JPH06272495A - Construction method of tunnel - Google Patents
Construction method of tunnelInfo
- Publication number
- JPH06272495A JPH06272495A JP5084137A JP8413793A JPH06272495A JP H06272495 A JPH06272495 A JP H06272495A JP 5084137 A JP5084137 A JP 5084137A JP 8413793 A JP8413793 A JP 8413793A JP H06272495 A JPH06272495 A JP H06272495A
- Authority
- JP
- Japan
- Prior art keywords
- lining form
- tunnel
- lining
- plates
- form plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、トンネル構築工法、
特にプレキャストコンクリート板と現場打ちコンクリー
トを併用して開削工法により構築する工法に関するもの
である。This invention relates to a tunnel construction method,
In particular, it relates to a construction method that uses a precast concrete plate and cast-in-place concrete in combination to construct by an open-cut construction method.
【0002】[0002]
【従来の技術】従来、開削工法によりトンネルを構築す
る工法として、一般に、内型枠と外型枠を配置してその
間に配筋した上で現場打ちコンクリートを打設する工法
が実施されている。2. Description of the Related Art Conventionally, as a method of constructing a tunnel by an excavation method, a method of arranging an inner mold and an outer mold, placing reinforcement between them, and then pouring a cast-in-place concrete is generally carried out. .
【0003】この現場打ちによる型枠工法では、型枠と
してバラセントルを使用する場合、内外の型枠の組立及
び解体に多大の日時と労力を要すると共に、型枠保持に
支保材を必要とするため、コンクリートが硬化して型枠
を解体するまでトンネル内の各種の作業が行えないこと
から、工期が長くなるという欠点がある。[0003] In this form-casting method using cast-in-place, when using a balacentre as a form, a great deal of time and labor is required for assembling and disassembling the inner and outer forms, and a supporting material is required for holding the form. However, various work inside the tunnel cannot be performed until the concrete hardens and the formwork is dismantled, so there is a drawback that the construction period becomes long.
【0004】また、型枠としてスライドセントルを使用
する場合も、工区単位でとびとびに施工するとき、その
都度セントルの解体、移動、組立作業が伴うため、多大
の工期と工費を要するという問題を生ずると共に、全長
の短いトンネルでは型枠費が割高となるという欠点があ
る。Further, even when a slide centle is used as a formwork, when the construction is carried out in each of the construction sections, there is a problem that a large amount of construction period and construction cost are required because the centle is disassembled, moved and assembled. At the same time, there is a disadvantage that the form cost is high in a tunnel with a short total length.
【0005】一方従来、複数の円弧型のプレキャストコ
ンクリート覆工板をリング状に組立てることにより、工
期を短くしてトンネルを構築する工法も知られている
が、埋め戻し土砂の土被り圧に耐力のある覆工板を製造
するためにはコストが高く、工費が膨大となる。On the other hand, conventionally, a method of constructing a tunnel by assembling a plurality of arc-shaped precast concrete lining boards in a ring shape to shorten the construction period is also known, but it is resistant to the overburden pressure of backfill soil. The cost is high and the construction cost is enormous in order to manufacture a lining plate with a ridge.
【0006】[0006]
【発明が解決しようとする課題】この発明は、上記現場
打ちによる型枠工法では多大の工期と工費を要する上に
作業効率も悪いという欠点と、プレキャストコンクリー
ト覆工板による工法では覆工板の製造に多大のコストを
要するという課題を解決することにある。DISCLOSURE OF THE INVENTION The present invention is disadvantageous in that the above-mentioned in-situ formwork construction method requires a great deal of construction time and cost, and that the working efficiency is poor. It is to solve the problem that a large cost is required for manufacturing.
【0007】[0007]
【課題を解決するための手段】この発明は、トンネル上
半アーチ部の内周部分を円弧方向に複数に分割した形態
で、それ自体にコンクリートの充填圧による剪断力や曲
げ等の外力に対してほとんど耐力を保有しないが、外力
が作用しないときにはその形態を維持して容易に折損し
ない程度に極薄肉のPC覆工型枠板1,1,1’の外周
面に、その円弧方向に沿って型鋼からなる補強鋼材6を
連結鋼材7を介して取付け、地盤を開削してその底部に
構築したトンネル下半部の溝型断面のインバート部13
に、構築すべきトンネルのアーチ形状に沿ってPC覆工
型枠板1,1,1’を支持するための支受材15,1
5’をジャッキにより伸縮自在に設置した仮受け組立架
台14を移動走行自在に設置し、この仮受け組立架台1
4において前記PC覆工型枠板1,1,1’をアーチ型
に組立ててインバート部13の両側部上に載置固定する
と共に、このリング方向に隣接するPC覆工型枠板1,
1,1’に取付けた補強鋼材の隣接端部同士を接合一体
化し、PC覆工型枠板1,1,1’の外周部に一連に鉄
筋26を配筋した後、その外側にアーチ型に外型枠29
を組立て、この外型枠29とPC覆工型枠板1,1,
1’との間隙に現場打ちコンクリートを注入充填し、そ
の養生硬化後において外型枠29を脱型する工程を順次
前記仮受け組立架台14を前進移動させながら連続する
ようにしたトンネル構築工法を提案するものである。According to the present invention, an inner peripheral portion of an upper half arch portion of a tunnel is divided into a plurality of parts in an arc direction, and the inner portion of the upper half arch portion itself is subjected to an external force such as a shearing force or bending due to a filling pressure of concrete. Although it has almost no proof strength, it maintains its shape when external force does not act and it is easy to break and it is along the arc direction on the outer peripheral surface of the extremely thin PC lining form plate 1, 1, 1 '. A reinforcing steel material 6 made of a vertical section steel is attached via a connecting steel material 7, the ground is excavated, and the invert portion 13 of the groove-shaped cross section of the lower half of the tunnel is constructed at the bottom of the ground.
And support members 15, 1 for supporting the PC lining formwork plates 1, 1, 1 ′ along the arch shape of the tunnel to be constructed.
A temporary receiving and assembling base 14 having a 5'extendable and retractable by a jack is installed so that it can move freely.
4, the PC lining form plates 1, 1, 1 ′ are assembled in an arch shape to be placed and fixed on both sides of the invert portion 13, and the PC lining form plates 1, which are adjacent to each other in the ring direction.
Adjacent ends of reinforcing steel materials attached to 1, 1'are joined and integrated, and after reinforcing bars 26 are arranged in series on the outer periphery of the PC lining form plate 1, 1, 1 ', an arch shape is formed on the outside. Outer formwork 29
Assemble the outer mold 29 and the PC lining mold plate 1, 1,
A tunnel construction method in which the step of pouring and filling in-situ concrete into the gap with 1'and removing the outer formwork 29 after curing and hardening it is continued while sequentially moving the temporary receiving assembly frame 14 forward It is a proposal.
【0008】[0008]
【作用】PC覆工型枠板1,1,1’を内型枠代わりと
するため、これと外型枠間に充填した現場打ちコンクリ
ートと一体化して養生硬化した後には、内型枠の脱型作
業が不要として工期が短縮され、脱型に要する工費と労
力も削減できる。Since the PC lining form plate 1, 1, 1'is used as an inner formwork, it is integrated with the cast-in-place concrete filled between it and the outer formwork, and after curing and hardening, the inner formwork The time required for demolding is shortened and the construction cost and labor required for demolding can be reduced.
【0009】またPC覆工型枠板1,1,1’は、補強
鋼材6の取付け後には型枠として自立することができる
ため、組立てたPC覆工型枠板1,1,1’の保持に支
保材を要せず、トンネル内空を早期に開放して内部の各
種作業を進行することが可能となる。Further, since the PC-covered formwork plates 1, 1, 1'can stand on their own as a formwork after the reinforcing steel material 6 is attached, the assembled PC-covered formwork plates 1, 1, 1 ' It does not require a supporting material for holding, and it is possible to open the inside of the tunnel early and proceed with various internal works.
【0010】PC覆工型枠板1,1,1’はそれ自体で
はコンクリートの充填圧に耐力を保持しない程度に薄肉
に成形されるため、製造コストや運搬コストを低減して
経済的にトンネルを構築することができ、またアーチ型
に組立てる際にはその外周に取付けた補強鋼材6により
コンクリートの充填圧に充分耐える耐力が保持されると
共に、PC覆工型枠板1,1,1’同志を剛結する必要
がないため、容易に分離しない程度に簡単な継手で連結
すればよく、特にピンヒンジでは不静定構造となる場合
においても剛結した補強鋼材で安定させるため、PC覆
工型枠板1,1,1’の接合作業を簡易化することがで
きる。Since the PC lining form plates 1, 1, 1'are formed so thin that they do not maintain the proof stress against the filling pressure of concrete by themselves, the manufacturing cost and transportation cost are reduced and the tunnel is economically manufactured. In addition, the reinforcing steel material 6 attached to the outer periphery of the arc-shaped structure maintains sufficient proof stress to withstand the filling pressure of concrete, and the PC lining form plates 1, 1, 1 ' Since it is not necessary to rigidly connect each other, it is only necessary to connect them with a simple joint that does not easily separate, and even when a pin hinge has a statically indeterminate structure, it is stabilized with a rigidly connected reinforcing steel material, so PC lining It is possible to simplify the work of joining the formwork plates 1, 1, 1 '.
【0011】[0011]
【実施例】予め工場において、トンネル上半アーチ部の
内周部分を円弧方向に複数に分割した形態の(実施例で
は3分割)極薄肉のプレキャストコンクリート覆工型枠
板(以下PC覆工型枠板という)1,1,1’を製作
し、これらを現場近くの地組ヤードに搬入する。[Example] In a factory, an extremely thin precast concrete lining form plate (hereinafter referred to as PC lining type) in which the inner circumferential portion of the upper half arch portion of the tunnel was divided into a plurality of parts in the arc direction in advance (3 divisions in the example) Produce 1, 1, 1'frame board) and bring these to the ground yard near the site.
【0012】PC覆工型枠板1,1,1’は、それ自体
にコンクリートの充填圧による剪断力や曲げ等の外力に
対してほとんど耐力を保有しないが、外力が作用しない
ときにはその形態を維持して容易に折損しない程度に薄
肉に成形され、側壁部のPC覆工型枠板1と天端部のP
C覆工型枠板1’との相互の接合端部には図4〜図6に
示すように、互いに相対して噛み合い結合する櫛歯型の
凹凸継手2,3が形成されており、この凹凸継手2,3
の凸部には相互の噛合時にトンネル軸線方向に互いに一
連に連通する通孔4,5が明けられている。The PC lining formwork plates 1, 1, 1'have almost no proof strength against external force such as shearing force and bending due to the filling pressure of concrete, but when the external force does not act, its form is changed. Molded to be thin enough to maintain and not break easily, PC lining form plate 1 on the side wall and P on the top end
As shown in FIGS. 4 to 6, comb-shaped concave and convex joints 2 and 3 are formed at the joint ends with the C lining form plate 1 ′ so as to face each other and engage with each other. Concavo-convex joint 2, 3
Through holes 4 and 5 are formed in the convex portions of the above so as to communicate with each other in series in the tunnel axis direction when meshing with each other.
【0013】そして地組ヤードにおいて図1及び図2に
示すように、各PC覆工型枠板1,1’には、その外周
面(アーチ外周側)に円弧方向に沿ってH型鋼等の剛性
の高い補強鋼材6をその長手方向に波型状に連続して配
した連結鋼材7を介して取付ける。As shown in FIGS. 1 and 2, in the ground yard, each PC lining form plate 1, 1 ′ has an H-shaped steel or the like on its outer peripheral surface (outer arch side) along the arc direction. The reinforcing steel material 6 having high rigidity is attached via the connecting steel material 7 continuously arranged in a wave shape in the longitudinal direction.
【0014】連結鋼材7は例えば図2、図3に示すよう
に、正面からみた形状が略V型状をなす帯鋼板からな
り、その左右に広がる斜面部分の端部にはボルト挿通孔
8を明けた固定片9が横向きに突設され、先細状をなす
底端部分にはボルト挿通孔8’を明けた固定板9’が設
けられている。As shown in FIGS. 2 and 3, for example, the connecting steel member 7 is made of a strip steel plate having a substantially V-shaped shape when viewed from the front, and a bolt insertion hole 8 is formed at the end of the slope portion that spreads to the left and right. The opened fixing piece 9 is projected laterally, and a fixing plate 9 ′ having a bolt insertion hole 8 ′ is provided at the bottom end portion having a tapered shape.
【0015】この連結鋼材7は、その固定片9,9を補
強鋼材6のフランジ等の底面の一側にボルト・ナット1
0により締結し、また固定片9’をPC覆工型枠板1,
1’の外周面にこれに埋設したインサート11にねじ込
んだボルト12により締結して補強鋼材6をPC覆工型
枠板1,1’に一体化し、同様にして連結鋼材7を順次
補強鋼材6の長手方向に沿って連続的に、しかも図3に
示すように交互に左右に若干位置をずらして取付ける。In this connecting steel material 7, the fixing pieces 9 and 9 are attached to one side of the bottom surface of the flange or the like of the reinforcing steel material 6 by the bolts and nuts 1.
0, and the fixing piece 9'to the PC lining form plate 1,
1'is fastened with bolts 12 screwed into inserts 11 embedded in the outer peripheral surface of the 1'to integrate the reinforcing steel material 6 with the PC lining formwork plates 1, 1 ', and in the same manner, the connecting steel material 7 is sequentially reinforced steel material 6 Are mounted continuously along the longitudinal direction of the plate, and alternately as shown in FIG.
【0016】このようにして補強鋼材6を取付けたPC
覆工型枠板1,1’をトンネル構築現場に順次搬入す
る。A PC with the reinforcing steel member 6 attached in this way
The lining form plates 1 and 1'are brought into the tunnel construction site in sequence.
【0017】なお、補強鋼材6及び連結鋼材7は、この
実施例に限ることなく他の形状構造のものを用いること
ができる。The reinforcing steel material 6 and the connecting steel material 7 are not limited to those in this embodiment, and other shapes and structures can be used.
【0018】一方、PC覆工型枠板1,1’を搬入する
トンネル構築現場においては、地盤を開削して予めトン
ネル下半部の溝型断面のインバート部13を現場打ち型
枠工法により構築しておき、このインバート部13に図
9及び図10に示すように仮受け組立架台14を移動走
行自在に設置する。On the other hand, in the tunnel construction site where the PC lining formwork plates 1 and 1'are carried in, the ground is excavated and the invert portion 13 of the groove section in the lower half of the tunnel is constructed in advance by the site casting formwork method. Then, the temporary receiving and assembling base 14 is installed on the inversion portion 13 so as to be movable and movable as shown in FIGS. 9 and 10.
【0019】仮受け組立架台14は、その上部両側に横
に複数枚並べたPC覆工型枠板1を構築すべきトンネル
のアーチ形状に沿って支持するための支受材15,1
5’がジャッキにより伸縮自在に設置されている。The temporary receiving and assembling base 14 is a support member 15, 1 for supporting a plurality of PC lining form plates 1 horizontally arranged on both sides of the upper part thereof along the arch shape of the tunnel to be constructed.
5'is installed by a jack so that it can expand and contract.
【0020】そして先ず図11に示すように、アーチ側
壁部のPC覆工型枠板1を仮受け組立架台14の両側に
横に複数枚並べて支持させながらインバート部13の両
側壁13’上に建込み、その下端を高さ調節ボルト16
で調節した上で側壁13’の上端に目地コーキング材1
7を介して載置し、また補強鋼材6はアングル型の接合
金物18を介してボルト19,19’により側壁13’
の上端に固定する。First, as shown in FIG. 11, a plurality of PC lining form plates 1 on the side wall of the arch are laterally arranged on both sides of the temporary receiving and assembling base 14 and supported on both side walls 13 'of the invert portion 13. Built-in, the lower end of which is a height adjustment bolt 16
Adjust the joint with the joint 13 on the top of the side wall 13 '.
7, and the reinforcing steel material 6 is mounted on the side wall 13 'by bolts 19 and 19' via the angle-type joint metal 18.
Secure to the top of.
【0021】横に複数枚並べたPC覆工型枠板1,1相
互は図4に示すように、その外周側の境界部分に跨って
複数のリング間継手板20を添接し、両端部をボルト2
1で締結することにより連結する。As shown in FIG. 4, a plurality of PC lining form plates 1 and 1 arranged side by side are spliced with a plurality of inter-ring joint plates 20 across the boundary part on the outer peripheral side thereof, and both end parts are connected. Bolt 2
Connect by fastening with 1.
【0022】次に図12に示すように、仮受け組立架台
14の両側に支持されたPC覆工型枠板1,1間に天端
部のPC覆工板1’を吊り込み、図6に示すように両側
接合端の凹凸継手2,3を噛み合わせた状態で相互に一
連に連通する通孔4,5にPC鋼棒22を通して連結す
ると共に、リング方向に隣接するPC覆工型枠板1,
1’相互の外周側の境界部分に跨って複数のパネル間継
手板23を添接し、両端部をボルト24で締結すること
により連結する。Next, as shown in FIG. 12, the PC lining plate 1 ′ at the top end is hung between the PC lining form plates 1 and 1 supported on both sides of the temporary receiving and assembling base 14, and FIG. As shown in Fig. 4, PC concave and convex joints 2 and 3 at both joint ends are connected through PC steel rods 22 to through holes 4 and 5 that communicate with each other in a state of being meshed with each other, and PC lining form frames adjacent to each other in the ring direction. Board 1,
A plurality of inter-panel joint plates 23 are spliced across the boundary portions on the outer peripheral side of each other 1 ', and both ends are fastened with bolts 24 to connect them.
【0023】さらに、リング方向に隣接するPC覆工型
枠板1,1’に取付けた補強鋼材6,6同士はその端部
を突き合わせた状態で継手板等を介して接合一体化し、
これによってアーチ状に組立てられた薄肉のPC覆工型
枠板1,1,1’はアーチ型に接合一体化された補強鋼
材6に強力に支えられて剪断力や曲げなどの外力に耐力
を保持する板体構造となる。Further, the reinforcing steel members 6 and 6 attached to the PC lining formwork plates 1 and 1'adjacent to each other in the ring direction are joined and integrated through a joint plate or the like with their ends abutted,
As a result, the thin-walled PC lining form plates 1, 1, 1'assembled in the shape of an arch are strongly supported by the reinforcing steel member 6 joined and integrated in the shape of an arch to withstand the external force such as shearing force and bending. It becomes a plate structure to hold.
【0024】この状態で仮受け組立架台14を前方に走
行移動させると共に、図13に示すようにPC覆工型枠
板1,1,1’の外周部に足場25を仮設し、この足場
25上においてPC覆工型枠板1,1,1’の外周部に
一連に鉄筋26を配筋し、またリング方向及びリング間
方向に隣接する各PC覆工型枠板1,1’間の目地部に
防水処理を施す。In this state, the temporary receiving and assembling platform 14 is moved forward, and as shown in FIG. 13, a scaffold 25 is temporarily installed on the outer peripheral portion of the PC lining form plates 1, 1, 1 ', and this scaffold 25 is used. Reinforcing bars 26 are continuously arranged on the outer peripheral portion of the PC lining form plates 1, 1, 1 ′ above, and between the PC lining form plates 1, 1 ′ adjacent in the ring direction and the inter-ring direction. Waterproof the joints.
【0025】インバート部13の両側壁13’上には図
7、図8に示すように鉄筋26の下端部にラップさせる
鉄筋27を突設しておき、これにPC覆工型枠板1の下
端部の外周面に突設した鉄筋28を溶接して連結するこ
とにより、側壁13’の上方部分に打設するコンクリー
トに対してPC覆工型枠板1と側壁13’とを確実に固
結一体化させることが可能となる。On both side walls 13 'of the invert portion 13, as shown in FIGS. 7 and 8, a reinforcing bar 27 to be wrapped around the lower end of the reinforcing bar 26 is provided in a projecting manner, and the reinforcing bar 27 of the PC lining form plate 1 is attached to this. By welding and connecting the reinforcing bars 28 projecting from the outer peripheral surface of the lower end portion, the PC-covered formwork plate 1 and the side wall 13 'can be firmly fixed to the concrete placed in the upper portion of the side wall 13'. It becomes possible to integrate them.
【0026】鉄筋26の配筋後図14に示すように、そ
の外側に両側壁13’,13’間に跨ってアーチ型に外
型枠29を組立て、この外型枠29と、トンネル内壁及
び内型枠を兼用するPC覆工型枠板1,1,1’との間
隙内に現場打ちコンクリート30を注入充填し、その養
生硬化後において外型枠29を脱型する。After the reinforcing bars 26 have been laid out, as shown in FIG. 14, an outer form frame 29 is assembled on the outside between the side walls 13 ', 13' in an arch shape, and the outer form frame 29, the tunnel inner wall and The cast-in-place concrete 30 is poured and filled into the gap between the PC lining form plate 1, 1, 1'which also serves as the inner form, and after the curing and curing, the outer form 29 is demolded.
【0027】以上の工程を順次連続して図15に示すよ
うなPC覆工型枠板1,1,1’と現場打ちコンクリー
ト30とを一体化したトンネルを構築した後、その上に
土砂を埋め戻して施工を完了する。After constructing a tunnel in which the PC lining form plates 1, 1, 1'and the cast-in-place concrete 30 are integrated as shown in FIG. Backfill to complete the construction.
【0028】[0028]
【発明の効果】以上の通りこの発明によれば、PC覆工
型枠板を内型枠代わりとするので、これと外型枠間に充
填した現場打ちコンクリートが一体化して養生硬化した
後に内型枠を脱型する作業が不要となり、それだけ工期
を短縮できると共に、脱型に要する工費と労力を削減す
ることが可能となる。As described above, according to the present invention, since the PC lining form plate is used as the inner formwork, the cast-in-place concrete filled between this and the outer formwork is integrally cured and hardened. The work of demolding the mold becomes unnecessary, and the construction period can be shortened accordingly, and the construction cost and labor required for demolding can be reduced.
【0029】またPC覆工型枠板は、補強鋼材の取付け
後には型枠として自立することができるので、組立てた
PC覆工型枠板の保持に支保材を要せず、トンネル内空
を早期に開放して内部の各種作業を行うことが可能とな
る。Further, since the PC-covered formwork plate can stand as a formwork after mounting the reinforcing steel material, no supporting material is required to hold the assembled PC-covered formwork plate, and the space inside the tunnel can be maintained. It becomes possible to open it early and perform various internal work.
【0030】PC覆工型枠板はそれ自体ではコンクリー
トの充填圧に耐力を保持しない程度に薄肉に成形するの
で、製造コストや運搬コストを低減して経済的にトンネ
ルを構築することができ、またアーチ型に組立てる際に
はその外周に取付けた補強鋼材によりコンクリートの充
填圧に充分耐える耐力を保持できると共に、PC覆工型
枠板同志を剛結する必要がないため、容易に分離しない
程度に簡単な継手で連結すればよく、特にピンヒンジで
は不静定構造となる場合においても剛結した補強鋼材で
安定するので、PC覆工型枠板の接合作業を簡易化する
ことができる。Since the PC lining form plate itself is formed so thin that it does not maintain the proof stress against the filling pressure of concrete, it is possible to economically construct a tunnel by reducing manufacturing costs and transportation costs. Also, when assembling into an arch shape, the reinforcing steel material attached to the outer periphery can maintain the proof strength to withstand the filling pressure of concrete sufficiently, and it is not necessary to rigidly connect the PC lining form plate members together, so it is not easily separated. It is only necessary to connect with a simple joint, and especially in the case where the pin hinge has a statically indeterminate structure, the reinforcing steel material that is rigidly connected stabilizes, so that the work of joining the PC lining form plate can be simplified.
【図1】この発明の施工状態を左右異なる態様で示す縦
断正面図。FIG. 1 is a vertical sectional front view showing a construction state of the present invention in left and right different modes.
【図2】この発明に係る補強鋼材取付状態を示すPC覆
工型枠板の部分縦断側面図。FIG. 2 is a partial vertical cross-sectional side view of a PC lining form plate showing a reinforcing steel material mounting state according to the present invention.
【図3】この発明に係るに補強鋼材に対する連結鋼材の
取付配置状態を示す平面図。FIG. 3 is a plan view showing a mounting arrangement state of a connecting steel material with respect to a reinforcing steel material according to the present invention.
【図4】この発明に係るPC覆工型枠板の組立状態を示
す平面図。FIG. 4 is a plan view showing an assembled state of the PC lining form plate according to the present invention.
【図5】この発明に係るPC覆工型枠板の連結状態を示
す部分正面図。FIG. 5 is a partial front view showing a connected state of the PC lining form plate according to the present invention.
【図6】この発明に係るPC覆工型枠板の連結状態を示
す部分平面図。FIG. 6 is a partial plan view showing a connected state of the PC lining form plate according to the present invention.
【図7】この発明におけるPC覆工型枠板のインバート
部への設置状態を示す部分縦断正面図。FIG. 7 is a partial vertical cross-sectional front view showing the installation state of the PC lining form plate in the invert section in the present invention.
【図8】この発明におけるPC覆工型枠板のインバート
部への設置状態を示す部分横断平面図。FIG. 8 is a partial cross-sectional plan view showing the installation state of the PC lining form plate in the invert section in the present invention.
【図9】この発明の施工状態を示す縦断正面図。FIG. 9 is a vertical sectional front view showing a construction state of the present invention.
【図10】この発明の施工状態を示す縦断側面図。FIG. 10 is a vertical sectional side view showing a construction state of the present invention.
【図11】この発明の施工状態を示す縦断正面図。FIG. 11 is a vertical sectional front view showing a construction state of the present invention.
【図12】この発明の施工状態を示す縦断正面図。FIG. 12 is a vertical sectional front view showing a construction state of the present invention.
【図13】この発明の施工状態を示す縦断正面図。FIG. 13 is a vertical sectional front view showing a construction state of the present invention.
【図14】この発明の施工状態を示す縦断正面図。FIG. 14 is a vertical sectional front view showing a construction state of the present invention.
【図15】この発明の施工状態を示す縦断正面図。FIG. 15 is a vertical sectional front view showing a construction state of the present invention.
1 PC覆工型枠板 1’ PC覆工型枠板 2 凹凸継手 3 凹凸継手 4 通孔 5 通孔 6 補強鋼材 7 連結鋼材 8 ボルト挿通孔 8’ ボルト挿通孔 9 固定片 9’ 固定片 10 ボルト・ナット 11 インサート 12 ボルト 13 インバート部 13’ 側壁部 14 仮受け組立架台 15 支受材 16 高さ調節ボルト 17 目地コーキング材 18 接合金物 19 ボルト 20 リング間継手板 21 ボルト 22 PC鋼棒 23 パネル間継手板 24 ボルト 25 足場 26 鉄筋 27 鉄筋 28 鉄筋 29 外型枠 1 PC lining form plate 1'PC lining form plate 2 Concavo-convex joint 3 Concavo-convex joint 4 Through hole 5 Through hole 6 Reinforcing steel material 7 Connecting steel material 8 Bolt insertion hole 8 'Bolt insertion hole 9 Fixing piece 9' Fixing piece 10 Bolts and nuts 11 Inserts 12 Bolts 13 Inverts 13 'Side walls 14 Temporary receiving assembly frames 15 Supporting materials 16 Height adjusting bolts 17 Joint caulking materials 18 Joining hardware 19 Bolts 20 Ring joint plates 21 Bolts 22 PC steel bars 23 Panels Inter-joint plate 24 Bolt 25 Scaffold 26 Reinforcing bar 27 Reinforcing bar 28 Reinforcing bar 29 Outer formwork
───────────────────────────────────────────────────── フロントページの続き (72)発明者 福岡 啓内 大阪府大阪市此花区伝法4丁目3番55号 株式会社鴻池組内 (72)発明者 坂口 武 大阪府大阪市此花区伝法4丁目3番55号 株式会社鴻池組内 (72)発明者 門屋 智 東京都港区芝4丁目2番3号 日本プレス コンクリート株式会社内 (72)発明者 大澤 廣 新潟県新潟市弁天橋通1丁目8番23号 日 本サミコン株式会社内 (72)発明者 白岩 督啓 東京都港区新橋1丁目8番3号 日本コン クリート工業株式会社内 (72)発明者 岡山 勝 東京都港区新橋1丁目8番3号 日本コン クリート工業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Fukuoka Keinai, Osaka City, Osaka City, Konohana Ward, 4-chome, No. 3 55 Konoikegumi Co., Ltd. (72) Inventor, Takeshi Sakaguchi, Osaka City, Osaka City, Konohana, Ward No. 55 Konoike Gumi Co., Ltd. (72) Inventor Satoshi Kadoya 4 2-3 Shiba, Minato-ku, Tokyo Japan Press Concrete Co., Ltd. (72) Inventor Hiro Osawa 1-8-23 Bentenbashi Dori, Niigata City, Niigata Prefecture Nihon Samicon Co., Ltd. (72) Inventor Masahiro Shiraiwa 1-8-3 Shimbashi, Minato-ku, Tokyo Inside Japan Concrete Industries Co., Ltd. (72) Inventor Masaru Okayama 1-3-8 Shimbashi, Minato-ku, Tokyo Within Japan Concrete Industry Co., Ltd.
Claims (1)
方向に複数に分割した形態で、それ自体にコンクリート
の充填圧による剪断力や曲げ等の外力に対してほとんど
耐力を保有しないが、外力が作用しないときにはその形
態を維持して容易に折損しない程度に極薄肉のPC覆工
型枠板の外周面に、その円弧方向に沿って型鋼からなる
補強鋼材を連結鋼材を介して取付け、地盤を開削してそ
の底部に構築したトンネル下半部の溝型断面のインバー
ト部に、構築すべきトンネルのアーチ形状に沿って前記
PC覆工型枠板を支持するための支受材をジャッキによ
り伸縮自在に設置した仮受け組立架台を移動走行自在に
設置し、この仮受け組立架台において前記PC覆工型枠
板をアーチ型に組立てて前記インバート部の両側部上に
載置固定すると共に、このリング方向に隣接するPC覆
工型枠板に取付けた補強鋼材の隣接端部同士を接合一体
化し、前記PC覆工型枠板の外周部に一連に鉄筋を配筋
した後、その外側にアーチ型に外型枠を組立て、外型枠
とPC覆工型枠板との間隙に現場打ちコンクリートを注
入充填し、その養生硬化後において外型枠を脱型する工
程を順次前記仮受け組立架台を前進移動させながら連続
することを特徴とするトンネル構築工法。1. An inner peripheral portion of an upper half arch portion of a tunnel is divided into a plurality of portions in an arc direction, and has almost no proof strength against an external force such as a shearing force or a bending due to a filling pressure of concrete, When the external force does not act, the reinforcing steel material made of the shape steel is attached along the arc direction to the outer peripheral surface of the PC lining form plate of ultra-thin wall so as not to break easily while maintaining its shape, through the connecting steel material, A jack for supporting the PC lining form plate along the arch shape of the tunnel to be constructed at the invert part of the groove type cross section of the lower half of the tunnel constructed by excavating the ground on the bottom of the jack. The tentative receiving assembly cradle is installed so as to be extendable and retractable, and the PC lining form plate is assembled in an arch shape on the temporary receiving assembler to be mounted and fixed on both sides of the invert section. , The adjacent ends of the reinforcing steel materials attached to the PC lining form plates adjacent to each other in the ring direction are joined and integrated, and the reinforcing bars are arranged in series on the outer peripheral part of the PC lining form plate, and then the outside thereof. The process of assembling the outer mold into an arch shape, pouring and filling in-situ concrete into the gap between the outer mold and the PC lining form plate, and demolding the outer mold after curing and hardening it in sequence A tunnel construction method characterized by continuing the assembly frame while moving forward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP08413793A JP3188342B2 (en) | 1993-03-18 | 1993-03-18 | Tunnel construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP08413793A JP3188342B2 (en) | 1993-03-18 | 1993-03-18 | Tunnel construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06272495A true JPH06272495A (en) | 1994-09-27 |
JP3188342B2 JP3188342B2 (en) | 2001-07-16 |
Family
ID=13822114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP08413793A Expired - Fee Related JP3188342B2 (en) | 1993-03-18 | 1993-03-18 | Tunnel construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3188342B2 (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09189198A (en) * | 1995-11-07 | 1997-07-22 | Taisei Corp | Lining method of tunnel |
JP2000513773A (en) * | 1995-11-17 | 2000-10-17 | キアヴェス,カルロ | Underground structure for constructing tunnel, underground passage, underground parking lot, etc., method of constructing the same, and prefabricated member for the structure |
JP2001323797A (en) * | 2000-05-12 | 2001-11-22 | Yoshiji Matsumoto | Tunnel lining reinforcing structure using segment with non-uniform section, and method for constructing the same |
CN102146798A (en) * | 2011-03-02 | 2011-08-10 | 中国土木工程集团有限公司 | Arch ring lining trolley for additionally building open cut tunnel on electrified railway business line and construction method of arch ring lining trolley |
JP2015214853A (en) * | 2014-05-12 | 2015-12-03 | 大成建設株式会社 | Tunnel lining method |
JP2016003531A (en) * | 2014-06-19 | 2016-01-12 | ジオスター株式会社 | Box culvert |
CN105401594A (en) * | 2015-12-08 | 2016-03-16 | 中交四公局第一工程有限公司 | Underground comprehensive pipe gallery lining trolley |
CN108979666A (en) * | 2018-07-11 | 2018-12-11 | 河北工程大学 | A kind of method of steel tube concrete pile control Floor Heave in Roadway |
CN109056548A (en) * | 2018-09-19 | 2018-12-21 | 中交二公局第六工程有限公司 | A kind of steel arch frame construction method |
CN110130929A (en) * | 2019-06-14 | 2019-08-16 | 贵州省水利水电勘测设计研究院 | A kind of protective device of rock burst geology hole section safe construction |
CN110219667A (en) * | 2019-07-05 | 2019-09-10 | 甘肃省交通规划勘察设计院股份有限公司 | Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology |
CN110617092A (en) * | 2019-10-12 | 2019-12-27 | 浙江省交通规划设计研究院有限公司 | Double-hinged connecting mechanism, tunnel steel arch frame and mounting method thereof |
CN111734456A (en) * | 2020-07-27 | 2020-10-02 | 福州大学 | Lining supporting construction suitable for laboratory model test tunnel subsection excavation |
JP2022012971A (en) * | 2020-07-02 | 2022-01-18 | 鹿島建設株式会社 | Method of constructing underground structure, and support structure |
CN114278341A (en) * | 2022-02-16 | 2022-04-05 | 中铁一局集团有限公司 | Two-lining template construction structure and method based on mine method tunnel special-shaped section |
CN115405338A (en) * | 2022-09-22 | 2022-11-29 | 中铁十四局集团隧道工程有限公司 | Subway construction top strutting arrangement |
WO2024124759A1 (en) * | 2022-12-16 | 2024-06-20 | 中铁七局集团有限公司 | Hydraulic tunnel open-cut structure external mold formwork and construction method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678136B (en) * | 2012-06-14 | 2014-08-20 | 中交二公局第三工程有限公司 | Dual-reduction turnover construction process for sprayed concrete |
CN103670446B (en) * | 2013-12-13 | 2016-03-23 | 中铁二十三局集团有限公司 | Circular diversion tunnel 2/3 circle concrete-liner construction method |
-
1993
- 1993-03-18 JP JP08413793A patent/JP3188342B2/en not_active Expired - Fee Related
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09189198A (en) * | 1995-11-07 | 1997-07-22 | Taisei Corp | Lining method of tunnel |
JP2000513773A (en) * | 1995-11-17 | 2000-10-17 | キアヴェス,カルロ | Underground structure for constructing tunnel, underground passage, underground parking lot, etc., method of constructing the same, and prefabricated member for the structure |
JP2001323797A (en) * | 2000-05-12 | 2001-11-22 | Yoshiji Matsumoto | Tunnel lining reinforcing structure using segment with non-uniform section, and method for constructing the same |
CN102146798A (en) * | 2011-03-02 | 2011-08-10 | 中国土木工程集团有限公司 | Arch ring lining trolley for additionally building open cut tunnel on electrified railway business line and construction method of arch ring lining trolley |
JP2015214853A (en) * | 2014-05-12 | 2015-12-03 | 大成建設株式会社 | Tunnel lining method |
JP2016003531A (en) * | 2014-06-19 | 2016-01-12 | ジオスター株式会社 | Box culvert |
CN105401594A (en) * | 2015-12-08 | 2016-03-16 | 中交四公局第一工程有限公司 | Underground comprehensive pipe gallery lining trolley |
CN108979666B (en) * | 2018-07-11 | 2024-04-02 | 河北工程大学 | Method for controlling tunnel floor heave by concrete filled steel tube pile |
CN108979666A (en) * | 2018-07-11 | 2018-12-11 | 河北工程大学 | A kind of method of steel tube concrete pile control Floor Heave in Roadway |
CN109056548A (en) * | 2018-09-19 | 2018-12-21 | 中交二公局第六工程有限公司 | A kind of steel arch frame construction method |
CN110130929A (en) * | 2019-06-14 | 2019-08-16 | 贵州省水利水电勘测设计研究院 | A kind of protective device of rock burst geology hole section safe construction |
CN110219667A (en) * | 2019-07-05 | 2019-09-10 | 甘肃省交通规划勘察设计院股份有限公司 | Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology |
CN110219667B (en) * | 2019-07-05 | 2024-03-19 | 甘肃省交通规划勘察设计院股份有限公司 | Tunnel inverted arch and inverted arch filling layer substituted steel-concrete combined structure and construction process |
CN110617092A (en) * | 2019-10-12 | 2019-12-27 | 浙江省交通规划设计研究院有限公司 | Double-hinged connecting mechanism, tunnel steel arch frame and mounting method thereof |
JP2022012971A (en) * | 2020-07-02 | 2022-01-18 | 鹿島建設株式会社 | Method of constructing underground structure, and support structure |
CN111734456A (en) * | 2020-07-27 | 2020-10-02 | 福州大学 | Lining supporting construction suitable for laboratory model test tunnel subsection excavation |
CN114278341A (en) * | 2022-02-16 | 2022-04-05 | 中铁一局集团有限公司 | Two-lining template construction structure and method based on mine method tunnel special-shaped section |
CN114278341B (en) * | 2022-02-16 | 2024-02-27 | 中铁一局集团有限公司 | Two-lining template construction structure and method based on mine tunnel special-shaped section |
CN115405338A (en) * | 2022-09-22 | 2022-11-29 | 中铁十四局集团隧道工程有限公司 | Subway construction top strutting arrangement |
CN115405338B (en) * | 2022-09-22 | 2023-05-09 | 中铁十四局集团隧道工程有限公司 | Subway construction top strutting arrangement |
WO2024124759A1 (en) * | 2022-12-16 | 2024-06-20 | 中铁七局集团有限公司 | Hydraulic tunnel open-cut structure external mold formwork and construction method |
Also Published As
Publication number | Publication date |
---|---|
JP3188342B2 (en) | 2001-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH06272495A (en) | Construction method of tunnel | |
US4730427A (en) | Shuttering and shoring wall | |
JPH0821196A (en) | Structure of floor system for segment type tunnel, and construction of segment type tunnel with precast floor system | |
JP3321697B2 (en) | Tunnel lining method using composite panels | |
JP4080621B2 (en) | Large section tunnel and its construction method | |
JP2593284B2 (en) | Tunnel lining structure and construction method | |
JPH07292783A (en) | Connective structure of prestressed concrete members | |
JP2004169474A (en) | Connecting structure for tunnel cutting and enlarging section | |
JP4143430B2 (en) | Assembly steel shell and tunnel expansion section lining | |
JP7010736B2 (en) | How to build an underground structure | |
KR200189807Y1 (en) | Precast concrete panel form | |
JP2002364008A (en) | Synthesized arch tunnel with large cross section and its work method | |
JPH0258440B2 (en) | ||
JP3578414B2 (en) | Construction method of reinforced concrete retaining wall | |
JP2579120B2 (en) | garage | |
JPH09209582A (en) | Reinforcing structural body and reinforcing method for structure with it | |
JPH06129114A (en) | Repairing method for existing column strip structure | |
JP3192982B2 (en) | Simple steel panel for tunnel liner and its mounting device | |
JPS61290137A (en) | Construction of columnar pillar | |
JP3530656B2 (en) | Construction method of the bottom inspection corridor at the fill dam | |
JP2757032B2 (en) | Construction method of underground building with pillars with capital by reverse hitting method | |
JPH04131443A (en) | Reinforced concrete structure for beam, column, or the like | |
JPH0353439B2 (en) | ||
JPH10131693A (en) | Segment | |
JPH0633598A (en) | Buried formwork for pillar/beam connecting part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |