 of the connecting piece 13, respectively. Perforated in rows.

【0017】次に、前述のように構成された鉄骨梁1と
鉄筋コンクリート梁2との接合方法について説明する。
大梁としての鉄骨梁1は予め柱あるいは壁等に固定され
て水平状態に架設されており、この鉄骨梁1に小梁とし
ての鉄筋コンクリート梁2の端部を接合する場合、工場
等で製造された鉄筋コンクリート梁2をクレーン等によ
って吊持し、その端部を鉄骨梁1のスチフナプレート3
に位置決めする。
Next, a method of joining the steel beam 1 and the reinforced concrete beam 2 configured as described above will be described.
The steel beam 1 as a large beam is fixed to a pillar or a wall in advance and erected in a horizontal state. When the end portion of a reinforced concrete beam 2 as a small beam is joined to this steel beam 1, it is manufactured in a factory or the like. The reinforced concrete beam 2 is suspended by a crane or the like, and the end portion of the stiffener plate 3 of the steel beam 1 is suspended.
To position.

【0018】そして、鉄筋コンクリート梁2の端部の連
結金具12の連結片13を鉄骨梁1のスチフナプレート
3に位置決めする。次に、連結片13とスチフナプレー
ト3の両側面にガセットプレート17を重ね、2枚のガ
セットプレート17によって連結片13とスチフナプレ
ート3を挟持し、ガセットプレート17のボルト孔18
をスチフナプレート3のボルト孔4および連結片13の
ボルト孔16に位置決めし、ボルト19を挿通した後、
ナット20を締め付けると、スチフナプレート3と連結
片13とがガセットプレート17を介して連結される。
次いで、鉄筋コンクリート梁2の梁上端主筋を鉄骨梁1
の上端に所定長さ定着させる。
Then, the connecting piece 13 of the connecting fitting 12 at the end of the reinforced concrete beam 2 is positioned on the stiffener plate 3 of the steel beam 1. Next, the gusset plates 17 are stacked on both side surfaces of the connecting piece 13 and the stiffener plate 3, and the connecting piece 13 and the stiffener plate 3 are sandwiched by the two gusset plates 17, and the bolt holes 18 of the gusset plate 17 are sandwiched.
Is positioned in the bolt hole 4 of the stiffener plate 3 and the bolt hole 16 of the connecting piece 13, and after inserting the bolt 19,
When the nut 20 is tightened, the stiffener plate 3 and the connecting piece 13 are connected via the gusset plate 17.
Next, the beam top main bar of the reinforced concrete beam 2 is connected to the steel frame beam 1.
It is fixed to the upper end of the specified length.

【0019】したがって、鉄骨梁1と鉄筋コンクリート
梁2の上面はほぼ面一となり、床型枠およびプレート3
0,30を鉄筋コンクリート梁2の幅に対応する位置に
仮止めして、例えば、溶着して接合部31を囲い、鉄骨
梁1と鉄筋コンクリート梁2の上面と前記接合部31の
内部にコンクリートを打設することにより、鉄骨梁1、
鉄筋コンクリート梁2の上面および連結片13、ガセッ
トプレート17を含む連結部はコンクリートに埋設され
ることになり、鉄筋コンクリート梁2の端部に生ずる全
てのせん断力は一群のボルトで負担する。
Therefore, the upper surfaces of the steel frame beam 1 and the reinforced concrete beam 2 are substantially flush with each other, and the floor formwork and plate 3
0 and 30 are temporarily fixed to the positions corresponding to the width of the reinforced concrete beam 2, for example, welded to surround the joint 31, and concrete is poured on the upper surfaces of the steel frame beam 1 and the reinforced concrete beam 2 and inside the joint 31. By installing the steel beam 1,
The upper surface of the reinforced concrete beam 2 and the connecting portion including the connecting piece 13 and the gusset plate 17 are buried in the concrete, and all the shearing force generated at the end of the reinforced concrete beam 2 is borne by the group of bolts.

【0020】なお、前記鉄骨梁1と鉄筋コンクリート梁
2との連結部におけるスタッドボルトの本数、配置は、
数1の式によって決定される。 Q:負担せん断力 e:連結部の偏心距離 Me:偏心モーメント Z:スタッドボルト全体の断面係数 n:スタッドボルトの全本数 ft:スタッドボルトの長期許容応力度 としたとき、
The number and arrangement of stud bolts at the connecting portion between the steel beam 1 and the reinforced concrete beam 2 are as follows:
It is determined by the formula of the formula 1. Q: Shearing force e: Eccentric distance of connecting part Me: Eccentric moment Z: Section coefficient of the whole stud bolt n: Total number of stud bolts ft: Long-term allowable stress of stud bolt,

【0021】[0021]

【数1】 [Equation 1]

【0022】また、スタットボルトの長さは数2の式に
よって決定される。 fa:長期許容付着応力度 ψ:スタッドボルトの周長 としたとき、引張り力
The length of the stat bolt is determined by the equation (2). fa: Allowable long-term adhesion stress ψ: Tensile force, where stud bolt circumference

【0023】[0023]

【数2】 [Equation 2]

【0024】図6および図7は第2の実施例を示し、第
1の実施例と同一構成部分は同一番号を付して説明を省
略する。この実施例は、鉄骨梁1を鉄骨鉄筋コンクリー
トの鉄骨とした場合であって、第1の実施例と同様の鉄
骨梁1と鉄筋コンクリート梁2とを接合するとともに、
鉄骨梁1の周囲にこれを囲繞するようにコンクリート断
面22を設ける。次に、鉄骨梁1を含むコンクリート断
面22を型枠23によって覆った後、鉄骨梁1と鉄筋コ
ンクリート梁2の上面にコンクリートを打設することに
より、鉄骨梁1はコンクリートによって覆われ、また鉄
筋コンクリート梁2の上面および連結片13、ガセット
プレート17を含む連結部はコンクリートに埋設される
ことになる。
FIG. 6 and FIG. 7 show the second embodiment, and the same components as those of the first embodiment are designated by the same reference numerals and their description is omitted. In this embodiment, the steel beam 1 is made of steel reinforced concrete, and the same steel beam 1 and reinforced concrete beam 2 as in the first embodiment are joined together,
A concrete cross section 22 is provided around the steel beam 1 so as to surround it. Next, after covering the concrete cross section 22 including the steel beam 1 with the formwork 23, concrete is placed on the upper surfaces of the steel beam 1 and the reinforced concrete beam 2, whereby the steel beam 1 is covered with concrete, and the reinforced concrete beam is also used. The upper surface of 2, the connecting piece 13, and the connecting portion including the gusset plate 17 are embedded in concrete.

【0025】なお、前記第1および第2の実施例におい
ては、スタッドボルトの周囲にスパイラル筋を設けてス
タッドボルトの抜け止めを図ったが、スタッドボルトの
周囲に複数の鍔部を設けてもよく、スタッドボルト自体
を折曲して抜け止めをしてもよい。
In the first and second embodiments, a spiral streak is provided around the stud bolt to prevent the stud bolt from coming off, but a plurality of flanges may be provided around the stud bolt. Of course, the stud bolt itself may be bent to prevent it from coming off.

【0026】[0026]

【発明の効果】以上説明したように、この発明によれ
ば、鉄筋コンクリート梁の端部に、コンクリートの内部
に埋設される複数のスタッドボルトと、このスタッドボ
ルトと結合され前記鉄筋コンクリート梁の端部から突出
する連結片とからなる連結金具を設け、この連結金具を
鉄骨梁とを連結したことを特徴とする。したがって、鉄
筋コンクリート梁の端部に鉄骨等を埋設することなく、
鉄骨梁と鉄筋コンクリート梁とを強固に結合でき、また
鉄筋コンクリート梁の製造が容易であると共に、軽量化
およびコスト低減化を図ることができるという効果があ
る。
As described above, according to the present invention, a plurality of stud bolts embedded in the concrete at the end of the reinforced concrete beam, and the end of the reinforced concrete beam coupled with the stud bolts. The present invention is characterized in that a connecting fitting made of a protruding connecting piece is provided, and the connecting fitting is connected to the steel beam. Therefore, without burying steel frames etc. at the end of the reinforced concrete beam,
There are effects that the steel frame beam and the reinforced concrete beam can be firmly connected, the reinforced concrete beam can be easily manufactured, and the weight and cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の第1の実施例を示す鉄骨梁と鉄筋コ
ンクリート梁との接合部の縦断正面図。
FIG. 1 is a vertical sectional front view of a joint portion between a steel frame beam and a reinforced concrete beam showing a first embodiment of the present invention.

【図2】図1の一部を断面した平面図。FIG. 2 is a plan view in which a part of FIG. 1 is sectioned.

【図3】同実施例の鉄筋コンクリート梁の斜視図。FIG. 3 is a perspective view of a reinforced concrete beam of the same embodiment.

【図4】同実施例の連結金具の側面図。FIG. 4 is a side view of the connecting fitting of the embodiment.

【図5】同実施例の鉄骨梁と鉄筋コンクリート梁との接
合部の概略的構成図。
FIG. 5 is a schematic configuration diagram of a joint portion between a steel frame beam and a reinforced concrete beam of the same example.

【図6】この発明の第2の実施例を示す鉄骨鉄筋コンク
リート梁と鉄筋コンクリート梁との接合部の縦断正面
図。
FIG. 6 is a vertical sectional front view of a joint portion between a steel frame reinforced concrete beam and a reinforced concrete beam showing a second embodiment of the present invention.

【図7】図6の一部を断面した平面図。FIG. 7 is a plan view in which a part of FIG. 6 is sectioned.

【図8】従来の鉄骨梁と鉄筋コンクリート梁との接合部
の概略的構成図。
FIG. 8 is a schematic configuration diagram of a joint portion between a conventional steel frame beam and a reinforced concrete beam.

【符号の説明】[Explanation of symbols]

1…鉄骨梁、2…鉄筋コンクリート梁、10…鉄筋、1
1…コンクリート、12…連結金具、13…連結片、1
4…スタッドボルト、15…スパイラル筋、17…ガセ
ットプレート。
1 ... steel beam, 2 ... reinforced concrete beam, 10 ... rebar, 1
1 ... Concrete, 12 ... Coupling metal, 13 ... Coupling piece, 1
4 ... Stud bolt, 15 ... Spiral streak, 17 ... Gusset plate.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 鉄骨梁と鉄筋コンクリート梁の端部とを
接合する接合構造において、 前記鉄筋コンクリート梁の端部に、コンクリートの内部
に埋設される複数のスタッドボルトと、前記スタッドボ
ルトと結合され前記鉄筋コンクリート梁の端部から突出
する連結片とからなる連結金具を設け、前記連結金具と
前記鉄骨梁とをガセットプレートを介して連結したこと
を特徴とする鉄骨梁と鉄筋コンクリート梁との接合構
造。
1. A joint structure for joining a steel beam and an end portion of a reinforced concrete beam, wherein a plurality of stud bolts embedded in the concrete at the end portion of the reinforced concrete beam, and the reinforced concrete joined with the stud bolts. A joining structure of a steel frame beam and a reinforced concrete beam, characterized in that a connecting metal piece composed of a connecting piece protruding from an end of the beam is provided, and the connecting metal piece and the steel frame beam are connected via a gusset plate.
【請求項2】 前記スタッドボルトの周囲にはスパイラ
ル筋が固定されていることを特徴とする請求項1または
2記載の鉄骨梁と鉄筋コンクリート梁との接合構造。
2. The joint structure between a steel frame beam and a reinforced concrete beam according to claim 1, wherein a spiral line is fixed around the stud bolt.
【請求項3】 前記鉄筋コンクリート梁は、プレキャス
トコンクリートであることを特徴とする請求項1記載の
鉄骨梁と鉄筋コンクリート梁との接合構造。
3. The joint structure of a steel frame beam and a reinforced concrete beam according to claim 1, wherein the reinforced concrete beam is precast concrete.
JP20723394A 1994-08-31 1994-08-31 Joint structure between steel beam and reinforced concrete beam Expired - Lifetime JP3538233B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20723394A JP3538233B2 (en) 1994-08-31 1994-08-31 Joint structure between steel beam and reinforced concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20723394A JP3538233B2 (en) 1994-08-31 1994-08-31 Joint structure between steel beam and reinforced concrete beam

Publications (2)

Publication Number Publication Date
JPH0868113A true JPH0868113A (en) 1996-03-12
JP3538233B2 JP3538233B2 (en) 2004-06-14

Family

ID=16536441

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20723394A Expired - Lifetime JP3538233B2 (en) 1994-08-31 1994-08-31 Joint structure between steel beam and reinforced concrete beam

Country Status (1)

Country Link
JP (1) JP3538233B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100626543B1 (en) * 2005-01-04 2006-09-21 삼성물산 주식회사 Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
KR100915921B1 (en) * 2008-05-20 2009-09-07 노윤근 Hybrid steel complex girder and this construction technique
KR100923564B1 (en) * 2007-09-11 2009-10-27 현대엔지니어링 주식회사 Precast concrete panel, construction method and structure of precast concrete panel using steel plate
KR101426509B1 (en) * 2013-02-12 2014-08-05 황기수 A joint structure of a precast concrete girder and a steel beam
CN113089825A (en) * 2021-04-19 2021-07-09 重庆恒昇大业建筑科技集团有限公司 Beam-column mixed frame node, and preparation method and construction method of precast concrete beam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100626543B1 (en) * 2005-01-04 2006-09-21 삼성물산 주식회사 Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
KR100923564B1 (en) * 2007-09-11 2009-10-27 현대엔지니어링 주식회사 Precast concrete panel, construction method and structure of precast concrete panel using steel plate
KR100915921B1 (en) * 2008-05-20 2009-09-07 노윤근 Hybrid steel complex girder and this construction technique
KR101426509B1 (en) * 2013-02-12 2014-08-05 황기수 A joint structure of a precast concrete girder and a steel beam
CN113089825A (en) * 2021-04-19 2021-07-09 重庆恒昇大业建筑科技集团有限公司 Beam-column mixed frame node, and preparation method and construction method of precast concrete beam
CN113089825B (en) * 2021-04-19 2023-07-25 重庆恒昇大业建筑科技集团有限公司 Beam-column mixed frame node, preparation method of precast concrete beam and construction method of precast concrete beam

Also Published As

Publication number Publication date
JP3538233B2 (en) 2004-06-14

Similar Documents

Publication Publication Date Title
JP2000170285A (en) Connecting method for steel sheet concrete structural wall and junction structure
JP2001173155A (en) Rc steel beam at the end portion
JPH0868113A (en) Connecting structure for steel beam and reinforced concrete beam
JPS6349776B2 (en)
JPH01235743A (en) Prestressed rpc construction work and pc column with prestressed beam
JPH02252830A (en) Pre-fabricated cruciform beam construction method
JP2620118B2 (en) Net formwork method for walls and floors
JP2001107373A (en) Joint structure of steel column base with foundation concrete
JP2004084353A (en) Roof truss beam installing structure and roof truss beam installing method
JPH04302607A (en) Composite girder and girder part of bridge beam
JP2023149166A (en) Reinforcement connection part structure for existing frame member
JP3052102B2 (en) Construction method of building drive using joint structure
JPH0443521Y2 (en)
JPH0762740A (en) Joint method for precast steel framed reinforced concrete construction pillar and beam
JP2893406B2 (en) Precast concrete beam-column joining method
JPS6013110B2 (en) Column-beam connection method for precast reinforced concrete beams
JPH03151429A (en) Reinforcement preassembled beam with formwork and working method thereof
JP2560912B2 (en) Column-beam joint structure and construction method
JP2958239B2 (en) Joint members at the joints between columns and beams
JPH05311673A (en) Foundation construction method for building
JPH02236328A (en) Construction method for super-highrice building
JPH0448143B2 (en)
JPH0533606Y2 (en)
JPS6217246A (en) Reinforced concrete structure
JPH0250262B2 (en)

Legal Events

Date Code Title Description
A61 First payment of annual fees (during grant procedure)

Effective date: 20040319

Free format text: JAPANESE INTERMEDIATE CODE: A61

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20100326

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110326

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20120326

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20120326

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20130326

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140326

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term