JPH0551122A - Load carrier equipment - Google Patents
Load carrier equipmentInfo
- Publication number
- JPH0551122A JPH0551122A JP21329191A JP21329191A JPH0551122A JP H0551122 A JPH0551122 A JP H0551122A JP 21329191 A JP21329191 A JP 21329191A JP 21329191 A JP21329191 A JP 21329191A JP H0551122 A JPH0551122 A JP H0551122A
- Authority
- JP
- Japan
- Prior art keywords
- load
- traveling
- conveyor
- signal
- sorting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Discharge Of Articles From Conveyors (AREA)
- Control Of Conveyors (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、一定経路上を走行し、
この一定経路に沿って設けられた複数のローダより荷を
搭載し、同じくこの一定経路に沿って設けられた複数の
仕分けシュートに荷を払い出す走行台車を複数台所定間
隔で連結して備えた荷搬送設備に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention
Loads are loaded from a plurality of loaders provided along the fixed route, and a plurality of traveling carriages for discharging the load to a plurality of sorting chutes also provided along the fixed route are connected at predetermined intervals. The present invention relates to a load carrying facility.
【0002】[0002]
【従来の技術】従来のこの種の荷搬送設備としては、各
走行台車上に左右に傾倒可能なトレ―を設置し、各仕分
け位置には台車が通過するときにトレ―を転倒させるア
クチュエ―タを設置し、トレ―の転倒によりトレ―上の
被搬送物を左右横方向に払い出すように構成した装置が
知られている。2. Description of the Related Art As a conventional load carrying facility of this type, an actuator is provided on each traveling carriage, in which a tray that can be tilted to the left and right is installed, and each sorting position causes the tray to fall when the carriage passes by. There is known a device in which a tray is installed and the to-be-conveyed object on the tray is discharged in the lateral direction when the tray falls.
【0003】[0003]
【発明が解決しようとする課題】しかし従来の荷搬送設
備では、トレ―の転倒により被搬送物を払い出すのであ
るからショックに弱い被搬送物には不適当であり、トレ
―転倒時に騒音を伴うという問題があった。また、転倒
したトレ―を元に戻すための手段も必要であるなど、機
構的にも複雑で故障し易いという問題があった。However, in the conventional load carrying equipment, since the object to be transferred is discharged by the fall of the tray, it is not suitable for the object to be transferred which is vulnerable to a shock, and noise is generated when the tray is overturned. There was a problem with it. In addition, there is a problem in that the mechanism is complicated and prone to failure, such as the need for means for returning the fallen tray.
【0004】この問題を解決するため、たとえば特公昭
53- 10338 号公報に開示された仕分けコンベヤの分岐装
置が発明されている。この発明は、各スケ―ル(受け
皿)にモ―タ―ロ―ラおよびフリ―ロ―ラを1組とした
ロ―ラ部を備え、モ―タ―ロ―ラに仕分け位置に布設さ
れたトロリ―バ―より集電部を介して給電して、ロ―ラ
部上の被搬送物をショックなしで仕分けるように構成さ
れ、さらにモ―タ―ロ―ラは、三相電源とトロリ―バ―
間に設けたマグネットコンタクタにより電源の相を入替
えてトロリ―バ―および集電部を介して給電されること
により正転あるいは逆転駆動されるよう構成されてい
る。しかし、この発明においてはモ―タ―ロ―ラの駆動
がトロリ―バ―への供給電源への給電を制御することに
より地上側(固定側)で行われるため、仕分け位置(ト
ロリ―バ―位置)とスケ―ルの位置関係を常に把握して
タイミングよく給電する必要があり、地上側の仕分け制
御が複雑になるという問題があった。さらに、台車の走
行速度が常に一定ではなく、またローダ(投入コンベ
ヤ)上の荷はローダの中心からずれて載置され、搬送さ
れることが多く、さらにローダからの投入タイミングが
ずれることにより、走行台車上に被搬送物が中心よりず
れて載置され、かつ被搬送物の載置面がコンベヤになっ
ているのでトレーの場合と異なり、被搬送物が中心に自
然に寄ることがなく、中心からずれたまま載置されるこ
とから、カーブ部の走行時や走行中の振動などにより被
搬送物が落下する危険があった。To solve this problem, for example, Japanese Patent Publication Sho
The branching device for the sorting conveyor disclosed in Japanese Patent No. 53-10338 is invented. According to the present invention, each scale (saucepan) is provided with a roller portion including a motor roller and a free roller, and is laid at the sorting position on the motor roller. It is configured to feed power from a trolley bar through a current collector to sort the objects to be transported on the roller section without shock. Furthermore, the motor roller is equipped with a three-phase power supply and a trolley. -Bar-
The magnetic contactor is provided between the two to switch the phases of the power source, and the power is supplied through the trolley bar and the current collecting section so that the motor is driven in the forward or reverse direction. However, in this invention, since the motor roller is driven on the ground side (fixed side) by controlling the power supply to the power supply to the trolley bar, the sorting position (trolley bar) is used. It is necessary to always grasp the positional relationship between the position) and the scale to supply power at a timely timing, and there is a problem that sorting control on the ground side becomes complicated. Further, the traveling speed of the trolley is not always constant, and the load on the loader (loading conveyor) is often placed and transported off the center of the loader, and the loading timing from the loader also shifts. Unlike the case of a tray, the transported object does not naturally deviate to the center, because the transported object is placed on the traveling carriage off the center and the loading surface of the transported object is a conveyor. Since the object is placed while being displaced from the center, there is a risk that the transported object may drop due to vibration during traveling of the curved portion or during traveling.
【0005】本発明は上記問題を解決するものであり、
地上側の制御を簡単にするとともに、走行台車上に載置
された被搬送物の位置を中心に維持でき、被搬送物の落
下事故を防止できる荷搬送設備を提供することを目的と
するものである。The present invention solves the above problems,
An object of the present invention is to provide a load carrying facility that simplifies the control on the ground side and can maintain the position of the transported object placed on the traveling carriage as a center and prevent the transported object from falling. Is.
【0006】[0006]
【課題を解決するための手段】上記問題を解決するため
本発明は、一定経路上を走行し、この一定経路に沿って
設けられた複数のローダより荷を搭載し、同じくこの一
定経路に沿って設けられた複数の仕分けシュートに荷を
払い出す走行台車を複数台所定間隔で連結して備えた荷
搬送設備であって、前記各走行台車に、前記荷が搭載さ
れ前記仕分けシュ―トへ荷を払い出す仕分け用コンベヤ
と、このコンベヤを制御する制御手段と、この制御手段
に接続された第1の信号伝送手段を備え、前記ローダと
仕分けシュート間の地上側に、前記走行台車上の荷の走
行方向に直角な左右方向のずれ量を検出するずれ量検出
手段と、このずれ量検出手段の下流側に前記第1の信号
伝送手段に対向して設けられ、ずれ量検出手段で検出さ
れたずれ量を第1の信号伝送手段を介して走行台車の制
御手段に伝送する第2の信号伝送手段を備えたことを特
徴とするものである。SUMMARY OF THE INVENTION In order to solve the above problems, the present invention travels on a fixed route, carries loads from a plurality of loaders provided along the fixed route, and also follows the fixed route. A plurality of sorting chutes provided on the plurality of sorting chutes connected to each other at predetermined intervals to provide a trolley, and each trolley is loaded with the load to the sorting shunt. The sorting conveyor for unloading the load, the control means for controlling the conveyor, and the first signal transmission means connected to the control means are provided, and on the traveling carriage on the ground side between the loader and the sorting chute. A shift amount detecting means for detecting a shift amount in the left-right direction perpendicular to the traveling direction of the load, and a shift amount detecting means provided downstream of the shift amount detecting means so as to face the first signal transmitting means. The first deviation It is characterized in that it comprises a second signal transmission means for transmitting to the control means of the traveling vehicle through a signal transmission means.
【0007】[0007]
【作用】上記構成により、前記ローダと仕分けシュート
間に設けられたずれ量検出手段は走行台車上の荷の左右
方向のずれ量を演算し、このずれ量を第1、第2の信号
伝送手段を介して走行台車の制御手段へ伝送する。よっ
て、走行台車の制御手段は、荷の搬送中、このずれ量に
よりコンベヤを駆動して荷を中心位置に移動することが
できる。With the above structure, the shift amount detecting means provided between the loader and the sorting chute calculates the shift amount of the load on the traveling carriage in the left-right direction, and the shift amount is detected by the first and second signal transmitting means. Is transmitted to the control means of the traveling vehicle via. Therefore, the control means of the traveling vehicle can move the load to the center position by driving the conveyor by this shift amount during the transfer of the load.
【0008】[0008]
【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図1は本発明の一実施例における荷搬送設備の
構成配置図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a structural layout view of a load carrying facility according to an embodiment of the present invention.
【0009】図1において、1は一定の走行経路5上を
互いに連結された状態でA方向へ走行し、図2に示すよ
うに、走行するA方向に対する左右横方向に荷(被搬送
物)2を搬送する仕分けコンベヤ3を上面に設けた走行
台車であり、ローダ6により搭載された荷2は、この走
行台車1上の仕分けコンベヤ3の駆動によりA方向に対
する左右横方向に開口し、走行経路に沿って複数台設け
られた仕分けシュ―ト4に払い出される。走行経路5は
図2に示すように、所定間隔置きに設けた脚体7を介し
て床上に設置される。In FIG. 1, reference numeral 1 denotes a fixed traveling path 5 which is connected to each other and travels in the direction A, and as shown in FIG. It is a traveling trolley provided with a sorting conveyor 3 for transporting 2 on its upper surface, and the load 2 loaded by the loader 6 is opened by driving the sorting conveyor 3 on the traveling trolley 1 in the left and right lateral directions with respect to the A direction to travel. It is paid out to the sorting sheets 4 provided along the route. As shown in FIG. 2, the travel route 5 is installed on the floor via legs 7 provided at predetermined intervals.
【0010】また、走行台車1の外側面には、各仕分け
シュ―ト4の前面に設置された反射板8により各仕分け
シュ―ト4の位置などを検出する光電式の一対のシュ―
ト検出器9,10と、信号の授受を行うための光送受信器
11が設けられ、さらに図3に示す制御装置12が設けら
れ、仕分けコンベヤ3を駆動するサーボモータ用のサー
ボアンプ13が配設される。制御装置12は、図3に示すよ
うに、サーボアンプ13にサーボモータ14の正転あるい逆
転の信号を伝達するリレイMCF,MCRと、後述する
コントロ―ラ15と、コントロ―ラ15およびリレイMC
F,MCRに電源を供給する定電圧電源16とから構成さ
れており、リレイMCF,MCRはコントロ―ラ15によ
り制御され、リレイMCFが駆動され、その信号がサー
ボアンプ13に伝達されると、サーボモータ14は正転して
右方向に荷2を払出し、リレイMCRが駆動され、その
信号がサーボアンプ13に伝達されると、サーボモータ14
は逆転して左方向に荷2を払出す。On the outer surface of the traveling carriage 1, a pair of photoelectric type shoes for detecting the position of each sorting suit 4 by a reflector 8 installed on the front surface of each sorting suit 4.
Optical detectors for exchanging signals with the detectors 9 and 10
11, a control device 12 shown in FIG. 3 is further provided, and a servo amplifier 13 for a servo motor that drives the sorting conveyor 3 is provided. As shown in FIG. 3, the control device 12 includes relays MCF and MCR for transmitting signals of forward rotation and reverse rotation of the servomotor 14 to the servo amplifier 13, a controller 15 described later, a controller 15 and a relay 15 and relays. MC
The relay MCF and MCR are controlled by the controller 15, the relay MCF is driven, and the signal is transmitted to the servo amplifier 13. When the servomotor 14 rotates forward to discharge the load 2 to the right, the relay MCR is driven, and the signal is transmitted to the servo amplifier 13, the servomotor 14
Reverses and discharges load 2 to the left.
【0011】また、ローダ6は、図1に示すように、走
行台車1に荷2を投入する先端コンベヤ17と、この先端
コンベヤ17に荷2を搬入する搬送コンベヤ18とから構成
され、後述するローダ制御装置19により駆動される。ま
た搬送コンベヤ18には、図5に詳細に示すように、搬送
コンベヤ18の搬送方向Bに沿って、搬送コンベヤ18上の
荷2の通過高さに、搬送方向Bに直角な左右方向に透過
形の第1の光電スイッチ20を設け、搬送方向Bに直角な
左右方向に同角度で対象な2組の透過形の第2、および
第3の光電スイッチ21,22を設け、さらにその出口に搬
送方向Bに直角な左右方向に透過形の第4の光電スイッ
チ23を設けている。また先端コンベヤ17の入口に搬送方
向Bに直角な左右方向に透過形の第5の光電スイッチ24
を設け、その出口(荷2の投入口)に透過形の第6の光
電スイッチ25を設けている。また、走行台車1の走行方
向Aのローダ6上流に、次に荷2の搭載を行う走行台車
1の通過を検出する反射形の第7の光電スイッチ26を設
け、さらにその上流にこの走行台車1に光送受信器11を
介して後述するタイマー設定信号yを伝送する光送受信
器27を設け、また走行台車1の走行方向Aのローダ6下
流に、荷2の搭載を行った走行台車1に光送受信器11を
介して荷2の仕分け先デ―タ(たとえば荷2を仕分ける
店舗のコ―ドなど)、仕分けシュート4のレイアウトデ
ータ、走行台車1の走行速度データからなる仕分け指令
信号xを伝送する光送受信器28を設けている。これら第
1〜第7の光電スイッチ20〜26と光送受信器27,28は図
4に示すように、ローダ制御装置19に接続されている。
またローダ6の上流側に走行経路5に沿って、第7の光
電スイッチ26の動作と同時に走行台車1のシュート検出
器9あるいは10が動作するよう反射板29が設けられてい
る。As shown in FIG. 1, the loader 6 is composed of a leading end conveyor 17 for loading the load 2 onto the traveling carriage 1 and a transfer conveyor 18 for loading the load 2 onto the leading end conveyor 17, which will be described later. It is driven by the loader control device 19. Further, as shown in detail in FIG. 5, the transport conveyor 18 is transmitted along the transport direction B of the transport conveyor 18 to the passing height of the load 2 on the transport conveyor 18 in the left-right direction perpendicular to the transport direction B. -Type first photoelectric switch 20 is provided, and two sets of transmission-type second and third photoelectric switches 21 and 22 that are symmetrical at the same angle in the left-right direction perpendicular to the conveyance direction B are provided, and further at the outlet thereof. A transmissive fourth photoelectric switch 23 is provided in the left-right direction perpendicular to the transport direction B. In addition, at the entrance of the tip conveyor 17, a fifth photoelectric switch 24 of a transmission type in the left-right direction perpendicular to the conveying direction B is formed.
Is provided, and a transmission-type sixth photoelectric switch 25 is provided at the outlet (the inlet of the load 2). Further, a reflection type seventh photoelectric switch 26 for detecting passage of the traveling vehicle 1 for carrying the next load 2 is provided upstream of the loader 6 in the traveling direction A of the traveling vehicle 1, and further upstream thereof, the traveling photoelectric vehicle switch 26 is provided. 1 is provided with an optical transmitter / receiver 27 that transmits a timer setting signal y described later via the optical transmitter / receiver 11, and the traveling carriage 1 on which the load 2 is mounted is provided downstream of the loader 6 in the traveling direction A of the traveling carriage 1. Through the optical transmitter / receiver 11, a sorting command signal x including sorting destination data of the load 2 (for example, a code of a store sorting the load 2), layout data of the sorting chute 4, and traveling speed data of the traveling carriage 1 is sent. An optical transmitter / receiver 28 for transmitting is provided. The first to seventh photoelectric switches 20 to 26 and the optical transceivers 27 and 28 are connected to a loader control device 19 as shown in FIG.
Further, on the upstream side of the loader 6, a reflecting plate 29 is provided along the traveling path 5 so that the chute detector 9 or 10 of the traveling vehicle 1 operates simultaneously with the operation of the seventh photoelectric switch 26.
【0012】ロ―ダ制御装置19は、図4に示すように、
第1の光電スイッチ20の検出信号を入力し、その検出時
間により、図5に示す搬送方向Bの荷2の長さl(エ
ル)を検出する荷長検出部31と、第2、第3の光電スイ
ッチ21,22の検出信号を入力して信号の入力に時間差が
あるとき、ローダ6の速度(コンベヤ17,18の速度)、
前記角度から荷2の左右方向のずれ量wを演算するずれ
量検出部32(詳細は後述する)と、荷長検出部31で検出
された荷長lとずれ量検出部32で検出されたずれ量wを
入力し、後述するタイマー設定時間Tと先端コンベヤ17
上での荷2の停止距離Zを演算し、タイマー設定時間T
からなるずれ量信号yを出力する設定演算部33(詳細は
後述する)と、設定演算部33で設定された停止距離Z、
第5〜第7の光電スイッチ24〜26の検出信号、後述する
仕分けデータ出力部36からスタート/ストップ信号、先
端コンベヤ17のパルスエンコーダ39のパルス信号を入力
し、先端コンベヤ17の制御装置37に駆動信号を出力し、
また搬送コンベヤ18の起動信号を出力する先端コンベヤ
駆動部34(詳細は後述する)と、先端コンベヤ駆動部34
の起動信号、第4の光電スイッチ23の検出信号、仕分け
データ出力部36から起動/停止信号を入力し、起動信号
により搬送コンベヤ18の制御装置38に駆動信号を出力
し、停止信号または第4の光電スイッチ23の検出信号に
より搬送コンベヤ18の制御装置38に停止信号を出力する
搬送コンベヤ駆動部35と、上位コンピュータから入力し
た荷2の仕分け先データ、仕分けシュート4のレイアウ
トデータ、走行台車1の走行速度データを記憶し、第6
の光電スイッチ25の検出信号により、順に光送受信器28
を介して走行台車1に前記仕分け指令信号xを出力し、
仕分け先データが有る場合に先端コンベヤ駆動部34と搬
送コンベヤ駆動部35にスタート信号を出力し、仕分け先
データがなくなると先端コンベヤ駆動部34と搬送コンベ
ヤ駆動部35にストップ信号を出力する仕分けデータ出力
部36とから構成されている。The loader control unit 19 is, as shown in FIG.
A load length detection unit 31 for inputting a detection signal of the first photoelectric switch 20 and detecting the length 1 (ell) of the load 2 in the transport direction B shown in FIG. When the detection signals of the photoelectric switches 21 and 22 are input and there is a time difference in the input of the signals, the speed of the loader 6 (speed of the conveyors 17 and 18),
A shift amount detection unit 32 (details will be described later) that calculates a shift amount w of the load 2 in the left-right direction from the angle, and a load length 1 detected by the load length detection unit 31 and a shift amount detection unit 32. Enter the deviation amount w, and set the timer T and the tip conveyor 17 described later.
The stop distance Z of the load 2 above is calculated, and the timer setting time T
A setting calculation unit 33 (which will be described in detail later) that outputs a deviation amount signal y including the stop amount Z set by the setting calculation unit 33.
The detection signals of the fifth to seventh photoelectric switches 24-26, the start / stop signal from the sorting data output section 36 described later, and the pulse signal of the pulse encoder 39 of the tip conveyor 17 are input to the controller 37 of the tip conveyor 17. Output a drive signal,
In addition, a tip conveyor drive unit 34 (details will be described later) that outputs a start signal for the conveyor 18 and a tip conveyor drive unit 34.
Input signal, the detection signal of the fourth photoelectric switch 23, the start / stop signal from the sorting data output unit 36, and the drive signal is output to the control device 38 of the conveyer conveyor 18 by the start signal. Transporting conveyor drive unit 35 that outputs a stop signal to the control device 38 of the transporting conveyor 18 according to the detection signal of the photoelectric switch 23, the sorting data of the load 2 input from the host computer, the layout data of the sorting chute 4, and the traveling carriage 1. The running speed data of
According to the detection signal of the photoelectric switch 25 of
The sorting command signal x is output to the traveling vehicle 1 via
Sorting data that outputs a start signal to the tip conveyor drive unit 34 and transport conveyor drive unit 35 when there is sort destination data, and outputs a stop signal to the tip conveyor drive unit 34 and transport conveyor drive unit 35 when there is no sort destination data. And an output unit 36.
【0013】ずれ量検出部32によるずれ量wの検出原理
を図5の模式図により説明する。第2、第3の光電スイ
ッチ21,22の取付け角度をΘ、荷2のコンベヤ18の中心
からのずれ量をw、コンベヤ18の搬送速度をu、第2の
光電スイッチ21の検出信号がオンとなり、第3の光電ス
イッチ22がオンとなるまでの時間差をta (第3の光電
スイッチ22が先にオンとなるとマイナスとする)、第2
の光電スイッチ21の検出信号がオフとなり、第3の光電
スイッチ22がオフとなるまでの時間差をt b (第3の光
電スイッチ22が先にオフとなるとマイナスとする)、第
2の光電スイッチ21の検出信号がオンとなり、第3の光
電スイッチ22がオンとなるまでの搬送距離をa、第2の
光電スイッチ21の検出信号がオフとなり、第3の光電ス
イッチ22がオフとなるまでの搬送距離をbとすると、 a=ta *u b=tb *u と表せ、この距離a,bが検出される地
点と搬送コンベヤ18中心迄の距離をc,dとすると、 c=a/(2tanΘ)=ta *u/(2tanΘ) d=b/(2tanΘ)=tb *u/(2tanΘ) したがって、 w=(c+d)/2=(u/4)*(ta +tb )/t
anΘ と表せる。Principle of detecting the deviation amount w by the deviation amount detecting unit 32
Will be described with reference to the schematic diagram of FIG. Second and third photoelectric switch
The angle of attachment of the switches 21 and 22 is Θ, and the center of the conveyor 18 for load 2
From the second, the conveyor 18 transfer speed is u, the second
The detection signal of the photoelectric switch 21 turns on, and the third photoelectric switch
The time lag until the switch 22 turns on is ta(The third photoelectric
If the switch 22 is turned on first, it will be negative), the second
The detection signal of the photoelectric switch 21 of the
The time difference until the switch 22 is turned off is t b(Third light
Power switch 22 is turned off first, it will be negative),
The detection signal of the second photoelectric switch 21 turns on, and the third light
The transport distance until the power switch 22 is turned on is a,
The detection signal of the photoelectric switch 21 turns off, and the third photoelectric switch
If the transport distance until the switch 22 is turned off is b, then a = ta* Ub = tb* U, where the distances a and b are detected
If the distance between the point and the center of the conveyor 18 is c and d, then c = a / (2tan Θ) = ta* U / (2tan Θ) d = b / (2tan Θ) = tb* U / (2tan Θ) Therefore, w = (c + d) / 2 = (u / 4) * (ta+ Tb) / T
It can be expressed as an Θ.
【0014】ずれ量検出部32はこの式により、第2、第
3の光電スイッチ21,22の検出信号が入力する毎に、ず
れ量wを演算して設定演算部33へ出力する。設定演算部
33によるタイマー設定時間Tと先端コンベヤ17での荷2
の第5の光電スイッチ24の動作からの停止距離Zを演算
する原理を図6の模式図により説明する。The deviation amount detecting section 32 calculates the deviation amount w and outputs it to the setting calculating section 33 each time the detection signals of the second and third photoelectric switches 21 and 22 are inputted by this equation. Setting calculator
Timer setting time T by 33 and load 2 at the tip conveyor 17
The principle of calculating the stop distance Z from the operation of the fifth photoelectric switch 24 will be described with reference to the schematic diagram of FIG.
【0015】走行台車1の走行速度をv、コンベヤ17の
搬送速度をu(=21/2 v)、コンベヤ17の加速度をa
とすると、停止位置Eからコンベヤ17が搬送速度21/2
vになる時間tP(停止位置EからF位置に到達する時
間)は、 tP =21/2 v/a このときのコンベヤ17の移動距離Pは、 P=(1/2)*tP *21/2 v=(21/2 v)2 /(2a)=v2 /a またこの時間tP の間、第7の光電スイッチ26の検出位
置にあった走行台車1の移動距離Qは、 Q=tP *v=21/2 v2 /a したがって、第7の光電スイッチ26の検出位置にあると
きの走行台車1の中心位置から停止位置Eまでの距離R
は、 R=Q−P/21/2 =21/2 v2 /a−v2 /a/21/2 =v2 /(21/2 a) またこの距離Rに相当する搬送コンベヤ17の移動距離D
は、 D=21/2 R=v2 /a したがって、停止距離Zは、設定値をXとすると、 Z=l(エル)/2−w+D+X=l/2−w+v2 /a+X この式で停止距離Zを演算して先端コンベヤ駆動部34へ
出力する。The traveling speed of the traveling carriage 1 is v, the conveying speed of the conveyor 17 is u (= 2 1/2 v), and the acceleration of the conveyor 17 is a.
Then, from the stop position E, the conveyor 17 moves at a conveying speed of 2 1/2
The time t P at which v becomes v (the time to reach the F position from the stop position E) is t P = 2 1/2 v / a The moving distance P of the conveyor 17 at this time is P = (1/2) * t P * 2 1/2 v = (2 1/2 v) 2 / (2a) = v 2 / a Further, during this time t P , movement of the traveling vehicle 1 at the detection position of the seventh photoelectric switch 26 Therefore, the distance Q is: Q = t P * v = 2 1/2 v 2 / a Therefore, the distance R from the center position of the traveling vehicle 1 to the stop position E when the seventh photoelectric switch 26 is at the detection position.
Is R = Q-P / 2 1/2 = 2 1/2 v 2 / a-v 2 / a / 2 1/2 = v 2 / (2 1/2 a) and the conveyance corresponding to this distance R Moving distance D of conveyor 17
Therefore, D = 2 1/2 R = v 2 / a Therefore, when the set value is X, the stop distance Z is: Z = 1 (el) / 2-w + D + X = 1 / 2-w + v 2 / a + X The stop distance Z is calculated and output to the leading end conveyor drive unit 34.
【0016】この停止距離Zの停止位置Eから第7の光
電スイッチ26の検出信号により搬送コンベヤ17を駆動す
ると、F位置で走行速度vの走行台車1と搬送速度2
1/2 vの荷2が並ぶことになる。When the conveyor 17 is driven by the detection signal of the seventh photoelectric switch 26 from the stop position E of the stop distance Z, the traveling carriage 1 and the conveying speed 2 at the traveling speed v at the F position are driven.
A 1/2 v load 2 will be lined up.
【0017】また、走行台車1の仕分けコンベヤ3の定
速度をV、減速度をbとすると、仕分けコンベヤ3の中
心に荷2が停止するための定速度Vからの減速時間tM
は tM =V/b このときの仕分けコンベヤ3の移動距離Mは、 M=(1/2)*tM *V=(1/2)*V/b*V=V2 /(2b) またずれ量wによる走行台車1の移動距離Jは、 J=21/2 w したがって、先端コンベヤ17の中心と走行経路5の交わ
る位置までの走行台車1の移動距離をH(設定値)とす
ると、仕分けコンベヤ3が減速を開始するまでに(図中
N位置に到達するまでに)走行台車1が走行する距離K
は、 K=H+J−M=H+21/2 w−V2 /(2b) よって、この走行距離Kを走行する時間Tは、 T=K/v=〔H+21/2 w−V2 /(2b)〕/v この式でタイマー設定時間Tを演算してずれ量信号yと
して光送受信器27を介して走行台車1へ出力する。よっ
て、走行台車1は反射板27を検出して(第7の光電スイ
ッチ26が動作して)タイマー設定時間T後に仕分けコン
ベヤ3の駆動を停止すると、仕分けコンベヤ3は減速
し、N位置にある荷2は走行台車1の中心に載置される
ことになる。When the constant velocity of the sorting conveyor 3 of the traveling carriage 1 is V and the deceleration is b, the deceleration time t M from the constant velocity V for stopping the load 2 at the center of the sorting conveyor 3 is t M.
Is t M = V / b The moving distance M of the sorting conveyor 3 at this time is M = (1/2) * t M * V = (1/2) * V / b * V = V 2 / (2b) Further, the moving distance J of the traveling carriage 1 due to the shift amount w is J = 2 1/2 w Therefore, the moving distance of the traveling carriage 1 to the position where the center of the tip conveyor 17 and the traveling path 5 intersect is H (set value). Then, the distance K that the traveling carriage 1 travels by the time the sorting conveyor 3 starts decelerating (by reaching the position N in the figure).
K = H + J−M = H + 2 1/2 w−V 2 / (2b) Therefore, the time T for traveling the traveling distance K is T = K / v = [H + 2 1/2 w−V 2 / ( 2b)] / v The timer setting time T is calculated by this formula and output as the deviation amount signal y to the traveling carriage 1 via the optical transmitter / receiver 27. Therefore, when the traveling carriage 1 detects the reflection plate 27 (the seventh photoelectric switch 26 operates) and stops driving the sorting conveyor 3 after the timer setting time T, the sorting conveyor 3 decelerates to the N position. The load 2 is placed at the center of the traveling carriage 1.
【0018】次に、先端コンベヤ駆動部34の動作を図7
のフローチャートにしたがって説明する。まず、仕分け
データ出力部36からスタート信号を入力すると(ステッ
プ−1)、先端コンベヤ17の制御装置37に駆動信号を出
力して先端コンベヤ17を駆動し(ステップ−2)、搬送
コンベヤ駆動部35に起動信号を出力して搬送コンベヤ18
を駆動する(ステップ−3)。荷2が搬送コンベヤ18か
ら先端コンベヤ17に搬送され、入口の第5の光電スイッ
チ5の検出信号を入力すると(ステップ−4)、パルス
エンコーダ39のパルスをカウントすることにより移動距
離のカウントを行い(ステップ−5)、移動距離が停止
距離Zとなると(ステップ−6)、先端コンベヤ制御装
置37に停止信号を出力して先端コンベヤ17を停止する
(先端コンベヤ17はブレーキにより停止する)(ステッ
プ−7)。次に、第7の光電スイッチ26の動作を検出し
て荷2を投入する走行台車1を検出すると(ステップ−
8)、先端コンベヤ制御装置37に駆動信号を出力して先
端コンベヤ17を駆動し(ステップ−9)、投入口の第6
の光電スイッチ25の検出信号がオンからオフになり荷2
の投入を確認すると(ステップ−10)、仕分けデータ出
力部36からストップ(荷の投入停止)信号を入力してい
るかを確認し(ステップ−11)、投入が続行される場
合、ステップ−3へ戻り、停止の場合、先端コンベヤ制
御装置37に停止信号を出力して先端コンベヤ17を停止し
(ステップ−12)、終了する。Next, the operation of the tip conveyor drive unit 34 will be described with reference to FIG.
It will be described in accordance with the flowchart of. First, when a start signal is input from the sorting data output unit 36 (step-1), a drive signal is output to the control device 37 of the tip conveyor 17 to drive the tip conveyor 17 (step-2), and the transport conveyor drive unit 35 The start signal is output to the conveyor 18
Is driven (step-3). When the load 2 is transferred from the transfer conveyor 18 to the leading end conveyor 17 and the detection signal of the fifth photoelectric switch 5 at the entrance is input (step-4), the pulse of the pulse encoder 39 is counted to count the moving distance. (Step-5) When the movement distance reaches the stop distance Z (Step-6), a stop signal is output to the tip conveyor control device 37 to stop the tip conveyor 17 (the tip conveyor 17 is stopped by the brake) (step). -7). Next, when the operation of the seventh photoelectric switch 26 is detected and the traveling vehicle 1 into which the load 2 is loaded is detected (step-
8), output a drive signal to the tip conveyor controller 37 to drive the tip conveyor 17 (step-9),
The detection signal of the photoelectric switch 25 of the
After confirming the input (step-10), it is confirmed whether a stop (loading stop) signal is input from the sorting data output section 36 (step-11). If the loading is continued, go to step-3. In the case of returning and stopping, a stop signal is output to the leading end conveyor control device 37 to stop the leading end conveyor 17 (step -12), and the process ends.
【0019】この先端コンベヤ駆動部34の動作により、
搬送コンベヤ18の駆動によって先端コンベヤ17へ搬送さ
れた荷2は停止距離Zで一旦停止し、投入する走行台車
1の検出により再び駆動されて、荷2は走行台車1へ投
入される。By the operation of the tip conveyor drive unit 34,
The load 2 transported to the leading end conveyor 17 by driving the transport conveyor 18 is temporarily stopped at the stop distance Z, and is driven again by detection of the traveling carriage 1 to be loaded, and the cargo 2 is loaded into the traveling carriage 1.
【0020】また、搬送コンベヤ18上の荷は、第4の光
電スイッチ23の検出信号の入力により一旦搬送コンベヤ
18の終端で停止し、先端コンベヤ駆動部34の起動信号に
より搬送コンベヤ18から先端コンベヤ17へ搬送される。Further, the load on the transfer conveyor 18 is temporarily transferred by inputting the detection signal of the fourth photoelectric switch 23.
It stops at the end of 18, and is conveyed from the conveying conveyor 18 to the tip conveyor 17 by a start signal of the tip conveyor driving unit 34.
【0021】また図1に示すように、ローダ6と仕分け
シュート4間に走行経路5に沿って、図8に詳細に示す
ように、走行台車1上の荷2の通過高さに、走行台車1
の走行方向Aに直角な左右方向に同角度で対象な2組の
透過形の第8、および第9の光電スイッチ51,52を設
け、これら光電スイッチ51,52の下流側に走行台車1の
光送受信器11に対向する光送受信器53を設け、光電スイ
ッチ51,52の2つの検出信号を入力し、信号の入力に時
間差があるとき、走行台車1の走行速度、前記角度から
荷2の左右方向のずれ量を演算し、このずれ量信号zを
光送受信器53,11を介して走行台車1の制御装置12のコ
ントローラ15へ伝送するずれ量検出装置54を設けてい
る。Further, as shown in FIG. 1, along the traveling route 5 between the loader 6 and the sorting chute 4, as shown in detail in FIG. 1
2 sets of transmission type 8th and 9th photoelectric switches 51 and 52 which are symmetrical at the same angle in the left-right direction perpendicular to the traveling direction A of the traveling carriage 1 are provided on the downstream side of these photoelectric switches 51 and 52. An optical transmitter / receiver 53 facing the optical transmitter / receiver 11 is provided, two detection signals of the photoelectric switches 51, 52 are input, and when there is a time difference in the input of the signals, the traveling speed of the traveling carriage 1 and the load 2 from the angle A shift amount detecting device 54 is provided which calculates the shift amount in the left-right direction and transmits this shift amount signal z to the controller 15 of the control device 12 of the traveling vehicle 1 via the optical transceivers 53 and 11.
【0022】このずれ量検出装置54によるずれ量の検出
原理はローダ制御装置19のずれ量検出部32で説明した検
出原理と同様であり、詳細な説明は省略する。荷2の走
行台車1の中心からのずれ量をwは、走行台車1の走行
速度をv、第8、第9の光電スイッチ51,52の取付け角
度をΘ、第8の光電スイッチ51の検出信号がオンとな
り、第9の光電スイッチ52がオンとなるまでの時間差を
ta (第3の光電スイッチ22が先にオンとなるとマイナ
スとする)、第8の光電スイッチ51の検出信号がオフと
なり、第9の光電スイッチ52がオフとなるまでの時間差
をtb (第3の光電スイッチ22が先にオフとなるとマイ
ナスとする)とすると、 w=(v/4)*(ta +tb )/tanΘ と表せ
る。The principle of detection of the deviation amount by the deviation amount detecting device 54 is the same as the detection principle described in the deviation amount detecting portion 32 of the loader control device 19, and detailed description thereof will be omitted. The shift amount w of the load 2 from the center of the traveling carriage 1 is v, the traveling speed of the traveling carriage 1 is v, the mounting angles of the eighth and ninth photoelectric switches 51 and 52 are θ, and the detection of the eighth photoelectric switch 51 is detected. signal is turned on, the difference in time the photoelectric switch 52 of the ninth is on t a (third photoelectric switch 22 minus the turned on first), the detection signal of the eighth photoelectric switch 51 is turned off Then, assuming that the time difference until the ninth photoelectric switch 52 is turned off is t b (it is negative when the third photoelectric switch 22 is turned off first), w = (v / 4) * (t a + t It can be expressed as b ) / tan Θ.
【0023】ずれ量検出装置54はこの式によりずれ量w
を演算し、ずれ量信号zとして走行台車1へ出力する。
以下上記仕分け指令信号x、ずれ量信号yおよびずれ量
信号zを光送受信器11を介して入力する制御装置12のコ
ントロ―ラ15の構成およびこのコントローラ15による仕
分けコンベヤ3の駆動動作について図9のブロック図に
基づいて詳細に説明する。The deviation amount detection device 54 uses this equation to calculate the deviation amount w
Is calculated and is output to the traveling carriage 1 as a deviation amount signal z.
The configuration of the controller 15 of the control device 12 for inputting the sorting command signal x, the shift amount signal y, and the shift amount signal z via the optical transmitter / receiver 11 and the drive operation of the sorting conveyor 3 by the controller 15 will be described below. It will be described in detail based on the block diagram of FIG.
【0024】第1のカウンタ41は走行方向Aの右側に設
けられた仕分けシュ―ト4の反射板8を検出するシュ―
ト検出器9の検出信号aを入力とし、また後述する払出
し設定器42からの設定信号bを入力して設定値Rとする
カウンタであり、検出信号aが入力する毎に設定値Rよ
り1を減算し、減算した結果が1以下となると、出力信
号cを第1のパルス発生部43へ出力する。第1のパルス
発生部43は第1のカウンタ61から出力信号cを入力する
と、払出し設定部42からのタイミング設定信号dにより
時間T遅延させて予め設定された時間Mの間リレイMC
Fをオンする出力信号eを出力する。第2のカウンタ44
は、走行方向Aの左側に設けられた仕分けシュ―ト4の
反射板8を検出するシュ―ト検出器10の検出信号fを入
力とし、払出し設定器42からの設定信号gを入力して設
定値1とするカウンタであり、検出信号fが入力する毎
に設定値Lより1を減算し、減算した結果が1以下とな
ると、出力信号hを第2のパルス発生部45へ出力する。
第2のパルス発生部45は第2のカウンタ44からの出力信
号hを入力すると、前記タイミング設定信号dにより時
間T遅延させて予め設定された時間Mの間リレイMCR
をオンする出力信号jを出力する。また、第1のパルス
発生部43は、払出し設定部42より第1のずれ量タイマー
設定信号pを入力すると、この信号pにより設定された
タイマー時間、リレイMCFをオンする出力信号eを出
力し、第2のパルス発生部45は、払出し設定部42より第
2のずれ量タイマー設定信号qを入力すると、この信号
qにより設定されたタイマー時間、リレイMCRをオン
する出力信号eを出力する。The first counter 41 is a shoe for detecting the reflector 8 of the sorting shoe 4 provided on the right side in the traveling direction A.
Is a counter that receives a detection signal a of the detector 9 and a setting signal b from a payout setting device 42 to be described later to obtain a set value R. Is subtracted, and when the result of the subtraction is 1 or less, the output signal c is output to the first pulse generator 43. When the first pulse generator 43 receives the output signal c from the first counter 61, the first pulse generator 43 delays the time T by the timing setting signal d from the payout setting unit 42 and delays the relay MC for a preset time M.
An output signal e that turns on F is output. Second counter 44
Is input with the detection signal f of the shoe detector 10 for detecting the reflector 8 of the sorting shoe 4 provided on the left side in the traveling direction A, and the setting signal g from the payout setting device 42 is input. The counter has a set value of 1, and subtracts 1 from the set value L each time the detection signal f is input, and outputs an output signal h to the second pulse generator 45 when the result of the subtraction is 1 or less.
When the second pulse generator 45 receives the output signal h from the second counter 44, the second pulse generator 45 delays the time T by the timing setting signal d and delays the relay MCR for a preset time M.
An output signal j that turns on is output. When the first deviation amount timer setting signal p is input from the payout setting unit 42, the first pulse generating unit 43 outputs the output signal e for turning on the relay MCF for the timer time set by the signal p. When the second deviation amount timer setting signal q is input from the payout setting unit 42, the second pulse generating unit 45 outputs the output signal e for turning on the relay MCR for the timer time set by the signal q.
【0025】仕分け指令信号xが入力した際の払出し設
定部42の動作を図10のフロ―チャ―トにしたがって説明
する。まずロ―ダ制御装置19から光送受信器28,11を介
して入力した仕分け指令信号xに仕分けシュート4のレ
イアウトデ―タが含まれているかを確認し(ステップ−
1)、レイアウトデ―タが含まれていると、レイアウト
デ―タにしたがってシュ―トナンバ―と仕分け先のコ―
ドを変更する(ステップ−2)。次に、仕分け指令信号
xに走行速度デ―タが含まれているかを確認し(ステッ
プ−3)、走行速度デ―タが含まれていると、走行速度
デ―タに反比例する遅延時間Tを演算し(ステップ−
4)、タイミング設定信号dとしてこの遅延時間Tをパ
ルス発生部43,45へ出力する(ステップ−5)。次に仕
分け指令信号xに仕分け先デ―タが含まれているかを確
認し(ステップ−6)、含まれていなければ終了とし、
含まれていれば仕分け先デ―タ(コ―ド)に基づいてシ
ュ―トナンバ―を検索する(ステップ−7)。シュ―ト
ナンバ―が検索されると、シュ―トナンバ―が進行方向
Aの右側あるいは左側のどちら側の仕分けシュ―ト4に
相当するかを確認し(ステップ−8)、続いて進行方向
Aの手前から何番目の仕分けシュ―ト4になるかを演算
する(ステップ−9,10)。たとえば、検索されたシュ
―トナンバ―をN、仕分けシュ―ト4の配列を進行方向
Aの手前から順に右側を奇数とし、左側を偶数とする
と、シュ―トナンバ―が奇数か偶数かにより右側か左側
かを特定でき、設定値RをR=(N+1)/2、設定値
LをL=N/2で演算できる。設定値Rあるいは設定値
Lを第1あるいは第2のカウンタ41,44へ出力信号bあ
るいは出力信号gとして出力する(ステップ−11,1
2)。The operation of the payout setting section 42 when the sorting command signal x is input will be described with reference to the flowchart of FIG. First, it is confirmed whether or not the layout command of the sorting chute 4 is included in the sorting command signal x input from the loader controller 19 through the optical transmitters / receivers 28, 11 (step-
1) If the layout data is included, according to the layout data, the shoot number and the sorting destination code
Change the mode (step-2). Next, it is confirmed whether or not the traveling speed data is included in the sorting command signal x (step-3). If the traveling speed data is included, the delay time T inversely proportional to the traveling speed data is obtained. Is calculated (step −
4) The delay time T is output to the pulse generators 43 and 45 as the timing setting signal d (step-5). Next, it is confirmed whether the sorting instruction signal x includes sorting destination data (step-6).
If it is included, the shot number is searched based on the sorting destination data (code) (step-7). When the shoe number is searched, it is confirmed whether the shot number corresponds to the sorting shoe 4 on the right side or the left side of the traveling direction A (step-8), and then the traveling number A The number of sorting suits 4 from the front is calculated (steps 9 and 10). For example, if the number of retrieved shorts is N and the arrangement of the sorting shorts 4 is an odd number on the right side in order from the front in the traveling direction A and an even number on the left side, it is determined whether the right number depends on whether the number is odd or even. The left side can be specified, and the set value R can be calculated by R = (N + 1) / 2 and the set value L can be calculated by L = N / 2. The set value R or the set value L is output to the first or second counter 41, 44 as the output signal b or the output signal g (steps-11, 1).
2).
【0026】次にずれ量信号zが入力した際の設定部42
の動作を図11のフロ―チャ―トにしたがって説明する。
まず、ずれ量信号zの入力を確認すると(ステップ−
1)、ずれ量信号zのずれ量wの絶対値をとり(ステッ
プ−2)、タイマー時間tを演算する。サーボモータ14
の所定の加減速度をαとすると、図12の速度特性図から
わかるように、 w/2=(1/2)*α*t2 と表せ、したがって、 t=(w/α)1/2 と演算できる(ステップ−3)。Next, the setting unit 42 when the shift amount signal z is input
The operation will be described according to the flowchart in FIG.
First, when the input of the deviation amount signal z is confirmed (step-
1) The absolute value of the deviation amount w of the deviation amount signal z is obtained (step-2), and the timer time t is calculated. Servo motor 14
Assuming that the predetermined acceleration / deceleration of is α, as can be seen from the speed characteristic diagram of FIG. 12, it can be expressed as w / 2 = (1/2) * α * t 2, and therefore t = (w / α) 1/2 Can be calculated (step-3).
【0027】次にずれ量wが正か負かを判断し(ステッ
プ−4)、正の場合、タイマー時間tからなる第1のず
れ量タイマー設定信号pを第1のパルス発生部43へ出力
し(ステップ−5)、負の場合、タイマー時間tからな
る第2のずれ量タイマー設定信号qを第2のパルス発生
部45へ出力する(ステップ−6)。Next, it is judged whether the deviation amount w is positive or negative (step-4). If the deviation amount w is positive, the first deviation amount timer setting signal p having the timer time t is output to the first pulse generator 43. If it is negative (step-5), the second deviation amount timer setting signal q having the timer time t is output to the second pulse generator 45 (step-6).
【0028】また図9において、46は、ずれ量信号y、
シュ―ト検出器9の検出信号a、シュ―ト検出器10の検
出信号fを入力し、リレイMCFをオンする出力信号
r、リレイMCRをオンする出力信号sを出力する搭載
設定部である。Further, in FIG. 9, reference numeral 46 is a shift amount signal y,
It is a mounting setting unit that receives the detection signal a of the short detector 9 and the detection signal f of the short detector 10 and outputs an output signal r for turning on the relay MCF and an output signal s for turning on the relay MCR. ..
【0029】ずれ量信号yが入力した際のこの搭載設定
部46の動作を図13のフロ―チャ―トにしたがって説明す
る。まず、ずれ量信号yの入力を確認すると(ステップ
−1)、ずれ量信号yのタイマー設定信号Tを記憶し
(ステップ−2)、シュ―ト検出器9の検出信号aを入
力したかを確認する(ステップ−3)。シュ―ト検出器
9の検出信号aを入力すると、リレイMCFをオンする
出力信号rを出力し(ステップ−4)、ずれ量信号yの
タイマー設定時間Tのカウントを開始し(ステップ−
5)、カウントアップすると(ステップ−6)、リレイ
MCFをオンする出力信号rをオフとし(ステップ−
7)、タイマー設定信号Tの記憶を消去する(ステップ
−8)。また、ステップ−3において、シュ―ト検出器
9の検出信号aの入力を確認できないと、シュ―ト検出
器10の検出信号fを入力したかを確認し(ステップ−
9)、このシュ―ト検出器10の検出信号fの入力を確認
できないとステップ−3へ戻り、検出信号a,fの入力
を待つ。シュ―ト検出器10の検出信号fの入力を確認す
ると、リレイMCRをオンする出力信号sを出力し(ス
テップ−10)、ずれ量信号yのタイマー設定時間Tのカ
ウントを開始し(ステップ−11)、カウントアップする
と(ステップ−12)、リレイMCRをオンする出力信号
sをオフする(ステップ−13)。そしてステップ−8に
おいてタイマー設定信号Tの記憶を消去する。The operation of the mounting setting section 46 when the shift amount signal y is input will be described with reference to the flowchart of FIG. First, when the input of the deviation amount signal y is confirmed (step-1), the timer setting signal T of the deviation amount signal y is stored (step-2), and whether the detection signal a of the short detector 9 is inputted is checked. Confirm (step-3). When the detection signal a of the short detector 9 is input, an output signal r for turning on the relay MCF is output (step-4), and counting of the timer setting time T of the deviation amount signal y is started (step-
5) When it counts up (step-6), the output signal r for turning on the relay MCF is turned off (step-
7) The memory of the timer setting signal T is erased (step-8). If the input of the detection signal a of the short detector 9 cannot be confirmed in step-3, it is confirmed whether the detection signal f of the short detector 10 is input (step-
9) If the input of the detection signal f of the short detector 10 cannot be confirmed, the process returns to step-3 and waits for the input of the detection signals a and f. When the input of the detection signal f of the short detector 10 is confirmed, the output signal s for turning on the relay MCR is output (step-10), and the counting of the timer setting time T of the deviation amount signal y is started (step- 11) After counting up (step-12), the output signal s for turning on the relay MCR is turned off (step-13). Then, in step-8, the memory of the timer setting signal T is erased.
【0030】上記コントロ―ラ15の構成により、コント
ロ―ラ15は、ロ―ダ制御装置19より仕分け指令信号xを
光送受信器28,11を介して入力すると、第1および第2
のパルス発生部43,45の遅延時間Tと、第1のカウンタ
41の設定値R、あるいは第2のカウンタ44の設定値Lを
設定し、光シュート検出器9あるいは10の検出信号aあ
るいはfにより仕分けシュ―ト4の反射板8をカウント
し、カウンタ41あるいは44の減算結果が1となると、パ
ルス発生部43あるいは45から遅延時間Tでパルス幅Mの
1パルスをリレイMCFあるいはMCRへ出力する。す
ると、サーボモータ14が正転あるいは逆転して仕分けコ
ンベヤ3が動作し、目的の仕分けシュ―ト4へ荷2が仕
分けられる。遅延時間Tは走行速度が速くなると短くな
り、サーボモータ13が作動するタイミングが速くなり、
よって走行速度に応じて荷2が正確に仕分けられる。ま
た、ずれ量信号zを光送受信器53,11を介して入力する
と、タイマー時間tを演算し、ずれ量信号zの正負によ
り第1あるいは第2のパルス発生部43,45にずれ量タイ
マー設定信号p,qを出力し、このタイマー時間tのパ
ルスがリレイMCFあるいはMCRへ出力され、サーボ
モータ14が正転あるいは逆転して仕分けコンベヤ3が動
作し、荷2は仕分けコンベヤ3の中心に移動する。さら
に、ずれ量信号yを光送受信器27,11を介して入力する
と、光シュート検出器9あるいは10の検出信号aあるい
はf(このとき走行台車1は第7の光電スイッチ26の検
出位置にある)によりタイマー設定時間Tの間出力信号
をリレイMCFあるいはMCRへ出力する。すると、サ
ーボモータ14が第7の光電スイッチ26の検出位置で駆動
され、タイマー設定時間Tの間正転あるいは逆転して仕
分けコンベヤ3が動作し、先端コンベヤ17から投入され
た荷2は上述されたようにタイマー設定時間T後減速し
た仕分けコンベヤ3により走行台車1の中心に移動す
る。With the configuration of the controller 15, the controller 15 receives the sorting command signal x from the loader controller 19 via the optical transmitters / receivers 28 and 11, and the first and second controllers 15 and 28 are provided.
Delay time T of the pulse generators 43 and 45 of the
The set value R of 41 or the set value L of the second counter 44 is set, and the reflection plate 8 of the sorting suit 4 is counted by the detection signal a or f of the optical chute detector 9 or 10, and the counter 41 or When the subtraction result of 44 becomes 1, the pulse generator 43 or 45 outputs one pulse of the pulse width M to the relay MCF or MCR with the delay time T. Then, the servomotor 14 is rotated normally or reversely to operate the sorting conveyor 3 to sort the load 2 to the target sorting shoe 4. The delay time T becomes shorter as the traveling speed becomes faster, and the timing at which the servo motor 13 operates becomes faster,
Therefore, the loads 2 are accurately sorted according to the traveling speed. Further, when the deviation amount signal z is input through the optical transmitters / receivers 53 and 11, the timer time t is calculated, and the deviation amount timer is set in the first or second pulse generators 43 and 45 depending on whether the deviation amount signal z is positive or negative. The signals p and q are output, the pulse of the timer time t is output to the relay MCF or MCR, the servo motor 14 rotates normally or reversely, the sorting conveyor 3 operates, and the load 2 moves to the center of the sorting conveyor 3. To do. Further, when the shift amount signal y is inputted through the optical transmitters / receivers 27 and 11, the detection signal a or f of the optical chute detector 9 or 10 (at this time, the traveling vehicle 1 is at the detection position of the seventh photoelectric switch 26). ) Outputs the output signal to the relay MCF or MCR during the timer setting time T. Then, the servomotor 14 is driven at the detection position of the seventh photoelectric switch 26, and the sorting conveyor 3 operates by rotating in the normal direction or in the reverse direction during the timer setting time T, and the load 2 loaded from the leading end conveyor 17 is described above. As described above, after the timer setting time T, the sorting conveyor 3 decelerated moves to the center of the traveling carriage 1.
【0031】このように、搬送コンベヤ18上の荷2のず
れ量wを検出し、そのずれ量wに応じて先端コンベヤ17
での停止距離Zを設定して、この停止距離Zの停止位置
Eに荷2を一旦停止し、また走行台車1のタイマー設定
時間Tを設定して、この荷2を搭載する走行台車1へ出
力し、この走行台車1が第7の光電スイッチ26の動作位
置に到達すると、先端コンベヤ17を駆動し、この位置か
ら仕分けコンベヤ3を駆動してタイマー設定時間T後に
停止することにより、先端コンベヤ17から走行台車1上
に搭載された荷2を走行台車1の中心位置に載置するこ
とができ、振動や仕分けコンベヤ3の傾きなどによる荷
2の落下を防止することができる。さらに、仕分けコン
ベヤ3上の荷2のずれ量を検出し、その位置を中心に補
正することができ、荷2がずれて載置された場合でも、
その位置を補正でき、振動や仕分けコンベヤ3の傾きな
どによる荷2の落下を防止できる。In this way, the deviation amount w of the load 2 on the conveyor 18 is detected, and the tip conveyor 17 is detected according to the deviation amount w.
The stop distance Z is set, the load 2 is temporarily stopped at the stop position E of the stop distance Z, the timer setting time T of the traveling vehicle 1 is set, and the traveling vehicle 1 carrying the load 2 is set. When the traveling cart 1 reaches the operating position of the seventh photoelectric switch 26 by outputting, the leading end conveyor 17 is driven, and the sorting conveyor 3 is driven from this position to stop after the timer setting time T. It is possible to place the load 2 mounted on the traveling carriage 1 from 17 at the center position of the traveling carriage 1, and to prevent the load 2 from dropping due to vibration or inclination of the sorting conveyor 3. Further, it is possible to detect the amount of shift of the load 2 on the sorting conveyor 3 and correct it centering on the position, and even if the load 2 is placed with a shift,
The position can be corrected, and the load 2 can be prevented from dropping due to vibration or inclination of the sorting conveyor 3.
【0032】[0032]
【発明の効果】以上のように本発明によれば、ローダと
仕分けシュート間に設けられたずれ量検出手段は走行台
車上の荷の左右方向のずれ量を演算し、このずれ量を第
1、第2の信号伝送手段を介して走行台車の制御手段へ
伝送することによって、走行台車の制御手段はこのずれ
量によりコンベヤを駆動して荷を中心位置に移動するこ
とができ、走行台車上の荷にずれが発生した場合でも、
その位置を補正でき、振動などによる荷の落下を防止で
きる。As described above, according to the present invention, the shift amount detecting means provided between the loader and the sorting chute calculates the shift amount of the load on the traveling carriage in the left-right direction, and the shift amount is calculated as the first shift amount. , By transmitting to the control means of the traveling carriage via the second signal transmitting means, the control means of the traveling carriage can drive the conveyor by this shift amount to move the load to the center position, and Even if the load on the
The position can be corrected and the load can be prevented from dropping due to vibration.
【図1】本発明の一実施例における荷搬送設備の構成配
置図である。FIG. 1 is a configuration layout diagram of a load carrying facility according to an embodiment of the present invention.
【図2】同荷搬送設備の要部斜視図である。FIG. 2 is a perspective view of an essential part of the same cargo transport facility.
【図3】同荷搬送設備の走行台車制御装置の回路図であ
る。[Fig. 3] Fig. 3 is a circuit diagram of a traveling vehicle control device of the same cargo transport facility.
【図4】同荷搬送設備のローダ制御装置のブロック図で
ある。FIG. 4 is a block diagram of a loader control device of the same cargo transport facility.
【図5】同荷搬送設備の搬送コンベヤ上の荷のずれ量を
検出する原理を説明する模式図である。FIG. 5 is a schematic diagram illustrating the principle of detecting the amount of shift of a load on a transfer conveyor of the same load transfer facility.
【図6】同荷搬送設備のタイマー設定時間と停止距離を
検出する原理を説明する模式図である。FIG. 6 is a schematic diagram illustrating a principle of detecting a timer set time and a stop distance of the same cargo transportation facility.
【図7】同荷搬送設備のローダ制御装置の先端コンベヤ
駆動部のフロ―チャ―トである。FIG. 7 is a flowchart of a leading end conveyor drive unit of a loader control device of the same load carrying facility.
【図8】同荷搬送設備の走行台車上の荷のずれ量を検出
する原理を説明する模式図である。FIG. 8 is a schematic diagram illustrating a principle of detecting a shift amount of a load on a traveling carriage of the load transfer facility.
【図9】同荷搬送設備の走行台車制御装置内コントロ―
ラのブロック図である。[Fig. 9] Control inside the traveling vehicle control device of the same cargo transport facility
It is a block diagram of LA.
【図10】同荷搬送設備の走行台車制御装置内コントロ
ーラの払出し設定部のフローチャートである。FIG. 10 is a flowchart of a payout setting unit of a controller in a traveling vehicle control device of the same cargo transportation facility.
【図11】同荷搬送設備の走行台車制御装置内コントロ―
ラの払出し設定部のフロ―チャ―トである。[Fig. 11] Control inside the traveling vehicle control device of the same cargo transport facility
It is a flowchart of the payout setting section of LA.
【図12】同荷搬送設備の走行台車上の荷を移動するコン
ベヤの速度特性図である。[Fig. 12] Fig. 12 is a speed characteristic diagram of a conveyor that moves a load on a traveling carriage of the same load transfer facility.
【図13】同荷搬送設備の走行台車制御装置内コントロ―
ラの搭載設定部のフロ―チャ―トである。[Fig. 13] Control inside the traveling vehicle control device of the same load transfer facility
It is a flowchart of the installation setting section of LA.
1 走行台車 2 荷(被搬送物) 3 仕分け用コンベヤ 4 仕分けシュ―ト 5 走行経路 6 ローダ 8,29 反射板 9,10 シュート検出器 11,27,28,53 光送受信器(信号伝送手段) 12 制御装置 15 コントロ―ラ 19 ローダ制御装置 20〜26,51,52 光電スイッチ 54 ずれ量検出装置 1 Traveling vehicle 2 Cargo (object to be transported) 3 Sorting conveyor 4 Sorting shoot 5 Traveling route 6 Loader 8, 29 Reflector 9, 10 Chute detector 11, 27, 28, 53 Optical transceiver (signal transmission means) 12 Control device 15 Controller 19 Loader control device 20 to 26, 51, 52 Photoelectric switch 54 Deviation amount detection device
Claims (1)
って設けられた複数のローダより荷を搭載し、同じくこ
の一定経路に沿って設けられた複数の仕分けシュートに
荷を払い出す走行台車を複数台所定間隔で連結して備え
た荷搬送設備であって、 前記各走行台車に、前記荷が搭載され前記仕分けシュ―
トへ荷を払い出す仕分け用コンベヤと、このコンベヤを
制御する制御手段と、この制御手段に接続された第1の
信号伝送手段を備え、 前記ローダと仕分けシュート間の地上側に、前記走行台
車上の荷の走行方向に直角な左右方向のずれ量を検出す
るずれ量検出手段と、このずれ量検出手段の下流側に前
記第1の信号伝送手段に対向して設けられ、ずれ量検出
手段で検出されたずれ量を第1の信号伝送手段を介して
走行台車の制御手段に伝送する第2の信号伝送手段を備
えたことを特徴とする荷搬送設備。1. Traveling along a fixed route, loading loads from a plurality of loaders provided along the fixed route, and discharging the load to a plurality of sorting chutes also provided along the fixed route. A cargo transport facility comprising a plurality of carts connected at a predetermined interval, wherein each of the traveling carts is loaded with the cargo.
A conveyor for sorting out a load to a container, a control means for controlling the conveyor, and a first signal transmission means connected to the control means, and the traveling carriage is provided on the ground side between the loader and the sorting chute. A deviation amount detecting means for detecting a deviation amount in the left-right direction perpendicular to the traveling direction of the upper load, and a deviation amount detecting means provided downstream of the deviation amount detecting means so as to face the first signal transmitting means. 2. A load carrying facility comprising a second signal transmission means for transmitting the deviation amount detected in step 1 to the control means of the traveling vehicle via the first signal transmission means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3213291A JP2785523B2 (en) | 1991-08-26 | 1991-08-26 | Load transfer equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3213291A JP2785523B2 (en) | 1991-08-26 | 1991-08-26 | Load transfer equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0551122A true JPH0551122A (en) | 1993-03-02 |
JP2785523B2 JP2785523B2 (en) | 1998-08-13 |
Family
ID=16636689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3213291A Expired - Fee Related JP2785523B2 (en) | 1991-08-26 | 1991-08-26 | Load transfer equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2785523B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6329311B1 (en) | 1998-09-30 | 2001-12-11 | Tdk Corporation | Non-reducible dielectric ceramic material, making method, and multilayer ceramic capacitor |
CN104955587A (en) * | 2012-11-21 | 2015-09-30 | 英特里格拉特德总部有限公司 | Dynamic discharge compensation for a sortation system |
CN110455379A (en) * | 2019-08-02 | 2019-11-15 | 金陵科技学院 | A kind of production line lifting weighing platform and control method and workflow |
JP2021109719A (en) * | 2020-01-08 | 2021-08-02 | 株式会社ダイフク | Sorting facility |
CN115285618A (en) * | 2022-08-02 | 2022-11-04 | 成都振鑫丰机电设备有限公司 | AGV intelligent robot operation state monitoring analysis control system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0543037A (en) * | 1991-08-12 | 1993-02-23 | Daifuku Co Ltd | Loading method |
JPH0543039A (en) * | 1991-08-12 | 1993-02-23 | Daifuku Co Ltd | Load conveyor equipment |
-
1991
- 1991-08-26 JP JP3213291A patent/JP2785523B2/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0543037A (en) * | 1991-08-12 | 1993-02-23 | Daifuku Co Ltd | Loading method |
JPH0543039A (en) * | 1991-08-12 | 1993-02-23 | Daifuku Co Ltd | Load conveyor equipment |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6329311B1 (en) | 1998-09-30 | 2001-12-11 | Tdk Corporation | Non-reducible dielectric ceramic material, making method, and multilayer ceramic capacitor |
CN104955587A (en) * | 2012-11-21 | 2015-09-30 | 英特里格拉特德总部有限公司 | Dynamic discharge compensation for a sortation system |
EP2928618A4 (en) * | 2012-11-21 | 2016-11-16 | Intelligrated Headquarters Llc | Dynamic discharge compensation for a sortation system |
CN106395303A (en) * | 2012-11-21 | 2017-02-15 | 英特里格拉特德总部有限公司 | Dynamic discharge compensation for a sortation system |
CN109205231A (en) * | 2012-11-21 | 2019-01-15 | 英特里格拉特德总部有限公司 | Dynamic discharging for separation system compensates |
CN109205231B (en) * | 2012-11-21 | 2021-06-25 | 英特里格拉特德总部有限公司 | Dynamic discharge compensation for sorting systems |
CN110455379A (en) * | 2019-08-02 | 2019-11-15 | 金陵科技学院 | A kind of production line lifting weighing platform and control method and workflow |
JP2021109719A (en) * | 2020-01-08 | 2021-08-02 | 株式会社ダイフク | Sorting facility |
CN115285618A (en) * | 2022-08-02 | 2022-11-04 | 成都振鑫丰机电设备有限公司 | AGV intelligent robot operation state monitoring analysis control system |
Also Published As
Publication number | Publication date |
---|---|
JP2785523B2 (en) | 1998-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114423532B (en) | Modular parcel sorting system | |
EP0700844B1 (en) | Crossbelt sortation system | |
CA2180249C (en) | Selective delivery conveyor system | |
EP1318959B1 (en) | A material sortation system | |
JP4182709B2 (en) | Traveling control method of traveling body | |
JP2011079589A (en) | Inventory information management method in article carrying sorting system | |
CN113086598A (en) | Sorting equipment | |
JP2785523B2 (en) | Load transfer equipment | |
JP3051879B1 (en) | Article sorting apparatus and method | |
JP2660883B2 (en) | Loading method | |
JP2660882B2 (en) | Load transfer equipment | |
JP4159309B2 (en) | Sorting device having divertor and diverter drive control method | |
JP2603531B2 (en) | Load transfer device | |
JP3311603B2 (en) | Sorting device and sorting method | |
JP2660881B2 (en) | Load transfer equipment | |
JP2002006952A (en) | Goods conveyance facility | |
JPH06195122A (en) | Running controller for moving body | |
JP2884125B2 (en) | Vehicle moving device | |
JP2712906B2 (en) | Load transfer equipment | |
JP2705381B2 (en) | Load transfer equipment | |
JPH06179519A (en) | Acceleration/deceleration control detector for traveling object | |
JPH02182616A (en) | Load conveyor device | |
JPH0847111A (en) | Conveying system | |
JPH0543036A (en) | Traveling truck testing device | |
JP3664048B2 (en) | Load handling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |