JPH08209937A - Shifting device for ready mixed concrete - Google Patents

Shifting device for ready mixed concrete

Info

Publication number
JPH08209937A
JPH08209937A JP32126595A JP32126595A JPH08209937A JP H08209937 A JPH08209937 A JP H08209937A JP 32126595 A JP32126595 A JP 32126595A JP 32126595 A JP32126595 A JP 32126595A JP H08209937 A JPH08209937 A JP H08209937A
Authority
JP
Japan
Prior art keywords
boom
container
concrete
ready
elevating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP32126595A
Other languages
Japanese (ja)
Other versions
JP3040338B2 (en
Inventor
Mitsuo Takeda
光雄 武田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KABUKI KENSETSU KK
Original Assignee
KABUKI KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KABUKI KENSETSU KK filed Critical KABUKI KENSETSU KK
Priority to JP7321265A priority Critical patent/JP3040338B2/en
Publication of JPH08209937A publication Critical patent/JPH08209937A/en
Application granted granted Critical
Publication of JP3040338B2 publication Critical patent/JP3040338B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE: To facilitate transfer by continuously supplying the belt conveyor of a boom with ready mixed concrete carried up by a vessel-shaped conveying tool from the lower section of a tower mast by a supply means mounted on the vessel-shaped conveying tool. CONSTITUTION: A tower mast A is moved up to an aimed place by utilizing rails 17, and a lift-lowering body section B is shifted and set in operation height to the tower mast A by using lift-lowering frames 20, 21. A boom C installed to the lift-lowering body section B is swiveled and set at a place corresponding to the place for casting ready mixed concrete F, and ready mixed concrete F is housed in a vessel-shaped conveying tool D and the conveying tool D is carried up upwards by a winch 63. A belt conveyor G" at a front-end side boom C" is supplied with ready mixed concrete F by a belt feeder E, etc., mounted on the vessel-shaped conveying tool D, and ready mixed concrete F is placed while shifting a tripper device H. Accordingly, the place for casting concrete can be fed continuously with ready mixed concrete quantitatively.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、垂直方向に所要
の高さまで生コンクリートを運び上げると共に、この運
び上げられた生コンクリートを、ベルトコンベヤに対し
て、連続して、定量的に送り出し、目的とするコンクリ
ートの打込み位置に、生コンクリートを、連続して、定
量的に供給できるようにした生コンクリートの移送装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention conveys ready-mixed concrete vertically to a required height and continuously and quantitatively delivers the conveyed ready-mixed concrete to a belt conveyor. The present invention relates to a fresh concrete transfer device capable of continuously and quantitatively supplying fresh concrete to a concrete driving position.

【0002】[0002]

【従来の技術】ダムなどのコンクリートの打設に用いら
れる生コンクリートは、通例骨材径の大きい貧配合(セ
メント配合量の少ない)のコンクリートとされており、
しかも、比較的高所に移送を要求されることが多く、こ
のためコンクリートポンプを用いての生コンクリートの
圧送に適さず、その多くの場合にはバケットを用いての
移送が採用されていた。
2. Description of the Related Art Green concrete used for pouring concrete such as dams is generally considered to be a concrete with a large aggregate diameter and a poor mixture (a small amount of cement mixture).
In addition, since it is often required to transfer to a relatively high place, it is not suitable for pumping fresh concrete using a concrete pump, and in many cases, transfer using a bucket has been adopted.

【0003】[0003]

【発明が解決しようとする課題】かかるバケットによ
る、例えば、タワークレーンないしはケーブルクレーン
などを用いた生コンクリートの移送、打設にあっては、
80mm径〜150mm径の比較的大きな骨材を含み、
しかも貧配合の生コンクリートを、その性状の劣化を生
ずることなく高所に案内、打設できる特長を有している
反面、単位時間当りの打設容量が少ないために、施工工
期が長くなり、また、各コンクリートの打設間隔が開く
ために、打設コンクリートの温度応力においても難があ
った。
In transferring and placing ready-mixed concrete by using such a bucket using, for example, a tower crane or a cable crane,
Includes a relatively large aggregate with a diameter of 80 mm to 150 mm,
Moreover, it has the feature that it can guide and place a poorly mixed ready-mixed concrete to a high place without deteriorating its properties, but on the other hand, because the placing capacity per unit time is small, the construction period becomes longer, In addition, since the pouring interval of each concrete is wide, there is a problem in the temperature stress of the pouring concrete.

【0004】また、かかるタワークレーンを用いたバケ
ットによる生コンクリートの移送、打設にあっては、ク
レーン操作などの特殊技術者によるオペレートを要し、
長期間に亘って、かかる特殊技術者を確保しておく必要
があった。
In addition, when transferring and placing fresh concrete by a bucket using such a tower crane, a special engineer such as a crane operator needs to operate the concrete.
It was necessary to secure such special engineers for a long period of time.

【0005】また、ケーブルクレーンを用いた生コンク
リートの移送、打設にあっては、ケーブルを張設するた
めに、多くの設備と、労力とを要し、しかも環境破壊を
当該ケーブルの張設などに伴って生ずる不都合があっ
た。
Further, in transferring and placing fresh concrete by using a cable crane, a lot of equipment and labor are required to stretch the cable, and further, environmental damage is required to stretch the cable. There was an inconvenience that accompanies this.

【0006】又、ダンプ自動車によって生コンクリート
を搬送する工法にあっては、多量の生コンクリートを比
較的短期間に、しかも良好な打設条件のもとで運搬打設
できる特長を有している反面、このダムコンクリートの
打込み面が狭まったダム頂上部付近、あるいは河床部に
おけるダムコンクリートの打込みに際して、別段に、ケ
ーブルクレーン、タワークレーンなどを設置、用意し、
これらの従来工法によるダムコンクリートの打ち込みを
なす必要があった。
[0006] Further, the method of transporting the ready-mixed concrete by the dump truck has a feature that a large amount of the ready-mixed concrete can be transported and placed in a relatively short period of time under good placing conditions. On the other hand, when driving the dam concrete near the top of the dam where the driving surface of the dam concrete is narrowed or in the riverbed, install and prepare a cable crane, tower crane, etc. separately,
It was necessary to drive dam concrete by these conventional methods.

【0007】又、かかるダンプ自動車によって生コンク
リートを搬送する工法にあっては、例えば、ダムコンク
リートの打設面が、ダンプの走行に適しない小規模ダム
におけるダムコンクリートの打設、あるいは同様にダム
コンクリート打設面が、ダンプの走行に適しない砂防ダ
ムなどにおけるダムコンクリートの打設に難があった。
Further, in the construction method for transporting ready-mixed concrete by such a dump truck, for example, a dam concrete is placed in a small-scale dam whose surface for placing the dam concrete is not suitable for running the dump, or in the same manner, the dam is also placed. It was difficult to place dam concrete in sabo dams where the concrete placement surface is not suitable for running dumps.

【0008】かかる点から、ダムコンクリートの打設に
際して、バケットエレベータを備えたタワーを設置し、
このタワーに設けたバケットエレベータを用いてダムコ
ンクリートの打設をなすことが検討された。
From this point of view, when pouring dam concrete, a tower equipped with a bucket elevator is installed,
It was considered to make a dam concrete by using the bucket elevator installed in this tower.

【0009】このバケットエレベータを用いてのダムコ
ンクリートの打設手法は、従前におけるバケット手法と
同様に、大きな骨材を含む低スランプの生コンクリート
の搬送を可能とし、しかも、従来の、例えばタワークレ
ーンないしはケーブルクレーンを用いた生コンクリート
の搬送に比較して、多量の生コンクリートを打設位置に
移送できる特長を有することが予想される。
The dam concrete pouring method using the bucket elevator, like the bucket method in the past, enables the transportation of low slump ready concrete containing large aggregates, and is of the conventional type such as tower cranes. Or, it is expected to have a feature that a large amount of fresh concrete can be transferred to the pouring position, as compared with the case of transporting fresh concrete using a cable crane.

【0010】しかしながら、このバケットエレベータを
用いてのダムコンクリートの打設にあっては、設備コス
トが割高となり、しかも駆動部分などの動作が多く、任
意の位置での取り出しが困難である不都合が考えられ、
更に、メンテナンスコストが著しく増す不都合が考えら
れ、しかも、多数のバケットを各コンクリートの打設毎
に洗う必要を生ずることが予想される。
However, in placing dam concrete using this bucket elevator, the equipment cost is relatively high, moreover, there are many movements of the driving part, and it is difficult to take it out at any position. The
Further, it is considered that maintenance cost will be significantly increased, and it is expected that a large number of buckets will need to be washed after each concrete is placed.

【0011】また、一方で、バケットエレベータの操作
に際して、チェーンのスプロケットとの噛み合い、ある
いはバケットのスライディングに伴う騒音の発生が考え
られる。
On the other hand, at the time of operating the bucket elevator, it is conceivable that the chain meshes with the sprocket or noise is generated due to the sliding of the bucket.

【0012】更に、このバケットエレベータで案内され
た打設用の生コンクリートを、例えば、ブームに備えら
れているベルトコンベヤに供給した場合、このベルトコ
ンベヤのベルト上に供給生コンクリートが山積みの状態
となり、ベルトコンベヤの動作が阻害される不都合が予
想される。
Furthermore, when the ready-mixed concrete for pouring guided by the bucket elevator is supplied to, for example, a belt conveyor provided in a boom, the supplied ready-mixed concrete is piled up on the belt of the belt conveyor. , Inconvenience that the operation of the belt conveyor is hindered is expected.

【0013】また、かかるベルトコンベヤの円滑な動作
の妨げとならないように、バケットエレベータによる生
コンクリートのベルトコンベヤに対する供給量を減じた
場合にあっては、設備コスト、メンテナンスコストに比
較して生コンクリートの搬送能力が著しく少なくなるこ
とが予想される。
Further, when the supply amount of green concrete by the bucket elevator to the belt conveyor is reduced so as not to hinder the smooth operation of the belt conveyor, the green concrete is compared with the equipment cost and the maintenance cost. It is expected that the carrying capacity of the will be significantly reduced.

【0014】この発明は叙上の点から、ダム、建物、煙
突などの各種構造物の構築に際して、生コンクリート
を、コンクリートの打込み位置に、連続して、定量的
に、しかも、多量に移送でき、これによって、多量の生
コンクリートの連続打込みを可能とする生コンクリート
の移送装置の提供を主たる目的としている。
From the above point of view, the present invention is capable of continuously, quantitatively, and transferring a large amount of ready-mixed concrete to a concrete pouring position when constructing various structures such as dams, buildings and chimneys. The main object of the invention is to provide a transfer device for ready-mixed concrete, which enables continuous injection of a large amount of ready-mixed concrete.

【0015】また、この発明は、比較的狭いスペースで
も設置が可能であり、しかも低い位置におけるコンクリ
ートの打込み、及び高い位置におけるコンクリートの打
込みのいずれに対しても、連続して、定量的に、多量の
生コンクリートを移送し得るようにした生コンクリート
の移送装置の提供を他の目的一つとしている。
Further, the present invention can be installed in a relatively narrow space, and further, for both concrete driving at a low position and concrete driving at a high position, continuously, quantitatively, Another purpose is to provide a transfer device for ready-mixed concrete that can transfer a large amount of ready-mixed concrete.

【0016】また、この発明は、骨材径の大きい貧配合
のコンクリートを、コンクリートの打込み位置に連続し
て、定量的に、しかも多量に移送できるようにした生コ
ンクリートの移送装置の提供を他の目的の一つとしてい
る。
The present invention also provides a raw concrete transfer device capable of transferring a poorly mixed concrete having a large aggregate diameter continuously, quantitatively and in a large amount to a concrete driving position. It is one of the purposes of.

【0017】また、この発明は、生コンクリートを、コ
ンクリートの打込み位置に、連続して、定量的に、しか
も多量に移送できる装置を、比較的安価に設置でき、し
かも、特殊技術者による操作を不要とし、低コストで稼
動することのできる生コンクリートの移送装置の提供を
他の目的の一つとしている。
Further, according to the present invention, a device capable of continuously, quantitatively, and transferring a large amount of ready-mixed concrete to a concrete pouring position can be installed at a relatively low cost and can be operated by a special engineer. Another purpose is to provide a transfer device for ready-mixed concrete that is unnecessary and can be operated at low cost.

【0018】[0018]

【課題を解決するための手段】この発明は、前記の目的
を達成するものとして、典型的な第1の発明に係る生コ
ンクリートの移送装置を、タワーマストAと、このタワ
ーマストAに昇降可能に備えられている昇降本体部B
と、この昇降本体部Bに旋回可能に備えられている一本
のブ−ム又は連設された複数本のブ−ムよりなるブ−ム
Cとを有する構成とし、しかも、前記タワーマストAに
は、生コンクリートFの搬送に用いられる容器状搬送具
Dが昇降可能に備えられていると共に、前記ブームCに
は、前記容器状搬送具Dから直接又は別段に備えられる
搬送手段を介して供給される生コンクリートFの搬送用
ベルトコンベヤGが設けてあり、更に、前記一本のブ−
ムよりなるブ−ムCにあっては該ブ−ムCに、前記連設
された複数本のブ−ムよりなるブ−ムCにあっては該ブ
−ムCにおける少なくとも昇降本体部Bに対する取り付
け側にあるブ−ムに、トリッパ装置Hが備えられてお
り、更に、前記容器状搬送具Dには、この容器状搬送具
Dによって搬送される生コンクリートFを、前記搬送用
ベルトコンベヤGに対して、直接又は別段に備えられる
搬送手段を介して、連続して定量的に供給する供給手段
Eが備えらた構成としてある。
In order to achieve the above-mentioned object, the present invention is capable of elevating a transfer apparatus for fresh concrete according to a typical first invention to a tower mast A and to the tower mast A. Elevating body B provided in the
And a boom C composed of a single boom or a plurality of continuous booms provided on the lifting main body B so as to be rotatable, and the tower mast A Is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and the boom C is directly provided from the container-shaped carrier D or via a carrier provided separately. A belt conveyor G for transporting the ready-mixed concrete F to be supplied is provided, and further, the one bou
In the case of a boom C made of a boom, at least the elevating main body portion B in the boom C is made up of the boom C made of a plurality of the booms connected to the boom C. A tripper device H is provided in the boom on the mounting side with respect to the container-shaped carrier D, and the concrete concrete F carried by the container-shaped carrier D is transferred to the container-shaped carrier D. It is configured such that a supply means E for continuously and quantitatively supplying to G is directly or via a transfer means provided separately.

【0019】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、この
容器状搬送具Dに設けられている供給手段Eによって、
ブームCに備えられているベルトコンベヤGに向けて、
連続して定量的に供給できると共に、この連続して定量
的に供給される生コンクリートFを、該ベルトコンベヤ
Gの先端側、又はトリッパ装置Hを用いることによって
該ベルトコンベヤGの途中の任意の位置から、コンクリ
ートの打込み位置に向けて、連続して、定量的に供給す
ることができる。
In the ready-mixed concrete transfer device having such a structure, the ready-mixed concrete F carried by the container-like carrier D from the lower part of the tower mast A is supplied to the container-like carrier D. By means E
Towards the belt conveyor G provided on the boom C,
It is possible to continuously and quantitatively supply the green concrete F which is continuously and quantitatively supplied, and to the tip side of the belt conveyor G, or by using a tripper device H, an arbitrary intermediate portion of the belt conveyor G. It is possible to continuously and quantitatively supply from the position toward the concrete pouring position.

【0020】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
における昇降本体部Bの昇降操作と、この昇降本体部B
に備えられたブームCの旋回操作と、先端側にあるブー
ムの繰入れ、繰出し操作又は該ブームCに備えられたト
リッパ装置Hの該ブームCに対する移動位置決め操作な
どによってなされるベルトコンベヤGからの生コンクリ
−トFの取り出し位置の位置決めによってなすことがで
きる。
Further, the positioning of the supply of the ready-mixed concrete F toward the pouring position of the concrete is performed by the tower mast A.
And the operation of raising and lowering the raising and lowering body portion B at
From the belt conveyor G, which is performed by a turning operation of the boom C provided in the boom C, a feeding operation and a feeding operation of the boom on the tip side, a moving and positioning operation of the tripper device H provided in the boom C with respect to the boom C, and the like. This can be done by positioning the take-out position of the concrete F.

【0021】次いで、前記の目的を達成するものとし
て、典型的な第2の発明に係る生コンクリートの移送装
置を、タワーマストAと、このタワーマストAに昇降可
能に備えられている昇降本体部Bと、この昇降本体部B
に回転可能に備えられた回転部Nと、この回転部Nに備
えられている一本のブーム又は連設された複数本のブー
ムよりなるブームCとを有する構成とし、しかも、前記
タワーマストAには、生コンクリートFの搬送に用いら
れる容器状搬送具Dが昇降可能に備えてあり、更に、前
記ブームCには、前記容器状搬送具Dから直接、又は別
段に備えられる搬送手段を介して供給される生コンクリ
ートFの搬送用ベルトコンベヤGが設けてあると共に、
前記一本のブームよりなるブームCにあっては当該ブー
ムCに、前記連設された複数本のブームよりなるブーム
Cにあっては、該ブームCにおける少なくとも前記回転
部Nに対する取り付け側にあるブームに、トリッパ装置
Hが備えてあり、更に、前記容器状搬送具Dには、この
容器状搬送具Dによって搬送される生コンクリートF
を、前記搬送用ベルトコンベヤGに対して、直接又は別
段に備えられる搬送手段を介して、連続して定量的に供
給する供給手段Eが備えらた構成としてある。
In order to achieve the above object, a transfer device for fresh concrete according to a typical second aspect of the present invention is provided with a tower mast A, and an elevating / lowering main body part capable of ascending / descending to the tower mast A. B and this lifting body B
The tower mast A is configured to have a rotating portion N rotatably provided on the rotating portion N and a boom C provided on the rotating portion N or a boom C including a plurality of booms connected in series. Is provided with a container-like carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and further, the boom C is directly provided from the container-like carrier D or via a carrying means provided separately. A belt conveyor G for transporting ready-mixed concrete F supplied by
The boom C composed of the one boom is attached to the boom C, and the boom C composed of the plurality of booms connected to each other is at least on the mounting side of the boom C to the rotating portion N. The boom is equipped with a tripper device H, and the container-shaped carrier D is provided with fresh concrete F carried by the container-shaped carrier D.
Is provided to the conveyor belt conveyor G directly or via a conveyor provided separately in a separate stage, and a supply means E for continuously and quantitatively supplying the conveyor belt conveyor G.

【0022】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、この
容器状搬送具Dに設けられている供給手段Eによって、
ブームCに備えられているベルトコンベヤGに、直接又
は別段に備えられる搬送手段を介して、連続して定量的
に供給できると共に、この連続して定量的に供給される
生コンクリートFを、該ベルトコンベヤGの先端側、又
はトリッパ装置Hを用いることによって該ベルトコンベ
ヤGの途中の任意の位置から、コンクリートの打込み位
置に向けて、連続して、定量的に供給することができ
る。
In the ready-mixed concrete transfer device having such a structure, the ready-mixed concrete F carried by the container-like carrier D from the lower part of the tower mast A is supplied to the container-like carrier D. By means E
It is possible to continuously and quantitatively supply the belt conveyor G provided on the boom C directly or via a conveying means provided separately to the belt conveyor G. By using the tip end side of the belt conveyor G or the tripper device H, it is possible to continuously and quantitatively supply from an arbitrary position on the belt conveyor G toward the concrete driving position.

【0023】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
における昇降本体部Bの昇降操作と、この昇降本体部B
に備えられた回転部Nの回転操作と、先端側にあるブー
ムの繰入れ、繰出し操作又はブームCに備えられたトリ
ッパ装置Hの該ブームCに対する移動操作などによって
なされる当該ベルトコンベヤGからの生コンクリートF
の取り出し位置の位置決めによってなすことができる。
Further, the positioning of the supply of the ready-mixed concrete F toward the pouring position of the concrete is performed by the tower mast A.
And the operation of raising and lowering the raising and lowering body portion B at
From the belt conveyor G, which is performed by a rotating operation of a rotating unit N provided in the front end, a feeding operation of a boom at the tip side, a feeding operation, or a movement operation of a tripper device H provided on the boom C with respect to the boom C. Concrete F
This can be done by positioning the take-out position.

【0024】次いで、前記の目的を達成するものとし
て、典型的な第3の発明に係る生コンクリートの移送装
置を、回転可能に立設されているタワーマストAと、こ
のタワーマストAに昇降可能に備えられている昇降本体
部Bと、この昇降本体部Bに備えられている一本のブー
ム又は連設された複数本のブームよりなるブームCとを
有する構成とし、しかも、前記タワーマストAには、生
コンクリートFの搬送に用いられる容器状搬送具Dが昇
降可能に備えられていると共に、前記ブームCには、前
記容器状搬送具Dから直接又は別段に備えられる搬送手
段を介して供給される該生コンクリートFの搬送用ベル
トコンベヤGが設けてあり、更に、前記一本のブームよ
りなるブームCにあっては該ブームCに、前記連設され
た複数本のブームよりなるブームCにあっては該ブーム
Cにおける少なくとも前記昇降本体部Dに対する取り付
け側にあるブームに、トリッパ装置Hが備えてあり、更
に、前記容器状搬送具Dには、この容器状搬送具Dによ
って搬送される生コンクリートFを、前記搬送用ベルト
コンベヤGに対して、直接又は別段に備えられる搬送手
段を介して、連続して定量的に供給する供給手段Eが備
えらた構成としてある。
In order to achieve the above object, a transfer device for fresh concrete according to a typical third aspect of the present invention is capable of vertically moving a tower mast A and a tower mast A that is rotatably erected. And a boom C composed of one boom or a plurality of booms connected in series, and the tower mast A Is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and the boom C is directly provided from the container-shaped carrier D or via a carrier provided separately. A belt conveyor G for transporting the ready-mixed concrete F to be supplied is provided. Further, in the case of the boom C composed of the one boom, the boom C is connected to the boom C by a plurality of booms connected to each other. In the boom C, the tripper device H is provided on at least the boom on the side of the boom C that is attached to the elevating body D, and the container-shaped carrier D includes the container-shaped carrier D. The supply means E is provided for quantitatively continuously and quantitatively supplying the ready-mixed concrete F conveyed by the above to the conveyor belt conveyor G directly or via a conveying means provided separately.

【0025】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、この
容器状搬送具Dに設けられている供給手段Eによって、
ブームCに備えられているベルトコンベヤGに向けて、
連続して定量的に供給できると共に、この連続して定量
的に供給される生コンクリートFを、該ベルトコンベヤ
Gの先端側、又はトリッパ装置Hを用いることによって
該ベルトコンベヤGの途中の任意の位置から、コンクリ
ートの打込み位置に向けて、連続して、定量的に供給す
ることができる。
In the ready-mixed concrete transfer device having such a structure, the ready-mixed concrete F carried up by the container-like carrier D from the lower portion of the tower mast A is supplied to the container-like carrier D. By means E
Towards the belt conveyor G provided on the boom C,
It is possible to continuously and quantitatively supply the green concrete F which is continuously and quantitatively supplied, and to the tip side of the belt conveyor G, or by using a tripper device H, an arbitrary intermediate portion of the belt conveyor G. It is possible to continuously and quantitatively supply from the position toward the concrete pouring position.

【0026】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
の回転操作と、このタワーマストAにおける昇降本体部
Bの昇降操作と、先端側にあるブームの繰入れ、繰出し
操作又は前記ブームCに備えられたトリッパ装置Hの該
ブームCに対する移動操作などによってなされる当該ベ
ルトコンベヤGからの生コンクリートFの取り出し位置
の位置決めによってなすことができる。
Further, the positioning of the supply of the ready-mixed concrete F toward the concrete driving position is performed by the tower mast A.
Rotation operation, lifting and lowering operation of the lifting / lowering main body portion B in the tower mast A, feeding and unwinding of the boom at the tip end, or moving operation of the tripper device H provided on the boom C with respect to the boom C. This can be done by positioning the take-out position of the green concrete F from the belt conveyor G.

【0027】次いで、前記の目的を達成するものとし
て、典型的な第4の発明に係る生コンクリートの移送装
置を、タワーマストAと、このタワーマストAに昇降可
能に備えられている昇降本体部Bと、この昇降本体部B
に旋回可能に備えられている一本のブームよりなるブー
ムC又は連設された複数本のブームよりなるブームCと
を有する構成とし、しかも、前記タワーマストAには、
生コンクリートFの搬送に用いられる容器状搬送具Dが
昇降可能に備えられていると共に、前記ブームCには、
生コンクリートFの搬送用ベルトコンベヤGが設けてあ
り、更に、前記昇降本体部D又は前記ブームCには、前
記容器状搬送具Dから直接又は別段に備えられる搬送手
段を介して生コンクリートFを受け入れる受け入れ容器
手段Pと、前記搬送用ベルトコンベヤGに対して、この
受け入れ生コンクリートFを直接又は別段に備えられる
搬送手段を介して、連続して定量的に供給する供給手段
Eとを備えた容器状中継具Mが設けてあり、更に、前記
一本のブームよりなるブームCにあっては該ブームC
に、前記連設された複数本のブームよりなるブームCに
あっては該ブームにおける少なくとも前記昇降本体部D
に対する取り付け側にあるブームに、トリッパ装置Hを
備えた構成としてある。
To achieve the above object, a typical concrete transfer device according to a fourth aspect of the present invention is a tower mast A, and an elevating / lowering main body part provided on the tower mast A so as to be able to ascend and descend. B and this lifting body B
And a boom C made up of a single boom or a boom C made up of a plurality of booms connected in series, and the tower mast A includes:
A container-shaped carrier D used for carrying the ready-mixed concrete F is provided so as to be able to move up and down, and the boom C is
A belt conveyor G for transporting the ready-mixed concrete F is provided, and the ready-mixed concrete F is supplied to the elevating main body D or the boom C directly from the container-like transfer tool D or via a transfer means provided separately. The receiving container means P for receiving and the supplying means E for continuously and quantitatively supplying the receiving green concrete F to the transfer belt conveyor G directly or via a transfer means provided in another stage. The container-like relay tool M is provided, and further, in the boom C including the one boom, the boom C
In the boom C composed of the plurality of booms connected in series, at least the lifting main body portion D of the boom is provided.
The boom on the mounting side with respect to is equipped with the tripper device H.

【0028】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、直
接、又は別段に備えられた搬送手段を介して容器状中継
具Mの受け入れ容器手段Pに受けれ、この受け入れ生コ
ンクリートFを、連続して、定量的に、該容器状中継具
Mに設けられている供給手段Eから、直接又は別段に備
えられる搬送手段を介して、前記ブームCに備えられて
いるベルトコンベヤGに対して供給し、この連続して定
量的に供給される生コンクリートFを、該ベルトコンベ
ヤGの任意の位置からトリッパ装置を用いて、コンクリ
ートの打込み位置に向けて供給し、又は該ベルトコンベ
ヤGの先端側からコンクリートの打ち込み位置に向けて
供給することができる。
In the fresh concrete transfer device having the above structure, the fresh concrete F carried up by the container-like carrier D from the lower part of the tower mast A is directly or via a carrying means provided separately. The receiving green concrete F can be continuously and quantitatively provided directly or separately from the supplying means E provided in the container-like relay M. The raw concrete F, which is continuously and quantitatively supplied to a belt conveyor G provided on the boom C via a transporting means, is trippered from any position of the belt conveyor G. Can be used to feed the concrete toward the driving position, or from the tip side of the belt conveyor G toward the concrete driving position. .

【0029】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
における昇降本体部Bの昇降操作と、この昇降本体部B
に備えられたブームCの旋回操作と、先端側にあるブー
ムの繰入れ、繰出し操作、又は、該ブームCに備えられ
たトリッパ装置Hの該ブームCに対する移動操作などに
よってなされる当該ベルトコンベヤGからの生コンクリ
ートFの取り出し位置の位置決めによってなすことがで
きる。
Further, the positioning of the supply of the ready-mixed concrete F toward the concrete pouring position is performed by the tower mast A.
And the operation of raising and lowering the raising and lowering body portion B at
From the belt conveyor G, which is performed by a turning operation of the boom C provided to the boom C, a feeding operation of the boom at the tip side, a feeding operation of the boom, or a movement operation of the tripper device H provided on the boom C with respect to the boom C. This can be done by positioning the take-out position of the fresh concrete F.

【0030】次いで、前記の目的を達成するものとし
て、典型的な第5の発明に係る生コンクリートの移送装
置を、タワーマストAと、このタワーマストAに昇降可
能に備えられている昇降本体部Bと、この昇降本体部B
に回転可能に備えられた回転部Nと、この回転部Nに備
えられている一本のブームよりなるブームC又は連設さ
れた複数本のブームよりなるブームCとを有する構成と
し、前記タワーマストAには、生コンクリートFの搬送
に用いられる容器状搬送具Dが昇降可能に備えてあると
共に、前記ブームCには、生コンクリートFの搬送用ベ
ルトコンベヤGが設けてあり、更に、前記昇降本体部
D、又は前記回転部N、又は前記ブームCには、前記容
器状搬送具Dから直接又は別段に備えられる搬送手段に
よって生コンクリートFを受け入れる受け入れ容器手段
Pと、この受け入れ生コンクリートFを前記搬送用ベル
トコンベヤGに対して、直接又は別段に備えられる搬送
手段を介して、連続して定量的に供給する供給手段Eを
備えた容器状中継具Mが備えてあり、 更に、前記一本
のブームよりなるブームCにあっては該ブームCに、前
記連設された複数本のブームよりなるブームCにあって
は該ブームCにおける前記回転部Nに対する取り付け側
にあるブームに、トリッパ装置Hを設けた構成としてあ
る。
In order to achieve the above object, a typical concrete transfer device according to a fifth aspect of the present invention is a tower mast A, and an elevating / lowering main body part provided to the tower mast A so as to be able to ascend and descend. B and this lifting body B
And a boom C made up of a single boom or a boom C made up of a plurality of booms connected in series. The mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and the boom C is provided with a belt conveyor G for carrying the ready-mixed concrete F. Receiving container means P that receives the fresh concrete F from the container-like carrier D directly or by a carrying means provided separately in the elevating body D, the rotating part N, or the boom C, and the receiving fresh concrete F. A container-like relay device provided with a supply means E for continuously and quantitatively supplying the above to the conveyor belt conveyor G directly or via a conveyor means provided separately. Further, in the boom C including the one boom, the boom C includes the boom C, and in the boom C including the plurality of booms connected in series, the rotating portion N of the boom C does not exist. The tripper device H is provided on the boom on the mounting side with respect to.

【0031】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、直
接、又は別段に備えられる搬送手段を介して容器状中継
具Mの受け入れ容器手段Pに受け入れ、この受け入れ生
コンクリートFを、容器状中継具Mに設けられている供
給手段Eによって、ブームCに備えられているベルトコ
ンベヤGに対して、連続して定量的に供給し、この連続
して定量的に供給される生コンクリートFを、該ベルト
コンベヤGの先端側からコンクリートの打込み位置に向
けて、又は該ベルトコンベヤGの任意の位置からトリッ
パ装置Hによってコンクリートの打込み位置に向けて、
連続して、定量的に供給することができる。
In the fresh concrete transfer device having such a structure, the fresh concrete F carried up by the container-like carrier D from the lower part of the tower mast A is directly or via a carrying means provided separately. It is received in the receiving container means P of the container-like relay tool M, and the received fresh concrete F is continuously supplied to the belt conveyor G provided in the boom C by the supply means E provided in the container-like relay tool M. Then, the continuous concretely supplied fresh concrete F is fed from the tip side of the belt conveyor G toward a concrete driving position or from an arbitrary position of the belt conveyor G by a tripper. With the device H, toward the concrete pouring position,
It can be supplied continuously and quantitatively.

【0032】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
における昇降本体部Bの昇降操作と、この昇降本体部B
に備えられた回転部Nの回転操作と、先端側にあるブー
ムの繰入れ、繰出し操作、又はブームCに備えられたト
リッパ装置Hの該ブームCに対する移動操作などによっ
てなされる当該ベルトコンベヤGからの生コンクリート
Fの取り出し位置の位置決めによってなすことができ
る。
Further, the positioning of the supply of the ready-mixed concrete F toward the concrete pouring position is performed by the tower mast A.
And the operation of raising and lowering the raising and lowering body portion B at
From the belt conveyor G, which is performed by a rotating operation of a rotating portion N provided in the boom C, a feeding operation and a feeding operation of a boom on the tip side, a moving operation of a tripper device H provided on the boom C with respect to the boom C, and the like. This can be done by positioning the take-out position of the green concrete F.

【0033】次いで、前記の目的を達成するものとし
て、典型的な第6の発明に係る生コンクリートの移送装
置を、回転可能に立設されているタワーマストAと、こ
のタワーマストAに昇降可能に備えられている昇降本体
部Bと、この昇降本体部Bに備えられている一本のブー
ムよりなるブームC又は連設された複数本のブームより
なるブームCとを有する構成とし、しかも、前記タワー
マストAには、生コンクリートFの搬送に用いられる容
器状搬送具Dが昇降可能に備えてあると共に、前記ブー
ムCには、生コンクリートFの搬送用ベルトコンベヤG
が設けてあり、更に、前記昇降本体部B又は前記ブーム
Cには、前記容器状搬送具Dから直接又は別段に備えら
れる搬送手段を介して生コンクリートFを受け入れる受
け入れ容器手段Pと、前記搬送用ベルトコンベヤGに対
して、この受け入れ生コンクリートFを、直接又は別段
に備えられる搬送手段を介して、連続して定量的に供給
する供給手段Eを備えた容器状中継具Mが備えてあり、
更に、前記一本のブームよりなるブームCにあっては該
ブームCに、前記連設された複数本のブームよりなるブ
ームCにあっては該ブームCにおける少なくとも前記昇
降本体部Bに対する取り付け側にあるブームに、トリッ
パ装置Hを設けた構成としてある。
In order to achieve the above-mentioned object, a transfer device for fresh concrete according to a typical sixth aspect of the present invention can be moved up and down to a tower mast A that is rotatably erected. And a boom C made up of one boom or a boom C made up of a plurality of booms connected in series, and The tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and the boom C is provided with a belt conveyor G for carrying the ready-mixed concrete F.
Further, the elevating main body B or the boom C is further provided with a receiving container means P for receiving the ready-mixed concrete F from the container-like carrier D directly or via a carrying means provided separately, and the carrying means. A container-shaped relay M having a supply unit E for quantitatively continuously and quantitatively supplying the received ready-mixed concrete F to the belt conveyor G directly or via a transfer unit provided separately. ,
Further, in the boom C composed of the one boom, the boom C is composed of the boom C. In the boom C composed of the plurality of booms connected in series, at least the mounting side of the boom C to the elevating body B is attached. The boom is provided with a tripper device H.

【0034】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から容器状搬送
具Dによって運び上げられた生コンクリートFを、この
容器状搬送具Dから直接又は別段に備えられた搬送手段
を介して容器状中継具Mにおける受け入れ容器手段Pに
受け入れ、この受け入れ生コンクリートFを、容器状中
継具Mに設けられている供給手段Eによって、ブームC
に備えられているベルトコンベヤGに対して、連続して
定量的に供給し、この連続して定量的に供給される生コ
ンクリートFを、該ベルトコンベヤGの先端側からコン
クリートの打ち込み位置に連続して、定量的に供給し、
又は該ベルトコンベヤGの任意の位置からトリッパ装置
を用いてコンクリートの打込み位置に連続して、定量的
に供給することができる。
In the ready-mixed concrete transfer device having such a structure, the ready-mixed concrete F carried by the container-shaped carrier D from the lower part of the tower mast A is directly or separately provided from the container-shaped carrier D. The receiving raw concrete F is received by the receiving container means P in the container-like relay tool M via the conveying means, and the receiving concrete E is supplied to the boom C by the supply means E provided in the container-like relay tool M.
Is continuously and quantitatively supplied to the belt conveyor G provided in, and the continuously and quantitatively supplied fresh concrete F is continuously supplied to the concrete driving position from the tip side of the belt conveyor G. And supply quantitatively,
Alternatively, it is possible to continuously and quantitatively supply from an arbitrary position of the belt conveyor G to a concrete driving position by using a tripper device.

【0035】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
の回転操作と、このタワーマストAにおける昇降本体部
Bの昇降操作と、先端側にあるブームの繰入れ、繰出し
操作、又は、前記ブームCに備えつけられたトリッパ装
置Hの該ブームCに対する移動操作などによってなされ
る当該ベルトコンベヤGからの生コンクリートFの取り
出し位置の位置決めによってなすことができる。
The positioning of the supply of the ready-mixed concrete F toward the concrete pouring position is performed by the tower mast A.
Rotation operation of the tower mast A, lifting and lowering operation of the lifting and lowering main body portion B in the tower mast A, feeding and unwinding operation of the boom at the tip side, movement operation of the tripper device H mounted on the boom C with respect to the boom C, and the like. It is possible to position the take-out position of the ready-mixed concrete F from the belt conveyor G.

【0036】叙上の第1〜第6の発明に係る各生コンク
リートの移送装置は、いずれも、生コンクリートの打込
み作業現場にあって、タワーマストAを定着の状態で立
設するように構成してあっても良く、またいずれも、走
行レールなどによって、例えば、構築されるダムのえん
堤に沿った向き(ダムの軸方向)に移動できるように構
成してあっても良い。
Each of the fresh concrete transfer devices according to the above-mentioned first to sixth inventions is constructed such that the tower mast A is erected in a fixed state at a working site for driving fresh concrete. Alternatively, each of them may be configured to be movable by a traveling rail or the like, for example, in a direction along the bank of the constructed dam (axial direction of the dam).

【0037】また、前記の第1〜第6の発明に係る各生
コンクリートの移送装置に備えられるブームCは、一本
の略水平なフレームとして構成されるブームによって構
成してあっても良く、又、昇降本体部Bは回転部Nに対
して略水平に取付けられるブームと、このブームに対し
て、2以上のブームとによって構成してあっても良く、
又、複数本のブームを、一連に固着した一本のブームと
して構成してあっても良い。
The boom C provided in each of the ready-mixed concrete transfer devices according to the first to sixth inventions may be a boom configured as one substantially horizontal frame, Further, the elevating / lowering main body portion B may be constituted by a boom attached substantially horizontally to the rotating portion N and two or more booms with respect to the boom.
Also, a plurality of booms may be configured as a single boom that is fixed in series.

【0038】かかる複数本のブームによってブームCを
構成する場合にあっては、根元側に備えられるブームに
備えられたベルトコンベヤGから、先端側ブームに備え
られたベルトコンベヤGに対して、生コンクリートF
が、順次に受け継がれる構成としてある。
When the boom C is constituted by a plurality of such booms, the belt conveyor G provided on the boom provided on the root side is fed to the belt conveyor G provided on the boom on the tip side. Concrete F
However, it is configured to be inherited sequentially.

【0039】又、前記の各発明に係る生コンクリートの
移送装置に備えられるトリッパ装置Hは、この生コンク
リートの移送装置に備えられるブームCが一本の場合に
あっては、このブームCに対して移動可能に備えてあ
る。又、前記ブームCが複数本のブームによって構成さ
れている場合にあっては、このブームCを構成する全て
のブーム、又は、該ブームCの昇降本体部B又は回転部
Nに対する取付け側にあるブーム、又は、この取付け側
にあるブームを少なくとも含む複数本のブームに対し
て、トリッパ装置Hを備える構成としてある。
Further, the tripper device H provided in the fresh concrete transfer device according to each of the above-mentioned inventions is different from the boom C in the case where the fresh concrete transfer device has one boom C. It is prepared to move. In the case where the boom C is composed of a plurality of booms, all the booms constituting the boom C, or the mounting side of the boom C for the elevating body B or the rotating unit N are provided. The tripper device H is provided for the boom or a plurality of booms including at least the boom on the mounting side.

【0040】又、前記第2、及び第5の発明に係る生コ
ンクリートの移送装置にあっては、ブームCを、回転部
Nに対して、旋回可能に設けてあっても良く、また、ブ
ームCを回転部Nに対して旋回しない態様に設けてあっ
ても良い。
In addition, in the ready-mixed concrete transferring device according to the second and fifth aspects of the present invention, the boom C may be provided so as to be rotatable with respect to the rotating portion N. The C may be provided so as not to turn with respect to the rotating portion N.

【0041】又、前記第3及び第6の発明に係る生コン
クリートの移送装置にあっては、ブームCを、昇降本体
部Bに対して、旋回可能に設けてあっても良く、また、
このブームCを昇降本体部Bに対して旋回しない態様に
設けてあっても良い。
In the ready-mixed concrete transferring apparatus according to the third and sixth aspects of the invention, the boom C may be provided so as to be rotatable with respect to the elevating main body section B, and
The boom C may be provided so as not to turn with respect to the elevating / lowering body B.

【0042】尚、叙上の各発明に係る生コンクリートの
移送装置を構成する、容器状搬送具Dは、タワーマスト
Aに対して、昇降可能に備えつけられる一基又は複数基
一組みのものとして用意される。
The container-shaped carrier D, which constitutes the transfer device for ready-mixed concrete according to each of the above-mentioned inventions, is a unit or a set of a plurality of units which is provided to the tower mast A so as to be able to move up and down. Be prepared.

【0043】ここに、同一のタワーマストAに対して、
複数基の容器状搬送具Dを備えつける場合、夫々の容器
状搬送具Dが、夫々に昇降のタイミングを異にして、順
次に、ベルトコンベヤGに向けて生コンクリートFを提
供できるように構成することが好ましい。
Here, for the same tower mast A,
When a plurality of container-shaped carriers D are provided, each container-shaped carrier D is configured to be able to sequentially provide the ready-mixed concrete F toward the belt conveyor G at different rising and lowering timings. Preferably.

【0044】また、ここで当該生コンクリートの移送装
置に備えられる容器状搬送具Dは、もっとも典型的に
は、タワーマストAに対して同一の鉛直線に沿って上下
方向に往復動する構成とすることが好ましい。
Further, the container-shaped carrier D provided in the fresh concrete transfer device is most typically configured to reciprocate vertically with respect to the tower mast A along the same vertical line. Preferably.

【0045】また、この容器状搬送具Dは、これを、タ
ワーマストAに対して昇降可能に備えつけられている昇
降搬送具Kに対して、載置状態、懸架状態、吊下げ状態
などの各種態様で支持した状態になすと共に、この昇降
搬送具Kを、例えば、ウインチによって操作されるワイ
ヤーを用いて昇降操作することで、該容器状搬送具Dを
前記タワーマストAに対して昇降するように構成してあ
っても良く、また、この容器状搬送具D自体に、ウイン
チ操作されるワイヤー端を結着して、この容器状搬送具
D自体を直接、タワーマストAに対して昇降するように
構成としてあっても良い。
Further, the container-shaped carrier D is mounted on the tower mast A so that it can be lifted up and down. The container-shaped carrier D can be lifted up and down with respect to the tower mast A by supporting the container mast A while supporting the container-shaped carrier D in a state of being supported by a mode, and lifting and lowering the carrier K by using, for example, a wire operated by a winch. Alternatively, the container-shaped carrier D itself may be connected to a winch-operated wire end to directly move the container-shaped carrier D itself up and down with respect to the tower mast A. It may be configured as follows.

【0046】尚、前記第1〜第3の発明に係る生コンク
リートの移送装置を構成する容器状搬送具Dには、この
容器状搬送具Dに受け入れた生コンクリートを、連続し
て、定量的に送り出す供給手段Eとして、スクリューフ
ィーダ、ベルトフィーダなどが備えられており、この供
給手段Eによって、生コンクリートを、ベルトコンベヤ
Gに対して、直接、又は別段に備えられる搬送手段を介
して、連続して、定量的に供給できる構成としてある。
In the container-shaped carrier D that constitutes the green concrete transfer device according to the first to third inventions, the raw concrete received in the container-shaped carrier D is continuously and quantitatively measured. A screw feeder, a belt feeder, or the like is provided as the feeding means E for feeding the raw concrete to the belt conveyor G directly or via a feeding means provided separately in a continuous manner. Then, it can be supplied quantitatively.

【0047】更に、第4〜第6の発明に係る生コンクリ
ートの移送装置を構成する容器状中継具Mは、前記容器
状搬送具Dから直接、又は別段に備えつけられる搬送手
段を介して生コンクリートFを供給される構成としてあ
り、しかも、この容器状中継具Mの下部側に、スクリュ
ーフィーダ、ベルトフィーダなどの定量供給手段E、こ
の場合にあっては、この容器状中継具Mに収納されてい
る生コンクリートFを、連続して、定量的に、ベルトコ
ンベヤGに向けて送り出す供給手段Eを備えた構成とし
てあり、この供給手段Eによって供給される生コンクリ
ートFを直接、又は、別段に備えられる搬送手段を介し
て、前記ベルトコンベヤGに対して供給できる構成とし
てある。
Further, the container-like relay tool M constituting the transfer device for ready-mixed concrete according to the fourth to sixth aspects of the present invention is directly supplied from the container-like transfer tool D or via a transfer means which is separately provided. F is supplied to the container-shaped relay tool M, and at the lower side of the container-shaped relay tool M, a fixed amount supply means E such as a screw feeder and a belt feeder, and in this case, is housed in the container-shaped relay tool M. The raw concrete F being supplied is continuously and quantitatively provided with a feeding means E for feeding it toward the belt conveyor G, and the raw concrete F fed by the feeding means E is directly or separately provided. It is configured such that it can be supplied to the belt conveyor G via a transportation means provided.

【0048】尚、前記の各発明に係る生コンクリートの
移送装置を構成する供給手段Eによる生コンクリートF
の供給に際して、“連続して”とは、ベルトコンベヤG
上に、一切の切れ目無しに、生コンクリートFが帯状に
連なって供給されることのみを意味するもので無く、ベ
ルトコンベヤG上に供給された生コンクリートFが、切
れ目によって途切れた状態で供給されている場合であっ
ても、これが、ベルトコンベヤGによる搬送を阻害せ
ず、しかも、コンクリートの打設面に悪影響をもたらさ
ない程度に、切れ目をもって連続して、ベルトコンベヤ
G上に生コンクリートFが提供される態様をも含む概念
である。
Incidentally, the ready-mixed concrete F by the supply means E which constitutes the transfer device for ready-mixed concrete according to each of the above inventions.
"Continuously" means that the belt conveyor G
It does not mean that the fresh concrete F is continuously supplied in a strip shape without any break on the top, and the fresh concrete F supplied on the belt conveyor G is supplied in a state of being interrupted by the break. Even if it is present, this does not hinder the conveyance by the belt conveyor G, and the raw concrete F is continuously and continuously cut on the belt conveyor G to the extent that it does not adversely affect the concrete placing surface. This is a concept including the modes provided.

【0049】又、ここで“定量的”とは、厳格に、均一
の量の生コンクリートの供給がなされることのみを意味
するものでなく、ベルトコンベヤGの駆動を阻害し、あ
るいはコンクリートの打設面に悪影響をもたらすような
量的な変化を経時的に生じない程度にバラ付きのある生
コンクリートFの供給をも意味するものであって、ベル
トコンベヤG上に供給される生コンクリートFの量が、
経時的に、前記許容範囲内においてバラついて供給され
ている場合をも含む概念である。
The term "quantitative" does not strictly mean that a uniform amount of fresh concrete is supplied, but it impedes the drive of the belt conveyor G or the concrete pouring. It also means the supply of fresh concrete F having a variation to the extent that it does not cause a quantitative change that adversely affects the installation surface over time. Quantity
This is a concept including a case where the supply is varied over time within the allowable range.

【0050】更に、叙上において構成される各発明に係
る生コンクリートの移送装置は、当該装置の典型例を示
したものであって、前記で示される構成に限定されるも
のではない。又、ここで示される各構成は、当該装置の
典型的な構成部分を示したものであって、これらの構成
に限定されるものではなく、これらの構成部分の改良、
これらの構成部分に対しての付加的な構成、などの各種
の態様での実施をなすことができる。
Further, the transfer device for ready-mixed concrete according to each invention constructed above is a typical example of the device, and is not limited to the structure shown above. Further, each configuration shown here shows a typical configuration part of the device, and is not limited to these configurations, and improvements of these configuration parts,
Implementation can be performed in various modes such as additional configurations to these components.

【0051】[0051]

【発明の実施の形態】以下本発明に係る生コンクリ−ト
の移送装置に関する典型的な各実施の形態について詳細
に説明する。図1〜図4は、本発明の、好的な実施の形
態の、より典型例を、模式的に示している。そして、図
5〜図36は、第1の実施の形態に係る生コンクリート
の移送装置を示している。さらに、図37〜図44は、
第2の実施の形態に係る生コンクリートの移送装置を示
している。さらに、図45〜図61は、第3の実施の形
態に係る生コンクリートの移送装置を示している。さら
に、図62〜図68は、第4の実施の形態に係る生コン
クリートの移送装置を示している。さらに、図69〜図
98は、第5の実施の形態に係る生コンクリートの移送
装置を示している。さらに、図99〜図100は、第6
の実施の形態に係る生コンクリートの移送装置を示して
いる。
BEST MODE FOR CARRYING OUT THE INVENTION Typical embodiments of a fresh concrete transfer device according to the present invention will be described in detail below. 1 to 4 schematically show more typical examples of preferred embodiments of the present invention. And FIGS. 5-36 have shown the transfer device of the fresh concrete which concerns on 1st Embodiment. Furthermore, FIGS.
The transfer device of the fresh concrete which concerns on 2nd Embodiment is shown. Further, FIGS. 45 to 61 show a fresh concrete transfer device according to the third embodiment. Further, FIGS. 62 to 68 show a ready-mixed concrete transfer device according to the fourth embodiment. Further, FIGS. 69 to 98 show a ready-mixed concrete transfer device according to the fifth embodiment. Furthermore, FIG. 99 to FIG.
2 shows a transfer device for ready-mixed concrete according to the embodiment.

【0052】図1は、生コンクリートFを連続して、定
量的に送り出す供給手段Eを備えた容器状搬送具Dによ
って、昇降本体部Bに備えられた旋回ブームCのベルト
コンベヤGに対して生コンクリートFを、連続して、定
量的に送り出すようにした移送装置を、その構成要部に
よって模式的に示している。
In FIG. 1, a container-shaped carrier D having a supply means E for continuously and quantitatively feeding the ready-mixed concrete F to a belt conveyor G of a revolving boom C provided in an elevating main body B. A transfer device configured to continuously and quantitatively send the ready-mixed concrete F is schematically shown by its main components.

【0053】図2は、生コンクリートFを連続して、定
量的に送り出す供給手段Eを備えた容器状搬送具Dによ
って、昇降本体部Bに回転可能に備えられた回転部Nの
ブームCにあるベルトコンベヤGに対して、生コンクリ
ートFを連続して、定量的に供給するようにした移送装
置を、その構成要部によって模式的に示している。
FIG. 2 shows a boom C of a rotating part N rotatably provided on an elevating main body B by a container-shaped carrier D having a supply means E for continuously and quantitatively feeding fresh concrete F. A transfer device configured to continuously and quantitatively supply fresh concrete F to a certain belt conveyor G is schematically shown by its main configuration.

【0054】図3は、生コンクリートFの受け入れ容器
手段Pと、この受け入れ生コンクリートFを、連続し
て、定量的に送り出す供給手段Eとを備えた容器状中継
具Mを、容器状搬送具Dから、昇降本体部Bに備えられ
たブームCのベルトコンベヤGに対して生コンクリート
Fを受け渡す搬送系路に組み入れ、ベルトコンベヤGに
対して、生コンクリートFを、連続して、定量的に送り
出すようにした移送装置を、その構成要部によって模式
的に示している。
FIG. 3 shows a container-like relay M provided with a container P for receiving the fresh concrete F and a supply means E for continuously and quantitatively sending the received fresh concrete F. The raw concrete F is continuously and quantitatively fed to the belt conveyor G by incorporating the raw concrete F from the D to the belt conveyor G of the boom C provided in the elevating and lowering body portion B, and transferring the raw concrete F to the belt conveyor G. The transfer device adapted to be sent out to is schematically shown by its main components.

【0055】図4は、生コンクリートFの受け入れ容器
手段Pと、この受け入れ生コンクリートFを、連続し
て、定量的に送り出す供給手段Eとを備えた容器状中継
具Mを、容器状搬送具Dから、昇降本体部Bに対して回
転可能に備えられた回転部Nに設けられているブームC
のベルトコンベヤGに対して、生コンクリートFを受け
渡す搬送系路に組み入れ、ベルトコンベヤGに対して、
生コンクリートFを、連続して、定量的に送り出すよう
にした移送装置を、その構成要部によって模式的に示し
ている。
FIG. 4 shows a container-shaped relay M provided with a container P for receiving fresh concrete F and a supply means E for continuously and quantitatively sending the received fresh concrete F. A boom C provided on a rotating portion N rotatably provided with respect to the elevating main body portion B from D.
Incorporation into the conveying system path for delivering the green concrete F to the belt conveyor G of
A transfer device configured to continuously and quantitatively send the ready-mixed concrete F is schematically shown by its main components.

【0056】前記図5〜図36で示される第1の実施の
形態に係る生コンクリートの移送装置において、図5
は、これを構成するタワーマストAなどの全体を一方の
側から見て示していると共に、図6では、この図5の状
態を側面から見て示し、また図7では、該装置の要部を
平面から見て示している。
In the ready-mixed concrete transfer device according to the first embodiment shown in FIGS.
Shows the entire tower mast A and the like constituting the same as seen from one side, FIG. 6 shows the state of FIG. 5 as seen from the side, and FIG. 7 shows essential parts of the device. Is viewed from a plane.

【0057】次いで、図8〜図13は、当該装置におけ
る下部の夫々の要部々分を示すものであり、図8では、
走行部分を除いたタワーマストAの旋回部分の要部縦断
面を、図9は、タワーマストAの途中から破断状に下面
を見た要部平面を示している。又、図10では、タワー
マストAの走行部分の要部を側面から見て示すと共に、
図11では、この走行部分の要部を、レール17と直交
する向きから示している。更に、図12と図13とは、
レール17部分における転倒防止手段16を、図12で
は、その側面から、また、図13では、レール17と直
交する向きから示している。
Next, FIGS. 8 to 13 show the essential parts of the lower part of the apparatus. In FIG.
9 is a vertical cross-sectional view of a main part of the turning part of the tower mast A excluding the traveling part, and FIG. In addition, in FIG. 10, the main part of the traveling portion of the tower mast A is shown from the side,
In FIG. 11, the main part of this traveling portion is shown from the direction orthogonal to the rail 17. Further, FIG. 12 and FIG.
The fall prevention means 16 in the rail 17 portion is shown from the side surface in FIG. 12 and from the direction orthogonal to the rail 17 in FIG.

【0058】図14〜図19は、昇降フレーム20など
のクライミング部分の要部を示すものであって、図14
は、このクライミング部分の要部をタワーマストAの一
方の側から、また、図15は、この図14と直交する向
きでの当該クライミング部分の要部を夫々示している。
図16〜図18は、このクライミング部分に用いられて
いる各昇降手段と共に用いられるロック手段の要部を示
すものであり、図16は、当該要部を一つの側面から、
図17は、これと直交する向きで、又、図18では、ロ
ック手段の一方を構成する受け段部26を示している。
更に、図19では、タワーマストAに対して昇降方向に
動作されるクライミング部分の略水平の向きでの嵌まり
合いの状態を断面として示している。
14 to 19 show the main part of a climbing portion such as the elevating frame 20.
Shows the main part of the climbing part from one side of the tower mast A, and FIG. 15 shows the main part of the climbing part in the direction orthogonal to FIG.
16 to 18 show the main parts of the locking means used together with the respective lifting means used in this climbing portion, and FIG. 16 shows the main parts from one side surface.
FIG. 17 shows the receiving step portion 26 constituting one of the locking means in the direction orthogonal to this, and in FIG.
Further, in FIG. 19, a state in which the climbing portion that is operated in the vertical direction with respect to the tower mast A is fitted in a substantially horizontal direction is shown as a cross section.

【0059】図20〜図22は、ブームCのタワーマス
トAに対する取付け部分と、その伸縮動作状態を示すも
のであって、図20では、該ブームCの取付け部分、特
に、水平方向に向けたブーム旋回装置33部分と、軸桿
34を回動軸とした上下方向に向けての旋回部分の要部
を拡大した断面として示している。また、図21と、図
22とは、根元側ブームC’に対する先端側ブームC”
の収め入れ、及び引き伸ばしの手段を、図21では、こ
れを側面から、図22ではこれを上面から、その要部々
分を取り出し、且つ一部を破断して示している。図23
〜図26は、ブームC’、C”に備えられているベルト
コベヤGと、ベルトコンベヤGのトリッパ装置Hを示す
ものであり、図23では、その要部を側面から見て示
し、また図24では、ベルトコンベヤGの前方から、そ
のブームCの部分を破断して示している。更に、図25
では、根元側ブームC’の側に備えられているトリッパ
装置Hが理解され易いように、該トリッパ装置Hの取り
出し側であるベルトコンベヤGの前方側から見て、該ブ
ームC部分を破断して示している。又、図26は、ブー
ムCに備えられている各ベルトコンベヤGの動作の状態
を示している。
20 to 22 show a mounting portion of the boom C to the tower mast A and its expanding / contracting operation state. In FIG. 20, the mounting portion of the boom C is directed to the horizontal direction. The boom turning device 33 part and the main part of the turning part in the up-down direction with the shaft rod 34 as the rotation axis are shown as an enlarged cross section. In addition, FIG. 21 and FIG. 22 show the tip side boom C ″ with respect to the root side boom C ′.
21 shows the means for storing and stretching the same in a side view in FIG. 21 and in a top view in FIG. FIG. 23
26 show the belt cover G provided for the booms C ′ and C ″ and the tripper device H of the belt conveyor G. FIG. 23 shows the main parts thereof as seen from the side, and FIG. 25, the portion of the boom C is cut away from the front of the belt conveyor G. Further, FIG.
Then, in order to facilitate understanding of the tripper device H provided on the base side boom C ′ side, the boom C portion is broken when viewed from the front side of the belt conveyor G which is the takeout side of the tripper device H. Is shown. Further, FIG. 26 shows an operation state of each belt conveyor G provided on the boom C.

【0060】図27〜図31は容器状搬送具Dの昇降手
法を示すものであって、図27〜図29では、その第1
の手法を、また、図30及び図31では、その第2の手
法を示している。そして、図27では、この第1の昇降
手法によって容器状搬送具Dを上下操作している状態を
側面から模式的に示し、図28では、同様に、これを上
面から、更に、図29では、図27と略直交する向きか
ら、夫々模式的に示している。更に、図30と図31の
第2の昇降手法にあっては、図30で、これらの手法を
容器状搬送具Dなどの側面から、また図31では、これ
を上面から、夫々模式的に示している。
27 to 31 show a method of raising and lowering the container-shaped carrier D, and in FIGS. 27 to 29, the first method is shown.
And the second method is shown in FIGS. 30 and 31. Then, in FIG. 27, a state in which the container-shaped carrier D is vertically operated by the first elevating method is schematically shown from the side surface, and similarly in FIG. 28, this is from the upper surface and further in FIG. 29. , Each of which is schematically shown from a direction substantially orthogonal to FIG. 27. Further, in the second lifting method of FIGS. 30 and 31, these methods are schematically illustrated in FIG. 30 from the side surface of the container-shaped carrier D and the like, and in FIG. 31 from the upper surface. Shows.

【0061】次いで、図32では、これらの容器状搬送
具Dの典型例としてのスクリュー供給装置75を定量供
給タイプのフィーダEとした容器状搬送具Dの要部を断
面して示している。
Next, FIG. 32 is a cross-sectional view showing the main parts of the container-shaped carrier D in which the screw feeding device 75, which is a typical example of the container-shaped carrier D, is used as a feeder E of a constant-volume supply type.

【0062】図33及び図34は、容器状搬送具Dか
ら、生コンクリートFをベルトコベヤGに取り出すため
のシュート70の要部を、第33図では、その側面か
ら、図34では、その正面から、夫々一部破断の状態で
示している。
33 and 34, the essential parts of the chute 70 for taking out the ready-mixed concrete F from the container-shaped carrier D to the belt coveyor G are shown from the side in FIG. 33 and from the front in FIG. , Each is shown in a partially broken state.

【0063】図35及び図36は、容器状搬送具Dに対
して、生コンクリートFを供給する手段としての投入ホ
ッパー71部分の要部を、特に、該投入ホッパー71の
動作状態が理解され易いように、図35では、これを並
設状態で、図35のAでは、該投入ホッパー71をベル
トコベヤ77の側に引き寄せた状態を、また、図35の
Bでは、タワーマストAにある容器状搬送具Dの上方
に、当該投入ホッパー71を位置づけるように、ベルト
コンベヤ77の側から前方に送り出している状態を夫々
要部々分の平面として示し、また、図36では、これを
側面から見て示している。
FIGS. 35 and 36 show the main part of the input hopper 71 as a means for supplying the ready-mixed concrete F to the container-shaped carrier D, and particularly the operating state of the input hopper 71 is easy to understand. As shown in FIG. 35, in a state where they are arranged side by side, in FIG. 35A, the input hopper 71 is drawn to the belt coveer 77 side, and in FIG. The state in which the feeding hopper 71 is positioned above the carrier D and is fed forward from the side of the belt conveyor 77 is shown as a plane for each main part, and in FIG. 36, this is seen from the side. Is shown.

【0064】図37〜図44は、第2の実施の形態に係
る装置を、タワーマストAの各面から示すものであり、
図37では該タワーマストの一つの面から見て示してい
ると共に、図38は、これと略直交する向きで、又、図
39では、これを平面から見て夫々示している。
37 to 44 show the apparatus according to the second embodiment from each side of the tower mast A.
FIG. 37 shows the tower mast viewed from one side, FIG. 38 shows it in a direction substantially orthogonal thereto, and FIG. 39 shows it in a plan view.

【0065】図40及び図41は、この装置、特に、ブ
ームCに備えられたクレーン手段Jを示すものであっ
て、図40では、このクレーン手段Jを、走行レール8
4と直交する向きから、また、図41では、このクレー
ン手段Jの要部を上面から見て示している。
FIG. 40 and FIG. 41 show the crane means J provided in this device, in particular, the boom C. In FIG. 40, this crane means J is shown in FIG.
4 and in FIG. 41, the main parts of the crane means J are shown from above.

【0066】図42〜図44は、生コンクリートFをタ
ワーマストAにある容器状搬送具Dに投入する他の投入
ホッパーを示すものであって、図42では、その要部を
側面から、図43では、これを平面から示し、図44で
は、該投入ホッパーの摺動部分にあるフレームを断面し
て示している。
42 to 44 show another charging hopper for charging the ready-mixed concrete F into the container-shaped carrier D in the tower mast A. In FIG. 43, this is shown from the plane, and FIG. 44 shows the frame at the sliding portion of the input hopper in cross section.

【0067】図45〜図61は第3の実施の形態に係る
装置におけるタワーマストAを各面から見て示すもので
あり、図45は該タワーマストAを一つの側から、図4
6では、これを略直交する向きで示している。又、図4
7は、ブームCの取付け部分の要部を拡大した側面とし
て、更に、図48では、タワーマストAに対する昇降本
体部Bの取付け状態を上面から見た要部構成図として示
している。
45 to 61 show the tower mast A in the apparatus according to the third embodiment as seen from each side, and FIG. 45 shows the tower mast A from one side and FIG.
6 shows this in a substantially orthogonal direction. Also, FIG.
7 is an enlarged side surface of the main part of the mounting portion of the boom C, and in FIG. 48, the mounting state of the elevating main body part B to the tower mast A is shown as a main part configuration diagram viewed from the top.

【0068】図49〜図58は、タワーマストAに備え
られている昇降搬送具Kを用いて容器状搬送具Dを搬送
する手段を示すものであって、図49では台車88を用
いて、タワーマストAの昇降搬送具Kに対して、容器状
搬送具Dを積み込む状態の要部を側面から見て示すと共
に、図50では、この台車88のレール96と直交する
向きでの要部々分を側面から見て示している。
FIGS. 49 to 58 show means for carrying the container-shaped carrier D using the elevator carrier K provided in the tower mast A. In FIG. 50 shows the main parts of the tower mast A in which the container-shaped carrier D is loaded with respect to the lifting / lowering carrier K, and in FIG. 50, the main parts of the cart 88 in a direction orthogonal to the rail 96. The minutes are shown from the side.

【0069】更に図51では、この昇降搬送具Kとして
用いられる吊フレーム台87の要部を斜視で、図52で
は、この吊フレーム台87に容器状搬送具Dを支承した
状態の要部々分を示している。また、図53では、この
容器状搬送具Dの取り入れ部分と、タワーマストAに対
する当該昇降搬送具Kの組込み状態が理解され易いよう
に、タワーマストAの途中で断面した状態として示して
いる。
Further, FIG. 51 is a perspective view of a main part of the suspension frame base 87 used as the lifting / lowering transport tool K, and FIG. Shows minutes. Further, in FIG. 53, in order to make it easy to understand the intake portion of the container-shaped carrier D and the assembled state of the elevating carrier K to the tower mast A, it is shown as a cross-sectional state in the middle of the tower mast A.

【0070】図54〜図58は容器状搬送具Dを昇降搬
送具Kを用いて昇降する手法を示すものであって、図5
4〜図56では、その第1の手法を、また、図57及び
図58では、その第2の手法を示している。そして、図
54では、この第1の昇降手法によって容器状搬送具D
を上下操作している状態を側面から模式的に示し、更
に、図55では、図54と略直交する向きから、更に、
図56では、同様に、これを上面から、夫々模式的に示
している。更に、図57と図58の第2の昇降手法にあ
っては、図57で、これらの手法を容器状搬送具Dなど
の側面から、また図58では、これを上面から、夫々模
式的に示している。
54 to 58 show a method of raising and lowering the container-shaped carrier D by using the lifting carrier K, and FIG.
4 to 56 show the first method, and FIGS. 57 and 58 show the second method. In FIG. 54, the container-shaped carrier D
54 is a side view schematically showing a state of operating up and down. Further, in FIG. 55, from the direction substantially orthogonal to FIG.
In FIG. 56, similarly, this is schematically shown from the upper side. Further, in the second lifting method of FIGS. 57 and 58, these methods are schematically illustrated in FIG. 57 from the side surface of the container-shaped carrier D and the like, and in FIG. 58 from the upper surface. Shows.

【0071】図59〜図61は、この台車88に載置さ
れた各容器状搬送具Dに対して、生コンクリートFを供
給する各手段を模式的に示している。
59 to 61 schematically show each means for supplying the fresh concrete F to each container-shaped carrier D mounted on the carriage 88.

【0072】図62〜図68は第4の実施の形態に係る
装置におけるタワーマストAを各面から見て示すもので
あり、図62は、タワーマストAを一つの側から、図6
3では、これと略直交する向きから、更に図64では、
これを上面から見て、夫々の構成要部により模式的に示
している。
62 to 68 show the tower mast A in the apparatus according to the fourth embodiment as seen from each side, and FIG. 62 shows the tower mast A from one side.
In FIG. 3, from the direction substantially orthogonal to this, further in FIG.
When viewed from the top, this is schematically shown by the respective main constituent parts.

【0073】図65は、このタワーマストAと、昇降本
体部B及び回転部Nとの各組付けの状態の要部を側面か
ら模式的に示し、図66では、この要部を、上面から、
模式的に示している。
FIG. 65 is a side view schematically showing the essential parts of the tower mast A, and the ascending / descending main body part B and the rotating part N in the assembled state. In FIG. 66, the essential parts are shown from the top surface. ,
It is shown schematically.

【0074】図67及び図68は、移送手段Lを示すも
のであって、図67では、この移送手段Lを平面の状態
で、模式的に示し、図68は、この移送手段Lの要部を
縦断面の状態で示している。
67 and 68 show the transfer means L. In FIG. 67, the transfer means L is schematically shown in a planar state, and FIG. 68 shows the main part of the transfer means L. Is shown in a state of a vertical section.

【0075】図69〜図98は、第5の実施の形態に係
る装置におけるタワーマストAなどを、各面から見て示
している。図69は、タワーマストAを一つの側面か
ら、図70は、これと略直交する向きから、更に、図7
1では、これを上方から見て、夫々の構成要部により模
式的に示している。また、図72は、タワーマストAの
頂部を上方から見て示している。
69 to 98 show the tower mast A and the like in the apparatus according to the fifth embodiment, as viewed from each side. 69 shows the tower mast A from one side surface, FIG. 70 shows the tower mast A from a direction substantially orthogonal thereto, and FIG.
In FIG. 1, this is schematically shown by the respective main components when viewed from above. 72 shows the top of the tower mast A as viewed from above.

【0076】図73は、タワーマストAに対する昇降本
体部Bの取付け状態を、構成要部々品により平面状態で
模式的に示している。図74は、昇降本体部Bのクライ
ミング部分を一つの側面から、また、図75は、これと
略直交する向きから、夫々構成要部により模式的に示し
ている。図76は、タワーマストAに対する昇降本体部
Bの昇降案内部の要部の破断端面を、更に、図77は、
当該昇降本体部BにおけるタワーマストAに対するロッ
ク部分の要部の破断端面を示している。
FIG. 73 schematically shows the mounting state of the elevating / lowering main body portion B with respect to the tower mast A in a planar state by the constituent main parts. FIG. 74 schematically shows the climbing portion of the elevating / lowering main body portion B from one side surface, and FIG. 75 schematically shows the constituent main portions from a direction substantially orthogonal thereto. 76 is a broken end face of a main part of the lifting guide of the lifting body B with respect to the tower mast A, and FIG.
The fracture | rupture end surface of the principal part of the lock part with respect to the tower mast A in the said raising / lowering main-body part B is shown.

【0077】図78は、ブームCの取付け部分の要部々
分を一つの側面から見て示している。図79〜図81は
ブームCに取付けられたトリッパ装置Hの要部を示すも
のであって、図79は、これを一つの側面から、また、
図80では、これと略直交する向きから、図81では、
これを上面から一部破断して示している。
FIG. 78 shows the main parts of the mounting portion of the boom C viewed from one side. 79 to 81 show the essential parts of the tripper device H attached to the boom C, and FIG. 79 shows this from one side,
In FIG. 80, from a direction substantially orthogonal to this, in FIG.
This is shown partially cut away from the top surface.

【0078】図82は、容器状搬送具Dから容器状中継
具Mに対して生コンクリートFを受け渡す状態を、構成
要部により模式的に示している。図83は、この生コン
クリートFの受け渡しに用いられるシュート165の取
付け要部を断面で示している。また、図84は、かかる
生コンクリートFを容器状搬送具Dから容器状中継具M
に受け渡す要部を、図82と略直交する向きで、構成要
部により模式的に示している。図85は、容器状搬送具
Dにおける開口部分の要部を、その構成要部々品で模式
的に示しており、図86では、これと略直交する向きに
あって、この容器状搬送具Dの開口部分の要部を破断し
て示している。
FIG. 82 schematically shows the state of delivering the ready-mixed concrete F from the container-shaped carrier D to the container-shaped relay M by the main components. FIG. 83 is a cross-sectional view showing the main part of the chute 165 used for the delivery of this fresh concrete F. Further, FIG. 84 shows that the ready-mixed concrete F is transferred from the container-shaped carrier D to the container-shaped relay M.
82 is schematically shown by the constituent main parts in a direction substantially orthogonal to FIG. FIG. 85 schematically shows the main parts of the opening part of the container-like carrier D by its constituent parts. In FIG. 86, the container-like carrier is in a direction substantially orthogonal to this. The main part of the opening portion of D is cut away.

【0079】図87〜図89は生コンクリートFを連続
して、定量的に送り出す供給手段Eとして、ベルトフィ
ーダを備えた容器状中継具Mを示すものであって、図8
7は、これを一つの側面から見て、図88は、これと略
直交する向きにおいて一部を破断して、更に図89で
は、これを上面から見て一部を破断して示している。図
90〜図92は、生コンクリートFを連続して、定量的
に送り出す供給手段Eとして、スクリュ−フィーダを備
えた容器状中継具Mを示すものであって、図90は、こ
れを一つの側面から見て、図91は、これと略直交する
向きにおいて一部を破断して、更に、図92では、これ
を上面から見て一部を破断して示している。
87 to 89 show a container-like relay M provided with a belt feeder as a supply means E for continuously and quantitatively feeding the ready-mixed concrete F, and FIG.
FIG. 7 shows this from one side, FIG. 88 shows a part thereof cut away in a direction substantially orthogonal thereto, and FIG. 89 shows a part of this view cut away from the top. . 90 to 92 show a container-like relay tool M equipped with a screw feeder as a supply means E for continuously and quantitatively feeding the fresh concrete F, and FIG. As seen from the side surface, FIG. 91 is partially cut away in a direction substantially orthogonal thereto, and further, FIG. 92 is partially cut away when viewed from the top.

【0080】図93は、タワーマストAの下部側にあっ
て、容器状搬送具Dの取り入れの状態を、平面の状態で
模式的に示している。図94〜図96は、昇降搬送具K
を示すものであり、図94では、これを斜視の状態で、
図95では、これを一つの側面から見て、更に、図96
では、これを縦方向での破断端面として示している。図
97及び図98は、台車195を示すものであり、図9
7では、これを一つの側面から、図98では、これを上
面から一部破断して示している。
FIG. 93 schematically shows a state in which the container-shaped carrier D is taken in on the lower side of the tower mast A in a planar state. 94 to 96 show the lifting / lowering transport tool K.
In FIG. 94, in a perspective view,
In Figure 95, looking at this from one side,
Then, this is shown as a broken end face in the vertical direction. 97 and 98 show the carriage 195, and FIG.
In FIG. 7, this is shown from one side surface, and in FIG. 98, this is shown partially cut away from the top surface.

【0081】図99及び図100は、第6の実施の形態
に係る装置を夫々一つの側面から見て、構成要部により
模式的に示したものであり、図99では、容器状中継具
Mを、回転部N又は回転部Nに備えたブームCの側に設
けた状態を、図100では、容器状中継具Mを昇降本体
部Bの側に設けた状態を夫々示している。
FIG. 99 and FIG. 100 schematically show the apparatus according to the sixth embodiment from one side, respectively, and show schematically the main components. In FIG. 99, the container-like relay tool M is shown. Is shown on the side of the rotating part N or the boom C provided on the rotating part N, and FIG. 100 shows the state of the container-like relay M provided on the side of the elevating body B.

【0082】以下、本発明に係る生コンクリートの移送
装置の各実施の形態について、これを詳細に説明する。
ここで示される典型的な実施の形態は、本発明に係る典
型的な実施の形態の、いくつかを示したものであって、
本発明は、これらの、ここで示される実施の形態に限定
されるものではない。
Hereinafter, each embodiment of the transfer device for ready-mixed concrete according to the present invention will be described in detail.
The exemplary embodiments shown here show some of the exemplary embodiments according to the present invention,
The present invention is not limited to these embodiments shown here.

【0083】この実施の形態の説明にあたって、本発明
が、より良く理解され易いように、また、以下の詳細に
記述する個々の好的な実施の形態が、より良く理解でき
るように、この発明の、より典型的な実施の形態を、図
1〜図4をもとに、概括的に説明する。
In describing this embodiment, the invention will be better understood and the individual preferred embodiments described in detail below will be better understood. A more typical embodiment will be generally described with reference to FIGS.

【0084】先ず、図1において示される生コンクリー
トの移送装置は、タワーマストAと、このタワーマスト
Aに昇降可能に備えられている昇降本体部Bと、この昇
降本体部Bに対して、主として水平の向きに旋回可能に
備えられているブームC、この図示例にあっては、連設
された2本のブームC’、C”よりなるブームCとを有
しする構成としてある。また、前記タワーマストAに
は、生コンクリートFの搬送に用いられる容器状搬送具
Dが昇降可能に備えられていると共に、前記ブームCに
は、該容器状搬送具Dによって搬送される生コンクリー
トFの搬送用ベルトコンベヤGが備えられた構成として
ある。また、前記ブームCの少なくとも根元側ブ−ム
C’には、トリッパ装置Hが備えられている。更に、前
記容器状搬送具Dには、この容器状搬送具Dによって搬
送される生コンクリートFを、連続して定量的に送り出
す供給手段Eが備えられている。(即ち、この図示例で
は、供給手段Eを備えた容器状搬送具Daとしてあ
る。)
First, the transfer device for ready-mixed concrete shown in FIG. 1 mainly includes a tower mast A, an elevating main body B which can be moved up and down on the tower mast A, and an elevating main body B. The boom C is rotatably provided in a horizontal direction, and in this example, the boom C is composed of two booms C ′ and C ″ that are connected in series. The tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down, and the boom C is provided with a container-shaped carrier D for carrying the ready-mixed concrete F carried by the container-shaped carrier D. A conveyor belt conveyor G is provided, and a tripper device H is provided at least on the root side boom C ′ of the boom C. Further, the container-like carrier D is provided with: The supply means E is provided for continuously and quantitatively feeding the ready-mixed concrete F conveyed by the container-shaped carrier D. (That is, in this illustrated example, the container-shaped carrier Da equipped with the supply means E is provided. There is.)

【0085】ここで示されるタワーマストAは、略垂直
に起立して設けられるマストフレーム3によって構成し
てあり、その上下方向に亘って空間4が連通した態様に
設けられている。
The tower mast A shown here is constituted by a mast frame 3 which is provided so as to stand substantially vertically, and is provided in a mode in which a space 4 communicates with the vertical direction thereof.

【0086】また、このタワーマストAは、基台1に対
して、回転可能に組付けられた旋回テーブル2に備えら
れた構成としてあり、旋回テーブル2の回転により、例
えばこのタワーマストAの鉛直方向の中心線を回転軸心
として回転可能な構成としてある。
The tower mast A is provided on a turntable 2 that is rotatably attached to the base 1. When the turntable 2 rotates, for example, the vertical direction of the tower mast A is increased. It is configured to be rotatable about the center line of the direction as the axis of rotation.

【0087】このタワーマストAに備えられている昇降
本体部Bは、このタワーマストAに対して、例えば外嵌
めの状態に組付けられるフレーム体として構成してあ
り、この図示例にあっては、相互に油圧シリンダー23
によって連結された上部昇降フレーム20と、下部昇降
フレーム21とをベースとして、これに、例えば、上部
昇降フレーム20に対して、ステージ本体18を一体に
設けると共に、このステージ本体18上にタワーマスト
Aを囲むように起立して設けたステージポスト18A
と、更に、このタワーマストAに対して外嵌めの状態で
組付けた支持枠110とを連桿111によって連設する
ことによって、昇降本体部Bを構成している。
The elevating / lowering main body portion B provided in the tower mast A is constructed as a frame body which is assembled to the tower mast A in an externally fitted state, for example. , Hydraulic cylinder 23 to each other
Based on the upper elevating frame 20 and the lower elevating frame 21 connected by the above, for example, the stage main body 18 is integrally provided on the upper elevating frame 20, and the tower mast A is mounted on the stage main body 18. Stage post 18A standing upright to surround the
Further, the elevating main body portion B is configured by connecting the support frame 110 assembled to the tower mast A in an externally fitted state by the connecting rod 111.

【0088】このように構成された昇降本体部Bは、前
記、上部昇降フレーム20、ステージ本体18、ステー
ジポスト18Aと支持枠110などが、タワーマストA
に対して、一体となって、上下方向に移動できる構成と
してある。
In the elevating main body section B thus constructed, the upper elevating frame 20, the stage main body 18, the stage post 18A and the support frame 110 are the tower mast A.
On the other hand, the structure is such that it can move in the vertical direction as a unit.

【0089】この昇降本体部Bは、適宜のクライミング
手段によってタワーマストAに対して昇降される構成と
してある。この昇降本体部Bの昇降は、この昇降本体部
Bを構成する前記上部昇降フレーム20と、この上部昇
降フレーム20の下方にあって、前記タワーマストAに
備えられる下部昇降フレーム21との間に油圧シリンダ
ー23を設け、この昇降フレーム20、21を、この油
圧シリンダー23を用いることで、相互に昇降できる構
成としてあると共に、この上部昇降フレーム20と、該
下部昇降フレーム21とに、昇降フレーム20、21
を、夫々の動作終了位置で、タワーマストAに対して、
夫々ロックするロック手段、例えば、油圧シリンダー2
4のプランジャーロッドを伸ばすことによってロックす
るロック手段を設けるように構成してある。
The elevating main body section B is constructed so as to be elevated and lowered with respect to the tower mast A by an appropriate climbing means. The elevating and lowering of the elevating and lowering body B is performed between the upper and lower elevating frame 20 that constitutes the elevating and lowering body B and a lower elevating and lowering frame 21 provided below the upper elevating frame 20 and provided on the tower mast A. A hydraulic cylinder 23 is provided, and the elevating frames 20 and 21 can be moved up and down mutually by using the hydraulic cylinder 23. The upper elevating frame 20 and the lower elevating frame 21 are connected to the elevating frame 20. , 21
To the tower mast A at each operation end position,
Locking means for locking each, for example, hydraulic cylinder 2
4 is provided with a locking means for locking by extending the plunger rod.

【0090】次いで、ブームCは、根元側ブームC’に
対して、先端側ブームC”が、この根元側ブームC’か
ら繰出し、繰入れ可能に備えられた構成としてあり、根
元側ブームC’の基端側が、前記昇降本体部Bに対し
て、旋回可能に組付けられた構成としてある。このブー
ムCの旋回組付けは、軸受115と、ブーム旋回装置3
3とによって、昇降本体部Bに対して、略水平の向きに
旋回可能に組付けられた構成としてある。
Next, the boom C has a structure in which the tip side boom C ″ can be fed out from the root side boom C ′ and fed into the root side boom C ′. The base end side is configured to be pivotally assembled to the elevating / lowering body B. The boom C is pivotally assembled by the bearing 115 and the boom revolving device 3.
3 is configured so as to be pivotable in a substantially horizontal direction with respect to the elevating / lowering main body section B.

【0091】かかるタワー機構に対して、昇降用ウイン
チ63によって、昇降される容器状搬送具Dを、前記タ
ワーマストAにおける構成空間4を、上下方向に移動可
能に設けてある。
With respect to such a tower mechanism, a container-shaped carrier D that is lifted and lowered by a lifting winch 63 is provided so as to be vertically movable in the constituent space 4 of the tower mast A.

【0092】また、前記ブームCには、根元側ブーム
C’と先端側ブームC”とに対応して、夫々にベルトコ
ンベヤG’、G”が設けてあり、ベルトコンベヤG’の
生コンクリートFを、ベルトコンベヤG”に送り込み得
る構成としてある。
Further, the boom C is provided with belt conveyors G'and G "respectively corresponding to the root side boom C'and the tip side boom C", and the green concrete F of the belt conveyor G'is provided. Can be sent to the belt conveyor G ″.

【0093】また、このブームC、特に、根元側ブーム
C’には、移動可能にトリッパ装置Hが設けてあり、ベ
ルトコンベヤG’の途中において、このベルトコンベヤ
G’で運ばれてきた生コンクリートFを、このベルトコ
ンベヤG’の側方に取り出し、又は、ブームC’の先端
にあっては、ブームC”のベルトコンベヤG”に対し
て、生コンクリートFを供給できる構成としてある。
Further, a tripper device H is movably provided on the boom C, particularly on the root side boom C ', and in the middle of the belt conveyor G', ready-mixed concrete carried by the belt conveyor G '. F is taken out to the side of the belt conveyor G ', or at the tip of the boom C', ready-mixed concrete F can be supplied to the belt conveyor G "of the boom C".

【0094】かかる構成よりなる生コンクリートの移送
装置にあっては、前記容器状搬送具DにタワーマストA
の下部側で収め入れられた生コンクリートFが、昇降用
ウインチ63によって上方に運び上げられると共に、こ
の容器状搬送具Dに備えられている供給手段Eによっ
て、この容器状搬送具Dに受け入れられている生コンク
リートFを連続、且つ定量的に、ベルトコンベヤG、こ
の図示例にあっては、転倒シート70と固定シート7
0’を介して、このベルトコンベヤGに対して送り込む
ことができる。
In the ready-mixed concrete transfer device having the above-mentioned structure, the container mast D is attached to the tower mast A.
The ready-mixed concrete F contained in the lower part of the container is carried up by the lifting winch 63 and received by the container-shaped carrier D by the supply means E provided in the container-shaped carrier D. The ready-to-use concrete F is continuously and quantitatively conveyed to the belt conveyor G, and in the illustrated example, the falling sheet 70 and the fixed sheet 7
It can be fed to this belt conveyor G via 0 '.

【0095】このように、生コンクリートFを、連続し
て、しかも定量的に受け入れたベルトコンベヤGにあっ
ては、先端側ブームC”にあるベルトコンベヤG”の先
端、又はトリッパ装置Hを用いて、ベルトコンベヤG’
から、生コンクリートFを、コンクリート打設面に対し
て供給する構成としてある。
As described above, in the belt conveyor G which receives the fresh concrete F continuously and quantitatively, the tip of the belt conveyor G ″ on the tip side boom C ″ or the tripper device H is used. Belt conveyor G '
Therefore, the fresh concrete F is supplied to the concrete placing surface.

【0096】かかる構成からなる生コンクリートの移送
装置にあっては、先ず、レール17を利用して、タワー
マストAを、目的とする位置まで移動セットする。次い
で、昇降フレーム20、21を利用して、昇降本体部B
を、タワーマストAに対して、作業対応高さに移動セッ
トする。また、同時に、ブームCを、生コンクリートF
の打込みに対応位置に旋回、セットする。
In the ready-mixed concrete transfer device having the above-mentioned structure, first, the rail 17 is used to move and set the tower mast A to a desired position. Then, using the elevating frames 20 and 21, the elevating body B
Is set to the height corresponding to the work with respect to the tower mast A. At the same time, boom C is used for ready-mixed concrete F
Turn and set to the position corresponding to.

【0097】かかる状態において、例えば、先端側ブー
ムC”を最大限に伸ばした位置から、漸次、この先端側
ブームC”を縮めながら、この先端側ブームC”にある
ベルトコンベヤG”の先端から生コンクリートFを、コ
ンクリート打込み面に供給し、更に、この先端側ブーム
C”によって生コンクリートFを、コンクリート内込み
面に供給できなくなった位置から、根元側ブームC’に
備えたトリッパ装置Hを漸次基部側に移動しながら、生
コンクリートFを、夫々のコンクリート打込み面に対し
て供給するように本装置を用いることができる。
In this state, for example, from the position where the tip side boom C ″ is maximally extended, the tip side boom C ″ is gradually contracted while the tip end of the belt conveyor G ″ on the tip side boom C ″ is extended. The fresh concrete F is supplied to the concrete driving surface, and the tripper device H provided on the root side boom C ′ is provided from the position where the raw concrete F cannot be supplied to the concrete inward surface by the tip side boom C ″. The present device can be used to feed the ready-mixed concrete F to each concrete driving surface while gradually moving to the base side.

【0098】また、かかる打ち込み操作と逆に、即ち、
ブームCの根元側ブームC’の取付け基部側から、順次
先端側に向けてトリッパ装置Hを移動しながら、生コン
クリートFを打設し、更に、縮み込まれているブーム
C”の状態から、順次ブームC”を繰出し、このブーム
C”にあるベルトコンベヤG”の先端側から生コンクリ
ートFを、打設するようにして、本装置を用いることが
できる。
Further, the reverse of the driving operation, that is,
While moving the tripper device H from the mounting base side of the root side boom C ′ of the boom C toward the tip side in sequence, the fresh concrete F is placed, and further, from the state of the retracted boom C ″, The present apparatus can be used by successively feeding out the boom C ″ and pouring the ready-mixed concrete F from the tip end side of the belt conveyor G ″ on the boom C ″.

【0099】また、前記先端側ブームC”のベルトコン
ベヤG”の先端、又は、根元側ブームC’におけるトリ
ッパ装置Hからの生コンクリートFの供給を、ブームC
を旋回させながら、夫々の対応コンクリート打込み面に
対してなすように本装置を用いることができる。
Further, the supply of the fresh concrete F from the tip of the belt conveyor G "of the tip side boom C" or the tripper device H of the root side boom C'is carried out by the boom C.
The present device can be used to rotate against each corresponding concrete driving surface.

【0100】また、本装置にあっては、前記の各動作間
にあって、または、前記の各動作と共に、タワーマスト
Aを、基台1に対して、回転位置づけ、又は回転しなが
ら用いることができる。
Further, in this apparatus, the tower mast A can be used while being rotationally positioned or rotating with respect to the base 1 during or during each of the above operations. .

【0101】また、本装置にあっては、前記の各動作間
にあって、または、前記の各動作と共に、タワーマスト
Aを、レール17に沿って移動位置づけし、又は移動し
ながら用いることができる。
Further, in this apparatus, the tower mast A can be used while being moved or positioned along the rail 17 between the above-mentioned operations or together with the above-mentioned operations.

【0102】また、本装置にあっては、前記の各動作間
にあって、または、前記の各動作と共に昇降本体部Bを
昇降操作して用いることができる。
Further, in the present apparatus, it is possible to use the raising / lowering main body section B for raising / lowering during the respective operations mentioned above or together with the respective operations mentioned above.

【0103】このように構成されるタワーマストAは、
レール17によって移動されない構成、即ち、基台1を
設置面に対して固定した構成としてあっても良い。ま
た、基台1に対して、マストフレーム3が旋回テーブル
2を介在せずに直接組付けられた構成、即ち、タワーマ
ストAが回転しない構成としてあっても良い。また、前
記のブームCを、二本のブーム、即ち、根元側ブーム
C’と、先端側ブームC”の連続したものとせず、これ
を一本のブームのみで構成してあっても良く、更に、三
本以上のブームの連設によって構成してあっても良い。
また、複数本で構成されるブームが、相互に固着された
一本棒の状態、即ち、伸び縮みしない構成としてあって
も良い。
The tower mast A thus constructed is
It may be configured so that it is not moved by the rail 17, that is, the base 1 is fixed to the installation surface. Further, the mast frame 3 may be directly attached to the base 1 without the turning table 2 interposed, that is, the tower mast A may not rotate. Further, the boom C may not be made into two booms, that is, the root side boom C ′ and the tip side boom C ″, but may be constituted by only one boom. Further, it may be configured by connecting three or more booms in series.
Further, the boom composed of a plurality of rods may be in the state of a single rod fixed to each other, that is, a structure that does not expand or contract.

【0104】このように構成されるブームCにあって
は、これが一本のブームによってブームCが構成されて
いる場合にあっては、当該ブームCにトリッパ装置を設
ける。また、複数本のブームが伸び縮みしない一本棒の
状態で構成されている場合にあっては、この一本棒とし
て構成されるブームCに設けられている各ベルトコンベ
ヤG毎に、生コンクリートFを取り出し得る態様に夫々
トリッパ装置を設ける。また、繰り入れ、繰り出される
ブームを備えたブームCにあっては、少なくとも、昇降
本体部Bに対する取付け側にあるブームに、トリッパ装
置Hを設ける。
In the boom C having such a structure, when the boom C is composed of one boom, the boom C is provided with a tripper device. Further, when the plurality of booms are configured as a single rod that does not expand or contract, ready-mixed concrete is provided for each belt conveyor G provided on the boom C configured as the single rod. A tripper device is provided in each mode in which F can be taken out. Further, in the boom C provided with a boom that is retracted and extended, the tripper device H is provided at least on the boom that is on the mounting side with respect to the elevating body B.

【0105】また、この図示例にあっては、容器状搬送
具Dを、昇降搬送具Kを用いて搬送する構成としてある
が、昇降ウインチ63のワイヤーロープ65を、該容器
状搬送具Dに直接取付けるようにしてあっても良い。ま
た、図示例にあっては、容器状搬送具D、特に生コンク
リートFを、供給手段Eによって、連続し、且つ、定量
的に、ベルトコンベヤGに対して供給する際に、転倒シ
ュート70及び固定シュート70’を用いているが、か
かるシュート以外の搬送手段によって、生コンクリート
FをベルトコンベヤGに移送しても良く、又、容器状搬
送具Dに備えられている供給手段Eから生コンクリート
Fを連続し、且つ、定量的に、直接、ベルトコンベヤG
に対して、供給する構成としてあっても良い。尚、図に
おいて、48、52はベルトコンベヤGの駆動モータ
を、46、47、49、50は、当該ベルトコンベヤG
のプーリーを示している。
Further, in this illustrated example, the container-shaped carrier D is configured to be transported by using the lifting / lowering carrier K, but the wire rope 65 of the lifting / lowering winch 63 is connected to the container-shaped carrier D. It may be attached directly. Further, in the illustrated example, when the container-shaped carrier D, particularly the ready-mixed concrete F is continuously and quantitatively supplied to the belt conveyor G by the supply means E, the falling chute 70 and Although the fixed chute 70 'is used, the fresh concrete F may be transferred to the belt conveyor G by a transport means other than the chute, or the fresh concrete from the supply means E provided in the container-shaped carrier D. Belt conveyor G continuously and quantitatively directly
However, it may be configured to supply. In the figure, 48 and 52 are drive motors for the belt conveyor G, and 46, 47, 49 and 50 are the belt conveyor G.
Shows the pulley.

【0106】次いで、図2において示される生コンクリ
ートの移送装置は、タワーマストAと、このタワーマス
トAに昇降可能に備えられている昇降本体部Bと、この
昇降本体部Bに回転可能に備えられた回転部Nと、この
回転部Nに備えられている一本のブーム又は連設された
複数本のブームよりなるブームCとを有する構成として
ある。また、前記タワーマストAには、生コンクリート
Fの搬送に用いられる容器状搬送具Dが昇降可能に備え
てあり、且つ前記ブームCには、該容器状搬送具Dによ
って搬送された生コンクリートFの搬送用ベルトコンベ
ヤGが備えられた構成としてある。また、前記ブームC
の少なくとも根元側ブームC’にはトリッパ装置Hが備
えられている。また、前記容器状搬送具Dには、この容
器状搬送具Dによって搬送される生コンクリートFを、
連続して定量的に送り出す供給手段Eが備えられた構成
としてある。(即ち、この図示例では、供給手段Eの備
えられた容器状搬送具Daとしてある。)
Next, the transfer device for ready-mixed concrete shown in FIG. 2 is provided with a tower mast A, an elevating main body portion B which can be moved up and down on the tower mast A, and a rotating body on the elevating main body portion B. The rotary unit N is provided with a single boom or a boom C including a plurality of booms connected to the rotary unit N. Further, the tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so that it can be raised and lowered, and the boom C is provided with the ready-mixed concrete F carried by the container-shaped carrier D. The transporting belt conveyor G is provided. Also, the boom C
Of at least the root side boom C'is provided with a tripper device H. Further, in the container-shaped carrier D, the green concrete F carried by the container-shaped carrier D is
The supply means E for continuously and quantitatively sending is provided. (That is, in this illustrated example, the container-shaped carrier Da is provided with the supply means E.)

【0107】この図2で示される生コンクリートの移送
装置にあっては、タワーマストAが旋回テーブル2を備
えていないことと、ブームCが、昇降本体部Bに備えら
れた回転部Nに備えられて、この昇降本体部B、更には
タワーマストAの回りを回転する構成としたこと、及
び、これらの構成の変更に伴う、例えば昇降用ウインチ
63をタワーマストAの頂部に直接備えつけるようにし
たこと、及び、容器状搬送具Dからの生コンクリートF
のベルトコンベヤGに対する受け渡しに際して、回転フ
ィーダなどの移送手段Lを設けるようにした以外の構成
を、前記図1で示される生コンクリートの移送装置にお
ける構成と同一、又は実質的に同一としている。かかる
点から、前記図1における生コンクリートの移送装置に
おける構成と同一、又は実質的に同一の構成部分につい
ては、同一の番号を付して、その説明を省略する。
In the transfer device for ready-mixed concrete shown in FIG. 2, the tower mast A is not provided with the turning table 2, and the boom C is provided in the rotating part N provided in the elevating main body part B. Then, the elevator main body B is rotated around the tower mast A, and the tower mast A is rotated around the tower mast A. For example, an elevating winch 63 is directly attached to the top of the tower mast A. And the concrete F from the container-shaped carrier D
The configuration except that the transporting means L such as a rotary feeder is provided at the time of delivery to the belt conveyor G is the same as or substantially the same as the configuration in the fresh concrete transporting device shown in FIG. From this point, the same or substantially the same components as those in the fresh concrete transfer device in FIG. 1 are designated by the same reference numerals, and the description thereof will be omitted.

【0108】この図2で示される生コンクリートの移送
装置にあっては、昇降フレーム21と昇降フレーム20
などを備えた昇降本体部Bに対して、回転部Nを、回転
可能に組付けた構成としてある。
In the transfer device for ready-mixed concrete shown in FIG. 2, the elevating frame 21 and the elevating frame 20 are used.
The rotating portion N is rotatably assembled to the elevating body portion B including the above.

【0109】このタワーマストAに備えられる昇降本体
部Bは、前記昇降フレーム20、昇降フレーム21及
び、これに一体に組付けた部材と、タワーマストAに対
して外嵌め状に備えられた支持枠110とを連桿111
で連設し、これらが一体となって、タワーマストAに対
して昇降される構成としてある。
The elevating main body B provided in the tower mast A includes the elevating frame 20, the elevating frame 21, members integrally assembled with the elevating frame 20, the supporting member provided on the tower mast A in an externally fitted shape. Frame 110 and connecting rod 111
The tower mast A is vertically moved with respect to the tower mast A.

【0110】かかる昇降本体部Bに組付けられる回転部
Nは、ステージ117と、前記昇降本体部Bの回りを取
り囲むように該ステージ117から立設された支柱11
8b及び該支柱118bの上部を連設する環状フレーム
118aとによって構成された回転フレーム118と、
を備えた構成としてあり、前記昇降本体部Bにおける昇
降フレーム20、支持枠110などに対して、回転可能
に組付けられた構成としてある。
The rotating part N assembled to the elevating main body B is a stage 117 and a support 11 which is erected from the stage 117 so as to surround the elevating main body B.
8b and a rotary frame 118 constituted by an annular frame 118a that continuously connects the upper portions of the columns 118b,
And is rotatably assembled to the elevating frame 20, the support frame 110, and the like in the elevating body B.

【0111】このようにタワーマストAに対して昇降可
能に備えられた昇降本体部Bに対して、回転可能に回転
部Nを設け、この回転部Nに対してブームCを設けた構
成としてあり、かかる昇降本体部Bに対して、この回転
部Nを回転することによって、ブームCを自在にコンク
リート打設対応位置に案内できる構成としてある。
As described above, the rotating body N is rotatably provided on the elevating main body portion B which is provided so as to be able to move up and down with respect to the tower mast A, and the boom C is provided on the rotating portion N. By rotating the rotating portion N with respect to the elevating / lowering main body portion B, the boom C can be freely guided to the concrete pouring corresponding position.

【0112】かかる構成よりなるタワーマストAにあっ
ては、このタワーマストA自体を回転可能に構成する必
要がない。また、ブームCを、この回転部Nに対して、
旋回可能に設けることが、必須の構成とする必要がな
い。
In the tower mast A having such a structure, it is not necessary to make the tower mast A itself rotatable. In addition, the boom C is
It is not necessary to provide the structure so that it can rotate.

【0113】尚、この図2で示される生コンクリートの
移送装置における当該生コンクリートの移送手法にあっ
ては、容器状搬送具Dによって運び上げられた生コンク
リートFを、シュート70、70’などを用いて、回転
フィーダなどの移送手段Lに一旦受け渡した後、更にシ
ュート123などを用いて、ベルトコンベヤGに受け渡
す手法とした点において、前記図1における生コンクリ
ートの移送装置と異なる手法としてあるが、これ以外の
点における生コンクリートFの移送手法を、前記図1に
おける生コンクリートの移送装置における移送手法と同
一、又は実質的に同一の手法によることができる。
In the green concrete transfer method in the green concrete transfer device shown in FIG. 2, the green concrete F carried up by the container-shaped carrier D is transferred to the chute 70, 70 'or the like. The method is different from the fresh concrete transfer device in FIG. 1 in that the transfer device L such as a rotary feeder is once transferred, and then the transfer device L is further transferred to the belt conveyor G by using a chute 123 or the like. However, the transfer method of the ready-mixed concrete F in other points can be the same as or substantially the same as the transfer method in the transfer device of the ready-mixed concrete in FIG.

【0114】尚、この図2で示される生コンクリートの
移送装置を用いた生コンクリートの打込みの方法は、昇
降本体部Bを、タワーマストAに対して、コンクリート
打設対応高さとなるように前記昇降フレーム20、21
を利用して昇降調整し、次いで回転部Nを、このコンク
リート打設対応位置にブームCが位置づけられるように
回転位置づけると共に、前記図1で示される生コンクリ
ートの移送装置におけると同様に、先端側ブームC”の
伸縮操作、トリッパ装置Hの移動操作によって、生コン
クリートを、コンクリートの打設対応位置に対して、連
続して、定量的に供給することができる。
[0114] The method of pouring fresh concrete using the fresh concrete transfer device shown in Fig. 2 is such that the elevating main body B is set to the tower mast A at a height suitable for concrete pouring. Lifting frames 20, 21
Up and down adjustment using the, and then the rotating part N is rotationally positioned so that the boom C is positioned at the concrete pouring corresponding position, and the tip end side is the same as in the fresh concrete transfer device shown in FIG. By performing the expansion / contraction operation of the boom C ″ and the operation of moving the tripper device H, the fresh concrete can be continuously and quantitatively supplied to the pouring corresponding position of the concrete.

【0115】又、かかる先端側ブームC”の伸縮操作並
びにトリッパ装置Hの移動操作による生コンクリートの
打設の間にあって、回転部Nを回転し、又は、これらの
先端側ブームC”の伸縮操作並びにトリッパ装置Hの移
動操作による生コンクリートの打設をしながら、回転部
Nを回転させるようにして、当該装置を用いるようにし
ても良い。
Further, during the operation of expanding and contracting the tip side boom C ″ and the placing of the fresh concrete by the operation of moving the tripper device H, the rotating part N is rotated or the operation of expanding and contracting the tip side boom C ″ is performed. In addition, while rotating the rotating part N while pouring fresh concrete by moving the tripper device H, the device may be used.

【0116】また、ここでは、図示していないが、この
図2に示される装置を、前記図1で示される装置と同様
に、レールを利用して移動可能に構成してあっても良
く、この場合、前記の各操作に先立って、このタワーマ
ストAを、生コンクリートの打設位置に移動、セット
し、又は、前記の各操作をタワーマストAを移動しなが
らなすように、当該装置を用いるようにしてあっても良
い。
Although not shown here, the device shown in FIG. 2 may be configured to be movable by using rails, like the device shown in FIG. In this case, prior to each of the above operations, the tower mast A is moved to and set at a pouring position of ready-mixed concrete, or each of the above operations is performed while moving the tower mast A. You may use it.

【0117】尚、この図2で示される生コンクリートの
移送装置にあっては、容器状搬送具Dによって運び上げ
られた生コンクリートFを、シュート70、70’を用
いて、タワーマストAの回りを回転するように備えられ
た回転フィーダなどの移送手段Lに対して、一旦受け渡
した後、この移送手段Lに受け渡された生コンクリート
Fを、シュート123などを用いてベルトコンベヤGに
対して再度、受け渡す構成としてあるが、前記生コンク
リートFを、容器状搬送具Dから、直接移送手段Lに対
して受け渡す構成としてあっても良い。
In the transfer device for ready-mixed concrete shown in FIG. 2, the ready-mixed concrete F carried up by the container-like carrier D is moved around the tower mast A using the chutes 70, 70 '. After being once delivered to a transfer means L such as a rotary feeder provided to rotate, the ready-mixed concrete F delivered to the transfer means L is conveyed to a belt conveyor G using a chute 123 or the like. Although it is configured to be delivered again, the ready-mixed concrete F may be delivered from the container-shaped carrier D directly to the transfer means L.

【0118】又、前記移送手段Lを介さずに、容器状搬
送具Dから直接、又はシュートなどを用いて、この容器
状搬送具Dによって運び上げられた生コンクリートFを
ベルトコンベヤGに対して受け渡すように構成してあっ
ても良い。更に又、前記移送手段Lから、直接、又はシ
ュート123以外の手段を用いて、移送手段Lに受け渡
された生コンクリートFを、ベルトコンベヤGに対して
受け渡すように構成してあっても良い。
Further, the green concrete F carried by the container-shaped carrier D directly to the container-shaped carrier D or by using a chute without passing through the transfer means L is conveyed to the belt conveyor G. It may be configured to deliver. Furthermore, the fresh concrete F transferred to the transfer means L may be transferred to the belt conveyor G directly from the transfer means L or using a means other than the chute 123. good.

【0119】次いで、図3に示される生コンクリートの
移送装置は、タワーマストAと、このタワーマストAに
昇降可能に備えられている昇降本体部Bと、この昇降本
体部Bに対して、主として水平の向きに旋回可能に備え
られたブームC、この図示例にあっては、連設された2
本のブームよりなるブームCとを有する構成としてあ
る。また、前記タワーマストAには、生コンクリートF
の搬送に用いられる容器状搬送具D(この図示例にあっ
ては、供給手段Eを備えていない容器状搬送具Db)が
昇降可能に備えられていると共に、前記ブームCには、
該容器状搬送具Dによって搬送された生コンクリートF
の搬送用ベルトコンベヤGが備えられている。また、前
記ブームCの根元側ブームC’には、トリッパ装置Hが
備えられている。更に、前記容器状搬送具Dによる前記
生コンクリートFの搬送と、前記ベルトコンベヤGによ
る該生コンクリートFの搬送との間の搬送系路に、該容
器状搬送具Dによって搬送される生コンクリートFの受
け入れ容器手段Pと、この受け入れ生コンクリートFを
連続して定量的に送り出す供給手段Eとを備えた容器状
中継具Mを設けており、特に、この図示例にあっては、
昇降本体部B又はブームCに、この容器状中継具Mを備
えた構成としている。
Next, the transfer device for ready-mixed concrete shown in FIG. 3 mainly includes a tower mast A, an elevating main body B which can be moved up and down on the tower mast A, and an elevating main body B. Boom C provided so as to be rotatable in a horizontal direction, in this example, two booms are provided in series.
It is configured to have a boom C which is a book boom. In addition, the concrete mast F is attached to the tower mast A.
The container-shaped carrier D (in this illustrated example, container-shaped carrier Db not provided with the supply means E) used for carrying the above is provided so as to be movable up and down, and the boom C is
Green concrete F transported by the container-shaped transport tool D
The conveyor belt conveyor G is provided. Further, a tripper device H is provided on the base side boom C ′ of the boom C. Further, the ready-mixed concrete F transported by the container-shaped carrier D is disposed in a transport system path between the transport of the green concrete F by the container-shaped carrier D and the transport of the green concrete F by the belt conveyor G. The container-like relay M having the receiving container means P and the supplying means E for continuously and quantitatively sending the receiving fresh concrete F is provided, and particularly in this illustrated example,
The lifting body B or the boom C is provided with the container-shaped relay M.

【0120】この図3に示される生コンクリートの移送
装置にあっては、容器状搬送具Dによって搬送される生
コンクリートFの受け入れ容器手段Pと、この受け入れ
生コンクリートFを、連続して定量的に送り出す供給手
段Eとを備えた容器状中継具Mを、前記昇降本体部B又
はブームCに設け、前記容器状搬送具Dによって運び上
げられた生コンクリートFを、一旦、この容器状中継具
Mを介して、ベルトコンベヤGに対し送り出すようにな
し、これに伴って、容器状搬送具Dには、生コンクリー
トFを、連続して定量的に送り出す供給手段Eを設けな
い構成としたものであって、これらの構成以外の構成
を、前記図1に示される生コンクリートの移送装置にお
ける構成と同一、又は、実質的に同一の構成としてあ
る。従って、前記図1で示される生コンクリートの移送
装置における構成と同一、又は実質的に同一の構成部分
については、同一の番号を付して、その説明を省略す
る。
In the fresh concrete transfer device shown in FIG. 3, the receiving container means P for receiving the fresh concrete F carried by the container-like carrier D and the received fresh concrete F are continuously quantitatively determined. A container-shaped relay M provided with a supply means E for feeding to the container is provided on the elevating main body B or the boom C, and the concrete concrete F carried up by the container-shaped carrier D is temporarily transferred to the container-shaped relay. It is configured such that it is sent out to the belt conveyor G via M, and accordingly, the container-like carrier D is not provided with the supply means E for continuously and quantitatively sending the fresh concrete F. However, the configuration other than these configurations is the same as or substantially the same as the configuration in the fresh concrete transfer device shown in FIG. Therefore, the same or substantially the same components as those in the transfer device for ready-mixed concrete shown in FIG. 1 are designated by the same reference numerals and the description thereof will be omitted.

【0121】この図3で示される生コンクリートの移送
装置にあっては、容器状中継具Mを、昇降本体部Bに備
えてあり、しかも、この容器状中継具Mを、前記容器状
搬送具Dから生コンクリートFを受け入れる受け入れ容
器手段Pと、例えば、スクリューフィーダ、ベルトフィ
ーダなどの生コンクリートFを連続し、しかも定量的に
送り出す供給手段Eとを備えた構成としてある。
In the transfer device for ready-mixed concrete shown in FIG. 3, the container-shaped relay tool M is provided in the elevating main body B, and the container-shaped relay tool M is used for the container-shaped transport tool. The receiving container means P for receiving the fresh concrete F from D and the supply means E for continuously and quantitatively sending the fresh concrete F such as a screw feeder and a belt feeder are provided.

【0122】かかる構成よりなる生コンクリートの移送
装置にあっては、前記図1において示される生コンクリ
ートの移送装置におけると全く同一の手法によって、タ
ワーマストの移動操作、昇降本体部Bの昇降操作、ブー
ムCの旋回操作、先端側ブームC”の伸縮操作、並び
に、トリッパ装置Hの移動操作をなすことができる。ま
た、容器状搬送具Dによって運び上げられた生コンクリ
ートFは、シュート165、168などによって、先ず
容器状中継具Mに案内されると共に、容器状中継具Mに
備えられた生コンクリートFを、連続して、定量的に送
り出す供給手段Eによって、ベルトコンベヤGに対して
連続して、定量的に送り出し、このベルトコンベヤGに
案内された生コンクリートFを、先端側ブームC”のベ
ルトコンベヤG”の先端、又は、根元側ブームC’のト
リッパ装置Hから、コンクリートの打込み位置に対して
供給する。
In the ready-mixed concrete transferring device having the above-mentioned structure, the moving operation of the tower mast and the lifting / lowering operation of the elevating / lowering main body part B are carried out by the same method as in the transferring device of ready-mixed concrete shown in FIG. It is possible to perform a swing operation of the boom C, an extension / contraction operation of the tip side boom C ″, and a movement operation of the tripper device H. The ready-mixed concrete F carried up by the container-shaped carrier D is chute 165, 168. First, the raw concrete F provided in the container-shaped relay M is continuously guided to the container-shaped relay M by a supply means E for quantitatively continuously feeding it to the belt conveyor G. Then, the ready-mixed concrete F, which is quantitatively sent out and guided to the belt conveyor G, is fed to the belt conveyor G "of the tip side boom C". End, or from tripe device H of the base-side boom C ', supplied to concrete driving position.

【0123】かかるコンクリートの打込みは、前記タワ
ーマストAの移動操作、昇降本体部Bの昇降操作、ブー
ムCの旋回操作、先端側ブームC”の伸縮操作、並びに
トリッパ装置Hの移動操作などによってなすことができ
る。又は、これらの各操作をなしながらなすことができ
る。
The concrete is placed by moving the tower mast A, moving the lifting body B up and down, swinging the boom C, extending and retracting the tip boom C ″, and moving the tripper device H. Or, it can be performed while performing each of these operations.

【0124】尚、ここで示された生コンクリートの移送
装置にあっては、レール17によってタワーマストAが
移動可能とされ、且つ、旋回テーブル2によってタワー
マストAが回転可能に構成してあるが、例えば、タワー
マストAをレール17によって移動する構成とせずに、
旋回テーブル2によって回転可能にコンクリート打設現
場に立設するようにしてあっても良い。また、タワーマ
ストAに旋回テーブル2を設けず、レール17上に移動
可能に設けた構成としてあっても良い。更にまた、タワ
ーマストAを旋回テーブル2によって回転可能に構成し
た図示例にあって、ブームCを昇降本体部Bに対して旋
回しない態様に固着するように設けてあっても良い。
In the ready-mixed concrete transferring device shown here, the tower mast A is movable by the rail 17, and the tower mast A is rotatable by the turning table 2. , For example, without constructing the tower mast A to be moved by the rail 17,
The turning table 2 may be rotatably installed upright at the concrete pouring site. Further, the tower mast A may not be provided with the turning table 2 but may be provided so as to be movable on the rail 17. Furthermore, in the illustrated example in which the tower mast A is configured to be rotatable by the revolving table 2, the boom C may be provided so as to be fixed to the elevating main body portion B in a non-revolving manner.

【0125】また、更に、前記の容器状中継具Mにあっ
ては、これを、昇降本体部Bに備えた構成としている
が、この容器状中継具Mを、昇降本体部Bに備えたブー
ムCに設けるようにしてあっても良い。尚、容器状中継
具Mに対する叙上における生コンクリートFの、容器状
搬送具Dからの受け渡しは、前記シュート165、16
8以外の他のシュート手段、その他の適宜の移送手段を
介してなすようにしてあっても良い。又は、これらの移
送手段を介することなく容器状搬送具Dから直接該容器
状中継具Mに対して、生コンクリートFの受け渡しがな
される構成としてあっても良い。また、ベルトコンベヤ
Gに対する叙上生コンクリートFの、容器状中継具Mか
らの受け渡しは、シュート、その他の適宜の移送手段を
介してなすことができる。又は、これらの移送手段を介
することなく容器状中継具Mから、直接該ベルトコンベ
ヤGに対して生コンクリートFの受け亘しがなされる構
成としてあっても良い。
Further, in the container-like relay tool M, which is provided in the elevating main body section B, the boom in which the container-like relay tool M is provided in the elevating main body section B is further provided. It may be provided in C. In addition, the transfer of the green concrete F from the container-shaped carrier D to the container-shaped relay M is performed by the chute 165, 16 described above.
It is also possible to use chute means other than 8 or other suitable transfer means. Alternatively, the ready-mixed concrete F may be delivered from the container-shaped carrier D directly to the container-shaped relay M without passing through these transfer means. Further, the transfer of the above-mentioned ready-mixed concrete F to the belt conveyor G from the container-like relay M can be performed through a chute or other appropriate transfer means. Alternatively, the green concrete F may be directly delivered from the container-shaped relay M to the belt conveyor G without passing through these transfer means.

【0126】次いで、図4に示される生コンクリートの
移送装置は、タワーマストAと、このタワーマストAに
昇降可能に備えられている昇降本体部Bと、この昇降本
体部Bに回転可能に備えられた回転部Nと、この回転部
Nに備えられた二本の連設されたブームC’、C”より
なるブームCとを有する構成としてある。
Next, the transfer device for ready-mixed concrete shown in FIG. 4 is provided with a tower mast A, an elevating main body B which is elevatably mounted on the tower mast A, and a rotatable elevating main body B. The rotating part N is provided with a boom C composed of two booms C ′ and C ″ which are provided in the rotating part N and which are continuously provided.

【0127】また、前記タワーマストAには、生コンク
リートFの搬送に用いられる容器状搬送具D(この図示
例にあっては、供給手段Eを備えていない容器状搬送具
Db)が昇降可能に備えてあると共に、前記ブームCに
は、該容器状搬送具Dによって搬送された生コンクリー
トFの搬送用ベルトコンベヤGが備えられた構成として
ある。
A container-shaped carrier D (container-shaped carrier Db not provided with the supply means E in this example) used for carrying the green concrete F can be moved up and down on the tower mast A. In addition, the boom C is provided with a belt conveyor G for transporting the green concrete F transported by the container-shaped transport tool D.

【0128】又、前記ブームCの根元側ブームC’には
トリッパ装置Hが備えられている。更に、前記容器状搬
送具Dによる前記生コンクリートFの搬送と、前記ベル
トコンベヤGによる該生コンクリートFの搬送とによる
搬送系路に、該容器状搬送具Dによって搬送される生コ
ンクリートの受け入れ容器手段Pと、この受け入れ生コ
ンクリートFを連続して定量的に送り出す供給手段Eと
を備えた容器状中継具Mを設ける構成としてある。即
ち、容器状中継具Mを、昇降本体部B、又は、回転部
N、又はブームCのいずれかに備えた構成としてある。
The base side boom C ′ of the boom C is equipped with a tripper device H. Further, a receiving container for the ready-mixed concrete transported by the container-like carrier D is provided on a transport system path by the transport of the fresh concrete F by the container-like carrier D and the transport of the fresh concrete F by the belt conveyor G. The container-like relay tool M is provided with the means P and the supply means E for continuously and quantitatively sending the received ready-mixed concrete F. That is, the container-shaped relay tool M is provided in any one of the elevating main body section B, the rotating section N, or the boom C.

【0129】この図4に示される生コンクリートの移送
装置にあっては、容器状搬送具Dによって運び上げられ
た生コンクリートFを、容器状中継具Mを介して、ベル
トコンベヤGに受け渡すようにした以外の構成を、前記
図2に示される生コンクリートの移送装置の構成と同
一、又は実質的に同一としてある。従って、前記図2で
示される生コンクリートの移送装置における構成と同
一、又は実質的に同一の構成部分については、同一の番
号を付して、その説明を省略する。
In the fresh concrete transfer device shown in FIG. 4, the fresh concrete F carried up by the container-shaped carrier D is transferred to the belt conveyor G through the container-shaped relay M. The construction other than the above is the same as or substantially the same as the construction of the fresh concrete transfer device shown in FIG. Therefore, the same or substantially the same components as those in the fresh concrete transfer device shown in FIG. 2 are designated by the same reference numerals and the description thereof will be omitted.

【0130】この図4で示される生コンクリートの移送
装置にあっては、容器状中継具Mが、回転部N、特に、
この図示例にあっては、ブームCに設けてあり、しか
も、この容器状中継具Mを、前記容器状搬送具Dによっ
て運び上げられた生コンクリートFを受け入れる受け入
れ容器手段Pと、この受け入れ生コンクリートFを連続
して、しかも定量的に送り出す供給手段Eとを備えた構
成としてある。
In the transfer device for ready-mixed concrete shown in FIG. 4, the container-like relay M includes the rotating part N, particularly,
In this illustrated example, the container C is provided on the boom C, and the container-like relay M is for receiving the fresh concrete F carried up by the container-like carrier D, and the receiving container means P. The concrete F is continuously and quantitatively supplied with a supply means E.

【0131】又、これに対応して、タワーマストAに対
して、昇降可能に備えられる容器状搬送具Dには、かか
る生コンクリートFを、連続して、定量的に送り出す供
給手段Eを設けない構成としてある。
Correspondingly, the container-shaped carrier D that can be moved up and down with respect to the tower mast A is provided with a supply means E for continuously and quantitatively supplying the green concrete F. Not as a configuration.

【0132】かかる構成よりなる生コンクリートの移送
装置にあっては、前記図2において示される生コンクリ
ートの移送装置におけると略同一の手法、即ち、昇降本
体部Bを、タワーマストAに対して、コンクリートの打
設対応高さとなるように前記昇降フレーム20、21を
利用して、昇降調整し、次いで、回転部Nを、このコン
クリート打設対応位置にブームCが位置づけられるよう
に回転位置づけると共に、先端側ブームC”の伸縮操
作、トリッパ装置Hの移動操作によって、生コンクリー
トFを、このコンクリート打設対応位置に対して、連続
して、定量的に供給することができる。
In the fresh concrete transfer device having the above-mentioned structure, the same method as in the fresh concrete transfer device shown in FIG. 2 is used. Using the elevating frames 20 and 21 to adjust the height so that the height will correspond to the pouring of concrete, and then the rotating portion N is rotationally positioned so that the boom C can be positioned at the concrete pouring corresponding position. By performing the expansion / contraction operation of the tip side boom C ″ and the operation of moving the tripper device H, the fresh concrete F can be continuously and quantitatively supplied to this concrete pouring corresponding position.

【0133】又、かかる先端側ブームC”の伸縮操作並
びにトリッパ装置Hの移動操作による生コンクリートの
打設の間にあって、回転部Nを回転し、又は、これらの
先端側ブームC”の伸縮操作、並びにトリッパ装置Hの
移動操作による生コンクリートの打設をしながら、回転
部Nを回転させるようにして、当該装置を用いても良
い。
Further, during the operation of expanding and contracting the tip side boom C ″ and the placing of the fresh concrete by the operation of moving the tripper device H, the rotating part N is rotated or the operation of expanding and contracting the tip side boom C ″ is performed. Alternatively, the rotary unit N may be rotated while pouring fresh concrete by moving the tripper device H to use the device.

【0134】また、ここでは、図示していないが、この
図4に示される装置を、前記図1で示される装置と同様
に、レールを利用して移動可能に構成してあっても良
く、この場合、前記の各操作に先立って、このタワーマ
ストAを、生コンクリートの打設位置に移動、セット
し、又は、前記の各操作をタワーマストAを移動しなが
らなすように、当該装置を用いても良い。
Although not shown here, the device shown in FIG. 4 may be constructed so as to be movable by using rails, like the device shown in FIG. In this case, prior to each of the above operations, the tower mast A is moved to and set at a pouring position of ready-mixed concrete, or each of the above operations is performed while moving the tower mast A. You may use.

【0135】このように構成された生コンクリートの移
送装置にあっては、タワーマストAに備えられた容器状
搬送具Dによって運び上げられた生コンクリートFをシ
ュート198を用いて移送手段L、この図示例にあって
は、タワーマストAの回りを回転している回転フィーダ
に受け渡すと共に、この移送手段Lに受け入れられた生
コンクリートFを、シュート199を用いて容器状中継
具Mに受け渡し、この容器状中継具Mから、生コンクリ
ートFを、連続して、定量的にベルトコンベヤGに対し
て送り出す構成としてある。
In the transfer device for ready-mixed concrete configured as described above, the transfer means L using the chute 198 for transferring the ready-mixed concrete F carried up by the container-like carrier D provided on the tower mast A, In the illustrated example, the concrete feed F received by the transfer means L is delivered to the container-shaped relay M using the chute 199 while being delivered to the rotary feeder rotating around the tower mast A. The concrete concrete F is continuously and quantitatively sent to the belt conveyor G from the container-shaped relay M.

【0136】かくして、ベルトコンベヤGに案内された
生コンクリートFは、先端側ブームC”にあるベルトコ
ンベヤGの先端、又はトリッパ装置Hから、コンクリー
ト打設位置に対して、連続して、定量的に供給される。
Thus, the ready-mixed concrete F guided to the belt conveyor G is continuously and quantitatively compared to the concrete pouring position from the tip of the belt conveyor G on the tip side boom C ″ or the tripper device H. Is supplied to.

【0137】尚、前記における容器状搬送具Dからの、
容器状中継具Mに対する生コンクリートFの受け渡しの
手法は、例えば、容器状搬送具Dから、タワーマストA
の周りを回転している回転フィーダなどの移送手段Lに
対して、直接、生コンクリートFの受け渡しがなされる
構成としてあっても良い。
From the container-shaped carrier D in the above,
The method of delivering the ready-mixed concrete F to the container-shaped relay tool M is, for example, from the container-shaped carrier tool D to the tower mast A.
Alternatively, the ready-mixed concrete F may be directly delivered to the transfer means L such as a rotary feeder rotating around the.

【0138】又、前記移送手段Lから、シュート199
を介さずに、直接、生コンクリートFが、容器状中継具
Mに対して受け渡される構成としてあっても良い。更
に、前記移送手段Lを設けずに、容器状搬送具Dから直
接、又は、シュートなどを介して、生コンクリートF
が、容器状中継具Mに受け渡される構成としてあっても
良い。
From the transfer means L, the chute 199
Alternatively, the ready-mixed concrete F may be directly delivered to the container-like relay tool M without going through. Further, without providing the transfer means L, the fresh concrete F is directly fed from the container-shaped carrier D or via a chute or the like.
However, it may be configured to be delivered to the container-shaped relay M.

【0139】更に又、生コンクリートFの受け入れ容器
手段Pと、受け入れ生コンクリートFを連続して、定量
的に送り出す供給手段Eとを備えた容器状中継具Mを、
図示例におけるようにブームC上に設けてあっても良
く、ブームCの組付けられる回転部Nに設けてあっても
良い。更に、この容器状中継具Mを、回転部Nを組付け
有している昇降本体部Bに設けるように構成してあって
も良い。
Furthermore, a container-like relay M provided with a receiving container means P for the fresh concrete F and a supply means E for continuously and quantitatively sending the receiving fresh concrete F,
It may be provided on the boom C as in the illustrated example, or may be provided on the rotating portion N to which the boom C is assembled. Further, the container-shaped relay tool M may be configured to be provided in the elevating / lowering main body section B having the rotating section N assembled therein.

【0140】(1) 第1の実施の形態に係る生コンクリー
トの移送装置 先ず図5〜図36に示す第1の実施の形態に係る生コン
クリートの移送装置について説明する。
(1) Fresh Concrete Transfer Device According to First Embodiment First, a fresh concrete transfer device according to a first embodiment shown in FIGS. 5 to 36 will be described.

【0141】この第1の実施の形態に係る生コンクリ−
トの移送装置は、タワーマストAと、このタワーマスト
Aに昇降可能に備えられている昇降本体部Bと、この昇
降本体部Bに、主として水平の向きに旋回可能に備えら
れているブームCとを有する構成としてある。
Raw concrete according to the first embodiment
The transfer device is a tower mast A, an elevating / lowering main body B that is vertically movable on the tower mast A, and a boom C that is mainly rotatably provided horizontally on the elevating / lowering main body B. It is configured to have and.

【0142】この昇降本体部Bに備えられるブ−ムC
は、一連に連設された先端側ブ−ムC”と、根元側ブ−
ムC’とによって構成してあり、先端側ブ−ムC”が、
根元側ブ−ムC’に対して、繰り入れ、繰り出し可能に
設けてある。
The boom C provided in the lifting body B
Is a series of tips on the tip side boom C "and the root side boom.
It is composed of the frame C'and the front side boom C ",
It is provided so that it can be fed in and out with respect to the root side boom C '.

【0143】また、前記タワーマストAには、生コンク
リートFの搬送に用いられる容器状搬送具Dが昇降可能
に備えられている。
Further, the tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down.

【0144】また、前記ブームCの、根元側ブ−ムC’
と、先端側ブ−ムC”には、順次に生コンクリ−トFの
乗り継がれるベルトコンベヤG’、G”が設けてあり、
前記容器状搬送具Dから、直接、又は別段に備えられる
搬送手段を介して供給される生コンクリートFを搬送で
きる構成としてある。
The root side boom C'of the boom C is also used.
And a belt conveyor G ', G "to which the raw concrete F is successively transferred is provided on the tip side boom C",
It is configured such that the ready-mixed concrete F supplied from the container-shaped carrier D directly or via a carrier provided in a separate stage can be carried.

【0145】また、前記ブ−ムCには、搬送される生コ
ンクリートFを先端側ブ−ムC”のベルトコンベヤG”
に送り込み、又は、該ベルトコンベヤG’、G”の中間
で取り出し、又は、ベルトコンベヤG”の先端において
取り出すトリッパ装置Hが備えられている。
The concrete C to be conveyed is transferred to the boom C by the belt conveyor G "of the front boom C".
To the belt conveyors G ′, G ″, or at the tip of the belt conveyor G ″.

【0146】更に、前記容器状搬送具Dには、この容器
状搬送具Dによって搬送される生コンクリートFを、連
続して、定量的に送り出す供給手段Eが備えてある。
Further, the container-shaped carrier D is provided with a supply means E for continuously and quantitatively supplying the ready-mixed concrete F carried by the container-shaped carrier D.

【0147】ここで、容器状搬送具Dによって運ばれた
生コンクリ−トFは、この容器状搬送具Dに備えられて
いる供給手段Eによって、前記搬送用ベルトコンベヤG
に対して、直接、又は別段に備えられる搬送手段を介し
て、連続して定量的に送り出される。
Here, the raw concrete F carried by the container-shaped carrier D is fed by the feeding means E provided in the container-shaped carrier D to the above-mentioned carrier belt conveyor G.
On the other hand, it is continuously and quantitatively sent out directly or via a conveying means provided separately.

【0148】また、この第1の実施の形態に係る生コン
クリートの移送装置は、この生コンクリ−トの移送装置
を構成するタワ−マストAが、その垂直軸線を回転軸線
として回転可能に立設された構成としてある。また、こ
の第1の実施の形態に係る生コンクリートの移送装置
は、レール17に沿って水平方向に移動可能に構成して
ある。
Further, in the fresh concrete transfer device according to the first embodiment, the tower mast A which constitutes the fresh concrete transfer device is rotatably erected with its vertical axis as a rotation axis. It is as a configured structure. Further, the fresh concrete transfer device according to the first embodiment is configured to be movable in the horizontal direction along the rail 17.

【0149】ここで構成されるタワーマストAは、各種
の立設手法によって立設されるものであって、例えば、
この実施の形態にあっては、基台1に対して、回転可能
に備えられた旋回テーブル2に立設されており、各マス
トフレーム3、3…を組付けて構成されていると共に、
その内部に、一対の容器状搬送具D、Dの昇降できる空
間4を構成してある。
The tower mast A constructed here is erected by various erection methods.
In this embodiment, a revolving table 2 rotatably provided on a base 1 is erected upright and is constructed by assembling each mast frame 3, 3 ,.
Inside thereof, a space 4 in which a pair of container-shaped transport tools D, D can be raised and lowered is formed.

【0150】また、このマストフレーム3、3…によっ
て構成されるタワーマストAには、外嵌状に昇降本体部
Bが取りつけてあり、これを構成するクライミング手段
を、該タワーマストAにおける各マストフレーム3、3
…に作用させることで、この昇降本体部Bを、タワーマ
ストAに対して、上下方向に移動できる構成としてあ
る。
Further, an elevating main body portion B is externally fitted to the tower mast A constituted by the mast frames 3, 3, ..., Climbing means constituting this is mounted on each mast of the tower mast A. Frame 3, 3
It is configured such that the elevating main body B can be moved in the vertical direction with respect to the tower mast A by acting on.

【0151】かかるタワーマストAの立設されている旋
回テーブル2は、基台1上にあって、下部ローラー5、
5…と、下面側スライドメタル6とによって垂直荷重を
受ける構成としてあると共に、基台1から、この旋回テ
ーブル2の上面側に延設されている転倒防止アーム7、
7…に備えた上部ローラ8、8…によって転倒モーメン
トを受ける構成としてある。
The turning table 2 on which the tower mast A is erected is located on the base 1, and the lower roller 5,
5 and the lower surface side slide metal 6 are configured to receive a vertical load and extend from the base 1 to the upper surface side of the revolving table 2 to prevent the tipping arm 7,
The upper rollers 8 and 8 provided for 7 ... Receive a falling moment.

【0152】また、旋回テーブル2の中心に設けた軸受
け部9に、基台1のセンターポスト10を、スライドメ
タル11を介して嵌め合せてあり、タワーマストAに生
ずるスラスト荷重を受ける構成としてある。かくして、
タワーマストAは基台1に対して該センターポスト10
の鉛直方向の中心線を回転中心線として回転できる構成
とされている。
Further, the center post 10 of the base 1 is fitted to the bearing portion 9 provided at the center of the turning table 2 via the slide metal 11 so as to receive the thrust load generated in the tower mast A. . Thus,
The tower mast A has the center post 10 with respect to the base 1.
It is configured such that it can be rotated with the center line in the vertical direction of as the rotation center line.

【0153】このタワーマストAの回転にあっては、旋
回テーブル2における円形の環状フレーム2aの外周の
円周方向に捲着したチェーン12に対して、旋回モータ
13に備えたスプロケット14を噛合させた旋回駆動手
段を用いている。(図8及び図9参照)
In the rotation of the tower mast A, the sprocket 14 provided on the turning motor 13 is engaged with the chain 12 wound around the outer circumference of the circular annular frame 2a of the turning table 2 in the circumferential direction. The turning drive means is used. (See FIGS. 8 and 9)

【0154】次いで、基台1の下面には4組の走行手段
15、15…と、転倒防止手段16とが備えてあり、設
置面に対して固定されているレール17、17上を、該
タワーマストAが移動できる構成としてある。この基台
1の走行手段15は、この具体例にあっては、軸桿15
aによって回動自在に該基台1に対して取付けられた車
輪フレーム15bに一対の車輪15c、15cを回転自
在に設けると共に、この各車輪15cと同軸に設けたギ
ヤ15dを、この車輪フレーム15bに備えた駆動モー
タ15eにより駆動される駆動ギヤ15fに噛合した構
成としてあり、前記タワーマストAをレール17に沿っ
て随時移動できる構成としている。(図10及び図11
参照)
Next, the bottom surface of the base 1 is provided with four sets of traveling means 15, 15 ... And fall prevention means 16, and the rails 17, 17 fixed to the installation surface are covered with the above means. The tower mast A is movable. In this specific example, the traveling means 15 of the base 1 is the rod 15
A pair of wheels 15c, 15c are rotatably provided on a wheel frame 15b rotatably attached to the base 1 by a, and a gear 15d provided coaxially with each wheel 15c is provided on the wheel frame 15b. It is configured to be meshed with a drive gear 15f driven by a drive motor 15e provided in the above, and the tower mast A can be moved along the rail 17 at any time. (FIGS. 10 and 11
reference)

【0155】次いで、基台1の下面に備えられている転
倒防止手段16は、先端の内側に、互いに向き合う挟持
突部16fを備えた一対の挾持片16a、16aを軸桿
16bによって基台1に取付けた構成としてある。この
挾持片16a、16aによって、レール17の薄肉部を
両側から挾持し、レール頭部17aに対する係合状態を
作り出すと共に、この各挾持片16a、16a間に挿通
した螺桿16c付きのハンドル16dの締込み、この場
合にあっては、一方の挾持片16aに設けたナット16
eに前記螺桿16cを螺挿し、ハンドル16dを回転す
ることによって、該挾持片16a、16aを互に引きつ
け合い、これによってレール17の締めつけ並びに解放
をなす構成としてある。(図12及び図13参照)
Next, the overturning preventing means 16 provided on the lower surface of the base 1 has a pair of holding pieces 16a, 16a each having a holding projection 16f facing each other on the inner side of the tip thereof by means of the rod 16b. It is attached to. The holding pieces 16a, 16a hold the thin-walled portion of the rail 17 from both sides to create an engaged state with the rail head 17a, and tighten the handle 16d with a threaded rod 16c inserted between the holding pieces 16a, 16a. In this case, the nut 16 provided on one of the holding pieces 16a
By screwing the threaded rod 16c into e and rotating the handle 16d, the holding pieces 16a, 16a are attracted to each other, whereby the rail 17 is tightened and released. (See FIGS. 12 and 13)

【0156】次いで、タワーマストAに備えられる昇降
本体部Bについて、図14〜図19を参照して説明す
る。ここでタワーマストAに昇降可能に備えられている
昇降本体部Bは、昇降用油圧シリンダー23によって相
互に連結された上部昇降フレーム20と、下部昇降フレ
ーム21とをベースとして、この上部昇降フレーム20
に対して、ステージ本体18が一体に、又、前記下部昇
降フレーム21に補助ステージ19が一体に、更に、ス
テージ本体18に対して、ステージポスト18Aを一体
に設けた構成としてあり、起立状態にあるタワーマスト
Aに対して、このタワーマストAを取り囲むように、こ
れらで構成される昇降本体部Bを、所謂外嵌状に取付け
た構成としてある。
Next, the elevating / lowering main body portion B provided in the tower mast A will be described with reference to FIGS. 14 to 19. The elevating main body B, which is provided in the tower mast A so as to be able to ascend and descend, is based on an upper elevating frame 20 and a lower elevating frame 21 which are connected to each other by an elevating hydraulic cylinder 23.
On the other hand, the stage main body 18 is integrally formed, the auxiliary stage 19 is integrally formed on the lower elevating frame 21, and the stage post 18A is integrally formed on the stage main body 18. With respect to a certain tower mast A, the elevating main body portion B composed of these is attached in a so-called external fitting shape so as to surround the tower mast A.

【0157】かかる上部昇降フレーム20に備えられる
ステージ本体18は、起立状態にあるタワーマストAに
対して外嵌状に装着される環枠状に構成してあり、下面
側に環枠状をなすように前記昇降フレーム20を一体に
備えた構成としてある。又、この昇降フレーム20に対
して、環枠状をなす昇降フレーム21が油圧シリンダー
23を介して、その下方に備えられた構成としてある。
また、この昇降フレーム21に備えられた、補助ステー
ジ19がこの昇降フレーム21と共に前記タワーマスト
Aに対して外嵌状態に取付けられている。
The stage main body 18 provided in the upper lifting frame 20 has a ring frame shape which is externally fitted to the tower mast A in the upright state, and has a ring frame shape on the lower surface side. As described above, the elevating frame 20 is integrally provided. Further, an elevating frame 21 having a ring frame shape is provided below the elevating frame 20 via a hydraulic cylinder 23.
Further, the auxiliary stage 19 provided on the elevating frame 21 is attached to the tower mast A together with the elevating frame 21 in an externally fitted state.

【0158】即ち、前記昇降フレーム20、21と、こ
れに組付けられるステージ本体18及び補助ステージ1
9などによって構成される昇降本体部Bは、これらが、
いずれも環状枠部を備え、これらに互連通する開口2
2、即ち、タワーマストAに嵌め合される開口22を備
えた構成としてある。
That is, the elevating frames 20 and 21, the stage body 18 and the auxiliary stage 1 assembled to the elevating frames 20 and 21.
The lifting main body B composed of 9 etc.
Each of them has an annular frame portion, and the openings 2 communicate with each other.
2, that is, the structure is provided with the opening 22 fitted to the tower mast A.

【0159】ここで構成される昇降本体部Bの昇降動作
は、主として前記昇降フレーム20、21によってなさ
れる。この昇降フレーム20、21は、タワーマストA
のマストフレーム3、3を取り囲むように略四角形のフ
レーム形状に構成してあると共に、このタワーマストA
の外周に沿うようにして上下方向に移動できる構成とし
てある。
The raising / lowering operation of the raising / lowering main body B constructed here is mainly performed by the raising / lowering frames 20 and 21. The lifting frames 20 and 21 are the tower mast A.
The tower mast A is constructed in a substantially rectangular frame shape so as to surround the mast frames 3, 3.
The structure is such that it can move in the vertical direction along the outer periphery of the.

【0160】かかる昇降フレーム21の4隅部分には、
昇降用油圧シリンダー23、23…が立設状態に軸桿2
3aを用いて取付けてあり、この昇降用油圧シリンダー
23におけるプランジャーロッド23bが上部側昇降フ
レーム20に対して、軸桿23cで取付けてあり、各昇
降フレーム20、21が油圧シリンダー23によって昇
降操作できる構成としてある。
At the four corners of the elevating frame 21,
The lifting hydraulic cylinders 23, 23 ... Stand up and the rod 2
3a, the plunger rod 23b of the lifting hydraulic cylinder 23 is mounted to the upper lifting frame 20 by a rod 23c, and the lifting frames 20 and 21 are lifted by the hydraulic cylinder 23. It can be configured.

【0161】尚、ここにおいてマストフレーム3に対す
る昇降本体部B、特に、昇降フレーム20、21の組付
けは、例えば、図19で明らかとされる。先ず、この実
施の形態にあっては、タワーマストAを、各隅部に主柱
3a、3a…を立設した平面が略長方形状をなす構成と
し、しかも、この長辺側にある主柱3a、3a間に、補
助支柱3bを設け、この主柱3aと補助支柱3bとを適
宜横桿3cによって連絡することによって、この短辺側
にある一対の主柱3a、3aと、該補助主柱3b、3b
とがなす夫々の空間4内を、容器状搬送具Dが上下方向
に、移動できるように構成している。
Incidentally, here, the assembling of the elevating / lowering main body part B, in particular, the elevating / lowering frames 20 and 21 with respect to the mast frame 3 is made clear, for example, in FIG. First, in this embodiment, the tower mast A has a structure in which the main pillars 3a, 3a ... An auxiliary column 3b is provided between 3a and 3a, and the main column 3a and the auxiliary column 3b are appropriately connected by a horizontal rod 3c, so that the pair of main columns 3a and 3a on the short side and the auxiliary column 3a. Pillars 3b, 3b
The container-shaped carrier D is configured to be movable in the vertical direction in each space 4 formed by and.

【0162】かかるタワーマストAにおける各主柱3a
の外側面にガイドレール92を該タワーマストAの上下
方向に亘るように設けると共に、前記昇降フレーム2
0、21の内側に設けたスライドガイド93に対して、
このガイドレール92を、スライドメタル94を介して
嵌めつけるようになし、該昇降フレーム20、21が、
このタワーマストAに対して、安定に上下方向に移動で
きる構成としてある。
Each main pillar 3a in the tower mast A
A guide rail 92 is provided on the outer surface of the tower mast A so as to extend in the vertical direction of the tower mast A.
With respect to the slide guide 93 provided inside 0 and 21,
The guide rail 92 is fitted through the slide metal 94, and the elevating frames 20 and 21 are
With respect to this tower mast A, it is configured to be able to move vertically in a stable manner.

【0163】更に、各昇降フレーム20、21は、夫々
の隅部にあって、前記タワーマストAを構成するマスト
フレーム3に、当該昇降フレーム20、21をロック状
態に止着するための油圧シリンダー24、24…を設け
てある。
Further, the lifting frames 20 and 21 are located at the respective corners, and are hydraulic cylinders for fixing the lifting frames 20 and 21 in a locked state to the mast frame 3 which constitutes the tower mast A. 24, 24 ... Are provided.

【0164】この油圧シリンダー24は、昇降フレーム
20、21の外側に突き出すように設けられた略水平の
シリンダー支持フレーム25に対して軸桿24aで取付
けてある。又、この油圧シリンダー24のプランジャー
ロッド24b側がロックシャフトとなるように、このプ
ランジャーロッド24bの側を、各昇降フレーム20、
21の側からマストフレーム3の側に突き出して、マス
トフレーム3に備えた受け段部26に対して抜き差し可
能に差し入れ得る構成としてある。
The hydraulic cylinder 24 is attached by a rod 24a to a substantially horizontal cylinder support frame 25 provided so as to project outside the elevating frames 20 and 21. In addition, the plunger rod 24b side of each of the lifting frames 20 is arranged so that the plunger rod 24b side of the hydraulic cylinder 24 serves as a lock shaft.
It is configured such that it projects from the side of 21 to the side of the mast frame 3 and can be removably inserted into the receiving step portion 26 provided in the mast frame 3.

【0165】尚、このマストフレーム3に備えられる受
け段部26は、油圧シリンダー23によって上下方向に
移動される各昇降フレーム20、21の各動作位置毎に
設けてある。この場合、油圧シリンダー24の動作を確
実とするために、シリンダー支持フレーム25の取付け
基部側に筒状受け部25aを設け、油圧シリンダー24
におけるプランジャーロッド24bが略水平に動作し、
且つ、該筒状受け部25aと、前記受け段部26との間
にあって、この各昇降フレーム20、21を確実にマス
トフレーム3に対して留めつけ得る構成としてある。ま
た、このプランジャーロッド24bを縮めた際に、この
プランジャーロッド24bの先端が受け段部26から外
れ、しかも、該筒状受け部25a内に、とどまるように
構成してある。
The receiving step portion 26 provided on the mast frame 3 is provided for each operating position of each of the elevating frames 20 and 21 vertically moved by the hydraulic cylinder 23. In this case, in order to ensure the operation of the hydraulic cylinder 24, a cylindrical receiving portion 25a is provided on the mounting base side of the cylinder support frame 25,
The plunger rod 24b in
Further, it is arranged between the cylindrical receiving portion 25a and the receiving step portion 26 so that the elevating frames 20 and 21 can be securely fastened to the mast frame 3. Further, when the plunger rod 24b is contracted, the tip end of the plunger rod 24b is disengaged from the receiving step portion 26, and is further retained in the cylindrical receiving portion 25a.

【0166】尚、このマストフレーム3に設けられる受
け段部26は、マストフレーム3の外側の面に金具26
aと金具26bとを突き出し状に設け、この各金具26
a、26bで取り囲まれた上面開口の凹部として構成し
てある。即ち、ここでマストフレーム3に備えられる受
け段部26は、該マストフレーム3に対して略水平に張
り出すように備えられた下部受け金具26aと、この受
け金具26a面から上方に延びるように、該マストフレ
ーム3に対して略垂直に張り出す一対の縦受け金具26
bと、この受け金具26aの下面から下方に延びるよう
にして設けられた一対の補強金具26cとによって構成
してあり、前記受け金具26aと、受け金具26bとに
よって構成される上面開口の凹部を、前記プランジャー
ロッド24bの先端の受け段部26として構成してあ
る。 かかる各昇降フレーム20、21におけるクライ
ミング手段は、典型的には、各油圧シリンダー24、2
4…におけるプランジャーロッド24bを伸ばした状態
で夫々マストフレーム3の受け段部26に対して、その
先端部分を差し入れた状態とし、しかも、前記油圧シリ
ンダー23を縮めた状態としてある。
The receiving step portion 26 provided on the mast frame 3 has a metal fitting 26 on the outer surface of the mast frame 3.
a and a metal fitting 26b are provided in a protruding shape, and each metal fitting 26
It is configured as a concave portion of the upper surface opening surrounded by a and 26b. That is, the receiving stepped portion 26 provided on the mast frame 3 has a lower receiving metal fitting 26a provided so as to extend substantially horizontally with respect to the mast frame 3 and extends upward from a surface of the receiving metal fitting 26a. , A pair of vertical receiving metal fittings 26 extending substantially perpendicularly to the mast frame 3
b and a pair of reinforcing metal fittings 26c provided so as to extend downward from the lower surface of the metal fitting 26a, and the concave portion of the upper opening formed by the metal fitting 26a and the metal fitting 26b is formed. It is configured as a receiving step portion 26 at the tip of the plunger rod 24b. The climbing means in each of the elevating frames 20 and 21 is typically the hydraulic cylinders 24 and 2.
4, the plunger rods 24b are extended and the tip portions of the plunger rods 24b are inserted into the receiving step portions 26 of the mast frame 3, and the hydraulic cylinder 23 is in a contracted state.

【0167】そこで、この各昇降フレーム20、21を
用いてステージ本体18と、補助ステージ19などの昇
降本体部Bを上方に移動する操作手法としては、先ず、
油圧シリンダー23のプランジャーロッド23bを伸ば
すことによって、前記昇降フレーム20の受け段部26
にある油圧シリンダー24のプランジャーロッド24b
を上方に抜け出させると同時に、この昇降フレーム20
の油圧シリンダー24を縮めるように操作する。
Therefore, as an operation method for moving the stage main body 18 and the vertical movement main body B such as the auxiliary stage 19 upward by using the respective vertical movement frames 20 and 21, first,
By extending the plunger rod 23b of the hydraulic cylinder 23, the receiving step portion 26 of the lifting frame 20 is extended.
Plunger rod 24b of hydraulic cylinder 24 at
And the lifting frame 20
The hydraulic cylinder 24 is operated so as to be contracted.

【0168】かかる状態で、油圧シリンダー23のプラ
ンジャーロッド23bを伸ばし、この上部側にある昇降
フレーム20をステージ本体18と共に上方に押し上げ
る。尚、この場合、油圧シリンダー24が完全に収縮し
たことをセンサーで確認し、この確認のもとに油圧シリ
ンダー23の上昇が続行される構成とし、この昇降フレ
ーム20にある油圧シリンダー24の収縮動作が完了し
ていない場合にあっては、該油圧シリンダー23の動作
が停止される構成とする。
In this state, the plunger rod 23b of the hydraulic cylinder 23 is extended, and the elevating frame 20 on the upper side is pushed upward together with the stage main body 18. In this case, the sensor confirms that the hydraulic cylinder 24 has completely contracted, and the hydraulic cylinder 23 continues to rise based on this confirmation, and the contraction operation of the hydraulic cylinder 24 in the elevating frame 20 is performed. If the above is not completed, the operation of the hydraulic cylinder 23 is stopped.

【0169】このことによって、油圧シリンダー24の
先端が、昇降フレーム20の上昇動作に伴って受け段部
26、特に受け金具26aに衝突することなく、上部側
にある受け段部26を超えて昇降フレーム20が移動さ
れる。
As a result, the tip end of the hydraulic cylinder 24 moves up and down beyond the receiving step portion 26 on the upper side without colliding with the receiving step portion 26, particularly the receiving metal fitting 26a as the lifting frame 20 moves up. The frame 20 is moved.

【0170】かくして、油圧シリンダー23によって、
昇降フレーム20を上方に押し上げ、所定の位置に位置
づけると共に、この状態において、該上部側にある昇降
フレーム20の油圧シリンダー24のプランジャーロッ
ド24bを伸ばし、このプランジャーロッド24bをマ
ストフレーム3に設けてある受け段部26に差し入れ
て、この昇降フレーム20、更には、ステージ本体18
をタワーマストAに固定する。
Thus, by the hydraulic cylinder 23,
The elevating frame 20 is pushed upward and positioned at a predetermined position. In this state, the plunger rod 24b of the hydraulic cylinder 24 of the elevating frame 20 on the upper side is extended, and the plunger rod 24b is provided on the mast frame 3. It is inserted in the receiving step portion 26 that is installed, and the lifting frame 20, and further the stage main body 18
Is fixed to the tower mast A.

【0171】次いで、下部側にある昇降フレーム21
を、油圧シリンダー23の収縮動作によって、この昇降
フレーム21にある油圧シリンダー24のプランジャー
ロッド24bがマストフレーム3の受け段部26から抜
け出すように、上方に引き出すと共に、油圧シリンダー
24の収縮動作を開始する。
Next, the elevating frame 21 on the lower side
By the contraction operation of the hydraulic cylinder 23, the plunger rod 24b of the hydraulic cylinder 24 in the elevating frame 21 is pulled upward so as to come out of the receiving step portion 26 of the mast frame 3, and the contraction operation of the hydraulic cylinder 24 is performed. Start.

【0172】かかる一連の動作、即ち、油圧シリンダー
23におけるプランジャーロッド23bの縮め動作に伴
って、この下部側にある昇降フレーム21を上方に移動
し、この上方の所期の位置に移動された昇降フレーム2
1における油圧シリンダー24を水平の向きに延ばすこ
とによって、そのプランジャーロッド24bをマストフ
レーム3における受け段部26に差し入れ、この上方に
移動された位置に該昇降フレーム21を固定する。
With a series of such operations, that is, with the operation of contracting the plunger rod 23b in the hydraulic cylinder 23, the elevating frame 21 on the lower side is moved upward and moved to a desired position above this. Lifting frame 2
By extending the hydraulic cylinder 24 in 1 in the horizontal direction, the plunger rod 24b is inserted into the receiving step portion 26 in the mast frame 3, and the elevating frame 21 is fixed to the position moved upward.

【0173】尚、この場合にあっても、昇降用の油圧シ
リンダー23は、ロック用の油圧シリンダー24が、完
全に収縮状態にあることを、センサーによって検出した
状態で、上方に向けた動作の続行をなす構成とし、油圧
シリンダー24の先端が前記受け段部26の受け金具2
6aに衝突しないように構成する。
Even in this case, the lifting hydraulic cylinder 23 is operated upward when the sensor detects that the locking hydraulic cylinder 24 is completely contracted. The hydraulic cylinder 24 is configured to continue, and the tip of the hydraulic cylinder 24 is the receiving fitting 2 of the receiving step portion 26.
6a so as not to collide with 6a.

【0174】またステージ本体18及び補助ステージ1
9などの昇降本体部Bの下降操作は、略前記の昇降操作
と逆、即ち、先ず下部側にある昇降フレーム21を前記
の手法によって下方に移動し、且つ、これをマストフレ
ーム3に固定した後、上部側にある昇降フレーム20を
ステージ本体18と共に下方に移動し、その移動終了位
置で、マストフレーム3に対してロックすることによっ
て、当該昇降本体部Bを下方に移動することができる。
Further, the stage body 18 and the auxiliary stage 1
The descending operation of the elevating body B such as 9 is almost the reverse of the elevating operation described above, that is, the elevating frame 21 on the lower side is first moved downward by the above-described method, and this is fixed to the mast frame 3. After that, the elevating frame 20 on the upper side is moved downward together with the stage main body 18, and the elevating main body B can be moved downward by locking the mast frame 3 at the movement end position.

【0175】即ち、先ず、下部側にある昇降フレーム2
1における油圧シリンダー24を動作し、この油圧シリ
ンダー24におけるプランジャーロッド24bを収縮
し、このロッド24bの先端が、受け段部26、特に受
け金具26aの面から完全に外れたことを確認した後、
油圧シリンダー23におけるプランジャーロッド23b
を所定位置まで延ばし、この延ばした状態において、昇
降フレーム21における油圧シリンダー24のプランジ
ャーロッド24bを延ばすことで、受け段部26の受け
金具26aの面上に該ロッド24bの先端部を支承させ
る。次いで、同様の手法で、上部側にある昇降フレーム
20を下方に移動し、これによって、ステージ本体18
をタワーマストAの下方に移動するようになす。
That is, first, the elevating frame 2 on the lower side.
After operating the hydraulic cylinder 24 in No. 1 and contracting the plunger rod 24b in this hydraulic cylinder 24, after confirming that the tip of this rod 24b is completely disengaged from the surface of the receiving step portion 26, particularly the receiving metal fitting 26a. ,
Plunger rod 23b in the hydraulic cylinder 23
Is extended to a predetermined position, and in this extended state, the plunger rod 24b of the hydraulic cylinder 24 in the elevating frame 21 is extended, so that the tip of the rod 24b is supported on the surface of the receiving metal fitting 26a of the receiving step portion 26. . Then, in the same manner, the elevating frame 20 on the upper side is moved downward, whereby the stage body 18
Is moved below the tower mast A.

【0176】次いで、図20〜図26を参照してブーム
C、ベルトコンベヤG、トリッパ装置Hなどについて説
明する。
Next, the boom C, the belt conveyor G, the tripper device H, etc. will be described with reference to FIGS.

【0177】ここでタワーマストAに装備される昇降本
体部Bの一部を構成するステージ本体18には、その一
方の側にブームCが備えられていると共に、他方の側に
は、カウンターウエイト27と、ブームCを支持するブ
ーム支持ウインチ29が備えてあり、このブーム支持ウ
インチ29のワイヤーロープ30を、タワーマストAの
上部に備えたガイドシーブ31、31…と、ブームCの
先端側に設けたガイドシーブ32とに掛け渡して、ブー
ムCを上下方向に首振り可能に支持している。尚、29
aは、ブーム支持ウインチ29の巻ドラムを、29bは
モーターを示している。
The stage main body 18 forming a part of the elevating main body B mounted on the tower mast A is provided with a boom C on one side and a counterweight on the other side. 27 and a boom support winch 29 that supports the boom C. A wire rope 30 of the boom support winch 29 is provided on the upper part of the tower mast A, guide sheaves 31, 31, ... The boom C is supported by the guide sheave 32 provided so as to be swingable in the vertical direction. Incidentally, 29
Reference numeral a denotes a winding drum of the boom supporting winch 29, and reference numeral 29b denotes a motor.

【0178】かかる構成よりなる昇降本体部B、この図
示例にあってはステージ本体18に対して、ブームCが
取付けられている。この昇降本体部Bを構成するステー
ジ本体18に対するブームCの取付けは、この実施の形
態にあっては、以下の取付け手法が用いられている。
A boom C is attached to the elevating / lowering main body B having such a structure, and in the illustrated example, the stage main body 18. To attach the boom C to the stage body 18 that constitutes the elevating body portion B, the following attachment method is used in this embodiment.

【0179】このブームCは、根元側ブ−ムC’と、こ
の根元側ブ−ムC’に対して摺動可能に組付けられた先
端側ブ−ムC”とによって構成している。先ず、この根
元側ブ−ムC’は、ステージ本体18即ち、昇降本体部
Bに取付けられたブーム旋回装置33の旋回テーブル3
3aに対して、軸桿34を用いて上下方向に回動できる
ようにして取付けてあり、これを前記ブーム支持ウイン
チ29によって操作するようにしてある。
The boom C is composed of a root side boom C'and a tip side boom C "slidably attached to the root side boom C '. First, the root side boom C'is attached to the stage main body 18, that is, the lifting / lowering main body portion B, of the turning table 3 of the boom turning device 33.
It is attached to 3a so as to be able to rotate in the vertical direction using a shaft rod 34, and this is operated by the boom support winch 29.

【0180】又、この旋回装置33は、旋回軸受け手段
33bによって、ステージ本体18即ち、昇降本体部B
に備えられているターンテーブル受け部33cに対し
て、ターンテーブル33aを回転可能に備えた構成とし
てある。この旋回装置33は、ターンテーブル33aの
周側面の円周方向に設けたギヤ33dに対して、ターン
テーブル受け部33c側に備えたモータ33eのギヤ3
3fを噛合してあり、この旋回装置33におけるターン
テーブル33a、更には、これに取り付けてある根元側
ブ−ムC’を略水平の方向に首振り状態に旋回操作でき
る構成としてある。(図20参照)
Further, in the turning device 33, the turning bearing means 33b is used to move the stage body 18, that is, the lifting body B.
A turntable 33a is rotatably provided with respect to a turntable receiving portion 33c provided in the. This turning device 33 includes a gear 3d of a motor 33e provided on the turntable receiving portion 33c side with respect to a gear 33d provided on the circumferential side surface of the turntable 33a in the circumferential direction.
3f is meshed with the turntable 33a of the turning device 33, and further, the root side boom C'attached to the turntable 33a can be turned in a swinging state in a substantially horizontal direction. (See Figure 20)

【0181】かかる根元側ブ−ムC’は、その先端に先
のガイドシーブ32を設けてあり、ブーム支持ウインチ
29で支承される構成としてあると共に、その下部に、
先端側ブ−ムC”のスライド手段35を設けてある。
The root side boom C'is provided with the guide sheave 32 at the tip thereof and is supported by the boom supporting winch 29, and at the lower part thereof,
A slide means 35 for the tip side boom C ″ is provided.

【0182】この先端側ブ−ムC”のスライド手段35
は、下面が開口35bされた長尺の溝状フレームとして
構成してある。そして、この幅側にあって、下方に垂下
している側板の下部を互に内方に折り曲げて、互に向き
合ったコ字状の凹部とし、これによって該スライド手段
35の長手方向に亘って、その幅側の両側の内側に、互
に向き合った一対のスライド溝35a、35aを構成し
ているかかるスライド手段35、特に、スライド溝35
aに対して、先端側ブームC”を繰入れ、繰出し可能に
組付けると共に、開口35bから先端側ブ−ムC”の下
部側、特に、点検歩廊36を外方に延設するように設け
てある。
This tip side boom C ″ slide means 35
Is configured as a long groove-shaped frame whose lower surface has an opening 35b. Then, the lower portions of the side plates that are on the width side and hang downward are bent inwardly into each other to form U-shaped concave portions facing each other, thereby extending in the longitudinal direction of the sliding means 35. , A pair of slide grooves 35a, 35a facing each other on the inner side of the width side thereof, and particularly, the slide groove 35.
The tip side boom C ″ is installed so that the tip side boom C ″ can be fed in and pulled out, and the lower side of the tip side boom C ″, in particular, the inspection corridor 36 is provided so as to extend outward from the opening 35b. is there.

【0183】また、この根元側ブ−ムC’に備えられた
スライド手段35に組付けられる先端側ブ−ムC”は、
その両側の長手方向に、前記スライド溝35a、35a
にがたなく収まり合うガイド凸条37が設けてあり、こ
のガイド凸条37を案内として、該先端側ブ−ムC”
を、根元側ブ−ムC’のスライド溝35a、35aに対
して、摺動自在に組み入れてある。尚、図中38はスラ
イドメタルを示し、39は根元側ブ−ムC’に設けた補
強リブを示している。(図25参照)
Further, the tip side boom C ″ assembled to the slide means 35 provided on the root side boom C ′ is
The slide grooves 35a, 35a are provided on both sides in the longitudinal direction.
There is provided a guide ridge 37 which fits in without any lag, and the guide ridge 37 is used as a guide for the tip side boom C ″.
Is slidably incorporated into the slide grooves 35a, 35a of the root side boom C '. In the figure, 38 indicates a slide metal, and 39 indicates a reinforcing rib provided on the root side boom C '. (See Figure 25)

【0184】尚、この先端側ブ−ムC”のスライド手段
35からの引き出し、収め入れは、この先端側ブ−ム
C”の基部側43に、一端42aを止着したローラチェ
ーン42を、前記根元側ブ−ムC’に備えたモーター4
0により駆動する当該根元側ブ−ムC’にあるスプロケ
ット41に捲装した後、根元側ブ−ムC’の先端側の内
側に設けたスプロケット44に掛け渡し、且つ、そのロ
ーラチェーン42の他端42bを、該先端側ブ−ムC”
の基部側43に止着し、このローラチェーン42を前記
モーター40により駆動することで、当該先端側ブ−ム
C”を、根元側ブ−ムC’のスライド手段35から引き
出し、又は、このスライド手段35内に収め入れ得る構
成としてある。(図21参照)
The leading end side boom C "is pulled out from the sliding means 35 and accommodated in the base side 43 of the leading end side boom C" by the roller chain 42 fixed at one end 42a. Motor 4 provided on the root side boom C '
After being wound around the sprocket 41 on the root side boom C ′ driven by 0, it is hung on the sprocket 44 provided inside the tip side of the root side boom C ′, and the roller chain 42 Connect the other end 42b to the tip side boom C "
By fixing the roller chain 42 to the base side 43 and driving the roller chain 42 by the motor 40, the tip side boom C ″ is pulled out from the sliding means 35 of the root side boom C ′, or It is configured so that it can be accommodated in the slide means 35 (see FIG. 21).

【0185】かかる構成よりなるブームCにベルトコン
ベヤGを備えさせている。このブームCに備えられるベ
ルトコンベヤGは、根元側ブ−ムC’に備えられている
第1のベルトコンベヤG’と、先端側ブ−ムC”に備え
られている第2のベルトコンベヤG”としてあり、シュ
ート70から供給される生コンクリートFを、このシュ
ート70の下方にあって、横方向に該生コンクリートF
を移送するベルトコンベヤ28を介して、該第1のベル
トコンベヤG’で受け入れると共に、これを第2のベル
トコンベヤG”に受け継げる構成としてある。
A belt conveyor G is provided on the boom C having such a structure. The belt conveyor G provided on the boom C includes a first belt conveyor G ′ provided on the root side boom C ′ and a second belt conveyor G provided on the tip side boom C ″. ", And the raw concrete F supplied from the chute 70 is located below the chute 70 in the lateral direction.
Is received by the first belt conveyor G ′ via the belt conveyor 28 for transferring the same and is inherited by the second belt conveyor G ″.

【0186】即ち、第1のベルトコンベヤG’は、根元
側ブームC’において、前記伸縮ブームC”の摺動組付
けられているスライド手段35の上方にあって、走行さ
れる構成としてあり、この根元側ブームC’の先端側に
コンベヤベルト45の駆動プーリ46を、又該根元側ブ
ームC’の取付け基部側に従動プーリ47を配置し、コ
ンベヤベルト45をエンドレスに張り設け、モータ48
を用いて、これを駆動する構成とし、このスライド手段
35に取り付けた先端側ブームC”に第2のベルトコン
ベヤG”を設けた構成としている。
That is, the first belt conveyor G'is configured to run on the root side boom C'above the slide means 35 to which the telescopic boom C "is slidably mounted. A drive pulley 46 of the conveyor belt 45 and a driven pulley 47 of the root side boom C ′ are arranged on the tip end side of the root side boom C ′, and the conveyor belt 45 is endlessly stretched and a motor 48 is installed.
And a second belt conveyor G ″ is provided on the tip side boom C ″ attached to the sliding means 35.

【0187】この第2のベルトコンベヤG”は、従っ
て、先端側ブームC”の取付け基部側43の側にある従
動プーリ49が、前記第1のベルトコンベヤG’におけ
るコンベヤベルト45の下方に位置し、この先端側ブー
ムC”の先端側に備えた駆動プーリ50との間にコンベ
ヤベルト51をエンドレスに張り、これを該先端側ブー
ムC”の先端側に備えたモータ52によって駆動する構
成としている。
In this second belt conveyor G ", therefore, the driven pulley 49 on the mounting base side 43 side of the tip side boom C" is located below the conveyor belt 45 in the first belt conveyor G '. Then, a conveyor belt 51 is endlessly stretched between the tip end side boom C ″ and a drive pulley 50 provided on the tip end side, and the conveyor belt 51 is driven by a motor 52 provided at the tip end side of the tip end side boom C ″. There is.

【0188】尚、ここで、根元側ブームC’及び先端側
ブームC”に備えられている第1及び第2の各ベルトコ
ンベヤG’、G”は、生コンクリートFの移送に都合の
良い、例えばトラフタイプのローラ53を、返えりのフ
ラット状のローラ54上に設けた構成としてある。
Here, the first and second belt conveyors G ′ and G ″ provided on the root side boom C ′ and the tip side boom C ″ are convenient for transferring the ready-mixed concrete F. For example, the trough type roller 53 is provided on the return flat roller 54.

【0189】また、前記のシュート70の下方と、前記
ベルトコンベヤG’との間に、横方向に生コンクリート
Fを移送するための比較的短かいベルトコンベヤ28、
28が設けてあり、夫々のシュート70、70から供給
される生コンクリートFを、順次に、該シュート70、
70の略中央部分に設けられている前記根元側ブーム
C’にあるベルトコンベヤG’に案内する構成としてあ
る。
Further, between the lower part of the chute 70 and the belt conveyor G ', a relatively short belt conveyor 28 for laterally transferring the green concrete F,
28, the ready-mixed concrete F supplied from the respective chutes 70, 70 is sequentially fed to the chutes 70,
It is configured to guide to the belt conveyor G ′ on the root side boom C ′ provided at the substantially central portion of 70.

【0190】次いで、前記各ベルトコンベヤG’、G”
には、図23〜図26に示すように夫々にトリッパ装置
Hを設け、コンベヤベルト45、51の各所定位置にお
いて搬送生コンクリートFをトリッパ装置Hのシュート
55から、コンクリート打設箇所、又は、ベルトコンベ
ヤG’からベルトコンベヤG”に向けて供給に投入でき
る構成としてある。
Next, each of the belt conveyors G'and G "
23 to 26, each of them is provided with a tripper device H, and at each predetermined position of the conveyor belts 45 and 51, the conveyed raw concrete F is fed from the chute 55 of the tripper device H to a concrete pouring place, or The configuration is such that the belt conveyor G ′ can be fed to the belt conveyor G ″ for supply.

【0191】ここで用いられるトリッパ装置として、本
実施例では、以下の構成よりなるトリッパ装置、特に、
第1のベルトコンベヤG’と、第2のベルトコンベヤ
G”とに備えられる各トリッパ装置Hは、夫々のコンベ
ヤベルト45及び51を、生コンクリートFを搬送して
いるベルト側において、これをS字状に曲げるトリッパ
プーリ56、56を備えたものとし、そのS字状の屈曲
部の下方にシュート55を設け、このシュート55によ
って、各ベルトコンベヤG’、G”で搬送されてきた生
コンクリートFを、該ベルトコンベヤG’、G”の側方
又は前方に導き出す構成としてある。
As a tripper device used here, in this embodiment, a tripper device having the following structure, in particular,
The respective tripper devices H provided on the first belt conveyor G ′ and the second belt conveyor G ″ carry the respective conveyor belts 45 and 51 on the side carrying the ready-mixed concrete F by S. It is assumed that tripper pulleys 56, 56 that bend in a letter shape are provided, and a chute 55 is provided below the S-shaped bent portion, and by this chute 55, fresh concrete that has been conveyed by each belt conveyor G ′, G ″. F is guided to the side or the front of the belt conveyors G ′ and G ″.

【0192】また、この各トリッパ装置H、Hは、斜め
に斜上する案内面57を備え、且つ移動手段としての台
車部58を備えた走行フレーム59も有しておあり、斜
上する案内面57にあるフレーム間にローラ60、60
…を設け、前記各ベルトコンベヤG’、G”を移動して
きた各コンベヤベルト45、51を、このローラ60、
60…上に案内し、これを、その斜上した上端におい
て、前記トリッパプーリ56、56によって、下方にS
字状に屈曲することによって、シュート55の受け空間
を構成すると共に、この各ベルト45、51を、各ベル
トコンベヤG’、G”上に再度復帰させる構成としてあ
る。
Each of the tripper devices H, H also has a traveling frame 59 having a guide surface 57 which is inclined obliquely, and a carriage portion 58 which is a moving means. Rollers 60, 60 between the frames on surface 57
, And each of the conveyor belts 45 and 51 which have moved the belt conveyors G ′ and G ″,
60 ... Guided upward, and at the upper end of the slanted upper end thereof, S is moved downward by the tripper pulleys 56, 56.
By bending in a letter shape, a receiving space for the chute 55 is formed, and the belts 45 and 51 are returned to the belt conveyors G ′ and G ″ again.

【0193】尚、図示例にあっては、ベルトコンベヤ
G、特に、第1のベルトコンベヤG’に備えられるトリ
ッパ装置を特に以下のように構成している。即ち、この
第1のベルトコンベヤG’の側に備えられているトリッ
パ装置Hにあっては、シュート55を構成する筒体の底
面の一部を開口55aしてあると共に、この開口55a
を塞ぐ蓋板55cと、更に、シュート55の筒体の内部
にあって、このシュート55の内部を仕切る遮蔽板55
bとを夫々開閉可能に備えた構成としてある。かかる構
成よりなるトリッパ装置Hは、先端ブームC”に設ける
こともできる。
In the illustrated example, the tripper device provided on the belt conveyor G, in particular, the first belt conveyor G ′ is constructed as follows. That is, in the tripper device H provided on the side of the first belt conveyor G ', a part of the bottom surface of the cylindrical body forming the chute 55 is formed with an opening 55a and the opening 55a is formed.
A cover plate 55c for closing the inside of the chute 55 and a shield plate 55 for partitioning the inside of the chute 55.
b and b can be opened and closed respectively. The tripper device H having such a configuration can be provided on the tip boom C ″.

【0194】トリッパ装置Hを、かかる構成とすること
によって、ベルトコンベヤGで移送される生コンクリー
トFをシュート55の先端側、又は開口55aの、いず
れかの側から、随時、選択的に、コンクリートの打込み
面、又は、先端側ブームC”のベルトコンベヤG”に供
給することができる。
By configuring the tripper device H in such a configuration, the fresh concrete F transferred by the belt conveyor G can be selectively selected from the tip side of the chute 55 or the opening 55a at any time and selectively. Or the belt conveyor G ″ of the tip side boom C ″.

【0195】図25は、かかるトリッパ装置Hを理解し
易いように示したものであり、遮蔽板55bを下方に回
動することで、シュート55の内部空間を略垂直に仕切
ることができ、これによって、生コンクリートFが、該
シュート55の吐出端側に送り込まれるのを防ぐと共
に、蓋板55cを解放することによって、開口55aか
ら、生コンクリートFを、トリッパ装置Hの前方に取り
出すことができる。
FIG. 25 is a view showing such a tripper device H for easy understanding. By rotating the shielding plate 55b downward, the internal space of the chute 55 can be partitioned substantially vertically. This prevents the fresh concrete F from being sent to the discharge end side of the chute 55, and by releasing the cover plate 55c, the fresh concrete F can be taken out from the opening 55a to the front of the tripper device H. .

【0196】次いで、図25における仮想線の状態、即
ち、蓋板55cを開口55aを塞ぐ位置に回動し、この
開口55aを塞ぐと共に、遮蔽板55bを、シュート5
5の上壁面に密着するように回動し、このシュート55
の筒状内部を連通状態とすることによって、生コンクリ
ートFを、トリッパ装置Hの側方に取り出すことができ
る。
Next, the state of the phantom line in FIG. 25, that is, the cover plate 55c is rotated to a position that closes the opening 55a, and while closing the opening 55a, the shield plate 55b is moved to the chute 5.
The close-up of the chute 55
The raw concrete F can be taken out to the side of the tripper device H by making the inside of the cylinder communicate with each other.

【0197】かかるトリッパ装置Hは、ベルトコンベヤ
G’、G”に搬送されてきた生コンクリートFを、随
時、その位置をずらせた位置に打設する必要から、レー
ル61、61上に台車部58の車輪58aが移動できる
ようにしてあり、しかも、この車輪58aを減速機付き
モータ62によって駆動する構成とし、別段のコントロ
ール手段によって、これら各トリッパ装置Hの移動、位
置決めをなす構成としてある。
In the tripper device H, since the ready-mixed concrete F conveyed to the belt conveyors G'and G "is required to be placed in a position where the position is deviated from time to time, the truck portion 58 is mounted on the rails 61 and 61. The wheels 58a are movable, and the wheels 58a are driven by the motor 62 with a reduction gear, and the tripper devices H are moved and positioned by separate control means.

【0198】かかる構成としたことによって、第1のベ
ルトコンベヤG’に備えられたトリッパ装置にあって
は、これをブームC’の先端側に備えることで、生コン
クリートFを、先端側ブームC”のベルトコンベヤG”
に供給できると共に、ブームC’を移動しながら、該ベ
ルトコンベヤG’の側方に生コンクリートFを取り出す
ことができる。又、第2のベルトコンベヤG”に備えら
れるトリッパ装置Hは、これを先端側ブームC”を移動
させながら、ベルトコンベヤG”の側方に生コンクリー
トFを取り出すことができる。又、この第2のベルトコ
ンベヤG”に備えられるトリッパ装置Hを、先端側ブー
ムC”の先端に備えつけ、該ブームC”を伸縮しなが
ら、ベルトコンベヤG”の先端側に生コンクリートFを
取り出すことができる。
With this structure, the tripper device provided on the first belt conveyor G'is provided on the tip side of the boom C ', so that the ready-mixed concrete F is fed to the tip side boom C. "Belt conveyor G"
In addition to being able to supply the raw concrete F to the side of the belt conveyor G ′ while moving the boom C ′. Further, the tripper device H provided on the second belt conveyor G ″ can take out the ready-mixed concrete F to the side of the belt conveyor G ″ while moving the tip side boom C ″. The tripper device H provided for the second belt conveyor G ″ is provided at the tip of the tip side boom C ″, and the concrete concrete F can be taken out to the tip side of the belt conveyor G ″ while expanding and contracting the boom C ″.

【0199】尚、叙上、図示例にあって、トリッパ装置
Hは、これを根元側ブームC’にのみ設けられるように
構成してあっても良い。尚、かかるモータ62による移
動、位置決めに代えて、トリッパ装置Hの台車部58
を、移動位置決め用のウインチに備えたワイヤーロープ
によって移動、位置決めをなすようにしてあっても良
い。
Incidentally, in the illustrated example, the tripper device H may be configured so that it is provided only on the root side boom C '. Instead of the movement and positioning by the motor 62, the carriage 58 of the tripper device H is used.
May be moved and positioned by a wire rope provided in a winch for moving and positioning.

【0200】かかる、ベルトコンベヤGをブームCに備
えたタワーマストAの空間4に対して、容器状搬送具D
を、昇降用ウインチ63及び、ガイドシーブ64、64
を用いて、ワイヤーロープ65によって吊り下げた構成
とし、この空間4を昇降可能に移動操作できる構成とし
てある。
With respect to the space 4 of the tower mast A provided with the belt conveyor G on the boom C, the container-shaped carrier D
The lifting winch 63 and the guide sheaves 64, 64
Is configured to be suspended by a wire rope 65, and the space 4 can be moved up and down.

【0201】この容器状搬送具Dの昇降操作は、各種の
昇降手段を用いてなすことができる。この図示例にあっ
ては、ウインチを用いた構成としており、前記ステージ
本体18に備えられたモータ66によって回転される巻
ドラム67に捲装したワイヤーロープ65の端部に各容
器状搬送具Dを繋着すると共に、このワイヤーロープ6
5を各ガイドシーブ64、64によって前記タワーマス
トAの空間4上に案内し、この空間4に対して、各容器
状搬送具Dが滑らかに上下動できるように吊下げ状態に
構成してある。尚、図において68は電磁ブレーキを、
69は減速機を示している。
The raising / lowering operation of the container-shaped carrier D can be performed by using various raising / lowering means. In this illustrated example, a winch is used, and each container-shaped carrier D is attached to an end of a wire rope 65 wound around a winding drum 67 rotated by a motor 66 provided in the stage body 18. With this wire rope 6
5 is guided by the guide sheaves 64, 64 onto the space 4 of the tower mast A, and the container-shaped carrier D is hung in the space 4 so that the container-shaped carrier D can smoothly move up and down. . In the figure, 68 is an electromagnetic brake,
Reference numeral 69 indicates a speed reducer.

【0202】次いで、図27〜図29は、容器状搬送具
Dの第1の昇降手段を示すものである。この容器状搬送
具Dは、タワーマストAの空間4に対して、2個の容器
状搬送具D、Dが並んだ状態に設けてあると共に、一方
の容器状搬送具D’には、巻ドラム67に対して下巻き
とされたワイヤーロープ65aを、又、他方の容器状搬
送具D”には、巻ドラム67に対して上巻きとされたワ
イヤーロープ65bを夫々繋着してある。この結果、モ
ータ66によって巻ドラム67を回転した際に、いずれ
か一方の容器状搬送具Dが上昇し、同時に、他方の容器
状搬送具Dが下降することとなり、容器状搬送具Dの昇
降操作に際してのモータ66の負荷を少なくすることが
できる。
Next, FIGS. 27 to 29 show the first elevating means of the container-shaped carrier D. As shown in FIG. This container-shaped carrier D is provided in the space 4 of the tower mast A in a state where the two container-shaped carriers D, D are arranged side by side, and one container-shaped carrier D'is wound around. A wire rope 65a wound under the drum 67 and a wire rope 65b wound over the winding drum 67 are connected to the other container-shaped carrier D ″. As a result, when the winding drum 67 is rotated by the motor 66, one of the container-shaped transport tools D rises, and at the same time, the other container-shaped transport tool D descends, so that the container-shaped transport tool D moves up and down. The load on the motor 66 during operation can be reduced.

【0203】尚、ここにおいて、タワーマストAの空間
4を昇降される容器状搬送具D、Dは、一方が下方にあ
って投入ホッパー71から生コンクリートFを受けてい
る際に、他方の容器状搬送具Dが、上方にあって、シュ
ート70からベルトコンベヤGに対して生コンクリート
Fを、ベルトコンベヤ28を介して定量的に供給する構
成としてあり、このシュート70と投入ホッパー71と
の間をタイミング良く交互に昇降する構成としてある。
Here, the container-shaped carriers D, D that are moved up and down in the space 4 of the tower mast A are such that one of them is below and the other container is receiving the ready-mixed concrete F from the charging hopper 71. The transporting tool D is located above and is configured to quantitatively supply the green concrete F from the chute 70 to the belt conveyor G via the belt conveyor 28. Between the chute 70 and the charging hopper 71. It is configured to alternately move up and down in good timing.

【0204】次いで、図30及び図31は、容器状搬送
具Dの第2の昇降手段を示すものである。この昇降手段
は、タワーマストAの空間4、4の夫々に、容器状搬送
具D、Dを吊り下げ状態に設け、この夫々の容器状搬送
具D、Dに対して、これを各別に昇降操作する昇降用ウ
インチ63を備えさせてある。そして各巻ドラム67に
対して、捲装したワイヤーロープ65の一方を下巻きの
ワイヤーロープ65aとし、これにカウンターウェイト
102を吊り下げ状態に設けると共に、他方の、即ち、
上巻きワイヤーロープ65bに、前記容器状搬送具Dを
吊り下げ状態に設けた構成としてある。
Next, FIG. 30 and FIG. 31 show the second elevating means of the container-shaped carrier D. This elevating means is provided with container-shaped carrier D, D in a suspended state in each of the spaces 4, 4 of the tower mast A, and lifts the container-shaped carrier D, D separately for each container-shaped carrier D, D. An elevating winch 63 for operation is provided. Then, for each winding drum 67, one of the wound wire ropes 65 is used as the underwound wire rope 65a, and the counterweight 102 is provided in a suspended state, and the other, namely,
The container-shaped carrier D is suspended from the upper winding wire rope 65b.

【0205】尚、この容器状搬送具Dにおける第2の昇
降手段にあっては、該カウンターウェイト102を用い
た以外の構成を、前記図27〜図29において示される
第1の昇降手段と同一の構成としてある。従って、前記
第1の昇降手段と同一又は実質的に同一の構成部分につ
いては同一の番号を付して、その説明を省略する。
The second lifting means in this container-shaped carrier D has the same structure as the first lifting means shown in FIGS. 27 to 29 except that the counterweight 102 is used. It is as the composition of. Therefore, the same or substantially the same components as those of the first elevating means are designated by the same reference numerals, and the description thereof will be omitted.

【0206】かかる容器状搬送具Dから、生コンクリー
トFをベルトコンベヤ28を介してベルトコンベヤGに
供給するシュート70は、この容器状搬送具Dが空間4
を通過する際に起立状態に軸70aを支点として、トル
クアクチュエータ70bによって回動されていると共
に、この容器状搬送具Dが、シュート70を通り越し
て、このシュート70の上方に位置された際に該シュー
ト70における上面開口が、該容器状搬送具Dの排出口
72の下方に位置するように前記トルクアクチュエータ
70bによって、回動状態に維持される構成としてあ
る。かかる構成よりなるシュート70が、前記2個の容
器状搬送具Dの夫々の排出口72、72の下方に夫々備
えられているものであって、前記ステージ本体18に起
立して、備えられているステージポスト部18A部に設
けており、前記容器状搬送具Dの昇降動作に対応して起
立、又は傾倒する構成としてある。
The chute 70 for supplying the green concrete F from the container-shaped carrier D to the belt conveyor G via the belt conveyor 28 has the container-shaped carrier D in the space 4.
When the container-shaped carrier D passes over the chute 70 and is positioned above the chute 70 while being rotated by the torque actuator 70b about the shaft 70a as a fulcrum when passing through the chute 70. A structure in which the upper surface opening of the chute 70 is maintained in a rotating state by the torque actuator 70b so as to be located below the discharge port 72 of the container-shaped carrier D. The chutes 70 having such a configuration are provided below the respective discharge ports 72, 72 of the two container-shaped transport tools D, and are provided upright on the stage body 18. The stage post portion 18A is provided and is configured to stand up or tilt in response to the raising / lowering operation of the container-shaped carrier D.

【0207】次いで、叙上で用いられる容器状搬送具D
は、この容器状搬送具本体73を、吊台74上に載置
し、この吊台74を前記昇降用ウインチ63を用いて昇
降操作しても良く、又、直接容器状搬送具本体73を該
昇降用ウインチ63を用いて昇降操作するようにしてあ
っても良い。
Next, the container-shaped carrier D used in the above
The container-shaped carrier main body 73 may be placed on the suspension base 74, and the suspension base 74 may be moved up and down using the lifting winch 63. Alternatively, the container-shaped carrier main body 73 may be directly moved. The lifting winch 63 may be used to perform the lifting operation.

【0208】尚、この吊台74は、タワーマストAにお
ける各主柱3a、3aと、補助主柱3b及び横桿3cと
によって構成される各空間4、4内に収め入れられる構
成としてあり、略四角形をなすフレーム台74aの両側
の略中央部分に一対の主柱74bを設けると共に、この
主柱74bの上端に向けて、夫々の側縁から補強フレー
ム74cを傾斜状に設け、且つ、この主柱74b、74
b上端間を横桿74dで連結した構成とし、この主柱7
4bの上端で、前記ワイヤーロープ65を止着する構成
としてある。
Incidentally, the suspension base 74 is constructed so as to be housed in each of the spaces 4 and 4 constituted by the main columns 3a, 3a of the tower mast A, the auxiliary main column 3b and the horizontal rod 3c. A pair of main pillars 74b are provided at substantially central portions on both sides of the frame base 74a forming a substantially quadrangular shape, and reinforcing frames 74c are provided in an inclined shape from the respective side edges toward the upper ends of the main pillars 74b. Main pillars 74b, 74
b The upper ends of the main pillars 7 are connected by a horizontal rod 74d.
The wire rope 65 is fixed to the upper end of 4b.

【0209】かかる吊台74の前記主柱74bの外側に
スライドガイド90を設け、このスライドガイド90
に、タワーマストAの上下方向に設けたガイドレール8
9をスライドメタル91を介装して嵌め入れることで、
該吊台74が、この空間4内を滑らかに昇降する構成と
してある。(図19参照)
A slide guide 90 is provided on the outside of the main pillar 74b of the suspension base 74, and the slide guide 90 is provided.
And the guide rail 8 provided in the vertical direction of the tower mast A.
By inserting 9 through slide metal 91,
The suspension 74 is configured to smoothly move up and down in the space 4. (See Figure 19)

【0210】ここで容器状搬送具Dを構成する容器状搬
送具本体73は、生コンクリートFの搬送容器部73a
の下部側に、生コンクリートFを連続して、定量的に送
り出すタイプの供給手段Eを備えた構成としてある。か
かる供給手段Eを備えた容器状搬送具Dは、追って説明
する他の態様に係る容器状搬送具D、特に、供給手段E
を備えていない容器状搬送具Dbと区別するために、容
器状搬送具Daとして図示している。
Here, the container-shaped carrier main body 73 constituting the container-shaped carrier D is a container container 73a for the ready-mixed concrete F.
On the lower side of the above, the raw concrete F is continuously and quantitatively fed in a supply means E. The container-shaped carrier D provided with such a supply means E is a container-shaped carrier D according to another aspect which will be described later, and particularly, the supply means E.
In order to distinguish it from the container-shaped carrier Db that does not include the container-shaped carrier D, the container-shaped carrier Da is illustrated.

【0211】図32は、スクリューフィーダ75を、こ
の生コンクリートFを連続して、定量的に送り出す供給
手段Eとして、該搬送容器部73aに備えさせた容器状
搬送具本体73よりなる容器状搬送具Daを示してい
る。
FIG. 32 shows a container-shaped carrier comprising a container-shaped carrier main body 73 provided in the carrier container portion 73a as a supply means E for continuously and quantitatively feeding the raw concrete F from the screw feeder 75. The tool Da is shown.

【0212】このスクリューフィーダ75を、生コンク
リートFを連続して、定量的に供給するタイプの供給手
段Eとして備えた容器状搬送具Daは、その排出口72
から、生コンクリートFが、該スクユーフィーダ75に
よって定量的に、且つ連続して取り出し得るように、ス
クリューフィーダ75による送り出し量を設定してあ
る。
The container-shaped carrier Da provided with this screw feeder 75 as a supply means E of a type for continuously and quantitatively supplying fresh concrete F has a discharge port 72.
Therefore, the feed amount by the screw feeder 75 is set so that the fresh concrete F can be taken out quantitatively and continuously by the squeeze feeder 75.

【0213】即ち、このスクリューフィーダ75は、当
該生コンクリートFを定量的、且つ連続して供給するの
に適した構造に備えた構成としてあって、搬送容器部7
3aの下部に定量供給用のスクリュー75aが備えてあ
ると共に、このスクリュー75aにおける生コンクリー
トFの送り出し前方側を筒状部75h内に収め入れた構
成としてある。そして、この筒状部75hの内周面と、
該スクリュー75aとによって搬送容器部73a内にあ
る生コンクリートFを、該スクリュー75aを回転する
ことで、定量的に、且つ、連続して、この筒状部45h
に設けた排出口72から取り出し得る構成としてある。
That is, the screw feeder 75 has a structure suitable for quantitatively and continuously supplying the green concrete F, and the transport container section 7 is provided.
A screw 75a for fixed quantity supply is provided in the lower part of 3a, and the front side of the screw 75a for feeding out the fresh concrete F is housed in a cylindrical portion 75h. Then, with the inner peripheral surface of the cylindrical portion 75h,
By rotating the screw 75a, the green concrete F in the transfer container portion 73a is quantitatively and continuously transferred to the cylindrical portion 45h by the screw 75a.
It can be taken out from the discharge port 72 provided in the.

【0214】尚、75bは、このスクリュー75aのシ
ャフト75cを受けるスラストベアリングを、75d
は、該シャフト75cに備えられたスプロケットを、7
5eは、モータ75fのスプロケット75gによって該
スプロケット75dに駆動伝達するチェーンを示してい
る。
75b is a thrust bearing for receiving the shaft 75c of the screw 75a.
Is a sprocket mounted on the shaft 75c.
Reference numeral 5e indicates a chain in which drive is transmitted to the sprocket 75d by the sprocket 75g of the motor 75f.

【0215】かかる容器状搬送具Daに備えられる生コ
ンクリートFを連続して、定量的に取り出すタイプの供
給手段Eは、前記スクリューフィーダ75に特定される
ものでなく、容器状搬送具Daから、これに収められて
いる生コンクリートFを、定量的に、連続してベルトコ
ンベヤGに向けて供給できる手段、又は、この容器状搬
送具Daから、これに収められている生コンクリートF
を、定量的に、区分しながら順次にベルトコンベヤGに
供給できる手段であれば、いかなる構成のものであって
も良い。
The supply means E of the type that continuously and quantitatively takes out the fresh concrete F provided in the container-shaped carrier Da is not limited to the screw feeder 75, but rather from the container-shaped carrier Da. A means for quantitatively and continuously supplying the fresh concrete F contained therein to the belt conveyor G, or the container-like carrier Da, the fresh concrete F contained therein.
Any means may be used as long as it can quantitatively and sequentially supply the belt conveyor G while classifying.

【0216】かかる容器状搬送具Dに対する生コンクリ
ートFの供給は、例えば、タワーマストAの側方に設け
たコンベアステージ76から供給される生コンクリート
Fを、ベルトコンベヤ77で投入ホッパー71に供給
し、この投入ホッパー71に供給された生コンクリート
Fを、タワーマストAの容器状搬送具Dに供給する。
The supply of the green concrete F to the container-shaped carrier D is performed, for example, by supplying the green concrete F supplied from the conveyor stage 76 provided on the side of the tower mast A to the input hopper 71 by the belt conveyor 77. The ready-mixed concrete F supplied to the input hopper 71 is supplied to the container-shaped carrier D of the tower mast A.

【0217】この生コンクリートFの供給にあっては、
投入ホッパー71を、ガイド手段79で、タワーマスト
Aの外から、マストフレーム3の内部の空間4に導き入
れる構成としてある。そこで、先ず、容器状搬送具D
が、この投入ホッパー71の導き入れられる位置を通り
越して、空間4の下方に移動された際に、この投入ホッ
パー71を、ガイド手段79を利用して、該空間4内に
導き入れ、該投入ホッパー71の直下に、当該容器状搬
送具Dの上部開口部分が位置づけられるようにして、こ
の投入ホッパー71から、生コンクリートFを、容器状
搬送具Dに供給する。
In supplying the fresh concrete F,
The charging hopper 71 is guided by the guide means 79 from outside the tower mast A into the space 4 inside the mast frame 3. Therefore, first, the container-shaped carrier D
However, when it is moved below the space 4 after passing through the position where the charging hopper 71 is introduced, the charging hopper 71 is guided into the space 4 by using the guide means 79, and the charging is performed. Fresh concrete F is supplied from the charging hopper 71 to the container-shaped carrier D such that the upper opening of the container-shaped carrier D is positioned immediately below the hopper 71.

【0218】このように、容器状搬送具Dに生コンクリ
ートFを供給した投入ホッパー71は、前記ガイド手段
79を案内として、タワーマストAの空間4から外方に
導き出され、容器状搬送具Dのウインチ63による吊り
上げ操作の妨げとならない態様に構成してある。
As described above, the feeding hopper 71 which has supplied the ready-mixed concrete F to the container-shaped carrier D is guided outward from the space 4 of the tower mast A by using the guide means 79 as a guide, and the container-shaped carrier D The winch 63 does not hinder the lifting operation.

【0219】尚、この投入ホッパー71は、開閉手段7
8を備えた構成としてあり、前記2個の容器状搬送具D
に対応した2組の投入ホッパー71、71として用意し
てあり、一方が、容器状搬送具Dに対して生コンクリー
トFを供給している間に、他方の投入ホッパー71が、
ベルトコンベヤ77から生コンクリートFを受け入れる
ように構成してある。
The input hopper 71 is provided with the opening / closing means 7
8 is provided, and the two container-shaped carrier D
Are prepared as two sets of input hoppers 71, 71, and while one is supplying the fresh concrete F to the container-shaped carrier D, the other input hopper 71 is
It is configured to receive the ready-mixed concrete F from the belt conveyor 77.

【0220】尚、このベルトコンベヤ77から生コンク
リートFの供給を受ける投入ホッパー71は、例えば図
35及び図36に示されるように、ベルトコンベヤ77
の備えられている架台105に、この投入ホッパー71
を備えた摺動フレーム104が、略水平の向きに移動自
在とされるように設けてあり、この架台105にガイド
手段79を備えた構成としてある。
The input hopper 71 which receives the supply of the green concrete F from the belt conveyor 77 has a belt conveyor 77 as shown in FIGS. 35 and 36, for example.
On the pedestal 105 equipped with the
The sliding frame 104 provided with is provided so as to be movable in a substantially horizontal direction, and the frame 105 is provided with the guide means 79.

【0221】即ち、この摺動フレーム104は、架台1
05におけるガイド手段79に沿って、摺動フレーム1
04の一対の案内輪104aが転動し、このガイド手段
79の備えられた架台105内に、摺動フレーム104
が引き込まれ、又は、このガイド手段79の備えられた
架台105から引き出され得る構成としてある。
That is, the sliding frame 104 is mounted on the frame 1
Along the guide means 79 at 05, the sliding frame 1
04, a pair of guide wheels 104a roll, and the sliding frame 104 is installed in the frame 105 provided with the guide means 79.
Can be pulled in or pulled out from the gantry 105 provided with the guide means 79.

【0222】この摺動フレーム104の架台105から
の引き出し、及びこれに対する収め入れ操作は、例え
ば、この摺動フレーム104に備えたウインチ手段10
3によってなす。このウインチ手段103は、減速機1
03bを備えたモータ103aによって駆動される巻ド
ラム103cに捲着したワイヤーロープ103dの一端
側を、前記摺動フレーム104の先端側に、又、他端側
を、該摺動フレーム104の後端側、即ち、架台105
に対する取付け側に止着する構成としてあり、これによ
って、該摺動フレーム104、従って、この摺動フレー
ム104に備えられた投入ホッパー71を架台105に
おけるベルトコンベヤ77の下方、特に、コンベヤベル
トから供給される生コンクリートFを受け入れ得る位置
に引き寄せることができると共に、生コンクリートFの
充填された投入ホッパー71を、タワーマストAの空間
内、特に、容器状搬送具Dの上方に移動させることがで
きる。
The operation of pulling out the sliding frame 104 from the pedestal 105 and the operation for storing the sliding frame 104 are performed, for example, by the winch means 10 provided in the sliding frame 104.
Made by 3. The winch means 103 is used for the speed reducer 1.
Of the wire rope 103d wound around the winding drum 103c driven by the motor 103a provided with 03b, one end side of the wire rope 103d, and the other end side of the wire rope 103d, the rear end of the sliding frame 104. Side, that is, pedestal 105
The sliding frame 104, and hence the feeding hopper 71 provided on the sliding frame 104, is supplied from below the belt conveyor 77 on the frame 105, particularly from the conveyor belt. It is possible to draw the ready-mixed concrete F to a position where it can be received, and it is possible to move the charging hopper 71 filled with the ready-mixed concrete F into the space of the tower mast A, particularly above the container-shaped carrier D. .

【0223】なお、前記ベルトコンベヤ77は、架台1
05の上部側に設けてあり、この架台105の下方のガ
イド手段79に沿って摺動される投入ホッパー71の摺
動の妨げとならない構成としてあると共に、タワーマス
トAの下部にあって、並設された一対の空間4、4に対
して備えられる一対の容器状搬送具Dに対して、夫々
に、各個別に生コンクリートFを供給し得るように、該
ベルトコンベヤ、並びに、これに対応する生コンクリー
トFの投入ホッパー71を備えた一対の装置が設けてあ
る。なお、図中、77aは前記ベルトコンベヤ77のコ
ンベヤベルトを、77bは該ベルトコンベヤ77aの駆
動モータを示している。又、図中、101はタワーマス
トAに昇降可能に備えられた点検用のゴンドラを示して
いる。
The belt conveyor 77 is mounted on the frame 1
It is provided on the upper side of 05, and has a structure that does not hinder the sliding of the charging hopper 71 that slides along the guide means 79 below the gantry 105. The belt conveyor and the corresponding one so that the fresh concrete F can be individually supplied to each of the pair of container-shaped carriers D provided in the pair of spaces 4 and 4 provided. A pair of devices provided with a hopper 71 for charging the ready-mixed concrete F is provided. In the figure, 77a indicates a conveyor belt of the belt conveyor 77, and 77b indicates a drive motor of the belt conveyor 77a. Further, in the figure, reference numeral 101 designates a gondola for inspection provided on the tower mast A so as to be able to move up and down.

【0224】(2) 第2の実施の形態に係る生コンクリー
トの移送装置 図37〜図44は、第2の実施の形態に係る生コンクリ
ートの移送装置を示している。
(2) Transfer Device for Ready-Mixed Concrete According to Second Embodiment FIGS. 37 to 44 show a transfer device for ready-mixed concrete according to the second embodiment.

【0225】この第2の実施の形態に係る生コンクリー
トの移送装置にあっては、タワーマストAと、このタワ
ーマストAに昇降可能に備えられている昇降本体部B
と、この昇降本体部Bに旋回可能に備えられているブー
ムCとを有する構成としてある。また、前記タワーマス
トAには、生コンクリートFの搬送に用いられる容器状
搬送具Dが昇降可能に備えられている。また、前記ブー
ムCには、前記容器状搬送具Dから直接又は別段に備え
つけられる搬送手段を介して供給される該生コンクリー
トFの搬送用ベルトコンベヤGが設けられている。
In the ready-mixed concrete transferring apparatus according to the second embodiment, the tower mast A and the elevating / lowering main body portion B provided on the tower mast A for elevating / lowering.
And a boom C rotatably provided on the elevating body B. Further, the tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down. Further, the boom C is provided with a belt conveyor G for transporting the ready-mixed concrete F, which is supplied from the container-shaped transport tool D directly or via a transport means provided separately.

【0226】また、このブームCには、前記ベルトコン
ベヤGによって搬送される生コンクリートFを該ベルト
コンベヤGの先端、又は、その途中で取り出すトリッパ
装置Hが備えられている。
Further, the boom C is provided with a tripper device H for taking out the ready-mixed concrete F carried by the belt conveyor G or at the tip of the belt conveyor G or in the middle thereof.

【0227】また、前記容器状搬送具Dには、この容器
状搬送具Dによって搬送される生コンクリートFを、連
続して定量的に送り出す供給手段Eが備えらており、前
記ベルトコンベヤGに対して、連続して、定量的に、生
コンクリートFを供給することができる。
Further, the container-shaped carrier D is provided with a supply means E for continuously and quantitatively feeding the green concrete F carried by the container-shaped carrier D, and the belt conveyor G On the other hand, the fresh concrete F can be continuously and quantitatively supplied.

【0228】また、この第2の実施の形態に係る生コン
クリートの移送装置にあっては、タワーマストAが、そ
の垂直軸線を回転軸線として、回転可能に立設してあ
る。
Further, in the ready-mixed concrete transferring apparatus according to the second embodiment, the tower mast A is rotatably erected with its vertical axis as the axis of rotation.

【0229】この第2の実施の形態に係る生コンクリー
トの移送装置は、ブームCを根元側ブームC’のみと
し、この根元側ブームC’にホイスト80などのクレー
ン手段Jを設けた点、タワーマストAを旋回テーブル2
などの旋回手段を介して直接固定すると共に、コンベヤ
ステージ76を設けずに、投入ホッパー71に対して直
接コンクリートミキサー車81によって生コンクリート
Fを供給するようにした点、及び点検ステージ82を設
けた点以外の構成を、前記第1の実施の形態に係る生コ
ンクリートの移送装置における構成と同一、又は実質的
に同一としてある。また、ここで構成される各部の動
作、及び各部の奏する機能は、前記第1の実施の形態に
係る生コンクリートの移送装置におけると同一、又は実
質的に同一である。従って、前記第1の実施の形態に係
る生コンクリートの移送装置における構成と同一又は実
質的に同一の構成部分、同一又は実質的に同一の機能を
奏する部分については、同一の番号を付して、その説明
を省略する。
In the ready-mixed concrete transferring apparatus according to the second embodiment, the boom C is only the root side boom C ', and the crane means J such as the hoist 80 is provided on the root side boom C'. Mast A turns table 2
In addition to directly fixing via a turning means such as, the conveyor stage 76 is not provided, and the raw concrete F is directly supplied to the input hopper 71 by the concrete mixer truck 81, and the inspection stage 82 is provided. The configuration other than the points is the same as or substantially the same as the configuration in the fresh concrete transfer device according to the first embodiment. The operation of each part configured here and the function performed by each part are the same as or substantially the same as those in the fresh concrete transfer device according to the first embodiment. Therefore, the same or substantially the same constituent parts as those in the transfer device for ready-mixed concrete according to the first embodiment, and the parts having the same or substantially the same functions are designated by the same reference numerals. , The description is omitted.

【0230】ここで装備されるクレーン手段Jとしての
ホイスト80は、根元側ブームC’の長さ方向の両側か
ら、垂下状に設けた補強トラス83、83をサドルとし
て利用し、この向き合っている各補強トラス83、83
の内側にレール84、84を設け、このレール84、8
4に対して、ホイスト80を走行可能に装備させてい
る。尚、図において、80aはホイスト本体部を、80
bは、レール84上を走行する車輪を、80cは、該ホ
イスト本体部80aを移動する手段としてのモータを、
80dは巻ドラム80eのモータを、80fは、モータ
80eの減速機を、80gは、このブレーキを示してお
り、フック80hのワイヤーロープ80iの操作をなし
得る構成としてある。
The hoist 80 as the crane means J mounted here uses the reinforcing trusses 83, 83 provided in a hanging shape from both sides in the lengthwise direction of the root side boom C'as saddles and faces each other. Reinforcement truss 83, 83
Rails 84, 84 are provided inside the
4 is equipped with a hoist 80 capable of running. In the figure, 80a is a hoist body
b is a wheel running on the rail 84, 80c is a motor as a means for moving the hoist body 80a,
Reference numeral 80d denotes a motor of the winding drum 80e, 80f denotes a speed reducer of the motor 80e, and 80g denotes this brake, and the wire rope 80i of the hook 80h can be operated.

【0231】尚、作業用ステージ82は、前記補助ステ
ージ19の備えられているクライミング手段としての下
部側にある昇降フレーム21に支持桿85によって垂設
状態に設けてあり、前記クライミング手段によって、昇
降フレーム21の昇降動作と一体となってタワーマスト
Aを昇降する構成としてある。即ち、ここでは、前記の
昇降本体部Bに対して、更に、作業用ステージ82を設
け、これらが一体となって、タワーマストAを昇降する
昇降本体部Bとして構成してある。
The working stage 82 is vertically provided by a supporting rod 85 on the elevating frame 21 on the lower side as the climbing means provided for the auxiliary stage 19, and is lifted by the climbing means. The tower mast A is configured to move up and down integrally with the elevating operation of the frame 21. That is, here, a work stage 82 is further provided to the elevating main body B, and these are integrally configured as an elevating main body B for elevating the tower mast A.

【0232】従って、ここでタワーマストAに備えられ
る作業用ステージ82は、前記ステージ本体18と略同
様の手法によって、昇降フレーム21と共に、タワーマ
ストAに対して昇降できる構成、即ち、タワーマストA
に対して、外嵌状に取りつけられるための開口22を備
えていると共に、この開口22に挿通されるマストフレ
ーム3、特に主柱3aに備えられたガイドレールが摺動
状態に収め入れられるスライドガイドを前記第1の実施
の形態におけると同様に備えた構成としてある。
Therefore, the work stage 82 provided in the tower mast A can be elevated and lowered with respect to the tower mast A together with the elevating frame 21 by a method substantially similar to that of the stage main body 18, that is, the tower mast A.
On the other hand, the slide 22 is provided with an opening 22 for external fitting, and the mast frame 3 inserted into the opening 22 and particularly the guide rail provided on the main pillar 3a is slidably accommodated. The guide is provided in the same manner as in the first embodiment.

【0233】また、投入ホッパー71に対する生コンク
リートFの供給は、コンクリートミキサー車81から、
ダイレクトに供給できるようにしてあり、タワーマスト
Aに向けて、該コンクリートミキサー車81の進入路8
6を設けてある。即ち、コンクリートミキサー車81の
進入路86と、タワーマストAにおけるマストフレーム
3、この場合にあっては、このマストフレーム3内に延
びるガイドフレーム106が設けてあると共に、このガ
イドフレーム106に対して、摺動フレーム107が、
摺動可能に組み付けられている。特に、摺動フレーム1
07における一対の案内車輪107a、107aが、ガ
イドフレーム106のコ字状をなす向き合った溝106
aをガイドとして組み込まれた構成としてある。
The supply of green concrete F to the input hopper 71 is carried out from the concrete mixer car 81.
The concrete mixer truck 81 can be directly supplied to the tower mast A toward the approach passage 8 of the concrete mixer truck 81.
6 is provided. That is, the approach path 86 of the concrete mixer truck 81, the mast frame 3 in the tower mast A, in this case, the guide frame 106 extending into the mast frame 3 is provided, and with respect to the guide frame 106. , The sliding frame 107
It is slidably assembled. Especially, the sliding frame 1
The pair of guide wheels 107 a and 107 a in 07 are formed by the U-shaped facing grooves 106 of the guide frame 106.
a is incorporated as a guide.

【0234】この摺動フレーム107は、ガイドフレー
ム106に設けた操作ウインチ手段108によって、こ
のガイドフレーム106に沿って、移動される構成とし
てあり、減速機108bを備えたモータ108aにより
回転される巻きドラム108cに捲装したワイヤーロー
プ108dの一端を、該摺動フレーム107の一端側
に、ワイヤーロープ108dの他端側を、この摺動フレ
ーム107の他側端部に夫々繋着し、当該ガイドフレー
ム106に沿って移動できる構成としてある。
The sliding frame 107 is constructed so as to be moved along the guide frame 106 by the operation winch means 108 provided on the guide frame 106, and is wound by the motor 108a equipped with the reduction gear 108b. One end of the wire rope 108d wound around the drum 108c is connected to one end of the sliding frame 107, and the other end of the wire rope 108d is connected to the other end of the sliding frame 107. It is configured to be movable along the frame 106.

【0235】かかる構成からなる摺動フレーム107に
対して、投入ホッパー71が備えてあり、前記コンクリ
ートミキサー車81からの生コンクリートFを、随時タ
ワーマストAに備えられている容器状搬送具Daに対し
て供給できる構成としてある。
Into the sliding frame 107 having such a structure, a charging hopper 71 is provided, and the ready-mixed concrete F from the concrete mixer truck 81 is supplied to the container-like carrier Da provided on the tower mast A at any time. It can be supplied to the customer.

【0236】なお、叙上で構成される図37〜図44に
おいて示される第2の実施の形態に係る生コンクリート
の移送装置は、タワーマストAの旋回手法及び当該構
成、各昇降本体部Bの昇降手法及び当該構成、ブームC
の旋回手法及び当該構成、容器状搬送具Dの昇降手法及
び当該構成、容器状搬送具Daから生コンクリートFを
定量供給する手段としての供給手段Eの機能及び当該構
成、容器状搬送具Dからシュート70を用いてベルトコ
ンベヤGに対して生コンクリートFを供給する手法及び
当該構成、ベルトコンベヤGによる生コンクリートFの
移送手法及び当該構成、ベルトコンベヤGから生コンク
リートFをシュート55に送り出すトリッパ装置Hの構
成など、当該装置の各操作手法、及び構成を、図5〜図
36に示される第1の実施の形態に係る生コンクリート
の移送装置と同一または実質的に同一のものとしてあ
る。
The concrete transfer apparatus according to the second embodiment shown in FIGS. 37 to 44, which is constructed as described above, is the same as the method of turning the tower mast A, the structure thereof, and the elevating body B. Lifting method and its configuration, boom C
And its configuration, the raising and lowering method of the container-shaped carrier D, the configuration, the function of the supply means E as a means for quantitatively supplying the fresh concrete F from the container-shaped carrier Da, and the configuration, the container-shaped carrier D Method for supplying ready-mixed concrete F to the belt conveyor G using the chute 70 and its configuration, method for transferring ready-mixed concrete F by the belt conveyor G and configuration, tripper device for sending the ready-mixed concrete F from the belt conveyor G to the chute 55 The operation method and configuration of the apparatus, such as the configuration of H, are the same or substantially the same as those of the fresh concrete transfer apparatus according to the first embodiment shown in FIGS.

【0237】尚、叙上作業用点検ステージ82と、クレ
ーン手段Jを、生コンクリートFの移送装置に設けるこ
とによって、前記生コンクリートFの打設と共に、この
打設に必要とされる各種機材の搬送処理を同時になすこ
とが可能とされ、ダム建築などの、より合理化をなすこ
とができる。又、煙突あるいは橋脚などのコンクリート
打設に際しては、逐一足場組みをする必要が無く、この
生コンクリートFの移送装置を用いて、打設型枠などの
搬送と、型枠施工、型外しなどの一連の作業を無足場の
状態でなし得る特長を有している。
By providing the inspection stage 82 for overhead work and the crane means J in the transfer device for the fresh concrete F, the pouring of the fresh concrete F and various equipments required for this pouring are performed. It is possible to carry out the transportation processing at the same time, and it is possible to make more rationalization such as dam construction. In addition, when placing concrete such as chimneys or bridge piers, it is not necessary to construct scaffolds one by one, and using this transfer device for ready-mixed concrete F, it is possible to transfer the placing form, etc., formwork, demold, etc. It has the feature that a series of work can be done without a scaffold.

【0238】(3) 第3の実施の形態に係る生コンクリー
トの移送装置 図45〜図61は、第3の実施の形態に係る生コンクリ
ートの移送装置を示している。
(3) Transfer device for ready-mixed concrete according to the third embodiment FIGS. 45 to 61 show a transfer device for ready-mixed concrete according to the third embodiment.

【0239】この第3の実施の形態に係る生コンクリー
トの移送装置にあっては、タワーマストAと、このタワ
ーマストAに昇降可能に備えられている昇降本体部B
と、この昇降本体部Bに旋回可能に備えられている2本
一組のブームCとを有する構成としある。また、前記タ
ワーマストAには、生コンクリートFの搬送に用いられ
る容器状搬送具Dが昇降可能に備えつけられている。ま
た、前記の根元側ブームC’と、これに繰り出し、繰り
入れ可能に備えられた先端側ブームC”とよりなるブー
ムCには、前記容器状搬送具Dから直接又は別段に備え
られる搬送手段を介して供給される生コンクリートF
の、搬送用ベルトコンベヤGが、順次に乗り継ぎ可能に
設けてある。また、該ブームCには、該ブームCに備え
られるベルトコンベヤGの先端、又は、その途中から搬
送生コンクリートFを取り出すトリッパ装置Hが設けて
ある。また、前記容器状搬送具Dには、この容器状搬送
具Dによって搬送される生コンクリートFを、前記搬送
用ベルトコンベヤGに対して、直接又は別段に備えられ
る搬送手段を介して、連続して定量的に送り出す供給手
段Eが備えらている。また、この第3の実施の形態に係
る生コンクリートの移送装置にあっては、タワーマスト
Aが、その垂直軸線を回転軸線として回転可能に立設し
てある。また、この第3実施の形態に係る生コンクリー
トの移送装置は、タワーマストAが、レール17に沿っ
て水平方向に移動可能に構成してある。
In the transfer device for ready-mixed concrete according to the third embodiment, the tower mast A and the elevating / lowering main body part B provided on the tower mast A for elevating / lowering.
And a pair of booms C that are provided on the elevating main body B so as to be rotatable. In addition, the tower mast A is provided with a container-shaped carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down. Further, the boom C composed of the root side boom C ′ and the tip side boom C ″ that is provided so as to be able to be extended and retracted in the boom C ′ is provided with a conveying means provided directly from the container-like carrier D or in a separate stage. Concrete F supplied via
The transfer belt conveyor G is provided so that the passengers can successively transfer. Further, the boom C is provided with a tripper device H for taking out the conveyed ready-mixed concrete F from the tip of the belt conveyor G provided in the boom C or the middle thereof. Further, in the container-shaped carrier D, the green concrete F carried by the container-shaped carrier D is continuously supplied to the carrier belt conveyor G directly or via a carrier means provided separately. A supply means E for quantitatively sending out is provided. Further, in the ready-mixed concrete transfer device according to the third embodiment, the tower mast A is erected rotatably with its vertical axis as a rotation axis. Further, in the transfer device for ready-mixed concrete according to the third embodiment, the tower mast A is configured to be horizontally movable along the rail 17.

【0240】この第3実施の形態に係る生コンクリート
の移送装置は、ブームCの支持手法を、その水平方向に
向けた旋回のみとし、このブームCをブーム支持フレー
ム109によって昇降本体部Bに備えさせるようにした
点、生コンクリトFを、連続して、定量的に送り出す供
給手段Eを備えた容器状搬送具Dを、タワーマストAの
内外に導き入れ、あるいは、これを導き出し可能になす
と共に、これに対して、生コンクリートFを充填し、且
つ、これを昇降搬送具Kとしての吊りフレーム台87に
よって、タワーマストA内を、昇降可能とした点、以外
の構成を、前記第1実施の形態に係る生コンクリートの
移送装置における構成と同一、又は実質的に同一として
ある。また、ここで構成される各部の動作、及び各部の
奏する機能は、前記第1実施の形態に係る生コンクリー
トの移送装置におけると同一、又は実質的に同一であ
る。従って、前記第1実施の形態に係る生コンクリート
の移送装置におけると、同一又は実質的に同一の構成部
分、同一又は実質的に同一の機能を奏する部分について
は同一の番号を付して、その説明を省略する。
In the ready-mixed concrete transfer device according to the third embodiment, the boom C is supported only by turning in the horizontal direction, and the boom C is provided to the lifting main body B by the boom support frame 109. The container-shaped carrier D having a supply means E for quantitatively continuously and quantitatively feeding the raw concrete F is introduced into or out of the tower mast A, or the container mast A can be derived. On the other hand, the constitution other than the point that the concrete mast F is filled and the inside of the tower mast A can be moved up and down by the suspension frame base 87 as the elevating and conveying tool K is the first embodiment. The configuration is the same as or substantially the same as the configuration of the ready-mixed concrete transfer device according to the embodiment. The operation of each part configured here and the function performed by each part are the same as or substantially the same as those in the fresh concrete transfer device according to the first embodiment. Therefore, in the fresh concrete transfer device according to the first embodiment, the same or substantially the same constituent parts, the parts having the same or substantially the same function are given the same reference numerals, and The description is omitted.

【0241】尚、ここにおいて構成される生コンクリー
トの移送装置にあっては、前記図5〜図36おいて示さ
れる第1実施の形態に係る生コンクリートの移送装置に
おけると同様に、タワーマストAが旋回可能、且つ、走
行可能に設けてあると共に、このタワーマストAに対し
て、昇降本体部Bが、該第1実施の形態に係る生コンク
リートの移送装置におけると同様に昇降調節可能に備え
てある。
Incidentally, in the ready-mixed concrete transfer device configured here, the tower mast A is the same as in the ready-mixed concrete transfer device according to the first embodiment shown in FIGS. 5 to 36. Is provided so as to be capable of turning and traveling, and for the tower mast A, the elevating / lowering main body part B is capable of elevating / lowering adjustment as in the transfer device for ready-mixed concrete according to the first embodiment. There is.

【0242】また、同様に、昇降本体部Bに備えらてい
るブームCは、前記第1実施の形態に係る生コンクリー
トの移送装置におけると同様の手法によって伸縮される
先端側ブームC”を根元側ブームC’に備え、且つ、こ
れを、該第1実施の形態に係る生コンクリートの移送装
置におけると同様の旋回装置33によって旋回可能に、
該昇降本体部Bに対して設けてある。
Similarly, the boom C provided in the elevating / lowering main body portion B has a tip end side boom C ″ which is expanded and contracted by the same method as in the fresh concrete transfer device according to the first embodiment. The side boom C ′ is provided, and can be turned by the turning device 33 similar to that in the fresh concrete transfer device according to the first embodiment.
It is provided for the elevating body B.

【0243】尚、この第3実施の形態に係る生コンクリ
ートの移送装置にあっては、該ブームCの支持手段を、
ウインチ29によるワイヤーロープ30の操作によるこ
となしに、各ブーム支持フレーム109によってなす構
成としてある。即ち、前記昇降本体部Bに対して、前記
第1実施の形態に係る生コンクリトの移送装置と同様
に、軸桿34によって、その基部側が支持されているブ
ームCに対し、このブームC、特に、根元側ブームC’
の先端側をブーム支持フレーム109によって吊るよう
に構成している。
In the ready-mixed concrete transferring apparatus according to the third embodiment, the boom C supporting means is
Each boom support frame 109 is configured without operating the wire rope 30 by the winch 29. That is, in the same manner as the raw concrete transfer device according to the first embodiment, with respect to the elevating / lowering body B, the boom C, especially the boom C whose base side is supported by the shaft rod 34, , Root side boom C '
The tip end side of the is supported by the boom support frame 109.

【0244】先ず、前記昇降本体部Bの上方にあって、
この昇降本体部Bと共に昇降動作して、該昇降本体部B
を構成する支持枠110を、タワーマストAの各マスト
フレーム3、3に対して、外嵌状に設けてある。この昇
降本体部Bを構成する支持枠110と、ブームC、特
に、根元側ブームC’の前端部分との間をブーム支持フ
レーム109で連結し、該ブームCを、この支持フレー
ム109により吊りさげ保持状態とする。
First, above the elevating main body B,
The lifting / lowering body B is moved up and down together with the lifting / lowering body B.
The support frame 110 constituting the above is provided on the mast frames 3, 3 of the tower mast A in an externally fitted shape. A boom supporting frame 109 connects between the supporting frame 110 that constitutes the elevating main body B and the boom C, particularly, the front end portion of the root side boom C ′, and the boom C is hung by the supporting frame 109. Set to the holding state.

【0245】尚、この支持枠110は、平面形状が略四
角形の枠体として構成してあり、前記タワーマストAに
おける各マストフレーム3の外側に設けられた各ガイド
レール92を収め入れるスライドガイド93が、この支
持枠110の内側に設けてあり、このマストフレーム3
の各ガイドレール92を案内として,前記昇降本体部B
と共に該タワーマストAを昇降する構成としてある。
The support frame 110 is constructed as a frame body having a substantially rectangular plane shape, and a slide guide 93 for accommodating each guide rail 92 provided outside each mast frame 3 in the tower mast A is provided. Is provided inside the support frame 110, and the mast frame 3
Each of the guide rails 92 of FIG.
Along with this, the tower mast A is configured to move up and down.

【0246】また、この支持枠110は、昇降本体部
B、特に、ステージ本体18のステージポスト部18A
に対して、各連桿111によって、連結されていると共
に、該ステージ本体18に支持フレーム112で支承さ
れた構成としてあり、昇降本体部Bを構成している。ま
た、支持フレーム112と平行な向きにブーム支持フレ
ーム109を延設状に設け、その先端に、根元側ブーム
C’の先端側を支持する構成としてある。
Further, the support frame 110 is provided in the lifting / lowering main body B, particularly the stage post portion 18A of the stage main body 18.
On the other hand, it is configured to be connected by each connecting rod 111 and supported by the support frame 112 on the stage main body 18 to form an elevating main body section B. Further, the boom support frame 109 is provided so as to extend in a direction parallel to the support frame 112, and the tip end thereof supports the tip end side of the root side boom C ′.

【0247】尚、このブーム支持フレーム109は、前
記ブームCと共に旋回できるように、該支持枠110に
設けてあり、特に、この実施例にあっては、根元側ブー
ムC’の比較的基部側から、ステージポスト部18Aの
上部に延びるように設けた補助フレーム113と、前記
ブーム支持フレーム109とを連結桿114で連結し、
これを該支持枠110及びステージポスト部18Aに設
けた各軸受115、115において、旋回可能に取り付
けた構成としてある。
The boom support frame 109 is provided on the support frame 110 so that it can be turned together with the boom C. Particularly, in this embodiment, the boom support frame 109 is located at the base side of the base side boom C '. From above, the auxiliary frame 113 provided so as to extend to the upper part of the stage post portion 18A and the boom support frame 109 are connected by a connecting rod 114,
The bearings 115, 115 provided on the support frame 110 and the stage post portion 18A are attached so as to be rotatable.

【0248】次いで、この実施の形態において用いられ
ている容器状搬送具Dの移送方法について説明する。こ
の実施の形態にあっては、容器状搬送具Dに対する生コ
ンクリートFの供給を、投入ホッパー71を用いないで
行なうものである。
Next, a method of transferring the container-shaped carrier D used in this embodiment will be described. In this embodiment, the fresh concrete F is supplied to the container-shaped carrier D without using the input hopper 71.

【0249】即ち、この実施の形態における容器状搬送
具Dは、前記の昇降用ウインチ63に直接吊り下げるよ
うに構成せず、この昇降用ウインチ63に吊り下げた吊
フレーム台87に対して、リフター付電動台車88を用
いることによって、該容器状搬送具Dを載置し、あるい
は、これから取り出すようにしたものである。
That is, the container-shaped carrier D in this embodiment is not constructed so as to be directly hung on the lifting winch 63, but to the hanging frame base 87 hung on the lifting winch 63. By using the electric cart 88 with a lifter, the container-shaped carrier D is placed or taken out from the container-shaped carrier D.

【0250】ここで用いられる吊フレーム台87は、タ
ワーマストAにおいて、マストフレーム3、3…の構成
空間として設けられている上下方向に亘る一対の空間
4、4に対して、上下方向に向けて移動可能に設けてあ
る。
In the tower mast A, the hanging frame base 87 used here is oriented vertically with respect to the pair of vertically extending spaces 4 and 4 provided as the constituent spaces of the mast frames 3, 3. It is provided so that it can be moved.

【0251】この吊フレーム台87は、コ字状に構成さ
れた下部枠体87aにおける向き合っている一対の枠材
87a’、87a’の両端から、略二等辺三角形状を構
成するように側枠体87bを起立し、その頂部を、前記
枠材87a’の略中央から一体に起立して設けてある柱
枠87cの上部に一体に止着し、且つ、この頂部間を、
頂部梁87dで一体に連結した構成としてあると共に、
この向き合っている一対の枠材87a’、87a’の内
側に、互に向き合って突き出すように支承突起87e、
87e…を設けた構成としてある。尚、この支承突起8
7eには、案内される容器状搬送具Dに対する略円錐台
状のストッパー87fが設けてある。
The suspension frame base 87 has side frames that form a substantially isosceles triangular shape from both ends of a pair of facing frame members 87a ', 87a' in a U-shaped lower frame body 87a. The body 87b is erected, and its top is integrally fixed to the upper portion of a column frame 87c provided so as to be integrally erected from substantially the center of the frame member 87a ', and between the tops,
In addition to being configured to be integrally connected by the top beam 87d,
Inside the pair of frame members 87a 'and 87a' facing each other, the bearing protrusions 87e are projected so as to face each other.
87e ... are provided. In addition, this bearing protrusion 8
7e is provided with a substantially circular truncated cone-shaped stopper 87f for the guided container-shaped carrier D.

【0252】かかる構成からなる吊フレーム台87は、
その両側にある各柱枠87cの頂部に、前記昇降用ウイ
ンチ63のワイヤーロープ65が取り付けてあると共
に、マストスレーム3の内側の上下方向に亘って設けら
れているガイドレール89を、この柱枠87cの上下部
に設けてあるスライドガイド90の溝内に収まるように
してある。尚、図中91はスライドメタルを示してい
る。
The suspension frame base 87 having the above structure is
The wire ropes 65 of the lifting winch 63 are attached to the tops of the respective column frames 87c on both sides thereof, and the guide rails 89 provided inside the mast slam 3 in the vertical direction are provided on the column frames 87c. It fits in the groove of the slide guide 90 provided in the upper and lower parts of the. In the figure, 91 indicates a slide metal.

【0253】尚、この吊フレーム台87の収まるマスト
フレーム3は、長方形状に区分される四隅部分に主柱3
a、3a…を、また、この区分される長方形状の長い辺
の略中間部分に補助支柱3b、3bを設け、この各主柱
3a、3a…支柱3b、3b…を横桿3c、3c…で連
結し、一対の吊フレーム台87、87の収まる空間4、
4が構成してある。
The mast frame 3 in which the suspension frame base 87 can be fitted has the main pillars 3 at the four corners divided into a rectangular shape.
a, 3a ... And auxiliary columns 3b, 3b are provided at substantially middle portions of the long sides of the divided rectangular shape, and the main columns 3a, 3a ... Columns 3b, 3b ... Space for connecting the pair of suspension frame bases 87, 87,
4 are configured.

【0254】また、このタワーマストAを構成するマス
トフレーム3の各主柱3a、3a…の外側の上下方向に
は、ガイドレール92が一体に設けてあると共に、この
ガイドレール92が、昇降本体部Bなどとして構成され
るステージ本体18、補助ステージ19、作業ステージ
82、及び各昇降フレーム20、21などに備えられる
スライドガイド93の溝内に摺動可能に収まる構成とし
てある。尚、図中94はスライドメタルを示している。
Further, a guide rail 92 is integrally provided in the vertical direction outside the main columns 3a, 3a, ... Of the mast frame 3 which constitutes the tower mast A, and the guide rail 92 is provided in the lifting main body. The stage main body 18 configured as the part B, the auxiliary stage 19, the work stage 82, and the slide guides 93 provided in the elevating frames 20 and 21 are slidably accommodated in the grooves. Incidentally, reference numeral 94 in the drawing denotes a slide metal.

【0255】かかるマストフレーム3の下部に、リフタ
ー付電動台車88の出し入れできる開口95、95を設
け、この開口95に対してリフター付電動台車88を移
動するレール96を設け、これにリフター付電動台車8
8を移動自在に備えつけるようにしてある。このリフタ
ー付電動台車88は、モータ駆動される車輪88aとリ
フター88bとを備えた構成としてある。
At the lower part of the mast frame 3, there are provided openings 95, 95 through which electric lift trucks 88 with lifters can be put in and taken out, and rails 96 for moving the electric carriages 88 with lifters are provided through the openings 95. Dolly 8
8 is provided so as to be freely movable. This lifter-equipped electric carriage 88 is configured to include a motor-driven wheel 88a and a lifter 88b.

【0256】かかる電動台車88に載置される容器状搬
送具Dは、定量供給タイプの供給手段Eとしての、例え
ばスクリューフィーダ機構を備えた構成としてあり、前
記第1の実施の形態に係る生コンクリートの移送装置に
おいて用いられたと同一の構成を備えた容器状搬送具D
aとして構成してある。
The container-shaped carrier D mounted on the electric carriage 88 has a structure including, for example, a screw feeder mechanism as the fixed amount supply means E, and the raw material according to the first embodiment. Container-like carrier D having the same structure as used in the concrete transfer device
It is configured as a.

【0257】かかる構成からなる容器状搬送具Daは、
これをフリター88b上に載置し、且つ、該リフター8
8bを用いてリフトアップ状態にして、前記開口95か
らタワーマストAの空間4内に導き入れた後、該リフタ
ー88bによるリフトアップ状態を解消して、これを吊
フレーム台87における支承突起87e、87e上にリ
フトダウン状態にして載置する。このリフター88bの
降下に伴う容器状搬送具Daの支承突起87eに対する
支承に際して、この支承突起87eにあるストッパー8
7fが、該容器状搬送具Dの下面に設けた孔97に差し
入れ、係合される構成としてある。
The container-shaped carrier Da having the above structure is
This is placed on the fritter 88b, and the lifter 8
After being lifted up by using 8b and guided into the space 4 of the tower mast A through the opening 95, the lifted up state by the lifter 88b is eliminated, and the supporting projection 87e in the hanging frame base 87 is removed. 87e is placed in a lift-down state. At the time of supporting the container-shaped carrier Da with respect to the support protrusion 87e as the lifter 88b descends, the stopper 8 on the support protrusion 87e is provided.
7f is inserted into a hole 97 provided on the lower surface of the container-shaped carrier D to be engaged therewith.

【0258】かかるリフター付電動台車88を用いた容
器状搬送具DのタワーマストAに対する取込み手法を備
えた生コンクリートの移送装置にあっては、例えば、こ
の容器状搬送具Dに対してベルトコンベヤによる投入方
式98を用いて生コンクリートFを供給することができ
る。又、例えば、トランスファーカーによる投入方式9
9を用いて生コンクリートFを供給することができる。
更に、例えば、コンクリートミキサー車による投入方式
100を用いて生コンクリートFを供給することができ
る。
In a transfer device for ready-mixed concrete equipped with a method for taking in the tower mast A of the container-shaped carrier D using the electric cart 88 with lifter, for example, a belt conveyor is used for the container-shaped carrier D. The fresh concrete F can be supplied by using the charging method 98 according to. In addition, for example, a transfer car 9
9 can be used to supply ready-mixed concrete F.
Furthermore, for example, the ready-mixed concrete F can be supplied using the injection system 100 using a concrete mixer truck.

【0259】尚、図54〜図56は、昇降搬送具Kの第
1の昇降手段を示すものであって、この昇降搬送具K
は、タワーマストAの空間4に対して、2個の昇降搬送
具K、Kが並んだ状態に設けてあると共に、一方の容器
状搬送具D’を取り入れた昇降搬送具Kには、巻ドラム
67に対して下巻きとされたワイヤーロープ65aを、
又、他方の容器状搬送具D”を取り入れた昇降搬送具K
には、巻ドラム67に対して上巻きとされたワイヤーロ
ープ65bを夫々繋着してある。
54 to 56 show the first elevating means of the elevating / conveying tool K, and the elevating / conveying tool K is shown in FIGS.
Is provided in the space 4 of the tower mast A in a state in which two lifting transport tools K, K are arranged side by side, and the lifting transport tool K incorporating one container-shaped transport tool D ′ The wire rope 65a wound under the drum 67,
In addition, the lifting transport tool K incorporating the other container-shaped transport tool D "
The wire ropes 65b wound around the winding drum 67 are connected to each other.

【0260】この結果、モータ66によって巻ドラム6
7を回転した際に、いずれか一方の昇降搬送具Kが上昇
し、同時に、他方の昇降搬送具Kが下降することとな
り、昇降搬送具Kの昇降操作に際してのモータ66の負
荷を少なくすることができる。
As a result, the winding drum 6 is driven by the motor 66.
When one of the lifting / lowering transport tools K is raised when rotating 7, the other lifting / lowering transport tool K is lowered at the same time, and the load on the motor 66 during the lifting / lowering operation of the lifting / lowering transport tool K is reduced. You can

【0261】尚、ここにおいて、タワーマストAの空間
4を昇降する容器状搬送具D、Dは、一方が下方にあっ
て投入ホッパー71から生コンクリートFを受けている
際に、他方の容器状搬送具Dが、上方にあって、シュー
ト70からベルトコンベヤGに対して生コンクリートF
を、ベルトコンベヤ28を介して定量的に供給する構成
としてある。この結果、シュート70と投入ホッパー7
1との間をこの2基の容器状搬送具D、Dがタイミング
良く昇降することとなる。
Here, the container-shaped carriers D, D for moving up and down in the space 4 of the tower mast A are such that one of them is in the lower part and the other is in the container-shaped condition when receiving the fresh concrete F from the charging hopper 71. The transport tool D is located above, and the chute 70 directs the green concrete F from the belt conveyor G.
Is quantitatively supplied via the belt conveyor 28. As a result, the chute 70 and the charging hopper 7
The two container-shaped transport tools D, D move up and down with respect to 1.

【0262】次いで、図57及び図58は、昇降搬送具
Kの第2の昇降手段を示すものである。この昇降手段
は、タワーマストAの空間4、4の夫々に昇降搬送具
K、Kを吊り下げ状態に設けたものであって、この夫々
の昇降搬送具K、Kに対して、これを各別に昇降操作す
る昇降用ウインチ63を備えさせた構成としている。
又、夫々の巻ドラム67に対して、捲装したワイヤーロ
ープ65の一方を下巻きのワイヤーロープ65aとし、
これにカウンターウェイト102を吊り下げ状態に設け
ると共に、他方の、即ち、上巻きワイヤーロープ65b
に、前記容器状搬送具Dを取り入れる昇降搬送具Kを吊
り下げ状態に設けた構成としてある。
Next, FIGS. 57 and 58 show the second elevating means of the elevating / conveying tool K. As shown in FIG. This elevating means is provided with elevator conveyors K, K in a suspended state in each of the spaces 4, 4 of the tower mast A. For each elevator conveyor K, K Separately, a raising and lowering winch 63 for raising and lowering is provided.
Further, one of the wire ropes 65 wound around each winding drum 67 is used as the under-wound wire rope 65a,
The counterweight 102 is provided in a suspended state, and the other, that is, the upper wire rope 65b.
In addition, the elevating and lowering transport tool K for receiving the container-shaped transport tool D is provided in a suspended state.

【0263】尚、この昇降搬送具Kにおける第2の昇降
手段にあっては、該カウンターウェイト102を用いた
以外の構成を、前記図54〜図56において示される第
1の昇降手段と同一の構成としてある。従って、前記第
1の昇降手段と同一又は実質的に同一の構成部分につい
ては同一の番号を付して、その説明を省略する。
The second raising / lowering means in the raising / lowering conveyor K has the same structure as the first raising / lowering means shown in FIGS. 54 to 56 except that the counterweight 102 is used. It is as a configuration. Therefore, the same or substantially the same components as those of the first elevating means are designated by the same reference numerals, and the description thereof will be omitted.

【0264】なお、叙上で構成される図45〜図61に
おいて示される第3の実施の形態に係る生コンクリート
の移送装置は、タワーマストAの旋回手法及び当該構
成、各昇降本体部の昇降手法及び当該構成、ブームCの
旋回手法及び当該構成、昇降搬送具Kと容器状搬送具D
の昇降手法及び当該構成、容器状搬送具Dから生コンク
リートFを定量供給する手段としての供給手段Eの機能
及び当該構成、容器状搬送具Dからシュート70を用い
てベルトコンベヤGに対して生コンクリートFを供給す
る手法及び当該構成、ベルトコンベヤGの構成、ベルト
コンベヤGから生コンクリートFをシュート55に送り
出すトリッパ装置Hの構成など、当該装置の各操作手
法、及び構成を、図5〜図36に示される第1の実施の
形態に係る生コンクリートの移送装置と同一または実質
的に同一のものとしてある。
The concrete transfer apparatus according to the third embodiment shown in FIGS. 45 to 61, which is constructed as described above, uses the method of turning the tower mast A, the structure thereof, and the lifting and lowering of each lifting / lowering main body. Method and relevant configuration, boom C turning method and relevant configuration, lifting transport tool K and container-like transport tool D
And the function of the supply means E as a means for quantitatively supplying the green concrete F from the container-shaped carrier D and the structure and the structure of the container-shaped carrier D to the belt conveyor G using the chute 70. 5 to FIG. 5 show respective operation methods and configurations of the apparatus, such as a method of supplying the concrete F and the configuration, a configuration of the belt conveyor G, a configuration of the tripper device H that sends the fresh concrete F from the belt conveyor G to the chute 55, and the like. This is the same as or substantially the same as the transfer device for ready-mixed concrete according to the first embodiment shown in FIG.

【0265】尚、叙上吊りフレーム台87を昇降搬送具
Kとして用いることによって、タワーマストAの構成が
簡素化でき、これによって、タワーマストAの設備コス
トが割安とされる特長を有し、しかも、タワーマスト
A、特に。容器状搬送具Dの管理が容易となり、いかな
る生コンクリートの供給手段に対しても、容易に対応で
きる特長を当該装置にもたらすことができ、ダム建築な
どの、より合理化と共に工期の短縮、経費の削減を計る
ことができる。又、当該装置において構成されるブーム
Cは、タワーマストAに対して、昇降本体部Bと共に安
定して、しかも、円滑に昇降されることとなる。
By using the overhead suspension frame base 87 as the lifting / conveying tool K, the structure of the tower mast A can be simplified, and the facility cost of the tower mast A can be reduced. Moreover, Tower Mast A, especially. The container-shaped carrier D can be easily managed, and the device can be provided with a feature that can easily cope with any supply means of ready-mixed concrete, and the construction of the dam can be more streamlined and the construction period can be shortened and the cost can be reduced. You can measure reductions. Further, the boom C configured in the apparatus can be stably and smoothly moved up and down with respect to the tower mast A together with the elevating body B.

【0266】(4) 第4の実施の形態に係る生コンクリー
トの移送装置 図62〜図68は、第4の実施の形態に係る生コンクリ
ートの移送装置を示している。
(4) Green Concrete Transfer Device According to Fourth Embodiment FIGS. 62 to 68 show a green concrete transfer device according to a fourth embodiment.

【0267】ここで構成される生コンクリートの移送装
置は、タワーマストAと、このタワーマストAに昇降可
能に備えられている昇降本体部Bと、この昇降本体部B
に回転可能に備えられた回転部Nと、この回転部Nに備
えられているブームCとを有する構成としてある。ま
た、前記タワーマストAには、生コンクリートFの搬送
に用いられる容器状搬送具Daが昇降可能に備えつけて
ある。また、前記ブームCには、該生コンクリートFの
搬送用ベルトコンベヤGと、該ベルトコンベヤGによっ
て搬送される生コンクリートFを該ベルトコンベヤGの
途中で取り出すのに用いられるトリッパ装置Hとが備え
られている。また、前記容器状搬送具Dには、この容器
状搬送具Dに受け入れられた生コンクリートFを、連続
して、定量的に送り出す供給手段Eが備えられており、
この容器状搬送具Daに受け入れられた生コンクリート
Fを、前記搬送用ベルトコンベヤGに向けて直接又は別
段に備えられる搬送手段を介して、連続して定量的に供
給できる構成としてある。また、ここにおいて構成され
る生コンクリートの移送装置は、レール17に沿って移
動可能に設置してある。
The ready-mixed concrete transfer device constructed as above comprises a tower mast A, an elevating main body part B which can be moved up and down on the tower mast A, and an elevating main body part B.
The rotary unit N is rotatably mounted on the rotary unit and the boom C is mounted on the rotary unit N. Further, the tower mast A is provided with a container-shaped carrier Da used for carrying the ready-mixed concrete F so as to be able to move up and down. Further, the boom C is provided with a belt conveyor G for conveying the green concrete F, and a tripper device H used for taking out the green concrete F conveyed by the belt conveyor G in the middle of the belt conveyor G. Has been. Further, the container-shaped carrier D is provided with a supply means E for continuously and quantitatively sending the green concrete F received in the container-shaped carrier D.
The ready-mixed concrete F received in the container-shaped carrier Da can be continuously and quantitatively supplied toward the conveyor belt conveyor G directly or via a conveyor provided separately. Further, the ready-mixed concrete transfer device configured here is installed so as to be movable along the rail 17.

【0268】この第4の実施の形態に係る生コンクリー
トの移送装置にあっては、クライミング手段によってタ
ワーマストAに昇降可能に備えられた昇降本体部Bに対
して、回転部Nを、回転可能に備えさせ、しかも、この
回転部Nに対して、ブームCを取付けるようにして、容
器状搬送具Dによって運び上げられる生コンクリートF
を、移送手段Lを介して直接、又は別段に用意される搬
送手段を用いてベルトコンベヤGに対して供給するよう
にした以外の構成を、前記第1の実施の形態に係る生コ
ンクリートの移送装置の構成と同一、又は実質的に同一
の構成としてある。また、ここで構成される各部の動
作、及び各部の奏する機能は、前記の相違点以外の点に
おいて、前記第1の実施の形態に係る生コンクリートの
移送装置における動作、及び機能と同一又は実質的に同
一としてある。従って、前記第1の実施の形態に係る生
コンクリートの移送装置と、同一又は実質的に同一の構
成部分、及び同一又は実質的に同一の機能を奏する部分
については同一の番号を付して、その説明を省略する。
In the transfer device for ready-mixed concrete according to the fourth embodiment, the rotating part N can be rotated with respect to the elevating / lowering main body part B provided on the tower mast A by the climbing means. And the boom C is attached to the rotating portion N so that the ready-mixed concrete F is carried up by the container-shaped carrier D.
Is supplied to the belt conveyor G directly via the transfer means L or using a transfer means prepared separately, and the transfer of the ready-mixed concrete according to the first embodiment is performed. It has the same or substantially the same configuration as the device. Further, the operation of each part configured here and the function performed by each part are the same as or substantially the same as the operation and the function in the fresh concrete transfer device according to the first embodiment, except for the above-mentioned differences. Are the same. Therefore, the same or substantially the same constituent parts, and the same or substantially the same function as the transfer device of the ready-mixed concrete according to the first embodiment are given the same numbers, The description is omitted.

【0269】ここでタワーマストAに昇降可能に備えつ
けられる昇降本体部Bには、このタワーマストAを回転
中心とするように回転部Nが、略水平の向きに回転可能
に備えつけられている。
Here, in the elevating / lowering main body portion B which is provided on the tower mast A so as to be able to move up and down, the rotating portion N is provided so as to be rotatable about the tower mast A in a substantially horizontal direction.

【0270】ここで、タワーマストAに対して、昇降可
能に備えられる昇降本体部Bは、前記第1の実施の形態
における生コンクリートの移送装置におけると略同様に
構成してある。即ち、昇降用油圧シリンダー23によっ
て連設された上部昇降フレーム20と、下部昇降フレー
ム21とをベースとし、このクライミング手段の上方に
あって、タワーマストAに昇降可能、且つ外嵌めの状態
に備えられた支持枠110を、前記上部昇降フレーム2
0、又は、この上部昇降フレーム20に備えられたステ
ージ部材に対して、連桿111によって一体に組付ける
ことによって、昇降本体部Bを構成している。
[0270] Here, the elevating / lowering main body portion B which is provided so as to be capable of elevating / lowering with respect to the tower mast A has substantially the same structure as that of the ready-mixed concrete transfer device according to the first embodiment. That is, based on the upper elevating frame 20 and the lower elevating frame 21 that are continuously provided by the elevating hydraulic cylinder 23, the upper part of the climbing means is located above the climbing means, and the tower mast A can be raised and lowered and prepared for external fitting. The support frame 110 thus attached is used to replace the upper lifting frame 2
0, or an ascending / descending main body B is configured by integrally assembling the stage member provided in the upper elevating frame 20 with the connecting rod 111.

【0271】かかる構成よりなる昇降本体部Bは、前記
第1の実施の形態に係る生コンクリートの移送装置にお
けると同様に、下部昇降フレ〜ム21と、上部昇降フレ
ーム20とに、夫々油圧シリンダー24が設けてある。
従って、前記の第1の実施の形態に係る生コンクリート
の移送装置におけると同様に、油圧シリンダー23によ
って、上方、又は下方に移動される昇降フレーム20、
21を、夫々の動作終端で、タワーマストA、特に、マ
ストフレーム3に対して、ロック状態とし、または、こ
のロック状態を解いて移動可能に構成している。
The lifting / lowering main body B having such a structure has hydraulic cylinders for the lower lifting / lowering frame 21 and the upper / lowering lifting frame 20, respectively, as in the transfer device for ready-mixed concrete according to the first embodiment. 24 is provided.
Therefore, as in the transfer device for ready-mixed concrete according to the first embodiment described above, the lifting frame 20, which is moved upward or downward by the hydraulic cylinder 23,
21 is configured to be in a locked state with respect to the tower mast A, in particular, the mast frame 3 at each operation end, or to be movable by releasing this locked state.

【0272】かかるクライミング手段を備えた昇降本体
部Bに対して、回転部Nが回転軸受手段116によっ
て、水平の向きに回転可能に備えられた構成としてあ
る。この図示例にあっては、上部昇降フレーム20の上
部側に備えられた円環状軸受部116aと、前記軸桿1
11によって該昇降フレーム20に対して一体に備えら
れた支持枠110に備えられた円環状軸受部116aに
対して、回転部Nの下部側と、上部側とに夫々備えつけ
られた円環状軸受け部116b、116bを夫々嵌め合
せ、この軸受手段116によって回転方向と、鉛直方向
の荷重を受ける構成としてあり、この具体例にあって
は、旋回ベアリング手段を用いて当該軸受手段116を
構成している。
The rotating body N is rotatably provided in the horizontal direction by the rotary bearing means 116 with respect to the elevating / lowering main body section B having such climbing means. In this illustrated example, an annular bearing portion 116 a provided on the upper side of the upper lifting frame 20 and the shaft rod 1
An annular bearing portion 116a provided on a supporting frame 110 integrally provided with the elevating frame 20 by 11 is provided on a lower side and an upper side of the rotating portion N, respectively. 116b and 116b are fitted with each other, and the bearing means 116 receives loads in the rotational direction and the vertical direction. In this specific example, the bearing means 116 is configured by using a slewing bearing means. .

【0273】かかる昇降本体部Bに対して、回転可能に
備えられる回転部Nは、前記昇降フレーム20の上方に
あって、タワーマストAに対して、回転可能に備えられ
ているステージ117と、このステージ117に一体と
なるように備えられた回転フレーム118とによって構
成してある。
The rotating portion N rotatably provided with respect to the elevating / lowering main body portion B is located above the elevating / lowering frame 20 and has a stage 117 rotatably provided with respect to the tower mast A. The rotary frame 118 is provided integrally with the stage 117.

【0274】また、回転フレーム118は、前記タワー
マストAに対して、外嵌めの状態に備えられた上部環状
フレーム118aと、この上部環状フレーム118aを
前記ステージ117に組付ける支柱118bとによって
構成してある。
The rotating frame 118 is composed of an upper annular frame 118a fitted to the tower mast A in an externally fitted state, and a column 118b for assembling the upper annular frame 118a to the stage 117. There is.

【0275】かかる構成よりなる回転部Nは、前記昇降
フレーム20によって支承されるように、前記タワーマ
ストAに対して、回転可能に備えられると共に、前記昇
降本体部Bにおける円環状軸受部116a、特に、昇降
フレーム20に備えた円環状軸受部116aと、支持枠
110に設けた円環状軸受部116aに対して、この回
転部Nにおけるステージ117側にある円環状軸受部1
16bと、上部環状フレーム118aの側にある円環状
軸受部116bとを、ボールペアリングなどを介して組
付けた構成としてある。
The rotating portion N having such a structure is rotatably provided with respect to the tower mast A so as to be supported by the elevating frame 20, and has an annular bearing portion 116a in the elevating main body portion B. In particular, with respect to the annular bearing portion 116a provided on the elevating frame 20 and the annular bearing portion 116a provided on the support frame 110, the annular bearing portion 1 on the stage 117 side of the rotating portion N is provided.
16b and an annular bearing portion 116b on the side of the upper annular frame 118a are assembled by ball pairing or the like.

【0276】又、この昇降本体部Bに対して回転可能に
備えられる回転部Nは、この回転部Nを構成するステー
ジ117に備えられたピニオン120を、該昇降本体部
B、この図示例にあっては、昇降フレーム20に備えた
円環状をなすガイドレール119の外周面に設けたラッ
ク119aに噛合さるように構成してある。また、この
ピニオン120は、ステージ117に設けた減速機12
1を介して、モータ122で駆動する構成としてある。
Further, the rotating portion N rotatably provided with respect to the elevating / lowering body portion B has the pinion 120 provided on the stage 117 constituting the rotating portion N, and is connected to the elevating / lowering body portion B, as shown in this example. Then, it is configured to mesh with a rack 119a provided on the outer peripheral surface of an annular guide rail 119 provided on the elevating frame 20. In addition, the pinion 120 is the reduction gear 12 provided on the stage 117.
1 is driven by the motor 122.

【0277】かかる構成よりなる回転部Nは、この回転
部Nを構成するステージ117に設けたモータ122を
用いて、ピニオン120をラック119aに沿って、駆
動し、これによって、回転部Nを、タワーマストAに対
して回転することができる。かくして、タワーマストA
に対して昇降可能、且つ、回転可能に備えつけられた回
転部Nに対して、ブームCを組み付けてある。
The rotating portion N having such a structure drives the pinion 120 along the rack 119a by using the motor 122 provided on the stage 117 which constitutes the rotating portion N, whereby the rotating portion N is moved. It can rotate with respect to the tower mast A. Thus, Tower Mast A
The boom C is attached to the rotating portion N that is provided so as to be able to move up and down and rotate.

【0278】ここで、回転部Nに備えられるブームC
は、タワーマストAに対して、当該回転部Nが回転可能
とされていることから、旋回、特に、水平の方向に向け
た旋回構造を備えない構成としてあるが、更に、前記第
1の実施の形態におけるように、水平の向きに、当該ブ
ームCを旋回可能に設けてあっても良い。
Here, the boom C provided in the rotating portion N
Since the rotating part N is rotatable with respect to the tower mast A, the structure is not provided with a turning structure, in particular, a turning structure oriented in the horizontal direction. The boom C may be provided so as to be pivotable in the horizontal direction, as in the above-mentioned embodiment.

【0279】また、この図示例にあっては、ブームCに
備えられるトリッパ装置Hを、根元側ブームC’にのみ
設け、先端側ブームC”にあっては、この先端側ブーム
C”を、根元側ブームC’に対して、繰入れ、繰出し状
態に操作することによって、この先端側ブームC”のベ
ルトコンベヤG”の先端側から、トリッパ装置を用いる
ことなしに生コンクリートの打込みをなし得るように構
成してある。
Further, in this illustrated example, the tripper device H provided on the boom C is provided only on the root side boom C ′, and in the tip side boom C ″, this tip side boom C ″ is By operating the base side boom C ′ in the feeding and unwinding state, it is possible to drive fresh concrete from the tip side of the belt conveyor G ″ of the tip side boom C ″ without using a tripper device. Is configured.

【0280】また、かかる構成からなる生コンクリート
の移送装置にあっては、容器状搬送具D、この場合、前
記第1の実施の形態におけると同様に、生コンクリート
Fを連続し、且つ定量的に供給する供給手段Eを備えた
容器状搬送具Daを、タワーマストAにおいて、昇降す
る昇降手段としての昇降用ウインチ63、及びガイドシ
ーブ64を、該タワーマストAの頂部に直接備えさせる
構成としてある。
Further, in the fresh concrete transfer device having such a structure, in the container-shaped carrier D, in this case, the fresh concrete F is continuously and quantitatively similarly to the case of the first embodiment. In the tower mast A, the container-shaped carrier Da provided with the supply means E for supplying the elevating winch 63 as the elevating means and the guide sheave 64 is directly provided on the top of the tower mast A. is there.

【0281】ここで、タワーマストAの頂部に備えられ
るウインチ手段は、電磁ブレーキ68、減速機69を介
してモータ66で駆動される巻ドラム67を各一対用意
し、夫々の巻ドラム67に対して容器状搬送具Dと、カ
ウンターウェイトとを、夫々ワイヤーロープ65によっ
て昇降可能に吊した構成としてあり、特に、この図示例
にあっては、下巻きのワイヤーロープ65aにカウンタ
ーウェイトを、上巻きのワイヤーロープ65bに容器状
搬送具Dを、夫々ガイドシーブ64を介して吊し設けた
構成としてある。
The winch means provided at the top of the tower mast A has a pair of winding drums 67 driven by a motor 66 via an electromagnetic brake 68 and a speed reducer 69. The container-shaped carrier D and the counterweight are respectively hung up and down by a wire rope 65. Particularly, in this illustrated example, the counterweight is wound around the lower wire rope 65a. The container-shaped carrier D is suspended from the wire rope 65b via the guide sheave 64.

【0282】次いで、叙上構成からなる生コンクリート
の移送装置における生コンクリートFの移送、特に、容
器状搬送具Dから、生コンクリートFを、ベルトコンベ
ヤGに受け渡す受け渡しの手段について説明する。
Next, the transfer means of the ready-mixed concrete F in the transfer device for ready-mixed concrete having the above construction, particularly the transfer means for transferring the ready-mixed concrete F from the container-shaped carrier D to the belt conveyor G will be described.

【0283】先ず、タワーマストAに備えられた容器状
搬送具B、この場合にあっては、生コンクリートFを連
続して、定量的に供給する供給手段Eを備えた容器状搬
送具Daによって運び上げられた生コンクリートFは、
起伏可能に備えつけられたシュート70と、固定シュー
ト70’とによって、このタワーマストAの回りを巡る
ように回転する状態に備えられた移送手段Lに案内さ
れ、この移送手段Lから、ブームCに備えられるベルト
コンベヤGに対してシュート123によって受け渡され
る。
First, the container-shaped carrier B provided in the tower mast A, in this case, the container-shaped carrier Da provided with the supply means E for continuously and quantitatively supplying the fresh concrete F. The fresh concrete F carried up is
The chute 70 that can be raised and lowered and the fixed chute 70 ′ are guided to the transfer means L that is provided so as to rotate around the tower mast A, and from the transfer means L to the boom C. It is delivered by the chute 123 to the belt conveyor G provided.

【0284】ここで、生コンクリートFの受け渡しに用
いられる移送手段Lは、前記昇降本体部Bにおける連桿
111ステージポストなどの外周に備えつけられた環状
フレーム124と、前記回転部Nの回転フレーム118
における支柱118bの内側に備えられた環状フレーム
125と、この環状フレーム124、125間にあっ
て、前記タワーマストAを巡るように回転する環状帯板
126とによって構成された、所謂回転フィーダとして
構成してある。
Here, the transfer means L used for delivering the ready-mixed concrete F is an annular frame 124 provided on the outer periphery of the connecting rod 111 stage post or the like in the elevating main body B, and the rotating frame 118 of the rotating part N.
In the so-called rotary feeder, which is composed of an annular frame 125 provided inside the column 118b and an annular strip 126 which is located between the annular frames 124 and 125 and rotates around the tower mast A. is there.

【0285】更に、この移送手段Lを、詳細に説明す
る。先ず、前記環状フレーム124における水平板部1
24aの上面には、夫々の軸中心線を、この環状フレー
ム124における放射線方向に揃えるようにして複数の
ローラ127を並設状態に設けてある。また、このロー
ラ127の軸に備えたスプロケット128をモータ12
9の回転軸に備えたスプロケット130にチェーン13
1で連絡する構成としている。更に、ローラ127相互
の各スプロケット132をチェーンで連絡した構成とし
てある。かかる構成よりなるローラ127上に、環状の
帯板126を設け、このローラ127によって、この帯
板126を駆動する構成としてある。かかるローラ12
7によって回転される環状帯板126の内側に接するよ
うに前記水平板部124aから起立される環状側板12
4bと、この環状側板124bに向き合い、しかも、該
環状帯板126の外側に位置して、前記回転フレーム1
18の側に設けられている側板状をなす環状フレーム1
25とによって、この環状帯板126に供給される生コ
ンクリートFを、その移送途中で落下することなく、シ
ュート123位置に案内する溝状案内部133を構成す
るようにしてある。
Further, the transfer means L will be described in detail. First, the horizontal plate portion 1 of the annular frame 124.
On the upper surface of 24a, a plurality of rollers 127 are provided in parallel so that the respective axial center lines are aligned with the radial direction of the annular frame 124. The sprocket 128 provided on the shaft of the roller 127 is attached to the motor 12
The chain 13 is attached to the sprocket 130 provided on the rotating shaft of
It is configured to contact you at 1. Further, each sprocket 132 of the rollers 127 is connected by a chain. An annular strip plate 126 is provided on the roller 127 having such a configuration, and the strip 127 is driven by the roller 127. Such roller 12
The annular side plate 12 that is erected from the horizontal plate portion 124a so as to contact the inside of the annular strip plate 126 that is rotated by 7.
4b, facing the annular side plate 124b, and located outside the annular band plate 126.
Side plate-shaped annular frame 1 provided on the side of 18
25, a groove-shaped guide portion 133 for guiding the green concrete F supplied to the annular strip plate 126 to the position of the chute 123 without dropping during the transfer.

【0286】尚、この環状帯板126によって搬送され
る生コンクリートFは、この環状帯板126と、前記環
状フレーム125及び環状側板124bの構成する生コ
ンクリートFの搬送空間としての溝状案内部133を、
遮蔽板134で遮断することによって、シュート123
に強制的に導き出し得る構成としてある。
The ready-mixed concrete F carried by the annular strip 126 is a groove-shaped guide portion 133 as a carrying space for the fresh concrete F constituted by the annular strip 126, the annular frame 125 and the annular side plate 124b. To
By blocking with the shield plate 134, the chute 123
It can be forcibly derived to.

【0287】尚、叙上で構成される図62〜図68にお
いて示される第4の実施の形態に係る生コンクリートの
移送装置は、叙上において明らかにされた以外の構成、
例えば、タワーマストAの走行手法及び当該構成、各昇
降本体部の昇降手法及び当該構成、ブームCの組付け手
法及び当該構成、容器状搬送具Dの昇降手法及び当該構
成生コンクリートFを連続して、定量的に送り出す供給
手段Eの機能及び当該構成、ベルトコンベヤGの構成、
ベルトコンベヤGに備えられるトリッパ装置Hの構成な
ど、当該装置の各操作手法、及び構成を、前記第1の実
施の形態に係る生コンクリートの移送装置と同一、又は
実質的に同一としてある。
The transfer device for ready-mixed concrete according to the fourth embodiment shown in FIGS. 62 to 68, which is configured as described above, has a configuration other than that disclosed above.
For example, the traveling method and the configuration of the tower mast A, the elevation method and the configuration of each elevating and lowering body section, the assembly method and the configuration of the boom C, the elevating method of the container-shaped carrier D, and the configuration ready-mixed concrete F are continuously performed. And the function of the supplying means E for quantitatively feeding and the structure, the structure of the belt conveyor G,
The operation method and configuration of the tripper device H provided on the belt conveyor G are the same as or substantially the same as those of the fresh concrete transfer device according to the first embodiment.

【0288】(5) 第5の実施の形態に係る生コンクリー
トの移送装置 図69〜図98は、第5の実施の形態に係る生コンクリ
ートの移送装置を示している。
(5) Transfer device for ready-mixed concrete according to fifth embodiment FIGS. 69 to 98 show a transfer device for ready-mixed concrete according to a fifth embodiment.

【0289】この第5の実施の形態に係る生コンクリ−
トの移送装置は、タワーマストAと、このタワーマスト
Aに昇降可能に備えられている昇降本体部Bと、この昇
降本体部Bに旋回可能に備えられているブームCとによ
って構成してある。また、ここで構成されるブ−ムC
は、根元側ブ−ムC’と、この根元側ブ−ムC’に対し
て、繰り入れ繰り出し可能に備えられた先端側ブ−ム
C”とによって構成してある。また、前記タワーマスト
Aには、生コンクリートFの搬送に用いられる容器状搬
送具Dが昇降可能に備えられている。また、前記ブーム
Cには、該容器状搬送具Dによって搬送される生コンク
リートFの搬送用ベルトコンベヤGが、根元側ブ−ム
C’に備えられるベルトコンベヤG’から、先端側ブ−
ムC”におけるベルトコンベヤG”が、前記生コンクリ
−トFを受け継ぎ得るように備えられている。また、前
記ブームC、特に、根元側ブ−ムC’に、トリッパ装置
が備えてある。
Raw concrete according to the fifth embodiment
The transfer device of the girth is composed of a tower mast A, an elevating and lowering body portion B that is provided on the tower mast A so as to be able to ascend and descend, and a boom C that is pivotally provided on the elevating and lowering body portion B. . Also, the boom C configured here
Is composed of a root side boom C'and a tip side boom C "provided so as to be able to be fed in and out with respect to the root side boom C '. The tower mast A is also provided. Is provided with a container-like carrier D used for carrying the ready-mixed concrete F so as to be able to move up and down. Further, the boom C is provided with a belt for carrying the ready-mixed concrete F carried by the container-like carrier D. From the belt conveyor G ′ provided on the root side boom C ′ to the conveyor side G,
The belt conveyor G "in the frame C" is provided so as to be able to inherit the raw concrete F. Further, a tripper device is provided on the boom C, particularly on the root side boom C '.

【0290】また、前記容器状搬送具Dによる生コンク
リートFの搬送と、前記ベルトコンベヤGによる生コン
クリートFの受け入れとの間にあって、この生コンクリ
ートFを一旦受け入れ、且つ、これを前記ベルトコンベ
ヤGに対して送り出す容器状中継具Mが、設けてある。
また、この容器状中継具Mは、前記昇降本体部B、又
は、この昇降本体部Bに対して備えられたブ−ムCに備
えられた構成としてある。また、この容器状中継具M
は、前記容器状搬送具Dから直接、又は、別段に備えら
れる搬送手段を介して生コンクリ−トFを受け入れる受
け入れ容器手段Pと、この受け入れ容器手段Pに受け入
れた生コンクリ−トFを、連続して、定量的に送り出す
供給手段Eとを備えた構成としてある。
[0290] Further, between the transport of the green concrete F by the container-shaped carrier D and the reception of the green concrete F by the belt conveyor G, the green concrete F is once received, and the belt concrete G is received. A container-shaped relay tool M for delivering the container is provided.
Further, the container-shaped relay tool M is configured to be provided in the elevating body B or the boom C provided for the elevating body B. Also, this container-shaped relay M
Is a receiving container means P for receiving the raw concrete F directly from the container-shaped carrier D or via a carrying means provided separately, and the raw concrete F received in the receiving container means P. A supply means E for continuously and quantitatively feeding is provided.

【0291】この第5の実施の形態に係る生コンクリー
トの移送装置は、前記容器状搬送具Dを、生コンクリー
トを連続して、定量的に送り出す供給手段Eを備えてい
ない容器状搬送具Dbとして構成した点、及び容器状中
継具Mを用意し、この容器状中継具Mを、前記容器状搬
送具Dによる生コンクリートFの搬送と、前記ベルトコ
ンベヤGによる生コンクリートFの搬送との各搬送路の
系路の間に別段に設けると共に、この容器状中継具M
を、生コンクリートFの受け入れ容器手段Pと、この受
け入れ生コンクリートFを、連続して、定量的に送り出
す供給手段Eとを備えた構成とした以外の構成を、前記
第1の実施の形態、及び他の実施の形態に係る生コンク
リートの移送装置における構成と同一、又は実質的に同
一の構成としてある。また、ここで構成される生コンク
リートの移送装置における各部の動作、及び、各部の奏
する機能は、前記容器状搬送具Dを供給手段Eを備えて
いない容器状搬送具Dbとした点、及び前記容器状中継
具Mの設置に伴って生ずる動作上、及び機能上の差異、
即ち、容器状搬送具Dから、生コンクリートFを、直接
的に、連続して、定量的にベルトコンベヤGに向けて送
り出すことなく、一旦、容器状中継具Mに対して、生コ
ンクリートFを収め入れると共に、この容器状中継具M
に受け入れられた生コンクリートFを、連続して、定量
的に、ベルトコンベヤGに送り出すようにした以外の点
における構成を、前記第1の実施の形態、及び他の実施
の形態に係る生コンクリートの移送装置における構成と
同一、又は実質的に同一としている。従って、前記各実
施の形態に係る生コンクリートの移送装置における構成
と同一、又は実質的に同一の構成部分、同一又は実質的
に同一の機能を奏する部分については、同一の番号を付
して説明を省略する。
The transfer device for ready-mixed concrete according to the fifth embodiment is a container-like transfer tool Db which does not have a supply means E for continuously and quantitatively supplying the ready-mixed concrete to the container-like transfer tool D. And a container-like relay tool M are prepared, and the container-like relay tool M is used to transport the fresh concrete F by the container-like transport tool D and transport the fresh concrete F by the belt conveyor G. The container-shaped relay tool M is provided separately between the system paths of the transport path.
In which the receiving container means P for the fresh concrete F and the feeding means E for continuously and quantitatively sending the receiving fresh concrete F are provided. And a configuration similar to or substantially the same as the configuration of the ready-mixed concrete transfer device according to another embodiment. Further, the operation of each part and the function performed by each part in the ready-mixed concrete transfer device configured here are that the container-shaped carrier D is a container-shaped carrier Db having no supply means E, and Operational and functional differences that accompany the installation of the container-shaped relay M,
That is, the raw concrete F is temporarily and continuously sent from the container-like carrier D directly and continuously to the belt conveyor G quantitatively to the container-like relay M. This container-like relay tool M
The ready-mixed concrete F according to the first embodiment and other embodiments has a configuration other than that the ready-mixed concrete F received in the above is continuously and quantitatively sent to the belt conveyor G. The same as or substantially the same as the configuration of the transfer device. Therefore, the same or substantially the same components as those in the transfer device for ready-mixed concrete according to each of the above-described embodiments, and the parts having the same or substantially the same function are denoted by the same reference numerals and described. Is omitted.

【0292】ここにおいて構成されるタワーマストA
は、設置面に対して固定された状態で立設してある。こ
のタワーマストAは、これをレールなどの走行手段を別
段に用意し、これによって、移動可能に構成してあって
も良い。また、ここでは用いていないが、タワーマスト
Aを設置部に対して回転可能、即ち、タワーマストAの
垂直軸線を回転軸線として、このタワーマストAを回転
可能に備えてあっても良い。
Tower mast A constructed here
Are erected while being fixed to the installation surface. The tower mast A may be configured to be movable by separately providing a traveling means such as a rail and the like. Although not used here, the tower mast A may be rotatable with respect to the installation portion, that is, the tower mast A may be rotatably provided with the vertical axis of the tower mast A as a rotation axis.

【0293】かかる構成のタワーマストAは、前記各実
施の形態におけると略同様の構成としてあり、四隅部分
に立設されたパイプ状をなす主柱3a…3aと、この各
主柱3a、3a間にあって立設されている補助支柱3b
…3bと、これらの各主柱3a及び補助支柱3bにおけ
る互に隣り合っている柱間と、前記広い間隔をもって立
設されている主柱3a、3a間に設けられた一対の補助
支柱3b、3b間とに、夫々横桿3c…3cを設けて構
成されたマストフレーム3を備えた構成としてある。
The tower mast A having such a structure has substantially the same structure as that in each of the above-mentioned embodiments, and has pipe-shaped main pillars 3a ... 3a standing upright at the four corners and the main pillars 3a, 3a. Auxiliary support column 3b standing upright in between
3b, a pair of auxiliary columns 3b provided between the columns adjacent to each other in each of the main columns 3a and the auxiliary columns 3b, and between the main columns 3a and 3a standing upright with the wide interval, 3b and 3b are respectively provided with horizontal rods 3c ... 3c, and the mast frame 3 is provided.

【0294】かかる構成よりなるマストフレーム3にあ
っては、このマストフレーム3の上下方向に亘って、容
器状搬送具Dの昇降用の空間4、4が対をなすように構
成されていると共に、このマストフレーム3の下部側
に、電動台車の進入可能な開口95が、また、容器状搬
送具Dからの生コンクリートFの取り出し位置には、シ
ュートの動作可能な開口が夫々備えられている。
In the mast frame 3 having such a structure, the vertical spaces 4 and 4 for the container-shaped carrier D are paired in the vertical direction of the mast frame 3. An opening 95 through which the electric carriage can enter is provided on the lower side of the mast frame 3, and an opening through which the chute can be operated is provided at a position where the fresh concrete F is taken out from the container-like carrier D. .

【0295】かかる構成よりなるタワーマストAにあっ
ては、前記主柱3a…3aを案内として、昇降本体部B
が、外嵌めの状態に組付けてあり、この昇降本体部B
が、上下方向に移動可能としてある。
In the tower mast A having such a structure, the elevating main body B is guided by the main columns 3a ... 3a.
Is assembled in an externally fitted state.
However, it can be moved vertically.

【0296】また、このタワーマストAに対する昇降本
体部Bの上下動々作は、昇降本体部Bを構成する昇降フ
レーム20、21に備えられた昇降用油圧シリンダー2
3による該昇降フレーム20、21の上下方向に向けた
移動操作と、この昇降本体部Bに備えられた油圧シリン
ダー24による該昇降フレーム20、21の前記各主柱
3aに対する各ロック操作などの各クライミング操作に
よってなされる。
The vertical movement of the elevating body B with respect to the tower mast A is performed by the elevating hydraulic cylinders 2 provided in the elevating frames 20 and 21 constituting the elevating body B.
3, the vertical movement of the elevating frames 20 and 21 and the lock operation of the elevating frames 20 and 21 to the main columns 3a of the elevating frames 20 and 21 by the hydraulic cylinder 24 provided in the elevating body B. It is done by climbing operation.

【0297】まず、タワーマストAに備えられる昇降本
体部Bは、前記マストフレーム3に対して外嵌め状態に
組付けられた上部側昇降フレ−ム20と、下部側昇降フ
レ−ム21とによって構成される昇降本体部Bのクライ
ミング手段をベ−スとして、これに、ステ−ジ本体1
8、補助ステ−ジ19などを備えた構成としてある。
First, the elevating / lowering main body portion B provided in the tower mast A is composed of the upper / lower elevating frame 20 and the lower elevating / lowering frame 21 assembled to the mast frame 3 in an externally fitted state. The climbing means of the ascending / descending main body B is used as a base, and the stage main body 1 is attached to the base.
8, an auxiliary stage 19 and the like.

【0298】この昇降本体部Bを構成する上部側昇降フ
レ−ム20と、下部側昇降フレ−ム21とは、夫々昇降
用の油圧シリンダ−24によって、上下方向に向けて、
交互に移動可能に構成してあると共に、夫々、その動作
終了位置において、油圧シリンダ−24によって、前記
タワ−マストAに対してロック可能な構成としてある。
The upper-side lifting frame 20 and the lower-side lifting frame 21 which constitute the lifting main body B are vertically moved by the lifting hydraulic cylinders 24, respectively.
The movable cylinders are alternately movable and can be locked with respect to the tower mast A by the hydraulic cylinders 24 at their respective operation end positions.

【0299】また、かかる昇降本体部Bを構成する前記
上部側昇降フレ−ム20には、前記マストフレーム3に
対して外嵌め状に組付けられたステージ本体18と、こ
のステージ本体18に備えられ、且つ、該マストフレ−
ムAを取り囲むように設けられたステ−ジポスト18A
と、このステ−ジポスト18Aの上部方にあって、連桿
111などによって該ステージポスト18Aに連設され
ている支持枠110などが組み付けられて、これらが一
体となって昇降本体部Bを構成している。
[0299] Further, the upper lifting frame 20 which constitutes the lifting main body B is provided with a stage main body 18 externally fitted to the mast frame 3 and the stage main body 18. And the mast frame
Stage post 18A provided around the frame A
Further, a support frame 110 and the like which is continuously provided on the stage post 18A by the connecting rod 111 and the like is assembled on the upper side of the stage post 18A, and these are integrated to constitute the elevating main body section B. are doing.

【0300】また、昇降本体部Bを構成する前記下部側
昇降フレーム21には、補助ステージ19が、この下部
側昇降フレ−ム21と一体になるように備えられてお
り、これらが共に昇降本体部Bを構成している。
The lower lifting frame 21 constituting the lifting main body B is provided with an auxiliary stage 19 so as to be integrated with the lower lifting frame 21. It constitutes part B.

【0301】また、これらの各昇降フレ−ム20、21
と、前記ステージ本体18、補助ステ−ジ19などは、
いずれも、前記タワ−マストAに対して、外嵌めの状態
に組み付けられており、これらが、前記クライミング手
段によって、タワーポストAを昇降する構成としてあ
り、いずれも、前記各実施の形態におけると基本的に同
一の構成としてある。
Further, each of these lifting frames 20, 21
And the stage body 18, the auxiliary stage 19, etc.,
Both are assembled to the tower mast A in an externally fitted state, and these are configured to move the tower post A up and down by the climbing means. The configurations are basically the same.

【0302】図73〜図77は、この昇降本体部Bの昇
降動作手段としての各昇降フレーム20、21の主柱3
aに対する組付け状態、及び、各油圧シリンダー23、
24の各配置状態を、主要構成部分のみで模式的に示し
たものであって、個々の、例えば、各昇降フレーム2
0、21に備えられた油圧シリンダー24のプランジャ
ーロッド24bを受け入れる受け段部26を、主柱3a
に設けた上下方向に稍々長い受け孔部26’とした点、
プランジャーロッド24bを案内する筒状受け部25
a’を各昇降フレーム20、21に設けるようになすと
共に、このプランジャーロッド24bの駆動油圧シリン
ダー24をシリンダー支持フレーム25’によって、該
昇降フレーム20、21に設けるようにした点などの若
干の差異はあるものの、これらの昇降本体部Bの昇降操
作をなす各部の構成を、前記各実施の形態に係る生コン
クリートの移送装置における昇降操作をなす各部の構成
と同一にしてある。
73 to 77 show the main pillars 3 of the elevating frames 20 and 21 as the elevating and lowering means of the elevating body B.
Assembled state to a, and each hydraulic cylinder 23,
Each of the arrangement states of 24 is schematically shown only by the main constituent parts, and each of the individual e.g.
The receiving step portion 26 for receiving the plunger rod 24b of the hydraulic cylinder 24 provided on the main cylinder 3a
The receiving hole portion 26 'that is long in the vertical direction is provided on the
Cylindrical receiving part 25 for guiding the plunger rod 24b
a'is provided on each of the elevating frames 20 and 21, and the drive hydraulic cylinder 24 of the plunger rod 24b is provided on the elevating frames 20 and 21 by the cylinder support frame 25 '. Although there are differences, the configuration of each part that performs the lifting operation of the lifting body B is the same as the configuration of each part that performs the lifting operation in the fresh concrete transfer device according to each of the above-described embodiments.

【0303】尚、この第5の実施の形態に係る生コンク
リ−トFの移送装置にあっては、昇降本体部Bの昇降動
作に際して、この昇降本体部Bを構成する各昇降フレー
ム20、21、及びステージ本体18、ステージポスト
18A、補助ステージ19などに対して、回転自在な案
内ロール135を設け、この案内ロール135を、タワ
ーマストA、特に、主柱3aの上下方向に亘って設けた
案内レール136に摺接転動する構成としてある。
In the transfer device for the fresh concrete F according to the fifth embodiment, when the elevating main body B is moved up and down, the elevating frames 20, 21 constituting the elevating main body B are formed. , And the stage body 18, the stage post 18A, the auxiliary stage 19, and the like, a rotatable guide roll 135 is provided, and the guide roll 135 is provided over the tower mast A, particularly, in the vertical direction of the main pillar 3a. The guide rail 136 is configured to slide and roll.

【0304】ここで、主柱3aに備えられる案内レール
136は、パイプ状主柱3aの周側面を挟むように止着
されるL字状をなすレール裏材136aを、タワーマス
トAの各隅縁に沿った上下方向に溶接すると共に、この
主柱3aの外側縁の上下方向に亘って設けられたレール
裏材136aにおける夫々に直交した面に、各案内レー
ル136、136を設けた構成としてある。
Here, the guide rails 136 provided on the main pillars 3a are provided with L-shaped rail backing members 136a fixed so as to sandwich the peripheral side surfaces of the pipe-shaped main pillars 3a, at each corner of the tower mast A. As a configuration in which the guide rails 136, 136 are welded in the vertical direction along the edge, and the guide rails 136, 136 are provided on the surfaces of the outer edge of the main pillar 3a that are provided in the vertical direction in the rail backing material 136a provided in the vertical direction. is there.

【0305】又、この案内レール136に摺接、転動さ
れる案内ロール135は、前記タワーマストAに対して
外嵌状に組付けられた前記昇降フレーム20、21など
の角隅部毎に、回転軸線が互に直交する向きにある夫々
対をなす案内ロール135、135として設けてあり、
これらの案内ロール135…135が、四方より、タワ
ーマストAを挾持する構成としてある。尚、図中135
aは、この案内ロール135の回転軸を示している。
The guide rolls 135 which are slidably contacted with and rolled by the guide rails 136 are provided at the corners of the elevating frames 20, 21 and the like which are assembled to the tower mast A in an externally fitted shape. , Provided as guide rolls 135, 135 which are paired with their rotation axes orthogonal to each other,
These guide rolls 135 ... 135 are configured to hold the tower mast A from all sides. In addition, 135 in the figure
Reference character a indicates a rotation axis of the guide roll 135.

【0306】尚、この実施の形態における昇降本体部B
の昇降動作は、油圧シリンダー24におけるプランジャ
ーロッド24bの受け部分が、受け孔部26’としてあ
ることから、この受け孔部26’から当該プランジャー
ロッド24bを抜き出す操作を、昇降用油圧シリンダー
23の上昇操作に先立ち、又は、下降操作に先立ってな
すようにしたものであるが、これ以外の基本的な昇降本
体部Bの昇降動作は、前記各実施の形態におけると実質
的に同一である。
Incidentally, the lifting / lowering main body B in this embodiment
Since the receiving portion of the plunger rod 24b in the hydraulic cylinder 24 is the receiving hole portion 26 ', the operation of pulling out the plunger rod 24b from the receiving hole portion 26' is performed by the lifting hydraulic cylinder 23. This is done prior to the ascending operation or prior to the descending operation, but the other basic elevating operation of the elevating / lowering main body portion B is substantially the same as that in each of the above-described embodiments. .

【0307】かかる構成からなるタワーマストAに備え
つけられる昇降本体部Bは、前記昇降フレーム20、2
1と共に、タワーマストAに対して外嵌めの状態に備え
つけられているステージ本体18と、このステージ本体
18に備えられているステージポスト18Aと、更に、
このタワーマストAに対して外嵌めの状態で備えられ、
しかも連桿111によって連設された支持枠110と、
更に補助ステージ19などと共に、該タワーマストAに
対して、上下方向に昇降可能に備えつけてあり、更に、
支持フレーム112、支持フレーム109、支持フレー
ム137などが、一体に組付けられる構成としてある。
[0307] The elevating main body B mounted on the tower mast A having the above-mentioned structure is composed of the elevating frames 20, 2
1, a stage main body 18 provided in a state of being externally fitted to the tower mast A, a stage post 18A provided in the stage main body 18, and
It is equipped with this tower mast A in an externally fitted state,
Moreover, the support frame 110 continuously provided by the connecting rod 111,
Further, together with the auxiliary stage 19 and the like, the tower mast A is provided so as to be vertically movable up and down.
The support frame 112, the support frame 109, the support frame 137, etc. are integrally assembled.

【0308】かかる昇降本体部Bに対してブームCを軸
桿34を用いて 上下方向に回動できる態様に組付けて
あると共に、この軸桿34によって、ブームCを取付け
ている取付け部を、第1の実施の形態において用いられ
たブーム旋回装置33と略同様のブーム旋回装置33を
用いて昇降本体部Bに対して組付けてある。
The boom C is assembled to the elevating / lowering main body B in such a manner that the boom C can be rotated in the vertical direction by using the shaft rod 34, and the mounting portion to which the boom C is mounted can be mounted by the shaft rod 34. The boom turning device 33, which is substantially the same as the boom turning device 33 used in the first embodiment, is used to assemble the lifting / lowering body B.

【0309】即ち、ここでは昇降本体部Bに備えられた
ターンテーブル受け部33cに、旋回軸受け手段を介し
て旋回テーブル33aが組付けてあり、この旋回テーブ
ル33aにブームCの側、この場合にあっては、軸桿3
4の軸受け部を設けることによって、ブームCを、昇降
本体部Bに対して、水平の向きに、旋回可能としてあ
る。
That is, here, the turning table 33a is assembled to the turntable receiving portion 33c provided in the lifting / lowering main body portion B via the turning bearing means, and the turning table 33a is attached to the boom C side, in this case. Yes, the rod 3
By providing the bearing portion 4, the boom C can be turned in the horizontal direction with respect to the elevating / lowering body portion B.

【0310】かくして、昇降本体部Bに対して水平旋回
可能に備えつけられるブームCは、根元側ブームC’
と、この根元側ブームC’に対して、繰入れ、繰出し可
能に備えられた先端側ブームC”とによって構成してあ
り、前記支持枠110に一端の枢支された支持フレーム
109、137及び支桿138などによって保持される
構成としてある。
Thus, the boom C provided so as to be horizontally rotatable with respect to the elevating / lowering main body section B is the base side boom C '.
And a tip side boom C ″ capable of being fed in and out with respect to the root side boom C ′, and the support frames 109 and 137 pivotally supported at one end by the support frame 110 and the support frame 110. It is configured to be held by a rod 138 or the like.

【0311】かかるブームCの水平旋回の位置として
は、モーター(図示省略)によって駆動されるピニオン
139をブームCの下面側に設けると共に、前記ブーム
旋回装置33における旋回軸を回転中心とする半円状の
軌跡に沿って平面が半円状のレール140を昇降本体部
B、特に、ステージ本体18の上面に設け、且つ、この
レール140の外側にラック140aを設けて、このラ
ック140aに対して、前記ピニオンを噛合するように
配置して、ブームCを、昇降本体部Bに対して、水平の
向きに旋回可能としてある。又、このブームCを定位
置、この具体例にあっては、図71及び図78の位置
で、その旋回を停止状態とする手段としてのロック装置
141が設けてある。
As for the position of horizontal swing of the boom C, a pinion 139 driven by a motor (not shown) is provided on the lower surface side of the boom C, and a semicircle with the swing axis of the boom swing device 33 as the center of rotation. A rail 140 having a semicircular plane along a curved locus is provided on the elevating main body B, particularly on the upper surface of the stage main body 18, and a rack 140a is provided outside the rail 140, with respect to the rack 140a. , The pinions are arranged so as to mesh with each other, and the boom C can be turned in a horizontal direction with respect to the elevating main body B. Further, a lock device 141 is provided as a means for stopping the turning of the boom C at a fixed position, in this specific example, the position shown in FIGS. 71 and 78.

【0312】このロック装置141は、昇降本体部Bに
備えつけられた油圧シリンダー142のプランジャーロ
ッド142aに備えつけたロックピン142bと、旋回
移動されるブームCの下面側に設けた掛合孔143とに
よって構成してあり、このロックピン142bの直上
に、ブームCの掛合孔143が移動位置づけられた際
に、この掛合孔143に向けて該ロックピン142bを
差し込み可能の構成としてある。
The lock device 141 is composed of a lock pin 142b provided on the plunger rod 142a of the hydraulic cylinder 142 provided on the lifting main body B and a hooking hole 143 provided on the lower surface side of the boom C which is pivotally moved. When the engaging hole 143 of the boom C is moved and positioned immediately above the lock pin 142b, the lock pin 142b can be inserted toward the engaging hole 143.

【0313】尚、ここにおいて、ブームCは、前記各実
施の形態におけると同様に、前記昇降本体部Bに備えつ
けた根元側ブームC’と、この根元側ブームC’に対し
て、繰り出し、繰り入れ可能に備えつけた先端側ブーム
C”とによって構成してあり、ブームCに備えつけられ
たベルトコンベヤG’の生コンクリートFが、トリッパ
装置Hによって先端側ブームC”におけるベルトコンベ
ヤG”に乗りつげる構成としてある。
Here, as in the above-mentioned respective embodiments, the boom C has a root side boom C'provided on the elevating main body B and a base side boom C'which is extended and retracted. The front concrete boom C "provided as much as possible, and the ready-mixed concrete F of the belt conveyor G'equipped on the boom C rides on the belt conveyor G" of the front boom C "by the tripper device H. There is.

【0314】尚、このブームCにおける根元側ブーム
C’に対する先端側ブームC”の繰入れ、繰出しの構造
などは、前記各実施の形態において明らかにされた構成
と実質的に同一であり、図中40は、先端側ブームC”
の移動に用いられるモータを示している。
Incidentally, the structure of feeding and feeding the tip side boom C ″ with respect to the root side boom C ′ in the boom C is substantially the same as the configuration clarified in each of the above-mentioned embodiments. 40 is a boom C on the tip side
Shows a motor used to move the.

【0315】また、ブームCに備えつけられるベルトコ
ンベヤG’、G”は、夫々モータ48、52によって駆
動される駆動プーリー46、50と、これに対応してコ
ンベヤベルト45、51を架け渡す従動プーリー47、
49とを備えた構成としてあり、容器状搬送具Dによっ
て搬送された生コンクリートFを、打ち込み位置に移送
案内できる構成としてある。
The belt conveyors G'and G "mounted on the boom C are drive pulleys 46 and 50 driven by motors 48 and 52, respectively, and driven pulleys that bridge the conveyor belts 45 and 51 corresponding thereto. 47,
49 is provided, and the ready-mixed concrete F transported by the container-shaped transport tool D can be transferred and guided to the driving position.

【0316】尚、このブームCに対するベルトコンベヤ
Gの備えつけは、前記各実施の形態におけると実質的に
同一の備えつけ手法で構成されている。かかるベルトコ
ンベヤGに対しては、このベルトコンベヤGによって搬
送されている生コンクリートFを、その搬送途中の任意
の位置で取り出すトリッパ装置Hが備えつけてある。
The belt conveyor G is mounted on the boom C by substantially the same mounting method as in the above-described embodiments. The belt conveyor G is equipped with a tripper device H that takes out the ready-mixed concrete F being conveyed by the belt conveyor G at an arbitrary position during the conveyance.

【0317】このトリッパ装置Hは、ブームCにおける
根元側ブームC’、及び先端側ブームC”の双方に設け
てあっても良いが、この実施の形態におけるように根元
側ブームC’にのみ設けてあっても良い。
Although the tripper device H may be provided on both the root side boom C'and the tip side boom C "of the boom C, it is provided only on the root side boom C'as in this embodiment. You can have it.

【0318】ここでブームCに装備されるトリッパ装置
Hは、シュート55を、旋回シュート55Aと、この旋
回シュート55Aから供給される生コンクリートFを、
ベルトコンベヤGの側方に送り出す固定シュート55
B、及びこの旋回シュート55Aから供給される生コン
クリートFを、先端側ブームC”にあるベルトコンベヤ
G”に送り出す固定シュート55Cとを備えた以外の構
成を第1実施の形態において用いられたトリッパ装置H
と、実質的に同一の構成としてある。
Here, the tripper device H mounted on the boom C is provided with a chute 55, a turning chute 55A, and a green concrete F supplied from the turning chute 55A.
Fixed chute 55 that feeds to the side of belt conveyor G
The tripper used in the first embodiment having a configuration other than that including B and a fixed chute 55C that sends the ready-mixed concrete F supplied from the turning chute 55A to the belt conveyor G "on the tip side boom C". Device H
And have substantially the same configuration.

【0319】即ち、このトリッパ装置Hにあっては、車
輪58aを備えた台車部58を有する走行フレーム59
に対して、案内面57を構成するガイドフレーム57A
を、一端側で該走行フレーム59に軸151で取り付
け、且つ他端側を、ハンドル145aを備えた調節螺桿
145によって上下動可能に、該走行フレーム59に組
付けてある。又、この走行フレーム59には、前記旋回
シュート55A、及び各固定シュート55B、55Cを
備えた構成としてある。
That is, in the tripper device H, the traveling frame 59 having the carriage 58 provided with the wheels 58a.
On the other hand, the guide frame 57A forming the guide surface 57
Is attached to the traveling frame 59 at one end side by a shaft 151, and the other end side is assembled to the traveling frame 59 so as to be vertically movable by an adjusting screw rod 145 provided with a handle 145a. The traveling frame 59 is provided with the turning chute 55A and the fixed chutes 55B and 55C.

【0320】ここで構成されるトリッパ装置Hは、台車
部58に備えたモータ62によって、車輪58aを駆動
する構成としてあると共に、転倒防止手段144を設け
てあり、レール61上を移動可能としてある。又、前記
ガイドフレーム57Aの上端下面側と、これより下方に
ある該ガイドフレーム57Aの下面側に、夫々プーリー
56、56を設け、ガイドフレーム57Aにおけるロー
ラー60…60によって構成される案内面57に沿って
案内されたベルトコンベヤG’におけるコンベヤベルト
45を、このプーリー56の先端側にあるプーリー56
aによって反転し、且つ、このコンベヤベルト45を、
ガイドフレーム57Aの下面の略中程に設けたプーリー
56bによって、更に反転すると共に、走行フレーム5
9、特に、台車部58に設けたプーリー56cによっ
て、ブームC’の先端側に向けて案内する構成としてあ
る。
The tripper device H constructed here has a structure in which the wheels 62a are driven by the motor 62 provided in the carriage portion 58, the fall prevention means 144 is provided, and the tripper device H is movable on the rail 61. . Further, pulleys 56, 56 are provided on the lower surface side of the upper end of the guide frame 57A and the lower surface side of the guide frame 57A below the guide frame 57A, and the guide surface 57 constituted by the rollers 60 ... 60 in the guide frame 57A. The conveyor belt 45 in the belt conveyor G ′ guided along the pulley 56 is provided on the front side of the pulley 56.
and the conveyor belt 45,
Further, the pulley 56b provided approximately in the middle of the lower surface of the guide frame 57A causes the pulley 56b to be further reversed and the traveling frame 5
9, in particular, it is configured to guide toward the tip end side of the boom C ′ by the pulley 56c provided on the carriage portion 58.

【0321】このようにガイドフレーム57Aの先端側
にあって、プーリー56aによって反転され、且つ、プ
ーリー56b、56cによって再反転されることで、S
字状に屈曲されたコンベヤベルト45の下方、特に、プ
ーリー56aの下方位置にシュート55を設け、ベルト
コンベヤG’によって送られてきた生コンクリートFの
取出しをなし得る構成としてある。
As described above, by being inverted by the pulley 56a and re-inverted by the pulleys 56b and 56c on the tip side of the guide frame 57A, S
A chute 55 is provided below the curved conveyor belt 45, particularly below the pulley 56a, so that the ready-mixed concrete F sent by the belt conveyor G'can be taken out.

【0322】ここで用いられる旋回シュート55Aは、
前記プーリー56aの先端側から送り出される生コンク
リートFを受けるケース状シュート146に対して、開
口した上部側をシュート55A’と、これから屈曲した
下部側シュート55A”とを備えており、この角筒状を
なす上部側シュート55A’の軸中心線上で、走行フレ
ーム59に対して、該旋回シュート55Aの回転軸14
7を設け、これに旋回シュート55Aを回転可能に組付
けることによって、上部側シュート55A’に対して、
下部側シュート55A”を旋回できる構成としてある。
The turning chute 55A used here is
With respect to the case-shaped chute 146 for receiving the ready-mixed concrete F sent from the front end side of the pulley 56a, a chute 55A 'having an open upper side and a lower chute 55A "bent from this are provided. On the axis center line of the upper side chute 55A ′ that forms the rotating chute 55A of the turning chute 55A with respect to the traveling frame 59.
7 is provided, and the turning chute 55A is rotatably assembled to the upper chute 55A ',
The lower chute 55A ″ can be turned.

【0323】即ち、この旋回シュート55Aは、上部側
シュート55A’の下面に設けた軸受け部148に、走
行フレーム59に設けた回転軸147を嵌めつけ、この
回転軸147に対して、該旋回シュート55Aを回転可
能に備えつけると共に、この軸受け部148に固設した
アーム149の先端に、走行フレーム59に設けた油圧
シリンダー150におけるプランジャーロッド150a
の先端を回動可能に組付けた構成としてある。
That is, in the turning chute 55A, the rotating shaft 147 provided on the traveling frame 59 is fitted to the bearing portion 148 provided on the lower surface of the upper chute 55A ', and the turning chute is attached to the rotating shaft 147. 55A is rotatably provided, and a plunger rod 150a of a hydraulic cylinder 150 provided on the traveling frame 59 is attached to the tip of an arm 149 fixed to the bearing 148.
The tip of the is rotatably assembled.

【0324】かかる走行フレーム59は、前記油圧シリ
ンダー150の動作によって、旋回シュート55Aにお
ける下部側シュート55A’を、コンベヤベルト45の
走行前方位置に旋回した際に、この旋回シュート55A
からの生コンクリートFを受け入れる位置に固定シュー
ト55Cを設けてあり、この固定シュート55Cによっ
て、生コンクリートFを、先端側ブームC”のベルトコ
ンベヤG”に送り出すようにしてある。
When the traveling frame 59 is swung by the operation of the hydraulic cylinder 150, the lower chute 55A ′ of the swiveling chute 55A is swung to the traveling front position of the conveyor belt 45, the swiveling chute 55A is moved.
A fixed chute 55C is provided at a position to receive the fresh concrete F from No. 3, and the fixed chute 55C sends the fresh concrete F to the belt conveyor G "of the tip side boom C".

【0325】また、この走行フレ−ム59は、該走行フ
レ−ム59の前側の側部位置、即ち、前記油圧シリンダ
ー150の動作によって、前記の状態から略90度旋回
シュ−ト55Aを旋回し、旋回シュート55Aにおける
下部側シュート55A’を、コンベヤベルト45の走行
側方位置に旋回した際に、この旋回シュート55Aから
の生コンクリートFを受け入れる位置に、固定シュート
55Bを設けてあり、この固定シュート55Bによっ
て、生コンクリートFを、コンクリートの打込み面に送
り出すようにしてある。
Further, the traveling frame 59 is swung around the swivel shoe 55A from the above state by the side position on the front side of the traveling frame 59, that is, the operation of the hydraulic cylinder 150. The lower chute 55A 'of the turning chute 55A is provided with a fixed chute 55B at a position for receiving the ready-mixed concrete F from the turning chute 55A when the lower chute 55A' is turned to the traveling lateral position of the conveyor belt 45. The fixed chute 55B sends the fresh concrete F to the concrete driving surface.

【0326】次いで、前記のタワーマストAに対して昇
降可能に備えられる各容器状搬送具Dは、この図示例に
あっては、連続供給手段Eを備えない容器状搬送具Db
として構成してあり、これを、タワーマストAにおける
各マストフレーム3で構成された一対の空間4、4に対
して吊り下げの状態に設けてある。
Next, each container-shaped carrier D provided so as to be able to move up and down with respect to the tower mast A is the container-shaped carrier Db without the continuous supply means E in this example.
And is provided in a suspended state with respect to the pair of spaces 4 and 4 formed by the mast frames 3 in the tower mast A.

【0327】この容器状搬送具Dbは、ステージ本体1
8に備えつけられた昇降用ウインチ63と、タワーマス
トAの頂部に備えられたガイドシーブ64と、カウンタ
ーウェイト102とを用い、昇降用ウインチ63によっ
て操作されるワイヤーロープ65の一端に、前記容器状
搬送具Dbを、又、他方端にカウンターウェイト102
を夫々ガイドシーブ64を介して吊り下げ状態に設ける
ようにしたものである。
This container-shaped carrier Db is composed of the stage body 1
8, a lifting winch 63, a guide sheave 64 provided on the top of the tower mast A, and a counterweight 102 are used, and the container shape is provided at one end of a wire rope 65 operated by the lifting winch 63. The carrier Db and the counterweight 102 at the other end
Are provided in a suspended state via the respective guide sheaves 64.

【0328】この図示例にあっては、電磁ブレーキ6
8、減速機69を介してモータ66で回転駆動される巻
ドラム67に備えた下巻きのワイヤーロープ65a、6
5aを、シーブ64a、64aに案内し、これにカウン
ターウェイト102を吊り下げ、また、この巻ドラム6
7に備えた上巻のワイヤーロープ65b、65bを、シ
ーブ64b、64bに案内し、これに容器状搬送具Db
を吊り下げ状態に設けた構成としてある。
In this illustrated example, the electromagnetic brake 6
8. Under-wound wire ropes 65a and 6 provided on a winding drum 67 that is driven to rotate by a motor 66 via a speed reducer 69.
5a is guided to the sheaves 64a, 64a, and the counterweight 102 is hung on the sheaves 64a, 64a.
The upper wire ropes 65b, 65b provided in No. 7 are guided to the sheaves 64b, 64b, and the container-shaped carrier Db
Is provided in a suspended state.

【0329】かかる昇降用ウインチ63によって、タワ
ーマストAを昇降される容器状搬送具Dbは、この図示
例にあっては、昇降搬送具Kによって持ち上げ、及び、
下げ降しがなされる構成としてあり、この昇降搬送具K
に、前記ワイヤーロープ65を繋着した構成としてい
る。
The container-shaped carrier Db for lifting and lowering the tower mast A by the lifting winch 63 is lifted and lifted by the lifting carrier K in this example.
It is configured to be lowered and lowered.
Further, the wire rope 65 is connected to the above.

【0330】かかる容器状搬送具Dbの昇降ウインチ6
3による昇降操作は、前記各実施の形態において示され
た各昇降操作と実質的に同一である。次いで、この容器
状搬送具Dbは、前記の第1の実施の形態に係る生コン
クリートの移送装置において用いられた容器状搬送具D
aと異なり、生コンクリートFを連続して、定量的に送
り出す供給手段Eを有しない構成としてあり、下面に開
閉手段を備えた生コンクリートFの収納具としての容器
として構成してあれば、いかなる態様のものであっても
良い。
Elevating winch 6 of such container-like carrier Db
The ascending / descending operation by 3 is substantially the same as the ascending / descending operation shown in each of the above-described embodiments. Next, this container-shaped carrier Db is the container-shaped carrier D used in the transfer device for ready-mixed concrete according to the first embodiment.
Unlike a, it has a structure that does not have a supply means E for continuously and quantitatively feeding the fresh concrete F, and if it is configured as a container as a storage tool for the fresh concrete F having an opening / closing means on the lower surface, It may be one of the aspects.

【0331】かかる容器状搬送具Dbの昇降に用いる昇
降搬送具Kは、この昇降搬送具Kの側方から送り込まれ
て来る該容器状搬送具Dbにおける鍔部154aに引っ
掛かる掛合突起152eを互に向き合うように設け、こ
の掛合突起152eに、容器状搬送具Dbにおける鍔部
154aを引っ掛け、吊り下げ得る構成としたものであ
る。
The elevating / conveying tool K used for elevating / lowering the container-like conveying tool Db mutually engages with the engaging projections 152e that are hooked on the collar portion 154a of the container-like conveying tool Db fed from the side of the elevating / conveying tool K. It is provided so as to face each other, and the flange 154a of the container-like carrier Db can be hooked and hung from the engaging projection 152e.

【0332】ここで用いられる昇降搬送具Kは、略二等
辺三角形状に構成された一対の側枠152a、152a
と、この側枠152a、152aの各頂端間を連設する
上枠152bと、この側枠152aの互に向き合ってい
る一対の水平桿152a’、152a’の略中心間を連
設する下枠152cとによって構成してある。又、側枠
152aにおける水平桿152a’の各側端から、夫々
容器状搬送具Dbの支承桿152dを垂下状態に設け、
この対向して設けられている側枠152aにおける一方
の側枠152aの支承桿152dの下端に設けた、掛合
突起152eと、他方の側枠152aの支承桿152d
の下端部に設けた掛合突起152eとが、互に向き合っ
た側に突き出す構成としてある。
The up-and-down conveying tool K used here is a pair of side frames 152a, 152a each having a substantially isosceles triangular shape.
And an upper frame 152b that connects between the top ends of the side frames 152a and 152a, and a lower frame that connects between approximately the centers of a pair of horizontal rods 152a ', 152a' facing each other of the side frames 152a. And 152c. Further, the supporting rods 152d of the container-shaped carrier Db are provided in a suspended state from the respective side ends of the horizontal rods 152a 'in the side frame 152a,
On the lower end of the supporting rod 152d of one side frame 152a of the side frames 152a provided to face each other, the engaging projection 152e and the supporting rod 152d of the other side frame 152a are provided.
The engaging projections 152e provided at the lower end of each of the projections are configured to project to the sides facing each other.

【0333】又、この昇降搬送具Kは、側枠152aの
頂部と、この頂部の直下にある水平桿152a’とに夫
々回転軸の向きを異にした2組のガイドローラ153A
と、153Bとが、夫々に外方に突き出すように設けて
あり、タワーマストAに構成される各空間4、4に設け
た夫々に対をなすガイドレール89に摺接、転動する構
成としてある。この空間4に備えられるガイドレール8
9は、空間4の向き合った一対の面に沿って、上下方向
に亘るように設けてあり、前記補助支柱3b、又は、横
桿3cに対して固設された構成としてある。
[0333] Also, in this lifting / lowering transport tool K, two sets of guide rollers 153A are provided with the rotation axes of the tops of the side frames 152a and the horizontal rods 152a 'directly below the tops being different from each other.
And 153B are respectively provided so as to project outward, and are configured to slide and roll on guide rails 89 that are paired with each of the spaces 4 and 4 formed in the tower mast A. is there. Guide rail 8 provided in this space 4
9 is provided so as to extend in the vertical direction along a pair of facing surfaces of the space 4, and is configured to be fixed to the auxiliary column 3b or the horizontal rod 3c.

【0334】かかるガイドレール89に摺接、転動され
る一方のガイドローラ153Aは、2個一組として構成
してあり、このガイドレール89を、その両側から挾み
込むように設けてある。また、ガイドレール89に摺
接、転動される他方のガイドローラ153Bは、ガイド
レール89の頂端面に沿ってローラが転動するように設
けてある。
One guide roller 153A, which is slidably brought into contact with and rolled on the guide rail 89, is constructed as a pair, and the guide rail 89 is provided so as to be sandwiched from both sides thereof. Further, the other guide roller 153B that is in sliding contact with the guide rail 89 and rolls is provided so that the roller rolls along the top end surface of the guide rail 89.

【0335】かかる昇降搬送具Kによって吊り下げ状態
に昇降移動される容器状搬送具Dbは、生コンクリート
Fを収め入れる容器本体部154の上部縁に鍔部154
aを有すると共に、この鍔部154aを、前記昇降搬送
具Kにおける掛合突起152eに引っ掛けるようにし
て、該昇降搬送具Kに対して取り込み吊り下げ得ると共
に、この昇降搬送具Kから取出し得る構成としてある。
The container-shaped carrier Db which is moved up and down in a suspended state by such an elevator carrier K has a collar 154 on the upper edge of the container body 154 for accommodating the ready-mixed concrete F.
In addition to having a, the collar portion 154a can be taken in and hung from the elevating and lowering tool K by being hooked on the engaging projection 152e of the elevating and lowering tool K, and taken out from the up and down carrier K. is there.

【0336】この容器状搬送具Dbにあっては、その容
器状本体部154の下部に四角形の筒状をなす吐出口部
155が設けてあると共に、この吐出口部155の開口
155aを塞ぐ開閉可能な蓋156が設けてある。
In this container-shaped carrier Db, a rectangular cylindrical discharge port 155 is provided at the bottom of the container-shaped main body 154, and the opening / closing for closing the opening 155a of this discharge port 155. A possible lid 156 is provided.

【0337】この蓋156は、吐出口部155の両側部
を挾むように延設された一対の側板部156aと、この
側板部156a、156a間に亘って、前記開口155
aの前方を塞ぐように機能する弧状断面をなす蓋板15
6bとを備えている。又、両側板部155bの開口側先
端を弧状縁155cに構成した前記吐出口部155にお
ける開口155aの開口縁に対して、この蓋156の蓋
板156bが密着して接する構成としてある。
The lid 156 has a pair of side plate portions 156a extending so as to sandwich both sides of the discharge port portion 155 and the opening 155 extending between the side plate portions 156a and 156a.
A cover plate 15 having an arcuate cross section that functions to close the front of a.
6b and. In addition, the lid plate 156b of the lid 156 is in close contact with the opening edge of the opening 155a in the discharge port portion 155 in which the tip ends on the opening side of the both side plate portions 155b are arcuate edges 155c.

【0338】かかる吐出口部155の開口155aを塞
ぐ蓋156は、前記側板部156a部分において、吐出
口部155に対して回動可能に軸157によって組付け
てあると共に、この蓋156が、前記開口155aを常
時閉じる向きにコイルスプリング158によって付勢さ
れる構成としてある。また、このコイルスプリング15
8によって付勢されている蓋156は、その蓋156の
閉じ側端を、吐出口部155における開口155aの下
端側に設けたストッパー159に対して、常時弾性的に
当接される構成としてある。
The lid 156 that closes the opening 155a of the discharge port 155 is rotatably attached to the discharge port 155 by the shaft 157 at the side plate portion 156a, and the lid 156 is formed as described above. The coil spring 158 biases the opening 155a so as to always close the opening 155a. Also, this coil spring 15
The lid 156 urged by 8 is always elastically abutted on the closed side end of the lid 156 with the stopper 159 provided on the lower end side of the opening 155a of the discharge port 155. .

【0339】かかるコイルスプリング158によって常
時閉蓋方向に付勢されている蓋156は、追って説明す
る移動シュート165に備えた油圧シリンダー160に
おけるプランジャーロッド160aの延び操作によっ
て、前記付勢に抗して開き出され、且つ、このプランジ
ャーロッド160aの縮み操作によって、該付勢に抗し
た蓋156の開放を解消し、前記コイルスプリング15
8による付勢で蓋156の閉蓋をなす構成としてある。
尚、図中160bは、プランジャーロッド160aに被
装した蛇腹状の防護カバーを示している。また、193
は、容器状搬送具Dbが都合良く停止されるための反力
受けを示している。
The lid 156, which is constantly biased in the closing direction by the coil spring 158, resists the bias by the extension operation of the plunger rod 160a in the hydraulic cylinder 160 provided in the moving chute 165, which will be described later. And the contraction operation of the plunger rod 160a cancels the opening of the lid 156 that resists the bias, and the coil spring 15
The lid 156 is closed by the urging force of 8.
Incidentally, reference numeral 160b in the figure denotes a bellows-like protective cover which is attached to the plunger rod 160a. Also, 193
Shows a reaction force receiver for conveniently stopping the container-shaped carrier Db.

【0340】この図示例にあっては、容器状搬送具D
b、特に、吐出口部155の下方に移動シュート165
を移動した際に、この移動シュート165に備えた油圧
シリンダー160におけるプランジャーロッド160a
の先端が当接する位置に、案内ロッド162によって移
動される摺動部材161を設けてある。
In this illustrated example, the container-shaped carrier D
b, especially the moving chute 165 below the discharge port 155.
Plunger rod 160a in the hydraulic cylinder 160 provided in the moving chute 165 when the
A sliding member 161 that is moved by a guide rod 162 is provided at a position where the tip of the sliding member 161 abuts.

【0341】この案内ロッド162に案内される摺動部
材161は、上下に設けた案内孔161aに対して、ロ
ッドフレーム162a、162a間に横架状態に設けた
上下の案内ロッド162、162を嵌挿状態にして組付
けてあり、前記プランジャーロッド160aの延び動作
によって、移動可能としてある。
The sliding member 161 guided by the guide rod 162 fits the upper and lower guide rods 162 and 162, which are provided in a horizontal state between the rod frames 162a and 162a, into the upper and lower guide holes 161a. It is assembled in the inserted state, and is movable by the extension operation of the plunger rod 160a.

【0342】また、この摺動部材161には、チェーン
163の一端が取り付けてあると共に、このチェーン1
63の他端が前記蓋156に取付けてあり、前記コイル
スプリング158の付勢によって常時閉蓋方向に向けて
付勢されている蓋156による引っ張りによって、この
摺動部材161は、前記プランジャーロッド160aに
当接する側に引きつけられた構成としてある。
One end of a chain 163 is attached to the sliding member 161, and the chain 1
The other end of 63 is attached to the lid 156, and the sliding member 161 is pulled by the lid 156 which is constantly urged toward the closing direction by the urging of the coil spring 158. It is configured to be attracted to the side in contact with 160a.

【0343】即ち、一端163aを前記摺動部材161
に取付けたチェーン163を、前記蓋156以外の部分
に設けたスプロケット164、164に掛け渡し、その
他端163bを蓋156に取付けた構成としてある。
尚、この蓋156に対するチェーン163の取付けは、
回動可能に軸157によって吐出口部155に組付けら
れている蓋156を、前記コイルスプリング158の付
勢に抗した向きに回動引っ張り得る位置に取付けるよう
にしてある。
That is, one end 163a is connected to the sliding member 161.
The chain 163 attached to the above is spanned over sprockets 164 and 164 provided on a portion other than the lid 156, and the other end 163b is attached to the lid 156.
The chain 163 is attached to the lid 156 by
A lid 156, which is rotatably attached to the discharge port 155 by a shaft 157, is attached to a position where the lid 156 can be rotationally pulled in a direction against the bias of the coil spring 158.

【0344】かかる構成よりなる蓋156の開閉構造に
あっては、移動シュート165を移動し、そのシュート
165の開口部を開口155aの下方に位置づけると共
に、この移動シュート165に備えた油圧シリンダー1
60におけるプランジャーロッド160aを伸ばし、前
記摺動部材161を、コイルスプリング158による付
勢に抗して押動することによって、蓋156を、軸15
7を回動中心として回動し、吐出口部155における開
口155aを開くことができる。
In the opening / closing structure of the lid 156 having the above structure, the moving chute 165 is moved, the opening of the chute 165 is positioned below the opening 155a, and the hydraulic cylinder 1 provided for the moving chute 165 is arranged.
By extending the plunger rod 160a in 60 and pushing the sliding member 161 against the bias by the coil spring 158, the lid 156 is moved to the shaft 15
It is possible to open the opening 155a in the discharge port portion 155 by rotating about 7 as the rotation center.

【0345】又、この吐出口部155からの生コンクリ
ートFの取り出しを中止する際には、前記プランジャー
ロッド160aを縮め、摺動部材161に対する押圧力
を解除することによって、蓋156を、コイルスプリン
グ158の付勢力によって、ストッパー159に当接す
る位置まで回動し、吐出口部155の開口155aを閉
じるようになす。
When the taking out of the ready-mixed concrete F from the discharge port 155 is stopped, the plunger rod 160a is contracted and the pressing force on the sliding member 161 is released, so that the lid 156 is closed. By the urging force of the spring 158, the spring 158 is rotated to a position where it abuts on the stopper 159, and the opening 155a of the discharge port 155 is closed.

【0346】かかる容器状搬送具Dbから生コンクリー
トFを取り出し、これを、容器状中継具Mに供給する移
動シュート165は、昇降本体部B、特に、ステージポ
スト18A部分に設けた、取付けフレーム166に対し
て、傾斜状態のままで、水平移動するように備えられて
いる。
The moving chute 165 that takes out the ready-mixed concrete F from the container-shaped carrier Db and supplies it to the container-shaped relay M is equipped with a mounting frame 166 provided on the elevating main body B, particularly on the stage post 18A. On the other hand, it is provided so as to move horizontally in the inclined state.

【0347】ここで、移動シュート165は、取付けフ
レーム166に対して、内側に開口面を向けて止着され
た水平ガイドフレーム166aと、移動シュート165
に対して、開口面を向けて止着された摺動フレーム16
6bとの組付けによって移動可能に構成してある。特
に、水平ガイドフレーム166a内に収まるように移動
シュート165の側面に設けた摺動フレーム166bを
収め入れ、この摺動フレーム166bが、該水平ガイド
フレーム166a内を移動可能となる構成としてある。
Here, the moving chute 165 is attached to the mounting frame 166 with the horizontal guide frame 166a fixed with the opening surface facing inward, and the moving chute 165.
To the sliding frame 16 fixed to the opening surface
It is configured to be movable by assembling with 6b. Particularly, the sliding frame 166b provided on the side surface of the moving chute 165 is housed so as to be housed in the horizontal guide frame 166a, and the sliding frame 166b is configured to be movable in the horizontal guide frame 166a.

【0348】また、この水平ガイドフレーム166aに
は、摺動フレーム166bの繰出し側と反対の側に、油
圧シリンダー167が取付けてあると共に、この水平ガ
イドフレーム166aに収め入れた摺動フレーム166
b内の先端側に、この油圧シリンダー167におけるプ
ランジャーロッド167aの先端が取付けてあり、この
油圧シリンダー167の操作によって移動シュート16
5の水平移動をなす構成としてある。
Further, a hydraulic cylinder 167 is attached to the horizontal guide frame 166a on the side opposite to the feeding side of the sliding frame 166b, and the sliding frame 166 housed in the horizontal guide frame 166a.
The tip of the plunger rod 167a of the hydraulic cylinder 167 is attached to the tip side in b, and the moving chute 16 is operated by operating the hydraulic cylinder 167.
It is configured to make 5 horizontal movements.

【0349】かかる移動シュート165は、タワーマス
トAに備えられた2個の容器状搬送具Db、Dbの夫々
に対応する2組のものが、前記取付けフレーム166に
対して、所定の傾斜角を備えたままの状態で、水平移動
可能に備えつけてある。また、この水平移動される移動
シュート165は、タワーマストAを容器状搬送具Db
が移動する際に、該タワーマストA、特に空間4の側か
ら、取付けフレーム166の側に導き出されると共に、
タワーマストAの上部側に案内された容器状搬送具Db
から生コンクリートFを受け入れる際に、このタワーマ
ストAの空間4内に向けて移動可能とし、該容器状搬送
具Dbから生コンクリートFを受け得る位置に都合良く
位置づけられる構成としてある。
Two sets of the moving chutes 165, which correspond to the two container-like conveying tools Db and Db provided on the tower mast A, have a predetermined inclination angle with respect to the mounting frame 166. It is equipped so that it can be moved horizontally as it is. The horizontally moving chute 165 moves the tower mast A to the container-shaped carrier Db.
Is moved toward the mounting frame 166 from the side of the tower mast A, particularly, the space 4 when moving.
Container-shaped carrier Db guided to the upper side of the tower mast A
When the fresh concrete F is received from the tower mast A, it can be moved into the space 4 of the tower mast A, and can be conveniently located at a position where the fresh concrete F can be received from the container-shaped carrier Db.

【0350】かかる移動シュート165が、容器状搬送
具Dbから、生コンクリートFを受け入れる状態とされ
た際に、この移動シュート165の下方にあって、これ
に連通状態とされる固定シュート168を、取付けフレ
ーム166に設けてある。
When the moving chute 165 is placed in a state of receiving the ready-mixed concrete F from the container-shaped carrier Db, the fixed chute 168, which is below the moving chute 165 and is in communication with the moving chute 165, It is provided on the mounting frame 166.

【0351】この固定シュート168は、前記タワーマ
ストAを昇降する容器状搬送具Dbの昇降の妨げとなら
ない態様に設けてあり、容器状中継具Mに対して、移動
シュート165からの生コンクリートFを供給する構成
としてある。
The fixed chute 168 is provided in such a manner that it does not hinder the raising and lowering of the container-shaped carrier Db for raising and lowering the tower mast A. For the container-shaped relay M, the fresh concrete F from the moving chute 165 is provided. Is configured to be supplied.

【0352】次いで、昇降本体部B、この図示例にあっ
ては、ステージ本体18に対して一体に組付け構成され
たステージポスト18A部分に、前記取付けフレーム1
66と共に、載置台フレーム169を一体に組付け構成
し、この台フレーム169上に、容器状中継具Mを備え
つけてある。
Next, the elevating / lowering main body portion B, in the illustrated example, is attached to the stage post 18A portion integrally assembled with the stage main body 18 to the mounting frame 1
The mounting table frame 169 is integrally assembled together with 66, and the container-shaped relay M is provided on the table frame 169.

【0353】この容器状中継具Mは、その上部側を受け
入れ容器手段Pとして構成すると共に、下部側に供給手
段Eを備えた構成としてあり、受け入れ容器手段Pに受
け入れられた生コンクリートFを、この供給手段Eによ
って、そのシュート170aから、連続して、定量的に
送り出し得る構成としてある。
This container-shaped relay tool M has an upper part as receiving container means P and a supplying means E on the lower side, and the fresh concrete F received by the receiving container means P is With this supply means E, the chute 170a can be continuously and quantitatively sent out.

【0354】かかる容器状中継具Mは、図87〜図89
に示すように、例えば、ホッパー状の容器本体170を
受け入れ容器手段Pとし、これを、上面開口170bの
ものとし、しかも、この容器本体170の絞り込まれた
ホッパー状下部開口170cを、ベルトコンベヤ171
におけるコンベヤベルト171a上に位置づけてある。
そして、このベルトコンベヤ171の駆動によって、運
び出される生コンクリートFの量に見合って、前記容器
本体170に収め入れられていた生コンクリートFが、
前記ホッパー状下部開口170cから連続して、定量的
に取り出される供給手段Eとして構成したものであり、
この供給手段Eを、所謂、ベルトフィーダとして構成し
てある。
Such a container-like relay tool M is shown in FIGS.
As shown in, for example, a hopper-shaped container main body 170 is used as a receiving container means P, and this has a top opening 170b, and the hopper-shaped lower opening 170c of the container main body 170 is connected to the belt conveyor 171.
Is located on the conveyor belt 171a.
Then, by driving the belt conveyor 171, the fresh concrete F contained in the container body 170 is commensurate with the amount of the fresh concrete F carried out.
It is configured as a supply means E that is quantitatively taken out continuously from the hopper-shaped lower opening 170c,
This supply means E is configured as a so-called belt feeder.

【0355】従って、このホッパー状下部開口170c
から送り出される生コンクリートFは、ベルトコンベヤ
171におけるコンベヤベルト171aの上面と、この
コンベヤベルト171aを取り囲むように構成した筒状
案内部172とのなす空間173を案内されることとな
り、これらのなす空間173に運ばれた生コンクリート
Fは、シュート170aからベルトコンベヤGに向けて
送り出される。
Therefore, this hopper-shaped lower opening 170c
The ready-mixed concrete F sent out from is guided in a space 173 formed by the upper surface of the conveyor belt 171a in the belt conveyor 171 and a cylindrical guide portion 172 configured to surround the conveyor belt 171a. The fresh concrete F carried to 173 is sent from the chute 170a toward the belt conveyor G.

【0356】尚、この筒状案内部172と、コンベヤベ
ルト171aとによって構成される生コンクリートFの
移送空間173に対して、調節用ゲート板174を差し
入れ可能に設け、この空間173に移送される生コンク
リートFの量を、この調節用ゲート板174によって、
調整できる構成としてある。
An adjusting gate plate 174 is provided so that it can be inserted into a transfer space 173 for the fresh concrete F, which is constituted by the cylindrical guide portion 172 and the conveyor belt 171a, and is transferred to this space 173. The amount of ready-mixed concrete F is controlled by the adjusting gate plate 174.
It has a configuration that can be adjusted.

【0357】この調節用ゲート板174は、前記容器状
本体170に備えつけられた油圧シリンダー175のプ
ランジャーロッド175aによって上下方向に移動可能
としてあり、前記筒状案内部172の上方から、空間1
73に対して、その差し入れ幅を調節可能に差し入れた
構成としてある。尚、この調節用ゲート板174は、コ
ンベヤベルト171aの移動方向と直交する向きに備え
てあり、しかも、この直交する向きにあって、該空間の
全幅に亘るように設けておくことが好ましい。
The adjusting gate plate 174 is movable in the vertical direction by the plunger rod 175a of the hydraulic cylinder 175 provided in the container-shaped main body 170, and the space 1 from above the tubular guide portion 172.
The insertion width is adjustable with respect to 73. The adjusting gate plate 174 is provided in a direction orthogonal to the moving direction of the conveyor belt 171a, and is preferably provided so as to extend over the entire width of the space in the orthogonal direction.

【0358】尚、図において、167はモータを、17
7は減速機を示しており、コンベヤベルト171aの駆
動プーリー178と同軸のスプロケット179と、前記
減速機177と同軸のスプロケット180とをチェーン
181で駆動する構成とし、これにコンベヤベルト17
1aの従動プーリー182を備えつけた構成としてあ
る。
In the figure, 167 is a motor, 17
Reference numeral 7 denotes a speed reducer, in which a sprocket 179 coaxial with the drive pulley 178 of the conveyor belt 171a and a sprocket 180 coaxial with the speed reducer 177 are driven by a chain 181.
The driven pulley 182 of 1a is provided.

【0359】次いで、別段に図90〜図92において示
される容器状中継具Mについて説明する。この容器状中
継具Mは、その上部側を受け入れ容器手段Pとして構成
すると共に、下部側に供給手段Eを備えた構成としてあ
り、受け入れ容器手段Pに受け入れられた生コンクリー
トFを、この供給手段Eによって、そのシュート183
aから、連続して、定量的に送り出し得る構成としてあ
る。
Next, the container-like relay tool M shown in FIGS. 90 to 92 will be described separately. The container-shaped relay tool M is configured such that the upper side thereof is configured as a receiving container means P, and the lower side is provided with a supply means E, and the ready-mixed concrete F received by the receiving container means P is supplied to the container means. Shoot 183 by E
It is configured such that it can be continuously and quantitatively sent out from a.

【0360】かかる容器状中継具Mは、例えば、ホッパ
ー状の容器本体183を受け入れ容器手段Pとし、これ
を、上面開口183bのものとし、この容器本体183
の絞り込まれたホッパー状下部開口183cを、スクリ
ューフィーダ184のスクリュー184a上に位置づけ
たものである。そして、このスクリューフィーダ184
を、生コンクリートFの供給手段Eとし、このフクリュ
ー184aを駆動することで、前記容器本体183に収
め入れられていた生コンクリートFを、前記ホッパー状
下部開口183cから、連続して、定量的に取り出す構
成としてある。
In this container-shaped relay tool M, for example, a hopper-shaped container main body 183 is used as a receiving container means P, and this has a top opening 183b.
The narrowed hopper-shaped lower opening 183c is positioned on the screw 184a of the screw feeder 184. And this screw feeder 184
Is used as a supply means E of the fresh concrete F, and by driving the fume 184a, the fresh concrete F contained in the container body 183 is continuously and quantitatively supplied from the hopper-shaped lower opening 183c. It is designed to be taken out.

【0361】従って、このホッパー状下部開口183c
から送り出される生コンクリートFは、スクリューフィ
ーダ184のスクリュー184aと、このスクリュー1
84aを取り囲むように構成した筒状案内部185との
なす空間186を案内され、これらのなす空間186に
運ばれた生コンクリートFを、シュート183aから、
連続して、定量的に取り出す構成としてある。
Therefore, this hopper-shaped lower opening 183c
The ready-mixed concrete F sent from the screw is the screw 184a of the screw feeder 184 and the screw 1
The space 186 formed by the cylindrical guide portion 185 configured to surround the 84a is guided, and the fresh concrete F carried into the space 186 is formed from the chute 183a.
It is configured to continuously and quantitatively extract.

【0362】尚、この筒状案内部185と、スクリュー
184aとによって構成される生コンクリートFの移送
空間186に対して、調節用ゲート板187を差し入れ
可能に設け、この空間186に移送される生コンクリー
トFの量を該調節用ゲート板187によって調整できる
構成としてある。
Incidentally, an adjusting gate plate 187 is provided so as to be insertable into a transfer space 186 for the fresh concrete F, which is constituted by the tubular guide portion 185 and the screw 184a, and is transferred to this space 186. The amount of concrete F can be adjusted by the adjusting gate plate 187.

【0363】この調節用ゲート板187は、前記容器状
本体183に備えつけられた油圧シリンダー188のプ
ランジャーロッド188aによって上下方向に移動可能
としてあり、前記筒状案内部185の上方から、空間1
86に対して、その差し入れ幅を調節可能に差し入れた
構成としてある。
The adjusting gate plate 187 is movable in the vertical direction by the plunger rod 188a of the hydraulic cylinder 188 provided in the container-shaped main body 183, and the space 1 is provided from above the tubular guide portion 185.
The insertion width is adjustable with respect to 86.

【0364】尚、この調節用ゲート板187は、スクリ
ュー184aの軸方向と直交する向きに備えてあり、し
かも、この直交する向きにあって、該空間の全幅に亘る
ように設けておくことが好ましく、特に、その下端を半
円状に凹欠した状態とし、スクリュー184aの回転円
の外方から等間隔で、これに離設される構成としておく
ことが好ましい。
The adjusting gate plate 187 is provided in a direction orthogonal to the axial direction of the screw 184a, and in this orthogonal direction, it may be provided so as to cover the entire width of the space. In particular, it is preferable that the lower end of the screw 184a is recessed in a semicircular shape and that the screw 184a is spaced apart from the outside of the rotation circle of the screw 184a at regular intervals.

【0365】尚、図において、189はモータを、19
0は減速機を示しており、ベルト192を介してモータ
189で駆動される減速機190に、カップリング19
1を介してスクリュー184aのシャフトを、連設し、
これを、前記モータ189の駆動によって回転させる構
成としてある。
In the figure, 189 is a motor, and 19
Reference numeral 0 denotes a speed reducer, which is connected to a speed reducer 190 driven by a motor 189 via a belt 192 and a coupling 19
1, the shaft of the screw 184a is continuously provided,
This is configured to be rotated by driving the motor 189.

【0366】尚、前記で、ワーマストAに対して、昇降
可能に備えつけられる容器状搬送具Dbは、これを、昇
降搬送具Kに対して、その鍔部154aを掛脱可能に引
っ掛け移送できる構成としてある。かかる点から、この
容器状搬送具DbはタワーマストAに対する取り込みに
際して、レール194上を移動する台車195を用い
て、タワーマストA内に運び込み可能とされ、前記昇降
搬送具Kに対して、その鍔部154aを引っかけるよう
にして吊り下げ用いることができる。
The container-shaped carrier Db, which is provided so as to be able to move up and down with respect to the warm mast A, can be transferred by hooking the collar portion 154a on the lifter-carrying device K so that it can be detached. There is. From this point of view, when the container-shaped carrier Db is taken into the tower mast A, it can be carried into the tower mast A by using the carriage 195 that moves on the rail 194. The collar portion 154a can be suspended and used as if hooked.

【0367】ここで容器状搬送具Dbの移動に用いられ
る台車195は、車輪195aの一方を駆動車輪195
a’とし、これを該台車195に備えたモータ196に
よって駆動する構成としてある。又、該台車195の上
部四隅には、上方に突き出すガイドピン191が設けて
あり、容器状搬送具Dbの下面に設けたガイド孔(図省
略)に収まり入る構成とし、台車195に対して、容器
状搬送具Dbが、横ずれなく載置できる構成としてあ
る。尚、図中198は、モータ196側と、駆動車輪1
95a’側とに設けたスプロケットを、199は、この
スプロケット198、198に架け渡したチェーンを示
している。
In the carriage 195 used for moving the container-shaped carrier Db, one of the wheels 195a is a driving wheel 195.
a ′, which is driven by a motor 196 provided on the carriage 195. Further, guide pins 191 protruding upward are provided at the four corners of the upper portion of the carriage 195, and the guide pins 191 are configured to fit in the guide holes (not shown) provided on the lower surface of the container-shaped carrier Db. The container-shaped carrier Db can be placed without lateral displacement. In the figure, 198 indicates the motor 196 side and the drive wheel 1
A sprocket provided on the side of 95a 'and a reference numeral 199 indicate a chain spanning the sprockets 198, 198.

【0368】尚、叙上で構成される図69〜図98にお
いて示される第5の実施の形態に係る生コンクリートの
移送装置は、タワーマストAに対する昇降本体部Bの昇
降手法及び当該構成、ブームCの伸縮、旋回手法及び当
該構成、容器状搬送具Dbの昇降手法及び当該構成、ブ
ームCにおけるベルトコンベヤGの搬送手法及び当該構
成、ブームCにおけるトリッパ装置Hによる生コンクリ
ートFの取出し手法及び当該構成、供給手段Eによる生
コンクリートFの取り出し手法及び当該構成などにあっ
て、叙上で別段に説明した以外の手法と、その為の構成
を除いた手法及び構成については、前記の各実施の形態
に係る生コンクリートの移送装置と概ね同一としてあ
る。
The concrete transfer apparatus according to the fifth embodiment shown in FIGS. 69 to 98, which is constructed as described above, is the same as the method for ascending / descending the elevating / lowering main body B with respect to the tower mast A, the construction thereof, and the boom. Expansion and contraction of C, swiveling method and its configuration, raising and lowering method of container-shaped carrier Db and its configuration, method of transporting belt conveyor G in boom C and its configuration, method of taking out fresh concrete F by tripper device H in boom C, and relevant Regarding the structure, the method of taking out the ready-mixed concrete F by the supply means E and the structure, etc., except for the method described above, and the method and the structure excluding the structure therefor, It is almost the same as the transfer device for ready-mixed concrete according to the embodiment.

【0369】(6) 第6の実施の形態に係る生コンクリー
トの移送装置 図99〜図100は、第6の実施の形態に係る生コンク
リートの移送装置を示している。
(6) Ready Concrete Transfer Device According to Sixth Embodiment FIGS. 99 to 100 show a ready concrete transfer device according to a sixth embodiment.

【0370】ここで構成される生コンクリ−トの移送装
置は、タワーマストAと、このタワーマストAに昇降可
能に備えられている昇降本体部Bと、この昇降本体部B
に回転可能に備えられた回転部Nと、この回転部Nに備
えられている連続する2本のブームC’、C”よりなる
ブ−ムCとを有する構成としてある。また、前記タワー
マストAには、生コンクリートFの搬送に用いられる容
器状搬送具Dが昇降可能に備えつけてある。更に、前記
ブームCには、該生コンクリートFの搬送用ベルトコン
ベヤGが備えてあり、しかも、該ブ−ムC、特に、根元
側ブ−ムC’にはトリッパ装置Hが備えられた構成とし
てある。更に、前記昇降本体部B、又は前記ブ−ムC、
又は前記回転部Nには、容器状中継具Mが設けてある。
また、ここで、昇降本体部B、又はブ−ムC、又は回転
部Bに備えられる容器状中継具Mは、前記容器状搬送具
Dから直接、又はシュ−トなどの搬送手段を介して生コ
ンクリ−トを受け入れる受け入れ容器手段Pと、前記搬
送用ベルトコンベヤGに対して、この受け入れ生コンク
リートFを、直接又は別段に備えられる搬送手段を介し
て、連続して定量的に送り出す供給手段Eを備えた構成
としてある。
[0370] The raw concrete transfer device constructed here comprises a tower mast A, an elevating main body section B which is provided for elevating the tower mast A, and an elevating main body section B.
And a boom C composed of two continuous booms C'and C "provided on the rotating part N. The tower mast is also provided. A is equipped with a container-shaped carrier D used for carrying the ready-mixed concrete F so that it can be moved up and down. Further, the boom C is provided with a belt conveyor G for carrying the ready-mixed concrete F, and The boom C, in particular, the root side boom C'is provided with a tripper device H. Further, the elevating body B or the boom C,
Alternatively, the rotating part N is provided with a container-like relay tool M.
Further, here, the container-shaped relay tool M provided in the elevating / lowering main body section B, the boom C, or the rotating section B is directly from the container-shaped carrier tool D, or via a carrier means such as a shoe. Supply means for continuously and quantitatively sending the receiving raw concrete F to the receiving container means P for receiving the fresh concrete and the conveying belt conveyor G directly or via the conveying means provided in a separate stage. It is provided with E.

【0371】かかる構成からなる生コンクリートの移送
装置にあっては、タワーマストAの下部から供給手段E
を備えていない容器状搬送具Dbによって運び上げられ
た生コンクリートFは、直接、又は別段に備えられた搬
送手段を介して容器状中継具Mに送り込まれると共に、
この容器状中継具Mに備えられた生コンクリ−トを連続
して、定量的に送り出す供給手段Eによって、ブームC
のベルトコンベヤGに向けて、直接、又は別段に用意さ
れる搬送手段を介して、連続して定量的に供給される。
In the ready-mixed concrete transferring device having the above structure, the supplying means E is provided from the lower part of the tower mast A.
The ready-mixed concrete F carried up by the container-shaped carrier Db not provided with is sent to the container-shaped relay M directly or through the carrier provided separately, and
The boom C is supplied by the supply means E which continuously and quantitatively supplies the raw concrete provided in the container-shaped relay M.
Is continuously and quantitatively supplied to the belt conveyer G directly or via a transporting means prepared separately.

【0372】この結果、この連続して定量的に供給され
る生コンクリートFを、トリッパ装置Hを用いることに
よって該ベルトコンベヤGの任意の位置、又は、該ベル
トコンベヤGの先端側の何れかから、コンクリートの打
込み対象位置に向けて、連続的に供給することができ
る。
As a result, by using the tripper device H, the continuous concretely quantitatively supplied green concrete F is supplied from any position of the belt conveyor G or from the tip side of the belt conveyor G. , Can be continuously supplied toward the position where concrete is poured.

【0373】又、このコンクリートの打込み位置に向け
た生コンクリートFの供給位置決めは、タワーマストA
の、レ−ル17による移動操作と、昇降本体部Bの昇降
位置決めと、この昇降本体部Bに備えられた回転部Nの
回転位置づけと、ブームCに備えられたトリッパ装置H
の該ブームCに対する移動位置決め、及び先端側ブ−ム
C”の伸縮操作などによってなすことができる。
[0373] Further, the positioning of the supply of the ready-mixed concrete F toward the concrete pouring position is performed by the tower mast A.
The moving operation by the rail 17, the lifting / lowering positioning of the lifting / lowering main body B, the rotational positioning of the rotating portion N provided in the lifting / lowering main body B, and the tripper device H provided in the boom C.
Can be performed by moving and positioning the boom C with respect to the boom C and expanding and contracting the front boom C ″.

【0374】この第6の実施の形態に係る生コンクリー
トの移送装置にあっては、容器状搬送具Dbによって運
び上げられる生コンクリートFを、この容器状搬送具D
bから直接、又は別段に備えられる移送手段Lなどの適
宜の搬送手段を介して受け入れる生コンクリ−トFの受
け入れ容器手段Pと、この受け入れ生コンクリ−トFを
連続して、定量的に送り出す供給手段Eとを備えた容器
状中継具Mに、一旦受け渡し、この容器状中継具Mに受
け入れられた生コンクリ−トFを、連続して、定量的
に、ベルトコンベヤGに対して受け渡すようにした構成
以外の構成を、前記第4の実施の形態に係る生コンクリ
ートの移送装置における構成と、同一又は実質的に同一
の構成としてある。また、ここで構成される各部の動
作、及び各部の奏する機能は、前記の相違点以外の点に
おいて、前記第4の実施の形態に係る生コンクリートの
移送装置と同一、又は実質的に同一としてある。従っ
て、前記第4の実施の形態に係る生コンクリートの移送
装置と、同一、又は実質的に同一の構成部分、及び同一
又は実質的に同一の機能を奏する部分については同一の
番号を付して、その説明を省略する。
In the transfer device for ready-mixed concrete according to the sixth embodiment, the ready-mixed concrete F carried by the container-like carrier Db is transferred to the container-like carrier D.
Receiving container means P for the raw concrete F received directly from b or via an appropriate conveying means such as a transfer means L provided separately, and the receiving raw concrete F are continuously and quantitatively sent out. Once delivered to the container-shaped relay M provided with the supply means E, the raw concrete F received by the container-shaped relay M is continuously and quantitatively transferred to the belt conveyor G. The configuration other than the above-described configuration is the same or substantially the same as the configuration of the fresh concrete transfer device according to the fourth embodiment. In addition, the operation of each part configured here and the function performed by each part are the same as or substantially the same as those of the transfer device for ready-mixed concrete according to the fourth embodiment, except for the differences described above. is there. Therefore, the same or substantially the same constituent parts, and the same or substantially the same function as the transfer device for ready-mixed concrete according to the fourth embodiment are designated by the same reference numerals. , The description is omitted.

【0375】即ち、叙上で構成される図99〜図100
において示される第6の実施の形態に係る生コンクリー
トの移送装置は、叙上において前記第4の実施の形態と
異なるとして明らかにされた以外の構成、例えば、タワ
ーマストAの走行手法及び当該構成、各昇降本体部の昇
降手法及び当該構成、ブームCの組付け手法及び当該構
成、容器状搬送具Dからの生コンクリ−トの供給手法及
び当該構成、生コンクリートFを連続して、定量的に送
り出す供給手段Eの機能及び当該構成、ベルトコンベヤ
Gの構成、ベルトコンベヤGからトリッパ装置Hを用
い、又は、これを用いることなく、生コンクリートFを
取り出す構成など、当該装置の各操作手法、及び構成
を、前記第4の実施の形態に係る生コンクリートの移送
装置と同一、または実質的に同一としてある。
That is, FIGS. 99 to 100 configured as described above.
The transfer device for ready-mixed concrete according to the sixth embodiment, which is shown in FIG. 1, is a configuration other than that which is clarified as different from the fourth embodiment above, for example, a traveling method of the tower mast A and the configuration. , Ascending / descending method of each ascending / descending main body part and the structure, assembling method of the boom C and the structure, supply method of the fresh concrete from the container-shaped carrier D and the structure, and ready-mixed concrete F, quantitatively. The function and the configuration of the supply means E to be sent to, the configuration of the belt conveyor G, using the tripper device H from the belt conveyor G, or a method of taking out the ready-mixed concrete F without using it, each operation method of the device, And the structure is the same as or substantially the same as the transfer device for ready-mixed concrete according to the fourth embodiment.

【0376】先ず、図99に示される生コンクリートの
移送装置にあっては、容器状中継具Mを回転部N、特
に、この回転部Nに備えられたブームCに設け、この容
器状中継具Mに備えた生コンクリートFを連続して、定
量的に送り出す供給手段Eによって、生コンクリートF
を、連続して、定量的に、ベルトコンベヤGに対して送
り出す構成としてある。
First, in the transfer device for ready-mixed concrete shown in FIG. 99, the container-like relay tool M is provided on the rotating part N, particularly on the boom C provided on the rotating part N, and the container-like relay tool is provided. The raw concrete F prepared in M is continuously and quantitatively fed by the feeding means E to obtain the raw concrete F.
Is continuously and quantitatively sent to the belt conveyor G.

【0377】従って、この図99で示される生コンクリ
ートの移送装置にあっては、タワーマストAに備えられ
た容器状搬送具Dbによって運び上げられた生コンクリ
ートFを、前記容器状中継具Mに受け渡す手段として、
回転フィーダーなどの移送手段Lを、タワーマストAの
回りを回転するように設けてある。
Therefore, in the ready-mixed concrete transferring device shown in FIG. 99, the ready-mixed concrete F carried up by the container-like carrier Db provided in the tower mast A is transferred to the container-like relay M. As a means of delivering
A transfer means L such as a rotary feeder is provided so as to rotate around the tower mast A.

【0378】この移送手段Lは、前記第4の実施の形態
に係る生コンクリートの移送装置を構成する移送手段L
と同様に、昇降本体部Bと、この昇降本体部Bに備えら
れた回転部Nとの間に備えられる構成としてあり、昇降
本体部Bの昇降動作、及び回転部Nの回転動作に対し
て、何等の支障をもたらすことのないように構成してあ
る。
The transfer means L is a transfer means L constituting the transfer device for ready-mixed concrete according to the fourth embodiment.
Similarly to the above, it is configured to be provided between the elevating / lowering main body part B and the rotating part N provided in the elevating / lowering main body part B. , Is constructed so as not to cause any trouble.

【0379】この図99に示される生コンクリートの移
送装置にあっては、容器状搬送具Dによって運び上げら
れた生コンクリートFが、この容器状搬送具Dbから直
接、又は、シュートなどの他の移送手段を介して、前記
移送手段Lに受け渡されると共に、この移送手段Lに受
け入れられた生コンクリートFが、シュート199を介
して、容器状中継具M、特に、この容器状中継具Mを構
成する受け入れ容器手段Pに受け渡される構成としてあ
る。
In the ready-mixed concrete transfer device shown in FIG. 99, the ready-mixed concrete F carried up by the container-shaped carrier D is directly fed from the container-shaped carrier Db or another chute or the like. Through the chute 199, the ready-mixed concrete F transferred to the transfer means L through the transfer means and received by the transfer means L passes through the chute 199 to move the container-like relay M, particularly the container-like relay M. It is configured to be delivered to the constituting receiving container means P.

【0380】また、このように、容器状中継具Mに受け
入れられた生コンクリートFは、この容器状中継具Mに
備えられている生コンクリートFを連続して、定量的に
送り出す供給手段Eによって、ブームCのベルトコンベ
ヤGに対して、連続して、定量的に送り出される構成と
してある。
As described above, the ready-mixed concrete F received in the container-like relay tool M is continuously and quantitatively fed by the supply means E provided in the container-like relay tool M. , Is continuously and quantitatively sent to the belt conveyor G of the boom C.

【0381】次いで、図100に示される生コンクリー
トの移送装置にあっては、容器状中継具Mを、昇降本体
部Bの側に設けた構成としている。ここで、昇降本体部
Bに備えられる容器状中継具Mは、生コンクリートFを
受け入れる受け入れ容器手段Pと、この受け入れ生コン
クリートFを、連続して、定量的に送り出す供給手段E
とを備えた構成としてある。
Next, in the ready-mixed concrete transfer device shown in FIG. 100, the container-shaped relay M is provided on the side of the elevating main body B. Here, the container-like relay tool M provided in the elevating / lowering main body part B is a container means P for receiving the fresh concrete F and a supply means E for continuously and quantitatively sending the received fresh concrete F.
It has a configuration including and.

【0382】この容器状中継具Mにあっては、シュート
198を介して、容器状搬送具Dbから生コンクリート
Fを受け入れると共に、この受け入れ生コンクリートF
を、連続して、定量的に、移送手段Lに送り出す構成と
してある。
In this container-shaped relay M, the fresh concrete F is received from the container-shaped carrier Db via the chute 198, and the received fresh concrete F is also received.
Is continuously and quantitatively sent to the transfer means L.

【0383】この容器状中継具Mから生コンクリートF
を受け渡される移送手段Lは、タワーマストAの回りを
回転するように設けられた回転フィーダなどの移送手段
によって構成してある。例えば、この移送手段Lは、昇
降本体部Bと、この昇降本体部Bに対して、回転可能に
備えられた回転部Nとの間にあって、タワーマストAの
回りを、回転する環帯状をなす回転フィーダなどによっ
て構成する。かかる移送手段Lに受け渡された生コンク
リートFを、シュート199を介して、ブームCのベル
トコンベヤGに受け渡す構成としてある。
From this container-shaped relay M to green concrete F
The transfer means L to be delivered is constituted by a transfer means such as a rotary feeder provided so as to rotate around the tower mast A. For example, the transfer means L is located between the elevating main body B and a rotating portion N rotatably provided with respect to the elevating main body B, and has a ring shape that rotates around the tower mast A. It is composed of a rotary feeder. The green concrete F delivered to the transfer means L is delivered to the belt conveyor G of the boom C via the chute 199.

【0384】尚、この図99及び図100で示される生
コンクリートの移送装置は、生コンクリートFを連続し
て、定量的に送り出す供給手段Eを、容器状搬送具Db
に設けず、これに代って、生コンクリートFを連続し
て、定量的に送り出す供給手段Eを容器状中継具Mに備
えさせると共に、この容器状中継具Mを、容器状搬送具
Dbと、ベルトコンベヤGとの間における生コンクリー
トFの受け渡しの搬送系路中に設けるように構成した以
外の構成を、前記第4の実施の形態に係る生コンクリー
トの移送手段と同一、又は実質的に同一としている。従
って、この第4の実施の形態に係る生コンクリートの移
送装置における構成と同一、又は実質的に同一の構成部
分については、同一の番号を付して、その説明を省略す
る。また、この図99及び図100で示される生コンク
リートの移送装置に用いられている容器状中継具Mは、
前記第5の実施の形態に係る生コンクリートの移送装置
において用いられた容器状中継具Mと同一の構成のもの
を用いることができる。従って、前記第5の実施の形態
に係る生コンクリートの移送装置において用いた容器状
中継具Mの構成と同一、又は実質的に同一の構成部分に
ついては、同一の番号を付して、その説明を省略する。
In the fresh concrete transfer device shown in FIGS. 99 and 100, the supply means E for continuously and quantitatively sending the fresh concrete F is used as a container-like carrier Db.
In place of this, the supply means E for continuously and quantitatively feeding the fresh concrete F is provided in the container-shaped relay tool M, and the container-shaped relay tool M and the container-shaped transport tool Db. The construction other than the construction in which it is provided in the transfer system path for delivering the fresh concrete F to and from the belt conveyor G is the same as or substantially the same as the transport means for the fresh concrete according to the fourth embodiment. The same. Therefore, the same or substantially the same components as those of the ready-mixed concrete transferring device according to the fourth embodiment are designated by the same reference numerals, and the description thereof will be omitted. Further, the container-shaped relay M used in the transfer device for ready-mixed concrete shown in FIGS. 99 and 100 is
The same construction as the container-like relay M used in the transfer device for ready-mixed concrete according to the fifth embodiment can be used. Therefore, the same or substantially the same components as those of the container-like relay M used in the transfer device for ready-mixed concrete according to the fifth embodiment are designated by the same reference numerals, and description thereof will be given. Is omitted.

【0385】また、この典型的な生コンクリートの移送
装置にあっては、前記タワーマストAが、固定状態に立
設してあっても良く、また、回転部Nは、前記昇降本体
部Bに対して、回転可能に備えつけられた構成であれば
良く、回転するフレーム体、あるいは、回転するステー
ジ体など、いかなる構成のものであっても良い。また、
ブームCは、回転部Nに対して、固定状態、又は旋回可
能に備えつけられていると共に、これにベルトコンベヤ
Gが備えつけられた構成としてあり、一本の水平なフレ
ーム状に構成してあっても良く、更に、連設された3本
以上のブームによって構成してあっても良い。
Further, in this typical ready-mixed concrete transfer device, the tower mast A may be erected in a fixed state, and the rotating part N is attached to the elevating main body part B. On the other hand, any structure can be used as long as it is rotatably provided, and may have any structure such as a rotating frame body or a rotating stage body. Also,
The boom C is fixed to the rotating portion N or is provided so as to be rotatable, and is also provided with a belt conveyor G, and is configured as a single horizontal frame. Alternatively, the boom may be formed of three or more booms connected in series.

【0386】尚、叙上で構成される図69〜図98にお
いて示される第5の実施の形態に係る生コンクリートの
移送装置は、タワーマストAに対する昇降本体部Bの昇
降手法及び当該構成、昇降本体部Bに対する回転部Nの
回転手法及び当該構成、ブームCの伸縮、旋回手法及び
当該構成、容器状搬送具Dbの昇降手法及び当該構成、
ブームCにおけるベルトコンベヤGの搬送手法及び当該
構成、ブームCにおけるトリッパ装置Hによる生コンク
リートFの取出し手法及び当該構成、容器状中継具Mに
よる受け次ぎ手法及び当該構成、供給手段Eによる生コ
ンクリートFの取り出し手法及び当該構成などにあっ
て、叙上で別段に説明した以外の手法と、その為の構成
を除いた手法及び構成については、前記の各実施の形態
に係る生コンクリートの移送装置と概ね同一としてあ
る。尚、叙上の各実施の形態において用いられる各種装
置、構造及び部品は、もっとも典型的な装置、構造及び
部品例を示すものであって、これらに当該発明に係る実
施の形態が限定されるものではない。例えば、生コンク
リートFを連続して、定量的に送り出す供給手段Eを備
えた記容器状搬送具Da、容器状中継具Mを、各種のフ
ィーダ類を直接そのまま用いるように構成してあっても
良い。
The concrete transfer apparatus according to the fifth embodiment shown in FIGS. 69 to 98, which is constructed as described above, is the method of raising and lowering the raising and lowering main body section B with respect to the tower mast A, and the construction and raising and lowering thereof. A method of rotating the rotating unit N with respect to the main body B and the configuration thereof, a method of expanding and contracting the boom C, a method of swinging the unit, a configuration of raising and lowering the container-shaped carrier Db and the configuration,
Conveying method of belt conveyor G in boom C and its structure, taking out method of fresh concrete F by tripper device H in boom C and its structure, receiving method by container-like relay M and its structure, fresh concrete F by supplying means E In the taking out method and the configuration, etc., a method other than the method explained otherwise above, and a method and a configuration excluding the configuration therefor are the concrete transfer device according to each of the above-mentioned embodiments. It is almost the same. It should be noted that the various devices, structures and parts used in each of the above embodiments are examples of the most typical devices, structures and parts, and the embodiments according to the present invention are limited thereto. Not a thing. For example, the container-shaped carrier tool Da and the container-shaped relay tool M provided with the supply means E for continuously and quantitatively supplying the green concrete F may be configured so that various feeders are directly used as they are. good.

【0387】又、叙上におけるタワーマストAの走行手
法、タワーマストAの旋回手法、タワーマストAの立設
手法、昇降本体部Bのクライミング手法、回転部Nの回
転手法、ブームCの旋回手法、ブームCの吊り手法、ブ
ームCの伸縮手法などは、叙上構成以外の他の任意の各
手法によって構成してあっても良い。更に、容器状搬送
具D及び昇降搬送具Kなどの昇降操作手法、各ベルトコ
ンベヤG’、G”の構成手法、このベルトコンベヤGか
ら生コンクリートFを取り出すトリッパ装置H、この容
器状搬送具DからベルトコンベヤG又は容器状中継具M
に対して生コンクリートを受け渡すシュートなどの各種
の搬送手法、容器状中継具MからベルトコンベヤGに対
して生コンクリートFを受け渡すシュートなどの搬送手
法、及び容器状搬送具Dに対する生コンクリートFの供
給手法など、いずれも叙上構成以外の他の各種の手法に
よって構成してあっても良い。
[0387] Further, the traveling method of the tower mast A, the turning method of the tower mast A, the standing method of the tower mast A, the climbing method of the lifting / lowering main body section B, the rotating method of the rotating section N, and the turning method of the boom C on the floor. The boom C suspension method, the boom C expansion / contraction method, and the like may be configured by any arbitrary method other than the above-described configuration. Furthermore, a method of raising and lowering the container-shaped carrier D and the elevator carrier K, a method of constructing each belt conveyor G ′, G ″, a tripper device H for taking out fresh concrete F from the belt conveyor G, and the container-shaped carrier D. From belt conveyor G or container-like relay M
To the belt conveyor G, such as a chute for delivering raw concrete to the belt conveyor G, and a concrete concrete F for the container-shaped transport tool D. May be configured by various methods other than the above configuration.

【0388】本発明に係る生コンクリートの移送装置
は、叙上における特長ある構成より、タワーマストAに
備えられた昇降搬送具Dによって、多量の生コンクリー
トを、目的とする高さまで運び上げることができると共
に、ブームCに備えたベルトコンベヤGによって、この
運び上げられた生コンクリートを、コンクリートの打込
み位置まで案内できる構成とし、しかも、供給手段Eに
よって、生コンクリートを、連続して、定量的にベルト
コンベヤGに対して送り出し得る構成としたことから、
生コンクリートを、その打込み位置に向けて、容易に、
しかも確実に移送することができる。
The transfer device for ready-mixed concrete according to the present invention is capable of transferring a large amount of ready-mixed concrete to a desired height by the lifting / lowering transfer tool D provided in the tower mast A because of the characteristic structure of the above. At the same time, the conveyor belt G provided on the boom C can guide the conveyed fresh concrete to the concrete driving position, and the supply means E can continuously and quantitatively measure the fresh concrete. Since it can be sent to the belt conveyor G,
Easily direct the ready-mixed concrete to its driving position,
Moreover, it can be reliably transferred.

【0389】従って、この生コンクリートの移送装置
は、ダムの構築に際しての、生コンクリートの移送に用
いるのに適している。また、この生コンクリートの移送
装置は、鉄筋コンクリート製の橋脚の構築に際しての、
生コンクリートの移送に用いるのに適している。また、
この生コンクリートの移送装置は、鉄筋コンクリート製
の煙突の構築に際しての、生コンクリートの移送に用い
るのに適している。また、この生コンクリトの移送装置
は、前記以外の各種構築物、前記以外の各種構造物の構
築に際しての、生コンクリートの移送に用いるのに適し
ている。
Therefore, this ready-mixed concrete transfer device is suitable for use in transfer of ready-mixed concrete when constructing a dam. In addition, this transfer device for ready-mixed concrete is used for the construction of piers made of reinforced concrete.
Suitable for transporting ready-mixed concrete. Also,
This fresh concrete transfer device is suitable for use in the transfer of fresh concrete when constructing a reinforced concrete chimney. Further, this fresh concrete transfer device is suitable for use in the transfer of fresh concrete when constructing various structures other than the above and various structures other than the above.

【0390】[0390]

【発明の効果】本発明に係る生コンクリートの移送装置
は、叙上における特長ある構成、特にタワーマストAに
対して、昇降本体部Bが昇降可能に備えられており、結
果的に、この昇降本体部Bに備えられているブームC
が、タワーマストAに対して昇降可能とされているこ
と、また、このタワーマストA自体を旋回し、又は走行
可能とし、又は、昇降本体部Bに備えられているブーム
Cを旋回可能とし、又は、ブームCを備えている回転部
Nを回転可能にタワーマストAに備えたこと、ブームに
ベルトコンベヤGと、トリッパ装置Hとを設けたこと、
このベルトコンベヤGに対して、タワーマストAに備え
られた容器状搬送具Dから供給手段Eを介して生コンク
リートを供給し、又は、供給手段Eを備えた容器状中継
具Mに対して容器状搬送具Dから、一旦生コンクリート
の受け渡しをなした後、この生コンクリートをベルトコ
ンベヤGに対して供給するようにしたことによって、ダ
ム、建物、煙突などの各種構造物の構築に際して、生コ
ンクリートを、コンクリートの打込み位置に、連続し
て、定量的に、しかも、多量に移送でき、これによっ
て、多量の生コンクリートの連続打込みが可能とされる
特長を有している。
The transfer device for ready-mixed concrete according to the present invention is provided with a lifting main body B capable of moving up and down relative to the tower mast A, which has a characteristic structure in the above. Boom C provided on the main body B
Is movable up and down with respect to the tower mast A, and the tower mast A itself can be swung or run, or the boom C provided in the lifting body B can be swung, Alternatively, the tower mast A is rotatably provided with the rotating portion N including the boom C, and the belt conveyor G and the tripper device H are provided on the boom.
To this belt conveyor G, green concrete is supplied from a container-shaped carrier D provided in the tower mast A through a supply means E, or a container is supplied to a container-shaped relay tool M provided with the supply means E. Since the fresh concrete is once delivered from the conveyor D, and the fresh concrete is supplied to the belt conveyor G, the fresh concrete can be used when constructing various structures such as dams, buildings, and chimneys. Can be continuously and quantitatively transferred to a concrete pouring position, and a large amount can be transferred, whereby a large amount of fresh concrete can be continuously poured.

【0391】また、比較的狭いスペースでも設置が可能
であり、しかも低い位置におけるコンクリートの打込
み、及び高い位置におけるコンクリートの打込みのいず
れに対しても、連続して、定量的に、多量の生コンクリ
ートを移送し得る特長を有している。
Further, it can be installed even in a relatively narrow space, and it is possible to continuously, quantitatively, and in large quantities, a large amount of fresh concrete for both concrete driving at a low position and concrete driving at a high position. It has the feature of being able to transfer.

【0392】また、骨材径の大きい貧配合のコンクリー
トを、コンクリートの打込み位置に連続して、定量的
に、しかも多量に移送できるようにした生コンクリート
の移送装置の提供を可能にしている。
Further, it is possible to provide a transfer device for ready-mixed concrete capable of transferring a poorly mixed concrete having a large aggregate diameter continuously, quantitatively and in a large amount to a concrete driving position.

【0393】また、生コンクリートを、コンクリートの
打込み位置に、連続して、定量的に、しかも多量に移送
できる装置を、比較的安価に設置でき、しかも、特殊技
術者による操作を不要とし、低コストで稼動することの
できる生コンクリートの移送装置の提供を可能としてい
る。
Further, a device capable of continuously, quantitatively, and transferring a large amount of ready-mixed concrete to a concrete pouring position can be installed at a relatively low cost, and the operation by a special engineer is not required, which is low. It is possible to provide a transfer device for ready-mixed concrete that can be operated at a cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る生コンクリートの移送装置の典型
例を模式的に示す構成図
FIG. 1 is a configuration diagram schematically showing a typical example of a transfer device for ready-mixed concrete according to the present invention.

【図2】本発明に係る生コンクリートの移送装置の他の
典型例を模式的に示す構成図
FIG. 2 is a configuration diagram schematically showing another typical example of the ready-mixed concrete transfer device according to the present invention.

【図3】本発明に係る生コンクリートの移送装置の更に
他の典型例を模式的に示す構成図
FIG. 3 is a configuration diagram schematically showing still another typical example of the ready-mixed concrete transfer device according to the present invention.

【図4】本発明に係る生コンクリートの移送装置の更に
他の典型例を模式的に示す構成図
FIG. 4 is a configuration diagram schematically showing still another typical example of the ready-mixed concrete transfer device according to the present invention.

【図5】第1の実施の形態に係る装置の側面図FIG. 5 is a side view of the device according to the first embodiment.

【図6】同装置を、その見る向きを変えて示した側面図FIG. 6 is a side view showing the same device with its viewing direction changed.

【図7】同装置の要部の平面図FIG. 7 is a plan view of the main part of the device.

【図8】同装置におけるタワ−マストAの下部の要部
を、一部破断して示した要部の側面図
FIG. 8 is a side view of an essential part of the lower part of the tower mast A in the same device, partially cut away.

【図9】同装置におけるタワ−マストAの下部の要部々
分を破断して示す平断面図
FIG. 9 is a plan sectional view showing a lower part of a lower part of a tower mast A in the apparatus, broken away and shown.

【図10】同装置の走行手段の要部の側面図FIG. 10 is a side view of the main part of the traveling means of the device.

【図11】同装置の走行手段の要部の側断面図FIG. 11 is a side sectional view of a main part of a traveling unit of the same device.

【図12】同装置の転倒防止手段の要部の側面図FIG. 12 is a side view of a main part of a fall prevention unit of the device.

【図13】同装置の転倒防止手段の要部の側断面図FIG. 13 is a side cross-sectional view of a main part of a fall prevention unit of the device.

【図14】同装置のクライミング部分の要部の側面図FIG. 14 is a side view of the main part of the climbing portion of the device.

【図15】同装置のクライミング部分の要部を、その見
る向きを変えて示した側面図
FIG. 15 is a side view showing the main part of the climbing portion of the same device with the viewing direction changed.

【図16】同装置の油圧シリンダー24の動作部分の要
部を示す断面図
FIG. 16 is a sectional view showing a main part of an operating portion of a hydraulic cylinder 24 of the same device.

【図17】同側面図FIG. 17 is a side view of the same.

【図18】同受け段部26部分を示す側面図FIG. 18 is a side view showing the receiving step portion 26 portion.

【図19】同装置のクライミング部分の平断面図FIG. 19 is a plan sectional view of a climbing portion of the device.

【図20】同装置のブーム取付け部分の要部の断面図FIG. 20 is a sectional view of an essential part of a boom mounting portion of the device.

【図21】同装置のブームの伸縮状態を、その要部々分
として一部を破断して示す側面図
FIG. 21 is a side view showing a telescopic state of the boom of the same apparatus, with some parts broken away.

【図22】同一部を破断して示す平面図FIG. 22 is a plan view showing the same portion in a broken manner.

【図23】同装置のトリッパ装置の構成例を示すベルト
コンベヤの要部の側面図
FIG. 23 is a side view of a main part of a belt conveyor showing a configuration example of a tripper device of the same device.

【図24】同トリッパ装置を備えたベルトコンベヤを、
向きを変えて示す側面図
FIG. 24 shows a belt conveyor equipped with the same tripper device,
Side view showing the orientation

【図25】同装置のトリッパ装置の更に他の構成例を、
その一部を破断して、ベルトコンベヤの要部と共に示す
断面図
FIG. 25 is a view showing still another configuration example of the tripper device of the same device,
A cross-sectional view showing a part of the belt conveyor with a part broken away

【図26】同装置のベルトコンベヤの動作状態を示す構
成図
FIG. 26 is a configuration diagram showing an operating state of a belt conveyor of the same device.

【図27】同装置に用いられる容器状搬送具Dの第1の
昇降手段を側面から見て示す構成図
FIG. 27 is a configuration diagram showing a first lifting / lowering means of a container-shaped carrier D used in the same apparatus as seen from a side surface.

【図28】同第1の昇降手段を平面から見て示す構成図FIG. 28 is a configuration diagram showing the first elevating means as seen from a plane.

【図29】同第1の昇降手段を側面から見る向きを変え
て示す構成図
FIG. 29 is a configuration diagram showing the first elevating means in a different direction when viewed from the side.

【図30】同装置に用いられる容器状搬送具Dの第2の
昇降手段を側面から見て示す構成図
FIG. 30 is a configuration diagram showing a second lifting means of the container-shaped carrier D used in the same apparatus as seen from a side surface.

【図31】同第2の昇降手段を平面から見て示す構成図FIG. 31 is a configuration diagram showing the second elevating means as seen from above.

【図32】同装置に用いられる定量供給手段Eを備えた
容器状搬送具の要部の断面図
FIG. 32 is a cross-sectional view of a main part of a container-shaped carrier equipped with a constant amount supply means E used in the apparatus.

【図33】同装置のシュート部分を、ステージタワ−マ
スト部18Aを破断して示す側面図
FIG. 33 is a side view showing the chute portion of the same device, with the stage tower-mast portion 18A being cut away.

【図34】同シュート部分の要部を向きを変えて見た状
態の断面図
FIG. 34 is a cross-sectional view showing a state in which the main part of the chute portion is turned and seen.

【図35】同装置に用いられる投入ホッパー部分の要部
の平面図
FIG. 35 is a plan view of a main part of a charging hopper used in the apparatus.

【図36】同投入ホッパー部分の要部の側面図FIG. 36 is a side view of the main part of the charging hopper portion.

【図37】第2の実施の形態に係る装置の側面図FIG. 37 is a side view of the device according to the second embodiment.

【図38】同装置を、向きを変え、且つ、一部を破断し
て示す側面図
FIG. 38 is a side view showing the same device with the orientation changed and a part thereof broken away.

【図39】同装置の平面図FIG. 39 is a plan view of the device.

【図40】同装置に用いられるクレーン手段Jの取付け
部分を、ブームと共に示す断面図
FIG. 40 is a cross-sectional view showing a mounting portion of a crane means J used in the same device together with a boom.

【図41】同クレーン手段Jの平面図FIG. 41 is a plan view of the crane means J.

【図42】同装置に用いられる投入ホッパー71部分の
要部の側面図
FIG. 42 is a side view of the main part of the input hopper 71 used in the apparatus.

【図43】同投入ホッパー71部分の要部の平面図FIG. 43 is a plan view of the main part of the input hopper 71.

【図44】同投入ホッパー71の摺動フレーム部分の断
面図
FIG. 44 is a sectional view of a sliding frame portion of the input hopper 71.

【図45】第3の実施の形態に係る装置の側面図FIG. 45 is a side view of the device according to the third embodiment.

【図46】同装置を見る向きを変えて示す側面図FIG. 46 is a side view showing the same device by changing the viewing direction.

【図47】同装置のフレーム上部々分の要部を示す側面
FIG. 47 is a side view showing the main parts of the upper part of the frame of the same device.

【図48】同装置のフレーム上部々分の要部を示す平面
FIG. 48 is a plan view showing the main parts of the upper part of the frame of the same device.

【図49】同装置の下部々分の要部、特に吊りフレーム
台87に対する容器状搬送具の取り入れ取り出し状態を
示す側面図
FIG. 49 is a side view showing a main part of the lower part of the apparatus, in particular, a state in which a container-shaped carrier is taken in and taken out from a hanging frame base 87.

【図50】同吊りフレーム台87に対する容器状搬送具
の取り入れ、取り出し状態を、その向きを変えて示す要
部の側面図
FIG. 50 is a side view of the main part showing the state in which the container-shaped carrier is taken in and taken out from the hanging frame base 87 in different directions.

【図51】同吊りフレーム台87の斜視図FIG. 51 is a perspective view of the hanging frame base 87.

【図52】同吊りフレーム87に容器状搬送具を取り入
れた状態の側面図
52 is a side view showing a state where a container-shaped carrier is incorporated in the hanging frame 87. FIG.

【図53】同装置のタワ−マストの下部々分の要部を示
す平断面図
FIG. 53 is a plan sectional view showing the main parts of the lower part of the tower mast of the same device.

【図54】同装置に用いられる吊りフレーム台87とし
ての昇降搬送具Kの第1の昇降手段を側面から見て示し
た構成図
FIG. 54 is a configuration diagram showing a first lifting / lowering means of a lifting / lowering conveyance tool K as a hanging frame base 87 used in the same apparatus as seen from a side surface.

【図55】同第1の昇降手段を平面から見て示した構成
FIG. 55 is a configuration diagram showing the first elevating means as seen from a plane.

【図56】同第1の昇降手段を、見る向きを変えて側面
から示した構成図
FIG. 56 is a configuration diagram showing the first elevating means from the side with the viewing direction changed.

【図57】同装置に用いられる吊りフレーム台87とし
ての昇降搬送具Kの第2の昇降手段を側面から見て示し
た構成図
FIG. 57 is a configuration diagram showing a second lifting means of a lifting / lowering conveyance tool K as a hanging frame base 87 used in the same apparatus as seen from the side surface.

【図58】同第2の昇降手段を平面から見て示した構成
FIG. 58 is a configuration diagram showing the second elevating means as seen from above.

【図59】同装置に用いられる容器状搬送具に対する第
1の生コンクリートの供給手段を側面から示す構成図
[Fig. 59] Fig. 59 is a configuration diagram showing, from a side surface, a supply means for supplying the first ready-mixed concrete to the container-shaped carrier used in the apparatus.

【図60】同装置に用いられる容器状搬送具に対する第
1の生コンクリートの供給手段を側面から示す他の構成
FIG. 60 is another configuration diagram showing the first ready-mixed concrete supply means for the container-like carrier used in the apparatus from the side.

【図61】同装置に用いられる容器状搬送具に対する第
1の生コンクリートの供給手段を側面から示す更に他の
構成図
FIG. 61 is still another configuration diagram showing from a side surface the supply means for supplying the first ready-mixed concrete to the container-shaped carrier used in the apparatus.

【図62】第4の実施の形態に係る装置の側面図FIG. 62 is a side view of the device according to the fourth embodiment.

【図63】同装置を見る向きを変えて示す側面図FIG. 63 is a side view showing the same device by changing the viewing direction.

【図64】同装置の要部を示す平面図FIG. 64 is a plan view showing the main parts of the same device.

【図65】同装置の上部々分の要部を示す構成図FIG. 65 is a configuration diagram showing the main parts of the upper part of the apparatus.

【図66】同装置の上部々分の要部を上面から見て示す
要部平面図
FIG. 66 is a plan view of a main part showing the main parts of the upper portion of the same device as seen from above.

【図67】同装置の移動手段Lの要部を示す構成図FIG. 67 is a configuration diagram showing a main part of moving means L of the apparatus.

【図68】同装置の移動手段Lの要部を示す断面構成図FIG. 68 is a cross-sectional configuration diagram showing a main part of moving means L of the same device.

【図69】第5の実施の形態に係る装置の側面図FIG. 69 is a side view of the device according to the fifth embodiment.

【図70】同装置を見る向きを変えて示す側面図FIG. 70 is a side view showing the same device with the viewing direction changed.

【図71】同装置の要部々分を示す平面図FIG. 71 is a plan view showing main parts of the apparatus.

【図72】同装置のタワーマストAの上部を示す平面図72 is a plan view showing the upper part of the tower mast A of the same apparatus. FIG.

【図73】同装置の昇降本体部の取付け状態の要部を水
平面で示す構成図
FIG. 73 is a block diagram showing the main part of the lifting and lowering main body part of the same apparatus in a mounted state in a horizontal plane

【図74】同装置の昇降本体部のクライミング部分を一
つの側面から見て示す要部側面図
FIG. 74 is a side view of a main portion showing the climbing portion of the elevating / lowering body portion of the same device as seen from one side surface.

【図75】同装置の昇降本体部のクライミング部分を他
の側面から見て示す要部側面図
[FIG. 75] A side view of the essential parts of the climbing portion of the elevating / lowering body portion of the same device as seen from the other side.

【図76】同装置の昇降本体部の要部の断面図FIG. 76 is a cross-sectional view of the main parts of the lifting / lowering main body of the same device.

【図77】同装置の昇降本体部の要部の他の部分を示す
断面図
77 is a cross-sectional view showing another part of the main part of the lifting / lowering main body of the same device. FIG.

【図78】同装置のブームの取付け部分の要部側面図FIG. 78 is a side view of a main part of a boom mounting portion of the same device.

【図79】同装置ののトリッパ装置を一つの面から見て
示す要部側面図
FIG. 79 is a side view of the essential parts showing the tripper device of the same device as seen from one side.

【図80】同装置のトリッパ装置を見る向きを変えて示
す要部の側面図
FIG. 80 is a side view of the essential part showing the tripper device of the same device with the viewing direction changed.

【図81】同装置のトリッパ装置を一部破断して示す要
部平面図
FIG. 81 is a plan view of essential parts showing the tripper device of the same device with a part thereof broken away;

【図82】同装置の容器状搬送具から容器状中継具に対
する生コンクリートの受け渡し部の要部を一つの側面か
ら見て示す構成図
FIG. 82 is a configuration diagram showing, from one side surface, a main part of a transfer part of fresh concrete from the container-shaped carrier of the same device to the container-shaped relay.

【図83】同装置のシュートの取付け部分の要部断面図FIG. 83 is a cross-sectional view of essential parts of a chute mounting portion of the same device.

【図84】同装置の容器状搬送具から容器状中継具に対
する生コンクリートの受け渡し部の要部を他の側面から
見て示す構成図
FIG. 84 is a configuration diagram showing a main part of a delivery part of ready-mixed concrete from the container-shaped carrier of the same apparatus to the container-shaped relay when viewed from another side.

【図85】同装置の容器状搬送具の開口部分の要部を一
つの側面から見て示す側面図
FIG. 85 is a side view showing the main part of the opening of the container-like carrier of the same apparatus as seen from one side.

【図86】同装置の容器状搬送具の開口部分の要部を他
の側面から見て一部を破断して示す側面図
FIG. 86 is a side view showing the main part of the opening of the container-like carrier of the same device as seen from the other side with a part broken away.

【図87】同装置に用いられる容器状中継具の一つを、
一つの側から見て示す側面図
FIG. 87 shows one of container-like relay tools used in the device,
Side view shown from one side

【図88】同装置に用いられる容器状中継具の一つを、
他の側から見て、一部を破断して示す側面図
88 is one of container-like relay tools used in the device, FIG.
A side view with part broken away, viewed from the other side

【図89】同装置を、上面から見て、一部を破断して示
す平面図
FIG. 89 is a plan view showing the same device as seen from above with a part broken away.

【図90】同装置に用いられる容器状中継具の他の一つ
を、一つの側から見て示す側面図
FIG. 90 is a side view showing another one of the container-like relay tools used in the same device as seen from one side.

【図91】同装置に用いられる容器状中継具の他の一つ
を、他の側から見て、一部を破断して示す側面図
FIG. 91 is a side view showing another one of the container-like relay tools used in the same device as seen from the other side with a part thereof broken away.

【図92】同装置に用いられる容器状中継具の他の一つ
を、上面から見て、一部を破断して示す平面図
FIG. 92 is a plan view showing another one of the container-like relays used in the same device, as seen from the top, with a part broken away.

【図93】同装置の容器状搬送具の取入れ状態を、上か
ら見て示す構成図
[Fig. 93] Fig. 93 is a configuration diagram showing the state of the container-shaped carrier of the same device taken in from above.

【図94】同装置に用いられる昇降搬送具の斜視図FIG. 94 is a perspective view of a lifting / lowering conveyance tool used in the apparatus.

【図95】同装置に用いられる昇降搬送具の側面図FIG. 95 is a side view of the lifting / lowering conveyance tool used in the apparatus.

【図96】同装置に用いられる昇降搬送具の断面図FIG. 96 is a cross-sectional view of a lifting / lowering transport tool used in the same device.

【図97】同装置に用いられる台車の側面図FIG. 97 is a side view of a trolley used in the device.

【図98】同装置に用いられる台車の一部を破断して示
す平面図
FIG. 98 is a plan view showing a trolley used in the apparatus by cutting away a part thereof.

【図99】第6の実施の形態に係る装置の一つを示す側
面図
FIG. 99 is a side view showing one of the devices according to the sixth embodiment.

【図100】第6の実施の形態に係る装置の他の一つを
示す側面図
FIG. 100 is a side view showing another one of the devices according to the sixth embodiment.

【符号の説明】[Explanation of symbols]

A タワ−マスト B 昇降本体部 C ブーム D 容器状搬送具 E 供給手段 F 生コンクリート G ベルトコンベヤ H トリッパ装置 J クレーン手段 K 昇降搬送具 L 移送手段 M 容器状中継具 N 回転部 P 受け入れ容器手段 A tower mast B lifting body C boom B container-like carrier E supply means F ready concrete G belt conveyor H tripper device J crane means K lifting carrier L transfer means M container-like relay N rotating part P receiving container means

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 タワーマストと、このタワーマストに昇
降可能に備えられている昇降本体部と、この昇降本体部
に旋回可能に備えられている一本のブーム又は連設され
た複数本のブームよりなるブームとを有し、 前記タワーマストには、生コンクリートの搬送に用いら
れる容器状搬送具が昇降可能に備えられていると共に、
前記ブームには、該容器状搬送具によって搬送された生
コンクリートの搬送用ベルトコンベヤが備えられてお
り、 且つ、前記一本のブームよりなるブームにあっては該ブ
ームに、前記連設された複数本のブームよりなるブーム
にあっては該ブ−ムにおける少なくとも前記昇降本体部
に対する取付け側にあるブームに、トリッパ装置が備え
られていると共に、 前記容器状搬送具には、この容器状搬送具によって搬送
される生コンクリートを、連続して定量的に送り出す供
給手段が備えられていることを特徴とする生コンクリー
トの移送装置。
1. A tower mast, an elevating and lowering main body part that can be moved up and down on the tower mast, and one boom or a plurality of booms that are connected to the elevating and lowering body part so as to be rotatable. With a boom consisting of, the tower mast is provided with a container-shaped transfer tool used to transfer ready-mixed concrete so as to be movable up and down,
The boom is equipped with a belt conveyor for transporting green concrete transported by the container-shaped transport tool, and in the case of a boom composed of the one boom, the boom is connected to the boom. In a boom composed of a plurality of booms, a tripper device is provided on at least the boom on the mounting side of the boom with respect to the elevating and lowering body portion, and the container-like carrier is provided with the tripper device. A transfer device for ready-mixed concrete, comprising a supply means for continuously and quantitatively supplying ready-mixed concrete conveyed by a tool.
【請求項2】 タワーマストと、このタワーマストに昇
降可能に備えられている昇降本体部と、この昇降本体部
に回転可能に備えられている回転部と、この回転部に備
えられている一本のブーム又は連設された複数本のブー
ムよりなるブームとを有し、 前記タワーマストには、
生コンクリートの搬送に用いられる容器状搬送具が昇降
可能に備えられていると共に、前記ブームには、該容器
状搬送具によって搬送された生コンクリートの搬送用ベ
ルトコンベヤが備えられており、 且つ、前記一本のブームよりなるブームにあっては該ブ
ームに、前記連設された複数本のブームよりなるブーム
にあっては該ブ−ムにおける少なくとも前記回転部に対
する取付け側にあるブームに、トリッパ装置が備えてあ
ると共に、 前記容器状搬送具には、この容器状搬送具によって搬送
される生コンクリートを、連続して定量的に送り出す供
給手段が備えられていることを特徴とする生コンクリー
トの移送装置。
2. A tower mast, an elevating and lowering main body part that is vertically movable in the tower mast, a rotating part that is rotatably provided in the elevating and lowering main body part, and one of the rotating parts. A boom consisting of a book boom or a plurality of booms connected in series, and the tower mast,
A container-like carrier used for carrying the ready-mixed concrete is provided so as to be able to move up and down, and the boom is provided with a belt conveyor for carrying the ready-mixed concrete carried by the container-like carrier, and A boom composed of the one boom is attached to the boom, and a boom composed of a plurality of booms connected to each other is attached to the boom at least on the side where the boom is attached to the rotating portion. Along with the device, the container-shaped carrier, the raw concrete carried by the container-shaped carrier, is provided with a supply means for continuously and quantitatively feeding the raw concrete, characterized in that Transfer device.
【請求項3】 回転可能に立設されているタワーマスト
と、このタワーマストに昇降可能に備えられている昇降
本体部と、この昇降本体部に備えられている一本のブー
ム又は連設された複数本のブームよりなるブームとを有
し、 前記タワーマストには、生コンクリートの搬送に用いら
れる容器状搬送具が昇降可能に備えられていると共に、
前記ブームには、該容器状搬送具によって搬送された生
コンクリートの搬送用ベルトコンベヤが備えられおり、 且つ、前記一本のブームよりなるブームにあっては該ブ
ームに、前記連設された複数本のブームよりなるブーム
にあっては該ブ−ムにおける少なくとも前記昇降本体部
に対する取付け側にあるブームに、トリッパ装置が備え
られていると共に、 前記容器状搬送具には、この容器状搬送具によって搬送
される生コンクリートを、連続して定量的に送り出す供
給手段が備えられていることを特徴とする生コンクリー
トの移送装置。
3. A tower mast rotatably erected, an elevating and lowering main body part capable of elevating and lowering on the tower mast, and a boom or a continuous body provided on the elevating and lowering main body part. And a boom composed of a plurality of booms, the tower mast is provided with a container-like carrier used for carrying the ready-mixed concrete so as to be able to move up and down,
The boom is provided with a belt conveyor for transporting green concrete transported by the container-shaped transport tool, and in the case of a boom composed of the one boom, a plurality of the booms connected to the boom are connected to the boom. In a boom composed of a book boom, a tripper device is provided on at least the boom on the mounting side of the boom with respect to the elevating and lowering body portion, and the container-shaped carrier has the container-shaped carrier. An apparatus for transferring ready-mixed concrete, comprising a supply means for continuously and quantitatively sending out ready-mixed concrete conveyed by.
【請求項4】 タワーマストと、このタワーマストに昇
降可能に備えられている昇降本体部と、この昇降本体部
に旋回可能に備えられている一本のブーム又は連設され
た複数本のブームよりなるブームとを有し、 前記タワーマストには、生コンクリートの搬送に用いら
れる容器状搬送具が昇降可能に備えられていると共に、
前記ブームには、該容器状搬送具によって搬送された生
コンクリートの搬送用ベルトコンベヤが備えられてお
り、 且つ、前記一本の前記ブームよりなるブームにあっては
該ブームに、前記連設された複数本のブームよりなるブ
ームにあっては該ブ−ムにおける少なくとも前記昇降本
体部に対する取付け側にあるブームに、トリッパ装置が
備えられていると共に、 前記昇降本体部又は前記ブームには、前記容器状搬送具
によって搬送される生コンクリートの受け入れ容器手段
と、この受け入れ生コンクリートを連続して定量的に送
り出す供給手段とを備えた容器状中継具が備えられてい
ることを特徴とする生コンクリートの移送装置。
4. A tower mast, an ascending / descending main body provided on the tower mast so as to be able to ascend / descend, and a boom or a plurality of consecutive booms provided on the ascent / descent main body so as to be rotatable. With a boom consisting of, the tower mast is provided with a container-shaped transfer tool used to transfer ready-mixed concrete so as to be movable up and down,
The boom is provided with a belt conveyor for transporting the green concrete transported by the container-shaped transport tool, and in the case of the boom composed of the one boom, the boom is connected to the boom. In a boom made up of a plurality of booms, at least the boom on the mounting side of the boom with respect to the lifting main body is provided with a tripper device, and the lifting main body or the boom includes A ready-mixed concrete comprising a container-like relay equipped with a container means for receiving fresh concrete conveyed by the container-like carrier and a supply means for continuously and quantitatively sending the received fresh concrete. Transfer device.
【請求項5】 タワーマストと、このタワーマストに昇
降可能に備えられている昇降本体部と、この昇降本体部
に回転可能に備えられている回転部と、この回転部に備
えられている一本のブーム又は連設された複数本のブー
ムよりなるブームとを有し、 前記タワーマストには、生コンクリートの搬送に用いら
れる容器状搬送具が昇降可能に備えられていると共に、
前記ブームには、該容器状搬送具によって搬送された生
コンクリートの搬送用ベルトコンベヤが備えられてお
り、 且つ、前記一本のブームよりなるブームにあっては該ブ
ームに、前記連設された複数本のブームよりなるブーム
にあっては該ブ−ムにおける少なくとも前記回転部に対
する取付け側にあるブームに、トリッパ装置が備えられ
ていると共に、 前記昇降本体部又は前記回転部又は前記ブームには、前
記容器状搬送具によって搬送される生コンクリートの受
け入れ容器手段と、この受け入れ生コンクリートを連続
して定量的に送り出す供給手段とを備えた容器状中継具
が備えられていることを特徴とする生コンクリートの移
送装置。
5. A tower mast, an elevating and lowering main body part that is vertically movable in the tower mast, a rotating part that is rotatably provided in the elevating and lowering main body part, and one of the rotating parts. It has a boom consisting of a book boom or a plurality of booms that are continuously provided, and the tower mast is provided with a container-like carrier used for carrying the ready-mixed concrete so as to be able to move up and down,
The boom is equipped with a belt conveyor for transporting green concrete transported by the container-shaped transport tool, and in the case of a boom composed of the one boom, the boom is connected to the boom. In a boom composed of a plurality of booms, a tripper device is provided on the boom at least on the mounting side of the boom with respect to the rotating portion, and the lifting main body portion, the rotating portion, or the boom is provided. And a container-like relay provided with a container means for receiving the fresh concrete conveyed by the container-like conveyer and a supply means for continuously and quantitatively sending the received fresh concrete. Transfer device for ready-mixed concrete.
【請求項6】 回転可能に立設されているタワーマスト
と、このタワーマストに昇降可能に備えられている昇降
本体部と、この昇降本体部に備えられている一本のブー
ム又は連設された複数本のブームよりなるブームとを有
し、 前記タワーマストには、生コンクリートの搬送に用いら
れる容器状搬送具が昇降可能に備えられていると共に、
前記ブームには、該容器状搬送具によって搬送された生
コンクリートの搬送用ベルトコンベヤが備えられてお
り、 且つ、前記一本のブームよりなるブームにあっては該ブ
ームに、前記連設された複数本のブームよりなるブーム
にあっては該ブ−ムにおける少なくとも前記昇降本体部
に対する取り付け側にあるブームに、トリッパ装置が備
えられていると共に、 前記昇降本体部又は前記ブームには、前記容器状搬送具
によって搬送される生コンクリートの受け入れ容器手段
と、この受け入れ生コンクリートを連続して定量的に送
り出す供給手段とを備えた容器状中継具が備えられてい
ることを特徴とする生コンクリートの移送装置。
6. A tower mast that is rotatably erected, an elevating main body part that can elevate and lower on the tower mast, and a boom or a continuous body that is provided on the elevating main body part. And a boom composed of a plurality of booms, the tower mast is provided with a container-like carrier used for carrying the ready-mixed concrete so as to be able to move up and down,
The boom is equipped with a belt conveyor for transporting green concrete transported by the container-shaped transport tool, and in the case of a boom composed of the one boom, the boom is connected to the boom. In a boom including a plurality of booms, at least a boom on the mounting side of the boom with respect to the elevating main body is provided with a tripper device, and the elevating main body or the boom includes the container. Of the ready-mixed concrete, which is provided with a container-like relay equipped with a receiving container means for the fresh concrete that is transported by the sheet-like carrier and a supply means that continuously and quantitatively sends the received fresh concrete. Transfer device.
JP7321265A 1994-11-22 1995-11-16 Ready-mixed concrete transfer equipment Expired - Lifetime JP3040338B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7321265A JP3040338B2 (en) 1994-11-22 1995-11-16 Ready-mixed concrete transfer equipment

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP31261494 1994-11-22
JP6-312614 1994-11-22
JP7321265A JP3040338B2 (en) 1994-11-22 1995-11-16 Ready-mixed concrete transfer equipment

Publications (2)

Publication Number Publication Date
JPH08209937A true JPH08209937A (en) 1996-08-13
JP3040338B2 JP3040338B2 (en) 2000-05-15

Family

ID=26567248

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7321265A Expired - Lifetime JP3040338B2 (en) 1994-11-22 1995-11-16 Ready-mixed concrete transfer equipment

Country Status (1)

Country Link
JP (1) JP3040338B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999011887A1 (en) * 1997-08-29 1999-03-11 Kabuki Construction Co., Ltd. Powder transfer apparatus and powder spraying method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999011887A1 (en) * 1997-08-29 1999-03-11 Kabuki Construction Co., Ltd. Powder transfer apparatus and powder spraying method
US6340278B1 (en) 1997-08-29 2002-01-22 Kabuki Construction Co., Ltd. Granule transfer apparatus and granule spreading method

Also Published As

Publication number Publication date
JP3040338B2 (en) 2000-05-15

Similar Documents

Publication Publication Date Title
WO1996016242A1 (en) Apparatus for transferring ready-mixed concrete
US5018923A (en) Automated bricklaying apparatus
US4033463A (en) Work-facilitating apparatus for lining converters, metallurgical furnaces, holding vessels and like equipment
US4360304A (en) Extendable crane trolley and method
US3777900A (en) Building crane
JPS62155490A (en) Device for lining inner wall of vessel by brick
US3866382A (en) Apparatus for supporting workmen within an open-ended vessel and carrying materials into and out of the vessel, and method of installing such apparatus in a vessel
US3955685A (en) Apparatus for lining a furnace
US3679071A (en) Apparatus for use in lining vessels
JP3040338B2 (en) Ready-mixed concrete transfer equipment
US3853204A (en) Apparatus for and methods of lining a furnace
JP4518982B2 (en) Brick arranging apparatus and method for converter
CN219409006U (en) TBM construction material conveyer
EP2096073A1 (en) Improvements in or relating to lifting apparatus
JP3718783B2 (en) Horizontal jib crane and traveling horizontal jib crane
JPH042130B2 (en)
JPH1150665A (en) Vertical weight lifting device for form material and pipe support
JPH02132091A (en) Cargo unloading device for elevator
FI127366B (en) METHOD FOR MOVING THE PIECES TO A FINISHING MILL
JP2645783B2 (en) Assembly structure of work deck of tower equipment
JP2000160538A (en) Concrete carrying device
JP2558180Y2 (en) Furnace tower equipment with outriggers on top
JPH0421712A (en) Apparatus for repairing furnace in converter
SU691386A1 (en) Hoisting vehicle
JPH05116887A (en) Vertical and horizontal carrier device for load

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080303

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090303

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110303

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110303

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120303

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130303

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140303

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term